You are on page 1of 1

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 26. Welding Works
Klang, Selangor. Date: Date:

26. Welding Works


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

-Serious injury
Chemical
(long term can impair 2 4 8 (6) To provide appropriate PPE.
Inhalation of welding fume.
workers lung)
Project Manager
-Serious injury Site Manager
Radiation
(long term can impair 2 4 8 (6) To provide appropriate PPE. Site Agent
Eye injury.
workers eye)
Site Engineer
Fatality or permanent Site Supervisor
(4) All cables are to be inspected.
Electrocution. disability or irreversible 2 5 10 (6) To provide appropriate PPE. SHO / SSS
illness
EO
4) Good / open ventilation at working area. Scaffolder
1 Welding / cutting Psychological Heat stress - To provide shelter/ rest area & drinking facilities
2 3 6 Work Leader
Hot weather. Minor injury / Illness (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
(6) To provide appropriate PPE. Machinery opr/

(5) Welding area must be free from any flammable Driver


Physical
-Minor injury material. Signalman
Burning due to welding / oxy 2 3 6
-Damage to property (6) To provide appropriate PPE.
cutter sparking. - To provide fire extinguisher at activity area Banksman
Rigger
(4) Oxy cylinder must be secure up-right / put in
Welder
cylinder cage.
Physical - Provide flash back arrestor to all oxy cylinder. Workers
-Minor injury 2 3 6
Worker hit by oxy cylinder. (5) Empty cylinder must be remove from activity area /
put in storage area.
(6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)