You are on page 1of 4
armed asia oraref wnfereseor National Highways Authority of India (ogo stare od err) of Road Transport an Highs) {NHAL/PIU-HPT/13029/2017/ 20 \ 04.05.2017 2) The Project Manager M/s GMR OSE HHH Pvt Ltd ass! ‘Toll Plaza e = \ 3) The Goneral Manager 4) M/s.Planning Infrastructural M/s Feedback Infra Pvt Ltd Development Consultants Ltd., JV Ist Floor, Langford Avenue, M/s. Almonds Global Infra Consultants Opp: HDFC Bank, No.4 Langford Ltd, Garden 102°13; Nirmala Nikot, Lalbag road (Near Richmond Circle) Jagadamba Path, S.K.Pus, Bangalore -5 60025. ftn2-800013 ‘Sub: Decision / Action points: Reg Ref: 1) Chairman Note No. M(P-RKP/M(PPP)/M(P)-AKS/M(T) Date: 204.217 2} Contract Agreement dt: 29.08.2016 for 4 laning of Fospet-Bellary-AP /Karnatalea Boarder section of NH-68 in the state of Karnataka, Sir, Please find enclosed herewith a copy of Chairman's Note cited at St No.1 above, regarding certain decision in respect of project under DPR and ongoing / ‘implementation stages. Im this connection, you are hereby requested to incorporate all she decisions / ‘changes communicated by the Chairman in the DPRs as well as in the Ongoing / Implementation projects, Particularly in regard to the instruction No.2 (i) regarding 6 laning of structures in ell the 4 laning projects the action is to be immediately initiated, In view of the above, M/s Gammon India Limited, the Contractor for the work is here by requested to immediately revise the design and drawings of the proposed 4 laning structures vide Agreement cited at SI No.2 to 6 lane widths as ‘per the manual of specifications for the purpose. ‘Corp, Oice: G8 6, Sector-10, Dwarka, New Delhi~ 110076, Ph 011-25074100 Accordingly, you may please submit the COS proposals if any required for the purpose, ‘THIS SHALL BE TREATED ON UTMOST PRIORITY. Further, henceforth design of all 4 lane structures as per the Agreement cited hove shall be immediately dispensed with. ‘Thanking you, ‘Yours! faith Oe 1 Cost KN Ajay Maat Ximar DOM (Tech) & Project Director Copy to M/s Stup Consultancy Pvt Ltd for information Copy to M/s Theme Engineering Services Pvt. Ltd. for information F National Highways Authority of India oneal ere eTAeT wey (ge hes ate oat ame) (ort Ree ranpet an ty) ‘ew Sear wre Tage ‘Gamma Regn REGIONAL OFFICE. SENGALURU 2 er ee ee Borgo “Turnr Road ps). Ranh enc, Nsw Nogeands ace Sion, Bargain - 0 BT No, NHAURO-BNGIHQ Comresp2017-18 feos Date: 27.48.2017 To All Project Director's, NHAL PIU, Karoatak Sub: Decision /Aetion points Ref: |, Chairman note dated 22.04.2017 2. This office email dated 26.04 2017, Sir In continuation of this office e-mail cited (2) above, Pease find enclosed copy of| Chairman note dated 2,04.2017 regarding following standing instructions be issued tothe DPR. Consultants. In this cegard, all PDs are requested 10 g0 through Chairman noe and ake necessary ation. Also, al PDs are requested, he contents ofthe Chairman nave may bring tothe notice ofall DPR Consultans!ConcessionsiresIEVAEs for taking necessary ation, Further. COS proposal required for implementation of para 2) pertaining © on going projects shall be submited atthe eas. Thanking 0, Yeni | aoa Higicpe Soy oft ic papas General agers) Enc: Asabov, ao wee qo all fe Comer Natio: Highways Authority of in [Bow Bet {rom th dal of Choe) Subject: Decision/Action points We nave been discussing various suas regarding our core functions fom time te time. ‘The flowing action points need tobe followed henceforth 1. Iehas been observed that invitation of bids for award af works before substantial {utftment ofthe conditions precedent leads to all kinds of problems and disputes. Similar is the situation incase of declaration of ‘appointed Sates’. Such, the detalis fen in the enclosed sheet are decd to be fellowes by al concerned, 2, Following standing instructions be fsved tothe OPR corultant: (0) tn case of al the 4lanng projects, lane structures wil be provided Furtser, wherever the work on ‘ructures on the Project under implementation yet-to be commenced, these be upgraded to,Slane 3 | using the Change of Scope, r aa | ge” 00 Werte anal ny pase sau anyinabed we fre 0 gee ie eed ean Qe fe BEST STE maa at (68) The practice for provision of cattle underpasses (CUPS and pedestrian underpasses (PUP!) shoud be stopped forthwith. Instead, provison should | bbe made for structures which pemit thugh access of tractors with | ‘rolleys across underneath the main carriageway. If need be, the multiple even ants could be clubbed and serviced through sec road forthe Burpose. The design spectfications for such structures sola Be decided | ‘mmeciately 50 5 to mainiala some unifrmity. — 3, Assan as the bids are invited for award of works, the bid fer engagement of independant Engineer/Authory Engineer shod be Ince within 7 days Chere 50 as tocnsute tha te IE/AE Is n position atthe time of declaration a apparoTer ow | 4, he Rrrs andthe contract Documents sous aso provide or a conctary

You might also like