You are on page 1of 2

KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 34. Storage Of Hazardous Chemical
Klang, Selangor. Date: Date:

34. Storage Of Hazardous Chemical


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Physical (5) Workers stay away from moving vehicle / lorry.


-Minor injury
Struck by moving vehicle. 2 3 6 - Traffic controlled by designated person.
Delivery of Chemical -Damage to property (6) To provide appropriate PPE.
(lorry)
1 Loading and Project Manager
unloading chemical (5) Manual handling/lifting should be carry out with Site Manager
Physical ( Ergonomic )
-Negligible injury 2 3 6 correct method. Site Agent
Improper method of handling. (6) To provide appropriate PPE.
Site Engineer
Physical (5) Supervised by designated person during stacking of Site Supervisor
material.
Slip / fall / collapse of material SHO / SSS
-Minor injury 2 3 6 - To ensure material not obstruct any access / walkway.
due to poor material - Proper storage of material.
Stacking / Storing EO
arrangement. (6) To provide appropriate PPE.
2 Chemical at site / Scaffolder
store (5) Proper storage of flammable liquid / material. Work Leader
Chemical
-Serious injury - No person are allowed to smoke in the store room.
Burn / Fire (by flammable 2 4 8 Machinery opr/
-Damage to property (6) To provide appropriate PPE.
liquid / material) - To provide fire extinguisher in the store room. Driver
Signalman
-Serious injury
Chemical (long term can impair (5) Training for workers use PPE. Banksman
2 4 8
Skin contact worker skin / (6) To provide appropriate PPE. Rigger
dermatitis)
Welder
3 Dilute of chemical
-Serious injury Workers
Chemical (long term can effect (5) Training for workers use PPE.
2 4 8
Inhalation human respiration (6) To provide appropriate PPE.
system)

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Storage Of Hazardous Chemical (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager
-Serious injury
Site Manager
Chemical (long term can impair (5) Training for workers use PPE.
2 4 8 Site Agent
Skin contact. worker skin / (6) To provide appropriate PPE.
dermatitis) Site Engineer
Site Supervisor
SHO / SSS
EO
-Serious injury
Chemical (long term can effect (5) Training for workers use PPE. Scaffolder
4 Storage of chemical 2 4 8
Inhalation. human respiration (6) To provide appropriate PPE. Work Leader
system)
Machinery opr/
Driver
Signalman

(5) Material handling should be carried out with correct Banksman


Physical (Ergonomic)
method. Rigger
Redundant repeated working -Negligible injury 2 3 6 - Take a 2-3 minutes rest after every 2 ( two ) hours.
behaviour. (6) To provide appropriate PPE. Welder
Workers

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)

You might also like