FLOWCHART FOR BRIDGE WORK

Land Based Pier/


Abutment River Based Pier
Setting Out/Survey
Work Site
Prepare/Cut-Fill Mobilize Barge,
Work Site Piling Rig/Hammer

Preparation of Casting
Bed/Yard for Precast ***If tidal
Beam/Girder Install CIP Piles velocity
Install CIP Piles is high

Install Cofferdam
Foundation Trench & Formwork, Rebar
Shoring/Cofferdam Fabrication & Concreting
Bailout & excavate
cofferdam

CC work, Formwork, Rebar RCC PSC Pour Seal Concrete/CC & Other
Fabrication, Concreting for Pile Girder Girder Water proofing measures
Cap, Trenching Backfilling

Break Pile Head & install


Prestressing of drainage facility
Girder
Install Staging, Falsework, Rebar &
Install Falsework, Rebar
Formwork for Pier, Pier Cap/
& Formwork for Pile Cap
Abutment Wall, Bearing Pedestal

Grouting & Sealing Pour Concrete From


of Prestressing Jack Barge & Cure

Backfilling, RE Wall
Construction & Install Staging, Falsework, Rebar
Compaction of Fill & Formwork for Pier, Pier Cap,
Bearing Pedestal
Transportation &
Launching of Girder on
Install Bridge Bearing Bridge Bearing Pour Concrete & Cure

Install Bridge Bearing


Construction Diaphragm/
Cross Girder
Bridge Approach/
Abutment Slope Protection
Construction of Deck Slab

Construction of Crash Barrier,


Median Barrier, Parapet,
Drainage Facility

Deck Surfacing, Road


Marking & Furniture
Installation

Demobilization