Process Plant Start-Up & Commissioning

I. Introduction
II. Process Plant configuration
III. Post maintenance inspection of Equipment condition
IV. Checklist for controlling maintenance activities
V. Verification / validating equipment maintenance completion.
VI. Visual / physical checks.
VII. Cleaning storage tanks / vessels
VIII. Leak tests
IX. Pressure testing
X. Instrument performance / control checks
XI. Safety Valves / Relief valves checking
XII. Plant line-up
XIII. De-blinding activities
XIV. Utility availability checks
XV. Steam / Air / Power system checking
XVI. Fuel Availability / line checks
XVII. Refrigerant system checks
XVIII. Solvent system checks
XIX. Pre-commissioning of units as per Standard Operating Procedure
XX. No load testing of Pumps / Motors / Compressors / turbines
XXI. Start-up – cold circulation
XXII. Warming up
XXIII. Feed heater line up
XXIV. Reactor line-up after catalyst checking
XXV. Lining out the process
XXVI. Checking feed / product quality
XXVII. Automatic control checks.
XXVIII. Checking yield pattern / product quality
XXIX. Applying parameter corrections
XXX. Line up DIDC system.
Discussion / Summing up