ALTERNATIVA NRO 01

Item Descripción Total FC


01 PUENTE 1,283,218.13 0.79
01.01 TRABAJOS PRELIMINARES 157,732.31 0.79
01.02 ESTRIBOS 320,616.81 0.79
01.03 SUPERESTRUCTURA 719,834.09 0.79
01.03.01 VIGAS DE ACERO ESTRUCTURAL 633,503.97 0.79
01.03.02 LOSA DE CONCRETO Y VEREDAS 86,330.12 0.79
01.04 LOSA DE APROXIMACION Y DURMIENTES 29,167.62 0.79
01.05 MURO PARAPETO PARA BARANDAS 26,178.06 0.79
01.06 VARIOS 29,689.24 0.79
02 ACCESOS 532,734.89 0.79
02.01 MOVIMIENTO DE TIERRAS 329,982.01 0.79
02.02 AFIRMADOS 19,212.94 0.79
02.03 OBRAS DE PROTECCIÓN 152,958.96 0.79
02.04 OBRAS DE ARTE Y DRENAJE 24,168.83 0.79
02.05 SEÑALIZACION Y SEGURIDAD VIAL 6,412.15 0.79
03 PLAN DE MANEJO AMBIENTAL 26,318.12 0.79
03.01 OBRAS DE MITIGACION DE IMPACTO AMBIENTAL 26,318.12 0.79
Costo Directo 1,842,271.14 0.79
Gastos Generales (15%) 276,340.67 0.79
Utilidad (10%) 184,227.11 0.79
Sub Total 2,302,838.92 0.79
IGV (18%) 414,511.01 0.79
Presupuesto Total de Obra 2,717,349.93 0.79
Costo de Expediente Tecnico (6%) 163,041.00 0.79
Costos de Supervision de Estudio (2%) 54,347.00 0.79
Costo de Supervision de Obra (5%) 135,867.50 0.79
PRESUPUESTO TOTAL DEL PROYECTO Alt . 1. 3,070,605.43 0.79

ALTERNATIVA NRO 02
Item Descripción
01 PUENTE
01.01 TRABAJOS PRELIMINARES
01.02 ESTRIBOS
01.03 SUPERESTRUCTURA
01.03.01 VIGAS DE ACERO ESTRUCTURAL
01.03.02 LOSA DE CONCRETO Y VEREDAS
01.04 LOSA DE APROXIMACION Y DURMIENTES
01.05 MURO PARAPETO PARA BARANDAS
01.06 VARIOS
02 ACCESOS
02.01 MOVIMIENTO DE TIERRAS
02.02 AFIRMADOS
02.03 OBRAS DE PROTECCION
02.04 SEÑALIZACION Y SEGURIDAD VIAL
03 PLAN DE MANEJO AMBIENTAL
03.01 OBRAS DE MITIGACION DE IMPACTO AMBIENTAL
Costo Directo
Gastos Generales (15%)
Utilidad (10%)
Sub Total
IGV (18%)
Presupuesto Total de Obra
Costo de Expediente Tecnico (6%)
Costos de Supervision de Estudios (2%)
Costos de Supervision de Obra (5%)
PRESUPUESTO TOTAL DEL PROYECTO Alt . 2.
PRECIO SOCIAL
1,013,742.32
124,608.52
253,287.28
568,668.93
500,468.14
68,200.79
23,042.42
20,680.67
23,454.50
420,860.56
260,685.79
15,178.22
120,837.58
19,093.38
5,065.60
20,791.31
20,791.31
1,455,394.20
218,309.13
145,539.42
1,819,242.75
327,463.70
2,146,706.44
128,802.39
42,934.13
107,335.33
2,425,778.29

Total FC PRECIO SOCIAL


1,363,010.21 0.79 1,076,778.07
157,732.31 0.79 124,608.52
323,749.46 0.79 255,762.07
788,203.20 0.79 622,680.53
702,010.66 0.79 554,588.42
86,192.54 0.79 68,092.11
29,090.34 0.79 22,981.37
26,102.76 0.79 20,621.18
38,132.14 0.79 30,124.39
620,158.78 0.79 489,925.44
328,675.45 0.79 259,653.61
19,972.89 0.79 15,778.58
264,688.27 0.79 209,103.73
6,822.17 0.79 5,389.51
23,513.15 0.79 18,575.39
23,513.15 0.79 18,575.39
2,006,682.14 0.79 1,585,278.89
301,002.32 0.79 237,791.83
200,668.21 0.79 158,527.89
2,508,352.67 0.79 1,981,598.61
451,503.48 0.79 356,687.75
2,959,856.15 0.79 2,338,286.36
177,591.37 0.79 140,297.18
59,197.12 0.79 46,765.72
162,792.09 0.79 128,605.75
3,344,637.45 0.79 2,642,263.59
COSTO DE MANTENIMIENTO RUTINARIO SITUACION SIN PROYECTO
PRECIOS PRIVADOS

MANTENIMIENTO RUTINARIO SIN PROYECTO A PRECIOS PRIVADOS

OBRA: PUENTE CARROZABLE CHUICUNI L= 0m

ITEM DESCRIPCION UND CANT P. UNIT P. PARCIAL TOTAL


1.00.01 Limpieza general m2 20.50 3.50 71.75
1.00.02 Limpieza de cauce del río en ambas márgenes m2 55.60 3.50 194.60
1.00.03 Rehabilitación de accesos m2 500.00 2.50 1,250.00
1.00.04 Rehanbilitación de baden natural existente m2 16.49 5.50 90.70

TOTAL PRESUPUESTO S/. 1,607.05


MANT. SOLES/ML/AÑO S/. 1607.05

COSTO DE MANTENIMIENTO RUTINARIO ALTERNATIVA N° 01


PRECIOS PRIVADOS
MANTENIMIENTO RUTINARIO ALTERNATIVA N| 01 A PRECIOS PRIVADOS
OBRA: PUENTE CARROZABLE CHUICUNI L= 50 m
ITEM DESCRIPCION UND CANT P. UNIT P. PARCIAL TOTAL
1.01 LIMPIEZA DE PUENTE und 1 200.00 200.00

1.02
LIMPIEZA DE SUPERFICIE DE CONCRETO CON AGUA A PRESIÓN m2 300.00 2.50 750.00
1.03 BACHEO DE ACCESOS m2 1,152.00 0.30 345.60
1.04 DESENCALAMINADO DE ACCESOS m2 160.00 0.25 40.00
1.05 LIMPIEZAE CUNETAS Y ALCANTARILLAS m 160.00 2.00 320.00
1.06 MITIGACIÓN DE IMPACTOS AMBIENTALES glb 1 500.00 500.00

Costo Directo 2,156


Gastos Generales (15%) 323
Utilidad (10%) 216
Sub Total 2,695
IGV (18%) 485
Presupuesto Total de Mantenimiento Rutinario (una vez por año)
3,180

COSTO DE MANTENIMIENTO PERIODICO (CADA 5 AÑOS) SITUACIÓN CON PROYECTO


PRECIOS PRIVADOS
MANTENIMIENTO PERIODICO (CADA 5 AÑOS) ALTERNATIVA 1 A PRECIOS PRIVADOS
OBRA: PUENTE CARROZABLE CHUICUNI L= 50 m
ITEM DESCRIPCION UND CANT P. UNIT P. PARCIAL TOTAL
PUENTE Y ACCESOS
1.01 LIMPIEZA Y SELLADO DE GRIETAS EN EL CONCRETO kg 2.00 250.00 500.00
1.02 RIEGO ASFALTICO PARA SELLADO DE GRIETAS EN LOSA m2 304.50 4.88 1,485.96
1.03 MANTENIMIENTO Y REPINTADO DE BARANDAS m 101.70 38.00 3,864.60
1.04 REPARACIÓN SUPERFICIAL DE CONCRETO m2 9.00 45.00 405.00
1.05 AFIRMADO DE ACCESOS AL PUENTE m2 1,152.00 18.05 20,793.60
1.06 MANTENIMIENTO Y LIMPIEZA DE CUNETAS Y ALCANTARILLAS m 160.00 1.20 192.00
1.07 MITIGACIÓN DE IMPACTOS AMBIENTALES glb 1.00 1,500.00 1,500.00
Costo Directo 28,741
Gastos Generales (15%) 4,311
Utilidad (10%) 2,874
Sub Total 35,926
IGV (18%) 6,467
Presupuesto Total de Mantenimiento Periodico (cada 5 años) 42,393
COSTO DE MANTENIMIENTO RUTINARIO ALTERNATIVA N° 02
PRECIOS PRIVADOS
MANTENIMIENTO RUTINARIO ALTERNATIVA NRO 02 A PRECIOS PRIVADOS
OBRA: PUENTE CARROZABLE CHUICUNI L= 50 m
ITEM DESCRIPCION UND CANT P. UNIT P. PARCIAL TOTAL
PUENTE Y ACCESOS
1.01 LIMPIEZA DE PUENTES und 1 350.00 350.00
1.02 LIMPIEZA DE CAUCES und 1.5 750.00 1,125.00
1.03 LIMPIEZA DE SUPERFICIE DE CONCRETO CON AGUA A PRESIÓN m2 263.40 3.50 921.90
LIMPIEZA DE SUPERFICIE DE PUENTES METÁLICOS CON AGUA A
1.04
PRESIÓN
m2 689.41 1.50 1,034.12
1.05 BACHEO DE ACCESOS m2 160.00 2.00 320.00
1.06 DESENCALAMINADO DE ACCESOS m2 1,152.00 0.25 288.00
1.07 MITIGACIÓN DE IMPACTOS AMBIENTALES glb 1 750.00 750.00

Costo Directo 4,789


Gastos Generales (15%) 718
Utilidad (10%) 479
Sub Total 5,986
IGV (18%) 1,078
Presupuesto Total de Mantenimiento Rutinario (una vez por año) 7,064

COSTO DE MANTENIMIENTO PERIODICO (CADA 4 AÑOS) SITUACIÓN CON PROYECTO


PRECIOS PRIVADOS
MANTENIMIENTO PERIODICO (CADA 5 AÑOS) ALTERNATIVA 2 A PRECIOS PRIVADOS
OBRA: PUENTE CARROZABLE CHUICUNI L= 50 m
ITEM DESCRIPCION UND CANT P. UNIT P. PARCIAL TOTAL
PUENTE Y ACCESOS
1.01 LIMPIEZA Y SELLADO DE GRIETAS EN EL CONCRETO kg 2.00 250.00 500.00
1.02 REPARACIÓN SUPERFICIAL DE CONCRETO m2 26.00 45.00 1,170.00
PREPARACIÓN SUPERFICIAL DE MENOR GRADO Y PINTADO DE LA
1.03 E.M.
m2 68.94 55.00 3,791.76
1.04 REPARACIÓN DE ACCESOS AL PUENTE m2 2,550.00 1.50 3,825.00

1.05 PROTECCIÓN DE RIVERAS MEDIANTE ENROCADOS (REPOSICIÓN) m3 212.00 27.96 5,926.46


1.06 MITIGACIÓN DE IMPACTOS AMBIENTALES glb 1.00 1,500.00 1,500.00
Costo Directo 16,713
Gastos Generales (15%) 2,507
Utilidad (10%) 1,671
Sub Total 20,892
IGV (18%) 3,760
Presupuesto Total de Mantenimiento Periodico (cada 5 años) 24,652
RESUMEN DE LOS COSTOS DEL PROYECTO

RESUMEN DEL COSTO TOTAL DE INVERSION DEL PROYECTO SEGÚN ALTERNATIVAS


PRESUPUESTO TOTAL DE INVERSION SEGÚN ALTERNATIVA

Alternativa Descripción CD GG GS Exp. Tec. Sup. Est Utilidad IGV Inv. Total
Puente Mixto Sección
Alternativa N° 01 Compuesta 1,842,271.14 276,340.67 54,347.00 163,041.00 54,347.00 184,227.11 414,511.01 3,070,605.43
Puente Mixto Sección
Alternativa N° 02 Compuesta 2,006,682.14 301,002.32 162,792.09 177,591.37 59,197.12 200,668.21 451,503.48 3,344,637.45

#REF!

COSTOS DE MANTENIMIENTO EN LA SITUACION SIN PROYECTO

Item Descripción CD GG GS Utlidad Sub Total Total

1.00 Puente Pasarela 1,607.05 1,607.05

Costo manten 1,607.05

COSTOS DE MANTENIMIENTO EN LA SITUACION CON PROYECTO ALTERNATIVA ÚNICA

Años Mantenimientos CD GG GS Utlidad Sub Total Total

Alternativa N° 01

Mantenimiento Periodico
Cada 5 años 28,741.16 4,311.17 9,340.88 42,393.21

Mantenimiento Rutinario
Anual 2,155.60 323.34 700.57 3,179.51

Alternativa N° 02

Mantenimiento Periodico
Cada 5 años 16,713.22 2,506.98 5,431.79 24,651.99

Mantenimiento Rutinario
Anual 4,789.02 718.35 1,556.43 7,063.80
5.Precios Sociales

Factores de Conversión
Obras Factor
Inversión 0.79
Mantenimiento y O 0.75
Fuente: Guía Metodológica Simplicada

Tipo de Cambio 2.99


Fuente: Banco Central de Reserva del Perú http://www.bcrp.gob.pe/

a)Costos de inversión y mantenimiento a precios sociales

COSTOS DE INVERSION Y MANTENIMIENTO SEGÚN ALTERNATIVA


En Miles de Soles a Precios Mercado

Alternativa 1 Alternativa 2
Año Sin Proyecto
Costos de
Mantenimiento Inversión Mantenimiento* Inversión Mantenimiento*
0 3,070,605 0 3,344,637 0
1 1,607.05 3,179.51 7,063.80
2 1,607.05 3,179.51 7,063.80
3 1,607.05 3,179.51 7,063.80
4 1,607.05 3,179.51 3,179.51
5 1,607.05 42,393.21 24,651.99
6 1,607.05 3,179.51 3,179.51
7 1,607.05 3,179.51 3,179.51
8 1,607.05 3,179.51 3,179.51
9 1,607.05 3,179.51 3,179.51
10 1,607.05 42,393.21 24,651.99
11 1,607.05 3,179.51 3,179.51
12 1,607.05 3,179.51 3,179.51
13 1,607.05 3,179.51 3,179.51
14 1,607.05 3,179.51 3,179.51
15 1,607.05 42,393.21 24,651.99
16 1,607.05 3,179.51 3,179.51
17 1,607.05 3,179.51 3,179.51
18 1,607.05 3,179.51 3,179.51
19 1,607.05 3,179.51 3,179.51
20 1,607.05 42,393.21 24,651.99
* Incluye costo de operación, el cual considera un 10% del costo de mantenimiento rutinario.

COSTOS DE INVERSION Y MANTENIMIENTO SEGÚN ALTERNATIVA


En Miles de Soles a Precios Sociales

Sin Proyecto
Costos de
Año Mantenimiento Alternativa 1 Alternativa 2
Inversión Mantenimiento Inversión Mantenimiento
0 2,425,778.29 0 2,642,263.59 0
1 1,205.28 2,384.63 5,297.85
2 1,205.28 2,384.63 5,297.85
3 1,205.28 2,384.63 5,297.85
4 1,205.28 2,384.63 2,384.63
5 1,205.28 31,794.91 18,488.99
6 1,205.28 2,384.63 2,384.63
7 1,205.28 2,384.63 2,384.63
8 1,205.28 2,384.63 2,384.63
9 1,205.28 2,384.63 2,384.63
10 1,205.28 31,794.91 18,488.99
11 1,205.28 2,384.63 2,384.63
12 1,205.28 2,384.63 2,384.63
13 1,205.28 2,384.63 2,384.63
14 1,205.28 2,384.63 2,384.63
15 1,205.28 31,794.91 18,488.99
16 1,205.28 2,384.63 2,384.63
17 1,205.28 2,384.63 2,384.63
18 1,205.28 2,384.63 2,384.63
19 1,205.28 2,384.63 2,384.63
20 1,205.28 31,794.91 18,488.99
COSTOS INCREMENTALES COSTOS INCREMENTALES
En Miles de Soles a Precios Sociales En Miles de Soles a Precios Privados

Año Alternativa 1 Alternativa 2 Año Alternativa 1


Inversión Mantenimiento Inversión Mantenimiento Inversión Mantenimiento
0 2,425,778 2,642,264 0 3,070,605
1 1,179 4,093 1 1,572
2 1,179 4,093 2 1,572
3 1,179 4,093 3 1,572
4 1,179 1,179 4 1,572
5 30,590 17,284 5 40,786
6 1,179 1,179 6 1,572
7 1,179 1,179 7 1,572
8 1,179 1,179 8 1,572
9 1,179 1,179 9 1,572
10 30,590 17,284 10 40,786
11 1,179 1,179 11 1,572
12 1,179 1,179 12 1,572
13 1,179 1,179 13 1,572
14 1,179 1,179 14 1,572
15 30,590 17,284 15 40,786
16 1,179 1,179 16 1,572
17 1,179 1,179 17 1,572
18 1,179 1,179 18 1,572
19 1,179 1,179 19 1,572
20 -242,578 30,590 -264,226 17,284 20 -307,061 40,786
STOS INCREMENTALES
de Soles a Precios Privados

Alternativa 2
Inversión
3,344,637

-334,464
PROYECCION DEL TRÁFICO NORMAL SIN PROYECTO

TRÁFICO NORMAL SIN


AÑO 0 1 2 3 4 5 6 7
TIPO DE VEHICULO 2014 2015 2016 2017 2018 2019 2020 2021

TRÁFICO NORMAL 70 70 71 72 73 76 77 79

Automovil 15 15 15 15 15 15 15 16
Camioneta 6 6 6 6 6 6 6 6
Camioneta Rural 26 26 26 26 26 27 27 27
Microbus 0 0 0 0 0 0 0 0
Omnibus 2 2 2 2 2 2 2 2
Camión 2E 21 21 22 23 24 26 27 28
Camión 3E 0 0 0 0 0 0 0 0
Tráfico Generado por Tipo 0 0 0 0 0 0 0 0
Elaboración Equipo Consultor
Tasas de crecimiento para el tráfico normal
Vehículos ligeros y de pasajeros 0.56
Vehículos de carga 5.2

PROYECCIÓN DEL TRÁFICO DESV


AÑO 0 1 2 3 4 5 6 7
TIPO DE VEHICULO 2014 2015 2016 2017 2018 2019 2020 2021

TRÁFICO NORMAL 70 70 71 72 73 76 77 79

Automovil 15 15 15 15 15 15 15 16
Camioneta 6 6 6 6 6 6 6 6
Camioneta Rural 26 26 26 26 26 27 27 27
Microbus 0 0 0 0 0 0 0 0
Omnibus 2 2 2 2 2 2 2 2
Camión 2E 21 21 22 23 24 26 27 28
Camión 3E 0 0 0 0 0 0 0 0
Tráfico Generado por Tipo 0 0 0 0 0 0 0 0
Elaboración Equipo Consultor
Tasas de crecimiento para el tráfico normal
Vehículos ligeros y de pasajeros 0.56
Vehículos de carga 5.2

10%
1 2 3 4 5 6 7 8
Años
2015 2016 2017 2018 2019 2020 2021 2022

TRAFICO GENERADO 8 8 8 8 8 9 9 9

Automovil 2 2 2 2 2 2 2 2
Camioneta 1 1 1 1 1 1 1 1
Camioneta Rural 3 3 3 3 3 3 3 3
Microbus 0 0 0 0 0 0 0 0
Omnibus 0 0 0 0 0 0 0 0
Camión 2E 2 2 2 2 2 3 3 3
Camión 3E 0 0 0 0 0 0 0 0
Tráfico Generado por Tipo 0 0 0 0 0 0 0 0

PROYECCIÓN DEL TRÁFICO TOT

0 1 2 3 4 5 6 7
AÑO 2014 2015 2016 2017 2018 2019 2020 2021
TRÁFICO NORMAL 70 70 71 72 73 76 77 79
Automovil 15 15 15 15 15 15 15 16
Camioneta 6 6 6 6 6 6 6 6
Camioneta Rural 26 26 26 26 26 27 27 27
Microbus 0 0 0 0 0 0 0 0
Omnibus 2 2 2 2 2 2 2 2
Camión 2E 21 21 22 23 24 26 27 28
Camión 3E 0 0 0 0 0 0 0 0
Camión 4E 0 0 0 0 0 0 0 0

TRAFICO GENERADO 8 8 8 8 8 9 9
Automovil 2 2 2 2 2 2 2
Camioneta 1 1 1 1 1 1 1
Camioneta Rural 3 3 3 3 3 3 3
Microbus 0 0 0 0 0 0 0
Omnibus 0 0 0 0 0 0 0
Camión 2E 2 2 2 2 2 3 3
Camión 3E 0 0 0 0 0 0 0
Camión 4E 0 0 0 0 0 0 0

IMD TOTAL 78 79 80 81 84 86 88
TRÁFICO NORMAL SIN PROYECTO
8 9 10 11 12 13 14 15 16 17 18 19 20
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034

81 83 84 86 89 91 93 95 98 100 104 107 110


16 16 16 16 16 16 16 16 16 16 16 17 17
6 6 6 6 6 6 6 6 7 7 7 7 7
27 27 27 27 28 28 28 28 28 28 29 29 29
0 0 0 0 0 0 0 0 0 0 0 0 0
2 2 2 2 2 2 2 2 2 2 2 2 2
30 32 33 35 37 39 41 43 45 47 50 52 55
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

ÓN DEL TRÁFICO DESVIADO DEL PROYECTO


8 9 10 11 12 13 14 15 16 17 18 19 20
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034

81 83 84 86 89 91 93 95 98 100 104 107 110

16 16 16 16 16 16 16 16 16 16 16 17 17
6 6 6 6 6 6 6 6 7 7 7 7 7
27 27 27 27 28 28 28 28 28 28 29 29 29
0 0 0 0 0 0 0 0 0 0 0 0 0
2 2 2 2 2 2 2 2 2 2 2 2 2
30 32 33 35 37 39 41 43 45 47 50 52 55
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

9 10 11 12 13 14 15 16 17 18 19 20
2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034

9 9 9 10 10 10 10 10 11 11 11 11

2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3 3 3 4 4 4 4 4 5 5 5 5
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0

CIÓN DEL TRÁFICO TOTAL CON PROYECTO

8 9 10 11 12 13 14 15 16 17 18 19 20
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
81 83 84 86 89 91 93 95 98 100 104 107 110
16 16 16 16 16 16 16 16 16 16 16 17 17
6 6 6 6 6 6 6 6 7 7 7 7 7
27 27 27 27 28 28 28 28 28 28 29 29 29
0 0 0 0 0 0 0 0 0 0 0 0 0
2 2 2 2 2 2 2 2 2 2 2 2 2
30 32 33 35 37 39 41 43 45 47 50 52 55
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

9 9 9 9 10 10 10 10 10 11 11 11 11
2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
3 3 3 3 4 4 4 4 4 5 5 5 5
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

90 92 93 95 99 101 103 105 108 111 115 118 121


6. EVALUACION

Cálculo de Beneficios

Calculo del Beneficio total por ahorro de costos operativos vehícular (Bcov)

Bcov = COVsp-COVcp

Donde: COVsp = Costo operativo vehícular total sin proyecto(*)


COVcp = Costo operativo vehícular total con proyecto(*)

Nota: (*).COVsp y COVcp se obtienen de las Tablas del COV del MTC

COSTOS DE OPERACIÓN VEHICULAR (US$ por km) SEGÚN TIPO DE VEHICULO


Escenario Región Tipología Superficie Estado Auto Camioneta Bus Mediano Bus Grande Cam.2E Cam.3E Articulado
Sin Proyecto Sierra Accidentado Afirmado Malo 0.49 0.68 1.05 1.49 2.40 2.91 3.31
Con Proyecto Sierra Accidentado Afirmado Bueno 0.32 0.56 0.75 1.21 1.56 2.05 2.54

Nota: Para efectos de estimar los beneficios totales en ahorro de COV, es necesario establecer la correspondencia entre la tipología de vehiculos de las tablas COV del MTC, con la tipología de vehículos de los
formatos de conteo del MTC, considerar lo siguiente:

TABLAS DE COV Formato


Auto, motos,de CONTEO del MTC
Auto mototaxi
Camioneta Pick UP + Camioneta Rural Luz del Puente 30.00
Bus Medio Micro Tipo de Cambio 2.89
Bus Grande Bus 2 ejes + Bus 3 ejes
Camión 2 Ejes Camión 2 Ejes
Camión 3 Ejes Camión 3 Ejes + Camión 4 Ejes
Articulado Semi-Trailer + Trailer

Costos de Operación Vehicular


En US$ x Veh - Km a Precios Sociales

Con Proyecto
Tipo de Vehículo Sin Proyecto
Alter. 1 Alter. 2
Automovil 0.49 0.32 0.32
Camioneta 0.68 0.56 0.56
Camioneta Rural 0.68 0.56 0.56
Microbus 1.05 0.75 0.75
Omnibus 1.49 1.21 1.21
Camión 2E 2.40 1.56 1.56
Camión 3E 2.91 2.05 2.05

Costos de Operación Vehicular - Sin Proyecto


En Soles a Precios Sociales

Tipo de Vehículo Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10
Tráfico Normal 2,607,822.17 2,683,695.42 2,759,568.68 2,835,441.93 3,008,665.94 3,084,539.20 3,175,938.36 3,327,684.86 3,479,431.36 3,555,304.62
Automovil 232,888.73 232,888.73 232,888.73 232,888.73 232,888.73 232,888.73 248,414.64 248,414.64 248,414.64 248,414.64
Camioneta 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10
Camioneta Rural 558,415.42 558,415.42 558,415.42 558,415.42 579,892.93 579,892.93 579,892.93 579,892.93 579,892.93 579,892.93
Microbus 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Omnibus 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67
Camión 2E 1,593,338.27 1,669,211.52 1,745,084.77 1,820,958.02 1,972,704.52 2,048,577.77 2,124,451.02 2,276,197.52 2,427,944.03 2,503,817.28
Camión 3E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 2,607,822.17 2,683,695.42 2,759,568.68 2,835,441.93 3,008,665.94 3,084,539.20 3,175,938.36 3,327,684.86 3,479,431.36 3,555,304.62

Tipo de Vehículo Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20
Tráfico Normal 3,707,051.12 3,880,275.13 4,032,021.64 4,183,768.14 4,335,514.64 4,508,738.66 4,660,485.16 4,909,582.43 5,076,854.84 5,304,474.60
Automovil 248,414.64 248,414.64 248,414.64 248,414.64 248,414.64 248,414.64 248,414.64 248,414.64 263,940.56 263,940.56
Camioneta 128,865.10 128,865.10 128,865.10 128,865.10 128,865.10 150,342.61 150,342.61 150,342.61 150,342.61 150,342.61
Camioneta Rural 579,892.93 601,370.45 601,370.45 601,370.45 601,370.45 601,370.45 601,370.45 622,847.97 622,847.97 622,847.97
Microbus 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Omnibus 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67 94,314.67
Camión 2E 2,655,563.78 2,807,310.28 2,959,056.78 3,110,803.28 3,262,549.78 3,414,296.29 3,566,042.79 3,793,662.54 3,945,409.04 4,173,028.79
Camión 3E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL 3,707,051.12 3,880,275.13 4,032,021.64 4,183,768.14 4,335,514.64 4,508,738.66 4,660,485.16 4,909,582.43 5,076,854.84 5,304,474.60
Costos de Operación Vehicular - Con Proyecto - Alternativa 1 Y 2
En Soles a Precios Sociales

Tipo de Vehículo Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10
Tráfico Normal 1,825,414.40 1,874,679.33 1,923,944.25 1,973,209.17 2,089,335.06 2,138,599.98 2,197,956.75 2,296,486.59 2,395,016.44 2,444,281.36
Automovil 151,377.67 151,377.67 151,377.67 151,377.67 151,377.67 151,377.67 161,469.52 161,469.52 161,469.52 161,469.52
Camioneta 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22
Camioneta Rural 457,496.97 457,496.97 457,496.97 457,496.97 475,093.01 475,093.01 475,093.01 475,093.01 475,093.01 475,093.01
Microbus - - - - - - - - - -
Omnibus 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15
Camión 2E 1,034,563.39 1,083,828.31 1,133,093.24 1,182,358.16 1,280,888.00 1,330,152.93 1,379,417.85 1,477,947.70 1,576,477.54 1,625,742.47
Camión 3E - - - - - - - - - -
Tráfico Generado 189,097.69 189,097.69 189,097.69 189,097.69 189,097.69 238,362.61 238,362.61 238,362.61 238,362.61 238,362.61
Automovil 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69
Camioneta 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04
Camioneta Rural 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11
Microbus - - - - - - - - - -
Omnibus - - - - - - - - - -
Camión 2E 98,529.85 98,529.85 98,529.85 98,529.85 98,529.85 147,794.77 147,794.77 147,794.77 147,794.77 147,794.77
Camión 3E - - - - - - - - - -
TOTAL 2,014,512.09 2,063,777.01 2,113,041.93 2,162,306.86 2,278,432.74 2,376,962.59 2,436,319.36 2,534,849.20 2,633,379.05 2,682,643.97

Costos de Operación Vehicular - Con Proyecto - Alternativa 1 Y 2


En Soles a Precios Sociales
Tipo de Vehículo Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20
Tráfico Normal 2,542,811.21 2,658,937.09 2,757,466.94 2,855,996.79 2,954,526.63 3,070,652.52 3,169,182.36 3,334,573.17 3,443,194.86 3,590,989.63
Automovil 161,469.52 161,469.52 161,469.52 161,469.52 161,469.52 161,469.52 161,469.52 161,469.52 171,561.36 171,561.36
Camioneta 105,576.22 105,576.22 105,576.22 105,576.22 105,576.22 123,172.26 123,172.26 123,172.26 123,172.26 123,172.26
Camioneta Rural 475,093.01 492,689.04 492,689.04 492,689.04 492,689.04 492,689.04 492,689.04 510,285.08 510,285.08 510,285.08
Microbus 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Omnibus 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15 76,400.15
Camión 2E 1,724,272.31 1,822,802.16 1,921,332.01 2,019,861.85 2,118,391.70 2,216,921.55 2,315,451.39 2,463,246.16 2,561,776.01 2,709,570.78
Camión 3E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tráfico Generado 238,362.61 287,627.53 287,627.53 287,627.53 287,627.53 287,627.53 336,892.46 336,892.46 336,892.46 336,892.46
Automovil 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69 20,183.69
Camioneta 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04 17,596.04
Camioneta Rural 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11 52,788.11
Microbus - - - - - - - - - -
Omnibus - - - - - - - - - -
Camión 2E 147,794.77 197,059.69 197,059.69 197,059.69 197,059.69 197,059.69 246,324.62 246,324.62 246,324.62 246,324.62
Camión 3E - - - - - - - - - -
TOTAL 2,781,173.82 2,946,564.63 3,045,094.47 3,143,624.32 3,242,154.16 3,358,280.05 3,506,074.82 3,671,465.63 3,780,087.32 3,927,882.09
Costos de Operación Vehicular
En Soles a Precios Sociales

Con Proyecto
Año Sin Proyecto Alternativa 1 Alternativa 2
Normal Generado Normal Generado
1 2,607,822.17 1,825,414.40 189,097.69 1825414.40 189097.69
2 2,683,695.42 1,874,679.33 189,097.69 1874679.33 189097.69
3 2,759,568.68 1,923,944.25 189,097.69 1923944.25 189097.69
4 2,835,441.93 1,973,209.17 189,097.69 1973209.17 189097.69
5 3,008,665.94 2,089,335.06 189,097.69 2089335.06 189097.69
6 3,084,539.20 2,138,599.98 238,362.61 2138599.98 238362.61
7 3,175,938.36 2,197,956.75 238,362.61 2197956.75 238362.61
8 3,327,684.86 2,296,486.59 238,362.61 2296486.59 238362.61
9 3,479,431.36 2,395,016.44 238,362.61 2395016.44 238362.61
10 3,555,304.62 2,444,281.36 238,362.61 2444281.36 238362.61
11 3,707,051.12 2,542,811.21 238,362.61 2542811.21 238362.61
12 3,880,275.13 2,658,937.09 287,627.53 2658937.09 287627.53
13 4,032,021.64 2,757,466.94 287,627.53 2757466.94 287627.53
14 4,183,768.14 2,855,996.79 287,627.53 2855996.79 287627.53
15 4,335,514.64 2,954,526.63 287,627.53 2954526.63 287627.53
16 4,508,738.66 3,070,652.52 287,627.53 3070652.52 287627.53
17 4,660,485.16 3,169,182.36 336,892.46 3169182.36 336892.46
18 4,909,582.43 3,334,573.17 336,892.46 3334573.17 336892.46
19 5,076,854.84 3,443,194.86 336,892.46 3443194.86 336892.46
20 5,304,474.60 3,590,989.63 336,892.46 3590989.63 336892.46

Beneficios Incrementales
En Soles a Precios Sociales

Año Alternativa 1 Alternativa 2


0
1 876,956.61 876956.61
2 903,564.94 903564.94
3 930,173.27 930173.27
4 956,781.60 956781.60
5 1,013,879.73 1013879.73
6 1,065,120.52 1065120.52
7 1,097,162.92 1097162.92
8 1,150,379.57 1150379.57
9 1,203,596.23 1203596.23
10 1,230,204.56 1230204.56
11 1,283,421.21 1283421.21
12 1,365,151.81 1365151.81
13 1,418,368.46 1418368.46
14 1,471,585.12 1471585.12
15 1,524,801.77 1524801.77
16 1,581,899.91 1581899.91
17 1,659,749.02 1659749.02
18 1,743,455.48 1743455.48
19 1,802,106.21 1802106.21
20 1,881,931.19 1881931.19

EVALUACION ECONOMICA

La metodología de evaluación para PIP de mejoramiento es la de COSTO/BENEFICIO

EVALUACION ECONOMICA - ALTERNATIVA 1


(En Nuevos Soles)

Costo de
Año Inversión Operación y Beneficios Flujo Neto
Mantenimiento
0 2,425,778.29 -2,425,778.29
1 1,179.35 876,956.61 875,777.27
2 1,179.35 903,564.94 902,385.59
3 1,179.35 930,173.27 928,993.92
4 1,179.35 956,781.60 955,602.25
5 30,589.62 1,013,879.73 983,290.11
6 1,179.35 1,065,120.52 1,063,941.17
7 1,179.35 1,097,162.92 1,095,983.57
8 1,179.35 1,150,379.57 1,149,200.22
9 1,179.35 1,203,596.23 1,202,416.88
10 30,589.62 1,230,204.56 1,199,614.93
11 1,179.35 1,283,421.21 1,282,241.86
12 1,179.35 1,365,151.81 1,363,972.46
13 1,179.35 1,418,368.46 1,417,189.11
14 1,179.35 1,471,585.12 1,470,405.77
15 30,589.62 1,524,801.77 1,494,212.15
16 1,179.35 1,581,899.91 1,580,720.56
17 1,179.35 1,659,749.02 1,658,569.67
18 1,179.35 1,743,455.48 1,742,276.14
19 1,179.35 1,802,106.21 1,800,926.86
20 -242,577.83 30,589.62 1,881,931.19 1,851,341.57
Tasa de Descuento: 9.00% VAN 8,167,315.32
TIR 39.57%
B/C 4.29

EVALUACION ECONOMICA - ALTERNATIVA 2


(En Nuevos Soles)

Costo de
Año Inversión Operación y Beneficios Flujo Neto
Mantenimiento
0 2,642,263.59 -2,642,263.59
1 4,092.56 876,956.61 872,864.05
2 #REF! 903,564.94 #REF!
3 #REF! 930,173.27 #REF!
4 #REF! 956,781.60 #REF!
5 #REF! 1,013,879.73 #REF!
6 #REF! 1,065,120.52 #REF!
7 #REF! 1,097,162.92 #REF!
8 #REF! 1,150,379.57 #REF!
9 #REF! 1,203,596.23 #REF!
10 #REF! #REF! 1,230,204.56 #REF!

Tasa de Descuento: 9.00% VAN #REF!


TIR #REF!
B/C #REF!
EVALUACIÓN ECONOMICA
ALTERNATIVA N° 01
En Miles de Soles a Precios de Mercado

COSTO DE BENEFICIO
AÑO INVERSIÓN FLUJO NETO
MANTENIM. AHORRO COV

2014 3,070,605.43 (3,070,605.43)


2015 1,572.47 876,956.61 875,384.15
2016 1,572.47 903,564.94 901,992.48
2017 1,572.47 930,173.27 928,600.81
2018 1,572.47 956,781.60 955,209.13
2019 40,786.17 1,013,879.73 973,093.57
2020 1,572.47 1,065,120.52 1,063,548.06
2021 1,572.47 1,097,162.92 1,095,590.45
2022 1,572.47 1,150,379.57 1,148,807.11
2023 1,572.47 1,203,596.23 1,202,023.76
2024 40,786.17 1,230,204.56 1,189,418.39
2025 1,572.47 1,283,421.21 1,281,848.75
2026 1,572.47 1,365,151.81 1,363,579.34
2027 1,572.47 1,418,368.46 1,416,796.00
2028 1,572.47 1,471,585.12 1,470,012.65
2029 40,786.17 1,524,801.77 1,484,015.61
2030 1,572.47 1,581,899.91 1,580,327.44
2031 1,572.47 1,659,749.02 1,658,176.56
2032 1,572.47 1,743,455.48 1,741,883.02
2033 1,572.47 1,802,106.21 1,800,533.74
2034 (307,060.54) 40,786.17 1,881,931.19 2,148,205.57
VA 3,144,772.84 10,648,719.17
Tasa Descuento 9% VAN S/. 7,558,735.41
TIR 31.91%
B/C 3.39

EVALUACIÓN ECONOMICA
ALTERNATIVA N° 01
En Miles de Soles a Precios Sociales

COSTO DE BENEFICIO
AÑO INVERSIÓN FLUJO NETO
MANTENIM. AHORRO COV

2014 2,425,778.29 (2,425,778.29)


2015 1,179.35 876,956.61 875,777.27
2016 1,179.35 903,564.94 902,385.59
2017 1,179.35 930,173.27 928,993.92
2018 1,179.35 956,781.60 955,602.25
2019 30,589.62 1,013,879.73 983,290.11
2020 1,179.35 1,065,120.52 1,063,941.17
2021 1,179.35 1,097,162.92 1,095,983.57
2022 1,179.35 1,150,379.57 1,149,200.22
2023 1,179.35 1,203,596.23 1,202,416.88
2024 30,589.62 1,230,204.56 1,199,614.93
2025 1,179.35 1,283,421.21 1,282,241.86
2026 1,179.35 1,365,151.81 1,363,972.46
2027 1,179.35 1,418,368.46 1,417,189.11
2028 1,179.35 1,471,585.12 1,470,405.77
2029 30,589.62 1,524,801.77 1,494,212.15
2030 1,179.35 1,581,899.91 1,580,720.56
2031 1,179.35 1,659,749.02 1,658,569.67
2032 1,179.35 1,743,455.48 1,742,276.14
2033 1,179.35 1,802,106.21 1,800,926.86
2034 (242,577.83) 30,589.62 1,881,931.19 2,093,919.40
VA 2,481,403.85 10,648,719.17
Tasa Descuento 9% VAN S/. 8,210,598.70
TIR 39.58%
B/C 4.29
EVALUACIÓN ECONOMICA
ALTERNATIVA N° 02
En Miles de Soles a Precios de Mercado

COSTO DE BENEFICIO
AÑO INVERSIÓN FLUJO NETO
MANTENIM. AHORRO COV

2014 3,070,605.43 (3,070,605.43)


2015 5,456.75 876,956.61 871,499.86
2016 5,456.75 903,564.94 898,108.19
2017 5,456.75 930,173.27 924,716.52
2018 1,572.47 956,781.60 955,209.13
2019 23,044.95 1,013,879.73 990,834.78
2020 1,572.47 1,065,120.52 1,063,548.06
2021 1,572.47 1,097,162.92 1,095,590.45
2022 1,572.47 1,150,379.57 1,148,807.11
2023 1,572.47 1,203,596.23 1,202,023.76
2024 23,044.95 1,230,204.56 1,207,159.61
2025 1,572.47 1,283,421.21 1,281,848.75
2026 1,572.47 1,365,151.81 1,363,579.34
2027 1,572.47 1,418,368.46 1,416,796.00
2028 1,572.47 1,471,585.12 1,470,012.65
2029 23,044.95 1,524,801.77 1,501,756.82
2030 1,572.47 1,581,899.91 1,580,327.44
2031 1,572.47 1,659,749.02 1,658,176.56
2032 1,572.47 1,743,455.48 1,741,883.02
2033 1,572.47 1,802,106.21 1,800,533.74
2034 (307,060.54) 23,044.95 1,881,931.19 2,165,946.79
VA 3,127,544.24 10,648,719.17
Tasa Descuento 9% VAN S/. 7,575,964.02
TIR 31.90%
B/C 3.40

EVALUACIÓN ECONOMICA
ALTERNATIVA N° 02
En Miles de Soles a Precios Sociales

COSTO DE BENEFICIO
AÑO INVERSIÓN FLUJO NETO
MANTENIM. AHORRO COV

2014 2,642,263.59 (2,642,263.59)


2015 4,092.56 876,956.61 872,864.05
2016 4,092.56 903,564.94 899,472.38
2017 4,092.56 930,173.27 926,080.71
2018 1,179.35 956,781.60 955,602.25
2019 17,283.71 1,013,879.73 996,596.02
2020 1,179.35 1,065,120.52 1,063,941.17
2021 1,179.35 1,097,162.92 1,095,983.57
2022 1,179.35 1,150,379.57 1,149,200.22
2023 1,179.35 1,203,596.23 1,202,416.88
2024 17,283.71 1,230,204.56 1,212,920.85
2025 1,179.35 1,283,421.21 1,282,241.86
2026 1,179.35 1,365,151.81 1,363,972.46
2027 1,179.35 1,418,368.46 1,417,189.11
2028 1,179.35 1,471,585.12 1,470,405.77
2029 17,283.71 1,524,801.77 1,507,518.06
2030 1,179.35 1,581,899.91 1,580,720.56
2031 1,179.35 1,659,749.02 1,658,569.67
2032 1,179.35 1,743,455.48 1,742,276.14
2033 1,179.35 1,802,106.21 1,800,926.86
2034 (264,226.36) 17,283.71 1,881,931.19 2,128,873.84
VA 2,684,967.69 10,648,719.17
Tasa Descuento 9% VAN S/. 8,010,897.62
TIR 36.60%
B/C 3.97
EVALUACIÓN ECONOMICA A PRECIOS DE MERCADO
En miles de soles a precios de mercado

INDICADORES ALT N° 01 ALT N° 02


VAN S/. 7,558,735 S/. 7,575,964.02
TIR 31.91% 31.90%
B/C 3.39 4.29

EVALUACIÓN ECONOMICA A PRECIOS SOCIALES


INDICADORES ALT N° 01 ALT N° 02
VAN S/. 8,210,599 S/. 8,010,898
TIR 39.58% 36.60%
B/C 4.29 3.97
SENSIBILIDAD AL INCREMENTO DE LOS COSTOS DE INVERSIÓN- PRECIO SOCIAL

Rango de Análisis : desde 0% hasta 40%

% Sensibilidad a variación de costos de inversión


8,400,000
Variación
de 8,200,000
Nº VAN
Costos
de 8,000,000
Inversión

VAN
7,800,000

1 0% 8,210,599 7,600,000
2 8% 8,019,999 7,400,000
3 12% 7,924,699
7,200,000
4 16% 7,829,400
7,000,000
5 20% 7,734,100
6 24% 7,638,800 6,800,000

7 28% 7,543,500 6,600,000


8 32% 7,448,200 0% 5% 10% 15% 20% 25% 30% 35% 40% 45%
% de incremento de costos de inversión
9 36% 7,352,901
10 40% 7,257,601

El proyecto soporta un incremento de los costos de inversión de 344.6%


SENSIBILIDAD AL INCREMENTO DE LOS COSTOS DE OPERACIÓN Y MANTENIMIENTO

Rango de Análisis : desde 0% hasta -30%

% Sensibilidad a variación de costos de O & M


Variación 8,230,000
Nº de VAN
Costos
de O & M 8,225,000

VAN
1 0% 8,210,599 8,220,000
2 -6% 8,213,936
3 -9% 8,215,605 8,215,000

4 -12% 8,217,274
8,210,000
5 -15% 8,218,943
6 -18% 8,220,611
8,205,000
7 -21% 8,222,280
8 -24% 8,223,949 8,200,000
9 -27% 8,225,618 -35% -30% -25% -20% -15% -10% -5% 0%
10 -30% 8,227,286 % de incremento de costos O & M

El proyecto soporta un incremento de los costos de O & M de 14760.5%

SENSIBILIDAD A LA REDUCCIÓN DE LOS BENEFICIOS

Rango de Análisis : desde 0% hasta -30%

% Sensibilidad a variación de beneficios


Variación 9,000,000
Nº de VAN
Beneficio 8,000,000
s 7,000,000
1 0% 8,210,599 #REF! 6,000,000
VAN

2 -6% 7,571,676 #REF! 5,000,000


3 -9% 7,252,214 #REF! 4,000,000
4 -12% 6,932,752 #REF! 3,000,000
5 -15% 6,613,291 #REF! 2,000,000
6 -18% 6,293,829 #REF! 1,000,000
7 -21% 5,974,368 #REF!
0
8 -24% 5,654,906 #REF!
-35% -30% -25% -20% -15% -10% -5% 0%
9 -27% 5,335,445 #REF!
% de reducción de beneficios
10 -30% 5,015,983 #REF!

El proyecto soporta una reducción de los beneficios de 77.1%


ANALISIS DE SENSIBILIDAD DEL PROYECTO

ANALISIS DE SENSIBILIDAD
EN MILES DE SOLES A PRECIOS DE MERCADO

BENEFICIOS COSTOS (+10%) COSTOS (+20%)


ALTERNATIVAS INVERSIÓN (+20%)
(- 10%) BENEFICIOS (-10%) BENEFICIOS (-20%)

ALTERNATIVA "1"
VAN S/. 5,339,111.811 S/. 5,044,582.705 S/. 4,737,522.162 S/. 3,521,811.426
TIR 27% 29% 27% 22%
B/C 2.42 2.61 2.38 1.94

#REF!

ANALLISIS DE SENSIBILIDAD
EN MILES DE SOLES A PRECIOS SOCIALES

BENEFICIOS COSTOS (+10%) COSTOS (+20%)


ALTERNATIVAS INVERSIÓN (+20%)
(- 10%) BENEFICIOS (-10%) BENEFICIOS (-20%)

ALTERNATIVA "1"
VAN S/. 6,128,570.279 S/. 5,705,075.744 S/. 5,462,497.915 S/. 4,311,269.894
TIR 34% 36% 33% 27%
B/C 3.07 3.31 3.01 2.46

#REF!