You are on page 1of 6

Pozo Cálculo de coeficiente de escorrentía Tc (min.

)
De A Par. C ΔA C SumAxC A total C Tc total
[1] [2] [3] [4] [5] [6] [7] [8] [9]
Tc (min.) I Q Q L S Díametro Dc
ΔTc (L/s.Ha) (L/s) (m3/s) (m) (m) (") (")
[10] [11] [12] [12A] [13] [14] [15] [16] [17]
Red del alcantarillado pluvial. Empate de los colectores en los pozos por Líne
Dc QII VII RII Q/QII V/VII d/D R/Rll V
(m) (m3/s) (m/s) (m) (m/s)
[18] [19] [20] [20A] [21] [22] [23] [23A] [24]
ores en los pozos por Línea de energía. Flujo subcrítico y super crítico
R τ V²/2g d H/D H NF E Dp
(m) (Pa) (m) (m) (m) (m) (m)
[24A] [24B] [25] [26] [26A] [27] [28] [29] [30]
Pérdidas (m) Dp 0.319Qd K*Hw Hw Cota rasante
rc/D Hc 0.2Hv Perd Ds D² Ds De
[31] [32] [33] [34] [35] [36] [37] [38] [39]
Cota rasante Cota clave Cota batea Cota energía Prof. a clave
A De A De A De A De A
[40] [41] [42] [43] [44] [45] [46] [47] [48]

You might also like