                 Srinagar Sonamarg Tunnelway Limited 

MONTHLY PROGRESS REPORT


For the Month of Apr 2018
Construction of Z-Morh Tunnel including approaches on (Srinagar-Sonmarg-Gumri Road)
with parallel escape tunnel on BOT (Annuity) basis, in DBFOT pattern in the state of
Jammu and Kashmir.

SRINAGAR SONAMARG TUNNELWAY LIMITED

Monthly Progress Report                                                                                                                   Page 1 of 83 

 
                 Srinagar Sonamarg Tunnelway Limited 

Content:

1. Abbreviations

2. Section-1

 Project Background

 Project Location

 Award of Concession

 Project stretch

 Important Meeting during the Month

 Important Visit during the Month

 Project Line Diagram

3. Section 2

 Project Brief

 Project Scope

4. Section 3

 Executive Summary

5. Section 4

 Organisation Chart

6. Section 5

 Project Status

7. Section 6

 Designing and Drawing Review Status.

8. Section 7

 Planning and Progress

Monthly Progress Report                                                                                                                   Page 2 of 83 

 
                 Srinagar Sonamarg Tunnelway Limited 

ABBREVIATIONS
Abbreviations Meaning

3A / 3D Clause of Land Acquisition

AASHTO American Association of State Highway and Transport Officials

Abt Abutment

BC Bituminous Concrete

BM Bituminous Macadam

BOT Built Operate and Transfer

BRO Border Road Organisation

C&G Clearing and Grubbing

C/s Cross-section

CBR California Bearing Ratio Test

Ch Chainage

Cm Centimetre

Cum Cubic Meter

CW Carriageway

DBM Dense Bituminous Macadam

DFBOT Design, Finance, Build, Operate and Transfer

DFO District Forest Officer

Dia Diameter

DPR Detailed Project Report

Emb Embankment

EPC Engineering Procurement Construction

Exc Excavation

FST Final Setting Time

GFC Good for Construction

GSB Granular Sub Base

HP Hume Pipe

Ht Height

Hyd Hydraulic

IC Independent Consultant

Monthly Progress Report                                                                                                                   Page 3 of 83 

 
                 Srinagar Sonamarg Tunnelway Limited 
Abbreviations Meaning

IE Independent Engineer

IS Indian Standard

IST Initial Setting Time

ITNL IL&FS Transportation Networks Limited

JV Joint Venture

Kg Kilogram

Km Kilometer

LHS Left Hand Side

LL Liquid Limit

Ltr Litre

M Meter

M Mix

M/s Messers

MB Minor Bridge

MDD Maximum Dry Density

Misc Miscellaneous

MJB Major Bridge

Mm Millimetre

MNB Minor Bridge

MoRT&H Ministry of Road Transport & Highways

MOST Minister of Surface Transport

NA Not Applicable

NH National Highway

NHAI National Highway Authority of India

NHDP National Highway Development Programme

NOC No Objection Certificate

Nos Numbers

oC Degree Centigrade

OGL Original Ground Level

OMC Optimum Moisture Content

PCC Plain Cement Concrete

PD Project Director

Monthly Progress Report                                                                                                                   Page 4 of 83 

 
                 Srinagar Sonamarg Tunnelway Limited 
Abbreviations Meaning

PHE Public Health and Environment

PI Plastic Index

PL Plastic Limit

PSC Prestressed Concrete

PTR Pneumatic Tyre Roller

PUP Pedestrian Underpass

Pvt. Ltd. Private Limited

QC Quality Control

RBI Reserve Bank of India

RE Reinforced Earth

REC Reinforced Cement Concrete

RHS Right Hand Side

ROB Road over Bridge / Rail over Bridge

ROW Right Of Way

Rs. Rupees

Sec Section

SG Sub-Grade

T Tonne

TBM Temporary Bench Mark

TMT Thermo Mechanically Treated

TPH Tonnes Per Hour

VUP Vehicular Underpass

W Watt

WMM Wet Mix Macadam

SSTL Srinagar Sonamarg Tunnelway Limited.

NHIDCL National Highways & Infrastructure Development Corporation Limited.

Monthly Progress Report                                                                                                                   Page 5 of 83 

 
                                                 
Srinagar Sonamarg Tunnelway Limited 
SECTION – 1
1. Project Background

The project involves construction operation and maintenance of 6.5 km long two lane bidirectional single tube tunnel
with parallel 6.5 km long escape tunnel and 0.6 km long Ventilation Tunnel with approaches on new alignment
between Kulan and Sonamarg in the state of Jammu and Kashmir under Srinagar-Leh section of NH-1 that will provide
all-weather connectivity between Srinagar and Leh.

At present, Leh-Ladakh remains cut off for six to seven months of the year during winter due to heavy snowfall on the
Jammu-Srinagar-Zozila-Kargil-Leh and the Manali-Sarchu-Leh routes that connect Leh to the rest of the country. It can
only be reached by air during the winter months. Snowfall and avalanches characterize the weather. The stretch
between Srinagar and Leh is not only important for the strategic interests of the Indian Army, but also for the socio-
economic well-being of the people of Ladakh and holistic development of the state.

The Ministry of Road Transport and Highways (MoRTH) has been entrusted with the development, maintenance, and
management of National Highways. The Authority had resolved to augment the existing road from approximately km
69.000 to km 81.300 (approximately 6.5 km tunnel and 6 km approaches) on the Srinagar Sonmarg Gumri Road section
of National Highway No.1 (hereinafter called the “NH -1”) in Jammu & Kashmir by Two -Laning on design, build,
finance, operate and transfer on annuity (“DBOFT Annuity”) basis in accordance with the terms and conditions set
forth in a concession agreement.

2. PROJECT LOCATION
Coordinates: 34º- 17’ Northing and 75 º - 10’ to 75 º- 16’ Easting
Location: Jammu and Kashmir, India
Client: National Highways and Infrastructure Development Corporation Limited (NHIDCL) under
Ministry of Road Transport and Highways (MoRTH).
Portals: West Portal at approx. km 74 NH-1 in the area of Rezan/Gagangeer approx. 30 km east of
Kangan.
East Portal at approx. km 81 on NH-1, approx. 3 km west of Sonamarg
Ventilation Portal & construction tunnel at approx. km 76.5 of NH-1
Elevation: West Portal at approx. 2500 m, East Portal at approx. 2637 m, Portal of ventilation & construction tunnel at
elevation approx. 2570 m
Main tunnel length: approx. 6.5 km
Egress tunnel length: approx. 6.5 km
Ventilation & construction tunnel length: approx. 0.6 Km
3. Award of Concession
i. The Government of India had entrusted to the Authority the development, maintenance and management of
Z-Morh Tunnel (Single tube Bidirectional tunnel with parallel egress tunnel) and its approaches on National
Highway No. 1 including section from approximately km 69.000 to km 81.300 (approx. 6.5 km tunnel and 6 km
approaches).
ii. The Authority had accordingly invited proposals by its Notice/ Request for Qualification dated April 2012
(the “Request for Qualification or RFQ”) for short listing of bidders for construction, operation and
maintenance of the above referred section of NH -1 on DBFOT Annuity basis and had shortlisted certain
bidders including, inter alia, the selected bidder i.e M/s Soma Enterprise Limited.
iii. The Authority had prescribed the technical and commercial terms and conditions, and invited bids (the
“Request for Proposals” or “RFP”) from the bidders shortlisted pursuant to the RFQ for undertaking the
Project.
iv. After evaluation of the bids received, the Authority had accepted the bid of the selected bidder and issued its
Letter of Award No. 24552/DGBR/BCN/Z-Morh/160/E8 dated March 12, 2013 (hereinafter called the
“LOA”) to the selected bidder requiring, inter alia, the execution of the Concession Agreement within 30
(thirty) days of the date of issue thereof.
                                                                                                                                                                                                                               
Page 6 of 83 

Monthly Progress Report   
                                                 
Srinagar Sonamarg Tunnelway Limited 
v. The selected bidder i.e. M/s Soma Enterprise Limited in consortium with M/s IL&FS Transportation
Networks Ltd has since promoted and incorporated the Concessionaire as a limited liability company under
the Companies Act 1956, and has requested the Authority to accept the Concessionaire as the entity which
shall undertake and perform the obligations and exercise the rights of the selected bidder under the LOA,
including the obligation to enter into the Concession Agreement pursuant to the LOA for executing the Project.
vi. By its letter dated April 16, 2013, the Concessionaire has also joined in the said request of the selected bidder to
the Authority to accept it as the entity, which shall undertake and perform the obligations and exercise the
rights of the selected bidder including the obligation to enter into the Concession Agreement pursuant to the
LOA. The Concessionaire has further represented to the effect that it has been promoted by the selected bidder
for the purposes hereof.
vii. The Authority has agreed to the said request of the selected bidder and the Concessionaire, and has
accordingly agreed to enter into the Concession Agreement with the Concessionaire for execution of the
Project on DBFOT basis, subject to and on the terms and conditions set forth therein.
viii. Accordingly, Authority and the Concessionaire had entered into Concession Agreement on April 30, 2013.
ix. Concessionaire fulfilled all its obligations, Condition Precedents, & Applicable Permits within the stipulated
time to achieve the financial close in accordance with Article 24 and requested the Authority to declared the
“Appointed Date”
x. Authority Communicated the appointed date as 01-05-2015 through letter No: RW/NH-12037/1262/Z-
Morh/PIU Srinagar/2015/NH-1 (P1) dated 08-05-2015.
xi. Subsequent upon the receipt of Appointed Date Concessionaire started the work in accordance with Scope of
Work Defined in Schedule B together with the provision of Project Facility as specified in Schedule – C and in
conformity with Specifications and Standards set forth in Schedule – D, performing and fulfilling all its
obligations in accordance with provisions of the Concession Agreement and matter incidental there to or
necessary for performance of any or all of the obligations of the Concessionaire under Concession Agreement.
xii. The Project was transferred from Ministry of Road Transport and Highways (MoRTH) to National Highways
and Infrastructure Development Corporation Limited (NHIDCL) through letter no.
RW/NH/12037/1247/J&K/2014/NH-1 dated 06-Jul-2016.
4. Project Stretch :
For the Construction purpose the Project Highway and Tunnel activities is divided into two sections.
Section – 1: Tunnel Works
Excavation Works from West Portal
Excavation Works from Ventilation Tunnel
Excavation Work from Eastern Portal
Section – 2: Surface Works:
Construction of Main Approach Road to West portal including one Major and one Minor bridge: 4.636 Km
Construction of Approach Road to Ventilation Tunnel : 0.876 Km
Construction of Approach Road to Eastern Portal including one Major Bridge: 0.932Km
5. Important Meetings during the Month: Meeting was called by NHIDCL-HQ on 6th March 2018 for discussion
and finalisation of COS. Another meeting was called by NHIDCL-BO to review CoS proposal on 21st March 2018.

                                                                                                                                                                                                                               
Page 7 of 83 

Monthly Progress Report   
                                                                                                                                                                                                                                                        Srinagar Sonamarg Tunnelway Limited 
Line Diagram:

                                                                                                                                                                                                                                                                                                                                                                                                                           Page 8 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
SECTION 2
PROJECT BRIEF:

Name of the Project – Construction of Z-Morh Tunnel including approaches on


(Srinagar-Sonmarg-Gumri Road) with parallel escape tunnel
on BOT (Annuity) basis, in DBFOT pattern in the state of
Jammu and Kashmir.

Name of Authority – National Highways & Infrastructure Development


Corporation Limited. (NHIDCL)

Name of Concessionaire – Srinagar Sonamarg Tunnelway Limited (SSTL)

Name of the EPC Contractor – IL&FS Transportation Networks Limited (ITNL)

Name of the Construction –Contractor – Apco-Titan (JV)

Name of Independent Consultant – Eptisa Servicious de Ingenieria S.L.

Total Project Cost – Rs. 2473.00 Crs.

Total Capital Cost - Rs 3289 Crs.

Annuity – Rs. 234.70 Crs.

Date of Signing of Concession – 30 April 2013


Agreement

Appointed Date – 01 May 2015

Concession Period – 20 Yrs. (incl. Construction period)

Construction Period – 5 yrs. (1825 Days)

Scheduled Two/Four-Lanning Date (As – 1825 days from Appointed Date 30th May 2020
per Concession Agreement)

                                                                                                                                                                                                                         
Page 9 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
PROJECT SCOPE:

Main Tunnel : 6.50 km (As per CA)

Escape Tunnel : 6.50 Km

Ventilation Tunnel : 587.72m

Rigid Pavement : 13.5 Km (Revised)

Flexible Pavement : 6.45 Km (Revised)

Minor Bridge : 1 nos. (Revised)

Major Bridge : 2 nos. (Revised under CoS)

Underpass : 1 No. (Under CoS)

Culvert : 19 Nos. Box Culverts (New Proposed under CoS)

Lay bays : 08 nos.

Cross Passages : 25 nos.

Approach road to Western portal : 4.636Km (Revised)

Approach Road to Ventilation Portal : 0.876 Km.

Approach Road to Eastern Portal : 0.995Km.

                                                                                                                                                                                                                         
Page 10 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
SECTION 3
EXECUTIVE SUMMARY
Main Approach road works started on 1st Sept 2015 and the excavation works are executed till CH. 0+900. The excavation
is being done for a limited depth due to non-availability of sufficient land for deep excavation in order to make stable
slope definition. At chainage beyond 1+100 on RHS of the proposed alignment high embankment is necessitated due to
restricted ROW and in order to maintain required alignment and gradient of Highway. IE has advised concessionaire to
review alignment and acquire additional land for this approach road. Concessionaire shall proceed with construction in all
stretch of this alignment after necessary final clearance from IE and land availability. Excavation from Ch 4+600 towards
4+050 has been started for constructing MSE walls.

IE and PD MoRTH has given in principle approval of new alignment, which was prepared as per IE’s suggestions.
Concessionaire has completed the Topographical survey of this new alignment and had completed Geotechnical
investigation for new viaduct location approved in liew of hair pin bend. Estimate of change of Scope has been
recommend by IE to Authority for issue of Change of Scope Order.

PD-MoRTH has recommended MoRTH HQ for additional land acquisition based of IE recommendations. MoRTH has
placed land indent to forest/revenue authority based on new alignment approved by IE. Concessionaire shall take this
work after receiving necessary Forest Clearance and Change of Scope Order for new alignment. However, road works in
first Km and last Km of Main Approach Road is in progress by constructing MSE Wall.

On advise of NHIDCL, IE has now recommended to review the overall gradient of approach Road based on international
practice and advised Concessionaire to stop further construction till such time a decision is taken by the Authority on new
recommendation.

Major Bridge (Eastern Portal) Reinforcement and Concreting work for A2 abutment raft foundation was completed in last
season. Abutment wall concreting in progress. The work of A1 abutment raft is completed, and wall concreting is in
progress.

Activity at Eastern Portal has been restarted on 25th march after almost 4 months of closure due to adverse weather
conditions and road closure.

Minor Bridge (Western Portal): Excavation for foundation of abutment A1 is completed. Further Construction of MSE
bridge abutment is in progress. Abutment excavation for A2 is in progress.

Ventilation Tunnel approach road alignment underwent revision as part of the original alignment was passing through
highly unstable slope which restricts the constructability. New alignment Plan and Profile has been reviewed by IE and
the work is in progress as per approved drawings.

Western Portal The temporary access road to reach top of the portal at elevation 2555 was constructed. While excavating
the portal area colluvium was noticed above tunnel axis sandwiched between Rocky surfaces. A Probing at the portal was
conducted to identify the length/depth of colluvium in order to make suitable changes in the design & construction
drawings. Revised drawings was submitted which was reviewed by IE and work was completed as per the same.Escape
Tunnel and Main Tunnel excavation is in progress beyond pipe roofing as per the work program. However, due to
unexpected Geology (clay) beyond ch 250 of Main Tunnel, series of pipe roofing was necessitated and is being closely
monitored.

To makeup slow progress of Main tunnel from WP due to encountered poor Geology, additional face (1a) was opened
through Motorable Cross Passage 1. Work is progressing as planned with face 1a reaching breakthrough at TM 561.

Ventilation Portal: IE has reviewed Ventilation Portal design and drawings. Portal design underwent revision post cloud
burst in the region due to safety reasons. The revised portal definition is completely different from the one originally
proposed as per DPR. Ventilation portal underwent 2nd revision which was necessitated due to revision in approach road
to portal as briefed above.

The portal works completed. Forepoling/pipe roofing was completed as per approved drawings. Tunnel Excavation and
Cavern work completed. Concessionaire is now opened 4 additional faces from Cavern 2 each for Main and Escape
Tunnel. Work is progressing from all faces as planned.

                                                                                                                                                                                                                         
Page 11 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
Eastern Portal design was submitted by the Concessionaire based on confirmatory bore holes findings as per the
suggestions of IE. IE’s review comment to submitted design has made concessionaire to re-look into the design and
Concessionaire after studying various option and its constructability and as advised by IE, submitted the new design with
micro pile wall option.

The works at Eastern Portal is completed as per New Design with Micro pile Solution and Canopy of escape and main
tunnel is completed. Escape tunnel excavation is progressing.

All works at Eastern Portal has been restarted after road opening from 25th March, which was suspended due to closure of
Highway and extreme weather conditions.

Important Meeting during the Month: Progress review meeting was held at SSTL site office on 17th and 18th of April by
EDIII, GM(T) and GM(P) of NHIDCL. Decision was taken to review approach road design parameters.

                                                                                                                                                                                                                         
Page 12 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
Section 4

                                                                                                                                                                                                                         
Page 13 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
SECTION 5
PROJECT STATUS:

Progress of Work:
Survey Work:

Pre-Construction Activities:
 Detail survey has been completed for entire Project. Horizontal and Vertical alignment have been designed based
on feasibility drawings, considering ROW land handed over to concessionaire.
 Resurveying has been completed for alignment portion undergoing change. New RoW plan has been submitted to
IE/authority for land acquisition.
 Temporary Bench Marks have been established at suitable intervals and has been reviewed by IE.
 Tunnel Control points was re-established as desired by IE.
 All statuary clearance and approvals are obtained as per Schedule-E of Concession agreement, Details are enclosed
in Annexure-I
 100% Land Acquisition for the project is also done, Details are enclosed in Annexure-II. New land Acquisition
under CoS is under process.
Mobilisation
 Aggregates are being procured from Quarry Location/Tunnel Excavation and the Aggregate Source detail has been
submitted to IE.
 Detail status for Mobilization of all major Plants by Contractor is enclosed as Annexure -III.
 All construction material has been procured either from approved sources or from the standard sources. Status of
source approval Review is annexed as Annexure VI.

Field Laboratories
 Laboratories with necessary equipment’s have been established for routine testing. Regular testing of all material
and Mix design of different grades of concrete is also completed/in progress and is being supervised by the team of
ITNL & IE.
 The quality assurance system has been established to ensure the effective implementation indicated in the Project
Quality Plan. Third party test for conformance is also being carried out as and when need arises for various critical
material/mixes from approved Laboratories. Regular calibration of all the equipments installed in laboratories is
being ensured.

Construction Activity
 From Appointed Date works are being carried out as per Scope of Work specified in Schedule B, Project Facility
specified in Schedule C in accordance with specifications and standards specified in Schedule D; where the land
free from hindrances & encumbrances made available to Concessionaries cleared. Concessionaire is carrying out
the work in accordance with QAS and expected standard in accordance with provision of CA.
 The Construction is taken up in accordance with the Project Specifications and methodology adopted for the
various processes and type of equipment / machinery.
 Safety of Construction workers are being ensured at site. ITNL and all the sub-contractors has mobilised the
dedicated teams to ensure the compliances of safety requirements mentioned in the Safety Manuals and Guidelines.
 Contractor has deployed a dedicated qualified Safety In – charge to monitor and implement the safety regulations
and guidelines under direct supervision of the concessionaire.
 Construction monitoring work is being carried out as per approved design. Monitoring report is annexed as
Annexure VII.
 Work progress report is annexed as Annexure IV.

                                                                                                                                                                                                                         
Page 14 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
Construction constrain:

 Due to changes in approach road alignment and pending CoS order, work has come to standstill beyond km 0+900.
 Local villagers have stopped the road/bridge work near Western Portal demanding cross passages.
 Cross passage demand at Ch 0+110 and Ch 4+373 by local villagers and its pending approval from Authority has
become a constrain to planned road work.
 Review of Approach road design as per the advice of Authority/IE has further resulted into stoppage of Road
works till such time a decision is taken on the issue.

Force majeure Event during the Month: The valley was shut due to civil unrest from 1st to 7th April 2018 which affected
the supplies to the project and workers remained absent during these days.

                                                                                                                                                                                                                         
Page 15 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
Section 6
DESIGN & DRAWINGS REVIEW STATUS
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
TUNNEL WORK
A TUNNEL DESIGN REPORT 1.2 Reviewed
by IE
B GEOTECHNICAL REPORT 2.0 Reviewed
by IE
1 DNDA/ADV/1029-Z MORH/2017/1 Plan topography study area 0 Reviewed by
IE
2 DNDA/ADV/1029-Z MORH/2017/2 Plan Tunnel Situation 0 Reviewed by
IE
3 DNDA/ADV/1029-Z MORH/2017/3 Plan Geological Study area 0 Reviewed by
IE
4 DNDA/ADV/1029-Z MORH/2017/4_1 Location plan layout with geological 0 Reviewed by
investigation-Sheet-1 IE
5 DNDA/ADV/1029-Z MORH/2017/4_2 Location plan layout with geological 0 Reviewed by
investigation-Sheet-2 IE
6 DNDA/ADV/1029-Z MORH/2017/5_1 Geological plan layout with geotechnical 0 Reviewed by
investigation-Sheet-1 IE
7 DNDA/ADV/1029-Z MORH/2017/5_2 Geological plan layout with geotechnical 0 Reviewed by
investigation-Sheet-2 IE
8 DNDA/ADV/1029-Z MORH/2017/6_1 Geological Log Drill Hole 0 Reviewed by
IE
9 DNDA/ADV/1029-Z MORH/2017/6_2 Geotechnical Longitudinal Profile-Sheet-1 0 Reviewed by
IE
10 DNDA/ADV/1029-Z MORH/2017/6_3 Geotechnical Longitudinal Profile-Sheet-2 0 Reviewed by
IE
11 DNDA/ADV/1029-Z MORH/2017/6_4 Geotechnical Longitudinal Profile Ventilation 0 Reviewed by
Tunnel IE
12 DNDA/ADV/1029-Z MORH/2017/7_1 Geological Cross Section 0 Reviewed by
IE
13 DNDA/ADV/1029-Z MORH/2017/8_1 Geometric Definition cross section Main Tunnel 0 Reviewed by
IE
14 DNDA/ADV/1029-Z MORH/2017/8_2 Geometric Definition cross section Lay-by 0 Reviewed by
IE
15 DNDA/ADV/1029-Z MORH/2017/8_3 Geometric Definition cross section 0 Reviewed by
Communication Galleries IE
16 DNDA/ADV/1029-Z MORH/2017/8_4 Geometric Definition cross section Ventilation 0 Reviewed by
Tunnel IE
17 DNDA/ADV/1029-Z MORH/2017/9_1 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-I IE
18 DNDA/ADV/1029-Z MORH/2017/9_2 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-I' - Rock Bursting IE
19 DNDA/ADV/1029-Z MORH/2017/9_3 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-II IE
20 DNDA/ADV/1029-Z MORH/2017/9_4 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-II bis IE
21 DNDA/ADV/1029-Z MORH/2017/9_5 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-III IE
22 DNDA/ADV/1029-Z MORH/2017/9_6 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-IV IE
23 DNDA/ADV/1029-Z MORH/2017/9_7 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-V IE
24 DNDA/ADV/1029-Z MORH/2017/9_8 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-III' Squeezing Hazard IE

                                                                                                                                                                                                                         
Page 16 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
25 DNDA/ADV/1029-Z MORH/2017/9_9 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-IV' Squeezing Hazard IE
26 DNDA/ADV/1029-Z MORH/2017/9_10 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-V' Squeezing Hazard IE
27 DNDA/ADV/1029-Z MORH/2017/9_11 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-VI Under fault Gouge IE
28 DNDA/ADV/1029-Z MORH/2017/9_12 Typical Section Excavation and Support Cross 0 Reviewed by
Section S-VI' Squeezing Hazard IE
29 DNDA/ADV/1029-Z MORH/2017/9_13 Main Tunnel Measurement and Payment Line 0 Reviewed by
IE
30 DNDA/ADV/1029-Z MORH/2017/9_14 Tunnel Measurement and Payment Lines Spiles 0 Reviewed by
Forepoling IE
31 DNDA/ADV/1029-Z MORH/2017/9_15 Typical Section Excavation and Support Cross 0 Reviewed by
Section Forepole Umbrella IE
32 DNDA/ADV/1029-Z MORH/2017/9_16 Typical Section Excavation and Support Cross 0 Reviewed by
Section Forepole Umbrella with water large IE
inflow
33 DNDA/ADV/1029-Z MORH/2017/9_17 Typical Section Excavation and Support Minor 0 Reviewed by
Squeezing Special support without water charge IE
34 DNDA/ADV/1029-Z MORH/2017/9_18 Typical Section Excavation and Support Minor 0 Reviewed by
Squeezing special section support without water IE
charge
35 DNDA/ADV/1029-Z MORH/2017/9_19 Typical Section Excavation and Support Special 0 Reviewed by
section support fault gouge with water charge IE
36 DNDA/ADV/1029-Z MORH/2017/9_20 Supplementary Improvement Crossing of Fault 0 Reviewed by
Zone IE
37 DNDA/ADV/1029-Z MORH/2017/9_21 Cross Section S-IV Supplementary treatment for 0 Reviewed by
Fault Zone IE
38 DNDA/ADV/1029-Z MORH/2017/9_22 Remedial Measures Treatment Stages in case of 0 Reviewed by
ground collapse IE
39 DNDA/ADV/1029-Z MORH/2017/9_23 Remedial Measures Treatment Stages of Caves 0 Reviewed by
IE
40 DNDA/ADV/1029-Z MORH/2017/9_24 Squeezing and Rock Bursting Improvement 0 Reviewed by
IE
41 DNDA/ADV/1029-Z MORH/2017/9_25 Typical Section Excavation and Support Cross 0 Reviewed by
Section SG-I Lay-By IE
42 DNDA/ADV/1029-Z MORH/2017/9_26 Typical Section Excavation and Support Cross 0 Reviewed by
Section SG-II Lay-By IE
43 DNDA/ADV/1029-Z MORH/2017/9_27 Typical Section Excavation and Support Cross 0 Reviewed by
Section SGE-I Without Invert Escape Tunnel and IE
Motorable Communication Gallery
44 DNDA/ADV/1029-Z MORH/2017/9_28 Typical Section Excavation and Support Cross 0 Reviewed by
Section SGE-II With Invert Arch Escape Tunnel IE
and Motorable Communication Gallery
45 DNDA/ADV/1029-Z MORH/2017/9_29 Typical Section Excavation and Support Cross 0 Reviewed by
Section SGE-III With Invert Arch Escape Tunnel IE
and Motorable Communication Gallery
46 DNDA/ADV/1029-Z MORH/2017/9_30 Typical Section Excavation and Support Cross 0 Reviewed by
Section SGE-III bis With Invert Arch Escape IE
Tunnel and Motorable Communication Gallery
47 DNDA/ADV/1029-Z MORH/2017/9_31 Typical Section Excavation and Support Cross 0 Reviewed by
Section SGC-I Pedestrian Communication IE
Gallery
48 DNDA/ADV/1029-Z MORH/2017/9_32 Measurement and Payment Lay-By and 0 Reviewed by
Communication Galleries IE

                                                                                                                                                                                                                         
Page 17 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
49 DNDA/ADV/1029-Z MORH/2017/9_33 Typical Section Excavation and Support Cross 0 Reviewed by
Section SVT-I without Invert Ventilation Tunnel IE
50 DNDA/ADV/1029-Z MORH/2017/9_34 Typical Section Excavation and Support Cross 0 Reviewed by
Section SVT-II with Invert Ventilation Tunnel IE
51 DNDA/ADV/1029-Z MORH/2017/9_35 Typical Section Excavation and Support Cross 0 Reviewed by
Section SVT-III with Invert Ventilation Tunnel IE
52 DNDA/ADV/1029-Z MORH/2017/9_36 Measurement and Payment Ventilation Tunnel 0 Reviewed by
IE
53 DNDA/ADV/1029-Z MORH/2017/9_37 Typical Section Excavation and Support 0 Reviewed by
Forepoling for Cross Sections communication IE
galleries
54 DNDA/ADV/1029-Z MORH/2017/9_38 Typical Section Excavation and Support 0 Reviewed by
Instrumented Cross Sections Severe Swelling IE
Hazard
55 DNDA/ADV/1029-Z MORH/2017/9_39 Typical Section Excavation and Support 0 Reviewed by
Instrumented Cross Sections without Special IE
Hazard
56 DNDA/ADV/1029-Z Western Portal Cut and Fill Plan View 0 Reviewed by
MORH/2017/10.1_01 IE
C PORTAL WEST DESIGN REPORT 5.8 Reviewed by
IE
DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by
57 MORH/2017/10.1_02 Longitudinal and Cross Sections Only for IE
Umbrella with overlap
DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by
58 MORH/2017/10.1_03 Longitudinal and Cross Sections-Sheet-1 IE

59 DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by


MORH/2017/10.1_04 Longitudinal and Cross Sections-Sheet-2 IE

60 DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by


MORH/2017/10.1_05 Front View Only for Umbrella with overlap IE

61 DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by


MORH/2017/10.1_06 Longitudinal Section Geotechnical Profiles IE

62 DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by


MORH/2017/10.1_07 Longitudinal Geotechnical Section Only for IE
Umbrella with overlap
63 DNDA/ADV/1029-Z Longitudinal and cross Sections Forepole 0 Reviewed by
MORH/2017/10.1_08 Umbrella and support details (Main Tunnel) IE
Solution for Umbrella with overlap Sheet-1
64 DNDA/ADV/1029-Z Longitudinal and cross Sections Forepole 0 Reviewed by
MORH/2017/10.1_09 Umbrella and support details (Main Tunnel) IE
Solution for Umbrella with overlap Sheet-2
65 DNDA/ADV/1029-Z Western Portal Temporary Cut and Support 0 Reviewed by
MORH/2017/10.1_10 Main Tunnel Longitudinal Section Solution for IE
Umbrella with overlap
66 DNDA/ADV/1029-Z Main Tunnel Cross Sections Solution for 0 Reviewed by
MORH/2017/10.1_11 Umbrella with overlap Sheet-1 IE

67 DNDA/ADV/1029-Z Main Tunnel Cross Sections Solution for 0 Reviewed by


MORH/2017/10.1_12 Umbrella with overlap Sheet-2 IE

68 DNDA/ADV/1029-Z Longitudinal and cross Sections Forepole 0 Reviewed by


MORH/2017/10.1_13 Umbrella and support details (Escape Tunnel) IE
Solution for Umbrella with overlap Sheet-1

                                                                                                                                                                                                                         
Page 18 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
69 DNDA/ADV/1029-Z Longitudinal and cross Sections Forepole 0 Reviewed by
MORH/2017/10.1_14 Umbrella and support details (Escape Tunnel) IE
Solution for Umbrella with overlap Sheet-2
70 DNDA/ADV/1029-Z Escape Tunnel Longitudinal Section Solution for 0 Reviewed by
MORH/2017/10.1_15 umbrella with overlap IE
71 DNDA/ADV/1029-Z Escape Tunnel Cross Section Solution for 0 Reviewed by
MORH/2017/10.1_16 umbrella with overlap IE
72 DNDA/ADV/1029-Z Western Portal cut and Fill Monitoring Plan 0 Reviewed by
MORH/2017/10.1_17 View IE
73 DNDA/ADV/1029-Z Western Portal cut and Fill Monitoring Only for 0 Reviewed by
MORH/2017/10.1_18 Umbrella with overlap IE
D PORTAL EAST DESIGN REPORT 2.1 Reviewed
by IE
74 DNDA/ADV/1029-Z MORH/2017/10.2_1 East Portal Temporary Cut and Support Plan 0 Reviewed by
View IE

75 DNDA/ADV/1029-Z MORH/2017/10.2_2 East Portal Temporary Cut and Support Front 0 Reviewed by
View IE

76 DNDA/ADV/1029-Z MORH/2017/10.2_3 East Portal Temporary Cut and Support 0 Reviewed by


Longitudinal Section-1 IE

77 DNDA/ADV/1029-Z MORH/2017/10.2_4 East Portal Temporary Cut and Support 0 Reviewed by


Longitudinal Section-2 IE

78 DNDA/ADV/1029-Z MORH/2017/10.2_5 East Portal Temporary Cut and Support 0 Reviewed by


Longitudinal Section-3 IE

79 DNDA/ADV/1029-Z MORH/2017/10.2_6 East Portal Temporary Cut and Support Front 0 Reviewed by
View - Dimensions IE

80 DNDA/ADV/1029-Z MORH/2017/10.2_7 East Portal Temporary Cut and Support 0 Reviewed by


Longitudinal Section Seismic and Geological IE
Profile
81 DNDA/ADV/1029-Z MORH/2017/10.2_8 Longitudinal and Cross Section Forepole 0 Reviewed by
Umbrella and support details (Main Tunnel) IE
Solution for Umbrella with overlap
82 DNDA/ADV/1029-Z MORH/2017/10.2_9 Longitudinal and Cross Section Forepole 0 Reviewed by
Umbrella and support details (Escape Tunnel) IE
Solution for Umbrella with overlap
83 DNDA/ADV/1029-Z East Portal Temporary Cut and Support Main 0 Reviewed by
MORH/2017/10.2_10 Tunnel Longitudinal Section Solution for IE
Umbrella with overlap
84 DNDA/ADV/1029-Z Main Tunnel Cross Sections Solution for 0 Reviewed by
MORH/2017/10.2_11 Umbrella with overlap Sheet-1 IE

85 DNDA/ADV/1029-Z Main Tunnel Cross Sections Solution for 0 Reviewed by


MORH/2017/10.2_12 Umbrella with overlap Sheet-2 IE

86 DNDA/ADV/1029-Z East Portal Temporary Cut and Support Escape 0 Reviewed by


MORH/2017/10.2_13 Tunnel Longitudinal Section Solution for IE
Umbrella with overlap
87 DNDA/ADV/1029-Z East Portal Escape Tunnel Cross Sections 0 Reviewed by
MORH/2017/10.2_14 solution for umbrella with overlap IE

88 DNDA/ADV/1029-Z East Portal Temporary Cut and Support Details 0 Reviewed by


MORH/2017/10.2_15 IE

                                                                                                                                                                                                                         
Page 19 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
89 DNDA/ADV/1029-Z East Portal Temporary Cut and Support 0 Reviewed by
MORH/2017/10.2_16 Monitoring IE

E PORTAL VENTILATION DESIGN REPORT 1.2 Reviewed


by IE
90 DNDA/ADV/1029-Z MORH/2017/10.3_1 Ventilation Tunnel Portal Plan View 0 Reviewed by
IE
91 DNDA/ADV/1029-Z MORH/2017/10.3_2 Ventilation Tunnel Portal Slope Treatment Cross 0 Reviewed by
Section Front View and details IE
92 DNDA/ADV/1029-Z MORH/2017/10.3_3 Ventilation Tunnel Portal Umbrella and support 0 Reviewed by
details Sheet-1 IE
93 DNDA/ADV/1029-Z MORH/2017/10.3_4 Ventilation Tunnel Portal Umbrella and support 0 Reviewed by
details Sheet-2 IE
94 DNDA/ADV/1029-Z MORH/2017/11_1 Main Tunnel Canopy Section Steel Rib ISHB-150 0 Reviewed by
IE
95 DNDA/ADV/1029-Z MORH/2017/11_2 Main Tunnel Section S-V (Under Umbrella) Steel 0 Reviewed by
Rib ISHB-150 IE
96 DNDA/ADV/1029-Z MORH/2017/11_3 Main Tunnel Section S-V' Steel Rib ISHB-150 0 Reviewed by
IE
97 DNDA/ADV/1029-Z MORH/2017/11_4 Main Tunnel Section S-IV Steel Rib ISHB-150 0 Reviewed by
IE
98 DNDA/ADV/1029-Z MORH/2017/11_5 Main Tunnel Section S-II bis Lattice Girder 0 Reviewed by
IE
99 DNDA/ADV/1029-Z MORH/2017/11_6 Main Tunnel Section S-IV Lattice Girder 0 Reviewed by
IE
100 DNDA/ADV/1029-Z MORH/2017/11_7 Main Tunnel Section S-IV' Lattice Girder 0 Reviewed by
IE
101 DNDA/ADV/1029-Z MORH/2017/11_8 Ventilation Tunnel Section SVT-II Lattice Girder 0 Reviewed by
IE
102 DNDA/ADV/1029-Z MORH/2017/11_9 Ventilation Tunnel Section SVT-III Lattice 0 Reviewed by
Girder IE
103 DNDA/ADV/1029-Z MORH/2017/11_10 Escape Tunnel Section SGE-II Lattice Girder 0 Reviewed by
IE
104 DNDA/ADV/1029-Z MORH/2017/11_11 Escape Tunnel Section SGE-III Lattice Girder 0 Reviewed by
IE
105 DNDA/ADV/1029-Z MORH/2017/11_12 Escape Tunnel Section SGE-III bis Lattice Girder 0 Reviewed by
IE
ROAD WORK
106 DNDA/ADV/1029-Z Plan CH:00+000 TO CH:01+000 R3 Reviewed by
MORH/2013/P&P/01 IE
107 DNDA/ADV/1029-Z Longitudinal Profile CH:00+000 TO CH:01+000 R3 Reviewed by
MORH/2013/P&P/01A IE
108 DNDA/ADV/1029-Z Plan CH:01+000 TO CH:02+000 R3 Reviewed by
MORH/2013/P&P/02 IE
109 DNDA/ADV/1029-Z Longitudinal Profile CH:01+000 TO CH:02+000 R3 Reviewed by
MORH/2013/P&P/02A IE
110 DNDA/ADV/1029-Z Plan CH:02+000 TO CH:03+000 R3 Reviewed by
MORH/2013/P&P/03 IE
111 DNDA/ADV/1029-Z Longitudinal Profile CH:02+000 TO CH:03+000 R3 Reviewed by
MORH/2013/P&P/03A IE
112 DNDA/ADV/1029-Z Plan CH:03+000 TO CH:04+000 R2 Reviewed by
MORH/2013/P&P/04 IE
113 DNDA/ADV/1029-Z Longitudinal Profile CH:03+000 TO CH:04+000 R2 Reviewed by
MORH/2013/P&P/04A IE
114 DNDA/ADV/1029-Z Plan CH:04+000 TO CH:05+000 R2 Reviewed by
MORH/2013/P&P/05 IE

                                                                                                                                                                                                                         
Page 20 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
115 DNDA/ADV/1029-Z Longitudinal Profile CH:04+000 TO CH:05+000 R2 Reviewed by
MORH/2013/P&P/05A IE
116 DNDA/ADV/1029-Z Plan CH:05+000 TO CH:06+000 R2 Reviewed by
MORH/2013/P&P/06 IE
117 DNDA/ADV/1029-Z Longitudinal Profile CH:05+000 TO CH:06+000 R2 Reviewed by
MORH/2013/P&P/06A IE
118 DNDA/ADV/1029-Z Plan CH:06+000 TO CH:07+000 R2 Reviewed by
MORH/2013/P&P/07 IE
119 DNDA/ADV/1029-Z Longitudinal Profile CH:06+000 TO CH:07+000 R2 Reviewed by
MORH/2013/P&P/07A IE
120 DNDA/ADV/1029-Z Plan CH:07+000 TO CH:08+000 R2 Reviewed by
MORH/2013/P&P/08 IE
121 DNDA/ADV/1029-Z Longitudinal Profile CH:07+000 TO CH:08+000 R2 Reviewed by
MORH/2013/P&P/08A IE
122 DNDA/ADV/1029-Z Plan & Longitudinal Profile CH:08+000 TO R2 Reviewed by
MORH/2013/P&P/09 CH:09+000 IE
123 DNDA/ADV/1029-Z Plan & Longitudinal Profile CH:09+000 TO R2 Reviewed by
MORH/2013/P&P/10 CH:10+000 IE
124 DNDA/ADV/1029-Z Plan CH:10+000 TO CH:11+000 R2 Reviewed by
MORH/2013/P&P/11 IE
125 DNDA/ADV/1029-Z Longitudinal Profile CH:10+000 TO CH:11+000 R2 Reviewed by
MORH/2013/P&P/11A IE
126 DNDA/ADV/1029-Z Plan CH:11+000 TO CH:12+000 R2 Reviewed by
MORH/2013/P&P/12 IE
127 DNDA/ADV/1029-Z Longitudinal Profile CH:11+000 TO CH:12+000 R2 Reviewed by
MORH/2013/P&P/12A IE
128 DNDA/ADV/1029-Z Plan & Longitudinal Profile CH:12+000 TO R2 Reviewed by
MORH/2013/P&P/13 CH:12+032 IE
129 DNDA/ADV/1029-Z Ventilation Tunnel Plan CH: 00+000 TO CH: R4 Reviewed by
MORH/2013/P&P/15 01+472.506 IE
130 DNDA/ADV/1029-Z Ventilation Tunnel Longitudinal Profile CH: R6 Reviewed by
MORH/2013/P&P/15A 00+000 TO CH: 00+880.557 IE
131 DNDA/ADV/1029-Z Ventilation Tunnel Longitudinal Profile CH: R6 Reviewed by
MORH/2013/P&P/15B 00+880.557 TO CH: 04+470.506 IE
MSE WALL CH 00+120 TO 00+420
132 REColND-N/16565/CH .0+120-0+420/PL- PLAN AT TOP OF REINFORCED EARTH® 1 Reviewed by
01 WALL SHEET-1 OF 3 IE
133 REColND-N/16565/CH .0+120-0+420/PL- PLAN AT TOP OF REINFORCED EARTH® 1 Reviewed by
01 WALL SHEET-2 OF 3 IE
134 REColND-N/16565/CH .0+120-0+420/PL- PLAN AT TOP OF REINFORCED EARTH® 2 Reviewed by
01 WALL SHEET-3 OF 3 IE
135 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-1 OF 7
136 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-2 OF 7
137 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-3 OF 7
138 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-4 OF 7
139 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-5 OF 7

                                                                                                                                                                                                                         
Page 21 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
140 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-6 OF 7
141 REColND-N/16565/CH.0+120-0+420/GA- GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
01 RAMP RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) SHEET-7 OF 7
142 REColND-N/16565/CH.0+120-0+420/GA- TOE WALL VIEW-A , VIEW-B AND VIEW-E 0 Reviewed by
02 IE
143 REColND-N/16565/CH.O+ 120- TOE VIEW-C .VIEW-D .AND VIEW-F 0 Reviewed by
0+420/GA-03 IE
144 REColND-N/16565/CH.0+120· TYPICAL MESH DETAIL, LEVELING PAD 2 Reviewed by
0+420/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES SHEET-1 OF 3
145 REColND-N/16565/CH.0+120· TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
0+420/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES SHEET-2 OF 3
146 REColND-N/16565/CH.0+120· TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
0+420/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES SHEET-3 OF 3
147 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-1 OF 16 1 Reviewed by
01 IE
148 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-2 OF 16 1 Reviewed by
01 IE
149 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-3 OF 16 1 Reviewed by
01 IE
150 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-4 OF 16 1 Reviewed by
01 IE
151 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-5 OF 16 1 Reviewed by
01 IE
152 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-6 OF 16 1 Reviewed by
01 IE
153 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-7 OF 16 1 Reviewed by
01 IE
154 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-8 OF 16 1 Reviewed by
01 IE
155 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-9 OF 16 1 Reviewed by
01 IE
156 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-10 OF 16 1 Reviewed by
01 IE
157 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-11 OF 16 2 Reviewed by
01 IE
158 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-12 OF 16 2 Reviewed by
01 IE
159 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-13 OF 16 2 Reviewed by
01 IE
160 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-14 OF 16 1 Reviewed by
01 IE
161 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-15 OF 16 1 Reviewed by
01 IE
162 REColND-N/16565/CH.0+120-0+420/DS- DESIGN SECTION SHEET-16 OF 16 1 Reviewed by
01 IE
MSE WALL CH 00+578 TO 00+722
163 REColND-N/16565/CH.578-722/PLAN-01 PLAN AT TOP OF REINFORCED EARTH® 2 Reviewed by
WALL IE

                                                                                                                                                                                                                         
Page 22 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
164 REColND-N/16565/CH.578-722/GA-01 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 01 OF03
165 REColND-N/16565/CH.578-722/GA-01 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 02 OF03
167 REColND-N/16565/CH.578-722/GA-01 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 03 OF03
168 REColND-N/16565/CH.578-722/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 01 OF03
169 REColND-N/16565/CH.578-722/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 02 OF03
170 REColND-N/16565/CH.578-722/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP IE
(RIGHT HAND SIDE WALL-(SONAMARG TO
REZAN ) 03 OF03
171 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 01 OF 16 1 Reviewed by
IE
171 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 02 OF 16 1 Reviewed by
IE
172 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 03 OF 16 1 Reviewed by
IE
173 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 04 OF 16 1 Reviewed by
IE
174 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 05 OF 16 1 Reviewed by
IE
175 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 06 OF 16 1 Reviewed by
IE
176 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 07 OF 16 1 Reviewed by
IE
177 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 08 OF 16 1 Reviewed by
IE
178 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 09 OF 16 1 Reviewed by
IE
179 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 10 OF 16 1 Reviewed by
IE
180 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 11 OF 16 1 Reviewed by
IE
181 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 12 OF 16 1 Reviewed by
IE
182 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 13 OF 16 1 Reviewed by
IE
183 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 14 OF 16 1 Reviewed by
IE
184 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 15 OF 16 1 Reviewed by
IE
185 REColND-N/16565/CH.578-722/DS-01 DESIGN SECTION 16 OF 16 0 Reviewed by
IE

                                                                                                                                                                                                                         
Page 23 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
186 REColND-N/16565/CH.578-722/DET-01 TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
DETAIL CROSS SECTION & GENERAL NOTES IE
01 OF02
187 REColND-N/16565/CH.578-722/DET-01 TYPICAL MESH DETAIL, LEVELING PAD 2 Reviewed by
DETAIL CROSS SECTION & GENERAL NOTES IE
02 OF02
MSE WALL CH 01+082 TO 01+157
188 REColND-Nl16565ICH.1082.250-1157 PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
.433IPL-01 WALL IE
189 REColND-Nl16565ICH.1082.250- GENERALARRANGEMENTOFAPPROACH 0 Reviewed by
1157.433IGA-01 RAMP (RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 01 OF 02
190 REColND-Nl16565ICH.1082.250- GENERALARRANGEMENTOFAPPROACH 0 Reviewed by
1157.433IGA-01 RAMP (RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 02 OF 02
191 REColND-Nl16565ICH.1082.250- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1157.4331DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF 02
192 REColND-Nl16565ICH.1082.250- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1157.4331DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 02 OF 02
193 REColND-Nl16565ICH.1082.250- CROSS SECTION 01 OF 07 0 Reviewed by
1157.433ICS-01 IE
194 REColND-Nl16565ICH.1082.250- CROSS SECTION 02 OF 07 0 Reviewed by
1157.433ICS-01 IE
195 REColND-Nl16565ICH.1082.250- CROSS SECTION 03 OF 07 0 Reviewed by
1157.433ICS-01 IE
196 REColND-Nl16565ICH.1082.250- CROSS SECTION 04 OF 07 0 Reviewed by
1157.433ICS-01 IE
197 REColND-Nl16565ICH.1082.250- CROSS SECTION 05 OF 07 0 Reviewed by
1157.433ICS-01 IE
198 REColND-Nl16565ICH.1082.250- CROSS SECTION 06 OF 07 0 Reviewed by
1157.433ICS-01 IE
199 REColND-Nl16565ICH.1082.250- CROSS SECTION 07 OF 07 0 Reviewed by
1157.433ICS-01 IE
MSE WALL CH 01+283 TO 01+446
200 REColNO-N/16565/CH.1245.973- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1446.800/PL-01 WALL 01 OF 04 IE
201 REColNO-N/16565/CH.1245.973- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1446.800/PL-01 WALL 02 OF 04 IE
202 REColNO-N/16565/CH.1245.973- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1446.800/PL-01 WALL 03 OF 04 IE
203 REColNO-N/16565/CH.1245.973- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1446.800/PL-01 WALL 03 OF 04 IE
204 REColND-N/16565/CH.1245.973- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1446.800/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 01 OF04
205 REColND-N/16565/CH.1245.973- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1446.800/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 02 OF04
206 REColND-N/16565/CH.1245.973- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1446.800/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 03 OF04

                                                                                                                                                                                                                         
Page 24 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
207 REColND-N/16565/CH.1245.973- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1446.800/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 04 OF04
208 REColND-N/16565/CH.1245.973- CROSS SECTION 01 OF 20 0 Reviewed by
1446.800/DS-01 IE
209 REColND-N/16565/CH.1245.973- CROSS SECTION 02 OF 20 0 Reviewed by
1446.800/DS-01 IE
210 REColND-N/16565/CH.1245.973- CROSS SECTION 03 OF 20 0 Reviewed by
1446.800/DS-01 IE
211 REColND-N/16565/CH.1245.973- CROSS SECTION 04 OF 20 0 Reviewed by
1446.800/DS-01 IE
212 REColND-N/16565/CH.1245.973- CROSS SECTION 05 OF 20 0 Reviewed by
1446.800/DS-01 IE
213 REColND-N/16565/CH.1245.973- CROSS SECTION 06 OF 20 0 Reviewed by
1446.800/DS-01 IE
214 REColND-N/16565/CH.1245.973- CROSS SECTION 07 OF 20 0 Reviewed by
1446.800/DS-01 IE
215 REColND-N/16565/CH.1245.973- CROSS SECTION 08 OF 20 0 Reviewed by
1446.800/DS-01 IE
216 REColND-N/16565/CH.1245.973- CROSS SECTION 09 OF 20 0 Reviewed by
1446.800/DS-01 IE
217 REColND-N/16565/CH.1245.973- CROSS SECTION 10 OF 20 0 Reviewed by
1446.800/DS-01 IE
218 REColND-N/16565/CH.1245.973- CROSS SECTION 11 OF 20 0 Reviewed by
1446.800/DS-01 IE
219 REColND-N/16565/CH.1245.973- CROSS SECTION 12 OF 20 0 Reviewed by
1446.800/DS-01 IE
220 REColND-N/16565/CH.1245.973- CROSS SECTION 13 OF 20 0 Reviewed by
1446.800/DS-01 IE
221 REColND-N/16565/CH.1245.973- CROSS SECTION 14 OF 20 0 Reviewed by
1446.800/DS-01 IE
222 REColND-N/16565/CH.1245.973- CROSS SECTION 15 OF 20 0 Reviewed by
1446.800/DS-01 IE
223 REColND-N/16565/CH.1245.973- CROSS SECTION 16 OF 20 0 Reviewed by
1446.800/DS-01 IE
224 REColND-N/16565/CH.1245.973- CROSS SECTION 17 OF 20 0 Reviewed by
1446.800/DS-01 IE
225 REColND-N/16565/CH.1245.973- CROSS SECTION 18 OF 20 0 Reviewed by
1446.800/DS-01 IE
226 REColND-N/16565/CH.1245.973- CROSS SECTION 19 OF 20 0 Reviewed by
1446.800/DS-01 IE
227 REColND-N/16565/CH.1245.973- CROSS SECTION 20 OF 20 0 Reviewed by
1446.800/DS-01 IE
228 REColND-N/16565/CH.1245.973- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1446.800/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF02
229 REColND-N/16565/CH.1245.973- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1446.800/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 02 OF02
MSE WALL CH 01+283 TO 01+446
230 REColND-N/16565/CH.1473.690- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1707.690/PL-01 WALL 01 OF 04 IE
231 REColND-N/16565/CH.1473.690- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1707.690/PL-01 WALL 02 OF 04 IE

                                                                                                                                                                                                                         
Page 25 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
232 REColND-N/16565/CH.1473.690- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1707.690/PL-01 WALL 03 OF 04 IE
233 REColND-N/16565/CH.1473.690- PLAN AT TOP OF REINFORCED EARTH® 0 Reviewed by
1707.690/PL-01 WALL 04 OF 04 IE
234 REColND-N/16565/CH.1473.690- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1707.690/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 01 OF 05
235 REColND-N/16565/CH.1473.690- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1707.690/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 02 OF 05
236 REColND-N/16565/CH.1473.690- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1707.690/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 03 OF 05
237 REColND-N/16565/CH.1473.690- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1707.690/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 04 OF 05
238 REColND-N/16565/CH.1473.690- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
1707.690/GA-01 RAMP IE
(RIGHT HAND SIDE WALL-{SONAMARG TO
REZAN ) 05 OF 05
239 REColND-N/16565/CH.1473.690- CROSS SECTION 01 OF 24 0 Reviewed by
1707.690/DS-01 IE
240 REColND-N/16565/CH.1473.690- CROSS SECTION 02 OF 24 0 Reviewed by
1707.690/DS-01 IE
241 REColND-N/16565/CH.1473.690- CROSS SECTION 03 OF 24 0 Reviewed by
1707.690/DS-01 IE
242 REColND-N/16565/CH.1473.690- CROSS SECTION 04 OF 24 0 Reviewed by
1707.690/DS-01 IE
243 REColND-N/16565/CH.1473.690- CROSS SECTION 05 OF 24 0 Reviewed by
1707.690/DS-01 IE
244 REColND-N/16565/CH.1473.690- CROSS SECTION 06 OF 24 0 Reviewed by
1707.690/DS-01 IE
245 REColND-N/16565/CH.1473.690- CROSS SECTION 07 OF 24 0 Reviewed by
1707.690/DS-01 IE
246 REColND-N/16565/CH.1473.690- CROSS SECTION 08 OF 24 0 Reviewed by
1707.690/DS-01 IE
247 REColND-N/16565/CH.1473.690- CROSS SECTION 09 OF 24 0 Reviewed by
1707.690/DS-01 IE
248 REColND-N/16565/CH.1473.690- CROSS SECTION 10 OF 24 0 Reviewed by
1707.690/DS-01 IE
249 REColND-N/16565/CH.1473.690- CROSS SECTION 11 OF 24 0 Reviewed by
1707.690/DS-01 IE
250 REColND-N/16565/CH.1473.690- CROSS SECTION 12 OF 24 0 Reviewed by
1707.690/DS-01 IE
251 REColND-N/16565/CH.1473.690- CROSS SECTION 13 OF 24 0 Reviewed by
1707.690/DS-01 IE
252 REColND-N/16565/CH.1473.690- CROSS SECTION 14 OF 24 0 Reviewed by
1707.690/DS-01 IE
253 REColND-N/16565/CH.1473.690- CROSS SECTION 15 OF 24 0 Reviewed by
1707.690/DS-01 IE
254 REColND-N/16565/CH.1473.690- CROSS SECTION 16 OF 24 0 Reviewed by
1707.690/DS-01 IE

                                                                                                                                                                                                                         
Page 26 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
255 REColND-N/16565/CH.1473.690- CROSS SECTION 17 OF 24 0 Reviewed by
1707.690/DS-01 IE
256 REColND-N/16565/CH.1473.690- CROSS SECTION 18 OF 24 0 Reviewed by
1707.690/DS-01 IE
257 REColND-N/16565/CH.1473.690- CROSS SECTION 19 OF 24 0 Reviewed by
1707.690/DS-01 IE
258 REColND-N/16565/CH.1473.690- CROSS SECTION 20 OF 24 0 Reviewed by
1707.690/DS-01 IE
259 REColND-N/16565/CH.1473.690- CROSS SECTION 21 OF 24 0 Reviewed by
1707.690/DS-01 IE
260 REColND-N/16565/CH.1473.690- CROSS SECTION 22 OF 24 0 Reviewed by
1707.690/DS-01 IE
261 REColND-N/16565/CH.1473.690- CROSS SECTION 23 OF 24 0 Reviewed by
1707.690/DS-01 IE
262 REColND-N/16565/CH.1473.690- CROSS SECTION 24 OF 24 0 Reviewed by
1707.690/DS-01 IE
263 REColND-N/16565/CH.1473.690- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1707.690/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF 03
264 REColND-N/16565/CH.1473.690- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1707.690/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 02 OF 03
265 REColND-N/16565/CH.1473.690- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
1707.690/DET-01 DETAIL, CROSS SECTION & GENERAL IE
NOTES 03 OF 03
MSE WALL CH 01+774 TO 01+906
266 RE Col ND-N/16565/CH.177 4-1906/PL- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
01 ®WALL 01 OF 03 IE
267 RE Col ND-N/16565/CH.177 4-1906/PL- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
01 ®WALL 02 OF 03 IE
268 RE Col ND-N/16565/CH.177 4-1906/PL- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
01 ®WALL 03 OF 03 IE
269 RE Col ND-N/16565/CH.177 4-1906/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 01 OF 03
270 RE Col ND-N/16565/CH.177 4-1906/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 02 OF 03
280 RE Col ND-N/16565/CH.177 4-1906/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 03 OF 03
290 REColND-N/16565/CH.1774-1906/DET- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
01 DETAIL CROSS SECTION & GENERAL NOTES IE
01 OF 02
300 REColND-N/16565/CH.1774-1906/DET- TYPICAL MESH DETAIL, LEVELING PAD 0 Reviewed by
01 DETAIL CROSS SECTION & GENERAL NOTES IE
02 OF 02
301 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 01 OF 14 0 Reviewed by
01 IE
302 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 02 OF 14 0 Reviewed by
01 IE
303 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 03 OF 14 0 Reviewed by
01 IE
304 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 04 OF 14 0 Reviewed by
01 IE

                                                                                                                                                                                                                         
Page 27 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
305 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 05 OF 14 0 Reviewed by
01 IE
306 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 06 OF 14 0 Reviewed by
01 IE
307 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 07 OF 14 0 Reviewed by
01 IE
308 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 08 OF 14 0 Reviewed by
01 IE
309 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 09 OF 14 0 Reviewed by
01 IE
310 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 10 OF 14 0 Reviewed by
01 IE
311 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 11 OF 14 0 Reviewed by
01 IE
312 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 12 OF 14 0 Reviewed by
01 IE
313 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 13 OF 14 0 Reviewed by
01 IE
314 RE Col ND-N/16565/CH.177 4-1906/DS- DESIGN SECTION 14 OF 14 0 Reviewed by
01 IE
RE WALL CH 01+774 TO 01+906
315 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 01 OF 06 IE
316 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 02 OF 06 IE
317 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 03 OF 06 IE
318 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 04 OF 06 IE
319 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 05 OF 06 IE
320 REColND-N/16565/MAR/4050- PLAN AT TOP OF REINFORCED EARTH 0 Reviewed by
4550/PLAN-01 ®WALL 06 OF 06 IE
321 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 01 OF12 IE
322 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 02 OF12 IE
323 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 03 OF12 IE
324 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 04 OF12 IE
325 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 05 OF12 IE
326 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 06 OF12 IE
327 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 07 OF12 IE
328 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 08 OF12 IE
329 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 09 OF12 IE
330 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 10 OF12 IE
331 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 11 OF12 IE

                                                                                                                                                                                                                         
Page 28 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
332 REColND-N/16565/MAR/4050-4550/GA- GENERAL ARRANGEMENT OF APPROACH 0 Reviewed by
01 RAMP (RIGHT HAND SIDE WALL) 12 OF12 IE
333 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 01 OF 18 0 Reviewed by
-01 IE
334 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 02 OF 18 0 Reviewed by
-01 IE
335 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 03 OF 18 0 Reviewed by
-01 IE
336 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 04 OF 18 0 Reviewed by
-01 IE
337 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 05 OF 18 0 Reviewed by
-01 IE
338 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 06 OF 18 0 Reviewed by
-01 IE
339 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 07 OF 18 0 Reviewed by
-01 IE
340 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 08 OF 18 0 Reviewed by
-01 IE
341 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 09 OF 18 0 Reviewed by
-01 IE
342 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 10 OF 18 0 Reviewed by
-01 IE
343 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 11 OF 18 0 Reviewed by
-01 IE
344 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 12 OF 18 0 Reviewed by
-01 IE
345 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 13 OF 18 0 Reviewed by
-01 IE
346 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 14 OF 18 0 Reviewed by
-01 IE
347 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 15 OF 18 0 Reviewed by
-01 IE
348 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 16 OF 18 0 Reviewed by
-01 IE
349 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 17 OF 18 0 Reviewed by
-01 IE
350 REColND-N/16565/MAR/4050--4550/DS- DESIGN SECTION 18 OF 18 0 Reviewed by
-01 IE
351 REColN0-N/16565/MAR/4050-4550IDET- TPICAL MESH DETAIL, LEVELLING PAD 0 Reviewed by
01 DETAIL CROSS SECTION & GENERAL NOTES IE
01 OF 02
352 REColN0-N/16565/MAR/4050-4550IDET- TPICAL MESH DETAIL, LEVELLING PAD 0 Reviewed by
01 DETAIL CROSS SECTION & GENERAL NOTES IE
02 OF 02
GENERAL ARRANGMENT OF RE
PANEL
353 STD/STEEL/180/STD-01 GENERAL ARRANGEMENT OF 180mm THK. 0 Reviewed by
PANELS ACCESSORIES IE
354 STD/STEEL/180/T-A4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A4 IE
355 STD/STEEL/180/T-A5 180mm THK CONCRETE FACING PANELS 0 Reviewed by
TYPES :A5 IE
356 STD/STEEL/180/T-A6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A6 IE
357 STD/STEEL/180/T-A7 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A7 IE

                                                                                                                                                                                                                         
Page 29 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
358 STD/STEEL/180/T-A8 180mm THK.CONCRETE FACING PANELS 0 Reviewed by
TYPES :AB IE
359 STD/STEEL/180/T-A9 180mm THK.CONCRETE FACING PANELS 0 Reviewed by
TYPES :A9 IE
360 STD/STEEL/180/T-A10 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A10 IE
361 STD/STEEL/180/T-B2 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :B2 IE
362 STD/STEEL/180/T-B3 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :B3 IE
363 STD/STEEL/180/T-B4 180mm THK.CONCRETE FACING PANELS 0 Reviewed by
TYPES :B4 IE
364 STD/STEEL/180/T-B5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : B5 IE
365 STD/STEEL/180/T-TA2 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TA2 IE
366 STD/STEEL/180/T-TB2 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TB2 IE
367 STD/STEEL/180/T-TC6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TC6 IE
368 STD/STEEL/180/T-TD6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TD6 IE
369 STD/STEEL/180/T-TES 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TES IE
370 STD/STEEL/180/T-TF6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TFS IE
371 STD/STEEL/180/T-TG6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TG6 IE
372 STD/STEEL/180/T-TH4 180mm THK.CONCRETE FACING PANELS 0 Reviewed by
TYPES : TH4 IE
373 STD/STEEL/180/T-TJ4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TJ4 IE
374 STD/STEEL/180/T-TK4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TK4 IE
375 STD/STEEL/180/T-TL4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TL4 IE
376 STD/STEEL/180/T-TM4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TM4 IE
377 STO/STEEL/180/T-TN4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TN4 IE
378 STD/STEEL/180/T-TP4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TP4 IE
379 STD/STEEL/180/T-TR4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TR4 IE
380 STD/STEEL/180/T-TS2 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TS2 IE
381 STD/STEEL/180/T'-A11 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A11 IE
382 STD/STEEL/180/T'-A12 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A12 IE
383 STD/STEEL/180/T'-A13 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A13 IE
384 STD/STEEL/180/T'-A14 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A14 IE
385 STD/STEEL/180/T'-A15 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A15 IE

                                                                                                                                                                                                                         
Page 30 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
386 STD/STEEL/180/T'-A16 160mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A16 IE

387 STD/STEEL/180/T'-A17 160mm THK. CONCRETE FACING PANELS 0 Reviewed by


TYPES : A17 IE
388 STD/STEEL180/T'-A18 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A18 IE
389 STD/STEEL/180/T'-A6ll/6/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A6/7/6/6 IE
390 STD/STEEL/180/T'-A6/6/6/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :AS/6/616 IE
391 STD/STEEL/180/T'-A6/6/6/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A6/6/6/5 IE
392 STD/STEEL/180/T'-A6/6/5/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A6/6/515 IE
393 STD/STEEL/180//T'-AS/6/5/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/6/515 IE
394 STD/STEEL/180/T-AS/5/4/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/5/4/5 IE
395 STD/STEEL/180/T-AS/4/4/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/4/4/5 IE
396 STD/STEEL/180/T-AS/5/5/4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/5/514 IE
397 STD/STEEL/180/T-AA/5/4/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : Al+/5/4/6 IE
398 STD/STEEL/180/T-AA/6/5/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A4/6/515 IE
399 STD/STEEL/180/T-A7/6/6/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A7/6/6/5 IE
400 STD/STEEL/180/T-AS/5/5/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/5/516 IE
401 STD/STEEL/180/T-AS/6/0/8 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :AS/6/0/8 IE
402 STD/STEEL/180/T-AS/5/0/8 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :AS/5/0/8 IE
403 STD/STEEL/180/T-AS/5/0ll 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : AS/5/0/7 IE
404 STD/STEEL/180/T-A3/6/0/8 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A3/6/0/8 IE
405 STD/STEEL/180/T-A9ll 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :A9/7 IE
406 STD/STEEL/180/T-A7/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : A7/5 IE
407 STD/STEEL/180/T-84/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : 84/5 IE
408 STD/STEEL/180/T-85/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : 85/6 IE
409 STD/STEEL/180/T-BS/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :85/5 IE
410 STD/STEEL/180/T-86/6 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : 86/6 IE
411 STD/STEEL/180/T-TJ3/2/3 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TJ3/2/3 IE
412 STD/STEEL/180/T-TK6ll 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TK6/7 IE

                                                                                                                                                                                                                         
Page 31 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
413 STD/STEEL/180/T-TL2/3 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TL2/3 IE
414 STD/STEEL/180/T-TD212/2/2 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TD212/2/2 IE
415 STD/STEEL/180/T-TD212/3 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TD212/3 IE
416 STD/STEEL/180/T-TFS/4/5 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES : TFS/4/5 IE
417 STD/STEEL/180/T-TG3/2/3 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TG3/2/3 IE
418 STD/STEEL/180/T-TS3/4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TS3/4 IE
419 STD/STEEL/180/T-TA3/4 180mm THK. CONCRETE FACING PANELS 0 Reviewed by
TYPES :TA3/4 IE
GENERAL ARRANGMENT OF
WESTERN PORTAL RE PANEL
420 RECo-lND/16568/WP/PLAN-01 GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by
WESTERN PORTAL (PLAN) 01 OF 02 IE
421 RECo-lND/16568/WP/PLAN-01 GENERAL ARRANGEMENT OF Z-MORH 0 Reviewed by
WESTERN PORTAL (PLAN) 02 OF02 IE
422 RECo-lND/16568/WP-A2NIEW-A GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by
WESTERN PORTAL VIEW-A 01 OF 02 IE

423 RECo-lND/16568/WP-A2NIEW-A GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by


WESTERN PORTAL VIEW-A 02 OF 02 IE

424 RECo-lND/16568/WP-A2/VIEW-B&C GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by


WESTERN PORTAL VIEW-B, VIEW-C IE

425 RECo-lND/16568/WP-A1NIEW-X1 ,X2 GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by


WESTERN PORTAL VIEW-X1, VIEW-X2 IE

426 RECo-lND/16568/WP-A1NIEW-Y GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by


WESTERN PORTAL VIEW-Y IE

427 RE Co-I ND/16568/WP-A 1 NIEW-21 GENERAL ARRANGEMENT OF Z-MORH 1 Reviewed by


WESTERN PORTAL VIEW-21, VIEW-22 IE

428 RECo-lND/16568/WP/DET/01 TYPICAL MESH DETAIL.LEVELING PAD,& 1 Reviewed by


TYPICAL CROSS SECTION, NOTES 01 OF 02 IE

429 RECo-lND/16568/WP/DET/01 TYPICAL MESH DETAIL.LEVELING PAD,& 0 Reviewed by


TYPICAL CROSS SECTION, NOTES 02 OF 02 IE

430 RECo-lND/16568/WP/CS/01 TYPICAL LONGITUDINAL SECTION OF 1 Reviewed by


Tech Abutment AT MCW OUTER IE

A2 MSE WALL
431 REColND-N/15550/A2/PLAN-01 PLAN AT TOP OF REINFORCED EARTH 2 Reviewed by
WALL 01 OF 02 IE
432 REColND-N/15550/A2/PLAN-01 PLAN AT TOP OF REINFORCED EARTH 2 Reviewed by
WALL 02 OF 02 IE
433 REColND-N/15550/A2/GA-01 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEWA,B ) IE
434 RE Col ND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEWC) IE
435 RE Col ND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW D & E) IE
                                                                                                                                                                                                                         
Page 32 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
436 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW E1 & F) IE
437 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEWF1 &G) 01 OF 02 IE
438 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEWF1 &G) 02 OF 02 IE
439 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW G1 & H) IE
440 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 01 OF 07 IE
441 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 02 OF 07 IE
442 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 03 OF 07 IE
443 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 04 OF 07 IE
444 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 05 OF 07 IE
445 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 06 OF 07 IE
446 REColND-N/15550/A2/GA-02 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW H1 &J) 07 OF 07 IE
447 REColNO-N/15550/A21GA-03 GENERAL ARRANGEMENT OF APPROACH 2 Reviewed by
RAMP (VIEW K&L) IE
448 REColND-N/15550/A2/DET-01 TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF 02
449 REColND-N/15550/A2/DET-01 TYPICAL MESH DETAIL, LEVELING PAD 2 Reviewed by
DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF 02
MAJOR BRIDGE AT CH 11+181
450 DNDA/ADV/1029-Z General Arrangement drawing for Major Bridge R2 Reviewed by
MORH/2013/STR/09-01 at CH: 11+181 Sheet 1 of 2 IE

451 DNDA/ADV/1029-Z General Arrangement drawing for Major Bridge R2 Reviewed by


MORH/2013/STR/09-01 at CH: 11+181 Sheet 2 of 2 IE

452 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by


MORH/2013/STR/09-06 Abutment and Footing for Abutment A1 for IE
Major Bridge at CH: 11+181 Sheet 1 of 5
453 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-06 Abutment and Footing for Abutment A1 for IE
Major Bridge at CH: 11+181 Sheet 2 of 5
454 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-06 Abutment and Footing for Abutment A1 for IE
Major Bridge at CH: 11+181 Sheet 3 of 5
455 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-06 Abutment and Footing for Abutment A1 for IE
Major Bridge at CH: 11+181 Sheet 4 of 5
456 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-06 Abutment and Footing for Abutment A1 for IE
Major Bridge at CH: 11+181 Sheet 5 of 5
457 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-07 Abutment and Footing for Abutment A2 for IE
Major Bridge at CH: 11+181 Sheet 1 of 5

                                                                                                                                                                                                                         
Page 33 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
458 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-07 Abutment and Footing for Abutment A2 for IE
Major Bridge at CH: 11+181 Sheet 2 of 5
459 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-07 Abutment and Footing for Abutment A2 for IE
Major Bridge at CH: 11+181 Sheet 3 of 5
460 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-07 Abutment and Footing for Abutment A2 for IE
Major Bridge at CH: 11+181 Sheet 4 of 5
461 DNDA/ADV/1029-Z Dimension & Reinforcement details of R1 Reviewed by
MORH/2013/STR/09-07 Abutment and Footing for Abutment A2 for IE
Major Bridge at CH: 11+181 Sheet 5 of 5
PIPE CULVERT
462 DNDA/ADV/1029-Z Typical General arrangement Drawing for New R0 Reviewed by
MORH/2013/STR/01-02 Pipe Culvert (Hill area) 01 of 02 IE
463 DNDA/ADV/1029-Z Typical General arrangement Drawing for New R0 Reviewed by
MORH/2013/STR/01-02 Pipe Culvert (Hill area) 02 of 02 IE
464 DNDA/ADV/1029-Z Schedule for Pipe Culvert (Hill Area) R0 Reviewed by
MORH/2013/STR/01-02 IE
BOX CULVERT
465 DNDA/ADV/1029-Z General arrangement Drawing for New Box R2 Reviewed by
MORH/2013/STR/02-01 Culvert at CH: 000+068 IE
466 DNDA/ADV/1029-Z General arrangement Drawing for New Box R0 Reviewed by
MORH/2013/STR/02-02 Culvert at CH: 000+219 IE
467 DNDA/ADV/1029-Z Typical Reinforcement Drawing for Box Culvert R0 Reviewed by
MORH/2013/STR/02-05 at CH: 00+068 01 of 02 IE
468 DNDA/ADV/1029-Z Typical Reinforcement Drawing for Box Culvert R0 Reviewed by
MORH/2013/STR/02-05 at CH: 00+068 02 of 02 IE
469 DNDA/ADV/1029-Z Typical General Arrangement Drawing for New R1 Reviewed by
MORH/2013/STR/02-02 Box Culvert IE
470 DNDA/ADV/1029-Z Typical Reinforcement Drawing for New Box R1 Reviewed by
MORH/2013/STR/02-04 Culvert IE
471 DNDA/ADV/1029-Z Typical General Arrangement Drawing for Box R0 Reviewed by
MORH/2013/STR/02-06 Culvert (Hill Area) IE
472 DNDA/ADV/1029-Z Schedule for Box Culvert (Hill Area) R0 Reviewed by
MORH/2013/STR/02-07 IE
473 DNDA/ADV/1029-Z Typical General Arrangement Drawing for New R0 Reviewed by
MORH/2013/STR/02-08 Box Culvert IE
MSE WALL VENTILATION PORTAL
ROAD
474 REColND-N/16567N-TUNNEL/PL-01 PLAN AT TOP OF REINFORCED EARTH® 1 Reviewed by
WALL 01 OF 02 IE
475 REColND-N/16567N-TUNNEL/PL-01 PLAN AT TOP OF REINFORCED EARTH® 1 Reviewed by
WALL 02 OF 02 IE
476 REColND-N/16567N-TUNNEL/GA--01 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP (LEFT HAND SIDE WALL) PLATFORM IE
VIEW-A
477 REColND-N/16567N -TUNNEL/GA--02 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP (LEFT HAND SIDE WALL) PLATFORM IE
VIEW-B,VIEW-C
478 REColND-N/16567N-TUNNEL/GA-03 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP (LEFT HAND SIDE WALL) PLATFORM IE
(VIEW-D)
479 REColND-N/16567N-TUNNEL/GA-04 GENERAL ARRANGEMENT OF APPROACH 1 Reviewed by
RAMP (LEFT HAND SIDE TOE WALL) VIEW-E IE

                                                                                                                                                                                                                         
Page 34 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
480 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 01 OF 07 1 Reviewed by
IE
481 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 02 OF 07 1 Reviewed by
IE
482 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 03 OF 07 1 Reviewed by
IE
483 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 04 OF 07 1 Reviewed by
IE
484 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 05 OF 07 1 Reviewed by
IE
485 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 06 OF 07 1 Reviewed by
IE
486 REColND-N/16567N-TUNNEL/CS-01 CROSS SECTION 07 OF 07 1 Reviewed by
IE
487 REColND-N/16567N-TUNNEL/DS-01 GEOTREL DESIGN SECTION 01 OF 03 1 Reviewed by
IE
488 REColND-N/16567N-TUNNEL/DS-01 GEOTREL DESIGN SECTION 02 OF 03 1 Reviewed by
IE
489 REColND-N/16567N-TUNNEL/DS-01 GEOTREL DESIGN SECTION 03 OF 03 1 Reviewed by
IE
490 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 01 OF 08 1 Reviewed by
IE
491 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 02 OF 08 1 Reviewed by
IE
492 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 03 OF 08 1 Reviewed by
IE
493 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 04 OF 08 1 Reviewed by
IE
494 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 05 OF 08 1 Reviewed by
IE
495 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 06 OF 08 1 Reviewed by
IE
496 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 07 OF 08 1 Reviewed by
IE
497 REColND-N/16567N-TUNNEL/OS-02 TERRATREL DESIGN SECTION 08 OF 08 1 Reviewed by
IE
498 REColND-N/16567N-TUNNEUDET- 01 TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
DETAIL,& GENERAL NOTES(GEOTREL) IE
499 REColND-N/16567N-TUNNEUDET-02 TYPICAL MESH DETAIL, LEVELING PAD 1 Reviewed by
DETAIL, & GENERAL NOTES(TERRATREL) IE
TYPICAL CROSS SECTIONS
500 DNDA/ADV/1029-Z Typical Cross Section Type-01 & 02 R0 Reviewed by
MORH/2013/TCS/01 IE
501 DNDA/ADV/1029-Z Typical Cross Section Type-03 R5 Reviewed by
MORH/2013/TCS/02 IE
502 DNDA/ADV/1029-Z Typical Cross Section Type-03A R4 Reviewed by
MORH/2013/TCS/02A IE
502 DNDA/ADV/1029-Z Typical Cross Section Type-04 R0 Reviewed by
MORH/2013/TCS/03 IE
503 DNDA/ADV/1029-Z Typical Cross Section Type-05 R0 Reviewed by
MORH/2013/TCS/04 IE
504 DNDA/ADV/1029-Z Typical Cross Section Type-06 R0 Reviewed by
MORH/2013/TCS/05 IE
505 DNDA/ADV/1029-Z Typical Cross Section Type-07 R0 Reviewed by
MORH/2013/TCS/06 IE

                                                                                                                                                                                                                         
Page 35 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
506 DNDA/ADV/1029-Z Typical Cross Section Type-08 R0 Reviewed by
MORH/2013/TCS/06A IE
507 DNDA/ADV/1029-Z Typical Cross Section Type-09 R1 Reviewed by
MORH/2013/TCS/07 IE
508 DNDA/ADV/1029-Z Typical Cross Section Type-10 & 11 R0 Reviewed by
MORH/2013/TCS/08 IE
509 DNDA/ADV/1029-Z Typical Details of Breast Wall (Masonary) R0 Reviewed by
MORH/2013/STR/01-01 IE
510 DNDA/ADV/1029-Z MORH/2017/12_01 Ventilation Cavern Plan and Longitudinal R3 Under
Section Excavation and Support Reviewed by
IE
511 DNDA/ADV/1029-Z MORH/2017/12_02 Typical Section Excavation and Support Cross R3 Under
Section STVC-I. Ventilation Cavern Reviewed by
IE
512 DNDA/ADV/1029-Z MORH/2017/12_03 Typical Section Excavation and Support Cross R3 Under
Section STVC-II. Ventilation Cavern Reviewed by
IE
513 DNDA/ADV/1029-Z MORH/2017/12_04 Typical Section Excavation and Support Cross R3 Under
Section STVC-III. Ventilation Cavern Reviewed by
IE
514 DNDA/ADV/1029-Z MORH/2017/12_05 Typical Section Excavation and Support Plan R3 Under
and Section. Ventilation Cavern Alternative-1 Reviewed by
IE
514 DNDA/ADV/1029-Z MORH/2017/12_06 Typical Section Excavation and Support Plan R3 Under
and Section. Ventilation Cavern Alternative-1 Reviewed by
IE
514 DNDA/ADV/1029-Z MORH/2017/12_07 Typical Section Excavation and Support Plan R3 Under
and Section. Ventilation Cavern Alternative-2 Reviewed by
IE
514 DNDA/ADV/1029-Z MORH/2017/12_08 Typical Section Excavation and Support Plan R3 Under
and Section. Ventilation Cavern Alternative-2 Reviewed by
IE
514 RECoIND-N/16565/CH.467-578/PLAN-01 PLAN AT TOP OF REINFORCED EARTH R4 Reviewed by
WALL IE
515 RECoIND-N/16565/CH.467-578/GA-02 GENERAL ARRANGEMENT OF APPROACH R1 Reviewed by
RAMP(RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 01 OF 02
516 RECoIND-N/16565/CH.467-578/GA-02 GENERAL ARRANGEMENT OF APPROACH R1 Reviewed by
RAMP(RIGHT HAND SIDE WALL- IE
(SONAMARG TO REZAN ) 02 OF 02
517 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 01 OF 11 R1 Reviewed by
IE
518 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 02 OF 11 R1 Reviewed by
IE
519 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 03 OF 11 R1 Reviewed by
IE
520 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 04 OF 11 R1 Reviewed by
IE
521 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 05 OF 11 R1 Reviewed by
IE
522 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 06 OF 11 R1 Reviewed by
IE
523 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 07 OF 11 R1 Reviewed by
IE
524 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 08 OF 11 R1 Reviewed by
IE

                                                                                                                                                                                                                         
Page 36 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
525 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 09 OF 11 R1 Reviewed by
IE
526 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 10 OF 11 R1 Reviewed by
IE
527 RECoIND-N/16565/CH.467-578/DS-01 DESIGN SECTION 11 OF 11 R1 Reviewed by
IE
528 RECoIND-N/16565/CH.467-578/DET-01 TYPICAL MESH DETAIL, LEVELING PAD R1 Reviewed by
DETAIL, CROSS SECTION & GENERAL IE
NOTES 01 OF 02
529 RECoIND-N/16565/CH.467-578/DET-01 TYPICAL MESH DETAIL, LEVELING PAD R1 Reviewed by
DETAIL, CROSS SECTION & GENERAL IE
NOTES 02 OF 02
530 DNDA/ADV/1029-Z Dimension detail of Deck Slab for Major Bridge R2 Under
MORH/2013/STR/09-02 at Ch 12+187.5 Review by IE
531 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R3 Under
MORH/2013/STR/09-03 12+187.5 Sheet 01 of 12 Review by IE
532 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R2 Under
MORH/2013/STR/09-03 12+187.5 Sheet 02 of 12 Review by IE
533 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R2 Under
MORH/2013/STR/09-03 12+187.5 Sheet 03 of 12 Review by IE
534 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 04 of 12 Review by IE
535 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R2 Under
MORH/2013/STR/09-03 12+187.5 Sheet 05 of 12 Review by IE
536 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 06 of 12 Review by IE
537 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 07 of 12 Review by IE
538 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 08 of 12 Review by IE
539 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 09 of 12 Review by IE
540 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 10 of 12 Review by IE
541 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 11 of 12 Review by IE
542 DNDA/ADV/1029-Z Detail of Super Structure for Major Bridge at Ch R1 Under
MORH/2013/STR/09-03 12+187.5 Sheet 12 of 12 Review by IE
543 DNDA/ADV/1029-Z Reinforcement details of Deck Slab for Major R2 Under
MORH/2013/STR/09-04 Bridge at Ch 12+187.5 Sheet 01 of 02 Review by IE
544 DNDA/ADV/1029-Z Reinforcement details of Deck Slab for Major R2 Under
MORH/2013/STR/09-04 Bridge at Ch 12+187.5 Sheet 02 of 02 Review by IE
545 DNDA/ADV/1029-Z Layout of Deck Slab for Major Bridge at Ch R1 Under
MORH/2013/STR/09-09 11+181 Review by IE
546 DNDA/ADV/1029-Z Miscellaneous Drawing (Typical details drawing R0 Under
MORH/2013/STR/10-01 for approach slab, drainage spout & Crash Review by IE
Barrier)
547 DNDA/ADV/1029-Z Typical Details of RCC Riling R0 Under
MORH/2013/STR/10-02 Review by IE
548 DNDA/ADV/1029-Z Bearing Layout, Design Forces and Movement R2 Under
MORH/2013/STR/09-05 on Bearing of Major Bridge at Ch 11+181 Review by IE
549 Analysis & Design of Composite Super Structure R2 Under
for Minor Bridge at Ch 05+073 Review by IE
550 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 1-8 Review by IE

                                                                                                                                                                                                                         
Page 37 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
551 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 2-8 Review by IE
552 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 3-8 Review by IE
553 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 4-8 Review by IE
554 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 5-8 Review by IE
555 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 6-8 Review by IE
556 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 7-8 Review by IE
557 DNDA/ADV/1029-Z Details of Super structure of Minor Bridge at Ch R2 Under
MORH/2013/STR/08/03-03 05+073 Sheet 8-8 Review by IE
Under
558 DNDA/ADV/1029-Z MORH/2017/51.1_1 Ventilation System - Tunnel R3 Review by IE
R3  Under
559 DNDA/ADV/1029-Z MORH/2017/51.1_2 Ventilation System - Tunnel Review by IE
R3  Under
560 DNDA/ADV/1029-Z MORH/2017/51.1_3 Ventilation System - Tunnel Review by IE
R3  Under
561 DNDA/ADV/1029-Z MORH/2017/51.1_4 Ventilation System - Tunnel Review by IE
R3  Under
562 DNDA/ADV/1029-Z MORH/2017/51.1_5 Ventilation System - Tunnel Review by IE
R3  Under
563 DNDA/ADV/1029-Z MORH/2017/51.1_6 Ventilation System - Tunnel Review by IE
R3  Under
564 DNDA/ADV/1029-Z MORH/2017/51.1_7 Ventilation System - Tunnel Review by IE
R3  Under
565 DNDA/ADV/1029-Z MORH/2017/51.1_8 Ventilation System - Tunnel Review by IE
R3  Under
566 DNDA/ADV/1029-Z MORH/2017/51.1_9 Ventilation System - Tunnel Review by IE
R3  Under
567 DNDA/ADV/1029-Z MORH/2017/51.2_1 Ventilation System - Ventilation Shaft Review by IE
R3  Under
568 DNDA/ADV/1029-Z MORH/2017/51.2_2 Ventilation System - Ventilation Shaft Review by IE
R3  Under
569 DNDA/ADV/1029-Z MORH/2017/51.2_3 Ventilation System - Ventilation Shaft Review by IE
R3  Under
570 DNDA/ADV/1029-Z MORH/2017/51.2_4 Ventilation System - Ventilation Shaft Review by IE
R3  Under
571 DNDA/ADV/1029-Z MORH/2017/51.2_5 Ventilation System - Ventilation Shaft Review by IE
R3  Under
572 DNDA/ADV/1029-Z MORH/2017/51.2_6 Ventilation System - Ventilation Shaft Review by IE
R3  Under
573 DNDA/ADV/1029-Z MORH/2017/51.3_1 Ventilation System - Technical Rooms Review by IE
R3  Under
574 DNDA/ADV/1029-Z MORH/2017/51.3_2 Ventilation System - Technical Rooms Review by IE
R3  Under
575 DNDA/ADV/1029-Z MORH/2017/51.3_3 Ventilation System - Technical Rooms Review by IE
R3  Under
576 DNDA/ADV/1029-Z MORH/2017/51.3_4 Ventilation System - Technical Rooms Review by IE
Ventilation System - Environmental Control. R3  Under
577 DNDA/ADV/1029-Z MORH/2017/51.4.1 Schematic Diagram Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
578 MORH/2017/51.4.2_1 Tunnel Review by IE

                                                                                                                                                                                                                         
Page 38 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
579 MORH/2017/51.4.2_2 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
580 MORH/2017/51.4.2_3 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
581 MORH/2017/51.4.2_4 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
582 MORH/2017/51.4.2_5 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
583 MORH/2017/51.4.2_6 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
584 MORH/2017/51.4.2_7 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
585 MORH/2017/51.4.2_8 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
586 MORH/2017/51.4.2_9 Tunnel Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
587 MORH/2017/51.4.3_1 Details Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
588 MORH/2017/51.4.3_2 Details Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
589 MORH/2017/51.4.3_3 Details Review by IE
DNDA/ADV/1029-Z Ventilation System - Environmental Control. R3  Under
590 MORH/2017/51.4.3_4 Details Review by IE
R3  Under
591 DNDA/ADV/1029-Z MORH/2017/51.5_1 Ventilation System - Pressurization Review by IE
R3  Under
592 DNDA/ADV/1029-Z MORH/2017/51.5_2 Ventilation System - Pressurization Review by IE
R3  Under
593 DNDA/ADV/1029-Z MORH/2017/52.1_1 Electrical System - Transformer Substation Review by IE
R3  Under
594 DNDA/ADV/1029-Z MORH/2017/52.1_2 Electrical System - Transformer Substation Review by IE
R3  Under
595 DNDA/ADV/1029-Z MORH/2017/52.1_3 Electrical System - Transformer Substation Review by IE
R3  Under
596 DNDA/ADV/1029-Z MORH/2017/52.1_4 Electrical System - Transformer Substation Review by IE
R3  Under
597 DNDA/ADV/1029-Z MORH/2017/52.1_5 Electrical System - Transformer Substation Review by IE
R3  Under
598 DNDA/ADV/1029-Z MORH/2017/52.1_6 Electrical System - Transformer Substation Review by IE
R3  Under
599 DNDA/ADV/1029-Z MORH/2017/52.1_7 Electrical System - Transformer Substation Review by IE
R3  Under
600 DNDA/ADV/1029-Z MORH/2017/52.1_8 Electrical System - Transformer Substation Review by IE
R3  Under
601 DNDA/ADV/1029-Z MORH/2017/52.1_9 Electrical System - Transformer Substation Review by IE
DNDA/ADV/1029-Z R3  Under
602 MORH/2017/52.1_10 Electrical System - Transformer Substation Review by IE
R3  Under
603 DNDA/ADV/1029-Z MORH/2017/52.2_1 Electrical System - MV Schematic Review by IE
R3  Under
604 DNDA/ADV/1029-Z MORH/2017/52.2_2 Electrical System - MV Schematic Review by IE
R3  Under
605 DNDA/ADV/1029-Z MORH/2017/52.3_1 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
606 DNDA/ADV/1029-Z MORH/2017/52.3_2 Electrical System - Power Distribution. Tunnel Review by IE

                                                                                                                                                                                                                         
Page 39 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
607 DNDA/ADV/1029-Z MORH/2017/52.3_3 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
608 DNDA/ADV/1029-Z MORH/2017/52.3_4 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
609 DNDA/ADV/1029-Z MORH/2017/52.3_5 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
610 DNDA/ADV/1029-Z MORH/2017/52.3_6 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
611 DNDA/ADV/1029-Z MORH/2017/52.3_7 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
612 DNDA/ADV/1029-Z MORH/2017/52.3_8 Electrical System - Power Distribution. Tunnel Review by IE
R3  Under
613 DNDA/ADV/1029-Z MORH/2017/52.3_9 Electrical System - Power Distribution. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
614 MORH/2017/52.3_10 Electrical System - Power Distribution. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
615 MORH/2017/52.3_11 Electrical System - Power Distribution. Tunnel Review by IE
Electrical System - Power Distribution. R3  Under
616 DNDA/ADV/1029-Z MORH/2017/52.4_1 TR&Gallery Review by IE
Electrical System - Power Distribution. R3  Under
617 DNDA/ADV/1029-Z MORH/2017/52.4_2 TR&Gallery Review by IE
Electrical System - Power Distribution. R3  Under
618 DNDA/ADV/1029-Z MORH/2017/52.4_3 TR&Gallery Review by IE
Electrical System - Power Distribution. R3  Under
619 DNDA/ADV/1029-Z MORH/2017/52.4_4 TR&Gallery Review by IE
Electrical System - Power Distribution. R3  Under
620 DNDA/ADV/1029-Z MORH/2017/52.4_5 TR&Gallery Review by IE
R3  Under
621 DNDA/ADV/1029-Z MORH/2017/52.5 Electrical System - Power Distribution. Details Review by IE
R3  Under
622 DNDA/ADV/1029-Z MORH/2017/52.6_1 Electrical System - Schematic Diagram Review by IE
R3  Under
623 DNDA/ADV/1029-Z MORH/2017/52.6_2 Electrical System - Schematic Diagram Review by IE
R3  Under
624 DNDA/ADV/1029-Z MORH/2017/52.6_3 Electrical System - Schematic Diagram Review by IE
R3  Under
625 DNDA/ADV/1029-Z MORH/2017/52.6_4 Electrical System - Schematic Diagram Review by IE
R3  Under
626 DNDA/ADV/1029-Z MORH/2017/52.6_5 Electrical System - Schematic Diagram Review by IE
R3  Under
627 DNDA/ADV/1029-Z MORH/2017/52.6_6 Electrical System - Schematic Diagram Review by IE
R3  Under
628 DNDA/ADV/1029-Z MORH/2017/52.6_7 Electrical System - Schematic Diagram Review by IE
R3  Under
629 DNDA/ADV/1029-Z MORH/2017/52.6_8 Electrical System - Schematic Diagram Review by IE
R3  Under
630 DNDA/ADV/1029-Z MORH/2017/52.6_9 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
631 MORH/2017/52.6_10 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
632 MORH/2017/52.6_11 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
633 MORH/2017/52.6_12 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
634 MORH/2017/52.6_13 Electrical System - Schematic Diagram Review by IE

                                                                                                                                                                                                                         
Page 40 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
DNDA/ADV/1029-Z R3  Under
635 MORH/2017/52.6_14 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
636 MORH/2017/52.6_15 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
637 MORH/2017/52.6_16 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
638 MORH/2017/52.6_17 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
639 MORH/2017/52.6_18 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
640 MORH/2017/52.6_19 Electrical System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
641 MORH/2017/52.6_20 Electrical System - Schematic Diagram Review by IE
R3  Under
622 DNDA/ADV/1029-Z MORH/2017/52.6_1 Electrical System - Schematic Diagram Review by IE
Electrical System - Earthing and bonding. R3  Under
642 DNDA/ADV/1029-Z MORH/2017/52.7_1 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
643 DNDA/ADV/1029-Z MORH/2017/52.7_2 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
644 DNDA/ADV/1029-Z MORH/2017/52.7_3 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
645 DNDA/ADV/1029-Z MORH/2017/52.7_4 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
646 DNDA/ADV/1029-Z MORH/2017/52.7_5 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
647 DNDA/ADV/1029-Z MORH/2017/52.7_6 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
648 DNDA/ADV/1029-Z MORH/2017/52.7_7 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
649 DNDA/ADV/1029-Z MORH/2017/52.7_8 Tunnel Review by IE
Electrical System - Earthing and bonding. R3  Under
650 DNDA/ADV/1029-Z MORH/2017/52.7_9 Tunnel Review by IE
DNDA/ADV/1029-Z Electrical System - Earthing and bonding. R3  Under
651 MORH/2017/52.7_10 Tunnel Review by IE
R3  Under
652 DNDA/ADV/1029-Z MORH/2017/52.8_1 Electrical System - Earthing and bonding. TR Review by IE
R3  Under
653 DNDA/ADV/1029-Z MORH/2017/52.8_2 Electrical System - Earthing and bonding. TR Review by IE
R3  Under
654 DNDA/ADV/1029-Z MORH/2017/52.8_3 Electrical System - Earthing and bonding. TR Review by IE
R3  Under
655 DNDA/ADV/1029-Z MORH/2017/52.8_4 Electrical System - Earthing and bonding. TR Review by IE
R3  Under
656 DNDA/ADV/1029-Z MORH/2017/52.9_1 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
657 DNDA/ADV/1029-Z MORH/2017/52.9_2 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
658 DNDA/ADV/1029-Z MORH/2017/52.9_3 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
659 DNDA/ADV/1029-Z MORH/2017/52.9_4 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
660 DNDA/ADV/1029-Z MORH/2017/52.9_5 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
661 DNDA/ADV/1029-Z MORH/2017/52.9_6 Electrical System - Duct Works. Tunnel Review by IE

                                                                                                                                                                                                                         
Page 41 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
662 DNDA/ADV/1029-Z MORH/2017/52.9_7 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
663 DNDA/ADV/1029-Z MORH/2017/52.9_8 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
664 DNDA/ADV/1029-Z MORH/2017/52.9_9 Electrical System - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
665 MORH/2017/52.9_10 Electrical System - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
666 MORH/2017/52.9_11 Electrical System - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
667 MORH/2017/52.9_12 Electrical System - Duct Works. Tunnel Review by IE
R3  Under
668 DNDA/ADV/1029-Z MORH/2017/53.1_1 Lighting System - Tunnel Review by IE
R3  Under
669 DNDA/ADV/1029-Z MORH/2017/53.1_2 Lighting System - Tunnel Review by IE
R3  Under
670 DNDA/ADV/1029-Z MORH/2017/53.1_3 Lighting System - Tunnel Review by IE
R3  Under
671 DNDA/ADV/1029-Z MORH/2017/53.1_4 Lighting System - Tunnel Review by IE
R3  Under
672 DNDA/ADV/1029-Z MORH/2017/53.1_5 Lighting System - Tunnel Review by IE
R3  Under
673 DNDA/ADV/1029-Z MORH/2017/53.1_6 Lighting System - Tunnel Review by IE
R3  Under
674 DNDA/ADV/1029-Z MORH/2017/53.1_7 Lighting System - Tunnel Review by IE
R3  Under
675 DNDA/ADV/1029-Z MORH/2017/53.1_8 Lighting System - Tunnel Review by IE
R3  Under
676 DNDA/ADV/1029-Z MORH/2017/53.1_9 Lighting System - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
677 MORH/2017/53.1_10 Lighting System - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
678 MORH/2017/53.1_11 Lighting System - Tunnel Review by IE
R3  Under
679 DNDA/ADV/1029-Z MORH/2017/53.2 Lighting System - Gallery Review by IE
R3  Under
680 DNDA/ADV/1029-Z MORH/2017/53.3_1 Lighting System - Schematic Diagram Review by IE
R3  Under
681 DNDA/ADV/1029-Z MORH/2017/53.3_2 Lighting System - Schematic Diagram Review by IE
R3  Under
682 DNDA/ADV/1029-Z MORH/2017/53.3_3 Lighting System - Schematic Diagram Review by IE
R3  Under
683 DNDA/ADV/1029-Z MORH/2017/53.3_4 Lighting System - Schematic Diagram Review by IE
R3  Under
684 DNDA/ADV/1029-Z MORH/2017/53.3_5 Lighting System - Schematic Diagram Review by IE
R3  Under
685 DNDA/ADV/1029-Z MORH/2017/53.3_6 Lighting System - Schematic Diagram Review by IE
R3  Under
686 DNDA/ADV/1029-Z MORH/2017/53.3_7 Lighting System - Schematic Diagram Review by IE
R3  Under
687 DNDA/ADV/1029-Z MORH/2017/53.3_8 Lighting System - Schematic Diagram Review by IE
R3  Under
688 DNDA/ADV/1029-Z MORH/2017/53.3_9 Lighting System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
689 MORH/2017/53.3_10 Lighting System - Schematic Diagram Review by IE

                                                                                                                                                                                                                         
Page 42 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
DNDA/ADV/1029-Z R3  Under
690 MORH/2017/53.3_11 Lighting System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
691 MORH/2017/53.3_12 Lighting System - Schematic Diagram Review by IE
DNDA/ADV/1029-Z R3  Under
692 MORH/2017/53.3_13 Lighting System - Schematic Diagram Review by IE
R3  Under
693 DNDA/ADV/1029-Z MORH/2017/53.4 Lighting System - Details Review by IE
FireFighting System - Schematic Diagram & R3  Under
694 DNDA/ADV/1029-Z MORH/2017/54.1_1 Pressure group Review by IE
FireFighting System - Schematic Diagram & R3  Under
695 DNDA/ADV/1029-Z MORH/2017/54.1_2 Pressure group Review by IE
FireFighting System - Schematic Diagram & R3  Under
696 DNDA/ADV/1029-Z MORH/2017/54.1_3 Pressure group Review by IE
R3  Under
697 DNDA/ADV/1029-Z MORH/2017/54.2_1 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
698 DNDA/ADV/1029-Z MORH/2017/54.2_2 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
699 DNDA/ADV/1029-Z MORH/2017/54.2_3 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
700 DNDA/ADV/1029-Z MORH/2017/54.2_4 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
701 DNDA/ADV/1029-Z MORH/2017/54.2_5 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
702 DNDA/ADV/1029-Z MORH/2017/54.2_6 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
703 DNDA/ADV/1029-Z MORH/2017/54.2_7 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
704 DNDA/ADV/1029-Z MORH/2017/54.2_8 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
705 DNDA/ADV/1029-Z MORH/2017/54.2_9 FireFighting System - Hydrants Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
706 MORH/2017/54.2_10 FireFighting System - Hydrants Tunnel Review by IE
R3  Under
707 DNDA/ADV/1029-Z MORH/2017/54.3_1 FireFighting System - Technical Rooms Review by IE
R3  Under
708 DNDA/ADV/1029-Z MORH/2017/54.3_2 FireFighting System - Technical Rooms Review by IE
R3  Under
709 DNDA/ADV/1029-Z MORH/2017/54.3_3 FireFighting System - Technical Rooms Review by IE
R3  Under
710 DNDA/ADV/1029-Z MORH/2017/54.3_4 FireFighting System - Technical Rooms Review by IE
R3  Under
711 DNDA/ADV/1029-Z MORH/2017/54.3_5 FireFighting System - Technical Rooms Review by IE
R3  Under
712 DNDA/ADV/1029-Z MORH/2017/55.1_1 Traffic Control - Schematic Diagram Review by IE
R3  Under
713 DNDA/ADV/1029-Z MORH/2017/55.1_2 Traffic Control - Schematic Diagram Review by IE
R3  Under
714 DNDA/ADV/1029-Z MORH/2017/55.1_3 Traffic Control - Schematic Diagram Review by IE
R3  Under
715 DNDA/ADV/1029-Z MORH/2017/55.2_1 Traffic Control - Tunnel Review by IE
R3  Under
716 DNDA/ADV/1029-Z MORH/2017/55.2_2 Traffic Control - Tunnel Review by IE
R3  Under
717 DNDA/ADV/1029-Z MORH/2017/55.2_3 Traffic Control - Tunnel Review by IE

                                                                                                                                                                                                                         
Page 43 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
718 DNDA/ADV/1029-Z MORH/2017/55.2_4 Traffic Control - Tunnel Review by IE
R3  Under
719 DNDA/ADV/1029-Z MORH/2017/55.2_5 Traffic Control - Tunnel Review by IE
R3  Under
720 DNDA/ADV/1029-Z MORH/2017/55.2_6 Traffic Control - Tunnel Review by IE
R3  Under
721 DNDA/ADV/1029-Z MORH/2017/55.2_7 Traffic Control - Tunnel Review by IE
R3  Under
722 DNDA/ADV/1029-Z MORH/2017/55.2_8 Traffic Control - Tunnel Review by IE
R3  Under
723 DNDA/ADV/1029-Z MORH/2017/55.2_9 Traffic Control - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
724 MORH/2017/55.2_10 Traffic Control - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
725 MORH/2017/55.2_11 Traffic Control - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
726 MORH/2017/55.2_12 Traffic Control - Tunnel Review by IE
R3  Under
727 DNDA/ADV/1029-Z MORH/2017/55.3_1 Traffic Control - Details Review by IE
R3  Under
728 DNDA/ADV/1029-Z MORH/2017/55.3_2 Traffic Control - Details Review by IE
R3  Under
729 DNDA/ADV/1029-Z MORH/2017/55.3_3 Traffic Control - Details Review by IE
R3  Under
730 DNDA/ADV/1029-Z MORH/2017/55.3_4 Traffic Control - Details Review by IE
R3  Under
731 DNDA/ADV/1029-Z MORH/2017/55.3_5 Traffic Control - Details Review by IE
R3  Under
732 DNDA/ADV/1029-Z MORH/2017/55.3_6 Traffic Control - Details Review by IE
R3  Under
733 DNDA/ADV/1029-Z MORH/2017/55.3_7 Traffic Control - Details Review by IE
R3  Under
734 DNDA/ADV/1029-Z MORH/2017/55.3_8 Traffic Control - Details Review by IE
R3  Under
735 DNDA/ADV/1029-Z MORH/2017/55.3_9 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
736 MORH/2017/55.3_10 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
737 MORH/2017/55.3_11 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
738 MORH/2017/55.3_12 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
739 MORH/2017/55.3_13 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
740 MORH/2017/55.3_14 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
741 MORH/2017/55.3_15 Traffic Control - Details Review by IE
DNDA/ADV/1029-Z R3  Under
742 MORH/2017/55.3_16 Traffic Control - Details Review by IE
R3  Under
743 DNDA/ADV/1029-Z MORH/2017/56.1 CCTV Monitoring - Schematic Diagram Review by IE
R3  Under
744 DNDA/ADV/1029-Z MORH/2017/56.2_1 CCTV Monitoring - Tunnel Review by IE
R3  Under
745 DNDA/ADV/1029-Z MORH/2017/56.2_2 CCTV Monitoring - Tunnel Review by IE

                                                                                                                                                                                                                         
Page 44 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
746 DNDA/ADV/1029-Z MORH/2017/56.2_3 CCTV Monitoring - Tunnel Review by IE
R3  Under
747 DNDA/ADV/1029-Z MORH/2017/56.2_4 CCTV Monitoring - Tunnel Review by IE
R3  Under
748 DNDA/ADV/1029-Z MORH/2017/56.2_5 CCTV Monitoring - Tunnel Review by IE
R3  Under
749 DNDA/ADV/1029-Z MORH/2017/56.2_6 CCTV Monitoring - Tunnel Review by IE
R3  Under
750 DNDA/ADV/1029-Z MORH/2017/56.2_7 CCTV Monitoring - Tunnel Review by IE
R3  Under
751 DNDA/ADV/1029-Z MORH/2017/56.2_8 CCTV Monitoring - Tunnel Review by IE
R3  Under
752 DNDA/ADV/1029-Z MORH/2017/56.2_9 CCTV Monitoring - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
753 MORH/2017/56.2_10 CCTV Monitoring - Tunnel Review by IE
R3  Under
754 DNDA/ADV/1029-Z MORH/2017/56.3_1 CCTV Monitoring - Details Review by IE
R3  Under
755 DNDA/ADV/1029-Z MORH/2017/56.3_2 CCTV Monitoring - Details Review by IE
R3  Under
756 DNDA/ADV/1029-Z MORH/2017/56.3_3 CCTV Monitoring - Details Review by IE
R3  Under
757 DNDA/ADV/1029-Z MORH/2017/56.3_4 CCTV Monitoring - Details Review by IE
R3  Under
758 DNDA/ADV/1029-Z MORH/2017/56.3_5 CCTV Monitoring - Details Review by IE
Emergency Call System (ECS) - Schematic R3  Under
759 DNDA/ADV/1029-Z MORH/2017/57.1 Diagram Review by IE
R3  Under
760 DNDA/ADV/1029-Z MORH/2017/57.2_1 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
761 DNDA/ADV/1029-Z MORH/2017/57.2_2 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
762 DNDA/ADV/1029-Z MORH/2017/57.2_3 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
763 DNDA/ADV/1029-Z MORH/2017/57.2_4 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
764 DNDA/ADV/1029-Z MORH/2017/57.2_5 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
765 DNDA/ADV/1029-Z MORH/2017/57.2_6 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
766 DNDA/ADV/1029-Z MORH/2017/57.2_7 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
767 DNDA/ADV/1029-Z MORH/2017/57.2_8 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
768 DNDA/ADV/1029-Z MORH/2017/57.2_9 Emergency Call System (ECS) - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
769 MORH/2017/57.2_10 Emergency Call System (ECS) - Tunnel Review by IE
R3  Under
770 DNDA/ADV/1029-Z MORH/2017/57.3_1 Emergency Call System (ECS) - Details Review by IE
R3  Under
771 DNDA/ADV/1029-Z MORH/2017/57.3_2 Emergency Call System (ECS) - Details Review by IE
R3  Under
772 DNDA/ADV/1029-Z MORH/2017/57.3_3 Emergency Call System (ECS) - Details Review by IE
R3  Under
773 DNDA/ADV/1029-Z MORH/2017/57.3_4 Emergency Call System (ECS) - Details Review by IE

                                                                                                                                                                                                                         
Page 45 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
774 DNDA/ADV/1029-Z MORH/2017/58.1 Communication Systems - Schematic Diagram Review by IE
R3  Under
775 DNDA/ADV/1029-Z MORH/2017/58.2_1 Communication Systems - Tunnel Review by IE
R3  Under
776 DNDA/ADV/1029-Z MORH/2017/58.2_2 Communication Systems - Tunnel Review by IE
R3  Under
777 DNDA/ADV/1029-Z MORH/2017/58.2_3 Communication Systems - Tunnel Review by IE
R3  Under
778 DNDA/ADV/1029-Z MORH/2017/58.2_4 Communication Systems - Tunnel Review by IE
R3  Under
779 DNDA/ADV/1029-Z MORH/2017/58.2_5 Communication Systems - Tunnel Review by IE
R3  Under
780 DNDA/ADV/1029-Z MORH/2017/58.2_6 Communication Systems - Tunnel Review by IE
R3  Under
781 DNDA/ADV/1029-Z MORH/2017/58.2_7 Communication Systems - Tunnel Review by IE
R3  Under
782 DNDA/ADV/1029-Z MORH/2017/58.2_8 Communication Systems - Tunnel Review by IE
R3  Under
783 DNDA/ADV/1029-Z MORH/2017/58.2_9 Communication Systems - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
784 MORH/2017/58.2_10 Communication Systems - Tunnel Review by IE
R3  Under
785 DNDA/ADV/1029-Z MORH/2017/58.3_1 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
786 DNDA/ADV/1029-Z MORH/2017/58.3_2 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
787 DNDA/ADV/1029-Z MORH/2017/58.3_3 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
788 DNDA/ADV/1029-Z MORH/2017/58.3_4 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
789 DNDA/ADV/1029-Z MORH/2017/58.3_5 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
790 DNDA/ADV/1029-Z MORH/2017/58.3_6 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
791 DNDA/ADV/1029-Z MORH/2017/58.3_7 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
792 DNDA/ADV/1029-Z MORH/2017/58.3_8 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
793 DNDA/ADV/1029-Z MORH/2017/58.3_9 Communication Systems - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
794 MORH/2017/58.3_10 Communication Systems - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
795 MORH/2017/58.3_11 Communication Systems - Duct Works. Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
796 MORH/2017/58.3_12 Communication Systems - Duct Works. Tunnel Review by IE
R3  Under
797 DNDA/ADV/1029-Z MORH/2017/58.4_1 Communication Systems - Details Review by IE
R3  Under
798 DNDA/ADV/1029-Z MORH/2017/58.4_2 Communication Systems - Details Review by IE
R3  Under
799 DNDA/ADV/1029-Z MORH/2017/58.4_3 Communication Systems - Details Review by IE
R3  Under
800 DNDA/ADV/1029-Z MORH/2017/58.4_4 Communication Systems - Details Review by IE
R3  Under
801 DNDA/ADV/1029-Z MORH/2017/58.4_5 Communication Systems - Details Review by IE

                                                                                                                                                                                                                         
Page 46 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
802 DNDA/ADV/1029-Z MORH/2017/58.4_6 Communication Systems - Details Review by IE
R3  Under
803 DNDA/ADV/1029-Z MORH/2017/58.5_1 Communication Systems - List of Signals Review by IE
R3  Under
804 DNDA/ADV/1029-Z MORH/2017/58.5_2 Communication Systems - List of Signals Review by IE
R3  Under
805 DNDA/ADV/1029-Z MORH/2017/59.1 Tunnel Radio System - Schematic Diagram Review by IE
R3  Under
806 DNDA/ADV/1029-Z MORH/2017/59.2_1 Tunnel Radio System - Tunnel Review by IE
R3  Under
807 DNDA/ADV/1029-Z MORH/2017/59.2_2 Tunnel Radio System - Tunnel Review by IE
R3  Under
808 DNDA/ADV/1029-Z MORH/2017/59.2_3 Tunnel Radio System - Tunnel Review by IE
R3  Under
809 DNDA/ADV/1029-Z MORH/2017/59.2_4 Tunnel Radio System - Tunnel Review by IE
R3  Under
810 DNDA/ADV/1029-Z MORH/2017/59.2_5 Tunnel Radio System - Tunnel Review by IE
R3  Under
811 DNDA/ADV/1029-Z MORH/2017/59.2_6 Tunnel Radio System - Tunnel Review by IE
R3  Under
812 DNDA/ADV/1029-Z MORH/2017/59.2_7 Tunnel Radio System - Tunnel Review by IE
R3  Under
813 DNDA/ADV/1029-Z MORH/2017/59.2_8 Tunnel Radio System - Tunnel Review by IE
R3  Under
814 DNDA/ADV/1029-Z MORH/2017/59.2_9 Tunnel Radio System - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
815 MORH/2017/59.2_10 Tunnel Radio System - Tunnel Review by IE
R3  Under
816 DNDA/ADV/1029-Z MORH/2017/59.3_1 Tunnel Radio System - Details Review by IE
R3  Under
817 DNDA/ADV/1029-Z MORH/2017/59.3_2 Tunnel Radio System - Details Review by IE
R3  Under
818 DNDA/ADV/1029-Z MORH/2017/60.1 Internal telephone System - Schematic Diagram Review by IE
R3  Under
819 DNDA/ADV/1029-Z MORH/2017/60.2_1 Internal telephone System - Tunnel Review by IE
R3  Under
820 DNDA/ADV/1029-Z MORH/2017/60.2_2 Internal telephone System - Tunnel Review by IE
R3  Under
821 DNDA/ADV/1029-Z MORH/2017/60.2_3 Internal telephone System - Tunnel Review by IE
R3  Under
822 DNDA/ADV/1029-Z MORH/2017/60.2_4 Internal telephone System - Tunnel Review by IE
R3  Under
823 DNDA/ADV/1029-Z MORH/2017/60.2_5 Internal telephone System - Tunnel Review by IE
R3  Under
824 DNDA/ADV/1029-Z MORH/2017/60.2_6 Internal telephone System - Tunnel Review by IE
R3  Under
825 DNDA/ADV/1029-Z MORH/2017/60.2_7 Internal telephone System - Tunnel Review by IE
R3  Under
826 DNDA/ADV/1029-Z MORH/2017/60.2_8 Internal telephone System - Tunnel Review by IE
R3  Under
827 DNDA/ADV/1029-Z MORH/2017/60.2_9 Internal telephone System - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
828 MORH/2017/60.2_10 Internal telephone System - Tunnel Review by IE
R3  Under
829 DNDA/ADV/1029-Z MORH/2017/61.1 Sound System - Schematic Diagram Review by IE

                                                                                                                                                                                                                         
Page 47 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
830 DNDA/ADV/1029-Z MORH/2017/61.2_1 Sound System - Tunnel Review by IE
R3  Under
831 DNDA/ADV/1029-Z MORH/2017/61.2_2 Sound System - Tunnel Review by IE
R3  Under
832 DNDA/ADV/1029-Z MORH/2017/61.2_3 Sound System - Tunnel Review by IE
R3  Under
833 DNDA/ADV/1029-Z MORH/2017/61.2_4 Sound System - Tunnel Review by IE
R3  Under
834 DNDA/ADV/1029-Z MORH/2017/61.2_5 Sound System - Tunnel Review by IE
R3  Under
835 DNDA/ADV/1029-Z MORH/2017/61.2_6 Sound System - Tunnel Review by IE
R3  Under
836 DNDA/ADV/1029-Z MORH/2017/61.2_7 Sound System - Tunnel Review by IE
R3  Under
837 DNDA/ADV/1029-Z MORH/2017/61.2_8 Sound System - Tunnel Review by IE
R3  Under
838 DNDA/ADV/1029-Z MORH/2017/61.2_9 Sound System - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
839 MORH/2017/61.2_10 Sound System - Tunnel Review by IE
R3  Under
840 DNDA/ADV/1029-Z MORH/2017/61.3_1 Sound System - Details Review by IE
R3  Under
841 DNDA/ADV/1029-Z MORH/2017/61.3_2 Sound System - Details Review by IE
R3  Under
842 DNDA/ADV/1029-Z MORH/2017/62.1 Fire Safety Equipment - Schematic Diagram Review by IE
R3  Under
843 DNDA/ADV/1029-Z MORH/2017/62.2_1 Fire Safety Equipment - Tunnel Review by IE
R3  Under
844 DNDA/ADV/1029-Z MORH/2017/62.2_2 Fire Safety Equipment - Tunnel Review by IE
R3  Under
845 DNDA/ADV/1029-Z MORH/2017/62.2_3 Fire Safety Equipment - Tunnel Review by IE
R3  Under
846 DNDA/ADV/1029-Z MORH/2017/62.2_4 Fire Safety Equipment - Tunnel Review by IE
R3  Under
847 DNDA/ADV/1029-Z MORH/2017/62.2_5 Fire Safety Equipment - Tunnel Review by IE
R3  Under
848 DNDA/ADV/1029-Z MORH/2017/62.2_6 Fire Safety Equipment - Tunnel Review by IE
R3  Under
849 DNDA/ADV/1029-Z MORH/2017/62.2_7 Fire Safety Equipment - Tunnel Review by IE
R3  Under
850 DNDA/ADV/1029-Z MORH/2017/62.2_8 Fire Safety Equipment - Tunnel Review by IE
R3  Under
851 DNDA/ADV/1029-Z MORH/2017/62.2_9 Fire Safety Equipment - Tunnel Review by IE
DNDA/ADV/1029-Z R3  Under
852 MORH/2017/62.2_10 Fire Safety Equipment - Tunnel Review by IE
R3  Under
853 DNDA/ADV/1029-Z MORH/2017/62.3_1 Fire Safety Equipment - Technical Rooms Review by IE
R3  Under
854 DNDA/ADV/1029-Z MORH/2017/62.3_2 Fire Safety Equipment - Technical Rooms Review by IE
R3  Under
855 DNDA/ADV/1029-Z MORH/2017/62.3_3 Fire Safety Equipment - Technical Rooms Review by IE
R3  Under
856 DNDA/ADV/1029-Z MORH/2017/62.3_4 Fire Safety Equipment - Technical Rooms Review by IE
R3  Under
857 DNDA/ADV/1029-Z MORH/2017/62.3_5 Fire Safety Equipment - Technical Rooms Review by IE

                                                                                                                                                                                                                         
Page 48 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
R3  Under
858 DNDA/ADV/1029-Z MORH/2017/62.4 Fire Safety Equipment - Details Review by IE
Integrated Tunnel Control System - SCADA. R3  Under
859 DNDA/ADV/1029-Z MORH/2017/63.1 Schematic Diagram Review by IE
Integrated Tunnel Control System - SCADA. R3  Under
860 DNDA/ADV/1029-Z MORH/2017/63.2 Details Review by IE
R3  Under
861 DNDA/ADV/1029-Z MORH/2017/64.1 Sections - Niche of ventilation Review by IE
R3  Under
862 DNDA/ADV/1029-Z MORH/2017/64.2 Sections - Niche with Hydrants & ECS Review by IE
R3  Under
863 DNDA/ADV/1029-Z MORH/2017/64.3 Sections - Lay-by & Egress Review by IE
R3  Under
864 DNDA/ADV/1029-Z MORH/2017/64.4 Sections - False Tunnel &Ventilation Review by IE
E&M Civil Works - West Portal. Plants, Sections R3  Under
865 DNDA/ADV/1029-Z MORH/2017/65.1_1 and Elevations Review by IE
E&M Civil Works - West Portal. Plants, Sections R3  Under
866 DNDA/ADV/1029-Z MORH/2017/65.1_1 and Elevations Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
867 DNDA/ADV/1029-Z MORH/2017/65.2_1 Steel Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
868 DNDA/ADV/1029-Z MORH/2017/65.2_2 Steel Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
869 DNDA/ADV/1029-Z MORH/2017/65.2_3 Steel Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
870 DNDA/ADV/1029-Z MORH/2017/65.2_4 Steel Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
871 DNDA/ADV/1029-Z MORH/2017/65.2_5 Steel Review by IE
E&M Civil Works - West Portal. Reinforcement R3  Under
872 DNDA/ADV/1029-Z MORH/2017/65.2_6 Steel Review by IE
E&M Civil Works - Est Portal. Plants, Sections R3  Under
873 DNDA/ADV/1029-Z MORH/2017/65.3_1 and Elevations Review by IE
E&M Civil Works - Est Portal. Plants, Sections R3  Under
874 DNDA/ADV/1029-Z MORH/2017/65.3_2 and Elevations Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
875 DNDA/ADV/1029-Z MORH/2017/65.4_1 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
876 DNDA/ADV/1029-Z MORH/2017/65.4_2 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
877 DNDA/ADV/1029-Z MORH/2017/65.4_3 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
878 DNDA/ADV/1029-Z MORH/2017/65.4_4 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
879 DNDA/ADV/1029-Z MORH/2017/65.4_5 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
880 DNDA/ADV/1029-Z MORH/2017/65.4_6 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
881 DNDA/ADV/1029-Z MORH/2017/65.4_7 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
882 DNDA/ADV/1029-Z MORH/2017/65.4_8 Steel Review by IE
E&M Civil Works - Est Portal. Reinforcement R3  Under
883 DNDA/ADV/1029-Z MORH/2017/65.4_9 Steel Review by IE
DNDA/ADV/1029-Z E&M Civil Works - Est Portal. Reinforcement R3  Under
884 MORH/2017/65.4_10 Steel Review by IE
E&M Civil Works - Cavern. Plants, Sections and R3  Under
885 DNDA/ADV/1029-Z MORH/2017/65.5_1 Elevations Review by IE

                                                                                                                                                                                                                         
Page 49 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
E&M Civil Works - Cavern. Plants, Sections and R3  Under
886 DNDA/ADV/1029-Z MORH/2017/65.5_2 Elevations Review by IE
R3  Under
887 DNDA/ADV/1029-Z MORH/2017/65.6 E&M Civil Works - Cavern. Reinforcement Steel Review by IE
E&M Civil Works - Comunication Gallery & R3  Under
888 DNDA/ADV/1029-Z MORH/2017/65.7_1 Technical Rooms Review by IE
E&M Civil Works - Comunication Gallery & R3  Under
889 DNDA/ADV/1029-Z MORH/2017/65.7_2 Technical Rooms Review by IE
E&M Civil Works - Comunication Gallery & R3  Under
890 DNDA/ADV/1029-Z MORH/2017/65.7_3 Technical Rooms Review by IE
R3  Under
891 DNDA/ADV/1029-Z MORH/2017/66.1 Control Center - West Portal. Impantation Review by IE
R3  Under
892 DNDA/ADV/1029-Z MORH/2017/66.2 Control Center - West Portal. Detail Review by IE
R3  Under
893 DNDA/ADV/1029-Z MORH/2017/66.3 Control Center - Est Portal. Impantation Review by IE
R3  Under
894 DNDA/ADV/1029-Z MORH/2017/66.4 Control Center - Est Portal. Detail Review by IE
Design Report - Tunnel Control_Safety_EM R3  Under
895 0 Report Review by IE
R3  Under
896 A1 Design Report - Ventilation System Review by IE
R3  Under
897 A2 Design Report - Electrical System Review by IE
R3  Under
898 A3 Design Report - Firefighting system Review by IE
R3  Under
899 A4 Design Report - IT Complementary Equipment Review by IE
R3  Under
900 A5 Design Report - Civil Works E & M Review by IE
Under
901 Final Lining Design Report V0.1 Review by IE
Under
902 DNDA/ADV/1029-Z MORH/2017/14_01 Final Lining Steel Reinforcement - Main Tunnel R0 Review by IE
Final Lining Steel Reinforcement - Escape Under
903 DNDA/ADV/1029-Z MORH/2017/14_02 Tunnel R0 Review by IE
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 01 of 09 0B Review by IE
904
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 02 of 09 0B Review by IE
905
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 03 of 09 0B Review by IE
906
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 04 of 09 0B Review by IE
907
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 05 of 09 0B Review by IE
908
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 06 of 09 0B Review by IE
909
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 07 of 09 0B Review by IE
910

                                                                                                                                                                                                                         
Page 50 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
List of Construction Drawings
S Current
Document No. Document Title Status
No. Revision
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 08 of 09 0B Review by IE
911
Under
DNDA/ADV/1029-Z MORH/2017/15_01 Z Morh Tunnel drainage Scheme sheet 09 of 09 0B Review by IE
912
Final Lining Defination Cross Section Main Under
DNDA/ADV/1029-Z MORH/2017/15_02 Tunnel Sheet 01 of 03 0B Review by IE
913
Final Lining Defination Cross Section Main Under
DNDA/ADV/1029-Z MORH/2017/15_02 Tunnel Sheet 02 of 03 0B Review by IE
914
Final Lining Defination Cross Section Main Under
DNDA/ADV/1029-Z MORH/2017/15_02 Tunnel Sheet 03 of 03 0B Review by IE
915
Under
DNDA/ADV/1029-Z MORH/2017/15_03 Z Morh Tunnel drainage details 0B Review by IE
916

                                                                                                                                                                                                                         
Page 51 of 83 

Monthly Progress Report   
                                            
Srinagar Sonamarg Tunnelway Limited 
SECTION 7
Planning and progress

1) Quality Control & Quality Assurance

 The in-house supervision team deployed by Concessionaire is regularly supervising the construction
activities and monitoring the quality aspects, progress, traffic and safety aspects of the project on a day-
to-day basis.

 Routine laboratory testing is being carried out to assure the quality of work. Routine quality checks are
being witnessed by representatives of IE also.

 The Quality Assurance Plan & Method Statement is submitted by the concessionaire to Authority & IE.

 Additional quality tests as & when requested by IE/SSTL, are also conducted to the satisfaction of
Authority/IE.

 Tests Description conducted during the month is annexed as Annexure V.

2) Construction Programme, Resource Deployment, Monthly planned Quantities

 The concessionaire has updated the Construction Methodology, Procurement, Engineering and Resource
Based Construction Time Schedule and submitted to IE for review.

3) Safety & Traffic Management

 Contractor has deputed dedicated qualified and trained Safety Engineers with his team to oversee the
safety and environmental aspect of the Project Highway. The Safety Engineer is advising the Section
Incharge for effective implementation of safety norms under direct supervision of SSTL.

 Summary of Accident reported is Annexed as Annexure-VIII

4) Maintenance of Existing Carriageway

 Existing carriageway is being maintained by the BRO and doesn’t fall in the scope of the concessionaire.
However, the concessionaire is taking necessary precautions in ensuring that construction activities do not
damage the existing Highway.

a) Weather Report

 The weather report for the reported month is attached as Annexure IX.

5) Achievement of Project Milestone (Schedule G).

 The project achieved its first Milestone on 2nd May 2016, which was duly intimated to IE/MoRT&H.
 2nd Milestone was due on 1st May 2017 has not been achieved due to Force majeure event during the period.
Concessionaire has submitted its request for time extension to the IE/Authority. Authority approved 2nd and
3rd milestone extension by 243 days.

                                                                                                                                                                                                                         
Page 52 of 83 

Monthly Progress Report   
                                                                                                                                                                                                                                                        Srinagar Sonamarg Tunnelway Limited 

Typical Sectional Plan

Monthly Progress Report  Page 53 of 83 

 
                                                      
Srinagar Sonamarg Tunnelway Limited 
Status of Permissions and Approvals (Schedule-E)
Annexure-I
Sr. No. Clearance Status

1 Environmental Not Applicable

2 Forest Clearance Received

3 Utility Shifting Completed

4 Land Acquisition Completed

5
APPROVALS AS IN SCHEDULE –E
Permission of the State Government for extraction of
A Received
boulders from quarry

Permission of Village Panchayat and Pollution Control


B Received
Board for installation of crushers

C Licence for use of explosives; Received

Permission of the State Government for drawing water


D Received
from river/reservoir

Licence from Inspector of factories or other competent


E Received
authority for setting up Batching Plant

Clearance of Pollution Control Board for setting up


F Received
Batching Plant;

Clearance of Village Panchayats and Pollution Control


G Not Applied
Board for Asphalt Plant;

Permission of Village panchayat and State Government


H Not Applied
for Borrow earth.

I Permission of State Government for Cutting trees Received

Any other permits or clearances required under


J _
Applicable Laws.

Monthly Progress Report  Page 54 of 83 

 
                                                      
Srinagar Sonamarg Tunnelway Limited 
Status of Land Acquisition
Annexure-II

SUMMARY OF LAND ACQUISITION (FOREST & REVENUE)


Area in Hectare
Sr. Length in Total Area required for Land in Possession /
Particular Remarks
No. Mtr the Project Taken over
Revenue Forest Revenue Forest
1 Approach Road :
A Eastern Portal 550 1.084 1.084
B Western Portal 5200 2.320 13.227 2.297 13.227
2 Main Tunnel 6500 . 27.300 27.300
3 Portal Area :
A Eastern Portal 2.870 2.870
B Western Portal 3.00 3.00
4 Ventilation Tunnel 600 1.20 1.20
Approach Road to Ventilation
5 1100 2.40 2.40
Tunnel
6 Muck Disposal Area :
A A1 1.150 1.150
B A2 2.730 2.730
C A3 1.590 1.590
Physical
D A4 1.650 1.650 Possession
pending.

E A5 6.00 6.00

F A6 7.280 3.24 7.447 3.24


G A7 2.800 2.800
7 Site Installation/Camp Area 5.000 5.000
Total 28.474 56.367 28.618 56.367
Grant Total 84.841 84.985
Percentage 100% 100%

Monthly Progress Report  Page 55 of 83 

 
                                                      
Srinagar Sonamarg Tunnelway Limited 

Annexure-III
Status of Plant and Equipment
Sl. No. Description of Equipment Model Total Receipt Sl. No. Description of Equipment Model Total Receipt

1 Crushing Plant 200 TPH 1 42 Tata Dumper-Prima 2528 16m3 11

2 Sand Washing Plant 75 TPH 1 43 Grout Pump with Mixer RGM900 4


3
3 Batching Plant 60 M 2 44 Tata Chassis 2518 -T/ Mixer 12
3
6m
4 Concrete Pump (D) 40m3/h 4 45 Transit Mixer Drum 12
3
5 Transit Mixer with batcher 4.5 m 1 46 Trailer-Semi Low bed 40T 2

6 Hydraulic Excavator -350/336 35T 3 47 Diesel Bowser 9KL/6KL 2

7 Hydraulic Excavator -290/329 30T 4 48 Water Tanker 9KL/10KL 6

8 Hydraulic Excavator -210/320 20T 4 49 Bus -32 seater 32 seater 2

9 Hydraulic Breaker 2.4T 2 50 SUV Car-Scorpio/Bolero 7 seater 6

10 Hydraulic Breaker 2.3T 2 51 Camper -Double Cab 5 seater 15

11 Hydraulic Breaker 1.7T 2 52 Pickup Van- Sgl/Cab 2 seater 2

12 Hydraulic Breaker -Dozco430 0.3T 1 53 TATA 709 709 2

13 Wheel Loader CAT 966H 3.2m3 4 54 D.G. Sets (KVA) 1010 1

14 Wheel Loader –Front 3.2m3 2 55 D.G. Sets (KVA) 600 2

15 Wheel Loader (Side Tilt) 2.5m3 2 56 D.G. Sets (KVA) 500 4

16 Crawler Dozer D6R 2 57 D.G. Sets (KVA) 320 4

17 Vibro Roller 10 T 4 58 D.G. Sets (KVA) 125 4

18 Motor Grader 12' 1 59 D.G. Sets (KVA) 82.5 2

19 Tandem/Roller- Mini 2.5T 2 60 D.G. Sets (KVA) 30 4

20 Back Hoe Loader 0.3/1.1 2 61 D.G. Sets (KVA) 15 3

21 Drilling Jumbo 3 boom 2 62 Light Tower 10 8

22 Drilling Jumbo 2 boom 4 63 Welding set –Ele 400A 14

23 Shotcrete Robot Wet 30m3/h 4 64 Diesel Welding Set 400A 1

24 Surface drill Hyd. DC120 1 65 Lathe Machine 1

25 Track Drill machine ROC203 3 66 Electric Winch Machine 05 T 2

26 Grout Pump- Mai 400 NT 8 67 Radial Drill Machine 1

27 Shotcret Dry / Wet unit 4.5m3/h 1 68 Telehandler ( Manitou) 2T 3

28 Pick & Carry Crane 14T/23T 3 69 Bar Cutting Machine 42 mm 3

29 RT Crane 40 Ton 1 70 Bar Bending Machine 42 mm 3

30 Scissors Lift 2T 3 71 Power Pack 300 T 1

31 Air Compressor-Diesel 600 cfm 4 72 Man Dumper 16 cum 12

32 Air Compressor-Diesel 400 cfm 2 73 Man Dumper 12.5 cum 8

33 High pressure jet cleaning  190Bar 1 74 Ventillation Fan  30‐132Kw  10

34 Plate Compactor  2 75 Hot Boiler plant  6

Monthly Progress Report  Page 56 of 83 

 
                                                      
Srinagar Sonamarg Tunnelway Limited 
Sl. No. Description of Equipment Model Total Receipt Sl. No. Description of Equipment Model Total Receipt

35 Power Saw machine  16" 1 76 Water Treatment plant  55cum/hr 1

36 Ambulance Force 2 77 Hose Crimping Machine  4" 1

37 Mobile Service Van Ajashy 1 78 Sewage Treatment Plant  150KLD  1 

38 Tractor with Tralley 605DI‐4WD Delux  1 79 Crawler Dozer D6G 1

39 Snow Blower‐RPM Tech  LM220  1 80 Skid steer loader‐BobCat  S‐770  1

40 Hot & Cold High pressure jet cleaner  HDS 2000  3 81 Vaccum Cleaner  NT 75/2  2

41 Tata Prima BS‐4  2530K BS‐4  10 82 Snow Thrower  ST 330P  7

TOTAL EQUIPMENT = 291

Monthly Progress Report  Page 57 of 83 

 
                                                      
Srinagar Sonamarg Tunnelway Limited 

Manpower Deployed
A Officers and Staff

Sr.No Grade Total

1 Executives &Officers 101

2 Staff 27

B. Skilled Workers

Sno Category Total

1 Highly Skilled 30

2 Skilled 394

3 Semi-skilled 49

4 Unskilled 309

Total 782

1 CSO/Supervisor 3

2 Armed Guard 6

3 Gaurds 60

4 Doctor 1

5 Nurse 6

Total Manpower Strength: 986

Monthly Progress Report  Page 58 of 83 

 
                                                                                                                                                                                                                                                        Srinagar Sonamarg Tunnelway Limited 
ANNEXURE IV

Monthly Progress Report  Page 59 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Tunnel Work Status:


Ventilation Tunnel (VP - VT):

Work Progress
Description
Up to Last Month This Month Up to Date

Pipe Roofing Completed - Completed

Canopy & Ventilation Installed - Installed

Tunnel Excavation (Heading)Cavern 596m 0m 596m


Portion

Tunnel Excavation (Benching) 596m 0m 596m

Escape Tunnel (WP-ET Face-1):

Work Progress
Description
Up to Last Month This Month Up to Date

Pipe Roofing Completed - Completed

Canopy & Ventilation Installed - Installed

Tunnel Excavation (Heading) 1167m 120m 1287m

Tunnel Excavation (Benching) 1167m 120m 1287m

Main Tunnel (WP-MT Face-1):

Work Progress
Description
Up to Last Month This Month Up to Date

Pipe Roofing Completed - Completed

Canopy & Ventilation Installed - Installed

Tunnel Excavation (Heading) 506.5m 54.5m 561m

Tunnel Excavation (Benching) 251.5m 8.5m 260m

Main Tunnel (WP Face-1A-MCP-2):

Work Progress
Description
Up to Last Month This Month Up to Date

Motrable X-Passage (MCP-2) Started - Completed

Tunnel Excavation (Heading) 367m 0m 367m

Tunnel Excavation (Benching) 39m 116m 155m

Monthly Progress Report  Page 60 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
EscapeTunnel (EP-ET Face-4):

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling Completed - Completed

Canopy Installed - Installed

Tunnel Excavation (Heading) 59m 57m 116m

Tunnel Excavation (Benching) 59m 57m 116m

Main Tunnel (EP-MT Face-4):

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling 1-Stage In Progress 1-Stage completed 1-Stage completed

Canopy Installed Installed Installed

Tunnel Excavation (Heading) 6m 11.5m 17.5m

Tunnel Excavation (Benching) 0m 0m 0m

Main Tunnel (VP-MT Face-2) including Layby:

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling Completed - Completed

Tunnel Excavation (Heading) 175.5m 99m 274.5m

Tunnel Excavation (Benching) 75.5m 0m 75.5m

Main Tunnel (VP-MT Face-3):

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling Completed - Completed

Tunnel Excavation (Heading) 249.5m 105m 354.5m

Tunnel Excavation (Benching) 154.5m 36.5m 154.5m

Escape Tunnel (VP-ET Face-3):

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling - Completed Completed

Tunnel Excavation (Heading) 133.5m 91m 224.5m

Tunnel Excavation (Benching) 133.5m 86m 224.5m

Monthly Progress Report  Page 61 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
Escape Tunnel (VP-ET Face-2):

Work Progress
Description
Up to Last Month This Month Up to Date

Forepoling Completed Completed Completed

Tunnel Excavation (Heading) 85.5m 90m 175.5m

Tunnel Excavation (Benching) 85.5m 90m 175.5m

UPTO DATE TUNNEL EXCAVATION PROGRESS

WORK PROGRESS
DESCRIPTION
MAIN TUNNEL ESCAPE TUNNEL VENTILATION TUNNEL PASSAGE TOTAL

HEADING 1574.5 1803 596 42 4015.5

BENCHING 645 1803 596 42 3086

Monthly Progress Report  Page 62 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

S-Curve:
Planned Vs Achieved

Physical Progress Achieved - 35.92%

Financial Progress Achieved - 31.43%

Description Planned Achieved

This Month This Month

Physical Progress (In Cr.) 46.41 26.65

(In %age) 2.18% 1.25%

Monthly Progress Report  Page 63 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

ANNEXURE V
Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

1  Cement   
             
Each Lot   
1.01  90Micron Passing Fineness  As reqd.  2  2  0  46  48 
one time 

Each Lot   
1.02  Soundness  As reqd.  2  2  0  46  48 
one time 

Each Lot   
1.03  Standard Consistency  As reqd.  2  2  0  46  48 
one time 

Each Lot   
1.04  Initial & Final Setting Time  As reqd.  2  2  0  46  48 
one time 

1.05    3       
2  2  0  46  48 
Days 
Compressive  Each Lot  As reqd.   
Strength  7  one time 
3  3  0  45  48    Sets 
Days 

28 
3  3  0  43  46 
Days 

01 Test / 06  Third 
1.06  Chemical Test  As reqd.  0  0  0  1  1 
month  Party Test 

2  Coarse Aggregate   
             
Weekly/ As   
2.01  Gradation 10 mm  As Reqd.  3  3  1  75  78 
reqd. 

Weekly/ As   
2.02  Gradation 20 mm  As Reqd.  3  3  0  73  76 
reqd. 

1 time/   
2.03  Flakiness Index  As Reqd.  4  4  0  66  70 
week 

      From 
2.04  Specific Gravity  Seasonal  As Reqd.  0  0  different 
0  8  8  Source 

      From 
2.05  Water Absorption  Seasonal  As Reqd.  0  0  different 
0  8  8  Source 

1 time /   
2.06  Impact Value  As Reqd.  4  4  0  65  69 
week 

1 time /   
2.07  Crushing Value  As Reqd.  4  4  0  63  67 
week 

Monthly Progress Report  Page 64 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

1 time / 1   
2.08  Abrasion Value  As Reqd.  4  4  0  63  67 
months 

One time /  Third 
2.09  Chemical Testing  0  0  0  1  1 
Source    Party test 

3  Fine Aggregate   
             
Both 
  Crusher 
         
Weekly/ As  3  91  94  Dust and 
3.01  Gradation  As Reqd.  3  0  Natural 
Reqd. 
Sand 

From 
3.02  Specific Gravity  Seasonal  As Reqd  0  0  0  6  6  Different 
Source 

From 
3.03  Water Absorption  Seasonal  As reqd.  0  0  0  6  6  Different 
Source 

1 time /   
3.04  Finer than 75 micron  As Reqd.  3  3  1  35  38 
week 

One time /  Third 
3.05  Chemical testing  0  0  0  1  1 
Source    Party Test 

4  Admixture     
           
01 test /  Third 
4.01  Uniformity Test  As reqd.  0  0  0  4  4 
9000 lit.  Party Test 

5  Batching Plant     
           
      Calibratio
            n 
Once Per  2  32 
5.01  Calibration of Plant  As reqd.  2  0  30  Done 
Month     

6  Reinforcement   
             
As per IS  Third 
6.01  Physical/Chemical Test  As reqd.  0  0  0  1  1 
1786  Party Test 

(32, 25, 20, 16, 12, 10, 8  Third 
0  0  0  1  1 
  mm dia bar)      Party Test 

7  Water   
             

Monthly Progress Report  Page 65 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

Third 
1 test / each 
Party Test 
7.01  Conformity Test  source / 3  As reqd.  0  0  0  1  1 
(Each 
month 
Source) 

8  Shotcrete Mix Design Trials   
             
Combined Gradation for   
8.01  1 / week  As reqd.  0  0  0  14  14 
Shotcrete 

3   
0  0  0  47  47 
Days 

7  As per           Sets 
Cube Compressive  0  0  0 
8.02  Days  specificatio As reqd. 
Strength Test  48  48 
n/ contract 

28     
0  0  0 
Days  50  50 

01   
0  0  0  49  49 
  Days 
 
  03 
WSC‐Core      0  0  0  48  48   
Compressive  Days 
 
Strength (Core  As per        Sets 
  07  specificatio
Method)  0  0  0  48  48 
Days  n/ contract  As reqd. 
8.03  ( Field suitability 
Test )  28  57 
0  0  0  57 
Days   

01       
16  16  94 
Days  0  110   
       
03   
        16  16  0  94  110 
Days 
Sets 
  WSC Panel Core  As per   
07     
Compressive  specificatio 14  91  105 
8.04  Days  As reqd.  14  0 
Strength  n/ contract 
28 
13  13  0  83  96 
Days 

WSC Core       
As per           
Compressive 
8.05  28  specificatio 78      Sets 
Strength ( In‐Situ  As reqd.  7  7  0  85 
Days  n/ contract 
Cores)   

Monthly Progress Report  Page 66 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

  As per        
WSC Flexural             
8.06  28  specificatio      Set 
Strength  As reqd.  0  0  0  4  4 
Days  n/ contract 

9  Rock Bolt   
             
Initial 5     
bolts / 100         
Physical Tests (Pull Out Test 
9.01  bolts then  As reqd.  2 
of SDR/IBO bolts)  2  0  110  112 
5bolts / 200 
bolts   

Initial 5     
  bolts / 100 
           
Physical Tests (Pull Out Test  bolts then  53 
9.02  5bolts / 200  As reqd.  3  2  2  56 
of SN Bolt)   
bolts 

Initial 5       
  bolts / 100 
       
Physical Tests (Pull Out Test  bolts then  As reqd.  35  340 
9.03  5bolts / 200  35  0  305 
of Swellex Bolt)     
bolts 

Initial 5   
  bolts / 100 
             
Physical Tests (Pull Out Test  bolts then 
9.04  5bolts / 200  As reqd.  0  0  0  4  4 
of GEWI Bolt) 
bolts 

10  Grout Mix Design Trials   
             
   
         
 
    12   
  0  0  0  12 
3 Days   
       
 
7 Days    0  0  0  12 
         Sets 
Cubes 
 
10.0 Compressive    12 
Strength  28   
1  Every Day 
As reqd.  0  0  0   
Days  Grouting  12 
12 

             
10.0    
 
2  Compressive   
Day  As reqd. 
3 Days  13  13  0  200  213 
Strength ( for 

Monthly Progress Report  Page 67 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

contact grout) at  7 Days  Grouting  14  14  0  199  213     Sets 


site 
28 
15  15  0  188  203 
Days 

11  Concrete Mix Design Trials   
             
3 Days  0  0  0  1  1    Sets 
 
11.0 Compressive  7 Days    0  0  0  3  3 
As per 
1  Strength – M10  specificatio As reqd. 
28  0  0  0  3  3 
n/ contract 
Days 

   
  0  0  0  11  11 
 
  3 Days 
   
As per 
Compressive  7 Days  12  12  0  16  28    Sets 
11.0 specificatio As reqd. 
Strength – M15 
2  28  n/ contract   
9  9  0  13  22 
Days 

   
  0  0  0  4  4 
 
  3 Days   
   
As per 
Compressive  7 Days  12  12  0  7  19     Sets 
11.0 specificatio As reqd. 
Strength – M20 
3  28  n/ contract 
9  9  0  4  13 
Days 

  11      
  0  0  0  11 
 
  3 Days     
   
As per 
Compressive  7 Days  12  12  0  15  27      Sets 
11.0 specificatio As reqd. 
Strength – M25 
4  28  n/ contract 
9  9  0  12  21 
Days 

           
3 Days 
  0  0  0  7  7   
   
 
7 Days  As per  12  12  0  13  25     Sets 
11.0 Compressive 
specificatio As reqd. 
5  Strength – M30       
28  n/ contract 
7  19 
Days  12  12  0 

Monthly Progress Report  Page 68 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

     
       
0  5   
  3 Days  0  0  5 
 
       
   
As per 
11.0          Sets 
Compressive  7 Days  specificatio As reqd.  9  9  0 

Strength – M35  n/ contract  29  38 

28     
6  6  0 
Days  26  32 

   
         

 
    3 Days  0  0  2  2 
   
As per 
11.0 Compressive    
7 Days  specificatio As reqd.  9  9  0  18  27   
7  Strength – M40 
n/ contract 
28     Sets 
9  9  0  12  21 
Days 

7 Days  9  9  0  6  15 
As per   
11.0 Compressive 
28  specificatio Sets 
8  Strength – M 45  As reqd. 
n/ contract  9  9  0  0  9 
Days 

7 Days  9  9  0  6  15 
As per   
11.0 Compressive 
specificatio Sets 
9  Strength – M 50  28 
n/ contract  As reqd.  9  9  0  0  9 
Days 

7 Days  9  9  0  6  15 
As per   
11.1 Compressive 
specificatio Sets 
0  Strength – M 55  28  As reqd.  9  9  0  0  9 
n/ contract 
Days 

12  Concrete Cube (At Site)                 

7 Days  As per  0  0  0  17  17   


12.0 Compressive   
28  specificatio    Sets 
1  Strength – M10  As reqd.  0  0  0  56  56 
Days  n/ contract 

7 Days  7  7  0  125  132     


As per   
12.0 Compressive 
specificatio    Sets 
2  Strength – M15  28  As reqd. 
n/ contract  9  9  0  161  170 
Days 

7 Days    3  3  0  78  81   


12.0 Compressive  As per 

Monthly Progress Report  Page 69 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

3  Strength – M 25  28  specificatio As reqd.     Sets 


2  2  0  88  90 
Days  n/ contract 

7 Days  As per  0  0  0  16  16   


12.0 Compressive   
28  specificatio    Sets 
4  Strength – M 30  As reqd.  0  0  0  18  18 
Days  n/ contract 

7 Days  9  9  0  125  134   


As per   
12.0 Compressive 
specificatio    Sets 
5  Strength – M 35  28 
n/ contract  As reqd.  3  3  0  197  200 
Days 

13  R R Masonry wall   
             
Compressive  7 Days  0  0  0  19  19   
As per   
13.0 Strength of 
specificatio    Sets 
1  Mortar (Cement  28  As reqd. 
n/ contract  0  0  0  21  21 
& sand Ratio 1:3)  Days 

14  Earthwork   
             
14.0 2 tests/3000   
Proctor Test  As reqd.  1  1  0  25  26 
1  m3 

14.0 2 tests/3000   
Atterberg’s Limit  As reqd.  0  0  0  6  6 
2  m3 

14.0 2 tests/3000   
Gradation  As reqd.  1  1  0  12  13 
3  m3 

As per   
14.0
Free Swelling Index  specificatio As reqd.  0  0  0  0  0 

14.0 1 tests/3000   
CBR  As reqd.  0  0  0  4  4 
5  m3 

  OGL  0  0  2  74  74   


As per 
14.0
Field Density  EMB.(  specificatio As reqd. 

Back  n  42  42  25  1264  1306   
( FDD)  Fill) 

PVC Waterproofing/   
15 
Geotextile               
15.0 PVC Water Proofing  1 sample /   
As reqd.  0  0  0  0  0 
1  membrane  20000m2 

Monthly Progress Report  Page 70 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Quality Control Test Statement for the Month of April. 01/04/2018 to 30/04/2018   
No. of   
Frequency   No. of 
Test  Cum. No. of 
of test as  No. of  tests   
No. of  carried  tests 
S.  per  Test  test Failed  carried 
Material  Tests  out  performed  Remarks 
No.  specificatio Passed  up to this  out up to 
required  During  up to this 
n / ITP /  months  previous 
this  months 
Manual  months 
months 

15.0 1 sample /   
Geotextile (Protective Felt)  As reqd.  0  0  0  0  0 
2  20000m2 

Granular Materials (RE   
16               
Wall) 

16.0 2 tests/3000   
Gradation  As reqd.  1  1  0  28  29 
1  m3 

16.0 2 tests/3000   
Atterberg’s Limit  As reqd.  1  1  0  7  8 
2  m3 

16.0 One test per   
Proctor Test  As reqd.  1  1  0  5  6 
3  source 

Field Density  As per   
16.4  specificatio As reqd.  46  46  0  101  147 
( FDD)  n 

16.0 1 tests/3000   
Filter Media ( Gradation)  As reqd.  0  0  0  36  36 
5  m3 

17  Granular Sub‐Base                 

  A‐5 
               
(Crusher 
One test per 
17 a  All Test (3rd Party)  As reqd.  0  0  0  1  1  Plant) 
source 

17.0 1 tests/200   
Gradation  As reqd.  0  0  0  4  4 
1  m3 
 
17.0 1 tests/200 
Atterberg’s Limit  As reqd.  0  0  0  1  1  In house  ( 
2  m3 
Apco 
17.0 One test per  Lab.) 
Proctor Test  As reqd.  0  0  0  1  1 
3  source 

17.0 One test per 
CBR Test  As reqd.  0  0  0  1  1 
4  source 

Field Density  As per   
17.0
specificatio As reqd.           
5  ( FDD)  n 

Monthly Progress Report  Page 71 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

ANNEXURE VI
Status of Review of Source Approvals

Date of
Sl.No. Material Description Source Status
Submission Remarks

Ch:-0+065 LHS
Provisional
1 Soil Ch:-0+400 LHS 02-11-2015 Approval Third Party
received
Ch:-1+005 LHS Test

Sindh River

Grand Nallah

2 Water Adit Portal 01-10-2015 Approved Third Party

East Portal Test

West Portal

CZARA Hotel Third Party

3 Granular Materials Sonamarg Village 17-10-2015 Approved Test

Baltal Quarry

Surfrow Crusher Provisional Third Party


4 Natural Boulder 01-10-2015 Approval
( Kulan) received Test

Surfrow Crusher Provisional Third Party


5 Crusher Sand 01-10-2015 Approval
( Kulan) received Test

Surfrow Crusher Provisional Third Party


Coarse Aggregate - 10 mm / 01-10-2015/05-04-
6 Approval
20mm ( Kulan) 2016 Test
received 

01-10-2015/05-04- Third Party


7 Cement OPC 53 G ACC /Ambuja
2016 Approved  Test

Provisional Third Party


Sikka Approval
8 Admixture 17-10-2015 received  Test

Mapie Approved

Provisional Third Party


Sikka Approval
received  Test
9 Accelerator 17-10-2015
Mapie AF 70

Alklai Free BASF SA160 Approved

Third Party
10 Silica Funes 01-10-2015
Approved  Test

Monthly Progress Report  Page 72 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Date of
Sl.No. Material Description Source Status
Submission Remarks

Third Party
11 Steel Fibre BEKAERT 01-10-2015
Approved  Test

Provisional Third Party


12 Poly Fibre BEKAERT SA 01-10-2015 Approval
received  Test

05-11-2015/05-04- Third Party


13 SDR Bolts MIPL/Sup Anchor Approved
2016 Test

Provisional
14 Project Quality Plan 15-07-2015 Approval
received 

Provisional
15 Shotcrete Mix Design TM # 01 02-09-2015 Approval
received 

Provisional
16 Project Quality Plan Rev. #01 17-10-2015 Approval
received 

Provisional
17 Shotcrete Mix Design M-30 (A10) 24-11-2015 Approval
received

Provisional
M-15 (A20), M-25(A20) & M-
18 Concrete Mix Design 24-11-2015 Approval
30 (A20)
received 

19 Concrete Mix Design M-15 (A20) to M-40 (A20) 13-01-2017 Approved 

Shotcrete Mix Design (Energy Approved 


20 (A) M-30 (A10) 10-11-2017
absorption)

Shotcrete Mix Design 2nd trial


20 (B) M-30 (A10) 19-01-2018
(Energy absorption) Under Review 

MTC & Technical Details of Materials for Source Approval

20 Cement OPC 53 G ACC HP India 01-10-2015 Approved 

21 Cement OPC 53 G Ambuja 01-10-2015 Approved 

Provisional
22 Cement OPC 53 G Ultratech 01-10-2015 Approval
received 

23 Cement OPC 53 G Jaypee 01-10-2015 Under Review

Admixture Master Poly Head Approved 


24 BASF Chemicals 01-10-2015
8951

Monthly Progress Report  Page 73 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Date of
Sl.No. Material Description Source Status
Submission Remarks

Provisional
25 Admixture Sikka Plast 5202 Sikka India 01-10-2015 Approval
received 

26 Admixture DYNAMON SX IN MAPEI Construction 01-10-2015 Approved 

27 Accelerator SA 160 BASF Chemicals 01-10-2015 Approved 

Provisional
28 Accelerator Sigunit L 54 AF Sikka India 01-10-2015 Approval
received 

29 Accelerator MAPEQUICK AF 70 MAPEI Construction 01-10-2015 Approved

30 Polypropylene Fibre- Synmix-55 M/s BEKAERT Pune India 01-10-2015 Under Review

Polypropylene Fibre- DUOMIX


31 M/s BEKAERT Pune India 01-10-2015 Under Review
M6

32 Steel Fibre-3D 65/35 BG M/s BEKAERT Pune India 01-10-2015 Approved

Welded Wire Mesh- FE 500 Gr. M/s Pratap Industries


33 01-10-2015 Approved
150 x 150x 6 mm Products

M/s CORNICHE India Pvt.


34 Silica Fume Corniche SF 01-10-2015 Approved
Ltd.

Water Proof Membrane &


35 MAPEI Construction 01-10-2015 Under Review
Protective Felt

MIPL Machino International


36 Self-Drilling Anchor 01-10-2015 Approved
Pvt. Ltd.

MIPL Machino International


37 Swell Friction Bolt 01-10-2015 Under Review
Pvt. Ltd.

Drucar- Geo Constech Pvt.


38 Swell Friction Bolt 01-10-2015 Under Review
Ltd.

MINOVA-ATLAS Copco
39 Self-Drilling Anchor 01-10-2015 Under Review
MAI Gmbh

MINOVA-ATLAS Copco
40 Swell Friction Bolt (Swellex) 01-10-2015 Under Review
MAI Gmbh

Glass Fibre Reinforced Polymer


41 Geo Constech Pvt. Ltd 01-10-2015 Under Review
rebar ( Fibre Glass Rock Bolts)

Cable Anchor – Strand Anchor DYWIDAG Strand Anchors


42 01-10-2015 Under Review
3.0 m length ( BS8081 or EN 1537) (DYWIDAG system)

Third Party
43 SN Bolt Dia. 32mm TATA TISCON 05-04-2016 Approved
test

Third Party
44 Anti-Freeze Admixture BASF 05-04-2016
test

Welded Wire Mesh Third Party


45 Jindal 05-04-2016 Approved test
(150x150x6)mm

Monthly Progress Report  Page 74 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Date of
Sl.No. Material Description Source Status
Submission Remarks

Reinforcement Steel ( Dia. 08


46 JSW 08-12-2016 Approved
mm to 32 mm)

47 ISHB 152*152mm*30 Kg Jindal 08-12-2016 Approved

Seamless pipe N-80 139.7 & 88.9


48 jindal 08-12-2016 Approved
mm

49 Tecco wire mesh G65/3 Geobrugg 08-12-2016

M/s Sri Venkateshware


50 Geo green Blanket fibre 08-12-2016
Udyog Pvt Ltd.

Third Party
51 32 mm GEWI Anchors DSI 08-07-2016 Approved test

Third Party
52 Swellex Anchor DSI FEB 240 08-07-2016 Approved test

Third Party
53 12 & 08 mm wire mesh RECO 08-07-2016 test

Third Party
54 Petrography Test of Boulder Sitkari /Adit /VT 08-07-2016 Approved test

Third Party
55 Natural sand Sindh / sangam 08-07-2016 Approved test

Safe Bearing capacity of MJB (A1 Third Party


56 East Portal 27-10-2016 test
& A2 )

Reinforcement Steel ( Dia. 08 Third Party


57 JSW 22-12-2016 Approved test
mm to 32 mm)

Third Party
58 Polypropylene Fiber (BARCHIP 54) 10-08-2017
test

Third Party
59 Cement OPC 53 G TCI MAX 10-08-2017
test

Third Party
60 GSB A-5 Crusher material 10-08-2017
test

Methodology

Monthly Progress Report  Page 75 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Date of
Sl.No. Material Description Source Status
Submission Remarks

Work Method for Rock


61 Excavation Filling & Support 17-10-2015 Under Review
Work

Procedure of Cold Weather


62 24-11-2015 Under Review
Concrete/Shotcrete

Provisional
63 Grouting Methodology 24-11-2015 Approval
received

64 Tecco Mesh Methodology 05-04-2016

65 RE wall Methodology 22-04-2016

Muck Disposal at Dumping yard


66 25-05-2016
Methodology

Fore poling Work Methodology


67 30-06-2016
of WP & VP

Work Methodology of Micro


68 30-11-2016
piling at East Portal

Work Methodology for Bridge


69 24-11-2016
foundation of concrete

Monthly Progress Report  Page 76 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
ANNEXURE VII
MONITORING REPORT

It is very important to monitor the vital parameters and the behaviour of Rock/Soil movements at Portal faces/Main and
Egress Tunnel/Ventilation Tunnel etc. as this forms the basic of NATM.

Following scheme has been planned to implement “Monitoring”:

The Monitoring will commence from the following directions.

 From western portal.


 From Eastern portal.
 Ventilation Tunnel/Central Adit from where we will move in opposite directions.

1. All Portal face should be monitored for the following parameters.

 Deformation (3-Dimensional deformation) of the surface, by installing Bi-reflex Targets, these optical targets will be
monitored through a high precision Total Station.
 Lateral displacement/horizontal shift of sub soil/rock movements-by Installing Digital Inclinometer System.
 Multi-point Borehole extensometer- for determining the sub surface deformation at different levels.

2. Egress/Escape Tunnel:
 Deformation (3-Dimensional deformation) of the surface, by installing Bi-reflex Targets, these optical targets will be
monitored through a precision Total Station.

 Tape extensometer to be installed at predefined critical zones to counter check the Convergence monitored by 3D
monitoring, by installing at-least 3 no of Convergence bolts of 250 mm length, one at the “Crown”, and two other at
“side walls”, opposite each other.

3. Main Tunnel:

 Deformation ( 3-Dimensional deformation) of the surface, by installing Bi-reflex Targets, at every 20 meters, totally 5
no in each section ( 3 no to be fixed at the “heading” and two in the “benching”, these optical targets will be
monitored through a precision Total Station. A profile will be generated by the Surveyor for further
evaluation/Planning and studies. This will also assist in the redefining the Tunnel support system.
 Tape extensometer to be installed at predefined critical zones to counter check the Convergence monitored by 3D
monitoring, by installing at-least 3 no of Convergence bolts of 250 mm length, one at the “Crown”, and two other at
“side walls”, opposite each other.
 We will be installing the MPBX (3-Point) with anchors ranging from 5, 10 & 15 m depth to monitor the rock mass
deformation at 3 different depths.

MPBX will be installed at the “Crown”, and at side walls, opposite to each other, for monitoring the rock mass
deformation at three different depths.

 These will be installed at every 500 m interval in normal conditions or it may change according to the geological
conditions of the tunnel. (Critical and identified zones).

Shot Crete Pressure Cells will be installing Vibrating Wire type “Shot Crete pressure cells” at 5 locations, to
monitor the “tangential” and “radial” stresses in the shotcrete/tunnel lining.

 One at the “Crown”, and two on each side walls, at 2 meter depth from the bottom level, on opposite directions, and
two numbers on opposite sides, from the “Spring/SPL” level of the Tunnel section.
 These will be installed at every 500 m interval in normal conditions or it may change according to the geological
conditions of the tunnel. (Critical and identified zones).

Monthly Progress Report  Page 77 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
Instrumentation for Severe Swelling Hazard Zones (for Rock mass quality class: S-V& S-VI):

 Deformation ( 3-Dimensional deformation) of the surface, by installing Bi-reflex Targets, at every 20 meters, totally 5
no in each section ( 3 no to be fixed at the “top heading” and two in the “benching”, these optical targets will be
monitored through a precision Total Station. A profile will be generated by the Surveyor for further
evaluation/Planning and studies. This will also assist in the redefining the Tunnel support system.
 Tape extensometer to be installed at predefined critical zones to counter check the Convergence monitored by 3D
monitoring, by installing at-least 3 no of Convergence bolts of 250 mm length, one at the “Crown”, and two other at
“side walls”, opposite each other.
 We will be installing the MPBX (3-Point) with anchors ranging from 5, 10 & 15 m depth to monitor the rock mass
deformation at 3 different depths.

MPBX will be installed at the “Crown”, and at side walls, opposite to each other, for monitoring the rock mass deformation at
three different depths.

Shot Crete Pressure Cells will be installing Vibrating Wire type “Shot Crete pressure cells” at 9 locations, to monitor the
“tangential” and “radial” stresses in the shotcrete/tunnel lining.
 One at the “Crown”, and two on each side walls, at 2 meter depth of 1.25 m, from the bottom level, on opposite
directions, and two numbers on opposite sides, approx., 1.25 m above from the “Spring/SPL” level of the Tunnel
section, and 4 no on the “Top Heading”.
 Data received from Shot Crete cells, will assist the designers to increase/decrease the Shot Crete thickness.

STRAIN GAUGE/STRAIN METERS:

Vibrating Wire type Strain gauges will be installed at 4- locations in each section on the “lattice girder/steel rib/Wire mesh),
two on opposite sides approximately at 1.25 m height, and rest 2 no 1.25 m above SPL on opposite sides. Two no of Strain
Gauges will be installed at right angles to monitor the “longitudinal” and the “tangential” strain.

Description of instruments:

a) Bi-reflex Targets are used to monitor the 3-dimensional deformation of the tunnel lining/Portal face. Measurements
are made by an opto‐electronical theodolite with integrated coaxial electronic distance meter (EDM).
b) Borehole extensometers are used to measure displacements of the surrounding rock at various depth (as per
designer). The extensometer readings inform about the absolute amount of displacements around a Tunnel and the
depth pattern of the deformation in the rock.
c) Shot Crete Pressure Cells are used to monitor the “radial/tangential” stresses in the Shotcrete lining at different
locations. The reading collected help the designer/engineer to take necessary action to control (increase/decrease)
the thickness of the Shot Crete, which is a part of Support for the primary lining.
d) Strain Gauges: Are installed to monitor the “longitudinal” and “tangential” strains in the wire mesh/lattice girder
support system. This data indirectly gives you “load acting “ on the Support, and assist the tunnel designer/engineer
to increase/decrease the spacing of the support, by closely monitoring the loading pattern.
e) Tape extensometer to be installed at predefined critical zones to counter check the Convergence monitored by 3D
monitoring.
Submission:

 Data sheets of the instruments mentioned above are regularly maintained provided to IE.
 Instrumentation section monitoring drawings, of Instrumentation for without special hazard & For Severe Swelling
Hazard Zone.
 Installation Methodology.
 Instrument calibration certificate.
Frequency of Monitoring:
The frequency of monitoring of the measurement reading can be envisaged for each measuring section as follows.

 1s t week: Daily.
 2nd Week: Twice a week.
 3rd& 4th Week: Once per week.
 Later: Monthly and bi-monthly.

Monthly Progress Report  Page 78 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

Note:- Actual frequency of readings will however be influenced by the construction stages top heading/bench heading in one
tunnel and by staggered parallel driven tunnels.

When the bench is approaching the Instrumentation Section’s installed during top heading, reading frequencies shall be
enhanced/increased accordingly. When the parallel tunnel tube approaches the already installed instrumentation section, in
the first tunnel tube, the frequency of the reading shall be increased respectively.

At sections where increasing rates of deformation occur, readings shall be taken frequently (at-least one/day), until the rate of
deformation decreases with time.

Measurements shall continue until the construction of work of “inner lining” stops.

Monthly Progress Report  Page 79 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

INSTRUMENTATION SUMMARY
 

PORTAL  INSTRUMENTATION  REMARKS 


Optical  No  deformation  observed  in  portal 
Targets  monitoring. 
Portal 
Inclinomet
Stable. 
er 

Convergence  crossed  attention  limit  From 


TM‐250  to  290  (Counter  measures applied 
Optical 
showing stable trend.), Rest All the data of 
Targets 
convergence monitoring is under attention 
WEST  limit. 
PORTAL   stable 
Main  MPBX 
Tunnel 
 stable 
PRESSURE 
CELLS 
 Not installed 
STRAIN 
GAUGES 
Escape  Optical  All  the  data  of  convergence  monitoring  is 
Tunnel  Targets  under attention limit.  
PORTAL  INSTRUMENTATION  REMARKS 
No deformation observed in portal 
Optical 
Portal  monitoring. 
Targets 
 
  All  the  data  of  convergence  monitoring  is 
Ventil Optical  under attention limit. 
ation  Targets   
Tunnel 
VENTILA All  the  data  of  convergence  monitoring  is 
TION  Optical 
under attention limit. 
PORTAL  Targets 
 
  Main     Not installed 
MPBX 
Tunnel 
Face‐2  PRESSURE   Not installed 
CELLS 
STRAIN   Not installed 
GAUGES 
Monthly Progress Report  Page 80 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 

PORTAL  INSTRUMENTATION  REMARKS 


All  the  data  of  convergence  monitoring  is 
Optical 
under attention limit. 
Targets 
 
  Main     Stable. 
MPBX 
Tunnel 
Face‐3  PRESSURE  Stable. 
CELLS 
STRAIN   Not installed 
GAUGES 
Escape   All  the  data  of  convergence  monitoring  is 
Optical 
Tunnel  under attention limit. 
Targets 
Face‐2 
 
Escape   All  the  data  of  convergence  monitoring  is 
Optical 
Tunnel  under attention limit. 
Targets 
Face‐3 
 
Optical  All  the  data  of  convergence  monitoring  is 
Targets  under attention limit 
 
Portal 
Total  deformation  observed  89  mm  up  to 
Inclinomet 6m depth. 
er   
 
Not installed 
Optical 
 
Targets 
 
EAST 
  Not installed 
PORTAL 
MPBX   
  Main   
PRESSURE 
Tunnel  Not installed 
CELLS 
 
 
 
STRAIN  Not installed 
GAUGES 
 
Escape  Optical  All  the  data  of  convergence  monitoring  is 
Tunnel  Targets  under attention limit 
 
 
 

Monthly Progress Report  Page 81 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
ANNEXURE VIII

SUMMARY OF ACCIDENT REPORTED AT SITE

No  Year/Month  Total Accidents  Fatal  Major  Minor 

1  FY 2016‐2017  0  0  0  0 

2  Q‐1 FY 2017‐18  1  0  0  1 

3  Q‐2 FY 2017‐18  3  0  0  3 

4  Q‐3 FY 2017‐18  1  0  1  0 

5  Q‐1 FY 2018‐19  1  0  0  1 

a)  APR ’18  0  0  0  0 

  Total  6  0  1  5 

Monthly Progress Report  Page 82 of 83 

 
                                              
Srinagar Sonamarg Tunnelway Limited 
ANNEXURE IX

WEATHER REPORT

Monthly Progress Report  Page 83 of 83 