Matric Scope of Work (

Project : Fabrication Steel Bo


Option 1
No. Activity
BMI SUBCON.

1 Project management
1.1 Organization Chart V
1.2 Koordinator (PIC) V
1.3 Laporan Harian V
1.4 Laporan Mingguan V
1.5 Laporan QC V
1.6 Memenuhi prosedure yang berlaku di BMI
- QC Standart Procedure V
- HSE Standart Procedure V
- Welding Contol Procedure V

2 Manpower Supply & Facilities


2.1 Manpower
- Koordinator V
- Supervisor / Foreman V
- Welder V
- Fitter V
- Helper V
- QC Inspector V
- HSE Inspector V
- Progress Control (adm) V
2.2 BPJS Ketenagakerjaan V
2.3 Temporary office & facilities V
2.4 Gudang Peralatan V
2.5 HSE
- Safety Shoes V
- Helmet V
- Ear plug V
- Kacamata Safety V
- Kacamata Welder V

3 Supply Equipment and Tools


Matric Scope of Work (
Project : Fabrication Steel Bo
Option 1
No. Activity
3.1 Flame Cutting Machine V
3.2 Flame Cutting Tools V
3.3 Cutting Wheel Machine V
3.4 Electric Power V
3.5 SAW Welding Machine & Accessories V
3.6 SMAW Welding Machine & Accessories V
3.7 GMAW Welding Machine & Accessories V
3.8 FCAW Welding Machine & Accessories V
3.9 Gouging Tools Machine & Accessories V
3.10 Dongkrak V
3.11 Chain block V
3.12 Lever block V
3.13 Mesin Gerinda V
3.14 Material Jig V
3.15 Setting Jig V
3.16 Portable Drilling Machine V
3.17 Lampu Penerangan (Portable Lighting) V
3.18 Gerobak / Trolley angkut material V
3.19 Forklift / Overhead Crane / Crane V
3.20 Power Cable & Acessories V
Matric Scope of Work (
Project : Fabrication Steel Bo
Option 1
No. Activity
4 Fabrication & Inspection
4.1 Shop Drawing Drawing V
4.2 Material List V
4.3 Cutting Plan V
4.4 SPM (Surat Permintaan Material) V
4.5 Cutting Plate V
4.6 Cutting Section V
4.7 Drilling Plate V
4.8 Drilling Profile V
4.9 Fitup V
4.10 Welding SAW V
4.11 Welding SMAW V
4.12 Welding GMAW V
4.13 Finishing/Cleaning V
4.14 Visual Inspection V V
4.15 Dimensional Inspection V V
4.16 Non Destructive Test
- UT V
- PT V
4.17 Repair Work V
4.18 Minimum Tools Inpection :
- Welding Guage V
- Meteran 30 m V
- Meteran 50 m V
- Meteran 5 m V
- Penyiku dari Baja V

5 Consumable
5.1 Welding Electrode / wire V
5.2 Batu Gerinda V
5.3 Cutting Disc V
5.4 CO2 V
5.5 Oxygen V
5.6 LPG (PGN) V
Matric Scope of Work (
Project : Fabrication Steel Bo
Option 1
No. Activity
5.7 Musker Welder V
5.8 Mata Bor Portable V
5.9 Masker kain V
5.10 Sarung tangan kombinasi V
5.11 Sarung tangan katun V
5.12 Sarung tangan welding V
5.13 Apron tangan V
5.14 Apron dada V
5.15 Apron kaki V
5.16 Penetran V
5.17 Developer V
5.18 Cleaner V
5.19 Power Electricily Including Panel V
cope of Work (SOW)
rication Steel Box Girder
Option 2
Remaks
BMI SUBCON.

V
V
V
V
V

V
V
V

V
V
V
V
V
V
V
V
V
V
V

V
V
V
V
V
cope of Work (SOW)
rication Steel Box Girder
Option 2
Remaks
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
V
cope of Work (SOW)
rication Steel Box Girder
Option 2
Remaks

V
V
V
V
V
V
V
V
V
V
V
V
V
V
V

V
V
V

V Minimal 1 set
V Minimal 1 set
V Minimal 1 set
V Setiap 1 Fitter 1 alat
V Setiap 1 Fitter 1 alat

V Minimal setara Atlantic


V Minimal setara merk Fuji
V
V
V
V
cope of Work (SOW)
rication Steel Box Girder
Option 2
Remaks
V
V
V
V
V
V
V
V
V
V
V
V
V