Nepal Electricity Authority

Bharatpur-Bardghat 220 kv transmission line project


Summmary of foundation details

FOUNDATION DA TYPE
BT+EXT NT+EXT
Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil
vol of excavation 11.52 126.75 151.23 273.0348 189.13 214.7148 187.23 11.52 126.75 151.23 273.0348 189.1308 214.7148 187.23
Vol of lean conc 1.76 2.12 4 2.72 3.12 2.68 1.76 2.12 4 2.72 3.12 2.68
Vol of M20 conc 8.914 19.43 22.516 38.251 27.318 30.477 27.12 8.914 17.477 20.563 36.298 25.365 28.525 25.167
Qty of steel 0.1071 1.23876 1.36132 2.0736 1.574 1.71984 1.57024 0.1071 1.21864 1.3412 2.05348 1.55412 1.69972 1.55012

FOUNDATION DB TYPE

BT+EXT NT+EXT
Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil
Vol of Excavation 21.782 308.4661 321.2113 524.0737 376.164 430.2231 393.7806 21.782 261.225 294.1281 509.2654 352.1781 426.5063 371.996
Vol of lean conc 4.24 4.4 7.28 5.24 6 5.48 3.56 4.04 7.08 4.88 5.96 5.16
Vol of M20 conc 15.13 46.264 47.963 74.67 55.517 62.673 57.845 15.13 35.576 39.807 67.99 47.66 57.648 50.236
Qty of steel 2.03 3.431 3.543 5.179 3.956 4.398 4.093 2.03 3.101 3.426 5.153 3.831 4.451 3.971

FOUNDATION DC TYPE

BT+EXT NT+EXT
Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil
Vol of Excavation 23.12 332.7188 357.035 600.635 431.235 504 442.9688 23.12 289.835 329.315 596.0588 408.24 495.635 371.996
Vol of lean conc 4.2 4.52 7.84 5.52 6.52 5.68 3.64 4.16 7.76 5.24 6.4 5.16
Vol of M20 conc 15.982 47.445 50.483 80.966 59.681 68.9 58.513 18.04 39.562 44.388 77.767 54.239 65.049 50.236
Qty of steel 2.0857 4.04 4.226 6.361 4.868 5.468 4.665 2.1135 3.431 3.75 6.097 4.397 5.117 3.971

FOUNDATION DD TYPE

BT+EXT NT+EXT
Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil Hard Rock Dry Soil Dry Fissured Rock Fully Submerged Sandy Soil Wet Fissured Rock Wet Soil
Vol of Excavation 32 389.558 431.235 751.1788 512.435 609.84 555.66 23.12 378.56 423.5 761.4688 512.435 628.46 568.9688
Vol of lean conc 4.96 5.52 9.88 6.64 7.96 7.2 4.84 5.44 10.04 6.64 8.2 7.4
Vol of M20 conc 22.202 69.19 114.027 80.517 94.076 86.448 18.04 54.889 61.097 108.75 73.614 89.801 81.485
Qty of steel 2.4663 4.694 5.022 8.234 5.809 6.726 6.199 2.1135 4.739 5.138 8.584 5.876 7.041 6.479

Note:Vol of excavation,lean concrete,M20 concrete are in cubic metre and Qty of steel is in Ton.