You are on page 1of 10

GHC RCU related problems.20.04.

2018

For Level16-31 cable laying is not completed .Thus location issues only
considered for this inspection.
Level 16
Room 14
RC-02 thermostat too deep required long screw.

Level 17
Room 06
RC-12 Sunk box embossed from wall.
Room 16
RC-12 Sunk box embossed from wall.
Room 17
RC-02 Sunk box embossed from wall.

Level 18
Room 03
RC-02 Sunk box embossed from wall.
Room 04
RC-12 Sunk box embossed from wall.
Room 05
RC-12 Sunk box embossed from wall.
Room 07
RC-12 Sunk box damaged need to reinstall.
Room 08
RC-12 Sunk box embossed from wall.
Room 09
RC-14 Sunk box must fill box opening.
Room 10
RC-17 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Room 13
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 14
RC-12 Sunk box must fill box opening.
Room 16
RC-12 Sunk box embossed from wall.

Level 19
Room 01
RC-12 entry panel too deep required long screw.
Room 02
RC-02 Sunk box must fill box opening.
Room 03
RC-12 Sunk box must fill box opening.
Room 08
RC-12 entry panel too deep required long screw.
Room 10
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
RC-17 Sunk box must fill box opening.
RC-14 Sunk box must fill box opening.
RC-18 Sunk box embossed from wall.

Room 12
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 20
Room 13
RC-02 Sunk box embossed from wall.
Room 14
RC-02 Sunk box embossed from wall.

Level 21
Room 1-2
RC-12 entry panel too deep required long screw.
Room 05
RC-02 Sunk box embossed from wall.
Room 17-18
RC-12 entry panel too deep required long screw

Level 22
Room 1-2
RC-13 Sunk box must fill box opening.
Room 04
RC-12 Sunk box must fill box opening.
Room 05
RC-12 Sunk box must fill box opening.
Room 08
RC-12 Sunk box embossed from wall.
Room 09
RC-17 Sunk box must fill box opening.
Room 10
RC-13 Sunk box embossed from wall.
Room 12
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

RC-02 Sunk box embossed from wall.


Room 14
RC-02 Sunk box embossed from wall.
Room 16-17
RC-12 too deep required long screw.
Room 19
RC-12 Missing.
RC-02 not installed
Room 20
RC-02 not installed

Level 23
Room 01
RC-13 Sunk box must fill box opening.
Room 03
RC-12 Sunk box embossed from wall.
Room 04
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Not installed properly.
Room 09
RC-18 Sunk box must fill box opening.
Room 10
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 14
RC-02 Sunk box embossed from wall.
Room 15
RC-02 Sunk box must fill box opening.
GHC RCU related problems.20.04.2018

Room 16
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 17-18
RC-12 too deep required long screw.
Room 12
RC-12 Sunk box must fill box opening.

Level 24
Room 1-2
RC-12 too deep required long screw.
Room 04
RC-02 Sunk box embossed from wall.

Level 25
Room 1-2 and 17-18
RCU location not finalized.
Room 04
RC-12 Sunk box missing.
Room 07
RC-02 Sunk box embossed from wall.
Room 09
RC-12 Sunk box embossed from wall.
Room 14
RC-02 too deep required long screw.

Level 26
Room 1-2 and 17-18
RCU location not finalized.
Room 03
RC-12 Sunk box must fill box opening.
Room 04
GHC RCU related problems.20.04.2018

RC-12 Sunk box must fill box opening.


RC-02 Sunk box must fill box opening.

Room 07
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.

Room 09
RC-12 Sunk box must fill box opening.
RC-14 too deep required long screw.
RC-17 too deep required long screw.

Room 10
RC-18 Sunk box must fill box opening.
Room 12
RC-02 Sunk box embossed from wall.
Room 13
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 14
RC-02 Sunk box embossed from wall.
Room 15
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 16
RC-12 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 27
Room 01
RC-12 Sunk box embossed from wall.
Room 03
RC-02 Sunk box must fill box opening.
Room 04
RC-02 Sunk box must fill box opening.
Room 05
RC-12 Sunk box must fill box opening.
Room 06
RC-02 Sunk box must fill box opening.
Room 07-08
RCU not finalized
RC-02 Sunk box must fill box opening.
Powder room panel not finished.
Room 13
RC-02 Sunk box embossed from wall.
Room 16
Due to presence of concrete beam accessing the RCU location will be difficult after celling
completed.
Room 17-08
RC-12 Sunk box embossed from wall.

Level 28
Room 05
RC-02 Sunk box embossed from wall.
Room 07-09 and 10-11
RCU not finalized
Room 15
RC-02 Sunk box embossed from wall.
GHC RCU related problems.20.04.2018

Level 29
Room 02
RC-02 Sunk box embossed from wall.
Room 07-10 and 17-20
RCU not finalized
Room 12
RC-02 Sunk box embossed from wall.

Level 30
Room 05
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Sunk box must fill box opening.
Room 07
RC-02 Sunk box embossed from wall.
RC-12 Sunk box must fill box opening.
Room 09
RC-12 too deep required long screw.
RC-14 powder room panel Sunk box must fill box opening.
RC-18 too deep required long screw.
Room 10
RC-12 Sunk box must fill box opening.
RC-17 Sunk box must fill box opening.
Room 12
RC-02 Sunk box must fill box opening.
RC-12 Sunk box must fill box opening.
Room 13
Cable trunking blocking the RCU
GHC RCU related problems.20.04.2018

Room 14
RC-12 Sunk box must fill box opening.
Room 16
RC-02 Sunk box embossed from wall.

Level 31
Room 03
Due to presence of concrete beam, accessing the RCU location will be difficult after celling
completed.
Room 04
RC-02 Sunk box embossed from wall.
Room 05
RC-02 Sunk box embossed from wall.
Room 06
RC-02 Sunk box embossed from wall.
RC-12 Sunk box embossed from wall.
Room 07
RCU panel need to finalize. Require more area for RCU panel.
Room 12
RC-02 Sunk box embossed from wall.
Room 13
RC-02 Sunk box embossed from wall.
Room 14
RC-12 Sunk box must fill box opening.
Room 15
RC-12 Sunk box damaged need to reinstall.
Room 16
RC-02 Sunk box must fill box opening.
Room 17
RC-02 Sunk box must fill box opening.
GHC RCU related problems.20.04.2018

Note:-
 For all bathrooms and powder room panels required longer screws.
 Two column Lutron keypad required sunk box screws installed at
vertical orientation as follows,

 Presidential suite required more area for RCU.