KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV.


Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 36. Footing Work
Klang, Selangor. Date: Date:

36. Footing Work


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

- Hearing and eye protection will be worn while


operating saws.
- Inspect and test equipment and cords prior to use.
- Excessive Noise - All guards must in place and operational, prior to use.
Cut Lumber - Cuts/Lacerations - Tools that are not in use will be unplugged from their
1 Set/Secure Lumber -Serious injury 2 4 8
- Electrical Shock power source. Project Manager
Drive/Secure Stakes - Flying Debris - Worker using sledge hammer will ensure that his work
area is clear of other workers prior to swinging the Site Manager
hammer. Site Agent
- To provide appropriate PPE.
Site Engineer
- Workers cutting rebar will wear face shields, gloves,
hearing protection, and hard hats. Site Supervisor
- Struck By (Hot Metal) - Grinder guards must be in place and fully operational SHO / SSS
- Cuts/Lacerations prior to use.
- Lathers will wear safety glasses, gloves, and hard hats. EO
- Mill scale
- Construction debris will be removed on a daily basis. Scaffolder
2 Rebar installation - Sharp/Sheared Tire Wire Ends -Serious injury / fatality 2 5 10 - All rebar ends shall be capped to protect workers from
- Trips/Falls impalement/laceration hazards. Work Leader
- Impalement Hazard - If possible, stack rebar in a location that is free from Machinery opr/
- Overhead Power Lines overhead power lines. If this is not possible, rebar will
be moved forward and away from the power lines before Driver
being lifted. Signalman
- Use qualified flagmen to ensure a clear path to the Banksman
work zone.
- The redi mix truck will have an operational back-up Rigger
- Redi Mix Truck Placement alarm. Welder
- Only the truck's operator will place the chute and run
- Struck By/Caught Between
3 - Serious injury 2 4 8 the mixer. Workers
Placing concrete - Hand Injuries - Wear safety glasses when working with wet concrete.
- Eye Injuries - Wear impervious gloves when working with wet
- Concrete Burns concrete.
- Wash off any excess concrete from your skin as soon
as possible.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)