Understanding and auditing ISO 9001’s clause 7.5.2

T
he language of ISO 9001:1994 in- special processes. ISO 9001:2008, shall establish arrangements for these
cluded the term “special process” 7.5.2, Validation of processes for processes including, as applicable:
until it was superseded by the production and service provision, • Defined criteria for review and
2000 version of the standard. Today, spells out the requirements for prov- approval of the processes
ISO 9001:2008 clause 7.5.2 refers ing these processes. • Approval of equipment and
to special processes as “processes qualification of personnel
requiring validation.” Revision B of Validation defined • Use of specific methods and
AS9100:2004 includes ISO 9001’s Validation needs to be under- procedures
terms and requirements and brought stood. Better understanding of • Requirements for records (see
the term “special process” back; it ISO 9001’s requirements can of- 4.2.4)
has survived its most recent revision ten be achieved through review • Revalidation”
process and remains unchanged in of guideline standards and other
AS9100:2009 Rev C. sources of information. To understand the requirements
I still like the term “special proc- One such source for better un- of ISO 9001:2008 clause 7.5.2, it’s
ess.” I think the term resonates with derstanding of these requirements helpful to break it into three manage-
many auditors; therefore, processes is ISO 9000:2005 Quality manage- able parts. The first two parts are very
requiring validation will also be called ment systems—Fundamentals and straightforward compared to the third
vocabulary. This source defines val- part, which is far more complex.
Check Points idation as a “confirmation, through The first part of clause 7.5.2
the provision of objective evidence, indicates which processes must be
Special processes” refer to that the requirements for a specific validated: those special processes
processes that produce outputs intended use or application have for which the output cannot be ef-
whose output cannot be veri- been fulfilled.” Validation means fectively verified nor will it become
fied before being released to confirming, qualifying, or otherwise apparent until after the product or
the customer. These products proving that a process is capable service is delivered to the customer.
and services require special of producing intended results by The second part of clause 7.5.2 sim-
attention during production providing objective evidence. The ply states what the validation must
to ensure that they’re free of
intended results are the resulting demonstrate: the process’s ability
defects.
product or service. to achieve planned results.
 ISO 9001:2008 clause 7.5.2
The third part covers the bulk of
refers to special processes as
“processes requiring valida-
Clause 7.5.2 requirements the clause’s requirements. It calls
ISO 9001:2008’s requirements for the organization to establish ar-
tion.” To understand it, it’s help-
ful to break the clause into three for validation of processes reads: rangements for how the process is
parts: which processes must be “The organization shall validate any going to be validated: criteria and a
validated, what the validation processes for production and service process for approval, how equipment
must demonstrate, and the way provision where the resulting output and personnel are qualified, what
an organization establishes its cannot be verified by subsequent records are kept, what procedures
validation process. monitoring or measurement and, as are followed, and when a process
Validating special processes a consequence, deficiencies become is to be revalidated.
takes considerable expertise, apparent only after the product is in use
though all quality auditors or the service has been delivered. Process expertise
should at least be able to rec- “Validation shall demonstrate the Experience is helpful when auditing
ognize a special process when ability of these processes to achieve clause 7.5.2—so much so that some
they see one. planned results. The organization industries require their auditors have

24 THE AUDITOR • NOVEMBER–DECEMBER 2009 COMMENTS? • feedback@theauditoronline.com

Nov-DecRough3.indd 24 11/9/09 2:30:48 PM


DECIPHIRING CLAUSES

advanced expertise in the discipline Be objective and expect compliance it’s imperative that an organization
they audit. I see this in the automotive What must we look for as audi- with a paint process proves that the
industry, in which years of automo- tors? Auditors must process is capable of
tive experience is required before an look for compliance to Generally, if producing product that
auditor can audit for an automotive requirements. If you
you cannot look meets required specifi-
organization. It’s most obvious in the cannot look at a finished cations for the painted
aerospace industry, in which there product or service and at the output of surface.
exists an industry-managed program tell whether it meets a process (the
for special processes called Nadcap required specifications, Tip for auditors
(formerly called the National Aerospace then you must look at resulting product The organization,
and Defense Contractors Accredita- the process. or service) and having had to estab-
tion Program, or NADCAP). Nadcap Take a paint process, lish arrangements for
auditors are required to be experts in for instance. The result-
know whether validation of its special
the particular processes they audit. ing output—painted it conforms to processes, should be able
Advanced expertise may be p a r t s — c a n n o t b e specifications, the to produce evidence that
necessary in some cases; however, completely verified by demonstrates its pro-
skilled quality auditors should be subsequent inspection. process is likely cesses’ ability to achieve
able to navigate their way through Some characteristics a special process planned results. In other
most audit situations where ISO of a painted surface, words, there should be
9001:2008’s clause 7.5.2 applies. such as color, gloss, dry that requires records. These records
film thickness, and the validation. should be collected by
Know one when you see one absence of visual paint the auditor as objective
Auditors must be able to recognize defects, can be immediately detected evidence that a process was vali-
a special process when they see one. at the end of the paint process. How- dated.
Generally, if you cannot look at the ever, nobody can look at a painted When the auditor has this record
output of a process (the resulting surface and see that it satisfies the in hand, he or she can compare the
product or service) and know whether corrosion resistance and adhesive validation records to the current pro-
it conforms to specifications, the qualities specified for painted sur- cess parameters. An auditor should
process is likely a special process faces. Paint defects related to poor expect to find special processes
that requires validation. paint adhesion and corrosion resis- operating to the conditions under
Some typical special tance become apparent which the process was qualified.
processes found in manu- If you cannot only after the product In our paint shop example, if the
facturing include welding, is in use. Only after paint process was validated while
painting, plating, and heat
look at a the product has been the paint conveyor was operating at
treating. Some not-so- finished product in use will we know if 20 feet per minute, for instance, then
obvious special processes or service and the painted surface will 20 feet per minute is the speed the
may include mold making chip or rust. auditor should expect to find when
and wire crimping. Ex- tell whether it That said, waiting until observing the process.
amples of service-related meets required after the product is in
special processes include use by the customer Revalidation
training services, hotel specifications, to know whether it Special processes must be revali-
check-in and check-out, then you must conforms to required dated when changes are made which
dental work, cleaning ser- specifications doesn’t affect those processes’ parameters
look at the
vices, computer help desk, make sense. To know for product or service quality. If the
and many food services, process. for sure, you must sub- auditor finds the paint shop conveyor
to name a few. These are ject the painted surface in the above example operating at
all products and services for which to a barrage of environmental tests 23 feet per minute, ask to see where
deficiencies become apparent only that are time consuming, costly, the process was revalidated at the
after delivery to the customer. and destructive. For these reasons new line speed.

COMMENTS? • feedback@theauditoronline.com THE AUDITOR • NOVEMBER–DECEMBER 2009 25

Nov-DecRough3.indd 25 11/9/09 2:30:49 PM


ARTICLE DECIPHIRING CLAUSES

The skilled auditor can query product did meet specifications, Inc. His background includes quali-
the owner of any particular process which avoided the organization hav- ty leadership, management consult-
about continuous improvement while ing to spend many more thousands ing, registration and surveillance
auditing special processes and learn of dollars to field test and possibly audits, and quality system imple-
much. A paint supervisor once told recall the product. mentation.
me about the many ways his organi- Brecken is a fellow of the Ameri-
zation improved since my last visit. Conclusion can Society for Quality (ASQ), a
He told me how he lowered the As previously mentioned, certified manager of quality and
oven temperatures by 20 degrees, skilled quality auditors should be organizational excellence, an
increased the paint conveyor speed able to navigate through most audit RABQSA business improvement
by two feet per minute, and that he situations where ISO 9001:2008’s auditor, and has served on the
now purchases more cost-effective clause 7.5.2 applies. A skilled au- board of examiners for the Malcolm
pretreatment chemicals from a new ditor should understand how criti- Baldrige National Quality Award.
supplier. He told me of the many cal it is for organizations to vali- He is also a deputy regional direc-
thousands of dollars saved annually date processes for production or tor for ASQ’s region 10.
from these improvements. service provision where the result- Brecken earned his MBA in stra-
He was excited about sharing ing output cannot be verified by tegic management from Davenport
these achievements until I asked if subsequent inspection. The audi- University’s Sneden Graduate School.
he revalidated the process after mak- tor must be objective, expect com- He also has three undergraduate
ing the changes. He admitted he had pliance, and be on the lookout for degrees in business with a techni-
not. My next question was how he those pesky processes that require cal specialty in quality leadership.
knew this “new” paint process was validation: special processes. Brecken instructs a variety of quality
producing product to required speci- and management-related courses for
fications. Fortunately for him and About the author Ferris State University and Daven-
his organization, when the process Don Brecken is the director of port University’s undergraduate and
was finally revalidated the painted quality for Commercial Tool & Die graduate programs. A

Righting the Audit Report (Continued from page 23)


checks were implemented. the auditor can easily refer to the
A review of the electronic docu- v Post the audit summary report and posted copy to help jog his or her
ment management system revealed observations so that everyone in memory and more quickly provide
the development of an “un-publish” the facility can review it in more answers to the auditee. The posted
folder so that obsolete and expired detail. Remember that the audit audit report also assists users as they
documents can be removed from isn’t complete until the paperwork work on necessary corrective and
viewer access. No other expired is finished, so make this a part of preventive actions.
documents were identified in the the process.
electronic document management The auditee might have questions About the author
system. about specific observations in the Gayle Norman, BASF quality sys-
audit report, so posting it into an tems team leader and Geismar site
The second quarter quality sum- electronic document management quality management representative,
mary report now provides measure- system or a protected folder that’s is responsible for the internal audit
ment evidence to indicate that a available to users with read-only process at its Geismar, Louisiana fa-
system has been developed to record access makes the audit results easily cility. She leads a team of 23 internal
on-site carrier nonconformances retrievable to both auditor and audi- auditors from the site, four of whom
as a preventive measure before the tee. Although the audit work papers are quality specialists trained as lead
external customer complains. are available for records retention, auditors. A

26 THE AUDITOR • NOVEMBER–DECEMBER 2009 COMMENTS? • feedback@theauditoronline.com