Comparison Between Components of BR 276 at Tender Phase and
Proposed
Components As per Tender Proposed Difference
Rail Top Level: (m) 10.301 12.707 2.406 Height of Rail: (m) 0.143 0.143 Height of Sleeper: (m) 0.210 0.210 Thickness of Ballast: (m) 0.250 0.250 Thickness of Deck Slab: (m) 0.250 0.250 Depth of Cross girder: (m) 0.910 0.910 Bottom Flange Thickness of Main Girder: (m) 0.060 0.060 Clearance Between Main Girder and Cross Girder: (m) 0.115 0.115 Road Top RL: (m) 6.769 6.769 Vertical Clearance from Road Top to Girder Soffit: (m) 1.594 4.000