You are on page 1of 2

FACULTY OF ARCHITECTURE, MIT, MANIPAL

PROJECTION OF WORKS FOR THE FINANCIAL YEAR 2010 – 2011

PHASE I:
(Works to be undertaken immediately)

SL. NAME OF WORK BRIEF DESCRIPTION OF THE JUSTIFICATION FOR


NO RENOVATION REQUIRED THE REQUIREMENT
1 Remodeling of STUDIO 5 Dismantling of redundant Conversion into a more
(Final Year B.ARCH) No. ND partitions and Weather efficient 40 seated
205 & Old CAD lab proofing of walls and studio. Seepage
openings. Furniture, fixtures, noticed during rainy
flooring etc. season

2 Remodeling of STUDIO 1 Shifting of model making To make effective use


Interventions workshop. Removal of of available space in
No. ND 201 existing wall. Extension of the form of two
the area. studios.

3 Remodeling of STUDIO’S UG Studio for 40 capacity & Reorganization of


ND 301(A) & ND 301(B) PG studio of 20 capacity spaces

Providing flooring, painting &


electrical fixtures

4 Displays boards in Appropriate/Identified To facilitate display of


STUDIOS area for display as required student drawings
by studio teachers. (large size) and
conduct of jury /review
of student work.
5 Board Room in Adjacent Provision of AC, LCD, LCD For efficient conduct of
Room projection screen and white meetings and
board.Furnitures & Fixtures, presentations.
False Ceiling.

6 Remodeling of Climatology Provision for visual arts To facilitate display of


Lab studio and services. student works and
climatology lab
facilities

PHASE II
(Works to be conducted in December ’10 during semester break)

7 Remodeling of STUDIO’S Studio for 40 students Shortage of studio and


ND 302/303 instead of present 30 staff rooms

1
capacity and staff cabins

FACULTY OF ARCHITECTURE, MIT, MANIPAL


PROJECTION OF WORKS FOR THE FINANCIAL YEAR 2010 – 2011

Providing flooring, painting &


electrical fixtures

8 Upgrading: “STATE OF Provision for access from Alteration in the existing


THE ART FACILITY” existing facility, renewal of facility to facilitate the
CAD LAB/ NATA floor finish, fixtures, furniture, mandatory provision as
CENTRE /M.Arch. false ceiling, provision for A per the regulatory body
Facility split AC units of 2 tons each, separate CAD lab facility
Furniture/ Fixtures/Futuristic for M.Arch/B.Arch Course
look with prominence for and reorganization of
aesthetics. plotting facility.

9 Curtains for openings Provision of dark curtains To improve upon the


in lecture room JURY acoustics & light control
HALL to facilitate use of LCD
projector
10 DEAN’S CHAMBER/ Provision for appropriate To facilitate better office
DEPARTMENT OFFICE furniture and partitions, organization &
including waiting area shifting of existing management.
for parents /guests ms staircase/ relocation of
storage and administrative
spaces.
11 Remodeling of staff Identified for further/existing To facilitate better office
cabins increase in teaching staff organization &
management

Dean, Faculty of Architecture.

You might also like