HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Demolition Work
Physical (5) Machine operated by competent operator.
Excavator moving -Serious injury
1 Struck by moving part of 2 4 8 - Workers stay away from moving machine.
into the demolition -Damage to property (6) To provide appropriate PPE.
machine.
area Project Manager
Physical (5) Machine operated by competent operator. Site Manager
-Serious injury
Struck by moving part of 2 4 8 - Workers stay away from moving machine. Site Agent
-Damage to property (6) To provide appropriate PPE.
machine.
Site Engineer
Gravitational (4) Steel plates shall be provided in soft ground area and
Site Supervisor
-Serious injury inspected by designated person.
Excavator overturn due to bad 2 4 8
-Damage to property - Proper working platform for excavator. SHO / SSS
Demolition to access / grounding. (6) To provide appropriate PPE.
EO
2 exposed building /
materials (4) To make proper slope at demolition area. Scaffolder
Physical -Serious injury - Cover long expose slope with plastic sheet to avoid
2 4 8 Work Leader
Soil erosion / slope failure. -Damage to property erosion during heavy rain.
(6) To provide appropriate PPE. Machinery opr/

Physical (4) To cordon / barricade demolition area. Driver


Workers slip and fall at -Serious injury 2 4 8 (5) To provide safety sign. Signalman
demolition area. (6) To provide appropriate PPE.
Banksman
Physical (5) Machine operated by competent operator. Rigger
-Serious injury
Struck by moving part of 2 4 8 - Workers stay away from moving machine.
-Damage to property (6) To provide appropriate PPE. Welder
machine
Loading materials Workers
3
into lorry (4) To ensure loading platform are firm and stable.
Gravitational -Serious injury
2 4 8 (5) Do not overload.
Lorry overturn -Damage to property (6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Demolition Works & Debris (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Physical -Serious injury (5) To control lorries speeding at site. (max.15km/h).


2 4 8
Struck by moving lorry. -Damage to property (6) To provide appropriate PPE.
Lorry moving to
4
demolition area Gravitational (5) To maintain proper access at site.
-Serious injury
Lorry slip / overturn due to bad 2 4 8 - To control lorries speeding at site. (max.15km/h). Project Manager
-Damage to property (6) To provide appropriate PPE.
access.
Site Manager
Gravitational (5) To provide signalman at dumping area. Site Agent
-Serious injury / fatality
5 Unloading material Lorry slip and fall into 2 5 10 - To maintain proper access.
Site Engineer
-Damage to property (6) To provide appropriate PPE.
demolition area.
Site Supervisor
(5) To ensure power-tool is in good condition before SHO / SSS
used. EO
Physical
-Minor injury 2 3 6 - Toolbox training to workers.
Struck by flying chip/object - Activity supervised by designated person. Scaffolder
(6) To provide appropriate PPE. Work Leader
Machinery opr/
(5) Training, Briefing.
Lightning exposure. -Serious injury / fatality 2 5 10 - Stop work during thunderstorm. Driver

Demolition of Signalman
6 -Minor injury (4) Spray water to materials to reduce the dust.
materials Dust 2 3 6 Banksman
(lung - impaction) (6) To provide appropriate PPE.
Rigger
-Minor injury
(5) Work carry out by skill workers. Welder
Noise exposure (long term can impair 1 4 4 (6) To provide appropriate PPE.
workers hearing) Workers

-Heat stress (low (4) Good / open ventilation at working area.


Psychological - To provide shelter/ rest area & drinking facilities
productivity) 2 3 6
Hot weather (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
- Skin burn (6) To provide appropriate PPE.

Legend: