Contents

Contents 2-6
How to use Heavy Construction Estimator 7
Wage rates 8
How to figure labor costs 9
Equipment costs 10
General contracting tips 11
Abbreviations and symbols 12-13
Craft codes & compositions 14
Crew rates and codes 15-98
Area modification factors 99
01-100 General Requirements 100
01-530 Barriers 101
01-660 Testing, adjusting & balancing 101
01-710 Contract closeout 101
01-720 Site final clean-up 102
01-910 Personnel costs 102
01-911 Safety, security & fire protection 103
01-941 Temporary facilities 104
01-942 Temporary site work 104
01-943 Temporary utilities 104
01-951 Health and safety 105
01-952 Radioactive waste abatement jobs 105
01-953 Hazardous and toxic waste jobs 113
01-954 Monitoring, sampling, and analysis 114
01-956 Submittals 129
01-957 Decontamination of construction 129
02-000 Site Work 130
02-011 Subsurface investigation, borings 130
02-081 Containment of hazardous waste 131
02-082 Landfill gas and leachate control 133
02-083 Collection of waste 137
02-084 Decontamination 147
02-085 Underground storage tank removal 150
02-101 Structure moving 152
02-102 Clearing and grubbing 152
02-111 Interior building demolition 154
02-112 Selective demolition 158
02-113 Asbestos removal 162
02-210 Site grading 164
02-211 Rock removal 164
02-212 Embankment & compaction 166
02-221 Trenching & backfilling 167
02-222 Structural excavation 170
02-223 Compaction water 170
02-224 Horizontal boring, casing only 171
02-225 Bulk excavation 171
02-226 Site excavation and fill 178
02-227 Compaction 178
02-231 Field tests 179
02-240 Soil stabilization with crushed rock 179
02-241 Soil stabilization with lime slurry 179
02-243 Vibro-flotation soil stabilization 179
02-244 Soil treatments and tests 179
02-245 Finish grading for structures 180
02-246 Drilling and pressure grouting 180
2015 Heavy Construction Estimator, All Rights Reserved Page 2 (part 2)

02-261 Rip rap 181


02-262 Gabions 181
02-263 Soil cement 181
02-264 Erosion control fabrics 181
02-304 Tunneling instrumentation 181
02-310 Tunnel and shaft excavation 184
02-313 Prestressed concrete piles 192
02-315 Steel H-section piles, rolled steel 192
02-316 Steel pipe piles 193
02-317 Concrete filled steel shell piles 194
02-318 Wood piles 194
02-351 Drilled caissons 194
02-411 Steel sheeting shoring 195
02-412 Wood sheeting 196
02-413 Wales and shores 196
02-414 Bin type retaining walls 196
02-415 Rock bolting 196
02-441 Irrigation systems 200
02-451 Concrete pipe 203
02-452 Reinforced concrete pipe 203
02-453 Prestressed 150 PSI concrete pipe 204
02-455 Ductile iron pipe 206
02-456 Welded steel pipe 214
02-457 Steel pipe 218
02-458 Corrugated metal pipe 218
02-459 Corrugated polyethylene pipe 222
02-463 Extra strength vitrified clay pipe 222
02-464 ABS plastic drainage pipe 222
02-511 Foundation drainage under drains 226
02-512 Underslab drainage 227
02-520 Storm drains 227
02-531 Sand drains 228
02-533 Relief wells 228
02-535 Soil stabilization 229
02-540 Erosion control 229
02-545 Membrane lining systems 229
02-551 Gas distribution lines 229
02-553 Natural gas meters 229
02-554 Power, fuel and water costs 230
02-555 Water distribution lines 230
02-557 Water wells 231
02-559 Chilled water distribution 239
02-560 Waste water collection 241
02-610 Paving and surfacing 244
02-611 Crushed stone paving 244
02-612 Bituminous concrete paving 244
02-613 Cold milling of pavement 245
02-614 Portland cement concrete paving 245
02-615 Roller compacted concrete 245
02-616 Roadway repair and resurfacing 245
02-617 Pavement sealing 245
02-618 Pavement marking 245
02-620 Curbs and gutters 246
02-630 Sidewalk 247
02-680 Aviation fuel distribution 248
02-711 Chain link fences 251
02-712 Wire and misc. metal fences 260
02-713 Wood fencing 262
02-720 Road and parking appurtenances 263
02-721 Guard rails 263
2015 Heavy Construction Estimator, All Rights Reserved Page 2 (part 3)

02-722 Traffic signage 265


02-725 Parking barriers 265
02-730 Playing field seating 266
02-731 Recreational facilities 268
02-738 Yard improvements, fountains 269
02-764 Planter boxes 269
02-770 Trash containment 270
02-810 Landscape seeding 271
02-820 Top soil 271
02-830 Lawns maintenance 272
02-850 Railroad work 273
03-000 Concrete 275
03-110 Structural concrete formwork 275
03-210 Concrete reinforcing steel 285
03-220 Welded wire fabric 286
03-230 Stressing tendons 286
03-240 Fibrous concrete reinforcement 287
03-251 Concrete expansion joints 287
03-253 Waterstops 288
03-302 Concrete admixtures 288
03-305 Concrete curing 288
03-311 Normal weight structural concrete 289
03-320 Concrete topping 291
03-351 Exposed aggregate concrete 291
03-352 Rusticated concrete finish 291
03-353 Solid board concrete finish 292
03-354 Flexural concrete 292
03-356 Grooved concrete surface 292
03-363 Specially placed concrete 292
03-364 Gunite (shotcrete) 292
03-365 Roller compacted concrete 292
03-411 Precast wall panels 294
03-412 Precast deck 296
03-413 Precast structural sections 297
03-414 Miscellaneous precast items 298
03-420 Precast prestressed concrete 301
03-470 Precast retaining walls 302
03-510 Gypsum concrete deck 302
03-520 Insulating concrete roof deck 302
03-530 Cementitious wood fiber planks 303
03-610 Grout for equipment bases 303
2015 Heavy Construction Estimator, All Rights Reserved Page 3

03-620 Grouting for joints 303


03-711 Mechanical concrete cleaning 304
04-000 Masonry 304
04-110 Cement and lime mortars 304
04-160 Masonry accessories, reinforcing 305
04-170 Anchors and tie systems 305
04-180 Control joints 306
04-190 Mortar 306
04-205 Scaffolding, tubular steel 307
04-210 Brick masonry 307
04-213 Structural glazed tile 309
04-220 Concrete unit masonry 311
04-221 Glazed concrete unit masonry 314
04-222 Precast structural units for masonry 315
04-235 Pre-assembled masonry panels 316
04-240 Clay backing and partition tile 316
04-251 Terra cotta coping (veneer) 317
04-270 Glass unit masonry 317
04-285 Sound absorbing unit masonry 318
04-286 Sound absorbing glazed tile 318
04-410 Stone 318
04-422 Marble 318
04-423 Limestone panels 319
04-424 Granite panels 320
04-426 Slate 320
04-510 Masonry cleaning 320
04-520 Masonry restoration 321
04-550 Refractories, flue liners 321
05-000 Metals 321
05-120 Structural steel metal framing 321
05-130 Structural aluminum 324
05-150 Wire rope and accessories 325
05-180 Steel chain and accessories 330
05-211 Standard steel joists 330
05-310 Metal roof and floor deck 331
05-501 Anchor bolts 332
05-502 Expansion bolts 334
05-503 Anchor rings 335
05-504 Hex bolts 335
05-505 Threaded rods 335
05-510 Metal stairs 336
05-521 Pipe and tube railing 336
05-530 Grating 337
05-540 Castings 338
05-560 Cutting and drilling 339
05-570 Cable and accessories 339
05-651 Water control devices 339
05-720 Ornamental metal handrail and railings 340
05-730 Ornamental sheet metal louvers 340
05-805 Expansion joint covers 341
06-000 Wood and Plastics 341
06-111 Light wood framing 341
06-113 Sheathing, siding and subflooring 345
06-132 Mill framed structures 343
06-220 Mouldings 347
06-311 Preservative treated lumber 349
06-312 Fire retardant treated lumber 349
06-313 Kiln drying treatment 349
06-410 Cabinetwork 349
06-420 Paneling 350
2015 Heavy Construction Estimator, All Rights Reserved Page 3 (part 2)

06-510 Fiberglass 351


06-610 Plastic netting 353
06-710 Fasteners, supports and anchors 353
06-720 Supports 354
07-000 Thermal & Moisture Protection 355
07-111 Elastomeric waterproofing 355
07-112 Bituminous waterproofing 355
07-113 Modified asphalt waterproofing 355
07-121 Liquid waterproofing 356
07-130 Bentonite waterproofing 356
07-140 Metallic oxide waterproofing 356
07-150 Dampproofing 356
07-160 Bituminous dampproofing 356
07-170 Sprayed silicone dampproofing 357
07-180 Cementitious dampproofing 357
07-210 Building insulation 357
07-211 Loose fill insulation 358
07-213 Rigid insulation for roofs 358
07-215 Sprayed on insulation 359
07-216 Freezer & chiller panel insulation 359
07-310 Shingles 360
07-320 Tile roofing 360
07-410 Preformed roofing 360
07-420 Siding 361
07-510 Built-up bituminous roofing 362
07-520 Prepared roll roofing 363
07-530 Elastic sheet roofing 363
07-540 Fluid applied roofing 364
07-550 Inverted roof system 364
07-610 Sheet metal roofing 364
07-620 Flashing and trim 364
07-631 Gutters and downspouts 365
07-650 Flashing 366
07-660 Gravel stops 366
07-670 Vents 366
07-811 Plastic skylights 367
07-812 Metal framed skylights 367
07-830 Roof hatches 367
07-835 Access doors 368
07-840 Gravity ventilators 368
07-910 Joint fillers and gaskets 368
07-920 Sealants and caulking 369
08-000 Doors and Windows 370
08-110 Steel doors and frames 370
08-114 Metal semi-circular head doors 374
08-120 Aluminum doors and frames 374
2015 Heavy Construction Estimator, All Rights Reserved Page 4

08-210 Wood doors 374


08-214 Wood semi-circular head doors 378
08-310 Sliding metal fire doors 378
08-310 Motor operated fire doors 378
08-320 Sliding metal clad doors 378
08-327 Hanger doors 378
08-330 Coiling doors 379
08-340 Coiling grilles 379
08-345 Telescoping doors 380
08-350 Bi-folding doors 380
08-353 Accordion folding doors 380
08-355 Flexible doors 381
08-361 Sectional wood overhead doors 381
08-362 Sectional metal overhead doors 381
08-370 Sliding glass doors 382
08-378 Vertical lift doors 382
08-390 Screen and storm doors 382
08-395 Cold storage doors 382
08-420 Storefront doors 383
08-450 Revolving doors 383
08-510 Steel windows 383
08-520 Aluminum windows 384
08-610 Wood windows 384
08-710 Finish hardware 385
08-720 Door operators 388
08-730 Weatherstripping and seals 388
08-740 Thresholds 389
08-811 Plate and float glass 389
08-812 Sheet glass 389
08-813 Tempered safety-glass 389
08-814 Wired glass 389
08-815 Rough and figured glass 390
08-816 Bullet resistant glass 390
08-817 Spandrel glass 390
08-821 Coated glass 390
08-822 Laminated glass 391
08-823 Insulating glass 391
08-830 Mirror glass 391
08-840 Plastic glazing 392
08-850 Glazing accessories 392
09-000 Finishes 393
09-110 Partition & wall systems 393
09-150 Gypsum plaster 395
09-180 Cement plaster 396
09-195 Plaster accessories 396
09-260 Gypsum wallboard systems 397
09-280 Gypsum wallboard accessories 398
09-310 Ceramic tile 398
09-320 Unglazed tiles 399
09-330 Quarry tile 400
09-380 Conductive tile 400
09-410 Portland cement terrazzo 400
09-420 Precast terrazzo 401
09-430 Conductive terrazzo 402
09-510 Acoustical ceiling panels 402
09-512 Acoustical ceiling tiles 403
09-513 Metal ceiling systems 404
09-530 Acoustical insulation & barriers 404
09-540 Ceiling suspension systems 404
09-560 Wood strip flooring 404
2015 Heavy Construction Estimator, All Rights Reserved Page 4 (part 2)

09-570 Wood parquet flooring 405


09-590 Gym floors 405
09-600 Wood block industrial flooring 405
09-650 Resilient flooring 405
09-670 Fluid applied resilient flooring 406
09-675 Conductive resilient flooring 406
09-681 Carpet and padding 406
09-682 Carpet 406
09-720 Epoxy marble chip flooring 407
09-750 Brick flooring 407
09-760 Floor mats 407
09-841 Sprayed fireproofing 407
09-910 Exterior painting 408
09-920 Interior painting 409
09-930 Transparent finishes 410
09-940 Hydraulic structure work 410
09-952 Vinyl wall coverings 415
09-953 Cork wall covering 415
09-955 Wall fabrics 415
09-956 Corner guards 415
09-960 Flexible wood sheets 415
10-000 Specialties 415
10-151 Hospital cubicles 415
10-160 Toilet partitions and urinal screens 416
10-162 Metal toilet partitions 416
10-170 Shower & dressing compartments 417
10-182 Turnstiles 417
10-290 Pest control 417
10-350 Flagpoles 417
10-410 Directory and bulletin boards 418
10-420 Plaques 419
10-440 Signs 419
10-501 Wardrobe lockers 420
10-502 Box lockers 420
10-503 Basket lockers 421
10-520 Fire extinguishers accessories 421
10-522 Fire extinguisher cabinets 422
10-551 Mail chutes 422
10-552 Mail boxes 422
10-610 Demountable partitions 423
10-617 Metal partitions, movable 423
10-618 Wire mesh partitions 424
10-671 Metal storage shelving 425
10-672 Wood shelving 426
10-800 Toilet and bath equipment 426
10-820 Dispensers and receptacles 426
10-830 Medicine cabinets 427
10-840 Ash trays 427
10-850 Shower curtain rod 427
10-860 Janitorial accessories 427
10-870 Hand dryers 427
10-880 Hospital accessories 428
10-900 Wardrobe specialties 428
10-950 Window treatment 428
11-000 Equipment 428
11-051 Vacuum cleaning system 428
11-100 Bank and vault equipment 428
11-175 Motorized checkroom equipment 430
11-180 Darkroom equipment 430
11-415 Unit kitchens 431
2015 Heavy Construction Estimator, All Rights Reserved Page 4 (part 3)

11-420 Cooking equipment 432


11-425 Ventilation hoods 433
11-428 Bakery equipment 433
11-430 Dishwashing equipment 434
11-435 Garbage disposers 434
11-436 Sprays and hoses 434
11-437 Pot and pan washing 434
11-440 Food preparation machines 434
11-450 Food preparation tables 435
11-460 Food serving units, ice machines 435
11-463 Serving equipment 435
11-465 Dispensing equipment 436
11-470 Refrigerated cases 436
11-471 Refrigerated boxes 437
11-473 Heated and holding cabinets 438
11-475 Shelving and racks 438
11-510 Gymnasium athletic equipment 439
11-520 Bowling alley equipment 439
11-551 Paint spray booths 440
11-570 Shop equipment 440
11-610 Steel laboratory cabinets 441
11-620 Medical laboratory equipment 441
11-621 Laboratory instruments 442
11-630 Laundry equipment 442
11-701 Medical equipment 443
11-702 Hospital cardiac care equipment 443
11-703 Hospital medication equipment 444
11-704 Optical care equipment 444
11-705 Physical therapy equipment 444
11-706 Radiology equipment 445
11-710 Medical sterilizing equipment 445
2015 Heavy Construction Estimator, All Rights Reserved Page 5

11-720 Surgical equipment 445


11-730 X-ray equipment 446
11-740 Autopsy equipment 446
11-750 Patient care equipment 446
11-760 Dental care equipment 446
11-770 General medical equipment 447
11-780 Medical furnishings 447
11-790 Medical instruments 447
11-861 Packaged incinerators 448
11-862 Waste compactors 448
11-871 Loading dock levelers 448
11-873 Portable platforms 448
11-874 Seals and shelters 448
11-875 Dock bumpers 449
11-910 Residential kitchen equipment 449
11-920 Residential washing equipment 450
11-930 Residential environment equip. 450
11-940 Access stairs 450
11-970 Stage equipment 450
11-980 Rifle range equipment 451
11-990 Warehouse equipment 451
12-000 Furnishings 451
12-500 Drapery accessories 451
12-600 Blinds 451
12-700 Floor mats 452
12-800 Landscape partitions 452
12-900 Furniture 452
13-000 Special Construction 452
13-150 Access and pedestal floors 452
13-162 Radio frequency shielding 452
13-205 Above ground storage tanks 454
13-215 Underground storage tanks 454
13-271 Treatment of hazardous waste 454
13-272 Primary treatment of waste 456
13-273 Secondary waste treatment 459
13-274 Tertiary treatment 465
13-275 Chemical fixation & stabilization 473
13-276 Sludge treatment 474
13-277 Thermal treatment and destruction 481
13-278 Disposal of hazardous waste 485
13-281 Nuclear construction 490
13-600 Air supported structures 492
13-601 Pre-engineered buildings 492
13-602 Metal building systems 494
13-800 Vaults 495
13-850 Swimming pool equipment 495
13-860 Swimming pool filtering systems 496
13-870 Swimming pool systems 496
13-875 Therapeutic pools 497
13-947 Energy monitoring and control 497
14-000 Conveying Systems 503
14-204 Collective elevators 503
14-205 Automatic elevators 504
14-206 Hydraulic elevators 504
14-207 Small elevators 505
14-210 Freight elevators 505
14-211 Collective freight elevators 505
14-212 Hydraulic freight elevators 505
14-301 Industrial hoists, light duty 506
14-302 Industrial hoists, heavy duty 506
2015 Heavy Construction Estimator, All Rights Reserved Page 5 (part 2)

14-310 Overhead traveling bridge cranes 507


14-402 Chair lifts 507
14-403 Vehicular lifts 507
14-404 Ash hoists 508
14-405 Commercial lifts 508
14-501 Material handling & transportation 508
14-561 Linen chutes 508
14-564 Trash chutes 508
14-565 Waste handling systems 509
14-610 Escalators 509
14-620 Moving sidewalks 509
14-710 Pneumatic message systems 509
14-750 Pneumatic trash systems 509
15-000 Mechanical 509
15-041 Valve tags 510
15-042 Piping systems identification 510
15-043 Balancing of HVAC systems 510
15-048 Testing, startup and checkout 512
15-061 Steel pipe 512
15-061 Steel pipe fittings 515
15-061 Roll grooved steel pipe fittings 521
15-061 Galvanized steel pipe fittings 523
15-062 Cast iron pipe 525
15-063 Copper pipe 534
15-064 Plastic pipe 540
15-065 Glass pipe 555
15-066 Stainless steel pipe 555
15-075 Rubber hose 564
15-080 Piping specialties 565
15-082 Swivel joints 566
15-083 Strainers, filters and driers 566
15-084 Basket strainers 567
15-086 Vacuum breakers 567
15-087 Shock absorbers 568
15-088 Medical gas system specialties 568
15-092 Wall seals, sleeves, holes 568
15-093 Flashing and safing 569
15-094 Hangers and supports 569
15-100 Valves, cocks and faucets 574
15-101 Gate valves 575
15-102 Flap and flush valves 577
15-103 Butterfly valves 577
15-104 Ball valves 578
15-105 Globe valves 578
15-109 Wall hydrants 580
15-110 Check valve 581
15-111 Swing check valves 581
15-112 Backwater valves 582
15-115 Faucets (hose bibbs) 582
15-116 Washer and dryer outlets 582
15-119 Flow control valves 583
15-121 Pressure regulating valves 583
15-122 Pressure relief valves 583
15-124 Solenoid valves 583
15-125 Steam traps 583
15-130 Tempering controllers 584
15-131 Trap primers 584
15-140 Pumps 584
15-141 Centrifugal pumps 584
15-142 Rotary pumps 586
2015 Heavy Construction Estimator, All Rights Reserved Page 5 (part 3)

15-143 Turbine pumps 587


15-145 Sump pumps 587
15-146 Submersible pump 588
15-147 Pneumatic ejectors 588
15-148 Pneumatic pumps 588
15-151 Vacuum pumps 589
15-152 Medical air compressors 589
15-160 Pumps 589
15-161 Vibration isolation 589
15-162 Piping expansion joints 591
15-173 Flow measuring devices 591
15-176 Steel tanks 592
15-177 Plastic tanks 594
15-178 Gas storage tanks 595
15-182 Piping insulation 595
15-183 Tempered water piping 603
15-189 Insulation foam rubber 604
15-190 Duct insulation 604
15-230 Booster pumping equipment 605
15-240 Water reservoirs and tanks 605
15-251 Filtration equipment 606
15-253 Water softening equipment 606
15-254 Water deionizers 606
15-261 Chlorinating equipment 606
15-262 Chemical feeders 606
15-263 Water filters 606
15-270 Water metering 607
15-310 Sewage ejectors, submersible 607
15-320 Grease interceptors 607
15-380 Sewage treatment equipment 608
15-390 Aeration equipment 608
15-421 Floor and shower drains 609
15-422 Roof drains 610
15-423 Cleanouts 611
15-424 Domestic water heaters 611
15-425 Commercial water heaters 612
15-428 Sediment interceptors & separators 612
15-430 Waste and vent piping 613
15-450 Plumbing fixtures and trim 613
15-452 Plumbing fixture carriers 616
15-455 Domestic water coolers 616
15-457 Bath & shower valves & heads 616
15-458 Shower receptors and enclosures 616
15-470 Swimming pool equipment 616
15-471 Circulation and filtration equipment 617
15-473 Swimming pool cleaning equipment 617
15-475 Chemical treatment equipment 618
15-501 Wet automatic sprinkler systems 618
15-502 Dry automatic sprinkler systems 618
15-503 Pre-action sprinkler system 618
15-504 Deluge sprinkler systems 618
15-506 Foam fire protection systems 618
15-508 Halon fire protection systems 619
2015 Heavy Construction Estimator, All Rights Reserved Page 6

15-510 Fire sprinkler equipment 619


15-522 Carbon dioxide equipment 619
15-530 Standpipe and fire hose equipment 620
15-532 Fire cabinets and accessories 620
15-534 Fire hose 621
15-605 Fuel handling systems 621
15-620 Boilers 622
15-621 Cast iron boilers 623
15-622 Firebox boilers 623
15-623 Scotch marine boilers 624
15-624 Water tube boilers 625
15-625 Cast iron steam boilers 626
15-627 Boiler connection 626
15-639 Boiler accessories 627
15-655 Refrigerant compressors 628
15-661 Air cooled condensing units 629
15-662 Water cooled condensing units 630
15-669 Evaporative coolers 630
15-670 Chillers 630
15-671 Reciprocating chillers 631
15-672 Air cooled chillers 631
15-674 Centrifugal water cooled chillers 631
15-675 Absorption chillers 632
15-680 Propeller type cooling towers 632
15-681 Centrifugal type cooling towers 633
15-695 Condensers 633
15-699 Refrigeration specialties 634
15-715 Steam specialties 636
15-720 Condensate pump and receiver sets 636
15-731 Storage water heaters 637
15-732 Heat exchangers 637
15-741 Induction units 638
15-745 Radiant panels and heaters 639
15-750 Coils 639
15-751 Hot & chilled water connections 641
15-752 Coil connections 643
15-753 Baseboard radiant convectors 643
15-754 Convectors, hot water 646
15-760 Unit heaters 646
15-761 Fan coil units 648
15-770 Packaged heating and cooling 649
15-772 Packaged heat pumps 650
15-773 Computer room air conditioners 651
15-781 Humidifiers 651
15-785 Dehumidifiers 652
15-810 Furnaces 652
15-821 Centrifugal fans 653
15-824 Propeller fans 656
15-826 Fly fans 656
15-827 Axial flow fans 657
15-829 Exhaust fans 657
15-830 Power roof ventilator 658
15-831 Power wall ventilators 658
15-832 Roof ventilators 658
15-833 Fans 659
15-834 Air handling units 659
15-840 Ductwork 660
15-848 Duct lining 661
15-851 Tailpipe exhaust equipment 662
15-855 Breeching and smoke pipe 664
2015 Heavy Construction Estimator, All Rights Reserved Page 6 (part 2)

15-861 Manual dampers 665


15-862 Dampers, motorized 665
15-864 Fire dampers 665
15-865 Smoke and fire dampers 666
15-866 Turning vanes 667
15-867 Distribution devices 667
15-868 Duct access panels and doors 670
15-871 Wall and floor diffusers 670
15-872 Ceiling diffusers 670
15-873 Louvers 671
15-880 Air treatment equipment 671
15-881 Air separators 672
15-883 High efficiency filters 672
15-888 Dust collectors 673
15-890 Sound attenuators 673
15-915 Air compressors and dryers 674
15-930 Primary HVAC control devices 675
15-931 Thermostats 676
15-932 Humidistats 676
15-933 Static pressure controllers 676
15-934 Aquastats 677
15-935 Freezestats 677
15-936 Carbon monoxide detectors 677
15-937 Control dampers 677
15-938 Control valves 677
15-939 Control motors 678
15-940 Relays and switches 678
15-942 Timers 679
15-960 Recorders 679
16-000 Electrical 679
16-050 Basic materials and methods 679
16-102 Cable instalation methods 680
16-110 Raceways 680
16-111 Conduit 681
16-112 Bus duct 691
16-113 Underfloor ducts 693
16-114 Cable trays 694
16-119 Metal framing materials 696
16-120 Wire and cable 697
16-121 Wire connections and devices 705
16-122 Multi-conductor cables 708
16-130 Boxes 710
16-140 Wiring devices 711
16-151 Motors and equipment 716
16-152 Motor mounting 717
16-155 Motor starters 717
16-170 Motor and circuit disconnects 719
16-182 Circuit breakers not in panel 721
16-211 Motor generator sets 721
16-251 Automatic transfer equipment 722
16-252 Uninterrupted power systems 724
16-311 Primary unit substations 726
16-312 Secondary unit substations 729
16-320 Sectionalizing switches 731
16-330 Transformers 731
16-411 Underground distribution 734
16-413 Pole line construction 735
16-430 Metering 741
16-431 Ground fault protection 742
16-450 Grounding 742
2015 Heavy Construction Estimator, All Rights Reserved Page 6 (part 3)

16-451 Copper conductors 744


16-452 Ground rods 745
16-453 Ground clamps and fittings 745
16-454 Cadweld bonding 746
16-456 Grounding equipment 746
16-460 Transformers 747
16-470 Distribution switchboards 747
16-471 Branch circuit panelboard 752
16-510 Lighting fixtures 757
16-511 Architectural lighting fixtures 766
16-512 Commercial lighting fixtures 767
16-513 Industrial fixtures 770
16-520 Exterior lighting fixtures 776
16-521 Exterior wall mounted fixtures 776
16-522 Walkway lighting 777
16-523 Flood lights 777
16-524 Street lighting 777
16-525 Exterior area lighting 778
16-530 Special purpose lighting fixtures 778
16-570 Poles and standards 779
16-580 Aviation lighting system 781
16-620 Emergency light and power 786
16-622 Battery charging equipment 786
16-630 Special electrical distribution 786
16-640 Cathodic protection 787
16-650 RF filters 788
16-720 Alarm and detection systems 788
16-721 Fire alarm & detection panels 788
16-730 Clock and program systems 789
16-740 Telephone equipment 790
16-760 Intercommunication equipment 790
16-770 Public address equipment 791
16-780 Closed circuit television 791
16-795 Fiber optics cable 793
16-797 Intrusion detection system 794
16-860 Electric resistance heating 796
16-881 Electric duct heaters & reheaters 796
16-890 Electric heaters 797
16-921 Motor control centers 797
16-922 Motor control centers 797
16-923 Factory installed accessories 799
16-930 Lighting control equipment 799
16-950 Electric HVAC controls 800
16-960 Limit switches 800
16-961 Sensing devices 800
16-962 Level switches 801
16-990 Cabinets and components 801
2015 Heavy Construction Estimator, All Rights Reserved Page 7

Heavy Construction Estimator Is An Encyclopedia


Of 2015 Heavy Construction Costs

The 2015 Heavy Construction Estimator lists estimated construction costs to general contractors as
of mid-2015. Overhead & profit are not included.

This Manual is in CSI Order. Anyone familiar with the 16-division Construction Specification Institute
format should have no trouble locating cost estimates for nearly anything in this manual. An electronic
index is also available. To search by CSI number or keyword, click on the Index Window button on the
tool bar. Instructions for using the National Estimator program begin on page 802.

Material Costs

Material Costs for each item are listed in the column headed "Material." These are neither retail nor
wholesale prices. They are estimates of what most contractors who buy in moderate volume will pay
suppliers as of mid-2015. Discounts may be available for purchases in larger volumes.

Add Delivery Expense to the material cost for other than local delivery of reasonably large quantities.
Cost of delivery varies with the distance from source of supply, method of transportation, and quantity to
be delivered. But most material dealers absorb the delivery cost on local delivery (5 to 15 miles) of larger
quantities to good customers. Add the expense of job site delivery when it is a significant part of the
material cost.

Add Sales Tax when sales tax will be charged to the contractor buying the materials.

Waste and Coverage loss is included in the installed material cost. The cost of many materials per
unit after installation is greater than the purchase price for the same unit because of waste, shrinkage or
coverage loss during installation. For example, about 120 square feet of nominal 1" x 4" square edge
boards will be needed to cover 100 square feet of floor or wall. There is no coverage loss with plywood
sheathing, but waste due to cutting and fitting will average about 6%.

Costs in the "Material" column assume normal waste and coverage loss. Small and irregular jobs may
require a greater waste allowance. Materials priced without installation (with no labor cost) do not
include an allowance for waste and coverage except as noted.

Labor Costs

Labor Costs for installing the material or doing the work described are listed in the column headed
"Labor." The labor cost per unit is the hourly labor cost multiplied by the manhours per unit shown after
the @ sign in the "Craft@Hours" column. Labor cost includes the basic wage, the employer's
contribution to welfare, pension, vacation and apprentice funds and all tax and insurance charges based
on wages.

Hourly labor costs for the various crafts are listed below.
2015 Heavy Construction Estimator, All Rights Reserved Page 8

Asbestos worker 50.07


Boilermaker 50.03
Bricklayer 44.75
Bricklayer (semi-skilled) 35.40
Carpenter apprentice 34.88
Carpenter 43.82
Cement finisher 42.51
Electrician 50.00
Elevator constructor apprentice 37.11
Elevator constructor 46.39
Equipment operator, crane and shovel 47.14
Equipment operator, light 37.18
Equipment operator, medium 37.18
Equipment operator, oilers 37.18
Glazier 45.68
Laborer (semi-skilled) 34.88
Lather 40.33
Marble setter 44.34
Millwright 44.45
Painter, ordinary 43.83
Painter, structural steel 53.91
Paperhanger 32.87
Pile driver apprentice 39.89
Pile driver 46.93
Plasterer 45.80
Plasterer (semi-skilled) 38.27
Plumber apprentice 44.37
Plumber 52.20
Powderman 34.88
Rodman (reinforcing) 52.11
Roofer, composition 41.64
Roofer (semi-skilled) 33.31
Roofer, tile and slate 41.64
Sheet metal worker apprentice 39.59
Sheet metal worker 49.49
Skilled worker 34.88
Sprinkler installer apprentice 42.47
Sprinkler installer 53.09
Steamfitter (pipefitter) apprentice 40.63
Steamfitter (pipefitters) 50.79
Stone mason 44.34
Structural steel worker apprentice 43.62
Structural steel worker 54.52
Tile mosaic and terrazzo worker 42.31
Tile layer (floor) 42.19
Tile layer (semi-skilled) 33.75
Truck driver, heavy 41.85
Truck driver, light 33.48
Welder, structural steel 54.52
Janitor 20.28
Field draftsman 45.76
Surveyor, chief 56.43
Surveyor 49.35
Field engineer 67.69
Industrial hygiene technician 72.81
Decontamination technician 53.55
Decontamination technician supervisor 74.83
Hot cell technician 60.53
Hot cell technician, senior 67.56
2015 Heavy Construction Estimator, All Rights Reserved Page 8 (part 2)

Lead decontamination technician 65.26


Radiation protection technician 67.82
Project manager 93.24
Assistant project manager 77.82
General superintendent 65.79
Civil superintendent 56.50
Carpenter superintendent 51.43
Mechanical superintendent 56.50
Electrical superintendent 57.50
Contract administrator 39.81
Comptroller 37.85
Administrative clerk 27.17
Personnel manager 40.03
Personnel clerk 21.39
Office manager 37.85
Interpreter 37.85
Accountant 37.85
Bookkeeper 22.67
Timekeeper 20.92
Pay master 21.39
Payroll clerks 21.39
Stenographer 20.38
Typist 20.38
Clerks 18.44
Mail clerk 18.44
Messenger 18.44
Reproduction operator 16.56
Cost engineer 55.80
Cost estimator 47.35
Civil engineer 61.79
Mechanical engineer 61.05
Electrical engineer 64.05
Field engineer 64.26
Office engineer 61.79
Engineering clerks 55.88
Chief planning engineer 55.88
Quality control engineer 55.88
Project engineer 66.67
Surveyor 46.81
Draftsman 43.38
Planners 43.10
Schedulers 43.10
Inspectors 39.99
Construction lab technicians 38.09
Chief purchasing agent 45.75
Purchasing agent 38.40
Buyers 38.40
Expediters 38.40
Safety engineer 70.83
Safety clerk 48.20
Security chief 70.83
Security officer 57.82
Watchman/guard 48.20
Fire chief 57.82
Fire fighter 27.25
Tunnel equipment operator, median 51.03
Tunnel equipment operator, light 51.03
Tunnel groutman 47.29
Tunnel heading motorman 51.03
Tunnel heading motorman (backup) 51.03
2015 Heavy Construction Estimator, All Rights Reserved Page 8 (part 3)

Tunnel miner (general) 51.03


Tunnel miner (semi-skilled) 47.29
Tunnel mole nipper 51.03
Tunnel mucking machine operator 51.03
Tunnel nozzleman 51.03
Tunnel shifter 54.95
Tunnel steel worker 51.03
Outside bricklayer apprentice 23.84
Outside bricklayer 28.88
Outside carpenter apprentice 39.32
Outside carpenter 47.65
Outside cement finisher apprentice 35.40
Outside cement finisher 42.98
Outside diver 116.90
Outside divers tender 53.10
Outside electrician apprentice 48.90
Outside electrician 58.18
Outside equipment operator, heavy 48.78
Outside equipment operator, light 33.25
Outside equipment operator, medium 44.20
Outside equipment operator, oilers 35.62
Outside laborer apprentice (semi-skilled) 16.20
Outside laborer (semi-skilled) 20.24
Outside plumber apprentice 35.24
Outside plumber 42.70
Outside rodman apprentice 47.29
Outside rodman 57.01
Outside steel worker apprentice 53.49
Outside steel worker 64.76
Outside truck driver, heavy 40.06
Outside truck driver, light 35.60
Maintenance carpenter 42.62
Maintenance electrician 46.77
Maintenance heating worker 40.59
Maintenance mason 42.63
Maintenance metal worker 42.63
Maintenance painter 42.63
Maintenance plumber 37.47
Maintenance refrig. & A/C worker 40.59
Maintenance roofer 42.63
2015 Heavy Construction Estimator, All Rights Reserved Page 9

Supervision Expense to the general contractor is not included in the labor cost. The cost of
supervision and other non-productive labor varies widely from job to job. Calculate the cost of supervision
and other non-productive labor and add this to the estimate.

Manhours per Unit and the Craft performing the work are listed in the "Craft@Hrs" column. The
paragraphs that follow explain the "Craft@Hrs" column. To find the units of work done per man in an
8-hour day, divide 8 by the manhours per unit. To find the units done by a crew in an 8-hour day,
multiply the units per man per 8-hour day by the number of crew members.

Manhours Include all productive labor normally associated with installing the materials described. This
will usually include tasks such as:

• Unloading and storing construction materials, tools and equipment on site.


• Moving tools and equipment from a storage area or truck on site at the beginning of the day.
• Returning tools and equipment to a storage area or truck on site at the end of the day.
• Normal time lost for work breaks.
• Planning and discussing the work to be performed.
• Normal handling, measuring, cutting and fitting.
• Keeping a record of the time spent and work done.
• Regular cleanup of construction debris.
• Infrequent correction or repairs required because of faulty installation.

Adjust the Labor Cost to the job you are figuring when your actual hourly labor cost is known or can be
estimated. The labor costs listed above will apply within a few percent on many jobs. But labor costs
may be much higher or much lower on the job you are estimating.

If an hourly wage rate listed above is not accurate for your job, use your own wage rate. National
Estimator Help explains how. Press the F1 key, click on Search, type "wage" and double click on
"Custom" to see the procedure for setting your own wage rates.

Adjust for Unusual Labor Productivity. Costs in the labor column are for normal conditions:
experienced craftsmen working on reasonably well planned and managed new construction with fair to
good productivity. Labor estimates assume that materials are standard grade, appropriate tools are on
hand, work done by other crafts is adequate, layout and installation are relatively uncomplicated, and
working conditions don't slow progress.

Working conditions at the job site have a major effect on labor cost. Estimating experience and careful
analysis can help you predict the effect of most changes in working conditions. Obviously, no single
adjustment will apply on all jobs. But the adjustments that follow should help you produce more
accurate labor estimates. More than one of these conditions may apply on an job.

Add 10% to 15% for most trades when working temperatures are below 40 degrees or above 95
degrees.

Add 15% to 25% for work on a ladder or a scaffold, in a crawl space, in a congested area or remote
from the material storage point.

Deduct 10% when the work is in a large open area with excellent access and good light.

Add 1% for each 10 feet materials must be lifted above ground level.

Add 5% to 50% for tradesmen with below average skills. Deduct 5% to 25% for highly motivated, highly
skilled tradesmen.

Deduct 10% to 20% when an identical task is repeated many times for several days at the same site.

Add 30% to 50% on small jobs where fitting and matching of materials is required, adjacent surfaces
have to be protected and the job site is occupied during construction.
2015 Heavy Construction Estimator, All Rights Reserved Page 9 (part 2)

Add 25% to 50% for work done following a major flood, fire, earthquake, hurricane or tornado while
skilled tradesmen are not readily available. Material costs may also be higher after a major disaster.

Add 10% to 35% for demanding specs, rigid inspections, unreliable suppliers, a difficult owner or an
inexperienced architect.

Area Modification Factors on page 99 may help improve the accuracy of your estimates. Add or
deduct these adjustment percentages for material, labor and equipment to find your local estimated
cost.
2015 Heavy Construction Estimator, All Rights Reserved Page 10

Equipment Costs

Equipment Costs are listed in the column headed "Equipment." Manhour estimates assume that the
equipment described in each section is available and used to good advantage. For all crews, labor and
equipment costs are proportional, they change with the duration of the job. In practice, specialized
equipment can't always be used 8 hours per day. Equipment costs per unit of work completed will be
higher, for example, when a tractor is used for 4 hours during a day and sits idle for the remaining 4
hours. Make allowances accordingly. Add the cost of moving equipment on and off the site.

Costs for expendable supplies (such as rags or tape) should be either itemized separately or included
with overhead expense and do not appear in the Equipment cost column. "Small tools" means hand
tools such as a screwdriver, hammer or shovel. "Miscellaneous power tools" includes equipment such
as a power drill, electric hand sander or router. Some type of tool is required for nearly every
construction task.

Hourly equipment costs used in this estimating database are listed below.

Air compressor, 1,600 CFM at 100 PSI 77.24


Air compressor, 250 CFM, 100 PSI 16.67
Air compressor, 375 CFM, 100 PSI 21.00
Air compressor, 450 CFM, 100 PSI 29.09
Air compressor, 600 CFM at 100 PSI, quiet 35.00
Air compressor, 750 CFM at 100 PSI 41.14
Air compressor, shop type, 330 CFM at 250 PSI 21.55
Air compressor, shop type, 850 CFM at 290 PSI 44.74
Air hose, 1", 100' length, hardrock 0.79
Air hose, 1-1/4", 100', hardrock 0.97
Air hose, 2", 100' length, hardrock 1.60
Air hose, 3", 100', hardrock 3.95
Asphalt distributor, 3000 gal., for truck mounting 24.77
Asphalt finisher, 10' W, with screed, pneumatic 92.87
Asphalt kettle for pavement work, 110 gal., towed 4.25
Asphalt profiler, 120" wide, 10" depth 216.75
Asphalt sealcoater, 200 gallon, 50" wide 11.58
Auger drill, 8" diameter, to 250' depth 59.22
Auger drill, hydraulic, to 60' depth, 8" x 21" leads 47.93
Belt loader, 12' x 60", triple deck screen 11.73
Belt loader, 24" x 50', 355 tons per hour 12.23
Belt loader, 72" W, single deck vibrating screen 12.94
Belt loader, dozer trapbelt feeder 4.50
Blade for D-10 dozer, universal 23.00
Blade for D-3C dozer, angle tilt 3.18
Blade for D-4 dozer, angle tilt 4.19
Blade for D-5 dozer, angle tilt 4.65
Blade for D-5 dozer, straight 4.57
Blade for D-6 dozer, angle tilt 6.72
Blade for D-7 dozer, universal 9.48
Blade for D-8 dozer, straight 11.55
Blade for D-8 dozer, universal 12.24
Blade for D-9 dozer, universal 16.18
Bottom dump truck trailer, 18 CY, 27 ton 11.24
Bottom dump truck trailer, 20 CY, 30 ton 13.18
Brush chipper, 6" diameter log capacity, towed 25.60
Centrifugal pump, 4", 465 GPM at 40' head 14.78
Centrifugal pump, 6", 100 GPM at 40' head 28.21
Chain boom wh. tr., 6" to 18" W, 60" D & bckhoe 21.69
Chain boom wh. tr., to 24" W, 72" D, 67 HP 94.83
2015 Heavy Construction Estimator, All Rights Reserved Page 10 (part 2)

Chain boom wh. tr., to 48" W, 90 " D, 150 HP 150.51


Chain saw, 31" bar 2.82
Chip spreader, self-propelled, 10' wide 31.17
Chip spreader, towed, 8' wide 2.59
Co2 blaster, 1,500 pounds per hour, dual hose 87.99
Co2 blaster, 1,500 lbs. per hour single hose 79.84
Co2 blaster, 1000 pounds per hour, single hose 55.91
Compactor, rammer, 11" x 13" shoe 3.16
Compactor, rammer, 13" x 11" shoe 3.83
Concrete bucket for crane, 8 CY 6.31
Concrete mixer, 6 CF, 8 HP, portable 3.52
Concrete paver, slipform, crawler, 25' wide 113.03
Concrete pump truck, 117 CY per hour, 75' boom 129.75
Concrete saw, walk-behind, 6.63" depth 9.21
Concrete slipform paver, 50' width, crawler type 275.97
Concrete vibrator, 2.5" diameter, high frequency 2.64
Core drill, skid-mounted, NX, to 400' depth 12.73
Core drill, skid mounted, 44 HP, to 1,000' depth 19.22
Crane for dragline or clamshell, 4 CY, 115' boom 141.14
Crane for dragline or clamshell, 5 CY, 135' boom 182.78
Crane for dragline or clamshell, 7 CY, 130' boom 357.56
Crane, 4-WD, rough terrain, hydraulic, 10 ton 37.96
Crane, 4-WD, rough terrain, hydraulic, 22 ton 57.10
Crane, crawler, mechanical, 100 ton, 210' boom 131.66
Crane, crawler, mechanical, 240 ton, 260' boom 327.72
Crane, crawler, mechanical, 25 ton, 50' boom 39.89
Crane, crawler, mechanical, 40 ton, 50 boom 63.23
Crane, crawler, mechanical, 85 ton, 160' boom 129.88
Crane, hydraulic, 115' boom, truck-mounted 104.57
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15
Crane, hydraulic, 8 ton, 85' boom 19.07
Crusher plant, portable, 15" x 36" jaw 100.53
30-ton mobile drum crusher 14.25
D-10N crawler tractor dozer 200.32
D-3C crawler tractor dozer 25.54
D-4 crawler tractor dozer, power shift 33.46
D-5H crawler tractor dozer, low ground pressure 56.13
D-5H crawler tractor dozer, power shift 50.09
D-6D crawler tractor dozer, power shift 55.99
D-6H crawler tractor dozer, power shift 64.25
D-7H crawler tractor dozer, low ground pressure 108.08
D-8L crawler tractor dozer, power shift 141.02
D-9N crawler tractor dozer 166.86
D-7H crawler tractor dozer 115.19
Dowel assembly kit, horizontal, 18" depth 2.89
Dragline bucket 4 CY medium weight 5.08
Dragline bucket, 5 CY, heavy weight 9.53
Dragline bucket, 6 CY, heavy weight 10.20
Dragline bucket, 7 CY, heavy weight 13.58
Dredge, 5,500 HP, 30 inch 898.85
Dump body for truck, 12 CY, 36,000 lbs. 4.47
Dump body for truck, 8 CY, 30,000 lbs. 4.26
Dump truck, off highway, 100 CY, 116 to 153 ton 426.07
Dump tr., off highway, 12 to 16 CY, 19 ton, 6x6 54.17
Dump tr., off highway, 13 to 17 CY, 6x6, 23 tons 70.74
Dump truck, off highway, 14 to 19 CY, 25 tons 69.13
Dump truck, off highway, 22 to 30 CY, 35 ton 116.26
Dump truck, off highway, 32 to 44 CY, 50 ton 177.38
Dump truck, off highway, 47 to 67 CY, 85 ton 239.47
2015 Heavy Construction Estimator, All Rights Reserved Page 10 (part 3)

Dump truck, off highway, 67 to 83 CY, 98 ton 265.46


Flatbed for truck, 8' wide, 16' long 1.10
Flatbed for truck, 8' wide, 24' long 1.44
Flatbed for truck, 8' wide, 9' long 0.82
Fork lift, wheel tire, 8,000 lb. at 24" load center 22.94
Fork lift, rough terrain, 8,000 lb., to 16' high 19.10
Front-end crawler loader, 1 CY 26.73
Front-end crawler loader, 2 CY, 953 56.65
Front-end crawler loader, 2.5 CY, 963 74.22
Front-end crawler loader, 3.75 CY, 973 129.83
Front-end wheel loader, 1.75 CY, articulated 30.07
Front-end wheel loader, 2.5 CY, articulated, 936E 50.79
Front-end wheel loader, 3 CY, articulated, 950E 64.00
Front-end wheel loader, 4 CY bucket 84.79
Front-end wheel loader, 4 CY, articulated, 966E 90.72
Front-end wheel loader, 7 CY, articulated, 988B 155.15
Front end wheel ldr., 13.5 CY, articulated, 992C 319.00
Front end wheel ldr., 5.25 CY, articulated, 980C 109.54
Front end wheel ldr., tool carrier, 28B 40.42
Generator, 5.5 KW 120/240 volt, portable 2.70
Gradall excavator, 1.4 CY, 4x4 65.65
Grout pump and mixer, 20 GPM at 100 PSI 6.64
Hoist for flatbed truck, 2 ton 1.23
Hoist for flatbed truck, 4 ton 1.43
Hydra-pak tamper, 21" wide, 30" long, 27" high 3.36
Hydraulic jack, 30 ton, with 50' rods 8.39
Landfill compactor, 58" deep, 38.5" long 80.80
Line truck with aerial platform 54.70
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91
Log chipper, 16" diameter, trailer-mounted 11.56
Lowboy trailer, 120 ton, 4 axle 26.90
Lowboy trailer, 35 ton, 2 axle 8.92
Lowboy trailer, 75 ton, 3 axle 16.78
Miscellaneous power tools 7.60
Motor grader, Cat 12-G, articulated, power shift 47.88
Motor grader, Cat 120-G, articulated, power shift 38.92
Motor grader, Cat 130G, articulated, power shift 45.35
Motor grader, Cat 14G, articulated, power shift 71.92
Pavement line striper truck 85.83
Paving breaker, pneumatic, 86 pound 8.15
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92
Pick-up truck, 4x2, 5,200 gross vehicle weight 11.82
Pick-up truck, compact, 1/4 ton, 4x2, 3,500 lbs. 8.47
Pick-up truck, suburban, 4x2, 8,600 lbs. 14.42
Pick-up truck, suburban, 4x4, 8,600 lbs. 15.16
Pick-up truck, 1 ton, 8,600 gross vehicle weight 17.01
Pile hammer, single action, 19,500 foot-pounds 24.06
Pile hammer, vibrating, 116 ton force drive 114.25
Pile leads, 8"x 26", 60' length 10.82
Pump for core drill, 3/4", 7 GPM at 100 PSI 0.95
Rake for D-8 crawler tractor, multi-application 8.30
Ripper beam, multi-shank, for D-7 dozer 9.42
Ripper beam, multi-shank, for D-9 dozer 17.02
Ripper beam, single shank, for D-5 dozer 4.55
Ripper beam, single shank, for D-8 dozer 16.55
Ripper shanks for beam on D-5 dozer, each 0.30
Ripper shanks for beam on D-7 dozer, each 0.51
Ripper shanks for beam on D-8 dozer, each 0.99
Ripper shanks for beam on D-9 dozer, each 1.06
2015 Heavy Construction Estimator, All Rights Reserved Page 10 (part 4)

Roller, static, 12 ton, 84" wide, 3-wheel 21.86


Roller, static, 13 ton, 84" wide, 11 tire 23.87
Roller, static, 30 tons, 96" wide 40.35
Roller, static, steel wheel, 5 ton, 42" wide 12.65
Roller, vibrating, 6.9 ton, 55" wide 39.73
Roller, vibrating, double drum, 11 ton, 66" wide 59.65
Roller, vibrating, single drum, 22 ton, 84" wide 63.56
Roller, vibrating, steel drum, 13 ton, 66" wide 48.26
Roller, vibrating, steel drum, 66" wide, 18 ton 56.12
Roller, vibrating, walking, 0.8 tons, 29.5" wide 10.30
Roofing kettle, 400 gallon, with pump 4.49
Rotary cutter for land clearing, 10.5' width 6.07
Rotary cutter for land clearing, 15' width, 2" to 12" 8.18
Rotary drill, crawler mounted, 6" to 8.75" dia. 99.64
Rotary drill, truck mounted, 16" diameter 150.11
Rotating grapple, 2 CY 23.60
Rotating mobile shear, 44" opening, 18'6" 97.96
Sandblaster, 1,400 pound, with hopper 12.54
Scissors lift, 25' height, 2,000 pound capacity 18.39
Scraper, self-propelled, 14 to 20 CY, 24 ton 127.54
Scraper, self-propelled, 21 to 31 CY, 37.5 tons 196.03
Scraper, self-propelled, 24 to 34 CY, 40.8 tons 194.04
Scraper, self-propelled, 32 to 44 CY, 52 tons 252.13
Scraper, self-propelled, 11 CY, 13 ton 68.61
Scraper, self-propelled, 22 CY, 25 ton 146.13
Sheepsfoot roller, towed, vib., 25.5 tons, 72" W 39.35
Shotcrete dry mix spraying machine 19.94
Shotcrete gun & mixer rig, 12 CY, on trailer 13.93
Shotcrete hydraulic spray arm 38.74
Shovel, crawler, hydraulic, 7.2 CY bucket 204.18
Small tools 2.10
Street sweeper, 7' wide, towed, with sprinkler 6.59
Stressing equipment 9.85
Submersible pump, 6", 1,950 GPM at 40' head 11.30
Terrazzo grinder 3.66
Track drill, 2.5" to 4" diameter, 12' reach 40.57
Track drill, 6.75" to 9.88" diameter 174.64
Track drill, 4" diameter, 12' feed, pneumatic 35.42
Tractor excavator, 4.5 CY bucket, hydraulic 219.37
Tractor excavator, 1 CY bucket, hydraulic 62.28
Tractor excavator, 1.23 CY bucket, hydraulic 64.00
Tractor excavator, 1.25 CY bucket, hydraulic 71.26
Tractor excavator, 1.5 CY bucket, hydraulic 90.49
Tractor excavator, 2 CY bucket, hydraulic 126.44
Tractor excavator, 3.125 CY bucket, hydraulic 191.59
Tractor excavator, 5.25 CY bucket, hydraulic 225.56
Tractor, farm type, 2-wheel drive, JD-2355 11.59
Transit mix body for truck, 7 CY 12.48
Trash pump, 6", 1,300 GPM at 100' head 9.78
Tree spade, truck-mounted, to 84" dia., 54" depth 29.64
Truck for dump body, 6x4, 3 axle, 43,000 lbs. 37.28
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97
Truck for flatbed, 2 axle, 4x2, 24,000 lbs. 27.38
Truck for transit mixer, 3 axle, 45,000 lbs. 39.54
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51
Truck, 4x2, 35,000 gross vehicle weight 51.95
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94
Truck, F600, 2 axle, 21,000 gross vehicle weight 27.36
Truck, highway, 6x4, 3 axle, 64,000 lbs. 61.88
Tunnel 2-boom miner, 137.8 ton, 238" to 350" 898.23
2015 Heavy Construction Estimator, All Rights Reserved Page 10 (part 5)

Tunnel boring machine, 150 ton, 3.5' diameter 410.60


Tunnel boring machine, 225 ton, 5' diameter 472.19
Tunnel boring machine, 475 ton, 8' to 10' dia. 527.77
Tunnel boring machine, 500 ton, 8' diameter 615.91
Tunnel boring machine, 750 ton, 11' to 14' dia. 795.53
Tunnel drilling rig, hydr. 4-boom, 700 to 1600 SF 350.55
Tunnel end dump truck, 10 CY 64.05
Tunnel end dump truck, 18 CY 104.79
Tunnel roadheader, 35 ton, 197 to 213" 250.58
Tunnel roadheader, 50 ton 350.38
Tunnel roadheader, 57 ton, 186" to 270" 439.76
Tunnel roadheader, 90 ton, 197" to 236" 520.71
Tunnel roadheader, 99 ton, 276" to 386" 626.92
Tunnel scooptram, 2.5 CY bucket 54.72
Tunnel scooptram, 6 CY bucket 109.22
Tunnel slewing belt conveyor 32.15
V-tree cutter for D-8L dozer 12.46
Vacuum truck, 5,000 gallon, 750 CFM 27.86
Vacuum, high efficiency (HEPA), 2 HP electric 2.47
Vacuum, trailer mounted, 5,500 gal., 2,100 CFM 42.89
Water blaster, 5.5 GPM at 3,000 PSI 7.17
Water blasting pump unit, 13.2 GPM 42.96
Water tank for truck mounting, 3,000 gallon 5.60
Water tanker trailer, 6000 gallon 17.51
Water wagon, 6,000 gallon, with Cat 621E 110.97
Welder, 220 amp, trailer mounted 12.56
Welder, 300 amp, skid mounted, electric drive 2.99
Wet abrasive blaster, 20 CF of accustrip abrasive 18.53
Winch (without cable) for D-5 dozer 6.13
Winch (without cable) for D-6 dozer 7.77
Winch (without cable) for D-8 dozer 9.43
Winch (without cable) for D-9 dozer 10.74
2015 Heavy Construction Estimator, All Rights Reserved Page 11

Subcontracted Work

Subcontractors do most of the work on construction projects. That's because specialty contractors
can often get the work done at competitive cost, even after adding the subcontractor's overhead and
profit.

Many sections of this cost estimating database cover work usually done by subcontractors. Costs for
work usually done by subcontractors include typical subcontractor markup but not the general
contractor's markup.

Markup

The General Contractor's Markup is not included in any costs in Heavy Construction Estimator.
Apply the general contractor's markup to all costs, including both subcontract items and work done by
the general contractor's own crews.

Markup includes overhead, contingency and profit and may be the most difficult item to estimate.

Keep in Mind

Labor and Material Costs Change. The costs in this database have been projected to mid-2015. Our
estimates will be accurate for some materials but inaccurate for others. No one can predict material
price changes accurately.

How Accurate Are These Figures? As accurate as possible considering that the estimators who
compiled Heavy Construction Estimator don't know your subcontractors or material suppliers, haven't
seen the plans or specifications, don't know what building code applies or where the job is, had to
project material costs at least 6 months into the future, and had no record of how much work the crew
that will be assigned to the job can handle.

You wouldn't bid a job under those conditions. And we don't claim that all construction is done at these
prices.

Estimating Is an Art, not a science. On many jobs the range between high and low bid will be 20% or
more. There's room for legitimate disagreement on what the correct costs are, even when complete
plans and specifications are available, the date and site are established, and labor and material costs
are identical for all bidders.

No cost fits all jobs. Good estimates are custom made for a particular project and a single contractor
through judgment, analysis and experience.

Heavy Construction Estimator isn't a substitute for judgment, analysis and sound estimating practice.
It's an aid in developing an informed opinion of cost. If you're using these cost estimates as your sole
cost authority for contract bids, you're reading more into these figures than the editors intend.

Use These Figures to compile preliminary estimates, to check your costs and subcontract bids and
when no actual costs are available. Heavy Construction Estimator will reduce the chance of error or
omission on bid estimates, speed "ball park" estimates, and be a good guide when there's no time to
get a quote. Of course, a written quote by the manufacturer or intended supplier is the only truly reliable
predictor of material cost.

Where Do We Get These Figures? The estimators who compiled Heavy Construction Estimator
started with the estimating database created for the Corps of Engineers MCACES Gold Cost Estimating
System. These figures were researched, edited, augmented, revised and altered to reflect what, in our
opinion, are current construction costs.
2015 Heavy Construction Estimator, All Rights Reserved Page 11 (part 2)

We'll Answer Your Questions about any part of Heavy Construction Estimator and explain how to
apply these costs. Free telephone assistance is available from 8 a.m. until 5 p.m. California time
Monday through Friday except holidays. Phone 760-438-7828. We don't accept collect calls and won't
estimate the job for you. But if you need clarification on something in this manual, we can help.
2015 Heavy Construction Estimator, All Rights Reserved Page 12

Abbreviations

AASHO American Assn. of State Highway Officials


ABS acrylonitrile butadiene styrene
AC alternating current
ACFM atmospheric cubic feet per minute
ACR accelerated cost recovery
AIC amp interrupting capacity
AISC American Institute of Steel Construction Inc.
APP attactic polypropylene
ASHRAE American Society of Heating, Refrigerating
and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing Materials
AWG American wire gauge
AWPA American Wood Products Association
AWWA American Water Works Association
B&W black & white
Ba bay
bbls barrels
Bdle bundle
BF board foot
BHMA Building Hardware Manufacturing Association
BHP boiler horsepower
BTEX benzene, toulene, ethylbenzene, xylene
Btr better
Btu British thermal unit
Btuh British thermal units per hour
BX interlocked armored cable
C thermal conductance
C one hundred
CEC cation exchange capacity
CF cubic foot
CFM cubic feet per minute
CI cast iron or certificate of insurance
CLF 100 linear feet
cm centimeter
CPE chlorinated polyethylene
CPM cycles per minute
CPVC chlorinated polyvinyl chloride
CSF 100 square feet
CSPE chloro sulphinated polyethylene
CSY 100 square yards
CW circulating water pipe
CWT 100 weight (100 pounds)
CY cubic yard
d penny
D depth, degree, density, penny (nail size)
dB decibel
DB direct burial power and communications duct
DC direct current
dia diameter
DOT Department of Transportation
2015 Heavy Construction Estimator, All Rights Reserved Page 12 (part 2)

DSB double strength B quality glass


DWV drain, waste, vent piping
e.s. energy saving
Ea each
EB encased burial power and communications duct
EDB ethylene dibromide
EDTA ethylene diamine tetracetic acid
EMCS energy monitoring and control system
EMT electric metallic tube
EPDM ethylene propylene diene monomer
equip. equipment
exp. exposure
F Fahrenheit
FA fire alarm
FAA Federal Aviation Administration
FICA Federal Insurance Contributions Act
FOB freight on board
FPM feet per minute
FRP fiberglass reinforced plastic
FS Federal Specification
FUTA Federal Unemployment Compensation Act Tax
Gal gallon
GC gas chromatograph
GFCI ground fault circuit interruptor
GFI ground fault interrupter
GPD gallons per day
GPH gallon(s) per hour
GPM gallon(s) per minute
GVW gross vehicle weight
H height
HCLI chloride
HEPA High efficiency particle
HP horsepower
Hr(s) hour(s)
HTW hazardous and toxic waste
HV high voltage
HVAC heating, ventilation, and air conditioning
ID Inside diameter
IMC intermediate metal conduit
IPS improved plow steel
IWRC independent wire rope center
KD kiln dried or knocked down
KSI kips per square inch
KV kilovolt(s)
KVA 1,000 volt amps
KVAR kilovar(s)
kw kilowatt(s)
kwh kilowatt hour(s)
L length
Lb(s) pound(s)
LF linear foot (feet)
LH left hand, long span, high strength bar joist
LJ long span, standard strength bar joist
LP liquified propane
LR long radius
LS lump sum
2015 Heavy Construction Estimator, All Rights Reserved Page 13

M one thousand
Mb million bytes (characters)
MBF 1,000 board feet
Mbh 1,000 btu's per hour
MBtu 1,000 British thermal units
MC miscellaneous channels
MCFM 1,000 cubic feet per minute
MCM 1,000 circular mils
MDO medium density overlaid
MGAL 1,000 gallons
MH manhour
Mi mile
mili-rem(s) 1/1000 rem (roentgen equivalent man)
MLF 1,000 linear feet
mm millimeter(s)
Mo month
MPH miles per hour
MSF 1,000 square feet
MSY 1,000 square yards
MVA 1,000 volt-amps
NEMA National Electrical Manufacturer's Association
NFPA National Fire Protection Association
No. number
NPT nominal pipe thread
NRC non-reinforced concrete
NRS non-rising stem
OC spacing from center to center
OD outside diameter
OS & Y outside screw & yoke
OSHA Occupational Safety and Health Administration
oz ounce
PAH polynuclear aromatic hydrocarbons
PCB polychlorinated biphenyl
pcf pounds per cubic foot
perf perforated
pH hydrogen ion concentration (acidity/alkalinity)
PPD pounds per day
Pr pair
PSF pounds per square foot
PSI pounds per square inch
PSIG pounds per square inch gauge
PV photovoltaic
PVA polyvinyl acetate
PVC polyvinyl chloride
pwr power
QC quality control
Qt quart
R thermal resistance
Rad radiataion absorbed dose
R/L random length(s)
R/W/L random widths and lengths
RC reinforced concrete
rem(s) roentgen equivalent man
RF radio frequency
RPM revolutions per minute
RSC rigid steel conduit
S1S2E surfaced 1 side, 2 edges
2015 Heavy Construction Estimator, All Rights Reserved Page 13 (part 2)

S2S surfaced 2 sides


S4S surfaced 4 sides
Sa sack
SAR sodium absorption ratio
SBS styrene butyl styrene
SCF standard cubic feet
SCFD super critical fluid oxidation
SCFM standard cubic feet per minute
SDR size to diameter ratio
SF square foot
SFCA square feet of form in contact with concrete
SJO hard service cord covered with oil-resistant thermoset plastic
Sq 100 square feet
SSB single strength B quality glass
STC sound transmission class
Std standard
SY square yard
T thick
T&G tongue & groove edge
TC terra cotta
TCLP toxic characteristic leaching procedure
TFFN heat-resistant thermoplastic-covered fixture wire, flexible stranded
THHN heat-resistant thermoplastic insulated wire
THHW heat-resistant thermoplastic insulated wire
THW moisture- and heat-resistant thermoplastic insulated wire
TL thermo luminescent
TPH total petroleum hydrocarbons
TRPH total recoverable petroleum hydrocarbons
TV television
UBC Uniform Building Code
UF-NMC underground feeder (cable)-nonmetallic sheathed cable
UL Underwriter's Laboratory
UPS United Parcel Service
URD underground distribution cable
USAR US Army Reserve
USBM US Bureau of Mines
USDA United States Dept. of Agriculture
VAC volts alternating current
VDC volts direct current
VHS standard video tape format
VLF vertical linear foot
W width
W/ with
Wk week
x by or times
XHHW moisture- and heat-resistant thermoplastic wire
XIPS extra improved plow steel
XLP cross-linked polyethylene power cable

Symbols

/ per
- through or to
@ at
% per 100 or percent
$ U.S. dollars
' feet
2015 Heavy Construction Estimator, All Rights Reserved Page 13 (part 3)

" inches
# pound or number
2015 Heavy Construction Estimator, All Rights Reserved Page 14

Craft Codes, Hourly Costs


and Crew Compositions

Heavy Construction Estimator has a column titled Craft@Hrs. Letters and numbers in this column show
our estimates of:

• Who will do the work (the craft code)


• The equipment required
• An @ symbol which means at
• How long the work will take (manhours).

For example, in CSI section 06-113 you'll find estimates for installing plywood wall sheathing by the
square foot. The Craft@Hrs column opposite 1/2" thick plywood wall sheathing shows:

ap@.016

That means we estimate the installation rate for crew "ap" at .016 manhours per square foot. That's the
same as 16 manhours per 1,000 square feet.

The table that follows (pages 15 to 98) defines each of the craft codes used in Heavy Construction
Estimator. On page 19 you'll see that crew "ap" is composed of two carpenters supervised one-quarter
of the time by a carpenter foreman. The table for crew "ap" also shows that this crew is assumed to be
using small tools (such as a hammer) and miscellaneous power tools (such as a power saw). To install
1,000 square feet of 1/2" wall sheathing at .016 manhours per square foot, that crew of 2.25 would need
16 manhours or 7.1 crew hours (16 manhours divided by a crew of 2.25 equals 7.1 crew hours).

Notice also in the table below that the average cost per manhour for crew "ap" is the sum of the hourly
cost for each of the 2.25 crew members divided by 2.25.

In the table below, the cost per manhour is the sum of hourly costs (or fractional cost) of all crew
members divided by the number of crew members. That's the average cost per manhour.

Costs in the Labor column in Heavy Construction Estimator are the installation time (in manhours)
multiplied by the average labor cost per manhour.

Costs in the Equipment column in Heavy Construction Estimator are the product of the installation time
(in manhours) multiplied by the average equipment cost per manhour.

Labor and equipment costs will be higher, perhaps much higher, on small jobs and may be lower when
crews and equipment can be used to good advantage for many days or even weeks
2015 Heavy Construction Estimator, All Rights Reserved Page 15

Crew Labor & Equipment Rates


Labor & Equipment $/Hr. Units Labor Equip

Crew 2a
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
D-6H crawler tractor dozer, power shift 64.25 1.00 -- 64.25
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.75 65.50 70.97
Cost Per Manhour -- -- 37.43 40.55

Crew 2b
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.75 65.50 124.67
Cost Per Manhour -- -- 37.43 71.24

Crew 2c
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
Outside equipment operator, heavy, foreman 49.28 0.25 12.32 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 1.75 71.22 153.26
Cost Per Manhour -- -- 40.70 87.58

Crew 2d
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Outside equipment operator, heavy, foreman 49.28 0.25 12.32 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 1.75 71.22 183.04
Cost Per Manhour -- -- 40.70 104.59

Crew 2e
Blade for D-10 dozer, universal 23.00 1.00 -- 23.00
D-10N crawler tractor dozer 200.32 1.00 -- 200.32
Outside equipment operator, heavy, foreman 49.28 0.25 12.32 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 1.75 71.22 223.32
Cost Per Manhour -- -- 40.70 127.61

Crew 2f
Blade for D-4 dozer, angle tilt 4.19 1.00 -- 4.19
D-4 crawler tractor dozer, power shift 33.46 1.00 -- 33.46
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 15 (part 2)

Outside laborer (semi-skilled) 20.24 0.50 10.12 --


Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.75 65.50 37.65
Cost Per Manhour -- -- 37.43 21.51

Crew 2g
Small tools 2.10 0.61 -- 1.28
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Manhour, Labor and Equipment Totals -- 3.00 107.44 49.70
2015 Heavy Construction Estimator, All Rights Reserved Page 16

Cost Per Manhour -- -- 35.81 16.57

Crew 3j
Small tools 2.10 1.00 -- 2.10
Outside electrician, foreman 58.68 0.17 9.98 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside electrician 58.18 1.00 58.18 --
Manhour, Labor and Equipment Totals -- 2.17 88.40 2.10
Cost Per Manhour -- -- 40.74 0.97

Crew a2
Small tools 2.10 0.75 -- 1.58
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 2.00 87.64 --
Plumber 52.20 0.50 26.10 --
Manhour, Labor and Equipment Totals -- 2.75 124.82 1.58
Cost Per Manhour -- -- 45.39 0.57

Crew a3
Small tools 2.10 0.45 -- 0.95
Carpenter, foreman 44.32 1.00 44.32 --
Sheet metal worker 49.49 0.50 24.75 --
Manhour, Labor and Equipment Totals -- 1.50 69.07 0.95
Cost Per Manhour -- -- 46.04 0.63

Crew a4
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Miscellaneous power tools 7.60 1.00 -- 7.60
Carpenter, foreman 44.32 1.00 44.32 --
Plumber 52.20 1.00 52.20 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 3.00 146.52 10.30
Cost Per Manhour -- -- 48.84 3.43

Crew a5
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 0.61 -- 1.28
Crane, hydraulic, 8 ton, 85' boom 19.07 1.00 -- 19.07
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 1.00 43.82 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 2.25 96.75 77.39
Cost Per Manhour -- -- 43.00 34.40

Crew a6
Small tools 2.10 1.43 -- 3.00
Miscellaneous power tools 7.60 0.19 -- 1.44
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Carpenter apprentice 34.88 1.00 34.88 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 2.00 87.64 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 5.00 204.02 53.22
2015 Heavy Construction Estimator, All Rights Reserved Page 16 (part 2)

Cost Per Manhour -- -- 40.80 10.64

Crew a7
Small tools 2.10 1.67 -- 3.51
Miscellaneous power tools 7.60 0.19 -- 1.44
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Carpenter apprentice 34.88 1.00 34.88 --
Carpenter, foreman 44.32 1.00 44.32 --
2015 Heavy Construction Estimator, All Rights Reserved Page 17

Carpenter 43.82 2.00 87.64 --


Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 6.00 251.16 109.52
Cost Per Manhour -- -- 41.86 18.25

Crew a8
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Miscellaneous power tools 7.60 1.00 -- 7.60
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Carpenter apprentice 34.88 2.00 69.76 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 3.00 131.46 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 9.00 362.44 101.45
Cost Per Manhour -- -- 40.27 11.27

Crew a9
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Miscellaneous power tools 7.60 1.00 -- 7.60
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Carpenter apprentice 34.88 2.00 69.76 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 2.00 87.64 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Painter, ordinary 43.83 2.00 87.66 --
Manhour, Labor and Equipment Totals -- 9.00 361.44 71.63
Cost Per Manhour -- -- 40.16 7.96

Crew aa
Small tools 2.10 0.34 -- 0.71
Asbestos worker, foreman 50.57 0.25 12.64 --
Asbestos worker 50.07 1.00 50.07 --
Manhour, Labor and Equipment Totals -- 1.25 62.71 0.71
Cost Per Manhour -- -- 50.17 0.57

Crew ab
Small tools 2.10 1.00 -- 2.10
Asbestos worker, foreman 50.57 0.50 25.29 --
Asbestos worker 50.07 2.00 100.14 --
Manhour, Labor and Equipment Totals -- 2.50 125.43 2.10
Cost Per Manhour -- -- 50.17 0.84

Crew ac
Small tools 2.10 0.68 -- 1.43
Asbestos worker, foreman 50.57 0.50 25.29 --
Asbestos worker 50.07 2.00 100.14 --
Manhour, Labor and Equipment Totals -- 2.50 125.43 1.43
Cost Per Manhour -- -- 50.17 0.57

Crew ad
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
2015 Heavy Construction Estimator, All Rights Reserved Page 17 (part 2)

Small tools 2.10 1.00 -- 2.10


Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Laborer (semi-skilled) 34.88 1.00 34.88 --
Asbestos worker 50.07 2.00 100.14 --
Manhour, Labor and Equipment Totals -- 3.00 135.02 28.71
Cost Per Manhour -- -- 45.01 9.57

Crew ae
2015 Heavy Construction Estimator, All Rights Reserved Page 18

Small tools 2.10 0.50 -- 1.05


Vacuum, high efficiency (HEPA), 2 HP electric 2.47 2.00 -- 4.94
Asbestos worker, foreman 50.57 1.00 50.57 --
Asbestos worker 50.07 2.00 100.14 --
Manhour, Labor and Equipment Totals -- 3.00 150.71 5.99
Cost Per Manhour -- -- 50.24 2.00

Crew af
Small tools 2.10 2.00 -- 4.20
Vacuum, high efficiency (HEPA), 2 HP electric 2.47 2.00 -- 4.94
Miscellaneous power tools 7.60 1.00 -- 7.60
Asbestos worker, foreman 50.57 1.00 50.57 --
Asbestos worker 50.07 3.00 150.21 --
Manhour, Labor and Equipment Totals -- 4.00 200.78 16.74
Cost Per Manhour -- -- 50.20 4.19

Crew ag
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 0.50 -- 3.80
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Asbestos worker, foreman 50.57 1.00 50.57 --
Asbestos worker 50.07 2.00 100.14 --
Manhour, Labor and Equipment Totals -- 3.00 150.71 32.51
Cost Per Manhour -- -- 50.24 10.84

Crew ah
Small tools 2.10 2.00 -- 4.20
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Asbestos worker, foreman 50.57 1.00 50.57 --
Asbestos worker 50.07 2.00 100.14 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 4.00 197.85 95.35
Cost Per Manhour -- -- 49.46 23.84

Crew ai
Small tools 2.10 0.32 -- 0.67
Millwright, foreman 44.95 0.25 11.24 --
Millwright 44.45 1.00 44.45 --
Manhour, Labor and Equipment Totals -- 1.25 55.69 0.67
Cost Per Manhour -- -- 44.55 0.54

Crew aj
Small tools 2.10 0.64 -- 1.34
Millwright, foreman 44.95 0.50 22.48 --
Millwright 44.45 2.00 88.90 --
Manhour, Labor and Equipment Totals -- 2.50 111.38 1.34
Cost Per Manhour -- -- 44.55 0.54

Crew ak
Miscellaneous power tools 7.60 2.00 -- 15.20
Millwright 44.45 2.00 88.90 --
Manhour, Labor and Equipment Totals -- 2.00 88.90 15.20
Cost Per Manhour -- -- 44.45 7.60
2015 Heavy Construction Estimator, All Rights Reserved Page 18 (part 2)

Crew al
Small tools 2.10 0.31 -- 0.65
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 1.00 43.82 --
Manhour, Labor and Equipment Totals -- 1.25 54.90 0.65
2015 Heavy Construction Estimator, All Rights Reserved Page 19

Cost Per Manhour -- -- 43.92 0.52

Crew am
Small tools 2.10 0.66 -- 1.39
Carpenter, foreman 44.32 0.50 22.16 --
Carpenter 43.82 2.00 87.64 --
Manhour, Labor and Equipment Totals -- 2.50 109.80 1.39
Cost Per Manhour -- -- 43.92 0.55

Crew an
Small tools 2.10 0.33 -- 0.69
Miscellaneous power tools 7.60 0.10 -- 0.76
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 1.00 43.82 --
Manhour, Labor and Equipment Totals -- 1.25 54.90 1.45
Cost Per Manhour -- -- 43.92 1.16

Crew ap
Small tools 2.10 0.61 -- 1.28
Miscellaneous power tools 7.60 0.19 -- 1.44
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 2.00 87.64 --
Manhour, Labor and Equipment Totals -- 2.25 98.72 2.73
Cost Per Manhour -- -- 43.88 1.21

Crew aq
Small tools 2.10 1.14 -- 2.39
Carpenter apprentice 34.88 1.00 34.88 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 2.00 87.64 --
Manhour, Labor and Equipment Totals -- 4.00 166.84 2.39
Cost Per Manhour -- -- 41.71 0.60

Crew as
Small tools 2.10 0.31 -- 0.65
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.25 89.78 0.65
Cost Per Manhour -- -- 39.90 0.29

Crew at
Small tools 2.10 0.61 -- 1.28
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 3.00 123.02 1.28
Cost Per Manhour -- -- 41.01 0.43

Crew au
Small tools 2.10 0.48 -- 1.01
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 2.00 87.64 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
2015 Heavy Construction Estimator, All Rights Reserved Page 19 (part 2)

Manhour, Labor and Equipment Totals -- 3.25 133.60 1.01


Cost Per Manhour -- -- 41.11 0.31

Crew av
Small tools 2.10 0.63 -- 1.32
Miscellaneous power tools 7.60 0.25 -- 1.90
Carpenter, foreman 44.32 1.00 44.32 --
2015 Heavy Construction Estimator, All Rights Reserved Page 20

Carpenter 43.82 2.00 87.64 --


Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 4.00 166.84 3.22
Cost Per Manhour -- -- 41.71 0.81

Crew aw
Small tools 2.10 0.39 -- 0.82
Carpenter, foreman 44.32 0.25 11.08 --
Carpenter 43.82 2.00 87.64 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 4.25 168.48 0.82
Cost Per Manhour -- -- 39.64 0.19

Crew ax
Small tools 2.10 0.79 -- 1.66
Miscellaneous power tools 7.60 0.32 -- 2.43
Carpenter apprentice 34.88 1.00 34.88 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 2.00 87.64 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 5.00 201.72 4.09
Cost Per Manhour -- -- 40.34 0.82

Crew ay
Small tools 2.10 1.06 -- 2.23
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Manhour, Labor and Equipment Totals -- 6.00 227.66 2.23
Cost Per Manhour -- -- 37.94 0.37

Crew b2
Small tools 2.10 1.00 -- 2.10
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Shotcrete gun & mixer rig, 12 CY, on trailer 13.93 1.00 -- 13.93
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Manhour, Labor and Equipment Totals -- 4.50 167.14 27.95
Cost Per Manhour -- -- 37.14 6.21

Crew b3
Small tools 2.10 4.00 -- 8.40
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Laborer (semi-skilled), foreman 35.38 3.00 106.14 --
Carpenter 43.82 2.00 87.64 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 7.00 278.10 99.55
Cost Per Manhour -- -- 39.73 14.22

Crew b5
Small tools 2.10 0.25 -- 0.53
Lather, foreman 40.83 0.25 10.21 --
2015 Heavy Construction Estimator, All Rights Reserved Page 20 (part 2)

Lather 40.33 1.00 40.33 --


Manhour, Labor and Equipment Totals -- 1.25 50.54 0.53
Cost Per Manhour -- -- 40.43 0.42

Crew b6
Small tools 2.10 0.50 -- 1.05
Lather, foreman 40.83 0.50 20.42 --
2015 Heavy Construction Estimator, All Rights Reserved Page 21

Lather 40.33 2.00 80.66 --


Manhour, Labor and Equipment Totals -- 2.50 101.08 1.05
Cost Per Manhour -- -- 40.43 0.42

Crew b7
Small tools 2.10 0.20 -- 0.42
Bricklayer, foreman 45.25 0.25 11.31 --
Bricklayer 44.75 1.00 44.75 --
Manhour, Labor and Equipment Totals -- 1.25 56.06 0.42
Cost Per Manhour -- -- 44.85 0.34

Crew b8
Small tools 2.10 0.39 -- 0.82
Bricklayer, foreman 45.25 0.50 22.63 --
Bricklayer 44.75 2.00 89.50 --
Manhour, Labor and Equipment Totals -- 2.50 112.13 0.82
Cost Per Manhour -- -- 44.85 0.33

Crew ba
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Miscellaneous power tools 7.60 1.00 -- 7.60
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Carpenter apprentice 34.88 2.00 69.76 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 2.00 87.64 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Painter, ordinary 43.83 2.00 87.66 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 9.00 371.40 114.01
Cost Per Manhour -- -- 41.27 12.67

Crew bc
Small tools 2.10 1.69 -- 3.55
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 1.00 43.82 --
Structural steel worker 54.52 1.00 54.52 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 5.00 226.98 94.70
Cost Per Manhour -- -- 45.40 18.94

Crew be
Small tools 2.10 0.12 -- 0.25
Cement finisher, foreman 43.01 0.25 10.75 --
Cement finisher 42.51 1.00 42.51 --
Manhour, Labor and Equipment Totals -- 1.25 53.26 0.25
Cost Per Manhour -- -- 42.61 0.20

Crew bf
Small tools 2.10 0.25 -- 0.53
Cement finisher, foreman 43.01 0.50 21.51 --
Cement finisher 42.51 2.00 85.02 --
Manhour, Labor and Equipment Totals -- 2.50 106.53 0.53
2015 Heavy Construction Estimator, All Rights Reserved Page 21 (part 2)

Cost Per Manhour -- -- 42.61 0.21

Crew bg
Small tools 2.10 0.18 -- 0.38
Miscellaneous power tools 7.60 0.21 -- 1.60
Cement finisher, foreman 43.01 0.10 4.30 --
Cement finisher 42.51 1.00 42.51 --
2015 Heavy Construction Estimator, All Rights Reserved Page 22

Manhour, Labor and Equipment Totals -- 1.10 46.81 1.97


Cost Per Manhour -- -- 42.56 1.79

Crew bh
Small tools 2.10 0.46 -- 0.97
Miscellaneous power tools 7.60 0.42 -- 3.19
Cement finisher, foreman 43.01 0.25 10.75 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Cement finisher 42.51 2.00 85.02 --
Manhour, Labor and Equipment Totals -- 3.25 130.65 4.16
Cost Per Manhour -- -- 40.20 1.28

Crew bi
Small tools 2.10 0.45 -- 0.95
Cement finisher, foreman 43.01 1.00 43.01 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 3.00 121.71 0.95
Cost Per Manhour -- -- 40.57 0.32

Crew bj
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Cement finisher, foreman 43.01 0.25 10.75 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Cement finisher 42.51 2.00 85.02 --
Manhour, Labor and Equipment Totals -- 4.25 167.83 21.79
Cost Per Manhour -- -- 39.49 5.13

Crew bk
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 0.18 -- 0.38
Grout pump and mixer, 20 GPM at 100 PSI 6.64 1.00 -- 6.64
Air compressor, 250 CFM, 100 PSI 16.67 1.00 -- 16.67
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Manhour, Labor and Equipment Totals -- 4.00 149.95 24.48
Cost Per Manhour -- -- 37.49 6.12

Crew bl
Small tools 2.10 0.34 -- 0.71
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Cement finisher, foreman 43.01 0.25 10.75 --
Equipment operator, medium 37.18 1.00 37.18 --
Cement finisher 42.51 2.00 85.02 --
Manhour, Labor and Equipment Totals -- 3.25 132.95 49.48
Cost Per Manhour -- -- 40.91 15.23

Crew bn
Small tools 2.10 0.24 -- 0.50
Glazier, foreman 46.18 0.50 23.09 --
Glazier 45.68 2.00 91.36 --
2015 Heavy Construction Estimator, All Rights Reserved Page 22 (part 2)

Manhour, Labor and Equipment Totals -- 2.50 114.45 0.50


Cost Per Manhour -- -- 45.78 0.20

Crew bq
Small tools 2.10 0.68 -- 1.43
Concrete vibrator, 2.5" diameter, high frequency 2.64 2.00 -- 5.28
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
2015 Heavy Construction Estimator, All Rights Reserved Page 23

Laborer (semi-skilled), foreman 35.38 1.00 35.38 --


Laborer (semi-skilled) 34.88 4.00 139.52 --
Cement finisher 42.51 1.00 42.51 --
Manhour, Labor and Equipment Totals -- 6.00 217.41 9.41
Cost Per Manhour -- -- 36.24 1.57

Crew bs
Small tools 2.10 0.68 -- 1.43
Concrete vibrator, 2.5" diameter, high frequency 2.64 2.00 -- 5.28
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 5.00 174.40 --
Equipment operator, oilers 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 9.00 336.61 113.98
Cost Per Manhour -- -- 37.40 12.66

Crew bt
Small tools 2.10 3.00 -- 6.30
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Miscellaneous power tools 7.60 1.00 -- 7.60
Transit mix body for truck, 7 CY 12.48 1.00 -- 12.48
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Carpenter apprentice 34.88 2.00 69.76 --
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 4.00 175.28 --
Laborer (semi-skilled) 34.88 10.00 348.80 --
Truck driver, heavy 41.85 1.00 41.85 --
Cement finisher 42.51 1.00 42.51 --
Rodman (reinforcing) 52.11 7.00 364.77 --
Manhour, Labor and Equipment Totals -- 26.00 1,087.29 85.02
Cost Per Manhour -- -- 41.82 3.27

Crew bu
Small tools 2.10 0.68 -- 1.43
Concrete vibrator, 2.5" diameter, high frequency 2.64 2.00 -- 5.28
Generator, 5.5 KW 120/240 volt, portable 2.70 1.00 -- 2.70
Concrete pump truck, 117 CY per hour, 75' boom 129.75 1.00 -- 129.75
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 5.00 174.40 --
Equipment operator, medium 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Manhour, Labor and Equipment Totals -- 8.00 289.47 139.16
Cost Per Manhour -- -- 36.18 17.39

Crew bv
Small tools 2.10 0.63 -- 1.32
Shotcrete gun & mixer rig, 12 CY, on trailer 13.93 1.00 -- 13.93
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Equipment operator, medium 37.18 1.00 37.18 --
Cement finisher 42.51 2.00 85.02 --
Manhour, Labor and Equipment Totals -- 7.00 262.22 15.25
Cost Per Manhour -- -- 37.46 2.18
2015 Heavy Construction Estimator, All Rights Reserved Page 23 (part 2)

Crew bx
Small tools 2.10 0.22 -- 0.46
Front-end wheel loader, 2.5 CY, articulated, 936E 50.79 0.25 -- 12.70
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Concrete slipform paver, 50' width, crawler type 275.97 1.00 -- 275.97
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 2.25 106.07 --
Manhour, Labor and Equipment Totals -- 4.25 178.63 393.70
2015 Heavy Construction Estimator, All Rights Reserved Page 24

Cost Per Manhour -- -- 42.03 92.64

Crew by
Small tools 2.10 1.16 -- 2.44
Miscellaneous power tools 7.60 0.30 -- 2.28
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Cement finisher 42.51 0.50 21.26 --
Rodman (reinforcing) 52.11 0.50 26.06 --
Manhour, Labor and Equipment Totals -- 6.00 240.09 4.72
Cost Per Manhour -- -- 40.02 0.79

Crew bz
Small tools 2.10 1.00 -- 2.10
Dump body for truck, 8 CY, 30,000 lbs. 4.26 1.00 -- 4.26
Front-end wheel loader, 2.5 CY, articulated, 936E 50.79 0.30 -- 15.24
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.90 -- 43.89
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Tractor excavator, 1 CY bucket, hydraulic 62.28 0.10 -- 6.23
Carpenter, foreman 44.32 1.00 44.32 --
Carpenter 43.82 1.80 78.88 --
Structural steel worker 54.52 0.40 21.81 --
Equipment operator, medium 37.18 3.70 137.57 --
Cement finisher 42.51 0.30 12.75 --
Manhour, Labor and Equipment Totals -- 7.20 295.32 126.69
Cost Per Manhour -- -- 41.02 17.60

Crew c3
Small tools 2.10 0.60 -- 1.26
Miscellaneous power tools 7.60 0.75 -- 5.70
Painter, structural steel, foreman 54.41 0.25 13.60 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Painter, structural steel 53.91 1.00 53.91 --
Manhour, Labor and Equipment Totals -- 3.25 139.57 6.96
Cost Per Manhour -- -- 42.95 2.14

Crew c5
Air hose, 1-1/4", 100', hardrock 0.97 2.00 -- 1.94
Small tools 2.10 2.00 -- 4.20
Sandblaster, 1,400 pound, with hopper 12.54 1.00 -- 12.54
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled) 34.88 1.00 34.88 --
Painter, structural steel 53.91 2.00 107.82 --
Manhour, Labor and Equipment Totals -- 3.00 142.70 39.68
Cost Per Manhour -- -- 47.57 13.23

Crew c6
Small tools 2.10 0.20 -- 0.42
Roofer, composition, foreman 42.14 0.25 10.54 --
Roofer, composition 41.64 1.00 41.64 --
Manhour, Labor and Equipment Totals -- 1.25 52.18 0.42
Cost Per Manhour -- -- 41.74 0.34
2015 Heavy Construction Estimator, All Rights Reserved Page 24 (part 2)

Crew c7
Small tools 2.10 0.40 -- 0.84
Roofer, composition, foreman 42.14 0.50 21.07 --
Roofer, composition 41.64 2.00 83.28 --
Manhour, Labor and Equipment Totals -- 2.50 104.35 0.84
Cost Per Manhour -- -- 41.74 0.34

Crew c8
2015 Heavy Construction Estimator, All Rights Reserved Page 25

Small tools 2.10 1.46 -- 3.07


Roofing kettle, 400 gallon, with pump 4.49 1.00 -- 4.49
Roofer, composition, foreman 42.14 1.00 42.14 --
Roofer, composition 41.64 4.00 166.56 --
Roofer (semi-skilled) 33.31 2.00 66.62 --
Manhour, Labor and Equipment Totals -- 7.00 275.32 7.56
Cost Per Manhour -- -- 39.33 1.08

Crew c9
Small tools 2.10 0.25 -- 0.53
Miscellaneous power tools 7.60 0.25 -- 1.90
Roofer, composition, foreman 42.14 0.25 10.54 --
Roofer, composition 41.64 1.00 41.64 --
Manhour, Labor and Equipment Totals -- 1.25 52.18 2.43
Cost Per Manhour -- -- 41.74 1.94

Crew ca
Small tools 2.10 0.33 -- 0.69
Bricklayer, foreman 45.25 0.25 11.31 --
Bricklayer (semi-skilled) 35.40 1.00 35.40 --
Bricklayer 44.75 1.00 44.75 --
Manhour, Labor and Equipment Totals -- 2.25 91.46 0.69
Cost Per Manhour -- -- 40.65 0.31

Crew cb
Small tools 2.10 0.60 -- 1.26
Miscellaneous power tools 7.60 0.70 -- 5.32
Bricklayer, foreman 45.25 1.00 45.25 --
Bricklayer (semi-skilled) 35.40 2.00 70.80 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 153.23 6.58
Cost Per Manhour -- -- 38.31 1.65

Crew cc
Small tools 2.10 0.82 -- 1.72
Bricklayer, foreman 45.25 1.00 45.25 --
Bricklayer (semi-skilled) 35.40 2.00 70.80 --
Carpenter 43.82 0.25 10.96 --
Bricklayer 44.75 2.00 89.50 --
Manhour, Labor and Equipment Totals -- 5.25 216.51 1.72
Cost Per Manhour -- -- 41.24 0.33

Crew cd
Small tools 2.10 0.87 -- 1.83
Bricklayer, foreman 45.25 1.00 45.25 --
Bricklayer (semi-skilled) 35.40 2.00 70.80 --
Carpenter 43.82 0.50 21.91 --
Bricklayer 44.75 2.00 89.50 --
Manhour, Labor and Equipment Totals -- 5.50 227.46 1.83
Cost Per Manhour -- -- 41.36 0.33

Crew ce
Small tools 2.10 0.96 -- 2.02
Bricklayer, foreman 45.25 1.00 45.25 --
2015 Heavy Construction Estimator, All Rights Reserved Page 25 (part 2)

Bricklayer (semi-skilled) 35.40 3.00 106.20 --


Carpenter 43.82 0.25 10.96 --
Bricklayer 44.75 2.00 89.50 --
Manhour, Labor and Equipment Totals -- 6.25 251.91 2.02
Cost Per Manhour -- -- 40.30 0.32

Crew cf
2015 Heavy Construction Estimator, All Rights Reserved Page 26

Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00


Bricklayer, foreman 45.25 1.00 45.25 --
Bricklayer (semi-skilled) 35.40 2.00 70.80 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 153.23 21.00
Cost Per Manhour -- -- 38.31 5.25

Crew cg
Small tools 2.10 0.98 -- 2.06
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Bricklayer, foreman 45.25 1.00 45.25 --
Bricklayer (semi-skilled) 35.40 2.00 70.80 --
Carpenter 43.82 0.25 10.96 --
Equipment operator, medium 37.18 1.00 37.18 --
Bricklayer 44.75 2.00 89.50 --
Manhour, Labor and Equipment Totals -- 6.25 253.69 50.83
Cost Per Manhour -- -- 40.59 8.13

Crew ch
Small tools 2.10 0.16 -- 0.34
Bricklayer, foreman 45.25 0.25 11.31 --
Bricklayer (semi-skilled) 35.40 1.00 35.40 --
Manhour, Labor and Equipment Totals -- 1.25 46.71 0.34
Cost Per Manhour -- -- 37.37 0.27

Crew ck
Small tools 2.10 0.32 -- 0.67
Marble setter, foreman 44.84 0.50 22.42 --
Marble setter 44.34 2.00 88.68 --
Manhour, Labor and Equipment Totals -- 2.50 111.10 0.67
Cost Per Manhour -- -- 44.44 0.27

Crew cn
Small tools 2.10 0.12 -- 0.25
Paperhanger, foreman 33.37 0.25 8.34 --
Paperhanger 32.87 1.00 32.87 --
Manhour, Labor and Equipment Totals -- 1.25 41.21 0.25
Cost Per Manhour -- -- 32.97 0.20

Crew cq
Small tools 2.10 0.14 -- 0.29
Plasterer, foreman 46.30 0.25 11.58 --
Plasterer 45.80 1.00 45.80 --
Manhour, Labor and Equipment Totals -- 1.25 57.38 0.29
Cost Per Manhour -- -- 45.90 0.24

Crew cs
Small tools 2.10 0.54 -- 1.13
Concrete mixer, 6 CF, 8 HP, portable 3.52 1.00 -- 3.52
Plasterer, foreman 46.30 1.00 46.30 --
Plasterer (semi-skilled) 38.27 2.00 76.54 --
Plasterer 45.80 2.00 91.60 --
Manhour, Labor and Equipment Totals -- 5.00 214.44 4.65
Cost Per Manhour -- -- 42.89 0.93
2015 Heavy Construction Estimator, All Rights Reserved Page 26 (part 2)

Crew ct
Small tools 2.10 0.65 -- 1.37
Concrete mixer, 6 CF, 8 HP, portable 3.52 1.00 -- 3.52
Plasterer, foreman 46.30 1.00 46.30 --
Plasterer (semi-skilled) 38.27 2.00 76.54 --
Lather 40.33 1.00 40.33 --
Plasterer 45.80 2.00 91.60 --
2015 Heavy Construction Estimator, All Rights Reserved Page 27

Manhour, Labor and Equipment Totals -- 6.00 254.77 4.89


Cost Per Manhour -- -- 42.46 0.81

Crew cu
Small tools 2.10 0.15 -- 0.32
Shotcrete gun & mixer rig, 12 CY, on trailer 13.93 1.00 -- 13.93
Plasterer, foreman 46.30 1.00 46.30 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plasterer (semi-skilled) 38.27 1.00 38.27 --
Manhour, Labor and Equipment Totals -- 3.00 119.45 14.25
Cost Per Manhour -- -- 39.82 4.75

Crew cw
Small tools 2.10 0.22 -- 0.46
Plasterer (semi-skilled), foreman 38.77 0.50 19.39 --
Plasterer (semi-skilled) 38.27 2.00 76.54 --
Manhour, Labor and Equipment Totals -- 2.50 95.93 0.46
Cost Per Manhour -- -- 38.37 0.18

Crew cx
Small tools 2.10 0.27 -- 0.57
Painter, ordinary, foreman 44.33 0.25 11.08 --
Painter, ordinary 43.83 1.00 43.83 --
Manhour, Labor and Equipment Totals -- 1.25 54.91 0.57
Cost Per Manhour -- -- 43.93 0.45

Crew cy
Small tools 2.10 0.53 -- 1.11
Painter, ordinary, foreman 44.33 0.50 22.17 --
Painter, ordinary 43.83 2.00 87.66 --
Manhour, Labor and Equipment Totals -- 2.50 109.83 1.11
Cost Per Manhour -- -- 43.93 0.45

Crew cz
Small tools 2.10 0.25 -- 0.53
Painter, structural steel, foreman 54.41 0.25 13.60 --
Painter, structural steel 53.91 1.00 53.91 --
Manhour, Labor and Equipment Totals -- 1.25 67.51 0.53
Cost Per Manhour -- -- 54.01 0.42

Crew d2
Air hose, 1", 100' length, hardrock 0.79 2.00 -- 1.58
Small tools 2.10 0.55 -- 1.16
Paving breaker, pneumatic, 86 pound 8.15 2.00 -- 16.30
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Powderman 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 4.00 141.82 40.04
Cost Per Manhour -- -- 35.46 10.01

Crew d3
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 0.25 -- 2.98
2015 Heavy Construction Estimator, All Rights Reserved Page 27 (part 2)

Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Laborer (semi-skilled) 34.88 2.00 69.76 --
Powderman 34.88 2.25 78.48 --
Manhour, Labor and Equipment Totals -- 4.25 148.24 29.59
Cost Per Manhour -- -- 34.88 6.96

Crew d4
2015 Heavy Construction Estimator, All Rights Reserved Page 28

Small tools 2.10 0.50 -- 1.05


Air hose, 3", 100', hardrock 3.95 2.00 -- 7.90
Pick-up truck, 1 ton, 8,600 gross vehicle weight 17.01 1.00 -- 17.01
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Track drill, 2.5" to 4" diameter, 12' reach 40.57 1.00 -- 40.57
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.00 106.94 107.67
Cost Per Manhour -- -- 35.65 35.89

Crew d5
Small tools 2.10 0.46 -- 0.97
Air hose, 3", 100', hardrock 3.95 2.00 -- 7.90
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 0.25 -- 2.98
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Track drill, 2.5" to 4" diameter, 12' reach 40.57 1.00 -- 40.57
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, medium 37.18 1.50 55.77 --
Powderman 34.88 0.25 8.72 --
Manhour, Labor and Equipment Totals -- 2.25 81.93 93.56
Cost Per Manhour -- -- 36.41 41.58

Crew d6
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 0.50 -- 3.80
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Core drill, skid-mounted, NX, to 400' depth 12.73 1.00 -- 12.73
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 57.16
Cost Per Manhour -- -- 35.05 19.05

Crew d7
Small tools 2.10 0.47 -- 0.99
Auger drill, 8" diameter, to 250' depth 59.22 1.00 -- 59.22
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.00 106.94 60.21
Cost Per Manhour -- -- 35.65 20.07

Crew de
Small tools 2.10 0.16 -- 0.34
Tile layer (floor), foreman 42.69 0.25 10.67 --
Tile layer (floor) 42.19 1.00 42.19 --
Manhour, Labor and Equipment Totals -- 1.25 52.86 0.34
Cost Per Manhour -- -- 42.29 0.27

Crew di
Small tools 2.10 0.17 -- 0.36
Tile mosaic and terrazzo worker, foreman 42.81 0.25 10.70 --
Tile mosaic and terrazzo worker 42.31 1.00 42.31 --
Manhour, Labor and Equipment Totals -- 1.25 53.01 0.36
Cost Per Manhour -- -- 42.41 0.29
2015 Heavy Construction Estimator, All Rights Reserved Page 28 (part 2)

Crew dj
Small tools 2.10 0.33 -- 0.69
Tile mosaic and terrazzo worker, foreman 42.81 0.50 21.41 --
Tile mosaic and terrazzo worker 42.31 2.00 84.62 --
Manhour, Labor and Equipment Totals -- 2.50 106.03 0.69
Cost Per Manhour -- -- 42.41 0.28
2015 Heavy Construction Estimator, All Rights Reserved Page 29

Crew dk
Small tools 2.10 0.23 -- 0.48
Concrete mixer, 6 CF, 8 HP, portable 3.52 1.00 -- 3.52
Terrazzo grinder 3.66 1.00 -- 3.66
Tile mosaic and terrazzo worker, foreman 42.81 1.00 42.81 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 77.69 7.66
Cost Per Manhour -- -- 38.85 3.83

Crew dl
Air hose, 2", 100' length, hardrock 1.60 2.00 -- 3.20
Small tools 2.10 0.28 -- 0.59
Air compressor, 450 CFM, 100 PSI 29.09 0.25 -- 7.27
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 0.25 9.30 --
Manhour, Labor and Equipment Totals -- 1.50 53.02 11.06
Cost Per Manhour -- -- 35.35 7.37

Crew dm
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 0.63 -- 1.32
Air compressor, 250 CFM, 100 PSI 16.67 1.00 -- 16.67
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Carpenter 43.82 1.00 43.82 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 5.00 183.84 18.78
Cost Per Manhour -- -- 36.77 3.76

Crew dn
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 0.22 -- 0.46
Concrete saw, walk-behind, 6.63" depth 9.21 1.00 -- 9.21
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 5.00 179.50 31.46
Cost Per Manhour -- -- 35.90 6.29

Crew dp
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 0.17 -- 0.36
Asphalt kettle for pavement work, 110 gal., towed 4.25 1.00 -- 4.25
Concrete saw, walk-behind, 6.63" depth 9.21 1.00 -- 9.21
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 142.32 35.61
Cost Per Manhour -- -- 35.58 8.90

Crew dq
Small tools 2.10 0.19 -- 0.40
2015 Heavy Construction Estimator, All Rights Reserved Page 29 (part 2)

Compactor, rammer, 13" x 11" shoe 3.83 2.00 -- 7.66


Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Manhour, Labor and Equipment Totals -- 5.00 174.90 8.06
Cost Per Manhour -- -- 34.98 1.61

Crew dr
Small tools 2.10 0.10 -- 0.21
2015 Heavy Construction Estimator, All Rights Reserved Page 30

Compactor, rammer, 13" x 11" shoe 3.83 1.00 -- 3.83


Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 72.56 128.71
Cost Per Manhour -- -- 36.28 64.36

Crew ds
Small tools 2.10 0.23 -- 0.48
Compactor, rammer, 13" x 11" shoe 3.83 1.00 -- 3.83
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 4.31
Cost Per Manhour -- -- 35.05 1.44

Crew dt
Small tools 2.10 0.08 -- 0.17
Roller, vibrating, walking, 0.8 tons, 29.5" wide 10.30 1.00 -- 10.30
Equipment operator, light, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 10.47
Cost Per Manhour -- -- 36.75 6.98

Crew du
Small tools 2.10 0.04 -- 0.08
Compactor, rammer, 13" x 11" shoe 3.83 1.00 -- 3.83
Miscellaneous power tools 7.60 0.22 -- 1.67
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.25 43.73 5.59
Cost Per Manhour -- -- 34.98 4.47

Crew dw
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 0.15 -- 0.32
Paving breaker, pneumatic, 86 pound 8.15 1.00 -- 8.15
Air compressor, 375 CFM, 100 PSI 21.00 0.50 -- 10.50
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 1.75 62.32 19.76
Cost Per Manhour -- -- 35.61 11.29

Crew dx
Air hose, 1", 100' length, hardrock 0.79 2.00 -- 1.58
Small tools 2.10 0.19 -- 0.40
Paving breaker, pneumatic, 86 pound 8.15 2.00 -- 16.30
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Manhour, Labor and Equipment Totals -- 5.00 174.90 39.28
Cost Per Manhour -- -- 34.98 7.86

Crew dy
2015 Heavy Construction Estimator, All Rights Reserved Page 30 (part 2)

Air hose, 1", 100' length, hardrock 0.79 2.00 -- 1.58


Small tools 2.10 0.48 -- 1.01
Paving breaker, pneumatic, 86 pound 8.15 2.00 -- 16.30
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 212.08 39.89
2015 Heavy Construction Estimator, All Rights Reserved Page 31

Cost Per Manhour -- -- 35.35 6.65

Crew e2
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 90.72
Cost Per Manhour -- -- 41.01 45.36

Crew e3
Small tools 2.10 1.02 -- 2.14
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 2.00 104.40 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 6.00 283.49 105.19
Cost Per Manhour -- -- 47.25 17.53

Crew e6
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 90.72
Cost Per Manhour -- -- 41.01 45.36

Crew e7
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 2 CY bucket, hydraulic 126.44 1.00 -- 126.44
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 126.67
Cost Per Manhour -- -- 41.01 63.34

Crew e9
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 4.5 CY bucket, hydraulic 219.37 1.00 -- 219.37
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 3.00 119.20 219.60
Cost Per Manhour -- -- 39.73 73.20

Crew ea
Small tools 2.10 0.38 -- 0.80
Track drill, 6.75" to 9.88" diameter 174.64 1.00 -- 174.64
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Manhour, Labor and Equipment Totals -- 5.00 174.90 175.44
Cost Per Manhour -- -- 34.98 35.09
2015 Heavy Construction Estimator, All Rights Reserved Page 31 (part 2)

Crew eb
Small tools 2.10 0.64 -- 1.34
Track drill, 6.75" to 9.88" diameter 174.64 1.00 -- 174.64
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, medium 37.18 1.00 37.18 --
Rodman (reinforcing) 52.11 1.00 52.11 --
Manhour, Labor and Equipment Totals -- 7.00 266.49 175.98
2015 Heavy Construction Estimator, All Rights Reserved Page 32

Cost Per Manhour -- -- 38.07 25.14

Crew ec
Small tools 2.10 0.75 -- 1.58
Centrifugal pump, 6", 100 GPM at 40' head 28.21 1.00 -- 28.21
Track drill, 6.75" to 9.88" diameter 174.64 1.00 -- 174.64
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 1.00 37.18 --
Rodman (reinforcing) 52.11 1.00 52.11 --
Manhour, Labor and Equipment Totals -- 8.00 303.67 204.43
Cost Per Manhour -- -- 37.96 25.55

Crew ed
Small tools 2.10 0.47 -- 0.99
Track drill, 6.75" to 9.88" diameter 174.64 1.00 -- 174.64
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 175.63
Cost Per Manhour -- -- 35.05 58.54

Crew ee
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Track drill, 4" diameter, 12' feed, pneumatic 35.42 2.00 -- 70.84
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.50 89.75 118.57
Cost Per Manhour -- -- 35.90 47.43

Crew ef
Small tools 2.10 0.16 -- 0.34
Auger drill, hydraulic, to 60' depth, 8" x 21" leads 47.93 1.00 -- 47.93
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Truck driver, heavy 41.85 1.00 41.85 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 3.25 132.72 139.42
Cost Per Manhour -- -- 40.84 42.90

Crew ej
Chain boom wh. tr., 6" to 18" W, 60" D & bckhoe 21.69 1.00 -- 21.69
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.25 46.03 21.69
Cost Per Manhour -- -- 36.82 17.35

Crew ek
Chain boom wh. tr., 6" to 18" W, 60" D & bckhoe 21.69 1.00 -- 21.69
Laborer (semi-skilled) 34.88 3.00 104.64 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 4.00 156.84 21.69
2015 Heavy Construction Estimator, All Rights Reserved Page 32 (part 2)

Cost Per Manhour -- -- 39.21 5.42

Crew el
Chain boom wh. tr., to 24" W, 72" D, 67 HP 94.83 1.00 -- 94.83
Laborer (semi-skilled) 34.88 0.17 5.93 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.17 43.11 94.83
2015 Heavy Construction Estimator, All Rights Reserved Page 33

Cost Per Manhour -- -- 36.85 81.05

Crew em
Chain boom wh. tr., to 48" W, 90 " D, 150 HP 150.51 1.00 -- 150.51
Laborer (semi-skilled) 34.88 0.17 5.93 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.17 43.11 150.51
Cost Per Manhour -- -- 36.85 128.64

Crew en
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1 CY bucket, hydraulic 62.28 1.00 -- 62.28
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 62.51
Cost Per Manhour -- -- 41.01 31.26

Crew ep
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1 CY bucket, hydraulic 62.28 1.00 -- 62.28
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 62.51
Cost Per Manhour -- -- 41.01 31.26

Crew es
Small tools 2.10 0.17 -- 0.36
Hydra-pak tamper, 21" wide, 30" long, 27" high 3.36 1.00 -- 3.36
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 2.00 -- 45.82
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 4.25 152.97 70.54
Cost Per Manhour -- -- 35.99 16.60

Crew et
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 22.91
Cost Per Manhour -- -- 36.75 15.27

Crew ev
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 72.56 22.91
Cost Per Manhour -- -- 36.28 11.46

Crew ew
Small tools 2.10 0.61 -- 1.28
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
2015 Heavy Construction Estimator, All Rights Reserved Page 33 (part 2)

Laborer (semi-skilled) 34.88 2.00 69.76 --


Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.25 115.79 24.19
Cost Per Manhour -- -- 35.63 7.44

Crew ex
2015 Heavy Construction Estimator, All Rights Reserved Page 34

Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 212.08 22.91
Cost Per Manhour -- -- 35.35 3.82

Crew f2
Tree spade, truck-mounted, to 84" dia., 54" depth 29.64 1.00 -- 29.64
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 0.10 -- 5.59
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 72.56 35.23
Cost Per Manhour -- -- 36.28 17.62

Crew f5
Blade for D-8 dozer, universal 12.24 0.17 -- 2.08
Scraper, self-propelled, 11 CY, 13 ton 68.61 1.00 -- 68.61
D-8L crawler tractor dozer, power shift 141.02 0.17 -- 23.97
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Laborer (semi-skilled) 34.88 0.25 8.72 --
Equipment operator, medium 37.18 1.17 43.50 --
Manhour, Labor and Equipment Totals -- 1.67 61.64 94.66
Cost Per Manhour -- -- 36.91 56.69

Crew f6
Blade for D-8 dozer, universal 12.24 0.17 -- 2.08
Scraper, self-propelled, 14 to 20 CY, 24 ton 127.54 1.00 -- 127.54
D-8L crawler tractor dozer, power shift 141.02 0.17 -- 23.97
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Laborer (semi-skilled) 34.88 0.25 8.72 --
Equipment operator, medium 37.18 1.17 43.50 --
Manhour, Labor and Equipment Totals -- 1.67 61.64 153.59
Cost Per Manhour -- -- 36.91 91.97

Crew f7
Winch (without cable) for D-6 dozer 7.77 0.50 -- 3.89
Blade for D-8 dozer, universal 12.24 0.50 -- 6.12
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Scraper, self-propelled, 11 CY, 13 ton 68.61 4.00 -- 274.44
D-8L crawler tractor dozer, power shift 141.02 0.50 -- 70.51
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 0.50 18.59 --
Equipment operator, crane and shovel 47.14 4.00 188.56 --
Manhour, Labor and Equipment Totals -- 5.00 224.84 361.55
Cost Per Manhour -- -- 44.97 72.31

Crew f8
Winch (without cable) for D-6 dozer 7.77 0.50 -- 3.89
Blade for D-8 dozer, universal 12.24 0.50 -- 6.12
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Scraper, self-propelled, 14 to 20 CY, 24 ton 127.54 4.00 -- 510.16
D-8L crawler tractor dozer, power shift 141.02 0.50 -- 70.51
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 0.50 18.59 --
2015 Heavy Construction Estimator, All Rights Reserved Page 34 (part 2)

Equipment operator, crane and shovel 47.14 4.00 188.56 --


Manhour, Labor and Equipment Totals -- 5.00 224.84 597.27
Cost Per Manhour -- -- 44.97 119.45

Crew fb
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
2015 Heavy Construction Estimator, All Rights Reserved Page 35

Equipment operator, crane and shovel 47.14 1.00 47.14 --


Manhour, Labor and Equipment Totals -- 5.00 187.16 90.72
Cost Per Manhour -- -- 37.43 18.14

Crew fd
Small tools 2.10 1.00 -- 2.10
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 142.32 92.59
Cost Per Manhour -- -- 35.58 23.15

Crew ff
Front end wheel ldr., 5.25 CY, articulated, 980C 109.54 1.00 -- 109.54
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 109.54
Cost Per Manhour -- -- 43.05 73.03

Crew fg
Front end wheel ldr., 13.5 CY, articulated, 992C 319.00 1.00 -- 319.00
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 319.00
Cost Per Manhour -- -- 43.05 212.67

Crew fh
Front end wheel ldr., tool carrier, 28B 40.42 1.00 -- 40.42
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 40.42
Cost Per Manhour -- -- 43.05 26.95

Crew fj
Front-end wheel loader, 7 CY, articulated, 988B 155.15 1.00 -- 155.15
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 155.15
Cost Per Manhour -- -- 43.05 103.43

Crew fl
Small tools 2.10 0.11 -- 0.23
Gradall excavator, 1.4 CY, 4x4 65.65 1.00 -- 65.65
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 82.02 65.88
Cost Per Manhour -- -- 41.01 32.94

Crew fq
Front-end crawler loader, 2 CY, 953 56.65 1.00 -- 56.65
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 56.65
2015 Heavy Construction Estimator, All Rights Reserved Page 35 (part 2)

Cost Per Manhour -- -- 36.75 37.77

Crew fr
Front end wheel ldr., 5.25 CY, articulated, 980C 109.54 1.00 -- 109.54
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
2015 Heavy Construction Estimator, All Rights Reserved Page 36

Manhour, Labor and Equipment Totals -- 1.50 55.12 109.54


Cost Per Manhour -- -- 36.75 73.03

Crew fs
Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 129.83
Cost Per Manhour -- -- 36.75 86.55

Crew ft
Small tools 2.10 0.10 -- 0.21
Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 72.56 130.04
Cost Per Manhour -- -- 36.28 65.02

Crew fu
Front-end wheel loader, 4 CY, articulated, 966E 90.72 1.00 -- 90.72
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 90.72
Cost Per Manhour -- -- 36.75 60.48

Crew fw
Front end wheel ldr., 5.25 CY, articulated, 980C 109.54 1.00 -- 109.54
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.00 37.18 109.54
Cost Per Manhour -- -- 37.18 109.54

Crew fx
Front-end wheel loader, 7 CY, articulated, 988B 155.15 1.00 -- 155.15
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 155.15
Cost Per Manhour -- -- 43.05 103.43

Crew fy
Front-end wheel loader, 7 CY, articulated, 988B 155.15 1.00 -- 155.15
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.50 64.58 155.15
Cost Per Manhour -- -- 43.05 103.43

Crew g2
Dump body for truck, 12 CY, 36,000 lbs. 4.47 4.00 -- 17.88
Truck for dump body, 6x4, 3 axle, 43,000 lbs. 37.28 4.00 -- 149.12
Front-end wheel loader, 3 CY, articulated, 950E 64.00 1.00 -- 64.00
Equipment operator, light 37.18 1.00 37.18 --
Truck driver, heavy 41.85 4.00 167.40 --
Manhour, Labor and Equipment Totals -- 5.00 204.58 231.00
Cost Per Manhour -- -- 40.92 46.20
2015 Heavy Construction Estimator, All Rights Reserved Page 36 (part 2)

Crew g3
Dump body for truck, 12 CY, 36,000 lbs. 4.47 4.00 -- 17.88
Truck for dump body, 6x4, 3 axle, 43,000 lbs. 37.28 4.00 -- 149.12
Front-end wheel loader, 4 CY, articulated, 966E 90.72 1.00 -- 90.72
Equipment operator, light 37.18 1.00 37.18 --
Truck driver, heavy 41.85 4.00 167.40 --
2015 Heavy Construction Estimator, All Rights Reserved Page 37

Manhour, Labor and Equipment Totals -- 5.00 204.58 257.72


Cost Per Manhour -- -- 40.92 51.54

Crew g6
Rotary cutter for land clearing, 10.5' width 6.07 1.00 -- 6.07
Tractor, farm type, 2-wheel drive, JD-2355 11.59 1.00 -- 11.59
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 2.00 74.36 17.66
Cost Per Manhour -- -- 37.18 8.83

Crew g8
Equipment operator, medium, foreman 37.68 0.50 18.84 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 2.50 93.20 0.00
Cost Per Manhour -- -- 37.28 0.00

Crew gb
Blade for D-9 dozer, universal 16.18 0.17 -- 2.75
D-9N crawler tractor dozer 166.86 0.17 -- 28.37
Scraper, self-propelled, 21 to 31 CY, 37.5 tons 196.03 1.00 -- 196.03
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Laborer (semi-skilled) 34.88 0.25 8.72 --
Equipment operator, crane and shovel 47.14 1.17 55.15 --
Manhour, Labor and Equipment Totals -- 1.67 75.78 227.15
Cost Per Manhour -- -- 45.38 136.02

Crew gc
Winch (without cable) for D-6 dozer 7.77 0.50 -- 3.89
Blade for D-8 dozer, universal 12.24 0.50 -- 6.12
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
D-8L crawler tractor dozer, power shift 141.02 0.50 -- 70.51
Scraper, self-propelled, 22 CY, 25 ton 146.13 4.00 -- 584.52
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 0.50 18.59 --
Equipment operator, crane and shovel 47.14 4.00 188.56 --
Manhour, Labor and Equipment Totals -- 5.00 224.84 671.63
Cost Per Manhour -- -- 44.97 134.33

Crew gd
Blade for D-9 dozer, universal 16.18 0.17 -- 2.75
D-9N crawler tractor dozer 166.86 0.17 -- 28.37
Scraper, self-propelled, 24 to 34 CY, 40.8 tons 194.04 1.00 -- 194.04
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Laborer (semi-skilled) 34.88 0.25 8.72 --
Equipment operator, crane and shovel 47.14 1.17 55.15 --
Manhour, Labor and Equipment Totals -- 1.67 75.78 225.16
Cost Per Manhour -- -- 45.38 134.82

Crew ge
Blade for D-9 dozer, universal 16.18 0.25 -- 4.05
D-9N crawler tractor dozer 166.86 0.25 -- 41.72
Scraper, self-propelled, 32 to 44 CY, 52 tons 252.13 1.00 -- 252.13
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Laborer (semi-skilled) 34.88 0.25 8.72 --
Equipment operator, crane and shovel 47.14 1.25 58.93 --
2015 Heavy Construction Estimator, All Rights Reserved Page 37 (part 2)

Manhour, Labor and Equipment Totals -- 1.75 79.56 297.89


Cost Per Manhour -- -- 45.46 170.22

Crew gf
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Scraper, self-propelled, 11 CY, 13 ton 68.61 1.00 -- 68.61
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
2015 Heavy Construction Estimator, All Rights Reserved Page 38

Equipment operator, crane and shovel 47.14 1.00 47.14 --


Manhour, Labor and Equipment Totals -- 1.50 64.83 75.20
Cost Per Manhour -- -- 43.22 50.13

Crew gg
Ripper shanks for beam on D-9 dozer, each 1.06 3.00 -- 3.18
Blade for D-6 dozer, angle tilt 6.72 0.25 -- 1.68
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
Ripper beam, multi-shank, for D-9 dozer 17.02 1.00 -- 17.02
Dump tr., off highway, 12 to 16 CY, 19 ton, 6x6 54.17 11.00 -- 595.87
D-6H crawler tractor dozer, power shift 64.25 0.25 -- 16.06
Front-end crawler loader, 2.5 CY, 963 74.22 1.00 -- 74.22
Front-end crawler loader, 3.75 CY, 973 129.83 0.25 -- 32.46
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Equipment operator, medium 37.18 1.50 55.77 --
Truck driver, heavy 41.85 11.00 460.35 --
Manhour, Labor and Equipment Totals -- 13.50 551.50 923.53
Cost Per Manhour -- -- 40.85 68.41

Crew gh
Ripper shanks for beam on D-9 dozer, each 1.06 1.00 -- 1.06
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
Ripper beam, multi-shank, for D-9 dozer 17.02 1.00 -- 17.02
Dump tr., off highway, 13 to 17 CY, 6x6, 23 tons 70.74 6.00 -- 424.44
Front-end crawler loader, 2.5 CY, 963 74.22 1.00 -- 74.22
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 6.00 251.10 --
Manhour, Labor and Equipment Totals -- 9.00 360.84 699.78
Cost Per Manhour -- -- 40.09 77.75

Crew gi
Scraper, self-propelled, 11 CY, 13 ton 68.61 1.00 -- 68.61
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.00 47.14 68.61
Cost Per Manhour -- -- 47.14 68.61

Crew gj
Blade for D-3C dozer, angle tilt 3.18 1.00 -- 3.18
D-3C crawler tractor dozer 25.54 1.00 -- 25.54
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 28.72
Cost Per Manhour -- -- 36.75 19.15

Crew gk
Blade for D-4 dozer, angle tilt 4.19 1.00 -- 4.19
D-4 crawler tractor dozer, power shift 33.46 1.00 -- 33.46
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.25 46.60 37.65
Cost Per Manhour -- -- 37.28 30.12
2015 Heavy Construction Estimator, All Rights Reserved Page 38 (part 2)

Crew gl
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
D-6H crawler tractor dozer, power shift 64.25 1.00 -- 64.25
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.25 46.60 70.97
Cost Per Manhour -- -- 37.28 56.78
2015 Heavy Construction Estimator, All Rights Reserved Page 39

Crew gm
Chip spreader, towed, 8' wide 2.59 1.00 -- 2.59
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
Sheepsfoot roller, towed, vib., 25.5 tons, 72" W 39.35 1.00 -- 39.35
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Roller, vibrating, steel drum, 13 ton, 66" wide 48.26 1.00 -- 48.26
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 3.00 111.54 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 7.00 260.83 317.72
Cost Per Manhour -- -- 37.26 45.39

Crew gn
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.25 46.60 124.67
Cost Per Manhour -- -- 37.28 99.74

Crew gr
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
Sheepsfoot roller, towed, vib., 25.5 tons, 72" W 39.35 1.00 -- 39.35
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.25 59.05 192.61
Cost Per Manhour -- -- 47.24 154.09

Crew gs
Ripper shanks for beam on D-8 dozer, each 0.99 1.00 -- 0.99
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
Ripper beam, single shank, for D-8 dozer 16.55 1.00 -- 16.55
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.25 59.05 170.80
Cost Per Manhour -- -- 47.24 136.64

Crew gt
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.25 59.05 183.04
Cost Per Manhour -- -- 47.24 146.43

Crew gu
Ripper shanks for beam on D-9 dozer, each 1.06 1.00 -- 1.06
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
Ripper beam, multi-shank, for D-9 dozer 17.02 1.00 -- 17.02
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
2015 Heavy Construction Estimator, All Rights Reserved Page 39 (part 2)

Equipment operator, crane and shovel, foreman 47.64 0.25 11.91 --


Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 1.25 59.05 201.12
Cost Per Manhour -- -- 47.24 160.90

Crew gx
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
D-7H crawler tractor dozer, low ground pressure 108.08 1.00 -- 108.08
2015 Heavy Construction Estimator, All Rights Reserved Page 40

Laborer (semi-skilled), foreman 35.38 0.50 17.69 --


Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.50 124.63 117.56
Cost Per Manhour -- -- 35.61 33.59

Crew gy
Blade for D-7 dozer, universal 9.48 2.00 -- 18.96
Front-end wheel loader, 4 CY, articulated, 966E 90.72 1.00 -- 90.72
D-7H crawler tractor dozer, low ground pressure 108.08 2.00 -- 216.16
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 3.00 111.54 --
Manhour, Labor and Equipment Totals -- 3.50 129.23 325.84
Cost Per Manhour -- -- 36.92 93.10

Crew gz
Dump body for truck, 12 CY, 36,000 lbs. 4.47 1.00 -- 4.47
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 59.44
Cost Per Manhour -- -- 41.85 59.44

Crew h2
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
Roller, vibrating, double drum, 11 ton, 66" wide 59.65 1.00 -- 59.65
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 2.00 74.36 184.32
Cost Per Manhour -- -- 37.18 92.16

Crew h4
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Roller, vibrating, double drum, 11 ton, 66" wide 59.65 1.00 -- 59.65
D-6H crawler tractor dozer, power shift 64.25 1.00 -- 64.25
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 2.00 74.36 130.62
Cost Per Manhour -- -- 37.18 65.31

Crew h5
Small tools 2.10 0.29 -- 0.61
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Roller, vibrating, single drum, 22 ton, 84" wide 63.56 1.00 -- 63.56
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 3.00 111.54 --
Manhour, Labor and Equipment Totals -- 6.00 216.68 133.91
Cost Per Manhour -- -- 36.11 22.32

Crew h6
Roller, vibrating, 6.9 ton, 55" wide 39.73 1.00 -- 39.73
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.50 54.62 39.73
2015 Heavy Construction Estimator, All Rights Reserved Page 40 (part 2)

Cost Per Manhour -- -- 36.41 26.49

Crew h9
Ripper beam, single shank, for D-5 dozer 4.55 1.00 -- 4.55
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Front-end crawler loader, 2.5 CY, 963 74.22 1.00 -- 74.22
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 1.00 37.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 41

Manhour, Labor and Equipment Totals -- 1.50 54.87 85.36


Cost Per Manhour -- -- 36.58 56.91

Crew ha
Dump body for truck, 8 CY, 30,000 lbs. 4.26 1.00 -- 4.26
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 59.23
Cost Per Manhour -- -- 41.85 59.23

Crew hb
Small tools 2.10 0.52 -- 1.09
Dump body for truck, 12 CY, 36,000 lbs. 4.47 1.00 -- 4.47
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 4.00 146.99 60.53
Cost Per Manhour -- -- 36.75 15.13

Crew hc
Small tools 2.10 0.37 -- 0.78
Dump body for truck, 8 CY, 30,000 lbs. 4.26 1.00 -- 4.26
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 4.00 149.29 82.92
Cost Per Manhour -- -- 37.32 20.73

Crew hd
Dump truck, off highway, 14 to 19 CY, 25 tons 69.13 1.00 -- 69.13
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 69.13
Cost Per Manhour -- -- 41.85 69.13

Crew he
Bottom dump truck trailer, 18 CY, 27 ton 11.24 1.00 -- 11.24
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 66.21
Cost Per Manhour -- -- 41.85 66.21

Crew hg
Dump truck, off highway, 22 to 30 CY, 35 ton 116.26 1.00 -- 116.26
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 116.26
Cost Per Manhour -- -- 41.85 116.26

Crew hh
Small tools 2.10 0.28 -- 0.59
Dump body for truck, 12 CY, 36,000 lbs. 4.47 2.00 -- 8.94
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 2.00 -- 109.94
2015 Heavy Construction Estimator, All Rights Reserved Page 41 (part 2)

Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83


Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 2.00 83.70 --
Manhour, Labor and Equipment Totals -- 6.00 226.02 249.30
Cost Per Manhour -- -- 37.67 41.55
2015 Heavy Construction Estimator, All Rights Reserved Page 42

Crew hi
Air hose, 1", 100' length, hardrock 0.79 4.00 -- 3.16
Small tools 2.10 1.17 -- 2.46
Dump body for truck, 12 CY, 36,000 lbs. 4.47 2.00 -- 8.94
Paving breaker, pneumatic, 86 pound 8.15 2.00 -- 16.30
Air compressor, 375 CFM, 100 PSI 21.00 1.00 -- 21.00
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 2.00 -- 109.94
Front-end crawler loader, 3.75 CY, 973 129.83 2.00 -- 259.66
Laborer (semi-skilled), foreman 35.38 2.00 70.76 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Equipment operator, medium 37.18 3.00 111.54 --
Truck driver, heavy 41.85 2.00 83.70 --
Manhour, Labor and Equipment Totals -- 13.00 475.28 421.46
Cost Per Manhour -- -- 36.56 32.42

Crew hk
Small tools 2.10 0.65 -- 1.37
Dump body for truck, 8 CY, 30,000 lbs. 4.26 3.00 -- 12.78
Air compressor, 375 CFM, 100 PSI 21.00 0.25 -- 5.25
Front-end wheel loader, 2.5 CY, articulated, 936E 50.79 1.00 -- 50.79
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 3.00 -- 164.91
Equipment operator, light 37.18 2.00 74.36 --
Truck driver, heavy 41.85 3.00 125.55 --
Powderman 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 6.00 234.79 235.10
Cost Per Manhour -- -- 39.13 39.18

Crew hl
Small tools 2.10 0.78 -- 1.64
Dump body for truck, 12 CY, 36,000 lbs. 4.47 2.00 -- 8.94
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 2.00 -- 109.94
Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 2.00 83.70 --
Manhour, Labor and Equipment Totals -- 7.00 263.20 299.12
Cost Per Manhour -- -- 37.60 42.73

Crew hm
Small tools 2.10 0.53 -- 1.11
Dump body for truck, 8 CY, 30,000 lbs. 4.26 1.00 -- 4.26
Miscellaneous power tools 7.60 0.25 -- 1.90
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Front end wheel ldr., 5.25 CY, articulated, 980C 109.54 1.00 -- 109.54
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Carpenter 43.82 1.00 43.82 --
Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 5.00 195.41 262.93
Cost Per Manhour -- -- 39.08 52.59

Crew hq
2015 Heavy Construction Estimator, All Rights Reserved Page 42 (part 2)

Dump body for truck, 8 CY, 30,000 lbs. 4.26 2.00 -- 8.52
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 2.00 -- 109.94
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Truck driver, heavy 41.85 2.00 83.70 --
Manhour, Labor and Equipment Totals -- 3.00 121.38 208.95
Cost Per Manhour -- -- 40.46 69.65

Crew hr
2015 Heavy Construction Estimator, All Rights Reserved Page 43

Small tools 2.10 0.47 -- 0.99


Dump body for truck, 8 CY, 30,000 lbs. 4.26 1.00 -- 4.26
Front-end wheel loader, 2.5 CY, articulated, 936E 50.79 1.00 -- 50.79
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Tractor excavator, 1 CY bucket, hydraulic 62.28 1.00 -- 62.28
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Truck driver, light 33.48 1.00 33.48 --
Equipment operator, medium 37.18 2.00 74.36 --
Electrician 50.00 0.33 16.50 --
Manhour, Labor and Equipment Totals -- 3.58 133.76 173.29
Cost Per Manhour -- -- 37.36 48.40

Crew ht
Small tools 2.10 0.75 -- 1.58
Crane, 4-WD, rough terrain, hydraulic, 22 ton 57.10 1.00 -- 57.10
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 142.32 58.68
Cost Per Manhour -- -- 35.58 14.67

Crew hu
Roller, static, steel wheel, 5 ton, 42" wide 12.65 1.00 -- 12.65
Equipment operator, light, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 12.65
Cost Per Manhour -- -- 36.75 8.43

Crew hv
Small tools 2.10 0.73 -- 1.53
Roller, static, steel wheel, 5 ton, 42" wide 12.65 1.00 -- 12.65
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 212.08 14.18
Cost Per Manhour -- -- 35.35 2.36

Crew hw
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.00 37.18 47.88
Cost Per Manhour -- -- 37.18 47.88

Crew hx
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 21.86
Cost Per Manhour -- -- 36.75 14.57

Crew hy
Compactor, rammer, 13" x 11" shoe 3.83 2.00 -- 7.66
Roller, vibrating, walking, 0.8 tons, 29.5" wide 10.30 1.00 -- 10.30
Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 3.00 104.64 17.96
2015 Heavy Construction Estimator, All Rights Reserved Page 43 (part 2)

Cost Per Manhour -- -- 34.88 5.99

Crew hz
Small tools 2.10 0.16 -- 0.34
Roller, static, 13 ton, 84" wide, 11 tire 23.87 1.00 -- 23.87
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Equipment operator, medium, foreman 37.68 0.50 18.84 --
2015 Heavy Construction Estimator, All Rights Reserved Page 44

Laborer (semi-skilled) 34.88 1.00 34.88 --


Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 0.50 20.93 --
Manhour, Labor and Equipment Totals -- 4.00 149.01 72.09
Cost Per Manhour -- -- 37.25 18.02

Crew ia
Project manager 93.24 1.00 93.24 --
Manhour, Labor and Equipment Totals -- 1.00 93.24 0.00
Cost Per Manhour -- -- 93.24 0.00

Crew ib
Assistant project manager 77.82 1.00 77.82 --
Manhour, Labor and Equipment Totals -- 1.00 77.82 0.00
Cost Per Manhour -- -- 77.82 0.00

Crew ic
General superintendent 65.79 1.00 65.79 --
Manhour, Labor and Equipment Totals -- 1.00 65.79 0.00
Cost Per Manhour -- -- 65.79 0.00

Crew id
Civil superintendent 56.50 1.00 56.50 --
Manhour, Labor and Equipment Totals -- 1.00 56.50 0.00
Cost Per Manhour -- -- 56.50 0.00

Crew ie
Carpenter superintendent 51.43 1.00 51.43 --
Manhour, Labor and Equipment Totals -- 1.00 51.43 0.00
Cost Per Manhour -- -- 51.43 0.00

Crew if
Mechanical superintendent 56.50 1.00 56.50 --
Manhour, Labor and Equipment Totals -- 1.00 56.50 0.00
Cost Per Manhour -- -- 56.50 0.00

Crew ig
Electrical superintendent 57.50 1.00 57.50 --
Manhour, Labor and Equipment Totals -- 1.00 57.50 0.00
Cost Per Manhour -- -- 57.50 0.00

Crew ih
Contract administrator 39.81 1.00 39.81 --
Manhour, Labor and Equipment Totals -- 1.00 39.81 0.00
Cost Per Manhour -- -- 39.81 0.00

Crew ij
Comptroller 37.85 1.00 37.85 --
Manhour, Labor and Equipment Totals -- 1.00 37.85 0.00
Cost Per Manhour -- -- 37.85 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 44 (part 2)

Crew ik
Administrative clerk 27.17 1.00 27.17 --
Manhour, Labor and Equipment Totals -- 1.00 27.17 0.00
Cost Per Manhour -- -- 27.17 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 45

Crew il
Personnel manager 40.03 1.00 40.03 --
Manhour, Labor and Equipment Totals -- 1.00 40.03 0.00
Cost Per Manhour -- -- 40.03 0.00

Crew im
Personnel clerk 21.39 1.00 21.39 --
Manhour, Labor and Equipment Totals -- 1.00 21.39 0.00
Cost Per Manhour -- -- 21.39 0.00

Crew in
Office manager 37.85 1.00 37.85 --
Manhour, Labor and Equipment Totals -- 1.00 37.85 0.00
Cost Per Manhour -- -- 37.85 0.00

Crew io
Interpreter 37.85 1.00 37.85 --
Manhour, Labor and Equipment Totals -- 1.00 37.85 0.00
Cost Per Manhour -- -- 37.85 0.00

Crew ip
Accountant 37.85 1.00 37.85 --
Manhour, Labor and Equipment Totals -- 1.00 37.85 0.00
Cost Per Manhour -- -- 37.85 0.00

Crew iq
Bookkeeper 22.67 1.00 22.67 --
Manhour, Labor and Equipment Totals -- 1.00 22.67 0.00
Cost Per Manhour -- -- 22.67 0.00

Crew ir
Timekeeper 20.92 1.00 20.92 --
Manhour, Labor and Equipment Totals -- 1.00 20.92 0.00
Cost Per Manhour -- -- 20.92 0.00

Crew is
Pay master 21.39 1.00 21.39 --
Manhour, Labor and Equipment Totals -- 1.00 21.39 0.00
Cost Per Manhour -- -- 21.39 0.00

Crew it
Payroll clerks 21.39 1.00 21.39 --
Manhour, Labor and Equipment Totals -- 1.00 21.39 0.00
Cost Per Manhour -- -- 21.39 0.00

Crew iu
Stenographer 20.38 1.00 20.38 --
Manhour, Labor and Equipment Totals -- 1.00 20.38 0.00
Cost Per Manhour -- -- 20.38 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 45 (part 2)

Crew iv
Typist 20.38 1.00 20.38 --
Manhour, Labor and Equipment Totals -- 1.00 20.38 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 46

Cost Per Manhour -- -- 20.38 0.00

Crew iw
Clerks 18.44 1.00 18.44 --
Manhour, Labor and Equipment Totals -- 1.00 18.44 0.00
Cost Per Manhour -- -- 18.44 0.00

Crew ix
Mail clerk 18.44 1.00 18.44 --
Manhour, Labor and Equipment Totals -- 1.00 18.44 0.00
Cost Per Manhour -- -- 18.44 0.00

Crew iy
Messenger 18.44 1.00 18.44 --
Manhour, Labor and Equipment Totals -- 1.00 18.44 0.00
Cost Per Manhour -- -- 18.44 0.00

Crew iz
Reproduction operator 16.56 1.00 16.56 --
Manhour, Labor and Equipment Totals -- 1.00 16.56 0.00
Cost Per Manhour -- -- 16.56 0.00

Crew i1
Cost engineer 55.80 1.00 55.80 --
Manhour, Labor and Equipment Totals -- 1.00 55.80 0.00
Cost Per Manhour -- -- 55.80 0.00

Crew i2
Cost estimator 47.35 1.00 47.35 --
Manhour, Labor and Equipment Totals -- 1.00 47.35 0.00
Cost Per Manhour -- -- 47.35 0.00

Crew j4
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Asphalt distributor, 3000 gal., for truck mounting 24.77 1.00 -- 24.77
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Truck driver, light 33.48 1.00 33.48 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 4.00 145.09 111.84
Cost Per Manhour -- -- 36.27 27.96

Crew j5
Small tools 2.10 0.04 -- 0.08
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Truck driver, light 33.48 2.00 66.96 --
Manhour, Labor and Equipment Totals -- 2.00 66.96 44.10
Cost Per Manhour -- -- 33.48 22.05

Crew j6
2015 Heavy Construction Estimator, All Rights Reserved Page 46 (part 2)

Small tools 2.10 0.25 -- 0.53


Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Asphalt distributor, 3000 gal., for truck mounting 24.77 0.50 -- 12.39
Roller, static, 13 ton, 84" wide, 11 tire 23.87 1.00 -- 23.87
Chip spreader, self-propelled, 10' wide 31.17 1.00 -- 31.17
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 0.50 -- 27.49
2015 Heavy Construction Estimator, All Rights Reserved Page 47

Equipment operator, medium, foreman 37.68 0.50 18.84 --


Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 3.00 111.54 --
Truck driver, heavy 41.85 0.50 20.93 --
Manhour, Labor and Equipment Totals -- 6.00 221.07 117.30
Cost Per Manhour -- -- 36.84 19.55

Crew j7
Small tools 2.10 0.56 -- 1.18
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Asphalt distributor, 3000 gal., for truck mounting 24.77 1.00 -- 24.77
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 6.00 221.35 102.78
Cost Per Manhour -- -- 36.89 17.13

Crew j8
Dump body for truck, 12 CY, 36,000 lbs. 4.47 4.00 -- 17.88
Asphalt distributor, 3000 gal., for truck mounting 24.77 1.00 -- 24.77
Chip spreader, self-propelled, 10' wide 31.17 1.00 -- 31.17
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 4.00 -- 219.88
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 5.00 209.25 --
Manhour, Labor and Equipment Totals -- 7.00 284.11 348.67
Cost Per Manhour -- -- 40.59 49.81

Crew j9
Small tools 2.10 0.30 -- 0.63
Asphalt sealcoater, 200 gallon, 50" wide 11.58 1.00 -- 11.58
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Asphalt distributor, 3000 gal., for truck mounting 24.77 1.00 -- 24.77
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 5.00 186.47 113.81
Cost Per Manhour -- -- 37.29 22.76

Crew ja
Water tank for truck mounting, 3,000 gallon 5.60 1.00 -- 5.60
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
Sheepsfoot roller, towed, vib., 25.5 tons, 72" W 39.35 1.00 -- 39.35
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
D-7H crawler tractor dozer 115.19 1.00 -- 115.19
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 1.00 41.85 --
2015 Heavy Construction Estimator, All Rights Reserved Page 47 (part 2)

Manhour, Labor and Equipment Totals -- 2.75 105.89 224.59


Cost Per Manhour -- -- 38.51 81.67

Crew jc
Roller, vibrating, steel drum, 13 ton, 66" wide 48.26 1.00 -- 48.26
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 2.75 101.22 48.26
2015 Heavy Construction Estimator, All Rights Reserved Page 48

Cost Per Manhour -- -- 36.81 17.55

Crew jd
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Roller, static, 30 tons, 96" wide 40.35 2.00 -- 80.70
D-6H crawler tractor dozer, power shift 64.25 2.00 -- 128.50
Motor grader, Cat 14G, articulated, power shift 71.92 1.00 -- 71.92
Landfill compactor, 58" deep, 38.5" long 80.80 2.00 -- 161.60
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Equipment operator, light 37.18 5.00 185.90 --
Equipment operator, medium 37.18 1.00 37.18 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 8.00 302.61 462.62
Cost Per Manhour -- -- 37.83 57.83

Crew jg
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Transit mix body for truck, 7 CY 12.48 1.00 -- 12.48
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Truck for transit mixer, 3 axle, 45,000 lbs. 39.54 1.00 -- 39.54
Roller, static, 30 tons, 96" wide 40.35 1.00 -- 40.35
Roller, vibrating, steel drum, 66" wide, 18 ton 56.12 1.00 -- 56.12
D-6H crawler tractor dozer, power shift 64.25 2.00 -- 128.50
Laborer (semi-skilled), foreman 35.38 0.30 10.61 --
Equipment operator, light 37.18 0.60 22.31 --
Equipment operator, medium 37.18 1.20 44.62 --
Truck driver, heavy 41.85 0.60 25.11 --
Manhour, Labor and Equipment Totals -- 2.70 102.65 290.30
Cost Per Manhour -- -- 38.02 107.52

Crew jh
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Transit mix body for truck, 7 CY 12.48 1.00 -- 12.48
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Truck for transit mixer, 3 axle, 45,000 lbs. 39.54 1.00 -- 39.54
Roller, static, 30 tons, 96" wide 40.35 1.00 -- 40.35
Roller, vibrating, steel drum, 66" wide, 18 ton 56.12 1.00 -- 56.12
D-6H crawler tractor dozer, power shift 64.25 2.00 -- 128.50
Motor grader, Cat 14G, articulated, power shift 71.92 2.00 -- 143.84
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Equipment operator, light 37.18 2.00 74.36 --
Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 6.00 225.95 440.73
Cost Per Manhour -- -- 37.66 73.46

Crew jj
Small tools 2.10 0.25 -- 0.53
Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 142.32 130.36
Cost Per Manhour -- -- 35.58 32.59
2015 Heavy Construction Estimator, All Rights Reserved Page 48 (part 2)

Crew jk
Ripper shanks for beam on D-7 dozer, each 0.51 3.00 -- 1.53
Ripper beam, multi-shank, for D-7 dozer 9.42 1.00 -- 9.42
Blade for D-7 dozer, universal 9.48 1.00 -- 9.48
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
D-7H crawler tractor dozer, low ground pressure 108.08 1.00 -- 108.08
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.50 54.87 135.10
Cost Per Manhour -- -- 36.58 90.07
2015 Heavy Construction Estimator, All Rights Reserved Page 49

Crew jl
Ripper shanks for beam on D-5 dozer, each 0.30 3.00 -- 0.90
Ripper beam, single shank, for D-5 dozer 4.55 1.00 -- 4.55
Blade for D-5 dozer, angle tilt 4.65 1.00 -- 4.65
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
D-5H crawler tractor dozer, low ground pressure 56.13 1.00 -- 56.13
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.50 54.87 72.82
Cost Per Manhour -- -- 36.58 48.55

Crew jm
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 72.56 47.88
Cost Per Manhour -- -- 36.28 23.94

Crew jn
Motor grader, Cat 130G, articulated, power shift 45.35 1.00 -- 45.35
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 1.00 37.18 45.35
Cost Per Manhour -- -- 37.18 45.35

Crew jr
Centrifugal pump, 4", 465 GPM at 40' head 14.78 1.00 -- 14.78
Equipment operator, light, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 0.50 17.44 --
Manhour, Labor and Equipment Totals -- 1.50 55.12 14.78
Cost Per Manhour -- -- 36.75 9.85

Crew ju
Water tank for truck mounting, 3,000 gallon 5.60 1.00 -- 5.60
Submersible pump, 6", 1,950 GPM at 40' head 11.30 0.50 -- 5.65
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Equipment operator, light 37.18 0.50 18.59 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.75 69.86 66.22
Cost Per Manhour -- -- 39.92 37.84

Crew jv
Submersible pump, 6", 1,950 GPM at 40' head 11.30 1.00 -- 11.30
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Equipment operator, light, foreman 37.68 0.25 9.42 --
Equipment operator, light 37.18 0.50 18.59 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.75 69.86 122.27
Cost Per Manhour -- -- 39.92 69.87

Crew jw
Submersible pump, 6", 1,950 GPM at 40' head 11.30 0.25 -- 2.83
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
2015 Heavy Construction Estimator, All Rights Reserved Page 49 (part 2)

Laborer (semi-skilled) 34.88 2.00 69.76 --


Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 3.00 111.61 113.80
Cost Per Manhour -- -- 37.20 37.93

Crew jx
Water blaster, 5.5 GPM at 3,000 PSI 7.17 1.00 -- 7.17
2015 Heavy Construction Estimator, All Rights Reserved Page 50

Submersible pump, 6", 1,950 GPM at 40' head 11.30 0.25 -- 2.83
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Laborer (semi-skilled) 34.88 1.00 34.88 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 2.00 76.73 120.97
Cost Per Manhour -- -- 38.37 60.48

Crew jy
Water tanker trailer, 6000 gallon 17.51 1.00 -- 17.51
Lowboy trailer, 120 ton, 4 axle 26.90 1.00 -- 26.90
Water blasting pump unit, 13.2 GPM 42.96 1.00 -- 42.96
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 3.00 104.50 143.31
Cost Per Manhour -- -- 34.83 47.77

Crew jz
Submersible pump, 6", 1,950 GPM at 40' head 11.30 1.00 -- 11.30
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.00 34.88 11.30
Cost Per Manhour -- -- 34.88 11.30

Crew k2
Chain saw, 31" bar 2.82 3.00 -- 8.46
Winch (without cable) for D-6 dozer 7.77 1.00 -- 7.77
Rake for D-8 crawler tractor, multi-application 8.30 1.00 -- 8.30
V-tree cutter for D-8L dozer 12.46 1.00 -- 12.46
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
D-7H crawler tractor dozer, low ground pressure 108.08 2.00 -- 216.16
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 9.00 319.02 266.33
Cost Per Manhour -- -- 35.45 29.59

Crew k3
Chain saw, 31" bar 2.82 3.00 -- 8.46
Winch (without cable) for D-6 dozer 7.77 1.00 -- 7.77
Rotary cutter for land clearing, 15' width, 2" to 12" 8.18 1.00 -- 8.18
Rake for D-8 crawler tractor, multi-application 8.30 1.00 -- 8.30
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
D-5H crawler tractor dozer, power shift 50.09 1.00 -- 50.09
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 5.00 174.40 --
Equipment operator, light 37.18 1.00 37.18 --
Skilled worker 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 7.50 264.15 89.39
Cost Per Manhour -- -- 35.22 11.92

Crew k5
Small tools 2.10 0.90 -- 1.89
Air hose, 3", 100', hardrock 3.95 2.00 -- 7.90
Pile leads, 8"x 26", 60' length 10.82 1.00 -- 10.82
2015 Heavy Construction Estimator, All Rights Reserved Page 50 (part 2)

Pile hammer, single action, 19,500 foot-pounds 24.06 1.00 -- 24.06


Air compressor, 1,600 CFM at 100 PSI 77.24 1.00 -- 77.24
Crane, crawler, mechanical, 85 ton, 160' boom 129.88 1.00 -- 129.88
Pile driver apprentice 39.89 2.00 79.78 --
Pile driver, foreman 47.43 1.00 47.43 --
Pile driver 46.93 2.00 93.86 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 2.00 94.28 --
Manhour, Labor and Equipment Totals -- 8.00 352.53 251.79
Cost Per Manhour -- -- 44.07 31.47
2015 Heavy Construction Estimator, All Rights Reserved Page 51

Crew k8
Small tools 2.10 1.35 -- 2.84
Pile hammer, vibrating, 116 ton force drive 114.25 1.00 -- 114.25
Crane, crawler, mechanical, 85 ton, 160' boom 129.88 1.00 -- 129.88
Pile driver apprentice 39.89 2.00 79.78 --
Pile driver, foreman 47.43 1.00 47.43 --
Pile driver 46.93 2.00 93.86 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 2.00 94.28 --
Manhour, Labor and Equipment Totals -- 8.00 352.53 246.97
Cost Per Manhour -- -- 44.07 30.87

Crew ka
Small tools 2.10 0.04 -- 0.08
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Pick-up truck, 4x2, 5,200 gross vehicle weight 11.82 1.00 -- 11.82
Outside truck driver, light 35.60 2.00 71.20 --
Manhour, Labor and Equipment Totals -- 2.00 71.20 18.49
Cost Per Manhour -- -- 35.60 9.25

Crew kb
Small tools 2.10 0.46 -- 0.97
Asphalt finisher, 10' W, with screed, pneumatic 92.87 1.00 -- 92.87
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 4.00 140.02 93.84
Cost Per Manhour -- -- 35.01 23.46

Crew kd
Small tools 2.10 0.83 -- 1.74
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
Asphalt finisher, 10' W, with screed, pneumatic 92.87 1.00 -- 92.87
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 6.00 214.38 116.47
Cost Per Manhour -- -- 35.73 19.41

Crew kf
Small tools 2.10 1.46 -- 3.07
Concrete paver, slipform, crawler, 25' wide 113.03 1.00 -- 113.03
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 8.00 279.04 --
Equipment operator, medium 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Rodman (reinforcing) 52.11 1.00 52.11 --
Manhour, Labor and Equipment Totals -- 12.00 448.52 116.10
Cost Per Manhour -- -- 37.38 9.67

Crew kg
Small tools 2.10 1.00 -- 2.10
Dump body for truck, 12 CY, 36,000 lbs. 4.47 2.00 -- 8.94
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
2015 Heavy Construction Estimator, All Rights Reserved Page 51 (part 2)

Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 2.00 -- 109.94
Asphalt profiler, 120" wide, 10" depth 216.75 1.00 -- 216.75
Equipment operator, medium, foreman 37.68 1.00 37.68 --
Laborer (semi-skilled) 34.88 7.00 244.16 --
Equipment operator, medium 37.18 2.00 74.36 --
Truck driver, heavy 41.85 2.00 83.70 --
Manhour, Labor and Equipment Totals -- 12.00 439.90 369.83
Cost Per Manhour -- -- 36.66 30.82
2015 Heavy Construction Estimator, All Rights Reserved Page 52

Crew kh
Small tools 2.10 1.00 -- 2.10
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Asphalt sealcoater, 200 gallon, 50" wide 11.58 1.00 -- 11.58
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Asphalt profiler, 120" wide, 10" depth 216.75 1.00 -- 216.75
Equipment operator, medium, foreman 37.68 0.50 18.84 --
Truck driver, light 33.48 1.00 33.48 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 4.50 161.56 262.53
Cost Per Manhour -- -- 35.90 58.34

Crew km
Pavement line striper truck 85.83 1.00 -- 85.83
Truck driver, light 33.48 1.00 33.48 --
Painter, ordinary 43.83 1.00 43.83 --
Manhour, Labor and Equipment Totals -- 2.00 77.31 85.83
Cost Per Manhour -- -- 38.66 42.92

Crew kq
Belt loader, 12' x 60", triple deck screen 11.73 1.00 -- 11.73
Belt loader, 24" x 50', 355 tons per hour 12.23 6.00 -- 73.38
Belt loader, 72" W, single deck vibrating screen 12.94 1.00 -- 12.94
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Front-end wheel loader, 4 CY, articulated, 966E 90.72 1.00 -- 90.72
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.50 55.77 --
Equipment operator, oilers 37.18 1.00 37.18 --
Skilled worker 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 5.00 180.40 201.95
Cost Per Manhour -- -- 36.08 40.39

Crew kr
Belt loader, dozer trapbelt feeder 4.50 1.00 -- 4.50
Belt loader, 24" x 50', 355 tons per hour 12.23 2.00 -- 24.46
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Front-end wheel loader, 3 CY, articulated, 950E 64.00 1.00 -- 64.00
Front-end crawler loader, 2 CY, 953 56.65 1.00 -- 56.65
Crusher plant, portable, 15" x 36" jaw 100.53 1.00 -- 100.53
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Equipment operator, oilers 37.18 1.50 55.77 --
Skilled worker 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 5.00 180.40 263.32
Cost Per Manhour -- -- 36.08 52.66

Crew ks
Small tools 2.10 0.74 -- 1.55
Log chipper, 16" diameter, trailer-mounted 11.56 1.00 -- 11.56
Front-end crawler loader, 3.75 CY, 973 129.83 1.00 -- 129.83
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, medium 37.18 1.00 37.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 52 (part 2)

Manhour, Labor and Equipment Totals -- 6.00 212.08 142.94


Cost Per Manhour -- -- 35.35 23.82

Crew kt
Small tools 2.10 2.00 -- 4.20
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Winch (without cable) for D-6 dozer 7.77 1.00 -- 7.77
Rake for D-8 crawler tractor, multi-application 8.30 1.00 -- 8.30
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
2015 Heavy Construction Estimator, All Rights Reserved Page 53

Brush chipper, 6" diameter log capacity, towed 25.60 1.00 -- 25.60
D-6D crawler tractor dozer, power shift 55.99 1.00 -- 55.99
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 214.38 121.76
Cost Per Manhour -- -- 35.73 20.29

Crew ku
Ripper shanks for beam on D-9 dozer, each 1.06 3.00 -- 3.18
Chain saw, 31" bar 2.82 2.00 -- 5.64
Rotary cutter for land clearing, 15' width, 2" to 12" 8.18 1.00 -- 8.18
Rake for D-8 crawler tractor, multi-application 8.30 2.00 -- 16.60
Winch (without cable) for D-8 dozer 9.43 1.00 -- 9.43
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
Ripper beam, multi-shank, for D-9 dozer 17.02 1.00 -- 17.02
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 8.00 286.44 409.53
Cost Per Manhour -- -- 35.81 51.19

Crew kv
Ripper shanks for beam on D-9 dozer, each 1.06 3.00 -- 3.18
Chain saw, 31" bar 2.82 3.00 -- 8.46
Rotary cutter for land clearing, 15' width, 2" to 12" 8.18 1.00 -- 8.18
Rake for D-8 crawler tractor, multi-application 8.30 2.00 -- 16.60
Winch (without cable) for D-8 dozer 9.43 1.00 -- 9.43
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Blade for D-9 dozer, universal 16.18 2.00 -- 32.36
Ripper beam, multi-shank, for D-9 dozer 17.02 1.00 -- 17.02
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
D-9N crawler tractor dozer 166.86 2.00 -- 333.72
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Equipment operator, light 37.18 2.00 74.36 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 11.00 393.38 595.39
Cost Per Manhour -- -- 35.76 54.13

Crew kw
Ripper shanks for beam on D-8 dozer, each 0.99 1.00 -- 0.99
Small tools 2.10 2.00 -- 4.20
Blade for D-6 dozer, angle tilt 6.72 1.00 -- 6.72
Winch (without cable) for D-6 dozer 7.77 1.00 -- 7.77
Rake for D-8 crawler tractor, multi-application 8.30 2.00 -- 16.60
Blade for D-8 dozer, universal 12.24 1.00 -- 12.24
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Ripper beam, single shank, for D-8 dozer 16.55 1.00 -- 16.55
Brush chipper, 6" diameter log capacity, towed 25.60 2.00 -- 51.20
2015 Heavy Construction Estimator, All Rights Reserved Page 53 (part 2)

D-6D crawler tractor dozer, power shift 55.99 1.00 -- 55.99


D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 2.00 74.36 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 9.00 323.62 326.46
Cost Per Manhour -- -- 35.96 36.27

Crew kx
Chain saw, 31" bar 2.82 2.00 -- 5.64
2015 Heavy Construction Estimator, All Rights Reserved Page 54

Rake for D-8 crawler tractor, multi-application 8.30 3.00 -- 24.90


Winch (without cable) for D-9 dozer 10.74 1.00 -- 10.74
Blade for D-8 dozer, universal 12.24 2.00 -- 24.48
Blade for D-9 dozer, universal 16.18 1.00 -- 16.18
Brush chipper, 6" diameter log capacity, towed 25.60 1.00 -- 25.60
D-8L crawler tractor dozer, power shift 141.02 2.00 -- 282.04
D-9N crawler tractor dozer 166.86 1.00 -- 166.86
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 3.00 111.54 --
Manhour, Labor and Equipment Totals -- 9.00 323.62 556.44
Cost Per Manhour -- -- 35.96 61.83

Crew ky
Chain saw, 31" bar 2.82 3.00 -- 8.46
Blade for D-5 dozer, angle tilt 4.65 1.00 -- 4.65
Winch (without cable) for D-5 dozer 6.13 1.00 -- 6.13
Rake for D-8 crawler tractor, multi-application 8.30 1.00 -- 8.30
V-tree cutter for D-8L dozer 12.46 1.00 -- 12.46
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
D-5H crawler tractor dozer, low ground pressure 56.13 2.00 -- 112.26
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Equipment operator, light 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 9.00 319.02 165.44
Cost Per Manhour -- -- 35.45 18.38

Crew kz
Chain saw, 31" bar 2.82 3.00 -- 8.46
Winch (without cable) for D-6 dozer 7.77 1.00 -- 7.77
Rake for D-8 crawler tractor, multi-application 8.30 1.00 -- 8.30
V-tree cutter for D-8L dozer 12.46 1.00 -- 12.46
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
D-5H crawler tractor dozer, low ground pressure 56.13 1.00 -- 56.13
D-7H crawler tractor dozer, low ground pressure 108.08 1.00 -- 108.08
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 9.00 319.02 214.38
Cost Per Manhour -- -- 35.45 23.82

Crew l2
Small tools 2.10 3.00 -- 6.30
Sheet metal worker apprentice 39.59 1.00 39.59 --
Elevator constructor apprentice 37.11 1.00 37.11 --
Electrician, foreman 50.50 0.33 16.67 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Sheet metal worker 49.49 2.00 98.98 --
Elevator constructor 46.39 2.00 92.78 --
Manhour, Labor and Equipment Totals -- 8.33 354.89 6.30
Cost Per Manhour -- -- 42.60 0.76

Crew l3
Small tools 2.10 2.00 -- 4.20
2015 Heavy Construction Estimator, All Rights Reserved Page 54 (part 2)

Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.25 -- 12.19
Elevator constructor apprentice 37.11 1.00 37.11 --
Electrician, foreman 50.50 1.00 50.50 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Elevator constructor 46.39 1.00 46.39 --
Equipment operator, medium 37.18 0.25 9.30 --
Manhour, Labor and Equipment Totals -- 4.25 178.18 16.39
Cost Per Manhour -- -- 41.92 3.86

Crew l4
2015 Heavy Construction Estimator, All Rights Reserved Page 55

Small tools 2.10 2.00 -- 4.20


Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.25 -- 22.79
Elevator constructor apprentice 37.11 1.00 37.11 --
Electrician, foreman 50.50 1.00 50.50 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Elevator constructor 46.39 1.00 46.39 --
Equipment operator, crane and shovel 47.14 0.25 11.79 --
Manhour, Labor and Equipment Totals -- 4.25 180.67 26.99
Cost Per Manhour -- -- 42.51 6.35

Crew l5
Small tools 2.10 0.50 -- 1.05
Decontamination technician 53.55 3.00 160.65 --
Decontamination technician supervisor 74.83 0.25 18.71 --
Manhour, Labor and Equipment Totals -- 3.25 179.36 1.05
Cost Per Manhour -- -- 55.19 0.32

Crew l6
Small tools 2.10 0.50 -- 1.05
Decontamination technician 53.55 7.00 374.85 --
Decontamination technician supervisor 74.83 0.25 18.71 --
Manhour, Labor and Equipment Totals -- 7.25 393.56 1.05
Cost Per Manhour -- -- 54.28 0.14

Crew l7
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 1.00 -- 2.10
Wet abrasive blaster, 20 CF of accustrip abrasive 18.53 1.00 -- 18.53
Air compressor, 1,600 CFM at 100 PSI 77.24 1.00 -- 77.24
Equipment operator, medium 37.18 1.00 37.18 --
Decontamination technician 53.55 2.00 107.10 --
Lead decontamination technician 65.26 0.25 16.32 --
Manhour, Labor and Equipment Totals -- 3.25 160.60 99.47
Cost Per Manhour -- -- 49.41 30.61

Crew l8
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 1.00 -- 2.10
Wet abrasive blaster, 20 CF of accustrip abrasive 18.53 1.00 -- 18.53
Air compressor, 1,600 CFM at 100 PSI 77.24 1.00 -- 77.24
Equipment operator, medium 37.18 1.00 37.18 --
Decontamination technician 53.55 1.00 53.55 --
Lead decontamination technician 65.26 0.25 16.32 --
Manhour, Labor and Equipment Totals -- 2.25 107.05 99.47
Cost Per Manhour -- -- 47.58 44.21

Crew l9
Small tools 2.10 1.00 -- 2.10
Air compressor, shop type, 850 CFM at 290 PSI 44.74 1.00 -- 44.74
Co2 blaster, 1,500 pounds per hour, dual hose 87.99 1.00 -- 87.99
Equipment operator, medium 37.18 1.00 37.18 --
Decontamination technician 53.55 2.00 107.10 --
Lead decontamination technician 65.26 0.25 16.32 --
Manhour, Labor and Equipment Totals -- 3.25 160.60 134.83
Cost Per Manhour -- -- 49.41 41.49
2015 Heavy Construction Estimator, All Rights Reserved Page 55 (part 2)

Crew ld
Dump truck, off highway, 47 to 67 CY, 85 ton 239.47 1.00 -- 239.47
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 239.47
Cost Per Manhour -- -- 41.85 239.47

Crew le
2015 Heavy Construction Estimator, All Rights Reserved Page 56

Dump truck, off highway, 32 to 44 CY, 50 ton 177.38 1.00 -- 177.38


Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 177.38
Cost Per Manhour -- -- 41.85 177.38

Crew lf
Dump truck, off highway, 100 CY, 116 to 153 ton 426.07 1.00 -- 426.07
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 426.07
Cost Per Manhour -- -- 41.85 426.07

Crew lg
Dump truck, off highway, 67 to 83 CY, 98 ton 265.46 1.00 -- 265.46
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 1.00 41.85 265.46
Cost Per Manhour -- -- 41.85 265.46

Crew lj
Small tools 2.10 0.23 -- 0.48
Electrician, foreman 50.50 0.25 12.63 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 1.25 62.63 0.48
Cost Per Manhour -- -- 50.10 0.39

Crew lk
Small tools 2.10 0.23 -- 0.48
Electrician, foreman 50.50 0.50 25.25 --
Electrician 50.00 2.00 100.00 --
Manhour, Labor and Equipment Totals -- 2.50 125.25 0.48
Cost Per Manhour -- -- 50.10 0.19

Crew ll
Electrician, foreman 50.50 0.25 12.63 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 3.25 132.39 0.00
Cost Per Manhour -- -- 40.73 0.00

Crew lm
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.13 -- 6.34
Electrician, foreman 50.50 1.00 50.50 --
Equipment operator, medium 37.18 0.13 4.83 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 2.13 105.33 6.34
Cost Per Manhour -- -- 49.45 2.98

Crew ln
Small tools 2.10 0.40 -- 0.84
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.10 -- 4.88
Electrician, foreman 50.50 1.00 50.50 --
Equipment operator, medium 37.18 0.10 3.72 --
Electrician 50.00 3.00 150.00 --
Manhour, Labor and Equipment Totals -- 4.10 204.22 5.72
2015 Heavy Construction Estimator, All Rights Reserved Page 56 (part 2)

Cost Per Manhour -- -- 49.81 1.39

Crew lp
Small tools 2.10 0.45 -- 0.95
Outside electrician apprentice 48.90 2.00 97.80 --
Electrician, foreman 50.50 0.66 33.33 --
2015 Heavy Construction Estimator, All Rights Reserved Page 57

Electrician 50.00 2.00 100.00 --


Manhour, Labor and Equipment Totals -- 4.66 231.13 0.95
Cost Per Manhour -- -- 49.60 0.20

Crew lr
Small tools 2.10 0.40 -- 0.84
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.13 -- 11.85
Electrician, foreman 50.50 1.00 50.50 --
Equipment operator, crane and shovel 47.14 0.13 6.13 --
Electrician 50.00 3.00 150.00 --
Manhour, Labor and Equipment Totals -- 4.13 206.63 12.69
Cost Per Manhour -- -- 50.03 3.07

Crew ls
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Electrician, foreman 50.50 1.00 50.50 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Electrician 50.00 3.00 150.00 --
Manhour, Labor and Equipment Totals -- 7.00 307.44 48.77
Cost Per Manhour -- -- 43.92 6.97

Crew lt
Small tools 2.10 0.49 -- 1.03
Line truck with aerial platform 54.70 1.00 -- 54.70
Outside electrician apprentice 48.90 2.00 97.80 --
Electrician, foreman 50.50 1.00 50.50 --
Electrician 50.00 2.00 100.00 --
Manhour, Labor and Equipment Totals -- 5.00 248.30 55.73
Cost Per Manhour -- -- 49.66 11.15

Crew lu
Small tools 2.10 0.68 -- 1.43
Line truck with aerial platform 54.70 1.00 -- 54.70
Outside electrician apprentice 48.90 3.00 146.70 --
Electrician, foreman 50.50 1.00 50.50 --
Electrician 50.00 3.00 150.00 --
Manhour, Labor and Equipment Totals -- 7.00 347.20 56.13
Cost Per Manhour -- -- 49.60 8.02

Crew lv
Small tools 2.10 3.00 -- 6.30
Elevator constructor apprentice 37.11 3.00 111.33 --
Electrician, foreman 50.50 1.00 50.50 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Elevator constructor 46.39 3.00 139.17 --
Manhour, Labor and Equipment Totals -- 9.00 370.76 6.30
Cost Per Manhour -- -- 41.20 0.70

Crew lw
Small tools 2.10 1.00 -- 2.10
Elevator constructor apprentice 37.11 1.00 37.11 --
Elevator constructor, foreman 46.89 0.17 7.97 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Elevator constructor 46.39 2.00 92.78 --
2015 Heavy Construction Estimator, All Rights Reserved Page 57 (part 2)

Manhour, Labor and Equipment Totals -- 4.17 172.74 2.10


Cost Per Manhour -- -- 41.42 0.50

Crew lx
Small tools 2.10 1.00 -- 2.10
Elevator constructor apprentice 37.11 1.00 37.11 --
Elevator constructor, foreman 46.89 0.17 7.97 --
2015 Heavy Construction Estimator, All Rights Reserved Page 58

Elevator constructor 46.39 1.00 46.39 --


Manhour, Labor and Equipment Totals -- 2.17 91.47 2.10
Cost Per Manhour -- -- 42.15 0.97

Crew lz
Small tools 2.10 1.00 -- 2.10
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.17 8.50 --
Sheet metal worker 49.49 2.00 98.98 --
Manhour, Labor and Equipment Totals -- 3.17 147.07 2.10
Cost Per Manhour -- -- 46.39 0.66

Crew m2
Small tools 2.10 3.00 -- 6.30
Hot cell technician 60.53 3.00 181.59 --
Hot cell technician, senior 67.56 0.25 16.89 --
Radiation protection technician 67.82 1.00 67.82 --
Manhour, Labor and Equipment Totals -- 4.25 266.30 6.30
Cost Per Manhour -- -- 62.66 1.48

Crew m3
Small tools 2.10 3.00 -- 6.30
Hot cell technician 60.53 3.00 181.59 --
Hot cell technician, senior 67.56 0.25 16.89 --
Manhour, Labor and Equipment Totals -- 3.25 198.48 6.30
Cost Per Manhour -- -- 61.07 1.94

Crew m4
Small tools 2.10 3.00 -- 6.30
Hot cell technician 60.53 2.00 121.06 --
Hot cell technician, senior 67.56 0.25 16.89 --
Radiation protection technician 67.82 1.00 67.82 --
Manhour, Labor and Equipment Totals -- 3.25 205.77 6.30
Cost Per Manhour -- -- 63.31 1.94

Crew m5
Small tools 2.10 2.00 -- 4.20
Hot cell technician 60.53 2.00 121.06 --
Hot cell technician, senior 67.56 0.25 16.89 --
Manhour, Labor and Equipment Totals -- 2.25 137.95 4.20
Cost Per Manhour -- -- 61.31 1.87

Crew m6
Front end wheel ldr., 13.5 CY, articulated, 992C 319.00 1.00 -- 319.00
Vacuum, trailer mounted, 5,500 gal., 2,100 CFM 42.89 1.00 -- 42.89
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Outside equipment operator, light 33.25 1.00 33.25 --
Manhour, Labor and Equipment Totals -- 5.00 157.99 416.86
Cost Per Manhour -- -- 31.60 83.37

Crew m7
2015 Heavy Construction Estimator, All Rights Reserved Page 58 (part 2)

Vacuum, trailer mounted, 5,500 gal., 2,100 CFM 42.89 1.00 -- 42.89
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.00 84.26 97.86
Cost Per Manhour -- -- 42.13 48.93
2015 Heavy Construction Estimator, All Rights Reserved Page 59

Crew m8
Small tools 2.10 1.00 -- 2.10
Industrial hygiene technician 72.81 1.00 72.81 --
Manhour, Labor and Equipment Totals -- 1.00 72.81 2.10
Cost Per Manhour -- -- 72.81 2.10

Crew ma
Small tools 2.10 1.00 -- 2.10
Air compressor, shop type, 330 CFM at 250 PSI 21.55 1.00 -- 21.55
Co2 blaster, 1000 pounds per hour, single hose 55.91 1.00 -- 55.91
Equipment operator, medium 37.18 1.00 37.18 --
Decontamination technician 53.55 1.00 53.55 --
Lead decontamination technician 65.26 0.25 16.32 --
Manhour, Labor and Equipment Totals -- 2.25 107.05 79.56
Cost Per Manhour -- -- 47.58 35.36

Crew mb
Small tools 2.10 1.00 -- 2.10
Air compressor, shop type, 850 CFM at 290 PSI 44.74 1.00 -- 44.74
Co2 blaster, 1,500 lbs. per hour single hose 79.84 1.00 -- 79.84
Equipment operator, medium 37.18 1.00 37.18 --
Decontamination technician 53.55 1.00 53.55 --
Lead decontamination technician 65.26 0.25 16.32 --
Manhour, Labor and Equipment Totals -- 2.25 107.05 126.68
Cost Per Manhour -- -- 47.58 56.30

Crew mc
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 1.00 -- 7.60
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.25 43.73 9.70
Cost Per Manhour -- -- 34.98 7.76

Crew md
Small tools 2.10 1.00 -- 2.10
Fork lift, rough terrain, 8,000 lb., to 16' high 19.10 0.25 -- 4.78
Electrician, foreman 50.50 0.25 12.63 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 0.50 18.59 --
Electrician 50.00 2.00 100.00 --
Manhour, Labor and Equipment Totals -- 4.75 200.98 6.88
Cost Per Manhour -- -- 42.31 1.45

Crew me
Small tools 2.10 1.00 -- 2.10
Fork lift, rough terrain, 8,000 lb., to 16' high 19.10 0.50 -- 9.55
Plumber, foreman 52.70 0.25 13.18 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Plumber 52.20 2.00 104.40 --
Equipment operator, light 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 4.75 205.93 11.65
Cost Per Manhour -- -- 43.35 2.45

Crew mf
2015 Heavy Construction Estimator, All Rights Reserved Page 59 (part 2)

Small tools 2.10 1.00 -- 2.10


Fork lift, rough terrain, 8,000 lb., to 16' high 19.10 0.25 -- 4.78
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 0.25 9.30 --
Manhour, Labor and Equipment Totals -- 2.50 87.90 6.88
Cost Per Manhour -- -- 35.16 2.75
2015 Heavy Construction Estimator, All Rights Reserved Page 60

Crew mg
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 1.00 -- 7.60
Outside laborer (semi-skilled), foreman 20.74 0.25 5.19 --
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Manhour, Labor and Equipment Totals -- 2.25 45.67 9.70
Cost Per Manhour -- -- 20.30 4.31

Crew mm
Small tools 2.10 1.00 -- 2.10
30-ton mobile drum crusher 14.25 1.00 -- 14.25
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.00 72.06 16.35
Cost Per Manhour -- -- 36.03 8.18

Crew mq
Small tools 2.10 1.00 -- 2.10
Rotating grapple, 2 CY 23.60 1.00 -- 23.60
Tractor excavator, 1.23 CY bucket, hydraulic 64.00 1.00 -- 64.00
Equipment operator, medium, foreman 37.68 0.25 9.42 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.25 81.48 89.70
Cost Per Manhour -- -- 36.21 39.87

Crew mr
Small tools 2.10 1.00 -- 2.10
Trash pump, 6", 1,300 GPM at 100' head 9.78 1.00 -- 9.78
Water tanker trailer, 6000 gallon 17.51 1.00 -- 17.51
Fork lift, wheel tire, 8,000 lb. at 24" load center 22.94 1.00 -- 22.94
Truck, F600, 2 axle, 21,000 gross vehicle weight 27.36 1.00 -- 27.36
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.50 124.63 79.69
Cost Per Manhour -- -- 35.61 22.77

Crew ms
Small tools 2.10 1.00 -- 2.10
Bottom dump truck trailer, 20 CY, 30 ton 13.18 1.00 -- 13.18
Fork lift, wheel tire, 8,000 lb. at 24" load center 22.94 1.00 -- 22.94
Truck, F600, 2 axle, 21,000 gross vehicle weight 27.36 1.00 -- 27.36
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.50 124.63 65.58
Cost Per Manhour -- -- 35.61 18.74

Crew mt
Miscellaneous power tools 7.60 1.00 -- 7.60
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 60 (part 2)

Manhour, Labor and Equipment Totals -- 2.50 89.75 7.60


Cost Per Manhour -- -- 35.90 3.04

Crew mu
Hoist for flatbed truck, 2 ton 1.23 1.00 -- 1.23
Flatbed for truck, 8' wide, 24' long 1.44 1.00 -- 1.44
Lowboy trailer, 35 ton, 2 axle 8.92 1.00 -- 8.92
Fork lift, wheel tire, 8,000 lb. at 24" load center 22.94 1.00 -- 22.94
2015 Heavy Construction Estimator, All Rights Reserved Page 61

Truck, 4x2, 35,000 gross vehicle weight 51.95 1.00 -- 51.95


Outside laborer (semi-skilled), foreman 20.74 0.25 5.19 --
Equipment operator, light, foreman 37.68 0.25 9.42 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Equipment operator, light 37.18 1.00 37.18 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 3.50 113.88 86.48
Cost Per Manhour -- -- 32.54 24.71

Crew mv
Scissors lift, 25' height, 2,000 pound capacity 18.39 2.00 -- 36.78
Laborer (semi-skilled) 34.88 5.00 174.40 --
Manhour, Labor and Equipment Totals -- 5.00 174.40 36.78
Cost Per Manhour -- -- 34.88 7.36

Crew mw
Small tools 2.10 1.00 -- 2.10
Radiation protection technician 67.82 1.00 67.82 --
Manhour, Labor and Equipment Totals -- 1.00 67.82 2.10
Cost Per Manhour -- -- 67.82 2.10

Crew mx
Small tools 2.10 4.00 -- 8.40
Hot cell technician 60.53 4.00 242.12 --
Hot cell technician, senior 67.56 0.25 16.89 --
Radiation protection technician 67.82 2.00 135.64 --
Manhour, Labor and Equipment Totals -- 6.25 394.65 8.40
Cost Per Manhour -- -- 63.14 1.34

Crew my
Small tools 2.10 4.00 -- 8.40
Hot cell technician 60.53 4.00 242.12 --
Hot cell technician, senior 67.56 0.25 16.89 --
Radiation protection technician 67.82 1.00 67.82 --
Manhour, Labor and Equipment Totals -- 5.25 326.83 8.40
Cost Per Manhour -- -- 62.25 1.60

Crew mz
Small tools 2.10 4.00 -- 8.40
Hot cell technician 60.53 4.00 242.12 --
Hot cell technician, senior 67.56 0.25 16.89 --
Manhour, Labor and Equipment Totals -- 4.25 259.01 8.40
Cost Per Manhour -- -- 60.94 1.98

Crew n2
Small tools 2.10 0.74 -- 1.55
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.20 -- 9.75
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.50 25.00 --
Sheet metal worker 49.49 1.00 49.49 --
Equipment operator, medium 37.18 0.20 7.44 --
Manhour, Labor and Equipment Totals -- 2.70 121.51 11.31
Cost Per Manhour -- -- 45.00 4.19
2015 Heavy Construction Estimator, All Rights Reserved Page 61 (part 2)

Crew n3
Small tools 2.10 1.03 -- 2.16
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.50 25.00 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 3.50 148.96 2.16
2015 Heavy Construction Estimator, All Rights Reserved Page 62

Cost Per Manhour -- -- 42.56 0.62

Crew n4
Small tools 2.10 0.78 -- 1.64
Miscellaneous power tools 7.60 0.13 -- 0.99
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 1.00 49.99 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 4.00 173.95 2.63
Cost Per Manhour -- -- 43.49 0.66

Crew n5
Small tools 2.10 1.19 -- 2.50
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 1.00 49.99 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 4.00 173.95 2.50
Cost Per Manhour -- -- 43.49 0.62

Crew n6
Small tools 2.10 0.36 -- 0.76
Steamfitter (pipefitters), foreman 51.29 0.25 12.82 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 1.25 63.61 0.76
Cost Per Manhour -- -- 50.89 0.60

Crew n7
Small tools 2.10 0.72 -- 1.51
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 2.50 117.07 1.51
Cost Per Manhour -- -- 46.83 0.60

Crew n8
Small tools 2.10 0.72 -- 1.51
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 2.00 101.58 --
Manhour, Labor and Equipment Totals -- 2.50 127.23 1.51
Cost Per Manhour -- -- 50.89 0.60

Crew n9
Small tools 2.10 0.72 -- 1.51
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 2.50 117.07 1.51
Cost Per Manhour -- -- 46.83 0.60

Crew nb
Small tools 2.10 0.34 -- 0.71
Plumber, foreman 52.70 0.25 13.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 62 (part 2)

Plumber 52.20 1.00 52.20 --


Manhour, Labor and Equipment Totals -- 1.25 65.38 0.71
Cost Per Manhour -- -- 52.30 0.57

Crew nc
Small tools 2.10 0.67 -- 1.41
Plumber apprentice 44.37 1.00 44.37 --
2015 Heavy Construction Estimator, All Rights Reserved Page 63

Plumber, foreman 52.70 0.50 26.35 --


Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 2.50 122.92 1.41
Cost Per Manhour -- -- 49.17 0.56

Crew nd
Small tools 2.10 0.19 -- 0.40
Plumber, foreman 52.70 0.10 5.27 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 1.10 57.47 0.40
Cost Per Manhour -- -- 52.25 0.36

Crew ne
Small tools 2.10 0.34 -- 0.71
Plumber, foreman 52.70 0.25 13.18 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 1.25 65.38 0.71
Cost Per Manhour -- -- 52.30 0.57

Crew nf
Small tools 2.10 0.67 -- 1.41
Plumber, foreman 52.70 0.50 26.35 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 2.50 113.43 1.41
Cost Per Manhour -- -- 45.37 0.56

Crew ng
Small tools 2.10 0.47 -- 0.99
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 0.25 13.18 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 3.25 144.63 0.99
Cost Per Manhour -- -- 44.50 0.30

Crew nh
Small tools 2.10 0.62 -- 1.30
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.10 -- 4.88
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 0.25 13.18 --
Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.10 3.72 --
Manhour, Labor and Equipment Totals -- 2.35 113.46 6.18
Cost Per Manhour -- -- 48.28 2.63

Crew ni
Small tools 2.10 0.67 -- 1.41
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 0.50 26.35 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 2.50 122.92 4.40
Cost Per Manhour -- -- 49.17 1.76
2015 Heavy Construction Estimator, All Rights Reserved Page 63 (part 2)

Crew nj
Small tools 2.10 1.39 -- 2.92
Plumber apprentice 44.37 1.00 44.37 --
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 4.25 175.18 2.92
2015 Heavy Construction Estimator, All Rights Reserved Page 64

Cost Per Manhour -- -- 41.22 0.69

Crew nk
Small tools 2.10 1.01 -- 2.12
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 0.50 26.35 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 3.50 157.80 2.12
Cost Per Manhour -- -- 45.09 0.61

Crew nl
Small tools 2.10 1.01 -- 2.12
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 0.50 26.35 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 3.50 157.80 5.11
Cost Per Manhour -- -- 45.09 1.46

Crew nm
Small tools 2.10 1.17 -- 2.46
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 4.00 184.15 2.46
Cost Per Manhour -- -- 46.04 0.61

Crew nn
Small tools 2.10 1.06 -- 2.23
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.20 -- 9.75
Plumber, foreman 52.70 0.50 26.35 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.20 7.44 --
Manhour, Labor and Equipment Totals -- 2.70 120.87 11.98
Cost Per Manhour -- -- 44.77 4.44

Crew np
Small tools 2.10 1.17 -- 2.46
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Manhour, Labor and Equipment Totals -- 4.00 184.15 5.45
Cost Per Manhour -- -- 46.04 1.36

Crew nq
Small tools 2.10 1.27 -- 2.67
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.40 -- 19.51
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 1.00 52.70 --
2015 Heavy Construction Estimator, All Rights Reserved Page 64 (part 2)

Laborer (semi-skilled) 34.88 1.00 34.88 --


Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.40 14.87 --
Manhour, Labor and Equipment Totals -- 4.40 199.02 22.18
Cost Per Manhour -- -- 45.23 5.04

Crew nr
2015 Heavy Construction Estimator, All Rights Reserved Page 65

Small tools 2.10 1.27 -- 2.67


Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.40 -- 19.51
Plumber apprentice 44.37 1.00 44.37 --
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.40 14.87 --
Manhour, Labor and Equipment Totals -- 4.40 199.02 25.17
Cost Per Manhour -- -- 45.23 5.72

Crew nt
Small tools 2.10 0.56 -- 1.18
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.50 -- 24.39
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 3.50 158.37 25.56
Cost Per Manhour -- -- 45.25 7.30

Crew nu
Small tools 2.10 0.60 -- 1.26
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.75 -- 36.58
Plumber, foreman 52.70 1.00 52.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Plumber 52.20 1.00 52.20 --
Equipment operator, medium 37.18 0.75 27.89 --
Manhour, Labor and Equipment Totals -- 3.75 167.67 37.84
Cost Per Manhour -- -- 44.71 10.09

Crew nv
Outside plumber 42.70 1.00 42.70 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Outside electrician 58.18 1.00 58.18 --
Small tools 2.10 0.34 -- 0.71
Manhour, Labor and Equipment Totals -- 3.00 135.76 0.71
Cost Per Manhour -- -- 45.25 0.24

Crew nw
Small tools 2.10 0.34 -- 0.71
Sheet metal worker, foreman 49.99 0.25 12.50 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 1.25 61.99 0.71
Cost Per Manhour -- -- 49.59 0.57

Crew nx
Small tools 2.10 0.69 -- 1.45
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.50 25.00 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 2.50 114.08 1.45
Cost Per Manhour -- -- 45.63 0.58

Crew ny
2015 Heavy Construction Estimator, All Rights Reserved Page 65 (part 2)

Small tools 2.10 0.64 -- 1.34


Sheet metal worker, foreman 49.99 0.25 12.50 --
Sheet metal worker 49.49 2.00 98.98 --
Manhour, Labor and Equipment Totals -- 2.25 111.48 1.34
Cost Per Manhour -- -- 49.55 0.60

Crew nz
2015 Heavy Construction Estimator, All Rights Reserved Page 66

Small tools 2.10 0.69 -- 1.45


Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.50 25.00 --
Sheet metal worker 49.49 1.00 49.49 --
Manhour, Labor and Equipment Totals -- 2.50 114.08 1.45
Cost Per Manhour -- -- 45.63 0.58

Crew oa
Civil engineer 61.79 1.00 61.79 --
Manhour, Labor and Equipment Totals -- 1.00 61.79 0.00
Cost Per Manhour -- -- 61.79 0.00

Crew ob
Mechanical engineer 61.05 1.00 61.05 --
Manhour, Labor and Equipment Totals -- 1.00 61.05 0.00
Cost Per Manhour -- -- 61.05 0.00

Crew oc
Electrical engineer 64.05 1.00 64.05 --
Manhour, Labor and Equipment Totals -- 1.00 64.05 0.00
Cost Per Manhour -- -- 64.05 0.00

Crew od
Field engineer 64.26 1.00 64.26 --
Manhour, Labor and Equipment Totals -- 1.00 64.26 0.00
Cost Per Manhour -- -- 64.26 0.00

Crew oe
Office engineer 61.79 1.00 61.79 --
Manhour, Labor and Equipment Totals -- 1.00 61.79 0.00
Cost Per Manhour -- -- 61.79 0.00

Crew of
Engineering clerks 55.88 1.00 55.88 --
Manhour, Labor and Equipment Totals -- 1.00 55.88 0.00
Cost Per Manhour -- -- 55.88 0.00

Crew og
Chief planning engineer 55.88 1.00 55.88 --
Manhour, Labor and Equipment Totals -- 1.00 55.88 0.00
Cost Per Manhour -- -- 55.88 0.00

Crew oh
Quality control engineer 55.88 1.00 55.88 --
Manhour, Labor and Equipment Totals -- 1.00 55.88 0.00
Cost Per Manhour -- -- 55.88 0.00

Crew oi
Project engineer 66.67 1.00 66.67 --
Manhour, Labor and Equipment Totals -- 1.00 66.67 0.00
Cost Per Manhour -- -- 66.67 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 66 (part 2)

Crew oj
Surveyor 46.81 1.00 46.81 --
Manhour, Labor and Equipment Totals -- 1.00 46.81 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 67

Cost Per Manhour -- -- 46.81 0.00

Crew ok
Draftsman 43.38 1.00 43.38 --
Manhour, Labor and Equipment Totals -- 1.00 43.38 0.00
Cost Per Manhour -- -- 43.38 0.00

Crew ol
Planners 43.10 1.00 43.10 --
Manhour, Labor and Equipment Totals -- 1.00 43.10 0.00
Cost Per Manhour -- -- 43.10 0.00

Crew om
Schedulers 43.10 1.00 43.10 --
Manhour, Labor and Equipment Totals -- 1.00 43.10 0.00
Cost Per Manhour -- -- 43.10 0.00

Crew on
Inspectors 39.99 1.00 39.99 --
Manhour, Labor and Equipment Totals -- 1.00 39.99 0.00
Cost Per Manhour -- -- 39.99 0.00

Crew op
Construction lab technicians 38.09 1.00 38.09 --
Manhour, Labor and Equipment Totals -- 1.00 38.09 0.00
Cost Per Manhour -- -- 38.09 0.00

Crew oq
Chief purchasing agent 45.75 1.00 45.75 --
Manhour, Labor and Equipment Totals -- 1.00 45.75 0.00
Cost Per Manhour -- -- 45.75 0.00

Crew or
Purchasing agent 38.40 1.00 38.40 --
Manhour, Labor and Equipment Totals -- 1.00 38.40 0.00
Cost Per Manhour -- -- 38.40 0.00

Crew os
Buyers 38.40 1.00 38.40 --
Manhour, Labor and Equipment Totals -- 1.00 38.40 0.00
Cost Per Manhour -- -- 38.40 0.00

Crew ot
Expediters 38.40 1.00 38.40 --
Manhour, Labor and Equipment Totals -- 1.00 38.40 0.00
Cost Per Manhour -- -- 38.40 0.00

Crew ou
Safety engineer 70.83 1.00 70.83 --
Manhour, Labor and Equipment Totals -- 1.00 70.83 0.00
Cost Per Manhour -- -- 70.83 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 67 (part 2)

Crew ov
Safety clerk 48.20 1.00 48.20 --
Manhour, Labor and Equipment Totals -- 1.00 48.20 0.00
2015 Heavy Construction Estimator, All Rights Reserved Page 68

Cost Per Manhour -- -- 48.20 0.00

Crew ow
Security chief 70.83 1.00 70.83 --
Manhour, Labor and Equipment Totals -- 1.00 70.83 0.00
Cost Per Manhour -- -- 70.83 0.00

Crew ox
Security officer 57.82 1.00 57.82 --
Manhour, Labor and Equipment Totals -- 1.00 57.82 0.00
Cost Per Manhour -- -- 57.82 0.00

Crew oy
Watchman/guard 48.20 1.00 48.20 --
Manhour, Labor and Equipment Totals -- 1.00 48.20 0.00
Cost Per Manhour -- -- 48.20 0.00

Crew oz
Fire chief 57.82 1.00 57.82 --
Manhour, Labor and Equipment Totals -- 1.00 57.82 0.00
Cost Per Manhour -- -- 57.82 0.00

Crew o1
Fire fighter 27.25 1.00 27.25 --
Manhour, Labor and Equipment Totals -- 1.00 27.25 0.00
Cost Per Manhour -- -- 27.25 0.00

Crew p2
Small tools 2.10 0.74 -- 1.55
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.10 -- 4.88
Sprinkler installer apprentice 42.47 1.00 42.47 --
Sprinkler installer, foreman 53.59 0.50 26.80 --
Sprinkler installer 53.09 1.00 53.09 --
Equipment operator, medium 37.18 0.10 3.72 --
Manhour, Labor and Equipment Totals -- 2.60 126.07 6.43
Cost Per Manhour -- -- 48.49 2.47

Crew p3
Small tools 2.10 1.24 -- 2.60
Sprinkler installer apprentice 42.47 1.00 42.47 --
Sprinkler installer, foreman 53.59 1.00 53.59 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Sprinkler installer 53.09 1.00 53.09 --
Manhour, Labor and Equipment Totals -- 4.00 184.03 2.60
Cost Per Manhour -- -- 46.01 0.65

Crew p5
Small tools 2.10 0.39 -- 0.82
Rodman (reinforcing), foreman 52.61 0.50 26.31 --
Rodman (reinforcing) 52.11 2.00 104.22 --
Manhour, Labor and Equipment Totals -- 2.50 130.53 0.82
Cost Per Manhour -- -- 52.21 0.33
2015 Heavy Construction Estimator, All Rights Reserved Page 68 (part 2)

Crew p6
Small tools 2.10 0.68 -- 1.43
Rodman (reinforcing), foreman 52.61 1.00 52.61 --
Rodman (reinforcing) 52.11 3.00 156.33 --
Manhour, Labor and Equipment Totals -- 4.00 208.94 1.43
2015 Heavy Construction Estimator, All Rights Reserved Page 69

Cost Per Manhour -- -- 52.24 0.36

Crew p7
Small tools 2.10 0.68 -- 1.43
Stressing equipment 9.85 1.00 -- 9.85
Outside rodman apprentice 47.29 1.00 47.29 --
Rodman (reinforcing), foreman 52.61 1.00 52.61 --
Rodman (reinforcing) 52.11 2.00 104.22 --
Manhour, Labor and Equipment Totals -- 4.00 204.12 11.28
Cost Per Manhour -- -- 51.03 2.82

Crew p8
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 1.22 -- 2.56
Grout pump and mixer, 20 GPM at 100 PSI 6.64 1.00 -- 6.64
Stressing equipment 9.85 1.00 -- 9.85
Air compressor, 250 CFM, 100 PSI 16.67 1.00 -- 16.67
Outside rodman apprentice 47.29 2.00 94.58 --
Rodman (reinforcing), foreman 52.61 1.00 52.61 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Rodman (reinforcing) 52.11 2.00 104.22 --
Manhour, Labor and Equipment Totals -- 8.00 358.35 36.51
Cost Per Manhour -- -- 44.79 4.56

Crew p9
Small tools 2.10 0.84 -- 1.76
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Outside rodman apprentice 47.29 1.00 47.29 --
Rodman (reinforcing), foreman 52.61 1.00 52.61 --
Equipment operator, medium 37.18 1.00 37.18 --
Rodman (reinforcing) 52.11 2.00 104.22 --
Manhour, Labor and Equipment Totals -- 5.00 241.30 50.53
Cost Per Manhour -- -- 48.26 10.11

Crew pa
Small tools 2.10 0.72 -- 1.51
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 2.50 117.07 4.50
Cost Per Manhour -- -- 46.83 1.80

Crew pb
Small tools 2.10 0.27 -- 0.57
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.20 -- 9.75
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.20 7.44 --
Manhour, Labor and Equipment Totals -- 2.70 124.50 10.32
Cost Per Manhour -- -- 46.11 3.82

Crew pc
2015 Heavy Construction Estimator, All Rights Reserved Page 69 (part 2)

Small tools 2.10 0.79 -- 1.66


Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.30 -- 14.63
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.30 11.15 --
Manhour, Labor and Equipment Totals -- 2.80 128.22 16.29
Cost Per Manhour -- -- 45.79 5.82
2015 Heavy Construction Estimator, All Rights Reserved Page 70

Crew pd
Small tools 2.10 0.82 -- 1.72
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.25 12.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 3.25 139.12 14.28
Cost Per Manhour -- -- 42.81 4.39

Crew pe
Small tools 2.10 1.06 -- 2.23
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 3.50 151.95 2.23
Cost Per Manhour -- -- 43.41 0.64

Crew pf
Small tools 2.10 0.89 -- 1.87
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.50 25.65 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 3.50 151.95 14.43
Cost Per Manhour -- -- 43.41 4.12

Crew ph
Small tools 2.10 1.27 -- 2.67
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 4.00 177.59 2.67
Cost Per Manhour -- -- 44.40 0.67

Crew pi
Small tools 2.10 1.24 -- 2.60
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 4.00 177.59 5.59
Cost Per Manhour -- -- 44.40 1.40

Crew pj
Small tools 2.10 1.29 -- 2.71
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.20 -- 9.75
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
2015 Heavy Construction Estimator, All Rights Reserved Page 70 (part 2)

Steamfitter (pipefitters) 50.79 1.00 50.79 --


Equipment operator, medium 37.18 0.20 7.44 --
Manhour, Labor and Equipment Totals -- 4.20 185.03 12.46
Cost Per Manhour -- -- 44.05 2.97

Crew pk
Small tools 2.10 1.30 -- 2.73
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
2015 Heavy Construction Estimator, All Rights Reserved Page 71

Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.20 -- 9.75
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.20 7.44 --
Manhour, Labor and Equipment Totals -- 4.20 185.03 15.47
Cost Per Manhour -- -- 44.05 3.68

Crew pl
Small tools 2.10 1.32 -- 2.77
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.30 -- 14.63
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.30 11.15 --
Manhour, Labor and Equipment Totals -- 4.30 188.74 17.40
Cost Per Manhour -- -- 43.89 4.05

Crew pm
Small tools 2.10 1.32 -- 2.77
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.30 -- 14.63
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.30 11.15 --
Manhour, Labor and Equipment Totals -- 4.30 188.74 17.40
Cost Per Manhour -- -- 43.89 4.05

Crew pn
Small tools 2.10 1.37 -- 2.88
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.50 -- 24.39
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 4.50 196.18 27.26
Cost Per Manhour -- -- 43.60 6.06

Crew pp
Small tools 2.10 1.37 -- 2.88
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.50 -- 24.39
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 4.50 196.18 27.26
Cost Per Manhour -- -- 43.60 6.06

Crew pq
Small tools 2.10 1.33 -- 2.79
2015 Heavy Construction Estimator, All Rights Reserved Page 71 (part 2)

Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.30 -- 27.35
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, crane and shovel 47.14 0.30 14.14 --
Manhour, Labor and Equipment Totals -- 4.30 191.73 33.13
Cost Per Manhour -- -- 44.59 7.70
2015 Heavy Construction Estimator, All Rights Reserved Page 72

Crew pr
Small tools 2.10 1.45 -- 3.05
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.20 -- 18.23
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 1.80 62.78 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, crane and shovel 47.14 0.20 9.43 --
Manhour, Labor and Equipment Totals -- 5.00 214.92 24.27
Cost Per Manhour -- -- 42.98 4.85

Crew ps
Small tools 2.10 1.03 -- 2.16
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.25 12.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.25 176.30 63.49
Cost Per Manhour -- -- 41.48 14.94

Crew pt
Small tools 2.10 1.57 -- 3.30
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.50 -- 24.39
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 5.50 231.06 27.68
Cost Per Manhour -- -- 42.01 5.03

Crew pu
Small tools 2.10 1.76 -- 3.70
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.50 -- 45.58
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 1.00 51.29 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, crane and shovel 47.14 0.50 23.57 --
Manhour, Labor and Equipment Totals -- 6.50 270.92 49.27
Cost Per Manhour -- -- 41.68 7.58

Crew pv
Small tools 2.10 1.24 -- 2.60
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.25 12.82 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
2015 Heavy Construction Estimator, All Rights Reserved Page 72 (part 2)

Equipment operator, medium 37.18 1.00 37.18 --


Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 5.25 218.15 136.65
Cost Per Manhour -- -- 41.55 26.03

Crew pw
Small tools 2.10 0.50 -- 1.05
Welder, 220 amp, trailer mounted 12.56 0.75 -- 9.42
Steamfitter (pipefitters), foreman 51.29 0.25 12.82 --
2015 Heavy Construction Estimator, All Rights Reserved Page 73

Laborer (semi-skilled) 34.88 1.00 34.88 --


Steamfitter (pipefitters) 50.79 1.00 50.79 --
Manhour, Labor and Equipment Totals -- 2.25 98.49 10.47
Cost Per Manhour -- -- 43.77 4.65

Crew px
Small tools 2.10 0.36 -- 0.76
Sprinkler installer, foreman 53.59 0.25 13.40 --
Sprinkler installer 53.09 1.00 53.09 --
Manhour, Labor and Equipment Totals -- 1.25 66.49 0.76
Cost Per Manhour -- -- 53.19 0.60

Crew py
Small tools 2.10 0.72 -- 1.51
Sprinkler installer, foreman 53.59 0.50 26.80 --
Sprinkler installer 53.09 2.00 106.18 --
Manhour, Labor and Equipment Totals -- 2.50 132.98 1.51
Cost Per Manhour -- -- 53.19 0.60

Crew pz
Small tools 2.10 0.72 -- 1.51
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Sprinkler installer, foreman 53.59 0.50 26.80 --
Sprinkler installer 53.09 1.00 53.09 --
Manhour, Labor and Equipment Totals -- 2.50 120.52 1.51
Cost Per Manhour -- -- 48.21 0.60

Crew q2
Small tools 2.10 0.69 -- 1.45
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Structural steel worker, foreman 55.02 1.00 55.02 --
Equipment operator, light 37.18 1.00 37.18 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 3.00 146.72 14.01
Cost Per Manhour -- -- 48.91 4.67

Crew q3
Small tools 2.10 0.53 -- 1.11
Welder, 220 amp, trailer mounted 12.56 2.00 -- 25.12
Structural steel worker, foreman 55.02 0.25 13.76 --
Equipment operator, light 37.18 1.00 37.18 --
Welder, structural steel 54.52 2.00 109.04 --
Manhour, Labor and Equipment Totals -- 3.25 159.98 26.23
Cost Per Manhour -- -- 49.22 8.07

Crew q5
Small tools 2.10 0.25 -- 0.53
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Tractor excavator, 1.25 CY bucket, hydraulic 71.26 1.00 -- 71.26
Rotating mobile shear, 44" opening, 18'6" 97.96 1.00 -- 97.96
Welder, structural steel, foreman 55.02 1.00 55.02 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 4.00 173.98 172.74
2015 Heavy Construction Estimator, All Rights Reserved Page 73 (part 2)

Cost Per Manhour -- -- 43.50 43.18

Crew q8
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
2015 Heavy Construction Estimator, All Rights Reserved Page 74

Shotcrete dry mix spraying machine 19.94 1.00 -- 19.94


Shotcrete hydraulic spray arm 38.74 1.00 -- 38.74
Tunnel groutman, foreman 47.79 1.00 47.79 --
Tunnel groutman 47.29 1.00 47.29 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Outside electrician 58.18 1.00 58.18 --
Tunnel nozzleman 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 5.00 251.58 93.28
Cost Per Manhour -- -- 50.32 18.66

Crew q9
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Shotcrete dry mix spraying machine 19.94 1.00 -- 19.94
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Shotcrete hydraulic spray arm 38.74 1.00 -- 38.74
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Tunnel groutman, foreman 47.79 1.00 47.79 --
Tunnel groutman 47.29 1.00 47.29 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel nozzleman 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 5.00 244.43 148.01
Cost Per Manhour -- -- 48.89 29.60

Crew qa
Small tools 2.10 0.35 -- 0.74
Structural steel worker, foreman 55.02 0.25 13.76 --
Structural steel worker 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 1.25 68.28 0.74
Cost Per Manhour -- -- 54.62 0.59

Crew qb
Small tools 2.10 0.69 -- 1.45
Structural steel worker, foreman 55.02 0.50 27.51 --
Structural steel worker 54.52 2.00 109.04 --
Manhour, Labor and Equipment Totals -- 2.50 136.55 1.45
Cost Per Manhour -- -- 54.62 0.58

Crew qc
Small tools 2.10 0.72 -- 1.51
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Structural steel worker apprentice 43.62 1.00 43.62 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Manhour, Labor and Equipment Totals -- 4.00 207.68 14.07
Cost Per Manhour -- -- 51.92 3.52

Crew qd
Small tools 2.10 1.59 -- 3.34
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Structural steel worker apprentice 43.62 3.00 130.86 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 5.00 272.60 --
2015 Heavy Construction Estimator, All Rights Reserved Page 74 (part 2)

Manhour, Labor and Equipment Totals -- 9.00 458.48 15.90


Cost Per Manhour -- -- 50.94 1.77

Crew qe
Small tools 2.10 1.00 -- 2.10
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Structural steel worker, foreman 55.02 0.50 27.51 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, medium 37.18 1.00 37.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 75

Manhour, Labor and Equipment Totals -- 3.50 173.73 50.87


Cost Per Manhour -- -- 49.64 14.53

Crew qf
Small tools 2.10 0.77 -- 1.62
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 201.24 50.39
Cost Per Manhour -- -- 50.31 12.60

Crew qg
Small tools 2.10 1.16 -- 2.44
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Structural steel worker apprentice 43.62 1.00 43.62 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 5.00 244.86 51.21
Cost Per Manhour -- -- 48.97 10.24

Crew qh
Small tools 2.10 1.55 -- 3.26
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 288.48 52.03
Cost Per Manhour -- -- 48.08 8.67

Crew qi
Small tools 2.10 1.95 -- 4.10
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, medium 37.18 1.00 37.18 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 7.00 343.00 65.43
Cost Per Manhour -- -- 49.00 9.35

Crew qj
Small tools 2.10 2.07 -- 4.35
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 3.00 163.56 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 7.00 352.96 95.50
Cost Per Manhour -- -- 50.42 13.64

Crew qk
2015 Heavy Construction Estimator, All Rights Reserved Page 75 (part 2)

Small tools 2.10 2.87 -- 6.03


Welder, 220 amp, trailer mounted 12.56 2.00 -- 25.12
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, light 37.18 2.00 74.36 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 2.00 109.04 --
2015 Heavy Construction Estimator, All Rights Reserved Page 76

Manhour, Labor and Equipment Totals -- 10.00 481.84 122.30


Cost Per Manhour -- -- 48.18 12.23

Crew ql
Small tools 2.10 0.91 -- 1.91
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, oilers 37.18 1.00 37.18 --
Cement finisher 42.51 1.00 42.51 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 8.00 378.13 93.06
Cost Per Manhour -- -- 47.27 11.63

Crew qm
Small tools 2.10 1.86 -- 3.91
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 3.00 163.56 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 8.00 390.14 108.48
Cost Per Manhour -- -- 48.77 13.56

Crew qn
Small tools 2.10 1.95 -- 4.10
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 8.00 390.14 121.23
Cost Per Manhour -- -- 48.77 15.15

Crew qp
Small tools 2.10 3.14 -- 6.59
Welder, 220 amp, trailer mounted 12.56 2.00 -- 25.12
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 3.00 163.56 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 2.00 109.04 --
Manhour, Labor and Equipment Totals -- 11.00 536.36 136.28
Cost Per Manhour -- -- 48.76 12.39

Crew qq
Small tools 2.10 2.28 -- 4.79
2015 Heavy Construction Estimator, All Rights Reserved Page 76 (part 2)

Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56


Crane, hydraulic, 115' boom, truck-mounted 104.57 0.50 -- 52.29
Structural steel worker apprentice 43.62 4.50 196.29 --
Structural steel worker, foreman 55.02 1.50 82.53 --
Structural steel worker 54.52 6.00 327.12 --
Equipment operator, oilers 37.18 0.50 18.59 --
Equipment operator, crane and shovel 47.14 0.50 23.57 --
Manhour, Labor and Equipment Totals -- 13.00 648.10 69.63
Cost Per Manhour -- -- 49.85 5.36
2015 Heavy Construction Estimator, All Rights Reserved Page 77

Crew qs
Small tools 2.10 1.95 -- 4.10
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 2.00 109.04 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 8.00 390.14 148.32
Cost Per Manhour -- -- 48.77 18.54

Crew qt
Small tools 2.10 2.34 -- 4.91
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 3.00 163.56 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 9.00 444.66 149.13
Cost Per Manhour -- -- 49.41 16.57

Crew qu
Small tools 2.10 2.73 -- 5.73
Welder, 220 amp, trailer mounted 12.56 1.00 -- 12.56
Crane, crawler, mechanical, 240 ton, 260' boom 327.72 1.00 -- 327.72
Structural steel worker apprentice 43.62 2.00 87.24 --
Structural steel worker, foreman 55.02 1.00 55.02 --
Structural steel worker 54.52 4.00 218.08 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 10.00 499.18 346.01
Cost Per Manhour -- -- 49.92 34.60

Crew qx
Crane, crawler, mechanical, 40 ton, 50 boom 63.23 1.00 -- 63.23
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Equipment operator, medium 37.18 1.00 37.18 --
Equipment operator, oilers 37.18 1.00 37.18 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 7.00 280.29 63.23
Cost Per Manhour -- -- 40.04 9.03

Crew qy
Small tools 2.10 0.21 -- 0.44
Welder, 300 amp, skid mounted, electric drive 2.99 1.00 -- 2.99
Welder, structural steel, foreman 55.02 0.25 13.76 --
Welder, structural steel 54.52 1.00 54.52 --
Manhour, Labor and Equipment Totals -- 1.25 68.28 3.43
2015 Heavy Construction Estimator, All Rights Reserved Page 77 (part 2)

Cost Per Manhour -- -- 54.62 2.74

Crew r3
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Tunnel slewing belt conveyor 32.15 1.00 -- 32.15
Tunnel scooptram, 2.5 CY bucket 54.72 1.00 -- 54.72
Tunnel end dump truck, 10 CY 64.05 1.00 -- 64.05
Tunnel shifter, foreman 55.45 1.00 55.45 --
2015 Heavy Construction Estimator, All Rights Reserved Page 78

Outside truck driver, heavy 40.06 1.00 40.06 --


Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 6.00 280.48 172.50
Cost Per Manhour -- -- 46.75 28.75

Crew r4
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Tunnel slewing belt conveyor 32.15 1.00 -- 32.15
Tunnel scooptram, 2.5 CY bucket 54.72 1.00 -- 54.72
Tunnel end dump truck, 10 CY 64.05 2.00 -- 128.10
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside truck driver, heavy 40.06 2.00 80.12 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 7.00 320.54 236.55
Cost Per Manhour -- -- 45.79 33.79

Crew r5
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Tunnel slewing belt conveyor 32.15 1.00 -- 32.15
Tunnel scooptram, 2.5 CY bucket 54.72 2.00 -- 109.44
Tunnel end dump truck, 10 CY 64.05 3.00 -- 192.15
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside truck driver, heavy 40.06 3.00 120.18 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 9.00 411.63 355.32
Cost Per Manhour -- -- 45.74 39.48

Crew r6
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Tunnel slewing belt conveyor 32.15 1.00 -- 32.15
Tunnel scooptram, 2.5 CY bucket 54.72 2.00 -- 109.44
Tunnel end dump truck, 10 CY 64.05 2.00 -- 128.10
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside truck driver, heavy 40.06 2.00 80.12 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 8.00 371.57 291.27
Cost Per Manhour -- -- 46.45 36.41

Crew r7
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
2015 Heavy Construction Estimator, All Rights Reserved Page 78 (part 2)

Tunnel slewing belt conveyor 32.15 1.00 -- 32.15


Tunnel end dump truck, 18 CY 104.79 3.00 -- 314.37
Tunnel scooptram, 6 CY bucket 109.22 1.00 -- 109.22
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside truck driver, heavy 40.06 3.00 120.18 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 9.00 411.63 477.32
Cost Per Manhour -- -- 45.74 53.04
2015 Heavy Construction Estimator, All Rights Reserved Page 79

Crew r8
Small tools 2.10 4.00 -- 8.40
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Tunnel slewing belt conveyor 32.15 1.00 -- 32.15
Tunnel end dump truck, 18 CY 104.79 4.00 -- 419.16
Tunnel scooptram, 6 CY bucket 109.22 2.00 -- 218.44
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside truck driver, heavy 40.06 4.00 160.24 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 1.00 47.29 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel mucking machine operator 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 10.00 451.69 691.33
Cost Per Manhour -- -- 45.17 69.13

Crew ra
Small tools 2.10 1.00 -- 2.10
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Tunnel shifter, foreman 55.45 1.00 55.45 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Tunnel equipment operator, median 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Manhour, Labor and Equipment Totals -- 7.00 354.15 64.05
Cost Per Manhour -- -- 50.59 9.15

Crew rb
Small tools 2.10 5.00 -- 10.50
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Tunnel drilling rig, hydr. 4-boom, 700 to 1600 SF 350.55 1.00 -- 350.55
Tunnel shifter, foreman 55.45 1.00 55.45 --
Tunnel miner (general), foreman 51.53 2.00 103.06 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 1.00 58.18 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 7.00 362.30 415.37
Cost Per Manhour -- -- 51.76 59.34

Crew rc
Small tools 2.10 7.00 -- 14.70
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel boring machine, 475 ton, 8' to 10' dia. 527.77 1.00 -- 527.77
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 3.00 106.86 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel heading motorman (backup) 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 13.00 621.25 892.62
Cost Per Manhour -- -- 47.79 68.66
2015 Heavy Construction Estimator, All Rights Reserved Page 79 (part 2)

Crew rd
Small tools 2.10 7.00 -- 14.70
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel boring machine, 750 ton, 11' to 14' dia. 795.53 1.00 -- 795.53
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 3.00 106.86 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 1.00 58.18 --
2015 Heavy Construction Estimator, All Rights Reserved Page 80

Tunnel heading motorman 51.03 1.00 51.03 --


Tunnel heading motorman (backup) 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 13.00 621.25 1,160.38
Cost Per Manhour -- -- 47.79 89.26

Crew re
Small tools 2.10 7.00 -- 14.70
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel boring machine, 750 ton, 11' to 14' dia. 795.53 1.00 -- 795.53
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 3.00 106.86 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel heading motorman (backup) 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 13.00 621.25 1,160.38
Cost Per Manhour -- -- 47.79 89.26

Crew rf
Small tools 2.10 7.00 -- 14.70
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel 2-boom miner, 137.8 ton, 238" to 350" 898.23 1.00 -- 898.23
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 3.00 106.86 --
Tunnel miner (semi-skilled) 47.29 3.00 141.87 --
Outside electrician 58.18 2.00 116.36 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel heading motorman (backup) 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 16.00 777.75 1,263.08
Cost Per Manhour -- -- 48.61 78.94

Crew rg
Small tools 2.10 7.00 -- 14.70
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel 2-boom miner, 137.8 ton, 238" to 350" 898.23 1.00 -- 898.23
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 3.00 106.86 --
Tunnel miner (semi-skilled) 47.29 3.00 141.87 --
Outside electrician 58.18 2.00 116.36 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel heading motorman (backup) 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 16.00 777.75 1,263.08
Cost Per Manhour -- -- 48.61 78.94
2015 Heavy Construction Estimator, All Rights Reserved Page 80 (part 2)

Crew rh
Small tools 2.10 3.00 -- 6.30
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel roadheader, 35 ton, 197 to 213" 250.58 1.00 -- 250.58
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
2015 Heavy Construction Estimator, All Rights Reserved Page 81

Tunnel miner (general) 51.03 3.00 153.09 --


Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 8.00 404.40 607.03
Cost Per Manhour -- -- 50.55 75.88

Crew ri
Small tools 2.10 4.00 -- 8.40
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel roadheader, 50 ton 350.38 1.00 -- 350.38
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 8.00 404.40 708.93
Cost Per Manhour -- -- 50.55 88.62

Crew rj
Small tools 2.10 4.00 -- 8.40
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel roadheader, 57 ton, 186" to 270" 439.76 1.00 -- 439.76
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 8.00 404.40 798.31
Cost Per Manhour -- -- 50.55 99.79

Crew rk
Small tools 2.10 5.00 -- 10.50
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel roadheader, 90 ton, 197" to 236" 520.71 1.00 -- 520.71
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 10.00 506.46 881.36
Cost Per Manhour -- -- 50.65 88.14

Crew rl
Small tools 2.10 5.00 -- 10.50
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel roadheader, 99 ton, 276" to 386" 626.92 1.00 -- 626.92
2015 Heavy Construction Estimator, All Rights Reserved Page 81 (part 2)

Tunnel shifter, foreman 55.45 1.00 55.45 --


Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 10.00 506.46 987.57
Cost Per Manhour -- -- 50.65 98.76

Crew rm
2015 Heavy Construction Estimator, All Rights Reserved Page 82

Small tools 2.10 5.00 -- 10.50


Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel 2-boom miner, 137.8 ton, 238" to 350" 898.23 1.00 -- 898.23
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 10.00 506.46 1,258.88
Cost Per Manhour -- -- 50.65 125.89

Crew rn
Small tools 2.10 5.00 -- 10.50
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel drilling rig, hydr. 4-boom, 700 to 1600 SF 350.55 1.00 -- 350.55
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 1.00 58.18 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 2.00 102.06 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 10.00 498.98 752.34
Cost Per Manhour -- -- 49.90 75.23

Crew rp
Small tools 2.10 5.00 -- 10.50
Submersible pump, 6", 1,950 GPM at 40' head 11.30 20.00 -- 226.00
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
Tunnel drilling rig, hydr. 4-boom, 700 to 1600 SF 350.55 1.00 -- 350.55
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Tunnel miner (semi-skilled) 47.29 3.00 141.87 --
Outside electrician 58.18 1.00 58.18 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 3.00 153.09 --
Tunnel mole nipper 51.03 2.00 102.06 --
Manhour, Labor and Equipment Totals -- 13.00 648.33 752.34
Cost Per Manhour -- -- 49.87 57.87

Crew rq
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Tunnel boring machine, 475 ton, 8' to 10' dia. 527.77 1.00 -- 527.77
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 4.00 142.48 --
2015 Heavy Construction Estimator, All Rights Reserved Page 82 (part 2)

Tunnel miner (semi-skilled) 47.29 2.00 94.58 --


Outside electrician 58.18 2.00 116.36 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 17.00 814.86 673.24
Cost Per Manhour -- -- 47.93 39.60

Crew rr
2015 Heavy Construction Estimator, All Rights Reserved Page 83

Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Tunnel boring machine, 150 ton, 3.5' diameter 410.60 1.00 -- 410.60
Tunnel shifter, foreman 55.45 1.00 55.45 --
Tunnel miner (general), foreman 51.53 4.00 206.12 --
Outside equipment operator, oilers 35.62 4.00 142.48 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 2.00 116.36 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 17.00 816.86 556.07
Cost Per Manhour -- -- 48.05 32.71

Crew rs
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Tunnel boring machine, 750 ton, 11' to 14' dia. 795.53 1.00 -- 795.53
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 4.00 142.48 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Outside electrician 58.18 2.00 116.36 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 4.00 204.12 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 17.00 814.86 941.00
Cost Per Manhour -- -- 47.93 55.35

Crew rt
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Tunnel boring machine, 225 ton, 5' diameter 472.19 1.00 -- 472.19
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 4.00 142.48 --
Tunnel miner (semi-skilled) 47.29 3.00 141.87 --
Outside electrician 58.18 2.00 116.36 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 5.00 255.15 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 19.00 913.18 617.66
Cost Per Manhour -- -- 48.06 32.51

Crew ru
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Tunnel boring machine, 500 ton, 8' diameter 615.91 1.00 -- 615.91
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 4.00 142.48 --
2015 Heavy Construction Estimator, All Rights Reserved Page 83 (part 2)

Tunnel miner (semi-skilled) 47.29 3.00 141.87 --


Outside electrician 58.18 2.00 116.36 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 5.00 255.15 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 19.00 913.18 761.38
Cost Per Manhour -- -- 48.06 40.07

Crew rw
2015 Heavy Construction Estimator, All Rights Reserved Page 84

Small tools 2.10 3.00 -- 6.30


Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Tunnel roadheader, 50 ton 350.38 1.00 -- 350.38
Tunnel shifter, foreman 55.45 1.00 55.45 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside electrician 58.18 1.00 58.18 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel heading motorman 51.03 1.00 51.03 --
Tunnel miner (general) 51.03 2.00 102.06 --
Tunnel mole nipper 51.03 1.00 51.03 --
Manhour, Labor and Equipment Totals -- 8.00 404.40 411.00
Cost Per Manhour -- -- 50.55 51.38

Crew s2
Flatbed for truck, 8' wide, 16' long 1.10 0.20 -- 0.22
Small tools 2.10 0.47 -- 0.99
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 0.20 -- 5.10
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 6.31
Cost Per Manhour -- -- 35.05 2.10

Crew s3
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 0.47 -- 0.99
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 27.60
Cost Per Manhour -- -- 35.05 9.20

Crew s4
Flatbed for truck, 8' wide, 16' long 1.10 0.30 -- 0.33
Hoist for flatbed truck, 4 ton 1.43 0.30 -- 0.43
Small tools 2.10 0.47 -- 0.99
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 0.30 -- 7.65
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 9.40
Cost Per Manhour -- -- 35.05 3.13

Crew s5
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 0.47 -- 0.99
Crane, hydraulic, 8 ton, 85' boom 19.07 1.00 -- 19.07
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 4.00 142.32 76.13
Cost Per Manhour -- -- 35.58 19.03

Crew s6
Small tools 2.10 1.00 -- 2.10
2015 Heavy Construction Estimator, All Rights Reserved Page 84 (part 2)

Core drill, skid mounted, 44 HP, to 1,000' depth 19.22 1.00 -- 19.22
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.50 52.57 21.32
Cost Per Manhour -- -- 35.05 14.21

Crew s7
Miscellaneous power tools 7.60 1.00 -- 7.60
Line truck with aerial platform 54.70 1.00 -- 54.70
2015 Heavy Construction Estimator, All Rights Reserved Page 85

Laborer (semi-skilled), foreman 35.38 0.50 17.69 --


Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 3.50 122.33 62.30
Cost Per Manhour -- -- 34.95 17.80

Crew s8
Grout pump and mixer, 20 GPM at 100 PSI 6.64 1.00 -- 6.64
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.50 124.63 6.64
Cost Per Manhour -- -- 35.61 1.90

Crew s9
Small tools 2.10 1.00 -- 2.10
Rotary drill, truck mounted, 16" diameter 150.11 1.00 -- 150.11
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.50 89.75 152.21
Cost Per Manhour -- -- 35.90 60.88

Crew sb
Small tools 2.10 8.00 -- 16.80
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Tunnel shifter, foreman 55.45 1.00 55.45 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel steel worker 51.03 4.00 204.12 --
Manhour, Labor and Equipment Totals -- 9.00 456.21 71.12
Cost Per Manhour -- -- 50.69 7.90

Crew sc
Small tools 2.10 8.00 -- 16.80
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 1.00 -- 13.18
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Tunnel shifter, foreman 55.45 1.00 55.45 --
Tunnel miner (semi-skilled) 47.29 2.00 94.58 --
Tunnel equipment operator, light 51.03 1.00 51.03 --
Tunnel mole nipper 51.03 1.00 51.03 --
Tunnel steel worker 51.03 4.00 204.12 --
Manhour, Labor and Equipment Totals -- 9.00 456.21 119.89
Cost Per Manhour -- -- 50.69 13.32

Crew sj
Small tools 2.10 0.23 -- 0.48
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.20 10.26 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 3.20 151.68 0.48
Cost Per Manhour -- -- 47.40 0.15
2015 Heavy Construction Estimator, All Rights Reserved Page 85 (part 2)

Crew sk
Small tools 2.10 0.23 -- 0.48
Steamfitter (pipefitter) apprentice 40.63 1.00 40.63 --
Steamfitter (pipefitters), foreman 51.29 0.20 10.26 --
Steamfitter (pipefitters) 50.79 1.00 50.79 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 3.20 151.68 0.48
2015 Heavy Construction Estimator, All Rights Reserved Page 86

Cost Per Manhour -- -- 47.40 0.15

Crew sm
Small tools 2.10 0.23 -- 0.48
Sheet metal worker apprentice 39.59 1.00 39.59 --
Sheet metal worker, foreman 49.99 0.20 10.00 --
Sheet metal worker 49.49 1.00 49.49 --
Electrician 50.00 1.00 50.00 --
Manhour, Labor and Equipment Totals -- 3.20 149.08 0.48
Cost Per Manhour -- -- 46.59 0.15

Crew sq
Small tools 2.10 0.13 -- 0.27
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.25 43.73 0.27
Cost Per Manhour -- -- 34.98 0.22

Crew sr
Small tools 2.10 0.27 -- 0.57
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 2.50 87.45 0.57
Cost Per Manhour -- -- 34.98 0.23

Crew ss
Small tools 2.10 0.40 -- 0.84
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 3.50 122.33 0.84
Cost Per Manhour -- -- 34.95 0.24

Crew st
Small tools 2.10 0.43 -- 0.90
Skilled worker, foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Skilled worker 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.25 113.49 0.90
Cost Per Manhour -- -- 34.92 0.28

Crew su
Small tools 2.10 0.09 -- 0.19
Miscellaneous power tools 7.60 0.22 -- 1.67
Laborer (semi-skilled), foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 1.25 43.73 1.86
Cost Per Manhour -- -- 34.98 1.49

Crew sv
Small tools 2.10 1.00 -- 2.10
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 3.00 104.64 --
Manhour, Labor and Equipment Totals -- 3.50 122.33 50.87
2015 Heavy Construction Estimator, All Rights Reserved Page 86 (part 2)

Cost Per Manhour -- -- 34.95 14.53

Crew sw
Small tools 2.10 0.93 -- 1.95
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 1.95
2015 Heavy Construction Estimator, All Rights Reserved Page 87

Cost Per Manhour -- -- 35.05 0.65

Crew sx
Small tools 2.10 0.76 -- 1.60
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Manhour, Labor and Equipment Totals -- 5.00 174.90 1.60
Cost Per Manhour -- -- 34.98 0.32

Crew sy
Small tools 2.10 0.25 -- 0.53
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Truck driver, light 33.48 1.00 33.48 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 3.00 103.74 12.45
Cost Per Manhour -- -- 34.58 4.15

Crew sz
Small tools 2.10 0.25 -- 0.53
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 0.40 -- 4.77
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.00 105.14 5.29
Cost Per Manhour -- -- 35.05 1.76

Crew t6
Small tools 2.10 1.00 -- 2.10
Crane for dragline or clamshell, 4 CY, 115' boom 141.14 1.00 -- 141.14
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 3.00 119.70 143.24
Cost Per Manhour -- -- 39.90 47.75

Crew t7
Miscellaneous power tools 7.60 1.00 -- 7.60
Air compressor, 600 CFM at 100 PSI, quiet 35.00 1.00 -- 35.00
Crane, crawler, mechanical, 25 ton, 50' boom 39.89 1.00 -- 39.89
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 3.00 111.54 --
Manhour, Labor and Equipment Totals -- 4.00 146.42 82.49
Cost Per Manhour -- -- 36.61 20.62

Crew t8
Vacuum truck, 5,000 gallon, 750 CFM 27.86 1.00 -- 27.86
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.50 89.75 27.86
Cost Per Manhour -- -- 35.90 11.14

Crew ta
Small tools 2.10 1.00 -- 2.10
2015 Heavy Construction Estimator, All Rights Reserved Page 87 (part 2)

Rotary drill, truck mounted, 16" diameter 150.11 1.00 -- 150.11


Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 3.00 107.44 152.21
Cost Per Manhour -- -- 35.81 50.74
2015 Heavy Construction Estimator, All Rights Reserved Page 88

Crew tb
Small tools 2.10 1.00 -- 2.10
Rotary drill, truck mounted, 16" diameter 150.11 0.26 -- 39.03
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 0.26 9.67 --
Manhour, Labor and Equipment Totals -- 2.26 79.93 41.13
Cost Per Manhour -- -- 35.37 18.20

Crew tc
Small tools 2.10 1.00 -- 2.10
Centrifugal pump, 6", 100 GPM at 40' head 28.21 1.00 -- 28.21
Rotary drill, truck mounted, 16" diameter 150.11 0.50 -- 75.06
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 2.50 88.85 105.37
Cost Per Manhour -- -- 35.54 42.15

Crew td
Small tools 2.10 1.00 -- 2.10
Centrifugal pump, 6", 100 GPM at 40' head 28.21 1.00 -- 28.21
Rotary drill, truck mounted, 16" diameter 150.11 0.25 -- 37.53
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, medium 37.18 0.25 9.30 --
Manhour, Labor and Equipment Totals -- 1.75 61.87 67.84
Cost Per Manhour -- -- 35.35 38.76

Crew te
Small tools 2.10 1.00 -- 2.10
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 2.00 70.26 2.10
Cost Per Manhour -- -- 35.13 1.05

Crew tj
Small tools 2.10 0.15 -- 0.32
Dragline bucket 4 CY medium weight 5.08 1.00 -- 5.08
Crane for dragline or clamshell, 4 CY, 115' boom 141.14 1.00 -- 141.14
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 146.54
Cost Per Manhour -- -- 42.16 73.27

Crew tk
Small tools 2.10 0.15 -- 0.32
Dragline bucket, 5 CY, heavy weight 9.53 1.00 -- 9.53
Crane for dragline or clamshell, 5 CY, 135' boom 182.78 1.00 -- 182.78
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 192.63
Cost Per Manhour -- -- 42.16 96.31

Crew tl
2015 Heavy Construction Estimator, All Rights Reserved Page 88 (part 2)

Small tools 2.10 0.15 -- 0.32


Dragline bucket, 6 CY, heavy weight 10.20 1.00 -- 10.20
Crane for dragline or clamshell, 5 CY, 135' boom 182.78 1.00 -- 182.78
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 193.30
Cost Per Manhour -- -- 42.16 96.65
2015 Heavy Construction Estimator, All Rights Reserved Page 89

Crew tm
Small tools 2.10 0.15 -- 0.32
Dragline bucket, 7 CY, heavy weight 13.58 1.00 -- 13.58
Crane for dragline or clamshell, 7 CY, 130' boom 357.56 1.00 -- 357.56
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 371.46
Cost Per Manhour -- -- 42.16 185.73

Crew tq
Small tools 2.10 0.60 -- 1.26
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, medium 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 6.00 212.08 50.03
Cost Per Manhour -- -- 35.35 8.34

Crew tr
Small tools 2.10 0.44 -- 0.92
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 0.25 -- 22.79
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, oilers 37.18 0.25 9.30 --
Equipment operator, crane and shovel 47.14 0.25 11.79 --
Manhour, Labor and Equipment Totals -- 5.50 195.98 23.71
Cost Per Manhour -- -- 35.63 4.31

Crew ts
Small tools 2.10 0.11 -- 0.23
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 91.38
Cost Per Manhour -- -- 42.16 45.69

Crew tt
Small tools 2.10 1.50 -- 3.15
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 7.00 259.22 107.72
Cost Per Manhour -- -- 37.03 15.39

Crew tu
Small tools 2.10 0.11 -- 0.23
Crane, hydraulic, 115' boom, truck-mounted 104.57 1.00 -- 104.57
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 104.80
Cost Per Manhour -- -- 42.16 52.40
2015 Heavy Construction Estimator, All Rights Reserved Page 89 (part 2)

Crew tv
Small tools 2.10 1.50 -- 3.15
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 7.00 259.22 134.81
2015 Heavy Construction Estimator, All Rights Reserved Page 90

Cost Per Manhour -- -- 37.03 19.26

Crew tw
Small tools 2.10 0.11 -- 0.23
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 131.89
Cost Per Manhour -- -- 42.16 65.95

Crew ty
Small tools 2.10 0.11 -- 0.23
Crane, crawler, mechanical, 240 ton, 260' boom 327.72 1.00 -- 327.72
Equipment operator, oilers 37.18 1.00 37.18 --
Equipment operator, crane and shovel 47.14 1.00 47.14 --
Manhour, Labor and Equipment Totals -- 2.00 84.32 327.95
Cost Per Manhour -- -- 42.16 163.98

Crew u3
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 2.00 -- 4.20
Street sweeper, 7' wide, towed, with sprinkler 6.59 1.00 -- 6.59
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 2.00 -- 43.72
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Roller, static, 13 ton, 84" wide, 11 tire 23.87 1.00 -- 23.87
Asphalt finisher, 10' W, with screed, pneumatic 92.87 1.00 -- 92.87
Outside equipment operator, medium, foreman 44.70 1.00 44.70 --
Outside laborer (semi-skilled) 20.24 7.00 141.68 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, medium 44.20 3.00 132.60 --
Manhour, Labor and Equipment Totals -- 12.00 359.04 223.37
Cost Per Manhour -- -- 29.92 18.61

Crew u4
Blade for D-4 dozer, angle tilt 4.19 1.00 -- 4.19
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.50 -- 6.59
Roller, static, 12 ton, 84" wide, 3-wheel 21.86 1.00 -- 21.86
D-4 crawler tractor dozer, power shift 33.46 1.00 -- 33.46
Front-end wheel loader, 3 CY, articulated, 950E 64.00 1.00 -- 64.00
Motor grader, Cat 14G, articulated, power shift 71.92 1.00 -- 71.92
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Equipment operator, light 37.18 1.00 37.18 --
Equipment operator, medium 37.18 2.00 74.36 --
Manhour, Labor and Equipment Totals -- 3.50 129.23 202.02
Cost Per Manhour -- -- 36.92 57.72

Crew u6
Flatbed for truck, 8' wide, 16' long 1.10 0.70 -- 0.77
Pick-up truck, 3/4 ton, 4x4, 8,800 lbs. 13.18 0.70 -- 9.23
Truck for flatbed, 2 axle, 4x2, 24,000 lbs. 27.38 0.70 -- 19.17
Crane, 4-WD, rough terrain, hydraulic, 10 ton 37.96 0.50 -- 18.98
Laborer (semi-skilled), foreman 35.38 0.70 24.77 --
Laborer (semi-skilled) 34.88 2.73 95.22 --
Truck driver, heavy 41.85 0.70 29.30 --
2015 Heavy Construction Estimator, All Rights Reserved Page 90 (part 2)

Skilled worker 34.88 2.00 69.76 --


Equipment operator, crane and shovel 47.14 0.50 23.57 --
Outside carpenter 47.65 0.50 23.83 --
Manhour, Labor and Equipment Totals -- 7.13 266.44 48.14
Cost Per Manhour -- -- 37.37 6.75

Crew ui
Small tools 2.10 0.12 -- 0.25
Skilled worker, foreman 35.38 0.25 8.85 --
2015 Heavy Construction Estimator, All Rights Reserved Page 91

Skilled worker 34.88 1.00 34.88 --


Manhour, Labor and Equipment Totals -- 1.25 43.73 0.25
Cost Per Manhour -- -- 34.98 0.20

Crew uj
Small tools 2.10 0.23 -- 0.48
Skilled worker, foreman 35.38 0.50 17.69 --
Skilled worker 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 2.50 87.45 0.48
Cost Per Manhour -- -- 34.98 0.19

Crew uk
Hydraulic jack, 30 ton, with 50' rods 8.39 1.00 -- 8.39
Skilled worker, foreman 35.38 2.00 70.76 --
Skilled worker 34.88 8.00 279.04 --
Manhour, Labor and Equipment Totals -- 10.00 349.80 8.39
Cost Per Manhour -- -- 34.98 0.84

Crew ul
Small tools 2.10 2.00 -- 4.20
Miscellaneous power tools 7.60 1.00 -- 7.60
Skilled worker, foreman 35.38 0.50 17.69 --
Skilled worker 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 2.50 87.45 11.80
Cost Per Manhour -- -- 34.98 4.72

Crew um
Flatbed for truck, 8' wide, 16' long 1.10 2.00 -- 2.20
Small tools 2.10 4.00 -- 8.40
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 2.00 -- 51.02
Skilled worker, foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 12.00 418.56 --
Skilled worker 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 15.00 523.70 61.62
Cost Per Manhour -- -- 34.91 4.11

Crew un
Flatbed for truck, 8' wide, 16' long 1.10 1.00 -- 1.10
Small tools 2.10 1.00 -- 2.10
Truck, 24,500 gross vehicle weight, 4x2, 2 axle 25.51 1.00 -- 25.51
Skilled worker, foreman 35.38 1.00 35.38 --
Laborer (semi-skilled) 34.88 6.00 209.28 --
Skilled worker 34.88 1.00 34.88 --
Manhour, Labor and Equipment Totals -- 8.00 279.54 28.71
Cost Per Manhour -- -- 34.94 3.59

Crew up
Small tools 2.10 1.00 -- 2.10
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.50 -- 24.39
Skilled worker, foreman 35.38 0.25 8.85 --
Laborer (semi-skilled) 34.88 1.00 34.88 --
Outside equipment operator, light 33.25 0.50 16.63 --
Skilled worker 34.88 2.00 69.76 --
Manhour, Labor and Equipment Totals -- 3.75 130.11 26.49
2015 Heavy Construction Estimator, All Rights Reserved Page 91 (part 2)

Cost Per Manhour -- -- 34.70 7.06

Crew uq
Small tools 2.10 1.00 -- 2.10
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 0.25 -- 12.19
Skilled worker, foreman 35.38 0.25 8.85 --
Outside truck driver, light 35.60 0.25 8.90 --
Skilled worker 34.88 2.00 69.76 --
2015 Heavy Construction Estimator, All Rights Reserved Page 92

Manhour, Labor and Equipment Totals -- 2.50 87.51 14.29


Cost Per Manhour -- -- 35.00 5.72

Crew uu
Small tools 2.10 2.46 -- 5.17
Water tank for truck mounting, 3,000 gallon 5.60 0.25 -- 1.40
Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 0.25 -- 13.74
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Laborer (semi-skilled), foreman 35.38 1.00 35.38 --
Outside truck driver, light 35.60 0.25 8.90 --
Laborer (semi-skilled) 34.88 4.00 139.52 --
Truck driver, heavy 41.85 1.00 41.85 --
Manhour, Labor and Equipment Totals -- 6.25 225.65 93.03
Cost Per Manhour -- -- 36.10 14.88

Crew vi
Small tools 2.10 6.00 -- 12.60
Outside carpenter, foreman 48.15 1.00 48.15 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside cement finisher 42.98 1.00 42.98 --
Outside carpenter 47.65 1.00 47.65 --
Manhour, Labor and Equipment Totals -- 4.00 159.02 12.60
Cost Per Manhour -- -- 39.76 3.15

Crew vm
Small tools 2.10 1.00 -- 2.10
Concrete vibrator, 2.5" diameter, high frequency 2.64 1.00 -- 2.64
Outside cement finisher apprentice 35.40 1.00 35.40 --
Outside cement finisher apprentice, foreman 35.90 0.17 6.10 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside cement finisher 42.98 1.00 42.98 --
Manhour, Labor and Equipment Totals -- 3.17 104.72 4.74
Cost Per Manhour -- -- 33.04 1.50

Crew w3
Small tools 2.10 1.00 -- 2.10
Outside plumber, foreman 43.20 0.17 7.34 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside plumber 42.70 1.00 42.70 --
Manhour, Labor and Equipment Totals -- 2.17 70.28 2.10
Cost Per Manhour -- -- 32.39 0.97

Crew w4
Small tools 2.10 1.00 -- 2.10
Outside plumber, foreman 43.20 0.17 7.34 --
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Outside plumber 42.70 1.00 42.70 --
Manhour, Labor and Equipment Totals -- 3.17 90.52 2.10
Cost Per Manhour -- -- 28.56 0.66

Crew w5
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 1.00 -- 7.60
Outside plumber apprentice 35.24 1.00 35.24 --
2015 Heavy Construction Estimator, All Rights Reserved Page 92 (part 2)

Outside plumber, foreman 43.20 0.17 7.34 --


Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside plumber 42.70 1.00 42.70 --
Manhour, Labor and Equipment Totals -- 3.17 105.52 9.70
Cost Per Manhour -- -- 33.29 3.06

Crew w6
2015 Heavy Construction Estimator, All Rights Reserved Page 93

Concrete bucket for crane, 8 CY 6.31 3.00 -- 18.93


Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 4.00 124.88 150.59
Cost Per Manhour -- -- 31.22 37.65

Crew w7
Blade for D-8 dozer, straight 11.55 1.00 -- 11.55
Chip spreader, self-propelled, 10' wide 31.17 1.00 -- 31.17
Motor grader, Cat 12-G, articulated, power shift 47.88 1.00 -- 47.88
Front-end crawler loader, 2 CY, 953 56.65 1.00 -- 56.65
Water wagon, 6,000 gallon, with Cat 621E 110.97 1.00 -- 110.97
D-8L crawler tractor dozer, power shift 141.02 1.00 -- 141.02
Outside equipment operator, medium, foreman 44.70 1.00 44.70 --
Outside laborer (semi-skilled) 20.24 3.00 60.72 --
Outside truck driver, light 35.60 2.00 71.20 --
Outside equipment operator, medium 44.20 2.00 88.40 --
Manhour, Labor and Equipment Totals -- 8.00 265.02 399.24
Cost Per Manhour -- -- 33.13 49.91

Crew wf
Small tools 2.10 1.00 -- 2.10
Outside laborer (semi-skilled), foreman 20.74 0.34 7.05 --
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Manhour, Labor and Equipment Totals -- 2.34 47.53 2.10
Cost Per Manhour -- -- 20.31 0.90

Crew wg
Small tools 2.10 1.00 -- 2.10
Outside laborer (semi-skilled), foreman 20.74 0.34 7.05 --
Outside laborer (semi-skilled) 20.24 3.00 60.72 --
Manhour, Labor and Equipment Totals -- 3.34 67.77 2.10
Cost Per Manhour -- -- 20.29 0.63

Crew wi
Small tools 2.10 0.25 -- 0.53
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Outside laborer (semi-skilled), foreman 20.74 1.00 20.74 --
Outside laborer (semi-skilled) 20.24 4.00 80.96 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 6.00 145.90 23.44
Cost Per Manhour -- -- 24.32 3.91

Crew x2
Flatbed for truck, 8' wide, 9' long 0.82 1.00 -- 0.82
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 1.00 -- 7.60
Truck for flatbed, 2 axle, 4x2, 24,000 lbs. 27.38 1.00 -- 27.38
Laborer (semi-skilled) 34.88 1.00 34.88 --
Equipment operator, light 37.18 1.00 37.18 --
Manhour, Labor and Equipment Totals -- 2.00 72.06 37.90
Cost Per Manhour -- -- 36.03 18.95
2015 Heavy Construction Estimator, All Rights Reserved Page 93 (part 2)

Crew x3
Miscellaneous power tools 7.60 1.00 -- 7.60
Laborer (semi-skilled), foreman 35.38 0.50 17.69 --
Laborer (semi-skilled) 34.88 1.50 52.32 --
Manhour, Labor and Equipment Totals -- 2.00 70.01 7.60
Cost Per Manhour -- -- 35.01 3.80

Crew xk
2015 Heavy Construction Estimator, All Rights Reserved Page 94

Dump truck, off highway, 14 to 19 CY, 25 tons 69.13 1.00 -- 69.13


Outside truck driver, heavy 40.06 1.00 40.06 --
Manhour, Labor and Equipment Totals -- 1.00 40.06 69.13
Cost Per Manhour -- -- 40.06 69.13

Crew xm
Water tank for truck mounting, 3,000 gallon 5.60 1.00 -- 5.60
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Outside truck driver, heavy 40.06 1.00 40.06 --
Manhour, Labor and Equipment Totals -- 1.00 40.06 60.57
Cost Per Manhour -- -- 40.06 60.57

Crew xn
Dump body for truck, 12 CY, 36,000 lbs. 4.47 1.00 -- 4.47
Truck for dump body, 6x4, 3 axle, 46,000 lbs. 54.97 1.00 -- 54.97
Outside truck driver, light 35.60 1.00 35.60 --
Manhour, Labor and Equipment Totals -- 1.00 35.60 59.44
Cost Per Manhour -- -- 35.60 59.44

Crew xt
Small tools 2.10 1.00 -- 2.10
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Outside plumber, foreman 43.20 0.50 21.60 --
Outside laborer (semi-skilled) 20.24 3.00 60.72 --
Outside plumber 42.70 1.00 42.70 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 5.50 169.22 50.87
Cost Per Manhour -- -- 30.77 9.25

Crew xu
Small tools 2.10 2.00 -- 4.20
Crane, hydraulic, 20 ton, 70' boom, rough terrain 48.77 1.00 -- 48.77
Outside plumber apprentice 35.24 1.00 35.24 --
Outside plumber, foreman 43.20 0.50 21.60 --
Outside laborer (semi-skilled) 20.24 4.00 80.96 --
Outside plumber 42.70 1.00 42.70 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 7.50 224.70 52.97
Cost Per Manhour -- -- 29.96 7.06

Crew xv
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 2.50 -- 5.25
Welder, 300 amp, skid mounted, electric drive 2.99 2.00 -- 5.98
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78
Air compressor, 450 CFM, 100 PSI 29.09 1.00 -- 29.09
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Crane, hydraulic, 40 ton, 84' boom, rough terrain 91.15 1.00 -- 91.15
Outside plumber apprentice 35.24 1.00 35.24 --
Outside plumber, foreman 43.20 1.00 43.20 --
Outside plumber 42.70 6.00 256.20 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
2015 Heavy Construction Estimator, All Rights Reserved Page 94 (part 2)

Manhour, Labor and Equipment Totals -- 11.00 459.10 217.71


Cost Per Manhour -- -- 41.74 19.79

Crew xw
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 2.50 -- 5.25
Welder, 300 amp, skid mounted, electric drive 2.99 2.00 -- 5.98
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
2015 Heavy Construction Estimator, All Rights Reserved Page 95

Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78


Air compressor, 450 CFM, 100 PSI 29.09 1.00 -- 29.09
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Outside plumber apprentice 35.24 1.00 35.24 --
Outside plumber, foreman 43.20 1.00 43.20 --
Outside plumber 42.70 6.00 256.20 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 11.00 459.10 258.22
Cost Per Manhour -- -- 41.74 23.47

Crew xx
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 2.75 -- 5.78
Welder, 300 amp, skid mounted, electric drive 2.99 3.00 -- 8.97
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78
Air compressor, 450 CFM, 100 PSI 29.09 1.00 -- 29.09
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Outside plumber apprentice 35.24 1.00 35.24 --
Outside plumber, foreman 43.20 1.00 43.20 --
Outside plumber 42.70 7.00 298.90 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 12.00 501.80 261.74
Cost Per Manhour -- -- 41.82 21.81

Crew xy
Small tools 2.10 3.00 -- 6.30
Welder, 300 amp, skid mounted, electric drive 2.99 4.00 -- 11.96
Pick-up truck, 3/4 ton, 8,600 gross vehicle weight 11.92 1.00 -- 11.92
Lowboy trailer, 75 ton, 3 axle 16.78 1.00 -- 16.78
Air compressor, 450 CFM, 100 PSI 29.09 1.00 -- 29.09
Truck, 50,000 gross vehicle weight, 6x4, 3 axle 55.94 1.00 -- 55.94
Crane, crawler, mechanical, 100 ton, 210' boom 131.66 1.00 -- 131.66
Outside plumber apprentice 35.24 1.00 35.24 --
Outside plumber, foreman 43.20 1.00 43.20 --
Outside plumber 42.70 8.00 341.60 --
Outside truck driver, heavy 40.06 1.00 40.06 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 13.00 544.50 263.65
Cost Per Manhour -- -- 41.88 20.28

Crew xz
Small tools 2.10 1.00 -- 2.10
Miscellaneous power tools 7.60 1.00 -- 7.60
Laborer (semi-skilled) 34.88 2.50 87.20 --
Equipment operator, light 37.18 0.50 18.59 --
Manhour, Labor and Equipment Totals -- 3.00 105.79 9.70
Cost Per Manhour -- -- 35.26 3.23

Crew y4
2015 Heavy Construction Estimator, All Rights Reserved Page 95 (part 2)

Small tools 2.10 0.11 -- 0.23


Tractor excavator, 3.125 CY bucket, hydraulic 191.59 1.00 -- 191.59
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 3.00 104.64 191.82
Cost Per Manhour -- -- 34.88 63.94

Crew y5
2015 Heavy Construction Estimator, All Rights Reserved Page 96

Small tools 2.10 0.11 -- 0.23


Tractor excavator, 4.5 CY bucket, hydraulic 219.37 1.00 -- 219.37
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 3.00 104.64 219.60
Cost Per Manhour -- -- 34.88 73.20

Crew y6
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 5.25 CY bucket, hydraulic 225.56 1.00 -- 225.56
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 3.00 104.64 225.79
Cost Per Manhour -- -- 34.88 75.26

Crew y7
Small tools 2.10 0.11 -- 0.23
Shovel, crawler, hydraulic, 7.2 CY bucket 204.18 1.00 -- 204.18
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, oilers 35.62 1.00 35.62 --
Outside equipment operator, heavy 48.78 1.00 48.78 --
Manhour, Labor and Equipment Totals -- 3.00 104.64 204.41
Cost Per Manhour -- -- 34.88 68.14

Crew y8
Loader backhoe, wheel, 1.38 CY, 30" dip 22.91 1.00 -- 22.91
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.00 44.20 22.91
Cost Per Manhour -- -- 44.20 22.91

Crew yg
Air hose, 1", 100' length, hardrock 0.79 1.00 -- 0.79
Small tools 2.10 1.00 -- 2.10
Grout pump and mixer, 20 GPM at 100 PSI 6.64 1.00 -- 6.64
Air compressor, 250 CFM, 100 PSI 16.67 1.00 -- 16.67
Fork lift, rough terrain, 8,000 lb., to 16' high 19.10 0.25 -- 4.78
Outside laborer (semi-skilled), foreman 20.74 1.00 20.74 --
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Manhour, Labor and Equipment Totals -- 3.00 61.22 30.98
Cost Per Manhour -- -- 20.41 10.33

Crew yh
Fork lift, rough terrain, 8,000 lb., to 16' high 19.10 1.00 -- 19.10
Outside laborer (semi-skilled), foreman 20.74 1.00 20.74 --
Outside laborer (semi-skilled) 20.24 2.00 40.48 --
Outside equipment operator, light 33.25 1.00 33.25 --
Manhour, Labor and Equipment Totals -- 4.00 94.47 19.10
Cost Per Manhour -- -- 23.62 4.78

Crew yi
Pick-up truck, compact, 1/4 ton, 4x2, 3,500 lbs. 8.47 0.33 -- 2.80
Manhour, Labor and Equipment Totals -- 0.00 0.00 2.80
2015 Heavy Construction Estimator, All Rights Reserved Page 96 (part 2)

Cost Per Manhour -- -- 0.00 8.47

Crew z2
Small tools 2.10 0.11 -- 0.23
Gradall excavator, 1.4 CY, 4x4 65.65 1.00 -- 65.65
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.00 64.44 65.88
2015 Heavy Construction Estimator, All Rights Reserved Page 97

Cost Per Manhour -- -- 32.22 32.94

Crew z3
Small tools 2.10 0.25 -- 0.53
Tractor excavator, 1 CY bucket, hydraulic 62.28 1.00 -- 62.28
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.00 64.44 62.81
Cost Per Manhour -- -- 32.22 31.40

Crew z5
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 1.5 CY bucket, hydraulic 90.49 1.00 -- 90.49
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.00 64.44 90.72
Cost Per Manhour -- -- 32.22 45.36

Crew z7
Small tools 2.10 0.11 -- 0.23
Tractor excavator, 2 CY bucket, hydraulic 126.44 1.00 -- 126.44
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.00 64.44 126.67
Cost Per Manhour -- -- 32.22 63.34

Crew z8
Blade for D-3C dozer, angle tilt 3.18 1.00 -- 3.18
D-3C crawler tractor dozer 25.54 1.00 -- 25.54
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.75 65.50 28.72
Cost Per Manhour -- -- 37.43 16.41

Crew z9
Blade for D-5 dozer, straight 4.57 1.00 -- 4.57
D-5H crawler tractor dozer, power shift 50.09 1.00 -- 50.09
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
Outside laborer (semi-skilled) 20.24 0.50 10.12 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.75 65.50 54.66
Cost Per Manhour -- -- 37.43 31.23

Crew zg
Air hose, 2", 100' length, hardrock 1.60 1.00 -- 1.60
Small tools 2.10 1.00 -- 2.10
Air compressor, 750 CFM at 100 PSI 41.14 1.00 -- 41.14
Track drill, 2.5" to 4" diameter, 12' reach 40.57 1.00 -- 40.57
Outside equipment operator, light, foreman 33.75 0.25 8.44 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, light 33.25 1.00 33.25 --
Manhour, Labor and Equipment Totals -- 2.25 61.93 85.41
Cost Per Manhour -- -- 27.52 37.96
2015 Heavy Construction Estimator, All Rights Reserved Page 97 (part 2)

Crew zh
Pump for core drill, 3/4", 7 GPM at 100 PSI 0.95 1.00 -- 0.95
Small tools 2.10 1.00 -- 2.10
Core drill, skid-mounted, NX, to 400' depth 12.73 1.00 -- 12.73
Outside equipment operator, light, foreman 33.75 0.25 8.44 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, light 33.25 1.00 33.25 --
2015 Heavy Construction Estimator, All Rights Reserved Page 98

Manhour, Labor and Equipment Totals -- 2.25 61.93 15.78


Cost Per Manhour -- -- 27.52 7.01

Crew zq
Front-end wheel loader, 4 CY, articulated, 966E 90.72 1.00 -- 90.72
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.00 44.20 90.72
Cost Per Manhour -- -- 44.20 90.72

Crew zv
Scraper, self-propelled, 14 to 20 CY, 24 ton 127.54 1.00 -- 127.54
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 1.00 44.20 127.54
Cost Per Manhour -- -- 44.20 127.54

Crew zx
Small tools 2.10 1.00 -- 2.10
Rotary drill, crawler mounted, 6" to 8.75" dia. 99.64 1.00 -- 99.64
Outside equipment operator, medium, foreman 44.70 0.25 11.18 --
Outside laborer (semi-skilled) 20.24 1.00 20.24 --
Outside equipment operator, medium 44.20 1.00 44.20 --
Manhour, Labor and Equipment Totals -- 2.25 75.62 101.74
Cost Per Manhour -- -- 33.61 45.22
2015 Heavy Construction Estimator, All Rights Reserved Page 99

==========================================================================
General Requirements
==========================================================================
2015 Heavy Construction Estimator, All Rights Reserved Page 100

CSI 01-100, Overhead Need help? Click: http://costbook.com/estimator/index.htm

Architectural fees
Overhead is calculated as a percentage of the project or contract cost and labeled as Other Project
Cost (OPC)
Add this amount to the bare material, labor, and equipment cost as needed to cover the Overhead cost
The following percentage adders are rule of thumb and can be adjusted as to the complexity of each
Project or Contract changes.
For Construction work,
$50,000 to $500,000 ---@--- % -- 10.00 -- --
For Construction work over $500,000 ---@--- % -- 6.00 -- --
For alternation work to $500,000 ---@--- % -- 50.00 -- --
For alternation work over $500,000 ---@--- % -- 25.00 -- --

Construction Management Fees


For work to $10,000 ---@--- % -- 10.00 -- --
For work to $25,000 ---@--- % -- 9.00 -- --
For work to $100,000 ---@--- % -- 6.00 -- --
For work to $500,000 ---@--- % -- 5.00 -- --
For work to $1,000,000 ---@--- % -- 4.00 -- --

Engineering Fees
Electrical Planning Consultant ---@--- % -- 8.00 -- --
Mechanical Planning Consultant ---@--- % -- 6.00 -- --
Structural Planning Consultant ---@--- % -- 1.00 -- --

Insurance
Builder risk ---@--- % -- 1.00 -- --
Contractor equipment ---@--- % -- 2.00 -- --
Worker Compensation
& employees liability ---@--- % -- 20.00 -- --
Clerical ---@--- % -- 1.00 -- --
Concrete ---@--- % -- 20.00 -- --
Electrical ---@--- % -- 8.00 -- --
Excavation ---@--- % -- 13.00 -- --
Glazing ---@--- % -- 15.00 -- --
Insulation ---@--- % -- 20.00 -- --
Lathing ---@--- % -- 13.00 -- --
Masonry ---@--- % -- 20.00 -- --
Painting ---@--- % -- 15.00 -- --
Plastering ---@--- % -- 16.00 -- --
Plumbing ---@--- % -- 10.00 -- --
Roofing ---@--- % -- 35.00 -- --
Sheet metal ---@--- % -- 13.00 -- --
Steel erection ---@--- % -- 45.00 -- --
Tile ---@--- % -- 10.00 -- --
Waterproofing ---@--- % -- 9.00 -- --

Markup
Markup is for the General contractor to apply as oversite to Subcontractors
Add Markup to all work performed by the Subcontractor
The following percentage rate is rule of thumb.
Charge as a percentage
of Total Project cost ---@--- % -- 10.00 -- --

Performance Bond
Performance Bond is for the General contractor to apply to the overall cost of the Project
2015 Heavy Construction Estimator, All Rights Reserved Page 100 (part 2)

The following percentage rate is rule of thumb.


Charge as a percentage
of Total Project cost ---@--- % -- 2.00 -- --

Permits
Permits are for the General contractor to apply to the overall cost of the Project
The following percentage rate is rule of thumb.
Charge as a percentage
of Total Project cost ---@--- % -- 1.00 -- --

Taxes
Sales Taxes are applied to all non-labor cost, specifically material and equipment cost
Costs vary widely. Use the lines below
As a checklist of possible cost categories.
Sales Tax, State/County/City ---@--- % -- -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 101

Taxes applied to Labor


Social Security ---@--- % -- 6.20 -- --
Unemployment ---@--- % -- 3.00 -- --

CSI 01-530, Barriers

Temporary median barricades


Using a 1.38 CY wheeled loader-backhoe and small tools.
Precast temporary barrier wall,
10 foot sections ew@.102 LF 39.70 3.63 0.76 44.09

Temporary Movable barricades


5' high, 3 rail 2"x 8" ew@1.00 LF 24.00 35.63 7.44 67.07
6' high, 8' wide, stock units ew@2.30 Ea 565.00 81.95 17.10 664.05

CSI 01-660, Quality Control, Tank testing adjusting & balancing

Tank testing, test of volumetric tightness


Per tank tested, by manufacturer prior to shipment.
To 12,000 gallon tank --@.000 Ea 670.00 -- -- 670.00
Over 12,000 to 30,000 gallon tank --@.000 Ea 744.00 -- -- 744.00
Over 30,000 gallon tank --@.000 Ea 818.00 -- -- 818.00

Asphalt testing
Testing, compressive strength
Construction lab tech., small tools.
Marshalll, Density Test, set of 3 op@4.25 Set -- 161.90 -- 161.90
Penetration op@2.30 Ea -- 87.61 -- 87.61
Mix design op@5.00 Ea -- 190.50 -- 190.50
Specific gravity op@2.25 Ea -- 85.70 -- 85.70

Concrete testing
Testing, small tools, Lab equipment
Construction lab tech., small tools.
Aggregates, abrasion op@4.80 Ea -- 182.80 -- 182.80
Absorption op@2.60 Ea -- 99.03 -- 99.03
Sieve Analysis op@3.10 Ea -- 118.10 -- 118.10
Specific gravity op@2.60 Ea -- 99.03 -- 99.03
Compressive Test op@1.05 Ea -- 39.99 -- 39.99
Mix Design op@7.21 Ea -- 274.60 -- 274.60
Water -cement ration curve,
3-4 batches op@25.0 Ea -- 952.30 -- 952.30

Masonry testing
Testing, small tools, Lab equipment
Construction lab tech., small tools.
Absorption op@4.70 Ea -- 179.00 -- 179.00
Chemical Resistance op@3.10 Ea -- 118.10 -- 118.10
Compressive Test op@4.70 Ea -- 179.00 -- 179.00
Imperviousness op@5.20 Ea -- 198.10 -- 198.10

Reinforcing Steel testing


Testing, small tools, Lab equipment
Construction lab tech., small tools.
Tensile test, up to #8 bar op@1.80 Ea -- 68.56 -- 68.56
2015 Heavy Construction Estimator, All Rights Reserved Page 101 (part 2)

Tensile test, up to #9 to #11 op@2.70 Ea -- 102.80 -- 102.80


Tensile test,
up to #14 bar and larger op@3.70 Ea -- 140.90 -- 140.90

Soil testing
Testing, small tools, Lab equipment
Construction lab tech., small tools.
Atterberg limits Liquid/Plastics op@2.80 Ea -- 106.70 -- 106.70
Sieve Analysis op@2.10 Ea -- 79.99 -- 79.99
Specific Gravity op@2.70 Ea -- 102.80 -- 102.80
Permeability op@12.0 Ea -- 457.10 -- 457.10

CSI 01-710, Contract closeout

Final clean-up, per 100 square feet (CSF) cleaned


Using small tools.
Debris removal
from building interior sr@.222 CSF 2.29 7.77 0.05 10.11
Clean and polish floors sr@.800 CSF 0.65 27.98 0.18 28.81
Clean glass surfaces, per side cleaned, no paint,
no mastic, 1st floor only sr@.500 CSF 1.82 17.49 0.12 19.43
2015 Heavy Construction Estimator, All Rights Reserved Page 102

CSI 01-720, Site clean-up

Site final clean-up


Using a 46,000 lb. 3-axle 6x4 truck with 8 CY dump body, a 1.38 CY wheeled loader-backhoe and small
tools.
Site debris clean-up and removal hc@6.40 Acre -- 238.80 133.00 371.80

CSI 01-910, Personnel

Management staff - Superintendents


Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Project manager ia@1.00 Hr -- 93.24 -- 93.24
Assistant project manager ib@1.00 Hr -- 77.82 -- 77.82
General superintendent ic@1.00 Hr -- 65.79 -- 65.79
Civil superintendent id@1.00 Hr -- 56.50 -- 56.50
Carpenter superintendent ie@1.00 Hr -- 51.43 -- 51.43
Mechanical superintendent if@1.00 Hr -- 56.50 -- 56.50
Electrical superintendent ig@1.00 Hr -- 57.50 -- 57.50

Management staff - Office administration


Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Contract administrator ih@1.00 Hr -- 39.81 -- 39.81
Comptroller ij@1.00 Hr -- 37.85 -- 37.85
Administrative clerk ik@1.00 Hr -- 27.17 -- 27.17
Personnel manager il@1.00 Hr -- 40.03 -- 40.03
Personnel clerk im@1.00 Hr -- 21.39 -- 21.39

Management staff - Office personnel


Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Office manager in@1.00 Hr -- 37.85 -- 37.85
Interpreter io@1.00 Hr -- 37.85 -- 37.85
Accountant ip@1.00 Hr -- 37.85 -- 37.85
Bookkeeper iq@1.00 Hr -- 22.67 -- 22.67
Timekeeper ir@1.00 Hr -- 20.92 -- 20.92
Pay master is@1.00 Hr -- 21.39 -- 21.39
Payroll clerks it@1.00 Hr -- 21.39 -- 21.39
Stenographer iu@1.00 Hr -- 20.38 -- 20.38
Typist iv@1.00 Hr -- 20.38 -- 20.38
Clerks iw@1.00 Hr -- 18.44 -- 18.44
Mail clerk ix@1.00 Hr -- 18.44 -- 18.44
Messenger iy@1.00 Hr -- 18.44 -- 18.44
Reproduction operator iz@1.00 Hr -- 16.56 -- 16.56

Cost engineering
Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Cost engineer i1@1.00 Hr -- 55.80 -- 55.80
Cost estimator i2@1.00 Hr -- 47.35 -- 47.35
2015 Heavy Construction Estimator, All Rights Reserved Page 102 (part 2)

Design engineering
Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Civil engineer oa@1.00 Hr -- 61.79 -- 61.79
Mechanical engineer ob@1.00 Hr -- 61.05 -- 61.05
Electrical engineer oc@1.00 Hr -- 64.05 -- 64.05
Field engineer od@1.00 Hr -- 64.26 -- 64.26
Office engineer oe@1.00 Hr -- 61.79 -- 61.79
Engineering clerks of@1.00 Hr -- 55.88 -- 55.88
Chief planning engineer og@1.00 Hr -- 55.88 -- 55.88
Quality control engineer oh@1.00 Hr -- 55.88 -- 55.88
2015 Heavy Construction Estimator, All Rights Reserved Page 103

Project engineer oi@1.00 Hr -- 66.67 -- 66.67

Other engineering personnel


Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Surveyor oj@1.00 Hr -- 46.81 -- 46.81
Draftsman ok@1.00 Hr -- 43.38 -- 43.38
Planners ol@1.00 Hr -- 43.10 -- 43.10
Schedulers om@1.00 Hr -- 43.10 -- 43.10
Inspectors on@1.00 Hr -- 39.99 -- 39.99
Construction lab technicians op@1.00 Hr -- 38.09 -- 38.09

Purchasing personnel
Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Chief purchasing agent oq@1.00 Hr -- 45.75 -- 45.75
Purchasing agent or@1.00 Hr -- 38.40 -- 38.40
Buyers os@1.00 Hr -- 38.40 -- 38.40
Expediters ot@1.00 Hr -- 38.40 -- 38.40

CSI 01-911, Safety, security and fire protection

Safety personnel
Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Safety engineer ou@1.00 Hr -- 70.83 -- 70.83
Safety clerk ov@1.00 Hr -- 48.20 -- 48.20

Security personnel
Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Security chief ow@1.00 Hr -- 70.83 -- 70.83
Security officer ox@1.00 Hr -- 57.82 -- 57.82
Watchman/guard oy@1.00 Hr -- 48.20 -- 48.20

Fire protection personnel


Labor rates are per hour. Weekly = 40; Monthly = 172; Annually = 2064. All labor rates include payroll
taxes and insurance at 25% of the base wage rate. Add $10.00 per hour for subsistence and per diem
(if applicable).
Fire chief oz@1.00 Hr -- 57.82 -- 57.82
Fire fighter o1@1.00 Hr -- 27.25 -- 27.25
2015 Heavy Construction Estimator, All Rights Reserved Page 104

CSI 01-941, Temporary facilities

Temporary office trailers, rented, per month


20' x 8' wide, without hookup --@.000 Mo -- -- 148.00 148.00
Set-up charge, 20' long trailer --@.000 Ea -- -- 400.00 400.00
32' x 8' wide, without hookup --@.000 Mo -- -- 218.00 218.00
Set-up charge, 32' long trailer --@.000 Ea -- -- 500.00 500.00
50' x 10' wide, without hookup --@.000 Mo -- -- 405.00 405.00
50' x 12' wide, without hookup --@.000 Mo -- -- 437.00 437.00
Set-up charge, 50' long trailer --@.000 Ea -- -- 600.00 600.00

CSI 01-942, Temporary Barriers and Enclosures

Temporary construction fence


Typical cost per job duration, erected and removed, using small tools.
5' high chain link ss@.070 LF 4.85 2.45 0.02 7.32
6' high chain link ss@.078 LF 5.82 2.73 0.02 8.57
3' high vinyl fence ss@.043 LF 2.51 1.50 0.01 4.02
4' high vinyl fence ss@.051 LF 4.63 1.78 0.01 6.42
4' high Plywood,
painted, 2" X 4" frame ss@.200 LF 7.28 6.99 0.05 14.32
8' high Plywood,
painted, 4" X 4" frame ss@.410 LF 11.80 14.33 0.10 26.23
4' high, Wire mesh on 4" X 4" post ss@.150 LF 7.57 5.24 0.04 12.85
8' high, Wire mesh on 4" X 4" post ss@.226 LF 7.11 7.90 0.05 15.06
Flat base post ss@.027 Ea 4.65 0.94 0.01 5.60
Sand bag anchor for flat base post ss@.027 Ea 1.25 0.94 0.01 2.20
Environmental construction boundry fence,
18" high ss@.051 LF 0.31 1.78 0.01 2.10

Project signs
Fabricated, hand lettered, erected and removed, using small tools.
Temporary construction sign,
per SF of sign --@.000 SF 12.70 -- -- 12.70

CSI 01-943, Temporary utilities

Temporary construction heat


Typical cost per 12-hour day, using small tools.
To 32 degrees F. (0 C.) --@.000 CSF 4.45 -- -- 4.45
Severe conditions --@.000 CSF 10.20 -- -- 10.20

Temporary water service


Typical costs, using small tools.
Meter fee, 2" meter
(excluding $400.00 deposit) --@.000 LS 1.81 -- 65.00 66.81
Water cost,
per 1,000 gallons, piped --@.000 M 2.84 -- -- 2.84
Water cost,
per 1,000 gallons, trucked xm@.062 M 2.84 2.48 3.76 9.08

Temporary construction lighting and electrical service


Typical cost per job duration, using small tools.
Minimum ll@.325 CSF 3.09 13.24 -- 16.33
Maximum ll@.650 CSF 7.10 26.47 -- 33.57
Per kilowatt hour ($5.00 minimum) ll@.000 Hr 0.18 -- -- 0.18
2015 Heavy Construction Estimator, All Rights Reserved Page 104 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 105

CSI 01-951, Health and safety

Construction site emergency equipment - Eye and body wash stations


Add the cost of extra drain and supply piping, if required, using small tools.
Emergency body shower,
assumes standard hook-up nb@2.86 Ea 168.00 149.60 1.63 319.23
Emergency body
shower and eye wash stations nb@5.00 Ea 750.00 261.50 2.85 1,014.35
Eye wash bowl,
assumes standard hookup nb@2.50 Ea 225.00 130.80 1.43 357.23
Faucet mounted eye wash --@.000 Ea 60.60 -- -- 60.60
Hand held body flush station,
two 32 oz. bottles --@.000 Pair 48.30 -- -- 48.30
Hand held eye wash station,
one 32 oz. bottle --@.000 Ea 25.60 -- -- 25.60
Portable eye wash station,
6 gallon, 10 pound capacity --@.000 Ea 293.00 -- -- 293.00

Temporary fire suppression systems


Co2 extinguisher, 5 pound capacity --@.000 Ea 216.00 -- -- 216.00
Co2 extinguisher, 10 pound capacity --@.000 Ea 326.00 -- -- 326.00
Dry chemical extinguisher,
10 pound capacity --@.000 Ea 98.70 -- -- 98.70
Dry chemical extinguisher,
20 pound capacity --@.000 Ea 166.00 -- -- 166.00
Halon extinguisher,
2.5 pound capacity --@.000 Ea 47.10 -- -- 47.10
Halon extinguisher,
9 pound capacity --@.000 Ea 116.00 -- -- 116.00
Smoke alarms, battery powered --@.000 Ea 15.70 -- -- 15.70

Environmental foam fire extinguishing systems


Foam concentrate (5 gallon can) --@.000 Ea 160.00 -- -- 160.00
Foam concentrate (30 gallon drum) --@.000 Ea 893.00 -- -- 893.00
Foam generator (requires a water source such
as a fire hose or pump truck) --@.000 Ea 1,380.00 -- -- 1,380.00
3-6% polar compound (5 gallon can),
for use on hydrocarbons --@.000 Ea 165.00 -- -- 165.00
6-6% polar compound (5 gallon can), for use on alcohols,
esters and ethers --@.000 Ea 164.00 -- -- 164.00

Sorbents
Barrier (36" x 200' x 1/4") --@.000 Ea 176.00 -- -- 176.00
Booms, 4" diameter x 10', case of 4 --@.000 Case 106.00 -- -- 106.00
Loose sorbent (12 pound bag) --@.000 Bag 94.80 -- -- 94.80
Pads (18" x 18" x 3/16"),
pack of 200 --@.000 Pack 89.30 -- -- 89.30
Pads (18" x 18" x 3/8") with absorbing capacity
of 0.95 I (case of 75) --@.000 Ea 109.00 -- -- 109.00
Pillows (14" x 25" x 5") with absorbing capacity
of 3.7 to 10.2 l (case of 10) --@.000 Ea 121.00 -- -- 121.00
Rolls (13" x 100') --@.000 Ea 62.10 -- -- 62.10
Rolls (19" x 100') --@.000 Ea 95.20 -- -- 95.20

First aid kits


15 components --@.000 Ea 21.00 -- -- 21.00
21 components --@.000 Ea 45.60 -- -- 45.60
2015 Heavy Construction Estimator, All Rights Reserved Page 105 (part 2)

30 components --@.000 Ea 80.20 -- -- 80.20


36 components --@.000 Ea 171.00 -- -- 171.00
Emergency medical cart on wheels --@.000 Ea 1,000.00 -- -- 1,000.00
Emergency medical cart supplies,
66 items --@.000 Ea 2,020.00 -- -- 2,020.00

CSI 01-952, Radioactive waste abatement jobs

Radioactive contamination emergency equipment - Transporters


Accident carrier and decontamination unit, transparent top enclosure with access and latex gloves,
adjustable mobile gurney, AC/DC powered air supply, filtered drain assembly
and waste storage container --@.000 Ea 20,200.00 -- -- 20,200.00
Heavy duty transport bag and absorbent pad with handles
and side zipper access ports --@.000 Ea 2,000.00 -- -- 2,000.00

Personnel monitoring
Heat stress monitor, monthly rental --@.000 Ea 633.00 -- -- 633.00
2015 Heavy Construction Estimator, All Rights Reserved Page 106

Crew for radioactive waste jobs - Hot cell technician


Using small tools.
Radiation technician
using on-site equipment mw@8.00 Day 391.00 542.60 16.80 950.40

Radioactive waste personal protection gear - Boots (reusable)


Latex overboots --@.000 Pair 8.18 -- -- 8.18
Neoprene overboots --@.000 Pair 38.10 -- -- 38.10
PVC overboots --@.000 Pair 20.50 -- -- 20.50

Radioactive waste personal protection gear - Disposable clothing


Aprons, vinyl, box of 12 --@.000 Box 11.60 -- -- 11.60
Boot covers, Tyvek, bag of 10 pair --@.000 Bag 15.40 -- -- 15.40
Briefs, case of 100 --@.000 Case 115.00 -- -- 115.00
Coveralls, Tyvek, case of 25 --@.000 Case 197.00 -- -- 197.00
Coveralls, Tyvek,
polycoated, case of 25 --@.000 Case 221.00 -- -- 221.00
Gloves, latex, box of 50 pair --@.000 Box 12.80 -- -- 12.80
Halter top, case of 100 --@.000 Case 129.00 -- -- 129.00
Hoods, case of 100 --@.000 Case 123.00 -- -- 123.00
Lab coats, Tyvek, case of 30 --@.000 Case 121.00 -- -- 121.00
Shoe covers, Tyvek, bag of 150 pair --@.000 Bag 112.00 -- -- 112.00
Sleeves, 18", case of 100 --@.000 Case 74.60 -- -- 74.60
Hip waders, rental --@.000 Week 26.70 -- -- 26.70

Radioactive waste personal protection gear - Encapsulating chemical suits, reusable


Aluminized outer cover --@.000 Ea 996.00 -- -- 996.00
Basic level A suit (large) --@.000 Ea 495.00 -- -- 495.00
Basic level B suit (large) --@.000 Ea 190.00 -- -- 190.00
Butyl, level A suit (large) --@.000 Ea 1,810.00 -- -- 1,810.00
PVC, level A suit (large) --@.000 Ea 555.00 -- -- 555.00
Teflon/Nomex, level A suit (large) --@.000 Ea 573.00 -- -- 573.00
Viton, level A suit (large) --@.000 Ea 5,020.00 -- -- 5,020.00

Radioactive waste personal protection gear - Eye protection


Face shield --@.000 Ea 16.00 -- -- 16.00
Safety glasses --@.000 Ea 3.92 -- -- 3.92
Safety goggles --@.000 Ea 3.32 -- -- 3.32
Face shield, hard hat mountable --@.000 Ea 21.40 -- -- 21.40

Radioactive waste personal protection gear - Gloves (reusable)


Butyl, medium weight gloves --@.000 Pair 27.60 -- -- 27.60
Neoprene coated gloves,
pack of 12 pair --@.000 Pack 62.10 -- -- 62.10
PVC coated gloves --@.000 Pair 31.60 -- -- 31.60
PVC/Nitrile blend gloves,
package of 12 pair --@.000 Pair 58.90 -- -- 58.90
Viton gloves --@.000 Pair 51.90 -- -- 51.90

Radioactive waste personal protection gear - Ear protection


Ear muffs --@.000 Ea 13.80 -- -- 13.80
Ear plugs, disposable, box of 200 --@.000 Box 28.60 -- -- 28.60

Radioactive waste breathing apparatus - Emergency escape gear


5 minute unit --@.000 Ea 384.00 -- -- 384.00
2015 Heavy Construction Estimator, All Rights Reserved Page 106 (part 2)

10 minute unit --@.000 Ea 434.00 -- -- 434.00

Radioactive waste breathing apparatus - Respirators


Air pump, 2 man with hose kit --@.000 Ea 975.00 -- -- 975.00
Air pump, 6 man with
hose kit and filter element --@.000 Ea 3,200.00 -- -- 3,200.00
Cartridges,
respirator, organic vapor --@.000 Ea 57.60 -- -- 57.60
Dust or mist respirators,
disposable, box of 20 --@.000 Box 18.70 -- -- 18.70
Full face piece air purifying respirators,
chemical cartridge --@.000 Ea 187.00 -- -- 187.00
Half-mask air purifying respirators --@.000 Ea 18.90 -- -- 18.90
Portable air filtration unit,
6-person with Co2 monitor --@.000 Ea 2,530.00 -- -- 2,530.00
Powered air-purifying,
respirator with battery pack --@.000 Ea 826.00 -- -- 826.00
Self-contained breathing apparatus,
30-minute unit --@.000 Ea 2,100.00 -- -- 2,100.00
Self-contained breathing apparatus,
60 minute unit --@.000 Ea 3,290.00 -- -- 3,290.00
Supplied air respirator, full face piece with hose assembly,
constant flow --@.000 Ea 269.00 -- -- 269.00
2015 Heavy Construction Estimator, All Rights Reserved Page 107

Radioactive waste breathing apparatus - Respiratory cleaning equipment


Respirator washer 24 capacity,
monthly rental --@.000 Mo -- -- 345.00 345.00

Radioactive waste protection equipment


Hard hats --@.000 Ea 7.46 -- -- 7.46
Ear-mike two-way radio --@.000 Ea 347.00 -- -- 347.00

Radioactive waste protection equipment - Garments


12" cotton glove liner,
package of 12 pair --@.000 Ea 5.32 -- -- 5.32
14" cotton glove liner,
package of 12 pair --@.000 Ea 5.60 -- -- 5.60
12" anti-contamination
latex rubber gloves --@.000 Pair 1.67 -- -- 1.67
15" anti-contamination
latex rubber gloves --@.000 Pair 1.60 -- -- 1.60
Lead loaded
radiation resistant gloves --@.000 Ea 62.10 -- -- 62.10
100% cotton anti-contamination hood
with Velcro closure and tab --@.000 Ea 5.24 -- -- 5.24
100% cotton anti-contamination panel hood with Velcro closure on crossover
chest flaps and chin ties --@.000 Ea 8.00 -- -- 8.00
Anti-contamination PVC disposable booties,
.004 mil --@.000 Pair 0.40 -- -- 0.40
Anti-contamination PVC disposable booties,
.008 mil --@.000 Pair 0.67 -- -- 0.67
Anti-contamination PVC "T
cut" disposable shoe covers --@.000 Pair 0.47 -- -- 0.47
Anti-contamination
100% cotton shoe covers --@.000 Pair 7.64 -- -- 7.64
One piece 100% cotton anti-contamination coverall with 2 way zipper front
closure and dosimeter tab --@.000 Ea 22.70 -- -- 22.70
One piece 100% cotton anti-contamination coverall
with dosimeter straps --@.000 Ea 26.70 -- -- 26.70
Anti-contamination 100%
cotton "bagsuit" coverall --@.000 Ea 26.70 -- -- 26.70
Heavy duty
anti-contamination PVC boots --@.000 Pair 39.30 -- -- 39.30
Modesty garment --@.000 Set 13.00 -- -- 13.00
One ply lead strap apron --@.000 Ea 104.00 -- -- 104.00
Three ply lead coat apron --@.000 Ea 161.00 -- -- 161.00
16" leaded neoprene dry box gloves
(.25 mm lead equivalent) --@.000 Pair 101.00 -- -- 101.00
31" leaded neoprene dry box gloves
(.25 mm lead equivalent) --@.000 Pair 60.70 -- -- 60.70
Thermal vest with 6 cold/hot packs --@.000 Ea 49.00 -- -- 49.00

Radioactive waste protection equipment - High efficiency particle filter cartridges


HEPA standard filter cartridge --@.000 Ea 60.90 -- -- 60.90
HEPA organic vapors cartridge --@.000 Ea 69.20 -- -- 69.20
HEPA acid gas cartridge --@.000 Ea 72.80 -- -- 72.80
HEPA organic
vapors and acid gas cartridge --@.000 Ea 69.20 -- -- 69.20
HEPA ammonia
and methylamine cartridge --@.000 Ea 72.80 -- -- 72.80
2015 Heavy Construction Estimator, All Rights Reserved Page 107 (part 2)

Radioactive waste protection equipment - Respirator systems


PVC supplied-air
respirator and hood --@.000 Ea 33.30 -- -- 33.30
50' airline with belt loop assembly --@.000 Ea 60.00 -- -- 60.00
100' airline
with belt loop assembly --@.000 Ea 86.60 -- -- 86.60

Radioactive waste protection equipment - Decontamination equipment and supplies


Using a 4-ton fork lift and small tools.
Portable
marine alloy aluminum shower me@38.0 Ea 825.00 1,647.00 93.10 2,565.10
Personnel and equipment
decontamination shower me@38.0 Ea 1,500.00 1,647.00 93.10 3,240.10
Automatic, drain water pump and filtration unit, 2 stage filter,
6 GPM with 5 micron filters nc@20.0 Ea 1,210.00 983.40 11.20 2,204.60
Manual, drain water pump and filtration unit, 2 stage filter,
6 GPM with 5 micron filters nc@20.0 Ea 1,010.00 983.40 11.20 2,004.60
Continuous hot water heater nc@20.0 Ea 2,010.00 983.40 11.20 3,004.60
1, 3, 5 and 25 micron replacement cartridges for water pump/filtration
system (30 per case) --@.000 Ea 5.04 -- -- 5.04
100 micron replacement drain filter
for showers (25 per case) --@.000 Ea 66.90 -- -- 66.90
In-take strainer, 40 mesh screen --@.000 Ea 10.80 -- -- 10.80
Exit and entry expandable tunnel frames,
3' wide --@.000 Ea 327.00 -- -- 327.00
Polyethylene
tunnel cover (2 per case) --@.000 Case 49.40 -- -- 49.40
Decontamination spray --@.000 Ea 12.80 -- -- 12.80
Decontamination spray,
case of 12 cans --@.000 Case 104.00 -- -- 104.00
Decontamination
towelettes (package of 100) --@.000 Pack 24.90 -- -- 24.90
Decontamination
foam hand and surface cleaner --@.000 Ea 9.06 -- -- 9.06
Decontamination
hand soap (1 gallon) --@.000 Ea 47.10 -- -- 47.10
Decontamination kit in 3
gallon metal drum (27 items) --@.000 Kit 393.00 -- -- 393.00
Mobile dry cleaning laundry. Includes three self contained 65 pound capacity laundry machines, three
75 pound electric dryers, one HEPA protected downdraft sort table, two waste air HEPA
systems. (monthly rental) --@.000 Mo -- -- 11,600.00 11,600.00
36" x 36" step off mat --@.000 Mo -- -- 32.60 32.60
36" x 500' walkway
liner cotton and wool blend --@.000 Ea 288.00 -- -- 288.00
2015 Heavy Construction Estimator, All Rights Reserved Page 108

Radioactive waste protection equipment - Face protection


Lead glass safety glasses, non-prescription with protective side panels
(.75 mm lead equivalent) --@.000 Ea 397.00 -- -- 397.00
Lead glass safety glasses, prescription with protective side panels
(.75 mm lead equivalent) --@.000 Ea 531.00 -- -- 531.00
Pliable vinyl goggles with lead glass, adjustable strap, four direct ventilators
(2.00 mm lead equivalent) --@.000 Ea 101.00 -- -- 101.00
Lead plastic full face shield
(.32 mm lead equivalent) --@.000 Ea 368.00 -- -- 368.00

Hazardous & Toxic Waste (HTW) training - Off site training


8-hour refresher course --@.000 Ea 678.00 -- -- 678.00
8-hour supervisor course --@.000 Ea 150.00 -- -- 150.00
24 hour hazardous
material worker training --@.000 Ea 319.00 -- -- 319.00
40-hour hazardous
material worker training --@.000 Ea 493.00 -- -- 493.00

Hazardous & Toxic Waste (HTW) training - On site training


40 hour site specific
training (cost per student) --@.000 Ea 599.00 -- -- 599.00
24 hour site specific CERCL Act compliance
training (cost per student) --@.000 Ea 359.00 -- -- 359.00
24 hour site specific emergency response
training (per student) --@.000 Ea 359.00 -- -- 359.00

Radioactive waste specific training - On site training


Introduction
to radiation safety (8 hours) --@.000 Ea 184.00 -- -- 184.00
Fundamentals of
radiation safety (16 hours) --@.000 Ea 343.00 -- -- 343.00
Basic radiation
protection (40 hours) --@.000 Ea 878.00 -- -- 878.00
Radiation safety
officer training (40 hours) --@.000 Ea 798.00 -- -- 798.00

Radiation control - Cylindrical glove bags


15" x 12", 4 glove ports --@.000 Ea 89.80 -- -- 89.80
16" x 15", 2 glove ports --@.000 Ea 96.80 -- -- 96.80
24" x 15",
6 glove ports 1 support ring --@.000 Ea 132.00 -- -- 132.00
30" x 15",
6 glove ports 1 support ring --@.000 Ea 141.00 -- -- 141.00

Radiation control - Rectangular glove bags


23" x 36", 2 glove ports --@.000 Ea 106.00 -- -- 106.00
24" x 32", 2 glove ports --@.000 Ea 106.00 -- -- 106.00
30" x 30", 4 glove ports --@.000 Ea 114.00 -- -- 114.00
50" x 32", 4 glove ports --@.000 Ea 158.00 -- -- 158.00

Radiation enclosures - Polypropylene


2' x 4' --@.000 Ea 207.00 -- -- 207.00
4' x 8' --@.000 Ea 293.00 -- -- 293.00
2' x 12' --@.000 Ea 416.00 -- -- 416.00

Radiation enclosures - Lead


2015 Heavy Construction Estimator, All Rights Reserved Page 108 (part 2)

1' x 4' --@.000 Ea 540.00 -- -- 540.00


1' x 8' --@.000 Ea 946.00 -- -- 946.00

Radiation enclosures - Stainless steel


2' x 4' --@.000 Ea 265.00 -- -- 265.00
2' x 12' --@.000 Ea 507.00 -- -- 507.00
4' x 8' --@.000 Ea 513.00 -- -- 513.00

Radiation enclosures - Polycarbonate


2' x 4' --@.000 Ea 229.00 -- -- 229.00
2' x 12' --@.000 Ea 583.00 -- -- 583.00
4' x 8' --@.000 Ea 484.00 -- -- 484.00

HEPA filtration and blower systems - Portable units


Using miscellaneous power tools.
125 CFM HEPA filtration unit
(12.4" diameter. X 25" long) mg@3.50 Ea 2,890.00 71.05 15.10 2,976.15
500 CFM HEPA
filtration unit cart mounted mg@3.50 Ea 6,670.00 71.05 15.10 6,756.15
500 CFM HEPA charcoal filtration unit (no pre-filter) - cart mounted (for radioiodine removal, use with
500 CFM HEPA filtration unit) mg@3.50 Ea 7,200.00 71.05 15.10 7,286.15

HEPA filtration and blower systems - Portable units


1,000 CFM HEPA charcoal filtration unit,
cart mounted mf@5.00 Ea 18,100.00 175.80 13.80 18,289.60
2015 Heavy Construction Estimator, All Rights Reserved Page 109

2,000 CFM HEPA


filtration unit cart mounted mf@5.00 Ea 15,300.00 175.80 13.80 15,489.60

Radiation control - Polyethylene bags


12" x 20", 3 mil (600 per roll) --@.000 Ea 75.20 -- -- 75.20
24" x 36", 3 mil (250 per roll) --@.000 Ea 73.80 -- -- 73.80
35" x 52", 4 mil (100 per roll) --@.000 Ea 115.00 -- -- 115.00
38" x 63", 4 mil (100 per roll) --@.000 Ea 129.00 -- -- 129.00
12" x 8" x 30", 2 mil
liner bags (20 per package) --@.000 Ea 8.00 -- -- 8.00
12" x 9" x 17-1/2" 2 mil
liner bags (20 per package) --@.000 Ea 18.70 -- -- 18.70
10" x 8" x 26", 4 mil
liner bags (100 per package) --@.000 Ea 41.30 -- -- 41.30

Radiation control - Cotton bags


12" x 18" --@.000 Ea 8.66 -- -- 8.66
38" x 50" --@.000 Ea 21.30 -- -- 21.30

Radiation control - Nylon bags


12" x 18" --@.000 Ea 8.66 -- -- 8.66
24" x 24" with Velcro closure --@.000 Ea 6.44 -- -- 6.44
24" x 36" with handle --@.000 Ea 7.42 -- -- 7.42
60" x 45" with Velcro closure --@.000 Ea 18.50 -- -- 18.50
55 gallon drum with handles --@.000 Ea 34.00 -- -- 34.00

Radiation control - Laundry bags


38" x 50" cotton bag
with drawstring and 2 handles --@.000 Ea 26.70 -- -- 26.70
26" x 36", soluble bag 1.2 mil, (100 per case), to be used with
cotton or poly transport bag --@.000 Ea 261.00 -- -- 261.00
34" x 44", soluble bag 1.2 mil, (100 per case), to be used with
cotton or poly transport bag --@.000 Ea 283.00 -- -- 283.00

Radiation control - Polyethylene (poly) and PVC tubing


Poly 3" x .004" --@.000 LF 0.04 -- -- 0.04
Poly 6" x .006" --@.000 LF 0.13 -- -- 0.13
Poly 14" x .008" --@.000 LF 0.37 -- -- 0.37
PVC 3" x .008" --@.000 LF 0.20 -- -- 0.20
PVC 6" x .008" --@.000 LF 0.40 -- -- 0.40
PVC 10" x .008" --@.000 LF 0.67 -- -- 0.67

Radiation control - Yellow polyethylene (poly) and PVC tubing


Poly, .008" material thickness --@.000 SY 0.71 -- -- 0.71
PVC , 10 ounces per SY weight --@.000 SY 2.40 -- -- 2.40
PVC , 13 ounces per SY weight --@.000 SY 3.07 -- -- 3.07

Radiation shielding - Lead blankets, wraps & strips


3" x 48" x 1/2" standard --@.000 Ea 22.30 -- -- 22.30
6" x 12" x 1/2" standard --@.000 Ea 14.00 -- -- 14.00
12" x 24" x 1/2" standard --@.000 Ea 44.70 -- -- 44.70
12" x 72" x 1/2" standard --@.000 Ea 125.00 -- -- 125.00
12" x 60" x 1/2" standard --@.000 Ea 98.00 -- -- 98.00
3" x 48" x 1/2" hang or wrap --@.000 Ea 42.30 -- -- 42.30
6" x 24" x 1/2" hang or wrap --@.000 Ea 34.00 -- -- 34.00
12" x 60" x 1/2" hang or wrap --@.000 Ea 68.00 -- -- 68.00
12" x 72" x 1/2" hang or wrap --@.000 Ea 133.00 -- -- 133.00
2015 Heavy Construction Estimator, All Rights Reserved Page 109 (part 2)

3" x 4', strip --@.000 Ea 28.70 -- -- 28.70


6" x 4', strip --@.000 Ea 51.70 -- -- 51.70
12" x 3', strip --@.000 Ea 78.00 -- -- 78.00

Radiation shielding - Portable bench shields, 1/16" lead equivalent, clear


9" x 12"
x 1-3/8" lead loaded acrylic --@.000 Ea 391.00 -- -- 391.00
12" x 18" x 1-3/8" leaded plastic,
angled --@.000 Ea 593.00 -- -- 593.00
15" x 24" x 1-3/8" leaded plastic,
angled --@.000 Ea 793.00 -- -- 793.00

Radiation shielding - Portable table top shields, 1/16" lead equivalent, clear
20" x 22" x 19" 1/2" lead wall with 1-3/8" lead plastic
window on a lead base shield --@.000 Ea 1,290.00 -- -- 1,290.00
16" x 14" x 24-1/2" 1/2" lead wall with 1/4" lead glass window
at 45 degree angle on a base --@.000 Ea 1,100.00 -- -- 1,100.00

Radiation shielding - Mobile lead shields


Using a 4-ton fork lift and small tools.
48" x 54" lead mf@2.50 Ea 3,850.00 87.90 6.88 3,944.78
30" x 75" lead with acrylic lead viewing panel
(0.5 mm lead equivalent) mf@2.50 Ea 2,040.00 87.90 6.88 2,134.78
2015 Heavy Construction Estimator, All Rights Reserved Page 110

36" x 61" lead with lead plastic view panel


(0.8 mm lead equivalent) mf@2.50 Ea 2,390.00 87.90 6.88 2,484.78
24" x 24-48" adjustable lead vinyl mf@2.50 Ea 616.00 87.90 6.88 710.78
3'-5" x 6'-6" x 20"
deep rack for lead blankets mf@2.50 Ea 866.00 87.90 6.88 960.78

Radiation shielding - Putty, sheets and foil


Lead putty, 1 can --@.000 Ea 353.00 -- -- 353.00
1/16" lead sheet --@.000 SF 13.30 -- -- 13.30
1/4" lead sheet --@.000 SF 42.70 -- -- 42.70
1/2" lead sheet --@.000 SF 85.30 -- -- 85.30
2' x 3' x 1/8" lead vinyl sheets,
(1.00 mm lead equivalent) --@.000 Ea 267.00 -- -- 267.00
2' x 6' x 1/32" lead vinyl sheets,
(.25 mm lead equivalent) --@.000 Ea 205.00 -- -- 205.00
1/2" lead acrylic
(.5 mm lead equivalent) --@.000 SF 200.00 -- -- 200.00
7/8" lead acrylic
(1.00 mm lead equivalent) --@.000 SF 223.00 -- -- 223.00
1-3/8" lead acrylic
(1.5 mm lead equivalent) --@.000 SF 249.00 -- -- 249.00
5/16" lead glass
(2.00 mm lead equivalent) --@.000 SF 173.00 -- -- 173.00
7/16" lead glass
(2.5 mm lead equivalent) --@.000 SF 193.00 -- -- 193.00
9/16" lead glass
(3.00 mm lead equivalent) --@.000 SF 233.00 -- -- 233.00
Lead foil 14" x 22' x .006", 14" x 9' x
.015" and 14" x 4.5' x .030" --@.000 Ea 113.00 -- -- 113.00

Radiation storage - Cabinets


Using miscellaneous power tools and small tools.
12-3/4" OD x 14-3/4" circular, 1/16" lead lined 3 tier rotating shelves,
35 mm lead plastic door ap@4.50 Ea 1,290.00 197.50 5.45 1,492.95
15-1/2" x 7-1/2" x 10" rectangular,
1/4" lead glass sliding doors ap@4.50 Ea 813.00 197.50 5.45 1,015.95

Radiation storage - Safes


Using a 4-ton fork lift and small tools.
17-1/2" x 16-1/2" x 19" 2" lead walls and door,
(inside: 12" x 12" x 12") mf@2.50 Ea 5,990.00 87.90 6.88 6,084.78

Radiation storage - Refrigerators


Using 20-ton hydraulic crane with 70’ boom and small tools.
20" x 23" x 34" 1/8" lead-lined steel,
5 CF sv@3.50 Ea 3,630.00 122.30 50.90 3,803.20
20" x 23" x 34" 1/8" lead-lined steel,
with lead-lined drawers sv@3.50 Ea 3,630.00 122.30 50.90 3,803.20

Radiation storage - Cylindrical containers


3" deep x 1-1/2" diameter. X 1" thick,
small lead carrying case --@.000 Ea 127.00 -- -- 127.00
8" deep x 8" diameter. X 1" thick with two heavy duty side handles,
two levels and removable tray --@.000 Ea 393.00 -- -- 393.00

Radiation storage - Rectangular containers, 8" x 8" x 11" exterior


Using 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 110 (part 2)

1/2" lead-lined
steel (inside: 7" x 7" x 9") sv@3.50 Ea 573.00 122.30 50.90 746.20
2" lead-lined
steel (inside: 4" x 4" x 6") sv@3.50 Ea 746.00 122.30 50.90 919.20

Radiation storage - Waste containers


Stainless steel receptacle with swing open lid, 1/8" lead lined inner container,
20 quart capacity --@.000 Ea 854.00 -- -- 854.00
5 gallon polyethylene
bottle with carrying handles --@.000 Ea 48.00 -- -- 48.00
15 gallon polyethylene
bottle with carrying handles --@.000 Ea 124.00 -- -- 124.00
Fill and vent
assembly for poly bottles --@.000 Ea 56.00 -- -- 56.00
Drip funnel, 12" opening with 30" drain tube,
1/2" OD with cut off --@.000 Ea 41.90 -- -- 41.90
Drip funnel, 20" opening with 30" drain tube,
1/2" OD with cut off --@.000 Ea 45.60 -- -- 45.60

Radiation barricades, stanchions and gates


Stainless steel auto return arm with sign mount,
floor unit --@.000 Ea 314.00 -- -- 314.00
Stainless steel auto return arm with sign mount,
wall unit --@.000 Ea 188.00 -- -- 188.00
Stainless steel stanchion with split ring for rope,
weighted base --@.000 Ea 165.00 -- -- 165.00

Radioactive warning tape


Pressure sensitive perforated paper tape,
(1" x 180' roll) --@.000 Ea 7.55 -- -- 7.55
Pressure sensitive perforated
plastic tape (1" x 180' roll) --@.000 Ea 7.45 -- -- 7.45
Pressure sensitive
cloth barrier tape (2" x 90') --@.000 Ea 7.60 -- -- 7.60
Vinyl barrier tape,
6 mil (2" x 54' roll) --@.000 Ea 10.80 -- -- 10.80

Radiation warning signs


10" x 14" aluminum and acrylic --@.000 Ea 16.10 -- -- 16.10
2015 Heavy Construction Estimator, All Rights Reserved Page 111

7" x 10" flexible self adhesive, heavy weight, high gloss paper,
1 mil poly laminate --@.000 Ea 15.90 -- -- 15.90
10" x 14" steel 30 gauge --@.000 Ea 9.71 -- -- 9.71
8-1/2" x 11" vinyl pocket signs,
1 pocket --@.000 Ea 3.59 -- -- 3.59
8-1/2" x 11" vinyl pocket signs,
3 pocket --@.000 Ea 3.78 -- -- 3.78
8-1/2" x 11" vinyl pocket signs,
6 pocket --@.000 Ea 4.36 -- -- 4.36
Pocket inserts --@.000 Ea 0.31 -- -- 0.31

Radiation caution tags


2-5/8" x 5-1/4" cardboard,
pre-strung --@.000 Ea 0.11 -- -- 0.11
2-5/8" x 5-1/4" cardboard, with cable ties (moisture, grease and chemical resistant),
double sided --@.000 Ea 0.15 -- -- 0.15
3-1/4" x 5" self laminating tags,
with cable ties --@.000 Ea 0.83 -- -- 0.83

Radioactive warning labels


1" x 3" pre-cut pressure
sensitive (500 per roll) --@.000 Ea 8.69 -- -- 8.69
5" x 6" pressure
sensitive (20 per package) --@.000 Ea 0.13 -- -- 0.13
3" x 3-1/2" gummed
labels (100 per package) --@.000 Ea 19.50 -- -- 19.50

Radiation monitors - Audible alarms


Alarming ratemeter with belt clip x and gamma,
500 mr/hr threshold --@.000 Ea 135.00 -- -- 135.00
Alarming ratemeter with belt clip x and gamma,
adjustable threshold --@.000 Ea 318.00 -- -- 318.00
Alarming ratemeter and dosimeter with belt clip, x and gamma,
adjustable threshold --@.000 Ea 334.00 -- -- 334.00
Badge size clip-on alarm, alpha --@.000 Ea 150.00 -- -- 150.00
Badge size clip-on alarm,
alpha-beta-gamma --@.000 Ea 161.00 -- -- 161.00
Badge size clip-on alarm, gamma --@.000 Ea 173.00 -- -- 173.00
Badge size clip-on alarm, additional
cost for LED display --@.000 Ea 21.60 -- -- 21.60
Badge size clip-on alarm, additional
cost for banana plug ear jack --@.000 Ea 21.60 -- -- 21.60
Badge size clip-on alarm, additional cost
for LED display and ear jack --@.000 Ea 32.40 -- -- 32.40

Radiation monitors - Pocket ion chambers


Quartz fiber, gamma and x-ray low energy level, 0 to 500 mili-rems
in 10 o 20 mili-rem divisions --@.000 Ea 111.00 -- -- 111.00
Quartz fiber, gamma and x-ray medium energy level, 0 to 20 rems in 50
mili-rem to 1 rem divisions --@.000 Ea 107.00 -- -- 107.00
Quartz fiber, gamma and x-ray high energy level, 0 to 600
rems in 2 to 20 rem divisions --@.000 Ea 113.00 -- -- 113.00
Fast neutron, 0 to 200 mili-rems --@.000 Ea 271.00 -- -- 271.00
Thermal neutron, 0 to 120 mili-rems --@.000 Ea 276.00 -- -- 276.00
Line operated charger (110v-AC) --@.000 Ea 486.00 -- -- 486.00
Battery powered charger --@.000 Ea 131.00 -- -- 131.00
Desk top calibrator --@.000 Ea 406.00 -- -- 406.00
Dosimeter viewer-charger --@.000 Ea 5,300.00 -- -- 5,300.00
2015 Heavy Construction Estimator, All Rights Reserved Page 111 (part 2)

Multiple calibrator,
75 dosimeters maximum --@.000 Ea 6,040.00 -- -- 6,040.00
Characterized
direct reading dosimeter kit --@.000 Ea 3,250.00 -- -- 3,250.00
Plastic protective end caps (set) --@.000 Set 2.16 -- -- 2.16
Dosimeter log book --@.000 Ea 27.00 -- -- 27.00
Pocket ion chamber alligator clip (color
coded for calibration status) --@.000 Ea 3.24 -- -- 3.24
Dosimeter clip remover tool --@.000 Ea 135.00 -- -- 135.00
100 hole tray --@.000 Ea 32.40 -- -- 32.40
LED light source with battery (fits
over dosimeter for reading) --@.000 Ea 6.47 -- -- 6.47

Radiation dosimeters
Electronic dosimeter --@.000 Ea 264.00 -- -- 264.00

Electronic dosimeter readers and components


Remote station
with limited capabilities --@.000 Ea 4,310.00 -- -- 4,310.00
Health physics station
with expanded capabilities --@.000 Ea 5,400.00 -- -- 5,400.00

Electronic dosimeter readers and components


Using a 4-ton fork lift and small tools.
Automatic electronic
dosimeter calibrator md@76.0 Ea 59,400.00 3,216.00 110.00 62,726.00
Personal computer system including 21" color monitor, 30 GB hard drive,
Windows compatible --@.000 Ea 5,400.00 -- -- 5,400.00
Dosimetry system software --@.000 Ea 10,800.00 -- -- 10,800.00

Thermo luminescent (TL) dosimetry systems


One element badge --@.000 Ea 8.63 -- -- 8.63
Two element badge --@.000 Ea 23.00 -- -- 23.00
Three element badge --@.000 Ea 27.60 -- -- 27.60
2015 Heavy Construction Estimator, All Rights Reserved Page 112

Four element badge --@.000 Ea 31.20 -- -- 31.20


Neutron badge --@.000 Ea 67.70 -- -- 67.70
Ring with basil chip --@.000 Ea 16.90 -- -- 16.90
Wrist bracelet with basil chip --@.000 Ea 14.30 -- -- 14.30
Personal badge with 0 chip --@.000 Ea 8.72 -- -- 8.72
Ring with 0 chip --@.000 Ea 8.72 -- -- 8.72
Wrist strap with 0 chip --@.000 Ea 8.63 -- -- 8.63

Thermo luminescent (TL) readers and components


Using a 4-ton fork lift and small tools.
Manual, economy without printer,
one element lj@1.25 Ea 10,700.00 62.63 0.49 10,763.12
Manual, economy with mini-printer,
one element lj@1.25 Ea 8,870.00 62.63 0.49 8,933.12
Manual,
one element with mini-printer lj@1.25 Ea 15,100.00 62.63 0.49 15,163.12
Manual, 2,
3, or 4 element cards base lj@1.25 Ea 17,100.00 62.63 0.49 17,163.12
Manual, 2, 3,
or 4 element cards with id lj@1.25 Ea 19,200.00 62.63 0.49 19,263.12
Manual, 2, 3, or 4 element cards,
with options ll@3.25 Ea 30,000.00 132.40 -- 30,132.40
50 card, automatic, base model ll@3.25 Ea 22,900.00 132.40 -- 23,032.40
50 card, automatic with options ll@3.25 Ea 31,800.00 132.40 -- 31,932.40
200 card, automatic, base model ll@5.20 Ea 48,700.00 211.80 -- 48,911.80
200 card, automatic with options ll@5.20 Ea 63,200.00 211.80 -- 63,411.80
1,700 card, automatic, base model ll@5.20 Ea 81,100.00 211.80 -- 81,311.80
1,700 card, automatic with options ll@5.20 Ea 98,900.00 211.80 -- 99,111.80
Optical heating, 50 card automatic ll@5.20 Ea 21,700.00 211.80 -- 21,911.80
Optical heating, 50
card automatic with options ll@5.20 Ea 51,400.00 211.80 -- 51,611.80
Optical heating,
200 card automatic, base ll@5.20 Ea 45,400.00 211.80 -- 45,611.80
Optical heating, 200
card automatic with options ll@5.20 Ea 75,200.00 211.80 -- 75,411.80
Optical heating,
500 card automatic, base md@9.50 Ea 80,100.00 401.90 13.80 80,515.70
Optical heating, 500
card automatic with options md@9.50 Ea 110,000.00 401.90 13.80110,415.70

Thermo luminescent (TL) dosimetry system accessories


Pyrex annealing dish --@.000 Ea 108.00 -- -- 108.00
Annealing furnace, manual, 400 degree C maximum, for pre and
post read annealing cycles lj@1.25 Ea 1,080.00 62.63 0.49 1,143.12
Annealing furnace, manual low temperature, down to 80 degree C for
pre or post read annealing lj@1.25 Ea 542.00 62.63 0.49 605.12
Annealing furnace, automatic lj@1.25 Ea 1,670.00 62.63 0.49 1,733.12
Plotter (for
current temperature curves) lj@1.25 Ea 305.00 62.63 0.49 368.12
Serial interface device, RS232 for connection
to temperature reader lj@1.25 Ea 188.00 62.63 0.49 251.12
Serial printer --@.000 Ea 53.10 -- -- 53.10
Parallel printer --@.000 Ea 67.20 -- -- 67.20
Table top irradiator,
strontium-90 source lj@1.25 Ea 5,420.00 62.63 0.49 5,483.12
Automatic irradiator, cesium-137 source
without magazine changer ll@3.25 Ea 21,800.00 132.40 -- 21,932.40
Magazine changer for TL badges,
automatic --@.000 Ea 17,400.00 -- -- 17,400.00
2015 Heavy Construction Estimator, All Rights Reserved Page 112 (part 2)

Magazine holder for TL badges, works with


automatic magazine changer --@.000 Ea 10.90 -- -- 10.90
Plug in heater for TL badges --@.000 Ea 113.00 -- -- 113.00
TL dosimeter calibrator, automatic ll@3.25 Ea 48,800.00 132.40 -- 48,932.40
Data acquisition system ll@26.0 Ea 21,700.00 1,059.00 -- 22,759.00

Thermo luminescent (TL) dosimetry system accessories


Using a 4-ton fork lift and small tools.
Access control reader md@76.0 Ea 54,000.00 3,216.00 110.00 57,326.00

Thermo luminescent (TL) dosimetry materials - Crystals


Calcium fluoride dysprosium --@.000 Ea 2.43 -- -- 2.43
Calcium fluoride thulium --@.000 Ea 3.56 -- -- 3.56

Thermo luminescent (TL) dosimetry materials - Ribbons


Calcium fluoride manganese --@.000 Ea 3.02 -- -- 3.02
Lithium borate manganese --@.000 Ea 4.21 -- -- 4.21

Personnel radiation monitoring


Beta, gamma hand monitor --@.000 Ea 8,310.00 -- -- 8,310.00
Alpha hand monitor --@.000 Ea 8,650.00 -- -- 8,650.00
2015 Heavy Construction Estimator, All Rights Reserved Page 113

Personnel radiation monitoring


Using a 4-ton fork lift and small tools.
Beta, gamma hand and foot monitor md@152. Ea 9,070.00 6,431.00 220.00 15,721.00
Alpha, beta,
gamma hand and foot monitor md@76.0 Ea 13,200.00 3,216.00 110.00 16,526.00

Whole body or portal radiation monitors


Using a 4-ton fork lift and small tools.
Portal monitors with GM detectors,
manual read ll@52.0 Ea 5,030.00 2,118.00 -- 7,148.00
Portable portal monitors with scintillation detectors,
computerized control ll@52.0 Ea 15,100.00 2,118.00 -- 17,218.00

Whole body or portal radiation monitors


Using a 4-ton fork lift and small tools.
Portal monitors with plastic scintillation detectors,
computerized control md@152. Ea 26,500.00 6,431.00 220.00 33,151.00
Portal monitors with gas flow proportional detectors,
computerized control md@76.0 Ea 22,500.00 3,216.00 110.00 25,826.00
Portal monitors with beta detection, computerized control,
enclosed closet type md@152. Ea 46,800.00 6,431.00 220.00 53,451.00
Whole body monitor, internal contamination
computerized analysis md@76.0 Ea 45,200.00 3,216.00 110.00 48,526.00
Calibration programming
for computerized monitors --@.000 Ea 1,400.00 -- -- 1,400.00

CSI 01-953, Miscellaneous costs for Hazardous and Toxic Waste Jobs

Project photographs - Color photography, including film or tape cost


3-1/2" x 5", roll of 24 frames --@.000 Ea 14.90 -- -- 14.90
4" x 6", roll of 24 frames --@.000 Ea 13.00 -- -- 13.00
5" x 7", roll of 24 frames --@.000 Ea 79.00 -- -- 79.00
5" x 7", roll of 24 frames,
slide film --@.000 Ea 97.70 -- -- 97.70
8" x 10" prints, per print --@.000 Ea 5.20 -- -- 5.20
35 mm Ectachrome slides,
roll of 24 frames --@.000 Ea 10.30 -- -- 10.30
Aerial photos, 11" x 14" color,
by jet helicopter --@.000 Ea 200.00 -- -- 200.00
5 minute aerial video, 3 copies of tape
and a 11" x 14" color print --@.000 Ea 279.00 -- -- 279.00
Aerial tour of project site, up to 3 passengers,
by helicopter --@.000 Hour 160.00 -- -- 160.00

Time lapse video tape recording cameras, purchase costs


Using VHS tape, seven time lapse modes from 24 to 480 hours per tape.
Standard resolution, 300 lines in black and
white and 240 lines in color lj@.665 Ea 1,150.00 33.32 0.26 1,183.58
Super VHS, 400 lines
in color or black and white lj@.714 Ea 1,980.00 35.77 0.28 2,016.05
Super VHS, 400 lines in color or black and white. Includes port for remote control
or computer integration. lj@.767 Ea 2,150.00 38.43 0.30 2,188.73
Deluxe model, uses 1/2" cassette,
350 line resolution. lj@.767 Ea 3,650.00 38.43 0.30 3,688.73

Standard VHS recorders, 2, 4 or 6 hour modes


2015 Heavy Construction Estimator, All Rights Reserved Page 113 (part 2)

4 head, noiseless, slow,


still and auto operation lj@.665 Ea 124.00 33.32 0.26 157.58
Portable recorder, 4 head, noiseless, slow, still, forward, reverse, search. Includes adapter and 300
ohm to 75 ohm transformer. lj@.665 Ea 538.00 33.32 0.26 571.58

Dust tight camera enclosures, non-corrosive environment, aluminum


4" (10 cm) diameter, 12" long lj@2.50 Ea 313.00 125.30 0.98 439.28
6" (15.25 cm) diameter, 16" long lj@2.50 Ea 360.00 125.30 0.98 486.28
8" (20.32 cm) diameter, 24" long lj@2.50 Ea 514.00 125.30 0.98 640.28
10" (25.4 cm) diameter, 24" long lj@2.50 Ea 761.00 125.30 0.98 887.28

Dust tight camera enclosures, corrosive environment, stainless steel


4" (10 cm) diameter, 12" long lj@2.50 Ea 412.00 125.30 0.98 538.28
6" (15.24 cm) diameter, 24" long lj@2.50 Ea 515.00 125.30 0.98 641.28
8" (20.32) diameter, 24" long lj@2.50 Ea 696.00 125.30 0.98 822.28
10" (25.4 cm) diameter, 24" long lj@2.50 Ea 1,550.00 125.30 0.98 1,676.28

Pressurized camera enclosures, factory sealed


3" (7.62 cm) diameter with heater lj@3.79 Ea 655.00 189.90 1.48 846.38
4" (10.16 cm) diameter with heater lj@3.79 Ea 704.00 189.90 1.48 895.38
6" (15.24)
diameter with two heaters lj@3.79 Ea 744.00 189.90 1.48 935.38

Explosion-proof camera enclosures, non-pressurized


4" (10.16 cm) diameter, 12" long lj@2.50 Ea 941.00 125.30 0.98 1,067.28
6" (15.24 cm) diameter, 24" long lj@2.50 Ea 1,110.00 125.30 0.98 1,236.28
8" (20.32 cm) diameter, 24" long lj@2.50 Ea 1,350.00 125.30 0.98 1,476.28
10" (25.40 cm) diameter, 24" long lj@2.50 Ea 1,640.00 125.30 0.98 1,766.28

Water cooled camera enclosures


10" (25.40 cm) diameter camera enclosure rated to 2500 degrees, water cooled, 24" long,
Vycor glass window port lj@5.00 Ea 2,150.00 250.50 1.95 2,402.45
10" (25.40 cm) diameter camera enclosure rated to 300 degrees, water cooled, 24" long,
Pyrex glass window port lj@5.00 Ea 1,520.00 250.50 1.95 1,772.45
Infrared reflective
coating for window glass --@.000 Ea 269.00 -- -- 269.00
2015 Heavy Construction Estimator, All Rights Reserved Page 114

Alarm thermostat kit for


water cooled camera enclosure lj@2.50 Ea 77.90 125.30 0.98 204.18

Video camera scanner mounts


Without pan or tilt capability.
Light indoor scanner, 15 lb. maximum load,
115 or 24 volt AC operation lj@2.50 Ea 225.00 125.30 0.98 351.28
Medium indoor or outdoor scanner, 50 lb. maximum load,
115 or 24 volt AC lj@2.50 Ea 645.00 125.30 0.98 771.28

Pan and tilt video scanner mounts


355 degree horizontal movement, 90 degree vertical movement.
Light duty indoor, 15 lb. maximum load,
115 or 24 volt lj@2.50 Ea 572.00 125.30 0.98 698.28
Light duty indoor or outdoor, 20 lb. maximum load,
115 or 24 volt lj@2.50 Ea 879.00 125.30 0.98 1,005.28
Medium duty indoor and outdoor,
50 lb. maximum load, 24 volt lj@2.50 Ea 1,350.00 125.30 0.98 1,476.28
Medium duty outdoor, 40 lb. maximum load,
115 volt lj@2.50 Ea 1,200.00 125.30 0.98 1,326.28
Explosion-proof, 100 lb. maximum load,
115 or 220 volt lj@3.33 Ea 3,050.00 166.80 1.30 3,218.10
Heavy duty indoor and outdoor, 100 lb. maximum load,
115 volt lj@3.33 Ea 2,140.00 166.80 1.30 2,308.10
Extra heavy duty outdoor, 150 lb. maximum load,
115 volt lj@5.00 Ea 3,620.00 250.50 1.95 3,872.45
Super heavy duty outdoor, 500 lb. maximum load,
115 volt lj@10.0 Ea 6,370.00 501.00 3.90 6,874.90

TV monitor mounts
Light wall mount for cameras, 7 lb. maximum load,
adjustable head lj@.625 Ea 37.80 31.31 0.24 69.35
Light wall mount,
20 lb. maximum load lj@.625 Ea 43.90 31.31 0.24 75.45
Light scanner with pan and tilt mount,
25 lb. maximum load lj@.625 Ea 32.60 31.31 0.24 64.15
Medium wall mount for camera enclosures,
40 lb. maximum load lj@1.25 Ea 68.70 62.63 0.49 131.82
Medium pedestal mount for camera enclosures,
40 lb. maximum load lj@1.25 Ea 44.10 62.63 0.49 107.22
Medium wall mount for pan and tilt camera enclosures,
40 lb. maximum load lj@1.25 Ea 53.60 62.63 0.49 116.72
Heavy wall mount for pan and tilt camera enclosures,
75 lb. maximum load lj@1.25 Ea 64.10 62.63 0.49 127.22
Heavy pedestal mount for pan and tilt and camera enclosures,
75 lb. maximum load lj@1.25 Ea 87.90 62.63 0.49 151.02

CSI 01-954, Monitoring, sampling, testing and analysis

Field sampling equipment for liquids - Sub-surface grab samplers


6' aluminum, poly head with narrow
mouth borosilicate bottle --@.000 Ea 227.00 -- -- 227.00
12' aluminum, poly head with narrow mouth borosilicate bottle,
telescopes to 5'-7" --@.000 Ea 374.00 -- -- 374.00
6' stainless with poly head, requires wide mouth bottles. See bottle
and extension costs below. --@.000 Ea 444.00 -- -- 444.00

Field sampling equipment for liquids - Coliwasas


2015 Heavy Construction Estimator, All Rights Reserved Page 114 (part 2)

Glass, disposable, 7/8" x 42",


200 ml, case of 12 --@.000 Case 120.00 -- -- 120.00
Glass, reusable, 7/8" x 42",
200 ml, case of 4 --@.000 Case 111.00 -- -- 111.00
PVC, 1.9" outside diameter by 49",
760 ml --@.000 Ea 154.00 -- -- 154.00
Coliwasa rental --@.000 Day 64.70 -- -- 64.70

Field sampling equipment for liquids - Bomb samplers


2.5" diameter x 10", holds 500 ml --@.000 Ea 515.00 -- -- 515.00

Field sampling equipment for liquids - Drum thief tubes


3/4" x 42", 150 ml,
disposable, case of 25 --@.000 Case 94.60 -- -- 94.60
1/2" x 42", 75 ml,
disposable, case of 25 --@.000 Case 55.60 -- -- 55.60

Field sampling equipment for liquids - Remote water sampling bottles


3 collection chambers, 1-20 ml, lead weight, acrylic exterior chamber.
Includes calibrated line. --@.000 Ea 82.00 -- -- 82.00

Field sampling equipment for liquids - Bottom samplers


3 pound brass (7.5" x 4.5")
includes calibrated cable --@.000 Ea 182.00 -- -- 182.00
17 pound stainless steel
(6" x 6" x 6") with 100' line --@.000 Ea 318.00 -- -- 318.00
60 pound stainless steel (9" x 9") --@.000 Ea 518.00 -- -- 518.00

Field sampling equipment for liquids - Water current meters


Rod suspended, utilizing earphone,
counts and rating tables --@.000 Ea 2,520.00 -- -- 2,520.00
Rod suspended,
digital readout meter --@.000 Ea 3,190.00 -- -- 3,190.00
Rod suspended pygmy meter for shallow streams,
digital readout --@.000 Ea 2,770.00 -- -- 2,770.00

Field sampling equipment for liquids - Fluorescent dyes


Tablets (bottle of 200) one tablet in 60 gallons of water gives a visible
dye concentration of 1 PPM --@.000 Ea 32.20 -- -- 32.20
Cakes, one cake in 3,600 gallons of water gives a visible
dye concentration of 1 PPM --@.000 Ea 7.40 -- -- 7.40
Cones, one cone in 6,700 gallons of water gives a visible
dye concentration of 1 PPM --@.000 Ea 11.50 -- -- 11.50
Donuts, one donut in 93,000 gallons of water gives a visible
dye concentration of 1 PPM --@.000 Ea 32.60 -- -- 32.60
Liquid concentrate, one gallon in 100,000 gallons of water gives a visible
dye concentration of 1 PPM --@.000 Ea 66.90 -- -- 66.90

Field sampling equipment for liquids - Water level indicators


Electronic with light and horn,
100' tape --@.000 Ea 480.00 -- -- 480.00
2015 Heavy Construction Estimator, All Rights Reserved Page 115

Electronic with light and horn,


300' tape --@.000 Ea 692.00 -- -- 692.00
Electronic with light and horn,
500' tape --@.000 Ea 938.00 -- -- 938.00
Manual steel chalk tape with brass weight,
100' length --@.000 Ea 82.60 -- -- 82.60
Water level chart recorder, battery operated, for
monitoring wells on casings --@.000 Ea 3,330.00 -- -- 3,330.00

Field sampling equipment for liquids - Turbidity meters


Secchi disk, 8" diameter black and white acrylic one side,
white other side --@.000 Ea 95.00 -- -- 95.00
Digital turbidity meter --@.000 Ea 642.00 -- -- 642.00

Field sampling equipment for liquids - Dissolved oxygen meters


Analog, portable, 6' cable, polarographic
probe (purchase) --@.000 Ea 1,400.00 -- -- 1,400.00
Digital, portable, 10' cable, small
diameter probe (purchase) --@.000 Ea 1,390.00 -- -- 1,390.00
Highly portable with probe and 10' cable, quick readings. Compensates for altitude, salt
or fresh water. Purchase. --@.000 Ea 886.00 -- -- 886.00
Dissolved oxygen meter, rental --@.000 Day 54.00 -- -- 54.00

Field sampling equipment for liquids - Conductivity meters


Hand held with dip-type sensor, digital, 9 volt battery 7" x 3.2" x 2",
purchase --@.000 Ea 273.00 -- -- 273.00
Digital 1" diameter probe, 150' cable, measures temperature and water level,
purchase --@.000 Ea 412.00 -- -- 412.00
10' cable with probe, compact (also measures temperature and salinity),
purchase --@.000 Ea 395.00 -- -- 395.00
Conductivity meter, rental --@.000 Day 54.00 -- -- 54.00

Field sampling equipment for liquids - Thermometers


Stainless steel bi-metal thermometer, 40 to 160 degrees F,
12" stem --@.000 Ea 31.60 -- -- 31.60
Thermocouple thermometer --@.000 Ea 252.00 -- -- 252.00
Digital thermometer --@.000 Ea 35.00 -- -- 35.00

Field sampling equipment for liquids - PH meters


PH test paper kits, 200 paper
strips with indicator charts --@.000 Kit 9.98 -- -- 9.98
Digital pH meter kit, LCD
meter with 0 to 14 pH range --@.000 Ea 264.00 -- -- 264.00
PH temperature meter rental --@.000 Day 54.00 -- -- 54.00

Ground water sampling equipment - Teflon bailers, purchase


1-7/8" outside diameter x 1', 350cc --@.000 Ea 137.00 -- -- 137.00
1-7/8" outside diameter x 2', 700cc --@.000 Ea 195.00 -- -- 195.00
1-7/8" outside diameter x 3',
1050cc --@.000 Ea 225.00 -- -- 225.00
3/4" outside diameter x 1', 60cc --@.000 Ea 139.00 -- -- 139.00
3/4" outside diameter x 3', 180cc --@.000 Ea 185.00 -- -- 185.00
1" outside diameter x 1', 80cc --@.000 Ea 147.00 -- -- 147.00
1" outside diameter x 3', 240cc --@.000 Ea 194.00 -- -- 194.00

Ground water sampling equipment - Stainless steel bailers, purchase


1.75" outside diameter x 3',
2015 Heavy Construction Estimator, All Rights Reserved Page 115 (part 2)

1,000 ml --@.000 Ea 101.00 -- -- 101.00


1.75" OD x 2’,
stainless steel bailer --@.000 Ea 86.30 -- -- 86.30

Ground water sampling equipment - PVC bailers, purchase


1.66" outside diameter x 34" --@.000 Ea 22.70 -- -- 22.70
1.50" OD x 36" disposable
polyethylene bailer --@.000 Ea 6.39 -- -- 6.39

Ground water sampling equipment - Bailer accessories, purchase


Emptying stand
(1-7/8" outside diameter) --@.000 Ea 182.00 -- -- 182.00
Suspension cable, Teflon
coated 304 stainless steel --@.000 LF 0.93 -- -- 0.93
Hand reel (holds 300 to 500 feet) --@.000 Ea 18.20 -- -- 18.20

Ground water sampling equipment - Lysimeters


Using a 16" truck-mounted rotary drill and small tools.
1.90" PVC tube type,
PVC body with Teflon filter ta@2.00 Ea 174.00 71.62 101.00 346.62
1.90" Teflon tube type,
Teflon body and filter ta@2.00 Ea 234.00 71.62 101.00 406.62
2.38" PVC tube type,
PVC body and Teflon filter ta@2.00 Ea 183.00 71.62 101.00 355.62
2.38" Teflon tube type,
Teflon body and filter ta@2.00 Ea 255.00 71.62 101.00 427.62
1.90" PVC cup type,
PVC body and Teflon filter ta@2.00 Ea 170.00 71.62 101.00 342.62
1.90" Teflon cup type,
Teflon body and filter ta@2.00 Ea 218.00 71.62 101.00 390.62
1.90" PVC deep sampling type,
Teflon body and filter ta@2.00 Ea 374.00 71.62 101.00 546.62
1.90" Teflon deep sampling type,
Teflon body and filter ta@2.00 Ea 480.00 71.62 101.00 652.62

Ground water sampling equipment - Lysimeter accessories


Using a 16" truck-mounted rotary drill and small tools.
Lysimeter head assembly,
all PVC fittings ta@2.00 Ea 136.00 71.62 101.00 308.62
Lysimeter head assembly,
Teflon and PVC fittings ta@2.00 Ea 217.00 71.62 101.00 389.62
Silica flour, 50 pound pail
to maintain media continuum ta@.600 Pail 57.20 21.49 30.40 109.09
Vacuum pressure hand pump --@.000 Ea 37.00 -- -- 37.00
2015 Heavy Construction Estimator, All Rights Reserved Page 116

1/4" nylon tubing --@.000 LF 0.68 -- -- 0.68


1/4" Teflon tubing --@.000 LF 1.58 -- -- 1.58

Ground water sampling equipment - Well monitor, rental


Daily rental --@.000 Day -- -- 80.00 80.00
Water quality testing parameter device,
rental --@.000 Week -- -- 210.00 210.00
Pressure transducer, rental --@.000 Week -- -- 110.00 110.00
Data logger, rental --@.000 Week -- -- 610.00 610.00

Ground water sampling equipment - Submersible pump rental


1/2 HP, stainless steel,
115V TFE (4-6) --@.000 Week -- -- 600.00 600.00
3/4 HP, stainless steel,
220V TFE (4-8) --@.000 Week -- -- 665.00 665.00

Air sampling equipment - Particulate samplers, monthly rental


Bacteriological air sampler --@.000 Mo -- -- 675.00 675.00
Microbial air sampler --@.000 Mo -- -- 315.00 315.00
Cotton dust sampler --@.000 Mo -- -- 590.00 590.00
Digital dust sampler --@.000 Mo -- -- 758.00 758.00
Flow calibrator --@.000 Mo -- -- 159.00 159.00
Personal low flow sampling pump --@.000 Mo -- -- 185.00 185.00

Air sampling equipment - Toxic gas and vapor monitors, monthly rental
Ambient air monitor --@.000 Mo -- -- 1,560.00 1,560.00
Ambient co analyzer --@.000 Mo -- -- 1,760.00 1,760.00
Ambient ozone monitor --@.000 Mo -- -- 1,180.00 1,180.00
Ambient sulfur dioxide monitor --@.000 Mo -- -- 1,760.00 1,760.00
Calibration gas (purchased) --@.000 Ea 130.00 -- -- 130.00
Chloride (HCLl) analyzer --@.000 Mo -- -- 2,440.00 2,440.00
Gas monitors --@.000 Mo -- -- 250.00 250.00
Hydrogen sulfide analyzer --@.000 Mo -- -- 235.00 235.00
Manual air sampling kit --@.000 Mo -- -- 175.00 175.00
Manual air sampling kit
detection tubes (purchase) --@.000 Ea 36.70 -- -- 36.70
Mercury vapor monitor --@.000 Mo -- -- 825.00 825.00
Nitrogen dioxide analyzer --@.000 Mo -- -- 565.00 565.00
Personal alarms --@.000 Mo -- -- 315.00 315.00
Portable ambient air analyzer --@.000 Mo -- -- 1,850.00 1,850.00
Portable Co2 monitor --@.000 Mo -- -- 513.00 513.00
Portable combustible
gas and oxygen indicator --@.000 Mo -- -- 310.00 310.00
Portable organic vapor analyzers --@.000 Mo -- -- 1,040.00 1,040.00
Portable oxygen deficiency monitor --@.000 Mo -- -- 223.00 223.00
Portable toxic gas analyzer --@.000 Mo -- -- 738.00 738.00
Solvent vapor indicator --@.000 Mo -- -- 375.00 375.00
Specific vapor analyzer --@.000 Mo -- -- 1,260.00 1,260.00
Stack sampling probe --@.000 Mo -- -- 1,750.00 1,750.00
Trace-gas analyzer --@.000 Mo -- -- 913.00 913.00
Remote toxic air sampler, manual --@.000 Ea 1,620.00 -- -- 1,620.00

Other monitoring equipment (monthly rental)


Audio dosimeter --@.000 Mo -- -- 350.00 350.00
Radiation meter --@.000 Mo -- -- 255.00 255.00
Radon meter --@.000 Mo -- -- 750.00 750.00
Oxygen/reduction potential meter,
rental --@.000 Day -- -- 50.00 50.00
2015 Heavy Construction Estimator, All Rights Reserved Page 116 (part 2)

Weather monitoring stations


5 weather readings, 11" x 17", wind speed/direction, barometric pressure, outside and inside
temperature, battery operated with 65' of cable. Purchase.
Add installation cost. --@.000 Ea 585.00 -- -- 585.00
11 weather readings, time, inside and outside temperature, barometric pressure, wind speed, direction
and chill factor, relative humidity, rainfall, degree days heating/cooling. Purchase.
Add installation cost. --@.000 Ea 1,710.00 -- -- 1,710.00
11 weather readings, 11" x 17', time, inside and outside temperature, barometric pressure, wind speed,
direction and chill factor, relative humidity, rainfall, degree days heating/cooling. Monthly rental.
Add installation cost. --@.000 Mo -- -- 532.00 532.00

Instrument shelters
Using small tools.
30" x 20" x 32",
pine, 3 coats latex paint sq@1.25 Ea 658.00 43.73 0.28 702.01
18" x 13" x 20",
wood, painted white sq@1.25 Ea 112.00 43.73 0.28 156.01
8" x 5.5" x 16.5",
wood, painted white sq@1.25 Ea 181.00 43.73 0.28 225.01
2015 Heavy Construction Estimator, All Rights Reserved Page 117

Radiation monitors
Basic model, 3 counting
scales 1,500 volt maximum --@.000 Ea 387.00 -- -- 387.00
Basic model, 4 counting
scales 1,500 volt maximum --@.000 Ea 392.00 -- -- 392.00
Proportional G-M and SCT detectors, HV readout, adjustable gain,
2,500 volt maximum --@.000 Ea 500.00 -- -- 500.00
Proportional G-M and SCT detectors, adjustable gain,
2,500 volt maximum --@.000 Ea 500.00 -- -- 500.00
Proportional G-M and SCT detectors, adjustable window,
2,500 volt maximum --@.000 Ea 630.00 -- -- 630.00

Desktop radiation monitors


Count rate meter,
0 to 5 million CPM --@.000 Ea 681.00 -- -- 681.00
Count rate meter, 0 to 500,000
CPM with count accumulator --@.000 Ea 906.00 -- -- 906.00
Count rate meter,
0 to 500,000 CPM liner --@.000 Ea 1,570.00 -- -- 1,570.00
Count rate meter, 0 to 500,000 CPM or 0 to 100 mili-rems per
hour or 1 to 10 rems per hour --@.000 Ea 837.00 -- -- 837.00
Internal
rechargeable battery option --@.000 Ea 103.00 -- -- 103.00
Background subtraction option --@.000 Ea 184.00 -- -- 184.00

Digital radiation monitors


Bench top, no data storage
or logging capabilities --@.000 Ea 858.00 -- -- 858.00
Bench top, with data storage
and logging capabilities --@.000 Ea 1,290.00 -- -- 1,290.00
Hand held, portable, no data storage
or logging capabilities --@.000 Ea 728.00 -- -- 728.00
Hand held, portable with data storage
and logging capabilities --@.000 Ea 1,290.00 -- -- 1,290.00

Radiation monitoring scalers


Basic scaler --@.000 Ea 858.00 -- -- 858.00
Dual channel stabilized analyzer --@.000 Ea 2,810.00 -- -- 2,810.00
Computer controlled
single channel analyzer --@.000 Ea 2,480.00 -- -- 2,480.00
Single channel
analyzer with speech output --@.000 Ea 2,370.00 -- -- 2,370.00
Spectrometer --@.000 Ea 2,920.00 -- -- 2,920.00
Dual alpha, beta, gamma scaler --@.000 Ea 2,670.00 -- -- 2,670.00
Printer for scalers --@.000 Ea 371.00 -- -- 371.00
Automatic recycling scaler --@.000 Ea 1,100.00 -- -- 1,100.00

Radiation ratemeters
Alarm ratemeter --@.000 Ea 570.00 -- -- 570.00
AC/DC radiation monitor --@.000 Ea 637.00 -- -- 637.00

Combined radiation scalers and ratemeters


Single channel --@.000 Ea 1,180.00 -- -- 1,180.00
Dual channel --@.000 Ea 2,810.00 -- -- 2,810.00

Alpha radiation detectors


2015 Heavy Construction Estimator, All Rights Reserved Page 117 (part 2)

Alpha scintillator --@.000 Ea 365.00 -- -- 365.00


Proportional alpha scintillator --@.000 Ea 106.00 -- -- 106.00
Sample counter --@.000 Ea 441.00 -- -- 441.00
Gas proportional detector --@.000 Ea 392.00 -- -- 392.00
Air proportional alpha probe --@.000 Ea 128.00 -- -- 128.00

Alpha, beta, gamma detectors


End window G-M detector --@.000 Ea 128.00 -- -- 128.00
Pancake G-M detector --@.000 Ea 193.00 -- -- 193.00

Neutron detectors
Neutron scintillator --@.000 Ea 2,260.00 -- -- 2,260.00
Neutron detector --@.000 Ea 786.00 -- -- 786.00
Neutron ball cart --@.000 Ea 4,750.00 -- -- 4,750.00

Beta, gamma detector


Beta scintillator --@.000 Ea 392.00 -- -- 392.00
Gamma scintillator --@.000 Ea 403.00 -- -- 403.00
Stainless steel G-M wall probe --@.000 Ea 128.00 -- -- 128.00
Gamma scintillator --@.000 Ea 403.00 -- -- 403.00
Integral line well scintillator --@.000 Ea 1,220.00 -- -- 1,220.00
Integral line scintillator --@.000 Ea 802.00 -- -- 802.00
AM-241 stabilized scintillator --@.000 Ea 1,920.00 -- -- 1,920.00
2015 Heavy Construction Estimator, All Rights Reserved Page 118

Beta, gamma sandwich probe --@.000 Ea 441.00 -- -- 441.00


Led stabilized scintillator --@.000 Ea 780.00 -- -- 780.00
G-M hand frisker detector --@.000 Ea 344.00 -- -- 344.00
G-M foot frisker detector --@.000 Ea 441.00 -- -- 441.00
Energy compensated G-M probe --@.000 Ea 139.00 -- -- 139.00
Shielded G-M pancake probe --@.000 Ea 306.00 -- -- 306.00
G-M detector --@.000 Ea 193.00 -- -- 193.00

Miscellaneous radiation detectors


Radon flask counter, minimum --@.000 Ea 743.00 -- -- 743.00
Radon flask counter , maximum --@.000 Ea 1,350.00 -- -- 1,350.00
Shielded well counter --@.000 Ea 1,230.00 -- -- 1,230.00
Shielded well scintillator --@.000 Ea 1,730.00 -- -- 1,730.00
Multi-energy gamma scintillator --@.000 Ea 802.00 -- -- 802.00

Off-site calibration of radiation detection equipment


Includes survey meter with one detector. Costs per detection assembly.
One detector only --@.000 Ea 1,400.00 -- -- 1,400.00
With one additional detector --@.000 Ea 1,500.00 -- -- 1,500.00
With two additional detectors --@.000 Ea 1,610.00 -- -- 1,610.00
With three additional detectors --@.000 Ea 1,720.00 -- -- 1,720.00

Off-site repair and calibration of monitors and detectors


Cost per hour
for detector repair in shop --@.000 Ea 91.70 -- -- 91.70
Radon gas monitor --@.000 Ea 6,250.00 -- -- 6,250.00
Portal monitor --@.000 Ea 26,500.00 -- -- 26,500.00

On-site calibration of radiation detection equipment


Based on a calibration engineer working on site.
Cost per day, excluding expenses
and 10% administrative cost --@.000 Ea 998.00 -- -- 998.00
Additional cost per hour over 8 hours,
Saturday or Sunday --@.000 Ea 178.00 -- -- 178.00
Additional
cost per hour for holidays --@.000 Ea 237.00 -- -- 237.00

Radiation calibration standards


Instrument calibrator, contains 165 mCi of
CS-37 with attenuator shields --@.000 Ea 3,720.00 -- -- 3,720.00
Cesium-137, .1-10 micro Ci calibrated (same price for ba-133, cd-109, co-57, co-60,
mn-54, na-22, zn-65, s-13) --@.000 Ea 156.00 -- -- 156.00
Radon canister, ra-226 10-15 micro ci,
calibrated --@.000 Ea 378.00 -- -- 378.00
Multi-gamma standard eurodium-152,-154, or -155, 1 micro ci, (same cost for sb-125,
eu-155, mn-54, co-60) --@.000 Ea 534.00 -- -- 534.00
Miscellaneous uncalibrated sources,
alpha, beta, or gamma --@.000 Ea 37.80 -- -- 37.80

Soil sampling equipment - Recovery probes


Unslotted, 7/8" x 1' --@.000 Ea 141.00 -- -- 141.00
Unslotted, 7/8" x 2' or 9/8" x 1' --@.000 Ea 152.00 -- -- 152.00
Unslotted, 9/8" x 2' --@.000 Ea 162.00 -- -- 162.00
Liners, butyrate plastic, 7/8" --@.000 LF 0.50 -- -- 0.50
Liners, butyrate plastic, 9/8" --@.000 LF 0.60 -- -- 0.60
Liners, stainless steel, 7/8" --@.000 Ea 7.77 -- -- 7.77
Liners, stainless steel, 9/8" --@.000 Ea 8.85 -- -- 8.85
2015 Heavy Construction Estimator, All Rights Reserved Page 118 (part 2)

Soil sampling equipment - Soil gas vapor probes


Stainless steel, non removable tip,
ground penetration by hand --@.000 Ea 216.00 -- -- 216.00
Stainless steel, removable tip, electric
rotary and up/down hammer --@.000 Ea 2,600.00 -- -- 2,600.00

Soil sampling equipment - Screw augers


High carbon steel, 1.5" x 6" --@.000 Ea 81.50 -- -- 81.50
High carbon steel, 1.75" x 6" --@.000 Ea 96.60 -- -- 96.60
Hand auger rental --@.000 Day -- -- 75.00 75.00

Soil sampling equipment - Auger buckets


Dutch, 3" diameter,
carbon/stainless --@.000 Ea 132.00 -- -- 132.00
Mud, 2" diameter carbon/stainless --@.000 Ea 121.00 -- -- 121.00
Regular soil,
2" diameter carbon/stainless --@.000 Ea 99.10 -- -- 99.10
Sand, 2" diameter carbon/stainless --@.000 Ea 117.00 -- -- 117.00

Soil sampling equipment - Auger buckets and liners


Stainless steel, 2.25" x 8" --@.000 Ea 352.00 -- -- 352.00
Stainless steel, 3.25" x 10" --@.000 Ea 364.00 -- -- 364.00
2015 Heavy Construction Estimator, All Rights Reserved Page 119

Stainless steel
with carbon bits 2.25" x 8" --@.000 Ea 310.00 -- -- 310.00
Stainless steel
with carbon bits 3.25" x 10" --@.000 Ea 320.00 -- -- 320.00
Liners, butyrate plastic,
3" x 10" or 2" x 8" --@.000 Ea 5.14 -- -- 5.14
Liners, stainless steel,
3" x 10" or 2" x 8" --@.000 Ea 17.50 -- -- 17.50

Soil sampling equipment - Sludge sampler


3.25" x 12",
stainless steel, thread on --@.000 Ea 368.00 -- -- 368.00

Soil sampling equipment - Tensiometer soil moisture probe


Standard, 7/8" x 18", fixed --@.000 Ea 55.30 -- -- 55.30
Jet fill, 7/8" x 18", fixed,
recovery time in minutes --@.000 Ea 67.20 -- -- 67.20
Quick draw, 18", quick readings,
highly mobile --@.000 Ea 335.00 -- -- 335.00

Soil sampling equipment - Packaged test kit


Detailed soil
evaluation kit (50 tests) --@.000 Kit 215.00 -- -- 215.00

Soil sampling equipment - Soil gas investigation and analysis


Soil gas investigation and analysis --@.000 Day 2,700.00 -- -- 2,700.00

Sample collection - Subcontracted work, air, water, soil or ground water


Hourly rate --@.000 Hour 39.90 -- -- 39.90
Daily rate --@.000 Day 255.00 -- -- 255.00

Sample collection - Field vehicles


Van or pickup rental --@.000 Day -- -- 75.00 75.00
Flat bed truck rental --@.000 Day -- -- 100.00 100.00
Boat rental (without motor) --@.000 Day -- -- 50.00 50.00
Boat rental (with motor) --@.000 Day -- -- 75.00 75.00

Sample collection - Vehicle mileage charge


Car or van mileage charge --@.000 Mile -- -- 0.30 0.30
Pickup truck mileage charge --@.000 Mile -- -- 0.40 0.40
Flatbed truck mileage charge --@.000 Mile -- -- 0.75 0.75

Sample collection - Personnel travel costs


Typical per diem --@.000 Day 112.00 -- -- 112.00
Mobilize and demobilize 2 man sampling crew,
500 miles --@.000 LS 2,980.00 -- -- 2,980.00

Geophysical investigations, costs per crew per day


Magnetometer --@.000 Day 2,230.00 -- -- 2,230.00
Electromagnetics --@.000 Day 2,530.00 -- -- 2,530.00
Ground penetrating radar --@.000 Day 2,830.00 -- -- 2,830.00
Seismic refraction --@.000 Day 2,380.00 -- -- 2,380.00
Resistivity --@.000 Day 2,230.00 -- -- 2,230.00

Sample collection using CPT


2015 Heavy Construction Estimator, All Rights Reserved Page 119 (part 2)

CPT rig, includes labor, sampling,


punching, decontamination --@.000 Day 2,680.00 -- -- 2,680.00
Mobilize and
demobilize CPT rig and crew --@.000 Ea 4,460.00 -- -- 4,460.00
Standby time for CPT rig and crew --@.000 Hour 223.00 -- -- 223.00
Setup cost per each hole, CPT rig --@.000 Ea 74.40 -- -- 74.40
Decontamination trailer rent --@.000 Day -- -- 200.00 200.00
Decontaminate cone on CPT rig --@.000 Day -- -- 200.00 200.00
Level "D" personal protection equipment rental,
per 2-man CPT crew --@.000 Day -- -- 240.00 240.00
Level "C" personal protection equipment rental,
per 2-man CPT crew --@.000 Day -- -- 500.00 500.00
In situ BAT sampling for ground- water,
CPT rig --@.000 Ea -- -- 300.00 300.00
In situ soil sampling,
CPT rig (per sample) --@.000 Ea -- -- 150.00 150.00
Hydropunch with CPT rig, hard soil --@.000 LF -- -- 15.00 15.00
Hydropunch with CPT rig,
medium soil --@.000 LF -- -- 13.50 13.50
Hydropunch with CPT rig, soft soil --@.000 LF -- -- 12.00 12.00
Grout hole after hydropunching --@.000 LF -- -- 6.50 6.50

Sample packaging, vials, bottles


1 liter (35.2 oz.) clear
wide mouth jar (case of 12) --@.000 Case 56.10 -- -- 56.10
500 ml (17.6 oz.) clear
wide mouth jar (case of 12) --@.000 Case 47.50 -- -- 47.50
250 ml (8.8 oz.) clear
wide mouth jar (case of 24) --@.000 Case 50.60 -- -- 50.60
120 ml (4.4 oz.) clear
wide mouth jar (case of 24) --@.000 Case 70.70 -- -- 70.70
1 liter (35.2 oz.) Boston
round bottle (case of 12) --@.000 Case 42.70 -- -- 42.70
2015 Heavy Construction Estimator, All Rights Reserved Page 120

500 ml ( 17.6 oz.) Boston


round bottle (case of 12) --@.000 Case 37.60 -- -- 37.60
40 ml clear vials (case of 72) --@.000 Case 131.00 -- -- 131.00
20 ml clear vials (case of 72) --@.000 Case 105.00 -- -- 105.00
250 ml (8.8 oz.) clear wide mouth
vial with SEPTA (case of 24) --@.000 Case 78.00 -- -- 78.00
125 ml (4.4 oz.) clear wide mouth
vial with SEPTA (case of 24) --@.000 Case 88.30 -- -- 88.30
1 liter ( 35.2
oz.) HDPE bottle (case of 12) --@.000 Case 43.50 -- -- 43.50
500 ml (17.6
oz.) HDPE bottle (case of 24) --@.000 Case 38.80 -- -- 38.80
250 ml (8.8
oz.) HDPE bottle (case of 24) --@.000 Case 54.90 -- -- 54.90
125 ml (4.4
oz.) HDPE bottle (case of 24) --@.000 Case 65.70 -- -- 65.70
Custody seals (package of 10) --@.000 Pack 1.68 -- -- 1.68
Safe transport can filled with vermiculite,
1 gallon, case of 4 --@.000 Case 20.90 -- -- 20.90
Documentation pack, quality assurance verification,
(data and benchwork) --@.000 Pack 231.00 -- -- 231.00
Packing tape, per roll --@.000 Ea 5.95 -- -- 5.95
Plastic sheeting (per roll) --@.000 Ea 23.80 -- -- 23.80
Isopropanol --@.000 Gal 44.60 -- -- 44.60
Deionized water --@.000 Gal 14.90 -- -- 14.90
Alconox soap --@.000 Ea 16.40 -- -- 16.40
1 gallon, 128 oz, glass sample container,
4 per case --@.000 Ea 46.10 -- -- 46.10

Overnight delivery service for collected samples


8 oz. letter --@.000 Ea 25.40 -- -- 25.40
1 lb. package --@.000 Ea 34.30 -- -- 34.30
2 lb. to 5 lb. packages --@.000 Ea 48.90 -- -- 48.90
6 lb. to 10 lb. packages --@.000 Ea 69.80 -- -- 69.80
11 lb. to 20 lb. packages --@.000 Ea 95.80 -- -- 95.80
21 lb. to 50 lb. packages --@.000 Ea 188.00 -- -- 188.00
51 lb. to 70 lb. packages --@.000 Ea 251.00 -- -- 251.00
71 lb. or greater packages --@.000 Ea 482.00 -- -- 482.00

Coolers and ice chests for collected samples


48 quart ice chest --@.000 Ea 29.50 -- -- 29.50
60 quart ice chest --@.000 Ea 63.80 -- -- 63.80
80 quart ice chest --@.000 Ea 84.60 -- -- 84.60
102 quart ice chest --@.000 Ea 98.10 -- -- 98.10
120 quart ice chest --@.000 Ea 179.00 -- -- 179.00
Blue ice soft packs,
equivalent to 4 lbs. of ice --@.000 Ea 7.17 -- -- 7.17
Bag ice --@.000 Ea 1.43 -- -- 1.43

Field samples for underground storage tank removal


Using small tools.
Collection of sludge sample m8@.250 Ea -- 18.20 0.53 18.73
Collection
of pumpable liquids sample m8@.250 Ea -- 18.20 0.53 18.73

Field samples for underground storage tank removal


Using a 1 CY hydraulic tractor excavator and small tools.
Collection
2015 Heavy Construction Estimator, All Rights Reserved Page 120 (part 2)

of contaminated soil sample en@.500 Ea -- 20.51 15.60 36.11


Shipping of samples to laboratory, including ice, packaging, coolers and freight
(usually overnight UPS) --@.000 Ea 40.90 -- -- 40.90

Testing for arsenic


Arsenic, hydride (SW7061)
with sample preparation --@.000 Ea 144.00 -- -- 144.00

Waste and waste water analysis


Acidity and alkalinity --@.000 Ea 26.80 -- -- 26.80
Ammonia (no distillation) --@.000 Ea 22.30 -- -- 22.30
Ammonia (distillation) --@.000 Ea 37.20 -- -- 37.20
Biochemical oxygen demand --@.000 Ea 52.10 -- -- 52.10
Boron --@.000 Ea 11.90 -- -- 11.90
Bromide --@.000 Ea 22.30 -- -- 22.30
Chemical oxygen demand (COD) --@.000 Ea 29.80 -- -- 29.80
Chloride --@.000 Ea 20.80 -- -- 20.80
Chlorine, residual --@.000 Ea 22.30 -- -- 22.30
Color --@.000 Ea 14.90 -- -- 14.90
Conductivity --@.000 Ea 10.40 -- -- 10.40
Cyanide --@.000 Ea 37.20 -- -- 37.20
2015 Heavy Construction Estimator, All Rights Reserved Page 121

Dissolved oxygen --@.000 Ea 14.90 -- -- 14.90


Fecal coliform --@.000 Ea 52.10 -- -- 52.10
Fluoride (no distillation) --@.000 Ea 17.90 -- -- 17.90
Fluoride (with distillation) --@.000 Ea 37.20 -- -- 37.20
Hardness, total --@.000 Ea 22.30 -- -- 22.30
Iodine --@.000 Ea 22.30 -- -- 22.30
Tal metals (6010/7000s) --@.000 Ea 305.00 -- -- 305.00
Coliform, total, method 908a --@.000 Ea 37.20 -- -- 37.20
Specific conductance EPA 120 --@.000 Ea 14.90 -- -- 14.90
Temperature EPA 170.1 --@.000 Ea 7.44 -- -- 7.44
Arsenic EPA 7060 --@.000 Ea 22.30 -- -- 22.30
Lead EPA 3050 --@.000 Ea 37.20 -- -- 37.20
Mercury EPA 7470 --@.000 Ea 104.00 -- -- 104.00
Selenium EPA 7740 --@.000 Ea 22.30 -- -- 22.30
Oil and grease EPA 413.2 --@.000 Ea 112.00 -- -- 112.00
Ethylene glycol --@.000 Ea 149.00 -- -- 149.00
Phenols EPA 8040 --@.000 Ea 193.00 -- -- 193.00
Chromium EPA 3005/7191 --@.000 Ea 44.60 -- -- 44.60
Lead EPA 3005/7421 --@.000 Ea 52.10 -- -- 52.10
Arsenic, hydride 206.3 --@.000 Ea 77.40 -- -- 77.40
Chromium, hexavalent 218.5 --@.000 Ea 57.30 -- -- 57.30
Ion chromatography 300 --@.000 Ea 232.00 -- -- 232.00
Silica dissolved 370.1 --@.000 Ea 18.60 -- -- 18.60
NTA 430.2 --@.000 Ea 31.00 -- -- 31.00

Specific organic contaminate analysis


Acrolein/acrylonitrile (603, 8030) --@.000 Ea 335.00 -- -- 335.00
Benzidines (605) --@.000 Ea 335.00 -- -- 335.00
Chlorinated herbicides (615, 8150) --@.000 Ea 260.00 -- -- 260.00
Chlorinated hydrocarbons (612,
8120) --@.000 Ea 223.00 -- -- 223.00
Haloethers (611) --@.000 Ea 335.00 -- -- 335.00
Organophosphorus pesticides (8140) --@.000 Ea 275.00 -- -- 275.00
Nitrosoamines (607) --@.000 Ea 208.00 -- -- 208.00
Pesticides and PCBs (608, 8080) --@.000 Ea 223.00 -- -- 223.00
Phenols (605) --@.000 Ea 208.00 -- -- 208.00
Phthalate esters --@.000 Ea 223.00 -- -- 223.00
Polynuclear aromatic hydro-carbons (610,
8100,8310, HPLC) --@.000 Ea 223.00 -- -- 223.00
Purgeable aromatics (602, 8020) --@.000 Ea 134.00 -- -- 134.00
Purgeable halocarbons (601, 8010) --@.000 Ea 164.00 -- -- 164.00
Purgeable organics (624, 8260) --@.000 Ea 335.00 -- -- 335.00
Nitroaromatics and isophorone (609,
8090) --@.000 Ea 335.00 -- -- 335.00
Semi-volatile organics (625, 8270) --@.000 Ea 521.00 -- -- 521.00
Nitrogen, nitrate/nitrite --@.000 Ea 44.60 -- -- 44.60
Nitrogen, kjeldahl --@.000 Ea 44.60 -- -- 44.60
Odor test --@.000 Ea 44.60 -- -- 44.60
Oil and grease --@.000 Ea 32.70 -- -- 32.70
PH (acidity) --@.000 Ea 10.40 -- -- 10.40
Phenols --@.000 Ea 32.70 -- -- 32.70
Phosphorus, ortho/hydrolizable --@.000 Ea 44.60 -- -- 44.60
Phosphorus total --@.000 Ea 29.80 -- -- 29.80
Settleable matter --@.000 Ea 17.90 -- -- 17.90
Dissolved solids --@.000 Ea 14.90 -- -- 14.90
Suspended solids --@.000 Ea 14.90 -- -- 14.90
Total solids --@.000 Ea 14.90 -- -- 14.90
Volatile solids --@.000 Ea 14.90 -- -- 14.90
Sulfur: sulfate, sulfide, sulfite --@.000 Ea 69.90 -- -- 69.90
Surfactant (MBAS) --@.000 Ea 52.10 -- -- 52.10
2015 Heavy Construction Estimator, All Rights Reserved Page 121 (part 2)

Total organic carbons --@.000 Ea 37.20 -- -- 37.20


Total organic halogens (tox) --@.000 Ea 126.00 -- -- 126.00
Turbidity --@.000 Ea 14.90 -- -- 14.90
Metals --@.000 Ea 11.90 -- -- 11.90
2015 Heavy Construction Estimator, All Rights Reserved Page 122

Dioxins and dibenzofurans (8280) --@.000 Ea 2,230.00 -- -- 2,230.00


Organochlorine
pesticides and PCBs (617) --@.000 Ea 232.00 -- -- 232.00
2,3,7,8-tetrachloro-dibzo-p-
dioxin (613) --@.000 Ea 446.00 -- -- 446.00
Triazine pesticides (619) --@.000 Ea 310.00 -- -- 310.00
Carbamate and urea pesticides (632) --@.000 Ea 310.00 -- -- 310.00
Semi-volatile organics,
packed column (8250) --@.000 Ea 696.00 -- -- 696.00
Trihalomethanes 501.1 --@.000 Ea 77.40 -- -- 77.40
EDB and 1,2-dibromo-3-
chloropropane 504 --@.000 Ea 298.00 -- -- 298.00
VOC by isotope dilution, 162 --@.000 Ea 929.00 -- -- 929.00
Semi-volatile organics by isotope dilution,
1625 --@.000 Ea 1,390.00 -- -- 1,390.00
Arsenic, (SW7060)
with sample preparation --@.000 Ea 99.20 -- -- 99.20
Metals screen,
25 listed in SW3005 or SW6010 --@.000 Ea 640.00 -- -- 640.00
Chromium,
hexavalent (SW7195 with prep) --@.000 Ea 144.00 -- -- 144.00
Mercury, cold vapor (SW7470)
with sample preparation --@.000 Ea 134.00 -- -- 134.00
Cyanide (SW9010)
with sample preparation --@.000 Ea 178.00 -- -- 178.00
Purgeable halocarbons (SW5030/8010) --@.000 Ea 178.00 -- -- 178.00
Purgeable
aromatics (SW5030 or 8020) --@.000 Ea 178.00 -- -- 178.00
Pesticides
and PCB's (SW3510 or SW8080) --@.000 Ea 453.00 -- -- 453.00
Polynuclear aromatic hydrocarbons,
PAH (SW3510 or SW8310) --@.000 Ea 453.00 -- -- 453.00
Base neutral and acid extractable
organics (SW3510 or SW8270) --@.000 Ea 870.00 -- -- 870.00
Carbamate and urea
pesticides (SW3510 or SW8318) --@.000 Ea 310.00 -- -- 310.00
Lead (SW3005 or SW7421) --@.000 Ea 99.20 -- -- 99.20
Ethylene dibromide (SW8011)
with sample preparation --@.000 Ea 134.00 -- -- 134.00
Dioxins (SW8280)
with sample preparation --@.000 Ea 1,100.00 -- -- 1,100.00
Selenium (SW7740)
with sample preparation --@.000 Ea 99.20 -- -- 99.20
Non halogenated volatile
organics (SW5030 or SW8015) --@.000 Ea 178.00 -- -- 178.00
Organophosphorous
pesticides (SW3510 or SW8140) --@.000 Ea 270.00 -- -- 270.00
Chlorinated phenoxy
herbicides (SW3510 or SW8150) --@.000 Ea 274.00 -- -- 274.00
Gasoline group (modified EPA 601 or 602,
lead, EDB) --@.000 Ea 335.00 -- -- 335.00
Kerosene group (modified EPA 601,
602, or 610, lead, EDB) --@.000 Ea 610.00 -- -- 610.00
BTEX/MTBE (modified EPA 602) --@.000 Ea 112.00 -- -- 112.00
Ethylene
dibromide (EDB) (EPA 501.4) --@.000 Ea 104.00 -- -- 104.00
Chromium, total (EPA 218.1) --@.000 Ea 73.10 -- -- 73.10
Titanium (EPA 283.2) --@.000 Ea 100.00 -- -- 100.00

Biomonitoring and bioassay


2015 Heavy Construction Estimator, All Rights Reserved Page 122 (part 2)

Daphnia species 48-hour,


LC50, definitive --@.000 Ea 521.00 -- -- 521.00
Pimephales promelas 48-hour,
LC50, definitive --@.000 Ea 670.00 -- -- 670.00
Mysidopsis species 48-hour,
LC50, definitive --@.000 Ea 670.00 -- -- 670.00
Cyprindon species 48-hour,
LC50, definitive --@.000 Ea 670.00 -- -- 670.00
Drilling mud bioassay,
LC50 mysidoosis bahia --@.000 Ea 1,300.00 -- -- 1,300.00
Chronic toxicity
bioassay ceriodaphnia dubia --@.000 Ea 1,490.00 -- -- 1,490.00
Chronic toxicity bioassay
pimephales promelas larval --@.000 Ea 1,770.00 -- -- 1,770.00
Chronic toxicity
bioassay Mysidopsis species --@.000 Ea 2,340.00 -- -- 2,340.00
Chronic toxicity
bioassay cyprinodon species --@.000 Ea 2,160.00 -- -- 2,160.00
Daphnia IQ --@.000 Ea 186.00 -- -- 186.00
Ames (full) --@.000 Ea 3,270.00 -- -- 3,270.00
Ames (screen) --@.000 Ea 1,190.00 -- -- 1,190.00
Microtox --@.000 Ea 81.80 -- -- 81.80
Total heterotrophic plate count --@.000 Ea 52.10 -- -- 52.10
Hydrocarbon degraders --@.000 Ea 52.10 -- -- 52.10
Fluorescent pseudomonas --@.000 Ea 74.40 -- -- 74.40
Laboratory bench-scale studies --@.000 Ea 2,980.00 -- -- 2,980.00

Hazardous waste testing, RCR Act - EP toxicity analysis


Extraction, metals, pesticides,
herbicides (1311) --@.000 Ea 134.00 -- -- 134.00
Metals (6010, 7470) --@.000 Ea 141.00 -- -- 141.00
Pesticides / herbicides (8080,
8150) --@.000 Ea 432.00 -- -- 432.00
EP toxicity, metals EPA 3010 --@.000 Ea 231.00 -- -- 231.00

Hazardous waste testing, RCR Act - Toxic characteristic leaching procedure (TCLP)
Extraction: metals, pesticides, semi-volatiles,
herbicides (1311) --@.000 Ea 104.00 -- -- 104.00
2015 Heavy Construction Estimator, All Rights Reserved Page 123

Extraction: volatiles (1311) --@.000 Ea 179.00 -- -- 179.00


Metals (6010, 7470) --@.000 Ea 141.00 -- -- 141.00
Pesticides and herbicides (8080,
8150) --@.000 Ea 432.00 -- -- 432.00
Semi-volatile organics (8270) --@.000 Ea 521.00 -- -- 521.00
Volatile organics (8260) --@.000 Ea 335.00 -- -- 335.00
TCL (RCR) (EPA 1311) --@.000 Ea 2,330.00 -- -- 2,330.00

Hazardous waste testing, RCR Act - Corrosivity, ignitability and reactivity


Corrosivity (EPA 150.1 pH) --@.000 Ea 10.40 -- -- 10.40
Corrosivity (1110, NACE) --@.000 Ea 96.70 -- -- 96.70
Ignitibility (1010) --@.000 Ea 52.10 -- -- 52.10
Reactivity (cyanide/sulfide) --@.000 Ea 104.00 -- -- 104.00

Miscellaneous waste tests


Percent acid --@.000 Ea 22.30 -- -- 22.30
Ash: ASTM d482 --@.000 Ea 22.30 -- -- 22.30
Asphaltenes: ASTM d482 --@.000 Ea 89.30 -- -- 89.30
Bottoms, sediment and water (B,
S and W): ASTM d1796 --@.000 Ea 22.30 -- -- 22.30
Bromine number: ASTM d1159 --@.000 Ea 22.30 -- -- 22.30
BTU heat of combustion ASTM d240 --@.000 Ea 74.40 -- -- 74.40
Caustic percent FCC III monograph --@.000 Ea 22.30 -- -- 22.30
Chloride (microculombric)
dorhman method --@.000 Ea 119.00 -- -- 119.00
Chloride (parr bomb): ASTM d808 --@.000 Ea 126.00 -- -- 126.00
Chloride/sulfur (parr
bomb) ASTM d808 and d129 --@.000 Ea 126.00 -- -- 126.00
Corrosivity (24 hour) NACE TM-01-69 --@.000 Ea 74.40 -- -- 74.40
Flash point: ASTM d92, d93 --@.000 Ea 37.20 -- -- 37.20
Formaldehyde
in water FCC III monograph --@.000 Ea 22.30 -- -- 22.30
Freeze point ASTM d2386,
d1493, d1015 --@.000 Ea 52.10 -- -- 52.10
Heavy metals
(as lead) FCC III monograph --@.000 Ea 22.30 -- -- 22.30
Hydroxyl number: ASTM d1638 --@.000 Ea 74.40 -- -- 74.40
Iodine number: ASTM d1959 --@.000 Ea 44.60 -- -- 44.60
Mercaptan sulfur: ASTM d3227 --@.000 Ea 44.60 -- -- 44.60
Metals in oil: ASTM d2788, d811 --@.000 Ea 14.90 -- -- 14.90
Moisture percent, ASTM d1037 --@.000 Ea 29.80 -- -- 29.80
Neutralization no, ASTM d974 --@.000 Ea 22.30 -- -- 22.30
PH (extract, ASTM d2110) --@.000 Ea 74.40 -- -- 74.40
Saponification no, ASTM d94 --@.000 Ea 14.90 -- -- 14.90
Specific gravity/density
ASTM d891 and d1298 --@.000 Ea 14.90 -- -- 14.90
Sulfur (parr bomb), ASTM d129 --@.000 Ea 126.00 -- -- 126.00
Sulfur (microculombric) ASTM d3120 --@.000 Ea 112.00 -- -- 112.00
Viscosity: ASTM d88,d445,d2161 --@.000 Ea 59.50 -- -- 59.50
Water, by Karl Fisher ASTM d1744 --@.000 Ea 74.40 -- -- 74.40
Water/sediment in
distillate fuels (ASTM d2709) --@.000 Ea 14.90 -- -- 14.90
Bulk density --@.000 Ea 20.80 -- -- 20.80
Compatibility test for
waste membrane liners (9090) --@.000 Ea 13,200.00 -- -- 13,200.00
Paint filter liquids test (9095) --@.000 Ea 22.30 -- -- 22.30
Sat hydraulic conductivity,
leachate, perm (9100) --@.000 Ea 348.00 -- -- 348.00
Sorbent cartridges
2015 Heavy Construction Estimator, All Rights Reserved Page 123 (part 2)

from VOC sampling (5040) --@.000 Ea 162.00 -- -- 162.00


Moisture content (209A) --@.000 Ea 29.80 -- -- 29.80
Moisture content (209a) --@.000 Ea 29.80 -- -- 29.80
Sample preparation
(3005/3010/ 3020/3040/3050) --@.000 Ea 46.40 -- -- 46.40
Sample preparation
(3510/3520/ 3540/3550/5030) --@.000 Ea 77.40 -- -- 77.40
Sample preparation,
waste dilution (3580) --@.000 Ea 23.20 -- -- 23.20
Cleanup (3610/3611/3620/3630/
3650/3660) --@.000 Ea 77.40 -- -- 77.40
Cleanup, gel-permeation (3640) --@.000 Ea 116.00 -- -- 116.00

Soil and sediment analysis


Ammonia nitrogen (350.2m) --@.000 Ea 52.10 -- -- 52.10
BTEX: benzene, toulene, ethylbenzene,
xylene (8060,8020) --@.000 Ea 104.00 -- -- 104.00
Bromide, titrimetric (320.1m) --@.000 Ea 96.70 -- -- 96.70
Cation exchange capacity (CEC) (9080,
9081) --@.000 Ea 84.80 -- -- 84.80
Chloride, titrimetric (9252) --@.000 Ea 44.60 -- -- 44.60
Conductivity
(9050) specific conductance --@.000 Ea 22.30 -- -- 22.30
2015 Heavy Construction Estimator, All Rights Reserved Page 124

Cyanide, total,
(9010) spectrophotometric --@.000 Ea 70.70 -- -- 70.70
Exchangeable sodium percentage (LADNR,
29b) --@.000 Ea 112.00 -- -- 112.00
Extractable organic
halide (EPA 600/4/84-008) --@.000 Ea 112.00 -- -- 112.00
Fluoride, potentiometric (340.2m) --@.000 Ea 40.90 -- -- 40.90
Iodine, titrimetric (345.1 m) --@.000 Ea 52.10 -- -- 52.10
Mercury (7041) --@.000 Ea 37.20 -- -- 37.20
Metals (1cp) (6010) --@.000 Ea 11.90 -- -- 11.90
Nitrogen, nitrate/nitrite (353.3m) --@.000 Ea 52.10 -- -- 52.10
Oil and grease
(9071) total recoverable --@.000 Ea 96.70 -- -- 96.70
PH, electrometric (9045) --@.000 Ea 14.90 -- -- 14.90
Phenols (9066) total recoverable --@.000 Ea 52.10 -- -- 52.10
Phosphorus, all forms (365.3m) --@.000 Ea 37.20 -- -- 37.20
Sodium absorption
ratio (SAR) (LADNR 29b) --@.000 Ea 81.80 -- -- 81.80
Solids, total (166.3m) --@.000 Ea 14.90 -- -- 14.90
Sulfates (375.3m) --@.000 Ea 17.90 -- -- 17.90
Total organic carbon (16.3) --@.000 Ea 37.20 -- -- 37.20
Total petroleum hydrocarbons (TPH) --@.000 Ea 141.00 -- -- 141.00
Total petroleum
hydrocarbons diesel (TPH) --@.000 Ea 186.00 -- -- 186.00
Volatile organic analysis (8240) --@.000 Ea 387.00 -- -- 387.00
Semivolatile organics (8270) --@.000 Ea 759.00 -- -- 759.00
Pesticides and PCBs (8080) --@.000 Ea 312.00 -- -- 312.00
Tal metals (6010/7000s) --@.000 Ea 350.00 -- -- 350.00
Ammonia EPA 350.2/350.3 --@.000 Ea 64.00 -- -- 64.00
Chlordane EPA 8080 --@.000 Ea 149.00 -- -- 149.00
Chlorinated phenoxy
acid herbicides EPA 8150 --@.000 Ea 365.00 -- -- 365.00
Chromium EPA 3050/6010 --@.000 Ea 37.20 -- -- 37.20
Hydrocarbon screen GC/FID --@.000 Ea 208.00 -- -- 208.00
BTE/gasoline hydrocarbons
mod EPA 8020 (PID/FID) --@.000 Ea 193.00 -- -- 193.00
Diesel hydrocarbon GC/FID --@.000 Ea 179.00 -- -- 179.00
Gasoline hydrocarbon GC/FID --@.000 Ea 179.00 -- -- 179.00
Chromium hexavalent
7195/7196 /7197/7198 --@.000 Ea 44.60 -- -- 44.60
Selenium, hydride 7741 --@.000 Ea 81.20 -- -- 81.20
Arsenic, hydride 7061 --@.000 Ea 81.20 -- -- 81.20
Chromium, total (SW7190)
with sample preparation --@.000 Ea 72.20 -- -- 72.20
Antimony (SW7040)
with sample preparation --@.000 Ea 72.20 -- -- 72.20
Antimony (SW7041)
with sample preparation --@.000 Ea 99.20 -- -- 99.20
Thallium (SW7840)
with sample preparation --@.000 Ea 72.20 -- -- 72.20
Thallium (SW7841)
with sample preparation --@.000 Ea 99.20 -- -- 99.20
Gasoline group (mod EPA 8010/8020,
lead, EDB) --@.000 Ea 372.00 -- -- 372.00
Kerosene group (mod EPA 8010/8020,
8100, TPH, lead, EDB) --@.000 Ea 640.00 -- -- 640.00
BTE/MTB (mod EPA 8020) --@.000 Ea 126.00 -- -- 126.00
Dioxins (SW8280) --@.000 Ea 1,120.00 -- -- 1,120.00
Selenium (SW7740) --@.000 Ea 112.00 -- -- 112.00
Chlorinated phenoxyl
2015 Heavy Construction Estimator, All Rights Reserved Page 124 (part 2)

herbicides (SW3510 or SW8150) --@.000 Ea 290.00 -- -- 290.00

Radiation testing of animal tissue or bone - Alpha spectroscopy


Americium isotopic --@.000 Ea 275.00 -- -- 275.00
Curium isotopic --@.000 Ea 279.00 -- -- 279.00
Neptunium - 237 --@.000 Ea 279.00 -- -- 279.00
Plutonium isotopic --@.000 Ea 275.00 -- -- 275.00
Thorium isotopic --@.000 Ea 275.00 -- -- 275.00
Uranium isotopic --@.000 Ea 275.00 -- -- 275.00

Radiation testing of animal tissue or bone - Gas flow proportional counting


Strontium - 89, 90 --@.000 Ea 179.00 -- -- 179.00
Strontium - 90 --@.000 Ea 164.00 -- -- 164.00
Technitium - 99 --@.000 Ea 197.00 -- -- 197.00

Radiation testing of animal tissue or bone - Gamma spectroscopy


Americium isotopic --@.000 Ea 186.00 -- -- 186.00
Gamma isotopic --@.000 Ea 164.00 -- -- 164.00
Iodine - 25 (filter or charcoal) --@.000 Ea 193.00 -- -- 193.00
2015 Heavy Construction Estimator, All Rights Reserved Page 125

Iodine-129 (filter or charcoal) --@.000 Ea 193.00 -- -- 193.00


Iodine-131 (filter or charcoal) --@.000 Ea 193.00 -- -- 193.00
Krypton - 85 --@.000 Ea 595.00 -- -- 595.00
Lead - 210 --@.000 Ea 201.00 -- -- 201.00
Radium - 226, 228 --@.000 Ea 186.00 -- -- 186.00
Uranium - total --@.000 Ea 186.00 -- -- 186.00

Radiation testing of animal tissue or bone - Liquid scintillation


Carbon - 14 --@.000 Ea 394.00 -- -- 394.00

Radiation testing of animal tissue or bone - Miscellaneous


Uranium isotopic fluorometric --@.000 Ea 275.00 -- -- 275.00
Uranium
isotopic laser phosphorometer --@.000 Ea 275.00 -- -- 275.00

Radiation analytical, air - Alpha spectroscopy


Americium isotopic --@.000 Ea 205.00 -- -- 205.00
Curium isotopic --@.000 Ea 208.00 -- -- 208.00
Neptunium - 237 --@.000 Ea 212.00 -- -- 212.00
Polonium - 210 --@.000 Ea 167.00 -- -- 167.00
Plutonium isotopic --@.000 Ea 205.00 -- -- 205.00
Radium - 226 --@.000 Ea 134.00 -- -- 134.00
Thorium isotopic --@.000 Ea 205.00 -- -- 205.00
Uranium isotopic --@.000 Ea 205.00 -- -- 205.00

Radiation analytical, air - Gas flow proportional counting


Gross beta - total --@.000 Ea 68.40 -- -- 68.40
Lead - 210 --@.000 Ea 179.00 -- -- 179.00
Strontium - 89, 90 --@.000 Ea 208.00 -- -- 208.00
Strontium - 90 --@.000 Ea 149.00 -- -- 149.00
Technitium - 99 --@.000 Ea 182.00 -- -- 182.00

Radiation analytical, air - Gamma spectroscopy


Gamma isotopic --@.000 Ea 160.00 -- -- 160.00
Radium - 226, 228 --@.000 Ea 182.00 -- -- 182.00

Radiation analytical, air - Liquid scintillation


Carbon - 14 --@.000 Ea 260.00 -- -- 260.00
Iron - 55 --@.000 Ea 238.00 -- -- 238.00

Radiation analytical, air - Miscellaneous tests


Gross alpha - total gas flow proportional counting or
alpha scintillation counting --@.000 Ea 47.60 -- -- 47.60
Gross alpha and gross beta - total gas flow proportional counting or
alpha scintillation counting --@.000 Ea 112.00 -- -- 112.00
Plutonium isotopic (including plutonium - 241) alpha spectroscopy
and liquid scintillation --@.000 Ea 219.00 -- -- 219.00
Radium - 226 radon de-emanation --@.000 Ea 179.00 -- -- 179.00
Uranium
- total laser phosphorometer --@.000 Ea 171.00 -- -- 171.00
Uranium - total fluorometric --@.000 Ea 171.00 -- -- 171.00

Radiation testing, analytical liquid - Alpha spectroscopy


Americium --@.000 Ea 205.00 -- -- 205.00
Curium isotopic --@.000 Ea 208.00 -- -- 208.00
Neptunium - 237 --@.000 Ea 212.00 -- -- 212.00
2015 Heavy Construction Estimator, All Rights Reserved Page 125 (part 2)

Polonium - 210 --@.000 Ea 167.00 -- -- 167.00


Plutonium - isotopic --@.000 Ea 208.00 -- -- 208.00
Radium - 226 --@.000 Ea 134.00 -- -- 134.00
Radium - 226, 228 --@.000 Ea 234.00 -- -- 234.00
Thorium isotopic --@.000 Ea 205.00 -- -- 205.00
Uranium isotopic --@.000 Ea 205.00 -- -- 205.00

Radiation testing, analytical liquid - Beta/gamma coincidence


Iodine - 131 --@.000 Ea 179.00 -- -- 179.00
Radium - 226, 228 --@.000 Ea 234.00 -- -- 234.00
Radium - 228 --@.000 Ea 134.00 -- -- 134.00

Radiation testing, analytical liquid - Gas flow proportional counting


Gross beta - total --@.000 Ea 74.40 -- -- 74.40
Calcium - 45 --@.000 Ea 171.00 -- -- 171.00
Cerium - 144 --@.000 Ea 283.00 -- -- 283.00
Chlorine - 36 --@.000 Ea 238.00 -- -- 238.00
2015 Heavy Construction Estimator, All Rights Reserved Page 126

Iodine - 131 --@.000 Ea 171.00 -- -- 171.00


Lead - 210 --@.000 Ea 179.00 -- -- 179.00
Radium - 226, 228 --@.000 Ea 179.00 -- -- 179.00
Radium - 228 --@.000 Ea 312.00 -- -- 312.00
Ruthenium - 106 --@.000 Ea 219.00 -- -- 219.00
Strontium - 89,90 --@.000 Ea 212.00 -- -- 212.00
Strontium - 90 --@.000 Ea 149.00 -- -- 149.00
Sulfur - 35 --@.000 Ea 305.00 -- -- 305.00
Technitium - 99 --@.000 Ea 179.00 -- -- 179.00

Radiation testing, analytical liquid - Gamma spectroscopy


Cerium - 144 --@.000 Ea 179.00 -- -- 179.00
Gamma isotopic
(cesium - 137 20 PCI/I) --@.000 Ea 175.00 -- -- 175.00
Iodine - 125 --@.000 Ea 193.00 -- -- 193.00
Iodine - 129 --@.000 Ea 193.00 -- -- 193.00
Ruthenium - 106 --@.000 Ea 208.00 -- -- 208.00
Sulfur - 35 --@.000 Ea 305.00 -- -- 305.00

Radiation testing, analytical liquid - Liquid scintillation


Chlorine - 36 --@.000 Ea 246.00 -- -- 246.00
Carbon - 14 --@.000 Ea 179.00 -- -- 179.00
Iron - 55 --@.000 Ea 312.00 -- -- 312.00
Iron - 125 --@.000 Ea 275.00 -- -- 275.00
Iron - 129 --@.000 Ea 275.00 -- -- 275.00
Nickel - 63 --@.000 Ea 283.00 -- -- 283.00
Promethium - 147 --@.000 Ea 201.00 -- -- 201.00
Sulfur - 35 --@.000 Ea 81.80 -- -- 81.80
Tritium (direct counting) --@.000 Ea 93.00 -- -- 93.00
Tritium (distillation) --@.000 Ea 119.00 -- -- 119.00
Tritium (electrolytic enrichment) --@.000 Ea 260.00 -- -- 260.00

Radiation testing, analytical liquid - Gross alpha and beta tests


Gross alpha only, total gas flow, proportional counting or
alpha scintillation counting --@.000 Ea 74.40 -- -- 74.40
Suspended or dissolved, gas flow proportional flow or
alpha scintillation counting --@.000 Ea 119.00 -- -- 119.00
Suspended and dissolved, gas flow proportional counting or
alpha scintillation counting --@.000 Ea 104.00 -- -- 104.00
Total gas flow, proportional counting or
alpha scintillation counting --@.000 Ea 104.00 -- -- 104.00

Radiation testing, analytical liquid - Miscellaneous tests


Plutonium isotopic (including plutonium - 241) alpha spectroscopy
or liquid scintillation --@.000 Ea 372.00 -- -- 372.00
Total radium
alpha scintillation counting --@.000 Ea 74.40 -- -- 74.40
Radium - 226 radon de-emanation --@.000 Ea 149.00 -- -- 149.00
Radium - 226,228 radon de-emanation --@.000 Ea 234.00 -- -- 234.00
Radon - 222 --@.000 Ea 149.00 -- -- 149.00
Uranium
- total laser phosphorometer --@.000 Ea 104.00 -- -- 104.00
Uranium - total (fluorometric
1 mg/l) fluorometric --@.000 Ea 112.00 -- -- 112.00

Radiation tests of urine and feces - Alpha spectroscopy


Americium isotopic --@.000 Ea 387.00 -- -- 387.00
Curium isotopic --@.000 Ea 387.00 -- -- 387.00
2015 Heavy Construction Estimator, All Rights Reserved Page 126 (part 2)

Neptunium - 237 --@.000 Ea 402.00 -- -- 402.00


Polonium - 210 --@.000 Ea 253.00 -- -- 253.00
Plutonium isotopic --@.000 Ea 298.00 -- -- 298.00
Thorium isotopic --@.000 Ea 268.00 -- -- 268.00
Uranium isotopic --@.000 Ea 268.00 -- -- 268.00

Radiation tests of urine and feces - Gas flow proportional counting


Gross beta - total --@.000 Ea 77.40 -- -- 77.40
Ruthenium - 106 --@.000 Ea 141.00 -- -- 141.00
Strontium - 89, 90 --@.000 Ea 298.00 -- -- 298.00
Strontium - 90 --@.000 Ea 201.00 -- -- 201.00

Radiation tests of urine and feces - Gamma spectroscopy


Cerium - 144 --@.000 Ea 223.00 -- -- 223.00
Gamma isotopic --@.000 Ea 223.00 -- -- 223.00
Iodine - 131 --@.000 Ea 223.00 -- -- 223.00
2015 Heavy Construction Estimator, All Rights Reserved Page 127

Radium - 228 --@.000 Ea 223.00 -- -- 223.00


Ruthenium - 106 --@.000 Ea 223.00 -- -- 223.00

Radiation tests of urine and feces - Liquid scintillation


Carbon - 14 --@.000 Ea 81.80 -- -- 81.80
Promethium - 147 --@.000 Ea 372.00 -- -- 372.00
Phosphorus - 32 --@.000 Ea 81.80 -- -- 81.80
Tritium (direct counting) --@.000 Ea 89.30 -- -- 89.30
Tritium (distillation) --@.000 Ea 81.80 -- -- 81.80

Radiation tests of urine and feces - Other tests


Mixed fission products gamma spectroscopy and gas
flow proportional counting --@.000 Ea 350.00 -- -- 350.00
Plutonium isotopic (including plutonium - 241) alpha spectroscopy
and liquid scintillation --@.000 Ea 476.00 -- -- 476.00
Radium - 226 radon de-emanation --@.000 Ea 208.00 -- -- 208.00
Radium - 226, 228 radon de-emanation, gas flow proportional counting,
gamma spectroscopy --@.000 Ea 424.00 -- -- 424.00
Uranium
- total (5 mg/l) fluorometric --@.000 Ea 89.30 -- -- 89.30
Uranium - total
(5 mg/l) laser phosphorometer --@.000 Ea 89.30 -- -- 89.30
Uranium - total (radiometric)
alpha scintillation counting --@.000 Ea 112.00 -- -- 112.00
Uranium - total (.02
mg/l) laser phosphorometer --@.000 Ea 112.00 -- -- 112.00

Radiation tests of vegetation, sediment or soil - Alpha spectroscopy


Americium isotopic --@.000 Ea 372.00 -- -- 372.00
Curium isotopic --@.000 Ea 372.00 -- -- 372.00
Neptunium --@.000 Ea 298.00 -- -- 298.00
Plutonium isotopic --@.000 Ea 253.00 -- -- 253.00
Thorium isotopic --@.000 Ea 260.00 -- -- 260.00
Uranium isotopic --@.000 Ea 260.00 -- -- 260.00

Radiation tests of vegetation, sediment or soil - Gas flow proportional counting


Gross beta - total --@.000 Ea 71.40 -- -- 71.40
Ruthenium - 106 --@.000 Ea 305.00 -- -- 305.00
Strontium - 89, 90 --@.000 Ea 223.00 -- -- 223.00
Strontium - 90 --@.000 Ea 179.00 -- -- 179.00
Technitium - 99 --@.000 Ea 253.00 -- -- 253.00

Radiation tests of vegetation, sediment or soil - Gamma spectroscopy


Americium isotopic --@.000 Ea 201.00 -- -- 201.00
Gamma isotopic --@.000 Ea 201.00 -- -- 201.00
Iodine - 129 --@.000 Ea 190.00 -- -- 190.00
Lead - 210 --@.000 Ea 205.00 -- -- 205.00
Polonium - 210 --@.000 Ea 190.00 -- -- 190.00
Radium - 226, 228 --@.000 Ea 201.00 -- -- 201.00
Ruthenium - 106 --@.000 Ea 201.00 -- -- 201.00
Uranium - total --@.000 Ea 201.00 -- -- 201.00
Radium 228 (9320) --@.000 Ea 141.00 -- -- 141.00

Radiation tests of vegetation, sediment or soil - Liquid scintillation


Carbon - 14 --@.000 Ea 268.00 -- -- 268.00
Nickel - 63 --@.000 Ea 268.00 -- -- 268.00
Tritium --@.000 Ea 134.00 -- -- 134.00
2015 Heavy Construction Estimator, All Rights Reserved Page 127 (part 2)

Radiation tests of vegetation, sediment or soil - Other tests


Gross alpha - total gas flow, proportional counting or
alpha scintillation counting --@.000 Ea 80.40 -- -- 80.40
Gross alpha and gross beta - total gas flow, proportional counting or
alpha scintillation counting --@.000 Ea 107.00 -- -- 107.00
Plutonium isotopic (including plutonium - 241) alpha spectroscopy
and liquid scintillation --@.000 Ea 286.00 -- -- 286.00
Uranium - total laser phoshorometer --@.000 Ea 126.00 -- -- 126.00
Uranium - total fluorometric --@.000 Ea 126.00 -- -- 126.00

Other radiation tests - Liquid scintillation


Carbon - 14 radiation analytical,
feces --@.000 Ea 351.00 -- -- 351.00
Carbon - 14 radiation analytical,
soda lime cartridge --@.000 Ea 595.00 -- -- 595.00
Tritium (distillation) radiation analytical,
silica gel --@.000 Ea 186.00 -- -- 186.00

Other radiation tests - Sample preparation


Prefiltering liquids --@.000 Ea 18.60 -- -- 18.60
Acid digestion for air filters,
vegetation, sediment or soil --@.000 Ea 29.80 -- -- 29.80
Drying and grinding of vegetation,
sediment or soil --@.000 Ea 26.00 -- -- 26.00
2015 Heavy Construction Estimator, All Rights Reserved Page 128

Dissolution by microwave for vegetation,


sediment or soil --@.000 Ea 37.20 -- -- 37.20
Urine preparation --@.000 Ea 29.80 -- -- 29.80
Feces preparation --@.000 Ea 55.80 -- -- 55.80
Blood preparation --@.000 Ea 112.00 -- -- 112.00
Animal bone and tissue preparation --@.000 Ea 74.40 -- -- 74.40

Other radiation tests - Data packaging


Gas flow proportional counting --@.000 Ea 26.00 -- -- 26.00
Liquid scintillation --@.000 Ea 22.30 -- -- 22.30
Alpha spectroscopy --@.000 Ea 33.50 -- -- 33.50
Gamma spectroscopy --@.000 Ea 33.50 -- -- 33.50
Fluorometric
or laser phosphorometer --@.000 Ea 29.80 -- -- 29.80
Alpha scintillation counting --@.000 Ea 29.80 -- -- 29.80
Radon de-emanation --@.000 Ea 22.30 -- -- 22.30
Beta/gamma coincidence --@.000 Ea 33.50 -- -- 33.50

Other radiation tests - Additional charges


Radioactivity screening
(tritium not present) --@.000 Ea 37.20 -- -- 37.20
Radioactivity
screening (tritium present) --@.000 Ea 59.50 -- -- 59.50
Repackage sample --@.000 Ea 22.30 -- -- 22.30
Repackage and ship sample --@.000 Ea 44.60 -- -- 44.60

Other radiation tests - Additional lab testing services


Characterization of any unknown radioactive
sample (low level) --@.000 Ea 208.00 -- -- 208.00

Lab tests for underground storage tank removal


Procedure as detailed in EPA SW-846.
Test for benzene, tolulene, ethylbenzene and xylene (BTEX) using
procedure 8020 on EPA SW-846 --@.000 Ea 149.00 -- -- 149.00
Flashpoint test using procedure
40CFR 261.21 in EPA SW-846 --@.000 Ea 59.50 -- -- 59.50
Test for total organic halides using
procedure 9020 in EPA SW-846 --@.000 Ea 186.00 -- -- 186.00
Test for total petroleum hydrocarbons by gas chromatography using
procedure 8015 (modified) --@.000 Ea 223.00 -- -- 223.00
Test for total recoverable petroleum hydrocarbons
(TRPH) using procedure 418.1 --@.000 Ea 164.00 -- -- 164.00
Test for volatile
organics using procedure 8240 --@.000 Ea 446.00 -- -- 446.00
Test for semi-volitile
organics using procedure 8270 --@.000 Ea 818.00 -- -- 818.00
Test for oil and
grease using procedure 413.1 --@.000 Ea 112.00 -- -- 112.00
Extraction test for toxicity characteristics leaching procedures
using procedure 1311 --@.000 Ea 186.00 -- -- 186.00
Test for metals
using procedure 6010 RCRA --@.000 Ea 260.00 -- -- 260.00
Test for
arsenic using procedure 7060 --@.000 Ea 59.50 -- -- 59.50
Test for selenium
(Se) using procedure 7740 --@.000 Ea 59.50 -- -- 59.50
Test for lead using procedure 7421 --@.000 Ea 59.50 -- -- 59.50
Test for
2015 Heavy Construction Estimator, All Rights Reserved Page 128 (part 2)

mercury using procedure 7470 --@.000 Ea 53.60 -- -- 53.60


Test for polynuclear aromatic hydrocarbons
(PAH) using procedure 8100 --@.000 Ea 351.00 -- -- 351.00
Test to determine the constituents of fuel using the
procedure in ASTM D3328-78 --@.000 Ea 112.00 -- -- 112.00
Cyanide (335.2) --@.000 Ea 59.50 -- -- 59.50
Ion chromatography, per each --@.000 Ea 29.80 -- -- 29.80
Volatile aromatic halocarbon to-1 --@.000 Ea 372.00 -- -- 372.00
Highly volatile
non-polar organics to-2 --@.000 Ea 372.00 -- -- 372.00
Volatile non-polar organics to-3 --@.000 Ea 372.00 -- -- 372.00
Organochlorine pesticides/PCBs to-4 --@.000 Ea 372.00 -- -- 372.00
Aldehydes and ketones to-5 --@.000 Ea 298.00 -- -- 298.00
Phosgene in ambient air to-6 --@.000 Ea 930.00 -- -- 930.00
N-nitrosodimethylamine to-7 --@.000 Ea 930.00 -- -- 930.00
Phenol and methyl phenols to-8 --@.000 Ea 275.00 -- -- 275.00
Dioxins to-9 --@.000 Ea 298.00 -- -- 298.00
Total non-methane organics to-12 --@.000 Ea 372.00 -- -- 372.00
Polyaromatic hydrocarbons to-13 --@.000 Ea 670.00 -- -- 670.00
Summa canisters by GC/ms to-14 --@.000 Ea 595.00 -- -- 595.00
Hydrocarbon
speciation c1-c8 to-12/14 --@.000 Ea 149.00 -- -- 149.00
Hydrocarbon
speciation c8-c22 to-12/14 --@.000 Ea 223.00 -- -- 223.00
Hydrocarbon
speciation c1-c22 to-12/14 --@.000 Ea 327.00 -- -- 327.00
Hydrocarbon
speciation c4-c22 to-12/14 --@.000 Ea 714.00 -- -- 714.00

Mobile laboratory equipment


Mobile laboratory trailer rental,
8'w x 24'l x 7'h --@.000 Mo -- -- 3,500.00 3,500.00
2015 Heavy Construction Estimator, All Rights Reserved Page 129

Gas chromatograph, hp5890a, rental --@.000 Mo -- -- 2,250.00 2,250.00


Mass spectrometer,
HP5970b MD, rental --@.000 Mo -- -- 2,250.00 2,250.00

Hazardous material control


Secondary containment berm,
monthly rental --@.000 Mo -- -- 650.00 650.00
20,000 gallon Baker tank, rental --@.000 Mo -- -- 700.00 700.00

Hazardous material control - Wastewater holding tanks


Above ground wastewater tank, monthly rental.
550 gallon, stainless steel,
DOT approved --@.000 Mo -- -- 300.00 300.00
630 gallon,
polyethylene, DOT approved --@.000 Mo -- -- 300.00 300.00
630 gallon, polyethylene, stackable --@.000 Mo -- -- 600.00 600.00
4,000 gallon,
polyethylene, stackable --@.000 Mo -- -- 450.00 450.00
4,000 gallon, polyethylene,
trailer mounted --@.000 Mo -- -- 1,050.00 1,050.00
6,000 gallon,
polyethylene, total drain --@.000 Mo -- -- 750.00 750.00
21,000 gallon (500barrel),
steel, open, stationary --@.000 Mo -- -- 1,260.00 1,260.00
21,000 gallon (500barrel),
steel, closed, stationary --@.000 Mo -- -- 1,510.00 1,510.00
21,000 gallon (500barrel),
steel, vapor proof --@.000 Mo -- -- 2,550.00 2,550.00

CSI 01-956, Submittals

Planning costs for hazardous and toxic waste abatement


Costs vary widely. Use the lines below as a checklist of possible cost categories.
Work plan, refer to header notes --@.000 Hour -- -- -- --
Well installation plan, defines
where samples are taken --@.000 Hour -- -- -- --
Soil sampling plan, defines
where samples are taken --@.000 Hour -- -- -- --
Chemical data acquisition plan,
defines quality steps --@.000 Hour -- -- -- --
Site safety and health plan,
requires industrial hygienist --@.000 Hour -- -- -- --
Pollution
control and mitigation plan --@.000 Hour -- -- -- --
Daily quality control plan --@.000 Hour -- -- -- --
Quality control summary --@.000 Hour -- -- -- --
Chemical quality assurance --@.000 Hour -- -- -- --

CSI 01-957, Decontamination cost for construction projects

Pressure washers, monthly rental


Cold water, gasoline powered,
3,200 PSI, 4.2 GPM, 11 HP --@.000 Mo -- -- 725.00 725.00
Cold water, electric powered,
1,800 PSI, 5 GPM, 5 HP --@.000 Mo -- -- 518.00 518.00
Hot water, gasoline powered,
3,200 PSI, 4.2 GPM, 11 HP --@.000 Mo -- -- 1,380.00 1,380.00
Hot water, electric powered,
2015 Heavy Construction Estimator, All Rights Reserved Page 129 (part 2)

1,800 PSI, 5 GPM, 5 HP --@.000 Mo -- -- 983.00 983.00

Pressure washers, daily operation cost


Using small tools.
Cold water, gasoline powered,
3,200 PSI, 4.2 GPM, 11 HP sq@10.0 Day 98.20 349.80 2.20 450.20
Cold water, electric powered,
1,800 PSI, 5 GPM, 5 HP sq@10.0 Day 83.40 349.80 2.20 435.40
Hot water, gasoline powered,
3,200 PSI, 4.2 GPM, 11 HP sq@10.0 Day 208.00 349.80 2.20 560.00
Hot water, electric powered,
1,800 PSI, 5 GPM, 5 HP sq@10.0 Day 208.00 349.80 2.20 560.00

Decontaminate construction equipment


Using miscellaneous power tools and small tools.
Light equipment xz@3.00 Ea -- 105.80 9.69 115.49
Medium equipment xz@6.00 Ea -- 211.60 19.40 231.00
Heavy equipment xz@8.88 Ea -- 313.10 28.70 341.80

Decontaminate storage tanks - Pressure wash


Using a 24,000 lb. 2-axle 4x2 truck with a 8’ x 9’ flat bed, miscellaneous power tools and small tools.
Tank decontamination,
high pressure wash x2@.050 SF -- 1.80 0.95 2.75

Decontaminate storage tanks - Steam cleaning


Using miscellaneous power tools.
Tank decontamination, steam clean x3@.040 SF -- 1.40 0.15 1.55

Decontaminate storage tank - Dry ice


Using a 3/4-ton pickup truck and small tools.
Purge tank with dry ice,
per 1,000 gallons capacity sz@.960 M 19.20 33.65 1.69 54.54
2015 Heavy Construction Estimator, All Rights Reserved Page 130

Clean any surface


Using miscellaneous power tools.
Steam cleaning, 137.5 SF per hour x3@.015 SF -- 0.53 0.06 0.59

Clean any surface


Using a 24,000 lb. 2-axle 4x2 truck with a 8’ x 9’ flat bed, miscellaneous power tools and small tools.
Pressure washing, 105 SF per hour x2@.019 SF -- 0.69 0.36 1.05

Cleaning equipment, purchase


Electric, 1,800 PSI, 4.8 GPM,
pressure washer with 50' hose --@.000 Ea 3,770.00 -- -- 3,770.00
Electric, 1,800 PSI, 6 HP, steam cleaner with 50' hose,
thermostat --@.000 Ea 4,020.00 -- -- 4,020.00
Diesel, 3,000 PSI,
4-1/2 GPM pressure washer --@.000 Ea 4,300.00 -- -- 4,300.00

Cleaning accessories
Decontamination soap,
55 gallon drum --@.000 Ea 182.00 -- -- 182.00
Decontamination rig,
augers, screen, rental --@.000 Day 168.00 -- -- 168.00
Decontamination split spoon,
bailers, auger, rental --@.000 Ea 6.73 -- -- 6.73

Decontamination facilities for personnel - Shower trailers


8' x 36', 2 showers,
2 wall fans, monthly rent --@.000 Mo -- -- 450.00 450.00
8' x 24', 4 showers,
HVAC, 2 sinks, monthly rent --@.000 Mo -- -- 1,900.00 1,900.00
Transportation of shower trailers --@.000 Mile 2.02 -- -- 2.02

CSI 01-960, Maintenance

Facilities Maintenance
Carpet care equipment, misc small equipment, small tools, purchase.
Dual motor vacuum equipment,
1hp. 16" brush --@.000 Ea -- -- 750.00 750.00
Upright Vacuum, 12" brush --@.000 Ea -- -- 310.00 310.00
14" brush --@.000 Ea -- -- 632.00 632.00

Floor Care Equipment


Purchase
Polishing, buffing, waxing machine, 175 RPM.
.33 hp. 11" dia. brush --@.000 Ea -- -- 876.00 876.00
1 hp., 16" dia. brush --@.000 Ea -- -- 980.00 980.00
1 hp., 18" dia. brush --@.000 Ea -- -- 1,120.00 1,120.00

Snow Removal equipment


Purchase.
Thrower, 3 hp.,
20", single stage, gas --@.000 Ea -- -- 660.00 660.00
Electric start --@.000 Ea -- -- 725.00 725.00
Thrower, 5 hp., 24", two stage, gas --@.000 Ea -- -- 1,130.00 1,130.00
Thrower,
11 hp., 36", two stage, gas --@.000 Ea -- -- 2,450.00 2,450.00
2015 Heavy Construction Estimator, All Rights Reserved Page 130 (part 2)

Final Cleaning
Following construction, Small tools, by MSF.
Rubbish removal, small trash only,
add for equipment x3@.005 MSF -- 0.18 0.02 0.20
Final x3@.003 MSF -- 0.11 0.01 0.12

==========================================================================
Sitework
==========================================================================

CSI 02-011, Subsurface investigation, penetrations, corings, borings

Auger holes in earth, no sample collection included


Per linear foot of depth, using a skid mounted NX core drill, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat
bed, miscellaneous power tools, a 3/4-ton pickup truck and small tools.
2-1/2" (6.4cm) diameter
augured boring in earth d6@.130 LF 40.00 4.56 2.48 47.04
4" (10cm) diameter
augured boring in earth d6@.140 LF 45.50 4.91 2.67 53.08

Cased borings in earth with samples


Per linear foot of depth, using a skid mounted NX core drill, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat
bed, miscellaneous power tools, a 3/4-ton pickup truck and small tools.
2-1/2" (6.4cm) diameter d6@.244 LF 55.20 8.55 4.65 68.40
4" (10cm) diameter d6@.261 LF 63.50 9.15 4.97 77.62

Drilling in rock, BX core


Per linear foot of depth, using a skid mounted NX core drill, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat
bed, miscellaneous power tools, a 3/4-ton pickup truck and small tools.
No casing, no sample collection d6@.488 LF 182.00 17.10 9.30 208.40
With casing and sampling d6@.609 LF 193.00 21.35 11.60 225.95
2015 Heavy Construction Estimator, All Rights Reserved Page 131

Drilling in rock, NX core


Per linear foot of depth, using a skid mounted NX core drill, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat
bed, miscellaneous power tools, a 3/4-ton pickup truck and small tools.
No casing, no sample collection d6@.293 LF 220.00 10.27 5.58 235.85
With casing and sampling d6@.332 LF 227.00 11.64 6.32 244.96
With NX core boxes --@.000 Ea 16.70 -- -- 16.70

Test pits, excavated by hand


Material costs shown are an allowance for shoring, using small tools.
Light soil sq@2.22 CY 113.00 77.66 0.49 191.15
Heavy soil sq@3.99 CY 182.00 139.60 0.88 322.48

Test pits, backhoe dug


Material costs shown are an allowance for shoring, using a 1.38 CY wheeled loader-backhoe.
Light material ev@.571 CY 46.00 20.72 6.54 73.26
Medium material ev@.667 CY 50.60 24.20 7.64 82.44
Heavy material ev@.889 CY 57.50 32.25 10.20 99.95

CSI 02-021, Dewatering

Trenching with 1.5 CY hydraulic track excavator


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools, using a
1.38 CY wheeled loader-backhoe.
2' to 2' deep fd@.155 CY -- 5.52 3.59 9.11

CSI 02-031, Shoring

Existing structure, with timber, no salvage value


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools, trenching
with 1.5 CY hydraulic track excavator.
Shoring with 35 ton screw jacks fd@5.40 Jack 54.00 192.10 125.00 371.10

CSI 02-032, Sheet Piling

Steel, not included, wales, 22 psf, left in place


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools, trenching
with 1.5 CY hydraulic track excavator.
15' excavation fd@5.95 Ton 689.00 211.70 138.00 1,038.70
20' excavation fd@4.95 Ton 689.00 176.10 115.00 980.10
25' excavation fd@3.86 Ton 689.00 137.30 89.40 915.70
40' excavation fd@3.01 Ton 689.00 107.10 69.70 865.80

Steel, not included, wales, 22 psf, drive/extract/salvage


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools.
Trenching with 1.5 CY hydraulic track excavator, trenching with 1.5 CY hydraulic track excavator.
15' excavation fd@8.96 Ton 210.00 318.80 207.00 735.80
20' excavation fd@7.35 Ton 210.00 261.50 170.00 641.50
25' excavation fd@5.00 Ton 210.00 177.90 116.00 503.90
40' excavation fd@4.50 Ton 210.00 160.10 104.00 474.10

CSI 02-081, Containment of hazardous waste

Burial of hazardous waste - Very low density polyethylene liner and cover system
Using a 24,500 lb. 2-axle truck with 8’ x 16’ flat bed and small tools.
20 mil un@.016 SF 0.53 0.56 0.06 1.15
2015 Heavy Construction Estimator, All Rights Reserved Page 131 (part 2)

30 mil un@.027 SF 0.62 0.94 0.10 1.66


40 mil un@.032 SF 0.72 1.12 0.11 1.95
50 mil un@.040 SF 0.64 1.40 0.14 2.18
60 mil un@.048 SF 0.91 1.68 0.17 2.76
70 mil un@.053 SF 0.89 1.85 0.19 2.93
80 mil un@.059 SF 1.19 2.06 0.21 3.46
90 mil un@.067 SF 1.12 2.34 0.24 3.70
100 mil un@.075 SF 1.81 2.62 0.27 4.70

Burial of hazardous waste - Chlorosulfunated polyethylene cover system


Using two 24,500 lb. 2-axle trucks with 8’ x 16’ flat beds and four sets of small tools.
36 mil hypalon um@.001 SF 2.01 0.04 -- 2.05
45 mil hypalon um@.001 SF 2.11 0.04 -- 2.15
2015 Heavy Construction Estimator, All Rights Reserved Page 132

Burial of hazardous waste - Polyvinyl chloride (PVC) cover system


Using two 24,500 lb. 2-axle trucks with 8’ x 16’ flat beds and four sets of small tools.
20 mil PVC um@.001 SF 0.31 0.04 -- 0.35
30 mil PVC um@.001 SF 0.50 0.04 -- 0.54
40 mil PVC um@.001 SF 0.65 0.04 -- 0.69
50 mil PVC um@.001 SF 0.81 0.04 -- 0.85
60 mil PVC um@.001 SF 0.98 0.04 -- 1.02
70 mil PVC um@.001 SF 1.16 0.04 -- 1.20
80 mil PVC um@.001 SF 1.32 0.04 -- 1.36
90 mil PVC um@.001 SF 1.47 0.04 -- 1.51
100 mil PVC um@.002 SF 1.66 0.07 0.01 1.74

Burial of hazardous waste - Rough textured high density polyethylene cover system
Using a 24,500 lb. 2-axle truck with 8’ x 16’ flat bed and small tools.
40 mil un@.032 SF 0.70 1.12 0.11 1.93
60 mil un@.047 SF 0.86 1.64 0.17 2.67
80 mil un@.058 SF 1.13 2.03 0.21 3.37

Burial of hazardous waste - Soil and Bentonite liners


Purchase costs. Costs can be expected to vary, depending on source. Check with local supplier.
High contaminant resistant Bentonite,
resists salts to 100,000 PPM --@.000 Ton 444.00 -- -- 444.00
Contaminant resistant Bentonite tank farm liners,
chemical storage --@.000 Ton 454.00 -- -- 454.00
90 barrel yield Bentonite,
no contamination resistance --@.000 Ton 252.00 -- -- 252.00
125 barrel yield Bentonite,
no contamination resistance --@.000 Ton 269.00 -- -- 269.00
180 barrel yield Bentonite,
no contamination resistance --@.000 Ton 312.00 -- -- 312.00

Burial of hazardous waste - Soil and Bentonite liners


Using D7-H crawler tractor dozer with blade and 25.5-ton towed vibrating sheepsfoot roller, a towed chip
spreader, a Cat 12-G motor grader, a 13-ton vibrating steel drum self-propelled roller and a 46,000 lb.
3-axle 6x4 truck.
Liner and cap installed, cost per 6" lift,
4 lbs. of Bentonite per SF gm@.006 SF 0.86 0.22 0.27 1.35

Burial of hazardous waste - Soil and gravel cover


Purchase costs.
Clay backfill --@.000 CY 6.16 -- -- 6.16
Select granular fill (sand) --@.000 CY 8.40 -- -- 8.40
Borrow material, unclassified fill --@.000 CY 6.26 -- -- 6.26
Gravel backfill --@.000 CY 15.40 -- -- 15.40

Geocomposite hazardous waste lining systems - Polypropylene and Bentonite sandwich sheets
Using a 1.5 CY hydraulic tractor excavator and small tools.
1/4" thick geocomposite installed
on soil or aggregate base fd@.003 SF 1.09 0.11 0.07 1.27

Geocomposite hazardous waste lining systems - Polypropylene and Bentonite sandwich sheets
Using a 24,500 lb. 2-axle truck with 8’ x 16’ flat bed and small tools.
1/4" thick geocomposite
installed on polymeric base un@.016 SF 1.09 0.56 0.06 1.71

Hazardous waste liner and dike support - Geogrids


2015 Heavy Construction Estimator, All Rights Reserved Page 132 (part 2)

Using a 24,500 lb. 2-axle truck with 8’ x 16’ flat bed and small tools.
Biaxial, 9.8' x 164' rolls, tensile modulus
is 14,000 pounds per SF un@.001 SF 0.22 0.04 -- 0.26
Biaxial, 13.1' x 164' rolls, tensile modulus
is 14,000 pounds per SF un@.001 SF 0.22 0.04 -- 0.26
Biaxial, 9.8' x 164' rolls, tensile modulus
is 18,500 pounds per SF un@.001 SF 0.34 0.04 -- 0.38
Biaxial, 13.1' x 164' rolls, tensile modulus
is 18,500 pounds per SF un@.001 SF 0.34 0.04 -- 0.38
Uniaxial, 4.3' x 98' rolls, tensile modulus
is 50,000 pounds per SF un@.001 SF 0.67 0.04 -- 0.71
Uniaxial, 3.3' x 98' rolls, tensile modulus
is 100,000 pounds per SF un@.001 SF 1.15 0.04 -- 1.19
Uniaxial, 4.3' x 98' rolls, tensile modulus
is 100,000 pounds per SF un@.002 SF 1.15 0.07 0.01 1.23
Uniaxial, 4.3' x 98' rolls, tensile modulus
is 130,000 pounds per SF un@.002 SF 1.36 0.07 0.01 1.44
Composite grip layer mat, nylon geomatrix,
PVC coated polyester un@.001 SF 2.08 0.04 -- 2.12

Hazardous waste liner and dike support - Slurry wall installation


Using two D-6H power shift dozers with angle blades, an 18-ton vibrating steel drum roller, a Cat 14-G
motor grader, a 3/4-ton 4x4 pickup truck, a 30-ton self-propelled static roller, a 45,000 lb. 3-axle truck.
Level and compact working surface jh@.056 CY -- 2.11 4.11 6.22
Construct dike for mixing basin jh@.056 CY -- 2.11 4.11 6.22

Hazardous waste liner and dike support - Slurry wall installation


Using a 3.125 CY hydraulic tractor excavator and small tools.
Normal soil, 26'
to 75' slurry wall excavation e8@.058 CY -- 2.92 2.62 5.54
Clay and sand with boulders, 26'
to 75' slurry wall excavation e8@.086 CY -- 4.32 3.88 8.20

Hazardous waste liner and dike support - Slurry wall installation


Using a 50’ crane for 1.25 CY dragline or clamshell and small tools.
Normal soil, 76' to
120' slurry wall excavation t6@.124 CY -- 4.95 5.92 10.87
2015 Heavy Construction Estimator, All Rights Reserved Page 133

Clay and sand with boulders, 76' to


120' slurry wall excavation t6@.185 CY -- 7.38 8.83 16.21

Hazardous waste liner and dike support - Slurry wall installation


Using a 20 GPM grout pump and mixer.
Slurry mixing, hydration and placement,
per gallon s8@.002 Gal -- 0.07 -- 0.07

Hazardous waste liner and dike support - Slurry wall installation


Using two D-7H low ground pressure crawler tractor dozers with universal blades and a 4 CY front end
wheel loader.
Soil and Bentonite backfill mixing,
per cubic yard gy@.024 CY -- 0.89 2.23 3.12

Hazardous waste liner and dike support - Slurry wall installation


Using a 5.25 CY front-end wheel loader.
Backfill slurry wall trench,
1,000' average haul distance fw@.017 CY -- 0.63 1.86 2.49

Hazardous waste liner and dike support - Slurry wall installation


Using a D-7H low ground pressure crawler tractor dozer with universal blade.
Cleanup
and re-grade working surface gx@.001 SF -- 0.04 0.03 0.07

CSI 02-082, Landfill gas and leachate control

Landfill gas and leachate collection pipe - Slotted PVC


No excavation included, using small tools.
2" diameter schedule 40 pipe,
2 to 3 rows of slots st@.052 LF 2.11 1.82 0.01 3.94
4" diameter schedule 40 pipe,
2 to 4 rows of slots st@.065 LF 4.12 2.27 0.02 6.41
6" diameter SDR 21,
2 to 6 rows of slots st@.087 LF 7.39 3.04 0.02 10.45
6" diameter SDR 26,
2 to 6 rows of slots st@.087 LF 6.42 3.04 0.02 9.48
8" diameter SDR 21,
2 to 6 rows of slots st@.130 LF 12.40 4.54 0.04 16.98
8" diameter SDR 26,
2 to 6 rows of slots st@.130 LF 10.60 4.54 0.04 15.18
10" diameter SDR 21,
2 to 8 rows of slots st@.173 LF 20.30 6.04 0.05 26.39
10" diameter SDR 26,
2 to 8 rows of slots st@.173 LF 16.30 6.04 0.05 22.39
12" diameter SDR 21,
2 to 10 rows of slots st@.260 LF 28.40 9.08 0.07 37.55
12" diameter SDR 26,
2 to 10 rows of slots st@.260 LF 22.80 9.08 0.07 31.95

Landfill gas and leachate transfer - High density polyethylene pipe


No excavation included, using miscellaneous power tools and small tools.
3" diameter, SDR 13.5 w5@.063 LF 1.95 2.10 0.19 4.24
3" diameter, SDR 26 w5@.063 LF 1.41 2.10 0.19 3.70
4" diameter, SDR 13.5 w5@.067 LF 3.22 2.23 0.21 5.66
4" diameter, SDR 21 w5@.067 LF 2.18 2.23 0.21 4.62
4" diameter, SDR 26 w5@.067 LF 2.32 2.23 0.21 4.76
6" diameter, SDR 13.5 w5@.079 LF 7.60 2.63 0.24 10.47
2015 Heavy Construction Estimator, All Rights Reserved Page 133 (part 2)

6" diameter, SDR 21 w5@.079 LF 6.16 2.63 0.24 9.03


6" diameter, SDR 26 w5@.079 LF 5.03 2.63 0.24 7.90
8" diameter, SDR 13.5 w5@.091 LF 15.80 3.03 0.28 19.11
8" diameter, SDR 21 w5@.085 LF 10.50 2.83 0.26 13.59
8" diameter, SDR 26 w5@.085 LF 8.53 2.83 0.26 11.62
10" diameter, SDR 13.5 w5@.115 LF 24.50 3.83 0.35 28.68
10" diameter, SDR 21 w5@.098 LF 16.20 3.26 0.30 19.76
10" diameter, SDR 26 w5@.098 LF 13.20 3.26 0.30 16.76
12" diameter, SDR 13.5 w5@.141 LF 34.50 4.69 0.43 39.62
12" diameter, SDR 21 w5@.115 LF 22.80 3.83 0.35 26.98
12" diameter, SDR 26 w5@.115 LF 18.60 3.83 0.35 22.78
14" diameter, SDR 13.5 w5@.181 LF 41.60 6.03 0.55 48.18
14" diameter, SDR 21 w5@.141 LF 27.60 4.69 0.43 32.72
14" diameter, SDR 26 w5@.141 LF 22.50 4.69 0.43 27.62
16" diameter, SDR 13.5 w5@.254 LF 54.40 8.46 0.78 63.64
16" diameter, SDR 21 w5@.181 LF 36.00 6.03 0.55 42.58
16" diameter, SDR 26 w5@.181 LF 29.30 6.03 0.55 35.88
18" diameter, SDR 13.5 w5@.317 LF 68.80 10.55 0.97 80.32
18" diameter, SDR 21 w5@.254 LF 45.50 8.46 0.78 54.74
18" diameter, SDR 26 w5@.254 LF 37.10 8.46 0.78 46.34
24" diameter, SDR 13.5 w5@.423 LF 122.00 14.08 1.29 137.37
24" diameter, SDR 21 w5@.317 LF 81.00 10.55 0.97 92.52
24" diameter, SDR 26 w5@.317 LF 66.00 10.55 0.97 77.52
2015 Heavy Construction Estimator, All Rights Reserved Page 134

Landfill gas and leachate transfer - Heavy duty polyethylene 90 degree elbows
No excavation included, using miscellaneous power tools and small tools.
3" diameter, SDR 13.5 w5@.793 Ea 116.00 26.40 2.43 144.83
3" diameter, SDR 21 w5@.793 Ea 116.00 26.40 2.43 144.83
3" diameter, SDR 26 w5@.793 Ea 116.00 26.40 2.43 144.83
4" diameter, SDR 13.5 w5@.906 Ea 161.00 30.16 2.77 193.93
4" diameter, SDR 21 w5@.906 Ea 144.00 30.16 2.77 176.93
4" diameter, SDR 26 w5@.906 Ea 144.00 30.16 2.77 176.93
6" diameter, SDR 13.5 w5@1.06 Ea 284.00 35.29 3.24 322.53
6" diameter, SDR 21 w5@1.06 Ea 254.00 35.29 3.24 292.53
6" diameter, SDR 26 w5@1.06 Ea 241.00 35.29 3.24 279.53
8" diameter, SDR 13.5 w5@1.41 Ea 356.00 46.94 4.31 407.25
8" diameter, SDR 21 w5@1.41 Ea 283.00 46.94 4.31 334.25
8" diameter, SDR 26 w5@1.41 Ea 270.00 46.94 4.31 321.25
10" diameter, SDR 13.5 w5@2.11 Ea 656.00 70.24 6.46 732.70
10" diameter, SDR 21 w5@2.11 Ea 555.00 70.24 6.46 631.70
10" diameter, SDR 26 w5@2.11 Ea 528.00 70.24 6.46 604.70
12" diameter, SDR 13.5 w5@2.82 Ea 1,070.00 93.88 8.63 1,172.51
12" diameter, SDR 21 w5@2.82 Ea 832.00 93.88 8.63 934.51
12" diameter, SDR 26 w5@2.82 Ea 790.00 93.88 8.63 892.51
14" diameter, SDR 13.5 w5@4.23 Ea 1,410.00 140.80 12.90 1,563.70
14" diameter, SDR 21 w5@4.23 Ea 1,060.00 140.80 12.90 1,213.70
14" diameter, SDR 26 w5@4.23 Ea 1,010.00 140.80 12.90 1,163.70
16" diameter, SDR 13.5 w5@6.34 Ea 1,840.00 211.10 19.40 2,070.50
16" diameter, SDR 21 w5@6.34 Ea 1,440.00 211.10 19.40 1,670.50
16" diameter, SDR 26 w5@6.34 Ea 1,370.00 211.10 19.40 1,600.50
18" diameter, SDR 13.5 w5@8.45 Ea 2,160.00 281.30 25.90 2,467.20
18" diameter, SDR 21 w5@8.45 Ea 1,840.00 281.30 25.90 2,147.20
18" diameter, SDR 26 w5@8.45 Ea 1,750.00 281.30 25.90 2,057.20
24" diameter, SDR 13.5 w5@12.7 Ea 3,870.00 422.80 38.90 4,331.70
24" diameter, SDR 21 w5@12.7 Ea 3,420.00 422.80 38.90 3,881.70
24" diameter, SDR 26 w5@12.7 Ea 3,250.00 422.80 38.90 3,711.70

Landfill gas and leachate transfer - Heavy duty polyethylene tees


No excavation included, using miscellaneous power tools and small tools.
3" diameter, SDR 13.5 w5@.845 Ea 50.90 28.13 2.59 81.62
3" diameter, SDR 21/SDR 26 w5@.845 Ea 50.90 28.13 2.59 81.62
4" diameter, SDR 13.5 w5@.975 Ea 80.40 32.46 2.98 115.84
4" diameter, SDR 21/SDR 26 w5@.975 Ea 80.40 32.46 2.98 115.84
6" diameter, SDR 13.5 w5@1.15 Ea 200.00 38.28 3.52 241.80
6" diameter, SDR 21/SDR 26 w5@1.15 Ea 200.00 38.28 3.52 241.80
8" diameter, SDR 13.5 w5@1.81 Ea 419.00 60.25 5.54 484.79
8" diameter, SDR 21/SDR 26 w5@1.81 Ea 359.00 60.25 5.54 424.79
12" diameter, SDR 13.5 w5@3.17 Ea 866.00 105.50 9.70 981.20
12" diameter, SDR 21/SDR 26 w5@3.17 Ea 719.00 105.50 9.70 834.20
18" diameter, SDR 13.5 w5@12.7 Ea 1,860.00 422.80 38.90 2,321.70
18" diameter, SDR 21/SDR 26 w5@12.7 Ea 1,360.00 422.80 38.90 1,821.70
24" diameter, SDR 13.5 w5@16.9 Ea 3,090.00 562.60 51.70 3,704.30
24" diameter, SDR 21/SDR 26 w5@16.9 Ea 2,060.00 562.60 51.70 2,674.30

Landfill gas and leachate transfer - Heavy duty chemical resistant polyethylene manholes
No excavation included, using small tools.
Concrete filled polyethylene lid, stainless steel handle,
27" diameter st@.813 Ea 196.00 28.39 0.23 224.62
2' high riser section with or without steps,
4' diameter st@1.63 Ea 356.00 56.92 0.46 413.38
3.25' high upper unit with or without steps,
4' diameter st@3.25 Ea 598.00 113.50 0.91 712.41
2015 Heavy Construction Estimator, All Rights Reserved Page 134 (part 2)

4.25' high upper unit with or without steps,


4' diameter st@3.25 Ea 765.00 113.50 0.91 879.41
3' high x 4' diameter manhole base,
no outlets st@3.25 Ea 605.00 113.50 0.91 719.41
12" inlet/outlet, factory attached --@.000 Ea 291.00 -- -- 291.00
15" inlet/outlet, factory attached --@.000 Ea 449.00 -- -- 449.00
18" inlet/outlet, factory attached --@.000 Ea 497.00 -- -- 497.00
24" inlet/outlet, factory attached --@.000 Ea 588.00 -- -- 588.00
2015 Heavy Construction Estimator, All Rights Reserved Page 135

30" inlet/outlet, factory attached --@.000 Ea 671.00 -- -- 671.00


36" inlet/outlet, factory attached --@.000 Ea 787.00 -- -- 787.00
4" inlet gasket, to attach
leachate transport pipe --@.000 Ea 13.80 -- -- 13.80
6" inlet gasket, to attach
leachate transport pipe --@.000 Ea 18.40 -- -- 18.40
8" inlet gasket, to attach
leachate transport pipe --@.000 Ea 23.00 -- -- 23.00
10" inlet gasket, to attach
leachate transport pipe --@.000 Ea 34.50 -- -- 34.50
12" inlet gasket, to attach
leachate transport pipe --@.000 Ea 43.70 -- -- 43.70
Additional
penetrations into manhole --@.000 Ea 275.00 -- -- 275.00

Landfill gas and leachate transfer - High density polyethylene sumps


No excavation included, using small tools.
42" diameter riser sump with
30" or 22-1/2" diameter neck st@13.0 Ea 957.00 454.00 3.64 1,414.64
2" riser sump extension,
22-1/2" or 30" diameter st@6.50 Ea 219.00 227.00 1.82 447.82
48" sump base st@1.63 Ea 402.00 56.92 0.46 459.38
30" sump cover st@1.63 Ea 241.00 56.92 0.46 298.38
22" sump cover st@1.63 Ea 207.00 56.92 0.46 264.38
Riser sump to base seal st@1.63 Ea 207.00 56.92 0.46 264.38
Riser sump to extension seal st@1.63 Ea 124.00 56.92 0.46 181.38
2" conduit grommet, box of 6 st@5.20 Box 51.20 181.60 1.46 234.26
4" conduit grommet, box of 6 st@6.50 Box 56.00 227.00 1.82 284.82
6" conduit grommet, box of 6 st@6.50 Box 220.00 227.00 1.82 448.82

Landfill drainage nets, high density polyethylene


Made of two sets of parallel strands. Intersecting strands form two overlaid sets of continuous deep
channels, using a 24,500 lb. 2-axle truck with 8’ x 16’ flat bed and small tools.
1/4" thick drainage net un@.001 SF 0.56 0.04 -- 0.60
Drainage net with geotextile fabric
heat bonded to one side un@.001 SF 2.11 0.04 -- 2.15
Drainage net with geotextile fabric
heat bonded to both sides un@.002 SF 2.46 0.07 0.01 2.54

Landfill gas flares


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2.25 million BTU per hour pb@15.4 Ea 87,000.00 710.10 58.80 87,768.90
7.5 million BTU per hour pb@18.0 Ea 56,600.00 830.00 68.80 57,498.80
10.5 million BTU per hour pt@36.7 Ea 73,400.00 1,542.00 185.00 75,127.00
22.5 million BTU per hour pt@38.9 Ea 151,000.00 1,634.00 196.00152,830.00
30 million BTU per hour pt@40.0 Ea 175,000.00 1,680.00 201.00176,881.00
36 million BTU per hour pt@59.1 Ea 199,000.00 2,483.00 297.00201,780.00
60 million BTU per hour pt@60.4 Ea 236,000.00 2,537.00 304.00238,841.00
120 million BTU per hour pt@87.3 Ea 1,050,000.00 3,667.00 439.001,054,106.00

Single stage gas scrubber for landfill flare, fluidized bed


Purchase only.
1,500 CFM gas scrubber --@.000 Ea 23,400.00 -- -- 23,400.00
3,000 CFM gas scrubber --@.000 Ea 29,900.00 -- -- 29,900.00
4,400 CFM gas scrubber --@.000 Ea 31,500.00 -- -- 31,500.00
5,800 CFM gas scrubber --@.000 Ea 33,000.00 -- -- 33,000.00
7,700 CFM gas scrubber --@.000 Ea 35,200.00 -- -- 35,200.00
9,600 CFM gas scrubber --@.000 Ea 38,000.00 -- -- 38,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 135 (part 2)

12,000 CFM gas scrubber --@.000 Ea 40,200.00 -- -- 40,200.00


17,000 CFM gas scrubber --@.000 Ea 43,200.00 -- -- 43,200.00
23,600 CFM gas scrubber --@.000 Ea 46,300.00 -- -- 46,300.00
30,200 CFM gas scrubber --@.000 Ea 49,300.00 -- -- 49,300.00
38,700 CFM gas scrubber --@.000 Ea 56,300.00 -- -- 56,300.00
47,200 CFM gas scrubber --@.000 Ea 64,600.00 -- -- 64,600.00
58,000 CFM gas scrubber --@.000 Ea 70,300.00 -- -- 70,300.00
79,700 CFM gas scrubber --@.000 Ea 80,300.00 -- -- 80,300.00
90,900 CFM gas scrubber --@.000 Ea 84,600.00 -- -- 84,600.00
2015 Heavy Construction Estimator, All Rights Reserved Page 136

Positive displacement blowers for landfill gas collection


Using small tools.
4.9 maximum HP, 48 CFM n8@15.4 Ea 3,100.00 783.70 9.24 3,892.94
5.6 maximum HP, 111 CFM n8@16.7 Ea 3,420.00 849.90 10.00 4,279.90
12.2 maximum HP, 143 CFM n8@18.2 Ea 3,970.00 926.20 10.90 4,907.10
11.8 maximum HP, 271 CFM n8@20.0 Ea 4,070.00 1,018.00 12.00 5,100.00
15 maximum HP, 134 CFM,
relief valve not included n8@20.0 Ea 3,690.00 1,018.00 12.00 4,720.00
19.7 maximum HP, 278 CFM n8@20.0 Ea 4,470.00 1,018.00 12.00 5,500.00
18.3 maximum HP, 399 CFM n8@24.1 Ea 4,670.00 1,226.00 14.50 5,910.50
254 maximum HP, 247 CFM n8@24.1 Ea 5,470.00 1,226.00 14.50 6,710.50
28.3 maximum HP., 427 CFM n8@24.1 Ea 6,970.00 1,226.00 14.50 8,210.50
29 maximum HP, 665 CFM n8@24.1 Ea 7,120.00 1,226.00 14.50 8,360.50
38.8 maximum HP, 393 CFM,
relief valve not included n8@25.3 Ea 7,810.00 1,288.00 15.20 9,113.20
49.6 maximum HP, 615 CFM n8@25.3 Ea 10,700.00 1,288.00 15.20 12,003.20
46.5 maximum HP, 1248 CFM n8@32.3 Ea 11,600.00 1,644.00 19.40 13,263.40
55 maximum HP, 574 CFM,
relief valve not included n8@32.3 Ea 12,100.00 1,644.00 19.40 13,763.40
67.1 maximum HP, 1071 CFM n8@33.9 Ea 14,600.00 1,725.00 20.30 16,345.30
65.5 maximum HP, 1878 CFM n8@35.1 Ea 16,800.00 1,786.00 21.10 18,607.10

Landfill dust suppressant, sprayed


Treating of areas such as haul roads, banks and parking lots. Add the cost of water, using a 46,000 lb.
3-axle 6x4 truck with a 3,000 gallon asphalt distributor, a 24,500 lb. 2-axle truck with a 7’ wide towed
street sweeper.
Overall dust suppression and erosion control, treesap based sprayed dust suppressant, delivered price
based on 5,800 gallon load j4@.032 SY 0.43 1.16 0.89 2.48
Erosion control for landfill cap, delivered price
based on 5,800 gallon load j4@.032 SY 0.72 1.16 0.89 2.77
Stockpile dust suppression treesap based dust suppressant, delivered price
based on 5,800 gallon load j4@.032 SY 0.72 1.16 0.89 2.77
Periodic maintenance application, treesap based sprayed dust suppressant, delivered
price based on 5,800 gal load j4@.032 SY 0.14 1.16 0.89 2.19
Overall dust suppression and erosion control, chloride based
sprayed dust suppressant j4@.032 SY 0.52 1.16 0.89 2.57
Erosion control for landfill cap, chloride based
sprayed dust suppressant j4@.032 SY 1.13 1.16 0.89 3.18
Stockpile dust suppression, chloride based,
sprayed dust suppressant j4@.032 SY 0.81 1.16 0.89 2.86
Periodic maintenance application, chloride based
sprayed dust suppressant j4@.032 SY 0.20 1.16 0.89 2.25
Overall dust suppression and erosion control, oil emulsion
sprayed dust suppressant j4@.032 SY 0.95 1.16 0.89 3.00
Erosion control for landfill cap j4@.032 SY 2.11 1.16 0.89 4.16
Stockpile dust suppression, oil emulsion
sprayed dust suppressant j4@.032 SY 1.50 1.16 0.89 3.55
Periodic maintenance application, oil emulsion
sprayed dust suppressant j4@.032 SY 0.38 1.16 0.89 2.43
Overall dust suppression and erosion control, asphalt emulsion
sprayed dust suppressant j4@.036 SY 1.01 1.31 1.01 3.33
Erosion control for landfill cap, asphalt emulsion
sprayed dust suppressant j4@.036 SY 2.28 1.31 1.01 4.60
Stockpile dust suppression, asphalt emulsion
sprayed dust suppressant j4@.036 SY 1.62 1.31 1.01 3.94
Periodic maintenance application, asphalt emulsion
sprayed dust suppressant j4@.036 SY 0.40 1.31 1.01 2.72
Overall dust suppression and erosion control, lignosulphonate
2015 Heavy Construction Estimator, All Rights Reserved Page 136 (part 2)

sprayed dust suppressant j4@.032 SY 0.46 1.16 0.89 2.51


Erosion control for landfill cap, lignosulphonate
sprayed dust suppressant j4@.032 SY 1.07 1.16 0.89 3.12
Stockpile dust suppression, lignosulphonate
sprayed dust suppressant j4@.032 SY 0.75 1.16 0.89 2.80
Periodic maintenance application, lignosulphonate
sprayed dust suppressant j4@.032 SY 0.20 1.16 0.89 2.25

Synthetic covers over waste piles, plastic laminate


Using small tools.
130 lb. tear strength, 1 to 1-1/2
year outdoor life expectancy ss@.001 SF 0.22 0.04 -- 0.26
135 lb. tear strength, 2 to 2-1/2
year outdoor life expectancy ss@.001 SF 0.32 0.04 -- 0.36
185 lb. tear strength, 3 to 4
year outdoor life expectancy ss@.001 SF 0.58 0.04 -- 0.62
250 lb. tear strength, 4 to 5
year outdoor life expectancy ss@.001 SF 0.79 0.04 -- 0.83
Add for cover drawstring --@.000 LF 0.99 -- -- 0.99
Add for metal
grommets used with tie-downs --@.000 Ea 1.03 -- -- 1.03

CSI 02-083, Collection, handling, packaging, and shipping of hazardous and toxic waste

Hydraulic contract dredging


Collection of sludge and sediment, daily rental rate. Add the cost of mobilization and demobilization,
using small tools.
8' x 34' dredge, 170 HP, 60 CY per hour capacity,
1,200 GPM pump --@.000 Day -- -- 500.00 500.00
600 LF of 8" integral floating discharge hose,
flexible --@.000 Day -- -- 150.00 150.00
1,000' x 250', 4
post traverse cabling system --@.000 Day -- -- 50.00 50.00
1,000 LF of on-shore discharge pipe --@.000 Day -- -- 75.00 75.00
2015 Heavy Construction Estimator, All Rights Reserved Page 137

In-line booster pump, 1,200 GPM --@.000 Day 247.00 -- -- 247.00


Certified dredge operator, 10 hour day,
6 days a week, per day --@.000 Day 293.00 -- -- 293.00
Operator's assistant, 10 hour day,
6 days per week, per day --@.000 Day 272.00 -- -- 272.00

Waste collection drums - Drum crushers, purchase


Mobile, 18 HP, gas --@.000 Ea 17,200.00 -- -- 17,200.00
Mobile, 7.5 HP, electric --@.000 Ea 18,600.00 -- -- 18,600.00
Stationary, 7 HP, electric --@.000 Ea 18,600.00 -- -- 18,600.00

Waste collection drums - Self-propelled electric drum openers, purchase


Inside chime cut, 110 volt, single phase, 1.25" (3.18
cm) diameter cutter wheel --@.000 Ea 2,650.00 -- -- 2,650.00
Inside chime cut, 110 volt, single phase, 1.5" (3.81
cm) diameter cutter wheel --@.000 Ea 2,500.00 -- -- 2,500.00
Outside chime cut, 110 volt, single phase,
includes lift cover --@.000 Ea 2,650.00 -- -- 2,650.00
Cuts drum shell, 110 volt, single phase. Used where large
number of drums are scrapped. --@.000 Ea 2,500.00 -- -- 2,500.00
Inside chime cut, 220 volt, single phase, 1.25" (3.18
cm) diameter cutter wheel --@.000 Ea 3,090.00 -- -- 3,090.00
Inside chime cut, 220 volt, single phase, 1.5" (3.81
cm) diameter cutter wheel --@.000 Ea 2,940.00 -- -- 2,940.00
Outside chime cut, 220 volt, single phase,
includes lift cover --@.000 Ea 3,090.00 -- -- 3,090.00
Cuts drum shell, 220 volt, single phase, used where large
number of drums are scrapped --@.000 Ea 2,940.00 -- -- 2,940.00

Waste collection drums - Self-propelled air-powered drum openers, purchase


Inside chime cut, 1.25" (3.18
cm) diameter cutter wheel --@.000 Ea 2,940.00 -- -- 2,940.00
Inside chime cut, 1.5" (3.81
cm) diameter cutter wheel --@.000 Ea 2,790.00 -- -- 2,790.00
Inside chime cut,
for 16 gauge drums --@.000 Ea 3,240.00 -- -- 3,240.00
Outside chime cut,
including cover lifter --@.000 Ea 2,940.00 -- -- 2,940.00
Cuts drum shell, used where large
numbers of drums are scrapped --@.000 Ea 2,790.00 -- -- 2,790.00
Inside chime cut, automatic, 1.25" (3.18
cm) diameter cutter wheel --@.000 Ea 4,030.00 -- -- 4,030.00
Inside chime cut, automatic, 1.5" (3.81
cm) diameter cutter wheel --@.000 Ea 3,880.00 -- -- 3,880.00
Cuts drum shell, automatic, used where large
numbers of drums are scrapped --@.000 Ea 3,880.00 -- -- 3,880.00
Airline lubricator and filter, required
for air powered models --@.000 Ea 171.00 -- -- 171.00
Drum deheader tower allowing
deheader to be suspended --@.000 Ea 1,040.00 -- -- 1,040.00

Waste collection drums - Labor for drum deheading with electric or air-powered opener
Using small tools.
30 or 55 gallon steel drums sq@.208 Ea -- 7.28 0.05 7.33

CSI 02-083, Hazardous waste packaging

Steel salvage drums, 16 gauge, purchase


2015 Heavy Construction Estimator, All Rights Reserved Page 137 (part 2)

110 gallon, 30" diameter x 41" high --@.000 Ea 255.00 -- -- 255.00


85 gallon, 26" diameter x 38" high --@.000 Ea 145.00 -- -- 145.00
83 gallon, 26" diameter x 36" high --@.000 Ea 140.00 -- -- 140.00
55 gallon, DOT 17c,
18" diameter x 34" high --@.000 Ea 87.70 -- -- 87.70
30 gallon, DOT 17c,
18" diameter x 28" high --@.000 Ea 69.10 -- -- 69.10
22 gallon, 16" diameter x 25" high --@.000 Ea 46.50 -- -- 46.50
15 gallon, DOT 17c,
14" diameter x 24" high --@.000 Ea 42.10 -- -- 42.10
10 gallon,
13.8" diameter x 15" high --@.000 Ea 37.10 -- -- 37.10

Polyethylene overpacks
95 gallon DOT E9618, twist-on lid,
31" diameter x 41" high --@.000 Ea 285.00 -- -- 285.00
20 gallon labpack, twist-on lid,
21" diameter x 7.5" high --@.000 Ea 52.70 -- -- 52.70
85 gallon DOT E9775, clamp ring lid,
27" diameter x 41" high --@.000 Ea 258.00 -- -- 258.00

Composite overpacks
55 gallon DOT 17C, steel drum nested with
two 20-gallon fiber drums --@.000 Ea 144.00 -- -- 144.00
55 gallon DOT 17C, steel drum nested with
four 10-gallon fiber drums --@.000 Ea 198.00 -- -- 198.00
85 gallon 16 gauge salvage drum nested with
three 20-gallon fiber drums --@.000 Ea 269.00 -- -- 269.00

DOT E-9168 exempt packaging


Includes bottle, carton, insert, can, poly bag and tape.
32 oz. bottle --@.000 Ea 18.40 -- -- 18.40
950 cc bottle --@.000 Ea 19.40 -- -- 19.40
500 cc bottle --@.000 Ea 19.00 -- -- 19.00
250 cc bottle --@.000 Ea 9.39 -- -- 9.39
2015 Heavy Construction Estimator, All Rights Reserved Page 138

DOT E-9168 exempt special purpose packaging


Can, carton, insert, and tape, for corrosives and flammables,
UPS --@.000 Ea 7.57 -- -- 7.57
16 oz. bottle, carton, insert and tape,
sludge/viscous, UPS --@.000 Ea 5.28 -- -- 5.28
32 oz. bottle, carton, insert and tape, for sludge and viscous materials,
UPS --@.000 Ea 6.87 -- -- 6.87

CSI 02-083, Hazardous waste packaging

DOT steel drums


Closed head drums have standard plug and drain vents. Used primarily for liquids.
55 gallon, 17C, open --@.000 Ea 90.20 -- -- 90.20
55 gallon, 17C, closed --@.000 Ea 85.30 -- -- 85.30
55 gallon, 17H, open only --@.000 Ea 69.20 -- -- 69.20
55 gallon, 17H, closed only --@.000 Ea 54.50 -- -- 54.50
30 gallon, 17C, open --@.000 Ea 63.20 -- -- 63.20
30 gallon, 17H, open --@.000 Ea 53.70 -- -- 53.70
30 gallon, 17E, open --@.000 Ea 39.00 -- -- 39.00
20 gallon, 17C, open --@.000 Ea 54.80 -- -- 54.80
20 gallon, 17E, open --@.000 Ea 36.90 -- -- 36.90
8 gallon, 17C, open --@.000 Ea 48.40 -- -- 48.40

55 gallon stainless steel drums, DOT 5C CH seamless, 16 gauge


10 to 24 drums --@.000 Ea 1,120.00 -- -- 1,120.00
25 to 49 drums --@.000 Ea 1,100.00 -- -- 1,100.00
50 or more drums --@.000 Ea 994.00 -- -- 994.00

55 gallon stainless steel drums, DOT 5C CH, 16 gauge


1 to 9 drums --@.000 Ea 1,060.00 -- -- 1,060.00
10 to 24 drums --@.000 Ea 1,040.00 -- -- 1,040.00
25 to 49 drums --@.000 Ea 1,020.00 -- -- 1,020.00
50 or more drums --@.000 Ea 916.00 -- -- 916.00

55 gallon stainless steel drums, DOT 17E CH, 18 gauge


1 to 9 drums --@.000 Ea 802.00 -- -- 802.00
10 to 24 drums --@.000 Ea 783.00 -- -- 783.00
25 to 49 drums --@.000 Ea 769.00 -- -- 769.00
50 or more drums --@.000 Ea 693.00 -- -- 693.00

30 gallon stainless steel drums, DOT 5C CH, 16 gauge


1 to 9 drums --@.000 Ea 653.00 -- -- 653.00
10 to 24 drums --@.000 Ea 628.00 -- -- 628.00
25 to 49 drums --@.000 Ea 600.00 -- -- 600.00
50 or more drums --@.000 Ea 579.00 -- -- 579.00

55 gallon stainless steel drums, DOT 5C seamless OH, 16 gauge


1 to 9 drums --@.000 Ea 1,100.00 -- -- 1,100.00
10 to 24 drums --@.000 Ea 1,080.00 -- -- 1,080.00
25 to 49 drums --@.000 Ea 971.00 -- -- 971.00
50 or more drums --@.000 Ea 920.00 -- -- 920.00

55 gallon stainless steel drums, DOT 5C OH, 16 gauge


1 to 9 drums --@.000 Ea 1,020.00 -- -- 1,020.00
10 to 24 drums --@.000 Ea 998.00 -- -- 998.00
2015 Heavy Construction Estimator, All Rights Reserved Page 138 (part 2)

25 to 49 drums --@.000 Ea 899.00 -- -- 899.00


50 or more drums --@.000 Ea 853.00 -- -- 853.00

55 gallon reconditioned steel drums, 17H


1 to 9 drums --@.000 Ea 69.50 -- -- 69.50
10 to 24 drums --@.000 Ea 61.60 -- -- 61.60
25 to 49 drums --@.000 Ea 53.70 -- -- 53.70
50 or more drums --@.000 Ea 47.40 -- -- 47.40

Hazardous waste packaging - Polyethylene closed head drums


55 gallon --@.000 Ea 55.00 -- -- 55.00
35 gallon --@.000 Ea 42.20 -- -- 42.20
30 gallon --@.000 Ea 38.30 -- -- 38.30
20 gallon --@.000 Ea 26.80 -- -- 26.80
15 gallon --@.000 Ea 26.30 -- -- 26.30

Hazardous waste packaging - Polyethylene open head drums


55 gallon --@.000 Ea 69.50 -- -- 69.50
35 gallon --@.000 Ea 51.10 -- -- 51.10
2015 Heavy Construction Estimator, All Rights Reserved Page 139

30 gallon --@.000 Ea 48.60 -- -- 48.60


20 gallon --@.000 Ea 35.80 -- -- 35.80
15 gallon --@.000 Ea 30.70 -- -- 30.70

Hazardous waste packaging - Steel top, fiber bottom drums


DOT 21C-250 polyethylene and polyester lined.
10 gallon, 20" diameter --@.000 Ea 26.50 -- -- 26.50
20 gallon, 20" diameter --@.000 Ea 29.00 -- -- 29.00
20 gallon, 23" diameter --@.000 Ea 33.80 -- -- 33.80

Hazardous waste packaging - 55 gallon fiber drums, DOT-21C


1 to 9 drums --@.000 Ea 42.60 -- -- 42.60
10 to 24 drums --@.000 Ea 40.20 -- -- 40.20
25 to 49 drums --@.000 Ea 37.20 -- -- 37.20
50 to 99 drums --@.000 Ea 36.00 -- -- 36.00
100 or more drums --@.000 Ea 31.20 -- -- 31.20

Hazardous waste packaging - 30 gallon fiber drums, DOT-21C


1 to 9 drums --@.000 Ea 41.40 -- -- 41.40
10 to 24 drums --@.000 Ea 38.80 -- -- 38.80
25 to 49 drums --@.000 Ea 35.40 -- -- 35.40
50 or more drums --@.000 Ea 35.00 -- -- 35.00

Hazardous waste packaging - Drum funnels


Polyethylene,
21" diameter, 2" spout --@.000 Ea 41.90 -- -- 41.90
Snap on funnel cover --@.000 Ea 22.40 -- -- 22.40
Steel funnel with screen, 21" --@.000 Ea 89.80 -- -- 89.80

Hazardous waste packaging - Drum handling accessories


Drum lifter, for loading drums into
overpacks (add hoist cost) --@.000 Ea 152.00 -- -- 152.00
Overpack drum trucks, for 85
gallon or less salvage drums --@.000 Ea 320.00 -- -- 320.00
Forklift drum and barrel lifter, for
transport of 55 gallon drums --@.000 Ea 56.50 -- -- 56.50
Fork mounted drum grabs,
55 gallon drums --@.000 Ea 443.00 -- -- 443.00

Hazardous waste packaging - Drum liners


55 gallon, 6 mil --@.000 Ea 2.33 -- -- 2.33
85 gallon, 8 mil --@.000 Ea 7.77 -- -- 7.77
55 gallon, 10 mil, corrugated --@.000 Ea 9.23 -- -- 9.23
55 gallon, 15 mil, corrugated --@.000 Ea 13.80 -- -- 13.80

Hazardous waste storage - Drum storage


Poly spill pallet, 4 to 55 gallon drums,
85 gallon sump, liftable --@.000 Ea 787.00 -- -- 787.00
Poly drum storage system, 2 drum capacity,
135 gallon sump, lockable --@.000 Ea 869.00 -- -- 869.00
7 gauge steel drum rack, 4 to 55 gallon drums,
85 gallon sump --@.000 Ea 2,210.00 -- -- 2,210.00
Poly drum storage, 1 drum capacity,
85 gallon sump --@.000 Ea 286.00 -- -- 286.00

Hazardous waste storage - Bulk liquid storage


2015 Heavy Construction Estimator, All Rights Reserved Page 139 (part 2)

250 gallon bulk container, 2" ball valve,


poly with metal case --@.000 Ea 1,510.00 -- -- 1,510.00
350 gallon
bulk container polyethylene --@.000 Ea 1,650.00 -- -- 1,650.00
450 gallon bulk container polyethylene,
non DOT --@.000 Ea 1,910.00 -- -- 1,910.00
550 gallon bulk container polyethylene,
non DOT --@.000 Ea 2,060.00 -- -- 2,060.00
Dry flow hopper, solids/granular polyethylene,
non DOT, 35 CF --@.000 Ea 1,530.00 -- -- 1,530.00
Dry flow hopper, solids/granular polyethylene,
non DOT, 70 CF --@.000 Ea 1,940.00 -- -- 1,940.00
300 gallon round tank,
portable metal skid, non DOT --@.000 Ea 662.00 -- -- 662.00
300 gallon stationary,
above ground tank --@.000 Ea 397.00 -- -- 397.00

Hazardous waste storage - Storage buildings


5.58' x 5.5' x 8.33', 4 drum capacity,
88 gallon sump, one door --@.000 Ea 9,090.00 -- -- 9,090.00
10.25' x 5.5' x 8.33', 10 drum capacity,175
gallon sump, two doors --@.000 Ea 12,900.00 -- -- 12,900.00
10.25' x 5.5' x 8.33', 10 drum capacity, 175 gallon sump,
4 hour rated --@.000 Ea 24,900.00 -- -- 24,900.00
Equipment building, 10' ceiling, built-up roof,
concrete block exterior --@.000 SF 69.20 -- -- 69.20

Hazardous waste storage - Containerization of hazardous waste


Using a 4-ton pneumatic tired fork lift, a 1,300 GPM 6" trash pump, a F600 2-axle truck with 6,000
gallon water tanker trailer and small tools.
Bulk liquid sludge into 55 gallon drums,
add the cost of drums mr@.875 Ea -- 31.16 19.90 51.06
2015 Heavy Construction Estimator, All Rights Reserved Page 140

Hazardous waste storage - Containerization of hazardous waste


Using 20 CY bottom dump truck trailer, 4-ton pneumatic tired fork lift and small tools, F600 2-axle truck.
Bulk solids into 55 gallon drums,
add the cost of drums ms@3.11 Ea -- 110.70 58.30 169.00

Hazardous waste storage - Hazardous materials storage box, 1 CY, with liner
1 to 9 boxes --@.000 Ea 175.00 -- -- 175.00
10 to 24 boxes --@.000 Ea 156.00 -- -- 156.00
25 to 49 boxes --@.000 Ea 136.00 -- -- 136.00
50 or more boxes --@.000 Ea 124.00 -- -- 124.00

Hazardous waste handling - Loading hazardous waste for shipment


Using a 35,000 lb. 4x2 truck with 8’ x 24’ flat bed and 2-ton hoist, a 2,500 lb. pneumatic tire fork lift, and
a 35-ton lowboy trailer.
Load drums on disposal truck mu@.088 Ea -- 2.86 2.17 5.03

Hazardous waste handling - Loading hazardous waste for shipment


Using a 6" 1,950 GPM submersible pump and a 6,000 gallon off highway water wagon.
Load liquid or sludge into
5000 gallon bulk tank truck jw@9.01 Ea -- 335.20 342.00 677.20

Hazardous waste handling - Loading hazardous waste for shipment


Using a 1.23 CY hydraulic tractor excavator, a 2 CY rotating grapple and small tools.
Drum staging mq@.450 Ea -- 16.29 17.90 34.19

Hazardous waste handling - Loading hazardous waste for shipment


Using a 4-ton pneumatic tired fork lift, a 1,300 GPM 6" trash pump, a F600 2-axle truck with 6,000
gallon water tanker trailer and small tools.
Drummed liquid waste consolidation,
per gallon mr@.016 Gal -- 0.57 0.36 0.93

Hazardous waste handling - Loading hazardous waste for shipment


Using 20 CY bottom dump truck trailer, 4-ton pneumatic tired fork lift and small tools, F600 2-axle truck.
Drummed solid waste consolidation,
per cubic yard ms@11.4 CY -- 406.00 214.00 620.00

Hazardous waste handling - Leaking drums handling


Using a 1.23 CY hydraulic tractor excavator, a 2 CY rotating grapple and small tools.
Recontainerize leaking 55 gallon drums, not
including salvage of drums mq@.750 Ea -- 27.16 29.90 57.06

Hazardous waste handling - Leaking drums handling


Using a 30-ton mobile drum crusher and small tools.
Drum crushing, per drum mm@.033 Ea -- 1.19 0.27 1.46
Vacuum truck on board loader --@.000 Hour 147.00 -- -- 147.00
Tanker pumping
equipment to load liquid --@.000 Hour 88.50 -- -- 88.50

Hazardous waste handling - Temporary emissions containment buildings


Portable 40' wide x 150' long x 18' high emissions containment building, walk-in.
Leased for a year --@.000 Year 73,900.00 -- -- 73,900.00
Purchase price --@.000 Ea 171,000.00 -- --171,000.00

Hazardous waste handling - Temporary emissions containment buildings


2015 Heavy Construction Estimator, All Rights Reserved Page 140 (part 2)

Using two 25' high 2,000 pound scissors lifts.


Assemble emissions
containment building mv@200. Ea -- 6,976.00 1,470.00 8,446.00
Disassemble emissions
containment building mv@120. Ea -- 4,186.00 883.00 5,069.00

Hazardous waste containment - Inflatable berms, single lined


Using small tools.
10' x 10' x 17",
750 gallon, 70 CF of air st@1.08 Ea 4,110.00 37.71 0.30 4,148.01
13' x 13' x 17",
1,800 gallon, 80 CF of air st@1.08 Ea 5,160.00 37.71 0.30 5,198.01
18' x 18' x 17",
3,400 gallon, 130 CF of air st@2.17 Ea 6,300.00 75.78 0.61 6,376.39
24' x 24' x 17",
6,100 gallon, 170 CF of air st@2.60 Ea 8,170.00 90.79 0.73 8,261.52
32' x 32' x 17",
10,800 gallon, 230 CF of air st@3.25 Ea 11,400.00 113.50 0.91 11,514.41
32' x 32' x 34",
21,600 gallon, 920 CF of air st@5.20 Ea 14,000.00 181.60 1.46 14,183.06
74' x 34' x 34", 53,400
gallon, 1,500 CF of air st@8.67 Ea 33,100.00 302.80 2.43 33,405.23

Hazardous waste containment - Inflatable berms, double lined


Using small tools.
45' x 15' x 17",
7,600 gallon, 220 CF of air st@3.25 Ea 15,200.00 113.50 0.91 15,314.41
65' x 16' x 17",
11,000 gallon, 290 CF of air st@3.25 Ea 19,100.00 113.50 0.91 19,214.41
50' x 22' x 17",
11,600 gallon, 260 CF of air st@3.25 Ea 18,400.00 113.50 0.91 18,514.41
Air blower to inflate
portable containment berms --@.000 Ea 330.00 -- -- 330.00

Bulk hazardous material hauling - Poly liners for bulk solids and sludge
20 CY and 30 CY roll-off liner,
4 mil, disposable --@.000 Ea 35.10 -- -- 35.10
20 CY and 30 CY roll-off liner,
6 mil, disposable --@.000 Ea 53.50 -- -- 53.50
2015 Heavy Construction Estimator, All Rights Reserved Page 141

32' dump truck body liner,


4 mil, disposable --@.000 Ea 49.80 -- -- 49.80
32' dump truck body liner,
6 mil, disposable --@.000 Ea 70.50 -- -- 70.50
50 to 54' rail gondolas liner,
10 mil, disposable --@.000 Ea 265.00 -- -- 265.00
39 foot dump truck liner,
72" deep, 4 mil --@.000 Ea 51.90 -- -- 51.90
39 foot dump truck liner,
96" deep, 4 mil --@.000 Ea 62.20 -- -- 62.20
40 foot dump truck liner,
96" deep, 4 mil --@.000 Ea 149.00 -- -- 149.00
40 foot to 44 foot van liner,
96" deep, 8 mil --@.000 Ea 149.00 -- -- 149.00

Roll-off containers for hazardous materials - Open top, 84" wide


Purchase price.
18' long x 4' high, 18 CY --@.000 Ea 9,170.00 -- -- 9,170.00
18' long x 4-1/2" high, 20 CY --@.000 Ea 9,460.00 -- -- 9,460.00
18' long x 5' high, 23 CY --@.000 Ea 9,770.00 -- -- 9,770.00
18' long x 5-1/2' high, 25 CY --@.000 Ea 10,100.00 -- -- 10,100.00
18' long x 6' high, 27 CY --@.000 Ea 10,300.00 -- -- 10,300.00
20' long x 4' high, 20 CY --@.000 Ea 9,740.00 -- -- 9,740.00
20' long x 4-1/2' high, 23 CY --@.000 Ea 9,970.00 -- -- 9,970.00
20' long x 5' high, 25 CY --@.000 Ea 10,300.00 -- -- 10,300.00
20' long x 5-1/2' high, 28 CY --@.000 Ea 10,600.00 -- -- 10,600.00
20' long x 6' high, 30 CY --@.000 Ea 10,900.00 -- -- 10,900.00
22' long x 3-1/2' high, 19 CY --@.000 Ea 9,890.00 -- -- 9,890.00
22' long x 4' high, 22 CY --@.000 Ea 10,200.00 -- -- 10,200.00
22' long x 4-1/2' high, 25 CY --@.000 Ea 10,400.00 -- -- 10,400.00
22' long x 5' high, 28 CY --@.000 Ea 10,700.00 -- -- 10,700.00
22' long x 5-1/2' high, 31 CY --@.000 Ea 11,100.00 -- -- 11,100.00
24' long x 3-1/2' high, 21 CY --@.000 Ea 10,400.00 -- -- 10,400.00
24' long x 4' high, 24 CY --@.000 Ea 10,700.00 -- -- 10,700.00
24' long x 4-1/2' high, 27 CY --@.000 Ea 11,000.00 -- -- 11,000.00
24' long x 5' high, 30 CY --@.000 Ea 11,900.00 -- -- 11,900.00

Roll-off containers for hazardous materials - Closed top, 84" wide


Purchase price.
18' long x 3-1/2' high, 16 CY --@.000 Ea 10,500.00 -- -- 10,500.00
18' long x 4' high, 16 CY --@.000 Ea 10,700.00 -- -- 10,700.00
20' long x 3-1/2' high, 17 CY --@.000 Ea 11,100.00 -- -- 11,100.00
20' long x 4' high, 20 CY --@.000 Ea 11,300.00 -- -- 11,300.00
22' long x 3-1/2' high, 19 CY --@.000 Ea 11,600.00 -- -- 11,600.00
22' long x 4' high, 19 CY --@.000 Ea 11,900.00 -- -- 11,900.00
24' long x 3-1/2' high, 19 CY --@.000 Ea 12,300.00 -- -- 12,300.00
24' long x 4' high, 21 CY --@.000 Ea 12,500.00 -- -- 12,500.00

Roll-off containers for hazardous materials - Extra costs for epoxy coated interiors
Open top roll-off container --@.000 Ea 446.00 -- -- 446.00
Closed top roll-off container --@.000 Ea 810.00 -- -- 810.00

Roll-off containers for hazardous materials - Testing for leakage


Liquid leakage test --@.000 Ea 810.00 -- -- 810.00

Fill doors for closed top containers, spring assisted


36" x 36" door --@.000 Ea 596.00 -- -- 596.00
36" x 48" door --@.000 Ea 813.00 -- -- 813.00
2015 Heavy Construction Estimator, All Rights Reserved Page 141 (part 2)

48" x 60" door --@.000 Ea 1,280.00 -- -- 1,280.00


60" x 72"door --@.000 Ea 1,590.00 -- -- 1,590.00
10" round door, with vent --@.000 Ea 294.00 -- -- 294.00
20" manhole with 10" fill door --@.000 Ea 375.00 -- -- 375.00

Hazardous material hauling - Truck chassis mounted ejector bodies


Purchase price. Add the cost of operation and maintenance.
14 CY ejector body --@.000 Ea 26,800.00 -- -- 26,800.00
19 CY ejector body --@.000 Ea 27,500.00 -- -- 27,500.00
17.3 CY ejector body --@.000 Ea 33,200.00 -- -- 33,200.00
24 CY ejector body --@.000 Ea 35,000.00 -- -- 35,000.00
Truck suitable for
chassis mounted ejector body --@.000 Ea 78,400.00 -- -- 78,400.00
2015 Heavy Construction Estimator, All Rights Reserved Page 142

Hazardous material hauling - Horizontal discharge ejector trailers


18 CY, 23' long x 44" high --@.000 Ea 57,600.00 -- -- 57,600.00
25 CY, 23' long x 60" high --@.000 Ea 59,300.00 -- -- 59,300.00
21 CY, 26' long x 44" high --@.000 Ea 61,400.00 -- -- 61,400.00
29 CY, 26' long x 60" high --@.000 Ea 63,600.00 -- -- 63,600.00
23 CY, 28' long x 44" high --@.000 Ea 64,100.00 -- -- 64,100.00
31 CY, 28" long x 60" high --@.000 Ea 65,200.00 -- -- 65,200.00
25 CY, 30' long x 44" high --@.000 Ea 66,900.00 -- -- 66,900.00
34 CY, 30' long x 60" high --@.000 Ea 69,100.00 -- -- 69,100.00
27 CY, 32' long x 44" high --@.000 Ea 70,500.00 -- -- 70,500.00
36 CY, 32' long x 60" high --@.000 Ea 72,500.00 -- -- 72,500.00
42 CY, 37' long x 60" high --@.000 Ea 81,700.00 -- -- 81,700.00
Semi-tractor suitable for
horizontal discharge trailer --@.000 Ea 123,000.00 -- --123,000.00

Subcontracted shipping of hazardous waste


Transport eighty 55 gallon drums
of solid hazardous waste --@.000 Mile 4.45 -- -- 4.45
Transport 20 CY
of bulk solid hazardous waste --@.000 Mile 4.45 -- -- 4.45
Transport 18 tons
of bulk solid hazardous waste --@.000 Mile 4.45 -- -- 4.45
Transport 5,000 gallons of bulk sludge
or liquid hazardous waste --@.000 Mile 5.08 -- -- 5.08

Remove bulk hazardous liquids and sludge from containers


Using 3/4-ton pickup truck and small tools.
Under 220 gallons sy@.027 Gal -- 0.93 0.11 1.04

Remove bulk hazardous liquids and sludge from containers


Using a 24,500 lb. 2-axle truck 4x2 with 8’ x 16’ flat bed.
221 to 500 gallons xq@.009 Gal -- 0.35 0.15 0.50

Remove bulk hazardous liquids and sludge from containers


Using a 46,000 lb. 6x4 3-axle highway truck with 3,000 gallon water tank.
501 to 3,000 gallons xm@.005 Gal -- 0.20 0.30 0.50

Remove bulk hazardous liquids and sludge from containers


Using a 46,000 lb. 3-axle 6x4 truck with a 18 CY bottom dump truck trailer.
Over 3000 gallons he@.003 Gal -- 0.13 0.20 0.33

LEA containers for radioactive waste - Strong tight containers


47" h x 33-1/2" w x 57-1/2" l, 4,000 pound capacity, without holddowns,
50 CF container --@.000 Ea 958.00 -- -- 958.00
47" h x 33-1/2" w x 57-1/2" l, 4,000 pound capacity with 2 sets of holddowns,
50 CF container --@.000 Ea 1,300.00 -- -- 1,300.00
47" h x 33-1/2" w x 57-1/2" l, 4,000 pound capacity with 4 sets of holddowns,
50 CF container --@.000 Ea 1,520.00 -- -- 1,520.00
47" h x 46" w x 72" l, 7,000 pound capacity, without
holddowns 89 CF container --@.000 Ea 1,020.00 -- -- 1,020.00
47" h x 46" w x 72" l, 7,000 pound capacity with 2 sets of holddowns,
89 CF container --@.000 Ea 1,400.00 -- -- 1,400.00
47" h x 46" w x 72" l, 7,000 pound capacity with 4 sets of holddowns,
89 CF container --@.000 Ea 1,690.00 -- -- 1,690.00
45" h x 45" w x 89" l, 7000 pound capacity with 2 sets of holddowns,
100 CF container --@.000 Ea 1,090.00 -- -- 1,090.00
2015 Heavy Construction Estimator, All Rights Reserved Page 142 (part 2)

45" h x 45" w x 89" l, 7,000 pound capacity with 4 sets of holddowns,


100 CF container --@.000 Ea 1,790.00 -- -- 1,790.00

LEA containers for radioactive waste - High density poly liners


90 mil, 55 gallon drum --@.000 Ea 125.00 -- -- 125.00

LEA containers for radioactive waste - Carbon steel liners, for burial
142 CF, bead --@.000 Ea 10,500.00 -- -- 10,500.00
142 CF, powdex --@.000 Ea 13,300.00 -- -- 13,300.00
142 CF, sludge --@.000 Ea 19,100.00 -- -- 19,100.00
190 CF, bead --@.000 Ea 11,200.00 -- -- 11,200.00
190 CF, powdex --@.000 Ea 14,000.00 -- -- 14,000.00
190 CF, sludge --@.000 Ea 19,900.00 -- -- 19,900.00
210 CF, bead --@.000 Ea 11,400.00 -- -- 11,400.00
210 CF, powdex --@.000 Ea 14,200.00 -- -- 14,200.00
210 CF, sludge --@.000 Ea 20,100.00 -- -- 20,100.00

LEA containers for radioactive waste - Drums and pails


5 gallon pail, DOT 17c --@.000 Ea 43.70 -- -- 43.70
10 gallon drum, DOT 6c --@.000 Ea 63.80 -- -- 63.80
35 gallon, 20 gauge,
nuclear waste crushable drum --@.000 Ea 102.00 -- -- 102.00

10 ton payload shipping casks, fourteen 55 gallon drums or 215 CF liner, rented
Radiation rating based on cobalt 60.
20 rems per hour --@.000 Day -- -- 250.00 250.00
2015 Heavy Construction Estimator, All Rights Reserved Page 143

20 rems per hour --@.000 Mo -- -- 7,000.00 7,000.00


7 rems per hour --@.000 Day -- -- 200.00 200.00
7 rems per hour --@.000 Mo -- -- 6,500.00 6,500.00

LEA containers for radioactive waste


DOT 7A, 2.8" diameter, 6" high cavity, 700 capacity (cobalt),
rented --@.000 Day -- -- 100.00 100.00
DOT 7A, 2.8" diameter, 6" high cavity, 700 capacity (cobalt),
prep charge --@.000 LS 2,190.00 -- -- 2,190.00
DOT 7V, 9,000 pound capacity, vented,
no free liquids permitted --@.000 Ea 5,660.00 -- -- 5,660.00
DOT 7NV, 9,000 pound capacity, non-vented,
for use with liquids --@.000 Ea 6,900.00 -- -- 6,900.00

Radioactive waste containers - Fissile uranium


Tall 55 gallon drum for
250 pounds of uranium oxide --@.000 Ea 2,250.00 -- -- 2,250.00
Container for shipping seven 1.5" diameter fuel elements or twenty-five .5" diameter fuel elements,
36" high --@.000 Ea 2,250.00 -- -- 2,250.00
310 pound payload for shipping uranium
oxide powder or pellets --@.000 Ea 2,900.00 -- -- 2,900.00
To ship seven 1.5" diameter fuel elements or twenty-five .5" diameter fuel elements,
55" high --@.000 Ea 2,310.00 -- -- 2,310.00
5,020 pound payload, 30" cylinder to ship enriched UF6,
requires overpack --@.000 Ea 6,810.00 -- -- 6,810.00
11-1/2" x 18" x 179" inner to ship one or two
fuel assemblies or bundles --@.000 Ea 7,590.00 -- -- 7,590.00
27,560 pound payload, cylinder
to ship UF6 as a solid --@.000 Ea 15,500.00 -- -- 15,500.00
55 gallon drum for two to five
gallon pails of uranium oxide --@.000 Ea 1,630.00 -- -- 1,630.00
5" 55 pound UF6 cylinder overpack --@.000 Ea 4,210.00 -- -- 4,210.00
8" 250 pound UF6 cylinder overpack --@.000 Ea 8,340.00 -- -- 8,340.00
12" 430 pound UF6 cylinder overpack --@.000 Ea 9,380.00 -- -- 9,380.00
30" 2.5 ton UF6 cylinder overpack --@.000 Ea 26,900.00 -- -- 26,900.00
48" 10 ton UF6 cylinder overpack --@.000 Ea 125,000.00 -- --125,000.00
48" 14 ton UF6 cylinder overpack --@.000 Ea 209,000.00 -- --209,000.00

Radioactive waste containers - Californium 252


Handling charge
for all sized containers --@.000 LS 802.00 -- -- 802.00
30" x 30", 200 underground capacity,
rental --@.000 Mo -- -- 600.00 600.00
30" x 34", 500 underground capacity,
rental --@.000 Mo -- -- 600.00 600.00
42" x 42", 1,500 underground capacity,
rental --@.000 Mo -- -- 1,200.00 1,200.00
48" x 50", 3,700 under ground capacity,
rental --@.000 Mo -- -- 1,200.00 1,200.00
50" x 50", 3,700 under ground capacity,
rental --@.000 Mo -- -- 1,200.00 1,200.00

Radioactive by-product (type B) waste containers - Gamma ray projectors, purchase


100 CI iridium 192,
25' pistol control --@.000 Ea 14,600.00 -- -- 14,600.00
100 CI iridium 192,
25' reel control --@.000 Ea 11,500.00 -- -- 11,500.00
140 CI iridium-192,
2015 Heavy Construction Estimator, All Rights Reserved Page 143 (part 2)

35' pistol control --@.000 Ea 11,500.00 -- -- 11,500.00


140 CI iridium-192,
35' reel control --@.000 Ea 20,600.00 -- -- 20,600.00
140 CI iridium-192,
50' pistol control --@.000 Ea 12,900.00 -- -- 12,900.00
140 CI iridium-192,
50' reel control --@.000 Ea 21,800.00 -- -- 21,800.00
240 CI iridium-192, 25' control hose,
pneumatic, underwater use --@.000 Ea 13,900.00 -- -- 13,900.00
240 CI iridium-192, 25' control hose,
pneumatic, land use --@.000 Ea 23,900.00 -- -- 23,900.00
11 CI cobalt-60, 25' pistol control --@.000 Ea 39,100.00 -- -- 39,100.00
11 CI cobalt-60, 25' reel control --@.000 Ea 40,700.00 -- -- 40,700.00
11 CI cobalt-60, 50' pistol control --@.000 Ea 41,000.00 -- -- 41,000.00
11 CI cobalt-60, 50' reel control --@.000 Ea 42,600.00 -- -- 42,600.00
33 CI cobalt-60, 25' pistol control --@.000 Ea 47,000.00 -- -- 47,000.00
33 CI cobalt-60, 25' reel control --@.000 Ea 47,600.00 -- -- 47,600.00
33 CI cobalt-60, 50' pistol control --@.000 Ea 48,900.00 -- -- 48,900.00
33 CI cobalt-60, 50' reel control --@.000 Ea 49,400.00 -- -- 49,400.00
110 CI cobalt-60, 25' reel control --@.000 Ea 56,300.00 -- -- 56,300.00
110 CI cobalt-60, 35' reel control --@.000 Ea 57,000.00 -- -- 57,000.00
110 CI cobalt-60, 50' reel control --@.000 Ea 58,100.00 -- -- 58,100.00
330 CI cobalt-60, 25' reel control --@.000 Ea 77,800.00 -- -- 77,800.00
330 CI cobalt-60, 35' reel control --@.000 Ea 78,400.00 -- -- 78,400.00
330 CI cobalt-60, 50' reel control --@.000 Ea 79,600.00 -- -- 79,600.00

Radioactive by-product (type B) waste containers - Irradiated fuel element casks, rental
7-5/8" dia. X 10",
4,800 lb., prep charge --@.000 LS 5,020.00 -- -- 5,020.00
7-5/8" dia. X 10",
4,800 lb., rental --@.000 Day -- -- 300.00 300.00
2015 Heavy Construction Estimator, All Rights Reserved Page 144

7-5/8" dia. X 37", 10,000 lb.,


prep charge, not certified --@.000 LS 5,020.00 -- -- 5,020.00
7-5/8" dia. X 37", 10,000 lb.,
rental, not certified --@.000 Day -- -- 375.00 375.00
20-1/2" dia. X 46", 26,200 lb.,
prep charge, not certified --@.000 LS 8,020.00 -- -- 8,020.00
20-1/2" dia. X 46", 26,200 lb.,
rental, not certified --@.000 Day -- -- 500.00 500.00
26-1/2" dia. X 54", 25,500 lb.,
prep charge, not certified --@.000 LS 8,020.00 -- -- 8,020.00
26-1/2" dia. X 54", 25,500 lb.,
rental, not certified --@.000 Day -- -- 500.00 500.00
26-1/2" dia. X 54", 5,450 lb.,
normal form, prep charge --@.000 LS 10,500.00 -- -- 10,500.00
26-1/2" dia. x 54", 5,450
lb., normal form, rental --@.000 Day -- -- 2,500.00 2,500.00

Radioactive by-product (type B) waste containers - Plutonium normal form containers


DOT 6M, 55 gallon
drum for plutonium shipments --@.000 Ea 32,200.00 -- -- 32,200.00
Tall 55 gallon
drum for plutonium shipments --@.000 Ea 17,600.00 -- -- 17,600.00

Radioactive by-product (type B) waste containers - Plutonium special form containers


Tall 55 gallon drum for plutonium,
shielded version --@.000 Ea 32,200.00 -- -- 32,200.00
To ship fuel bundles (2
standard or 4 short elements) --@.000 Ea 74,200.00 -- -- 74,200.00

Plutonium special form containers - 7" diameter, 25" high cavity, 15,500 lb. gross
Preparation charge --@.000 LS 10,700.00 -- -- 10,700.00
Container rental --@.000 Day -- -- 375.00 375.00

Radioactive by-product (type B) waste containers


142" x 91" x 54" high,
5,000 lb., prep charge --@.000 LS 2,190.00 -- -- 2,190.00
142" x 91" x 54" high,
5,000 lb., rental --@.000 Day -- -- 500.00 500.00
Overpack for M-3A
or M-4 3,000 lb., prep charge --@.000 LS 6,050.00 -- -- 6,050.00
Overpack for
M-3A or M-4 3,000 lb., rental --@.000 Day -- -- 500.00 500.00

Spent radioactive fuel shipping containers, rental


For intact spent fuel assemblies (1 pwr, 2 bwr), consolidated fuel rods (2 pwr, 4 bwr), or 15 metallic fuel
rods.
First 10 days of rental, including 4 days
of labor for site assistance --@.000 LS -- -- 55,500.00 55,500.00
Days 11 to 30 --@.000 Day -- -- 3,000.00 3,000.00
Days 31 to 90 --@.000 Day -- -- 2,500.00 2,500.00
Days 91 to 180 --@.000 Day -- -- 20,000.00 20,000.00
Days 181 to 360 --@.000 Day -- -- 1,500.00 1,500.00
10,000 pound payload, ten 55 gallon drums or 142 CF liner, 350 rads
per hour (based on cobalt-60) --@.000 Mo -- -- 26,500.00 26,500.00

Spent radioactive fuel container liners - Polyethylene high integrity, for burial
142 CF, foam --@.000 Ea 14,700.00 -- -- 14,700.00
2015 Heavy Construction Estimator, All Rights Reserved Page 144 (part 2)

142 CF, bead --@.000 Ea 18,700.00 -- -- 18,700.00


142 CF, powdex --@.000 Ea 16,800.00 -- -- 16,800.00
142 CF, sludge --@.000 Ea 24,000.00 -- -- 24,000.00
190 CF, foam --@.000 Ea 14,500.00 -- -- 14,500.00
190 CF, bead --@.000 Ea 15,800.00 -- -- 15,800.00
190 CF, powdex --@.000 Ea 18,300.00 -- -- 18,300.00
190 CF, sludge --@.000 Ea 23,000.00 -- -- 23,000.00
210 CF, foam --@.000 Ea 14,700.00 -- -- 14,700.00
210 CF, bead --@.000 Ea 16,400.00 -- -- 16,400.00
210 CF, powdex --@.000 Ea 18,900.00 -- -- 18,900.00
210 CF, sludge --@.000 Ea 23,000.00 -- -- 23,000.00

Spent radioactive fuel container liners - Enviralloy high integrity


50 CF, fill head top,
for processing of spent media --@.000 Ea 45,600.00 -- -- 45,600.00
50 CF, full bolt top,
used as overpack --@.000 Ea 50,600.00 -- -- 50,600.00
142 CF, fill head top,
for processing of spent media --@.000 Ea 72,000.00 -- -- 72,000.00
142 CF, full bolt top,
used as overpack --@.000 Ea 85,500.00 -- -- 85,500.00
190 CF, fill head top,
for processing of spent media --@.000 Ea 92,500.00 -- -- 92,500.00
190 CF, full bolt top,
used as overpack --@.000 Ea 113,000.00 -- --113,000.00
210 CF, fill head top,
for processing of spent media --@.000 Ea 109,000.00 -- --109,000.00
210 CF, full bolt top,
used as overpack --@.000 Ea 131,000.00 -- --131,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 145

Spent radioactive fuel containers - Rail shipment casks, rental


Must have license for class C waste. Not for 55 gallon drum disposal.
LF-300, (18bwr or 7pwr elements) --@.000 Day -- -- 3,500.00 3,500.00
125 B, 20,000 lb. payload,
1 year rental --@.000 Day -- -- 2,000.00 2,000.00
125 B, 20,000 lb. payload,
6 month rental --@.000 Day -- -- 4,000.00 4,000.00
125 B, 20,000 lb. payload,
1 month rental --@.000 Day -- -- 6,000.00 6,000.00

Radioactive container transport by truck - Shipping empty containers, per mile


32,000 lb. load --@.000 Mile 2.42 -- -- 2.42
38,000 lb. load --@.000 Mile 2.88 -- -- 2.88
44,000 lb. load --@.000 Mile 3.34 -- -- 3.34
50,000 lb. load --@.000 Mile 3.78 -- -- 3.78
56,000 lb. load --@.000 Mile 4.23 -- -- 4.23

Radioactive container transport by truck - Loaded containers, over 500 miles, per mile
36,000 lb. load --@.000 Mile 5.85 -- -- 5.85
42,000 lb. load --@.000 Mile 6.80 -- -- 6.80
48,000 lb. load --@.000 Mile 7.79 -- -- 7.79
56,000 lb. load --@.000 Mile 9.09 -- -- 9.09
66,000 lb. load --@.000 Mile 10.70 -- -- 10.70
76,000 lb. load --@.000 Mile 12.30 -- -- 12.30

Radioactive container transport by truck - Loaded containers 251 to 500 miles, per mile
36,000 lb. load --@.000 Mile 9.52 -- -- 9.52
42,000 lb. load --@.000 Mile 11.10 -- -- 11.10
48,000 lb. load --@.000 Mile 11.70 -- -- 11.70
56,000 lb. load --@.000 Mile 13.70 -- -- 13.70
66,000 lb. load --@.000 Mile 16.10 -- -- 16.10
76,000 lb. load --@.000 Mile 18.60 -- -- 18.60

Radioactive container transport by truck - Loaded containers, 101 to 250 miles, per mile
36,000 lb. load --@.000 Mile 12.20 -- -- 12.20
42,000 lb. load --@.000 Mile 14.30 -- -- 14.30
48,000 lb. load --@.000 Mile 16.30 -- -- 16.30
56,000 lb. load --@.000 Mile 19.00 -- -- 19.00
66,000 lb. load --@.000 Mile 22.40 -- -- 22.40
76,000 lb. load --@.000 Mile 25.80 -- -- 25.80

Radioactive container transport by truck - Loaded containers, to 100 miles, per mile
36,000 lb. load --@.000 Mile 18.00 -- -- 18.00
42,000 lb. load --@.000 Mile 20.90 -- -- 20.90
48,000 lb. load --@.000 Mile 23.90 -- -- 23.90
56,000 lb. load --@.000 Mile 27.90 -- -- 27.90
66,000 lb. load --@.000 Mile 32.90 -- -- 32.90
76,000 lb. load --@.000 Mile 37.90 -- -- 37.90

Radioactive container transport by truck - Unirradiated fuel assemblies, per 100 lbs.
200 miles --@.000 CWT 3.21 -- -- 3.21
500 miles --@.000 CWT 4.83 -- -- 4.83
800 miles --@.000 CWT 6.20 -- -- 6.20
1,100 miles --@.000 CWT 7.90 -- -- 7.90
1,400 miles --@.000 CWT 10.20 -- -- 10.20
1,700 miles --@.000 CWT 12.40 -- -- 12.40
2015 Heavy Construction Estimator, All Rights Reserved Page 145 (part 2)

2,000 miles --@.000 CWT 14.50 -- -- 14.50


2,300 miles --@.000 CWT 16.70 -- -- 16.70
2,600 miles --@.000 CWT 18.90 -- -- 18.90
2,900 miles --@.000 CWT 21.10 -- -- 21.10
3,200 miles --@.000 CWT 23.30 -- -- 23.30

Radioactive container transport by truck - Radioactive waste, for burial


One-way shipments to points east of the Mississippi.
To 100 miles --@.000 Mile 8.56 -- -- 8.56
Over 100 to 200 miles --@.000 Mile 5.70 -- -- 5.70
Over 200 to 300 miles --@.000 Mile 4.72 -- -- 4.72
Over 300 to 400 miles --@.000 Mile 4.07 -- -- 4.07
2015 Heavy Construction Estimator, All Rights Reserved Page 146

Over 400 to 500 miles --@.000 Mile 3.54 -- -- 3.54


Over 500 to 750 miles --@.000 Mile 3.15 -- -- 3.15
Over 750 to 1,000 miles --@.000 Mile 2.83 -- -- 2.83

Radioactive container transport by truck - Radioactive waste, for burial


One-way shipments to points west of the Mississippi.
To 100 miles --@.000 Mile 9.03 -- -- 9.03
Over 100 to 200 miles --@.000 Mile 6.26 -- -- 6.26
Over 200 to 300 miles --@.000 Mile 5.29 -- -- 5.29
Over 300 to 400 miles --@.000 Mile 4.69 -- -- 4.69
Over 400 to 500 miles --@.000 Mile 4.19 -- -- 4.19
Over 500 to 750 miles --@.000 Mile 3.81 -- -- 3.81
Over 750 to 1,000 miles --@.000 Mile 3.53 -- -- 3.53
Over 1,000 to 1,500 miles --@.000 Mile 3.38 -- -- 3.38
Over 1,500 to 2,000 miles --@.000 Mile 3.27 -- -- 3.27
Over 2,500 miles --@.000 Mile 3.16 -- -- 3.16

Radioactive container transport by truck - Shipments over 80,000 lbs. gross vehicle weight
To 200 miles --@.000 CWT 4.10 -- -- 4.10
Over 200 to 500 miles --@.000 CWT 6.05 -- -- 6.05
Over 500 to 800 miles --@.000 CWT 7.88 -- -- 7.88
Over 800 to 1,100 miles --@.000 CWT 10.10 -- -- 10.10
Over 1,100 to 1,400 miles --@.000 CWT 12.80 -- -- 12.80
Over 1,400 to 1,700 miles --@.000 CWT 15.60 -- -- 15.60
Over 1,700 to 2,000 miles --@.000 CWT 18.30 -- -- 18.30
Over 2,000 to 2,300 miles --@.000 CWT 21.10 -- -- 21.10
Over 2,300 to 2,600 miles --@.000 CWT 23.90 -- -- 23.90
Over 2,600 to 2,900 miles --@.000 CWT 26.60 -- -- 26.60
Over 2,900 to 3,200 miles --@.000 CWT 29.40 -- -- 29.40
Over 3,200 to 3,500 miles --@.000 CWT 32.20 -- -- 32.20
Over 3,500 to 3,800 miles --@.000 CWT 34.90 -- -- 34.90
Over 3,800 to 4,100 miles --@.000 CWT 37.50 -- -- 37.50
Over 4,100 to 4,300 miles --@.000 CWT 39.50 -- -- 39.50

Empty radioactive container transport - Materials not otherwise categorized


To 200 miles --@.000 CWT 2.45 -- -- 2.45
Over 200 to 500 miles --@.000 CWT 3.88 -- -- 3.88
Over 500 to 800 miles --@.000 CWT 6.12 -- -- 6.12
Over 800 to 1,100 miles --@.000 CWT 8.41 -- -- 8.41
Over 1,100 to 1,400 miles --@.000 CWT 2.78 -- -- 2.78
Over 1,400 to 1,700 miles --@.000 CWT 13.00 -- -- 13.00
Over 1,700 to 2,000 miles --@.000 CWT 15.40 -- -- 15.40
Over 2,000 to 2,300 miles --@.000 CWT 17.80 -- -- 17.80
Over 2,300 to 2,600 miles --@.000 CWT 20.10 -- -- 20.10
Over 2,600 to 2,900 miles --@.000 CWT 22.40 -- -- 22.40
Over 2,900 to 3,200 miles --@.000 CWT 24.70 -- -- 24.70
Over 3,200 to 3,500 miles --@.000 CWT 27.00 -- -- 27.00
Over 3,500 to 3,800 miles --@.000 CWT 29.30 -- -- 29.30
Over 3,800 to 4,100 miles --@.000 CWT 31.70 -- -- 31.70
Over 4,100 to 4,300 miles --@.000 CWT 33.20 -- -- 33.20

Loaded radioactive container transport - Materials not otherwise categorized


To 200 miles --@.000 CWT 4.10 -- -- 4.10
Over 200 to 500 miles --@.000 CWT 6.05 -- -- 6.05
Over 500 to 800 miles --@.000 CWT 7.88 -- -- 7.88
Over 800 to 1,100 miles --@.000 CWT 10.10 -- -- 10.10
Over 1,100 to 1,400 miles --@.000 CWT 12.90 -- -- 12.90
Over 1,400 to 1,700 miles --@.000 CWT 15.60 -- -- 15.60
2015 Heavy Construction Estimator, All Rights Reserved Page 146 (part 2)

Over 1,700 to 2,000 miles --@.000 CWT 18.30 -- -- 18.30


Over 2,000 to 2,300 miles --@.000 CWT 23.90 -- -- 23.90
Over 2,300 to 2,600 miles --@.000 CWT 23.90 -- -- 23.90
Over 2,600 to 2,900 miles --@.000 CWT 26.60 -- -- 26.60
2015 Heavy Construction Estimator, All Rights Reserved Page 147

Over 2,900 to 3,200 miles --@.000 CWT 29.40 -- -- 29.40


Over 3,200 to 3,500 miles --@.000 CWT 32.20 -- -- 32.20
Over 3,500 to 3,800 miles --@.000 CWT 34.90 -- -- 34.90
Over 3,800 to 4,100 miles --@.000 CWT 37.50 -- -- 37.50
Over 4,100 to 4,300 miles --@.000 CWT 39.50 -- -- 39.50

Radioactive container transport by truck - Special services


Charge for additional driver --@.000 Mile 0.42 -- -- 0.42
Arbitrary charge per state
permit or prior notification --@.000 Ea 41.60 -- -- 41.60
Charge for
required security inspection --@.000 Ea 41.60 -- -- 41.60
Charge for checking all
service every 4 to 8 hours --@.000 Mile 0.20 -- -- 0.20
Charge for checking all
service every 2 to 3 hours --@.000 Mile 0.42 -- -- 0.42
Movement of special equipment --@.000 Mile 2.49 -- -- 2.49
Power equipment rental for on-site yard work,
5 hours minimum --@.000 Hour -- -- 50.00 50.00
Service charge for highway route controlled shipment,
$1,000 minimum --@.000 Mile 0.75 -- -- 0.75
Shipment of mobile decontamination trailer,
$1,000 minimum --@.000 Mile 2.66 -- -- 2.66
Shipment of mobile decontamination equipment,
$1,000 minimum --@.000 Mile 2.74 -- -- 2.74

CSI 02-084, Decontamination & decommissioning

Acids and solvents for chemical decontamination - EDTA, ethylene diamine tetraacetic acid
EDTA, 1 kg --@.000 Ea 60.40 -- -- 60.40
EDTA, 10 kg --@.000 Ea 256.00 -- -- 256.00

Acids and solvents for chemical decontamination - Oxalic acid


Oxaclic acid, crystal, 3 kg --@.000 Ea 76.90 -- -- 76.90
Oxaclic acid, crystal, 12 kg --@.000 Ea 1,730.00 -- -- 1,730.00

Acids and solvents for chemical decontamination - Sulfamic acid


Sulfamic acid, crystal, 0.5 kg --@.000 Ea 33.40 -- -- 33.40
Sulfamic acid, crystal, 3 kg --@.000 Ea 950.00 -- -- 950.00
Sulfamic acid, crystal, 50# bag --@.000 Lb 1.60 -- -- 1.60

Acids and solvents for chemical decontamination - Hydrochloric acid in 500 pound drums
1 to 14 drums --@.000 Lb 0.40 -- -- 0.40
Over 14 drums --@.000 Lb 0.35 -- -- 0.35

Acids and solvents for chemical decontamination - Sulfuric acid solution


220 pound drummed liquid --@.000 Lb 0.49 -- -- 0.49
750 pound drummed liquid --@.000 Lb 0.30 -- -- 0.30

Acids and solvents for chemical decontamination - Citric acid


Monohydrate granular, 3 kg --@.000 Ea 73.60 -- -- 73.60
Monohydrate granular, 12 kg --@.000 Ea 168.00 -- -- 168.00

Acids and solvents for chemical decontamination - Ammonium citrate


Prices can be expected to vary depending on source. Check with local supplier.
ACS grade, 250 pound barrel --@.000 Lb 8.17 -- -- 8.17
2015 Heavy Construction Estimator, All Rights Reserved Page 147 (part 2)

Pure grade, 250 pound barrel --@.000 Lb 7.11 -- -- 7.11

Acids and solvents for chemical decontamination - Sodium fluoride


Sodium fluoride, 3 kg --@.000 Ea 196.00 -- -- 196.00
Sodium fluoride, 12 kg --@.000 Ea 2,630.00 -- -- 2,630.00

Acids and solvents for chemical decontamination - Hydrogen peroxide


50%, drummed liquid, 145 pounds --@.000 Lb 1.41 -- -- 1.41
35%, drummed liquid, 145 pounds --@.000 Lb 1.06 -- -- 1.06

Acids and solvents for chemical decontamination - Sodium hydroxide


Smaller quantities will cost more per pound.
Liquid, 190 pound drum --@.000 Lb 0.54 -- -- 0.54
Beads, 500 pound container --@.000 Lb 1.19 -- -- 1.19
Flakes, 500 pound container --@.000 Lb 1.26 -- -- 1.26

Manual chemical decontamination - Powder for manual or ultrasonic cleaning


4 pound box --@.000 Ea 22.80 -- -- 22.80
Case of nine 4 pound boxes --@.000 Ea 159.00 -- -- 159.00
2015 Heavy Construction Estimator, All Rights Reserved Page 148

25 pound carton --@.000 Ea 104.00 -- -- 104.00


50 pound carton --@.000 Ea 206.00 -- -- 206.00
100 pound drum --@.000 Ea 413.00 -- -- 413.00
300 pound drum --@.000 Ea 1,200.00 -- -- 1,200.00
Dispenser
box of fifty 1/2 oz. packets --@.000 Ea 30.90 -- -- 30.90

Manual chemical decontamination - Powder plus enzyme for manual or ultrasonic cleaning
4 pound box --@.000 Ea 22.80 -- -- 22.80
Case of nine 4 pound boxes --@.000 Ea 159.00 -- -- 159.00
25 pound carton --@.000 Ea 107.00 -- -- 107.00
50 pound carton --@.000 Ea 206.00 -- -- 206.00
100 pound drum --@.000 Ea 413.00 -- -- 413.00
300 pound drum --@.000 Ea 1,140.00 -- -- 1,140.00

Manual chemical decontamination - Phosphate free liquid for manual or ultrasonic cleaning
For manual or ultrasonic cleaning.
1 quart bottle --@.000 Ea 19.00 -- -- 19.00
Case of twelve 1 quart bottles --@.000 Ea 130.00 -- -- 130.00
1 gallon bottle --@.000 Ea 45.30 -- -- 45.30
Case of four 1 gallon bottles --@.000 Ea 154.00 -- -- 154.00
15 gallon drum --@.000 Ea 575.00 -- -- 575.00
55 gallon drum --@.000 Ea 2,070.00 -- -- 2,070.00

Manual chemical decontamination - Phosphate free acidic liquid


For manual or ultrasonic cleaning.
1 gallon bottle --@.000 Ea 43.50 -- -- 43.50
Case of four 1 gallon bottles --@.000 Ea 147.00 -- -- 147.00
15 gallon drum --@.000 Ea 556.00 -- -- 556.00
55 gallon drum --@.000 Ea 1,700.00 -- -- 1,700.00

Manual chemical decontamination - Phosphate free liquid for electronics and circuit boards
1 gallon bottle --@.000 Ea 55.50 -- -- 55.50
Case of four 1 gallon bottles --@.000 Ea 174.00 -- -- 174.00
15 gallon drum --@.000 Ea 637.00 -- -- 637.00
55 gallon drum --@.000 Ea 2,080.00 -- -- 2,080.00

Manual chemical decontamination - Spot washing


Using small tools.
Small crew, small job l5@.052 SF -- 2.87 0.02 2.89
Large crew, large job l6@.029 SF -- 1.57 -- 1.57

Manual chemical decontamination - Spot washing


Using miscellaneous power tools.
Triple rinse 55 gallon drums mt@.208 Ea -- 7.47 0.63 8.10

Mechanical decontamination - Wet abrasive blasting media, aviation formula 969011


2,450 pound minimum order --@.000 Lb 0.63 -- -- 0.63
9 to 13 pallets --@.000 Lb 0.56 -- -- 0.56
14 to 18 pallet order --@.000 Lb 0.52 -- -- 0.52

Blaster for aviation formula media, purchase


Portable, 1 nozzle, 3 CF tank --@.000 Ea 17,400.00 -- -- 17,400.00
Portable, 1 nozzle, 6 CF --@.000 Ea 20,500.00 -- -- 20,500.00
Skid mount, 2 nozzles, 20 CF tank --@.000 Ea 30,300.00 -- -- 30,300.00
2015 Heavy Construction Estimator, All Rights Reserved Page 148 (part 2)

Wet abrasive blasting


Using a 1,600 CFM at 100 PSI air compressor, 100’ of 2" hardrock air hose, a wet accustrip abrasive
blaster and small tools.
20 CF, 2 nozzle l7@.013 SF -- 0.64 0.40 1.04
6 CF, 1 nozzle l8@.023 SF -- 1.09 1.02 2.11

Carbon dioxide blasting equipment, purchase costs


Add the cost of an air compressor.
1,000 pound per hour output --@.000 Ea 221,000.00 -- --221,000.00
1,500 pound per hour output,
single hose delivery --@.000 Ea 300,000.00 -- --300,000.00
1,500 pound per hour output,
dual hose delivery --@.000 Ea 350,000.00 -- --350,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 149

Air compressors for carbon dioxide blasting


Medium capacity, 250 PSI at 330 CFM --@.000 Ea 37,900.00 -- -- 37,900.00
High capacity, 290 PSI at 850 CFM --@.000 Ea 85,800.00 -- -- 85,800.00

Carbon dioxide blasting, small compressor


Using a shop-type 330 CFM at 250 PSI air compressor, a 1,000 lbs. per hour Co2 blaster and small
tools.
1,500 pounds per hour,
dual hose delivery l9@.013 SF -- 0.64 0.54 1.18
1,000 pounds
per hour single hose delivery mb@.021 SF -- 1.00 1.18 2.18

Carbon dioxide blasting, large compressor


Using a shop-type 850 CFM at 290 PSI air compressor, a 1,500 lbs. per hour dual hose Co2 blaster and
small tools.
1,500 pounds per hour,
dual hose delivery ma@.014 SF -- 0.67 0.50 1.17

Electropolishing tank cleaning equipment


220 gallon tank capacity, includes HEPA ventilation
system and electric hoist --@.000 Ea 130,000.00 -- --130,000.00

Ultrasonic tank cleaning equipment


1/2 gallon, 115 volts --@.000 Ea 561.00 -- -- 561.00
1/2 gallon, 220/240 volts --@.000 Ea 678.00 -- -- 678.00
3/4 gallon, 115 volts --@.000 Ea 740.00 -- -- 740.00
3/4 gallon, 220/240 volts --@.000 Ea 935.00 -- -- 935.00
1-1/2 gallon, 115 volts --@.000 Ea 1,150.00 -- -- 1,150.00
1-1/2 gallon, 220/240 volts --@.000 Ea 1,530.00 -- -- 1,530.00
2-1/2 gallon, 115 volts --@.000 Ea 1,460.00 -- -- 1,460.00
2-1/2 gallon, 220/240 volts --@.000 Ea 1,820.00 -- -- 1,820.00
2-3/4 gallon pipette cleaner,
115 volts --@.000 Ea 1,490.00 -- -- 1,490.00
2-3/4 gallon pipette cleaner,
220/240 volts --@.000 Ea 2,010.00 -- -- 2,010.00
5-1/2 gallon, 115 volts --@.000 Ea 2,560.00 -- -- 2,560.00
5-1/2 gallon, 220/240 volts --@.000 Ea 3,320.00 -- -- 3,320.00

Purchase plasma arc equipment for activated metal segmentation


35 amp, 1/2"
maximum material thickness --@.000 Ea 2,810.00 -- -- 2,810.00
60 amp,
1" maximum material thickness --@.000 Ea 2,810.00 -- -- 2,810.00
100 amp, 1-1/2"
maximum material thickness --@.000 Ea 6,150.00 -- -- 6,150.00

Activated metal segmentation with plasma arc equipment


Using miscellaneous power tools and small tools.
35 amp and 60 amp, 1-1/2"
maximum material thickness mc@.125 LF -- 4.37 0.97 5.34
100 amp, 1-1/2"
maximum material thickness mc@.087 LF -- 3.04 0.68 3.72

Purchase oxygen burner decontamination equipment


Oxygen regulator --@.000 Ea 146.00 -- -- 146.00
2015 Heavy Construction Estimator, All Rights Reserved Page 149 (part 2)

Acetylene regulator --@.000 Ea 137.00 -- -- 137.00


21" cutting torch --@.000 Ea 271.00 -- -- 271.00

Oxygen burner decontamination


Using miscellaneous power tools and small tools.
Cutting tip size 000,
including change out time mc@.208 Ea 17.80 7.28 1.61 26.69
Cutting tip size #5,
including change out time mc@.208 Ea 20.40 7.28 1.61 29.29
Acetylene/oxygen twin hose,
25', 50' and 100' lengths --@.000 LF 1.29 -- -- 1.29
Cutting metal with torch (1" thickness) segmentation
by the linear foot of cut mc@.125 LF -- 4.37 0.97 5.34

Purchase thermic lance decontamination equipment


Thermolance holder --@.000 Ea 138.00 -- -- 138.00
Thermolance bars, 5/8" x 10'-5" --@.000 Ea 7.80 -- -- 7.80
Thermolance bars,11/16" x 10'-6" --@.000 Ea 8.32 -- -- 8.32
2015 Heavy Construction Estimator, All Rights Reserved Page 150

Decontamination with thermic lance


Using miscellaneous power tools and small tools.
Structural steel segmentation thermic lance downsizing by the linear
foot of cut (all sizes) mc@.100 LF 0.46 3.50 0.78 4.74

Thermic lance concrete cutting, per LF of cut at 1' deep


Using miscellaneous power tools and small tools.
Non-reinforced concrete mc@.625 LF -- 21.86 4.85 26.71
Reinforced concrete mc@1.00 LF -- 34.98 7.76 42.74

Expansive demolition grout, vertical placement to 12"


Using miscellaneous power tools and small tools.
1-1/2" hole,
conventional demolition grout mg@.692 LF 10.10 14.05 2.98 27.13
1-1/2" hole,
rapid curing demolition grout mg@.692 LF 12.00 14.05 2.98 29.03
1-5/8" hole,
conventional demolition grout mg@.692 LF 11.80 14.05 2.98 28.83
1-5/8" hole,
rapid curing demolition grout mg@.692 LF 14.10 14.05 2.98 31.13
1-3/4" hole,
conventional demolition grout mg@.720 LF 13.70 14.62 3.10 31.42
1-3/4" hole,
rapid curing demolition grout mg@.720 LF 16.30 14.62 3.10 34.02
1-7/8" hole,
conventional demolition grout mg@.720 LF 15.80 14.62 3.10 33.52
1-7/8" hole,
rapid curing demolition grout mg@.720 LF 18.80 14.62 3.10 36.52
2" hole,
conventional demolition grout mg@.750 LF 17.90 15.23 3.23 36.36
2" hole,
rapid curing demolition grout mg@.750 LF 21.30 15.23 3.23 39.76

Material cost for demolition grout


Conventional grout,
11 pound (5 kg) bag --@.000 Ea 84.30 -- -- 84.30
Rapid curing grout,
11 pound (5 kg) bag --@.000 Ea 100.00 -- -- 100.00
Conventional grout, case
of four 11 pound (5 kg) bags --@.000 Case 338.00 -- -- 338.00
Rapid curing grout, case
of four 11 pound (5 kg) bags --@.000 Case 401.00 -- -- 401.00

CSI 02-085, Underground storage tank removal

Decommission underground storage tanks


Using two 46,000 lb. 3-axle 6x4 trucks with 12 CY dump bodies, a 3.75 CY front-end crawler loader and
small tools.
Fill tank or vault with sand,
material not included hh@.003 Gal -- 0.11 0.12 0.23

Flare Tank
Using skill workers, including special flaring equipment and small tools
Flare tank,, flaring, underground storage tanks.
50 to 1000 gallon tank ui@8.00 Ea -- 279.80 1.60 281.40
1000 to 5,000 gallon tank ui@8.50 Ea -- 297.30 1.70 299.00
2015 Heavy Construction Estimator, All Rights Reserved Page 150 (part 2)

5,000 to 10,000 gallon tank ui@10.0 Ea -- 349.80 2.00 351.80


Over 10,000 tank ui@12.0 Ea -- 419.80 2.40 422.20

Transfer of reusable fuel from petroleum tanks


Using a 6" 1,950 GPM submersible pump, 46,000 lb. 3-axle 6x4 truck with 3,000 gallon water tank.
Removal and handling of
reusable petroleum products. ju@.004 Gal -- 0.16 0.15 0.31

Pumping liquids and rinsate from tanks


Using a 46,000 lb. 3-axle truck with a trailer mounted 2,100 CFM industrial vacuum.
Removal and handling of pumpable liquids
and rinsate from a tank. m7@.004 Gal -- 0.17 0.20 0.37
Transport pumpable liquids and rinsate from jobsite to disposal facility. Costs will be higher where state
regulations restrict transportation and where transportation
distances are greater. --@.000 Gal -- -- -- --
Typical fee charged by the disposal facility to deal with the liquids and rinsate. Costs will be higher
where more rigid state regulations
apply. No testing included. --@.000 Gal -- -- -- --

Hazardous sludge handling in tanks


Using a 450 CFM, 100 PSI air compressor, 200’ of 2" hardrock air hose and small tools.
Scraping the interior of the tank of all residue and collecting of sludge
to one area for removal. dl@.010 Gal -- 0.35 0.07 0.42

Hazardous sludge handling in tanks


Using a 13-ton front-end wheel loader with 60" bucket, a 46,000 lb. 3-axle truck with trailer mounted
2,100 CFM industrial vacuum.
Remove sludge from a tank, store in 55 gallon drums (80% full), move drums to a staging
area. No drums included. m6@.020 Gal -- 0.63 1.67 2.30
Transport drums from a staging area to the disposal facility. Costs vary with state regulations
and transportation distance. --@.000 Ea -- -- -- --
Typical disposal fee for hazardous sludge in 55 gallon drums. Costs will be higher where more rigid
state regulations
apply. No testing included. --@.000 Ea -- -- -- --

Non-hazardous sludge handling in tanks


Using a 450 CFM, 100 PSI air compressor, 200’ of 2" hardrock air hose and small tools.
Scraping the interior of a tank of all residue and collecting of sludge
to one area for removal. dl@.010 Gal -- 0.35 0.07 0.42

Non-hazardous sludge handling in tanks


Using a 13-ton front-end wheel loader with 60" bucket, a 46,000 lb. 3-axle truck with trailer mounted
2,100 CFM industrial vacuum.
Remove sludge from a tank, store in 55 gallon drums (80% full), move drums to a staging
area. No drums included. m6@.020 Gal -- 0.63 1.67 2.30
2015 Heavy Construction Estimator, All Rights Reserved Page 151

Purging petroleum storage tanks


Using a 13-ton front-end wheel loader with 60" bucket, a 46,000 lb. 3-axle truck with trailer mounted
2,100 CFM industrial vacuum.
Purge tank using 3 lbs. of dry ice per
100 gallons of tank volume. sq@.020 Lb 1.62 0.70 -- 2.32

Demolish petroleum piping


Add the cost of removal to a disposal site, using a 20-ton hydraulic crane with 70’ boom and small
tools.
Less than 4" in diameter xt@.169 LF -- 5.20 1.56 6.76
4" to 8" in diameter xt@.226 LF -- 6.95 2.09 9.04

Remove underground petroleum storage tank


Cut straps, extract tank from the pit and block to prevent movement. No excavation or backfill included,
using a 20-ton hydraulic crane with 70’ boom and small tools.
Tank to 2,000 gallons tq@12.0 Ea -- 424.20 100.00 524.20
Tank 2,001 to 5,000 gallons tq@12.0 Ea -- 424.20 100.00 524.20
Tank 5001 to 10,000 gallons tq@24.0 Ea -- 848.40 200.00 1,048.40
Tank 10,001 to 20,000 gallons tq@30.0 Ea -- 1,061.00 250.00 1,311.00
Tank 20,001 to 30,000 gallons tq@35.9 Ea -- 1,269.00 299.00 1,568.00
Tank 30,001 to 40,000 gallons tq@42.3 Ea -- 1,495.00 353.00 1,848.00
Tank 40,001 to 50,000 gallons tq@48.0 Ea -- 1,697.00 400.00 2,097.00

Excavate to remove underground storage tanks


Using a 5.5 CY hydraulic tractor excavator and small tools.
2,000 to 50,000 gallon tank e9@11.3 Ea -- 448.90 827.00 1,275.90

Clean and rinse tank interior


Cleaning with high pressure water spray, using a 6" 1,950 GPM submersible pump and a 6,000 gallon
off-highway water wagon.
Tank to 2,000 gallons jv@3.50 Ea -- 139.70 245.00 384.70
Tank 2,001 to 5,000 gallons jv@7.00 Ea -- 279.40 489.00 768.40
Tank 5001 to 10,000 gallons jv@10.5 Ea -- 419.20 734.00 1,153.20
Tank 10,001 to 20,000 gallons jv@15.8 Ea -- 630.70 1,100.00 1,730.70
Tank 20,001 to 30,000 gallons jv@21.1 Ea -- 842.30 1,470.00 2,312.30
Tank 30,001 to 40,000 gallons jv@26.1 Ea -- 1,042.00 1,820.00 2,862.00
Tank 40,001 to 50,000 gallons jv@35.0 Ea -- 1,397.00 2,450.00 3,847.00

Scrape and clean exterior of a petroleum storage tank


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose and small tools.
Tank to 2,000 gallons dm@10.0 Ea -- 367.70 37.60 405.30
Tank 2,001 to 5,000 gallons dm@10.0 Ea -- 367.70 37.60 405.30
Tank 5001 to 10,000 gallons dm@20.0 Ea -- 735.40 75.20 810.60
Tank 10,001 to 20,000 gallons dm@40.0 Ea -- 1,471.00 150.00 1,621.00
Tank 20,001 to 30,000 gallons dm@50.0 Ea -- 1,839.00 188.00 2,027.00
Tank 30,001 to 40,000 gallons dm@64.9 Ea -- 2,386.00 244.00 2,630.00
Tank 40,001 to 50,000 gallons dm@89.3 Ea -- 3,284.00 336.00 3,620.00

Cut petroleum tank into sections


Dismantling for transport to a disposal site, using a 1.25 CY hydraulic tractor excavator, a 44" rotating
mobile shear, a 300-amp skid mounted welder and small tools.
Tank to 2,000 gallons q5@4.00 Ea -- 174.00 173.00 347.00
Tank 2,001 to 5,000 gallons q5@8.00 Ea -- 348.00 345.00 693.00
Tank 5001 to 10,000 gallons q5@12.0 Ea -- 522.00 518.00 1,040.00
Tank 10,001 to 20,000 gallons q5@16.0 Ea -- 696.00 691.00 1,387.00
Tank 20,001 to 30,000 gallons q5@20.0 Ea -- 870.00 864.00 1,734.00
2015 Heavy Construction Estimator, All Rights Reserved Page 151 (part 2)

Tank 30,001 to 40,000 gallons q5@24.0 Ea -- 1,044.00 1,040.00 2,084.00


Tank 40,001 to 50,000 gallons q5@32.0 Ea -- 1,392.00 1,380.00 2,772.00

Haul dismantled petroleum storage tank to disposal site


Includes hauling 10 miles one way to the disposal facility, using a 50,000 lb. 6x4 3-axle truck with a
75-ton 3-axle lowboy trailer and two sets of small tools. No salvage included.
Tank to 2,000 gallons uu@6.00 Ea -- 216.60 89.30 305.90
Tank 2,001 to 5,000 gallons uu@6.00 Ea -- 216.60 89.30 305.90
Tank 5001 to 10,000 gallons uu@12.0 Ea -- 433.20 179.00 612.20
Tank 10,001 to 20,000 gallons uu@12.0 Ea -- 433.20 179.00 612.20
Tank 20,001 to 30,000 gallons uu@18.0 Ea -- 649.80 268.00 917.80
2015 Heavy Construction Estimator, All Rights Reserved Page 152

Tank 30,001 to 40,000 gallons uu@18.0 Ea -- 649.80 268.00 917.80


Tank 40,001 to 50,000 gallons uu@24.0 Ea -- 866.40 357.00 1,223.40

Excavation of soil contaminated with petroleum


Using a 1.5 CY hydraulic tractor excavator and small tools.
Determine if soil is reusable or contaminated
and stockpile as appropriate e2@.080 CY -- 3.28 3.63 6.91

Excavation of soil contaminated with petroleum


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
30 mil base liner for stockpile, based on 9.93 SF of liner per 1 ton of contaminated soil. Cost
per ton of contaminated soil. s2@.085 Ton -- 2.98 0.18 3.16
10 mil base liner for stockpile, based on 9.93 SF of liner per 1 ton of contaminated soil. Cost
per ton of contaminated soil. s2@.060 Ton 2.17 2.10 0.13 4.40

Excavation of soil contaminated with petroleum


Using 3/4-ton pickup truck and small tools.
Sandbags for stockpile, based on 0.22 sandbags per ton of petroleum contaminated soil.
Per ton of contaminated soil. sy@.011 Ton 0.79 0.38 0.05 1.22

Excavation of soil contaminated with petroleum


Using a D-6H power shift crawler tractor dozer with angle tilt blade and a 11-ton double drum self
propelled vibratory roller.
Berm soil for stockpile, based on 0.08 CY per ton of petroleum contaminated soil.
Per ton of contaminated soil. h4@.002 Ton 0.46 0.07 0.13 0.66

CSI 02-101, Structure moving

Structure moving
Based on one day move of structure to 24' wide. Includes reset on new foundation, patch and hook up,
using a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer and two sets of small tools.
Move wood or steel frame building
based on ground floor area uu@.240 SF -- 8.66 3.57 12.23
Move masonry building
based on ground floor area uu@.320 SF -- 11.55 4.76 16.31

CSI 02-102, Clearing and grubbing

Cut brush and trees, stack and chip debris, no stump removal
Per acre cleared, using a 3.75 CY front-end crawler loader, a trailer mounted 16" log chipper and small
tools.
Light trees to 6" (15cm) diameter ks@48.0 Acre -- 1,697.00 1,140.00 2,837.00
Medium trees to 10" (25cm) diameter ks@60.0 Acre -- 2,121.00 1,430.00 3,551.00
Heavy trees to 16" (41cm) diameter ks@72.0 Acre -- 2,545.00 1,720.00 4,265.00

Grub roots and stumps, including removal


Using a D-6D crawler tractor dozer with angle blade and multi-application rake and winch, a 3/4-ton 4x4
pickup truck with towed 6" log brush chipper and two sets of small tools.
Light stumps to 6" (15cm) diameter hq@2.00 Ea -- 80.92 139.00 219.92
Medium
stumps to 10" (25cm) diameter hq@3.50 Ea -- 141.60 244.00 385.60
Heavy stumps to 16" (41cm) diameter hq@4.00 Ea -- 161.80 279.00 440.80

Clearing brush, no grubbing of roots included


Using a D-6D dozer with angle blade, multi-application rake and winch, a 3/4 ton pickup truck, a towed
6" log and brush chipper and two sets of small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 152 (part 2)

Light brush kt@8.00 Acre -- 285.80 162.00 447.80

Clearing brush, no grubbing of roots included


Using a D-6D dozer with angle blade, multi-application rake and winch, a D-8L dozer with universal
blade, single shank ripper beam and ripper shank, a 3/4-ton 4x4 pickup truck with two towed 6" log
brush chippers and small tools.
Medium brush kw@10.0 Acre -- 359.60 363.00 722.60

Clearing brush, no grubbing of roots included


Using a D-8L crawler tractor dozer with universal blade, a D-9N crawler tractor dozer with blade,
multi-application rake and winch, towed 6" log capacity brush chipper and two 31" chain saws.
Heavy brush kx@12.0 Acre -- 431.50 742.00 1,173.50

Thinning brush and trees


No disposal included, using three 31" chain saws, a D-5H crawler tractor dozer with multi-application
rake, a 15’ rotary cutter for land clearing and winch, a 3/4-ton 4x4 pickup truck.
Selective thinning of trees,
8" to 12" diameter k3@2.80 Ea -- 98.62 33.40 132.02

Stack brush and chip debris on site


Using a 3.75 CY front-end crawler loader, a trailer mounted 16" log chipper and small tools.
Light brush ks@24.0 Acre -- 848.40 572.00 1,420.40
Medium brush ks@30.0 Acre -- 1,061.00 715.00 1,776.00
2015 Heavy Construction Estimator, All Rights Reserved Page 153

Heavy brush ks@48.0 Acre -- 1,697.00 1,140.00 2,837.00

Clear brush, grub roots and stack debris, per CY of debris


Using D-5H crawler tractor dozer, low ground pressure with angle blade, ripper beam and three ripper
shanks and a 3/4-ton 4x4 pickup truck.
Clear and grub with D5 dozer jl@.086 CY -- 3.15 4.18 7.33

Clear brush, grub roots and stack debris, per CY of debris


Using a D-7H low ground pressure crawler tractor dozer with universal blade, multi-shank ripper beam
and three ripper shanks and a 3/4-ton 4x4 pickup truck.
Clear and grub with D7 dozer jk@.025 CY -- 0.92 2.25 3.17

Clear brush, grub roots and stack debris, per CY of debris


Using a D-9N crawler tractor dozer with blade, ripper beam and ripper shanks.
Clear and grub with D9 dozer gu@.003 CY -- 0.14 0.48 0.62

Clear brush, grub roots and stack debris, per CY of debris


Using a 2.5 CY front-end crawler loader with a single shank ripper beam and a 3/4-ton 4x4 pickup truck.
Clear and
grub with 963 track loader h9@.058 CY -- 2.12 3.30 5.42

Clear brush, grub roots and stack debris, per CY of debris


Using a 3.75 CY front-end crawler loader and small tools.
Clear and
grub with 973 track loader ft@.051 CY -- 1.85 3.32 5.17

Clear brush, grub roots and stack debris, per CY of debris


Using a D-8L crawler tractor dozer with universal blade and winch, four 11 CY elevating scrapers and a
3/4-ton 4x4 pickup truck.
Clear and grub with 11 CY scraper f7@.022 CY -- 0.99 1.59 2.58

Clear brush, grub roots and stack debris, per CY of debris


Using a D-8L crawler tractor dozer with universal blade and winch, a 3/4-ton 4x4 pickup truck and four
14 to 20 CY self-propelled elevating scrapers.
Clear and grub with 15 CY scraper f8@.015 CY -- 0.68 1.79 2.47

Clear brush, grub roots and stack debris, per CY of debris


Using a D-8L crawler tractor dozer with universal blade and winch, four 22 CY elevating scrapers and a
3/4-ton 4x4 pickup truck.
Clear and grub with 22 CY scraper gc@.009 CY -- 0.41 1.21 1.62

Clearing in wet ground, no grubbling, stack debris on site


Using two D-5H low ground pressure crawler tractor dozers with angle blades, one multi-application rake
and one winch, three 31" chain saws, a 3/4-ton 4x4 pickup truck with V-tree cutter.
Lightly wooded, with D5 dozer ky@18.0 Acre -- 638.10 331.00 969.10

Clearing in wet ground, no grubbling, stack debris on site


Using three 31" chain saws, a D-5H low ground pressure crawler tractor dozer with multi-application
rake, a D-7H low ground pressure crawler tractor dozer with V-tree cutter and winch, a 3/4-ton 4x4
pickup truck.
Medium wooded, with D7 dozer kz@27.0 Acre -- 957.20 643.00 1,600.20

Clearing in wet ground, no grubbling, stack debris on site


Using three 31" chain saws, two D-7H low ground pressure crawler tractor dozers, one multi-application
rake, a V-tree cutter for one dozer, a winch and 3/4-ton 4x4 pickup truck.
2015 Heavy Construction Estimator, All Rights Reserved Page 153 (part 2)

Heavily wooded, with D7 dozer k2@36.0 Acre -- 1,276.00 1,070.00 2,346.00

Loading and trucking debris from land clearing


Using a 46,000 lb. 3-axle 6x4 truck with 8 CY dump body, a 1.38 CY wheeled loader-backhoe and small
tools.
Machine load spoil,
2 mile (3.2km) haul to dump hc@.744 CY -- 27.77 15.40 43.17

Tree trimming for pole line construction


Cost per truck setup, assuming street or highway access. Add the cost of debris removal, using a line
truck with aerial platform and miscellaneous power tools.
Light cutting s7@.166 Ea -- 5.80 2.95 8.75
Medium cutting s7@.250 Ea -- 8.74 4.45 13.19
Heavy cutting s7@.332 Ea -- 11.60 5.91 17.51

Individual stump removal


Grub stump, load debris and haul 2 miles (3.2km) to dump, using two 46,000 lb. 3-axle 6x4 trucks with
8 CY dump bodies and a 1.5 CY hydraulic tractor excavator.
Stump to 6" (15cm) diameter hq@1.05 Ea -- 42.48 73.10 115.58
Stump over 6" to
12" (15cm to 30cm) diameter hq@1.60 Ea -- 64.74 111.00 175.74
Stump over 12" to
24" (30cm to 61cm) diameter hq@2.35 Ea -- 95.08 164.00 259.08
Stump over 24" to
36" (61cm to 91cm) diameter hq@3.50 Ea -- 141.60 244.00 385.60

Individual tree removal, excluding stump


Using a 3.75 CY front-end crawler loader, a trailer mounted 16" log chipper and small tools.
Tree to 6" (15cm) diameter ks@4.00 Ea -- 141.40 95.30 236.70
Tree over 6" to
12" (15cm to 30cm) diameter ks@6.00 Ea -- 212.10 143.00 355.10
Tree over 12" to
24" (30cm to 61cm) diameter ks@8.00 Ea -- 282.80 191.00 473.80
Tree over 24" to
36" (61cm to 91cm) diameter ks@12.0 Ea -- 424.20 286.00 710.20

Wet ground stump removal


Using a D-7H low ground pressure crawler tractor dozer with universal blade and winch.
Stump to 6" diameter gw@1.25 Ea -- 61.11 85.50 146.61
Stump over 6" diameter to 12" gw@1.50 Ea -- 73.34 103.00 176.34
Stump over 12" diameter to 24" gw@2.00 Ea -- 97.78 137.00 234.78
Stump over 24" diameter to 36" gw@3.00 Ea -- 146.70 205.00 351.70
2015 Heavy Construction Estimator, All Rights Reserved Page 154

Clear trees with 335 HP dozer


Pile debris on site. No loading or hauling included, using a D-8L crawler tractor dozer with universal
blade, shank ripper beam and ripper shanks.
Trees to 6" diameter gs@.500 Ea -- 23.62 68.30 91.92
Trees over 6" to 12" diameter gs@.750 Ea -- 35.43 102.00 137.43
Trees over 12" to 24" diameter gs@1.00 Ea -- 47.24 137.00 184.24
Trees over 24" to 36" diameter gs@1.50 Ea -- 70.86 205.00 275.86

Grub stumps with 335 HP dozer


Pile debris on site. No loading or hauling included, using a D-8L crawler tractor dozer with universal
blade, shank ripper beam and ripper shanks.
Stumps to 6" diameter gs@.500 Ea -- 23.62 68.30 91.92
Stumps over 6" to 12" diameter gs@.750 Ea -- 35.43 102.00 137.43
Stumps over 12" to 24" diameter gs@1.00 Ea -- 47.24 137.00 184.24
Stumps over 24" to 36" diameter gs@1.50 Ea -- 70.86 205.00 275.86

CSI 02-111, Interior building demolition

Debris chute installation and removal


Cost includes all materials and erection and removal. Estimate 50 LF as a minimum charge, using
20-ton hydraulic crane with 70’ boom and small tools.
18" (46 cm) diameter
prefabricated steel chute sv@.700 LF 39.40 24.47 10.20 74.07
36" (91 cm) diameter
prefabricated steel chute sv@.933 LF 59.20 32.61 13.60 105.41

Remove complete building interior, gutted


Interior stripped back to structural walls. Building structure to remain. Hand loaded and hauled 2 miles
(3.2km) to dump. Add dump charges. No salvage included. Per square foot of floor area from 5,000 sqft
to 10,000 sqft, using a 46,000 lb. 3-axle 6x4 truck with 12 CY dump body and small tools.
Wood-frame building hb@.265 SF -- 9.74 4.01 13.75
Metal-frame building,
wood or metal partitions hb@.243 SF -- 8.93 3.68 12.61

Truck hauling of debris


By loose material volume, add dump charges and the cost of loading at the work site, using a 46,000 lb.
3-axle 6x4 truck with 12 CY dump body.
One load each hour hg@.083 CY -- 3.47 9.65 13.12
One load each two hours hg@.166 CY -- 6.95 19.30 26.25

Demolish entire building - Plain concrete structure


By building volume before demolition, add hauling cost and dump charges, using a 375 CFM, 100 PSI
compressor, three 46,000 lb. 3-axle 6x4 trucks with 8 CY dump bodies, a 2.5 CY front end wheel loader
and small tools.
Demolish building
structure by blasting hk@.009 CY 0.09 0.35 0.35 0.79

Demolish entire building - Plain concrete structure


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 30 SF of floor
becomes 1 CY of debris, using a 375 CFM, 100 PSI compressor, 400’ of 1" air hose, two 46,000 lb.
3-axle 6x4 trucks with 12 CY dump bodies, two 3.75 CY front-end crawler loaders, two 86 pound paving
breakers and small tools.
With pneumatic tools hi@.089 SF -- 3.25 2.89 6.14

Demolish entire building - Plain concrete structure


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 30 SF of floor
becomes 1 CY of debris, using a 20-ton hydraulic crane with 70’ boom, two 46,000 lb. 3-axle 6x4 trucks
with two 12 CY dump bodies, a 3.75 CY front-end crawler loader and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 154 (part 2)

With a crane and headache ball hl@.031 SF -- 1.17 1.32 2.49

Demolish entire building - Reinforced concrete building


By building volume before demolition. Loading, hauling and dump charges not included, using a 375
CFM, 100 PSI compressor, three 46,000 lb. 3-axle 6x4 trucks with 8 CY dump bodies, a 2.5 CY front
end wheel loader and small tools.
Demolish building by blasting hk@.010 CY 0.09 0.39 0.39 0.87
2015 Heavy Construction Estimator, All Rights Reserved Page 155

Demolish entire building - Reinforced concrete building


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 25 SF of floor
becomes 1 CY of debris, using a 375 CFM, 100 PSI compressor, 400’ of 1" air hose, two 46,000 lb.
3-axle 6x4 trucks with 12 CY dump bodies, two 3.75 CY front-end crawler loaders, two 86 pound paving
breakers and small tools.
With pneumatic tools hi@.098 SF -- 3.58 3.18 6.76

Demolish entire building - Reinforced concrete building


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 30 SF of floor
becomes 1 CY of debris, using a 20-ton hydraulic crane with 70’ boom, two 46,000 lb. 3-axle 6x4 trucks
with two 12 CY dump body, a 3.75 CY front-end crawler loader and small tools.
With a crane and headache ball hl@.038 SF -- 1.43 1.62 3.05

Demolish entire building - Masonry building


By building volume before demolition, add hauling cost and dump charges, using a 375 CFM, 100 PSI
compressor, three 46,000 lb. 3-axle 6x4 trucks with 8 CY dump bodies, a 2.5 CY front end wheel loader
and small tools.
Demolish building by blasting hk@.007 CY 0.27 0.27 0.27 0.81

Demolish entire building - Masonry building


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 50 SF of floor
becomes 1 CY of debris, using a 375 CFM, 100 PSI compressor, 400’ of 1" air hose, two 46,000 lb.
3-axle 6x4 trucks with 12 CY dump bodies, two 3.75 CY front-end crawler loaders, two 86 pound paving
breakers and small tools.
With pneumatic tools hi@.074 SF -- 2.71 2.40 5.11

Demolish entire building - Masonry building


Based on 8' ceiling height. No salvage, loading, hauling or dump charges included. 50 SF of floor
becomes 1 CY of debris, using a 20-ton hydraulic crane with 70’ boom, two 46,000 lb. 3-axle 6x4 trucks
with two 12 CY dump body, a 3.75 CY front-end crawler loader and small tools.
With crane and headache ball hl@.026 SF -- 0.98 1.11 2.09

Wood frame building demolition


Based on 8' ceiling height. Includes loading but no salvage, hauling or dump charges. 50 SF of floor
becomes 1 CY of debris, using two 46,000 lb. 3-axle 6x4 trucks with 12 CY dump bodies, a 3.75 CY
front-end crawler loader and small tools.
Typical cost
per CF of building volume hh@.006 CF -- 0.23 0.25 0.48
Cost per SF of floor, minimum hh@.038 SF -- 1.43 1.58 3.01
Cost per SF of floor, maximum hh@.065 SF -- 2.45 2.70 5.15

Building component demolition - Demolish brick or concrete block partitions


By area measured one side. Debris piled on site. No salvage, loading, hauling or dump charges
included. At 4" thick, 60 SF of wall becomes 1 CY of debris; at 8" thick, 30 SF of wall becomes 1 CY of
debris; at 12" thick, 20 SF of wall becomes 1 CY of debris, using a 375 CFM, 100 PSI compressor, 200’
of 1" air hose, a 86 pound paving breaker and small tools.
4" (10cm) thick brick
or concrete block partition dx@.040 SF -- 1.40 0.31 1.71
8" (20cm) thick brick
or concrete block partition dx@.057 SF -- 1.99 0.45 2.44
12" (31cm) thick brick
or concrete block partition dx@.073 SF -- 2.55 0.57 3.12
2015 Heavy Construction Estimator, All Rights Reserved Page 156

Add for horizontal reinforcement ---@--- % -- 12.00 -- --


Add for vertical reinforecment ---@--- % -- 12.00 -- --

Building component demolition - Cast-in-place concrete partitions


By in place material volume. Debris piled on site. No salvage, loading, hauling or dump charges
included. For plain concrete allow 18 CF of wall per CY of debris; for reinforced concrete allow, 20 CF
of wall per CY of debris, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, a 86 pound paving
breaker and small tools.
Plain concrete partition dx@.267 CF -- 9.34 2.10 11.44
Reinforced concrete partition dx@.364 CF -- 12.73 2.86 15.59

Building component demolition - Gypsum or terra-cotta partition


Includes metal lath, surface area measured one side. Debris piled on site. No salvage, loading, hauling
or dump charges included. 90 SF of partition yields one CY of debris, using a 375 CFM, 100 PSI
compressor, 200’ of 1" air hose, a 86 pound paving breaker and small tools.
To 6" (15cm) thick partition dx@.097 SF -- 3.39 0.76 4.15

Building component demolition - Stud partitions


By surface area measured one side. Debris piled on site. No salvage, loading, hauling or dump charges
included. 100 SF becomes 1 CY of debris, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose,
a 86 pound paving breaker and small tools.
Drywall on two sides of
wood or metal stud partition ed@.028 SF -- 0.98 1.64 2.62
Plaster and lath on two
sides of metal stud partition ed@.026 SF -- 0.91 1.52 2.43

Elevated concrete slab cut outs.


Debris allowed to free fall. Debris piled on site. No salvage, loading, hauling or dump charges included.
20 CF of slab yields 1 CY of debris, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, a 86
pound paving breaker and small tools.
Less than 6 CF (.17m3)
with wire mesh reinforcing dx@.533 CF -- 18.64 4.19 22.83
Over 6 CF (.17m3)
with wire mesh reinforcing dx@.444 CF -- 15.53 3.49 19.02
Less than 6 CF
(.17m3) with bar reinforcing dx@.667 CF -- 23.33 5.24 28.57
Over 6 CF
(.17m3) with bar reinforcing dx@.615 CF -- 21.51 4.83 26.34

Brick wall cutouts


Not including toothing, to 4 square feet. Debris piled on site. No salvage, loading, hauling or dump
charges included. For 4" thick wall, 60 SF become 1 CY of debris; for 8" thick wall, 30 SF become 1
CY of debris; for 12" thick wall, 20 SF become 1 CY of debris, using a 375 CFM, 100 PSI compressor,
200’ of 1" air hose, a 86 pound paving breaker and small tools.
4" (10cm) thick,
up to 4 SF (.37m2) opening dx@1.33 Ea -- 46.52 10.50 57.02
8" (20cm) thick,
up to 4 SF (.37m2) opening dx@1.82 Ea -- 63.66 14.30 77.96
12" (31cm) thick,
up to 4 SF (.37m2) opening dx@2.67 Ea -- 93.40 21.00 114.40

Concrete block wall cutouts


Not including toothing, to 4 square feet. Debris piled on site. No salvage, loading, hauling or dump
charges included. Multiply by the figure in parenthesis to convert quantity before demolition to volume of
loose debris, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, a 86 pound paving breaker and
small tools.
4" (10cm) thick, up to 4 SF (.37m2) opening
2015 Heavy Construction Estimator, All Rights Reserved Page 156 (part 2)

(1 SF becomes .017 CY) dx@1.33 Ea -- 46.52 10.50 57.02


8" (20cm) thick, up to 4 SF (.37m2) opening
(1 SF becomes .033 CY) dx@1.48 Ea -- 51.77 11.60 63.37
12" (31cm) thick, up to 4 SF (.37m2)
opening (1 SF becomes .05 CY) dx@1.60 Ea -- 55.97 12.60 68.57

Flooring removal
Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Ceramic or quarry tile
floor (1 SF becomes .004 CY) sx@.034 SF -- 1.19 0.01 1.20
Brick flooring
(1 SF becomes .006 CY) sx@.036 SF -- 1.26 0.01 1.27
Terrazzo flooring
(1 SF becomes .004 CY) sx@.051 SF -- 1.78 0.02 1.80

Remove lighting fixtures


No salvage value assumed, using small tools.
4' surface mounted fluorescent fixture
in a gypsum board ceiling lk@1.11 Ea -- 55.61 0.21 55.82
Remove a residential light fixture lk@.625 Ea -- 31.31 0.12 31.43
2015 Heavy Construction Estimator, All Rights Reserved Page 157

Remove electrical cabinets mounted in wood-frame walls


No salvage value assumed, using small tools.
Fused disconnect 200
amp heavy duty NEMA 1 cabinet lk@2.14 Ea -- 107.20 0.41 107.61
Fused disconnect 30 pole,
NEMA 1 panelboard lk@5.00 Ea -- 250.50 0.95 251.45
Demolish a residential 200 amp or less load
center with breakers and wire lk@10.0 Ea -- 501.00 1.90 502.90

Remove wire from conduit


No salvage value assumed, using small tools.
Remove 3 strands of
12 gauge wire in 3/4" conduit lk@.003 LF -- 0.15 -- 0.15

Remove surface mounted conduit from walls


Includes loading and disposal, using small tools.
Remove conduit,
1/2" to 1" (1.27cm to 2.54cm) lk@.010 LF -- 0.50 -- 0.50
Remove conduit,
1-1/4" to 2" (3.1cm to 5.1cm) lk@.015 LF -- 0.75 -- 0.75

Remove residential outlets from exposed walls


Including box and receptacle, using small tools.
Remove a residential
110 volt outlet and wire lk@.417 Ea -- 20.89 0.08 20.97
Remove a residential
220 volt outlet and wire lk@.833 Ea -- 41.73 0.16 41.89
Remove a residential
TV telephone outlet and wire lk@.417 Ea -- 20.89 0.08 20.97

Plumbing fixture removal


Fixtures only, no salvage value assumed, using small tools.
Wall hung lavatory nb@1.11 Ea -- 58.05 0.63 58.68
Floor-mounted water closet nb@1.43 Ea -- 74.79 0.82 75.61
Wall-mounted urinal nb@1.67 Ea -- 87.34 0.95 88.29
Recessed water fountain nb@1.67 Ea -- 87.34 0.95 88.29

Metal piping removal


Remove pipe and hangers from exposed walls, using small tools.
Pipe to 2" (5cm) nb@.050 LF -- 2.62 0.03 2.65
Pipe over 2" to 4" (10cm) nb@.083 LF -- 4.34 0.05 4.39
Pipe over 4" to 8" (20cm) nc@.200 LF -- 9.83 0.11 9.94
Pipe over 8" to 16" (41cm) nc@.400 LF -- 19.67 0.22 19.89

Air conditioner demolition


No salvage value assumed, using a 20-ton hydraulic crane with 70’ boom and small tools.
Roof-top 3 ton air conditioner nn@10.8 Ea -- 483.50 48.00 531.50

Boiler demolition
Including piping and valves. No salvage value assumed, using small tools.
Gas or oil-fired boiler,
150,000 BTU nm@16.0 Ea -- 736.60 9.76 746.36

Ductwork demolition
Including insulation and hangers. No hazardous materials and salvage value assumed, using small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 157 (part 2)

4"x 8" (10cm


x 20cm) sheet metal ductwork n6@.057 LF -- 2.90 0.03 2.93
6"x 8" (15cm
x 20cm) sheet metal ductwork n6@.071 LF -- 3.61 0.04 3.65
10"x 12" (25cm
x 30cm) sheet metal ductwork n6@.100 LF -- 5.09 0.06 5.15
14"x 16" (36cm
x 41cm) sheet metal ductwork n6@.200 LF -- 10.18 0.12 10.30
2015 Heavy Construction Estimator, All Rights Reserved Page 158

CSI 02-112, Selective demolition

Demolish concrete pavement and load on trucks


No salvage, hauling or dump charges included. Multiply by the figure in parenthesis to convert from area
in square yards (SY) to volume in cubic yards (CY) of loose debris, using a jackhammer with chisel bit,
compressor, two 1.38 CY wheeled loader-backhoes and small tools.
6" (15cm) thick with wire
mesh (1 SY becomes .24 CY) es@.162 SY -- 5.83 2.69 8.52
6" (15cm) thick with reinforcing
bars (1 SY becomes .25 CY) es@.179 SY -- 6.44 2.97 9.41
7" to 24" (17.8cm to 61cm) thick, reinforced
(1 CY becomes 2 CY) es@3.58 CY -- 128.80 59.40 188.20

Cut out and remove section of concrete slab, sidewalk or pavement.


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert area in square feet before demolition to volume in cubic yards of loose debris,
using a 375 CFM, 100 PSI compressor, 100’ of 1" air hose, a pneumatic pavement breaker, a 6.63"
depth walk-behind concrete saw and small tools.
Demolish unreinforced concrete to 6"
thick (1 SF becomes .024 CY) dn@.027 SF -- 0.97 0.17 1.14
Demolish mesh reinforced concrete to 6"
thick (1 SF becomes .026 CY) dn@.039 SF -- 1.40 0.25 1.65
Demolish rod reinforced concrete to 6"
thick (1 SF becomes .028 CY) dn@.042 SF -- 1.51 0.26 1.77

Demolish curbing and load on trucks.


No salvage, hauling or dump charges included. Multiply by the figure in parenthesis to convert length of
curb before demolition to volume of loose debris, using a 1.38 CY wheeled loader-backhoe and small
tools.
Granite curbing
(1 LF becomes .166 CY) ew@.079 LF -- 2.82 0.59 3.41
Plain concrete curbing
(1 LF becomes .143 CY) ew@.087 LF -- 3.10 0.65 3.75
Bituminous curbing
(1 LF becomes .125 CY) ew@.032 LF -- 1.14 0.24 1.38
Reinforced concrete
curbs (1 LF becomes .15 CY) ew@.118 LF -- 4.20 0.88 5.08

Remove hollow metal door and frame in masonry wall.


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert the quantity before demolition to volume of loose debris after demolition, using
small tools.
2'-6"x 6'-8" single door
and frame (1 becomes .5 CY) sr@1.25 Ea -- 43.73 0.29 44.02
3' x 7' single door
and frame (1 becomes .5 CY) sr@1.25 Ea -- 43.73 0.29 44.02
4' x 8' single door
and frame (1 becomes .5 CY) sr@1.25 Ea -- 43.73 0.29 44.02
Double 3' x 7' doors
and frame (1 becomes .666 CY) sr@2.00 Ea -- 69.96 0.46 70.42
Double 4' x 8' doors
and frame (1 becomes .666 CY) sr@2.00 Ea -- 69.96 0.46 70.42

Remove door and frame in wood-frame wall.


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
2'-6" x 6'-8" door
2015 Heavy Construction Estimator, All Rights Reserved Page 158 (part 2)

and frame (1 becomes .5 CY) sr@.833 Ea -- 29.14 0.19 29.33


3' x 6'-8" single door
and frame (1 becomes .5 CY) sr@.833 Ea -- 29.14 0.19 29.33
Double 2'-6" x 6'-8" doors
and frame (1 becomes .666 CY) sr@.960 Ea -- 33.58 0.22 33.80
Double 3' x 6'-8" doors
and frame (1 becomes .666 CY) sr@.960 Ea -- 33.58 0.22 33.80

Remove door and frame in salvage condition


Using small tools.
Hollow metal door and frame sr@2.00 Ea -- 69.96 0.46 70.42
Wood door and frame sr@1.25 Ea -- 43.73 0.29 44.02

Remove flooring in salvage condition for re-use


Removed and piled on site, using small tools.
Brick flooring sr@.030 SF -- 1.05 0.01 1.06
Heavy wood flooring sr@.025 SF -- 0.88 0.01 0.89

Remove acoustical tile ceiling


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Adhesive fastened
(1 SF becomes .004 CY) sr@.013 SF -- 0.46 -- 0.46
2015 Heavy Construction Estimator, All Rights Reserved Page 159

Furred and stapled, including furring


(1 SF becomes .008 CY) sr@.013 SF -- 0.46 -- 0.46
Tile ceiling and suspension
system (1 SF becomes .008 CY) sr@.010 SF -- 0.35 -- 0.35

Remove drywall ceiling


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Nailed or screwed on wood furring, including furring
(1 SF becomes .008 CY) sr@.025 SF -- 0.88 0.01 0.89
Nailed or screwed to wood framing
(1 SF becomes .004 CY) sr@.020 SF -- 0.70 -- 0.70

Remove plaster ceiling


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Plaster on metal furring
(1 SF becomes .007 CY) sr@.025 SF -- 0.88 0.01 0.89
Suspended plaster ceiling
(1 SF becomes .010 CY) sr@.020 SF -- 0.70 -- 0.70

Remove roofing on a steel frame


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Corrugated metal roofing
(1 SF becomes .005 CY) sr@.023 SF -- 0.81 0.01 0.82
Built-up roof on metal
deck (1 SF becomes .004 CY) sr@.028 SF -- 0.98 0.01 0.99

Remove roofing on a wood frame


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Built-up roof on wood
deck (1 SF becomes .004 CY) sr@.015 SF -- 0.53 -- 0.53
Composition or wood shingles on a wood frame
roof (1 SF becomes .005 CY) sr@.018 SF -- 0.63 -- 0.63
Concrete roof tile on a wood frame
roof (1 SF becomes .013 CY) sr@.020 SF -- 0.70 -- 0.70

Remove wood or metal frame windows


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using small tools.
Less than 15 SF (1.3m2)
window (1 SF becomes .028 CY) sr@1.67 Ea -- 58.42 0.38 58.80
16 to 30 SF (1.5m2 to 2.8m2)
window (1 SF becomes .033 CY) sr@2.22 Ea -- 77.66 0.51 78.17
Over 31 SF (2.9m2)
window (1 SF becomes .039 CY) sr@.100 SF -- 3.50 0.02 3.52

Pad mounted transformer removal


Using a 20-ton hydraulic crane with 70’ boom.
150 KVA pad-mounted transformer,
disconnect and load lm@5.68 Ea -- 280.90 16.90 297.80

Pole mounted transformer removal


Using a 20-ton hydraulic crane with 70’ boom and small tools.
25 KVA pole mounted transformer,
2015 Heavy Construction Estimator, All Rights Reserved Page 159 (part 2)

disconnect, lower and load ln@16.4 Ea -- 816.90 22.80 839.70

Building foundation demolition


Per cubic foot of in-place volume. Debris piled on site. No salvage, loading, hauling or dump charges
included. Multiply by the figure in parenthesis to convert quantity before demolition to volume of loose
debris, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, a 3.75 front-end crawler loader, two
86 pound paving breakers and small tools.
Brick or stone building foundation
(1 CF becomes .025 CY) dy@.053 CF -- 1.87 0.35 2.22
Plain concrete building foundation
(1 CF becomes .028 CY) dy@.054 CF -- 1.91 0.36 2.27
Reinforced concrete building foundation
(1 CF becomes .033 CY) dy@.071 CF -- 2.51 0.47 2.98

Catch basin and manhole demolition


Debris piled on site. No salvage, loading, hauling or dump charges included. Multiply by the figure in
parenthesis to convert quantity before demolition to volume of loose debris, using a 1.38 CY wheeled
loader-backhoe and small tools.
Masonry, 5' (1.5m) deep by 4' (1.2m) diameter,
remove (Each becomes 032 CY) ew@6.50 Ea -- 231.60 48.40 280.00

Railroad trackage removal, no salvage assumed


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Railroad track and ties tq@.508 LF -- 17.96 4.24 22.20
2015 Heavy Construction Estimator, All Rights Reserved Page 160

Railroad trackage removal and re-install


Using a 1.38 CY wheeled loader-backhoe and small tools.
Remove and re-install tie and track with
salvaged bolts and spikes ex@.960 LF -- 33.94 3.67 37.61
Load railroad track ballast ex@.111 CY -- 3.92 0.42 4.34
Remove track turnouts, re-install with
salvaged bolts and spikes ex@48.0 Ea -- 1,697.00 183.00 1,880.00

Chain link fence removal


For disposal, no salvage assumed, using small tools.
Remove chain link
fence in salvage condition sr@.040 LF -- 1.40 0.01 1.41
Remove and reset chain link fence sr@.200 LF -- 7.00 0.05 7.05
Remove 7/8" to 1-1/2"metal post sr@.600 Ea -- 20.99 0.14 21.13

Wood fence removal


For disposal, no salvage assumed, using small tools.
To 6' high, minimum cost wf@.037 LF -- 0.75 0.03 0.78
To 6' high, maximum cost wf@.075 LF -- 1.52 0.07 1.59

Barbed wire fence removal


For disposal, no salvage assumed, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small
tools.
Demolish 3-strand barbed wire fence s2@.024 LF -- 0.84 0.05 0.89
Demolish 5-strand barbed wire fence s2@.035 LF -- 1.23 0.07 1.30

Demolish highway guardrail


using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Demolish, no salvage s2@.240 LF -- 8.41 0.50 8.91
Remove and reset guardrail s2@.480 LF -- 16.82 1.01 17.83

Demolish highway guardrail


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
Remove and dispose
of guardrail guardposts only s5@.427 Ea -- 15.19 8.13 23.32

Saw or torch cutting, per linear inch of depth


Per inch of depth and foot of length, using miscellaneous power tools and small tools.
Saw cut brick masonry wall su@.075 LF -- 2.62 0.11 2.73
Saw cut block masonry wall su@.090 LF -- 3.15 0.13 3.28
Saw cut plain concrete walls su@.097 LF -- 3.39 0.14 3.53
Saw cut
rod reinforced concrete walls su@.165 LF -- 5.77 0.25 6.02
Saw cut bituminous paving su@.050 LF -- 1.75 0.07 1.82
Saw cut
mesh-reinforced concrete slab su@.041 LF -- 1.43 0.06 1.49
Saw cut
rod-reinforced concrete slab su@.071 LF -- 2.48 0.11 2.59
Torch cut steel plate su@.280 LF -- 9.79 0.42 10.21

Concrete core drilling, horizonal


Per linear foot of core depth. Based on single mat reinforcing. Green concrete may cost less and
difficult drill setups will cost more, using a skid mounted 44 HP core drill and small tools.
1" (2.5cm) diameter core s6@.770 LF -- 26.99 10.90 37.89
2015 Heavy Construction Estimator, All Rights Reserved Page 160 (part 2)

2" (5cm) diameter core s6@.850 LF -- 29.79 12.10 41.89


3" (7.5cm) diameter core s6@1.00 LF -- 35.05 14.20 49.25
4" (10cm) diameter core s6@1.15 LF -- 40.31 16.30 56.61
6" (15cm) diameter core s6@1.70 LF -- 59.59 24.20 83.79
8" (20cm) diameter core s6@2.00 LF -- 70.10 28.40 98.50
10" (25cm) diameter core s6@2.30 LF -- 80.62 32.70 113.32
12" (30cm) diameter core s6@3.80 LF -- 133.20 54.00 187.20
14" (35cm) diameter core s6@4.38 LF -- 153.50 62.20 215.70
16" (40cm) diameter core s6@5.00 LF -- 175.30 71.10 246.40
18" (45cm) diameter core s6@5.50 LF -- 192.80 78.20 271.00
20" (50cm) diameter core s6@6.10 LF -- 213.80 86.70 300.50
24" (60cm) diameter core s6@7.30 LF -- 255.90 104.00 359.90
2015 Heavy Construction Estimator, All Rights Reserved Page 161

Sewer and water pipe removal


Green concrete may cost less and difficult drill setups will cost more, using a skid mounted 44 HP core
drill and small tools.
Green concrete may cost less and difficult drill setups will cost more, using a skid mounted 44 HP core
drill and small tools.
Includes loading for disposal but no excavation, using a 20-ton hydraulic crane with 70’ boom and small
tools.
Concrete pipe 12" diameter xt@.147 LF -- 4.52 1.36 5.88
Concrete pipe 15" to 18" diameter xt@.176 LF -- 5.42 1.63 7.05
Concrete pipe 21" to 24" diameter xt@.220 LF -- 6.77 2.04 8.81
Concrete pipe 27" to 36" diameter xt@.293 LF -- 9.02 2.71 11.73
Steel pipe 4" diameter xt@.169 LF -- 5.20 1.56 6.76
Welded
steel pipe 6" to 12" diameter xt@.314 LF -- 9.66 2.90 12.56
Remove fire hydrant xt@6.00 Ea -- 184.60 55.50 240.10
Remove and reset fire hydrant xt@18.0 Ea -- 553.90 167.00 720.90
2015 Heavy Construction Estimator, All Rights Reserved Page 162

CSI 02-113, Asbestos removal

Asbestos removal - Pre and post abatement costs


Costs vary widely.
Asbestos
abatement notification fees --@.000 Job 1,610.00 -- -- 1,610.00
Asbestos decontamination
of trucks and equipment --@.000 Job 2,410.00 -- -- 2,410.00

Asbestos removal - Remove and return office furniture and equipment


Using small tools.
Per SF of office floor ab@.020 SF -- 1.00 0.02 1.02
Remove
and replace lighting fixtures ab@.625 Ea -- 31.36 0.53 31.89

Asbestos removal - Pre-cleaning with high efficiency vacuum and wet clean
Using two 2 HP electric HEPA vacuums and small tools.
6' to 11' ceiling, per SF of floor,
wall or ceiling ae@.004 SF 0.02 0.20 0.01 0.23
12 to 15' ceiling, per SF of floor,
wall or ceiling ae@.005 SF 0.02 0.25 0.01 0.28
Over 15' ceiling, per SF of floor,
wall or ceiling ae@.008 SF 0.02 0.40 0.02 0.44

Asbestos removal - Isolating the work area


Set up negative pressure air work area. Per SF of floor, using two 2 HP electric HEPA vacuums,
miscellaneous power tools and small tools.
Isolate floor area
with 2 layers of 6 mil poly af@.007 SF 0.40 0.35 0.03 0.78
Isolate walls and ceiling
with 2 layers 4 mil poly af@.009 SF 0.40 0.45 0.04 0.89

Asbestos removal - Isolating the work area


Using small tools.
Wrap general office furniture and
equipment with 1-ply sheeting ab@.068 Ea 4.02 3.41 0.06 7.49
Wrap large or complex equipment
with 2-ply 6mm sheeting ab@.011 SF 0.40 0.55 0.01 0.96

Set up portable asbestos decontamination facility


Based on amortization over 10 jobs, using 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, miscellaneous
power tools and small tools.
Cost per job ag@2.00 Ea 804.00 100.50 21.70 926.20

Asbestos decontamination equipment


Using small tools.
Decontamination
facility in building interior ab@6.67 Ea 161.00 334.60 5.60 501.20

Asbestos decontamination equipment


Using 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, miscellaneous power tools and small tools.
Weatherized decontamination
facility on building exterior ag@12.0 Ea 1,930.00 602.90 130.00 2,662.90

Asbestos decontamination equipment


2015 Heavy Construction Estimator, All Rights Reserved Page 162 (part 2)

Using small tools.


Negative pressure air machine for asbestos removal, 1,000 to 2,000 CFM unit
for 25,000 CF room volume ac@2.00 Ea 402.00 100.30 1.14 503.44

Asbestos decontamination equipment


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
Containment barrier for asbestos removal, wood frame
wall with 4 mil poly barrier af@.015 SF 3.22 0.75 0.06 4.03

Air monitoring and bulk sampling


Asbestos air monitor, 4 to 6 hours per day bulk sampling,
technician time only --@.000 Day 160.00 -- -- 160.00
Rent 5-pump
asbestos air monitor set --@.000 Day 148.00 -- -- 148.00
Post asbestos abatement air testing --@.000 Job 23.90 -- -- 23.90
Bulk sampling and analysis of
suspected asbestos materials --@.000 Ea 78.20 -- -- 78.20
Parts per million
sample analysis for asbestos --@.000 Ea 23.90 -- -- 23.90
Air sample analysis for asbestos,
24 to 48 hour turn-around --@.000 Ea 399.00 -- -- 399.00

Asbestos removal - Personnel protection equipment


Costs per worker per day. The cost of paper and type C respirators can be amortized over 10 jobs.
Coveralls, respirator, gloves --@.000 Ea 31.10 -- -- 31.10
Paper respirator, pump, battery --@.000 Ea 21.00 -- -- 21.00
Type-C respirator, hoses, air pump --@.000 Ea 64.00 -- -- 64.00
2015 Heavy Construction Estimator, All Rights Reserved Page 163

Install ground fault interrupter --@.000 Job 66.50 -- -- 66.50

Clean-up after asbestos abatement


Costs per SF of floor, wall and ceiling surface, using two 2 HP electric HEPA vacuums and small tools.
Initial asbestos abatement clean-up,
isolated work area ae@.011 SF 0.01 0.55 0.02 0.58
Post abatement visual inspection --@.000 Ea 168.00 -- -- 168.00
Reclean for failed clearance, HEPA
vacuuming or wet cleaning ae@.008 SF 0.01 0.40 0.02 0.43
Final clean-up, HEPA vacuuming,
remove final sheeting layer ae@.006 SF 0.01 0.30 0.01 0.32
Remove site fabricated
decontamination facility ae@6.00 Ea 1.00 301.40 12.00 314.40
HEPA vacuum glove-bag work areas, clean-up
of non-isolated areas ae@.011 SF 0.01 0.55 0.02 0.58

Clean-up after asbestos abatement


Using 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, miscellaneous power tools and small tools.
Remove portable
decontamination facility ag@3.00 Ea 20.00 150.70 32.50 203.20

Disposal of asbestos cleanup materials


Using small tools.
Handling of asbestos disposal bags
from work site to haul truck ab@.047 Ea -- 2.36 0.04 2.40
Asbestos landfill disposal, per ton --@.000 Ton 140.00 -- -- 140.00
Asbestos landfill disposal,
per cubic yard --@.000 CY 27.90 -- -- 27.90

Remove mag-block asbestos pipe insulation in isolated work areas


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@.064 LF 0.02 3.21 0.27 3.50
4" to 6" pipe af@.080 LF 0.04 4.02 0.34 4.40
7" to 12" pipe af@.107 LF 0.06 5.37 0.45 5.88

Remove air cell asbestos pipe insulation in isolated work areas


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@.040 LF 0.02 2.01 0.17 2.20
4" to 6" pipe af@.050 LF 0.04 2.51 0.21 2.76
7" to 12" pipe af@.067 LF 0.06 3.36 0.28 3.70

Remove hand-packed asbestos plaster insulation from pipe fittings in isolated work areas
Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@.377 Ea 0.04 18.93 1.58 20.55
4" to 6" pipe af@.711 Ea 0.06 35.69 2.98 38.73
7" to 12" pipe af@1.28 Ea 0.08 64.26 5.36 69.70

Remove asbestos boiler insulation in isolated work areas


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
Remove up
to 3-1/2" boiler insulation af@.229 SF 0.02 11.50 0.96 12.48
Remove boiler
insulation when boiler is hot af@.640 SF 0.02 32.13 2.68 34.83

Remove asbestos boiler gaskets in isolated work areas


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 163 (part 2)

Remove boiler gaskets ab@.064 LF 0.01 3.21 0.05 3.27

Remove spray-on asbestos acoustical fire proofing in isolated work areas


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
Flat ceiling or wall,
scrape plaster af@.020 SF 0.02 1.00 0.08 1.10
Flat ceiling or wall,
scrape drywall or concrete af@.011 SF 0.02 0.55 0.05 0.62
Scrape metal beams af@.026 SF 0.02 1.31 0.11 1.44
Scrape metal ductwork af@.022 SF 0.02 1.10 0.09 1.21
Final scraping with hand brush af@.020 SF 0.02 1.00 0.08 1.10
Pressure wash after final scraping af@.010 SF 0.02 0.50 0.04 0.56
Add for over 12' in height ---@--- % -- 15.00 -- --

Miscellaneous asbestos removal in isolated work areas


Using small tools.
Remove hard coat plaster
from ductwork or machines ab@.160 SF 0.02 8.03 0.13 8.18
Remove vinyl asbestos flooring ab@.033 SF 0.01 1.66 0.03 1.70
Remove sheet or
paper-backed vinyl flooring ab@.022 SF 0.01 1.10 0.02 1.13
Remove asbestos paper backing ab@.013 SF 0.02 0.65 0.01 0.68

Miscellaneous asbestos removal in isolated work areas


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
Remove interior
asbestos plaster walls af@.237 SF 0.40 11.90 0.99 13.29
Remove exterior
asbestos plaster walls af@.136 SF 0.40 6.83 0.57 7.80

Remove air-cell pipe insulation with glove bags in semi-isolated work area
Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@.112 LF 2.03 5.62 0.47 8.12
4" to 6" pipe af@.121 LF 2.03 6.07 0.51 8.61
2015 Heavy Construction Estimator, All Rights Reserved Page 164

7" to 12" pipe af@.168 LF 2.71 8.43 0.70 11.84

Remove mag-block pipe insulation with glove bags in semi-isolated work area
Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@.168 LF 2.03 8.43 0.70 11.16
4" to 6" pipe af@.194 LF 2.03 9.74 0.81 12.58
7" to 12" pipe af@.320 LF 2.71 16.06 1.34 20.11

Remove hand-packed asbestos plaster insulation from pipe fittings in semi-isolated work areas
Using glove bags, using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
1/2" to 4" pipe af@1.00 Ea 6.38 50.20 4.19 60.77
4" to 6" pipe af@1.07 Ea 6.38 53.71 4.48 64.57
7" to 12" pipe af@1.60 Ea 9.58 80.32 6.70 96.60

Remove asbestos pipe and ductwork insulation in semi-isolated work areas


Removed by the "cut, wrap and take" method, using two 2 HP electric HEPA vacuums, miscellaneous
power tools and small tools.
Pipe under 6" diameter af@.085 LF 0.44 4.27 0.36 5.07
Metal duct under 12" af@.107 LF 0.36 5.37 0.45 6.18

Remove asbestos board in semi-isolated work area


Using small tools.
Remove cement-asbestos
transite board ab@.015 SF 0.02 0.75 0.01 0.78
Remove asbestos millboard ab@.020 SF 0.02 1.00 0.02 1.04

Remove asbestos siding in semi-isolated work area


Using 40-ton hydraulic crane with 84’ boom and small tools.
Remove transite shingle siding ah@.043 SF 0.02 2.13 1.03 3.18

Remove asbestos roofing in semi-isolated work area


Using two 2 HP electric HEPA vacuums, miscellaneous power tools and small tools.
Remove asbestos shingle roofing af@.021 SF 0.01 1.05 0.09 1.15

CSI 02-210, Site grading

Site grading and clearing


Using a Cat 12-G motor grader.
Rough roadway clearing with grader,
general area grading. jm@.572 MSY -- 20.75 13.70 34.45
Subgrade,
fine grading to + or - .1' jm@.925 MSY -- 33.56 22.10 55.66
Cut and grade embankment, ditch to 3' (1m), slopes
to 1 vertical in 2 horizontal jm@1.60 MSY -- 58.05 38.30 96.35

Grading and compacting


Based on 8" lifts and 3 passes at 5' wide, using a D-8L crawler tractor dozer with universal blade and a
25.5-ton towed vibrating sheepsfoot roller.
Grade and compact
large area with 300 HP dozer gr@.012 CY -- 0.57 1.85 2.42

Grading and compacting


Based on 6" lifts and 3 passes at 5' wide, using a D-4H crawler tractor dozer with angle tilt blade.
Grade and compact
small area with 75 HP dozer gk@.018 CY -- 0.67 0.54 1.21
2015 Heavy Construction Estimator, All Rights Reserved Page 164 (part 2)

Roadway grading
Using a Cat 12-G motor grader.
Grade roadway sub base courses jm@2.10 MSY -- 76.19 50.30 126.49
Finish grade roadway
base or leveling courses jm@2.36 MSY -- 85.62 56.50 142.12

Rough grade for structures and slabs


Using a D-6H crawler tractor dozer, power shift with angle tilt blade.
Push to
stockpile with 140 HP dozer gl@.015 CY -- 0.56 0.85 1.41

CSI 02-211, Rock removal

Quarry drilling
Finish grade, material under 3/4" diameter, using a 750 CFM 100 PSI air compressor, 200’ of 3"
hardrock air hose, a 3/4-ton pickup truck and small tools and a 2.5" to 4" track drill with 12’ reach.
Drilling for rock bolts d5@.055 LF 1.74 2.00 2.29 6.03

Quarry drilling
Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 3/4-ton pickup truck and
small tools and a 2.5" to 4" track drill with 12’ reach.
Drilling for pre-splitting, based on 2-1/2" (.64mm) diameter hole and drill production of
40 linear feet (12m) per hour d5@.057 LF 1.74 2.08 2.37 6.19
2015 Heavy Construction Estimator, All Rights Reserved Page 165

Quarry production drilling


Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 3/4-ton pickup truck and
small tools and a 2.5" to 4" track drill with 12’ reach.
30 LF (9m) per hour d5@.076 LF 1.39 2.77 3.16 7.32
40 LF (12m) per hour d5@.057 LF 1.39 2.08 2.37 5.84
50 LF (15m) per hour d5@.046 LF 1.39 1.68 1.91 4.98
60 LF 18m) per hour d5@.038 LF 1.39 1.38 1.58 4.35
75 LF (23m) per hour d5@.030 LF 1.39 1.09 1.25 3.73

Quarry production drilling


Using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, two 86 pound paving breakers and small
tools.
Rocks under 1,500 pounds d2@.800 CY 7.97 28.37 8.01 44.35

Quarry production drilling


Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 3/4-ton pickup truck and
small tools and a 2.5" to 4" track drill with 12’ reach.
Rocks over 1,500 pounds d5@.600 CY 7.97 21.85 24.90 54.72

Quarry production drilling


Using a 750 CFM 100 PSI air compressor, a 4" air track drill with 12' feed and a 3/4-ton 4x4 pickup
truck.
2 1/2" bore at 25',
64' per hour at 80% capacity ee@.025 LF -- 0.90 1.19 2.09

Blasting caps for a shot load


Using a 750 CFM compressor, 2.5" to 4" diameter track drill, a 1 ton truck and small tools.
Electric blasting caps d4@.020 EA 2.11 0.71 0.72 3.54
Non-electric blasting caps d4@.020 EA 2.61 0.71 0.72 4.04
Electric detonation tool (purchase) --@.000 EA 105.00 -- -- 105.00

Blasting for quarry production


Trench excavation assumes 20 LF (6m) lifts with production of two holes per hour. Pattern and spacing
depends of rock character. Add the drilling cost, using a 24,500 lb.2-axle truck with 8’ x 16’ flat bed and
a 3/4-ton pickup truck.
6' square (1.8m x 1.8m) pattern d3@.080 CY 13.70 2.79 0.56 17.05
7' square (2.1m x 2.1m) pattern d3@.060 CY 13.70 2.09 0.42 16.21
8' square (2.4m x 2.4m) pattern d3@.045 CY 13.70 1.57 0.31 15.58
9' square (2.7m x 2.7m) pattern d3@.035 CY 13.70 1.22 0.24 15.16
10' square (3m x 3m) pattern d3@.029 CY 13.70 1.01 0.20 14.91
12' square (3.7m x 3.7m) pattern d3@.020 CY 13.70 0.70 0.14 14.54
14' square (4.3m x 14.3m) pattern d3@.015 CY 13.70 0.52 0.10 14.32

Blasting for pre-splitting


Does not include the drilling cost, using a 24,500 lb.2-axle truck with 8’ x 16’ flat bed and a 3/4-ton
pickup truck.
Load and detonate d3@.072 LF 3.98 2.51 0.50 6.99
Ammonium nitrite explosives --@.000 Lb 2.31 -- -- 2.31
Detonator wire --@.000 LF 0.12 -- -- 0.12
Primacord (50 grain) --@.000 MLF 156.00 -- -- 156.00
Fuel oil for blasting --@.000 Gal 4.22 -- -- 4.22

Blasting boulders
No drilling required, using a 24,500 lb.2-axle truck with 8’ x 16’ flat bed and a 3/4-ton pickup truck.
Load and detonate d3@.170 CY 40.20 5.93 1.18 47.31
2015 Heavy Construction Estimator, All Rights Reserved Page 165 (part 2)

Blasting for ditch or shallow trenches to 10 feet wide


using a 24,500 lb.2-axle truck with 8’ x 16’ flat bed and a 3/4-ton pickup truck.
Blast for
5' wide (1.5m) shallow trench d3@.061 CY 43.60 2.13 0.42 46.15
Blast for
6.5' wide (2m) shallow trench d3@.034 CY 40.40 1.19 0.24 41.83
Blast for
10' wide (3m) shallow trench d3@.023 CY 37.80 0.80 0.16 38.76

Ripping soft clays (not sedimented)


Using a D-9N crawler tractor dozer with blade, ripper beam and ripper shanks.
D-9 cat in clays
with double shank ripper gu@.002 CY -- 0.09 0.32 0.41

Ripping soft clays (not sedimented)


Using a D-8L crawler tractor dozer with universal blade, single shank ripper beam and ripper shanks.
D-8 cat in clays
with single shank ripper gs@.003 CY -- 0.14 0.41 0.55

Glacial tills
Using a D-9N crawler tractor dozer with blade, ripper beam and ripper shanks.
D-9 cat with double shank ripper gu@.004 CY -- 0.19 0.64 0.83

Glacial tills
Using a D-8L crawler tractor dozer with universal blade, single shank ripper beam and ripper shanks.
D-8 cat with single shank ripper gs@.005 CY -- 0.24 0.68 0.92

Ripping sedimentary rocks (shale, sandstone, limestone)


Some sedimentary rock must be blasted before excavation. Seismic tests will identify sedimentary rock
that is rippable, using a D-9N crawler tractor dozer with blade, ripper beam and ripper shanks.
D-9 cat with double shank ripper gu@.008 CY -- 0.38 1.29 1.67

Ripping sedimentary rocks (shale, sandstone, limestone)


Using a D-8L crawler tractor dozer with universal blade, single shank ripper beam and ripper shanks.
D-8 cat with single shank ripper gs@.011 CY -- 0.52 1.50 2.02
2015 Heavy Construction Estimator, All Rights Reserved Page 166

Ripping metamorphic rock (slate)


Using a D-9N crawler tractor dozer with blade, ripper beam and ripper shanks.
D-9 cat with double shank ripper gu@.011 CY -- 0.52 1.77 2.29

Ripping metamorphic rock (slate)


Using a D-8L crawler tractor dozer with universal blade, single shank ripper beam and ripper shanks.
D-8 cat with single shank ripper gs@.016 CY -- 0.76 2.19 2.95

Ripping igneous rock (granite, basalt) highly weathered rock


Non weathered rock must be blasted, using a D-9N crawler tractor dozer with blade, ripper beam and
ripper shanks.
D-9 cat with double shank ripper gu@.013 CY -- 0.61 2.09 2.70

Ripping igneous rock (granite, basalt) highly weathered rock


Using a D-8L crawler tractor dozer with universal blade, single shank ripper beam and ripper shanks.
D-8, cat with single shank ripper gs@.027 CY -- 1.28 3.69 4.97

Rock crushing material plants, operating costs only


Using two 24" x 50' belt loaders rated at 355-tons per hour, a belt loader with dozer trap belt feeder, a 2
CY front-end crawler loader, a 3 CY front end wheel loader, a 3/4-ton 4x4 pickup truck, a portable
crusher plant with 15" x 36" jaw.
200 tons per hour rock crusher kr@5.00 Hour -- 180.40 263.00 443.40

Rock screening material plants, operating costs only


Using a 12' x 60" belt loader with triple deck screen, six 24" x 50' belt loaders rated at 355-tons per
hour, a 72" wide belt loader with single deck vibrating grizzle screen, a 4 CY front end wheel loader, a
3/4-ton 4x4 pickup truck.
125 tons per
hour screen and wash plant kq@4.86 Hour -- 175.30 196.00 371.30

Breaking rock with an air hammer


Add the cost for loading debris, using a 375 CFM, 100 PSI compressor, 100’ of 1" air hose, a 86 pound
paving breaker and small tools.
Dense rock dw@1.43 CY -- 50.92 16.10 67.02
Medium dense dw@.835 CY -- 29.73 9.43 39.16
Soft rock dw@.500 CY -- 17.81 5.65 23.46

CSI 02-212, Embankment, compaction & shaping

Spread and compact roadway embankment


Includes spreading, shaping and compaction. Add the cost of loading and hauling, using a D-8L crawler
tractor dozer with universal blade and a 25.5-ton towed vibrating sheepsfoot roller.
8" (20cm) lift with 300 HP tractor gr@.007 CY -- 0.33 1.08 1.41

Compact roadway embankment


Using a 13-ton vibrating steel drum self-propelled roller.
8" (20cm) lift with steel wheel
vibratory roller (two passes) jc@.005 CY -- 0.18 0.09 0.27

Spread and compact with a towed 6' wide sheepsfoot roller


Operated at 3 MPH for 45 minutes per hour. Three passes, using a D7-H crawler tractor dozer with
blade, a 25.5-ton towed vibrating sheepsfoot roller, a 46,000 lb. 3-axle 6x4 truck with 3,000 gallon water
tank.
6" (15cm) lift, 185 CY per hour ja@.016 CY -- 0.62 1.31 1.93
2015 Heavy Construction Estimator, All Rights Reserved Page 166 (part 2)

8" (20cm) lift, 245 CY per hour ja@.012 CY -- 0.46 0.98 1.44

Compact with a self-propelled 7' wide roller


Operated at 6 MPH for 45 minutes per hour. Three passes, using a 13-ton static self-propelled 11-tire
roller and an off highway 6,000 gallon water wagon.
6" (15cm) lift, 500 CY per hour jb@.006 CY -- 0.29 0.19 0.48
8" (20cm) lift, 750 CY per hour jb@.004 CY -- 0.19 0.13 0.32
10" (25cm) lift, 1,000 CY per hour jb@.003 CY -- 0.14 0.10 0.24

Shaping embankment slopes with heavy equipment


Using a Cat 12-G motor grader, a 13-ton static self-propelled 11-tire roller and small tools.
Up to 1 in 4 slope hz@.017 SY -- 0.63 0.31 0.94

Shaping embankment slopes with heavy equipment


Using a D-8L crawler tractor dozer with universal blade and a 25.5-ton towed vibrating sheepsfoot roller.
Greater than 1 in 4 slope gr@.008 SY -- 0.38 1.23 1.61

Shaping embankment slopes by hand


Using small tools.
Up to 1 in 4 slope sq@.063 SY -- 2.20 0.01 2.21
Greater than 1 in 4 slope sq@.080 SY -- 2.80 0.02 2.82

Compaction of embankment backfill for structures and trenches


Using a compactor rammer with 13" x 11" shoe and small tools.
Compact by hand with air tamp, 6"
(15cm) lift. Add water cost. dq@.065 CY -- 2.27 0.10 2.37
2015 Heavy Construction Estimator, All Rights Reserved Page 167

Compaction of embankment backfill for structures and trenches


Using a walk-behind 1-ton 29.5" wide vibratory double roller and small tools.
Compact by hand with 1 ton roller,
6" (15cm) lift dt@.040 CY -- 1.47 0.28 1.75

Compaction of embankment backfill for structures and trenches


Using a 12-ton 3-wheel self propelled static roller.
Compact by self-propelled roller,
6" (15cm) lift hx@.020 CY -- 0.74 0.29 1.03

Water for embankment compaction


Optimum moisture is 10 percent of maximum natural moisture. Based on water purchase cost of $0.005
per gallon, using a 6" 1,950 GPM submersible pump, 46,000 lb. 3-axle 6x4 truck with 3,000 gallon water
tank.
3,000 gallon truck,
3 mile (5km) haul ju@.015 CY 0.20 0.60 0.57 1.37
3,000 gallon truck,
6 mile (10km) haul ju@.020 CY 0.20 0.80 0.76 1.76
3,000 gallon
truck,12 mile (20km) haul ju@.031 CY 0.20 1.24 1.17 2.61

Water for embankment compaction


Using a 6" 1,950 GPM submersible pump and a 6,000 gallon off highway water wagon.
6,000 gallon wagon,
3 mile (5km) haul jv@.010 CY 0.20 0.40 0.70 1.30
6,000 gallon wagon,
6 mile (10km) haul jv@.012 CY 0.20 0.48 0.84 1.52

CSI 02-221, Trenching, backfilling, and compaction

Excavating continuous footings with a 1.4 CY Gradall


Excavated material piled on bank, using a 1.4 CY 4x4 Gradall excavator and small tools.
Light soil,
50 CY per hour (40m3/hr) fl@.040 CY -- 1.64 1.32 2.96
Medium soil,
40 CY per hour (32m3/hr) fl@.050 CY -- 2.05 1.65 3.70
Heavy soil,
35 CY per hour (30m3/hr) fl@.057 CY -- 2.34 1.88 4.22
Loose rock,
25 CY per hour (20m3/hr) fl@.080 CY -- 3.28 2.64 5.92

Trenching 6' to 10' deep with a 1.4 CY Gradall


Excavated material piled on bank, using a 1.4 CY 4x4 Gradall excavator and small tools.
Light soil,
40 CY per hour (30m3/hr) z2@.050 CY -- 1.61 1.65 3.26
Medium soil,
33 CY per hour (25 m3/hr) z2@.060 CY -- 1.93 1.98 3.91
Heavy soil,
29 CY per hour (22 m3/hr) z2@.070 CY -- 2.26 2.31 4.57
Loose rock,
21 CY per hour (18 m3/hr) z2@.094 CY -- 3.03 3.10 6.13

Excavating continuous footings with a 1 CY hydraulic excavator


Excavated material piled on bank, using a 1 CY hydraulic tractor excavator and small tools.
Light soil,
58 CY per hour (45m3/hr) en@.034 CY -- 1.39 1.06 2.45
2015 Heavy Construction Estimator, All Rights Reserved Page 167 (part 2)

Medium soil,
47 CY per hour (37m3/hr) en@.042 CY -- 1.72 1.31 3.03
Heavy soil,
38 CY per hour (30m3/hr) en@.052 CY -- 2.13 1.63 3.76
Loose rock,
34 CY per hour (27m3/hr) en@.059 CY -- 2.42 1.84 4.26

Trenching 4' to 6' deep with 1 CY hydraulic excavator


Excavated material piled on bank, using a 1 CY hydraulic tractor excavator and small tools.
Light soil,
65 CY per hour (51m3/hr) z3@.031 CY -- 1.00 0.97 1.97
Medium soil,
53 CY per hour (42m3/hr) z3@.038 CY -- 1.22 1.19 2.41
Heavy soil,
43 CY per hour (34m3/hr) z3@.047 CY -- 1.51 1.48 2.99
Loose rock,
39 CY per hour (29m3/hr) z3@.052 CY -- 1.68 1.63 3.31

Trenching 4' to 6' deep with 1.5 CY hydraulic excavator


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools.
Light soil,
83 CY per hour (65m3/hr) e2@.024 CY -- 0.98 1.09 2.07
Medium soil,
70 CY per hour (55m3/hr) e2@.029 CY -- 1.19 1.32 2.51
Heavy soil,
57 CY per hour (45m3/hr) e2@.035 CY -- 1.44 1.59 3.03
Loose rock,
48 CY per hour (38m3/hr) e2@.042 CY -- 1.72 1.91 3.63
Blasted rock,
43 CY per hour (34m3/hr) e2@.047 CY -- 1.93 2.13 4.06

Trenching 6' to 10' deep with 1.5 CY hydraulic excavator


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools.
Light soil,
50 CY per hour (38m3/hr) z5@.040 CY -- 1.29 1.81 3.10
Medium soil,
40 CY per hour (30m3/hr) z5@.050 CY -- 1.61 2.27 3.88
Heavy soil,
33 CY per hour (25m3/hr) z5@.060 CY -- 1.93 2.72 4.65
Loose rock,
30 CY per hour (23m3/hr) z5@.065 CY -- 2.09 2.95 5.04
Blasted rock,
29 CY per hour (22m3/hr) z5@.070 CY -- 2.26 3.18 5.44
2015 Heavy Construction Estimator, All Rights Reserved Page 168

Excavating continuous footings with 1.5 CY hydraulic excavator


Excavated material piled on bank, using a 1.5 CY hydraulic tractor excavator and small tools.
Light soil,
74 CY per hour (58m3/hr) e6@.027 CY -- 1.11 1.22 2.33
Medium soil,
62 CY per hour (48m3/hr) e6@.032 CY -- 1.31 1.45 2.76
Heavy soil,
51 CY per hour (40m3/hr) e6@.039 CY -- 1.60 1.77 3.37
Loose rock,
43 CY per hour (34m3/hr) e6@.046 CY -- 1.89 2.09 3.98
Blasted rock,
38 CY per hour (30m3/hr) e6@.052 CY -- 2.13 2.36 4.49

Trenching 6' to 10' deep with 2 CY hydraulic excavator


Excavated material piled on bank, using a 2 CY hydraulic tractor excavator and small tools.
Light soil,
97 CY per hour (76m3/hr) z7@.021 CY -- 0.68 1.33 2.01
Medium soil,
80 CY per hour (63m3/hr) z7@.025 CY -- 0.81 1.58 2.39
Heavy soil,
65 CY per hour (51m3/hr) z7@.031 CY -- 1.00 1.96 2.96
Loose rock,
55 CY per hour (43m3/hr) z7@.036 CY -- 1.16 2.28 3.44
Blasted rock,
53 CY per hour (40m3/hr) z7@.038 CY -- 1.22 2.41 3.63
Rental per
day for 8' x 16' trench box --@.000 Ea -- -- 152.00 152.00

Excavating continuous footings with a 2 CY hydraulic excavator


Excavated material piled on bank, using a 2 CY hydraulic tractor excavator and small tools.
Light soil,
74 CY per hour (57m3/hr) e7@.027 CY -- 1.11 1.71 2.82
Medium soil,
61 CY per hour (48m3/hr) e7@.033 CY -- 1.35 2.09 3.44
Heavy soil,
50 CY per hour (39m3/hr) e7@.040 CY -- 1.64 2.53 4.17
Loose rock,
40 CY per hour (31m3/hr) e7@.050 CY -- 2.05 3.17 5.22
Blasted rock,
35 CY per hour (27m3/hr) e7@.057 CY -- 2.34 3.61 5.95

Excavating continuous footings with a 3.125 CY hydraulic excavator


Excavated material piled on bank, using a 3.125 CY hydraulic tractor excavator and small tools.
Light soil,
154 CY per hour (120m3/hr) e8@.013 CY -- 0.65 0.59 1.24
Medium soil,
125 CY per hour (100m3/hr) e8@.016 CY -- 0.80 0.72 1.52
Loose rock,
100 CY per hour (80m3/hr) e8@.020 CY -- 1.01 0.90 1.91
Blasted rock,
83 CY per hour (67m3/hr) e8@.024 CY -- 1.21 1.08 2.29

Trenching 14' to 20' deep with 3.125 CY hydraulic excavator


Excavated material piled on bank, using a 3.125 CY hydraulic tractor excavator and small tools.
Light soil,
170 CY per hour (133m3/hr) y4@.012 CY -- 0.42 0.77 1.19
Medium soil,
2015 Heavy Construction Estimator, All Rights Reserved Page 168 (part 2)

140 CY per hour (110m3/hr) y4@.014 CY -- 0.49 0.90 1.39


Heavy soil,
105 CY per hour (825m3/hr) y4@.019 CY -- 0.66 1.21 1.87
Loose rock,
110 CY per hour (86m3/hr) y4@.018 CY -- 0.63 1.15 1.78
Blasted rock,
91 CY per hour (71m3/hr) y4@.022 CY -- 0.77 1.41 2.18

Trenching 20' to 25' deep with 5.5 CY hydraulic excavator


Excavated material piled on bank, using a 5.5 CY hydraulic tractor excavator and small tools.
Light soil,
250 CY per hour (196m3/hr) y5@.008 CY -- 0.28 0.59 0.87
Medium soil,
200 CY per hour (157m3/hr) y5@.010 CY -- 0.35 0.73 1.08
Heavy soil,
165 CY per hour (129m3/hr) y5@.012 CY -- 0.42 0.88 1.30
Loose rock,
142 CY per hour (111m3/hr) y5@.014 CY -- 0.49 1.02 1.51
Blasted rock,
124 CY per hour (97m3/hr) y5@.016 CY -- 0.56 1.17 1.73

Trenching 20' to 25' deep with 5.25 CY hydraulic excavator


Excavated material piled on bank, using a 5.25 CY hydraulic tractor excavator and small tools.
Light soil,
275 CY per hour (215m3/hr) y6@.007 CY -- 0.24 0.53 0.77
Medium soil,
220 CY per hour (172m3/hr) y6@.009 CY -- 0.31 0.68 0.99
Heavy soil,
166 CY per hour (130m3/hr) y6@.012 CY -- 0.42 0.90 1.32
Loose rock,
154 CY per hour (120m3/hr) y6@.013 CY -- 0.45 0.98 1.43
Blasted rock,
133 CY per hour (104m3/hr) y6@.015 CY -- 0.52 1.13 1.65
Rental per
day for 10' x 20' trench box --@.000 Day -- -- 228.00 228.00
2015 Heavy Construction Estimator, All Rights Reserved Page 169

Trenching with a chain-boom trencher, 1 foot wide to 5 feet deep


Using a 6" to 18" wide chain boom trencher to 60" deep.
Light soil, 10 CY per hour (8m3/hr) ej@.125 CY -- 4.60 2.17 6.77
Medium soil,
8.5 CY per hour (6.66m3/hr) ej@.147 CY -- 5.41 2.55 7.96
Heavy soil,
7 CY per hour (5.5m3/hr) ej@.178 CY -- 6.55 3.09 9.64

Trenching to 72" deep with a chain boom trencher


Using a chain boom trencher to 24" wide.
Light soil,
145 CY per hour (113m3/hr) el@.008 CY -- 0.30 0.65 0.95
Medium soil,
130 CY per hour (102m3/hr) el@.009 CY -- 0.33 0.73 1.06
Heavy soil,
97 CY per hour (76m3/hr) el@.012 CY -- 0.44 0.97 1.41

Trenching with a chain boom trencher to 90" deep


Using a chain boom wheel trencher to 48" wide.
Light soil,
195 CY per hour (153m3/hr) em@.006 CY -- 0.22 0.77 0.99
Medium soil,
167 CY per hour (131m3/hr) em@.007 CY -- 0.26 0.90 1.16
Heavy soil,
130 CY per hour (102m3/hr) em@.009 CY -- 0.33 1.16 1.49

Bulk excavation by hand, wheeled 300 feet (91m) and dumped


Using small tools.
Normal soil sq@2.50 CY -- 87.45 0.55 88.00
Sand and gravel sq@2.50 CY -- 87.45 0.55 88.00
Medium clay sq@2.86 CY -- 100.00 0.63 100.63
Heavy clay sq@3.33 CY -- 116.50 0.73 117.23
Loose rock sq@4.00 CY -- 139.90 0.88 140.78

Hand excavate trench to 2 feet (.61m) deep, piled on bank only


Using small tools.
Normal soil sq@.714 CY -- 24.98 0.16 25.14
Sand and gravel sq@.625 CY -- 21.86 0.14 22.00
Medium clay sq@.833 CY -- 29.14 0.18 29.32
Heavy clay sq@1.00 CY -- 34.98 0.22 35.20
Loose rock sq@1.25 CY -- 43.73 0.28 44.01

Hand excavate trench over 2 feet (.61m) to 6 feet (1.8m) deep


Spoil piled on the bank only, using small tools.
Normal soil sq@1.43 CY -- 50.02 0.31 50.33
Sand and gravel sq@1.25 CY -- 43.73 0.28 44.01
Medium clay sq@1.67 CY -- 58.42 0.37 58.79
Heavy clay sq@2.00 CY -- 69.96 0.44 70.40
Loose rock sq@2.50 CY -- 87.45 0.55 88.00

Backfill trenches, without compaction


Using small tools.
By hand sq@.350 CY -- 12.24 0.08 12.32

Backfill trenches, without compaction


Using a D-3C crawler tractor dozer with angle blade.
2015 Heavy Construction Estimator, All Rights Reserved Page 169 (part 2)

60 HP tractor dozer gj@.028 CY -- 1.03 0.54 1.57

Backfill trenches, without compaction


Using a 1.5 CY front-end crawler loader.
Small front-end loader fq@.021 CY -- 0.77 0.79 1.56

Backfill trenches, without compaction


Using a D7-H crawler tractor dozer with blade.
200 HP tractor dozer gn@.004 CY -- 0.15 0.40 0.55

Spread dumped fill or gravel without compaction


Assumes dozer working in an open area, using a D7-H crawler tractor dozer with blade.
6" layers, no compaction gn@.003 SY -- 0.11 0.30 0.41
12" layers, no compaction gn@.001 SY -- 0.04 0.10 0.14

Spread dumped fill or gravel without compaction


Using a D-6H crawler tractor dozer, power shift with angle tilt blade.
Spread excess material on site fq@.014 CY -- 0.52 0.53 1.05
Spread borrow with dozer gl@.014 CY -- 0.52 0.79 1.31
2015 Heavy Construction Estimator, All Rights Reserved Page 170

Compaction in 6" (15cm) layers


Using a compactor rammer with 13" x 11" shoe and small tools.
Air tamp by hand dq@.100 CY -- 3.50 0.16 3.66

Compaction in 6" (15cm) layers


Using small tools.
Compaction in 6" layers by hand sr@.667 CY -- 23.33 0.15 23.48

Backfill sand bedding in trenches, without compaction


Using a 1.5 CY front-end crawler loader.
Small front end loader fq@.032 CY 34.70 1.18 1.21 37.09

CSI 02-222, Structural excavation

Pier and isolated foundation excavation - To 2 feet (.61m) deep


Spoil piled on the bank only, using small tools.
Normal soil sq@1.00 CY -- 34.98 0.22 35.20
Sand and gravel sq@.909 CY -- 31.80 0.20 32.00
Medium clay sq@1.18 CY -- 41.28 0.26 41.54
Heavy clay sq@1.43 CY -- 50.02 0.31 50.33
Loose rock sq@1.82 CY -- 63.66 0.40 64.06

Pier and isolated foundation excavation - Over 2 feet (.61m) to 6 feet (1.8m) deep
Spoil piled on the bank only, using small tools.
Normal soil sq@2.00 CY -- 69.96 0.44 70.40
Sand and gravel sq@1.82 CY -- 63.66 0.40 64.06
Medium clay sq@2.50 CY -- 87.45 0.55 88.00
Heavy clay sq@2.86 CY -- 100.00 0.63 100.63
Loose rock sq@3.33 CY -- 116.50 0.73 117.23

Hand labor excavation


Using small tools.
Trim bottom of excavation su@.017 SF -- 0.60 0.03 0.63
Trim slopes or sides of excavation su@.017 SF -- 0.60 0.03 0.63
Excavation around obstructions sq@5.00 CY -- 174.90 1.10 176.00

Backfilling foundation without compaction, 6" lifts


Using small tools.
Hand labor sq@.250 CY -- 8.75 0.06 8.81

Backfilling foundation without compaction, 6" lifts


Wheel-rolled compaction isn't usually acceptable on commercial or public works jobs unless the soil is
very conducive to compaction, using a 1 CY hydraulic tractor excavator and small tools.
With tractor excavator ep@.050 CY -- 2.05 1.56 3.61

Backfilling foundation without compaction, 6" lifts


Using a D7-H crawler tractor dozer with blade.
With dozer gn@.015 CY -- 0.56 1.50 2.06

Backfilling foundation without compaction, 6" lifts


Using a 1.5 CY front-end crawler loader.
With tractor-loader fq@.050 CY -- 1.84 1.89 3.73

Compaction of backfill around structures and in trenches in 8" layers


2015 Heavy Construction Estimator, All Rights Reserved Page 170 (part 2)

Using a compactor rammer with 13" x 11" shoe and small tools.
Air tamp dq@.050 CY -- 1.75 0.08 1.83

Compaction of backfill around structures and in trenches in 8" layers


Based on compaction to 95% optimum density and 4' x 5' trench, using a walk-behind 1-ton 29.5" wide
vibratory double roller and small tools.
One ton roller dt@.070 CY -- 2.57 0.49 3.06

CSI 02-223, Compaction water

Compaction water
Assumes optimum moisture at 10 percent of maximum, natural moisture at 2%, evaporation at 2%,
weight at optimum of 3179 lbs. per CY (4165 kg/m3), based on 3 mil (5km) haul, using a 6" 1,950 GPM
submersible pump and a 6,000 gallon off highway water wagon.
Water at $.005/gallon jv@.010 CY 0.20 0.40 0.70 1.30
Water at $.010/gallon jv@.010 CY 0.40 0.40 0.70 1.50
Water at $.020/gallon jv@.010 CY 0.80 0.40 0.70 1.90
2015 Heavy Construction Estimator, All Rights Reserved Page 171

CSI 02-224, Horizontal boring, casing only

Boring under roadways


Based on 100' minimum, add the cost of jacking pits and dewatering, using a hydraulic auger drill to 60'
depth with 8" x 21" leads, a 40-ton hydraulic crane with 84’ boom and small tools.
24" diameter, 1/4" (61cm) casing ef@1.93 LF 540.00 78.82 82.80 701.62
36" diameter, 3/8" (91cm) casing ef@2.89 LF 641.00 118.00 124.00 883.00
48" diameter, 3/8" (122cm) casing ef@3.71 LF 776.00 151.50 159.00 1,086.50

Boring under railroad lines


Add the cost of jacking pits and dewatering, using a hydraulic auger drill to 60' depth with 8" x 21"
leads, a 40-ton hydraulic crane with 84’ boom and small tools.
24" diameter, 1/4" (61cm) casing ef@2.60 LF 540.00 106.20 112.00 758.20
36" diameter, 3/8" (91cm) casing ef@4.33 LF 641.00 176.80 186.00 1,003.80
48" diameter, 3/8" (122cm) casing ef@5.20 LF 776.00 212.40 223.00 1,211.40

CSI 02-225, Bulk excavation

Bulk site excavation, shaping included


Using a D-3C crawler tractor dozer with angle blade.
Large areas gj@.028 CY -- 1.03 0.54 1.57
Small area gj@.035 CY -- 1.29 0.67 1.96
Trim banks gj@.049 CY -- 1.80 0.94 2.74

Dragline bulk site excavation, includes casting - 1-1/2 CY bucket


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Sand or gravel ts@.031 CY -- 1.31 1.42 2.73
Light clay ts@.029 CY -- 1.22 1.33 2.55
Heavy clay ts@.064 CY -- 2.70 2.92 5.62
Unclassified soil ts@.071 CY -- 2.99 3.24 6.23

Dragline bulk site excavation, includes casting - 2 CY bucket


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
Sand or gravel ts@.032 CY -- 1.35 1.46 2.81
Light clay tu@.031 CY -- 1.31 1.62 2.93
Heavy clay tu@.053 CY -- 2.23 2.78 5.01
Unclassified soil tu@.064 CY -- 2.70 3.35 6.05

Dragline bulk site excavation, includes casting - 2-1/2 CY bucket


Using a 100-ton crawler mounted mechanical crane with 210’ boom and small tools.
Sand or gravel tw@.027 CY -- 1.14 1.78 2.92
Light clay tw@.026 CY -- 1.10 1.71 2.81
Heavy clay tw@.044 CY -- 1.86 2.90 4.76
Unclassified soil tw@.056 CY -- 2.36 3.69 6.05

Dragline bulk site excavation, includes casting - 3 CY bucket


Using a 240-ton mechanical crawler crane with 260’ boom and small tools.
Sand or gravel ty@.025 CY -- 1.05 4.10 5.15
Light clay ty@.024 CY -- 1.01 3.94 4.95
Heavy clay ty@.042 CY -- 1.77 6.89 8.66
Unclassified soil ty@.064 CY -- 2.70 10.50 13.20

Dragline bulk site excavation, includes casting - 4 CY bucket


Using a 115 ‘ mechanical crane for dragline or clamshell with a 4 CY medium weight dragline bucket
and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 171 (part 2)

Sand or gravel tj@.014 CY -- 0.59 1.03 1.62


Light clay tj@.015 CY -- 0.63 1.10 1.73
Heavy clay tj@.017 CY -- 0.72 1.25 1.97
Unclassified soil tj@.024 CY -- 1.01 1.76 2.77

Dragline bulk site excavation, includes casting - 5 CY bucket


Using a 135’ mechanical crane for dragline or clamshell with a 5 CY heavy weight dragline bucket and
small tools.
Sand or gravel tk@.013 CY -- 0.55 1.25 1.80
Light clay tk@.013 CY -- 0.55 1.25 1.80
Heavy clay tk@.015 CY -- 0.63 1.44 2.07
Unclassified soil tk@.020 CY -- 0.84 1.93 2.77

Dragline bulk site excavation, includes casting - 6 CY bucket


Using a 135’ mechanical crane for dragline or clamshell, a 6 CY heavy weight dragline bucket and small
tools.
Sand or gravel tl@.011 CY -- 0.46 1.06 1.52
Light clay tl@.012 CY -- 0.51 1.16 1.67
Heavy clay tl@.013 CY -- 0.55 1.26 1.81
Unclassified soil tl@.018 CY -- 0.76 1.74 2.50
2015 Heavy Construction Estimator, All Rights Reserved Page 172

Dragline bulk site excavation, includes casting - 7 CY bucket


Using a 130’ mechanical crane for dragline or clamshell with a 7 CY heavy weight dragline bucket and
small tools.
Sand or gravel tm@.010 CY -- 0.42 1.86 2.28
Light clay tm@.011 CY -- 0.46 2.04 2.50
Heavy clay tm@.012 CY -- 0.51 2.23 2.74
Unclassified soil tm@.017 CY -- 0.72 3.16 3.88

Excavation and loading with a 1 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 1 CY hydraulic tractor excavator and
small tools.
Light material,
50 CY per hour (38m3/hr) e2@.040 CY -- 1.64 1.81 3.45
Medium material
40 CY per hour (31m3/hr) e2@.050 CY -- 2.05 2.27 4.32
Wet material,
30 CY per hour (23m3/hr) e2@.067 CY -- 2.75 3.04 5.79
Blasted rock,
28 CY per hour (21m3/hr) e2@.071 CY -- 2.91 3.22 6.13

Excavation and loading with a 1.5 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 1.5 CY hydraulic tractor excavator and
small tools.
Light material,
65 CY per hour (50m3/hr) e6@.031 CY -- 1.27 1.41 2.68
Medium material,
60 CY per hour (46m3/hr) e6@.034 CY -- 1.39 1.54 2.93
Wet material,
55 CY per hour (42m3/hr) e6@.036 CY -- 1.48 1.63 3.11
Blasted rock,
45 CY per hour (35m3/hr) e6@.045 CY -- 1.85 2.04 3.89

Excavation and loading with a 2 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 2 CY hydraulic tractor excavator and
small tools.
Light material,
80 CY per hour (61m3/hr) e7@.025 CY -- 1.03 1.58 2.61
Medium material,
75 CY per hour (57m3/hr) e7@.026 CY -- 1.07 1.65 2.72
Wet material,
70 CY per hour (53m3/hr) e7@.029 CY -- 1.19 1.84 3.03
Blasted rock,
65 CY per hour (49m3/hr) e7@.031 CY -- 1.27 1.96 3.23

Excavation and loading with a 3.125 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 3.125 CY hydraulic tractor excavator and
small tools.
Light material,
218 CY per hour (167m3/hr) y4@.014 CY -- 0.49 0.90 1.39
Medium material,
147 CY per hour (112m3/hr) y4@.020 CY -- 0.70 1.28 1.98
Wet material,
99 CY per hour (76m3/hr) y4@.030 CY -- 1.05 1.92 2.97
Blasted rock,
67 CY per hour (51 m3/hr) y4@.045 CY -- 1.57 2.88 4.45

Excavation and loading with a 5.5 CY hydraulic excavator


2015 Heavy Construction Estimator, All Rights Reserved Page 172 (part 2)

In cubic yards of bank measure. Add the hauling cost, using a 5.5 CY hydraulic tractor excavator and
small tools.
Light material,
290 CY per hour (222m3/hr) y5@.010 CY -- 0.35 0.73 1.08
Medium material,
196 CY per hour (150m3/hr) y5@.015 CY -- 0.52 1.10 1.62
Wet rock,
131 CY per hour (100m3/hr) y5@.023 CY -- 0.80 1.68 2.48
Blasted rock,
89 CY per hour (68m3/hr) y5@.034 CY -- 1.19 2.49 3.68

Excavation and loading with a 5.25 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 5.25 CY hydraulic tractor excavator and
small tools.
Light material,
363 CY per hour (278m3/hr) y6@.008 CY -- 0.28 0.60 0.88
Medium material,
245 CY per hour (187m3/hr) y6@.012 CY -- 0.42 0.90 1.32
Light rock,
163 CY per hour (125m3/hr) y6@.018 CY -- 0.63 1.35 1.98
Blasted rock,
111 CY per hour (85m3/cy) y6@.027 CY -- 0.94 2.03 2.97

Excavation and loading with a 7.2 CY hydraulic excavator


In cubic yards of bank measure. Add the hauling cost, using a 7.2 CY crawler hydraulic shovel and
small tools.
Light material,
582 CY per hour (444m3/hr) y7@.005 CY -- 0.17 0.34 0.51
Medium material,
392 CY per hour (300 m3/hr) y7@.008 CY -- 0.28 0.55 0.83
Wet rock,
262 CY per hour (200m3/hr) y7@.012 CY -- 0.42 0.82 1.24
Blasted rock,
179 CY per hour (136m3/hr) y7@.017 CY -- 0.59 1.16 1.75

Excavation and loading with a wheel-mounted 1.38 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 1.38 CY wheeled loader-backhoe.
Light material,
39 CY per hour (30m3/hr) et@.039 CY -- 1.43 0.60 2.03
2015 Heavy Construction Estimator, All Rights Reserved Page 173

Medium material,
32 CY per hour (24m3/hr) et@.047 CY -- 1.73 0.72 2.45
Wet rock, 21 CY per hour (16m3/hr) et@.071 CY -- 2.61 1.08 3.69
Blasted rock,
19 CY per hour (15m3/hr) et@.079 CY -- 2.90 1.21 4.11

Excavation and loading with a wheel-mounted 2.5 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 2.5 CY front end wheel loader.
Light material,
60 CY per hour (46m3/hr) fp@.025 CY -- 1.18 0.54 1.72
Medium material,
50 CY per hour (38m3/hr) fp@.030 CY -- 1.42 0.65 2.07
Wet rock, 33 CY per hour (25m3/hr) fp@.046 CY -- 2.18 1.00 3.18
Blasted rock,
30 CY per hour (23m3/hr) fp@.050 CY -- 2.36 1.08 3.44

Excavation and loading with a wheel-mounted 5.25 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 5.25 CY front end wheel loader.
Light material,
90 CY per hour (69m3/hr) fr@.017 CY -- 0.63 1.24 1.87
Medium material,
75 CY per hour (57m3/hr) fr@.021 CY -- 0.77 1.53 2.30
Wet rock, 50 CY per hour (38m3/hr) fr@.030 CY -- 1.10 2.19 3.29
Blasted rock,
45 CY per hour (34m3/hr) fr@.033 CY -- 1.21 2.41 3.62

Excavation and loading with a wheel-mounted 4 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 4 CY front end wheel loader.
Light material,
155 CY per hour (118m3/hr) fu@.010 CY -- 0.37 0.60 0.97
Medium material,
103 CY per hour (99m3/hr) fu@.012 CY -- 0.44 0.73 1.17
Wet rock, 87 CY per hour (66m3/hr) fu@.017 CY -- 0.63 1.03 1.66
Blasted rock,
79 CY per hour (60m3/hr) fu@.019 CY -- 0.70 1.15 1.85

Excavation and loading with a wheel-mounted 7 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 7 CY front-end wheel loader.
Light material,
270 CY per hour (206m3/hr) fy@.006 CY -- 0.26 0.62 0.88
Medium material,
224 CY per hour (171m3/hr) fy@.007 CY -- 0.30 0.72 1.02
Wet rock,
150 CY per hour (115m3/hr) fy@.010 CY -- 0.43 1.03 1.46
Blasted rock,
135 CY per hour (103m3/hr) fy@.011 CY -- 0.47 1.14 1.61
Add for each additional
100 feet (30m) of travel ---@--- % -- 43.00 -- --

Excavation and loading with a wheel-mounted 12 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 12 CY front-end wheel loader.
Light material,
395 CY per hour (303m3) fx@.004 CY -- 0.17 0.41 0.58
Medium material,
355 CY per hour (271m3) fx@.004 CY -- 0.17 0.41 0.58
Wet rock, 315 CY per hour (241m3) fx@.005 CY -- 0.22 0.52 0.74
Blasted rock,
230 CY per hour (174m3) fx@.007 CY -- 0.30 0.72 1.02
2015 Heavy Construction Estimator, All Rights Reserved Page 173 (part 2)

Excavation and loading with a wheel-mounted 13.5 CY front-end loader


In cubic yards of bank measure. Add the hauling cost, using a 13.5 CY front end wheel loader.
Light material,
580 CY per hour (445m3/hr) fg@.003 CY -- 0.13 0.64 0.77
Medium material,
520 CY per hour (398m3/hr) fg@.003 CY -- 0.13 0.64 0.77
Wet rock,
465 CY per hour (354m3/hr) fg@.003 CY -- 0.13 0.64 0.77
Blasted rock,
335 CY per hour (256m3/hr) fg@.005 CY -- 0.22 1.06 1.28

Excavation and loading with a track mounted 1-1/2 CY front end loader
In cubic yards of bank measure. Add the hauling cost, using a 1.5 CY front-end crawler loader.
Light material,
95 CY per hour (73m3/hr) fq@.016 CY -- 0.59 0.60 1.19
Medium material,
80 CY per hour (61m3/hr) fq@.019 CY -- 0.70 0.72 1.42
Wet rock, 53 CY per hour (40m3/hr) fq@.028 CY -- 1.03 1.06 2.09
2015 Heavy Construction Estimator, All Rights Reserved Page 174

Blasted rock,
47 CY per hour (36m3/hr) fq@.032 CY -- 1.18 1.21 2.39

Excavation and loading with a track mounted 2.75 CY front end loader
In cubic yards of bank measure. Add the hauling cost, using a 2.75 CY front-end crawler loader.
Light material,
120 CY per hour (92m3/hr) fs@.013 CY -- 0.48 1.13 1.61
Medium material,
100 CY per hour (76m3/hr) fs@.015 CY -- 0.55 1.30 1.85
Wet rock, 66 CY per hour (50m3/hr) fs@.023 CY -- 0.85 1.99 2.84
Blasted rock,
59 CY per hour (45m3/hr) fs@.025 CY -- 0.92 2.16 3.08
Add for each additional
100 feet (30m) of travel ---@--- % -- 61.00 -- --

Excavation and loading with a 3.75 CY front end crawler loader


In cubic yards of bank measure. Add the hauling cost, using a 3.75 CY front-end crawler loader.
Light material,
255 CY per hour (195m3/hr) ft@.006 CY -- 0.22 0.39 0.61
Medium material,
230 CY per hour (174m3/hr) ft@.007 CY -- 0.25 0.46 0.71
Wet rock,
205 CY per hour (155m3/hr) ft@.007 CY -- 0.25 0.46 0.71
Blasted rock,
145 CY per hour (112m3/hr) ft@.010 CY -- 0.36 0.65 1.01

Excavation and loading with a track mounted 7 CY front end loader


In cubic yards of bank measure. Add the hauling cost, using a 7 CY front-end wheel loader.
Light material,
335 CY per hour (255m3/hr) fj@.004 CY -- 0.17 0.41 0.58
Medium material,
300 CY per hour (228m3/hr) fj@.005 CY -- 0.22 0.52 0.74
Wet rock,
265 CY per hour (293m3/hr) fj@.006 CY -- 0.26 0.62 0.88
Blasted rock,
190 CY per hour (147m3/hr) fj@.008 CY -- 0.34 0.83 1.17

Truck hauling - 8 loose CY (6.1m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using a 46,000 lb. 3-axle
6x4 truck with 8 CY dump body.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour ha@.031 CY -- 1.30 1.84 3.14
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour ha@.044 CY -- 1.84 2.61 4.45
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour ha@.061 CY -- 2.55 3.61 6.16

Truck hauling - 12 loose CY (9.1m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using a 46,000 lb. 3-axle
6x4 truck with 12 CY dump body.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour gz@.020 CY -- 0.84 1.19 2.03
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour gz@.029 CY -- 1.21 1.72 2.93
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour gz@.041 CY -- 1.72 2.44 4.16

Truck hauling - 16.5 loose CY (12.6m3) loads


2015 Heavy Construction Estimator, All Rights Reserved Page 174 (part 2)

Includes truck spotting, loading, travel and dump time. Add excavation cost, using a 14 to 19 CY off
highway dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour hd@.015 CY -- 0.63 1.04 1.67
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour hd@.021 CY -- 0.88 1.45 2.33
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour hd@.029 CY -- 1.21 2.00 3.21

Truck hauling - 26 loose CY (20cm3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using a 22 to 30 CY off
highway dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour hg@.009 CY -- 0.38 1.05 1.43
3 miles (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour hg@.013 CY -- 0.54 1.51 2.05
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour hg@.018 CY -- 0.75 2.09 2.84

Truck hauling - 40 loose CY (31m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using an off highway 32 to
44 CY dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour le@.006 CY -- 0.25 1.06 1.31
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour le@.009 CY -- 0.38 1.60 1.98
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour le@.012 CY -- 0.50 2.13 2.63

Truck hauling - 65 loose CY (50m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using an off highway 47 to
67 CY dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour ld@.004 CY -- 0.17 0.96 1.13
3 mile (6km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour ld@.005 CY -- 0.21 1.20 1.41
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour ld@.007 CY -- 0.29 1.68 1.97
2015 Heavy Construction Estimator, All Rights Reserved Page 175

Truck hauling - 67 loose CY (57m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using an off highway 67 CY
dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour lg@.003 CY -- 0.13 0.80 0.93
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour lg@.005 CY -- 0.21 1.33 1.54
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour lg@.006 CY -- 0.25 1.59 1.84

Truck hauling - 85 loose CY (65m3) loads


Includes truck spotting, loading, travel and dump time. Add excavation cost, using an off highway 100
CY dump truck.
1 mile (2km) haul, 20 MPH (30 km/hr),
4.2 cycles per hour lf@.003 CY -- 0.13 1.28 1.41
3 mile (5km) haul, 30 MPH (45 km/hr),
2.9 cycles per hour lf@.004 CY -- 0.17 1.70 1.87
6 mile (10km) haul, 40 MPH (60 km/hr),
2.1 cycles per hour lf@.006 CY -- 0.25 2.56 2.81

Load and haul excavation - 3 CY loader, 12 CY trucks


Using a 3 CY front end wheel loader and four 6x4 3-axle 43,000 lb. trucks with 12 CY dump bodies.
Load and haul medium soil 5 miles g2@.053 CY -- 2.17 2.45 4.62
Load and haul sand 5 miles g2@.048 CY -- 1.96 2.22 4.18

Load and haul excavation - 4 CY loader, 12 CY trucks


Using a 4 CY front end wheel loader, four 43,000 lb. 6x4 3-axle trucks with 12 CY dump bodies.
Load and haul rock 5 miles g3@.075 CY -- 3.07 3.87 6.94

Mass excavation - 65 HP dozer, excavate and 150' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-3C crawler tractor
dozer with angle blade.
Light material, 30 CY per hour z8@.058 CY -- 2.17 0.95 3.12
Medium material, 25 CY per hour z8@.070 CY -- 2.62 1.15 3.77
Wet material or loose rock,
20 CY per hour z8@.088 CY -- 3.29 1.44 4.73
Compacted or dense rock,
12 CY per hour z8@.145 CY -- 5.43 2.38 7.81

Mass excavation - 90 HP dozer, excavate and 150' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-4H crawler tractor
dozer with angle tilt blade.
Light material, 60 CY per hour 2f@.029 CY -- 1.09 0.62 1.71
Medium material, 45 CY per hour 2f@.039 CY -- 1.46 0.84 2.30
Wet material or loose rock,
35 CY per hour 2f@.050 CY -- 1.87 1.08 2.95
Compacted or dense rock,
20 CY per hour 2f@.087 CY -- 3.26 1.87 5.13

Mass excavation - 120 HP dozer, excavate and 150' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-5H crawler tractor
dozer.
Light material, 85 CY per hour z9@.021 CY -- 0.79 0.66 1.45
Medium material, 70 CY per hour z9@.025 CY -- 0.94 0.78 1.72
Wet material or loose rock,
50 CY per hour z9@.035 CY -- 1.31 1.09 2.40
2015 Heavy Construction Estimator, All Rights Reserved Page 175 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 176

Compacted or dense rock,


20 CY per hour z9@.035 CY -- 1.31 1.09 2.40

Mass excavation - 140 HP dozer, excavate and 150' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-6H crawler tractor
dozer with angle tilt blade.
Light material, 115 CY per hour 2a@.015 CY -- 0.56 0.61 1.17
Medium material, 90 CY per hour 2a@.019 CY -- 0.71 0.77 1.48
Wet material or loose rock,
70 CY per hour 2a@.025 CY -- 0.94 1.01 1.95
Compacted or dense rock,
35 CY per hour 2a@.050 CY -- 1.87 2.03 3.90

Mass excavation - 200 HP dozer with U-blade, excavate and 150' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D7-H crawler tractor
dozer.
Light material, 185 CY per hour 2b@.012 CY -- 0.45 0.85 1.30
Medium material, 150 CY per hour 2b@.015 CY -- 0.56 1.07 1.63
Wet material or loose rock,
115 CY per hour 2b@.017 CY -- 0.64 1.21 1.85
Blasted rock, 90 CY per hour 2b@.019 CY -- 0.71 1.35 2.06
Compacted or dense rock,
85 CY per hour 2b@.021 CY -- 0.79 1.50 2.29

Mass excavation - 335 HP dozer with U-blade, excavate and 150' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-8L crawler tractor
dozer.
Light material, 290 CY per hour 2c@.007 CY -- 0.29 0.61 0.90
Wet material, 235 CY per hour 2c@.008 CY -- 0.33 0.70 1.03
Medium material, 180 CY per hour 2c@.010 CY -- 0.41 0.88 1.29
Blasted rock, 145 CY per hour 2c@.014 CY -- 0.57 1.23 1.80

Mass excavation - 460 HP dozer with U-blade, excavate and 150' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-9N crawler tractor
dozer.
Light material, 375 CY per hour 2d@.005 CY -- 0.20 0.52 0.72
Medium material, 300 CY per hour 2d@.006 CY -- 0.24 0.63 0.87
Loose rock, 230 CY per hour 2d@.008 CY -- 0.33 0.84 1.17
Blasted rock, 185 CY per hour 2d@.010 CY -- 0.41 1.05 1.46

Mass excavation - 700 HP dozer with U-blade, excavate and 150' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-10N crawler tractor
dozer.
Light material, 495 CY per hour 2e@.004 CY -- 0.16 0.51 0.67
Medium material, 400 CY per hour 2e@.004 CY -- 0.16 0.51 0.67
Loose rock, 305 CY per hour 2e@.006 CY -- 0.24 0.77 1.01
Blasted rock, 245 CY per hour 2e@.007 CY -- 0.29 0.89 1.18

Mass excavation - 65 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-3C crawler tractor
dozer with angle blade.
Light material, 12.5 CY per hour z8@.145 CY -- 5.43 2.38 7.81
Medium material, 10 CY per hour z8@.175 CY -- 6.55 2.87 9.42

Mass excavation - 90 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-4H crawler tractor
dozer with angle tilt blade.
2015 Heavy Construction Estimator, All Rights Reserved Page 176 (part 2)

Light material, 20 CY per hour 2f@.088 CY -- 3.29 1.89 5.18


Medium material, 17.5 CY per hour 2f@.100 CY -- 3.74 2.15 5.89
Loose rock, 15 CY per hour 2f@.117 CY -- 4.38 2.52 6.90

Mass excavation - 120 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-5H crawler tractor
dozer with straight blade.
Light material, 35 CY per hour z9@.050 CY -- 1.87 1.56 3.43
Medium material, 30 CY per hour z9@.058 CY -- 2.17 1.81 3.98
Loose rock, 25 CY per hour z9@.070 CY -- 2.62 2.19 4.81

Mass excavation - 140 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-6H crawler tractor
dozer with angle tilt blade.
Light material, 55 CY per hour 2a@.032 CY -- 1.20 1.30 2.50
Medium material, 45 CY per hour 2a@.039 CY -- 1.46 1.58 3.04
2015 Heavy Construction Estimator, All Rights Reserved Page 177

Loose rock, 35 CY per hour 2a@.050 CY -- 1.87 2.03 3.90

Mass excavation - 200 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D7-H crawler tractor
dozer with blade.
Light material, 85 CY per hour 2b@.021 CY -- 0.79 1.50 2.29
Medium material, 65 CY per hour 2b@.027 CY -- 1.01 1.92 2.93
Loose rock, 50 CY per hour 2b@.035 CY -- 1.31 2.49 3.80
Blasted rock, 40 CY per hour 2b@.044 CY -- 1.65 3.13 4.78

Mass excavation - 335 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-8L crawler tractor
dozer with universal blade.
Light rock, 145 CY per hour 2c@.012 CY -- 0.49 1.05 1.54
Medium material, 115 CY per hour 2c@.015 CY -- 0.61 1.31 1.92
Loose rock, 90 CY per hour 2c@.019 CY -- 0.77 1.66 2.43
Blasted rock, 70 CY per hour 2c@.025 CY -- 1.02 2.19 3.21

Mass excavation - 460 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-9N crawler tractor
dozer with blade.
Light material, 195 CY per hour 2d@.009 CY -- 0.37 0.94 1.31
Medium material, 160 CY per hour 2d@.011 CY -- 0.45 1.15 1.60
Loose rock, 120 CY per hour 2d@.015 CY -- 0.61 1.57 2.18
Blasted rock, 95 CY per hour 2d@.018 CY -- 0.73 1.88 2.61

Mass excavation - 700 HP dozer, excavate and 300' push


Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-10N crawler tractor
dozer with blade.
Light material, 275 CY per hour 2e@.006 CY -- 0.24 0.77 1.01
Medium material, 220 CY per hour 2e@.008 CY -- 0.33 1.02 1.35
Loose rock, 170 CY per hour 2e@.010 CY -- 0.41 1.28 1.69
Blasted rock, 135 CY per hour 2e@.013 CY -- 0.53 1.66 2.19

Mass excavation - 215 HP dozer with U-blade, excavate and 450' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D7-H crawler tractor
dozer.
Light material, 75 CY per hour 2b@.023 CY -- 0.86 1.64 2.50
Medium material, 60 CY per hour 2b@.029 CY -- 1.09 2.07 3.16
Loose rock, 45 CY per hour 2b@.039 CY -- 1.46 2.78 4.24
Blasted rock, 35 CY per hour 2b@.050 CY -- 1.87 3.56 5.43

Mass excavation - 335 HP dozer with U-blade, excavate and 450' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-8L crawler tractor
dozer.
Light material, 105 CY per hour 2c@.017 CY -- 0.69 1.49 2.18
Medium material, 85 CY per hour 2c@.021 CY -- 0.86 1.84 2.70
Loose rock, 65 CY per hour 2c@.027 CY -- 1.10 2.36 3.46
Blasted rock, 50 CY per hour 2c@.035 CY -- 1.43 3.07 4.50

Mass excavation - 460 HP dozer with U-blade, excavate and 450' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-9N crawler tractor
dozer with blade.
Light material, 145 CY per hour 2d@.012 CY -- 0.49 1.26 1.75
Medium material, 115 CY per hour 2d@.015 CY -- 0.61 1.57 2.18
Loose rock, 90 CY per hour 2d@.019 CY -- 0.77 1.99 2.76
Blasted rock, 70 CY per hour 2d@.025 CY -- 1.02 2.61 3.63
2015 Heavy Construction Estimator, All Rights Reserved Page 177 (part 2)

Mass excavation - 700 HP dozer with U-blade, excavate and 450' push
Volumes are in bank measure. Based on +5% grade and 50 minute hour, using a D-10N crawler tractor
dozer.
Light material, 185 CY per hour 2e@.010 CY -- 0.41 1.28 1.69
Medium material, 150 CY per hour 2e@.012 CY -- 0.49 1.53 2.02
Loose rock, 115 CY per hour 2e@.015 CY -- 0.61 1.91 2.52
Blasted rock, 90 CY per hour 2e@.019 CY -- 0.77 2.42 3.19
2015 Heavy Construction Estimator, All Rights Reserved Page 178

CSI 02-226, Site excavation and fill

Dozer excavation, move 150' and stockpile


Using D-4H crawler tractor dozer with angle tilt blade.
Medium soil gk@.050 CY -- 1.86 1.51 3.37

Dozer excavation, move 150' and stockpile


Using a D-6H crawler tractor dozer, power shift with angle tilt blade.
Medium soil gl@.025 CY -- 0.93 1.42 2.35

Dozer excavation, move 150' and stockpile


Using a D7-H crawler tractor dozer with blade.
Medium soil gn@.019 CY -- 0.71 1.90 2.61

Dozer excavation, move 150' and stockpile


Using a D-8L crawler tractor dozer with universal blade and a 25.5-ton towed vibrating sheepsfoot roller.
Medium soil gr@.013 CY -- 0.61 2.00 2.61

Dozer excavation, move 150' and stockpile


Using a D-9N crawler tractor dozer with universal blade.
Medium soil gt@.009 CY -- 0.43 1.32 1.75

Excavation with a push loaded scraper - 9 CY (6.8 m3) scraper load


Using a D-8L crawler tractor dozer with universal blade and a 11 CY elevating scraper.
9 cycles per hour f5@.025 CY -- 0.92 1.42 2.34

Excavation with a push loaded scraper - 16 CY (12 m3) scraper load


Using a D-8L crawler tractor dozer with universal blade and a 14 to 20 CY self-propelled elevating
scraper.
9 cycles per hour f6@.015 CY -- 0.55 1.38 1.93
6 cycles per hour f6@.022 CY -- 0.81 2.02 2.83
4.5 cycles per hour f6@.033 CY -- 1.22 3.04 4.26

Excavation with a push loaded scraper - 25 CY (19 m3) scraper load


Using a D-9N crawler tractor dozer with blade and a 21 to 31 CY self-propelled scraper.
9 cycles per hour gb@.008 CY -- 0.36 1.09 1.45
6 cycles per hour gb@.013 CY -- 0.59 1.77 2.36
4.5 cycles per hour gb@.015 CY -- 0.68 2.04 2.72

Excavation with a push loaded scraper - 34 CY (26.6 m3) scraper load


Using a D-9N crawler tractor dozer with blade and a 24 to 34 CY self-propelled scraper.
9 cycles per hour gd@.006 CY -- 0.27 0.81 1.08
6 cycles per hour gd@.009 CY -- 0.41 1.21 1.62
4.5 cycles per hour gd@.012 CY -- 0.55 1.62 2.17

Excavation with a push loaded scraper - 43 CY (32.7 m3) scraper load


Using a D-9N crawler tractor dozer with blade and a 32 to 44 CY self-propelled scraper.
9 cycles per hour ge@.005 CY -- 0.23 0.85 1.08
6 cycles per hour ge@.008 CY -- 0.36 1.36 1.72
4.5 cycles per hour ge@.010 CY -- 0.46 1.70 2.16

CSI 02-227, Compaction

Compaction with a static steel wheel roller


2015 Heavy Construction Estimator, All Rights Reserved Page 178 (part 2)

Using a 5-ton steel wheel self propelled static roller.


Tandem roller compaction hu@.061 CY -- 2.24 0.51 2.75

Compaction with a vibratory roller


Using a 6.9-ton self-propelled vibratory roller.
Tandem roller compaction h6@.028 CY -- 1.02 0.74 1.76

Compaction with a compactor rammer


Using a compactor rammer with 13" x 11" shoe, miscellaneous power tools and small tools.
Compaction by compactor rammer du@.077 CY -- 2.69 0.34 3.03
2015 Heavy Construction Estimator, All Rights Reserved Page 179

CSI 02-231, Field tests

Nuclear field density tests for compacted soil


Using small tools.
Soil density test, nuclear method ASTM D2922-71,
D2167-66 uj@1.25 Ea -- 43.73 0.24 43.97

Sand cone field density tests for compacted soil


Using small tools.
Soil density test, sand cone method,
ASTM D1556-64 ui@1.25 Ea -- 43.73 0.25 43.98

Lab test for soil density


Using small tools.
Moisture density
of soils ASTM D1557-70 ui@1.16 Ea -- 40.58 0.23 40.81
Soil grain
size test (no. 200 sieve) ui@1.95 Ea -- 68.21 0.39 68.60
Soil moisture ui@.369 Ea -- 12.91 0.07 12.98
Laboratory permeability test (remolded sample),
soil ui@15.4 Ea -- 538.70 3.08 541.78
Moisture content ui@2.66 Ea -- 93.05 0.53 93.58
Undisturbed soil permeability test ui@14.0 Ea -- 489.70 2.80 492.50
Soil dry density
(undisturbed sample) test ui@3.39 Ea -- 118.60 0.68 119.28
Moisture content test,
undisturbed sample ui@1.48 Ea -- 51.77 0.30 52.07
Soil grain size test (2 micron) ui@1.95 Ea -- 68.21 0.39 68.60
Atterberg limits test ui@2.92 Ea -- 102.10 0.58 102.68

In place permeability tests for soil


Double ring infiltrometer test --@.000 Ea 419.00 -- -- 419.00
Unconfined compressive strength
(pocket penetrometer) test --@.000 Ea 21.00 -- -- 21.00

Lab tests for soil permeability


Falling head rigid wall
consolidometer technique CAE --@.000 Ea 117.00 -- -- 117.00
Falling head permeability test,
EPA-9100 --@.000 Ea 335.00 -- -- 335.00
Constant head permeability test,
ASTM D2432 --@.000 Ea 109.00 -- -- 109.00

CSI 02-240, Soil stabilization with crushed rock

Soil stabilization with crushed rock


Using a 3.75 CY front-end crawler loader and small tools.
Crushed rock delivered and spread ft@.080 CY 9.50 2.90 5.20 17.60

CSI 02-241, Soil stabilization with lime slurry

Soil stabilization with crushed rock


See CSI 02-610 for lime stabilized roadway subgrade, using a Cat 12-G motor grader, a 12-ton 3-wheel
self propelled static roller, a 22-ton single drum self-propelled vibratory roller and small tools.
Add and mix 10% lime by volume h5@.240 CY 0.91 8.67 5.36 14.94
2015 Heavy Construction Estimator, All Rights Reserved Page 179 (part 2)

Lime for soil stabilization --@.000 CWT 4.55 -- -- 4.55

Soil stabilization with cement


Using a D-4 crawler tractor dozer with angle tilt blade, a 3 CY front end wheel loader, a Cat 14-G motor
grader, a 3/4-ton 4x4 pickup truck and a 12-ton 3-wheel self propelled static roller.
Cement stabilized base material u4@.075 Ton 20.70 2.77 4.33 27.80

CSI 02-243, Vibro-floatation soil stabilization

Vibro-flotation soil stabilization


Using a 50’ wide concrete slipform paver, a truck-mounted hydraulic crane with 115’ boom, a 25 CY
front end wheel loader and small tools.
Minimum cost bx@.046 CY -- 1.93 4.26 6.19
Maximum cost bx@.092 CY -- 3.87 8.52 12.39

CSI 02-244, Soil treatment and tests

Soil poisoning
Using small tools.
Soil insect control sq@.002 SF 0.13 0.07 -- 0.20

Weed control
Using a 6" 1,950 GPM submersible pump, 46,000 lb. 3-axle 6x4 truck with 3,000 gallon water tank.
Herbicide application from truck ju@.001 SY 0.02 0.04 0.04 0.10
2015 Heavy Construction Estimator, All Rights Reserved Page 180

CSI 02-245, Finish grading for structures and slabs

Grading for structures and slabs - Hand grading


Using small tools.
Hand clean for concrete placement sr@.012 SF -- 0.42 -- 0.42
Hand leveling
of machine excavated area sq@.008 SF -- 0.28 -- 0.28
Hand shaping for slab on grade sq@.017 SF -- 0.60 -- 0.60
Fine grading of gravel bed sq@.008 SF -- 0.28 -- 0.28

Grading for structures and slabs - With dozer


Using a D7-H crawler tractor dozer with blade.
Rough grade with dozer gn@2.78 CSY -- 103.60 277.00 380.60

Grading for structures and slabs - With grader


Using a Cat 12-G motor grader.
Semi-grade, 2 passes with grader jm@3.20 CSY -- 116.10 76.60 192.70
Fine grade, 3 passes with grader jm@4.44 CSY -- 161.10 106.00 267.10

Grading for structures and slabs - With loader


Using a Cat 966 articulated loader.
Semi-grade,
extra material stockpiled fu@2.80 CSY -- 102.90 169.00 271.90

CSI 02-246, Drilling and pressure grouting

Pressure grouting from top of dam


Includes drilling and pressure grouting, using a 750 CFM 100 PSI air compressor, 100’ of 3" hardrock air
hose and small tools, a 2.5" to 4" track drill with 12’ reach.
Grout placed in
3" hole drilled in concrete zg@.150 LF 38.20 4.13 5.69 48.02
Grout placed
in 3" hole drilled in rock zg@.277 LF 38.20 7.62 10.50 56.32

Installing guide sleeves for pressure grout


Using a skid mounted NX core drill to 400' depth with a 7 GPM 3/4" pump and small tools.
Install 3-1/2"
guide sleeves at top of dam zh@.900 LF 15.10 24.77 6.31 46.18

Hydraulic pressure test for grout


Using a 750 CFM 100 PSI air compressor, 100’ of 3" hardrock air hose and small tools, a 2.5" to 4"
track drill with 12’ reach.
Hydraulic
pressure test at top of dam zg@.225 Ea 341.00 6.19 8.54 355.73

Pressure grout hookup


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 4-ton fork lift, a 20 GPM grout pump
and mixer and small tools.
Grout hook-up at top of dam yg@.600 Ea 164.00 12.25 6.20 182.45

Grout cost at top of dam


Using a 4-ton fork lift.
Portland cement grout yh@.032 CWT 27.30 0.76 0.15 28.21
Fluidifier mixed in grout yh@.064 CWT 81.80 1.51 0.31 83.62
2015 Heavy Construction Estimator, All Rights Reserved Page 180 (part 2)

Grout cost at top of dam


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 4-ton fork lift, a 20 GPM grout pump
and mixer and small tools.
Cost per cubic foot for placing grout at
top of dam (add hookup cost) yg@.300 CF 27.30 6.12 3.10 36.52

Placing grout from inside dam galleries


Using a skid mounted NX core drill to 400' depth with a 7 GPM 3/4" pump and small tools.
Grout placed in
3" hole drilled in concrete zh@.180 LF 43.60 4.95 1.26 49.81
Grout placed
in 3" hole drilled in rock zh@.327 LF 43.60 9.00 2.29 54.89
Install 3-1/2"
guide sleeves in galleries zh@1.20 LF 15.10 33.02 8.41 56.53
Hydraulic pressure
test inside galleries zh@.257 Ea 341.00 7.07 1.80 349.87

Placing grout from inside dam galleries


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 4-ton fork lift, a 20 GPM grout pump
and mixer and small tools.
Grout hook-up in galleries yg@.686 Ea 164.00 14.00 7.09 185.09

Grout cost in galleries


Using a 4-ton fork lift.
Portland cement grout yh@.036 CWT 27.30 0.85 0.17 28.32
Fluidifier mixed in grout yh@.071 CWT 81.80 1.68 0.34 83.82

Grout cost in galleries


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 4-ton fork lift, a 20 GPM grout pump
and mixer and small tools.
Cost per cubic foot for placing inside
galleries (add hookup cost) yg@.343 CF 164.00 7.00 3.54 174.54

Rotary drill large diameter holes from top of the dam


Using a crawler mounted, 6" to 8.75" diameter rotary drill and small tools.
6" holes, vertical zx@.450 LF 36.80 15.12 20.30 72.22
6" holes, inclined zx@.514 LF 38.20 17.28 23.20 78.68
9" holes, vertical zx@.600 LF 65.40 20.17 27.10 112.67
9" holes, inclined zx@.720 LF 68.10 24.20 32.60 124.90
2015 Heavy Construction Estimator, All Rights Reserved Page 181

CSI 02-261, Rip rap

Slope protection - Random filter stone rip rap, dumped from trucks
Using a 1.5 CY hydraulic tractor excavator and small tools.
3/8 CY to 1/4 CY pieces fb@.513 CY 37.90 19.20 9.31 66.41

Slope protection - Random filter stone rip rap, dumped from trucks
Using a 46,000 lb. 3-axle 6x4 truck with 8 CY dump body, a 1.38 CY wheeled loader-backhoe and small
tools.
10 pound to 99 pound pieces hc@.125 CY 48.10 4.67 2.59 55.36
100 pound to 200 pound pieces hc@.125 CY 51.00 4.67 2.59 58.26
25 pound to 500 pound pieces hc@.125 CY 88.40 4.67 2.59 95.66
50 pound to 1,000 pound pieces hc@.125 CY 152.00 4.67 2.59 159.26

Slope protection - Sand-cement grouted rip rap


Using a 46,000 lb. 3-axle 6x4 truck with 8 CY dump body, a 1.38 CY wheeled loader-backhoe and small
tools.
3/8 CY to 1/4
CY pieces grouted in place hc@.640 SY 35.30 23.88 13.30 72.48

CSI 02-262, Gabions

Galvanized steel mesh (gabion) boxes, stone filled


Using a 20-ton hydraulic crane with 70’ boom and small tools.
6" (15cm) deep tq@.320 SY 8.89 11.31 2.67 22.87
9" (23cm) deep tq@.344 SY 14.50 12.16 2.87 29.53
12" (30cm) deep tq@.366 SY 32.90 12.94 3.05 48.89
18" (45cm) deep tq@.549 SY 38.10 19.41 4.58 62.09
36" (91cm) deep tq@.933 SY 57.20 32.98 7.78 97.96

CSI 02-263, Soil cement

Soil cement, costs include material and placement


Using a Cat 12-G motor grader, a 12-ton 3-wheel self propelled static roller, a 22-ton single drum
self-propelled vibratory roller and small tools.
7% Portland cement h5@1.20 CY 27.20 43.33 26.80 97.33
Add for slopes up to 3 in 1 ---@--- % -- 15.00 -- --
Add for slopes greater than 3 in 1 ---@--- % -- 25.00 -- --

CSI 02-264, Erosion control fabrics

Vinyl erosion control mat


Add the cost of mat stakes below, using small tools.
Webbed revegetation mat sr@.009 SY 6.07 0.32 -- 6.39

Nylon erosion control mat


Add the cost of mat stakes below, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small
tools.
9 mil nylon geomatrix s2@.041 SY 1.93 1.44 0.09 3.46
12 mil nylon geomatrix s2@.047 SY 6.54 1.65 0.10 8.29
18 mil nylon geomatrix s2@.052 SY 6.56 1.82 0.11 8.49
Stakes each 3' to 5' on mat --@.000 Ea 0.41 -- -- 0.41

Three dimensional polyethylene confinement silt fence


Panels are backfilled with sand or crushed stone. Add sand or stone cost, using a 1.38 CY wheeled
loader-backhoe and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 181 (part 2)

8' x 20' poly panels, 4" deep cells ew@.016 SF 1.60 0.57 0.12 2.29
8' x 20' poly panels, 8" deep cells ew@.022 SF 3.14 0.78 0.16 4.08

CSI 02-304, Tunneling instrumentation

Soil testing in tunnels


20 meter depth capacity, using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel
drilling rig, a 3/4-ton 4x4 pickup truck, five sets of small tools.
Vane borer,
complete, in cased borehole rb@9.33 Ea 14,200.00 482.90 554.00 15,236.90
Pressure meter, complete rb@18.7 Ea 30,400.00 967.90 1,110.00 32,477.90
Electric cone penetrometer,
complete rb@11.2 Ea 37,700.00 579.70 665.00 38,944.70

Rock borehole testing


Using a high capacity hydraulic tunnel drilling rig, a 750 CFM 100 PSI air compressor, a 3/4-ton 4x4
pickup truck with a 6,000 gallon off highway water wagon, twenty 6" 1,950 GPM submersible pumps
and five sets of small tools.
Double wireline packer system, NQ size,
200 meter depth capacity rn@26.7 Ea 16,600.00 1,332.00 2,010.00 19,942.00
2015 Heavy Construction Estimator, All Rights Reserved Page 182

USBM type borehole deformation gauge, complete,


20 meter depth capacity rn@16.0 Ea 25,000.00 798.40 1,200.00 26,998.40
Borehole rock indentor, complete,
20 meter depth capacity rn@26.7 Ea 27,600.00 1,332.00 2,010.00 30,942.00
Borehole dilatometer, complete,
20 meter depth capacity rn@20.0 Ea 42,900.00 998.00 1,500.00 45,398.00

Borehole testing
Using a 20-ton hydraulic crane with 70’ boom, a 3/4-ton 4x4 pickup truck and small tools.
Direct shear test assembly, complete
with auto data acquisition ra@56.0 Ea 82,800.00 2,833.00 512.00 86,145.00
USBM type plate load test assembly, complete
with auto data acquisition ra@56.0 Ea 129,000.00 2,833.00 512.00132,345.00

Miscellaneous rock testing


Add the equipment rental cost, using a 20-ton hydraulic crane with 70’ boom, a 3/4-ton 4x4 pickup truck
and small tools.
Convergence meter, 7.5 foot head room,
3 foot range ll@2.60 Ea 1,660.00 105.90 -- 1,765.90

Miscellaneous rock testing


Using a 20-ton hydraulic crane with 70’ boom, a 3/4-ton 4x4 pickup truck and small tools.
Rock bolt pull tester
complete with extensometer ra@5.60 Ea 8,170.00 283.30 51.20 8,504.50

Groundwater monitoring
Using small tools.
Vibrating wire piezometer
with 300 feet of cable lk@2.00 Ea 806.00 100.20 0.38 906.58
Pneumatic
packer for N size boreholes lk@2.00 Ea 1,210.00 100.20 0.38 1,310.58
Pneumatic packer for 6" boreholes lk@4.00 Ea 1,810.00 200.40 0.76 2,011.16

Laboratory testing for rock drilling


Triaxial cell for NQ size cores --@.000 Ea 2,890.00 -- -- 2,890.00
Point load tester --@.000 Ea 4,050.00 -- -- 4,050.00
Portable shear box --@.000 Ea 22,500.00 -- -- 22,500.00

Vibrating wire type strain gages - Surface mount


Using small tools.
50 foot cable with setting tools,
for structure mount lk@2.00 Ea 424.00 100.20 0.38 524.58
100 foot cable with setting
tools for structure mount lk@2.10 Ea 472.00 105.20 0.40 577.60
200 foot cable with setting
tools for structure mount lk@2.22 Ea 568.00 111.20 0.42 679.62
25 foot cable for component mount lk@1.94 Ea 208.00 97.19 0.37 305.56
50 foot cable for component mount lk@2.00 Ea 231.00 100.20 0.38 331.58
80 foot cable for component mount lk@2.08 Ea 260.00 104.20 0.40 364.60

Vibrating wire type strain gages - Concrete embedded


Using small tools.
100 foot capacity lk@2.10 Ea 279.00 105.20 0.40 384.60
300 foot capacity lk@2.25 Ea 472.00 112.70 0.43 585.13
500 foot capacity lk@2.32 Ea 665.00 116.20 0.44 781.64

Vibrating wire type stress-load cells - Total pressure cell


2015 Heavy Construction Estimator, All Rights Reserved Page 182 (part 2)

Using small tools.


50 PSI range, 100 foot cable lk@2.10 Ea 1,160.00 105.20 0.40 1,265.60
200 PSI range, 100 foot cable lk@2.10 Ea 1,250.00 105.20 0.40 1,355.60
200 PSI range, 300 foot cable lk@2.25 Ea 1,530.00 112.70 0.43 1,643.13
1,000 PSI range, 100 foot cable lk@2.10 Ea 1,540.00 105.20 0.40 1,645.60
1,000 PSI range, 300 foot cable lk@2.25 Ea 1,730.00 112.70 0.43 1,843.13

Vibrating wire type stress-load cells - Stressmeter


Using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel drilling rig, a 3/4-ton 4x4
pickup truck, five sets of small tools.
20 foot cable, hard or soft rock rb@5.60 Ea 578.00 289.90 332.00 1,199.90
50 foot cable, hard or soft rock rb@7.00 Ea 607.00 362.30 415.00 1,384.30
66 foot cable, hard or soft rock rb@8.00 Ea 622.00 414.10 475.00 1,511.10
80 foot cable, hard or soft rock rb@11.2 Ea 636.00 579.70 665.00 1,880.70
120 foot cable, hard or soft rock rb@17.5 Ea 674.00 905.80 1,040.00 2,619.80
165 foot cable, hard or soft rock rb@31.1 Ea 718.00 1,610.00 1,850.00 4,178.00
Hydraulic setting tool,
100 foot capacity --@.000 Ea 19,300.00 -- -- 19,300.00

Rock testing - Borehole stress cell


Using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel drilling rig, a 3/4-ton 4x4
pickup truck, five sets of small tools.
100 foot tubing with gauge,
N size boreholes rb@14.0 Ea 1,730.00 724.60 831.00 3,285.60
Instrumented rock bolt, 6 meter,
22 ton capacity, 5 points rb@4.21 Ea 2,700.00 217.90 250.00 3,167.90
2015 Heavy Construction Estimator, All Rights Reserved Page 183

Rock bolt load cell lk@2.00 Ea 713.00 100.20 0.38 813.58

Rock testing - Anchor load cell


Using small tools.
50 ton capacity lk@1.00 Ea 1,540.00 50.10 0.19 1,590.29
200 ton capacity lk@1.00 Ea 2,310.00 50.10 0.19 2,360.29
500 ton capacity lk@1.00 Ea 3,280.00 50.10 0.19 3,330.29

Extensometers and fissurometers - Multiple position borehole extensometers


Using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel drilling rig, a 3/4-ton 4x4
pickup truck, five sets of small tools.
Double point with anchors
at 10 feet and 20 feet rb@4.31 Ea 563.00 223.10 256.00 1,042.10
10 point,
anchors at 5 foot intervals rb@10.8 Ea 1,880.00 559.00 641.00 3,080.00
5 point, anchors at 5 foot intervals,
remote readout rb@5.39 Ea 3,380.00 279.00 320.00 3,979.00
Conversion of
10 point for remote reading rb@5.60 Ea 3,190.00 289.90 332.00 3,811.90

Extensometers and fissurometers - Tape extensometers


Purchase cost.
100 foot
tape with calibration frame --@.000 Ea 4,690.00 -- -- 4,690.00

Extensometers and fissurometers - Sonic probe extensometers


Using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel drilling rig, a 3/4-ton 4x4
pickup truck, five sets of small tools.
Probe installation with 6 anchors at 5 foot intervals,
aluminum guide rb@6.51 Ea 1,500.00 337.00 386.00 2,223.00
Flexible probe,
30 foot capacity with readout --@.000 Ea 12,200.00 -- -- 12,200.00

Extensometers and fissurometers - Borehole fissurometers


Using a 750 CFM 100 PSI air compressor, a high capacity hydraulic tunnel drilling rig, a 3/4-ton 4x4
pickup truck, five sets of small tools.
2 mechanical anchors rb@1.87 Ea 3,380.00 96.79 111.00 3,587.79

Data acquisition for tunneling and mining - Readouts


Mechanical
readout for DP extensometer --@.000 Ea 347.00 -- -- 347.00
Mechanical readout
for rock bolt load cell --@.000 Ea 578.00 -- -- 578.00
Digital
readout for convergence meter --@.000 Ea 2,760.00 -- -- 2,760.00
Digital
readout for MPB extensometer --@.000 Ea 2,990.00 -- -- 2,990.00
Readout for anchor load cell --@.000 Ea 3,080.00 -- -- 3,080.00
Vibrating wire digital readout --@.000 Ea 3,180.00 -- -- 3,180.00
Sequencer for expansion
to 8 channel capability --@.000 Ea 1,160.00 -- -- 1,160.00
Digital readout with rechargeable batteries,
engineering units --@.000 Ea 4,240.00 -- -- 4,240.00

Data acquisition for tunneling and mining - Central systems


Using small tools.
Cable, 4 conductor 24 AWG solid copper,
2015 Heavy Construction Estimator, All Rights Reserved Page 183 (part 2)

gel filled lk@.007 LF 0.96 0.35 -- 1.31


10 channel system with port, battery backup,
enclosure and software lk@13.3 Ea 10,600.00 666.30 2.53 11,268.83

Tunneling and mining guidance systems, purchase


Straight and curved application --@.000 Ea 163,000.00 -- --163,000.00
Pre-programmed
curved drive application --@.000 Ea 221,000.00 -- --221,000.00
Curved axis coordinator, computer
and A/G VDU and printer --@.000 Ea 280,000.00 -- --280,000.00

CSI 02-310, Tunnel and shaft excavation

Tunnel shaft excavation - 10 foot diameter (3.0 m) - To 3 KSI rock


Using a 8' to 10' diameter tunnel boring machine, twenty 6" 1,950 GPM submersible pumps, a 3/4-ton
4x4 pickup truck with a 6,000 gallon off highway water wagon and small tools.
Bore through 2 KSI rock rc@2.97 LF -- 141.90 204.00 345.90
2015 Heavy Construction Estimator, All Rights Reserved Page 184

Bore through 3 KSI rock rc@3.06 LF -- 146.20 210.00 356.20

Tunnel shaft excavation - 10 foot diameter (3.0 m) - 5 to 10 KSI rock


Using a 8' to 10' diameter tunnel boring machine, twenty 6" 1,950 GPM submersible pumps, a 3/4-ton
4x4 pickup truck with a 6,000 gallon off highway water wagon and small tools.
Bore through 5 KSI rock rc@3.15 LF -- 150.50 216.00 366.50
Bore through 7 KSI rock rc@3.25 LF -- 155.30 223.00 378.30
Bore through 9 KSI rock rc@3.36 LF -- 160.60 231.00 391.60
Bore through 10 KSI rock rc@3.47 LF -- 165.80 238.00 403.80

Tunnel shaft excavation - 10 foot diameter (3.0 m) - 12 to 20 KSI rock


Using a 8' to 10' diameter tunnel boring machine, twenty 6" 1,950 GPM submersible pumps, a 3/4-ton
4x4 pickup truck with a 6,000 gallon off highway water wagon and small tools.
Bore through 12 KSI rock rc@3.59 LF -- 171.60 246.00 417.60
Bore through 14 KSI rock rc@3.71 LF -- 177.30 255.00 432.30
Bore through 16 KSI rock rc@3.85 LF -- 184.00 264.00 448.00
Bore through 18 KSI rock rc@4.00 LF -- 191.20 275.00 466.20
Bore through 20 KSI rock rc@4.16 LF -- 198.80 286.00 484.80

Tunnel shaft excavation - 10 foot diameter (3.0 m) - 22 to 30 KSI rock


Using a 8' to 10' diameter tunnel boring machine, twenty 6" 1,950 GPM submersible pumps, a 3/4-ton
4x4 pickup truck with a 6,000 gallon off highway water wagon and small tools.
Bore through 22 KSI rock rc@4.33 LF -- 206.90 297.00 503.90
Bore through 24 KSI rock rc@4.52 LF -- 216.00 310.00 526.00
Bore through 26 KSI rock rc@4.73 LF -- 226.00 325.00 551.00
Bore through 28 KSI rock rc@4.95 LF -- 236.60 340.00 576.60
Bore through 30 KSI rock rc@5.20 LF -- 248.50 357.00 605.50

Tunnel shaft excavation - 11.5 foot diameter (3.5 m) - To 3 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 2 KSI rock rd@3.15 LF -- 150.50 281.00 431.50
Bore through 3 KSI rock rd@3.25 LF -- 155.30 290.00 445.30

Tunnel shaft excavation - 11.5 foot diameter (3.5 m) - 5 to 10 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 5 KSI rock rd@3.36 LF -- 160.60 300.00 460.60
Bore through 7 KSI rock rd@3.47 LF -- 165.80 310.00 475.80
Bore through 9 KSI rock rd@3.59 LF -- 171.60 320.00 491.60
Bore through 10 KSI rock rd@3.71 LF -- 177.30 331.00 508.30

Tunnel shaft excavation - 11.5 foot diameter (3.5 m) - 12 to 20 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 12 KSI rock rd@3.71 LF -- 177.30 331.00 508.30
Bore through 14 KSI rock rd@3.85 LF -- 184.00 344.00 528.00
Bore through 16 KSI rock rd@4.00 LF -- 191.20 357.00 548.20
Bore through 18 KSI rock rd@4.16 LF -- 198.80 371.00 569.80
Bore through 20 KSI rock rd@4.33 LF -- 206.90 386.00 592.90

Tunnel shaft excavation - 11.5 foot diameter (3.5 m) - 22 to 30 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 22 KSI rock rd@4.52 LF -- 216.00 403.00 619.00
Bore through 24 KSI rock rd@4.73 LF -- 226.00 422.00 648.00
Bore through 26 KSI rock rd@4.95 LF -- 236.60 442.00 678.60
2015 Heavy Construction Estimator, All Rights Reserved Page 184 (part 2)

Bore through 28 KSI rock rd@5.20 LF -- 248.50 464.00 712.50


Bore through 30 KSI rock rd@5.47 LF -- 261.40 488.00 749.40

Tunnel shaft excavation - 13 foot diameter (4.0 m) - To 3 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 2 KSI rock re@3.25 LF -- 155.30 290.00 445.30
Bore through 3 KSI rock re@3.36 LF -- 160.60 300.00 460.60

Tunnel shaft excavation - 13 foot diameter (4.0 m) - 5 to 10 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 5 KSI rock re@3.47 LF -- 165.80 310.00 475.80
Bore through 7 KSI rock re@3.59 LF -- 171.60 320.00 491.60
Bore through 9 KSI rock re@3.71 LF -- 177.30 331.00 508.30
Bore through 10 KSI rock re@3.85 LF -- 184.00 344.00 528.00

Tunnel shaft excavation - 13 foot diameter (4.0 m) - 12 to 20 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 12 KSI rock re@3.85 LF -- 184.00 344.00 528.00
Bore through 14 KSI rock re@4.00 LF -- 191.20 357.00 548.20
Bore through 16 KSI rock re@4.16 LF -- 198.80 371.00 569.80
Bore through 18 KSI rock re@4.33 LF -- 206.90 386.00 592.90
Bore through 20 KSI rock re@4.52 LF -- 216.00 403.00 619.00

Tunnel shaft excavation - 13 foot diameter (4.0 m) - 22 to 30 KSI rock


Using a 11' to 14' diameter tunnel boring machine, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 22 KSI rock re@4.73 LF -- 226.00 422.00 648.00
Bore through 24 KSI rock re@4.95 LF -- 236.60 442.00 678.60
Bore through 26 KSI rock re@5.20 LF -- 248.50 464.00 712.50
2015 Heavy Construction Estimator, All Rights Reserved Page 185

Bore through 28 KSI rock re@5.47 LF -- 261.40 488.00 749.40


Bore through 30 KSI rock re@5.78 LF -- 276.20 516.00 792.20

Tunnel shaft excavation - 16.5 foot diameter (5.0 m) - To 3 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 2 KSI rock rf@4.13 LF -- 200.80 326.00 526.80
Bore through 3 KSI rock rf@4.27 LF -- 207.60 337.00 544.60

Tunnel shaft excavation - 16.5 foot diameter (5.0 m) - 5 to 10 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 5 KSI rock rf@4.41 LF -- 214.40 348.00 562.40
Bore through 7 KSI rock rf@4.57 LF -- 222.10 361.00 583.10
Bore through 9 KSI rock rf@4.74 LF -- 230.40 374.00 604.40
Bore through 10 KSI rock rf@4.92 LF -- 239.20 388.00 627.20

Tunnel shaft excavation - 16.5 foot diameter (5.0 m) - 12 to 20 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 12 KSI rock rf@5.12 LF -- 248.90 404.00 652.90
Bore through 14 KSI rock rf@5.33 LF -- 259.10 421.00 680.10
Bore through 16 KSI rock rf@5.57 LF -- 270.80 440.00 710.80
Bore through 18 KSI rock rf@5.82 LF -- 282.90 459.00 741.90
Bore through 20 KSI rock rf@6.10 LF -- 296.50 482.00 778.50

Tunnel shaft excavation - 16.5 foot diameter (5.0 m) - 22 to 30 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 22 KSI rock rf@6.40 LF -- 311.10 505.00 816.10
Bore through 24 KSI rock rf@6.74 LF -- 327.60 532.00 859.60
Bore through 28 KSI rock rf@7.53 LF -- 366.00 594.00 960.00
Bore through 30 KSI rock rf@8.00 LF -- 388.90 632.00 1,020.90

Tunnel shaft excavation - 26 foot diameter (8.0 m) - To 3 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 2 KSI rock rg@4.27 LF -- 207.60 337.00 544.60
Bore through 3 KSI rock rg@4.41 LF -- 214.40 348.00 562.40

Tunnel shaft excavation - 26 foot diameter (8.0 m) - 5 to 10 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 5 KSI rock rg@4.57 LF -- 222.10 361.00 583.10
Bore through 7 KSI rock rg@4.74 LF -- 230.40 374.00 604.40
Bore through 9 KSI rock rg@4.92 LF -- 239.20 388.00 627.20
Bore through 10 KSI rock rg@5.12 LF -- 248.90 404.00 652.90

Tunnel shaft excavation - 26 foot diameter (8.0 m) - 12 to 20 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 12 KSI rock rg@5.33 LF -- 259.10 421.00 680.10
Bore through 14 KSI rock rg@5.57 LF -- 270.80 440.00 710.80
Bore through 16 KSI rock rg@5.82 LF -- 282.90 459.00 741.90
Bore through 18 KSI rock rg@6.10 LF -- 296.50 482.00 778.50
Bore through 20 KSI rock rg@6.40 LF -- 311.10 505.00 816.10
2015 Heavy Construction Estimator, All Rights Reserved Page 185 (part 2)

Tunnel shaft excavation - 26 foot diameter (8.0 m) - 22 to 30 KSI rock


Tunnel 2-boom miner, 137.8 ton, 238" to 350", a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and small tools.
Bore through 22 KSI rock rg@6.74 LF -- 327.60 532.00 859.60
Bore through 24 KSI rock rg@7.11 LF -- 345.60 561.00 906.60
Bore through 28 KSI rock rg@8.00 LF -- 388.90 632.00 1,020.90
Bore through 30 KSI rock rg@8.53 LF -- 414.60 673.00 1,087.60

Tunnel boring on-site preparatory work


Using a 8' to 10' diameter 475-ton tunnel boring machine, a 750 CFM 100 PSI air compressor, a 40-ton
hydraulic crane with 84’ boom and a 3/4-ton 4x4 pickup truck.
Erection and dismantlement underground of 10 foot diameter
tunnel boring machine rq@1700 LS -- 81,480.00 67,300.00148,780.00

Tunnel boring on-site preparatory work


Using a 3.5' diameter 150-ton tunnel boring machine, a 750 CFM 100 PSI air compressor, a 40-ton
hydraulic crane with 84’ boom, a 3/4-ton 4x4 pickup truck.
Erection and dismantlement underground of 11.5 foot diameter
tunnel boring machine rr@2125 LS --102,100.00 69,500.00171,600.00

Tunnel boring on-site preparatory work


Using a 11' to 14' 750-ton tunnel boring machine, a 750 CFM 100 PSI air compressor, a 40-ton
hydraulic crane with 84’ boom, a 3/4-ton 4x4 pickup truck.
Erection and dismantlement underground of 16.5 foot diameter
tunnel boring machine rs@2429 LS --116,400.00134,000.00250,400.00

Tunnel boring on-site preparatory work


Using a 5' diameter 225-ton tunnel boring machine, a 750 CFM 100 PSI air compressor, a 40-ton
hydraulic crane with 84’ boom and a 3/4-ton 4x4 pickup truck.
Erection and dismantlement underground of 16.5 foot diameter
tunnel boring machine rt@3167 LS --152,200.00103,000.00255,200.00

Tunnel boring on-site preparatory work


Using a 8' diameter 500-ton tunnel boring machine, a 750 CFM 100 PSI air compressor, a 40-ton
hydraulic crane with 84’ boom, a 3/4-ton 4x4 pickup truck.
Erection and dismantlement underground of 26 foot diameter
tunnel boring machine ru@3800 LS --182,600.00152,000.00334,600.00

Tunnel boring disc-cutters usage and replacement


Soft rock cutting, using any
size tunnel boring machine --@.000 CY 4.03 -- -- 4.03
2015 Heavy Construction Estimator, All Rights Reserved Page 186

Medium density rock cutting using any


size tunnel boring machine --@.000 CY 14.60 -- -- 14.60
Hard rock cutting using any
size tunnel boring machine --@.000 CY 20.20 -- -- 20.20

Tunneling - 35 ton roadheader


Using a 197" to 213" circumference 35-ton tunnel roadheader, a 3/4-ton 4x4 pickup truck with a 6,000
gallon off highway water wagon, twenty 6" 1,950 GPM submersible pumps and three sets of small tools.
Bore through 3 KSI rock rh@.388 CY -- 19.61 29.40 49.01
Bore through 6 KSI rock rh@.457 CY -- 23.10 34.70 57.80
Bore through 9 KSI rock rh@.556 CY -- 28.11 42.20 70.31
Bore through 12 KSI rock rh@.711 CY -- 35.94 54.00 89.94
Bore through 14 KSI rock rh@.985 CY -- 49.79 74.70 124.49

Tunneling - 50 ton roadheader


Using a 50-ton tunnel roadheader, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off highway water
wagon, twenty 6" 1,950 GPM submersible pumps and four sets of small tools.
Bore through 3 KSI rock ri@.312 CY -- 15.77 27.60 43.37
Bore through 6 KSI rock ri@.356 CY -- 18.00 31.50 49.50
Bore through 9 KSI rock ri@.413 CY -- 20.88 36.60 57.48
Bore through 12 KSI rock ri@.492 CY -- 24.87 43.60 68.47
Bore through 14 KSI rock ri@.610 CY -- 30.84 54.10 84.94

Tunneling - 57 ton roadheader


Using a 186" to 270" 57-ton tunnel roadheader, twenty 6" 1,950 GPM submersible pumps, a 3/4-ton 4x4
pickup truck with a 6,000 gallon off highway water wagon and four sets of small tools.
Bore through 3 KSI rock rj@.284 CY -- 14.36 28.30 42.66
Bore through 6 KSI rock rj@.320 CY -- 16.18 31.90 48.08
Bore through 9 KSI rock rj@.366 CY -- 18.50 36.50 55.00
Bore through 12 KSI rock rj@.427 CY -- 21.58 42.60 64.18
Bore through 14 KSI rock rj@.512 CY -- 25.88 51.10 76.98

Tunneling - 90 ton roadheader


Using 197" to 236" 90-ton tunnel roadheader, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off highway
water wagon, twenty 6" 1,950 GPM submersible pumps and 5 sets of small tools.
Bore through 3 KSI rock rk@.262 CY -- 13.27 23.10 36.37
Bore through 6 KSI rock rk@.286 CY -- 14.49 25.20 39.69
Bore through 9 KSI rock rk@.314 CY -- 15.90 27.70 43.60
Bore through 12 KSI rock rk@.348 CY -- 17.63 30.70 48.33
Bore through 14 KSI rock rk@.390 CY -- 19.75 34.40 54.15

Tunneling - 99 ton roadheader


Using a 276" to 386" 99-ton tunnel roadheader, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and 5 sets of small tools.
Bore through 3 KSI rock rl@.246 CY -- 12.46 24.30 36.76
Bore through 6 KSI rock rl@.267 CY -- 13.52 26.40 39.92
Bore through 9 KSI rock rl@.291 CY -- 14.74 28.70 43.44
Bore through 12 KSI rock rl@.320 CY -- 16.21 31.60 47.81
Bore through 14 KSI rock rl@.356 CY -- 18.03 35.20 53.23

Tunneling - 137 ton roadheader


Using a 238" to 350" 137.8-ton tunnel 2-boom miner, a 3/4-ton 4x4 pickup truck with a 6,000 gallon off
highway water wagon, twenty 6" 1,950 GPM submersible pumps and five sets of small tools.
Bore through 3 KSI rock rm@.111 CY -- 5.62 14.00 19.62
Bore through 6 KSI rock rm@.119 CY -- 6.03 15.00 21.03
Bore through 9 KSI rock rm@.127 CY -- 6.43 16.00 22.43
Bore through 12 KSI rock rm@.139 CY -- 7.04 17.50 24.54
2015 Heavy Construction Estimator, All Rights Reserved Page 186 (part 2)

Bore through 14 KSI rock rm@.151 CY -- 7.65 19.00 26.65

Roadheader pick usage and replacement


Picks for roadheaders average $20 each. In soft material, estimate one pick replacement each 10 CY.
Soft rock cutting,
using any size roadheader --@.000 CY 3.85 -- -- 3.85
Medium density rock cutting
using any size roadheader --@.000 CY 5.78 -- -- 5.78
Hard rock cutting
using any size roadheader --@.000 CY 7.23 -- -- 7.23
2015 Heavy Construction Estimator, All Rights Reserved Page 187

Hydraulic 4-boom drill rig


Using a hydraulic 4-boom 700 to 1,600 SF tunnel drilling rig, a 750 CFM 100 PSI air compressor, a
3/4-ton 4x4 pickup truck with a 6,000 gallon off highway water wagon, twenty 6" 1,950 GPM
submersible pumps and five sets of small tools.
Drill through 3 KSI rock rp@.054 LF -- 2.69 3.12 5.81
Drill through 5 KSI rock rp@.058 LF -- 2.89 3.36 6.25
Drill through 7 KSI rock rp@.063 LF -- 3.14 3.65 6.79
Drill through 12 KSI rock rp@.074 LF -- 3.69 4.28 7.97
Drill through 14 KSI rock rp@.082 LF -- 4.09 4.75 8.84
Drill through 16 KSI rock rp@.091 LF -- 4.54 5.27 9.81
Drill through 18 KSI rock rp@.103 LF -- 5.14 5.96 11.10
Drill through 20 KSI rock rp@.149 LF -- 7.43 8.62 16.05
Drill through 22 KSI rock rp@.260 LF -- 12.97 15.00 27.97
Drill through 24 KSI rock rp@.520 LF -- 25.93 30.10 56.03
Drill through 26 KSI rock rp@.743 LF -- 37.05 43.00 80.05
Drill through 28 KSI rock rp@1.30 LF -- 64.83 75.20 140.03
Drill through 30 KSI rock rp@2.60 LF -- 129.70 150.00 279.70

Rods and bits for tunnel drilling


1" hexagon rod with 1-1/4" rope at shank end and 1" rope at bit end,
8'- 1" long --@.000 Ea 224.00 -- -- 224.00
1-1/8" hexagon rod with 1-1/4" rope at shank end and 1-1/8" single rope at bit end,
10'-1-1/2" long --@.000 Ea 288.00 -- -- 288.00
1-1/4" hexagon rod with 1-1/2" rope at shank end and 1-1/4" single rope at bit end,
12" - 1-1/2" long --@.000 Ea 375.00 -- -- 375.00
1-1/4" hexagon rod with 1-1/2" rope at shank end and 1-1/4" double rope at bit end,
14'-1-1/2" long --@.000 Ea 448.00 -- -- 448.00
1-3/8" hexagon rod with 1-1/2" rope at shank end and 1-1/4" single rope at bit end,
18'-1-1/2" long --@.000 Ea 748.00 -- -- 748.00
1-1/2" button bit,
rope thread 1-1/8" --@.000 Ea 107.00 -- -- 107.00
1-5/8" button bit,
rope thread 1-1/8" --@.000 Ea 115.00 -- -- 115.00
1-11/16" button bit,
rope thread 1-1/8" --@.000 Ea 119.00 -- -- 119.00
1-3/4" button bit, rope
thread 1-1/8" rope thread --@.000 Ea 138.00 -- -- 138.00
1-3/4" button bit, rope
thread 1-1/4" rope thread --@.000 Ea 122.00 -- -- 122.00
1-7/8" button bit,
rope thread 1-1/8" --@.000 Ea 126.00 -- -- 126.00
2" button bit, rope thread 1-1/4" --@.000 Ea 128.00 -- -- 128.00

Couplings for tunnel drilling


Semi-bridge type,
2-1/2" diameter. 8-3/4" long --@.000 Ea 149.00 -- -- 149.00
Full-bridge type,
2-1/2" diameter 10" long --@.000 Ea 163.00 -- -- 163.00
Semi-bridge type,
3-3/8" diameter 12" long --@.000 Ea 324.00 -- -- 324.00
Semi-bridge type,
2-5/32" diameter 7-1/2" long --@.000 Ea 103.00 -- -- 103.00
Semi-bridge type,
2-1/2" diameter 8-5/32" long --@.000 Ea 149.00 -- -- 149.00
Full-bridge type,
2-1/2" diameter 8-3/4" long --@.000 Ea 163.00 -- -- 163.00
Semi-bridge type,
3-1/8" diameter 9-7/32" long --@.000 Ea 212.00 -- -- 212.00
2015 Heavy Construction Estimator, All Rights Reserved Page 187 (part 2)

Striker bars for tunnel drilling


1-1/2" diameter, 3 splined --@.000 Ea 229.00 -- -- 229.00
1-1./2" diameter, 4 splined --@.000 Ea 244.00 -- -- 244.00
2015 Heavy Construction Estimator, All Rights Reserved Page 188

1-1/2" diameter, 6 splined --@.000 Ea 358.00 -- -- 358.00


1-1/2" diameter, 8 splined --@.000 Ea 430.00 -- -- 430.00
1-1/2" diameter, 14 splined --@.000 Ea 570.00 -- -- 570.00
1-1/2" diameter,
14 splined water swivel --@.000 Ea 602.00 -- -- 602.00
1-3/4" diameter, 4 splined --@.000 Ea 272.00 -- -- 272.00
1-3/4" diameter, 6 splined --@.000 Ea 287.00 -- -- 287.00
1-3/4" diameter, 8 splined --@.000 Ea 473.00 -- -- 473.00
1-3/4" diameter, 10 splined --@.000 Ea 545.00 -- -- 545.00
1-3/4" diameter,
12 splined water swivel --@.000 Ea 616.00 -- -- 616.00

Integral drill steel for tunnel drilling (drill steel)


7/8" hexagon body, 3-1/4" x 7/8" hexagon shank,
2'-7" long --@.000 Ea 143.00 -- -- 143.00
7/8" hexagon body, 3-1/4" x 7/8" hexagon shank,
7'-10" long --@.000 Ea 179.00 -- -- 179.00
7/8" hexagon body, 3-1/4" x 7/8" hexagon shank,
13'-1" long --@.000 Ea 220.00 -- -- 220.00
7/8" hexagon body, 4-1/4" x 7/8" hexagon shank,
2'-7" long --@.000 Ea 143.00 -- -- 143.00
7/8" hexagon body,
4-1/4" x 7/8" 7'-10" long --@.000 Ea 179.00 -- -- 179.00
7/8" hexagon body, 4-1/4" x 7/8" hexagon shank,
13'-1" long --@.000 Ea 220.00 -- -- 220.00
1" hexagon body, 4-1/4" x 1" hexagon shank,
2'-0" long --@.000 Ea 166.00 -- -- 166.00
1" hexagon body,
4-1/4" x 1" 5'-0" long --@.000 Ea 196.00 -- -- 196.00
1" hexagon body, 6-1/4" x 1" hexagon shank,
10'-6" long --@.000 Ea 245.00 -- -- 245.00
1" hexagon body, 6-1/4" x 1" hexagon shank,
11'-9" long --@.000 Ea 260.00 -- -- 260.00

Tunnel blasting agents - Explosives


Add the cost of a blasting engineer for loading cartridge type explosives.
1-1/4" x 8" cartridges
non-nitroglycerin gelatin --@.000 Ea 1.82 -- -- 1.82
1-1/4" x 12" cartridges, small diameter cap
sensitive emulsion cartridges --@.000 Ea 1.63 -- -- 1.63

Tunnel blasting agents - Electric caps


By length of lead wire on electric caps or fuse on non-electric caps. Lead wire varies with hole depth.
8 foot --@.000 Ea 2.38 -- -- 2.38
12 foot --@.000 Ea 2.70 -- -- 2.70
16 foot --@.000 Ea 2.99 -- -- 2.99
1 - 20 delays, 8 foot --@.000 Ea 2.51 -- -- 2.51
1 - 20 delays, 12 foot --@.000 Ea 2.91 -- -- 2.91
1 - 20 delays, 16 foot --@.000 Ea 3.17 -- -- 3.17

Tunnel blasting agents - Non-electric caps


8 foot --@.000 Ea 2.29 -- -- 2.29
12 foot --@.000 Ea 2.44 -- -- 2.44
16 foot --@.000 Ea 2.64 -- -- 2.64
1 - 20 delays, 4 foot --@.000 Ea 2.46 -- -- 2.46
1 - 20 delays, 12 foot --@.000 Ea 2.94 -- -- 2.94
1 - 20 delays, 20 foot --@.000 Ea 3.66 -- -- 3.66
2015 Heavy Construction Estimator, All Rights Reserved Page 188 (part 2)

Tram and truck mucking - 10 foot diameter tunnel


Based on 10,000' tunnel, using a 10 CY tunnel end dump truck, a 2.5 CY tunnel scooptram, a tunnel
slewing belt conveyor, a 3/4-ton 4x4 pickup truck and four sets of small tools.
2 KSI rock r3@.471 CY -- 22.02 13.50 35.52
5 KSI rock r3@.500 CY -- 23.38 14.40 37.78
10 KSI rock r3@.546 CY -- 25.53 15.70 41.23
14 KSI rock r3@.585 CY -- 27.35 16.80 44.15
20 KSI rock r3@.658 CY -- 30.76 18.90 49.66
24 KSI rock r3@.716 CY -- 33.47 20.60 54.07
30 KSI rock r3@.814 CY -- 38.05 23.40 61.45
2015 Heavy Construction Estimator, All Rights Reserved Page 189

Tram and truck mucking - 11.5 foot diameter tunnel


Using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks, a 2.5 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
2 KSI rock r4@.471 CY -- 21.57 15.90 37.47
5 KSI rock r4@.496 CY -- 22.71 16.80 39.51
10 KSI rock r4@.519 CY -- 23.77 17.50 41.27

Tram and truck mucking - 11.5 foot diameter tunnel


Using a 10 CY tunnel end dump truck, a 2.5 CY tunnel scooptram, a tunnel slewing belt conveyor, a
3/4-ton 4x4 pickup truck and four sets of small tools.
14 KSI rock r3@.462 CY -- 21.60 13.30 34.90
20 KSI rock r3@.522 CY -- 24.40 15.00 39.40
24 KSI rock r3@.565 CY -- 26.41 16.20 42.61
30 KSI rock r3@.658 CY -- 30.76 18.90 49.66

Tram and truck mucking - 13 foot diameter


Using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks, a 2.5 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
5 KSI rock r4@.378 CY -- 17.31 12.80 30.11
10 KSI rock r4@.421 CY -- 19.28 14.20 33.48
14 KSI rock r4@.438 CY -- 20.06 14.80 34.86
20 KSI rock r4@.496 CY -- 22.71 16.80 39.51

Tram and truck mucking - 13 foot diameter


Using a 10 CY tunnel end dump truck, a 2.5 CY tunnel scooptram, a tunnel slewing belt conveyor, a
3/4-ton 4x4 pickup truck and four sets of small tools.
24 KSI rock r3@.466 CY -- 21.79 13.40 35.19
30 KSI rock r3@.539 CY -- 25.20 15.50 40.70

Tram and truck mucking - 16.5 foot diameter


Using a 3/4-ton 4x4 pickup truck, three 10 CY tunnel end dump trucks, two 2.5 CY tunnel scooptrams,
a tunnel slewing belt conveyor and four sets of small tools.
2 KSI rock r5@.272 CY -- 12.44 10.70 23.14
5 KSI rock r5@.295 CY -- 13.49 11.60 25.09
10 KSI rock r4@.293 CY -- 13.42 9.90 23.32
14 KSI rock r4@.313 CY -- 14.33 10.60 24.93
20 KSI rock r4@.337 CY -- 15.43 11.40 26.83
24 KSI rock r4@.371 CY -- 16.99 12.50 29.49
30 KSI rock r4@.441 CY -- 20.19 14.90 35.09

Tram and truck mucking - 26 foot diameter


Using a 3/4-ton 4x4 pickup truck, three 18 CY tunnel end dump trucks, a 6 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
2 KSI rock r7@.122 CY -- 5.58 6.47 12.05
5 KSI rock r7@.131 CY -- 5.99 6.95 12.94
10 KSI rock r7@.146 CY -- 6.68 7.74 14.42
14 KSI rock r7@.159 CY -- 7.27 8.43 15.70
20 KSI rock r6@.163 CY -- 7.57 5.93 13.50
24 KSI rock r6@.181 CY -- 8.41 6.59 15.00
30 KSI rock r6@.217 CY -- 10.08 7.90 17.98

Tram and truck mucking for tunnel excavation by roadheader - 32 ton roadheader
Using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks, a 2.5 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r4@.339 CY -- 15.52 11.50 27.02
6 KSI rock r4@.400 CY -- 18.32 13.50 31.82
2015 Heavy Construction Estimator, All Rights Reserved Page 189 (part 2)

9 KSI rock r4@.487 CY -- 22.30 16.50 38.80

Tram and truck mucking for tunnel excavation by roadheader - 32 ton roadheader
Using a 10 CY tunnel end dump truck, a 2.5 CY tunnel scooptram, a tunnel slewing belt conveyor, a
3/4-ton 4x4 pickup truck and four sets of small tools.
12 KSI rock r3@.533 CY -- 24.92 15.30 40.22
14 KSI rock r3@.739 CY -- 34.55 21.20 55.75

Tram and truck mucking for tunnel excavation by roadheader - 50 ton roadheader
Using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks, a 2.5 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r4@.273 CY -- 12.50 9.22 21.72
6 KSI rock r4@.311 CY -- 14.24 10.50 24.74
9 KSI rock r4@.361 CY -- 16.53 12.20 28.73
12 KSI rock r4@.431 CY -- 19.74 14.60 34.34

Tram and truck mucking for tunnel excavation by roadheader - 50 ton roadheader
Using a 10 CY tunnel end dump truck, a 2.5 CY tunnel scooptram, a tunnel slewing belt conveyor, a
3/4-ton 4x4 pickup truck and four sets of small tools.
14 KSI rock r3@.457 CY -- 21.36 13.10 34.46

Tram and truck mucking for tunnel excavation by roadheader - 57 ton roadheader
Using a 3/4-ton 4x4 pickup truck, three 10 CY tunnel end dump trucks, two 2.5 CY tunnel scooptrams,
a tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r5@.320 CY -- 14.64 12.60 27.24

Tram and truck mucking for tunnel excavation by roadheader - 57 ton roadheader
Using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks, a 2.5 CY tunnel scooptram, a
tunnel slewing belt conveyor and four sets of small tools.
6 KSI rock r4@.280 CY -- 12.82 9.46 22.28
9 KSI rock r4@.320 CY -- 14.65 10.80 25.45
2015 Heavy Construction Estimator, All Rights Reserved Page 190

12 KSI rock r4@.373 CY -- 17.08 12.60 29.68


14 KSI rock r4@.448 CY -- 20.51 15.10 35.61

Tram and truck mucking for tunnel excavation by roadheader - 90 ton roadheader
Using a 3/4-ton 4x4 pickup truck, three 10 CY tunnel end dump trucks, two 2.5 CY tunnel scooptrams,
a tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r5@.167 CY -- 7.64 6.59 14.23
6 KSI rock r5@.257 CY -- 11.76 10.10 21.86
9 KSI rock r5@.282 CY -- 12.90 11.10 24.00
12 KSI rock r5@.313 CY -- 14.32 12.40 26.72
14 KSI rock r4@.373 CY -- 17.08 12.60 29.68

Tram and truck mucking for tunnel excavation by roadheader - 99 ton roadheader
Using a 3/4-ton 4x4 pickup truck, three 10 CY tunnel end dump trucks, two 2.5 CY tunnel scooptrams,
a tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r5@.222 CY -- 10.15 8.76 18.91
6 KSI rock r5@.240 CY -- 10.98 9.48 20.46
9 KSI rock r5@.262 CY -- 11.98 10.30 22.28
12 KSI rock r5@.288 CY -- 13.17 11.40 24.57
14 KSI rock r5@.320 CY -- 14.64 12.60 27.24

Tram and truck mucking for tunnel excavation by roadheader - 138 ton roadheader
Using a 3/4-ton 4x4 pickup truck, four 18 CY tunnel end dump trucks, two 6 CY tunnel scooptrams, a
tunnel slewing belt conveyor and four sets of small tools.
3 KSI rock r8@.111 CY -- 5.01 7.67 12.68
6 KSI rock r8@.119 CY -- 5.38 8.23 13.61
9 KSI rock r8@.127 CY -- 5.74 8.78 14.52
12 KSI rock r8@.139 CY -- 6.28 9.61 15.89
14 KSI rock r8@.151 CY -- 6.82 10.40 17.22

Prefabricated steel tunnel liner plates - 24" wide


Costs are based on plates at 68 cents per pound. Plates are 3.14' long. Number of plates needed
equals the tunnel diameter in feet, using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks,
two 2.5 CY tunnel scooptrams, a tunnel slewing belt conveyor and four sets of small tools.
4 foot diameter, 12 gauge r6@.038 SF 9.65 1.77 1.38 12.80
4 foot diameter, 8 gauge r6@.039 SF 15.20 1.81 1.42 18.43
4 foot diameter, 3 gauge r6@.040 SF 22.20 1.86 1.46 25.52
6 foot diameter, 11 gauge r6@.039 SF 11.40 1.81 1.42 14.63
6 foot diameter, 7 gauge r6@.039 SF 16.50 1.81 1.42 19.73
6 foot diameter, 5/16" thick r6@.040 SF 29.30 1.86 1.46 32.62
8 foot diameter, 10 gauge r6@.037 SF 12.50 1.72 1.35 15.57
8 foot diameter, 8 gauge r6@.038 SF 15.20 1.77 1.38 18.35
8 foot diameter, 5 gauge r6@.039 SF 19.40 1.81 1.42 22.63
8 foot diameter, 5/16" thick r6@.040 SF 29.30 1.86 1.46 32.62
9 foot diameter, 12 gauge r6@.035 SF 9.65 1.63 1.27 12.55
9 foot diameter, 10 gauge liner r6@.036 SF 12.50 1.67 1.31 15.48
10 foot diameter, 10 gauge r6@.036 SF 12.50 1.67 1.31 15.48
10 foot diameter, 8 gauge r6@.037 SF 15.20 1.72 1.35 18.27
10 foot diameter, 7 gauge r6@.038 SF 16.50 1.77 1.38 19.65
10 foot diameter, 3 gauge r6@.039 SF 24.20 1.81 1.42 27.43
10 foot diameter, 5/16" thick r6@.042 SF 29.30 1.95 1.53 32.78
12 foot diameter, 7 gauge r6@.039 SF 16.50 1.81 1.42 19.73
12 foot diameter, 5 gauge r6@.039 SF 19.40 1.81 1.42 22.63
12 foot diameter, 3 gauge r6@.042 SF 22.20 1.95 1.53 25.68
13 foot diameter, 5 gauge r6@.040 SF 19.40 1.86 1.46 22.72
13 foot diameter, 3 gauge r6@.041 SF 22.20 1.90 1.49 25.59
13 foot diameter, 5/16" thick r6@.042 SF 29.30 1.95 1.53 32.78
14 foot diameter, 3 gauge r6@.042 SF 22.20 1.95 1.53 25.68
2015 Heavy Construction Estimator, All Rights Reserved Page 190 (part 2)

14 foot diameter, 5/16" thick r6@.043 SF 29.30 2.00 1.57 32.87


14 foot diameter, 3/8" thick r6@.044 SF 34.70 2.04 1.60 38.34
15 foot diameter, 5/16" thick r6@.044 SF 29.30 2.04 1.60 32.94
15 foot diameter, 3/8" thick r6@.045 SF 34.70 2.09 1.64 38.43
17 foot diameter, 5/16" thick r6@.047 SF 29.30 2.18 1.71 33.19
18 foot diameter, 3/8" thick r6@.047 SF 34.70 2.18 1.71 38.59
19 foot diameter, 3/8" thick r6@.049 SF 34.70 2.28 1.78 38.76
20 foot diameter, 3/8" thick r6@.051 SF 34.70 2.37 1.86 38.93
2015 Heavy Construction Estimator, All Rights Reserved Page 191

Steel liner plates - 16" wide


Costs are based on plates at 68 cents per pound. Plates are 3.14' long. Number of plates needed
equals the tunnel diameter in feet, using a 3/4-ton 4x4 pickup truck, two 10 CY tunnel end dump trucks,
two 2.5 CY tunnel scooptrams, a tunnel slewing belt conveyor and four sets of small tools.
4 foot diameter, 12 gauge r6@.035 SF 10.30 1.63 1.27 13.20
4 foot diameter, 10 gauge r6@.036 SF 13.30 1.67 1.31 16.28
4 foot diameter, 7 gauge r6@.036 SF 17.60 1.67 1.31 20.58
4 foot diameter, 3 gauge r6@.037 SF 23.60 1.72 1.35 26.67
4 foot diameter, 3/8" thick r6@.037 SF 37.00 1.72 1.35 40.07
6 foot diameter, 11 gauge r6@.036 SF 12.00 1.67 1.31 14.98
6 foot diameter, 8 gauge r6@.037 SF 16.60 1.72 1.35 19.67
6 foot diameter, 7 gauge r6@.038 SF 17.60 1.77 1.38 20.75
6 foot diameter, 3 gauge r6@.039 SF 23.60 1.81 1.42 26.83
6 foot diameter, 5/16" thick r6@.040 SF 29.70 1.86 1.46 33.02
8 foot diameter, 12 gauge r6@.036 SF 10.30 1.67 1.31 13.28
8 foot diameter, 11 gauge r6@.037 SF 12.00 1.72 1.35 15.07
8 foot diameter, 10 gauge r6@.037 SF 13.30 1.72 1.35 16.37
8 foot diameter, 5 gauge r6@.040 SF 21.00 1.86 1.46 24.32
8 foot diameter, 1/4" thick r6@.042 SF 24.70 1.95 1.53 28.18
10 foot diameter, 10 gauge r6@.038 SF 13.30 1.77 1.38 16.45
10 foot diameter, 7 gauge r6@.039 SF 17.60 1.81 1.42 20.83
10 foot diameter, 3 gauge r6@.041 SF 23.60 1.90 1.49 26.99
12 foot diameter, 7 gauge r6@.040 SF 17.60 1.86 1.46 20.92
12 foot diameter, 3 gauge r6@.044 SF 23.60 2.04 1.60 27.24
12 foot diameter, 3/8" thick r6@.046 SF 37.00 2.14 1.67 40.81
14 foot diameter, 5 gauge r6@.042 SF 21.00 1.95 1.53 24.48
14 foot diameter, 3 gauge r6@.043 SF 23.60 2.00 1.57 27.17
14 foot diameter, 3/8" thick r6@.044 SF 37.00 2.04 1.60 40.64
15 foot diameter, 5/16" thick r6@.045 SF 29.70 2.09 1.64 33.43
15 foot diameter, 3/8" thick r6@.045 SF 37.00 2.09 1.64 40.73
16 foot diameter, 5/16" thick r6@.046 SF 29.70 2.14 1.67 33.51
16 foot diameter, 3/8" thick r6@.047 SF 37.00 2.18 1.71 40.89
17 foot diameter, 3/8" thick r6@.048 SF 37.00 2.23 1.75 40.98
18 foot diameter, 3/8" thick r6@.049 SF 37.00 2.28 1.78 41.06
19 foot diameter, 3/8" thick r6@.051 SF 37.00 2.37 1.86 41.23
20 foot diameter, 3/8" thick r6@.054 SF 37.00 2.51 1.97 41.48

Lattice girders, triangular section - 6 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 3/4-ton 4x4 pickup truck and 8 sets of small tools.
2-#6 and 1-#8,
6.95 lbs. per LF, 4.5" high sb@.200 LF 18.50 10.14 1.58 30.22
2-#6 and 1-#10,
8.59 lbs per LF, 4.77" high sb@.214 LF 22.90 10.85 1.69 35.44
2-#8 and 1-#11, 11.93 lbs. per LF,
5.16" high sb@.225 LF 31.80 11.41 1.78 44.99
2-#6 and 1-#8,
7.07 lbs. per LF, 5.5" high sb@.237 LF 18.80 12.01 1.87 32.68
2-#6 and 1-#10,
8.70 lbs. per LF, 5.77" high sb@.257 LF 23.20 13.03 2.03 38.26

Lattice girders, triangular section - 10 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 3/4-ton 4x4 pickup truck and 8 sets of small tools.
2-#6 and 1-#8,
6.95 lbs. per LF, 4.5" high sb@.143 LF 18.50 7.25 1.13 26.88
2-#6 and 1-#10,
8.95 lbs. per LF, 4.77" high sb@.153 LF 22.90 7.76 1.21 31.87
2-#8 and 1-#11, 11.93 lbs. per LF,
5.16" high sb@.164 LF 31.80 8.31 1.30 41.41
2015 Heavy Construction Estimator, All Rights Reserved Page 191 (part 2)

2-#6 and 1-#8,


7.07 lbs. per LF, 5.5" high sb@.177 LF 18.80 8.97 1.40 29.17
2-#6 and 1-#10,
8.70 lbs/hr, 5.77" high sb@.192 LF 23.20 9.73 1.52 34.45

Lattice girders, triangular section - 11.5 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 3/4-ton 4x4 pickup truck and 8 sets of small tools.
2-#6 and 1-#8,
7.07 lbs. per LF, 5.5" high sb@.125 LF 18.80 6.34 0.99 26.13
2-#6 and 1-#10,
8.7 lbs. per LF, 5.77" high sb@.132 LF 23.20 6.69 1.04 30.93
2-#8 and 1-#11, 12.05 lbs. per LF,
6.16" high sb@.143 LF 32.10 7.25 1.13 40.48
2-#6 and 1-#8, 7.94 lbs. per LF,
6.25in height sb@.153 LF 21.20 7.76 1.21 30.17
2-#6 and 1-#10,
9.58 lbs. per LF, 6.52" high sb@.167 LF 25.50 8.47 1.32 35.29

Lattice girders, triangular section - 13 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 3/4-ton 4x4 pickup truck and 8 sets of small tools.
2-#6 and 1-#10,
8.70 lbs. per LF, 5.77" high sb@.125 LF 23.20 6.34 0.99 30.53
2-#8 and 1-#11, 12.05 lbs. per LF,
6.16" high sb@.136 LF 32.10 6.89 1.07 40.06
2-#6 and 1-#8,
7.94 lbs. per LF, 6.25" high sb@.148 LF 21.20 7.50 1.17 29.87
2-#6 and 1-#10,
9.58 lbs. per LF, 6.52" high sb@.161 LF 25.50 8.16 1.27 34.93
2015 Heavy Construction Estimator, All Rights Reserved Page 192

2-#8 and 1-#11, 12.92 lbs. per LF,


6.91" high sb@.177 LF 34.40 8.97 1.40 44.77

Lattice girders, triangular section - 16.5 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 20-ton hydraulic crane with 70’ boom, a 3/4-ton 4x4 pickup
truck and eight sets of small tools.
2-#8 and 1-#11, 12.05 lbs. per LF,
6.16" high sc@.115 LF 32.10 5.83 1.53 39.46
2-#6 and 1-#8,
7.94 lbs. per LF, 6.25" high sc@.127 LF 21.20 6.44 1.69 29.33
2-#6 and 1-#10,
9.58 lbs/hr, 6.52" high sc@.139 LF 25.50 7.05 1.85 34.40
2-#8 and 1-#11, 12.92 lbs. per LF,
6.91" high sc@.155 LF 34.40 7.86 2.06 44.32
2-#6 and 1-#8,
7.76 lbs. per LF, 6.87" high sc@.173 LF 20.70 8.77 2.30 31.77

Lattice girders, triangular section - 26 foot diameter tunnel


Using a 750 CFM 100 PSI air compressor, a 20-ton hydraulic crane with 70’ boom, a 3/4-ton 4x4 pickup
truck and eight sets of small tools.
2-#6 and 1-#10,
9.58 lbs. per LF, 6.52" high sc@.110 LF 25.50 5.58 1.47 32.55
2-#8 and 1-#11, 12.92 lbs. per LF,
6.91" high sc@.125 LF 34.40 6.34 1.67 42.41
2-#6 and 1-#8,
7.76 lbs. per LF, 6.87" high sc@.148 LF 20.70 7.50 1.97 30.17
2-#6 and 1-#10,
9.39 lbs. per LF, 7.14" high sc@.177 LF 25.00 8.97 2.36 36.33
2-#8 and 1-#11, 12.73 lbs. per LF,
7.53" high sc@.220 LF 33.90 11.15 2.93 47.98

Shotcreting - Fiber fortified, Portland cement mortar


Using 750 CFM 100 PSI air compressor, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, a 3/4-ton 4x4
pickup truck, a shotcrete dry mix spraying machine with a shotcrete hydraulic spray arm and four sets
of small tools.
1" thick q9@.007 SF 3.61 0.34 0.21 4.16
2" thick q9@.015 SF 7.22 0.73 0.44 8.39
3" thick q9@.022 SF 10.80 1.08 0.65 12.53
4" thick q9@.030 SF 14.30 1.47 0.89 16.66

Shotcreting - Non-accelerated cementitious microsilica mortar


Using 750 CFM 100 PSI air compressor, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, a 3/4-ton 4x4
pickup truck, a shotcrete dry mix spraying machine with a shotcrete hydraulic spray arm and four sets
of small tools.
1" thick q9@.007 SF 3.34 0.34 0.21 3.89
2" thick q9@.015 SF 6.67 0.73 0.44 7.84
3" thick q9@.022 SF 10.00 1.08 0.65 11.73
4" thick q9@.030 SF 13.30 1.47 0.89 15.66

Shotcreting - Polymer-modified cementitious microsilica mortar


Using 750 CFM 100 PSI air compressor, a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed, a 3/4-ton 4x4
pickup truck, a shotcrete dry mix spraying machine with a shotcrete hydraulic spray arm and four sets
of small tools.
1" thick q9@.007 SF 7.01 0.34 0.21 7.56

Shotcreting - Polymer-modified cementitious microsilica mortar


Using a 3/4-ton 4x4 pickup truck with a 8’ x 16’ flat bed, a 3/4-ton pickup truck, a shotcrete dry mix
spraying machine with a shotcrete hydraulic spray arm and four sets of small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 192 (part 2)

2" thick q8@.015 SF 14.00 0.76 0.28 15.04


3" thick q8@.022 SF 21.00 1.11 0.41 22.52
4" thick q8@.030 SF 27.70 1.51 0.56 29.77

CSI 02-313, Prestressed concrete piles

Prestressed concrete square piles


Piles averaging 40 feet (12 m) long. Per vertical foot driven. Add the cost of moving equipment on and off
the job site, using a 1,600 CFM at 100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton
crawler mechanical crane with 160’ boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile
leads and small tools.
10" (25cm) square k5@.045 VLF 14.00 1.98 1.42 17.40
12" (31cm) square k5@.054 VLF 16.10 2.38 1.70 20.18
14" (36cm) square k5@.075 VLF 19.70 3.31 2.36 25.37
16" (41cm) square k5@.100 VLF 24.10 4.41 3.15 31.66
18" (46cm) square k5@.125 VLF 28.50 5.51 3.93 37.94
20" (51cm) square k5@.138 VLF 34.80 6.08 4.34 45.22
24" (61cm) square k5@.145 VLF 58.50 6.39 4.56 69.45

Prestressed concrete straight cylinder piles


Using a 1,600 CFM at 100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton crawler
mechanical crane with 160’ boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile leads
and small tools.
12" (31cm) diameter, 2-3/8" wall k5@.089 VLF 16.10 3.92 2.80 22.82
14" (36cm) diameter, 2-1/2" wall k5@.094 VLF 16.80 4.14 2.96 23.90
16" (41cm) diameter, 3" wall k5@.100 VLF 20.00 4.41 3.15 27.56
18" (46cm) diameter, 3" wall k5@.107 VLF 23.10 4.72 3.37 31.19
20" (51cm) diameter, 3-1/2" wall k5@.114 VLF 27.50 5.02 3.59 36.11
24" (56cm) diameter, 3-1/2" wall k5@.123 VLF 32.40 5.42 3.87 41.69

CSI 02-315, Steel H-section piles, rolled steel

Rolled steel H piles


Per vertical foot driven. Add the cost of moving equipment on and off the job site, using a 1,600 CFM at
100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton crawler mechanical crane with 160’
boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile leads and small tools.
8 x 8 x 36 lbs. per foot k5@.070 VLF 32.00 3.09 2.20 37.29
10 x 10 x 42 lbs. per foot k5@.074 VLF 36.00 3.26 2.33 41.59
10 x 10 x 57 lbs. per foot k5@.075 VLF 42.70 3.31 2.36 48.37
2015 Heavy Construction Estimator, All Rights Reserved Page 193

12 x 12 x 53 lbs. per foot k5@.077 VLF 44.00 3.39 2.42 49.81


12 x 12 x 74 lbs. per foot k5@.077 VLF 60.00 3.39 2.42 65.81
14 x 14 x 73 lbs. per foot k5@.081 VLF 56.00 3.57 2.55 62.12
14 x 14 x 89 lbs. per foot k5@.089 VLF 69.30 3.92 2.80 76.02
14 x 14 x 102 lbs. per foot k5@.089 VLF 78.60 3.92 2.80 85.32
14 x 14 x 117 lbs. per foot k5@.089 VLF 91.70 3.92 2.80 98.42

Splices for H-piles, rolled steel


Using a 300-amp skid mounted welder and small tools.
8" (21cm) H-section pile splice qy@1.50 Ea 98.60 81.93 4.11 184.64
10" (25cm) H-section pile splice qy@1.75 Ea 107.00 95.59 4.80 207.39
12" (31cm) H-section pile splice qy@2.00 Ea 133.00 109.20 5.48 247.68
14" (36cm) H-section pile splice qy@2.50 Ea 160.00 136.60 6.85 303.45

Driving caps for H-section piles


Using a 300-amp skid mounted welder and small tools.
8" (21cm) H-section driving cap qy@1.50 Ea 98.60 81.93 4.11 184.64
10" (25cm) H-section driving cap qy@1.75 Ea 107.00 95.59 4.80 207.39
12" (31cm) H-section driving cap qy@2.00 Ea 133.00 109.20 5.48 247.68
14" (36cm) H-section driving cap qy@2.50 Ea 160.00 136.60 6.85 303.45

Points for H-section piles


Using a 300-amp skid mounted welder and small tools.
8" (21cm) H-section point, standard qy@1.50 Ea 98.60 81.93 4.11 184.64
10" (25cm) H-section point,
standard qy@1.75 Ea 107.00 95.59 4.80 207.39
12" (31cm) H-section point,
standard qy@2.00 Ea 133.00 109.20 5.48 247.68
14" (36cm) H-section point,
standard qy@2.50 Ea 160.00 136.60 6.85 303.45
10" (25cm) H-section point,
heavy duty qy@2.00 Ea 133.00 109.20 5.48 247.68
14" (36cm) H-section point,
heavy duty qy@3.13 Ea 240.00 171.00 8.58 419.58

CSI 02-316, Steel pipe piles

Concrete filled steel pipe piles


Per LF of vertical depth. Add the cost of moving equipment on and off the job site, using a 1,600 CFM at
100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton crawler mechanical crane with 160’
boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile leads and small tools.
8" (21cm), 29 lbs. per LF k5@.100 VLF 36.00 4.41 3.15 43.56
10" (25cm), 34 lbs. per LF k5@.101 VLF 44.30 4.45 3.18 51.93
12" (31cm), 44 lbs. per LF k5@.112 VLF 58.90 4.94 3.52 67.36
14" (36cm), 46 lbs. per LF k5@.131 VLF 62.90 5.77 4.12 72.79
16" (41cm), 52 lbs. per LF k5@.139 VLF 74.90 6.13 4.37 85.40
18" (46cm), 59 lbs. per LF k5@.149 VLF 85.60 6.57 4.69 96.86

Non-filled steel pipe piles


using a 1,600 CFM at 100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton crawler
mechanical crane with 160’ boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile leads
and small tools.
8" (21cm) k5@.085 VLF 29.30 3.75 2.67 35.72
10" (25cm) k5@.088 VLF 42.90 3.88 2.77 49.55
12" (31cm) k5@.096 VLF 53.60 4.23 3.02 60.85
14" (36cm) k5@.112 VLF 58.90 4.94 3.52 67.36
16" (41cm) k5@.120 VLF 67.20 5.29 3.78 76.27
18" (46cm) k5@.128 VLF 78.10 5.64 4.03 87.77
2015 Heavy Construction Estimator, All Rights Reserved Page 193 (part 2)

Steel pipe pile splices


Using a 300-amp skid mounted welder and small tools.
8" (21cm) qy@1.12 Ea 139.00 61.17 3.07 203.24
10" (25cm) qy@1.55 Ea 155.00 84.66 4.25 243.91
12" (31cm) qy@2.13 Ea 167.00 116.30 5.84 289.14
14" (36cm) qy@2.25 Ea 224.00 122.90 6.17 353.07
16" (41cm) qy@2.39 Ea 349.00 130.50 6.55 486.05
18" (46cm) qy@2.52 Ea 419.00 137.60 6.90 563.50

Standard steel points for steel pipe piles


Using a 300-amp skid mounted welder and small tools.
8" (21cm) qy@1.49 Ea 213.00 81.38 4.08 298.46
10" (25cm) qy@1.68 Ea 291.00 91.76 4.60 387.36
12" (31cm) qy@1.84 Ea 392.00 100.50 5.04 497.54
14" (36cm) qy@2.03 Ea 395.00 110.90 5.56 511.46
16" (41cm) qy@2.23 Ea 725.00 121.80 6.11 852.91
18" (46cm) qy@2.52 Ea 957.00 137.60 6.90 1,101.50
2015 Heavy Construction Estimator, All Rights Reserved Page 194

Heavy duty steel points for pipe piles


Using a 300-amp skid mounted welder and small tools.
10" (25cm) qy@2.94 Ea 56.50 160.60 8.06 225.16
12" (31cm) qy@2.94 Ea 70.60 160.60 8.06 239.26
14" (36cm) qy@3.23 Ea 84.70 176.40 8.85 269.95
16" (41cm) qy@3.23 Ea 141.00 176.40 8.85 326.25
18" (46cm) qy@3.23 Ea 198.00 176.40 8.85 383.25

CSI 02-317, Concrete-filled steel shell piles, including reinforcing

Tapered friction piles with fluted #7 gauge steel casing


Up to 50' (15m) long, 4,000 PSI concrete, no reinforcing included, using a 1,600 CFM at 100 PSI air
compressor, 200’ of 3" hardrock air hose, an 85-ton crawler mechanical crane with 160’ boom, a 19,500
lb. single action pile hammer, 8" x 26" 60’ long pile leads and small tools.
12" (31cm) diameter k5@.107 VLF 35.80 4.72 3.37 43.89
14" (36cm) diameter k5@.114 VLF 36.20 5.02 3.59 44.81
16" (41cm) diameter k5@.123 VLF 45.90 5.42 3.87 55.19
18" (46cm) diameter k5@.133 VLF 53.80 5.86 4.19 63.85

Constant diameter pipe piles, end bearing, #7 gauge steel


Up to 50' (15m) long, fluted steel casing, no reinforcing included, using a 1,600 CFM at 100 PSI air
compressor, 200’ of 3" hardrock air hose, an 85-ton crawler mechanical crane with 160’ boom, a 19,500
lb. single action pile hammer, 8" x 26" 60’ long pile leads and small tools.
12" (31cm) diameter k5@.107 VLF 36.70 4.72 3.37 44.79
14" (36cm) diameter k5@.114 VLF 46.00 5.02 3.59 54.61
16" (41cm) diameter k5@.123 VLF 52.80 5.42 3.87 62.09
18" (46cm) diameter k5@.133 VLF 57.50 5.86 4.19 67.55

CSI 02-318, Wood piles

Treated wood piles, friction or end bearing


12 lbs. of creosote per CF, ASTM class B.
12" butt x 8" tip, up to 30' (10m) --@.000 LF 9.04 -- -- 9.04
12" butt x 8" tip,
30' (10m) to 39' (13m) --@.000 LF 9.21 -- -- 9.21
12" butt x 7" tip,
40' (13m) to 49' (16m) --@.000 LF 10.10 -- -- 10.10
13" butt x 7" tip,
50' (16m) to 59' (19m) --@.000 LF 10.80 -- -- 10.80
13" butt x 6" tip,
60' (19m) to 69' (23m) --@.000 LF 13.70 -- -- 13.70
13" butt x 6" tip,
70' (23m) to 79' (26m) --@.000 LF 14.50 -- -- 14.50

Additional costs for wood piles


Deduct for untreated piles --@.000 Ea -59.76 -- -- -59.76
Add for wood pile tip points --@.000 Ea 38.90 -- -- 38.90
Add for pile butt driving cap --@.000 Ea 3,250.00 -- -- 3,250.00
Splices
for piles over 50 feet (15m) --@.000 Ea 50.50 -- -- 50.50

Pile load testing, by load range


Using a 40-ton hydraulic crane with 84’ boom, a 46,000 lb. 3-axle 6x4 truck with 8 CY dump body, a
5.25 CY front end wheel loader, miscellaneous power tools and small tools.
50 to 100 ton hm@200. Ea 18,000.00 7,816.00 10,500.00 36,316.00
101 to 200 ton hm@235. Ea 5,380.00 9,184.00 12,400.00 26,964.00
2015 Heavy Construction Estimator, All Rights Reserved Page 194 (part 2)

201 to 300 ton hm@266. Ea 7,170.00 10,400.00 14,000.00 31,570.00

CSI 02-351, Drilled caissons

Drilled caissons in stable ground


Assumes drilling in stable ground, no casing required and no ground water. Per vertical foot of depth,
using a 6.75" to 9.88" track drill and small tools.
18" (46cm) eb@.025 VLF -- 0.95 0.63 1.58
24" (64cm) eb@.035 VLF -- 1.33 0.88 2.21
30" (76cm) eb@.042 VLF -- 1.60 1.06 2.66
36" (91cm) eb@.050 VLF -- 1.90 1.26 3.16
48" (122cm) eb@.055 VLF -- 2.09 1.38 3.47
60" (152cm) eb@.083 VLF -- 3.16 2.09 5.25
72" (183cm) eb@.100 VLF -- 3.81 2.51 6.32
84" (213cm) eb@.117 VLF -- 4.45 2.94 7.39

Bell excavation for caissons in stable ground


Assumes stable ground and includes concrete fill, using a 6.75" to 9.88" track drill and small tools.
4' bell, 24" shaft, .44 CY per LF eb@2.80 Ea 242.00 106.60 70.40 419.00
6' bell, 30" shaft, 1.57 CY per LF eb@9.83 Ea 853.00 374.20 247.00 1,474.20
2015 Heavy Construction Estimator, All Rights Reserved Page 195

8' bell, 36" shaft, 3.72 CY per LF eb@23.3 Ea 2,110.00 887.00 586.00 3,583.00
9' bell, 48" shaft, 4.48 CY per LF eb@28.0 Ea 2,550.00 1,066.00 704.00 4,320.00
10' bell, 60" shaft, 5.24 CY per LF eb@32.9 Ea 2,960.00 1,253.00 827.00 5,040.00
12' bell, 72" shaft, 8.74 CY per LF eb@56.0 Ea 4,360.00 2,132.00 1,410.00 7,902.00
14' bell, 84" shaft, 13.6 CY per LF eb@80.0 Ea 6,090.00 3,046.00 2,010.00 11,146.00

Caisson drilled in wet ground with casing pulled


Using a 6" 100 GPM centrifugal pump, a 6.75" to 9.88" track drill and small tools.
18" (46cm) ec@.032 VLF 37.30 1.22 0.82 39.34
24" (61cm) ec@.053 VLF 63.30 2.01 1.35 66.66
30" (76cm) ec@.064 VLF 80.70 2.43 1.64 84.77
36" (91cm) ec@.086 VLF 116.00 3.27 2.20 121.47
48" (122cm) ec@.116 VLF 185.00 4.40 2.96 192.36
60" (152cm) ec@.183 VLF 255.00 6.95 4.68 266.63
72" (183cm) ec@.213 VLF 327.00 8.09 5.44 340.53
84" (213cm) ec@.260 VLF 393.00 9.87 6.64 409.51

Bell excavation in wet ground, including concrete fill


Using a 6" 100 GPM centrifugal pump, a 6.75" to 9.88" track drill and small tools.
4' bell, 24" shaft, .44 CY per LF ec@3.23 Ea 338.00 122.60 82.50 543.10
6' bell, 30" shaft, 1.57 CY per LF ec@11.2 Ea 1,090.00 425.20 286.00 1,801.20
8' bell, 36" shaft, 3.72 CY per LF ec@26.7 Ea 2,840.00 1,014.00 682.00 4,536.00
9' bell, 48" shaft, 4.48 CY per LF ec@32.0 Ea 3,430.00 1,215.00 818.00 5,463.00
10' bell, 60" shaft, 5.24 CY per LF ec@37.6 Ea 3,690.00 1,427.00 961.00 6,078.00
12' bell, 72" shaft, 8.74 CY per LF ec@64.0 Ea 5,450.00 2,429.00 1,640.00 9,519.00
14' bell, 84" shaft, 13.6 CY per LF ec@91.4 Ea 7,490.00 3,470.00 2,340.00 13,300.00

Caisson drilled in soft rock or medium hard shale, no casing, no ground water
Using a 6.75" to 9.88" track drill and small tools.
18" (46cm) diameter eb@.160 VLF 87.30 6.09 4.02 97.41
24" (61cm) diameter eb@.224 VLF 127.00 8.53 5.63 141.16
30" (76cm) diameter eb@.373 VLF 161.00 14.20 9.38 184.58
36" (91cm) diameter eb@.560 VLF 231.00 21.32 14.10 266.42
48" (122cm) diameter eb@.640 VLF 371.00 24.36 16.10 411.46
60" (152cm) diameter eb@.914 VLF 510.00 34.80 23.00 567.80
72" (183cm) diameter eb@1.07 VLF 654.00 40.73 26.90 721.63
84" (213cm) diameter eb@1.28 VLF 785.00 48.73 32.20 865.93

Bell excavation in soft rock or shale, including concrete fill


Using a 6.75" to 9.88" track drill and small tools.
4' bell, 24" shaft, .44 CY per LF ec@5.87 Ea 960.00 222.80 150.00 1,332.80
6' bell, 30" shaft, 1.57 CY per LF ec@20.6 Ea 2,620.00 782.00 526.00 3,928.00
8' bell, 36" shaft, 3.72 CY per LF ec@49.2 Ea 6,540.00 1,868.00 1,260.00 9,668.00
9' bell, 48" shaft, 4.48 CY per LF ec@58.2 Ea 7,140.00 2,209.00 1,490.00 10,839.00
10" bell, 60" shaft, 5.24 CY per LF ec@71.1 Ea 7,360.00 2,699.00 1,820.00 11,879.00
12' bell, 72" shaft, 8.74 CY per LF ec@107. Ea 10,900.00 4,062.00 2,730.00 17,692.00
14' bell, 84" shaft, 13.6 CY per LF ec@160. Ea 15,000.00 6,074.00 4,090.00 25,164.00
Add for 50 feet (15m) to
100 feet (30m) deep caissons ---@--- % 10.00 7.00 -- --
Add for 100 feet (30m) to
150 feet (45m) deep caissons ---@--- % 35.00 25.00 -- --
Add for 150 feet (45m) to
200 feet (60m) deep caissons ---@--- % 85.00 30.00 -- --

Caisson setup and removal


Using a 1,600 CFM at 100 PSI air compressor, 200’ of 3" hardrock air hose, an 85-ton crawler
mechanical crane with 160’ boom, a 19,500 lb. single action pile hammer, 8" x 26" 60’ long pile leads
and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 195 (part 2)

Small caisson rig, complete k5@142. Ea 85.30 6,258.00 4,470.00 10,813.30


Large caisson rig, complete k5@256. Ea 228.00 11,280.00 8,060.00 19,568.00

CSI 02-411, Steel sheet shoring

Standard carbon grade, pulled and salvaged


Based on good driving conditions and using sheets 30' to 50' in lengths, using a 85-ton crawler
mechanical crane with 160’ boom, a vibrating 116-ton pile hammer and small tools.
15' (5m) excavation, 22 PSF steel k8@16.8 Ton 2,050.00 740.40 519.00 3,309.40
20' (6m) excavation, 27 PSF steel k8@14.2 Ton 1,990.00 625.80 438.00 3,053.80
25' (8m) excavation, 38 PSF steel k8@9.70 Ton 1,990.00 427.50 299.00 2,716.50
40' (13m) excavation, 38 PSF steel k8@9.14 Ton 1,930.00 402.80 282.00 2,614.80
Add for sheeting left in place --@.000 Ton 899.00 -- -- 899.00
Add for lightweight steel sheeting,
8.6 and 9.2 PSF --@.000 Ton 740.00 -- -- 740.00
Add for high strength steel,
45,000 PSI --@.000 Ton 25.40 -- -- 25.40
2015 Heavy Construction Estimator, All Rights Reserved Page 196

Add for high strength steel,


55,000 PSI --@.000 Ton 28.30 -- -- 28.30

CSI 02-412, Wood sheeting

Wood shoring, installed, pulled and salvaged


Including wales, braces and spacers, using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose and
small tools.
8' (2.4m) deep, 55 SF per hour
in and 60 SF per hour out dm@.121 SF 2.30 4.45 0.45 7.20
10' (3m) deep, 50 SF per hour
in and 150 SF per hour out dm@.133 SF 2.59 4.89 0.50 7.98
12' (3.7m) deep, 45 SF per hour
in and 135 SF per hour out dm@.148 SF 2.90 5.44 0.56 8.90
14' (4.3m) deep, 42 SF per hour
in and 126 SF per hour out dm@.160 SF 3.81 5.88 0.60 10.29
16' (4.9m) deep, 40 SF per hour
in and 120 SF per hour out dm@.167 SF 4.03 6.14 0.63 10.80
18' (5.5m) deep, 38 SF per hour
in and 114 SF per hour out dm@.174 SF 3.95 6.40 0.65 11.00
20' (6m) deep, 35 SF per hour
in and 105 SF per hour out dm@.191 SF 3.91 7.02 0.72 11.65
Add for wood shoring left in place ---@--- % 100.00 -- -- --

CSI 02-413, Wales and shores

Wales and supports for shoring


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Walers, connections and struts,
including turnbuckles bc@36.4 Ton 790.00 1,653.00 689.00 3,132.00

CSI 02-414, Bin type retaining walls

Vertical bin retaining walls


Per SF of exposed front face of bin. Add the cost of excavation, using a 20-ton hydraulic crane with 70’
boom and small tools.
5.5' surcharge, heights to 11' qg@.200 SF 40.50 9.79 2.05 52.34
7.7' surcharge,
heights 8.33' to 16.33' qg@.200 SF 51.80 9.79 2.05 63.64
9.9' surcharge,
heights 13.67' to 21.67' qg@.229 SF 60.80 11.21 2.34 74.35
12.1' surcharge,
heights 17.67' to 25.67' qg@.229 SF 67.50 11.21 2.34 81.05
14.3' surcharge,
heights 20.33 to 28.33 qg@.267 SF 74.20 13.07 2.73 90.00
16.5' surcharge,
heights 20.33' to 28.33' qg@.267 SF 81.00 13.07 2.73 96.80

Battered bin retaining walls


Per SF of exposed front face of bin. Add the cost of excavation, using a 20-ton hydraulic crane with 70’
boom and small tools.
5.5' surcharge, heights to 11' qg@.222 SF 31.50 10.87 2.27 44.64
7.7' surcharge,
heights 8.33' to 16.33' qg@.222 SF 36.00 10.87 2.27 49.14
9.9' surcharge,
heights 13.67' to 21.67' qg@.250 SF 40.50 12.24 2.56 55.30
12.1' surcharge,
heights 17.67' to 25.67' qg@.250 SF 48.40 12.24 2.56 63.20
2015 Heavy Construction Estimator, All Rights Reserved Page 196 (part 2)

14.3' surcharge,
heights 20.33' to 28.33' qg@.296 SF 56.30 14.50 3.03 73.83
16.5' surcharge,
heights 20.33' to 28.33' qg@.296 SF 58.50 14.50 3.03 76.03

CSI 02-415, Rock bolting

Rock bolts - 3/4" (1.91 cm) hollow core prestressable anchors, ASTM A615
Includes both materials and placement, using small tools.
5' (1.5m) uj@.625 Ea 71.10 21.86 0.12 93.08
10' (3.05m) uj@.833 Ea 106.00 29.14 0.16 135.30
15' (4.57m) uj@.833 Ea 142.00 29.14 0.16 171.30
20' (6.10m) uj@1.25 Ea 177.00 43.73 0.24 220.97

Rock bolts - 1" (2.54cm) hollow core prestressable anchors, ASTM A615
Using small tools.
5' (1.52m) uj@.625 Ea 101.00 21.86 0.12 122.98
10' (3.05m) uj@.833 Ea 163.00 29.14 0.16 192.30
15' (4.57m) uj@.833 Ea 225.00 29.14 0.16 254.30
20' (6.1m) uj@1.25 Ea 288.00 43.73 0.24 331.97

Rock bolts - 1-3/8" (3.49cm) hollow core prestressable anchors, ASTM A615
Using small tools.
5' (1.52m) uj@.625 Ea 191.00 21.86 0.12 212.98
10' (3.0m) uj@.833 Ea 306.00 29.14 0.16 335.30
15' (4.6m) uj@.833 Ea 421.00 29.14 0.16 450.30
20' (6.1m) uj@1.25 Ea 535.00 43.73 0.24 578.97

Rock bolts - 2" (5.08cm) hollow core prestressable anchors, ASTM A615
Using small tools.
5' (1.5m) uj@.625 Ea 468.00 21.86 0.12 489.98
2015 Heavy Construction Estimator, All Rights Reserved Page 197

10' (3.1m) uj@.833 Ea 701.00 29.14 0.16 730.30


15' (4.6m) uj@.833 Ea 935.00 29.14 0.16 964.30
20' (6.1m) uj@1.25 Ea 1,170.00 43.73 0.24 1,213.97

Rock bolts - 3/4 in (1.91cm) super high-tensile anchors, ASTM A108


Using small tools.
5' (1.52m) uj@.625 Ea 41.10 21.86 0.12 63.08
10' (3.1m) uj@.833 Ea 54.90 29.14 0.16 84.20
15' (4.6m) uj@.833 Ea 68.60 29.14 0.16 97.90
20' (6.1m) uj@1.25 Ea 81.40 43.73 0.24 125.37

Rock bolts - 1" (2.54cm) super high-tensile anchors, ASTM A108


Using small tools.
5' (1.52m) uj@.625 Ea 56.40 21.86 0.12 78.38
10' (3.1m) uj@.833 Ea 80.60 29.14 0.16 109.90
15' (4.6m) uj@.833 Ea 104.00 29.14 0.16 133.30
20' (6.1m) uj@1.25 Ea 127.00 43.73 0.24 170.97

Rock bolts - 1-1/4" (3.175cm) super high-tensile anchors, ASTM A108


Using small tools.
5' (1.5m) uj@.625 Ea 101.00 21.86 0.12 122.98
10' (3.1m) uj@.833 Ea 145.00 29.14 0.16 174.30
15' (4.6m) uj@.833 Ea 188.00 29.14 0.16 217.30
20' (6.1m) uj@1.25 Ea 230.00 43.73 0.24 273.97

Rock bolts - 2" (5.08cm) super high-tensile anchors, ASTM A108


Using small tools.
5' (1.5m) uj@.625 Ea 329.00 21.86 0.12 350.98
10' (3.1m) uj@.833 Ea 471.00 29.14 0.16 500.30
15' (4.6m) uj@.833 Ea 587.00 29.14 0.16 616.30
20' (6.1m) uj@1.25 Ea 709.00 43.73 0.24 752.97

Rock bolts - 3/4" (1.91cm) solid rebar anchors, ASTM A615


Using small tools.
With 5' (1.5m) uj@.625 Ea 66.40 21.86 0.12 88.38
With 10' (3.1m) uj@.833 Ea 81.60 29.14 0.16 110.90
With 15' (4.6m) uj@.833 Ea 96.90 29.14 0.16 126.20
With 20' (6.1m) uj@1.25 Ea 112.00 43.73 0.24 155.97

Rock bolts - 1" (2.54cm) solid rebar anchors, ASTM A615


Using small tools.
With 5' (1.5m) uj@.625 Ea 83.70 21.86 0.12 105.68
With 10' (3.1m) uj@.833 Ea 110.00 29.14 0.16 139.30
With 15' (4.6m) uj@.833 Ea 137.00 29.14 0.16 166.30
With 20' (6.1m) uj@1.25 Ea 163.00 43.73 0.24 206.97

Rock bolts - 1-1/4" (3.175cm) solid rebar anchors, ASTM A615


Using small tools.
With 5' (1.5m) uj@.625 Ea 153.00 21.86 0.12 174.98
With 10' (3.1m) uj@.833 Ea 194.00 29.14 0.16 223.30
With 15' (4.6m) uj@.833 Ea 236.00 29.14 0.16 265.30
With 20' (6.1m) uj@1.25 Ea 277.00 43.73 0.24 320.97

Resin anchoring with grade 60 rebar - #6 rebar rock anchor


Using small tools.
5' (1.5m) resin anchor uj@.625 Ea 8.57 21.86 0.12 30.55
2015 Heavy Construction Estimator, All Rights Reserved Page 197 (part 2)

10' (3.1m) resin anchor uj@.833 Ea 17.20 29.14 0.16 46.50


15' (4.6m) resin anchor uj@.833 Ea 25.70 29.14 0.16 55.00
20' (6.1m) resin anchor uj@1.25 Ea 41.10 43.73 0.24 85.07

Resin anchoring with grade 60 rebar - #8 rebar rock anchor


Using small tools.
5' (1.5m) resin anchor uj@.625 Ea 15.20 21.86 0.12 37.18
10' (3.1m) resin anchor uj@.833 Ea 30.50 29.14 0.16 59.80
15' (4.6m) resin anchor uj@.833 Ea 45.70 29.14 0.16 75.00
20' (6.1m) resin anchor uj@1.25 Ea 61.00 43.73 0.24 104.97

Resin anchoring with grade 60 rebar - #10 rebar rock bolt


Using small tools.
5' (1.5m) resin anchor uj@.625 Ea 24.80 21.86 0.12 46.78
10' (3.1m) resin anchor uj@.833 Ea 49.60 29.14 0.16 78.90
15' (4.6m) resin anchor uj@.833 Ea 74.30 29.14 0.16 103.60
20' (6.1m) resin anchor uj@1.25 Ea 99.10 43.73 0.24 143.07

Resin anchoring with grade 60 rebar - #14 rebar rock bolt


Using small tools.
5' (1.5m) resin anchor uj@.625 Ea 47.70 21.86 0.12 69.68
10' (3.1m) resin anchor uj@.833 Ea 95.30 29.14 0.16 124.60
15' (4.6m) resin anchor uj@.833 Ea 143.00 29.14 0.16 172.30
2015 Heavy Construction Estimator, All Rights Reserved Page 198

20' (6.1m) resin anchor uj@1.25 Ea 191.00 43.73 0.24 234.97

Rock bolt collars


Plastic rebar collars for
number 4 to number 14 bars --@.000 Ea 1.72 -- -- 1.72

Rock bolt resin cartridges, 12" (30.48cm) long


7/8" (2.2cm) resin cartridge --@.000 Ea 1.42 -- -- 1.42
1" (2.54cm) resin cartridge --@.000 Ea 1.96 -- -- 1.96
1-1/16" (2.7cm) resin cartridge --@.000 Ea 2.11 -- -- 2.11
1-1/4" (3.2cm) resin cartridge --@.000 Ea 2.27 -- -- 2.27
1-3/8" (3.5cm) resin cartridge --@.000 Ea 2.61 -- -- 2.61
1-9/16" (4.0cm) resin cartridge --@.000 Ea 3.26 -- -- 3.26
1-3/4" (4.5cm) resin cartridge --@.000 Ea 4.48 -- -- 4.48

Head assemblies for rock bolts - 3/4" (1.91cm) rod diameter head assembly
1-5/8" (4.1cm) short cone and shell --@.000 Ea 28.50 -- -- 28.50
1-3/4" (4.5cm) short cone and shell --@.000 Ea 24.00 -- -- 24.00
1-7/8" (4.8cm) short cone and shell --@.000 Ea 25.20 -- -- 25.20
1-3/4" (4.5cm) long cone and shell --@.000 Ea 45.20 -- -- 45.20
1-7/8" (4.7cm) long cone and shell --@.000 Ea 45.20 -- -- 45.20
1-3/4" (4.5cm) long cone and shell --@.000 Ea 42.80 -- -- 42.80

Head assemblies for rock bolts - 1" (2.54cm) rod diameter head assembly
1-5/8" (4.1cm) short cone and shell --@.000 Ea 30.70 -- -- 30.70
1-3/4" (4.5cm) short cone and shell --@.000 Ea 26.30 -- -- 26.30
1-7/8" (4.8cm) short cone and shell --@.000 Ea 27.50 -- -- 27.50
1-3/4" (4.5cm) long cone and shell --@.000 Ea 47.50 -- -- 47.50
1-7/8" (4.8cm) long cone and shell --@.000 Ea 47.50 -- -- 47.50
1-3/4" (4.5cm) long cone and shell --@.000 Ea 45.30 -- -- 45.30

Head assemblies for rock bolts - 1-1/4" (3.18cm) rod diameter head assembly
2" (5.1cm) long cone and shell --@.000 Ea 68.60 -- -- 68.60
2-1/4" (5.7cm) short cone and shell --@.000 Ea 77.00 -- -- 77.00
2-1/2" (6.4cm) short cone and shell --@.000 Ea 81.20 -- -- 81.20
2-1/4" (5.7cm) long cone and shell --@.000 Ea 79.80 -- -- 79.80
2-1/2" (6.4cm) long cone and shell --@.000 Ea 84.00 -- -- 84.00

Head assemblies for rock bolts - 1-7/8 in (4.76cm) rod diameter head assembly
3" (7.6cm) long cone and shell --@.000 Ea 186.00 -- -- 186.00
3-1/2" (8.9cm) long cone and shell --@.000 Ea 270.00 -- -- 270.00

Head assemblies for rock bolts - 2" (5.08cm) rod diameter head assembly
3" (7.6cm) long cone and shell --@.000 Ea 186.00 -- -- 186.00
3-1/2" (8.9cm)long cone and shell --@.000 Ea 270.00 -- -- 270.00

Steel plates for rock bolts


With standard hole and washer.
1/4" x 4"
x 4" (.64 x 10.16 x 10.16cm) --@.000 Ea 5.18 -- -- 5.18
1/4" x 6"
x 6" (.64 x 15.24 x 15.24cm) --@.000 Ea 9.54 -- -- 9.54
3/8" x 6"
x 6" (.95 x 15.24 x 15.24cm) --@.000 Ea 13.30 -- -- 13.30
3/8" x 8"
x 8" (.95 x 20.32 x 20.32cm) --@.000 Ea 23.30 -- -- 23.30
2015 Heavy Construction Estimator, All Rights Reserved Page 198 (part 2)

1/2" x 5"
x 5" (1.27 x 12.7 x 12.7cm) --@.000 Ea 9.07 -- -- 9.07
1/2" x 8"
x 8" (1.27 x 20.3 x 20.3cm) --@.000 Ea 23.80 -- -- 23.80
3/4" x 7"
x 7" (1.91 x 17.8 x 17.8cm) --@.000 Ea 39.50 -- -- 39.50
3/4" x 8"
x 8" (1.91 x 20.3 x 20.3cm) --@.000 Ea 55.90 -- -- 55.90
1" x 4" x 7" (2.54 x 10.2 x 17.8cm) --@.000 Ea 33.60 -- -- 33.60
1" x 9" x 9" (2.54 x 22.9 x 22.9cm) --@.000 Ea 95.00 -- -- 95.00
1" x 12"
x 12" (2.54 x 30.5 x 30.5cm) --@.000 Ea 140.00 -- -- 140.00
1-1/4" x
5" x 8" (3.2 x 12.7 x 20.3cm) --@.000 Ea 61.40 -- -- 61.40
1-1/4" x 11"
x 11" (3.2 x 27.9 x 27.9cm) --@.000 Ea 166.00 -- -- 166.00
1-1/2" x 5"
x 10" (3.8 x 12.7 x 25.4cm) --@.000 Ea 83.10 -- -- 83.10
1-1/2" x 12"
x 12" (3.8 x 30.5 x 30.5cm) --@.000 Ea 200.00 -- -- 200.00
1-3/4" x 5"
x 10" (4.5 x 12.7 x 25.4cm) --@.000 Ea 91.70 -- -- 91.70
2015 Heavy Construction Estimator, All Rights Reserved Page 199

1-3/4" x 12"
x 12" (4.5 x 30.5 x 30.5cm) --@.000 Ea 222.00 -- -- 222.00

Hardened washers for rock bolts


For 3/4" rock bolt (1.91cm) --@.000 Ea 0.48 -- -- 0.48
For 1" rock bolt (2.54cm) --@.000 Ea 0.67 -- -- 0.67
For 1-1/4" rock bolt (3.18cm) --@.000 Ea 1.88 -- -- 1.88
For 2" rock bolt (5.08cm) --@.000 Ea 4.69 -- -- 4.69

Beveled washers for rock bolts


3/4" (1.91cm) diameter bar --@.000 Ea 1.23 -- -- 1.23
7/8" to 1-1/8" (2.22cm
to 2.86cm) diameter bar --@.000 Ea 1.21 -- -- 1.21
1-1/4"to 1-3/8" (3.18cm
to 3.49cm) diameter bar --@.000 Ea 1.83 -- -- 1.83
1-1/2" (3.81cm) diameter bar --@.000 Ea 7.83 -- -- 7.83
2" (5.08cm) diameter bar --@.000 Ea 5.42 -- -- 5.42

Hex nuts for rock bolts


3/4" (1.91cm) diameter tap size --@.000 Ea 0.22 -- -- 0.22
1" (2.54cm) diameter tap size --@.000 Ea 2.29 -- -- 2.29
1-1/4" (3.18cm) diameter tap size --@.000 Ea 3.65 -- -- 3.65
1-1/2" (3.81cm) diameter tap size --@.000 Ea 5.04 -- -- 5.04
2" (5.08cm) diameter tap size --@.000 Ea 11.10 -- -- 11.10

Drilling holes for rock bolts - 1-3/4" (4.45cm) hole for 3/4" (1.91cm) bolt
Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 1-ton pickup truck and small
tools and a 2.5" to 4" track drill with 12’ reach.
5' long hole d4@1.41 Ea -- 50.27 50.60 100.87
10' long hole d4@2.67 Ea -- 95.19 95.80 190.99
15' long hole d4@4.00 Ea -- 142.60 144.00 286.60
20' long hole d4@4.80 Ea -- 171.10 172.00 343.10

Drilling holes for rock bolts - 2" (5.08cm) hole for 1" (2.54cm) bolt
Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 1-ton pickup truck and small
tools and a 2.5" to 4" track drill with 12’ reach.
5' long hole d4@1.85 Ea -- 65.95 66.40 132.35
10' long hole d4@3.43 Ea -- 122.30 123.00 245.30
15' long hole d4@4.80 Ea -- 171.10 172.00 343.10
20' long hole d4@6.00 Ea -- 213.90 215.00 428.90

Drilling holes for rock bolts - 2-1/4" (5.72cm) hole for 1-1/4" (3.18cm) bolt
Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 1-ton pickup truck and small
tools and a 2.5" to 4" track drill with 12’ reach.
5' long hole d4@2.00 Ea -- 71.30 71.80 143.10
10' long hole d4@4.00 Ea -- 142.60 144.00 286.60
15' long hole d4@6.00 Ea -- 213.90 215.00 428.90
20' long hole d4@8.00 Ea -- 285.20 287.00 572.20

Drilling holes for rock bolts - 3-1/2" (8.89cm) hole for 2" (5.08cm) bolt
Using a 750 CFM 100 PSI air compressor, 200’ of 3" hardrock air hose, a 1-ton pickup truck and small
tools and a 2.5" to 4" track drill with 12’ reach.
5' long hole d4@2.40 Ea -- 85.56 86.10 171.66
10' long hole d4@4.80 Ea -- 171.10 172.00 343.10
15' long hole d4@8.00 Ea -- 285.20 287.00 572.20
20' long hole d4@12.0 Ea -- 427.80 431.00 858.80
2015 Heavy Construction Estimator, All Rights Reserved Page 199 (part 2)

Rock bolt equipment - Hydraulic jacks, monthly rental


1/2" to 1", 30 ton jack,
2" stroke, load and return --@.000 Mo -- -- 276.00 276.00
1-1/8" to 1-3/8", 60 ton jack,
3" stroke, spring return --@.000 Mo -- -- 406.00 406.00
1-1/8" to 1-3/8", 60 ton jack,
10" stroke, hydraulic return --@.000 Mo -- -- 682.00 682.00
1-7/8" to 2", 100 ton jack,
10" stroke, hydraulic return --@.000 Mo -- -- 1,020.00 1,020.00
1-7/8" to 2", 150 ton jack,
12" stroke, hydraulic return --@.000 Mo -- -- 1,530.00 1,530.00

Torque wrenches - To 500 foot pounds


Monthly rental.
1/2" to 1" bolt diameter --@.000 Mo -- -- 96.50 96.50
Wrench ratchet adapter --@.000 Mo -- -- 60.50 60.50
Torque wrench and adapter --@.000 Mo -- -- 157.00 157.00

Torque wrenches - To 600 foot-pounds (0-814j)


Monthly rental.
Self-ratcheting torque wrench --@.000 Mo -- -- 110.00 110.00

Torque wrenches - To 1,000 foot-pounds (0-1356j)


Monthly rental.
1-1/8" to 2" bolt diameter --@.000 Mo -- -- 210.00 210.00
2015 Heavy Construction Estimator, All Rights Reserved Page 200

Wrench ratchet adapter --@.000 Mo -- -- 51.90 51.90


Torque wrench with ratchet adapter --@.000 Mo -- -- 262.00 262.00

Torque multiplier, monthly rental


4 to 1 ratio --@.000 Mo -- -- 269.00 269.00

Pneumatic drive torque wrenches, monthly rental


250 to 900 foot-pounds --@.000 Mo -- -- 577.00 577.00

Grouting for rock bolts


Includes grout material and grouting labor only. Add the cost of pumps below, using small tools.
Hand pump, 1 to
2 gallons per minute delivery uj@.080 Gallon 8.22 2.80 0.02 11.04
Air pump, 3 to
4 gallons per minute delivery uj@.182 Gallon 8.22 6.37 0.03 14.62
Air-piston pump, 2 to
4 gallons per minute delivery uj@.160 Gallon 8.22 5.60 0.03 13.85

Grout pumps for rock bolts, monthly rental


Hand grout pump --@.000 Mo -- -- 103.00 103.00
Air powered
progressive feed grout pump --@.000 Mo -- -- 805.00 805.00
Air powered,
piston drive grout pump --@.000 Mo -- -- 1,410.00 1,410.00

Rock bolt testing, low to medium capacity


Based on testing over 100 bolts --@.000 Ea 189.00 -- -- 189.00

CSI 02-441, Irrigation systems

Pop up spray head with risers


Using small tools.
4" hi-pop full circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
4" hi-pop 3/4 circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
4" hi-pop 2/3 circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
4" hi-pop 1/2 circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
4" hi-pop 1/3 circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
4" hi-pop 1/4 circle pattern nf@.263 Ea 7.95 11.93 0.15 20.03
6" hi-pop full circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
6" hi-pop 3/4 circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
6" hi-pop 2/3 circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
6" hi-pop 1/2 circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
6" hi-pop 1/3 circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
6" hi-pop 1/4 circle pattern nf@.263 Ea 17.20 11.93 0.15 29.28
12" hi-pop full circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08
12" hi-pop 3/4 circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08
12" hi-pop 2/3 circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08
12" hi-pop 1/2 circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08
12" hi-pop 1/3 circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08
12" hi-pop 1/4 circle pattern nf@.263 Ea 20.00 11.93 0.15 32.08

Pop up bubbler heads with risers


Using small tools.
4" hi-pop bubbler head nf@.263 Ea 13.20 11.93 0.15 25.28
6" hi-pop bubbler head nf@.263 Ea 22.50 11.93 0.15 34.58
12" hi-pop bubbler head nf@.263 Ea 25.40 11.93 0.15 37.48
2015 Heavy Construction Estimator, All Rights Reserved Page 200 (part 2)

Impact full or part circle sprinklers, by precipitation rate


Using small tools.
.18" to .79" per hour, 28 to 54 foot spacing at water
pressure of 25 to 60 PSI nf@.541 Ea 16.30 24.55 0.30 41.15
.32" to .57" per hour, 37 to 49 foot spacing at water
pressure of 25 to 50 PSI nf@.541 Ea 54.80 24.55 0.30 79.65
.38" to .58" per hour, 43 to 61 foot spacing at water
pressure of 30 to 60 PSI nf@.541 Ea 77.70 24.55 0.30 102.55
.59" to .81" per hour, 54 to 78 foot spacing at water
pressure of 40 to 80 PSI nf@.541 Ea 151.00 24.55 0.30 175.85

Impact rotor pop-up full or part circle, by precipitation rate


Using small tools.
.27" to .54" per hour, 33 to 41 foot spacing at water
pressure of 25 to 50 PSI nf@.541 Ea 36.00 24.55 0.30 60.85
.18" to .79" per hour, 28 to 54 foot spacing at water
pressure of 25 to 60 PSI nf@.541 Ea 41.80 24.55 0.30 66.65
.26" to .84" per hour, 33 to 55 foot spacing at water pressure of 25 to 60 PSI,
commercial system nf@.541 Ea 57.60 24.55 0.30 82.45
.26" to .84"per hour, 33 to 55 foot spacing at water pressure of 25 to 60 PSI,
commercial system nf@.541 Ea 28.80 24.55 0.30 53.65
.37"to 1.0" per hour at 180 degrees, 47 to 90 foot spacing at water pressure of 25 to 60 PSI,
commercial system nf@.800 Ea 153.00 36.30 0.45 189.75

Full or part circle specification grade rotary pop up sprinklers, by precipitation rate
Using small tools.
.31" to .88" per hour, 42 to 65 foot spacing at water pressure of 35 to 80
PSI with 1" inlet feed line nf@.800 Ea 161.00 36.30 0.45 197.75
2015 Heavy Construction Estimator, All Rights Reserved Page 201

.37" to .55" per hour, 48 to 76 foot spacing at water pressure of 45 to 85


PSI with 1" inlet feed line nf@.800 Ea 153.00 36.30 0.45 189.75

Part circle specification grade impact rotor pop up sprinklers


Precipitation rate of .36" to 1.5" per hour at 40 to 100 PSI, 1" inlet feed, spaced at 40' to 70', using small
tools.
Plastic case, metal cover nf@.800 Ea 231.00 36.30 0.45 267.75
Plastic case, rubber cover nf@.800 Ea 207.00 36.30 0.45 243.75
Iron case, metal cover nf@.909 Ea 262.00 41.24 0.51 303.75
Iron case, rubber cover nf@.910 Ea 277.00 41.29 0.51 318.80

Part circle specification grade impact rotor pop up sprinklers


Precipitation rate of .57" to 1.01" per hour at 55 to 100 PSI, 1" inlet feed, spaced at 53' to 75', using
small tools.
Plastic case, metal cover nf@.800 Ea 195.00 36.30 0.45 231.75
Plastic case, rubber cover nf@.800 Ea 210.00 36.30 0.45 246.75
Iron case, metal cover nf@.909 Ea 262.00 41.24 0.51 303.75
Iron case, rubber cover nf@.909 Ea 277.00 41.24 0.51 318.75

Full circle specification grade impact rotor pop up sprinklers


Precipitation rate of .13" to .70" per hour at 30 to 100 PSI, 1" inlet feed, spaced at 39' to 99', using small
tools.
Plastic case, metal cover nf@.800 Ea 180.00 36.30 0.45 216.75
Plastic case, rubber cover nf@.800 Ea 195.00 36.30 0.45 231.75
Iron case, metal cover nf@.909 Ea 254.00 41.24 0.51 295.75
Iron case, rubber cover nf@.909 Ea 269.00 41.24 0.51 310.75
2 nozzle plastic, case metal cover nf@.909 Ea 193.00 41.24 0.51 234.75
2 nozzle plastic, case rubber cover nf@.909 Ea 209.00 41.24 0.51 250.75
2 nozzle iron case, metal cover nf@1.00 Ea 260.00 45.37 0.56 305.93
2 nozzle iron case, rubber cover nf@1.00 Ea 275.00 45.37 0.56 320.93

Electric remote control sprinkler valves - Plastic, in line, 5 to 30 GPM


15 to 125 PSI, using small tools.
3/4" electric valve nf@1.11 Ea 43.10 50.36 0.62 94.08
1" electric valve nf@1.11 Ea 46.70 50.36 0.62 97.68

Electric remote control sprinkler valves - Plastic, in line, 25 to 200 GPM


20 to 200 PSI, using small tools.
1" electric valve nf@1.11 Ea 85.30 50.36 0.62 136.28
1-1/2" electric valve nf@1.11 Ea 127.00 50.36 0.62 177.98
2" electric valve nf@1.11 Ea 171.00 50.36 0.62 221.98

Electric remote control sprinkler valves - Plastic, with pressure regulator


20 to 200 GPM, 15 to 100 PSI pressure regulation, using small tools.
1" electric valve nf@1.25 Ea 134.00 56.71 0.70 191.41
1-1/2" electric valve nf@1.25 Ea 162.00 56.71 0.70 219.41
2" electric valve nf@1.25 Ea 220.00 56.71 0.70 277.41

Electric remote control sprinkler valves - Plastic, with regulator and valve
20 to 200 GPM, 15 to 100 PSI pressure regulation, using small tools.
1" electric valve nf@1.25 Ea 163.00 56.71 0.70 220.41
1-1/2" electric valve nf@1.25 Ea 204.00 56.71 0.70 261.41
2" electric valve nf@1.25 Ea 248.00 56.71 0.70 305.41

Electric remote control sprinkler valves - Brass, pressure regulating


Flow control at 5 to 200 GPM, 15 to 200 PSI, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 201 (part 2)

3/4" electric valve nf@1.11 Ea 154.00 50.36 0.62 204.98


1" electric valve nf@1.11 Ea 190.00 50.36 0.62 240.98
1-1/4" electric valve nf@1.11 Ea 222.00 50.36 0.62 272.98
1-1/2" electric valve nf@1.11 Ea 251.00 50.36 0.62 301.98
2" electric valve nf@1.11 Ea 314.00 50.36 0.62 364.98

Electric remote control sprinkler valves - Brass, contamination proof


5 to 200 GPM, pressure regulation from 15 to 100 PSI, using small tools.
1" electric valve nf@1.25 Ea 296.00 56.71 0.70 353.41
1-1/4" electric valve nf@1.25 Ea 355.00 56.71 0.70 412.41
1-1/2" electric valve nf@1.25 Ea 379.00 56.71 0.70 436.41
2" electric valve nf@1.25 Ea 427.00 56.71 0.70 484.41

Quick coupling manual valves


Brass with locking cover, using small tools.
3/4" inlet coupling valve nf@.800 Ea 108.00 36.30 0.45 144.75
2015 Heavy Construction Estimator, All Rights Reserved Page 202

1" inlet coupling valve nf@.800 Ea 99.80 36.30 0.45 136.55

Sprinkler controller valve boxes


Using small tools.
6" round boxes nf@.800 Ea 7.79 36.30 0.45 44.54
10" round boxes nf@1.05 Ea 15.60 47.64 0.59 63.83
12" square box nf@1.54 Ea 30.40 69.87 0.86 101.13

Computer sprinkler controllers (timers)


Using small tools.
6 stations nf@6.45 Ea 84.30 292.60 3.61 380.51

Dual program computer sprinkler controllers


Including security pedestal and enclosure, using small tools.
4 stations nf@30.8 Ea 74.20 1,397.00 17.20 1,488.40
6 stations nf@45.5 Ea 85.90 2,064.00 25.50 2,175.40
8 stations nf@58.8 Ea 117.00 2,668.00 32.90 2,817.90

Independent station computer sprinkler controllers


Using small tools.
4 stations nf@20.0 Ea 825.00 907.40 11.20 1,743.60
8 stations nf@38.5 Ea 1,090.00 1,747.00 21.60 2,858.60
12 stations nf@51.2 Ea 1,390.00 2,323.00 28.70 3,741.70
16 stations nf@74.0 Ea 1,740.00 3,357.00 41.40 5,138.40
24 stations nf@111. Ea 2,430.00 5,036.00 62.20 7,528.20
32 stations nf@153. Ea 3,230.00 6,942.00 85.70 10,257.70

Electromechanical sprinkler controllers


Using small tools.
4 stations nf@20.0 Ea 383.00 907.40 11.20 1,301.60
7 stations nf@32.3 Ea 636.00 1,465.00 18.10 2,119.10
12 stations nf@51.2 Ea 950.00 2,323.00 28.70 3,301.70

Dual program electromechanical sprinkler controllers


Using small tools.
18 stations nf@117. Ea 1,860.00 5,308.00 65.50 7,233.50
23 stations nf@167. Ea 2,280.00 7,577.00 93.50 9,950.50

Reduced pressure backflow preventers


Using small tools.
3/4" backflow preventer nf@1.00 Ea 633.00 45.37 0.56 678.93
1" backflow preventer nf@1.25 Ea 789.00 56.71 0.70 846.41
1-1/4" backflow preventer nf@1.50 Ea 1,150.00 68.06 0.84 1,218.90
1-1/2" backflow preventer nf@1.75 Ea 1,270.00 79.40 0.98 1,350.38
2" backflow preventer nf@2.25 Ea 1,520.00 102.10 1.26 1,623.36

Pressure vacuum breaker backflow preventers


Using small tools.
3/4" vacuum breaker nf@1.00 Ea 275.00 45.37 0.56 320.93
1" vacuum breaker nf@1.25 Ea 286.00 56.71 0.70 343.41
1-1/4" vacuum breaker nf@1.50 Ea 464.00 68.06 0.84 532.90
1-1/2" vacuum breaker nf@1.75 Ea 584.00 79.40 0.98 664.38
2" vacuum breaker nf@2.25 Ea 611.00 102.10 1.26 714.36
2015 Heavy Construction Estimator, All Rights Reserved Page 203

PVC irrigation pressure pipe


Including one fitting each 10' but no excavation or backfill, using small tools.
3/4" pipe nf@.011 LF 0.38 0.50 0.01 0.89
1" pipe nf@.011 LF 0.51 0.50 0.01 1.02
1-1/2" pipe nf@.011 LF 1.21 0.50 0.01 1.72
2" pipe nf@.014 LF 1.85 0.64 0.01 2.50
2-1/2" pipe nf@.016 LF 2.69 0.73 0.01 3.43

CSI 02-451, Concrete pipe

Concrete extra strength bell and spigot or tongue and groove pipe
Mastic joint. See CSI 02-560 for concrete culvert pipe. No excavation or backfill included, using a 1.38
CY wheeled loader-backhoe and small tools.
6" (15cm) ex@.181 LF 3.10 6.40 0.69 10.19
8" (21cm) ex@.160 LF 4.22 5.66 0.61 10.49
10" (25cm) ex@.185 LF 5.94 6.54 0.71 13.19
12" (31cm) ex@.240 LF 6.29 8.48 0.92 15.69
15" (38cm) ex@.291 LF 8.40 10.29 1.11 19.80
18" (46cm) ex@.369 LF 10.20 13.04 1.41 24.65
21" (53cm) ex@.457 LF 17.80 16.15 1.75 35.70
24" (61cm) ex@.533 LF 24.60 18.84 2.04 45.48
Add for mortar joints ---@--- % 10.00 10.00 -- --

CSI 02-452, Reinforced concrete pipe

Reinforced concrete class 3 pipe, without gaskets


Mastic joints. No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small
tools.
12" (31cm) ex@.229 LF 9.10 8.10 0.87 18.07
15" (38cm) ex@.274 LF 10.30 9.69 1.05 21.04
18" (46cm) ex@.320 LF 13.10 11.31 1.22 25.63
21"(53cm) ex@.360 LF 15.30 12.73 1.38 29.41
24" (61cm) ex@.400 LF 20.30 14.14 1.53 35.97
27"(69cm) tq@.410 LF 22.40 14.49 3.42 40.31
Add for mortar joints ---@--- % 10.00 10.00 -- --

Reinforced concrete class 3 pipe, without gaskets


Mastic joints. No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small
tools.
30" (76cm) tq@.420 LF 30.80 14.85 3.50 49.15
36" (91cm) tq@.470 LF 45.10 16.61 3.92 65.63
42" (106cm) tq@.550 LF 56.60 19.44 4.59 80.63
48" (122cm) tq@.650 LF 68.30 22.98 5.42 96.70
60" (152cm) tq@.700 LF 103.00 24.75 5.84 133.59
72" (183cm) tq@.750 LF 135.00 26.51 6.26 167.77
78" (183cm) tq@.900 LF 154.00 31.82 7.51 193.33
84" (198cm) tq@1.10 LF 178.00 38.89 9.17 226.06
90" (229cm) tq@1.36 LF 192.00 48.08 11.30 251.38
96" (243cm) tq@1.50 LF 215.00 53.03 12.50 280.53
Add for class
4 reinforced concrete pipe ---@--- % 15.00 -- -- --
Add for class
5 reinforced concrete pipe ---@--- % 25.00 -- -- --
Add for mortar joints ---@--- % 10.00 10.00 -- --

Concrete class 3 reducing wyes


Using a 1.38 CY wheeled loader-backhoe and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 203 (part 2)

12" concrete wye ex@.960 Ea 230.00 33.94 3.67 267.61


15" concrete wye ex@1.17 Ea 275.00 41.36 4.47 320.83
18" concrete wye ex@1.30 Ea 347.00 45.96 4.97 397.93
24" concrete wye ex@1.92 Ea 440.00 67.87 7.33 515.20

Reinforced concrete class 5 pipe with preformed gaskets


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
60" pipe, class 5 tq@1.26 LF 120.00 44.54 10.50 175.04
72" culvert, class 5 tq@.923 LF 92.60 32.63 7.70 132.93
2015 Heavy Construction Estimator, All Rights Reserved Page 204

Precast flared end sections for class 3 concrete pipe


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
48" round flared end section tq@13.7 Ea 991.00 484.30 114.00 1,589.30
60" round flared end section tq@16.0 Ea 1,220.00 565.60 133.00 1,918.60

Concrete pipe joint gaskets


Material only. Labor included with pipe.
12" joint gasket --@.000 Ea 2.61 -- -- 2.61
15" joint gasket --@.000 Ea 3.08 -- -- 3.08
18" joint gasket --@.000 Ea 3.58 -- -- 3.58
24" joint gasket --@.000 Ea 5.06 -- -- 5.06
30" joint gasket --@.000 Ea 6.20 -- -- 6.20
36" joint gasket --@.000 Ea 7.57 -- -- 7.57
42" joint gasket --@.000 Ea 8.78 -- -- 8.78
48" joint gasket --@.000 Ea 10.10 -- -- 10.10
54" joint gasket --@.000 Ea 12.40 -- -- 12.40
60" joint gasket --@.000 Ea 18.40 -- -- 18.40
72" joint gasket --@.000 Ea 19.80 -- -- 19.80

Precast end sections for concrete pipe


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
12" diameter pipe ex@1.78 Ea 245.00 62.92 6.80 314.72
15" diameter pipe ex@1.92 Ea 353.00 67.87 7.33 428.20
18" diameter pipe ex@1.92 Ea 434.00 67.87 7.33 509.20
21" diameter pipe ex@2.18 Ea 379.00 77.06 8.33 464.39
24" diameter pipe ex@2.40 Ea 507.00 84.84 9.17 601.01
27" diameter pipe ex@2.53 Ea 477.00 89.44 9.66 576.10
30" diameter pipe ex@2.67 Ea 732.00 94.38 10.20 836.58
36" diameter pipe ex@3.20 Ea 950.00 113.10 12.20 1,075.30
42" diameter pipe ex@4.80 Ea 1,090.00 169.70 18.30 1,278.00
48" diameter pipe ex@6.00 Ea 981.00 212.10 22.90 1,216.00
60" diameter pipe ex@9.60 Ea 1,260.00 339.40 36.70 1,636.10
72" diameter pipe ex@16.0 Ea 1,540.00 565.60 61.10 2,166.70

CSI 02-453, Prestressed 150 PSI concrete pipe

Prestressed 150 PSI concrete pipe


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
15" (38cm) ex@.249 LF 27.70 8.80 0.95 37.45
18" (46cm) ex@.291 LF 32.30 10.29 1.11 43.70
20" (51cm) ex@.331 LF 37.60 11.70 1.26 50.56
24" (61cm) ex@.436 LF 46.80 15.41 1.67 63.88

Prestressed 150 PSI concrete pipe


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
30" (76cm) tq@.511 LF 62.00 18.06 4.26 84.32
36" (91cm) tq@.623 LF 77.80 22.02 5.20 105.02
42" (106cm) tq@.686 LF 92.30 24.25 5.72 122.27
48" (122cm) tq@.750 LF 125.00 26.51 6.26 157.77

Prestressed 150 PSI concrete pipe


No excavation or backfill included, using a truck-mounted hydraulic crane with 115’ boom and small
tools.
54" (137cm) tt@.966 LF 145.00 35.77 14.90 195.67
60" (152cm) tt@1.08 LF 169.00 39.99 16.60 225.59
66" (167cm) tt@1.22 LF 191.00 45.18 18.80 254.98
2015 Heavy Construction Estimator, All Rights Reserved Page 204 (part 2)

72" (183cm) tt@1.22 LF 237.00 45.18 18.80 300.98


78" (198cm) tt@1.40 LF 257.00 51.84 21.50 330.34
84" (213cm) tt@1.40 LF 276.00 51.84 21.50 349.34
90" (228cm) tt@1.87 LF 296.00 69.25 28.80 394.05
96" (244cm) tt@1.87 LF 316.00 69.25 28.80 414.05
2015 Heavy Construction Estimator, All Rights Reserved Page 205

Prestressed 150 PSI concrete pipe


No excavation or backfill included, using a 100-ton crawler mounted mechanical crane with 210’ boom
and small tools.
102" (259cm) tv@2.80 LF 336.00 103.70 53.90 493.60
108" (274cm) tv@2.80 LF 355.00 103.70 53.90 512.60
114" (290cm) tv@2.80 LF 375.00 103.70 53.90 532.60
120" (305cm) tv@3.50 LF 395.00 129.60 67.40 592.00
126" (320cm) tv@3.50 LF 414.00 129.60 67.40 611.00
132" (335cm) tv@3.50 LF 434.00 129.60 67.40 631.00
138" (351cm) tv@3.50 LF 455.00 129.60 67.40 652.00
144" (366cm) tv@3.50 LF 474.00 129.60 67.40 671.00

90 degree elbows for prestressed 150 PSI concrete pipe


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) ex@12.0 Ea 20.50 424.20 45.80 490.50
24" (61cm) ex@16.0 Ea 53.70 565.60 61.10 680.40

90 degree elbows for prestressed 150 PSI concrete pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
36" (91cm) tq@12.0 Ea 111.00 424.20 100.00 635.20
48" (122cm) tq@16.0 Ea 165.00 565.60 133.00 863.60

90 degree elbows for prestressed 150 PSI concrete pipe


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
60" (152cm) tt@28.0 Ea 259.00 1,037.00 431.00 1,727.00
72" (183cm) tt@35.0 Ea 15,200.00 1,296.00 539.00 17,035.00
84" (213cm) tt@43.1 Ea 19,100.00 1,596.00 663.00 21,359.00
96" (244cm) tt@56.0 Ea 22,800.00 2,074.00 862.00 25,736.00

90 degree elbows for prestressed 150 PSI concrete pipe


Using a 100-ton crawler mounted mechanical crane with 210’ boom and small tools.
108" (274cm) tv@84.8 Ea 33,100.00 3,140.00 1,630.00 37,870.00
120" (305cm) tv@140. Ea 43,400.00 5,184.00 2,700.00 51,284.00
132" (335cm) tv@187. Ea 57,300.00 6,925.00 3,600.00 67,825.00
144" (365cm) tv@187. Ea 71,400.00 6,925.00 3,600.00 81,925.00

45 degree elbows for prestressed 150 PSI concrete pipe


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) ex@12.0 Ea 13.70 424.20 45.80 483.70
24" (61cm) ex@16.0 Ea 35.80 565.60 61.10 662.50

45 degree elbows for prestressed 150 PSI concrete pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
36" (91cm) tq@12.0 Ea 74.00 424.20 100.00 598.20
48" (122cm) tq@16.0 Ea 110.00 565.60 133.00 808.60

45 degree elbows for prestressed 150 PSI concrete pipe


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
60" (152cm) tt@28.0 Ea 8,950.00 1,037.00 431.00 10,418.00
72" (183cm) tt@35.0 Ea 13,700.00 1,296.00 539.00 15,535.00
84" (213cm) tt@43.1 Ea 17,200.00 1,596.00 663.00 19,459.00
96" (244cm) tt@56.0 Ea 20,600.00 2,074.00 862.00 23,536.00

45 degree elbows for prestressed 150 PSI concrete pipe


Using a 100-ton crawler mounted mechanical crane with 210’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 205 (part 2)

108" (274cm) tv@84.8 Ea 29,800.00 3,140.00 1,630.00 34,570.00


120" (305cm) tv@140. Ea 39,100.00 5,184.00 2,700.00 46,984.00
132" (335cm) tv@187. Ea 51,600.00 6,925.00 3,600.00 62,125.00
144" (365cm) tv@187. Ea 64,200.00 6,925.00 3,600.00 74,725.00

Prestressed 100 PSI concrete pipe


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
20" (51cm) ex@.331 LF 46.70 11.70 1.26 59.66
24" (61cm) ex@.436 LF 17.90 15.41 1.67 34.98
30" (76cm) ex@.511 LF 25.00 18.06 1.95 45.01
36" (91cm) ex@.623 LF 37.00 22.02 2.38 61.40
42" (106cm) ex@.686 LF 45.50 24.25 2.62 72.37
48" (122cm) ex@.750 LF 55.00 26.51 2.87 84.38

Prestressed 100 PSI concrete pipe


No excavation or backfill included, using a truck-mounted hydraulic crane with 115’ boom and small
tools.
54" (137cm) tt@.966 LF 74.10 35.77 14.90 124.77
60" (152cm) tt@1.08 LF 86.40 39.99 16.60 142.99
66" (167cm) tt@1.22 LF 174.00 45.18 18.80 237.98
72" (183cm) tt@1.22 LF 215.00 45.18 18.80 278.98
78" (198cm) tt@1.40 LF 233.00 51.84 21.50 306.34
2015 Heavy Construction Estimator, All Rights Reserved Page 206

84" (213cm) tt@1.40 LF 251.00 51.84 21.50 324.34


90" (228cm) tt@1.87 LF 269.00 69.25 28.80 367.05
96" (244cm) tt@1.87 LF 287.00 69.25 28.80 385.05

Prestressed 100 PSI concrete pipe


No excavation or backfill included, using a 100-ton crawler mounted mechanical crane with 210’ boom
and small tools.
102" (259cm) tv@2.80 LF 305.00 103.70 53.90 462.60
108" (274cm) tv@2.80 LF 323.00 103.70 53.90 480.60
114" (290cm) tv@2.80 LF 341.00 103.70 53.90 498.60
120" (305cm) tv@3.50 LF 359.00 129.60 67.40 556.00
126" (320cm) tv@3.50 LF 377.00 129.60 67.40 574.00
132" (335cm) tv@3.50 LF 395.00 129.60 67.40 592.00
138" (351cm) tv@3.50 LF 413.00 129.60 67.40 610.00
144" (366cm) tv@3.50 LF 431.00 129.60 67.40 628.00

CSI 02-455, Ductile iron pipe

Mechanical joint ductile iron pipe, no fittings included


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) xt@.090 LF 15.10 2.77 0.83 18.70
6" (15cm) xt@.100 LF 16.40 3.08 0.93 20.41
8" (21cm) xt@.110 LF 22.00 3.39 1.02 26.41
Add for short runs (60' or less) ---@--- % 10.00 100.00 -- --

Mechanical joint ductile iron pipe, no fittings included


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and two sets of small
tools.
10" (25cm) xu@.120 LF 29.00 3.60 0.85 33.45
12" (31cm) xu@.150 LF 36.90 4.49 1.06 42.45
14" (36cm) xu@.160 LF 47.80 4.79 1.13 53.72
16" (41cm) xu@.180 LF 56.70 5.39 1.27 63.36
18" (46cm) xu@.200 LF 67.00 5.99 1.41 74.40
20" (51cm) xu@.210 LF 77.30 6.29 1.48 85.07
24" (61cm) xu@.330 LF 101.00 9.89 2.33 113.22
30" (76cm) xu@.410 LF 137.00 12.28 2.89 152.17
36" (91cm) xu@.440 LF 187.00 13.18 3.11 203.29
Add for short runs (60' or less) ---@--- % 10.00 100.00 -- --

90 degree elbows for mechanical joint ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) diameter xt@1.65 Ea 229.00 50.77 15.30 295.07
6" (15cm) diameter xt@2.10 Ea 309.00 64.62 19.40 393.02
8" (21cm) diameter xt@2.55 Ea 503.00 78.46 23.60 605.06
10" (25cm) diameter xu@2.75 Ea 644.00 82.39 19.40 745.79
12" (31cm) diameter xu@4.88 Ea 851.00 146.20 34.50 1,031.70
14" (36cm) diameter xu@5.35 Ea 1,380.00 160.30 37.80 1,578.10
16" (41cm) diameter xu@5.90 Ea 1,560.00 176.80 41.70 1,778.50
18" (46cm) diameter xu@6.30 Ea 2,400.00 188.70 44.50 2,633.20
20" (51cm) diameter xu@7.70 Ea 2,710.00 230.70 54.40 2,995.10
24" (61cm) diameter xu@8.89 Ea 4,900.00 266.30 62.80 5,229.10
30" (76cm) diameter xu@9.90 Ea 5,240.00 296.60 69.90 5,606.50
36" (91cm) diameter xu@10.6 Ea 7,680.00 317.60 74.80 8,072.40
42" (106cm) diameter xu@12.0 Ea 12,700.00 359.50 84.70 13,144.20
48" (122cm) diameter xu@13.6 Ea 17,100.00 407.50 96.00 17,603.50

45 degree elbows for mechanical joint ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 206 (part 2)

4" (10cm) diameter xt@1.57 Ea 79.70 48.31 14.50 142.51


6" (15cm) diameter xt@2.00 Ea 189.00 61.54 18.50 269.04
8" (21cm) diameter xt@2.42 Ea 246.00 74.46 22.40 342.86
10" (25cm) diameter xu@2.61 Ea 284.00 78.20 18.40 380.60
12" (31cm) diameter xu@4.64 Ea 609.00 139.00 32.80 780.80
14" (36cm) diameter xu@5.08 Ea 748.00 152.20 35.90 936.10
16" (41cm) diameter xu@5.61 Ea 1,260.00 168.10 39.60 1,467.70
2015 Heavy Construction Estimator, All Rights Reserved Page 207

18" (46cm) diameter xu@5.99 Ea 1,280.00 179.50 42.30 1,501.80


20" (51cm) diameter xu@7.32 Ea 2,170.00 219.30 51.70 2,441.00
24" (61cm) diameter xu@8.45 Ea 3,670.00 253.20 59.70 3,982.90
30" (76cm) diameter xu@9.41 Ea 4,280.00 281.90 66.40 4,628.30
36" (91cm) diameter xu@10.0 Ea 6,500.00 299.60 70.60 6,870.20
42" (106cm) diameter xu@11.4 Ea 12,200.00 341.50 80.50 12,622.00
48" (122cm) diameter xu@12.9 Ea 16,200.00 386.50 91.10 16,677.60

22-1/2 degree elbows for mechanical joint ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) diameter xt@1.53 Ea 93.50 47.08 14.20 154.78
6" (15cm) diameter xt@1.95 Ea 140.00 60.00 18.00 218.00
8" (21cm) diameter xt@2.37 Ea 204.00 72.92 21.90 298.82
10" (25cm) diameter xu@2.56 Ea 275.00 76.70 18.10 369.80
12" (31cm) diameter xu@4.54 Ea 364.00 136.00 32.10 532.10
14" (36cm) diameter xu@4.98 Ea 701.00 149.20 35.20 885.40
16" (41cm) diameter xu@5.49 Ea 853.00 164.50 38.80 1,056.30
18" (46cm) diameter xu@5.86 Ea 1,610.00 175.60 41.40 1,827.00
20" (51cm) diameter xu@7.16 Ea 1,990.00 214.50 50.50 2,255.00
24" (61cm) diameter xu@8.26 Ea 2,780.00 247.50 58.30 3,085.80
30" (76cm) diameter xu@8.37 Ea 5,970.00 250.80 59.10 6,279.90
36" (91cm) diameter xu@9.86 Ea 8,550.00 295.40 69.60 8,915.00
42" (106cm) diameter xu@11.2 Ea 12,200.00 335.60 79.10 12,614.70
48" (122cm) diameter xu@12.7 Ea 16,200.00 380.50 89.70 16,670.20

Tees for mechanical joint ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" x 3" tee xt@2.20 Ea 140.00 67.69 20.40 228.09
4" x 4" tee xt@2.20 Ea 149.00 67.69 20.40 237.09
6" x 3" tee xt@2.90 Ea 187.00 89.23 26.80 303.03
6" x 4" tee xt@2.90 Ea 196.00 89.23 26.80 312.03
6" x 6" tee xt@2.90 Ea 219.00 89.23 26.80 335.03
8" x 4" tee xt@3.30 Ea 257.00 101.50 30.50 389.00
8" x 6" tee xt@3.30 Ea 289.00 101.50 30.50 421.00
8" x 8" tee xt@3.30 Ea 310.00 101.50 30.50 442.00
10" x 4" tee xu@3.65 Ea 353.00 109.40 25.80 488.20
10" x 6" tee xu@3.65 Ea 374.00 109.40 25.80 509.20
10" x 8" tee xu@3.65 Ea 389.00 109.40 25.80 524.20
10"x 10" tee xu@3.65 Ea 432.00 109.40 25.80 567.20
12" x 4" tee xu@6.60 Ea 441.00 197.70 46.60 685.30
12" x 6" tee xu@6.60 Ea 443.00 197.70 46.60 687.30
12" x 8" tee xu@6.60 Ea 452.00 197.70 46.60 696.30
12"x 10" tee xu@6.60 Ea 517.00 197.70 46.60 761.30
12"x 12" tee xu@6.60 Ea 578.00 197.70 46.60 822.30
14" x 4" tee xu@6.80 Ea 1,460.00 203.70 48.00 1,711.70
14" x 6" tee xu@6.80 Ea 1,510.00 203.70 48.00 1,761.70
14" x 8" tee xu@6.80 Ea 1,560.00 203.70 48.00 1,811.70
14"x 10" tee xu@6.80 Ea 1,610.00 203.70 48.00 1,861.70
14"x 12" tee xu@6.80 Ea 1,710.00 203.70 48.00 1,961.70
14"x 14" tee xu@6.80 Ea 1,820.00 203.70 48.00 2,071.70
16" x 4" tee xu@7.60 Ea 1,800.00 227.70 53.70 2,081.40
16" x 6" tee xu@7.60 Ea 1,850.00 227.70 53.70 2,131.40
16" x 8" tee xu@7.60 Ea 1,880.00 227.70 53.70 2,161.40
16"x 10" tee xu@7.60 Ea 1,950.00 227.70 53.70 2,231.40
16"x 12" tee xu@7.60 Ea 2,020.00 227.70 53.70 2,301.40
16"x 14" tee xu@7.60 Ea 2,140.00 227.70 53.70 2,421.40
16"x 16" tee xu@7.60 Ea 2,240.00 227.70 53.70 2,521.40
18" x 6" tee xu@8.15 Ea 2,180.00 244.20 57.50 2,481.70
18" x 8" tee xu@8.15 Ea 2,230.00 244.20 57.50 2,531.70
2015 Heavy Construction Estimator, All Rights Reserved Page 207 (part 2)

18"x 10" tee xu@8.15 Ea 2,290.00 244.20 57.50 2,591.70


18"x 12" tee xu@8.15 Ea 2,360.00 244.20 57.50 2,661.70
18"x 14" tee xu@8.15 Ea 2,750.00 244.20 57.50 3,051.70
2015 Heavy Construction Estimator, All Rights Reserved Page 208

18"x 16" tee xu@8.15 Ea 2,860.00 244.20 57.50 3,161.70


18"x 18" tee xu@8.15 Ea 3,010.00 244.20 57.50 3,311.70
20" x 6" tee xu@9.80 Ea 2,630.00 293.60 69.20 2,992.80
20" x 8" tee xu@9.80 Ea 2,670.00 293.60 69.20 3,032.80
20"x 10" tee xu@9.80 Ea 2,750.00 293.60 69.20 3,112.80
20"x 12" tee xu@9.80 Ea 2,820.00 293.60 69.20 3,182.80
20"x 14" tee xu@9.80 Ea 2,910.00 293.60 69.20 3,272.80
20"x 16" tee xu@9.80 Ea 3,390.00 293.60 69.20 3,752.80
20"x 18" tee xu@9.80 Ea 4,780.00 293.60 69.20 5,142.80
20"x 20" tee xu@9.80 Ea 4,950.00 293.60 69.20 5,312.80
24" x 8" tee xu@11.6 Ea 4,810.00 347.50 81.90 5,239.40
24"x 10" tee xu@11.6 Ea 4,910.00 347.50 81.90 5,339.40
24"x 12" tee xu@11.6 Ea 4,960.00 347.50 81.90 5,389.40
24"x 14" tee xu@11.6 Ea 5,100.00 347.50 81.90 5,529.40
24"x 16" tee xu@11.6 Ea 5,210.00 347.50 81.90 5,639.40
24"x 18" tee xu@11.6 Ea 6,630.00 347.50 81.90 7,059.40
24"x 20" tee xu@11.6 Ea 6,870.00 347.50 81.90 7,299.40
24"x 24" tee xu@11.6 Ea 7,280.00 347.50 81.90 7,709.40
30" x 8" tee xu@12.8 Ea 9,660.00 383.50 90.40 10,133.90
30"x 10" tee xu@12.8 Ea 9,770.00 383.50 90.40 10,243.90
30"x 12" tee xu@12.8 Ea 9,840.00 383.50 90.40 10,313.90
30"x 14" tee xu@12.8 Ea 9,960.00 383.50 90.40 10,433.90
30"x 16" tee xu@12.8 Ea 10,100.00 383.50 90.40 10,573.90
30"x 18" tee xu@12.8 Ea 10,200.00 383.50 90.40 10,673.90
30"x 20" tee xu@12.8 Ea 10,400.00 383.50 90.40 10,873.90
30"x 24" tee xu@12.8 Ea 12,700.00 383.50 90.40 13,173.90
30"x 30" tee xu@12.8 Ea 14,300.00 383.50 90.40 14,773.90
36" x 8" tee xu@13.8 Ea 13,400.00 413.40 97.40 13,910.80
36"x 10" tee xu@13.8 Ea 13,500.00 413.40 97.40 14,010.80
36"x 12" tee xu@13.8 Ea 13,500.00 413.40 97.40 14,010.80
36"x 14" tee xu@13.8 Ea 13,700.00 413.40 97.40 14,210.80
36"x 16" tee xu@13.8 Ea 13,700.00 413.40 97.40 14,210.80
36"x 18" tee xu@13.8 Ea 13,900.00 413.40 97.40 14,410.80
36"x 20" tee xu@13.8 Ea 14,100.00 413.40 97.40 14,610.80
36"x 24" tee xu@13.8 Ea 14,300.00 413.40 97.40 14,810.80
36"x 30" tee xu@13.8 Ea 18,800.00 413.40 97.40 19,310.80
36"x 36" tee xu@13.8 Ea 19,800.00 413.40 97.40 20,310.80
42"x 12" tee xu@15.7 Ea 19,100.00 470.40 111.00 19,681.40
42"x 16" tee xu@15.7 Ea 19,400.00 470.40 111.00 19,981.40
42"x 18" tee xu@15.7 Ea 19,500.00 470.40 111.00 20,081.40
42"x 20" tee xu@15.7 Ea 19,600.00 470.40 111.00 20,181.40
42"x 24" tee xu@15.7 Ea 19,900.00 470.40 111.00 20,481.40
42"x 30" tee xu@15.7 Ea 24,800.00 470.40 111.00 25,381.40
42"x 36" tee xu@15.7 Ea 31,200.00 470.40 111.00 31,781.40
42"x 42" tee xu@15.7 Ea 32,900.00 470.40 111.00 33,481.40
48"x 12" tee xu@18.3 Ea 25,300.00 548.30 129.00 25,977.30
48"x 14" tee xu@18.3 Ea 25,400.00 548.30 129.00 26,077.30
48"x 16" tee xu@18.3 Ea 25,600.00 548.30 129.00 26,277.30
48"x 18" tee xu@18.3 Ea 25,700.00 548.30 129.00 26,377.30
48"x 20" tee xu@18.3 Ea 25,800.00 548.30 129.00 26,477.30
48"x 24" tee xu@18.3 Ea 26,100.00 548.30 129.00 26,777.30
48"x 30" tee xu@18.3 Ea 27,400.00 548.30 129.00 28,077.30
48"x 36" tee xu@18.3 Ea 32,600.00 548.30 129.00 33,277.30
48"x 42" tee xu@18.3 Ea 41,300.00 548.30 129.00 41,977.30
48"x 48" tee xu@18.3 Ea 42,700.00 548.30 129.00 43,377.30

Crosses for mechanical joint ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" x 3" cross xt@2.20 Ea 190.00 67.69 20.40 278.09
4" x 4" cross xt@2.20 Ea 204.00 67.69 20.40 292.09
2015 Heavy Construction Estimator, All Rights Reserved Page 208 (part 2)

6" x 3" cross xt@2.93 Ea 275.00 90.16 27.10 392.26


2015 Heavy Construction Estimator, All Rights Reserved Page 209

6" x 4" cross xt@2.93 Ea 257.00 90.16 27.10 374.26


6" x 6" cross xt@2.93 Ea 304.00 90.16 27.10 421.26
8" x 4" cross xt@3.50 Ea 313.00 107.70 32.40 453.10
8" x 6" cross xt@3.50 Ea 383.00 107.70 32.40 523.10
8" x 8" cross xt@3.50 Ea 446.00 107.70 32.40 586.10
10" x 4" cross xu@6.85 Ea 453.00 205.20 48.40 706.60
10" x 6" cross xu@6.85 Ea 453.00 205.20 48.40 706.60
10" x 8" cross xu@6.85 Ea 492.00 205.20 48.40 745.60
10" x 10" cross xu@6.85 Ea 594.00 205.20 48.40 847.60
12 x 4" cross xu@7.50 Ea 520.00 224.70 53.00 797.70
12" x 6" cross xu@7.50 Ea 573.00 224.70 53.00 850.70
12" x 8" cross xu@7.50 Ea 593.00 224.70 53.00 870.70
12" x 10" cross xu@7.50 Ea 707.00 224.70 53.00 984.70
12" x 12" cross xu@7.50 Ea 746.00 224.70 53.00 1,023.70
14" x 4" cross xu@8.56 Ea 1,580.00 256.50 60.40 1,896.90
14" x 6" cross xu@8.56 Ea 1,660.00 256.50 60.40 1,976.90
14" x 8" cross xu@8.56 Ea 1,750.00 256.50 60.40 2,066.90
14" x 10" cross xu@8.56 Ea 1,880.00 256.50 60.40 2,196.90
14" x 12" cross xu@8.56 Ea 2,040.00 256.50 60.40 2,356.90
14" x 14" cross xu@8.56 Ea 2,240.00 256.50 60.40 2,556.90
16" x 4" cross xu@10.0 Ea 1,280.00 299.60 70.60 1,650.20
16" x 6" cross xu@10.0 Ea 1,980.00 299.60 70.60 2,350.20
16" x 8" cross xu@10.0 Ea 2,090.00 299.60 70.60 2,460.20
16" x 10" cross xu@10.0 Ea 2,230.00 299.60 70.60 2,600.20
16" x 12" cross xu@10.0 Ea 2,360.00 299.60 70.60 2,730.20
16" x 14" cross xu@10.0 Ea 2,570.00 299.60 70.60 2,940.20
16" x 16" cross xu@10.0 Ea 2,760.00 299.60 70.60 3,130.20
18" x 6" cross xu@12.0 Ea 2,320.00 359.50 84.70 2,764.20
18" x 8" cross xu@12.0 Ea 2,430.00 359.50 84.70 2,874.20
18" x 10" cross xu@12.0 Ea 2,540.00 359.50 84.70 2,984.20
18" x 12" cross xu@12.0 Ea 2,680.00 359.50 84.70 3,124.20
18" x 14" cross xu@12.0 Ea 3,200.00 359.50 84.70 3,644.20
18" x 16" cross xu@12.0 Ea 3,410.00 359.50 84.70 3,854.20
18" x 18" cross xu@12.0 Ea 3,710.00 359.50 84.70 4,154.20
20" x 6" cross xu@13.3 Ea 2,780.00 398.50 93.90 3,272.40
20" x 8" cross xu@13.3 Ea 2,890.00 398.50 93.90 3,382.40
20" x 10" cross xu@13.3 Ea 3,000.00 398.50 93.90 3,492.40
20" x 12" cross xu@13.3 Ea 3,140.00 398.50 93.90 3,632.40
20" x 14" cross xu@13.3 Ea 4,470.00 398.50 93.90 4,962.40
20" x 16" cross xu@13.3 Ea 5,270.00 398.50 93.90 5,762.40
20" x 18" cross xu@13.3 Ea 5,690.00 398.50 93.90 6,182.40
20" x 20" cross xu@13.3 Ea 6,050.00 398.50 93.90 6,542.40
24" x 8" cross xu@15.0 Ea 5,060.00 449.40 106.00 5,615.40
24" x 10" cross xu@15.0 Ea 5,250.00 449.40 106.00 5,805.40
24" x 12" cross xu@15.0 Ea 5,380.00 449.40 106.00 5,935.40
24" x 14" cross xu@15.0 Ea 5,640.00 449.40 106.00 6,195.40
24" x 16" cross xu@15.0 Ea 5,860.00 449.40 106.00 6,415.40
24" x 18" cross xu@15.0 Ea 7,640.00 449.40 106.00 8,195.40
24" x 20" cross xu@15.0 Ea 8,040.00 449.40 106.00 8,595.40
24" x 24" cross xu@15.0 Ea 8,820.00 449.40 106.00 9,375.40
30" x 8" cross xu@15.5 Ea 9,990.00 464.40 109.00 10,563.40
30" x 10" cross xu@15.5 Ea 10,100.00 464.40 109.00 10,673.40
30" x 12" cross xu@15.5 Ea 10,300.00 464.40 109.00 10,873.40
30" x 14" cross xu@15.5 Ea 10,500.00 464.40 109.00 11,073.40
30" x 16" cross xu@15.5 Ea 10,800.00 464.40 109.00 11,373.40
30" x 18" cross xu@15.5 Ea 11,100.00 464.40 109.00 11,673.40
30" x 20" cross xu@15.5 Ea 11,400.00 464.40 109.00 11,973.40
30" x 24" cross xu@15.5 Ea 14,200.00 464.40 109.00 14,773.40
30" x 30" cross xu@15.5 Ea 17,400.00 464.40 109.00 17,973.40
36" x 8" cross xu@17.8 Ea 13,600.00 533.30 126.00 14,259.30
2015 Heavy Construction Estimator, All Rights Reserved Page 209 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 210

36" x 10" cross xu@17.8 Ea 13,800.00 533.30 126.00 14,459.30


36" x 12" cross xu@17.8 Ea 14,000.00 533.30 126.00 14,659.30
36" x 14" cross xu@17.8 Ea 14,200.00 533.30 126.00 14,859.30
36" x 16" cross xu@17.8 Ea 14,400.00 533.30 126.00 15,059.30
36" x 18" cross xu@17.8 Ea 14,700.00 533.30 126.00 15,359.30
36" x 20" cross xu@17.8 Ea 15,000.00 533.30 126.00 15,659.30
36" x 24" cross xu@17.8 Ea 15,600.00 533.30 126.00 16,259.30
36" x 30" cross xu@17.8 Ea 21,600.00 533.30 126.00 22,259.30
36" x 36" cross xu@17.8 Ea 23,700.00 533.30 126.00 24,359.30
42" x 12" cross xu@19.2 Ea 19,600.00 575.20 136.00 20,311.20
42" x 16" cross xu@19.2 Ea 20,000.00 575.20 136.00 20,711.20
42" x 18" cross xu@19.2 Ea 20,300.00 575.20 136.00 21,011.20
42" x 20" cross xu@19.2 Ea 20,600.00 575.20 136.00 21,311.20
42" x 24" cross xu@19.2 Ea 21,200.00 575.20 136.00 21,911.20
42" x 30" cross xu@19.2 Ea 27,500.00 575.20 136.00 28,211.20
42" x 36" cross xu@19.2 Ea 34,900.00 575.20 136.00 35,611.20
42" x 42" cross xu@19.2 Ea 38,300.00 575.20 136.00 39,011.20
48" x 12" cross xu@24.0 Ea 25,800.00 719.00 169.00 26,688.00
48" x 14" cross xu@24.0 Ea 25,900.00 719.00 169.00 26,788.00
48" x 16" cross xu@24.0 Ea 26,200.00 719.00 169.00 27,088.00
48" x 18" cross xu@24.0 Ea 26,500.00 719.00 169.00 27,388.00
48" x 20" cross xu@24.0 Ea 26,800.00 719.00 169.00 27,688.00
48" x 24" cross xu@24.0 Ea 27,300.00 719.00 169.00 28,188.00
48" x 30" cross xu@24.0 Ea 30,000.00 719.00 169.00 30,888.00
48" x 36" cross xu@24.0 Ea 36,000.00 719.00 169.00 36,888.00
48" x 42" cross xu@24.0 Ea 46,000.00 719.00 169.00 46,888.00
48" x 48" cross xu@24.0 Ea 48,900.00 719.00 169.00 49,788.00

Reducers (mechanical joint x mechanical joint) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
6" x 4" reducer xt@2.40 Ea 111.00 73.85 22.20 207.05
8" x 4" reducer xt@2.64 Ea 143.00 81.23 24.40 248.63
8" x 6" reducer xt@2.64 Ea 157.00 81.23 24.40 262.63
10" x 4" reducer xu@4.60 Ea 175.00 137.80 32.50 345.30
10" x 6" reducer xu@4.60 Ea 193.00 137.80 32.50 363.30
10" x 8" reducer xu@4.60 Ea 213.00 137.80 32.50 383.30
12" x 4" reducer xu@5.28 Ea 231.00 158.20 37.30 426.50
12" x 6" reducer xu@5.28 Ea 242.00 158.20 37.30 437.50
12" x 8" reducer xu@5.28 Ea 260.00 158.20 37.30 455.50
12" x 10" reducer xu@5.28 Ea 286.00 158.20 37.30 481.50
14" x 6" reducer xu@6.30 Ea 698.00 188.70 44.50 931.20
14" x 8" reducer xu@6.30 Ea 767.00 188.70 44.50 1,000.20
14" x 10" reducer xu@6.30 Ea 832.00 188.70 44.50 1,065.20
14" x 12" reducer xu@6.30 Ea 919.00 188.70 44.50 1,152.20
16" x 6" reducer xu@6.40 Ea 827.00 191.70 45.20 1,063.90
16" x 8" reducer xu@6.40 Ea 896.00 191.70 45.20 1,132.90
16" x 10" reducer xu@6.40 Ea 993.00 191.70 45.20 1,229.90
16" x 12" reducer xu@6.40 Ea 1,080.00 191.70 45.20 1,316.90
16" x 14" reducer xu@6.40 Ea 1,210.00 191.70 45.20 1,446.90
18" x 8" reducer xu@7.10 Ea 1,130.00 212.70 50.10 1,392.80
18" x 10" reducer xu@7.10 Ea 1,230.00 212.70 50.10 1,492.80
18" x 12" reducer xu@7.10 Ea 1,320.00 212.70 50.10 1,582.80
18" x 14" reducer xu@7.10 Ea 1,440.00 212.70 50.10 1,702.80
18" x 16" reducer xu@7.10 Ea 1,560.00 212.70 50.10 1,822.80
20" x 10" reducer xu@8.30 Ea 1,410.00 248.70 58.60 1,717.30
20" x 12" reducer xu@8.30 Ea 1,510.00 248.70 58.60 1,817.30
20" x 14" reducer xu@8.30 Ea 1,610.00 248.70 58.60 1,917.30
20" x 16" reducer xu@8.30 Ea 1,760.00 248.70 58.60 2,067.30
20" x 18" reducer xu@8.30 Ea 1,940.00 248.70 58.60 2,247.30
24" x 12" reducer xu@8.87 Ea 2,700.00 265.70 62.60 3,028.30
2015 Heavy Construction Estimator, All Rights Reserved Page 210 (part 2)

24" x 14" reducer xu@8.87 Ea 2,840.00 265.70 62.60 3,168.30


2015 Heavy Construction Estimator, All Rights Reserved Page 211

24" x 16" reducer xu@8.87 Ea 3,030.00 265.70 62.60 3,358.30


24" x 18" reducer xu@8.87 Ea 3,290.00 265.70 62.60 3,618.30
24" x 20" reducer xu@8.87 Ea 3,500.00 265.70 62.60 3,828.30
30" x 18" reducer xu@9.00 Ea 5,570.00 269.60 63.50 5,903.10
30" x 20" reducer xu@9.00 Ea 5,860.00 269.60 63.50 6,193.10
30" x 24" reducer xu@9.00 Ea 6,430.00 269.60 63.50 6,763.10
36" x 20" reducer xu@9.10 Ea 7,800.00 272.60 64.20 8,136.80
36" x 24" reducer xu@9.10 Ea 8,420.00 272.60 64.20 8,756.80
36" x 30" reducer xu@9.10 Ea 10,400.00 272.60 64.20 10,736.80
42" x 20" reducer xu@9.10 Ea 10,400.00 272.60 64.20 10,736.80
42" x 24" reducer xu@9.10 Ea 11,200.00 272.60 64.20 11,536.80
42" x 30" reducer xu@9.10 Ea 13,200.00 272.60 64.20 13,536.80
42" x 36" reducer xu@9.10 Ea 14,800.00 272.60 64.20 15,136.80
48" x 30" reducer xu@12.5 Ea 16,300.00 374.50 88.30 16,762.80
48" x 36" reducer xu@12.5 Ea 18,100.00 374.50 88.30 18,562.80
48" x 42" reducer xu@12.5 Ea 20,300.00 374.50 88.30 20,762.80

Solid sleeves (mechanical joint x mechanical joint) for ductile iron pipe
Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) solid sleeve xt@1.20 Ea 334.00 36.92 11.10 382.02
6" (15cm) solid sleeve xt@1.51 Ea 383.00 46.46 14.00 443.46
8" (20cm) solid sleeve xt@1.73 Ea 501.00 53.23 16.00 570.23
10" (25cm) solid sleeve xu@2.75 Ea 652.00 82.39 19.40 753.79
12" (31cm) solid sleeve xu@3.00 Ea 816.00 89.88 21.20 927.08
14" (36cm) solid sleeve xu@3.30 Ea 1,330.00 98.87 23.30 1,452.17
16" (41cm) solid sleeve xu@3.67 Ea 1,600.00 110.00 25.90 1,735.90
18" (46cm) solid sleeve xu@4.13 Ea 2,090.00 123.70 29.20 2,242.90
20" (51cm) solid sleeve xu@4.71 Ea 2,380.00 141.10 33.30 2,554.40
24" (61cm) solid sleeve xu@5.50 Ea 3,130.00 164.80 38.80 3,333.60
30" (76cm) solid sleeve xu@6.60 Ea 7,660.00 197.70 46.60 7,904.30
36" (91cm) solid sleeve xu@8.25 Ea 10,100.00 247.20 58.20 10,405.40
42" (106cm) solid sleeve xu@9.43 Ea 11,700.00 282.50 66.60 12,049.10
48" (122cm) solid sleeve xu@11.0 Ea 14,200.00 329.60 77.70 14,607.30

Adapters (mechanical joint x mechanical joint) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) adapter xt@1.20 Ea 312.00 36.92 11.10 360.02
6" (15cm) adapter xt@1.51 Ea 406.00 46.46 14.00 466.46
8" (20cm) adapter xt@1.73 Ea 544.00 53.23 16.00 613.23
10" (25cm) adapter xu@2.75 Ea 718.00 82.39 19.40 819.79
12" (31cm) adapter xu@3.00 Ea 900.00 89.88 21.20 1,011.08
14" (36cm) adapter xu@3.30 Ea 1,270.00 98.87 23.30 1,392.17
16" (41cm) adapter xu@3.67 Ea 1,540.00 110.00 25.90 1,675.90
18" (46cm) adapter xu@4.13 Ea 2,000.00 123.70 29.20 2,152.90
20" (51cm) adapter xu@4.71 Ea 2,360.00 141.10 33.30 2,534.40
24" (61cm) adapter xu@5.50 Ea 3,080.00 164.80 38.80 3,283.60
30" (76cm) adapter xu@6.60 Ea 6,370.00 197.70 46.60 6,614.30
36" (91cm) adapter xu@8.25 Ea 8,370.00 247.20 58.20 8,675.40
42" (106cm) adapter xu@9.43 Ea 11,300.00 282.50 66.60 11,649.10
48" (122cm) adapter xu@11.0 Ea 13,900.00 329.60 77.70 14,307.30

Adapters (mechanical joint x bell joint) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) adapter xt@.920 Ea 299.00 28.31 8.51 335.82
6" (15cm) adapter xt@1.15 Ea 363.00 35.39 10.60 408.99
8" (20cm) adapter xt@1.34 Ea 521.00 41.23 12.40 574.63
10" (25cm) adapter xu@2.06 Ea 680.00 61.72 14.50 756.22
12" (31cm) adapter xu@2.35 Ea 862.00 70.41 16.60 949.01
14" (36cm) adapter xu@2.53 Ea 1,040.00 75.80 17.90 1,133.70
2015 Heavy Construction Estimator, All Rights Reserved Page 211 (part 2)

16" (41cm) adapter xu@2.75 Ea 1,310.00 82.39 19.40 1,411.79


18" (46cm) adapter xu@3.30 Ea 1,540.00 98.87 23.30 1,662.17
20" (51cm) adapter xu@3.67 Ea 1,840.00 110.00 25.90 1,975.90
24" (61cm) adapter xu@4.25 Ea 2,400.00 127.30 30.00 2,557.30
2015 Heavy Construction Estimator, All Rights Reserved Page 212

30" (76cm) adapter xu@5.08 Ea 4,310.00 152.20 35.90 4,498.10


36" (91cm) adapter xu@6.34 Ea 6,150.00 189.90 44.80 6,384.70
42" (106cm) adapter xu@7.32 Ea 7,970.00 219.30 51.70 8,241.00
48" (122cm) adapter xu@9.43 Ea 10,200.00 282.50 66.60 10,549.10

Adapters (mechanical joint x plain end) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) adapter xt@1.20 Ea 245.00 36.92 11.10 293.02
6" (15cm) adapter xt@1.51 Ea 295.00 46.46 14.00 355.46
8" (20cm) adapter xt@1.73 Ea 431.00 53.23 16.00 500.23
10" (25cm) adapter xu@2.75 Ea 567.00 82.39 19.40 668.79
12" (31cm) adapter xu@3.00 Ea 748.00 89.88 21.20 859.08
14" (36cm) adapter xu@3.30 Ea 930.00 98.87 23.30 1,052.17
16" (41cm) adapter xu@3.67 Ea 1,130.00 110.00 25.90 1,265.90
18" (46cm) adapter xu@4.13 Ea 1,360.00 123.70 29.20 1,512.90
20" (51cm) adapter xu@4.71 Ea 1,630.00 141.10 33.30 1,804.40
24" (61cm) adapter xu@5.50 Ea 2,150.00 164.80 38.80 2,353.60
30" (76cm) adapter xu@6.60 Ea 3,840.00 197.70 46.60 4,084.30
36" (91cm) adapter xu@8.25 Ea 5,290.00 247.20 58.20 5,595.40
42" (106cm) adapter xu@9.43 Ea 6,810.00 282.50 66.60 7,159.10
48" (122cm) adapter xu@11.0 Ea 8,630.00 329.60 77.70 9,037.30

Caps (mechanical joint) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) cap xt@.810 Ea 78.90 24.92 7.49 111.31
6" (15cm) cap xt@1.00 Ea 105.00 30.77 9.25 145.02
8" (20cm) cap xt@1.15 Ea 137.00 35.39 10.60 182.99
10" (25cm) cap xu@1.83 Ea 181.00 54.83 12.90 248.73
12" (31cm) cap xu@2.00 Ea 228.00 59.92 14.10 302.02
14" (36cm) cap xu@2.20 Ea 447.00 65.91 15.50 528.41
16" (41cm) cap xu@2.44 Ea 603.00 73.10 17.20 693.30
18" (46cm) cap xu@2.75 Ea 844.00 82.39 19.40 945.79
20" (51cm) cap xu@3.14 Ea 983.00 94.07 22.20 1,099.27
24" (61cm) cap xu@3.67 Ea 1,420.00 110.00 25.90 1,555.90
30" (76cm) cap xu@4.40 Ea 2,780.00 131.80 31.10 2,942.90
36" (91cm) cap xu@5.50 Ea 3,960.00 164.80 38.80 4,163.60
42" (106cm) cap xu@6.06 Ea 5,980.00 181.60 42.80 6,204.40
48" (122cm) cap xu@7.33 Ea 7,950.00 219.60 51.70 8,221.30

Offsets (mechanical joint x plain end) for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" x 6" offset xt@1.65 Ea 418.00 50.77 15.30 484.07
4" x 12" offset xt@1.65 Ea 435.00 50.77 15.30 501.07
6" x 6" offset xt@2.06 Ea 514.00 63.39 19.10 596.49
6" x 12" offset xt@2.06 Ea 584.00 63.39 19.10 666.49
6" x 18" offset xt@2.06 Ea 670.00 63.39 19.10 752.49
8" x 6" offset xt@2.35 Ea 683.00 72.31 21.70 777.01
8" x 12" offset xt@2.35 Ea 857.00 72.31 21.70 951.01
8" x 18" offset xt@2.35 Ea 933.00 72.31 21.70 1,027.01
10" x 6" offset xt@2.75 Ea 1,150.00 84.62 25.40 1,260.02
10" x 12" offset xt@2.75 Ea 1,180.00 84.62 25.40 1,290.02
10" x 18" offset xt@2.75 Ea 1,390.00 84.62 25.40 1,500.02
12" x 6" offset xt@3.00 Ea 1,430.00 92.31 27.80 1,550.11
12" x 12" offset xt@3.00 Ea 1,610.00 92.31 27.80 1,730.11
12" x 18" offset xt@3.00 Ea 1,610.00 92.31 27.80 1,730.11
14" x 6" offset xt@3.30 Ea 1,450.00 101.50 30.50 1,582.00
14" x 12" offset xt@3.30 Ea 1,640.00 101.50 30.50 1,772.00
14" x 18" offset xt@3.30 Ea 1,770.00 101.50 30.50 1,902.00
16" x 6" offset xt@3.67 Ea 1,370.00 112.90 33.90 1,516.80
2015 Heavy Construction Estimator, All Rights Reserved Page 212 (part 2)

16" x 12" offset xt@3.67 Ea 1,800.00 112.90 33.90 1,946.80


16" x 18" offset xt@3.67 Ea 2,140.00 112.90 33.90 2,286.80
2015 Heavy Construction Estimator, All Rights Reserved Page 213

Push joint or lock joint ductile iron pipe, no fittings included


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) pipe xt@.090 LF 11.80 2.77 0.83 15.40
6" (15cm) pipe xt@.100 LF 13.20 3.08 0.93 17.21
8" (21cm) pipe xt@.120 LF 18.20 3.69 1.11 23.00
10" (25cm) pipe xu@.150 LF 24.10 4.49 1.06 29.65
12" (31cm) pipe xu@.150 LF 30.80 4.49 1.06 36.35
14" (36cm) pipe xu@.150 LF 40.20 4.49 1.06 45.75
16" (41cm) pipe xu@.170 LF 47.20 5.09 1.20 53.49
18" (46cm) pipe xu@.170 LF 54.40 5.09 1.20 60.69
20" (51cm) pipe xu@.210 LF 60.80 6.29 1.48 68.57
24" (51cm) pipe xu@.230 LF 76.50 6.89 1.62 85.01
30" (76cm) pipe xu@.270 LF 108.00 8.09 1.91 118.00
36" (91cm) pipe xu@.300 LF 142.00 8.99 2.12 153.11
42" (106cm)pipe xu@.450 LF 193.00 13.48 3.18 209.66
48" (122cm)pipe xu@.600 LF 246.00 17.98 4.24 268.22
54" (137cm)pipe xu@.680 LF 371.00 20.37 4.80 396.17
Add for small jobs (less than 80') ---@--- % 10.00 100.00 -- --

Push joint or lock joint elbows for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) elbow xt@.780 Ea 128.00 24.00 7.22 159.22
6" (15cm) elbow xt@1.10 Ea 184.00 33.85 10.20 228.05
8" (21cm) elbow xt@1.32 Ea 256.00 40.62 12.20 308.82
10" (25cm) elbow xu@2.57 Ea 386.00 77.00 18.10 481.10
12" (31cm) elbow xu@3.00 Ea 511.00 89.88 21.20 622.08
14" (35cm) elbow xu@3.60 Ea 1,120.00 107.90 25.40 1,253.30
16" (41cm) elbow xu@3.83 Ea 1,270.00 114.70 27.00 1,411.70
18" (46cm) elbow xu@4.50 Ea 2,000.00 134.80 31.80 2,166.60

Push joint or lock joint tees for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) tee xt@1.15 Ea 198.00 35.39 10.60 243.99
6" (15cm) tee xt@1.65 Ea 270.00 50.77 15.30 336.07
8" (20cm) tee xt@2.00 Ea 383.00 61.54 18.50 463.04
10" (25cm) tee xu@3.75 Ea 603.00 112.40 26.50 741.90
12" (31cm) tee xu@4.00 Ea 761.00 119.80 28.20 909.00
14" (36cm) tee xu@4.62 Ea 1,280.00 138.40 32.60 1,451.00
16" (41cm) tee xu@5.30 Ea 1,890.00 158.80 37.40 2,086.20
18" (46cm) tee xu@6.00 Ea 3,010.00 179.80 42.40 3,232.20

Push joint saddle connections for ductile iron pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) saddle connection xt@1.49 Ea 56.00 45.85 13.80 115.65
6" (15cm) saddle connection xt@1.69 Ea 73.70 52.00 15.60 141.30
8" (20cm) saddle connection xt@2.59 Ea 98.80 79.69 24.00 202.49
10"(25cm) saddle connection xu@4.00 Ea 103.00 119.80 28.20 251.00
12"(31cm) saddle connection xu@5.00 Ea 130.00 149.80 35.30 315.10
14"(36cm) saddle connection xu@5.71 Ea 162.00 171.10 40.30 373.40
16"(41cm) saddle connection xu@6.67 Ea 242.00 199.80 47.10 488.90
18"(46cm) saddle connection xu@8.57 Ea 324.00 256.80 60.50 641.30

Restrained gland AWWA mechanical joint ductile iron pipe, no fittings included
No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) restrained joint pipe xt@.366 LF 19.30 11.26 3.39 33.95
6" (15cm) restrained joint pipe xt@.366 LF 23.50 11.26 3.39 38.15
8" (20cm) restrained joint pipe xu@.546 LF 30.00 16.36 3.85 50.21
2015 Heavy Construction Estimator, All Rights Reserved Page 213 (part 2)

10" (25cm) restrained joint pipe xu@.600 LF 38.80 17.98 4.24 61.02
12" (31cm) restrained joint pipe xu@.666 LF 48.40 19.95 4.70 73.05
14" (36cm) restrained joint pipe xu@.750 LF 65.40 22.47 5.30 93.17
16" (41cm) restrained joint pipe xu@.858 LF 78.50 25.71 6.06 110.27
18" (46cm) restrained joint pipe xu@1.00 LF 90.30 29.96 7.06 127.32
20" (51cm) restrained joint pipe xu@1.20 LF 104.00 35.95 8.47 148.42
24" (61cm) restrained joint pipe xu@1.35 LF 133.00 40.45 9.53 182.98
2015 Heavy Construction Estimator, All Rights Reserved Page 214

30" (76cm) restrained joint pipe xu@1.50 LF 181.00 44.94 10.60 236.54
36" (91cm) restrained joint pipe xu@1.50 LF 250.00 44.94 10.60 305.54
42" (106cm) restrained joint pipe xu@1.75 LF 318.00 52.43 12.40 382.83
48" (122cm) restrained joint pipe xu@2.00 LF 379.00 59.92 14.10 453.02
54" (137cm) restrained joint pipe xu@2.50 LF 548.00 74.90 17.70 640.60

CSI 02-456, Welded steel pipe

Seamless welded steel pipe - 3/16" to 1/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 40-ton hydraulic crane with 84’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders.
8" (20cm), 3/16" wall pipe xv@.730 LF 23.30 30.47 14.40 68.17
8" (20cm), 1/4" wall pipe xv@.730 LF 30.70 30.47 14.40 75.57
10" (25cm), 3/16" wall pipe xv@.800 LF 29.20 33.39 15.80 78.39
10" (25cm), 1/4" wall pipe xv@.800 LF 38.60 33.39 15.80 87.79
12" (31cm), 3/16" wall pipe xv@.838 LF 38.00 34.98 16.60 89.58
12" (31cm), 1/4" wall pipe xv@.838 LF 45.20 34.98 16.60 96.78
14" (36cm), 3/16" wall pipe xv@.926 LF 84.30 38.65 18.30 141.25
14" (36cm), 1/4" wall pipe xv@.926 LF 53.60 38.65 18.30 110.55
16" (41cm), 3/16" wall pipe xv@.987 LF 50.80 41.20 19.50 111.50
16" (41cm), 1/4" wall pipe xv@.987 LF 55.30 41.20 19.50 116.00
18" (46cm), 1/4" wall pipe xv@1.10 LF 65.20 45.91 21.80 132.91
20" (51cm), 1/4" wall pipe xv@1.10 LF 72.60 45.91 21.80 140.31

Seamless welded steel pipe - 5/16" to 1/2" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 40-ton hydraulic crane with 84’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders.
12" (31cm), 5/16" wall pipe xv@.838 LF 55.60 34.98 16.60 107.18
14" (36cm), 5/16" wall pipe xv@.926 LF 67.50 38.65 18.30 124.45
16" (41cm), 5/16" wall pipe xv@.987 LF 76.30 41.20 19.50 137.00
18" (46cm), 5/16" wall pipe xv@1.10 LF 86.10 45.91 21.80 153.81
18" (46cm), 3/8" wall pipe xv@1.10 LF 91.10 45.91 21.80 158.81
20" (51cm), 5/16" wall pipe xv@1.10 LF 95.70 45.91 21.80 163.41
20" (51cm), 3/8" wall pipe xv@1.10 LF 101.00 45.91 21.80 168.71
24" (61cm), 5/16" wall pipe xv@1.26 LF 118.00 52.59 24.90 195.49
24" (61cm), 3/8" wall pipe xv@1.26 LF 134.00 52.59 24.90 211.49
24" (61cm), 7/16" wall pipe xv@1.26 LF 175.00 52.59 24.90 252.49
30" (76cm), 5/16" wall pipe xv@1.47 LF 148.00 61.36 29.10 238.46
30" (76cm), 3/8" wall pipe xv@1.47 LF 155.00 61.36 29.10 245.46
30" (76cm), 7/16" wall pipe xv@1.47 LF 219.00 61.36 29.10 309.46
36" (91cm), 5/16" wall pipe xv@1.47 LF 183.00 61.36 29.10 273.46
36" (91cm), 3/8" wall pipe xv@1.76 LF 214.00 73.46 34.80 322.26
36" (91cm), 7/16" wall pipe xv@1.76 LF 264.00 73.46 34.80 372.26
36" (91cm), 1/2" wall pipe xv@1.76 LF 251.00 73.46 34.80 359.26
42" (106cm), 7/16" wall pipe xv@1.96 LF 402.00 81.81 38.80 522.61
42" (106cm), 1/2" wall pipe xv@1.96 LF 226.00 81.81 38.80 346.61
48" (122cm), 7/16" wall pipe xv@2.20 LF 462.00 91.83 43.50 597.33
54" (137cm), 7/16" wall pipe xv@2.52 LF 480.00 105.20 49.90 635.10
48" (122cm), 1/2" wall pipe xv@2.20 LF 247.00 91.83 43.50 382.33
54" (137cm), 1/2" wall pipe xv@2.52 LF 536.00 105.20 49.90 691.10
60" (152cm), 1/2" wall pipe xv@2.94 LF 596.00 122.70 58.20 776.90
66" (168cm), 1/2" wall pipe xv@2.94 LF 396.00 122.70 58.20 576.90

Seamless welded steel pipe - 1/2" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with
210’ boom, a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two
300-amp skid mounted welders.
2015 Heavy Construction Estimator, All Rights Reserved Page 214 (part 2)

72" (183cm), 1/2" wall pipe xw@4.40 LF 407.00 183.70 103.00 693.70
78" (198cm), 1/2" wall pipe xw@4.40 LF 859.00 183.70 103.00 1,145.70

Seamless welded steel pipe - 5/8" to 3/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 40-ton hydraulic crane with 84’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders.
42" (106cm), 5/8" wall pipe xv@1.96 LF 517.00 81.81 38.80 637.61
48" (122cm), 5/8" wall pipe xv@2.20 LF 592.00 91.83 43.50 727.33
54" (137cm), 5/8" wall pipe xv@2.52 LF 667.00 105.20 49.90 822.10
2015 Heavy Construction Estimator, All Rights Reserved Page 215

60" (152cm), 5/8" wall pipe xv@2.94 LF 742.00 122.70 58.20 922.90
60" (152cm), 3/4" wall pipe xv@2.94 LF 892.00 122.70 58.20 1,072.90
66" (168cm), 5/8" wall pipe xv@2.94 LF 817.00 122.70 58.20 997.90
66" (168cm), 3/4" wall pipe xv@2.94 LF 980.00 122.70 58.20 1,160.90

Seamless welded steel pipe - 5/8" to 3/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with
210’ boom, a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two
300-amp skid mounted welders.
72" (183cm), 5/8" wall pipe xw@2.20 LF 897.00 91.83 51.60 1,040.43
72" (183cm), 3/4" wall pipe xw@2.20 LF 1,070.00 91.83 51.60 1,213.43
78" (198cm), 5/8" wall pipe xw@2.20 LF 1,080.00 91.83 51.60 1,223.43
78" (198cm), 3/4" wall pipe xw@2.20 LF 1,290.00 91.83 51.60 1,433.43
84" (213cm), 5/8" wall pipe xw@2.20 LF 1,170.00 91.83 51.60 1,313.43
84" (213cm), 3/4" wall pipe xw@2.20 LF 1,400.00 91.83 51.60 1,543.43
90" (229cm), 5/8" wall pipe xw@2.20 LF 1,210.00 91.83 51.60 1,353.43
90" (229cm), 3/4" wall pipe xw@2.40 LF 1,490.00 100.20 56.30 1,646.50
96" (244cm), 5/8" wall pipe xw@2.20 LF 1,210.00 91.83 51.60 1,353.43
96" (244cm), 3/4" wall pipe xw@2.40 LF 1,590.00 100.20 56.30 1,746.50

Seamless welded steel pipe - 3/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
100 PSI air compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with
210’ boom, a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid
mounted welders, a 3/4-ton pickup truck.
102" (259cm), 3/4" wall pipe xx@4.80 LF 1,690.00 200.70 105.00 1,995.70
108" (274cm), 3/4" wall pipe xx@4.80 LF 1,790.00 200.70 105.00 2,095.70
114" (290cm), 3/4" wall pipe xx@4.80 LF 1,890.00 200.70 105.00 2,195.70
120" (305cm), 3/4" wall pipe xx@8.80 LF 1,990.00 368.00 192.00 2,550.00
126" (320cm), 3/4" wall pipe xx@8.80 LF 2,090.00 368.00 192.00 2,650.00

Seamless welded steel pipe - 7/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders, and small tools.
72" (183cm), 7/8" wall pipe xw@4.40 LF 891.00 183.70 103.00 1,177.70
78" (198cm), 7/8" wall pipe xw@4.40 LF 967.00 183.70 103.00 1,253.70
84" (213cm), 7/8" wall pipe xw@4.40 LF 1,630.00 183.70 103.00 1,916.70

Seamless welded steel pipe - 7/8" to 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
84" (213cm), 1" wall pipe xx@4.80 LF 1,860.00 200.70 105.00 2,165.70
90" (229cm), 7/8" wall pipe xx@4.80 LF 1,750.00 200.70 105.00 2,055.70
90" (229cm), 1" wall pipe xx@4.80 LF 1,990.00 200.70 105.00 2,295.70
96" (244cm), 7/8" wall pipe xx@4.80 LF 1,860.00 200.70 105.00 2,165.70

Seamless welded steel pipe - 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000 lb. 6x4 3-axle truck
with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, four 300-amp skid mounted welders and three
sets of small tools.
96" (244cm), 1" wall pipe xy@5.20 LF 2,130.00 217.80 105.00 2,452.80
2015 Heavy Construction Estimator, All Rights Reserved Page 215 (part 2)

Seamless welded steel pipe - 7/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
102" (259cm), 7/8" wall pipe xy@4.80 LF 1,980.00 201.00 97.30 2,278.30

Seamless welded steel pipe - 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000 lb. 6x4 3-axle truck
with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, four 300-amp skid mounted welders and three
sets of small tools.
102" (259cm), 1" wall pipe xy@5.20 LF 2,260.00 217.80 105.00 2,582.80

Seamless welded steel pipe - 7/8" to 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a 3/4-ton
pickup truck.
102" (259cm), 1-1/8" wall pipe xx@9.60 LF 2,540.00 401.50 209.00 3,150.50
108" (274cm), 7/8" wall pipe xx@5.20 LF 2,100.00 217.50 113.00 2,430.50

Seamless welded steel pipe - 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000 lb. 6x4 3-axle truck
with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, four 300-amp skid mounted welders and three
sets of small tools.
108" (274cm), 1" wall pipe xy@5.20 LF 2,390.00 217.80 105.00 2,712.80
2015 Heavy Construction Estimator, All Rights Reserved Page 216

Seamless welded steel pipe - 7/8" to 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
108" (274cm), 1-1/8" wall pipe xx@9.60 LF 2,690.00 401.50 209.00 3,300.50
114" (290cm), 7/8" wall pipe xx@4.80 LF 2,220.00 200.70 105.00 2,525.70

Seamless welded steel pipe - 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000 lb. 6x4 3-axle truck
with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, four 300-amp skid mounted welders and three
sets of small tools.
114" (290cm), 1" wall pipe xy@5.20 LF 2,530.00 217.80 105.00 2,852.80

Seamless welded steel pipe - 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
114" (290cm), 1-1/8" wall pipe xx@9.60 LF 2,840.00 401.50 209.00 3,450.50

Seamless welded steel pipe - 7/8" to 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM,
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders, and small tools.
120" (305cm), 7/8" wall pipe xw@8.80 LF 2,330.00 367.30 207.00 2,904.30
120" (305cm), 1" wall pipe xw@8.80 LF 2,660.00 367.30 207.00 3,234.30

Seamless welded steel pipe - 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
120" (305cm), 1-1/8" wall pipe xx@9.60 LF 2,990.00 401.50 209.00 3,600.50

Seamless welded steel pipe - 7/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders, and small tools.
126" (320cm), 7/8" wall pipe xw@8.80 LF 2,450.00 367.30 207.00 3,024.30

Seamless welded steel pipe - 1" to 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
126" (320cm), 1" wall pipe xx@9.60 LF 2,800.00 401.50 209.00 3,410.50
126" (320cm), 1-1/8" wall pipe xx@9.60 LF 3,140.00 401.50 209.00 3,750.50

Seamless welded steel pipe - 7/8" to 1-1/8" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders, and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 216 (part 2)

132" (335cm), 7/8" wall pipe xw@9.60 LF 2,570.00 400.70 225.00 3,195.70
132" (335cm), 1" wall pipe xw@9.60 LF 2,930.00 400.70 225.00 3,555.70

Seamless welded steel pipe - 7/8" to 1-1/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
132" (335cm), 1-1/8" wall pipe xx@9.60 LF 3,290.00 401.50 209.00 3,900.50
132" (335cm), 1-1/4" wall pipe xx@14.4 LF 3,660.00 602.20 314.00 4,576.20
138" (351cm), 7/8" wall pipe xw@9.60 LF 2,690.00 400.70 225.00 3,315.70
138" (351cm), 1" wall pipe xw@9.60 LF 3,070.00 400.70 225.00 3,695.70

Seamless welded steel pipe - 1-1/8" to 1-1/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
138" (351cm), 1-1/8" wall pipe xx@14.4 LF 3,450.00 602.20 314.00 4,366.20
138" (351cm), 1-1/4" wall pipe xx@19.2 LF 3,830.00 802.90 419.00 5,051.90

Seamless welded steel pipe - 7/8" to 1" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" air hose, a 100-ton crawler mounted mechanical crane with 210’ boom, a 50,000
lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, a 3/4-ton pickup truck, two 300-amp skid
mounted welders, and small tools.
144" (366cm), 7/8" wall pipe xw@14.4 LF 2,800.00 601.10 338.00 3,739.10
144" (366cm), 1" wall pipe xw@14.4 LF 3,200.00 601.10 338.00 4,139.10

Seamless welded steel pipe - 1-1/8" to 1-1/4" wall thickness


Uncoated, plain end, installed in open trench. Add the cost of X-ray testing of welds, using a 450 CFM
compressor, 100’ of 2" hardrock air hose, a 100-ton crawler mounted mechanical crane with 210’ boom,
a 50,000 lb. 6x4 3-axle truck with a 75-ton 3-axle lowboy trailer, three 300-amp skid mounted welders, a
3/4-ton pickup truck.
144" (366cm), 1-1/8" wall pipe xx@19.2 LF 3,600.00 802.90 419.00 4,821.90
144" (366cm), 1-1/4" wall pipe xx@21.2 LF 3,990.00 886.60 462.00 5,338.60
2015 Heavy Construction Estimator, All Rights Reserved Page 217

Dresser couplings
Using a 20-ton hydraulic crane with 70’ boom and two sets of small tools.
2" (5cm) Dresser coupling xu@.500 Ea 99.80 14.98 3.53 118.31
3" (8cm) Dresser coupling xu@.800 Ea 104.00 23.97 5.65 133.62
4" (10cm) Dresser coupling xu@1.00 Ea 138.00 29.96 7.06 175.02
6" (15cm) Dresser coupling xu@1.56 Ea 241.00 46.74 11.00 298.74
8" (20cm) Dresser coupling xu@2.00 Ea 335.00 59.92 14.10 409.02
10" (25cm) Dresser coupling xu@2.50 Ea 521.00 74.90 17.70 613.60
12" (31cm) Dresser coupling xu@3.00 Ea 588.00 89.88 21.20 699.08
14" (36cm) Dresser coupling xu@3.50 Ea 640.00 104.90 24.70 769.60
16" (41cm) Dresser coupling xu@4.00 Ea 666.00 119.80 28.20 814.00
18" (46cm) Dresser coupling xu@4.50 Ea 746.00 134.80 31.80 912.60
20" (51cm) Dresser coupling xu@5.00 Ea 816.00 149.80 35.30 1,001.10
24" (61cm) Dresser coupling xu@6.00 Ea 1,160.00 179.80 42.40 1,382.20
30" (76cm) Dresser coupling xu@6.00 Ea 1,490.00 179.80 42.40 1,712.20
36" (91cm) Dresser coupling xu@7.00 Ea 1,790.00 209.70 49.40 2,049.10
42" (106cm) Dresser coupling xu@7.50 Ea 2,110.00 224.70 53.00 2,387.70
48" (122cm) Dresser coupling xu@8.00 Ea 2,450.00 239.70 56.50 2,746.20
54" (137cm) Dresser coupling xu@10.0 Ea 2,670.00 299.60 70.60 3,040.20
60" (152cm) Dresser coupling xu@12.0 Ea 2,920.00 359.50 84.70 3,364.20
66" (167cm) Dresser coupling xu@14.0 Ea 3,270.00 419.40 98.80 3,788.20
72" (183cm) Dresser coupling xu@15.0 Ea 3,870.00 449.40 106.00 4,425.40

Coal tar epoxy coating for pipe


Includes Kraft paper wrap. Listed by outside pipe diameter.
12" (31cm) wrap --@.000 LF 3.32 -- -- 3.32
14" (36cm) wrap --@.000 LF 4.42 -- -- 4.42
16" (41cm) wrap --@.000 LF 5.02 -- -- 5.02
18" (46cm) wrap --@.000 LF 5.28 -- -- 5.28
20" (51cm) wrap --@.000 LF 5.70 -- -- 5.70
24" (61cm) wrap --@.000 LF 6.62 -- -- 6.62
30" (76cm) wrap --@.000 LF 8.70 -- -- 8.70
36" (91cm) wrap --@.000 LF 13.80 -- -- 13.80
42" (106cm) wrap --@.000 LF 29.60 -- -- 29.60
48" (122cm) wrap --@.000 LF 33.90 -- -- 33.90
54" (137cm) wrap --@.000 LF 38.10 -- -- 38.10
60" (152cm) wrap --@.000 LF 42.40 -- -- 42.40
66" (167cm) wrap --@.000 LF 46.60 -- -- 46.60
72" (183cm) wrap --@.000 LF 50.80 -- -- 50.80
78" (108cm) wrap --@.000 LF 55.10 -- -- 55.10
84" (213cm) wrap --@.000 LF 59.30 -- -- 59.30
90" (228cm) wrap --@.000 LF 63.50 -- -- 63.50
96" (244cm) wrap --@.000 LF 67.80 -- -- 67.80
102" (259cm) wrap --@.000 LF 72.00 -- -- 72.00
108" (274cm) wrap --@.000 LF 76.30 -- -- 76.30
114" (290cm) wrap --@.000 LF 80.40 -- -- 80.40
120" (305cm) wrap --@.000 LF 84.70 -- -- 84.70
126" (320cm) wrap --@.000 LF 89.00 -- -- 89.00
132" (335cm) wrap --@.000 LF 93.00 -- -- 93.00
138" (351cm) wrap --@.000 LF 97.30 -- -- 97.30
144" (366cm) wrap --@.000 LF 102.00 -- -- 102.00

Cement coating (1" to 2") for pipe


Includes fiberglass or wire mesh reinforcing. Listed by outside pipe diameter.
12" (31cm) coating --@.000 LF 12.60 -- -- 12.60
14" (36cm) coating --@.000 LF 14.70 -- -- 14.70
16" (41cm) coating --@.000 LF 16.70 -- -- 16.70
18" (46cm) coating --@.000 LF 18.90 -- -- 18.90
2015 Heavy Construction Estimator, All Rights Reserved Page 217 (part 2)

20" (51cm) coating --@.000 LF 21.00 -- -- 21.00


24" (61cm) coating --@.000 LF 25.20 -- -- 25.20
30" (76cm) coating --@.000 LF 31.50 -- -- 31.50
36" (91cm) coating --@.000 LF 37.80 -- -- 37.80
2015 Heavy Construction Estimator, All Rights Reserved Page 218

42" (106cm) coating --@.000 LF 44.10 -- -- 44.10


48" (122cm) coating --@.000 LF 50.40 -- -- 50.40
54" (137cm) coating --@.000 LF 56.60 -- -- 56.60
60" (152cm) coating --@.000 LF 62.90 -- -- 62.90
66" (167cm) coating --@.000 LF 69.20 -- -- 69.20
72" (183cm) coating --@.000 LF 75.50 -- -- 75.50
78" (198cm) coating --@.000 LF 81.80 -- -- 81.80
84" (213cm) coating --@.000 LF 88.10 -- -- 88.10
90" (228cm) coating --@.000 LF 94.40 -- -- 94.40
96" (244cm) coating --@.000 LF 101.00 -- -- 101.00
102" (259cm) coating --@.000 LF 107.00 -- -- 107.00
108" (274cm) coating --@.000 LF 113.00 -- -- 113.00
114" (290cm) coating --@.000 LF 120.00 -- -- 120.00
120" (305cm) coating --@.000 LF 126.00 -- -- 126.00
126" (320cm) coating --@.000 LF 132.00 -- -- 132.00
132" (335cm) coating --@.000 LF 138.00 -- -- 138.00
138" (351cm) coating --@.000 LF 145.00 -- -- 145.00
144" (366cm) coating --@.000 LF 151.00 -- -- 151.00

CSI 02-457, Steel pipe

Steel AWWA standard weight water distribution pipe, cement lined, 20' lengths
Installed in an open trench. Includes coal tar enamel coating. Thickness based on 2% deflection with 10'
cover. No excavation or backfill included. Dresser coupling joints, using a 20-ton hydraulic crane with
70’ boom and two sets of small tools.
8" (21cm), 3/16" wall xu@.400 LF 38.40 11.98 2.82 53.20
10" (25cm), 3/16" wall xu@.440 LF 47.90 13.18 3.11 64.19
12" (31cm), 1/4" wall xu@.480 LF 75.40 14.38 3.39 93.17
14" (36cm), 1/4" wall xu@.600 LF 82.90 17.98 4.24 105.12
16" (41cm), 1/4" wall xu@.680 LF 94.90 20.37 4.80 120.07
18" (46cm), 5/16" wall xu@.800 LF 133.00 23.97 5.65 162.62
24" (61cm), 3/8" wall tq@1.05 LF 214.00 37.12 8.76 259.88
30" (76cm), 3/8" wall tq@1.10 LF 268.00 38.89 9.17 316.06
36" (91cm), 3/8" wall tq@1.10 LF 322.00 38.89 9.17 370.06
42" (106cm), 1/2" wall tq@1.15 LF 500.00 40.65 9.59 550.24
48" (122cm), 1/2" wall tq@1.15 LF 573.00 40.65 9.59 623.24
Deduct for 40' lengths ---@--- % -- -10.00 -- --

CSI 02-458, Corrugated metal pipe

Corrugated galvanized steel or aluminum pipe


Bituminous coated with paved invert, split band couplings, 20' to 30' length, no excavation or backfill
included, using a 1.38 CY wheeled loader-backhoe and small tools.
8" (21cm) 16 gauge pipe ex@.102 LF 13.00 3.61 0.39 17.00
10" (25CM) 16 gauge pipe ex@.102 LF 13.60 3.61 0.39 17.60
12" (31cm) 16 gauge pipe ex@.120 LF 14.10 4.24 0.46 18.80
15" (38cm) 16 gauge pipe ex@.120 LF 17.50 4.24 0.46 22.20
18" (46cm) 16 gauge pipe ex@.152 LF 20.90 5.37 0.58 26.85
24" (61cm) 14 gauge pipe ex@.196 LF 32.70 6.93 0.75 40.38
30" (76cm) 14 gauge pipe ex@.196 LF 40.40 6.93 0.75 48.08
Add for rod clamp couplings ---@--- % -- 20.00 -- --

Corrugated galvanized steel or aluminum pipe


Bituminous coated with paved invert, split band couplings, 20' to 30' length, no excavation or backfill
included, using a 20-ton hydraulic crane with 70’ boom and small tools.
36" (91cm) 14 gauge pipe tq@.231 LF 48.90 8.17 1.93 59.00
42" (106cm) 14 gauge pipe tq@.231 LF 57.00 8.17 1.93 67.10
48" (122cm) 14 gauge pipe tq@.272 LF 64.70 9.62 2.27 76.59
54" (137cm) 12 gauge pipe tq@.311 LF 75.90 10.99 2.59 89.48
2015 Heavy Construction Estimator, All Rights Reserved Page 218 (part 2)

60" (152cm) 12 gauge pipe tq@.311 LF 110.00 10.99 2.59 123.58


66" (167cm) 10 gauge pipe tq@.325 LF 120.00 11.49 2.71 134.20
72" (183cm) 8 gauge pipe tq@.463 LF 95.30 16.37 3.86 115.53
78" (198cm) 8 gauge pipe tq@.480 LF 102.00 16.97 4.00 122.97
Add for rod clamp couplings ---@--- % -- 20.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 219

Uncoated corrugated galvanized steel or aluminum pipe


Split band couplings, 20' to 30' length, no excavation or backfill included, using a 1.38 CY wheeled
loader-backhoe and small tools.
8" (21cm) 16 gauge pipe ex@.102 LF 10.80 3.61 0.39 14.80
10" (25cm) 16 gauge pipe ex@.102 LF 11.30 3.61 0.39 15.30
12" (31cm) 16 gauge pipe ex@.120 LF 11.80 4.24 0.46 16.50
15" (38cm) 16 gauge pipe ex@.120 LF 14.50 4.24 0.46 19.20
18" (41cm) 16 gauge pipe ex@.152 LF 17.40 5.37 0.58 23.35
24" (61cm) 14 gauge pipe ex@.200 LF 27.20 7.07 0.76 35.03
30" (76cm) 14 gauge pipe ex@.196 LF 33.70 6.93 0.75 41.38
Add for rod clamp couplings ---@--- % -- 20.00 -- --

Uncoated corrugated galvanized steel or aluminum pipe


Split band couplings, 20' to 30' length, no excavation or backfill included, using a 20-ton hydraulic crane
with 70’ boom and small tools.
36" (91cm) 14 gauge pipe tq@.231 LF 40.80 8.17 1.93 50.90
42" (106cm) 14 gauge pipe tq@.231 LF 47.50 8.17 1.93 57.60
48" (122cm) 14 gauge pipe tq@.272 LF 53.90 9.62 2.27 65.79
54" (137cm) 12 gauge pipe tq@.300 LF 83.30 10.61 2.50 96.41
60" (152cm) 12 gauge pipe tq@.311 LF 92.00 10.99 2.59 105.58
66" (167cm) 10 gauge pipe tq@.325 LF 100.00 11.49 2.71 114.20
72" (183cm) 8 gauge pipe tq@.463 LF 113.00 16.37 3.86 133.23
78" (198cm) 8 gauge pipe tq@.480 LF 85.00 16.97 4.00 105.97
Add for rod clamp couplings ---@--- % -- 20.00 -- --

Corrugated 90 degree bends, galvanized, bituminous coated with paved invert


Split band couplings, 20' to 30' length, no excavation or backfill included, using a 1.38 CY wheeled
loader-backhoe and small tools.
12" (31cm) 16 gauge 90 degree bend ex@1.60 Ea 65.00 56.56 6.11 127.67
15" (38cm) 16 gauge 90 degree bend ex@1.92 Ea 105.00 67.87 7.33 180.20
18" (46cm) 16 gauge 90 degree bend ex@2.40 Ea 125.00 84.84 9.17 219.01
24" (61cm) 14 gauge 90 degree bend ex@3.00 Ea 185.00 106.10 11.50 302.60
30" (76cm) 14 gauge 90 degree bend ex@3.80 Ea 268.00 134.30 14.50 416.80
Add for rod clamp couplings ---@--- % -- 20.00 -- --

Corrugated 90 degree bends, galvanized, bituminous coated with paved invert


Split band couplings, 20' to 30' length, no excavation or backfill included, using a 20-ton hydraulic crane
with 70’ boom and small tools.
36" (91cm) 12 gauge 90 degree bend tq@4.40 Ea 530.00 155.50 36.70 722.20
42" (106cm) 12 gauge 90 degree bend tq@4.80 Ea 687.00 169.70 40.00 896.70
48" (122cm) 12 gauge 90 degree bend tq@5.60 Ea 780.00 198.00 46.70 1,024.70
54" (137cm) 12 gauge 90 degree bend tq@5.80 Ea 1,080.00 205.00 48.40 1,333.40
60" (152cm) 10 gauge 90 degree bend tq@6.00 Ea 1,330.00 212.10 50.00 1,592.10
66" (167cm) 10 gauge 90 degree bend tq@7.70 Ea 1,470.00 272.20 64.20 1,806.40
72" (183cm) 8 gauge 90 degree bend tq@7.70 Ea 1,830.00 272.20 64.20 2,166.40
78" (198cm) 8 gauge 90 degree bend tq@9.60 Ea 2,080.00 339.40 80.10 2,499.50

Corrugated tees, galvanized, bituminous coated with paved invert


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) 16 gauge tee ex@1.60 Ea 147.00 56.56 6.11 209.67
15" (38cm) 16 gauge tee ex@1.92 Ea 176.00 67.87 7.33 251.20
18" (46cm) 16 gauge tee ex@2.40 Ea 227.00 84.84 9.17 321.01
24" (61cm) 14 gauge tee ex@3.00 Ea 323.00 106.10 11.50 440.60
30" (76cm) 14 gauge tee ex@3.80 Ea 445.00 134.30 14.50 593.80

Corrugated tees, galvanized, bituminous coated with paved invert


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 219 (part 2)

36" (91cm) 12 gauge tee tq@4.16 Ea 545.00 147.10 34.70 726.80


42" (106cm) 12 gauge tee tq@4.62 Ea 709.00 163.30 38.50 910.80
48" (122cm) 12 gauge tee tq@5.20 Ea 924.00 183.80 43.40 1,151.20
54" (137cm) 12 gauge tee tq@5.90 Ea 1,110.00 208.60 49.20 1,367.80
60" (152cm) 10 gauge tee tq@5.90 Ea 1,370.00 208.60 49.20 1,627.80
66" (167cm) 10 gauge tee tq@8.30 Ea 1,560.00 293.40 69.20 1,922.60
72" (183cm) 8 gauge tee tq@8.30 Ea 1,870.00 293.40 69.20 2,232.60
78" (198cm) 8 gauge tee tq@10.4 Ea 2,250.00 367.60 86.70 2,704.30

Corrugated 90 degree bends, galvanized, uncoated


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) 16 gauge 90 degree bend ex@1.60 Ea 101.00 56.56 6.11 163.67
15" (38cm) 16 gauge 90 degree bend ex@1.92 Ea 156.00 67.87 7.33 231.20
2015 Heavy Construction Estimator, All Rights Reserved Page 220

18" (46cm) 16 gauge 90 degree bend ex@2.40 Ea 186.00 84.84 9.17 280.01
24" (61cm) 14 gauge 90 degree bend ex@3.00 Ea 277.00 106.10 11.50 394.60
30" (76cm) 14 gauge 90 degree bend ex@3.80 Ea 398.00 134.30 14.50 546.80

Corrugated 90 degree bends, galvanized, uncoated


Using a 20-ton hydraulic crane with 70’ boom and small tools.
36" (91cm) 12 gauge 90 degree bend tq@4.16 Ea 480.00 147.10 34.70 661.80
42" (106cm) 12 gauge 90 degree bend tq@4.62 Ea 632.00 163.30 38.50 833.80
48" (122cm) 12 gauge 90 degree bend tq@5.20 Ea 717.00 183.80 43.40 944.20
54" (137cm) 12 gauge 90 degree bend tq@5.90 Ea 993.00 208.60 49.20 1,250.80
60" (152cm) 10 gauge 90 degree bend tq@5.90 Ea 1,240.00 208.60 49.20 1,497.80
66" (167cm) 10 gauge 90 degree bend tq@8.30 Ea 1,370.00 293.40 69.20 1,732.60
72" (183cm) 8 gauge 90 degree bend tq@8.30 Ea 1,690.00 293.40 69.20 2,052.60
78" (198cm) 8 gauge 90 degree bend tq@10.4 Ea 1,920.00 367.60 86.70 2,374.30

Corrugated tees, galvanized, uncoated


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) 16 gauge tee ex@2.13 Ea 138.00 75.30 8.14 221.44
15" (38cm) 16 gauge tee ex@2.55 Ea 165.00 90.14 9.74 264.88
18" (46cm) 16 gauge tee ex@3.20 Ea 210.00 113.10 12.20 335.30
24" (61cm) 14 gauge tee ex@4.00 Ea 300.00 141.40 15.30 456.70
30" (76cm) 14 gauge tee ex@5.33 Ea 412.00 188.40 20.40 620.80

Corrugated tees, galvanized, uncoated


Using a 20-ton hydraulic crane with 70’ boom and small tools.
36" (91cm) 12 gauge tee tq@5.70 Ea 506.00 201.50 47.50 755.00
42" (106cm) 12 gauge tee tq@6.04 Ea 666.00 213.50 50.40 929.90
48" (122cm) 12 gauge tee tq@6.50 Ea 812.00 229.80 54.20 1,096.00
54" (137cm) 12 gauge tee tq@6.85 Ea 1,040.00 242.10 57.10 1,339.20
60" (152cm) 10 gauge tee tq@6.85 Ea 1,290.00 242.10 57.10 1,589.20
66" (167cm) 10 gauge tee tq@9.60 Ea 1,470.00 339.40 80.10 1,889.50
72" (183cm) 8 gauge tee tq@9.60 Ea 1,750.00 339.40 80.10 2,169.50
78" (198cm) 8 gauge tee tq@12.0 Ea 2,100.00 424.20 100.00 2,624.20

Corrugated metal pipe end sections


Using a 1.38 CY wheeled loader-backhoe and small tools.
12" (31cm) end section ex@1.37 Ea 104.00 48.43 5.23 157.66
15" (38cm) end section ex@1.37 Ea 132.00 48.43 5.23 185.66
18" (46cm) end section ex@1.60 Ea 166.00 56.56 6.11 228.67
21" (53cm) end section ex@1.60 Ea 202.00 56.56 6.11 264.67
24" (61cm) end section ex@1.92 Ea 285.00 67.87 7.33 360.20
30" (76cm) end section ex@1.92 Ea 412.00 67.87 7.33 487.20
36" (91cm) end section ex@2.40 Ea 628.00 84.84 9.17 722.01
42" (106cm) end section ex@2.40 Ea 709.00 84.84 9.17 803.01
48" (122cm) end section ex@3.20 Ea 827.00 113.10 12.20 952.30
54" (137cm) end section ex@4.80 Ea 1,340.00 169.70 18.30 1,528.00
60" (152cm) end section ex@4.80 Ea 1,680.00 169.70 18.30 1,868.00
66" (167cm) end section ex@5.40 Ea 2,630.00 190.90 20.60 2,841.50
72" (183cm) end section ex@5.70 Ea 3,070.00 201.50 21.80 3,293.30

Galvanized split band couplings for corrugated metal pipe


12" (31cm) coupling --@.000 Ea 8.85 -- -- 8.85
15" (38cm) coupling --@.000 Ea 10.30 -- -- 10.30
18" (46cm) coupling --@.000 Ea 11.90 -- -- 11.90
24" (61cm) coupling --@.000 Ea 15.30 -- -- 15.30
30" (76cm) coupling --@.000 Ea 20.00 -- -- 20.00
36" (91cm) coupling --@.000 Ea 24.70 -- -- 24.70
42" (106cm) coupling --@.000 Ea 28.40 -- -- 28.40
2015 Heavy Construction Estimator, All Rights Reserved Page 220 (part 2)

48" (122cm) coupling --@.000 Ea 31.90 -- -- 31.90


54" (137cm) coupling --@.000 Ea 41.90 -- -- 41.90
60" (152cm) coupling --@.000 Ea 50.30 -- -- 50.30
66" (167cm) coupling --@.000 Ea 58.70 -- -- 58.70
72" (183cm) coupling --@.000 Ea 63.70 -- -- 63.70
78" (198cm) coupling --@.000 Ea 70.40 -- -- 70.40
2015 Heavy Construction Estimator, All Rights Reserved Page 221

Steel or aluminum oval arch culverts, bituminous coated with paved invert
No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
18"x 11" 16 gauge arch culvert ex@.133 LF 23.60 4.70 0.51 28.81
22"x 13" 16 gauge arch culvert ex@.167 LF 28.50 5.90 0.64 35.04
29"x 18" 14 gauge arch culvert ex@.222 LF 44.30 7.85 0.85 53.00
36"x 22" 14 gauge arch culvert ex@.228 LF 55.10 8.06 0.87 64.03

Steel or aluminum oval arch culverts, bituminous coated with paved invert
No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
43"x 27" 12 gauge arch culvert tq@.284 LF 66.70 10.04 2.37 79.11
50"x 31" 12 gauge arch culvert tq@.300 LF 77.90 10.61 2.50 91.01
58"x 36" 12 gauge arch culvert tq@.300 LF 90.30 10.61 2.50 103.41

Steel or aluminum oval arch culverts, uncoated


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
18"x 11" 16 gauge arch culvert ex@.133 LF 20.50 4.70 0.51 25.71
22"x 13" 16 gauge arch culvert ex@.167 LF 24.80 5.90 0.64 31.34
29"x 18" 14 gauge arch culvert ex@.222 LF 38.50 7.85 0.85 47.20
36"x 22" 14 gauge arch culvert ex@.228 LF 47.90 8.06 0.87 56.83

Steel or aluminum oval arch culverts, uncoated


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
43"x 27" 12 gauge arch culvert tq@.284 LF 58.00 10.04 2.37 70.41
50"x 31" 12 gauge arch culvert tq@.300 LF 67.80 10.61 2.50 80.91
58"x 36" 12 gauge arch culvert tq@.300 LF 78.50 10.61 2.50 91.61

Nestable corrugated metal pipe


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and two sets of small
tools.
8" (21cm) 16 gauge pipe xu@.075 LF 8.91 2.25 0.53 11.69
10" (25cm) 16 gauge pipe xu@.078 LF 10.70 2.34 0.55 13.59
12" (31cm) 16 gauge pipe xu@.090 LF 14.30 2.70 0.64 17.64
15" (38cm) 16 gauge pipe xu@.092 LF 17.80 2.76 0.65 21.21
18" (46cm) 16 gauge pipe xu@.094 LF 21.30 2.82 0.66 24.78
24" (61cm) 16 gauge pipe xu@.100 LF 27.80 3.00 0.71 31.51
30" (76cm) 16 gauge pipe xu@.110 LF 33.90 3.30 0.78 37.98
36" (91cm) 14 gauge pipe tq@.130 LF 40.60 4.60 1.08 46.28
41" (106cm) 14 gauge pipe tq@.150 LF 47.80 5.30 1.25 54.35
48" (122cm) 14 gauge pipe tq@.170 LF 54.90 6.01 1.42 62.33
Add for pipe assembly ---@--- % -- 10.50 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 222

CSI 02-459, Corrugated polyethylene pipe

Corrugated polyethylene pipe


Using a 1.5 CY hydraulic tractor excavator and small tools.
4" (10cm) pipe fb@.025 LF 0.68 0.94 0.45 2.07
6" (15cm) pipe fb@.030 LF 2.03 1.12 0.54 3.69
8" (20cm) pipe fb@.035 LF 3.16 1.31 0.63 5.10
10" (25cm) pipe fb@.038 LF 6.95 1.42 0.69 9.06
12" (31cm) pipe fb@.053 LF 9.89 1.98 0.96 12.83
15" (38cm) pipe fb@.080 LF 14.40 2.99 1.45 18.84
18" (46cm) pipe fb@.111 LF 20.00 4.16 2.01 26.17
24" (61cm) pipe fb@.200 LF 29.80 7.49 3.63 40.92

Polyethylene pipe couplers


4" (10cm) coupler --@.000 Ea 1.96 -- -- 1.96
6" (15cm) coupler --@.000 Ea 3.11 -- -- 3.11
8" (20cm) coupler --@.000 Ea 8.43 -- -- 8.43
10" (25cm) coupler --@.000 Ea 8.14 -- -- 8.14
12" (31cm) coupler --@.000 Ea 12.70 -- -- 12.70
15" (38cm) coupler --@.000 Ea 17.90 -- -- 17.90
18" (46cm) coupler --@.000 Ea 26.00 -- -- 26.00
24" (61cm) coupler --@.000 Ea 32.00 -- -- 32.00

CSI 02-463, Extra strength vitrified clay pipe

Extra strength vitrified clay pipe


No excavation or backfill included. Standard lengths. See SCI 02-560 for vitrified clay drain pipe, using a
20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) pipe xt@.170 LF 6.01 5.23 1.57 12.81
6" (15cm) pipe xt@.180 LF 12.50 5.54 1.67 19.71
8" (21cm) pipe xt@.185 LF 17.40 5.69 1.71 24.80
10" (25cm) pipe xu@.205 LF 28.50 6.14 1.45 36.09
12" (31cm) pipe xu@.225 LF 38.30 6.74 1.59 46.63
15" (38cm) pipe xu@.233 LF 38.60 6.98 1.64 47.22
18" (46cm) pipe xu@.260 LF 52.20 7.79 1.84 61.83
24" (61cm) pipe xu@.330 LF 94.80 9.89 2.33 107.02
30" (76cm) pipe xu@.360 LF 132.00 10.79 2.54 145.33
36" (91cm) pipe xu@.400 LF 218.00 11.98 2.82 232.80
Add for 3 foot (.92m) lengths ---@--- % 30.00 -- -- --
Add for 2 foot (.61m) lengths ---@--- % 40.00 -- -- --
Add for short runs, 60' or less ---@--- % -- 30.00 -- --

CSI 02-464, ABS plastic drainage pipe, truss type

ABS plastic drainage pipe, truss type


No excavation or backfill included, 12' 6" lengths, using a 20-ton hydraulic crane with 70’ boom and
small tools.
4" (10cm) pipe xt@.070 LF 3.66 2.15 0.65 6.46
6" (15cm) pipe xt@.083 LF 8.18 2.55 0.77 11.50
8" (21cm) pipe xt@.117 LF 8.55 3.60 1.08 13.23
10" (25cm) pipe xu@.133 LF 11.80 3.99 0.94 16.73
12" (31cm) pipe xu@.180 LF 16.60 5.39 1.27 23.26
15" (38cm) pipe xu@.290 LF 25.30 8.69 2.05 36.04
2015 Heavy Construction Estimator, All Rights Reserved Page 223

PVC class 200, SDR 21 pressure pipe


No excavation or backfill included, using small tools.
3/4"(19mm) pipe w3@.024 LF 0.48 0.78 0.02 1.28
1" (2.5cm) pipe w3@.026 LF 0.57 0.84 0.03 1.44
1-1/4" (3.1cm) pipe w3@.026 LF 0.85 0.84 0.03 1.72
1-1/2" (36mm) pipe w3@.027 LF 1.05 0.88 0.03 1.96
2" (51mm) pipe w3@.033 LF 1.42 1.07 0.03 2.52
2-1/2" (63mm) pipe w3@.035 LF 2.13 1.13 0.03 3.29
3" (75mm) pipe w4@.040 LF 3.10 1.14 0.03 4.27
4" (10cm) pipe w4@.045 LF 5.14 1.29 0.03 6.46
6" (15cm) pipe w4@.052 LF 11.10 1.49 0.03 12.62
8" (20cm) pipe w5@.068 LF 13.30 2.26 0.21 15.77

90 degree elbows for class 200, SDR 21 PVC pipe


Using small tools.
3/4" (1.9cm) elbow w3@.232 Ea 2.84 7.51 0.23 10.58
1" (2.5cm) elbow w3@.232 Ea 3.16 7.51 0.23 10.90
1-1/4" (3.1cm) elbow w3@.316 Ea 3.58 10.24 0.31 14.13
1-1/2" (3.6cm) elbow w3@.369 Ea 3.99 11.95 0.36 16.30
2" (5.1cm) elbow w3@.469 Ea 6.29 15.19 0.45 21.93
2-1/2" (6.3cm) elbow w3@.694 Ea 19.20 22.48 0.67 42.35
3" (7.5cm) elbow w4@1.34 Ea 22.90 38.27 0.88 62.05
4" (10cm) elbow w4@1.59 Ea 38.60 45.41 1.05 85.06
6" (15cm) elbow w4@1.81 Ea 130.00 51.69 1.19 182.88
8" (20cm) elbow w4@1.81 Ea 149.00 51.69 1.19 201.88

45 degree elbows for class 200, SDR 21 PVC pipe


Using small tools.
3/4" (1.9cm) elbow w3@.232 Ea 2.69 7.51 0.23 10.43
1" (2.5cm) elbow w3@.232 Ea 3.00 7.51 0.23 10.74
1-1/4" (3.1cm) elbow w3@.316 Ea 3.40 10.24 0.31 13.95
1-1/2" (3.6cm) elbow w3@.369 Ea 3.79 11.95 0.36 16.10
2" (5.1cm) elbow w3@.469 Ea 5.98 15.19 0.45 21.62
2-1/2" (6.3cm) elbow w3@.694 Ea 18.20 22.48 0.67 41.35
3" (7.5cm) elbow w4@1.34 Ea 21.70 38.27 0.88 60.85
4" (10cm) elbow w4@1.59 Ea 36.60 45.41 1.05 83.06
6" (15cm) elbow w4@1.81 Ea 123.00 51.69 1.19 175.88
8" (20cm) elbow w4@1.81 Ea 142.00 51.69 1.19 194.88

Tees for class 200, SDR 21 PVC pipe


Using small tools.
3/4" (1.9cm) tee w3@.369 Ea 3.10 11.95 0.36 15.41
1" (2.5cm) tee w3@.369 Ea 3.83 11.95 0.36 16.14
1-1/4" (3.1cm) tee w3@.434 Ea 5.04 14.06 0.42 19.52
1-1/2" (3.6cm) tee w3@.560 Ea 5.32 18.14 0.54 24.00
2" (5.1cm) tee w3@.694 Ea 7.80 22.48 0.67 30.95
2-1/2" (6.3cm) tee w3@.914 Ea 25.50 29.60 0.89 55.99
3" (7.5cm) tee w4@1.59 Ea 33.40 45.41 1.05 79.86
4" (10cm) tee w4@2.11 Ea 60.60 60.26 1.39 122.25
6" (15cm) tee w4@2.73 Ea 66.30 77.97 1.80 146.07
8" (20cm) tee w4@2.73 Ea 84.10 77.97 1.80 163.87
2015 Heavy Construction Estimator, All Rights Reserved Page 224

Couplings for class 200, SDR 21 PVC pipe


Using small tools.
3/4" (1.9cm) coupling w3@.232 Ea 3.51 7.51 0.23 11.25
1" (2.5cm) coupling w3@.232 Ea 3.63 7.51 0.23 11.37
1-1/4" (3.1cm) coupling w3@.316 Ea 4.96 10.24 0.31 15.51
1-1/2" (3.6cm) coupling w3@.369 Ea 5.82 11.95 0.36 18.13
2" (5.1cm) coupling w3@.469 Ea 7.38 15.19 0.45 23.02
2-1/2" (6.3cm) coupling w3@.694 Ea 10.90 22.48 0.67 34.05
3" (7.5cm) coupling w4@1.34 Ea 18.50 38.27 0.88 57.65
4" (10cm) coupling w4@1.59 Ea 22.00 45.41 1.05 68.46
6" (15cm) coupling w4@1.81 Ea 25.10 51.69 1.19 77.98
8" (20cm) coupling w4@1.81 Ea 44.10 51.69 1.19 96.98

PVC class 150 SDR 18 AWWA C900 pressure pipe


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
4" (10cm) pipe xt@.040 LF 2.20 1.23 0.37 3.80
6" (15cm) pipe xt@.050 LF 4.08 1.54 0.46 6.08
8" (21cm) pipe xt@.060 LF 7.04 1.85 0.56 9.45
10" (25cm) pipe xt@.080 LF 10.70 2.46 0.74 13.90
12" (31cm) pipe xt@.100 LF 15.10 3.08 0.93 19.11

PVC schedule 40 pipe


Glued joint, installed in an open trench. No excavation or backfill included, using small tools.
1" (2.5cm) pipe w3@.030 LF 0.44 0.97 0.03 1.44
1-1/2" (3.7cm) pipe w3@.040 LF 0.69 1.30 0.04 2.03
2" (3.7cm) pipe w3@.045 LF 0.98 1.46 0.04 2.48
2-1/2" (6.3cm) pipe w3@.050 LF 1.54 1.62 0.05 3.21
3" (7.6cm) pipe w4@.055 LF 2.00 1.57 0.04 3.61
4" (10cm) pipe w4@.070 LF 2.87 2.00 0.05 4.92
6" (15cm) pipe w4@.120 LF 5.04 3.43 0.08 8.55

90 degree elbows for PVC schedule 40 pipe


Using small tools.
1" (2.5cm) 90 degree elbow w3@.120 Ea 0.96 3.89 0.12 4.97
1-1/2" (3.7cm) 90 degree elbow w3@.180 Ea 1.81 5.83 0.17 7.81
2" (3.7cm) 90 degree elbow w3@.200 Ea 2.85 6.48 0.19 9.52
2-1/2" (6.3cm) 90 degree elbow w3@.250 Ea 8.67 8.10 0.24 17.01
3" (7.6cm) 90 degree elbow w4@.300 Ea 10.40 8.57 0.20 19.17
4" (10cm) 90 degree elbow w4@.500 Ea 18.60 14.28 0.33 33.21
6" (15cm) 90 degree elbow w4@.600 Ea 59.00 17.14 0.40 76.54

45 degree elbows for PVC schedule 40 pipe


Using small tools.
1" (2.5cm) 45 degree elbow w3@.120 Ea 1.45 3.89 0.12 5.46
1-1/2" (3.7cm) 45 degree elbow w3@.180 Ea 2.55 5.83 0.17 8.55
2" (3.7cm) 45 degree elbow w3@.200 Ea 3.33 6.48 0.19 10.00
2-1/2" (6.3cm) 45 degree elbow w3@.250 Ea 8.67 8.10 0.24 17.01
3" (7.6cm) 45 degree elbow w4@.300 Ea 13.50 8.57 0.20 22.27
4" (10cm) 45 degree elbow w4@.500 Ea 24.10 14.28 0.33 38.71
6" (15cm) 45 degree elbow w4@.600 Ea 59.80 17.14 0.40 77.34

Tees for PVC schedule 40 pipe


Using small tools.
1" (2.5cm) tee w3@.170 Ea 1.28 5.51 0.16 6.95
1-1/2" (3.7cm) tee w3@.250 Ea 2.43 8.10 0.24 10.77
2" (3.7cm) tee w3@.280 Ea 3.51 9.07 0.27 12.85
2015 Heavy Construction Estimator, All Rights Reserved Page 224 (part 2)

2-1/2" (6.3cm) tee w3@.350 Ea 11.60 11.34 0.34 23.28


3" (7.6cm) tee w4@.420 Ea 15.20 12.00 0.28 27.48
4" (10cm) tee w4@.560 Ea 27.50 15.99 0.37 43.86
6" (15cm) tee w4@.840 Ea 92.70 23.99 0.55 117.24

Couplings for PVC schedule 40 pipe


Using small tools.
1" (2.5cm) coupling w3@.120 Ea 0.74 3.89 0.12 4.75
1-1/2" (3.7cm) coupling w3@.180 Ea 1.10 5.83 0.17 7.10
2" (3.7cm) coupling w3@.200 Ea 1.72 6.48 0.19 8.39
2015 Heavy Construction Estimator, All Rights Reserved Page 225

2-1/2" (6.3cm) coupling w3@.250 Ea 3.76 8.10 0.24 12.10


3" (7.6cm) coupling w4@.300 Ea 5.90 8.57 0.20 14.67
4" (10cm) coupling w4@.500 Ea 8.51 14.28 0.33 23.12
6" (15cm) coupling w4@.600 Ea 26.90 17.14 0.40 44.44

Reducers for PVC schedule 40 pipe


Using small tools.
4" x 2" reducer w4@.200 Ea 11.30 5.71 0.13 17.14

Flange assemblies for PVC schedule 40 pipe


Using small tools.
3" flange w4@.210 Ea 36.50 6.00 0.14 42.64
4" flange w4@.280 Ea 46.30 8.00 0.18 54.48
6" flange w4@.420 Ea 72.70 12.00 0.28 84.98

PVC schedule 80 pipe


Glued joint, installed in an open trench. No excavation or backfill included, using small tools.
1" (2.5cm) pipe w3@.032 LF 0.62 1.04 0.03 1.69
1-1/2" (3.7cm) pipe w3@.042 LF 1.03 1.36 0.04 2.43
2" (3.7cm) pipe w3@.047 LF 1.45 1.52 0.05 3.02
2-1/2" (6.3cm) pipe w3@.052 LF 2.16 1.68 0.05 3.89
3" (7.6cm) pipe w4@.057 LF 2.89 1.63 0.04 4.56
4" (10cm) pipe w4@.074 LF 4.24 2.11 0.05 6.40
6" (15cm) pipe w4@.160 LF 8.08 4.57 0.11 12.76

90 degree elbows for PVC schedule 80 pipe


Using small tools.
1" (2.5cm) 90 degree elbow w3@.125 Ea 4.84 4.05 0.12 9.01
1-1/2" (3.7cm) 90 degree elbow w3@.190 Ea 6.93 6.15 0.18 13.26
2" (3.7cm) 90 degree elbow w3@.210 Ea 8.37 6.80 0.20 15.37
2-1/2" (6.3cm) 90 degree elbow w3@.262 Ea 19.50 8.49 0.25 28.24
3" (7.6cm) 90 degree elbow w4@.315 Ea 22.00 9.00 0.21 31.21
4" (10cm) 90 degree elbow w4@.520 Ea 33.50 14.85 0.34 48.69
6" (15cm) 90 degree elbow w4@.630 Ea 95.40 17.99 0.42 113.81

45 degree elbows for PVC schedule 80 pipe


Using small tools.
1" (2.5cm) 45 degree elbow w3@.125 Ea 10.10 4.05 0.12 14.27
1-1/2" (3.7cm) 45 degree elbow w3@.190 Ea 15.30 6.15 0.18 21.63
2" (3.7cm) 45 degree elbow w3@.210 Ea 19.90 6.80 0.20 26.90
2-1/2" (6.3cm) 45 degree elbow w3@.262 Ea 41.50 8.49 0.25 50.24
3" (7.6cm) 45 degree elbow w4@.315 Ea 50.50 9.00 0.21 59.71
4" (10cm) 45 degree elbow w4@.520 Ea 91.00 14.85 0.34 106.19
6" (15cm) 45 degree elbow w4@.630 Ea 115.00 17.99 0.42 133.41

Tees for PVC schedule 80 pipe


Using small tools.
1" (2.5cm) tee w3@.180 Ea 8.67 5.83 0.17 14.67
1-1/2" (3.7cm) tee w3@.265 Ea 23.80 8.58 0.26 32.64
2" (3.7cm) tee w3@.295 Ea 29.80 9.56 0.29 39.65
2-1/2" (6.3cm) tee w3@.368 Ea 32.40 11.92 0.36 44.68
3" (7.6cm) tee w4@.440 Ea 40.60 12.57 0.29 53.46
4" (10cm) tee w4@.585 Ea 47.00 16.71 0.39 64.10
6" (15cm) tee w4@.880 Ea 160.00 25.13 0.58 185.71

Couplings for PVC schedule 80 pipe


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 225 (part 2)

1" (2.5cm) coupling w3@.125 Ea 5.90 4.05 0.12 10.07


1-1/2" (3.7cm) coupling w3@.190 Ea 9.70 6.15 0.18 16.03
2015 Heavy Construction Estimator, All Rights Reserved Page 226

2" (3.7cm) coupling w3@.210 Ea 10.40 6.80 0.20 17.40


2-1/2" (6.3cm) coupling w3@.262 Ea 25.70 8.49 0.25 34.44
3" (7.6cm) coupling w4@.315 Ea 29.40 9.00 0.21 38.61
4" (10cm) coupling w4@.520 Ea 36.90 14.85 0.34 52.09
6" (15cm) coupling w4@.630 Ea 79.40 17.99 0.42 97.81

CSI 02-511, Foundation under drains

Clay foundation drain pipe


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) pipe ex@.060 LF 6.68 2.12 0.23 9.03
8" (21cm) pipe ex@.065 LF 9.84 2.30 0.25 12.39
10" (25cm) pipe ex@.075 LF 15.80 2.65 0.29 18.74
12" (31cm) pipe ex@.090 LF 20.40 3.18 0.34 23.92

Clay drain tile


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) drain tile ex@.060 LF 3.34 2.12 0.23 5.69
8" (20cm) drain tile ex@.065 LF 6.68 2.30 0.25 9.23
12" (31cm) drain tile ex@.090 LF 11.50 3.18 0.34 15.02

Porous concrete foundation drain pipe, standard strength


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) drain pipe ex@.060 LF 3.93 2.12 0.23 6.28
8" (20cm) drain pipe ex@.065 LF 4.26 2.30 0.25 6.81
12" (31cm) drain pipe ex@.090 LF 8.97 3.18 0.34 12.49
15" (38cm) drain pipe ex@.120 LF 10.90 4.24 0.46 15.60
18" (46cm) drain pipe ex@.240 LF 14.40 8.48 0.92 23.80

Corrugated, perforated metal foundation drain pipe, aluminum or steel


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) pipe ex@.060 LF 7.84 2.12 0.23 10.19
8" (21cm) pipe ex@.065 LF 9.13 2.30 0.25 11.68
10" (25cm) pipe ex@.070 LF 10.80 2.48 0.27 13.55
12" (31cm) pipe ex@.090 LF 15.10 3.18 0.34 18.62
18" (46cm) pipe ex@.110 LF 19.60 3.89 0.42 23.91

Perforated clay foundation drain pipe


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) pipe ex@.060 LF 3.34 2.12 0.23 5.69
8" (20cm) pipe ex@.065 LF 5.01 2.30 0.25 7.56
12" (31cm) pipe ex@.090 LF 10.20 3.18 0.34 13.72

Concrete foundation drain tile


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
6" (15cm) tile ex@.060 LF 5.27 2.12 0.23 7.62
8" (21cm) tile ex@.065 LF 6.59 2.30 0.25 9.14
12" (31cm) tile ex@.090 LF 8.47 3.18 0.34 11.99

Perforated concrete foundation drain tile


Add the cost of gravel fill, excavation and backfill, using a 1.38 CY wheeled loader-backhoe and small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 226 (part 2)

6" (15cm) tile ex@.060 LF 4.70 2.12 0.23 7.05


8" (21cm) tile ex@.065 LF 5.19 2.30 0.25 7.74
10" (25cm) tile ex@.080 LF 6.59 2.83 0.31 9.73
12" (36cm) tile ex@.090 LF 8.20 3.18 0.34 11.72

Gravel fill for foundation drain tile, crusher or bank run


Using a 1.38 CY wheeled loader-backhoe and small tools.
3/4" gravel fill,
installed in trench ew@.150 CY 32.90 5.35 1.12 39.37

Perforated PVC underdrain pipe


Add the cost of gravel fill, excavation and backfill, using a 1.5 CY hydraulic tractor excavator and small
tools.
4" (10cm) pipe fb@.127 LF 2.55 4.75 2.30 9.60
6" (15cm) pipe fb@.127 LF 4.79 4.75 2.30 11.84
8" (21cm) pipe fb@.129 LF 8.41 4.83 2.34 15.58
10" (25cm) pipe fb@.140 LF 10.40 5.24 2.54 18.18
12" (31cm) pipe fb@.148 LF 17.80 5.54 2.68 26.02
2015 Heavy Construction Estimator, All Rights Reserved Page 227

CSI 02-512, Underslab drainage

Underslab capillary water barrier fill, compacted thickness


Includes dumping and spreading. Add the cost of fine grading, using a 1.38 CY wheeled loader-backhoe
and small tools.
2" (5cm) thickness ex@.005 SF 0.63 0.18 0.02 0.83
4" (10cm) thickness ex@.107 SF 1.25 3.78 0.41 5.44
6" (15cm) thickness ex@.096 SF 1.86 3.39 0.37 5.62
8" (21cm) thickness ex@.080 SF 2.51 2.83 0.31 5.65

CSI 02-520 Storm drains

Grate inlets, formed reinforced concrete, light duty, cast iron grate, 6" thick wall, 3' 8" x 3' 8"
overall
Cast in place concrete, using miscellaneous power tools and small tools.
2' deep inlet by@13.7 Ea 680.00 548.30 10.80 1,239.10
3' deep inlet by@17.8 Ea 783.00 712.40 14.10 1,509.50
4' deep inlet by@24.0 Ea 904.00 960.50 19.00 1,883.50
5' deep inlet by@28.2 Ea 1,170.00 1,129.00 22.30 2,321.30
6' deep inlet by@33.1 Ea 1,280.00 1,325.00 26.10 2,631.10

Grate inlets, concrete, heavy duty, cast iron grate, 8" thick wall, 4' x 4' overall
Cast in place concrete, using miscellaneous power tools and small tools.
2' deep inlet by@14.5 Ea 745.00 580.30 11.50 1,336.80
3' deep inlet by@20.0 Ea 1,040.00 800.40 15.80 1,856.20
4' deep inlet by@25.9 Ea 1,160.00 1,037.00 20.50 2,217.50
5' deep inlet by@30.0 Ea 1,340.00 1,201.00 23.70 2,564.70
6' deep inlet by@38.4 Ea 1,680.00 1,537.00 30.30 3,247.30

Cast in place concrete headwalls - 30 degree skewed wingwall, by drain pipe size
No excavation or backfill included, using miscellaneous power tools and small tools.
12" pipe by@1.75 Ea 405.00 70.04 1.38 476.42
15" pipe by@1.90 Ea 488.00 76.04 1.50 565.54
18" pipe by@2.00 Ea 620.00 80.04 1.58 701.62
24" pipe by@2.25 Ea 926.00 90.05 1.78 1,017.83
30" pipe by@2.50 Ea 1,080.00 100.10 1.98 1,182.08
36" pipe by@3.75 Ea 1,210.00 150.10 2.96 1,363.06
42" pipe by@3.90 Ea 1,480.00 156.10 3.08 1,639.18
48" pipe by@4.95 Ea 1,550.00 198.10 3.91 1,752.01
54" pipe by@7.00 Ea 1,650.00 280.10 5.53 1,935.63
60" pipe by@7.75 Ea 2,150.00 310.20 6.12 2,466.32

Precast concrete headwalls


No excavation or backfill included, by pipe size, using a 1.38 CY wheeled loader-backhoe and small
tools.
12" pipe ex@4.00 Ea 227.00 141.40 15.30 383.70
15" pipe ex@4.00 Ea 227.00 141.40 15.30 383.70
18" pipe ex@4.80 Ea 227.00 169.70 18.30 415.00
24" pipe ex@4.80 Ea 278.00 169.70 18.30 466.00
30" pipe ex@6.00 Ea 421.00 212.10 22.90 656.00
36" pipe ex@6.00 Ea 421.00 212.10 22.90 656.00

Precast concrete headwalls


No excavation or backfill included, by pipe size, using a 20-ton hydraulic crane with 70’ boom and small
tools.
42" pipe tq@6.86 Ea 716.00 242.50 57.20 1,015.70
2015 Heavy Construction Estimator, All Rights Reserved Page 227 (part 2)

48" pipe tq@6.86 Ea 716.00 242.50 57.20 1,015.70


54" pipe tq@8.00 Ea 800.00 282.80 66.70 1,149.50
60" pipe tq@8.00 Ea 927.00 282.80 66.70 1,276.50
72" pipe tq@9.60 Ea 1,180.00 339.40 80.10 1,599.50
84" pipe tq@12.0 Ea 1,770.00 424.20 100.00 2,294.20
2015 Heavy Construction Estimator, All Rights Reserved Page 228

Cast iron catch basin frames and covers, Neenah or equal


Using a 1.38 CY wheeled loader-backhoe and small tools.
24" diameter, Neenah R2504C ew@2.60 Ea 422.00 92.64 19.30 533.94
26" diameter, Neenah R2504D ew@2.36 Ea 376.00 84.09 17.60 477.69
24" diameter, Neenah R2533 ew@2.17 Ea 338.00 77.32 16.10 431.42
23" x 23", Neenah R3336 ew@2.60 Ea 723.00 92.64 19.30 834.94
27" x 20", Neenah R3339 ew@2.60 Ea 772.00 92.64 19.30 883.94
24" x 24", Neenah R3339A ew@2.60 Ea 746.00 92.64 19.30 857.94
26" x 26", Neenah R3339B ew@2.60 Ea 732.00 92.64 19.30 843.94

Cast iron curb inlet frames and covers, Neenah or equal


Using a 1.38 CY wheeled loader-backhoe and small tools.
27"x 27", Neenah R3042 ew@2.60 Ea 1,610.00 92.64 19.30 1,721.94
22"x 24", Neenah R3065 ew@2.36 Ea 464.00 84.09 17.60 565.69
36"x 24", Neenah R3067 ew@2.60 Ea 524.00 92.64 19.30 635.94
25"x 24", Neenah R3069 ew@2.36 Ea 773.00 84.09 17.60 874.69
20" x 22", Neenah R3080 ew@2.17 Ea 702.00 77.32 16.10 795.42

Underground trench drains


Includes excavation, gravel fill and backfill but no pipe, using a 1.38 CY wheeled loader-backhoe and
small tools.
12"x 12" underground trench drain ew@.325 LF 309.00 11.58 2.42 323.00
18"x 18" underground trench drain ew@.371 LF 423.00 13.22 2.76 438.98
24"x 24" underground trench drain ew@.433 LF 528.00 15.43 3.22 546.65

Precast catch basins


Using a 1.38 CY wheeled loader-backhoe and small tools.
Single or double wing,
slab top with throat ew@13.0 Ea 79.40 463.20 96.70 639.30
4' x 4' weir box ew@1.63 Ea 397.00 58.08 12.10 467.18
4' diameter inlets, round,
connects to square adapter ew@1.73 Ea 155.00 61.64 12.90 229.54

Precast concrete box culvert trench sections


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
Box 2' x 2' inside tq@.160 LF 5.94 5.66 1.33 12.93
Box 2'6" x 2' inside tq@.168 LF 6.79 5.94 1.40 14.13
Box 3' x 2' inside tq@.177 LF 7.64 6.26 1.48 15.38
Box 3'6" x 2' inside tq@.188 LF 8.49 6.65 1.57 16.71
Box 4' x 2' inside tq@.200 LF 9.33 7.07 1.67 18.07
Box 5' x 2' inside tq@.213 LF 10.60 7.53 1.78 19.91
Box 6' x 2' inside tq@.229 LF 11.90 8.10 1.91 21.91
Box 4' x 2'6" inside tq@.210 LF 10.60 7.42 1.75 19.77
Box 5' x 2'6" inside tq@.229 LF 11.90 8.10 1.91 21.91
Box 6' x 2'6" inside tq@.246 LF 13.60 8.70 2.05 24.35

CSI 02-531, Sand drains

Gravity run-off drainage, including excavation


Using a 1.38 CY wheeled loader-backhoe and small tools.
Excavation for temporary trench drain, 2' x 3',
per CY of excavation ew@.260 CY -- 9.26 1.93 11.19

Corrugated metal pipe for temporary drainage


Installed and removed, based on 3 uses, using a 1.38 CY wheeled loader-backhoe and small tools.
12" pipe ew@.226 LF 2.53 8.05 1.68 12.26
2015 Heavy Construction Estimator, All Rights Reserved Page 228 (part 2)

18" pipe ew@.260 LF 3.75 9.26 1.93 14.94

CSI 02-533, Relief wells

Unlined sump hole


Including excavation and gravel fill, using a 1.38 CY wheeled loader-backhoe and small tools.
Unlined hole, per CF of excavation ew@.021 CY 0.53 0.75 0.16 1.44
12" (36cm), per LF of well depth ew@.371 LF 17.20 13.22 2.76 33.18
15" (38cm), per LF of well depth ew@.473 LF 21.10 16.85 3.52 41.47
24" (61cm), per LF of well depth ew@.650 LF 37.30 23.16 4.84 65.30
Wood lined hole,
to 4' x 4' contact area ew@.087 SF 1.41 3.10 0.65 5.16

Submersible pumps
20' head with starter and level control, using small tools.
60 GPM, 2" (5.1cm) discharge nb@3.33 Ea 1,850.00 174.20 1.90 2,026.10
120 GPM, 2" (5.1cm) discharge nb@5.00 Ea 5,050.00 261.50 2.85 5,314.35
160 GPM, 3" (7.6cm) discharge nf@13.3 Ea 7,680.00 603.40 7.45 8,290.85
2015 Heavy Construction Estimator, All Rights Reserved Page 229

300 GPM, 3" (7.6cm) discharge nf@20.0 Ea 8,550.00 907.40 11.20 9,468.60

Well pointing, typical cost, complete


Typical cost, complete.
200 LF well point system,
2" pipe, points each 5' --@.000 LF 89.90 -- -- 89.90

CSI 02-535, Soil stabilization

Geotextile fabrics, non-woven polypropylene, for subgrade


Using a 3/4-ton pickup truck and small tools.
55 mil sz@.016 SY 1.41 0.56 0.03 2.00
60 mil sz@.016 SY 1.77 0.56 0.03 2.36
70 mil sz@.016 SY 1.90 0.56 0.03 2.49
80 mil sz@.016 SY 2.03 0.56 0.03 2.62
90 mil sz@.020 SY 2.16 0.70 0.04 2.90
105 mil sz@.020 SY 2.42 0.70 0.04 3.16
120 mil sz@.020 SY 2.92 0.70 0.04 3.66
130 mil sz@.027 SY 3.20 0.95 0.05 4.20
150 mil sz@.027 SY 3.83 0.95 0.05 4.83
170 mil sz@.027 SY 4.59 0.95 0.05 5.59

Geotextile fabrics with asphalt overlay


Using a pneumatic asphalt finisher with screed, two 24,500 lb. 2-axle trucks, a towed 7’ wide street
sweeper, two 12-ton 3-wheel self propelled static rollers, a 13-ton static self-propelled 11-tire roller, and
small tools.
55 mil u3@4.80 MSY 1,780.00 143.60 89.30 2,012.90
60 mil u3@4.80 MSY 1,710.00 143.60 89.30 1,942.90
80 mil u3@4.80 MSY 2,160.00 143.60 89.30 2,392.90

CSI 02-540, Erosion control

Erosion control netting


100 SY (83.6m2), 4' wide roll, using 20-ton hydraulic crane with 70’ boom and small tools.
Jute mesh netting, stapled sv@.011 SY 0.97 0.38 0.16 1.51

CSI 02-545, Membrane lining systems

High density polyethylene liners for surface protection


Based on over 100,000 SF job. For surface impoundments, landfills and mining operations, using small
tools.
30 mil st@.014 SF 0.29 0.49 -- 0.78
40 mil st@.014 SF 0.38 0.49 -- 0.87
50 mil st@.014 SF 0.81 0.49 -- 1.30
60 mil st@.014 SF 0.56 0.49 -- 1.05
80 mil st@.014 SF 0.75 0.49 -- 1.24
100 mil st@.014 SF 0.95 0.49 -- 1.44
120 mil st@.014 SF 1.93 0.49 -- 2.42
140 mil st@.014 SF 2.01 0.49 -- 2.50

CSI 02-551, Gas distribution lines

Polyethylene gas lines, 60 PSI, coils


Fusion weld in an open trench. No excavation or backfill included, using miscellaneous power tools and
small tools.
1-1/4" (3.2cm) w5@.020 LF 1.97 0.67 0.06 2.70
1-1/2" (3.7cm) w5@.025 LF 2.22 0.83 0.08 3.13
2015 Heavy Construction Estimator, All Rights Reserved Page 229 (part 2)

2" (5.1cm) w5@.030 LF 2.78 1.00 0.09 3.87


3" (7.6cm) w5@.040 LF 6.08 1.33 0.12 7.53

Polyethylene gas lines, 60 PSI


Straight 100' lengths, fusion weld. No excavation or backfill included, using a 20-ton hydraulic crane with
70’ boom and small tools.
4" (10cm) xt@.169 LF 4.52 5.20 1.56 11.28
6" (15cm) xt@.183 LF 9.79 5.63 1.69 17.11
8" (20cm) xt@.220 LF 16.60 6.77 2.04 25.41

Steel, Schedule 40 welded gas distribution pipe


Installed in an open trench. No excavation or backfill included. Plain end, tar coated and wrapped, 20'
lengths, using small tools and a 300-amp skid mounted welder.
1" (2.5cm) np@.060 LF 1.99 2.76 0.08 4.83
2015 Heavy Construction Estimator, All Rights Reserved Page 230

2" (5.1cm) np@.100 LF 7.61 4.60 0.14 12.35


3" (7.6cm) np@.123 LF 14.90 5.66 0.17 20.73

Steel, Schedule 40 welded gas distribution pipe


Installed in an open trench. No excavation or backfill included. Plain end, tar coated and wrapped, 20'
lengths, using a 1.5 CY hydraulic tractor excavator, a trailer mounted 200-amp welder and small tools.
4" (10cm) e3@.170 LF 17.10 8.03 2.98 28.11
5" (12.5cm) e3@.210 LF 26.80 9.92 3.68 40.40
6" (15cm) e3@.240 LF 31.00 11.34 4.21 46.55
8" (20cm) e3@.280 LF 48.00 13.23 4.91 66.14

CSI 02-553, Natural gas meters

Diaphragm type natural gas meters


Standard direct digital reading, threaded, 5 to 100 lbs., no pressure or temperature compensation, using
small tools.
250 CF per hour at 5 PSI nf@2.70 Ea 58.50 122.50 1.51 182.51
425 CF per hour at 10 PSI nf@4.17 Ea 141.00 189.20 2.34 332.54
425 CF per hour at 25 PSI nf@4.17 Ea 183.00 189.20 2.34 374.54
800 CF per hour at 20 PSI nf@5.00 Ea 495.00 226.90 2.80 724.70
1,000 CF per hour at 25 PSI nf@6.25 Ea 547.00 283.60 3.50 834.10
800 CF per hour at 100 PSI nf@5.00 Ea 794.00 226.90 2.80 1,023.70
1,000 CF per hour at 100 PSI nf@6.25 Ea 868.00 283.60 3.50 1,155.10
1,400 CF per hour at 100 PSI nf@6.67 Ea 1,180.00 302.60 3.74 1,486.34
2,300 CF per hour at 100 PSI nf@8.00 Ea 1,710.00 363.00 4.48 2,077.48
5,000 CF per hour at 100 PSI nf@13.3 Ea 2,580.00 603.40 7.45 3,190.85

Gas pressure regulators


Using small tools.
3/4" (1.9cm), screwed end nb@.617 Ea 51.40 32.27 0.35 84.02
1" (2.5cm), screwed end nb@.654 Ea 51.40 34.20 0.37 85.97
1-1/4" (3.2cm), screwed end nb@.741 Ea 51.40 38.75 0.42 90.57
1-1/2" (3.7cm), screwed end nb@.885 Ea 233.00 46.29 0.50 279.79
2" (5.1cm), screwed end nf@1.46 Ea 233.00 66.24 0.82 300.06
3" (7.6cm), flanged end nf@3.33 Ea 681.00 151.10 1.86 833.96
4" (10cm), flanged end nf@4.35 Ea 956.00 197.40 2.44 1,155.84

Gas turbine meters, direct-digital reading


By capacity in cubic feet per hour at 175 PSI, flanged end connections, using a 20-ton hydraulic crane
with 70’ boom and small tools.
4", 18,000 CF per hour nh@12.5 Ea 4,590.00 603.50 32.90 5,226.40
6", 30,000 CF per hour nh@14.5 Ea 5,480.00 700.10 38.10 6,218.20
8", 60,000 CF per hour nh@20.0 Ea 8,600.00 965.60 52.60 9,618.20
12",150,000 CF per hour nh@25.5 Ea 27,100.00 1,231.00 67.10 28,398.10

CSI 02-554, Power, fuel and water costs

Electrical power rates


Industrial use, typical
cost for planning purposes --@.000 KWH 0.08 -- -- 0.08

Diesel fuel
Typical bulk rates --@.000 Gal 5.27 -- -- 5.27

Natural gas
Typical cost per 1,000 CF --@.000 MCF 22.20 -- -- 22.20
2015 Heavy Construction Estimator, All Rights Reserved Page 230 (part 2)

CSI 02-555, Water distribution lines

Copper tubing, type K


Soft copper pipe in 22' lengths joined with corporation couplings. No excavation or backfill included,
using small tools.
1/2" (1.3cm) ng@.044 LF 3.49 1.96 0.01 5.46
3/4" (1.9cm) ng@.045 LF 5.82 2.00 0.01 7.83
1" (2.5cm) ng@.047 LF 7.50 2.09 0.01 9.60
1-1/2" (3.8cm) ng@.048 LF 12.90 2.14 0.01 15.05
2" (5cm) ng@.065 LF 19.70 2.89 0.02 22.61
2-1/2" (6.3cm) ng@.076 LF 28.70 3.38 0.02 32.10
3" (7.6cm) ng@.082 LF 15.20 3.65 0.02 18.87
2015 Heavy Construction Estimator, All Rights Reserved Page 231

Cast iron gate valves with precast concrete valve vault


Using a 20-ton hydraulic crane with 70’ boom and small tools.
3" (7.6cm) xt@5.50 Ea 703.00 169.20 50.90 923.10
4" (10cm) xt@5.50 Ea 838.00 169.20 50.90 1,058.10
6" (15cm) xt@7.30 Ea 1,090.00 224.60 67.50 1,382.10
8" (21cm) xt@8.75 Ea 1,690.00 269.20 80.90 2,040.10
10" (25cm) xu@15.0 Ea 2,620.00 449.40 106.00 3,175.40
12" (31cm) xu@20.0 Ea 3,320.00 599.20 141.00 4,060.20
14" (36cm) xu@30.0 Ea 8,810.00 898.80 212.00 9,920.80
16" (41cm) xu@30.0 Ea 16,400.00 898.80 212.00 17,510.80

Indicator post valves, with 5' stem for 5' bury. No excavation included
Using small tools.
4" (10cm) nk@2.10 Ea 1,230.00 94.69 1.28 1,325.97
6" (15cm) nk@2.10 Ea 1,230.00 94.69 1.28 1,325.97
8" (20cm) nk@2.10 Ea 1,230.00 94.69 1.28 1,325.97

CSI 02-557, Water wells

Domestic water, drilled and cased, including casing


Using a 6.75" to 9.88" track drill and small tools.
4" (10cm) to 6" (15cm) well ea@.242 VLF 16.70 8.47 8.49 33.66
8" (21cm) well ea@.357 VLF 21.10 12.49 12.50 46.09

Gravel pack for water well, 40 feet (12m) deep, including gravel and casing
Using a 6.75" to 9.88" track drill and small tools.
24" (61cm) gravel pack ea@568. Ea 33,200.00 19,870.00 19,900.00 72,970.00
36" (91cm) gravel pack ea@794. Ea 35,300.00 27,770.00 27,900.00 90,970.00

Drill well hole in normal soil, sand or gravel


Using a 16" truck mounted rotary drill and small tools.
6" (15cm) well s9@.559 LF -- 20.07 34.00 54.07
8" (20cm) well s9@.730 LF -- 26.21 44.40 70.61
10" (25cm) well s9@.858 LF -- 30.80 52.20 83.00
12" (31cm) well ta@1.09 LF -- 39.03 55.30 94.33
14" (36cm) well ta@1.31 LF -- 46.91 66.50 113.41
16" (41cm) well ta@1.81 LF -- 64.82 91.80 156.62
18" (46cm) well ta@2.09 LF -- 74.84 106.00 180.84
20" (51cm) well ta@2.35 LF -- 84.15 119.00 203.15
22" (56cm) well ta@2.73 LF -- 97.76 139.00 236.76
24" (56cm) well ta@3.09 LF -- 110.70 157.00 267.70
26" (66cm) well ta@3.41 LF -- 122.10 173.00 295.10
28" (71cm) well ta@3.70 LF -- 132.50 188.00 320.50
30" (76cm) well ta@4.00 LF -- 143.20 203.00 346.20
36" (91cm) well ta@5.46 LF -- 195.50 277.00 472.50

Drill well hole in rock


Using a 16" truck mounted rotary drill and small tools.
6" (15cm) well s9@.645 LF -- 23.16 39.30 62.46
8" (20cm) well s9@.752 LF -- 27.00 45.80 72.80
10" (25cm) well s9@.858 LF -- 30.80 52.20 83.00
12" (31cm) well ta@1.09 LF -- 39.03 55.30 94.33
14" (36cm) well ta@1.41 LF -- 50.49 71.50 121.99
16" (41cm) well ta@2.05 LF -- 73.41 104.00 177.41
18" (46cm) well ta@2.44 LF -- 87.38 124.00 211.38
20" (51cm) well ta@2.83 LF -- 101.30 144.00 245.30
2015 Heavy Construction Estimator, All Rights Reserved Page 231 (part 2)

22" (56cm) well ta@3.33 LF -- 119.20 169.00 288.20


24" (56cm) well ta@3.85 LF -- 137.90 195.00 332.90

Steel water well casing


Using a 16" truck mounted rotary drill and small tools.
Typical cost per pound,
any diameter ta@.008 Lb 1.02 0.29 0.41 1.72

Well screen assembly - Stainless steel


Using a 16" truck mounted rotary drill and small tools.
2" (5.1cm) well screen s9@.073 LF 151.00 2.62 4.44 158.06
3" (7.6cm) well screen s9@.079 LF 166.00 2.84 4.81 173.65
4" (10cm) well screen s9@.100 LF 175.00 3.59 6.09 184.68
2015 Heavy Construction Estimator, All Rights Reserved Page 232

5" (13cm) well screen s9@.119 LF 231.00 4.27 7.24 242.51


6" (15cm) well screen s9@.159 LF 422.00 5.71 9.68 437.39
8" (20cm) well screen s9@.203 LF 466.00 7.29 12.40 485.69
10" (25cm) well screen ta@.329 LF 526.00 11.78 16.70 554.48
12" (31cm) well screen ta@.384 LF 618.00 13.75 19.50 651.25
14" (36cm) well screen ta@.442 LF 667.00 15.83 22.40 705.23
16" (41cm) well screen ta@.497 LF 711.00 17.80 25.20 754.00
18" (46cm) well screen ta@.612 LF 845.00 21.92 31.10 898.02
20" (51cm) well screen ta@.769 LF 1,070.00 27.54 39.00 1,136.54
24" (56cm) well screen ta@1.01 LF 1,380.00 36.17 51.20 1,467.37
26" (66cm) well screen ta@1.14 LF 1,600.00 40.82 57.80 1,698.62

Well screen assembly - Slotted PVC


Using a 16" truck mounted rotary drill and small tools.
1-1/4" (3.2cm) well screen s9@.038 LF 5.14 1.36 2.31 8.81
1-1/2" (3.8cm) well screen s9@.041 LF 6.17 1.47 2.50 10.14
2" (5.1cm) well screen s9@.073 LF 7.20 2.62 4.44 14.26
3" (7.6cm) well screen s9@.079 LF 13.40 2.84 4.81 21.05
4" (10cm) well screen s9@.100 LF 16.80 3.59 6.09 26.48
5" (13cm) well screen s9@.119 LF 21.60 4.27 7.24 33.11
6" (15cm) well screen s9@.159 LF 21.10 5.71 9.68 36.49
8" (20cm) well screen s9@.203 LF 32.90 7.29 12.40 52.59

Well drilling - Artificial gravel pack, 2" (5.1cm) screen


Based on 3" space between casing and well screen, using a 6" 100 GPM centrifugal pump, a 16" truck
mounted rotary drill and small tools.
6" (15cm) casing tc@.115 LF 0.08 4.09 4.85 9.02
8" (20cm) casing tc@.180 LF 0.36 6.40 7.59 14.35
10" (25cm) casing tc@.269 LF 0.57 9.56 11.30 21.43
12" (31cm) casing tc@.333 LF 0.83 11.83 14.00 26.66
14" (36cm) casing tc@.398 LF 1.15 14.14 16.80 32.09
16" (41cm) casing tc@.491 LF 1.52 17.45 20.70 39.67
18" (46cm) casing tc@.556 LF 1.94 19.76 23.40 45.10
20" (51cm) casing tc@.678 LF 2.39 24.10 28.60 55.09
24" (56cm) casing tc@.778 LF 3.44 27.65 32.80 63.89
26" (66cm) casing tc@.813 LF 4.05 28.89 34.30 67.24
30" (76cm) casing tc@1.00 LF 5.46 35.54 42.20 83.20
36" (91cm) casing tc@1.22 LF 7.77 43.36 51.40 102.53

Well drilling - Develop well


Using a 6" 100 GPM centrifugal pump, a 16" truck mounted rotary drill and small tools.
Develop well td@1.75 Hour -- 61.86 67.80 129.66

Well drilling - Pump test


Using a 6" 100 GPM centrifugal pump, a 16" truck mounted rotary drill and small tools.
Pump test well tc@2.50 Hour -- 88.85 105.00 193.85

Surface seal well


Using a 6" 100 GPM centrifugal pump, a 16" truck mounted rotary drill and small tools.
Concrete-filled, typical cost ta@24.0 LS 632.00 859.40 1,220.00 2,711.40

Well testing
Using a 6" 100 GPM centrifugal pump, a 16" truck mounted rotary drill and small tools.
Well test pump, install and remove ta@48.0 LS -- 1,719.00 2,440.00 4,159.00

Sterilization of well
Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 232 (part 2)

Chlorine sterilization te@16.0 LS 310.00 562.10 16.80 888.90

Well drilling, hollow stem auger


Includes drilling cost only. No unusual conditions, using a 16" truck mounted rotary drill and small tools.
2-1/4" inside, 6" outside,
for split spoon sampling ta@.343 LF -- 12.28 17.40 29.68
2015 Heavy Construction Estimator, All Rights Reserved Page 233

4-1/4" inside, 8" outside for


2" or less casing and screen ta@.436 LF -- 15.61 22.10 37.71
6-5/8" inside, 11" outside for
4" or less casing and screen ta@.533 LF -- 19.09 27.00 46.09
8-1/4" inside, 13-3/4" outside for
6" or less casing and screen ta@.686 LF -- 24.57 34.80 59.37
10-1/4" inside, 16" outside for
8" or less casing and screen ta@.800 LF -- 28.65 40.60 69.25
Split spoon sample,
2" x 24" during drilling --@.000 Ea 41.30 -- -- 41.30

Mud drilling
Using a 16" truck mounted rotary drill and small tools.
4" diameter borehole ta@.357 LF -- 12.78 18.10 30.88
6" diameter borehole ta@.393 LF -- 14.07 19.90 33.97
8" diameter borehole ta@.429 LF -- 15.36 21.80 37.16
10" diameter borehole ta@.488 LF -- 17.48 24.80 42.28
12" diameter borehole ta@.548 LF -- 19.62 27.80 47.42
15" diameter borehole ta@.667 LF -- 23.89 33.80 57.69

Air rotary drilling in unconsolidated soil


Using a 16" truck mounted rotary drill and small tools.
6" diameter borehole ta@.357 LF -- 12.78 18.10 30.88
8" diameter borehole ta@.595 LF -- 21.31 30.20 51.51
10" diameter borehole ta@1.07 LF -- 38.32 54.30 92.62
12" diameter borehole ta@1.43 LF -- 51.21 72.60 123.81
16" diameter borehole ta@1.91 LF -- 68.40 96.90 165.30
18" diameter borehole ta@2.38 LF -- 85.23 121.00 206.23
22" diameter borehole ta@2.98 LF -- 106.70 151.00 257.70

Air rotary drilling in consolidated soil


Using a 16" truck mounted rotary drill and small tools.
6" diameter borehole ta@.286 LF -- 10.24 14.50 24.74
8" diameter borehole ta@.714 LF -- 25.57 36.20 61.77
10" diameter borehole ta@1.43 LF -- 51.21 72.60 123.81
12" diameter borehole ta@2.98 LF -- 106.70 151.00 257.70

PVC well casing, schedule 40, flush threaded


10' standard lengths, using a 16" truck mounted rotary drill and small tools.
1/2" (12 mm) casing ta@.048 LF 1.81 1.72 2.44 5.97
3/4" (20 mm) casing ta@.048 LF 1.86 1.72 2.44 6.02
1" (25 mm) casing ta@.048 LF 2.20 1.72 2.44 6.36
1-1/4" (32 mm) casing ta@.048 LF 2.70 1.72 2.44 6.86
1-1/2" (40 mm) casing ta@.048 LF 2.70 1.72 2.44 6.86
2" (50 mm) casing ta@.080 LF 1.58 2.87 4.06 8.51
2-1/2" (60 mm) casing ta@.087 LF 2.48 3.12 4.41 10.01
3" (80 mm) casing ta@.096 LF 3.24 3.44 4.87 11.55
4" (100 mm) casing ta@.120 LF 4.58 4.30 6.09 14.97
4-1/2" (100 mm) casing ta@.120 LF 5.21 4.30 6.09 15.60
5" (125 mm) casing ta@.137 LF 6.26 4.91 6.95 18.12
6" (150 mm) casing ta@.192 LF 17.50 6.88 9.74 34.12
8" (200 mm) casing ta@.240 LF 24.70 8.59 12.20 45.49
10" (250 mm) casing ta@.240 LF 36.00 8.59 12.20 56.79
12" (300 mm) casing ta@.240 LF 44.50 8.59 12.20 65.29

PVC well casing, schedule 80, flush threaded


10' standard lengths, using a 16" truck mounted rotary drill and small tools.
1/2" (12 mm) casing ta@.048 LF 2.25 1.72 2.44 6.41
2015 Heavy Construction Estimator, All Rights Reserved Page 233 (part 2)

3/4" (20 mm) casing ta@.048 LF 2.48 1.72 2.44 6.64


1" (25 mm) casing ta@.048 LF 3.04 1.72 2.44 7.20
1-1/4" (32 mm) casing ta@.048 LF 3.71 1.72 2.44 7.87
1-1/2" (40 mm) casing ta@.048 LF 4.15 1.72 2.44 8.31
2" (50 mm) casing ta@.080 LF 4.73 2.87 4.06 11.66
2-1/2" (60 mm) casing ta@.087 LF 7.65 3.12 4.41 15.18
3" (80 mm) casing ta@.096 LF 9.89 3.44 4.87 18.20
4" (100 mm) casing ta@.120 LF 13.30 4.30 6.09 23.69
5" (125 mm) casing ta@.137 LF 22.50 4.91 6.95 34.36
6" (150 mm) casing ta@.192 LF 26.30 6.88 9.74 42.92
8" (200 mm) casing ta@.240 LF 37.80 8.59 12.20 58.59
10" (250 mm) casing ta@.240 LF 55.10 8.59 12.20 75.89
12" (300 mm) casing ta@.240 LF 73.10 8.59 12.20 93.89
2015 Heavy Construction Estimator, All Rights Reserved Page 234

Teflon well casing, flush threaded


5' standard lengths, using a 16" truck mounted rotary drill and small tools.
1-1/4" 32 mm) casing ta@.048 LF 47.20 1.72 2.44 51.36
1-1/2" (40 mm) casing ta@.048 LF 54.00 1.72 2.44 58.16
2" (50 mm) casing ta@.080 LF 68.80 2.87 4.06 75.73
3" (80 mm) casing ta@.087 LF 158.00 3.12 4.41 165.53
4" (100 mm) casing ta@.096 LF 268.00 3.44 4.87 276.31

Stainless steel well casing, 5' sections, flush threaded


Number 304 stainless steel, using a 16" truck mounted rotary drill and small tools.
2" (50 mm) casing ta@.080 LF 47.20 2.87 4.06 54.13
4" (100 mm) casing ta@.120 LF 137.00 4.30 6.09 147.39
6" casing ta@1.54 LF 114.00 55.15 78.10 247.25
8" casing ta@1.92 LF 181.00 68.76 97.40 347.16
10" casing ta@1.92 LF 210.00 68.76 97.40 376.16
12" casing ta@1.92 LF 277.00 68.76 97.40 443.16

Stainless steel well casing, 10' sections, flush threaded


Number 304 stainless steel, using a 16" truck mounted rotary drill and small tools.
6" casing ta@1.54 LF 170.00 55.15 78.10 303.25
8" casing ta@1.92 LF 270.00 68.76 97.40 436.16
10" casing ta@1.92 LF 351.00 68.76 97.40 517.16
12" casing ta@1.92 LF 461.00 68.76 97.40 627.16

Stainless steel well casing, 5' sections, welded ring


Using a 16" truck mounted rotary drill and small tools.
10" casing ta@1.92 LF 210.00 68.76 97.40 376.16
12" casing ta@1.92 LF 277.00 68.76 97.40 443.16

Stainless steel well casing, 10' sections, welded ring


Using a 16" truck mounted rotary drill and small tools.
10" casing ta@1.92 LF 351.00 68.76 97.40 517.16
12" casing ta@1.92 LF 461.00 68.76 97.40 627.16

Well monitoring screen, PVC schedule 40, flush threaded, 10' lengths
Using a 16" truck mounted rotary drill and small tools.
1/2" (12 mm) monitoring screens ta@.048 LF 6.13 1.72 2.44 10.29
3/4" (20 mm) monitoring screens ta@.048 LF 6.54 1.72 2.44 10.70
1" (25 mm) monitoring screens ta@.048 LF 8.40 1.72 2.44 12.56
1-1/4" (32 mm) monitoring screens ta@.048 LF 9.83 1.72 2.44 13.99
1-1/2" (40 mm) monitoring screens ta@.048 LF 10.20 1.72 2.44 14.36
2" (50 mm) monitoring screens ta@.080 LF 11.50 2.87 4.06 18.43
2-1/2" (60 mm) monitoring screens ta@.087 LF 19.20 3.12 4.41 26.73
3" (80 mm) monitoring screens ta@.096 LF 21.30 3.44 4.87 29.61
4" (100 mm) monitoring screens ta@.120 LF 25.40 4.30 6.09 35.79
4-1/2" (112 mm) monitoring screens ta@.120 LF 45.40 4.30 6.09 55.79
5" (125 mm) monitoring screens ta@.137 LF 48.10 4.91 6.95 59.96
6" (150 mm) monitoring screens ta@.192 LF 46.70 6.88 9.74 63.32
8" (200 mm) monitoring screens ta@.240 LF 71.60 8.59 12.20 92.39
10" (250 mm) monitoring screens ta@.240 LF 100.00 8.59 12.20 120.79
12" (300 mm) monitoring screens ta@.240 LF 129.00 8.59 12.20 149.79

Well monitoring screen, PVC schedule 80, flush threaded, 10' lengths
Using a 16" truck mounted rotary drill and small tools.
1/2" (12 mm) monitoring screens ta@.048 LF 3.82 1.72 2.44 7.98
3/4" (20 mm) monitoring screens ta@.048 LF 4.04 1.72 2.44 8.20
2015 Heavy Construction Estimator, All Rights Reserved Page 234 (part 2)

1" (25 mm) monitoring screens ta@.048 LF 5.18 1.72 2.44 9.34
1-1/4" (32 mm) monitoring screens ta@.048 LF 6.07 1.72 2.44 10.23
1-1/2" (40 mm) monitoring screens ta@.048 LF 6.52 1.72 2.44 10.68
2" (50 mm) monitoring screens ta@.080 LF 7.88 2.87 4.06 14.81
2-1/2" (60 mm) monitoring screens ta@.087 LF 11.70 3.12 4.41 19.23
3" (80 mm) monitoring screens ta@.096 LF 13.90 3.44 4.87 22.21
4" (100 mm) monitoring screens ta@.120 LF 17.50 4.30 6.09 27.89
2015 Heavy Construction Estimator, All Rights Reserved Page 235

5" (125 mm) monitoring screens ta@.137 LF 33.30 4.91 6.95 45.16
6" (150 mm) monitoring screens ta@.192 LF 36.00 6.88 9.74 52.62
8" (200 mm) monitoring screens ta@.240 LF 52.80 8.59 12.20 73.59
10" (250 mm) monitoring screens ta@.240 LF 76.50 8.59 12.20 97.29
12" (300 mm) monitoring screens ta@.240 LF 100.00 8.59 12.20 120.79

Well monitoring screens, Teflon, flush threaded, 5' lengths


Using a 16" truck mounted rotary drill and small tools.
1-1/4" (32 mm) monitoring screens ta@.048 LF 61.30 1.72 2.44 65.46
1-1/2" (40 mm) monitoring screens ta@.048 LF 74.00 1.72 2.44 78.16
2" (50 mm) monitoring screens ta@.080 LF 89.10 2.87 4.06 96.03
3" (80 mm) monitoring screens ta@.087 LF 210.00 3.12 4.41 217.53
4" (100 mm) monitoring screens ta@.096 LF 326.00 3.44 4.87 334.31

Well monitoring screens, wire wound stainless steel, flush threaded


Using a 16" truck mounted rotary drill and small tools.
2" (50 mm) monitoring screen ta@.080 LF 144.00 2.87 4.06 150.93
4" (100 mm) monitoring screen ta@.120 LF 169.00 4.30 6.09 179.39

Integral sand packed well monitoring screen


Used to filter out ultra fine sediment and sand. Based on 5' lengths with threaded ends, using a 16"
truck mounted rotary drill and small tools.
1-1/4" I.D. x 2.4" O.D. screen ta@.750 Ea 298.00 26.86 38.10 362.96
2" I.D. x 3.5" O.D. screens ta@.800 Ea 402.00 28.65 40.60 471.25
2.5" I.D. x 4" O.D. screens ta@.889 Ea 539.00 31.84 45.10 615.94
3" I.D. x 4.5" O.D. screens ta@1.00 Ea 551.00 35.81 50.70 637.51
4" I.D. x 5.75" O.D. screens ta@1.20 Ea 808.00 42.97 60.90 911.87
5" I.D. x 7" O.D. screens ta@1.33 Ea 1,120.00 47.63 67.50 1,235.13
6" I.D. x 8.25" O.D. screens ta@1.50 Ea 1,350.00 53.72 76.10 1,479.82

Filter wrap for water wells


Purchased in 100' rolls, using a 16" truck mounted rotary drill and small tools.
2" diameter filter sock ta@.024 LF 0.89 0.86 1.22 2.97
4" diameter filter sock ta@.024 LF 1.31 0.86 1.22 3.39
6" diameter filter sock ta@.024 LF 1.70 0.86 1.22 3.78
8" diameter filter sock ta@.024 LF 1.80 0.86 1.22 3.88

Stainless steel well screen, 5' sections, flush threaded


Using a 16" truck mounted rotary drill and small tools.
6" well screen ta@1.54 LF 147.00 55.15 78.10 280.25
8" well screen ta@1.92 LF 225.00 68.76 97.40 391.16
10" well screen ta@1.92 LF 285.00 68.76 97.40 451.16
12" well screen ta@1.92 LF 348.00 68.76 97.40 514.16

Stainless steel well screen, 10' sections, flush threaded


Using a 16" truck mounted rotary drill and small tools.
6" well screen ta@1.54 LF 241.00 55.15 78.10 374.25
8" well screen ta@1.92 LF 356.00 68.76 97.40 522.16
10" well screen ta@1.92 LF 446.00 68.76 97.40 612.16
12" well screen ta@1.92 LF 525.00 68.76 97.40 691.16

Stainless steel well screen, 5' sections, welded ring


Using a 16" truck mounted rotary drill and small tools.
10" well screen ta@1.92 LF 224.00 68.76 97.40 390.16
12" well screen ta@1.92 LF 268.00 68.76 97.40 434.16

Stainless steel well screen, 10' sections, welded ring


2015 Heavy Construction Estimator, All Rights Reserved Page 235 (part 2)

Using a 16" truck mounted rotary drill and small tools.


10" well screen ta@1.92 LF 385.00 68.76 97.40 551.16
12" well screen ta@1.92 LF 445.00 68.76 97.40 611.16

Monitoring well fittings - Solid plugs, flush threaded


Used at bottom of monitoring screen, using a 16" truck mounted rotary drill and small tools.
1-1/4" solid plug, Teflon ta@.240 Ea 57.80 8.59 12.20 78.59
1-1/2" solid plug, Teflon ta@.240 Ea 60.00 8.59 12.20 80.79
2" solid plug, Teflon ta@.240 Ea 87.80 8.59 12.20 108.59
3" solid plug, Teflon ta@.253 Ea 158.00 9.06 12.80 179.86
4" solid plug, Teflon ta@.267 Ea 165.00 9.56 13.50 188.06
2015 Heavy Construction Estimator, All Rights Reserved Page 236

1/2" solid plug, PVC ta@.240 Ea 16.80 8.59 12.20 37.59


3/4" solid plug, PVC ta@.240 Ea 17.20 8.59 12.20 37.99
1" solid plug, PVC ta@.240 Ea 19.00 8.59 12.20 39.79
1-1/4" solid plug, PVC ta@.240 Ea 21.30 8.59 12.20 42.09
1-1/2" solid plug, PVC ta@.240 Ea 22.50 8.59 12.20 43.29
2" solid plug, PVC ta@.240 Ea 24.80 8.59 12.20 45.59
2-1/2" solid plug, PVC ta@.253 Ea 32.10 9.06 12.80 53.96
3" solid plug, PVC ta@.253 Ea 38.50 9.06 12.80 60.36
4" solid plug, PVC ta@.267 Ea 64.00 9.56 13.50 87.06
4-1/2" solid plug, PVC ta@.267 Ea 93.00 9.56 13.50 116.06
5" solid plug, PVC ta@.282 Ea 110.00 10.10 14.30 134.40
6" solid plug, PVC ta@.300 Ea 121.00 10.74 15.20 146.94
8" solid plug, PVC ta@.343 Ea 138.00 12.28 17.40 167.68
10" solid plug, PVC ta@.400 Ea 155.00 14.32 20.30 189.62
12" solid plug, PVC ta@.480 Ea 214.00 17.19 24.40 255.59
2" solid plug,
no. 304 stainless steel ta@.240 Ea 81.80 8.59 12.20 102.59
4" solid plug,
no. 304 stainless steel ta@.267 Ea 168.00 9.56 13.50 191.06
2" locking test plug ta@.375 Ea 62.20 13.43 19.00 94.63
4" locking test plug ta@.462 Ea 76.20 16.54 23.40 116.14
6" locking test plug ta@.600 Ea 128.00 21.49 30.40 179.89
6" stainless steel plug ta@2.40 Ea 258.00 85.94 122.00 465.94
8" stainless steel plug ta@2.74 Ea 536.00 98.12 139.00 773.12
10" stainless steel plug ta@3.20 Ea 910.00 114.60 162.00 1,186.60
12" stainless steel plug ta@3.73 Ea 477.00 133.60 189.00 799.60
4" HDPE plug, purchase only --@.000 Ea 61.40 -- -- 61.40
6" HDPE plug, purchase only --@.000 Ea 210.00 -- -- 210.00

Well points, flush threaded, custom


For hydraulically driven flush joint sand points, using a 16" truck mounted rotary drill and small tools.
1/2" solid point, PVC ta@.240 Ea 18.40 8.59 12.20 39.19
3/4" solid point, PVC ta@.240 Ea 19.30 8.59 12.20 40.09
1" solid point, PVC ta@.240 Ea 20.90 8.59 12.20 41.69
1-1/4" solid point, PVC ta@.240 Ea 26.30 8.59 12.20 47.09
1-1/2" solid point, PVC ta@.240 Ea 32.40 8.59 12.20 53.19
2" solid point, PVC ta@.240 Ea 41.30 8.59 12.20 62.09
2-1/2" solid point, PVC ta@.253 Ea 42.60 9.06 12.80 64.46
3" solid point, PVC ta@.253 Ea 62.30 9.06 12.80 84.16
4" solid point, PVC ta@.267 Ea 111.00 9.56 13.50 134.06

Vented well caps, flush threaded


For top of monitoring casing, using a 16" truck mounted rotary drill and small tools.
1/2" vented cap, PVC ta@.240 Ea 7.50 8.59 12.20 28.29
3/4" vented cap, PVC ta@.240 Ea 7.94 8.59 12.20 28.73
1" vented cap, PVC ta@.240 Ea 8.95 8.59 12.20 29.74
1-1/4" vented cap, PVC ta@.240 Ea 9.54 8.59 12.20 30.33
1-1/2" vented cap, PVC ta@.240 Ea 10.00 8.59 12.20 30.79
2" vented cap, PVC ta@.240 Ea 10.90 8.59 12.20 31.69
2-1/2" vented cap, PVC ta@.253 Ea 12.70 9.06 12.80 34.56
3" vented cap, PVC ta@.253 Ea 14.30 9.06 12.80 36.16
4" vented cap, PVC ta@.267 Ea 20.60 9.56 13.50 43.66
4-1/2" vented cap, PVC ta@.267 Ea 48.60 9.56 13.50 71.66
5" vented cap, PVC ta@.282 Ea 49.30 10.10 14.30 73.70
6" vented cap, PVC ta@.300 Ea 53.40 10.74 15.20 79.34
8" vented cap, PVC ta@.343 Ea 85.70 12.28 17.40 115.38
10" vented cap, PVC ta@.400 Ea 246.00 14.32 20.30 280.62
12" vented cap, PVC ta@.480 Ea 424.00 17.19 24.40 465.59
1-1/4" vented cap, Teflon ta@.240 Ea 40.70 8.59 12.20 61.49
2015 Heavy Construction Estimator, All Rights Reserved Page 236 (part 2)

1-1/2" vented cap, Teflon ta@.240 Ea 47.10 8.59 12.20 67.89


2" vented cap, Teflon ta@.240 Ea 53.50 8.59 12.20 74.29
2015 Heavy Construction Estimator, All Rights Reserved Page 237

3" vented cap, Teflon ta@.253 Ea 146.00 9.06 12.80 167.86


4" vented cap, Teflon ta@.267 Ea 161.00 9.56 13.50 184.06

Protective well caps - PVC locking caps


Waterproof, with grout depth control ring, using a 16" truck mounted rotary drill and small tools.
2" PVC locking cap ta@.750 Ea 43.90 26.86 38.10 108.86
4" PVC locking cap ta@.857 Ea 55.40 30.69 43.50 129.59

Protective well caps - Aluminum locking caps


Using a 16" truck mounted rotary drill and small tools.
2" slip type, not water tight ta@.750 Ea 20.60 26.86 38.10 85.56
4" slip type, not water tight ta@.857 Ea 24.70 30.69 43.50 98.89
5" slip type, not water tight ta@.923 Ea 38.70 33.05 46.80 118.55
6" slip type, not water tight ta@1.00 Ea 38.80 35.81 50.70 125.31
7" slip type, not water tight ta@1.09 Ea 47.70 39.03 55.30 142.03
8" slip type, not water tight ta@1.20 Ea 60.50 42.97 60.90 164.37
10" slip type, not water tight ta@1.33 Ea 75.80 47.63 67.50 190.93
12" slip type, not water tight ta@1.50 Ea 126.00 53.72 76.10 255.82
2" hinged, female NPT threaded ta@.750 Ea 12.80 26.86 38.10 77.76
3" hinged, female NPT threaded ta@.800 Ea 20.80 28.65 40.60 90.05
4" hinged, female NPT threaded ta@.857 Ea 34.20 30.69 43.50 108.39

Protective well caps - Expandable well locking caps with stainless steel bolt
Using a 16" truck mounted rotary drill and small tools.
2" locking cap ta@.750 Ea 34.60 26.86 38.10 99.56
4" locking cap ta@.857 Ea 38.40 30.69 43.50 112.59

Protective well caps - Locking test well caps, self tapping, watertight
Using a 16" truck mounted rotary drill and small tools.
2" test well cap ta@.750 Ea 39.20 26.86 38.10 104.16
4" test well cap ta@.857 Ea 82.60 30.69 43.50 156.79
6" test well cap ta@1.00 Ea 96.20 35.81 50.70 182.71
Warning labels for caps --@.000 Ea 4.54 -- -- 4.54

Protective well caps - Locking test well caps, self tapping, watertight
Using a 16" truck mounted rotary drill and small tools.
4" x 4" x 5' standup cover ta@2.40 Ea 82.60 85.94 122.00 290.54
4" x 4" x 5' steel protective cover ta@2.40 Ea 157.00 85.94 122.00 364.94
6" x 6" x 5' steel protective cover ta@2.40 Ea 231.00 85.94 122.00 438.94
8" x 8" x 5' steel protective cover ta@2.40 Ea 380.00 85.94 122.00 587.94

Manhole covers for wells


Using a 16" truck mounted rotary drill and small tools.
8" x 7.5", non-locking ta@1.50 Ea 42.30 53.72 76.10 172.12
10" x 7.5", non-locking ta@1.71 Ea 54.60 61.24 86.80 202.64
12" x 7.5", non-locking ta@2.00 Ea 56.70 71.62 101.00 229.32
8" x 7.5", locking and watertight ta@1.50 Ea 72.30 53.72 76.10 202.12
12" x 7.5", locking and watertight ta@2.00 Ea 87.50 71.62 101.00 260.12

Protective well enclosures, schedule 40, hinged lid, lockable


Using a 16" truck mounted rotary drill and small tools.
4" x 3' ta@1.50 Ea 203.00 53.72 76.10 332.82
4" x 4' ta@2.00 Ea 217.00 71.62 101.00 389.62
4" x 5' ta@2.40 Ea 231.00 85.94 122.00 438.94
4" x 6' ta@3.00 Ea 246.00 107.40 152.00 505.40
5" x 3' ta@1.50 Ea 239.00 53.72 76.10 368.82
5" x 4' ta@2.00 Ea 260.00 71.62 101.00 432.62
2015 Heavy Construction Estimator, All Rights Reserved Page 237 (part 2)

5" x 5' ta@2.40 Ea 268.00 85.94 122.00 475.94


5" x 6' ta@3.00 Ea 304.00 107.40 152.00 563.40
6" x 3' ta@1.50 Ea 289.00 53.72 76.10 418.82
6" x 4' ta@2.00 Ea 311.00 71.62 101.00 483.62
6" x 5' ta@2.40 Ea 333.00 85.94 122.00 540.94
6" x 6' ta@3.00 Ea 354.00 107.40 152.00 613.40
8" x 3' ta@1.50 Ea 369.00 53.72 76.10 498.82
8" x 4' ta@2.00 Ea 398.00 71.62 101.00 570.62
8" x 5' ta@2.40 Ea 427.00 85.94 122.00 634.94
8" x 6' ta@3.00 Ea 456.00 107.40 152.00 715.40
2015 Heavy Construction Estimator, All Rights Reserved Page 238

Extraction well vault door


Using a 16" truck mounted rotary drill and small tools.
48"x48" steel trough frame pedestrian
loading double door ta@24.0 Ea 1,320.00 859.40 1,220.00 3,399.40
48" x 48" steel angle frame
heavy duty double door hatch ta@24.0 Ea 1,780.00 859.40 1,220.00 3,859.40

Stainless steel well casing centralizers


Using a 16" truck mounted rotary drill and small tools.
2" casing,
adjustable boreholes to 12" ta@.267 Ea 80.00 9.56 13.50 103.06
3" casing,
adjustable boreholes to 12" ta@.267 Ea 87.30 9.56 13.50 110.36
4" casing,
adjustable boreholes to 12" ta@.300 Ea 94.60 10.74 15.20 120.54
5" casing,
adjustable boreholes to 12" ta@.320 Ea 119.00 11.46 16.20 146.66
6" casing,
adjustable boreholes to 14" ta@.343 Ea 119.00 12.28 17.40 148.68
8" casing,
adjustable boreholes to 24" ta@.369 Ea 144.00 13.21 18.70 175.91
10" casing,
adjustable boreholes to 26" ta@.400 Ea 162.00 14.32 20.30 196.62
12" casing,
adjustable boreholes to 28" ta@.480 Ea 167.00 17.19 24.40 208.59

PVC bolt-on well casing centralizers, flexible


Using a 16" truck mounted rotary drill and small tools.
1-1/2" casing ta@.267 Ea 34.30 9.56 13.50 57.36
2" casing ta@.267 Ea 37.50 9.56 13.50 60.56
3" casing ta@.267 Ea 40.70 9.56 13.50 63.76
4" casing ta@.320 Ea 45.00 11.46 16.20 72.66
6" casing ta@.343 Ea 53.50 12.28 17.40 83.18
8" casing ta@.369 Ea 60.00 13.21 18.70 91.91
12" casing ta@.400 Ea 72.80 14.32 20.30 107.42

Half moon well casing centralizers, PVC, solvent welded


Using a 16" truck mounted rotary drill and small tools.
Small, 1" to 2", set of 3 ta@.480 Ea 21.40 17.19 24.40 62.99
Medium, 2" to 4", set of 2 ta@.600 Ea 32.10 21.49 30.40 83.99
Large, 4" to 6" ta@.600 Ea 30.00 21.49 30.40 81.89

Teflon casing centralizers, cloverleaf


Using a 16" truck mounted rotary drill and small tools.
2" casing, 4" borehole ta@.267 Ea 196.00 9.56 13.50 219.06
2" casing, 5" borehole ta@.267 Ea 216.00 9.56 13.50 239.06
2" casing, 6" borehole ta@.300 Ea 234.00 10.74 15.20 259.94
2" casing, 7" borehole ta@.343 Ea 250.00 12.28 17.40 279.68
2" casing, 8" borehole ta@.369 Ea 265.00 13.21 18.70 296.91

Well wash down valves


Using a 16" truck mounted rotary drill and small tools.
1-1/4" diameter valves ta@.200 Ea 19.50 7.16 10.10 36.76
1-1/2" diameter valves ta@.200 Ea 25.20 7.16 10.10 42.46
2" diameter valves ta@.218 Ea 29.70 7.81 11.10 48.61
3" diameter valves ta@.240 Ea 69.00 8.59 12.20 89.79
2015 Heavy Construction Estimator, All Rights Reserved Page 238 (part 2)

4" diameter valves ta@.267 Ea 88.90 9.56 13.50 111.96

Well K packer
Using a 16" truck mounted rotary drill and small tools.
2" x 4", K packer ta@.500 Ea 23.60 17.91 25.40 66.91
3" x 6", K packer ta@1.00 Ea 50.10 35.81 50.70 136.61
4" x 6", K packer ta@1.20 Ea 69.90 42.97 60.90 173.77
6" x 8", K packer ta@1.50 Ea 124.00 53.72 76.10 253.82

Well material steam cleaning, clean and bag pipe


An isopropyl alcohol bath can be substituted for steam cleaning for the same cost.
1/2" to 1" pipe or screen --@.000 LF 3.51 -- -- 3.51
1-1/4" to 2-1/2" pipe or screen --@.000 LF 4.16 -- -- 4.16
3" to 4" pipe or screen --@.000 LF 5.05 -- -- 5.05
5" to 6" pipe or screen --@.000 LF 9.21 -- -- 9.21

Well fill boxes


Using a 16" truck mounted rotary drill and small tools.
2" fill box with key female NPT ta@1.50 Ea 60.30 53.72 76.10 190.12
4" fill box with key female NPT ta@2.40 Ea 135.00 85.94 122.00 342.94
2015 Heavy Construction Estimator, All Rights Reserved Page 239

Bentonite tablets for wells


Using a 16" truck mounted rotary drill and small tools.
1/2" tablets, 10.16 pounds
per gallon at $.36 per pound ta@1.20 CF 52.10 42.97 60.90 155.97
3/8" tablets, 10.62 pounds
per gallon at $.50 per pound ta@1.20 CF 75.60 42.97 60.90 179.47
1/4" tablets, 10.80 pounds
per gallon at $.66 per pound ta@1.20 CF 101.00 42.97 60.90 204.87
Bentonite cylinder, 6" high,
2-7/8" I.D., seals 2" well ta@1.60 Ea 49.90 57.30 81.20 188.40
Drilling mud, chemical untreated Bentonite gel,
50 pounds per CF --@.000 CF 1.54 -- -- 1.54
Drilling mud, 50 pound bags,
chemically untreated --@.000 Ea 20.50 -- -- 20.50

Bentonite chips and grout for wells


Sealants and grouts are recommended for isolating screened intervals of monitoring wells. Chips are
recommended for shallow boreholes and abandoned wells, using a 16" truck mounted rotary drill and
small tools.
Bentonite chips, medium 1/4" to 3/8", 10.5 pounds
per gallon at $.09 per pound ta@1.20 CF 14.10 42.97 60.90 117.97
Bentonite grout, 3.04 pounds per gallon at $.42 per pound,
50 pounds yields 2.2 CF ta@1.20 CF 18.70 42.97 60.90 122.57
Bentonite grout, 50 pound bags --@.000 Ea 41.20 -- -- 41.20

Bentonite test equipment for wells


Mud balance --@.000 Ea 200.00 -- -- 200.00
Marsh funnel and cap --@.000 Ea 99.80 -- -- 99.80
Sand content kit --@.000 Ea 99.80 -- -- 99.80

Portland cement for wells


Using a 16" truck mounted rotary drill and small tools.
Portland cement grout, 94 lb. bag ta@1.20 CF 7.43 42.97 60.90 111.30

CSI 02-559, Chilled water distribution

Black preinsulated steel carrier pipe - Aligned and tackwelded on sleepers


Includes insulation and non-metallic casing, unloaded, distributed and placed, using a 20-ton hydraulic
crane with 70’ boom, a 75-ton 3-axle lowboy trailer, a 50,000 lb. 6x4 3-axle truck with 200-amp trailer
mounted welder and small tools.
1-1/2"(3.7cm) pipe on sleepers pv@.051 LF 25.20 2.12 1.33 28.65
2" pipe on sleepers pv@.062 LF 28.50 2.58 1.61 32.69
2-1/2" pipe on sleepers pv@.070 LF 34.70 2.91 1.82 39.43
3" (7.6cm) pipe on sleepers pv@.080 LF 35.70 3.32 2.08 41.10
4" (10cm) pipe on sleepers pv@.110 LF 41.60 4.57 2.86 49.03
5" pipe on sleepers pv@.123 LF 50.60 5.11 3.20 58.91
6" (15cm) pipe on sleepers pv@.140 LF 61.70 5.82 3.64 71.16
8" (21cm) pipe on sleepers pv@.160 LF 84.70 6.65 4.16 95.51
10" (25cm) pipe on sleepers pv@.170 LF 109.00 7.06 4.43 120.49
12" (31cm) pipe on sleepers pv@.190 LF 137.00 7.90 4.95 149.85
14" (36cm) pipe on sleepers pv@.200 LF 197.00 8.31 5.21 210.52
16" (41cm) pipe on sleepers pv@.220 LF 221.00 9.14 5.73 235.87

Black preinsulated steel carrier pipe - Aligned and tackwelded on trench bottom
No excavation or backfill included. Includes insulation and non-metallic casing. Unloaded, distributed
and placed, using a 20-ton hydraulic crane with 70’ boom, a 75-ton 3-axle lowboy trailer, a 50,000 lb.
6x4 3-axle truck with 200-amp trailer mounted welder and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 239 (part 2)

18" (46cm) pipe in trench pv@.240 LF 265.00 9.97 6.25 281.22


20" (51cm) pipe in trench pv@.250 LF 331.00 10.39 6.51 347.90
24" (61cm) pipe in trench pv@.290 LF 375.00 12.05 7.55 394.60
30" (76cm) pipe in trench pv@.347 LF 442.00 14.42 9.03 465.45
36" (91cm) pipe in trench pv@.420 LF 534.00 17.45 10.90 562.35
42" (106cm) pipe in trench pv@.477 LF 736.00 19.82 12.40 768.22

Elbows for preinsulated black steel carrier pipe, 2" insulation - Tackwelded on sleepers
Using a 200-amp trailer mounted-amp welder and small tools.
1-1/2" (3.7cm) elbow pd@.749 Ea 493.00 32.06 3.29 528.35
3" (7.6cm) elbow pd@1.50 Ea 655.00 64.22 6.59 725.81
4" (10cm) elbow pd@2.00 Ea 854.00 85.62 8.78 948.40
6" (15cm) elbow pd@2.00 Ea 1,290.00 85.62 8.78 1,384.40
8" (21cm) elbow pd@2.41 Ea 1,730.00 103.20 10.60 1,843.80
2015 Heavy Construction Estimator, All Rights Reserved Page 240

Tees for preinsulated black steel carrier pipe, 2" insulation - Tackwelded on sleepers
Using a 200-amp trailer mounted-amp welder and small tools.
1-1/2" (3.7cm) tee pd@.939 Ea 788.00 40.20 4.12 832.32
3" (7.6cm) tee pd@1.88 Ea 1,040.00 80.48 8.25 1,128.73
4" (10cm) tee pd@2.50 Ea 1,330.00 107.00 11.00 1,448.00
6" (15cm) tee pd@2.50 Ea 1,930.00 107.00 11.00 2,048.00
8" (21cm) tee pd@3.02 Ea 2,540.00 129.30 13.30 2,682.60

Reducers for preinsulated black steel carrier pipe, 2" insulation - Tackwelded on sleepers
Using a 200-amp trailer mounted-amp welder and small tools.
3" (7.6cm) reducer pd@1.00 Ea 655.00 42.81 4.39 702.20
4" (10cm) reducer pd@1.34 Ea 854.00 57.37 5.88 917.25
6" (15cm) reducer pd@1.34 Ea 1,290.00 57.37 5.88 1,353.25
8" (21cm) reducer pd@1.61 Ea 1,730.00 68.92 7.07 1,805.99

Anchors for preinsulated black steel carrier pipe - Tackwelded on sleepers


No concrete included, using a 200-amp trailer mounted-amp welder and small tools.
4" (10cm) pipe anchor pd@1.50 Ea 681.00 64.22 6.59 751.81
6" (15cm) pipe anchor pd@1.50 Ea 895.00 64.22 6.59 965.81
8" (21cm) pipe anchor pd@1.81 Ea 1,090.00 77.49 7.95 1,175.44

Caps for preinsulated black steel carrier pipe - Tackwelded on sleepers


Using a 200-amp trailer mounted-amp welder and small tools.
1-1/2" (3.7cm) pipe cap pd@.378 Ea 247.00 16.18 1.66 264.84
3" (7.6cm) pipe cap pd@.749 Ea 328.00 32.06 3.29 363.35
4" (10cm) pipe cap pd@1.00 Ea 427.00 42.81 4.39 474.20
6" (15cm) pipe cap pd@1.00 Ea 644.00 42.81 4.39 691.20
8" (21cm) pipe cap pd@1.20 Ea 865.00 51.37 5.27 921.64
10" (25cm) pipe cap pd@1.41 Ea 1,210.00 60.36 6.19 1,276.55
12" (31cm) pipe cap pd@1.44 Ea 1,510.00 61.65 6.32 1,577.97
14" (36cm) pipe cap pd@1.63 Ea 1,710.00 69.78 7.16 1,786.94
16" (41cm) pipe cap pd@1.81 Ea 1,990.00 77.49 7.95 2,075.44

Elbows for preinsulated black steel carrier pipe - Tackwelded in trench


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer
mounted welder and small tools.
10" (25cm) elbow ps@2.81 Ea 2,420.00 116.60 42.00 2,578.60
12" (31cm) elbow ps@2.86 Ea 3,020.00 118.60 42.70 3,181.30
14" (36cm) elbow ps@3.24 Ea 3,420.00 134.40 48.40 3,602.80
16" (41cm) elbow ps@3.58 Ea 3,980.00 148.50 53.50 4,182.00
18" (46cm) elbow ps@3.95 Ea 4,790.00 163.80 59.00 5,012.80
20" (51cm) elbow ps@4.10 Ea 5,520.00 170.10 61.30 5,751.40
24" (61cm) elbow ps@4.25 Ea 5,890.00 176.30 63.50 6,129.80
30" (76cm) elbow ps@5.08 Ea 8,840.00 210.70 75.90 9,126.60
36" (91cm) elbow ps@6.07 Ea 11,000.00 251.80 90.70 11,342.50
42" (106cm) elbow ps@6.94 Ea 14,700.00 287.90 104.00 15,091.90

Tees for preinsulated black steel carrier pipe - Tackwelded in trench


Using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and small tools.
10" (25cm) tee ps@3.47 Ea 3,460.00 143.90 51.80 3,655.70
12" (31cm) tee ps@3.58 Ea 4,420.00 148.50 53.50 4,622.00
14" (36cm) tee ps@4.00 Ea 5,150.00 165.90 59.80 5,375.70
16" (41cm) tee ps@4.47 Ea 5,960.00 185.40 66.80 6,212.20
18" (46cm) tee ps@5.00 Ea 7,180.00 207.40 74.70 7,462.10
20" (51cm) tee ps@5.08 Ea 8,280.00 210.70 75.90 8,566.60
24" (61cm) tee ps@5.31 Ea 8,840.00 220.30 79.30 9,139.60
2015 Heavy Construction Estimator, All Rights Reserved Page 240 (part 2)

30" (76cm) tee ps@6.42 Ea 13,300.00 266.30 95.90 13,662.20


36" (91cm) tee ps@7.73 Ea 16,600.00 320.60 115.00 17,035.60
42" (106cm) tee ps@8.72 Ea 22,100.00 361.70 130.00 22,591.70
2015 Heavy Construction Estimator, All Rights Reserved Page 241

Reducers for preinsulated black steel carrier pipe - Tackwelded in trench


Using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and small tools.
10" (25cm) reducer ps@1.88 Ea 2,420.00 77.98 28.10 2,526.08
12"(31cm) reducer ps@1.93 Ea 3,020.00 80.06 28.80 3,128.86
14"(36cm) reducer ps@2.17 Ea 3,420.00 90.01 32.40 3,542.41
16"(41cm) reducer ps@2.41 Ea 3,980.00 99.97 36.00 4,115.97
18"(46cm) reducer ps@2.66 Ea 4,790.00 110.30 39.70 4,940.00
20"(51cm) reducer ps@2.72 Ea 5,520.00 112.80 40.60 5,673.40
24"(61cm) reducer ps@2.83 Ea 5,890.00 117.40 42.30 6,049.70
30"(76cm) reducer ps@3.43 Ea 8,840.00 142.30 51.20 9,033.50
36"(91cm) reducer ps@4.00 Ea 11,000.00 165.90 59.80 11,225.70
42"(106cm) reducer ps@4.66 Ea 14,700.00 193.30 69.60 14,962.90

Anchors for preinsulated black steel carrier pipe - Tackwelded in trench


No concrete included, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder
and small tools.
10" (25cm) pipe anchor ps@2.10 Ea 1,270.00 87.11 31.40 1,388.51
12" (31cm) pipe anchor ps@2.17 Ea 1,440.00 90.01 32.40 1,562.41
14" (36cm) pipe anchor ps@2.45 Ea 1,660.00 101.60 36.60 1,798.20
16" (41cm) pipe anchor ps@2.70 Ea 1,840.00 112.00 40.30 1,992.30
18" (46cm) pipe anchor ps@2.98 Ea 2,210.00 123.60 44.50 2,378.10
20" (51cm) pipe anchor ps@3.06 Ea 2,580.00 126.90 45.70 2,752.60
24" (61cm) pipe anchor ps@3.15 Ea 2,950.00 130.70 47.10 3,127.80
30" (76cm) pipe anchor ps@3.82 Ea 3,310.00 158.50 57.10 3,525.60
36" (91cm) pipe anchor ps@4.47 Ea 4,050.00 185.40 66.80 4,302.20
42" (106cm) pipe anchor ps@5.23 Ea 5,150.00 216.90 78.10 5,445.00

Welding of preinsulated black steel carrier pipe - Welds on sleepers across trench
Costs per joint welded. Includes insulation collar, shrink sleeve and rock sleeve, using a 200-amp trailer
mounted welder and small tools.
1-1/2" (3.7cm) pipe pf@1.30 Ea 132.00 56.43 5.36 193.79
3" (7.6cm) pipe pf@2.86 Ea 197.00 124.20 11.80 333.00
4" (10cm) pipe pf@3.42 Ea 263.00 148.50 14.10 425.60
6" (15cm) pipe pf@4.18 Ea 316.00 181.50 17.20 514.70
8" (21cm) pipe pf@5.28 Ea 421.00 229.20 21.80 672.00
10" (25cm) pipe pf@6.09 Ea 533.00 264.40 25.10 822.50
12" (31cm) pipe pf@7.18 Ea 618.00 311.70 29.60 959.30
14" (36cm) pipe pf@7.78 Ea 723.00 337.70 32.10 1,092.80
16" (41cm) pipe pf@9.03 Ea 749.00 392.00 37.20 1,178.20

Welding of preinsulated black steel carrier pipe - Welds on trench bottom


No weld pit excavation included. Includes insulation collar, shrink sleeve and rock sleeve, using a
200-amp trailer mounted welder and small tools.
18" (46cm) pipe pf@14.7 Ea 934.00 638.10 60.60 1,632.70
20" (51cm) pipe pf@15.6 Ea 1,070.00 677.20 64.30 1,811.50
24" (61cm) pipe pf@17.5 Ea 1,330.00 759.70 72.10 2,161.80
30" (76cm) pipe pf@21.5 Ea 2,630.00 933.30 88.60 3,651.90
36" (91cm) pipe pf@23.3 Ea 2,630.00 1,011.00 96.00 3,737.00
42" (106cm) pipe pf@28.0 Ea 3,950.00 1,215.00 115.00 5,280.00

CSI 02-560, Waste water collection

Vitrified clay drain pipe, premium joint, C-200


4 and 5 foot standard lengths, no excavation included, using a 20-ton hydraulic crane with 70’ boom and
small tools.
4" (10cm) C200 pipe xt@.166 LF 2.31 5.11 1.54 8.96
6" (15cm) C200 pipe xt@.220 LF 3.49 6.77 2.04 12.30
2015 Heavy Construction Estimator, All Rights Reserved Page 241 (part 2)

8" (21cm) C100 pipe xt@.220 LF 5.34 6.77 2.04 14.15


10" (25cm) C200 pipe xu@.316 LF 9.04 9.47 2.23 20.74
12" (31cm) C200 pipe xu@.400 LF 11.60 11.98 2.82 26.40
15" (38cm) C200 pipe xu@.546 LF 22.60 16.36 3.85 42.81
Add for 3 foot (.92m) lengths ---@--- % 30.00 30.00 -- --
Add for 2 foot (.61m) lengths ---@--- % 60.00 60.00 -- --
Deduct for plain joint pipe ---@--- % -20.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 242

Unreinforced extra strength concrete pipe


See CSI 02-451 for concrete pressure pipe. No excavation or backfill included, using a 1.38 CY wheeled
loader-backhoe and small tools.
6" (15cm) pipe ex@.181 LF 5.42 6.40 0.69 12.51
8" (21cm) pipe ex@.160 LF 5.93 5.66 0.61 12.20
10"(25cm) pipe ex@.185 LF 6.54 6.54 0.71 13.79
12"(31cm) pipe ex@.242 LF 8.03 8.56 0.92 17.51
15"(38cm) pipe ex@.291 LF 9.24 10.29 1.11 20.64
18"(46cm) pipe ex@.369 LF 11.30 13.04 1.41 25.75
21"(53cm) pipe ex@.457 LF 14.20 16.15 1.75 32.10
24"(61cm) pipe ex@.533 LF 17.30 18.84 2.04 38.18

Reinforced concrete culvert pipe, class 3.


Using a 1.38 CY wheeled loader-backhoe and small tools. No excavation or backfill included.
12" (31cm) pipe ex@.253 LF 9.20 8.94 0.97 19.11
15" (38cm) pipe ex@.310 LF 11.10 10.96 1.18 23.24
18" (46cm) pipe ex@.393 LF 14.00 13.89 1.50 29.39
24" (61cm) pipe ex@.546 LF 21.80 19.30 2.09 43.19

Reinforced concrete culvert pipe, class 3.


Using a 20-ton hydraulic crane with 70’ boom and small tools.
30" (76cm) pipe tq@.716 LF 32.70 25.31 5.97 63.98
36" (91cm) pipe tq@.960 LF 47.70 33.94 8.01 89.65
42" (106cm) pipe tq@1.04 LF 60.60 36.76 8.67 106.03
48" (122cm) pipe tq@1.14 LF 73.10 40.30 9.51 122.91
60" (152cm) pipe tq@.960 LF 110.00 33.94 8.01 151.95
72" (183cm) pipe tq@1.92 LF 144.00 67.87 16.00 227.87
Add for class 4 reinforced
concrete culvert pipe ---@--- % 10.00 -- -- --
Add for class 5 reinforced
concrete culvert pipe ---@--- % 20.00 -- -- --

Precast concrete manhole slab tops, 8" (21cm) thick


Using a 1.38 CY wheeled loader-backhoe and small tools. No excavation or backfill included.
4' (1.2m) diameter ew@3.25 Ea 122.00 115.80 24.20 262.00
5' (1.5m) diameter ew@3.47 Ea 208.00 123.60 25.80 357.40
6' (1.8m) diameter ew@3.71 Ea 322.00 132.20 27.60 481.80

Manhole frames and covers, 24" (61cm) square


Using a 1.38 CY wheeled loader-backhoe and small tools. No excavation or backfill included.
Raise manhole cover and collar ew@6.50 Ea 37.20 231.60 48.40 317.20
300 pound (136kg) ew@2.99 Ea 426.00 106.50 22.20 554.70
350 pound (159kg) ew@3.33 Ea 453.00 118.60 24.80 596.40
400 pound (181kg) ew@3.33 Ea 481.00 118.60 24.80 624.40
2015 Heavy Construction Estimator, All Rights Reserved Page 243

500 pound (227kg) ew@3.33 Ea 536.00 118.60 24.80 679.40


1,200 pound (543kg) 3-piece,
10" (25cm) deep ew@8.67 Ea 609.00 308.90 64.50 982.40

Concrete inverts for manholes


Using small tools.
Single channel inverts ca@3.60 Ea 107.00 146.30 1.12 254.42
Triple channel inverts ca@6.00 Ea 107.00 243.90 1.86 352.76

Steps for manholes, cast iron


Using small tools.
7"x 9" (18cm x 23cm) steps b7@.250 Ea 44.00 11.21 0.09 55.30
8"x 9" (20cm x 23cm) steps b7@.250 Ea 78.20 11.21 0.09 89.50

Cast in place concrete manholes, 4' diameter, 8" (21cm) thick


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
4' (1.2m) deep ew@13.0 Ea 490.00 463.20 96.70 1,049.90
6' (1.8m) deep ew@17.3 Ea 660.00 616.40 129.00 1,405.40
8' (2.4m) deep ew@26.0 Ea 865.00 926.40 193.00 1,984.40
Typical
cost per linear foot of depth ew@3.25 VLF 114.00 115.80 24.20 254.00

Precast concrete manholes, 4' diameter, 8" (21cm) thick


No excavation or backfill included, using a 1.38 CY wheeled loader-backhoe and small tools.
4' (1.2m) deep ew@6.34 Ea 241.00 225.90 47.20 514.10
6' (1.8m) deep ew@8.67 Ea 347.00 308.90 64.50 720.40
8' (2.4m) deep ew@13.0 Ea 555.00 463.20 96.70 1,114.90
Typical
cost per linear foot of depth ew@1.63 VLF 53.50 58.08 12.10 123.68
Concrete grade rings 18" x 4" ew@2.17 Ea 29.70 77.32 16.10 123.12
Concrete grade rings 30" x 6" ew@2.60 Ea 44.60 92.64 19.30 156.54

Brick manholes, 4' (1.2m) inside diameter, 8" (20cm) wall


No excavation or backfill included, using small tools.
4' (1.2m) deep ca@22.0 Ea 397.00 894.30 6.82 1,298.12
6' (1.8m) deep ca@32.7 Ea 552.00 1,329.00 10.10 1,891.10
8' (2.4m) deep ca@43.9 Ea 701.00 1,785.00 13.60 2,499.60

Precast septic tanks, no excavation or piping included


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1,000 gallon tank nt@3.50 Ea 719.00 158.40 25.60 903.00
2,000 gallon tank nt@5.60 Ea 918.00 253.40 40.90 1,212.30
5,000 gallon tank nt@16.5 Ea 3,420.00 746.60 120.00 4,286.60

Precast septic tanks, no excavation or piping included


Using a 20-ton hydraulic crane with 70’ boom and small tools.
16,250 gallon tank tq@36.9 Ea 15,600.00 1,304.00 308.00 17,212.00
25,000 gallon tank tq@60.0 Ea 24,400.00 2,121.00 500.00 27,021.00
40,000 gallon tank tq@80.0 Ea 37,600.00 2,828.00 667.00 41,095.00

Septic tank distribution boxes, concrete


Using small tools.
5 outlet concrete distribution box nc@1.25 Ea 75.90 61.46 0.70 138.06

Septic tank distribution boxes, concrete


Using 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 243 (part 2)

12 outlet concrete distribution box nq@4.40 Ea 127.00 199.00 22.20 348.20

Leaching field chambers


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Standard leaching field
chamber 13'x 3'-7"x 1'-4" tq@3.00 Ea 502.00 106.10 25.00 633.10
Heavy duty leaching field
chamber 13'x 3'-9"x 1'-6" tq@4.00 Ea 585.00 141.40 33.40 759.80

Leaching pits, precast concrete


Using a 20-ton hydraulic crane with 70’ boom and small tools.
3' (1m) leaching pit nt@3.50 Ea 354.00 158.40 25.60 538.00
6' (2m) leaching pit nt@5.96 Ea 711.00 269.70 43.50 1,024.20

Leach field grates


Using a 1.38 CY wheeled loader-backhoe and small tools.
Cast iron, 24" x 24" ew@3.25 SF 179.00 115.80 24.20 319.00
2015 Heavy Construction Estimator, All Rights Reserved Page 244

Sewer connection fees


Using small tools.
Typical municipal fee w4@50.7 Ea -- 1,448.00 33.50 1,481.50
Treatment of waste water,
per 1,000 gallons --@.000 MGal 2.72 -- -- 2.72

CSI 02-610, Paving

Lime stabilized subgrade based on existing soil


Using a Cat 12-G motor grader, a 12-ton 3-wheel self propelled static roller, a 22-ton single drum
self-propelled vibratory roller and small tools.
6" (15cm) thick,
25 pounds (11kg) per SY h5@.040 SY 1.80 1.44 0.89 4.13
7" (18cm) thick,
29 pounds (13kg) per SY h5@.047 SY 2.38 1.70 1.05 5.13
8" (20cm) thick,
33 pounds (15kg) per SY h5@.053 SY 2.38 1.91 1.18 5.47

CSI 02-611, Crushed stone for paving

Prepare and roll sub base


Using a Cat 12-G motor grader, a 13-ton static self-propelled 11-tire roller and two sets of small tools, a
46,000 lb. 6x4 3-axle highway truck with 3,000 gallon water tank.
Small area xa@.032 SY 0.98 1.15 0.49 2.62
Large area xa@.032 SY 0.79 1.15 0.49 2.43

Roadway base courses


Using a D-8L crawler tractor dozer with straight blade, a 10’ wide self propelled chip spreader, a 1.5 CY
front-end crawler loader, a Cat 12-G motor grader and a 6,000 gallon off highway water wagon.
Graded crushed aggregate roadway base course,
per CY w7@.256 CY 38.70 8.48 12.80 59.98

Roadway base courses


Using a 1.38 CY wheeled loader-backhoe.
Washed
and graded sand loaded at pit et@.121 CY 7.85 4.45 1.85 14.15

Grade and compact crushed aggregate base course


Using a D-8L crawler tractor dozer with straight blade, a 10’ wide self propelled chip spreader, a 1.5 CY
front-end crawler loader, a Cat 12-G motor grader and a 6,000 gallon off highway water wagon.
4" (10cm) base w7@.028 SY 4.68 0.93 1.40 7.01
6" (15cm) base w7@.043 SY 6.45 1.43 2.15 10.03
9" (23 cm) base w7@.057 SY 9.68 1.89 2.84 14.41
12" (30cm) base w7@.085 SY 12.90 2.82 4.24 19.96

CSI 02-612, Bituminous concrete

Bituminous concrete base material


Delivered, spread and rolled, using a 46,000 lb. 3-axle 6x4 truck with a 3,000 gallon asphalt distributor,
a self propelled 10’ wide chip spreader, a 12-ton 3-wheel self propelled static roller, a 13-ton static
self-propelled 11-tire roller and small tools.
Macadam base, dry-bound
crushed stone or slag j6@.073 CY 55.10 2.69 1.43 59.22
Macadam base, water-bound
crushed stone or slag j6@.073 CY 55.10 2.69 1.43 59.22
2015 Heavy Construction Estimator, All Rights Reserved Page 244 (part 2)

Macadam base, bituminous


stabilized crushed stone j6@.073 CY 96.30 2.69 1.43 100.42
Bituminous stabilized sub base
course for bituminous paving j6@.073 CY 96.30 2.69 1.43 100.42

Bituminous intermediate courses


Delivered, spread and rolled, using a pneumatic asphalt finisher with screed, two 24,500 lb. 2-axle
trucks, a towed 7’ wide street sweeper, a 12-ton 3-wheel self propelled static roller, a 13-ton static
self-propelled 11-tire roller, and small tools.
Hot mix intermediate course, 3,954
pounds (2349kg/m3) per CY u3@.480 Ton 55.10 14.36 8.93 78.39

Bituminous surface courses


Delivered, spread and rolled, using a pneumatic asphalt finisher with screed, two 24,500 lb. 2-axle
trucks, a towed 7’ wide street sweeper, a 12-ton 3-wheel self propelled static roller, a 13-ton static
self-propelled 11-tire roller, and small tools.
Hot mix surface course, 3,774
pounds (2242kg/m3) per CY u3@.480 Ton 58.10 14.36 8.93 81.39

Bituminous surface courses


Using a 46,000 lb. 3-axle 6x4 truck with a 3,000 gallon truck-mounted asphalt distributor, a 24,500 lb.
2-axle truck with a 7’ wide towed street sweeper.
Surface prime coat, .28
gallons (1.25 l/m2) per SY j4@.012 CSF 9.48 0.44 0.34 10.26
Tack coat,
0.1 gallons (.5 l/m2) per SY j4@.032 CSF 3.21 1.16 0.89 5.26

Fabric overlays for roadways


Using a 46,000 lb. 6x4 3-axle truck and a 3,000 gallon asphalt distributor with 2,000 gallon asphalt
sealcoater, a 12-ton 3-wheel self propelled static roller and small tools.
4 oz. support fabric overlay j9@.003 SY 0.83 0.11 0.07 1.01

Bituminous surface treatment, based on 12' (3.7m) roadway width


Using a 3/4-ton pickup truck, a 24,500 lb. 2-axle truck with a 7’ wide towed street sweeper and small
tools.
Prepare and clean surface j5@2.17 Mile 9,370.00 72.65 47.80 9,490.45

Bituminous surface treatment, based on 12' (3.7m) roadway width


1/4 gallon liquid and 30 lbs. of gravel covers 1 SY. 1.13L of liquid and 16.3 kg of gravel covers m2, using
a 46,000 lb. 6x4 3-axle truck with a 3,000 gallon asphalt distributor, a 10’ wide self propelled chip
spreader, four 46,000 lb. 3-axle 6x4 trucks with 12 CY dump bodies.
Single course treatment j8@7.61 Mile 23,600.00 308.90 379.00 24,287.90
Double course treatment j8@15.2 Mile 33,200.00 617.00 757.00 34,574.00
Add for 15 foot (5m) width j8@1.20 Mile 18,200.00 48.71 59.80 18,308.51
Add for 18 foot (6m) width j8@2.39 Mile 20,100.00 97.01 119.00 20,316.01
Add for 21 foot (7m) width j8@3.59 Mile 23,600.00 145.70 179.00 23,924.70
2015 Heavy Construction Estimator, All Rights Reserved Page 245

Add for 24 foot (8m) width j8@4.79 Mile 27,900.00 194.40 239.00 28,333.40

CSI 02-613, Cold milling of pavement

Remove surface course by grinding


Using a 120" wide asphalt profiler, two 46,000 lb. 3-axle 6x4 trucks with 12 CY dump bodies, a 24,500
lb. 2-axle truck with 7’ wide towed street sweeper and small tools.
1"depth (2.5cm) kg@.020 SY -- 0.73 0.62 1.35

CSI 02-614, Portland cement concrete paving

Portland cement concrete paving, 4,500 PSI


On prepared and compacted base, using a crawler 25’ wide slipform concrete paver and small tools.
6" (15cm) concrete pavement kf@.058 SY 19.10 2.17 0.56 21.83
7" (18cm) concrete pavement kf@.064 SY 22.30 2.39 0.62 25.31
8" (20cm) concrete pavement kf@.077 SY 24.40 2.88 0.74 28.02
9" (23cm) concrete pavement kf@.085 SY 26.80 3.18 0.82 30.80
10" (25cm) concrete pavement kf@.096 SY 29.60 3.59 0.93 34.12
12" (30cm) concrete pavement kf@.115 SY 35.00 4.30 1.11 40.41
15" (38cm) concrete pavement kf@.152 SY 42.90 5.68 1.47 50.05

Finishing concrete pavement by hand


Using small tools.
Broom finish bf@.148 SY -- 6.31 0.03 6.34
Belt dragged finish bf@.070 SY -- 2.98 0.01 2.99

Curing concrete roadway


Using small tools.
Concrete
pavement curing (resin base) sq@.033 SY 0.47 1.15 0.01 1.63
Concrete pavement
curing (non resin base) sq@.033 SY 0.21 1.15 0.01 1.37

Cement
Using small tools.
Portland cement in bulk,
per hundred pounds --@.000 Ea 5.81 -- -- 5.81
Portland cement per 90 pound bag --@.000 Ea 8.84 -- -- 8.84

Concrete roadway joints


Using small tools.
Roadway joint, 10" depth al@.069 LF 1.73 3.03 0.04 4.80

CSI 02-615, Roller compacted concrete for large areas

Roller compacted concrete


Using a pneumatic asphalt finisher with screed, a 12-ton 3-wheel self propelled static roller and small
tools.
Place and compact concrete with roller,
per CY kd@.048 CY 86.60 1.72 0.93 89.25
8" (20cm) thick concrete pavement kd@.011 SY 19.10 0.39 0.21 19.70
12" (31cm) thick concrete pavement kd@.017 SY 28.70 0.61 0.33 29.64

CSI 02-616, Roadway repair and resurfacing

Roadway repair
2015 Heavy Construction Estimator, All Rights Reserved Page 245 (part 2)

Based on removing 12" outside damaged area and replacing base course and wear surface, using a
5-ton steel wheel self propelled static roller and small tools.
Asphalt repair,
resurface or patching hv@.150 SY 15.50 5.30 0.35 21.15

CSI 02-617, Pavement sealing

Filling expansion joints and shrinkage cracks in roads


Using a 375 CFM, 100 PSI compressor, 100’ of 1" air hose, a 110 gallon towed asphalt kettle for
pavement work, a 6.63" depth walk-behind concrete saw and small tools.
Per linear foot of concrete joint or crack,
liquid pour dp@.064 LF 3.13 2.28 0.57 5.98

Filling expansion joints and shrinkage cracks in roads


Using a 375 CFM, 100 PSI compressor, 100’ of 1" air hose, a walk-behind 6.63" depth concrete saw
and small tools.
Sealing joints
with preformed elastomerics dn@.080 LF 8.34 2.87 0.50 11.71

Asphalt seal coating, for roads and parking lots


Using a 46,000 lb. 3-axle 6x4 truck with a 3,000 gallon truck-mounted asphalt distributor, a 24,500 lb.
2-axle truck with a 7’ wide towed street sweeper.
2 coats of coal tar emulsion j4@.021 SY 1.16 0.76 0.59 2.51

CSI 02-618, Pavement marking

Marking lines painted on highway paving


Using a pavement line striper truck.
4" (10cm) wide lines km@1.08 MLF 82.10 41.75 46.40 170.25
6" (15cm) wide lines km@1.22 MLF 112.00 47.17 52.40 211.57
8" (21cm) wide lines km@1.32 MLF 168.00 51.03 56.70 275.73
Temporary painted lines km@.010 LF 0.18 0.39 0.43 1.00
2015 Heavy Construction Estimator, All Rights Reserved Page 246

Removing painted pavement lines


Using miscellaneous power tools and small tools.
Painted line removal su@.025 LF -- 0.88 0.04 0.92

Temporary taped pavement lines


Using small tools.
Temporary tape wf@.006 LF 0.34 0.12 0.01 0.47

Parking stall painting (per line painted)


Using small tools.
4" (10cm) wide stripe cy@.204 Ea 1.94 8.96 0.09 10.99
6" (15cm) wide stripe cy@.007 LF 0.10 0.31 -- 0.41

Miscellaneous pavement marking


Using small tools.
6" (15cm) wide letters cy@.059 Ea 2.70 2.59 0.03 5.32
12" (31cm) wide letters cy@.089 Ea 5.40 3.91 0.04 9.35
24" (56cm) wide letters cy@.148 Ea 8.10 6.50 0.07 14.67
36" (91cm) wide letter cy@.294 Ea 9.45 12.92 0.13 22.50
42" (107cm) wide arrows cy@.294 Ea 13.50 12.92 0.13 26.55
72" (183cm) wide arrows cy@.588 Ea 27.00 25.83 0.26 53.09
Standard handicap symbol cy@.588 Ea 27.00 25.83 0.26 53.09
Paint curbing, per LF painted cy@.015 LF 1.08 0.66 0.01 1.75
Remove 4"
(10cm) wide pavement stripe cy@.042 LF 1.35 1.85 0.02 3.22

Raised lane marker buttons


Using small tools.
Amber two sides cy@.021 Ea 8.10 0.92 0.01 9.03
One-way reflective cy@.021 Ea 8.10 0.92 0.01 9.03
Red and clear cy@.021 Ea 8.10 0.92 0.01 9.03

Thermoplastic pavement marking, hand work


Using small tools.
4" (10cm) wide stripe cy@.021 LF 0.29 0.92 0.01 1.22
8" (20cm) wide stripe cy@.042 LF 0.57 1.85 0.02 2.44
12" (31cm) wide stripe cy@.063 LF 0.85 2.77 0.03 3.65
24" (56cm) wide stripe cy@.168 LF 3.34 7.38 0.08 10.80
Thermoplastic arrow on pavement cy@4.00 Ea 83.60 175.70 1.80 261.10
Thermoplastic
24" (56cm) wide letters cy@1.18 Ea 27.90 51.84 0.53 80.27
Thermoplastic
cross hatching on pavement cy@.168 SY 0.20 7.38 0.08 7.66
Remove 4" (25cm)
wide thermoplastic stripes cy@.063 LF 0.85 2.77 0.03 3.65

Thermoplastic pavement marking, by machine


Using a pavement line striper truck.
4" (10cm) wide stripe km@.002 LF 0.39 0.08 0.09 0.56
8" (20cm) wide stripe km@.004 LF 0.85 0.16 0.17 1.18

CSI 02-620, Curbs and gutters

Curb forms - Wood forms for 6" x 18" cast-in-place concrete curb
Based on four uses of forms, using miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 246 (part 2)

Straight wood curb form av@.195 LF 2.32 8.13 0.16 10.61


Curved wood curb form av@.244 LF 2.32 10.18 0.20 12.70

Concrete for curbs - per CY


Using a portable 55 KW 120/240 volt generator, a 25" diameter concrete vibrator and small tools.
Placing
concrete and rebars for curb bq@.320 CY 122.00 11.60 0.50 134.10

Concrete for curbs - per LF


Using small tools.
18" high x 6" wide curb at@.253 LF 15.60 10.38 0.11 26.09
8" high x 8" wide curb at@.200 LF 8.18 8.20 0.09 16.47
12" high x 8" wide curb at@.225 LF 15.10 9.23 0.10 24.43
Add for
curved cast in place sections ---@--- % 8.00 29.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 247

Precast concrete curb


Using a 20-ton hydraulic crane with 70’ boom and small tools.
18" high x 6" wide straight curb cg@.160 LF 5.68 6.49 1.30 13.47
18" high x 6" wide radius curb cg@.200 LF 9.80 8.12 1.63 19.55
Add for curved precast sections ---@--- % 66.00 -- -- --

Bituminous plain asphalt curb, 8" (20cm) wide


Using a pneumatic asphalt finisher with screed and small tools.
6" (15cm) high, 50 LF per ton kb@.032 LF 2.14 1.12 0.75 4.01
8" (20cm) high, 44 LF per ton kb@.036 LF 2.79 1.26 0.84 4.89

Cast in place concrete curb and gutter combined


Including 6" curb formwork, rebar, concrete and finishing, using miscellaneous power tools and small
tools.
6" x 24", straight av@.162 LF 8.04 6.76 0.13 14.93
6" x 24", curved av@.216 LF 11.30 9.01 0.17 20.48
6" x 30", straight av@.162 LF 13.40 6.76 0.13 20.29
6" x 30", curved av@.216 LF 15.50 9.01 0.17 24.68

Granite curbs
Using a 20-ton hydraulic crane with 70’ boom and small tools.
5"x 16" split face granite curb cg@.125 LF 12.30 5.07 1.02 18.39
5"x 16" sawn face granite curb cg@.125 LF 9.68 5.07 1.02 15.77

CSI 02-630, Sidewalk

Bituminous sidewalk, no base included


Using a 5-ton steel wheel self propelled static roller and small tools.
2" (51cm) bituminous sidewalk hv@.074 SY 9.06 2.62 0.17 11.85
2-1/2" (63cm) bituminous sidewalk hv@.092 SY 11.30 3.25 0.22 14.77

Brick walk laid on sand bed


Using small tools.
Laid flat 4.5 brick per SF,
sand joint ca@.164 SF 3.00 6.67 0.05 9.72
Laid on edge, 7.2 brick per SF ca@.257 SF 5.89 10.45 0.08 16.42
Add for concrete bed and joints ---@--- % 29.00 95.00 -- --

Cast in place concrete walks


Includes reinforcing mesh but no base preparation, using small tools.
4" (10cm) thick concrete bi@.036 SF 1.93 1.46 0.01 3.40
5" (13cm) thick concrete bi@.038 SF 2.28 1.54 0.01 3.83
6" (15cm) thick concrete bi@.038 SF 2.76 1.54 0.01 4.31
Add for 4" (100mm)
thick bank run gravel base ---@--- % 9.00 32.00 -- --
Add for 6" (150mm)
thick bank run gravel base ---@--- % 14.00 50.00 -- --

Precast concrete patio blocks


Using small tools.
2" natural blocks ca@.068 SF 1.54 2.76 0.02 4.32
2" colored blocks ca@.068 SF 1.96 2.76 0.02 4.74

Precast concrete pavers, exposed aggregate finish


With 1/8" joints, including 2" sand bed, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 247 (part 2)

Natural color ca@.068 SF 1.74 2.76 0.02 4.52


Colored concrete ca@.068 SF 2.23 2.76 0.02 5.01
Granite or limestone aggregate ca@.068 SF 2.04 2.76 0.02 4.82
White tumblestone aggregate ca@.068 SF 2.08 2.76 0.02 4.86
2015 Heavy Construction Estimator, All Rights Reserved Page 248

Stone pavers
Add the cost of surface preparation and mortar bed. Material costs vary widely, check with local
supplier, using small tools.
1" (25cm) flagging,
bluestone paver, irregular sr@.222 SF 2.10 7.77 0.05 9.92
Snapped rectangular stone paver sr@.196 SF 2.97 6.86 0.05 9.88
3" (7.6cm) crushed stone paver,
white marble sr@.203 SF 0.45 7.10 0.05 7.60
3" (7.6cm) crushed stone paver,
bluestone sr@.203 SF 0.25 7.10 0.05 7.40

Snapped random rectangular pavers


Add the cost of surface preparation and mortar bed. Material costs vary widely, check with local
supplier, using small tools.
1-1/2" (3.7cm) rectangular paver sr@.212 SF 3.52 7.42 0.05 10.99
2" (5cm) rectangular paver sr@.217 SF 4.02 7.59 0.05 11.66

Slate pavers, natural cleft


Add the cost of surface preparation and mortar bed. Material costs vary widely, check with local
supplier, using small tools.
3/4" (1.9cm) irregular slate paver sr@.196 SF 2.65 6.86 0.05 9.56
1/2" (1.3cm) slate paver,
rectangular, random sr@.171 SF 4.53 5.98 0.04 10.55
1/4" (6mm) rectangular butt joint,
random sr@.120 SF 4.86 4.20 0.03 9.09
Add for sand rubbed finish ---@--- % 17.00 -- -- --
Add for
setting in building interiors ---@--- % -- 25.00 -- --

Granite block pavers


Add the cost of surface preparation and mortar bed. Material costs vary widely, check with local
supplier, using small tools.
3-1/2"x3-1/2"x3-1/2"granite block sr@.196 SF 3.00 6.86 0.05 9.91

3" to 5" thick granite pavers


Using small tools.
4" to 12" long, 3" to 5" wide sr@.184 SF 2.64 6.44 0.04 9.12
6" to 15" long, 3" to 6" wide sr@.171 SF 2.87 5.98 0.04 8.89

White granite pavers, sawn, thermal finish, 3/4" joint


Add the cost of surface preparation and mortar bed. Material costs vary widely, check with local
supplier, using small tools.
4" x 4" x 2" ce@.184 SF 3.29 7.42 0.06 10.77
4" x 4" x 3" ce@.184 SF 3.96 7.42 0.06 11.44
4" x 4" x 4" ce@.184 SF 4.49 7.42 0.06 11.97
4" x 8" x 2" ce@.171 SF 5.27 6.89 0.05 12.21
4" x 8" x 3" ce@.184 SF 5.93 7.42 0.06 13.41
4" x 8" x 4" ce@.184 SF 6.60 7.42 0.06 14.08
8" x 8" x 2" ce@.171 SF 7.91 6.89 0.05 14.85
8" x 8" x 3" ce@.171 SF 8.57 6.89 0.05 15.51
8" x 8" x 4" ce@.184 SF 9.24 7.42 0.06 16.72
12" x 12" x 2" ce@.171 SF 8.32 6.89 0.05 15.26
12" x 12" x 3" ce@.171 SF 9.89 6.89 0.05 16.83
12" x 12" x 4" ce@.171 SF 10.50 6.89 0.05 17.44

Precast concrete pavers


2015 Heavy Construction Estimator, All Rights Reserved Page 248 (part 2)

Dry joints, including surface preparation and sand bed, using small tools.
4" x 8" x 2-3/8" ce@.060 SF 1.92 2.42 0.02 4.36
4" x 8" x 3" ce@.060 SF 2.09 2.42 0.02 4.53
2-3/8" multi-sided paver,
interlocking ce@.065 SF 2.34 2.62 0.02 4.98
8" x 8" x 2-3/8" ce@.060 SF 2.17 2.42 0.02 4.61
12" x 12" x 2" ce@.055 SF 2.09 2.22 0.02 4.33
18" x 18" x 2" ce@.055 SF 2.01 2.22 0.02 4.25
24" x 24" x 2" ce@.050 SF 2.01 2.02 0.02 4.05
24" x 36" x 2" ce@.050 SF 2.01 2.02 0.02 4.05
36" x 36" x 2-1/2" ce@.055 SF 2.09 2.22 0.02 4.33

CSI 02-680, Aviation fuel distribution

Filter separators
Using a 20-ton hydraulic crane with 70’ boom and small tools.
50 GPM at 150 PSI, 2" connection pc@8.00 Ea 21,800.00 366.30 46.60 22,212.90
300 GPM at 200 PSI, 4" connection pc@12.0 Ea 52,700.00 549.50 69.80 53,319.30
600 GPM at 200 PSI, 6" connection pc@14.0 Ea 63,600.00 641.10 81.50 64,322.60
2015 Heavy Construction Estimator, All Rights Reserved Page 249

1200 GPM at 200 PSI, 8" connection pc@16.0 Ea 82,100.00 732.60 93.10 82,925.70

Double wall fiberglass pipe with fiberglass containment pipe


No excavation or backfill included, using a 20-ton hydraulic crane with 70’ boom and small tools.
1" pipe with 3" containment pj@.240 LF 34.70 10.57 0.71 45.98
2" pipe with 6" containment pj@.300 LF 44.30 13.22 0.89 58.41
3" pipe with 6" containment pj@.320 LF 50.50 14.10 0.95 65.55
4" pipe with 8" containment pj@.370 LF 65.80 16.30 1.10 83.20
6" pipe with 10" containment pj@.450 LF 104.00 19.82 1.34 125.16
8" pipe with 12" containment pj@.560 LF 131.00 24.67 1.66 157.33
10" pipe with 14" containment pj@.620 LF 170.00 27.31 1.84 199.15
12" pipe with 16" containment pj@.670 LF 201.00 29.51 1.99 232.50

Double wall fiberglass 90 degree elbows


Includes fiberglass containment elbow, using small tools.
1" elbow with 3" containment nf@2.30 Ea 243.00 104.40 1.29 348.69
2" elbow with 6" containment nf@3.10 Ea 436.00 140.60 1.74 578.34
3" elbow with 6" containment nf@3.30 Ea 448.00 149.70 1.85 599.55
4" elbow with 8" containment nf@4.20 Ea 627.00 190.60 2.35 819.95
6" elbow with 10" containment nk@5.00 Ea 1,250.00 225.50 3.05 1,478.55
8" elbow with 12" containment nk@6.20 Ea 1,480.00 279.60 3.78 1,763.38
10" elbow with 14" containment nk@7.00 Ea 2,070.00 315.60 4.27 2,389.87
12" elbow with 16" containment nk@7.60 Ea 2,170.00 342.70 4.64 2,517.34

Double wall fiberglass 45 degree elbows


Includes fiberglass containment elbow, using small tools.
1" elbow with 3" containment nf@2.30 Ea 243.00 104.40 1.29 348.69
2" elbow with 6" containment nf@3.10 Ea 436.00 140.60 1.74 578.34
3" elbow with 6" containment nf@3.30 Ea 448.00 149.70 1.85 599.55
4" elbow with 8" containment nf@4.20 Ea 523.00 190.60 2.35 715.95
6" elbow with 10" containment nk@5.00 Ea 1,160.00 225.50 3.05 1,388.55
8" elbow with 12" containment nk@6.20 Ea 1,410.00 279.60 3.78 1,693.38
10" elbow with 14" containment nk@7.00 Ea 1,870.00 315.60 4.27 2,189.87
12" elbow with 16" containment nk@7.60 Ea 1,970.00 342.70 4.64 2,317.34

Double wall fiberglass straight tees


Includes fiberglass containment tee, using small tools.
1" tee with 3" containment tee nf@2.40 Ea 439.00 108.90 1.34 549.24
2" tee with 6" containment tee nf@4.60 Ea 542.00 208.70 2.58 753.28
3" tee with 6" containment tee nf@4.60 Ea 553.00 208.70 2.58 764.28
4" tee with 8" containment tee nf@5.30 Ea 768.00 240.50 2.97 1,011.47
6" tee with 10" containment tee nk@7.50 Ea 1,230.00 338.20 4.58 1,572.78
8" tee with 12" containment tee nk@9.20 Ea 1,580.00 414.80 5.61 2,000.41
10" tee with 14" containment tee nk@10.0 Ea 1,920.00 450.90 6.10 2,377.00
12" tee with 16" containment tee nk@10.6 Ea 2,770.00 478.00 6.47 3,254.47

Double wall S40 steel pipe


Includes fiberglass containment pipe but no excavation or backfill, using small tools.
1/2" pipe with 3" containment nf@.200 LF 41.60 9.07 0.11 50.78
3/4" pipe with 3" containment nf@.200 LF 42.90 9.07 0.11 52.08
1" pipe with 4" containment nf@.220 LF 48.80 9.98 0.12 58.90
1-1/2" pipe with 4" containment nf@.240 LF 52.40 10.89 0.13 63.42
2" pipe with 6" containment nf@.290 LF 66.50 13.16 0.16 79.82
2-1/2" pipe with 6" containment nf@.310 LF 71.20 14.06 0.17 85.43

Double wall S40 steel pipe


Includes fiberglass containment pipe but no excavation or backfill, using a 300-amp skid mounted
welder and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 249 (part 2)

3" pipe with 6" containment pa@.350 LF 74.50 16.39 0.63 91.52
2015 Heavy Construction Estimator, All Rights Reserved Page 250

4" pipe with 8" containment pa@.440 LF 108.00 20.61 0.79 129.40
6" pipe with 10" containment pa@.580 LF 164.00 27.16 1.04 192.20

Double wall S40 steel 90 degree elbows


Includes fiberglass containment elbows, using small tools.
1/2" ell with 3" containment ell nf@1.56 Ea 250.00 70.78 0.87 321.65
3/4" ell with 3" containment ell nf@1.59 Ea 265.00 72.14 0.89 338.03
1" ell with 4" containment ell nf@2.03 Ea 291.00 92.10 1.14 384.24
1-1/2" ell with 4" containment ell nf@2.13 Ea 321.00 96.64 1.19 418.83
2" ell with 6" containment ell nf@2.54 Ea 408.00 115.20 1.42 524.62
2-1/2" ell with 6" containment ell nf@2.80 Ea 408.00 127.00 1.57 536.57

Double wall S40 steel 90 degree elbows


Includes fiberglass containment elbows, using a 300-amp skid mounted welder and small tools.
3" ell with 6" containment ell pa@4.03 Ea 419.00 188.70 7.25 614.95
4" ell with 8" containment ell pa@6.00 Ea 518.00 281.00 10.80 809.80
6" ell with 10" containment ell pa@8.79 Ea 690.00 411.60 15.80 1,117.40

Double wall S40 steel 45 degree elbows


Includes fiberglass containment elbows, using small tools.
1/2" ell with 3" containment ell nf@1.56 Ea 247.00 70.78 0.87 318.65
3/4" ell with 3" containment ell nf@1.59 Ea 262.00 72.14 0.89 335.03
1" ell with 4" containment ell nf@2.03 Ea 287.00 92.10 1.14 380.24
1-1/2" ell with 4" containment ell nf@2.13 Ea 318.00 96.64 1.19 415.83
2" ell with 6" containment ell nf@2.54 Ea 400.00 115.20 1.42 516.62
2-1/2" ell with 6" containment ell nf@2.80 Ea 400.00 127.00 1.57 528.57

Double wall S40 steel 45 degree elbows


Includes fiberglass containment elbows, using a 300-amp skid mounted welder and small tools.
3" ell with 6" containment ell pa@4.03 Ea 415.00 188.70 7.25 610.95
4" ell with 8" containment ell pa@6.00 Ea 518.00 281.00 10.80 809.80
6" ell with 10" containment ell pa@8.79 Ea 690.00 411.60 15.80 1,117.40

Double wall S40 steel straight tees


Includes fiberglass containment tees, using small tools.
1/2" tee with 3" containment tee nf@1.61 Ea 416.00 73.05 0.90 489.95
3/4" tee with 3" containment tee nf@1.66 Ea 436.00 75.31 0.93 512.24
1" tee with 4" containment tee nf@2.06 Ea 490.00 93.46 1.15 584.61
1-1/2" tee with 4" containment tee nf@2.26 Ea 543.00 102.50 1.27 646.77
2" tee with 6" containment tee nf@3.81 Ea 698.00 172.90 2.13 873.03
2-1/2" tee with 6" containment tee nf@4.06 Ea 698.00 184.20 2.27 884.47

Double wall S40 steel straight tees


Includes fiberglass containment tees, using a 300-amp skid mounted welder and small tools.
3" tee with 6" containment tee pa@6.04 Ea 707.00 282.90 10.90 1,000.80
4" tee with 8" containment tee pa@8.99 Ea 874.00 421.00 16.20 1,311.20
6" tee with 10" containment tee pa@13.2 Ea 1,180.00 618.20 23.80 1,822.00

Refueling pantographs
Includes stainless steel swivels, aluminum pipe, spools, 8" tires and hose trough, using small tools.
2" pantograph 40' long nc@2.50 Ea 83,500.00 122.90 1.40 83,624.30
2" pantograph 50' long nc@2.50 Ea 95,400.00 122.90 1.40 95,524.30
3" pantograph 45' long nc@3.00 Ea 139,000.00 147.50 1.68139,149.18
4" pantograph 40' long nc@4.00 Ea 142,000.00 196.70 2.24142,198.94
4" pantograph 50' long nc@4.00 Ea 167,000.00 196.70 2.24167,198.94
6" pantograph 40' long nc@4.00 Ea 323,000.00 196.70 2.24323,198.94
6" pantograph 50' long nc@4.00 Ea 396,000.00 196.70 2.24396,198.94
2015 Heavy Construction Estimator, All Rights Reserved Page 250 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 251

Fueling station leak detection cable


Using small tools.
Fuel detection cable ll@.020 LF 47.20 0.82 -- 48.02
Water detection cable ll@.020 LF 22.10 0.82 -- 22.92
Non detecting cable ll@.020 LF 3.05 0.82 -- 3.87

Fueling station control panels


Using small tools.
Single channel control panel lk@4.00 Ea 8,010.00 200.40 0.76 8,211.16
2 channel control panel lk@5.00 Ea 10,800.00 250.50 0.95 11,051.45
4 channel control panel lk@6.00 Ea 17,200.00 300.60 1.14 17,501.74

Fueling tank sump basins


Using small tools.
36" diameter, with lid nc@4.00 Ea 2,630.00 196.70 2.24 2,828.94
48" diameter, with lid nc@6.00 Ea 3,090.00 295.00 3.36 3,388.36

CSI 02-711, Chain link fences

Galvanized 9 gauge chain link fence, complete


Including 10" x 36" holes power augered in normal soil each 10', schedule 40 ASTM F 1083 steel pipe
line posts set in concrete, 1-5/8" schedule 40 steel pipe top rail and 9-gauge 2" steel mesh fabric
(ASTM A392 class 1 galvanized coating). Add the cost of gates, corner and end posts, barbed wire,
clearing, soil disposal and surveying, as required. See additional costs below, using a 24,500 lb. 2-axle
truck, front end loader with power auger and small tools.
4' high, 2" line posts 2g@.073 LF 8.92 2.61 1.21 12.74
5' high, 2" line posts 2g@.091 LF 9.94 3.26 1.51 14.71
6' high, 2" line posts 2g@.106 LF 10.90 3.80 1.76 16.46
6' high, 2-3/8" line posts 2g@.109 LF 12.10 3.90 1.81 17.81
7' high, 2-3/8" line posts 2g@.127 LF 12.40 4.55 2.10 19.05
8' high, 2-3/8" line posts 2g@.146 LF 14.30 5.23 2.42 21.95
10' high, 2-3/8" line posts 2g@.182 LF 16.80 6.52 3.02 26.34
12' high, 2-3/8" line posts 2g@.218 LF 19.40 7.81 3.61 30.82

Galvanized 9 gauge chain link fence with 3-strand barbed wire


Including 10" x 36" holes power augered in normal soil each 10', schedule 40 ASTM F 1083 steel pipe
line posts set in concrete, 1-5/8" schedule 40 steel pipe top rail, 9-gauge 2" steel mesh fabric (ASTM
A392 class 1 galvanized coating) and ASTM A-121 barbed wire 12" high. Add the cost of gates, corner
posts, clearing, soil disposal and surveying, as required. See additional costs below, using a 24,500 lb.
2-axle truck, front end loader with power auger and small tools.
6' fence, 1' high barbed wire,
2" line posts 2g@.127 LF 9.56 4.55 2.10 16.21
6' fence, 1' high barbed wire,
2-3/8" line posts 2g@.127 LF 10.50 4.55 2.10 17.15
7' fence, 1' high barbed wire,
2-3/8" line posts 2g@.145 LF 11.40 5.19 2.40 18.99
8' fence, 1' high barbed wire,
2-3/8" line posts 2g@.163 LF 13.20 5.84 2.70 21.74

End posts for galvanized chain link fence


Including 12" x 36" holes power augered in normal soil, schedule 40 ASTM F 1083 steel pipe posts set
in concrete, fittings and tension bar. Add the cost of brace rail and truss rod, if required. See additional
costs below, using a 24,500 lb. 2-axle truck, front end loader with power auger and small tools.
4' high, 2-3/8" end posts 2g@.455 EA 38.80 16.29 7.54 62.63
5' high, 2-3/8" end posts 2g@.455 EA 53.40 16.29 7.54 77.23
6' high, 3" end posts 2g@.758 EA 70.10 27.14 12.60 109.84
2015 Heavy Construction Estimator, All Rights Reserved Page 251 (part 2)

7' high, 3" end posts 2g@.758 EA 75.90 27.14 12.60 115.64
8' high, 3" end posts 2g@.909 EA 92.80 32.55 15.10 140.45
10' high, 3" end posts 2g@1.06 EA 113.00 37.96 17.60 168.56
12' high, 3" end posts 2g@1.06 EA 141.00 37.96 17.60 196.56

Corner posts for galvanized chain link fence


Including 12" x 36" holes power augered in normal soil, schedule 40 ASTM F 1083 steel pipe posts set
in concrete, fittings and tension bar. Add the cost of brace rail and truss rod, if required. See additional
costs below, using a 24,500 lb. 2-axle truck, front end loader with power auger and small tools.
4' high, 2-3/8" end posts 2g@.606 EA 52.60 21.70 10.00 84.30
5' high, 2-3/8" end posts 2g@.606 EA 58.80 21.70 10.00 90.50
6' high, 3" end posts 2g@.909 EA 79.90 32.55 15.10 127.55
7' high, 3" end posts 2g@.909 EA 87.20 32.55 15.10 134.85
8' high, 3" end posts 2g@1.36 EA 110.00 48.70 22.50 181.20
10' high, 3" end posts 2g@1.36 EA 126.00 48.70 22.50 197.20
12' high, 3" end posts 2g@1.51 EA 159.00 54.07 25.00 238.07

Additional costs for galvanized chain link fence


Add or deduct the following costs as required, using a 24,500 lb. 2-axle truck, front end loader with
power auger and small tools.
Add for 1-5/8" rail at fence bottom 2g@.036 LF 2.25 1.29 0.60 4.14
Add for 7 gauge
line wire at fence bottom 2g@.001 LF 0.16 0.04 0.02 0.22
Add for 7 gauge
line wire at fence bottom 2g@.001 LF 0.16 0.04 0.02 0.22
Deduct for 7 gauge wire at top of fence
in place of 1-5/8" to rail 2g@-0.0 LF -1.44 -0.54 -0.25 -2.23
2015 Heavy Construction Estimator, All Rights Reserved Page 252

Add for vertical barbed


wire extension on end posts 2g@.091 Ea 7.65 3.26 1.51 12.42
Add for vertical barbed wire
extension on corner posts 2g@.091 Ea 10.80 3.26 1.51 15.57
Add for pressed steel
angle arm on corner posts 2g@.091 Ea 12.60 3.26 1.51 17.37
Add for 1-5/8" brace rail
and truss rod on end post 2g@.758 Ea 25.20 27.14 12.60 64.94
Add for 1-5/8" brace rails
and truss rods on corner post 2g@1.52 Ea 50.40 54.43 25.20 130.03
Add for aluminized steel
chain link fence and posts ---@--- % 20.00 30.00 -- --
Add for vinyl coated steel
chain link fence and posts ---@--- % 30.00 50.00 -- --
Add for 6 gauge
galvanized chain link fence ---@--- % 50.00 30.00 -- --
Deduct for 11 gauge
galvanized chain link fence ---@--- % -15.00 30.00 -- --

Swing gates for galvanized chain link fence


Including 12" x 36" holes power augered in normal soil, 2" schedule 40 ASTM F 1083 steel pipe frame,
9 gauge 2" mesh, hinge post and latch posts set in concrete, hinges, center latch and holdbacks. See
additional costs below, using a 24,500 lb. 2-axle truck, front end loader with power auger and small
tools.
4' high, 4' wide, 3" posts 2g@1.62 Ea 171.00 58.01 26.80 255.81
4' high, 6' wide, 3" posts 2g@1.68 Ea 184.00 60.16 27.80 271.96
4' high, 10' wide,
3" posts, double leaf 2g@1.79 Set 340.00 64.10 29.70 433.80
4' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 355.00 65.89 30.50 451.39
4' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 432.00 69.83 32.30 534.13
5' high, 4' wide, 3" posts 2g@1.62 Ea 182.00 58.01 26.80 266.81
5' high, 6' wide, 3" posts 2g@1.68 Ea 196.00 60.16 27.80 283.96
5' high, 10' wide,
3" posts, double leaf 2g@1.79 Set 417.00 64.10 29.70 510.80
5' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 422.00 65.89 30.50 518.39
5' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 537.00 69.83 32.30 639.13
6' high, 4' wide, 3" posts 2g@1.62 Ea 209.00 58.01 26.80 293.81
6' high, 6' wide, 3" posts 2g@1.68 Ea 222.00 60.16 27.80 309.96
6' high, 10' wide,
3" posts, double leaf 2g@1.79 Set 319.00 64.10 29.70 412.80
6' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 338.00 65.89 30.50 434.39
6' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 542.00 69.83 32.30 644.13
6' high, 20' wide,
4" posts, double leaf 2g@2.06 Set 665.00 73.77 34.10 772.87
6' high, 24' wide,
4" posts, double leaf 2g@2.16 Set 728.00 77.35 35.80 841.15
6' high, 26' wide,
4" posts, double leaf 2g@2.22 Set 741.00 79.50 36.80 857.30
6' high, 30' wide,
6-5/8" posts, double leaf 2g@2.33 Set 1,050.00 83.44 38.60 1,172.04
7' high, 4' wide, 3" posts 2g@1.62 Ea 238.00 58.01 26.80 322.81
7' high, 6' wide, 3" posts 2g@1.68 Ea 250.00 60.16 27.80 337.96
7' high, 10' wide,
3" posts, double leaf 2g@1.79 Set 481.00 64.10 29.70 574.80
2015 Heavy Construction Estimator, All Rights Reserved Page 252 (part 2)

7' high, 12' wide,


3" posts, double leaf 2g@1.84 Set 499.00 65.89 30.50 595.39
7' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 591.00 69.83 32.30 693.13
7' high, 20' wide,
4" posts, double leaf 2g@2.06 Set 716.00 73.77 34.10 823.87
7' high, 24' wide,
4" posts, double leaf 2g@2.16 Set 764.00 77.35 35.80 877.15
7' high, 26' wide,
4" posts, double leaf 2g@2.22 Set 777.00 79.50 36.80 893.30
7' high, 30' wide,
6-5/8" posts, double leaf 2g@2.33 Set 1,140.00 83.44 38.60 1,262.04
8' high, 4' wide, 3" posts 2g@1.62 Ea 250.00 58.01 26.80 334.81
8' high, 6' wide, 3" posts 2g@1.68 Ea 261.00 60.16 27.80 348.96
8' high, 10' wide,
3" posts, double leaf 2g@1.78 Set 513.00 63.74 29.50 606.24
8' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 534.00 65.89 30.50 630.39
8' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 631.00 69.83 32.30 733.13
8' high, 20' wide,
4" posts, double leaf 2g@2.06 Set 774.00 73.77 34.10 881.87
8' high, 24' wide,
4" posts, double leaf 2g@2.16 Set 864.00 77.35 35.80 977.15
8' high, 26' wide,
4" posts, double leaf 2g@2.22 Set 892.00 79.50 36.80 1,008.30
8' high, 30' wide,
6-5/8" posts, double leaf 2g@2.33 Set 1,210.00 83.44 38.60 1,332.04
10' high, 4' wide, 3" posts 2g@1.62 Ea 342.00 58.01 26.80 426.81
10' high, 6' wide, 3" posts 2g@1.67 Ea 365.00 59.80 27.70 452.50
10' high, 10' wide,
3" posts, double leaf 2g@1.79 Set 637.00 64.10 29.70 730.80
10' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 682.00 65.89 30.50 778.39
10' high, 16' wide,
3" posts, double leaf 2g@1.95 Set 797.00 69.83 32.30 899.13
10' high, 20' wide,
4" posts, double leaf 2g@2.06 Set 956.00 73.77 34.10 1,063.87
10' high, 24' wide,
4" posts, double leaf 2g@2.16 Set 1,050.00 77.35 35.80 1,163.15
12' high, 4' wide, 3" posts 2g@1.62 Ea 386.00 58.01 26.80 470.81
12' high, 6' wide, 3" posts 2g@1.68 Ea 409.00 60.16 27.80 496.96
12' high, 10' wide,
3" posts, double leaf 2g@1.78 Set 705.00 63.74 29.50 798.24
12' high, 12' wide,
3" posts, double leaf 2g@1.84 Set 774.00 65.89 30.50 870.39
2015 Heavy Construction Estimator, All Rights Reserved Page 253

12' high, 16' wide,


3" posts, double leaf 2g@1.95 Set 887.00 69.83 32.30 989.13
12' high, 20' wide,
4" posts, double leaf 2g@2.06 Set 1,070.00 73.77 34.10 1,177.87
12' high, 24' wide,
4" posts, double leaf 2g@2.16 Set 1,180.00 77.35 35.80 1,293.15

Additional costs for galvanized chain link gates


Cost per opening, using a 24,500 lb. 2-axle truck, front end loader with power auger and small tools.
3-strand barbed wire on 4' opening 2g@.106 Ea 55.20 3.80 1.76 60.76
3-strand barbed wire on 6' opening 2g@.106 Ea 56.40 3.80 1.76 61.96
3-strand barbed wire on 10' opening 2g@.106 Ea 58.50 3.80 1.76 64.06
3-strand barbed wire on 12' opening 2g@.127 Ea 59.50 4.55 2.10 66.15
3-strand barbed wire on 16' opening 2g@.170 Ea 61.60 6.09 2.82 70.51
3-strand barbed wire on 20' opening 2g@.212 Ea 63.70 7.59 3.51 74.80
3-strand barbed wire on 24' opening 2g@.255 Ea 65.90 9.13 4.23 79.26
3-strand barbed wire on 26' opening 2g@.276 Ea 66.90 9.88 4.57 81.35
3-strand barbed wire on 30' opening 2g@.318 Ea 69.00 11.39 5.27 85.66
Add for 1-5/8" brace
rail and truss rod on gate 2g@.758 Ea 25.20 27.14 12.60 64.94
Add for aluminized
steel chain link gates ---@--- % 20.00 30.00 -- --
Add for vinyl
coated steel chain link gates ---@--- % 30.00 30.00 -- --

Drilling fence post holes, medium soil


10" x 36" hole, no removal of spoil included, using small tools.
Hand augered, per post hole sr@.875 Ea -- 30.61 0.20 30.81

Drilling fence post holes, medium soil


Does not include removal of spoil, using a 9" gas-powered auger drill and small tools.
Auger drill fence post hole d7@.200 Ea -- 7.13 4.01 11.14

Fence posts in rocky ground


Does not include removal of spoil, using a 375 CFM, 100 PSI compressor, 200’ of 1" air hose, two 86
pound paving breakers and small tools.
Jackhammer fence post hole dy@3.00 Ea -- 106.10 20.00 126.10

Fence posts in rocky ground


Does not include removal of spoil, using a 6.75" to 9.88" track drill and small tools.
Rock drill fence post hole ed@.250 Ea -- 8.76 14.60 23.36

Galvanized H-beam 1-7/8" (3.8cm) steel line posts for chain link fence
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
4' fence height 2g@.375 Ea 6.09 13.43 6.21 25.73
5' fence height 2g@.387 Ea 7.21 13.86 6.41 27.48
6' fence height 2g@.400 Ea 8.33 14.32 6.63 29.28
7' fence height 2g@.414 Ea 9.45 14.83 6.86 31.14
8' fence height 2g@.429 Ea 10.60 15.36 7.11 33.07

Vinyl clad 2-1/2" (6.3cm) steel line posts for chain link fence
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
4' fence height 2g@.375 Ea 14.50 13.43 6.21 34.14
5' fence height 2g@.387 Ea 18.00 13.86 6.41 38.27
6' fence height 2g@.400 Ea 20.90 14.32 6.63 41.85
2015 Heavy Construction Estimator, All Rights Reserved Page 253 (part 2)

7' fence height 2g@.414 Ea 24.10 14.83 6.86 45.79


8' fence height 2g@.429 Ea 27.40 15.36 7.11 49.87

Galvanized steel end and gate posts, 3" (7.6cm) for chain link fence
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
4' fence height 2g@.429 Ea 15.70 15.36 7.11 38.17
5' fence height 2g@.444 Ea 19.30 15.90 7.36 42.56
6' fence height 2g@.462 Ea 22.80 16.54 7.66 47.00
7' fence height 2g@.480 Ea 26.30 17.19 7.95 51.44
8' fence height 2g@.500 Ea 29.80 17.91 8.29 56.00
2015 Heavy Construction Estimator, All Rights Reserved Page 254

Vinyl clad end and gate posts, 3" (7.6cm) without top rail fitting
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
4' fence height 2g@.429 Ea 23.20 15.36 7.11 45.67
5' fence height 2g@.444 Ea 28.60 15.90 7.36 51.86
6' fence height 2g@.462 Ea 34.00 16.54 7.66 58.20
7' fence height 2g@.480 Ea 39.40 17.19 7.95 64.54
8' fence height 2g@.500 Ea 44.80 17.91 8.29 71.00
Add for gate posts for double gates
in excess of 24 feet (7.3m) ---@--- % 172.00 30.00 -- --

Galvanized steel end or gate posts, 4" (10cm) for chain link fence
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
4' fence height 2g@.444 Ea 38.90 15.90 7.36 62.16
6' fence height 2g@.462 Ea 46.40 16.54 7.66 70.60
7' fence height 2g@.480 Ea 52.20 17.19 7.95 77.34
8' fence height 2g@.500 Ea 61.30 17.91 8.29 87.50

Vinyl clad end or gate posts, 4" (10cm) for chain link fence
Set in concrete. Add the cost of top rail, fittings and post holes, using a 24,500 lb. 2-axle truck, front
end loader with power auger and small tools.
5' fence height 2g@.444 Ea 48.20 15.90 7.36 71.46
6' fence height 2g@.462 Ea 57.60 16.54 7.66 81.80
7' fence height 2g@.480 Ea 66.90 17.19 7.95 92.04
8' fence height 2g@.500 Ea 76.20 17.91 8.29 102.40
Add for line posts
with single barbed wire arm --@.000 Ea 6.90 -- -- 6.90
Add for line posts
with double barbed wire arms --@.000 Ea 43.10 -- -- 43.10
Add for corner, gate and end posts
with single barbed wire arm --@.000 Ea 13.80 -- -- 13.80
Add for corner, gate and end posts
with double barbed wire arm --@.000 Ea 22.40 -- -- 22.40
Add for line
posts with top rail fitting --@.000 Ea 15.50 -- -- 15.50

Galvanized steel line posts 2-1/2" (6.3cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
4' fence height 2g@.300 Ea 7.00 10.74 4.97 22.71
5' fence height 2g@.308 Ea 8.68 11.03 5.10 24.81
6' fence height 2g@.316 Ea 9.69 11.32 5.24 26.25
7' fence height 2g@.324 Ea 11.00 11.60 5.37 27.97
8' fence height 2g@.333 Ea 12.40 11.92 5.52 29.84

Galvanized H-beam steel line posts 2-1/4" (5.7cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
4' fence height 2g@.300 Ea 6.09 10.74 4.97 21.80
5' fence height 2g@.308 Ea 7.21 11.03 5.10 23.34
6' fence height 2g@.316 Ea 8.33 11.32 5.24 24.89
7' fence height 2g@.324 Ea 9.45 11.60 5.37 26.42
8' fence height 2g@.333 Ea 10.60 11.92 5.52 28.04

Vinyl-clad steel line posts 2-1/4" (5.7cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 254 (part 2)

4' fence height 2g@.300 Ea 14.50 10.74 4.97 30.21


5' fence height 2g@.308 Ea 18.00 11.03 5.10 34.13
6' fence height 2g@.316 Ea 20.90 11.32 5.24 37.46
7' fence height 2g@.324 Ea 24.10 11.60 5.37 41.07
8' fence height 2g@.333 Ea 27.40 11.92 5.52 44.84

Galvanized steel end or gate posts 3" (7.6cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
4' fence height 2g@.333 Ea 15.70 11.92 5.52 33.14
5' fence height 2g@.343 Ea 19.30 12.28 5.68 37.26
6' fence height 2g@.353 Ea 22.80 12.64 5.85 41.29
7' fence height 2g@.364 Ea 26.30 13.03 6.03 45.36
8' fence height 2g@.375 Ea 29.80 13.43 6.21 49.44
2015 Heavy Construction Estimator, All Rights Reserved Page 255

Vinyl-clad steel end or gate posts 3" (7.6cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
4' fence height 2g@.333 Ea 23.20 11.92 5.52 40.64
5' fence height 2g@.343 Ea 28.60 12.28 5.68 46.56
6' fence height 2g@.353 Ea 34.00 12.64 5.85 52.49
7' fence height 2g@.364 Ea 39.40 13.03 6.03 58.46
8' fence height 2g@.375 Ea 44.80 13.43 6.21 64.44
Add for gate posts for double gates
over 24 feet (7.3m) wide ---@--- % 172.00 30.00 -- --

Galvanized 4" steel corner or end posts 4" (10cm) for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
5' fence height 2g@.343 Ea 38.90 12.28 5.68 56.86
6' fence height 2g@.353 Ea 46.40 12.64 5.85 64.89
7' fence height 2g@.364 Ea 52.20 13.03 6.03 71.26
8' fence height 2g@.375 Ea 61.30 13.43 6.21 80.94

Vinyl clad 4" corner or end posts for chain link fence
Grouted into rock. Add the cost of top rail, fitting and post hole, using a 24,500 lb. 2-axle truck with a 8’
x 16’ flat bed and small tools.
5' fence height 2g@.343 Ea 48.20 12.28 5.68 66.16
6' fence height 2g@.353 Ea 57.60 12.64 5.85 76.09
7' fence height 2g@.364 Ea 66.90 13.03 6.03 85.96
8' fence height 2g@.375 Ea 76.20 13.43 6.21 95.84
Add for line posts
with single barbed wire arm --@.000 Ea 6.90 -- -- 6.90
Add for line posts
with double barbed wire arm --@.000 Ea 43.10 -- -- 43.10
Add for corner, gate and end posts
with single barbed wire arm --@.000 Ea 13.80 -- -- 13.80
Add for corner, gate and end posts
with double barbed wire arm --@.000 Ea 22.40 -- -- 22.40
Add for top
rail fitting for line posts --@.000 Ea 15.50 -- -- 15.50
Add for chain link fence
with 2 oz. galvanized coating ---@--- % 30.00 -- -- --

Galvanized chain link fabric, 1.2 oz., 2" (50cm) mesh, 9 gauge
Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
4' (1.2m) high fence 2g@.075 LF 2.94 2.69 1.24 6.87
5' (1.5m) high fence 2g@.080 LF 3.70 2.87 1.33 7.90
6' (1.8m) high fence 2g@.086 LF 4.32 3.08 1.43 8.83
7' (2.1m) high fence 2g@.092 LF 5.19 3.30 1.52 10.01
8' (2.4m) high fence 2g@.100 LF 5.85 3.58 1.66 11.09

Vinyl-coated chain link fabric, 2" (50cm) mesh, 9 gauge, fused


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
4' (1.2m) high fence 2g@.075 LF 2.56 2.69 1.24 6.49
5' (1.5m) high fence 2g@.080 LF 3.20 2.87 1.33 7.40
6' (1.8m) high fence 2g@.086 LF 3.84 3.08 1.43 8.35
7' (2.1m) high fence 2g@.092 LF 4.49 3.30 1.52 9.31
8' (2.4m) high fence 2g@.100 LF 5.11 3.58 1.66 10.35

Barbed wire, cost per strand


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 255 (part 2)

Galvanized barbed wire, per strand 2g@.010 LF 0.07 0.36 0.17 0.60
Vinyl-coated barbed wire (fused),
per strand 2g@.010 LF 0.19 0.36 0.17 0.72
Barbed wire extension arms,
3 strands 2g@.160 Ea 3.02 5.73 2.65 11.40
2 3/8" bar arms,
one piece, 6 strands 2g@.192 Ea 7.51 6.88 3.18 17.57
2 3/8" eye tops 2g@.160 Ea 1.90 5.73 2.65 10.28

Top rail for chain link fence, 1-5/8" (4.1cm), includes tie wires
Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Galvanized top rail 2g@.025 LF 0.62 0.90 0.41 1.93
Vinyl-coated top rail 2g@.025 LF 1.51 0.90 0.41 2.82
2015 Heavy Construction Estimator, All Rights Reserved Page 256

Grounding rod for chain link fence


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Copper grounding rods, 5/8" x 10' 2g@1.60 Ea 37.10 57.30 26.50 120.90

Middle or bottom rail for chain link fence, 1-5/8" (4.1cm), includes tie wire
Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Galvanized middle or bottom rail 2g@.025 LF 1.51 0.90 0.41 2.82
Vinyl coated middle or bottom rail 2g@.025 LF 1.51 0.90 0.41 2.82

Coiled spring reinforcing wire, galvanized


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
7 gauge 2g@.010 LF 0.17 0.36 0.17 0.70

Coiled spring reinforcing wire, vinyl-coated


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
9 gauge 2g@.010 LF 0.17 0.36 0.17 0.70

Galvanized gates for 4' (1.2m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.750 Ea 52.90 26.29 6.90 86.09
4' (1.2m) single gate s3@.750 Ea 70.60 26.29 6.90 103.79
10' (3m) wide double gate s3@1.60 Ea 153.00 56.08 14.70 223.78
12' (3.7m) wide double gate s3@1.71 Ea 183.00 59.94 15.70 258.64
14' (4.3m) wide double gate s3@1.85 Ea 182.00 64.84 17.00 263.84
16' (4.9m) wide double gate s3@2.00 Ea 198.00 70.10 18.40 286.50

Galvanized gates for 4' (1.2m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
18' (5.5m) wide double gate s3@2.13 Ea 223.00 74.66 19.60 317.26
20' (6.1m) wide double gate s3@2.29 Ea 229.00 80.26 21.10 330.36
22' (6.7m) wide double gate s3@2.46 Ea 252.00 86.22 22.60 360.82
24' (7.3m) wide double gate s3@2.67 Ea 275.00 93.58 24.60 393.18
26' (7.9m) wide double gate s3@2.91 Ea 297.00 102.00 26.80 425.80
28' (8.5m) wide double gate s3@3.20 Ea 320.00 112.20 29.40 461.60
30' (9.1m) wide double gate s3@3.56 Ea 299.00 124.80 32.80 456.60

Galvanized gates for 5' (1.5m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.800 Ea 66.20 28.04 7.36 101.60
4' (1.2m) wide single gate s3@.800 Ea 88.20 28.04 7.36 123.60
10' (3m) wide double gate s3@1.71 Ea 168.00 59.94 15.70 243.64
12' (3.7m) wide double gate s3@1.85 Ea 202.00 64.84 17.00 283.84
14' (4.3m) wide double gate s3@2.00 Ea 247.00 70.10 18.40 335.50

Galvanized gates for 5' (1.5m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
16' (4.9m) wide double gate s3@2.13 Ea 242.00 74.66 19.60 336.26
18' (5.5m) wide double gate s3@2.29 Ea 248.00 80.26 21.10 349.36
20' (6.1m) wide double gate s3@2.46 Ea 263.00 86.22 22.60 371.82
22' (6.7m) wide double gate s3@2.67 Ea 267.00 93.58 24.60 385.18
24' (7.3m) wide double gate s3@2.91 Ea 291.00 102.00 26.80 419.80
2015 Heavy Construction Estimator, All Rights Reserved Page 256 (part 2)

26' (7.9m) wide double gate s3@3.20 Ea 315.00 112.20 29.40 456.60
28' (8.5m) wide double gate s3@3.56 Ea 339.00 124.80 32.80 496.60
30' (9.1m) wide double gate s3@4.00 Ea 364.00 140.20 36.80 541.00

Galvanized gates for 6' (1.8m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.857 Ea 63.50 30.04 7.88 101.42
4' (1.2m) wide single gate s3@.857 Ea 84.60 30.04 7.88 122.52
10' (3m) wide double gate s3@1.85 Ea 179.00 64.84 17.00 260.84
12' (3.7m) wide double gate s3@2.00 Ea 215.00 70.10 18.40 303.50

Galvanized gates for 6' (1.8m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
14' (4.3m) wide double gate s5@2.29 Ea 209.00 81.48 43.60 334.08
16' (4.9m) wide double gate s5@2.46 Ea 225.00 87.53 46.80 359.33
2015 Heavy Construction Estimator, All Rights Reserved Page 257

18' (5.5m) wide double gate s5@2.67 Ea 253.00 95.00 50.80 398.80
20' (6.1m) wide double gate s5@2.91 Ea 254.00 103.50 55.40 412.90
22' (6.7m) wide double gate s5@3.20 Ea 279.00 113.90 60.90 453.80
24' (7.3m) wide double gate s5@3.56 Ea 305.00 126.70 67.70 499.40
26' (7.9m) wide double gate s5@4.00 Ea 330.00 142.30 76.10 548.40
28' (8.5m) wide double gate s5@4.57 Ea 355.00 162.60 87.00 604.60
30' (9.1m) wide double gate s5@5.33 Ea 380.00 189.60 101.00 670.60

Galvanized gates for 7' (2.1m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.923 Ea 49.80 32.35 8.49 90.64
4' (1.2m) wide single gate s3@.923 Ea 58.80 32.35 8.49 99.64
10' (3m) wide double gate s3@2.00 Ea 191.00 70.10 18.40 279.50

Galvanized gates for 7' (2.1m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
12' (3.7m) wide double gate s5@2.29 Ea 194.00 81.48 43.60 319.08
14' (4.3m) wide double gate s5@2.46 Ea 226.00 87.53 46.80 360.33
16' (4.9m) wide double gate s5@2.67 Ea 240.00 95.00 50.80 385.80
18' (5.5m) wide double gate s5@2.91 Ea 270.00 103.50 55.40 428.90
20' (6.1m) wide double gate s5@3.20 Ea 281.00 113.90 60.90 455.80
22' (6.7m) wide double gate s5@3.56 Ea 292.00 126.70 67.70 486.40
24' (7.3m) wide double gate s5@4.00 Ea 319.00 142.30 76.10 537.40
26' (7.9m) wide double gate s5@4.57 Ea 345.00 162.60 87.00 594.60
28' (8.5m) wide double gate s5@5.33 Ea 372.00 189.60 101.00 662.60
30' (9.1m) wide double gate s5@6.40 Ea 399.00 227.70 122.00 748.70

Galvanized gates for 8' (2.4m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@1.00 Ea 58.70 35.05 9.20 102.95
4' (1.2m) wide high single gate s3@1.00 Ea 78.20 35.05 9.20 122.45

Galvanized gates for 8' (2.4m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
10' (3m) wide high double gate s5@2.29 Ea 201.00 81.48 43.60 326.08
12' (3.7m) wide high double gate s5@2.46 Ea 241.00 87.53 46.80 375.33
14' (4.3m) wide high double gate s5@2.67 Ea 236.00 95.00 50.80 381.80
16' (4.9m) wide high double gate s5@2.91 Ea 240.00 103.50 55.40 398.90
18' (5.5m) wide high double gate s5@3.20 Ea 270.00 113.90 60.90 444.80
20' (6.1m) wide high double gate s5@3.56 Ea 287.00 126.70 67.70 481.40
22' (6.7m) wide high double gate s5@4.00 Ea 316.00 142.30 76.10 534.40
24' (7.3m) wide high double gate s5@4.57 Ea 345.00 162.60 87.00 594.60
26' (7.9m) wide high double gate s5@5.33 Ea 373.00 189.60 101.00 663.60
28' (8.5m) wide high double gate s5@6.40 Ea 402.00 227.70 122.00 751.70
30' (9.1m) wide high double gate s5@8.00 Ea 438.00 284.60 152.00 874.60
Add for single barbed
wire arm on single gate --@.000 Ea 8.22 -- -- 8.22
Add for double barbed
wire arm on single gate --@.000 Ea 23.00 -- -- 23.00
Add for single barbed
wire arm on double gate --@.000 Pair 6.57 -- -- 6.57
Add for double barbed
wire arm on double gate --@.000 Pair 19.70 -- -- 19.70
2015 Heavy Construction Estimator, All Rights Reserved Page 257 (part 2)

Vinyl coated gates for 4' (1.2m) high chain link fence
Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.750 Ea 73.10 26.29 6.90 106.29
4' (1.2m) wide single gate s3@.750 Ea 97.50 26.29 6.90 130.69
10' (3m) wide double gate s3@1.60 Ea 244.00 56.08 14.70 314.78
12' (3.7m) wide double gate s3@1.71 Ea 292.00 59.94 15.70 367.64
14' (4.3m) wide double gate s3@1.85 Ea 341.00 64.84 17.00 422.84
16' (4.9m) wide double gate s3@2.00 Ea 390.00 70.10 18.40 478.50

Vinyl coated gates for 4' (1.2m) high chain link fence
Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
18' (5.5m) wide double gate s5@2.13 Ea 439.00 75.79 40.50 555.29
2015 Heavy Construction Estimator, All Rights Reserved Page 258

20' (6.1m) wide double gate s5@2.29 Ea 487.00 81.48 43.60 612.08
22' (6.7m) wide double gate s5@2.46 Ea 536.00 87.53 46.80 670.33
24' (7.3m) wide double gate s5@2.67 Ea 585.00 95.00 50.80 730.80
26' (7.9m) wide double gate s5@2.91 Ea 634.00 103.50 55.40 792.90
28' (8.5m) wide double gate s5@3.20 Ea 682.00 113.90 60.90 856.80
30' (9.1m) wide double gate s5@3.56 Ea 731.00 126.70 67.70 925.40

Vinyl-coated gates for 5' (1.5m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.800 Ea 80.80 28.04 7.36 116.20
4' (1.2m) wide single gate s3@.800 Ea 108.00 28.04 7.36 143.40
10' (3m) wide double gate s3@1.71 Ea 269.00 59.94 15.70 344.64
12' (3.7m) wide double gate s3@1.85 Ea 323.00 64.84 17.00 404.84
14' (4.3m) wide double gate s3@2.00 Ea 377.00 70.10 18.40 465.50

Vinyl-coated gates for 5' (1.5m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
16' (4.9m) wide double gate s5@2.13 Ea 431.00 75.79 40.50 547.29
18' (5.5m) wide double gate s5@2.29 Ea 485.00 81.48 43.60 610.08
20' (6.1m) wide double gate s5@2.46 Ea 539.00 87.53 46.80 673.33
22' (6.7m) wide double gate s5@2.67 Ea 592.00 95.00 50.80 737.80
24' (7.3m) wide double gate s5@2.91 Ea 646.00 103.50 55.40 804.90
26' (7.9m) wide double gate s5@3.20 Ea 700.00 113.90 60.90 874.80
28' (8.5m) wide double gate s5@3.56 Ea 754.00 126.70 67.70 948.40
30' (9.1m) wide double gate s5@4.00 Ea 808.00 142.30 76.10 1,026.40

Vinyl-coated gates for 6' (1.8m) high chain link fence


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
3' (.92m) wide single gate s3@.857 Ea 80.80 30.04 7.88 118.72
4' (1.2m) wide single gate s3@.857 Ea 108.00 30.04 7.88 145.92
10' (3m) wide double gate s3@1.85 Ea 269.00 64.84 17.00 350.84
12' (3.7m) wide double gate s3@2.00 Ea 323.00 70.10 18.40 411.50

Vinyl-coated gates for 6' (1.8m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
14' (4.3m) wide double gate s5@2.29 Ea 377.00 81.48 43.60 502.08
16' (4.9m) wide double gate s5@2.46 Ea 431.00 87.53 46.80 565.33
18' (5.5m) wide double gate s5@2.67 Ea 485.00 95.00 50.80 630.80
20' (6.1m) wide double gate s5@2.91 Ea 539.00 103.50 55.40 697.90
22' (6.7m) wide double gate s5@3.20 Ea 592.00 113.90 60.90 766.80
24' (7.3m) wide double gate s5@3.56 Ea 646.00 126.70 67.70 840.40
26' (7.9m) wide double gate s5@4.00 Ea 700.00 142.30 76.10 918.40
28' (8.5m) wide double gate s5@4.57 Ea 754.00 162.60 87.00 1,003.60
30' (9.1m) wide double gate s5@5.33 Ea 808.00 189.60 101.00 1,098.60

Vinyl-coated gates for 7' (2.1m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@.923 Ea 92.90 32.35 8.49 133.74
4' (1.2m) wide single gate s3@.923 Ea 124.00 32.35 8.49 164.84
10' (3m) wide double gate s3@2.00 Ea 310.00 70.10 18.40 398.50

Vinyl-coated gates for 7' (2.1m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 258 (part 2)

12' (3.7m) wide double gate s5@2.29 Ea 372.00 81.48 43.60 497.08
14' (4.3m) wide double gate s5@2.46 Ea 434.00 87.53 46.80 568.33
16' (4.9m) wide double gate s5@2.67 Ea 496.00 95.00 50.80 641.80
18' (5.5m) wide double gate s5@2.91 Ea 557.00 103.50 55.40 715.90
20' (6.1m) wide double gate s5@3.20 Ea 619.00 113.90 60.90 793.80
22' (6.7m) wide double gate s5@3.56 Ea 681.00 126.70 67.70 875.40
24' (7.3m) wide double gate s5@4.00 Ea 743.00 142.30 76.10 961.40
26' (7.9m) wide double gate s5@4.57 Ea 805.00 162.60 87.00 1,054.60
28' (8.5m) wide double gate s5@5.33 Ea 867.00 189.60 101.00 1,157.60
30' (9.1m) wide double gate s5@6.40 Ea 929.00 227.70 122.00 1,278.70
2015 Heavy Construction Estimator, All Rights Reserved Page 259

Vinyl-coated gates for 8' (2.4m) high chain link fence


Including hardware but no posts or barbed wire, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
3' (.92m) wide single gate s3@1.00 Ea 92.30 35.05 9.20 136.55
4' (1.2m) wide single gate s3@1.00 Ea 123.00 35.05 9.20 167.25

Vinyl-coated gates for 8' (2.4m) high chain link fence


Including hardware but no posts or barbed wire, using an 8-ton hydraulic crane with 85’ boom, a 46,000
lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
10' (3m) wide double gate s5@2.29 Ea 308.00 81.48 43.60 433.08
12' (3.7m) wide double gate s5@2.46 Ea 369.00 87.53 46.80 503.33
14' (4.3m) wide double gate s5@2.67 Ea 431.00 95.00 50.80 576.80
16' (4.9m) wide double gate s5@2.91 Ea 492.00 103.50 55.40 650.90
18' (5.5m) wide double gate s5@3.20 Ea 554.00 113.90 60.90 728.80
20' (6.1m) wide double gate s5@3.56 Ea 616.00 126.70 67.70 810.40
22' (6.7m) wide double gate s5@4.00 Ea 677.00 142.30 76.10 895.40
24' (7.3m) wide double gate s5@4.57 Ea 739.00 162.60 87.00 988.60
26' (7.9m) wide double gate s5@5.33 Ea 800.00 189.60 101.00 1,090.60
28' (8.5m) wide double gate s5@6.40 Ea 862.00 227.70 122.00 1,211.70
30' (9.1m) wide double gate s5@8.00 Ea 923.00 284.60 152.00 1,359.60
Add for single barbed
wire arm on single gate --@.000 Ea 8.22 -- -- 8.22
Add for double barbed
wire arm on single gate --@.000 Ea 23.00 -- -- 23.00
Add for single barbed
wire arm on double gate --@.000 Ea 8.22 -- -- 8.22
Add for double barbed
wire arm on double gate --@.000 Ea 19.70 -- -- 19.70

Sliding galvanized chain link gates


Add the cost of posts, holes and hardware, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and
small tools.
4' (1.2m) high sliding gate s3@.865 LF 15.70 30.32 7.96 53.98
5' (1.5m) high sliding gate s3@.941 LF 17.90 32.98 8.66 59.54
6' (1.8m) high sliding gate s3@1.10 LF 55.20 38.56 10.10 103.86
7' (2.1m) high sliding gate s3@1.23 LF 58.50 43.11 11.30 112.91
8' (2.4m) high sliding gate s3@1.33 LF 86.10 46.62 12.20 144.92

Cantilever gate, manually operated, exposed roller


Add the cost of posts, holes and hardware, using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb.
3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
40' x 8' opening (pair) s5@45.7 Pair 6,080.00 1,626.00 870.00 8,576.00
30' x 8' opening (sq) s5@29.1 Ea 3,780.00 1,035.00 554.00 5,369.00
24' x 8' opening (sq) s5@26.7 Ea 3,290.00 950.00 508.00 4,748.00

Operators for chain link gates


Add the cost of the gate and electrical connection, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed
and small tools.
Operator for
swinging gate to 3' (1m) wide s3@2.50 Ea 691.00 87.63 23.00 801.63
Operator for swinging gate over 3'
(1m) wide to 20' (6.1m) wide s3@5.00 Ea 3,780.00 175.30 46.00 4,001.30
Operator for sliding
gates to 45 ' wide pairs s3@28.0 Ea 3,710.00 981.40 258.00 4,949.40
Overhead gate operator, 6' to 18' wide,
sliding or cantilever s3@.328 LF 68.90 11.50 3.02 83.42
Gate operator digital receiver s3@1.87 Ea 164.00 65.54 17.20 246.74
2015 Heavy Construction Estimator, All Rights Reserved Page 259 (part 2)

Gate operator
two button transmitter s3@.560 Ea 49.30 19.63 5.15 74.08
Gate operator 3 button stations s3@1.40 Ea 65.70 49.07 12.90 127.67
Master-slave gate operator system s3@3.50 Ea 822.00 122.70 32.20 976.90

Tennis court chain link fencing

Galvanized steel chain link tennis court fencing


Complete, including 2-1/2" posts at 10', 1-5/8" top, middle and bottom line rails, 3" corner posts,
hardware and fabric. Add gate costs below. No post hole drilling included, using a 24,500 lb. 2-axle
truck with a 8’ x 16’ flat bed and small tools.
10' (3m) high s3@.229 LF 11.90 8.03 2.11 22.04
12' (3.7m) high s3@.246 LF 15.80 8.62 2.26 26.68

Vinyl coated steel chain link tennis court fencing


Complete, including 2-1/2" posts at 10', 1-5/8" top, middle and bottom line rails, 3" corner posts,
hardware and fabric. Add gate costs below. No post hole drilling included, using a 24,500 lb. 2-axle
truck with a 8’ x 16’ flat bed and small tools.
10' (3m) high s3@.229 LF 23.20 8.03 2.11 33.34
12' (3.7m) high s3@.246 LF 29.70 8.62 2.26 40.58
2015 Heavy Construction Estimator, All Rights Reserved Page 260

Galvanized gates for tennis court fencing


Complete, including hardware and fabric, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and
small tools.
3' wide 7' high,
3' trans, single gate s3@2.12 Ea 66.70 74.31 19.50 160.51
4' wide, 7' high,
3' trans, single gate s3@2.76 Ea 181.00 96.74 25.40 303.14
3' wide, 10' high,
3' trans, single gate s3@1.68 Ea 94.50 58.88 15.50 168.88
4' wide, 10' high 3' trans,
single gate s3@1.68 Ea 103.00 58.88 15.50 177.38
10' wide, 7' high,
3' trans, double gate s3@3.58 Ea 167.00 125.50 32.90 325.40

Galvanized gates for tennis court fencing


Complete, including hardware and fabric, using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb.
3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
12' wide, 7' high,
3' trans, double gate s5@5.61 Ea 185.00 199.60 107.00 491.60
14' wide, 7' high,
3' trans, double gate s5@6.67 Ea 211.00 237.30 127.00 575.30
10' wide, 10' high, double gate s5@3.37 Ea 160.00 119.90 64.10 344.00
12' wide, 10' high, double gate s5@3.60 Ea 174.00 128.10 68.50 370.60
14' wide, 10' high, double gate s5@3.90 Ea 194.00 138.80 74.20 407.00

Vinyl coated gates for tennis court fencing


Complete, including hardware and fabric, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and
small tools.
3' wide 7' high,
3' trans, single gate s3@2.12 Ea 107.00 74.31 19.50 200.81
4' wide, 7' high,
3' trans, single gate s3@2.76 Ea 355.00 96.74 25.40 477.14
3' wide, 10' high, single gate s3@1.68 Ea 151.00 58.88 15.50 225.38
4' wide, 10' high, single gate s3@1.68 Ea 165.00 58.88 15.50 239.38
10' wide, 7' high,
3' trans, double gate s3@3.58 Ea 267.00 125.50 32.90 425.40

Vinyl coated gates for tennis court fencing


Complete, including hardware and fabric, using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb.
3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
12' wide, 7' high,
3' trans, double gate s5@4.71 Ea 298.00 167.60 89.60 555.20
14' wide, 7' high,
3' trans, double gate s5@7.11 Ea 325.00 253.00 135.00 713.00
10' wide, 10' high, double gate s5@3.37 Ea 256.00 119.90 64.10 440.00
12' wide, 10' high, double gate s5@3.60 Ea 278.00 128.10 68.50 474.60
14' wide, 10' high, double gate s5@3.90 Ea 310.00 138.80 74.20 523.00
Add for 12 foot (3.7m) high gates ---@--- % 5.00 10.00 -- --

Chain link backstops, complete

Regulation softball backstops


Includes 3" posts each 8', top, middle and bottom brace rails, overhang panel with 9 gauge mesh and
1-1/8" frame, 16' of 6 gauge mesh and 32' of 9 gauge mesh, using an 8-ton hydraulic crane with 85’
boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and small tools.
14' (4.3m) high, galvanized s5@38.6 Ea 5,610.00 1,373.00 735.00 7,718.00
14' (4.3m) high, vinyl-coated steel s5@38.6 Ea 8,980.00 1,373.00 735.00 11,088.00
2015 Heavy Construction Estimator, All Rights Reserved Page 260 (part 2)

18' (5.4m) high, galvanized s5@43.0 Ea 6,790.00 1,530.00 818.00 9,138.00


18' (5.4m) high, vinyl-coated steel s5@43.0 Ea 10,900.00 1,530.00 818.00 13,248.00
20' (6.1m) high, galvanized s5@45.3 Ea 8,050.00 1,612.00 862.00 10,524.00
20' (6.1m) high, vinyl-coated steel s5@45.3 Ea 12,900.00 1,612.00 862.00 15,374.00
22' (6.7m) high, galvanized s5@48.5 Ea 9,680.00 1,726.00 923.00 12,329.00
22' (6.7m) high, vinyl-coated steel s5@48.5 Ea 15,500.00 1,726.00 923.00 18,149.00
24' (7.3m) high, galvanized s5@53.1 Ea 12,000.00 1,889.00 1,010.00 14,899.00
24' (7.3m) high, vinyl coated steel s5@53.1 Ea 19,300.00 1,889.00 1,010.00 22,199.00

CSI 02-712, Wire and miscellaneous metal fences, complete

Chicken wire fence


Posts set at 4' (1.2m), 6' high, using small tools.
1" (2.5cm) mesh ss@.068 LF 1.91 2.38 0.02 4.31
2" (5.1cm) mesh ss@.080 LF 1.68 2.80 0.02 4.50

Galvanized steel fence, 12 gauge


2" (50mm) x 4" (100mm) mesh, posts at 5', using small tools.
3' (.9m) high ss@.093 LF 1.10 3.25 0.02 4.37
5' (1.5m) high ss@.093 LF 1.65 3.25 0.02 4.92
2015 Heavy Construction Estimator, All Rights Reserved Page 261

Galvanized steel fence, 14 gauge


1" (25mm) by 2" (50mm) mesh, posts at 5', using small tools.
3' (.9m) high ss@.093 LF 0.99 3.25 0.02 4.26
5' (1.5m) high ss@.093 LF 1.47 3.25 0.02 4.74

Fabric security fence, standard


Using small tools.
5' (1.5m) high, standard FE-5 ss@.054 LF 15.20 1.89 0.01 17.10
6' (1.8m) high, standard FE-6 ss@.056 LF 18.30 1.96 0.01 20.27
7' (2.1m) high, standard FE-7 ss@.058 LF 21.30 2.03 0.01 23.34

10' high security fence


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
Galvanized security fence s5@.334 LF 33.90 11.88 6.36 52.14
Vinyl coated security fence s5@.334 LF 51.70 11.88 6.36 69.94
Galvanized corner post s5@.734 Ea 129.00 26.12 14.00 169.12
Vinyl coated corner post s5@.734 Ea 197.00 26.12 14.00 237.12
Galvanized end post s5@.667 Ea 129.00 23.73 12.70 165.43
Vinyl coated end post s5@.667 Ea 197.00 23.73 12.70 233.43

12' (3.7m) high security fence


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
Galvanized security fence s5@.351 LF 41.40 12.49 6.68 60.57
Vinyl coated security fence s5@.351 LF 62.60 12.49 6.68 81.77
Galvanized corner post s5@.600 Ea 141.00 21.35 11.40 173.75
Vinyl coated corner post s5@.600 Ea 214.00 21.35 11.40 246.75
Galvanized end post s5@.600 Ea 141.00 21.35 11.40 173.75
Vinyl coated end post s5@.600 Ea 213.00 21.35 11.40 245.75

16' (4.9m) high security fence


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
Galvanized security fence s5@.364 LF 87.10 12.95 6.93 106.98
Vinyl coated security fence s5@.364 LF 136.00 12.95 6.93 155.88
Galvanized corner post s5@.615 Ea 680.00 21.88 11.70 713.58
Vinyl coated corner post s5@.615 Ea 1,060.00 21.88 11.70 1,093.58
Galvanized end post s5@.615 Ea 510.00 21.88 11.70 543.58
Vinyl coated end post s5@.615 Ea 808.00 21.88 11.70 841.58

Barbed wire and fittings for security fence


Per support fitting installed, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Straight barbed wire
fitting and 3 strands of wire s3@.240 Ea 7.69 8.41 2.21 18.31
V-shaped barbed wire
fitting and 6 strands of wire s3@.380 Ea 10.10 13.32 3.50 26.92
Add for an 3 additional strands of barbed wire,
per fitting s3@.190 Ea 2.38 6.66 1.75 10.79

Galvanized gates for security fence


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
3' wide, 7' high,
3' trans, single gate s3@2.35 Ea 131.00 82.37 21.60 234.97
4' wide, 7' high,
3' trans, single gate s3@3.05 Ea 148.00 106.90 28.10 283.00
2015 Heavy Construction Estimator, All Rights Reserved Page 261 (part 2)

3' wide, 10' high, single gate s3@2.40 Ea 175.00 84.12 22.10 281.22
4' wide, 10' high, single gate s3@2.40 Ea 198.00 84.12 22.10 304.22
10' wide, 7' high,
3' trans, double gate s3@4.32 Ea 346.00 151.40 39.70 537.10

Galvanized gates for security fence


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
12' wide, 7' high,
3' trans , double gate s5@6.75 Ea 379.00 240.20 128.00 747.20
14' wide, 7' high,
3' trans, double gate s5@8.00 Ea 400.00 284.60 152.00 836.60
10' wide, 10' high, double gate s5@4.32 Ea 484.00 153.70 82.20 719.90
12' wide, 10' high, double gate s5@4.76 Ea 530.00 169.40 90.60 790.00
14' wide, 10' high, double gate s5@5.22 Ea 561.00 185.70 99.30 846.00
2015 Heavy Construction Estimator, All Rights Reserved Page 262

Vinyl-coated gates for security fence


Using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
3' wide, 7' high,
3' trans, single gate s3@2.35 Ea 1,160.00 82.37 21.60 1,263.97
4' wide, 7' high,
3' trans, single gate s3@3.05 Ea 1,240.00 106.90 28.10 1,375.00
3' wide, 10' high, single gate s3@2.40 Ea 1,160.00 84.12 22.10 1,266.22
4' wide, 10' high, single gate s3@2.40 Ea 1,240.00 84.12 22.10 1,346.22
10' wide, 7' high,
3' trans, double gate s3@4.32 Ea 600.00 151.40 39.70 791.10

Vinyl-coated gates for security fence


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
12' wide, 7' high,
3' trans, double gate s5@6.75 Ea 720.00 240.20 128.00 1,088.20
14' wide, 7' high,
3' trans, double gate s5@8.00 Ea 840.00 284.60 152.00 1,276.60
10' wide, 10' high, double gate s5@4.32 Ea 857.00 153.70 82.20 1,092.90
12' wide, 12' high, double gate s5@4.76 Ea 1,110.00 169.40 90.60 1,370.00
14' wide, 14' high, double gate s5@5.22 Ea 1,500.00 185.70 99.30 1,785.00
Add for gates
on 16 foot (4.9m) high fence ---@--- % 18.00 33.00 -- --

Barbed wire fence, complete


Based on post at 10', using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
3-strand barbed wire fence,
galvanized s3@.080 LF 1.96 2.80 0.74 5.50

Barbed wire (per strand)


No posts included, using a 24,500 lb. 2-axle truck with a 8’ x 16’ flat bed and small tools.
Galvanized s3@.008 LF 0.07 0.28 0.07 0.42
Vinyl coated s3@.008 LF 0.07 0.28 0.07 0.42

Miscellaneous wire and screen

Screen wire for partitions and fences


No framing or posts included, using miscellaneous power tools and small tools.
48" wide rolls ap@.023 SF 0.33 1.01 0.03 1.37

Hog wire
Including driven posts, using miscellaneous power tools and small tools.
4" x 4" mesh hog wire fence ap@.010 SF 0.12 0.44 0.01 0.57
6" x 6" mesh hog wire fence ap@.010 SF 0.12 0.44 0.01 0.57

Snow fence
Including driven steel posts set at 10', using small tools.
4' high snow fence wg@.053 LF 1.60 1.08 0.03 2.71

CSI 02-713, Wood fencing

Basket weave fence


3/8" x 4" boards, 6' high, 4" x 4" posts set at 8', using small tools.
#1 cedar basket weave fence wg@.107 LF 19.90 2.17 0.07 22.14
Treated pine basket weave fence wg@.117 LF 8.89 2.37 0.07 11.33
2015 Heavy Construction Estimator, All Rights Reserved Page 262 (part 2)

Board fence
1" x 4" boards, 2" x 4" rails, 4" x 4" posts set at 8', using small tools.
3' high treated board fence,
2 rails wg@.124 LF 4.87 2.52 0.08 7.47
4' high treated board fence,
2 rails wg@.138 LF 5.69 2.80 0.09 8.58
5' high treated board fence,
3 rails wg@.146 LF 6.95 2.96 0.09 10.00
6' high treated board fence,
3 rails wg@.156 LF 7.64 3.17 0.10 10.91
3' high #2 western red cedar fence,
2 rails wg@.124 LF 6.19 2.52 0.08 8.79
4' high #2 western red cedar fence,
2 rails wg@.138 LF 6.19 2.80 0.09 9.08
2015 Heavy Construction Estimator, All Rights Reserved Page 263

5' high #2 western red cedar fence,


3 rails wg@.146 LF 7.57 2.96 0.09 10.62
6' high #2 western red cedar fence,
3 rails wg@.125 LF 8.31 2.54 0.08 10.93
3' high #1 grade cedar fence,
2 rails wg@.124 LF 6.19 2.52 0.08 8.79
4' high #1 grade cedar fence,
2 rails wg@.138 LF 9.94 2.80 0.09 12.83
5' high
#1 grade cedar fence. 3 rails wg@.146 LF 10.50 2.96 0.09 13.55
6' high
#1 grade cedar fence. 3 rails wg@.156 LF 11.60 3.17 0.10 14.87

Shadow box fence


1" x 6" #1 cedar boards, 2" x 4" rails, 4" x 4" posts set at 8', using small tools.
3' high wg@.115 LF 8.19 2.33 0.07 10.59

Cedar board gates, 4' high


Mounted on masonry wall, based on 2" x 4" frame, 1" x 4" boards, galvanized nails and hinges,
including hardware, using miscellaneous power tools and small tools.
8' double leaf gate vd@8.68 Ea 45.90 368.00 32.40 446.30
10' double leaf gate vd@8.68 Ea 55.10 368.00 32.40 455.50
12' double leaf gate vd@8.68 Ea 59.70 368.00 32.40 460.10

Cedar split rail fence


Using miscellaneous power tools and small tools.
2 rails, 3' high, # 1 cedar wg@.107 LF 4.20 2.17 0.07 6.44
2 rails, 3' high, # 2 cedar wg@.107 LF 2.22 2.17 0.07 4.46
3 rails, 4' high, # 1 cedar wg@.116 LF 5.54 2.35 0.07 7.96
3 rails, 4' high, # 2 cedar wg@.116 LF 2.46 2.35 0.07 4.88

Rustic rail fence


Using miscellaneous power tools and small tools.
2 rails, 3' high, # 1 cedar wg@.107 LF 3.38 2.17 0.07 5.62
2 rails, 3' high, # 2 cedar wg@.107 LF 2.02 2.17 0.07 4.26
3 rails, 4' high, # 1 cedar wg@.118 LF 4.20 2.39 0.07 6.66
3 rails, 4' high, # 2 cedar wg@.118 LF 2.52 2.39 0.07 4.98

Rustic picket fence, 2 rail, 3' high


Using miscellaneous power tools and small tools.
Molded pine picket fence wg@.131 LF 3.20 2.66 0.08 5.94
# 1 cedar picket fence wg@.131 LF 2.75 2.66 0.08 5.49

CSI 02-720, Road and parking appurtenances

Pipe bollards
8' length sunk 4' in 13" diameter hole, painted yellow, using a 16" truck mounted rotary drill and small
tools.
6" steel pipe bollard s9@2.25 Ea 179.00 80.78 137.00 396.78

Steel pipe bollards


Concrete filled, painted, 8' long, set in 4' deep hole, using a 16" truck mounted rotary drill and small
tools.
8" steel pipe bollard s9@2.25 Ea 228.00 80.78 137.00 445.78
12" steel pipe bollard s9@2.25 Ea 185.00 80.78 137.00 402.78

CSI 02-721, Guard rails


2015 Heavy Construction Estimator, All Rights Reserved Page 263 (part 2)

Highway guard rail


No posts included. Add the cost of posts from the next section, using small tools.
Corrugated steel rail set on galvanized
posts 12'-6" on center sx@.308 LF 8.42 10.77 0.10 19.29
Corrugated
steel flared end sections sx@.513 Ea 46.30 17.94 0.16 64.40
Corrugated steel
wrap-around end sections sx@.513 Ea 80.00 17.94 0.16 98.10
Guard rail anchorage unit sx@2.67 Ea 337.00 93.40 0.85 431.25
Guard rail wraparound ends ea@1.29 LF 83.20 45.12 45.30 173.62
Timber guard rail, 4"x 8" timber sx@.092 LF 23.20 3.22 0.03 26.45
2015 Heavy Construction Estimator, All Rights Reserved Page 264

Post for highway guard rail


No guard rail included. Add the cost of guard rail or cable, using a 16" truck mounted rotary drill and
small tools.
Wood posts for guard rail s9@.229 LF 39.20 8.22 13.90 61.32

Cable guard rail, three 3/4" cables


No posts included. Add the cost of posts from the section above, using small tools.
Set on steel posts sx@.113 LF 20.10 3.95 0.04 24.09
Set on wood posts sx@.103 LF 18.70 3.60 0.03 22.33

Impact barrier
Using small tools.
Barrel type impact barriers sx@.205 Ea 311.00 7.17 0.07 318.24

Crash cushions
Using small tools.
Crash cushions, barrel type sx@.205 Ea 185.00 7.17 0.07 192.24

Energy absorbing guard rail terminals


Energy absorbing terminal. Crushable foam cartridges surrounded by steel guard rail. Suitable for narrow
hazards. Costs per terminal, using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck
with a 8’ x 16’ flat bed and small tools.
3' wide, 10 cartridge bays s5@320. Ea 37,600.00 11,390.00 6,090.00 55,080.00
2.5' wide, 7 cartridge bays s5@229. Ea 28,800.00 8,148.00 4,360.00 41,308.00
2' wide, 5 cartridge bays s5@178. Ea 21,000.00 6,333.00 3,390.00 30,723.00

Foam sandwich system for wide hazard protection


using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
7.5' wide, 7 cartridge bays s5@229. Ea 46,900.00 8,148.00 4,360.00 59,408.00
5' wide, 7 cartridge bays s5@213. Ea 40,600.00 7,579.00 4,050.00 52,229.00
3' wide, 7 cartridge bays s5@200. Ea 34,400.00 7,116.00 3,810.00 45,326.00

Resilient guard fence and light shield


Add the cost of post holes, using small tools.
6' (1.8m) high sx@.308 LF 33.60 10.77 0.10 44.47

Concrete posts, per post, 6'-5" post length


Add the cost of post holes, using small tools.
Round posts sx@.320 Ea 88.80 11.19 0.10 100.09
Square posts sx@.364 Ea 98.60 12.73 0.12 111.45
Triangular posts sx@.364 Ea 94.70 12.73 0.12 107.55

Median barrier, concrete


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Precast 3'-6" high, single face tq@.126 LF 97.60 4.45 1.05 103.10
Precast, 2' wide, double face tq@.141 LF 113.00 4.98 1.18 119.16

CSI 02-722, Traffic signage

Reflectorized signs, per OSHA standards


Includes reflectorized post to 9', using small tools.
Stop sign, 24"x 24" sr@1.25 Ea 53.00 43.73 0.29 97.02
Yield sign, 30" triangle sr@1.25 Ea 44.10 43.73 0.29 88.12
2015 Heavy Construction Estimator, All Rights Reserved Page 264 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 265

Speed limit sign, 12"x 18" sr@1.25 Ea 33.00 43.73 0.29 77.02
Directional sign, 12"x 18" sr@1.25 Ea 33.00 43.73 0.29 77.02
Exit sign, 12"x 18" sr@1.25 Ea 33.00 43.73 0.29 77.02
Entry sign, 12"x 18" sr@1.25 Ea 33.00 43.73 0.29 77.02
Warning sign, 24"x 24" sr@1.25 Ea 47.70 43.73 0.29 91.72
Information sign, 12"x 18" sr@1.25 Ea 33.00 43.73 0.29 77.02
Handicap parking sign, 12"x 18" sr@1.25 Ea 26.60 43.73 0.29 70.62

Removal of signs, including supports


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
To 10 SF sign s5@2.00 Ea -- 71.16 38.10 109.26
11 SF to 20 SF sign s5@6.40 Ea -- 227.70 122.00 349.70

Removal of signs, including supports


Using a 1.38 CY wheeled loader-backhoe and small tools.
21 SF to 40 SF sign wi@34.3 Ea -- 834.20 134.00 968.20

Removal of signs, including supports


Using a 20-ton hydraulic crane with 70’ boom and small tools.
41 SF to 100 SF sign tq@48.0 Ea -- 1,697.00 400.00 2,097.00

Remove and relocate signs, including supports


Using an 8-ton hydraulic crane with 85’ boom, a 46,000 lb. 3-axle 6x4 truck with a 8’ x 16’ flat bed and
small tools.
To 10 SF sign s5@6.40 Ea 42.90 227.70 122.00 392.60
11 SF to 20 SF sigh s5@18.8 Ea 56.30 668.90 358.00 1,083.20

Remove and relocate signs, including supports


Using a 1.38 CY wheeled loader-backhoe and small tools.
21 SF to 40 SF sign wi@102. Ea 84.50 2,481.00 399.00 2,964.50

Remove and relocate signs, including supports


Using a 20-ton hydraulic crane with 70’ boom and small tools.
41 SF to 100 SF sign tq@192. Ea 215.00 6,787.00 1,600.00 8,602.00

CSI 02-725, Parking barriers

Parking barriers
Using small tools.
4"x 4" timber barrier with saddles for cars,
treated sx@.077 LF 3.74 2.69 0.02 6.45
6"x 6" timber barriers with saddle for trucks,
treated sx@.077 LF 7.13 2.69 0.02 9.84
Folding barrier, individual padlocks, flexible stanchion,
3' high, 3" deep sx@.800 Ea 101.00 27.98 0.26 129.24
Flexible fixed stanchion,
2' high, 3" (7.6cm) diameter sx@.400 Ea 33.20 13.99 0.13 47.32
12" x 6" precast concrete barrier,
set with dowels sx@.077 LF 114.00 2.69 0.02 116.71
6" x 10" x 6' precast concrete wheel stop,
including dowels sx@.333 Ea 69.70 11.65 0.11 81.46
8" x 13" x 6' precast concrete wheel stop,
including dowels sx@.333 Ea 89.60 11.65 0.11 101.36

Parking equipment
Includes electrical hookup only. Add the cost of rough-in, equipment pads and equipment installation,
using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 265 (part 2)

Traffic detectors, magnetic lj@3.70 Ea 245.00 185.40 1.44 431.84


Traffic detectors, single treadle lj@4.17 Ea 864.00 208.90 1.63 1,074.53
Automatic gate, 8' arm, one-way lj@9.09 Ea 2,450.00 455.40 3.55 2,908.95
Automatic gate, 8' arm, two-way lj@9.09 Ea 2,700.00 455.40 3.55 3,158.95
Parking booth for attendant,
minimum --@.000 Ea 883.00 -- -- 883.00
Parking booth for attendant,
average --@.000 Ea 1,210.00 -- -- 1,210.00
Parking booth for attendant,
maximum --@.000 Ea 1,840.00 -- -- 1,840.00
Parking fee indicator, 1" display lj@2.44 Ea 1,020.00 122.20 0.95 1,143.15
Standard parking ticket dispenser,
includes printer lj@7.14 Ea 5,490.00 357.70 2.78 5,850.48
Rate computing parking ticket dispenser,
includes printer lj@7.14 Ea 7,550.00 357.70 2.78 7,910.48
1-period card control station lj@2.44 Ea 758.00 122.20 0.95 881.15
4-period card control station lj@2.44 Ea 786.00 122.20 0.95 909.15
Parking key station on pedestal lj@2.44 Ea 393.00 122.20 0.95 516.15
Multiple coin station, parking lj@2.44 Ea 1,260.00 122.20 0.95 1,383.15
2015 Heavy Construction Estimator, All Rights Reserved Page 266

CSI 02-730, Playing field seating

Bleachers, outdoor, portable


Assembled on site, using small tools.
3 to 10 tier,
minimum price per seat qb@.167 Ea 14.70 9.12 0.10 23.92
3 to 10 tier,
maximum price per seat qb@.250 Ea 33.00 13.66 0.15 46.81
11 to 20 tier,
minimum price per seat qb@.167 Ea 23.10 9.12 0.10 32.32
11 to 20 tier,
maximum price per seat qb@.250 Ea 123.00 13.66 0.15 136.81

Permanent grandstands, wood seat, steel frame


Assembled on site, using small tools.
3 to 15 tier,
minimum price per seat qb@.333 Ea 28.40 18.19 0.19 46.78
3 to 15 tier,
maximum price per seat qb@.417 Ea 49.70 22.78 0.24 72.72
16 to 30 tier,
minimum price per seat qb@.333 Ea 46.30 18.19 0.19 64.68
16 to 30 tier,
average price per seat qb@.364 Ea 53.10 19.88 0.21 73.19
16 to 30 tier,
maximum price per seat qb@.417 Ea 63.40 22.78 0.24 86.42

Seat backs only


Installed on existing supports, using small tools.
Fiberglass seat backs qb@.125 Ea 36.60 6.83 0.07 43.50
Steel and wood seat backs qb@.125 Ea 33.20 6.83 0.07 40.10

Seat renewal, cover with fiberglass on wood


Using small tools.
Renew seats with backs,
cover with fiberglass on wood am@.200 Ea 53.70 8.78 0.11 62.59
Renew plain bench seats without back,
cover with fiberglass on wood am@.100 Ea 23.90 4.39 0.06 28.35

Park type benches, precast concrete with backs


Delivered and set on site, using small tools.
4' (1.2m) long am@4.00 Ea 366.00 175.70 2.20 543.90
8' (2.4m) long am@5.00 Ea 536.00 219.60 2.75 758.35

Fiberglass bench with back and supports


Assembled and set on concrete base, using small tools.
4' (1.2m) long am@2.00 Ea 536.00 87.84 1.10 624.94
8' (2.4m) long am@2.86 Ea 732.00 125.60 1.57 859.17

Wood benches with back and supports


Delivered and set on site, using small tools.
4' (1.2m) long am@.950 Ea 869.00 41.72 0.52 911.24
8' (2.4m) long am@.950 Ea 1,020.00 41.72 0.52 1,062.24

Wood benches with back and supports


Delivered and set on site, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 266 (part 2)

6' wood slat bench wf@.950 Ea 152.00 19.29 0.86 172.15


6' redwood slat bench wf@.950 Ea 218.00 19.29 0.86 238.15
6' solid redwood bench wf@.950 Ea 291.00 19.29 0.86 311.15
8' redwood contour bench with
back and fiberglass supports wf@.950 Ea 377.00 19.29 0.86 397.15
8' heavy duty redwood bench with
back and fiberglass supports wf@.950 Ea 337.00 19.29 0.86 357.15
Ornate 8' redwood
bench with back and supports wf@.950 Ea 526.00 19.29 0.86 546.15

Steel frame playing field benches, 6' (1.8m) long


Using small tools.
All steel bench am@2.50 Ea 632.00 109.80 1.38 743.18
Steel-frame
bench with hardwood boards am@2.50 Ea 517.00 109.80 1.38 628.18

Aluminum benches
Using small tools.
10' (3m) steel frame players bench,
fir seat with no back am@.200 LF 10.80 8.78 0.11 19.69
6' permanent enclosed slat bench wf@1.87 Ea 160.00 37.98 1.68 199.66
6' portable anodized aluminum bench wf@.950 Ea 238.00 19.29 0.86 258.15
6' portable colored aluminum bench wf@.950 Ea 278.00 19.29 0.86 298.15

Steel benches
Using small tools.
6' portable super slat steel bench wf@.950 Ea 632.00 19.29 0.86 652.15
6' permanent one-piece steel bench wf@1.87 Ea 575.00 37.98 1.68 614.66
2015 Heavy Construction Estimator, All Rights Reserved Page 267

6' portable perma-glass park bench wf@.950 Ea 661.00 19.29 0.86 681.15

Play field improvements

Goal posts
Using small tools.
Double steel football goal posts wg@17.8 Pair 1,180.00 361.20 11.20 1,552.40
Single goal post, steel, deluxe wg@17.8 Pair 1,660.00 361.20 11.20 2,032.40
Football goal post,
convertible to soccer wg@17.8 Pair 1,740.00 361.20 11.20 2,112.40

Gravel and cinder running track


Using a walk-behind 8-ton 29.5" wide vibratory double roller and small tools.
Gravel and cinders over stone base dt@.160 SY 4.83 5.88 1.12 11.83

Resilient running track


Using a pneumatic asphalt finisher with screed, a 12-ton 3-wheel self propelled static roller and small
tools.
Rubber-cork base resilient pavement kc@1.19 SY 4.63 53.59 9.32 67.54
Colored surface applied to cork and rubberized asphalt,
resilient surfaces only kc@.230 SY 3.35 10.36 1.80 15.51
Running track,
rubberized, asphalt colored kc@1.51 SY 8.41 68.00 11.80 88.21
Running track,
resilient mat over asphalt kc@3.48 SY 22.10 156.70 27.20 206.00

Tennis court surfaces


Using a pneumatic asphalt finisher with screed, a 12-ton 3-wheel self propelled static roller and small
tools.
Bituminous pavement 2-1/2" thick kc@.421 SY 17.20 18.96 3.30 39.46
Clay tennis court kc@.350 SY 19.20 15.76 2.74 37.70
Pulverized natural greenstone including 4" (10cm) base,
fast dry kc@.412 SY 25.20 18.55 3.23 46.98
Rubber-cork base resilient pavement kc@.267 SY 24.10 12.02 2.09 38.21

Colored tennis court sealer


Using small tools.
3 coats of acrylic emulsion cx@.144 SY 5.69 6.33 0.06 12.08

Posts for tennis court nets


Using small tools.
3-1/2" tennis court posts,
including eye bolts cx@8.24 Pair 254.00 362.00 3.71 619.71
Tennis court net
posts with pulley and reel cx@8.24 Pair 354.00 362.00 3.71 719.71

Nets for tennis courts, 42' wide


Using small tools.
Nylon thread, including binder cx@2.80 Ea 205.00 123.00 1.26 329.26
All metal tennis court net cx@4.31 Ea 422.00 189.30 1.94 613.24

Line markings for tennis courts


Using small tools.
Paint markings on asphalt, 2 coats cx@11.1 Ea 50.30 487.60 5.00 542.90

Complete tennis court with fence and bituminous surface


2015 Heavy Construction Estimator, All Rights Reserved Page 267 (part 2)

Using a pneumatic asphalt finisher with screed, a 12-ton 3-wheel self propelled static roller and small
tools.
Minimum cost kc@952. Ea 9,250.00 42,870.00 7,450.00 59,570.00
Maximum cost kc@1428 Ea 19,600.00 64,330.00 11,200.00 95,130.00
2015 Heavy Construction Estimator, All Rights Reserved Page 268

CSI 02-731, Recreational facilities, playground equipment

Ground sockets for movable playground posts


Using power tools and miscellaneous small tools.
2-3/8" socket su@1.75 Pair 37.60 61.22 2.61 101.43
3-1/2" socket su@1.75 Pair 82.30 61.22 2.61 146.13

See-saw, steel
Using power tools and miscellaneous small tools.
2 unit steel see-saw su@10.8 Ea 401.00 377.80 16.10 794.90
4 unit steel see-saw su@12.7 Ea 768.00 444.20 18.90 1,231.10
6 unit steel see-saw su@15.6 Ea 1,120.00 545.70 23.20 1,688.90

Slides, stainless steel bed


Using power tools and miscellaneous small tools.
12' (3.7) long, 6' (1.8m) high slide
with stainless steel bed su@17.5 Ea 802.00 612.20 26.10 1,440.30
20' (6.1m) long, 10' (3m) high slide
with stainless steel bed su@21.5 Ea 1,200.00 752.10 32.00 1,984.10

Swings, plain seats


Using power tools and miscellaneous small tools.
8' (2.4m) high swing with 4 seats su@17.5 Ea 611.00 612.20 26.10 1,249.30
8' (2.4m) high swing with 8 seats su@21.5 Ea 1,160.00 752.10 32.00 1,944.10
12' (3.7m) high swing with 4 seats su@21.5 Ea 868.00 752.10 32.00 1,652.10
12' (3.7m) high swing with 8 seats su@31.8 Ea 1,540.00 1,112.00 47.40 2,699.40

Whirlers
Using power tools and miscellaneous small tools.
8' (2.4m) diameter whirler su@23.3 Ea 1,220.00 815.00 34.70 2,069.70
10' (3m) diameter whirler su@28.0 Ea 1,400.00 979.40 41.70 2,421.10

Miscellaneous playground equipment


Using power tools and miscellaneous small tools.
10' (3m) long permanent bike rack su@5.96 Ea 223.00 208.50 8.88 440.38
14' (4.3m)
long horizontal monkey ladder su@4.67 Ea 500.00 163.40 6.96 670.36
Tether ball post su@1.22 Ea 67.20 42.68 1.82 111.70
10'-6" long multiple purpose posts su@2.15 Pair 95.20 75.21 3.20 173.61
3-person
fiberglass golf tee shelter su@6.09 Ea 1,870.00 213.00 9.07 2,092.07

Miscellaneous playground equipment


Using small tools.
2-way climber wg@5.34 Ea 400.00 108.30 3.36 511.66
4-way climber wg@5.34 Ea 716.00 108.30 3.36 827.66
Horizontal ladder wg@5.34 Ea 441.00 108.30 3.36 552.66
Horizontal bars wg@5.34 Ea 121.00 108.30 3.36 232.66

Fitness systems
Using small tools.
9 to 10 timber fitness stations wg@107. Ea 4,550.00 2,171.00 67.40 6,788.40
9 to 10 steel fitness stations wg@157. Ea 2,700.00 3,186.00 98.90 5,984.90
16 to 20 timber fitness stations wg@157. Ea 6,070.00 3,186.00 98.90 9,354.90
16 to 20 steel fitness stations wg@205. Ea 7,420.00 4,159.00 129.00 11,708.00
2015 Heavy Construction Estimator, All Rights Reserved Page 268 (part 2)

16 to 20 steel advance
course fitness stations wg@205. Ea 11,100.00 4,159.00 129.00 15,388.00
16 to 20 timber advance
course fitness stations wg@157. Ea 8,450.00 3,186.00 98.90 11,734.90

Modular PVC preschool playground platforms


Using small tools.
Single 3' deck platform wg@13.4 Ea 2,050.00 271.90 8.44 2,330.34
2 deck platform wg@17.8 Ea 1,880.00 361.20 11.20 2,252.40
3 deck platform wg@29.7 Ea 4,260.00 602.60 18.70 4,881.30
4 deck platform wg@38.2 Ea 5,400.00 775.10 24.10 6,199.20
5 deck platform wg@48.5 Ea 5,730.00 984.10 30.60 6,744.70

Modular steel playground platforms for parks and school yards


Using small tools.
3' and double 5' decks wg@107. Ea 13,500.00 2,171.00 67.40 15,738.40
3' and 5', 2 decks wg@33.4 Ea 4,670.00 677.70 21.00 5,368.70
5 decks wg@107. Ea 13,100.00 2,171.00 67.40 15,338.40
6 decks wg@107. Ea 13,900.00 2,171.00 67.40 16,138.40
2015 Heavy Construction Estimator, All Rights Reserved Page 269

7 decks wg@134. Ea 14,700.00 2,719.00 84.40 17,503.40


8 decks wg@134. Ea 15,600.00 2,719.00 84.40 18,403.40

Modular PVC playground platforms for parks and school yards


Using small tools.
2 decks wg@17.8 Ea 4,680.00 361.20 11.20 5,052.40
3 decks wg@29.7 Ea 6,010.00 602.60 18.70 6,631.30
7 decks wg@134. Ea 6,640.00 2,719.00 84.40 9,443.40
8 decks wg@134. Ea 14,800.00 2,719.00 84.40 17,603.40
5 decks wg@48.5 Ea 9,050.00 984.10 30.60 10,064.70
6 decks wg@107. Ea 13,500.00 2,171.00 67.40 15,738.40
Multi-deck PVC playground platforms
for parks and school yards wg@134. Ea 19,500.00 2,719.00 84.40 22,303.40

Modular steel playground platforms


With 6" x 6" redwood deck posts, using small tools.
Single 3' deck wg@13.4 Ea 2,320.00 271.90 8.44 2,600.34
3' deck combination platform wg@29.7 Ea 3,170.00 602.60 18.70 3,791.30
4' deck wg@44.5 Ea 5,120.00 902.90 28.00 6,050.90
4' deck combination platform wg@44.5 Ea 5,120.00 902.90 28.00 6,050.90
4' deck and double 5' deck platform wg@107. Ea 7,530.00 2,171.00 67.40 9,768.40

Modular PVC playground platforms


With 6" x 6" redwood deck posts, using small tools.
4' deck and double 5' deck wg@107. Ea 12,600.00 2,171.00 67.40 14,838.40
4' deck combination platform wg@44.5 Ea 10,900.00 902.90 28.00 11,830.90
Single 3' deck wg@13.4 Ea 3,590.00 271.90 8.44 3,870.34
3' deck combination platform wg@29.7 Ea 5,410.00 602.60 18.70 6,031.30
4' deck wg@44.5 Ea 7,490.00 902.90 28.00 8,420.90
5' and 6'-6"
deck combination platform wg@29.7 Ea 4,680.00 602.60 18.70 5,301.30

CSI 02-738, Yard improvements, fountains

Timber fountains
Including plumbing hookup but no electrical work, using small tools.
6' x 7' x 12' high timber fountain,
12"x 12" post w3@8.68 Ea 7,430.00 281.10 8.42 7,719.52
7'-4" x 7'-4" x 11' high timber fountain,
12"x 12" w3@11.6 Ea 4,930.00 375.70 11.30 5,317.00

CSI 02-764, Planter boxes

Precast circular concrete planters


Using small tools.
24" diameter, 18" high sr@.667 Ea 415.00 23.33 0.15 438.48
42" diameter, 30" high sr@1.33 Ea 804.00 46.52 0.31 850.83
48" diameter, 24" high sr@1.33 Ea 768.00 46.52 0.31 814.83
7' diameter, 36" high, fluted sr@2.00 Ea 2,710.00 69.96 0.46 2,780.42

Fiberglass circular planters


Using small tools.
36" diameter x 27" high sr@1.33 Ea 706.00 46.52 0.31 752.83
60" diameter x 39" high sr@2.00 Ea 1,690.00 69.96 0.46 1,760.42
36" diameter x 24" high sr@1.33 Ea 648.00 46.52 0.31 694.83
60" diameter x 24" high sr@2.00 Ea 1,250.00 69.96 0.46 1,320.42
2015 Heavy Construction Estimator, All Rights Reserved Page 269 (part 2)

Fiberglass tapered circular planters


Using small tools.
24" diameter x 36" high sr@1.33 Ea 609.00 46.52 0.31 655.83
40" diameter x 36" high sr@1.33 Ea 821.00 46.52 0.31 867.83

PVC square planters


Using small tools.
2' x 2' x 17" high sr@1.33 Ea 376.00 46.52 0.31 422.83
4' x 4' x 39" high sr@2.00 Ea 1,610.00 69.96 0.46 1,680.42
2015 Heavy Construction Estimator, All Rights Reserved Page 270

2' x 2' x 36" sr@1.33 Ea 509.00 46.52 0.31 555.83


4' x 4' x 36" sr@1.33 Ea 1,520.00 46.52 0.31 1,566.83

PVC rectangular planters


Using small tools.
4' x 1' x 18" high sr@1.33 Ea 489.00 46.52 0.31 535.83
4' x 2' x 21" high sr@2.00 Ea 721.00 69.96 0.46 791.42

Tapered circular seating units


Using small tools.
72" diameter x 29" high sr@4.00 Ea 2,600.00 139.90 0.92 2,740.82
84" diameter x 32" high sr@4.00 Ea 2,830.00 139.90 0.92 2,970.82

Planter and bench combinations


Using small tools.
72" square 36" high sr@4.00 Ea 3,990.00 139.90 0.92 4,130.82
96" square x 27" high sr@4.00 Ea 5,490.00 139.90 0.92 5,630.82

Timber planters, square and rectangular


Using small tools.
1'-2" x 1'-2" x 2'-6" high sr@1.33 Ea 453.00 46.52 0.31 499.83
1'-9" x 1'-2" x 2'-6" high sr@1.33 Ea 446.00 46.52 0.31 492.83
2'-3" x 1'-2" x 2'-6" high sr@1.33 Ea 512.00 46.52 0.31 558.83
1'-9" x 1'-9" x 2'-6" high sr@1.33 Ea 453.00 46.52 0.31 499.83
2'-3" x 1'-9" x 2'-6" high sr@1.33 Ea 709.00 46.52 0.31 755.83
2'-10" x 1'-9" x 2'-6" high sr@1.33 Ea 797.00 46.52 0.31 843.83
3'-5" x 1'-9" x 2'-6" high sr@1.33 Ea 1,060.00 46.52 0.31 1,106.83
2'-3" x 2'-3" x 2'-6" high sr@1.33 Ea 972.00 46.52 0.31 1,018.83
2'-10" x 2'-3" x 2'-6" high sr@1.33 Ea 1,250.00 46.52 0.31 1,296.83
4'-6" x 2'-3" x 2'-6" high sr@1.33 Ea 1,870.00 46.52 0.31 1,916.83
2'-10" x 2'-10" x 2'-6" high sr@1.33 Ea 826.00 46.52 0.31 872.83
4'-6" x 2'-10" x 3' high sr@1.33 Ea 2,130.00 46.52 0.31 2,176.83
5'-8" x 2'-10" x 3' high sr@1.33 Ea 2,440.00 46.52 0.31 2,486.83
3'-5" x 3'-5" x 3' high sr@1.33 Ea 1,010.00 46.52 0.31 1,056.83
4'-6" x 3'-5" x 3' high sr@1.33 Ea 2,320.00 46.52 0.31 2,366.83
5'-8" x 3'-5" x 3' high sr@1.33 Ea 2,640.00 46.52 0.31 2,686.83
6'-9" x 3'-5" x 3' high sr@1.33 Ea 2,970.00 46.52 0.31 3,016.83
4'-6" x 4'-6" x 3' high sr@1.33 Ea 2,790.00 46.52 0.31 2,836.83
3'-5" x 2'-3" x 2'-6" high sr@1.33 Ea 1,410.00 46.52 0.31 1,456.83
6'-9" x 6'-9" x 3' high sr@1.33 Ea 4,260.00 46.52 0.31 4,306.83

CSI 02-770, Trash containment

Steel frame trash containers surrounded with kiln-dried wood


Using small tools.
2' x 2' x 2.58' high, flat top sr@1.33 Ea 335.00 46.52 0.31 381.83
23" x 23" x 37" high, dome top sr@1.33 Ea 335.00 46.52 0.31 381.83
13" x 13" x 30" high ash receptacle sr@1.33 Ea 383.00 46.52 0.31 429.83
18" x 18" x 37" high, dome top sr@1.33 Ea 383.00 46.52 0.31 429.83
22" x 22" x 38" high, hopper top sr@1.33 Ea 1,270.00 46.52 0.31 1,316.83
24" x 24" x 30" high, open top sr@1.33 Ea 361.00 46.52 0.31 407.83
24" x 24" x 38" high, hopper top sr@1.33 Ea 445.00 46.52 0.31 491.83
24" x 24" x 37" high, dome top sr@1.33 Ea 502.00 46.52 0.31 548.83
21" x 21" x 31" high, flat top sr@1.33 Ea 361.00 46.52 0.31 407.83

Perforated round steel trash containers, pipe frame


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 270 (part 2)

21" diameter x 32" high, open top sr@1.33 Ea 771.00 46.52 0.31 817.83
21" diameter x 32" high, flat top sr@1.33 Ea 844.00 46.52 0.31 890.83
21" diameter x 39" high, dome top sr@1.33 Ea 1,000.00 46.52 0.31 1,046.83
21" diameter x 40" high, hopper top sr@1.33 Ea 899.00 46.52 0.31 945.83

Round steel trash containers


Pipe and flat steel frames surrounded with kiln dried wood, using small tools.
21" diameter x 32" high, open top sr@1.33 Ea 872.00 46.52 0.31 918.83
21" diameter x 32" high, flat top sr@1.33 Ea 945.00 46.52 0.31 991.83
21" diameter x 39" high, dome top sr@1.33 Ea 1,100.00 46.52 0.31 1,146.83
21" diameter x 40" high, hopper top sr@1.33 Ea 991.00 46.52 0.31 1,037.83

Square steel frame trash containers, surrounded with flat steel


Using small tools.
26" diameter x 34" high, open top sr@1.33 Ea 563.00 46.52 0.31 609.83
26" diameter x 34" high, dome top sr@1.33 Ea 615.00 46.52 0.31 661.83
26" diameter x 39" high, dome top sr@1.33 Ea 615.00 46.52 0.31 661.83
2015 Heavy Construction Estimator, All Rights Reserved Page 271

Round steel pipe frame trash containers, welded wire surround


Using small tools.
21" diameter x 32" high, flat top sr@1.33 Ea 596.00 46.52 0.31 642.83
21" diameter x 32" high, open top sr@1.33 Ea 670.00 46.52 0.31 716.83
21" diameter x 39" high, dome top sr@1.33 Ea 826.00 46.52 0.31 872.83
21" diameter x 40" high, hopper top sr@1.33 Ea 725.00 46.52 0.31 771.83

CSI 02-810, Landscape seeding

Hand seeding
Using small tools.
At 10 pounds of seed per 100 SY sq@.020 CSY 29.20 0.70 -- 29.90

Sodding, placement by hand


Using a 1.38 CY wheeled loader-backhoe and small tools.
Sod placed on a leveled prepared subgrade,
by hand ex@5.33 MSF 738.00 188.40 20.40 946.80

Fertilizing and watering


Using a 6" 1,950 GPM submersible pump and a 6,000 gallon off highway water wagon.
35 lbs. of fertilizer per
1,000 SF, spread by machine jv@.023 MSF 7.71 0.92 1.61 10.24
18.36 lbs. of fertilizer per
1,000 SF, sprayed from truck jv@.023 MSF 3.86 0.92 1.61 6.39

CSI 02-820, Top soil

Remove topsoil and stockpile on site


Using a D7-H crawler tractor dozer with blade.
4" (10cm) deep gn@.025 CY -- 0.93 2.49 3.42
6" (15cm) deep gn@.028 CY -- 1.04 2.79 3.83

Remove topsoil and stockpile on site


Using a 4 CY front end wheel loader, articulated, 966E.
4" (10cm) deep zq@.037 CY -- 1.64 3.36 5.00
6" (15cm) deep zq@.040 CY -- 1.77 3.63 5.40

Spreading topsoil with a wheel loader


Using a 2.5 CY front end wheel loader.
Spread topsoil from stockpile fp@.061 CY 13.10 2.88 1.32 17.30

Spreading topsoil with a wheel loader


Using a 4 CY front end wheel loader, articulated, 966E.
4" (10cm) deep zq@.050 CY -- 2.21 4.54 6.75
6" (15cm) deep zq@.050 CY -- 2.21 4.54 6.75

Spreading topsoil by hand


Using small tools.
Spread topsoil
by hand from stockpile sq@.220 CY 14.60 7.70 0.05 22.35
Top dressing spread by hand sq@.002 SF 0.07 0.07 -- 0.14

Furnish and place imported topsoil


Using a 2.5 CY front end wheel loader.
2015 Heavy Construction Estimator, All Rights Reserved Page 271 (part 2)

4" deep, by machine fp@.088 CY 45.00 4.16 1.91 51.07

Furnish and place imported topsoil


Using small tools.
By hand sq@.848 CY 45.00 29.66 0.19 74.85
2015 Heavy Construction Estimator, All Rights Reserved Page 272

CSI 02-830, Lawn maintenance, trees and shrubs

Guying trees
Using small tools.
2" to 5" diameter sq@.622 Ea 11.50 21.76 0.14 33.40
6" to 8" diameter sq@1.00 Ea 23.00 34.98 0.22 58.20

Specialty trees, in place costs including typical excavation and backfill


By trunk caliper, using a 50,000 lb. 3-axle truck 6x4 with a truck-mounted 84" x 54" deep tree spade.
Red maple, 4" caliper, 16'-18' high f2@5.67 Ea 133.00 205.70 99.90 438.60
Southern magnolia, 10'-12' high f2@4.13 Ea 55.10 149.80 72.80 277.70
Laurel oak,
3" caliper, 18'-22' high f2@8.51 Ea 68.90 308.70 150.00 527.60
Laurel oak, 5" caliper, 18'-22' f2@8.89 Ea 413.00 322.50 157.00 892.50
Live oak, 4" caliper, 15'-20' high f2@8.89 Ea 321.00 322.50 157.00 800.50
Weeping willow,
2" caliper, 10'-12' high f2@2.82 Ea 23.00 102.30 49.70 175.00
Weeping evergreen elm,
3" caliper, 12' to 15' high f2@4.44 Ea 230.00 161.10 78.20 469.30
Tulip tree, 14' to 16' high f2@2.60 Ea 184.00 94.33 45.80 324.13
Poplar tree, 14' to 16' high f2@3.86 Ea 184.00 140.00 68.00 392.00
Loquat, 7' to 8' high f2@2.89 Ea 57.40 104.80 50.90 213.10
Savannah holly, 8' to 10' high f2@2.89 Ea 39.00 104.80 50.90 194.70
Yaupon holly, 6' to 7' high f2@2.89 Ea 27.50 104.80 50.90 183.20
Crape myrtle, 8' to 9' high f2@2.67 Ea 29.80 96.87 47.00 173.67
Ligustrum, 6' to 8' high f2@2.67 Ea 25.30 96.87 47.00 169.17
Slash pine, 4' to 5' high f2@1.29 Ea 9.18 46.80 22.70 78.68
Loblolly pine, 5' to 6' high f2@1.29 Ea 13.80 46.80 22.70 83.30
Dogwood, 6' to 8' high, f2@2.86 Ea 23.00 103.80 50.40 177.20
Willow oak, 14' to 16' high f2@4.49 Ea 50.50 162.90 79.10 292.50
Eastern red bud, 5' to 6' high f2@3.09 Ea 25.30 112.10 54.40 191.80

Specialty shrubs, in place costs including excavation


Using a 50,000 lb. 3-axle truck 6x4 with a truck-mounted 84" x 54" deep tree spade.
Cast-iron plant, 12" to 15" high sq@.668 Ea 25.20 23.37 0.15 48.72
Acuba, 3' to 4' high, sq@.862 Ea 29.40 30.15 0.19 59.74
Cleyera, 3' to 4' high, sq@.862 Ea 30.50 30.15 0.19 60.84
2015 Heavy Construction Estimator, All Rights Reserved Page 273

Pampas grass, 3' to 4' high sq@.481 Ea 30.50 16.83 0.11 47.44
Burford holly, 3' to 4' high sq@.757 Ea 29.40 26.48 0.17 56.05
Dwarf burford holly, 2'- 3' high sq@1.34 Ea 29.40 46.87 0.29 76.56
Dwarf Chinese holly, 2'- 3' high sq@.704 Ea 29.40 24.63 0.15 54.18
Repandens holly, 15" to 18" high sq@.747 Ea 29.40 26.13 0.16 55.69
Pfitzer juniper, 18" to 24" high sq@.972 Ea 29.40 34.00 0.21 63.61
Leather-leaf mahonia, 2'- 3' high sq@1.12 Ea 29.40 39.18 0.25 68.83
Wax myrtle, 3' to 4' high in place sq@.859 Ea 29.40 30.05 0.19 59.64
Dwarf pittosporum, 12" to 15" high sq@.452 Ea 84.00 15.81 0.10 99.91
Southern yew, 2' to 3' high sq@.769 Ea 29.40 26.90 0.17 56.47
Glossy abelia, 2' to 3' high sq@.831 Ea 29.40 29.07 0.18 58.65
Kurume azalea, 18" to 24" high sq@.940 Ea 27.30 32.88 0.21 60.39
Indian hawthorn, 18" to 24" high sq@.952 Ea 29.40 33.30 0.21 62.91

Specialty ground cover, in place costs


Using small tools.
English ivy, 12" to 15" runners sq@.057 Ea 20.20 1.99 0.01 22.20
Big blue liriope, 1 gallon sq@.299 Ea 3.23 10.46 0.07 13.76
Oregon holly-grape, 2'- 3' high sq@.452 Ea 8.00 15.81 0.10 23.91
Variegated liriope, 1 gallon sq@.299 Ea 7.90 10.46 0.07 18.43
Creeping gardenia, 2 gallon sq@.284 Ea 50.40 9.93 0.06 60.39
Andora creeping juniper, 2 gallon sq@.452 Ea 16.80 15.81 0.10 32.71
Sweet viburnum, 24" to 30" high sq@.452 Ea 24.40 15.81 0.10 40.31

Landscape cutting
Using a rotary cutter for land clearing and a 2-wheel drive farm-type tractor.
Mowing g6@.014 MSF -- 0.52 0.12 0.64

Landscape watering
Using a 6" 1,950 GPM submersible pump, 46,000 lb. 3-axle 6x4 truck with 3,000 gallon water tank.
Watering by truck ju@.040 MSF -- 1.60 1.51 3.11

CSI 02-850, Railroad work

New prime rail and relays, ARA-A and ARAE


Using a 40-ton hydraulic crane with 84’ boom and small tools.
90 pound new rail tr@.039 LF 22.80 1.39 0.17 24.36
90 pound relay rail tr@.039 LF 11.20 1.39 0.17 12.76
100 pound new rail tr@.039 LF 25.20 1.39 0.17 26.76
100 pound relay rail tr@.039 LF 12.40 1.39 0.17 13.96
110 pound new rail tr@.039 LF 28.80 1.39 0.17 30.36
110 pound relay rail tr@.039 LF 14.20 1.39 0.17 15.76
115 pound new rail tr@.039 LF 34.30 1.39 0.17 35.86
115 pound relay rail tr@.039 LF 16.90 1.39 0.17 18.46
132 pound new rail tr@.039 LF 39.80 1.39 0.17 41.36
132 pound relay rail tr@.039 LF 19.60 1.39 0.17 21.16

Angle bars, ARA-A and ARAE, prime


Using 20-ton hydraulic crane with 70’ boom and small tools.
90 pound angle bar sv@.066 Pair 65.10 2.31 0.96 68.37
90 pound angle bar, relay sv@.066 Pair 26.40 2.31 0.96 29.67
100 pound angle bar sv@.066 Pair 68.50 2.31 0.96 71.77
100 pound angle bar, relay sv@.066 Pair 27.80 2.31 0.96 31.07
110 pound angle bar sv@.066 Pair 85.60 2.31 0.96 88.87
110 pound angle bar, relay sv@.066 Pair 34.70 2.31 0.96 37.97
115 pound angle bar sv@.066 Pair 103.00 2.31 0.96 106.27
115 pound angle bar, relay sv@.066 Pair 41.70 2.31 0.96 44.97
132 pound angle bar sv@.066 Pair 123.00 2.31 0.96 126.27
2015 Heavy Construction Estimator, All Rights Reserved Page 273 (part 2)

132 pound angle bar, relay sv@.066 Pair 50.00 2.31 0.96 53.27

Tie plates ARA-A and ARAE


Using 20-ton hydraulic crane with 70’ boom and small tools.
90 pound tie plate sv@.045 Ea 8.62 1.57 0.65 10.84
90 pound tie plate, relay sv@.045 Ea 2.35 1.57 0.65 4.57
100 pound tie plate sv@.045 Ea 8.62 1.57 0.65 10.84
100 pound tie plate, relay sv@.045 Ea 2.35 1.57 0.65 4.57
2015 Heavy Construction Estimator, All Rights Reserved Page 274

110 pound tie plate sv@.045 Ea 13.20 1.57 0.65 15.42


110 pound tie plate, relay sv@.045 Ea 5.87 1.57 0.65 8.09
115 pound tie plate sv@.045 Ea 13.20 1.57 0.65 15.42
115 pound tie plate, relay sv@.045 Ea 5.87 1.57 0.65 8.09
132 pound tie plate sv@.045 Ea 14.90 1.57 0.65 17.12
132 pound tie plate, relay sv@.045 Ea 7.04 1.57 0.65 9.26

Track accessories
Using 20-ton hydraulic crane with 70’ boom and small tools.
8'-6" wood cross tie sv@.596 Ea 70.40 20.83 8.66 99.89
8'-6" concrete cross tie sv@.596 Ea 204.00 20.83 8.66 233.49
5" tie plugs sv@.030 Ea 0.14 1.05 0.44 1.63
1" track bolts with nuts sv@.032 Ea 4.39 1.12 0.46 5.97
1" track lock washers sv@.017 Ea 0.77 0.59 0.25 1.61
6" track spikes sv@.133 Ea 0.80 4.65 1.93 7.38
Wood switch ties sv@.033 BF 8.29 1.15 0.48 9.92
Rail anchors sv@.115 Ea 1.74 4.02 1.67 7.43
Railroad ballast sv@.622 Ton 13.60 21.74 9.04 44.38
Railroad gauge rods sv@.528 Ea 29.30 18.45 7.67 55.42
Compromise splice bar sv@.824 Pair 492.00 28.80 12.00 532.80

Track accessories
Using a 40-ton hydraulic crane with 84’ boom and small tools.
Railroad bumpers, standard tr@17.0 Ea 2,760.00 605.70 73.30 3,439.00
Railroad bumpers, heavy duty tr@17.0 Ea 5,220.00 605.70 73.30 5,899.00
Railroad car wheel stops tr@2.43 Pair 963.00 86.58 10.50 1,060.08
Hand throw derailer
with standard timbers tr@6.18 Ea 1,620.00 220.20 26.60 1,866.80
Crushed stone ballast,
railroad work tr@.068 LF 18.10 2.42 0.29 20.81

Turnouts, Number 8, ARA-A and AREA


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Using new 90 pound rail tr@113. Ea 24,800.00 4,026.00 487.00 29,313.00
Using 90 pound relay rail tr@113. Ea 9,730.00 4,026.00 487.00 14,243.00
Using new 100 pound rail tr@113. Ea 25,100.00 4,026.00 487.00 29,613.00
Using 100 pound relay rail tr@113. Ea 10,900.00 4,026.00 487.00 15,413.00
Using new 110 pound rail tr@113. Ea 15,300.00 4,026.00 487.00 19,813.00
Using 110 pound relay rail tr@113. Ea 11,300.00 4,026.00 487.00 15,813.00
Using new 115 pound rail tr@113. Ea 27,000.00 4,026.00 487.00 31,513.00
Using 115 pound relay rail tr@113. Ea 10,200.00 4,026.00 487.00 14,713.00
Using new 132 pound rail tr@113. Ea 22,900.00 4,026.00 487.00 27,413.00
Using 132 pound relay rail tr@113. Ea 10,900.00 4,026.00 487.00 15,413.00

Railroad track and turnouts, in place and complete


Using a 40-ton hydraulic crane with 84’ boom and small tools.
90 pound rail tr@1.04 LF 43.60 37.06 4.48 85.14
90 pound rail, relay tr@1.04 LF 19.40 37.06 4.48 60.94
100 pound rail tr@1.04 LF 48.80 37.06 4.48 90.34
100 pound rail, relay tr@1.04 LF 22.20 37.06 4.48 63.74
110 pound rail tr@1.04 LF 46.30 37.06 4.48 87.84
110 pound rail, relay tr@1.04 LF 18.80 37.06 4.48 60.34
115 pound rail tr@1.04 LF 55.80 37.06 4.48 97.34
115 pound rail, relay tr@1.04 LF 26.10 37.06 4.48 67.64
132 pound rail tr@1.04 LF 64.10 37.06 4.48 105.64
132 pound rail, relay tr@1.04 LF 30.00 37.06 4.48 71.54
Remove existing railroad track tr@.520 LF -- 18.53 2.24 20.77
Remove number 8 turnout tr@52.4 Ea -- 1,867.00 226.00 2,093.00
2015 Heavy Construction Estimator, All Rights Reserved Page 274 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 275

Railroad crossings, asphalt, based on 8" thickness


Using a 46,000 lb. 3-axle 6x4 truck with a 3,000 gallon asphalt distributor, a 12-ton 3-wheel self
propelled static roller and small tools.
12' roadway, 6 CY j7@12.0 Ea 818.00 442.70 206.00 1,466.70
15' roadway, 7.4 CY j7@13.7 Ea 1,010.00 505.40 235.00 1,750.40
18' roadway, 8.9 CY j7@16.0 Ea 1,210.00 590.20 274.00 2,074.20
21' roadway, 10.4 CY j7@19.2 Ea 1,420.00 708.30 329.00 2,457.30
24' roadway, 11.9 CY j7@24.0 Ea 1,620.00 885.40 411.00 2,916.40

Railroad crossings, precast concrete inserts, standard gauge


Using a 20-ton hydraulic crane with 70’ boom and two sets of small tools.
12' road, 6" thick qh@5.65 Ea 1,730.00 271.70 49.00 2,050.70
15' road, 6" thick qh@7.06 Ea 2,160.00 339.40 61.20 2,560.60
18' road, 6" thick qh@8.42 Ea 2,600.00 404.80 73.00 3,077.80
21' road, 6" thick qh@9.80 Ea 3,030.00 471.20 85.00 3,586.20
24' road, 6" thick qh@11.2 Ea 3,460.00 538.50 97.10 4,095.60

Railroad crossings, molded rubber with headers


Using a 20-ton hydraulic crane with 70’ boom and two sets of small tools.
12' road, 3' x 8'-6" sections qh@5.65 Ea 4,610.00 271.70 49.00 4,930.70
15' road, 3' x 8'-6" sections qh@7.06 Ea 5,410.00 339.40 61.20 5,810.60
18' road, 3' x 8'-6" sections qh@8.42 Ea 6,200.00 404.80 73.00 6,677.80
21' road 3' x 8'-6" sections qh@9.80 Ea 7,000.00 471.20 85.00 7,556.20
24' road 3' x 8'-6" sections qh@11.2 Ea 7,800.00 538.50 97.10 8,435.60

Rehabilitation of existing crossings, including subgrade, ballast and ties


Using a 46,000 lb. 3-axle 6x4 truck with a 3,000 gallon asphalt distributor, a 12-ton 3-wheel self
propelled static roller and small tools.
Cost per crossing, typical j7@145. Ea 909.00 5,349.00 2,480.00 8,738.00

==========================================================================
Concrete
==========================================================================

CSI 03-110, Structural cast-in-place concrete formwork

Continuous wall footing forms


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use av@.085 SF 3.27 3.55 0.07 6.89
2 uses av@.073 SF 2.40 3.05 0.06 5.51
3 uses av@.068 SF 2.01 2.84 0.06 4.91
4 uses av@.066 SF 1.73 2.75 0.05 4.53

Column footing forms, spread


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use av@.105 SF 4.23 4.38 0.09 8.70
2 uses av@.084 SF 3.42 3.50 0.07 6.99
3 uses av@.078 SF 2.87 3.25 0.06 6.18
4 uses av@.074 SF 2.18 3.09 0.06 5.33

Grade beam forms


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.090 SF 2.26 3.63 0.07 5.96
2015 Heavy Construction Estimator, All Rights Reserved Page 275 (part 2)

2 uses ax@.072 SF 1.48 2.90 0.06 4.44


3 uses ax@.066 SF 1.20 2.66 0.05 3.91
4 uses ax@.064 SF 1.08 2.58 0.05 3.71

Pile cap forms - Square or rectangular


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use av@.110 SF 4.40 4.59 0.09 9.08
2 uses av@.093 SF 3.55 3.88 0.08 7.51
3 uses av@.087 SF 2.98 3.63 0.07 6.68
4 uses av@.084 SF 2.27 3.50 0.07 5.84
2015 Heavy Construction Estimator, All Rights Reserved Page 276

Pile cap forms - Triangular or hexagonal


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use av@.142 SF 4.40 5.92 0.12 10.44
2 uses av@.114 SF 3.55 4.76 0.09 8.40
3 uses av@.105 SF 2.98 4.38 0.09 7.45
4 uses av@.102 SF 2.27 4.25 0.08 6.60

Wall forms, below grade - Up to 8’ (2.4m) high


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.108 SF 4.90 4.36 0.09 9.35
2 uses ax@.092 SF 4.08 3.71 0.08 7.87
3 uses ax@.081 SF 2.77 3.27 0.07 6.11
4 uses ax@.079 SF 2.09 3.19 0.06 5.34

Wall forms, below grade - Over 8' (2.4m) high


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.143 SF 5.75 5.77 0.12 11.64
2 uses ax@.116 SF 4.29 4.68 0.10 9.07
3 uses ax@.107 SF 3.26 4.32 0.09 7.67
4 uses ax@.101 SF 3.04 4.07 0.08 7.19

Retaining wall forms - Less than 8' high


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.160 SF 2.73 6.45 0.13 9.31
2 uses ax@.136 SF 1.69 5.49 0.11 7.29
3 uses ax@.127 SF 1.46 5.12 0.10 6.68
4 uses ax@.123 SF 1.32 4.96 0.10 6.38

Retaining wall forms - 8' to 16' high


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.167 SF 2.97 6.74 0.14 9.85
2 uses ax@.136 SF 1.86 5.49 0.11 7.46
3 uses ax@.131 SF 1.48 5.29 0.11 6.88
4 uses ax@.125 SF 1.32 5.04 0.10 6.46

Curved form - Smooth curved


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.178 SF 5.12 7.18 0.15 12.45
2 uses ax@.153 SF 3.84 6.17 0.13 10.14
3 uses ax@.145 SF 3.47 5.85 0.12 9.44
4 uses ax@.140 SF 3.06 5.65 0.11 8.82

Curved form - Radial wall form to 8' (2.4m) high, 2' chord
Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.195 SF 4.93 7.87 0.16 12.96
2 uses ax@.160 SF 3.70 6.45 0.13 10.28
3 uses ax@.148 SF 3.34 5.97 0.12 9.43
4 uses ax@.143 SF 2.94 5.77 0.12 8.83
2015 Heavy Construction Estimator, All Rights Reserved Page 276 (part 2)

Curved form - Radial wall form over 8’ (2.4m) high, 2' chord
Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.208 SF 4.04 8.39 0.17 12.60
2 uses ax@.175 SF 2.54 7.06 0.14 9.74
3 uses ax@.163 SF 1.97 6.58 0.13 8.68
4 uses ax@.159 SF 1.78 6.41 0.13 8.32

Curved form - Radial form, smooth curved


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.238 SF 3.30 9.60 0.20 13.10
2015 Heavy Construction Estimator, All Rights Reserved Page 277

2 uses ax@.202 SF 2.14 8.15 0.17 10.46


3 uses ax@.189 SF 1.94 7.62 0.15 9.71
4 uses ax@.184 SF 1.86 7.42 0.15 9.43

Buttress forms, to 8' high


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.114 SF 5.41 4.60 0.09 10.10
2 uses ax@.093 SF 3.53 3.75 0.08 7.36
3 uses ax@.087 SF 2.66 3.51 0.07 6.24
4 uses ax@.083 SF 2.13 3.35 0.07 5.55

Column pier and pilaster forms


Including plywood, bracing, ties, accessories, oil, erecting, stripping, stacking and repairs for multiple
use, using miscellaneous power tools and small tools.
1 use ax@.178 SF 6.01 7.18 0.15 13.34
2 uses ax@.143 SF 3.92 5.77 0.12 9.81
3 uses ax@.129 SF 2.96 5.20 0.11 8.27
4 uses ax@.125 SF 2.86 5.04 0.10 8.00

Slab forms

Slab-on-grade edge forms


Using 2" lumber. Includes stakes, oil, stripping and repairs. Based on 4 uses, using miscellaneous
power tools and small tools.
Up to 6" (15 cm) high av@.053 LF 0.82 2.21 0.04 3.07
7" to 12" (18cm to 31cm) high av@.074 LF 1.61 3.09 0.06 4.76
Over 12" (over 31cm) high av@.096 SF 2.15 4.00 0.08 6.23

Depressed edge slab forms


Includes lumber, stakes, oil, stripping and repairs. Based on 4 uses, using small tools.
To 12" high au@.087 LF 1.19 3.58 0.03 4.80
12" to 24" high au@.149 LF 1.42 6.13 0.05 7.60

Slab on grade carton forms, including forms


Using small tools.
6" x 12" x 10' corrugated
fiberboard carton form ay@.034 SF 1.10 1.29 0.01 2.40

Pad foundations
Using 2" lumber. Includes stakes, oil, stripping and repairs, using miscellaneous power tools and small
tools.
1 use ax@.250 SF 3.34 10.09 0.21 13.64
2 uses ax@.211 SF 1.92 8.51 0.17 10.60
3 uses ax@.200 SF 1.46 8.07 0.16 9.69
4 uses ax@.195 SF 1.30 7.87 0.16 9.33

Block-out forms to 6"


Includes lumber, stakes, oil, stripping and repairs, using miscellaneous power tools and small tools.
1 use ax@.250 SF 3.45 10.09 0.21 13.75
2 uses ax@.211 SF 2.01 8.51 0.17 10.69
3 uses ax@.200 SF 2.03 8.07 0.16 10.26
4 uses ax@.195 SF 1.28 7.87 0.16 9.31

Block-out forms over 6", 1 use


Includes lumber, stakes, oil and stripping, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 277 (part 2)

Over 6" to 12" au@.130 LF 1.19 5.34 0.04 6.57


Over 12" to 24" au@.217 LF 1.44 8.92 0.07 10.43

Trench forms
Includes lumber, stakes, oil, stripping and repairs, using miscellaneous power tools and small tools.
1 use au@.163 SF 3.88 6.70 0.05 10.63
2 uses au@.149 SF 2.23 6.13 0.05 8.41
3 uses au@.144 SF 1.71 5.92 0.04 7.67
4 uses au@.141 SF 1.38 5.80 0.04 7.22
2015 Heavy Construction Estimator, All Rights Reserved Page 278

Curb forms, 6" to 12" high


Includes lumber, stakes, oil stripping and repairs for multiple use, using miscellaneous power tools and
small tools.
1 use au@.121 SF 3.13 4.97 0.04 8.14
2 uses au@.104 SF 1.79 4.28 0.03 6.10
3 uses au@.098 SF 1.40 4.03 0.03 5.46
4 uses au@.095 SF 1.30 3.91 0.03 5.24

Stairway forms
Includes lumber, stakes, oil stripping and repairs for multiple use, using miscellaneous power tools and
small tools.
1 use ax@.182 SF 5.10 7.34 0.15 12.59
3 uses ax@.182 SF 2.35 7.34 0.15 9.84
4 uses ax@.167 SF 1.97 6.74 0.14 8.85

Culvert forms, 5’ to 8', square or rectangular


Includes lumber, stakes, oil stripping and repairs for multiple use, using small tools.
1 use au@.153 SF 2.54 6.29 0.05 8.88
2 uses au@.144 SF 1.59 5.92 0.04 7.55
3 uses au@.137 SF 1.47 5.63 0.04 7.14
4 uses au@.130 SF 1.47 5.34 0.04 6.85
Add for foundations more than
20 feet (6.1m) below grade ---@--- % -- 25.00 -- --

Square column forms - 8" x 8" columns


Includes plywood, braces, brackets, oil, stripping and repairs for multiple use, using miscellaneous
power tools and small tools.
1 use av@.194 SF 3.73 8.09 0.16 11.98
2 uses av@.164 SF 2.57 6.84 0.13 9.54
3 uses av@.152 SF 2.32 6.34 0.12 8.78
4 uses av@.149 SF 2.03 6.22 0.12 8.37

Square column forms - 12" x 12" columns


Includes plywood, braces, brackets, oil, stripping and repairs for multiple use, using miscellaneous
power tools and small tools.
1 use av@.178 SF 3.46 7.42 0.14 11.02
2 uses av@.152 SF 2.23 6.34 0.12 8.69
3 uses av@.146 SF 1.95 6.09 0.12 8.16
4 uses av@.142 SF 1.80 5.92 0.12 7.84

Square column forms - 16" x 16" columns


Includes plywood, braces, brackets, oil, stripping and repairs for multiple use, using miscellaneous
power tools and small tools.
1 use av@.173 SF 3.29 7.22 0.14 10.65
2 uses av@.149 SF 2.15 6.22 0.12 8.49
3 uses av@.139 SF 1.83 5.80 0.11 7.74
4 uses av@.136 SF 1.68 5.67 0.11 7.46

Square column forms - 24" x 24" columns


Includes plywood, braces, brackets, oil, stripping and repairs for multiple use, using miscellaneous
power tools and small tools.
1 use av@.168 SF 2.77 7.01 0.14 9.92
2 uses av@.146 SF 1.83 6.09 0.12 8.04
3 uses av@.136 SF 1.53 5.67 0.11 7.31
4 uses av@.133 SF 1.38 5.55 0.11 7.04
2015 Heavy Construction Estimator, All Rights Reserved Page 278 (part 2)

Square column forms - 36" x 36" columns


Includes plywood, braces, brackets, oil, stripping and repairs for multiple use, using miscellaneous
power tools and small tools.
1 use av@.160 SF 3.14 6.67 0.13 9.94
2 uses av@.139 SF 1.90 5.80 0.11 7.81
3 uses av@.131 SF 1.49 5.46 0.11 7.06
4 uses av@.128 SF 1.31 5.34 0.10 6.75
2015 Heavy Construction Estimator, All Rights Reserved Page 279

Round column forms, fiber, plastic lined


One use. Includes form stripping, using small tools.
10" diameter au@.168 LF 4.70 6.91 0.05 11.66
12" diameter au@.170 LF 5.78 6.99 0.05 12.82
14" diameter au@.174 LF 7.33 7.15 0.05 14.53
16" diameter au@.179 LF 8.88 7.36 0.06 16.30
18" diameter au@.183 LF 16.30 7.52 0.06 23.88
20" diameter au@.190 LF 18.30 7.81 0.06 26.17
24" diameter au@.200 LF 19.90 8.22 0.06 28.18
30" diameter au@.208 LF 29.90 8.55 0.06 38.51
36" diameter au@.226 LF 37.20 9.29 0.07 46.56
42" diameter au@.260 LF 68.00 10.69 0.08 78.77
48" diameter au@.306 LF 71.70 12.58 0.09 84.37

Beam bottom forms, to 30" (76cm) wide


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.211 SF 4.40 8.51 0.17 13.08
2 uses ax@.182 SF 2.55 7.34 0.15 10.04
3 uses ax@.170 SF 2.03 6.86 0.14 9.03
4 uses ax@.167 SF 1.76 6.74 0.14 8.64

Beam vertical side forms


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.143 SF 3.20 5.77 0.12 9.09
2 uses ax@.119 SF 2.02 4.80 0.10 6.92
3 uses ax@.111 SF 1.69 4.48 0.09 6.26
4 uses ax@.107 SF 1.49 4.32 0.09 5.90

Beam upstanding side forms, to 36" high


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.178 SF 5.03 7.18 0.15 12.36
2 uses ax@.157 SF 3.04 6.33 0.13 9.50
3 uses ax@.146 SF 2.48 5.89 0.12 8.49
4 uses ax@.143 SF 2.19 5.77 0.12 8.08

Beam sloped side forms, to 36" high


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.131 SF 3.37 5.29 0.11 8.77
2 uses ax@.108 SF 2.19 4.36 0.09 6.64
3 uses ax@.099 SF 1.76 3.99 0.08 5.83
4 uses ax@.094 SF 1.56 3.79 0.08 5.43
Deduct for
beam bottoms over 30" wide ---@--- % -5.00 -15.00 -- --

Beam and girder forms for concrete-encased steel frame


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.123 SF 2.76 4.96 0.10 7.82
2 uses ax@.103 SF 1.62 4.16 0.08 5.86
3 uses ax@.096 SF 1.21 3.87 0.08 5.16
4 uses ax@.093 SF 1.06 3.75 0.08 4.89
2015 Heavy Construction Estimator, All Rights Reserved Page 279 (part 2)

Beam and girder forms, to 12" wide


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
Exterior spandrel, 1 use ax@.178 SF 3.54 7.18 0.15 10.87
Exterior spandrel, 2 use ax@.146 SF 1.95 5.89 0.12 7.96
Exterior spandrel, 3 use ax@.136 SF 1.43 5.49 0.11 7.03
Exterior spandrel, 4 use ax@.129 SF 1.18 5.20 0.11 6.49
Interior beam, 1 use ax@.133 SF 2.84 5.37 0.11 8.32
Interior beam, 2 uses ax@.118 SF 1.70 4.76 0.10 6.56
Interior beam, 3 uses ax@.110 SF 1.79 4.44 0.09 6.32
Interior beam, 4 uses ax@.106 SF 1.61 4.28 0.09 5.98
2015 Heavy Construction Estimator, All Rights Reserved Page 280

Beam and girder forms, to 18" wide


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
Exterior spandrel, 1 use ax@.160 SF 3.42 6.45 0.13 10.00
Exterior spandrel, 2 use ax@.146 SF 2.10 5.89 0.12 8.11
Exterior spandrel, 3 use ax@.131 SF 1.70 5.29 0.11 7.10
Exterior spandrel, 4 use ax@.127 SF 1.53 5.12 0.10 6.75
Interior beam, 1 use ax@.129 SF 2.53 5.20 0.11 7.84
Interior beam, 2 uses ax@.113 SF 1.62 4.56 0.09 6.27
Interior beam, 3 uses ax@.107 SF 1.35 4.32 0.09 5.76
Interior beam, 4 uses ax@.104 SF 1.24 4.20 0.09 5.53

Beam and girder forms, to 24" wide


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
Exterior spandrel, 1 use ax@.151 SF 3.42 6.09 0.12 9.63
Exterior spandrel, 2 use ax@.138 SF 2.10 5.57 0.11 7.78
Exterior spandrel, 3 use ax@.127 SF 1.70 5.12 0.10 6.92
Exterior spandrel, 4 use ax@.123 SF 1.53 4.96 0.10 6.59
Interior beam, 1 use ax@.125 SF 3.22 5.04 0.10 8.36
Interior beam, 2 uses ax@.110 SF 2.01 4.44 0.09 6.54
Interior beam, 3 uses ax@.104 SF 1.66 4.20 0.09 5.95
Interior beam, 4 uses ax@.101 SF 1.50 4.07 0.08 5.65

Interior wall forms - Plywood, to 8’ (2.4m) high


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.131 SF 2.44 5.29 0.11 7.84
2 uses ax@.110 SF 1.67 4.44 0.09 6.20
3 uses ax@.098 SF 1.41 3.95 0.08 5.44
4 uses ax@.095 SF 1.29 3.83 0.08 5.20

Interior wall forms - Rented panel forms, to 8’ (2.4m) high


Includes erection and stripping. Based on uses per month, using miscellaneous power tools and small
tools.
1 use per month ax@.044 SF 1.40 1.78 0.04 3.22
2 uses per month ax@.043 SF 0.82 1.74 0.04 2.60
3 uses per month ax@.042 SF 0.58 1.69 0.03 2.30
4 uses per month ax@.041 SF 0.48 1.65 0.03 2.16

Interior wall forms - Plywood, over 8’ (2.4m) to 16' (4.8) high


Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.148 SF 3.51 5.97 0.12 9.60
2 uses ax@.121 SF 2.21 4.88 0.10 7.19
3 uses ax@.111 SF 1.85 4.48 0.09 6.42
4 uses ax@.108 SF 1.73 4.36 0.09 6.18

Interior wall forms - Rented panel forms, over to 8’ (2.4m) to 16' (4.8m) high
Includes erection and stripping. Based on uses per month, using miscellaneous power tools and small
tools.
1 use per month ax@.073 SF 1.93 2.95 0.06 4.94
2 uses per month ax@.070 SF 1.08 2.82 0.06 3.96
3 uses per month ax@.068 SF 0.78 2.74 0.06 3.58
4 uses per month ax@.066 SF 0.70 2.66 0.05 3.41
2015 Heavy Construction Estimator, All Rights Reserved Page 280 (part 2)

Interior wall forms - Plywood interior wall forms, over 16’ (4.8m) high
Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.160 SF 3.83 6.45 0.13 10.41
2 uses ax@.133 SF 2.49 5.37 0.11 7.97
3 uses ax@.121 SF 2.09 4.88 0.10 7.07
4 uses ax@.111 SF 1.93 4.48 0.09 6.50
2015 Heavy Construction Estimator, All Rights Reserved Page 281

Interior wall forms - Rented steel frame panel forms, over 16' (4.8m) high
Includes erection and stripping. Based on uses per month, using miscellaneous power tools and small
tools.
1 use per month ax@.094 SF 1.69 3.79 0.08 5.56
2 uses per month ax@.092 SF 1.42 3.71 0.08 5.21
3 uses per month ax@.088 SF 1.02 3.55 0.07 4.64
4 uses per month ax@.086 SF 0.88 3.47 0.07 4.42
Add for exterior wall forms ---@--- % -- 10.00 -- --
Add for elevated walls ---@--- % -- 10.00 -- --
Add for battered walls one side ---@--- % 10.00 10.00 -- --
Add for battered walls two sides ---@--- % 15.00 15.00 -- --

Blockout forms
Includes lumber, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools and
small tools.
Boxout to 10 SF, to 16" thick ax@1.95 Ea 32.80 78.66 1.60 113.06
Boxout over 10 SF, to 16" thick ax@.143 LF 2.08 5.77 0.12 7.97

Brick shelf forms, 4"


Based on wall area above shelf. Includes lumber, bracing, oil, stripping and repairs for multiple use,
using miscellaneous power tools and small tools.
1 use ax@.167 SF 2.58 6.74 0.14 9.46
2 uses ax@.146 SF 1.54 5.89 0.12 7.55
4 uses ax@.133 SF 1.10 5.37 0.11 6.58

Lintel or sill forms


Includes lumber, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools and
small tools.
1 use ax@.333 SF 3.31 13.43 0.27 17.01
2 uses ax@.294 SF 1.86 11.86 0.24 13.96
3 uses ax@.278 SF 1.40 11.21 0.23 12.84
4 uses ax@1.08 SF 1.18 43.57 0.89 45.64

Corbel forms, 12" wide corbel (haunch)


Using miscellaneous power tools and small tools.
1 use, add to wall form cost ax@.267 LF 2.80 10.77 0.22 13.79
2 uses, add to wall form cost ax@.235 LF 2.80 9.48 0.19 12.47
3 uses, add to wall form cost ax@.229 LF 2.10 9.24 0.19 11.53
4 uses, add to wall form cost ax@.222 LF 1.82 8.96 0.18 10.96

Pilaster forms
Includes plywood, bracing, oil, stripping and repairs for multiple use, using miscellaneous power tools
and small tools.
1 use ax@.148 SF 4.28 5.97 0.12 10.37
2 uses ax@.121 SF 2.56 4.88 0.10 7.54
3 uses ax@.108 SF 2.01 4.36 0.09 6.46
4 uses ax@.104 SF 1.83 4.20 0.09 6.12

Elevated slab formwork

Forming elevated slabs with drop panels


Includes setting forms and adjustable shores, stripping and cleaning, using miscellaneous power tools
and small tools.
1 use, ceiling to 15' ax@.107 SF 4.75 4.32 0.09 9.16
2 uses, ceiling to 15' ax@.096 SF 3.29 3.87 0.08 7.24
3 uses, ceiling to 15' ax@.092 SF 2.54 3.71 0.08 6.33
2015 Heavy Construction Estimator, All Rights Reserved Page 281 (part 2)

4 uses, ceiling to 15' ax@.091 SF 2.28 3.67 0.07 6.02


Over 15’ to 20' ceiling, 4 uses ax@.083 SF 2.98 3.35 0.07 6.40
Over 20’ to 35' ceiling, 4 uses ax@.092 SF 3.22 3.71 0.08 7.01
2015 Heavy Construction Estimator, All Rights Reserved Page 282

Floor slab forms hung from steel beams


Includes setting forms, stripping and cleaning, using miscellaneous power tools and small tools.
1 use ax@.098 SF 3.18 3.95 0.08 7.21
2 uses ax@.087 SF 2.15 3.51 0.07 5.73
3 uses ax@.084 SF 1.77 3.39 0.07 5.23
4 uses ax@.082 SF 1.66 3.31 0.07 5.04

Floor slab formed with 20" pans or domes


Includes setting forms, stripping and cleaning, using miscellaneous power tools and small tools.
1 use ax@.128 SF 7.59 5.16 0.10 12.85
2 uses ax@.108 SF 4.85 4.36 0.09 9.30
3 uses ax@.101 SF 4.02 4.07 0.08 8.17
4 uses ax@.098 SF 3.61 3.95 0.08 7.64

Elevated slab edge forms


Includes setting forms, stripping and cleaning, using miscellaneous power tools and small tools.
To 6" high, 4 uses au@.052 LF 0.60 2.14 0.02 2.76
7" to 12" high, 1 use au@.161 LF 1.45 6.62 0.05 8.12
7" to 12" high, 2 uses au@.131 LF 0.74 5.39 0.04 6.17
7" to 12" high, 3 uses au@.117 LF 0.47 4.81 0.04 5.32
7" to 12" high, 4 uses au@.074 LF 0.35 3.04 0.02 3.41
To 12" high, 4 uses, depressed area au@.087 LF 0.95 3.58 0.03 4.56
12" to 24" high,
4 uses, depressed area au@.149 LF 1.23 6.13 0.05 7.41

Elevated slab flat plate forms


Includes setting forms, stripping and cleaning, using miscellaneous power tools and small tools.
To 15’ high, 1 use au@.055 SF 3.28 2.26 0.02 5.56
To 15’ high, 2 uses au@.050 SF 2.23 2.06 0.02 4.31
To 15’ high, 3 uses au@.048 SF 1.72 1.97 0.01 3.70
To 15’ high, 4 uses au@.046 SF 1.49 1.89 0.01 3.39
15’ to 20' high, 4 uses au@.054 SF 1.66 2.22 0.02 3.90

Elevated slab curb forms, 6" to 12" high


Includes setting forms, stripping and cleaning, using small tools.
1 use au@.144 SF 2.93 5.92 0.04 8.89
2 uses au@.127 SF 1.59 5.22 0.04 6.85
3 uses au@.118 SF 1.17 4.85 0.04 6.06
4 uses au@.116 SF 1.00 4.77 0.04 5.81
Straight
perimeter deck and rail forms au@.289 LF 10.90 11.88 0.09 22.87
Curved
perimeter deck and rail forms au@.400 LF 15.00 16.44 0.12 31.56

Elevated slab boxout forms


Includes setting forms, stripping and cleaning, using miscellaneous power tools and small tools.
Shallow boxout, to 10 SF ax@.952 Ea 13.30 38.40 0.78 52.48
Shallow boxout, more than 10 SF ax@.100 SF 2.87 4.03 0.08 6.98
Opening, more than 16" diameter,
1 use ax@.211 SF 3.61 8.51 0.17 12.29
Opening, more than 16" diameter,
3 uses ax@.167 SF 2.10 6.74 0.14 8.98

Stair forms (cast on sloping ground) no excavation, min. grading


Includes minimum excavation, erection, stripping and cleaning. Per square foot of slant area (length
times width), using miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 282 (part 2)

1 use ax@.256 SF 4.73 10.33 0.21 15.27


2 uses ax@.234 SF 4.22 9.44 0.19 13.85
2015 Heavy Construction Estimator, All Rights Reserved Page 283

3 uses ax@.211 SF 3.10 8.51 0.17 11.78


4 uses ax@.020 SF 2.61 0.81 0.02 3.44

Miscellaneous formwork

Keyed joint forms, based on 4 uses


Includes setting, removing and cleaning form, using miscellaneous power tools and small tools.
6" (15 cm) high av@.054 LF 0.55 2.25 0.04 2.84
7" to 12" (15 cm) high av@.069 LF 0.76 2.88 0.06 3.70

Keyway forms, tapered, based on 4 uses


Includes setting, removing and cleaning form, using small tools.
2x4 al@.015 LF 0.27 0.66 0.01 0.94
2x6 al@.017 LF 0.32 0.75 0.01 1.08

Walls with keyways


Includes setting and removing form, using miscellaneous power tools and small tools.
2 piece ax@.182 LF 3.00 7.34 0.15 10.49
3 piece ax@.276 LF 3.80 11.13 0.23 15.16

Elevated slab keyway


Includes setting and removing form, using miscellaneous power tools and small tools.
2 piece ax@.092 LF 3.60 3.71 0.08 7.39
3 piece ax@.100 LF 5.07 4.03 0.08 9.18

Ground slab keyway


Includes setting and removing form, using miscellaneous power tools and small tools.
2 piece ax@.090 LF 3.73 3.63 0.07 7.43
3 piece ax@.114 LF 5.00 4.60 0.09 9.69

Wood chamfer strip for form


Using small tools.
1/2" wide am@.015 LF 0.21 0.66 0.01 0.88
3/4" wide am@.016 LF 0.27 0.70 0.01 0.98
1" wide am@.017 LF 0.35 0.75 0.01 1.11

PVC chamfer strip for form


Using small tools.
1/2" wide with leg am@.015 LF 1.02 0.66 0.01 1.69
3/4" wide with leg am@.015 LF 1.30 0.66 0.01 1.97
1" wide with leg am@.016 LF 1.66 0.70 0.01 2.37
1" radius am@.016 LF 1.62 0.70 0.01 2.33
1-1/2" radius am@.017 LF 2.86 0.75 0.01 3.62

Galvanized steel reglets set in form


Using miscellaneous power tools and small tools.
24 gauge an@.083 LF 1.40 3.65 0.10 5.15

Sleeves and chases placed in concrete formwork (12" long)


Using small tools.
2" diameter, PVC CL 150 plastic al@.100 Ea 1.36 4.39 0.05 5.80
2" diameter, sheet metal al@.100 Ea 0.42 4.39 0.05 4.86
2" diameter, steel pipe al@.100 Ea 14.10 4.39 0.05 18.54
4" diameter, PVC CL 150 plastic al@.111 Ea 1.94 4.88 0.06 6.88
4" diameter, sheet metal al@.111 Ea 0.52 4.88 0.06 5.46
4" diameter, steel pipe al@.111 Ea 23.20 4.88 0.06 28.14
2015 Heavy Construction Estimator, All Rights Reserved Page 283 (part 2)

6" diameter, PVC CL 150 plastic al@.133 Ea 3.60 5.84 0.07 9.51
6" diameter, sheet metal al@.133 Ea 0.77 5.84 0.07 6.68
6" diameter, steel pipe al@.133 Ea 25.50 5.84 0.07 31.41
8" diameter, PVC CL 150 plastic al@.151 Ea 6.20 6.63 0.08 12.91
8" diameter, sheet metal al@.151 Ea 1.07 6.63 0.08 7.78
8" diameter, steel pipe al@.151 Ea 31.50 6.63 0.08 38.21
10" diameter, PVC CL 150 plastic al@.160 Ea 9.40 7.03 0.08 16.51
2015 Heavy Construction Estimator, All Rights Reserved Page 284

10" diameter, sheet metal al@.160 Ea 0.77 7.03 0.08 7.88


10" diameter, steel pipe al@.160 Ea 39.40 7.03 0.08 46.51
12" diameter, PVC CL 150 plastic al@.167 Ea 13.30 7.34 0.09 20.73
12" diameter, sheet metal al@.167 Ea 1.94 7.34 0.09 9.37
12" diameter, steel pipe al@.167 Ea 62.00 7.34 0.09 69.43

Metal formwork

Straight edge metal forms


Set with stakes, 10’ long, based on 100 uses, using small tools.
4" (10 cm) high au@.050 LF 0.22 2.06 0.02 2.30
6" (10 cm) high au@.050 LF 0.24 2.06 0.02 2.32
8" (10 cm) high au@.054 LF 0.29 2.22 0.02 2.53
12" (10 cm) high au@.062 LF 0.36 2.55 0.02 2.93
16" (10 cm) high au@.068 LF 0.44 2.80 0.02 3.26

Radius metal form


Set with stakes, 10’ long, based on 100 uses, using small tools.
4" (10 cm) high au@.062 LF 0.22 2.55 0.02 2.79
6" (10 cm) high au@.062 LF 0.25 2.55 0.02 2.82
8" (10 cm) high au@.068 LF 0.36 2.80 0.02 3.18
12" (10 cm) high au@.077 LF 0.47 3.17 0.02 3.66

Metal curb form


S-shape, 10’ long, based on 100 uses, using small tools.
12" (30 cm) x 1.5' (.46m) au@.100 LF 0.44 4.11 0.03 4.58
12" (30 cm) x 2.0' (.61m) au@.091 LF 0.54 3.74 0.03 4.31
12" (30 cm) x 2.5' (.76m) au@.083 LF 0.60 3.41 0.03 4.04
12" (30 cm) x 3.0' (.91m) au@.076 LF 0.69 3.12 0.02 3.83

Metal column forms, square


Including, setting, braces, stripping and cleaning, based on 4 uses per month, per LF of form height,
using small tools.
12" square, regular duty au@.179 LF 4.01 7.36 0.06 11.43
16" square, regular duty au@.208 LF 4.37 8.55 0.06 12.98
20" square, heavy duty au@.248 LF 4.63 10.20 0.08 14.91
24" square, heavy duty au@.306 LF 4.90 12.58 0.09 17.57
30" square, heavy duty au@.371 LF 5.26 15.25 0.12 20.63
36" square, heavy duty au@.433 LF 6.01 17.80 0.13 23.94
48" square, heavy duty au@.520 LF 9.09 21.38 0.16 30.63
60" square, heavy duty au@.578 LF 10.90 23.76 0.18 34.84

Forming 24" column capitals


Including, setting, bracing, stripping and cleaning, based on 4 uses per month, using small tools.
24" x 4' diameter au@2.17 Ea 21.10 89.21 0.67 110.98
24" x 5' diameter au@2.36 Ea 24.40 97.02 0.73 122.15
24" x 6' diameter au@2.60 Ea 26.50 106.90 0.81 134.21
24" x 7' diameter au@2.89 Ea 29.40 118.80 0.90 149.10

Slipforms
Using a 30-ton hydraulic jack with 50' rods.
Silos, minimum cost uk@.021 SF 0.45 0.74 0.02 1.21
2015 Heavy Construction Estimator, All Rights Reserved Page 285

Silos, maximum cost uk@.073 SF 0.73 2.55 0.06 3.34


Buildings, minimum cost uk@.022 SF 0.49 0.77 0.02 1.28
Buildings, maximum cost uk@.091 SF 0.77 3.18 0.08 4.03

CSI 03-210, Concrete reinforcing steel

Footing and slab reinforcing


Using small tools.
Grade 50 bars, #3 to #6 bars p6@12.8 Ton 1,360.00 668.70 4.61 2,033.31
Grade 50 bars, #7 and up bars p6@11.4 Ton 1,270.00 595.50 4.10 1,869.60
Grade 60 bars, #3 to #6 bars p6@12.8 Ton 1,390.00 668.70 4.61 2,063.31
Grade 60 bars, #7 and up bars p6@11.4 Ton 1,300.00 595.50 4.10 1,899.60
Grade 70 bars, #3 to #6 bars p6@12.8 Ton 1,380.00 668.70 4.61 2,053.31
Grade 70 bars, #7 and up bars p6@11.4 Ton 1,450.00 595.50 4.10 2,049.60

Beam, column and wall reinforcing


Using small tools.
Grade 50 bars, #3 to #6 bars p6@12.8 Ton 1,380.00 668.70 4.61 2,053.31
Grade 50 bars, #7 and up bars p6@11.4 Ton 1,290.00 595.50 4.10 1,889.60
Grade 60 bars, #3 to #6 bars p6@12.8 Ton 1,410.00 668.70 4.61 2,083.31
Grade 60 bars, #7and up bars p6@11.4 Ton 1,300.00 595.50 4.10 1,899.60
Grade 70 bars, #3 to #6 bars p6@12.8 Ton 1,560.00 668.70 4.61 2,233.31
Grade 70 bars, #7 and up bars p6@11.4 Ton 1,470.00 595.50 4.10 2,069.60
Add for
epoxy coated reinforcing bars --@.000 Ton 1,160.00 -- -- 1,160.00
Add for bending, cutting and splicing,
minimum p6@5.00 Ton -- 261.20 1.80 263.00

Butt weld column reinforcement splicing


Using small tools.
Number 4 to number 6 bars p5@.291 Ea 1.21 15.19 0.10 16.50
Number 8 to number 10 bars p5@.301 Ea 2.16 15.72 0.10 17.98

Mechanical joint connection for reinforcing bars


Excludes bar threading, number 10 to number 18 bars, using small tools.
Thermal type, add per splice p5@.833 Ea 41.30 43.49 0.27 85.06
Screwed type, add per splice p5@.500 Ea 56.10 26.11 0.17 82.38

Straight dowels, 24" (61cm) long


Using small tools.
1" (25mm) diameter am@.027 Ea 4.45 1.19 0.01 5.65
3/4" (19mm) diameter am@.022 Ea 2.49 0.97 0.01 3.47
1/2" (13mm) diameter am@.020 Ea 1.09 0.88 0.01 1.98
5/8" (16mm) diameter am@.021 Ea 1.73 0.92 0.01 2.66

Epoxy coated straight dowel reinforcing


24" (61cm) long, using small tools.
3/8", #3 rebar am@.019 Ea 1.63 0.83 0.01 2.47
1/2", #4 rebar am@.020 Ea 2.46 0.88 0.01 3.35
5/8", #5 rebar am@.021 Ea 3.67 0.92 0.01 4.60
3/4", #6 rebar am@.022 Ea 4.88 0.97 0.01 5.86
7/8", #7 rebar am@.024 Ea 6.64 1.05 0.01 7.70
1", #8 rebar am@.027 Ea 8.17 1.19 0.01 9.37
1-1/8", #9 rebar am@.031 Ea 9.90 1.36 0.02 11.28
1-1/4", #10 rebar am@.036 Ea 12.00 1.58 0.02 13.60

Spiral reinforcing, grade 60


2015 Heavy Construction Estimator, All Rights Reserved Page 285 (part 2)

Based on spirals up to 30" diameter and 20' depth fabricated on site, using small tools.
8" to 15" diameter p6@16.4 Ton 1,630.00 856.70 5.90 2,492.60
15" to 24" diameter p6@16.0 Ton 1,630.00 835.80 5.76 2,471.56
24" to 36" diameter p6@16.0 Ton 1,630.00 835.80 5.76 2,471.56
36" to 48" diameter p6@15.2 Ton 1,630.00 794.00 5.47 2,429.47
48" to 64" diameter p6@14.5 Ton 1,630.00 757.50 5.22 2,392.72
64" to 84" diameter p6@13.9 Ton 1,670.00 726.10 5.00 2,401.10
84" to 96" diameter p6@13.3 Ton 1,670.00 694.80 4.79 2,369.59
2015 Heavy Construction Estimator, All Rights Reserved Page 286

Deduct for shop fabricated spirals ---@--- % -- -10.00 -- --


Add for each 10' over 20' depth ---@--- % -- 5.00 -- --
Deduct
for spirals over 30" diameter ---@--- % -- -5.00 -- --

Accessories for reinforcing steel


using small tools.
Bar chair 1-3/4" high --@.000 M 290.00 -- -- 290.00

CSI 03-220, Welded wire fabric

Welded wire fabric


Placed in floors or slabs, under 5 tons, using small tools.
6 x 6 x #10, 21 lbs. per CSF,
(W1.4 x W1.4) p5@.006 SF 0.26 0.31 -- 0.57
6 x 6 x #8, 30 lbs. per CSF,
(W2.0 x W2.0) p5@.007 SF 0.37 0.37 -- 0.74
6 x 6 x #6, 42 lbs. per CSF,
(W2.9 x W2.9) p5@.007 SF 0.52 0.37 -- 0.89
6 x 6 x #4, 58 lbs. per CSF,
(W4.0 x W4.0) p5@.007 SF 0.55 0.37 -- 0.92
4 x 4 x #10, 31 lbs. per CSF,
(W1.4 x W1.4) p5@.007 SF 0.28 0.37 -- 0.65
4 x 4 x #8, 44 lbs. per CSF,
(W2.0 x W2.0) p5@.007 SF 0.37 0.37 -- 0.74
4 x 4 x #6, 52 lbs. per CSF,
(W2.9 x W2.9) p5@.008 SF 0.53 0.42 -- 0.95
4 x 4 x #4, 85 lbs. per CSF,
(W4.0 x W4.0) p5@.008 SF 0.79 0.42 -- 1.21
Deduct for welded wire mesh quantities over 5 tons,
per ton --@.000 Ton -21.03 -- -- -21.03

Beam and column reinforcing mesh


Galvanized, under 5 tons, using small tools.
2 x 2 x #14 at 21 lbs. per 100 SF p5@2.45 CSF 29.90 127.90 0.81 158.61

Gunite reinforcing steel mesh


Galvanized, under 5 tons, using small tools.
2 x 2 x #12 p5@2.45 CSF 46.00 127.90 0.81 174.71

CSI 03-230, Stressing tendons

Grouted concrete stressing tendons - 50’ (15m) span


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM grout pump and mixer,
stressing equipment and small tools.
100 kips p8@2.67 Ea 290.00 119.60 12.20 421.80
300 kips p8@4.57 Ea 871.00 204.70 20.80 1,096.50

Grouted concrete stressing tendons - 100’ (31m) span


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM grout pump and mixer,
stressing equipment and small tools.
100 kips p8@4.57 Ea 580.00 204.70 20.80 805.50
300 kips p8@7.53 Ea 1,740.00 337.30 34.30 2,111.60

Grouted concrete stressing tendons - 200’ (61m) span


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM grout pump and mixer,
stressing equipment and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 286 (part 2)

100 kips p8@9.14 Ea 1,210.00 409.40 41.70 1,661.10


300 kips p8@29.1 Ea 3,480.00 1,303.00 133.00 4,916.00

Grouted concrete stressing bars - 50’ (15m) span


Using small tools and stressing equipment.
42 kips p7@2.76 Ea 145.00 140.80 7.78 293.58
143 kips p7@3.43 Ea 435.00 175.00 9.67 619.67

Grouted concrete stressing bars - 75’ (23m) span


Using small tools and stressing equipment.
42 kips p7@3.43 Ea 218.00 175.00 9.67 402.67
143 kips p7@3.64 Ea 653.00 185.70 10.30 849.00

Ungrouted concrete stressing wire or strands - 50’ (15m) span


Using small tools and stressing equipment.
100 kips p7@3.81 Ea 194.00 194.40 10.70 399.10
300 kips p7@10.7 Ea 580.00 546.00 30.20 1,156.20
2015 Heavy Construction Estimator, All Rights Reserved Page 287

Ungrouted concrete stressing wire or strands - 100’ (31m) span


Using small tools and stressing equipment.
100 kips p7@6.81 Ea 388.00 347.50 19.20 754.70
300 kips p7@17.8 Ea 1,160.00 908.30 50.20 2,118.50

Ungrouted concrete stressing wire or strands - 200’ (61m) span


Using small tools and stressing equipment.
100 kips p7@14.5 Ea 776.00 739.90 40.90 1,556.80
300 kips p7@38.1 Ea 2,320.00 1,944.00 107.00 4,371.00

Ungrouted concrete stressing bars - 50’ (15m) span


Using small tools and stressing equipment.
42 kips p7@3.90 Ea 78.90 199.00 11.00 288.90
143 kips p7@4.64 Ea 563.00 236.80 13.10 812.90

Ungrouted concrete stressing bars - 75’ (23m) span


Using small tools and stressing equipment.
42 kips p7@4.64 Ea 116.00 236.80 13.10 365.90
143 kips p7@4.92 Ea 352.00 251.10 13.90 617.00

CSI 03-240, Fibrous concrete reinforcement

Fibrous concrete reinforcement


Added to concrete at the batch plant.
Polypropylene mesh, 1.5 Lbs per CY --@.000 CY 10.20 -- -- 10.20
Steel fibers, 50 Lbs. Per CY --@.000 CY 44.00 -- -- 44.00
Steel fibers, 75 Lbs. Per CY --@.000 CY 38.30 -- -- 38.30

CSI 03-251, Concrete expansion joints

Poured concrete expansion joint


Using small tools.
Plain asphalt, 1/2" x 1" sq@.022 LF 0.71 0.77 -- 1.48
Plain asphalt, 1" x 2" sq@.025 LF 3.26 0.88 0.01 4.15
Liquid neoprene,
1/2" x 1", cold applied sq@.022 LF 2.83 0.77 -- 3.60
Liquid neoprene,
1" x 2", cold applied sq@.025 LF 10.40 0.88 0.01 11.29
Polyurethane, 1/2" x 1", 1 parts sq@.025 LF 3.36 0.88 0.01 4.25
Polyurethane,
1" x 2", hot or cold applied sq@.029 LF 12.50 1.01 0.01 13.52
Rubberized asphalt, 1/2" x 1",
hot or cold applied sq@.022 LF 0.88 0.77 -- 1.65
Rubberized asphalt, 1" x 2",
hot applied, fuel resistant sq@.025 LF 2.69 0.88 0.01 3.58
Rubberized asphalt, 1/2" x 1",
hot applied, fuel resistant sq@.022 LF 1.61 0.77 -- 2.38
Rubberized asphalt, 1" x 2" sq@.025 LF 5.18 0.88 0.01 6.07

Premolded concrete expansion joint


Placed in slabs, using small tools.
Asphalt, 1/2" x 6" al@.027 LF 1.10 1.19 0.01 2.30
Asphalt, 1" x 12" al@.033 LF 1.95 1.45 0.02 3.42
Cork with resin, 1/2" x 6" al@.027 LF 1.86 1.19 0.01 3.06
Cork with resin, 1" x 12" al@.033 LF 7.34 1.45 0.02 8.81
Neoprene sponge,1/2" x 6" al@.027 LF 2.55 1.19 0.01 3.75
2015 Heavy Construction Estimator, All Rights Reserved Page 287 (part 2)

Neoprene sponge, 1" x 12" al@.033 LF 9.48 1.45 0.02 10.95


Polyurethane foam, 1/2" x 6" al@.027 LF 0.65 1.19 0.01 1.85
Polyurethane foam, 1" x 12" al@.033 LF 4.59 1.45 0.02 6.06
Polyurethane tube, 3/8"
inside diameter x 3/8" wall al@.020 LF 0.96 0.88 0.01 1.85
Polyurethane tube , 3/8"
inside diameter x 3/4" wall al@.020 LF 17.30 0.88 0.01 18.19
Polyurethane tube, 1"
inside diameter x 3/8" wall al@.020 LF 11.00 0.88 0.01 11.89
Polyurethane foam, 1/2" x 1/2",
with polybutylene al@.021 LF 0.53 0.92 0.01 1.46
Polyurethane foam,
1" x 1", with polybutylene al@.022 LF 1.04 0.97 0.01 2.02
Polyurethane foam,
1/2" x 6", regular al@.027 LF 1.18 1.19 0.01 2.38
Polyurethane foam,
1" x 12", regular al@.033 LF 3.94 1.45 0.02 5.41
Polyvinyl chloride foam, 1/2" x 6" al@.027 LF 5.70 1.19 0.01 6.90
Polyvinyl chloride foam, 1" x 12" al@.033 LF 9.78 1.45 0.02 11.25
Gray sponge rubber, 1/2" x 6" al@.027 LF 3.44 1.19 0.01 4.64
2015 Heavy Construction Estimator, All Rights Reserved Page 288

Gray sponge rubber, 1" x 12" al@.033 LF 9.73 1.45 0.02 11.20

Asphalt felt control joints or bond breaker


Using small tools.
4" slab al@.010 LF 1.29 0.44 0.01 1.74
6" slab al@.010 LF 1.66 0.44 0.01 2.11
8" slab al@.011 LF 2.18 0.48 0.01 2.67
10" slab al@.012 LF 3.07 0.53 0.01 3.61

Screed joints placed in concrete slabs


Using small tools.
For 4" (10 cm) thick slab al@.050 LF 1.16 2.20 0.03 3.39
For 6" (15 cm) thick slab al@.050 LF 1.46 2.20 0.03 3.69
For 8" (21cm) thick slab al@.053 LF 1.94 2.33 0.03 4.30
For 10" (25cm) thick slab al@.056 LF 2.70 2.46 0.03 5.19

Keyed cold expansion and control joints


24 gauge galvanized steel with stakes, using miscellaneous power tools and small tools.
3-1/2" (8.8 cm) an@.050 LF 0.71 2.20 0.06 2.97
4-1/2" (11.3 cm) an@.050 LF 0.87 2.20 0.06 3.13
5-1/2" (13.8 cm) an@.051 LF 1.02 2.24 0.06 3.32
7-1/2" (18.8 cm) an@.053 LF 1.24 2.33 0.06 3.63
9-1/2" (23.8 cm) an@.056 LF 1.40 2.46 0.06 3.92

CSI 03-253, Waterstops

Polyvinyl chloride water stop


Using small tools.
Ribbed, 3/16" thick x 4" wide al@.065 LF 1.78 2.86 0.03 4.67
Ribbed, 3/16" thick x 6" wide al@.069 LF 2.18 3.03 0.04 5.25
Ribbed, 3/16" thick x 9" wide al@.074 LF 2.18 3.25 0.04 5.47
Ribbed, 3/16" thick x 9" wide,
with center bulb al@.074 LF 2.80 3.25 0.04 6.09
Ribbed, 3/8" thick x 9" wide al@.077 LF 2.80 3.38 0.04 6.22
Ribbed, 3/8" thick x 9" wide,
with center bulb al@.077 LF 3.46 3.38 0.04 6.88
Ribbed, 1/2" thick x 9" wide al@.077 LF 5.90 3.38 0.04 9.32
Dumbbell, 3/8" thick x 6" wide al@.069 LF 4.68 3.03 0.04 7.75
Plain, 3/8" thick x 9" wide al@.077 LF 5.68 3.38 0.04 9.10
Center bulb, 3/8" thick x 9" wide al@.077 LF 7.82 3.38 0.04 11.24

Rubber water stop


Using small tools.
Dumbbell, 3/8" thick x 6" wide al@.069 LF 8.48 3.03 0.04 11.55
Dumbbell, 3/8" thick x 9" wide al@.074 LF 13.50 3.25 0.04 16.79
Center bulb, 3/8" thick x 6" wide al@.069 LF 9.00 3.03 0.04 12.07
Center bulb, 3/8" thick x 9" wide al@.074 LF 16.10 3.25 0.04 19.39

CSI 03-302, Concrete admixtures

Concrete admixtures, based on 3,000 PSI concrete


Per gallon of admixture.
Water reducing --@.000 Gal 19.10 -- -- 19.10
Set retarding --@.000 Gal 33.80 -- -- 33.80
Air entraining --@.000 Gal 11.30 -- -- 11.30

CSI 03-305, Concrete curing


2015 Heavy Construction Estimator, All Rights Reserved Page 288 (part 2)

Concrete curing
Per 100 SF of surface cured, using small tools.
7.5 oz. burlap, 4 uses sr@.364 CSF 5.00 12.73 0.08 17.81
12 oz. burlap, 4 uses sr@.364 CSF 6.87 12.73 0.08 19.68
Waterproof paper, 2-ply reinforced sr@.286 CSF 7.80 10.00 0.07 17.87

Sprayed membrane curing compound


using small tools.
Resin base sr@.211 CSF 3.89 7.38 0.05 11.32
Polymer base sr@.211 CSF 5.11 7.38 0.05 12.54

Electric blankets
using small tools.
Elect heated pads,
110V, 15 watts, buy --@.000 SF 9.41 -- -- 9.41
2015 Heavy Construction Estimator, All Rights Reserved Page 289

Elect heated pads,


110V, 20 watts, buy --@.000 SF 8.10 -- -- 8.10

CSI 03-311, Normal weight structural concrete

Placing concrete with a crane and bucket


Based on 3,000 PSI concrete with 3% waste, using a portable 55 KW 120/240 volt generator, two 25"
diameter concrete vibrators, a truck-mounted hydraulic crane with 115’ boom and small tools.
Pile caps to 5 CY (5m3) bs@.908 CY 111.00 33.96 11.50 156.46
Pile caps over 5 CY (5m3) bs@.517 CY 111.00 19.34 6.55 136.89
Continuous shallow footings bs@.800 CY 111.00 29.92 10.10 151.02
Continuous deep footings bs@.720 CY 111.00 26.93 9.12 147.05
Spread footings to 5 CY (5m3) bs@1.60 CY 111.00 59.84 20.30 191.14
Spread footings over 5 CY (5m3) bs@.720 CY 111.00 26.93 9.12 147.05
Mat foundations bs@.240 CY 111.00 8.98 3.04 123.02
Grade beams bs@.600 CY 111.00 22.44 7.60 141.04
Slabs on grade, under 6" (15 cm) bs@.664 CY 111.00 24.83 8.41 144.24
Slabs on grade 6" (15 cm) or more bs@.504 CY 111.00 18.85 6.38 136.23
Stairs on grade bs@3.66 CY 111.00 136.90 46.30 294.20
Small elevated beams bs@1.60 CY 111.00 59.84 20.30 191.14
Large elevated beams bs@1.11 CY 111.00 41.51 14.10 166.61
Elevated slabs under 6" (15 cm) bs@.758 CY 111.00 28.35 9.60 148.95
Elevated slabs 6" (15 cm) or more bs@.554 CY 111.00 20.72 7.01 138.73
12" (31cm) square or round columns bs@1.84 CY 111.00 68.82 23.30 203.12
18" (46cm) square or round columns bs@1.35 CY 111.00 50.49 17.10 178.59
24" (61cm) square or round columns bs@1.09 CY 111.00 40.77 13.80 165.57
36" (91cm) square or round columns bs@.770 CY 111.00 28.80 9.75 149.55
8" (21cm) thick building walls bs@.963 CY 111.00 36.02 12.20 159.22
12" (31cm) thick building walls bs@.818 CY 111.00 30.59 10.40 151.99
15" (38cm) thick building walls bs@.770 CY 111.00 28.80 9.75 149.55
Elevated stairs bs@3.85 CY 111.00 144.00 48.70 303.70
Deduct for 2,500 PSI concrete --@.000 CY -4.64 -- -- -4.64
Add for 3,500 PSI concrete --@.000 CY 4.64 -- -- 4.64
Add for 4,000 PSI concrete --@.000 CY 9.12 -- -- 9.12
Add for 4,500 PSI concrete --@.000 CY 13.60 -- -- 13.60
Add for 5,000 PSI concrete --@.000 CY 18.20 -- -- 18.20
Add for type V cement concrete --@.000 CY 22.40 -- -- 22.40
Add for white cement concrete --@.000 CY 20.60 -- -- 20.60

Pouring concrete directly from a chute


Based on 3,000 PSI concrete with 3% waste, using a portable 55 KW 120/240 volt generator, a 25"
diameter concrete vibrator and small tools.
Pile caps to 5 CY (5m3) bq@.565 CY 111.00 20.48 0.89 132.37
Pile caps over 5 CY (5m3) bq@.243 CY 111.00 8.81 0.38 120.19
Continuous shallow footings bq@.400 CY 111.00 14.50 0.63 126.13
Continuous deep footings bq@.310 CY 111.00 11.23 0.49 122.72
Spread footings to 5 CY (5m3) bq@.873 CY 111.00 31.64 1.37 144.01
Spread footings over 5 CY (5m3) bq@.436 CY 111.00 15.80 0.68 127.48
Mat foundations bq@.147 CY 111.00 5.33 0.23 116.56
Grade beams bq@.315 CY 111.00 11.42 0.49 122.91
Slabs on grade under 6" (15 cm) bq@.363 CY 111.00 13.16 0.57 124.73
Slabs on grade 6" (15 cm) or more bq@.274 CY 111.00 9.93 0.43 121.36
Stairs on grade bq@1.94 CY 111.00 70.31 3.05 184.36
8" (21cm) thick building walls bq@.548 CY 111.00 19.86 0.86 131.72
12" (31cm) thick building walls bq@.514 CY 111.00 18.63 0.81 130.44
15" (38cm) thick building walls bq@.457 CY 111.00 16.56 0.72 128.28
Elevated stairs bq@1.71 CY 111.00 61.97 2.68 175.65
Add for placing with a walking cart,
handling 150 feet (46m) bq@1.97 CY -- 71.39 3.09 74.48
2015 Heavy Construction Estimator, All Rights Reserved Page 289 (part 2)

Add for placing with a riding cart,


handling 150 feet (46m) bq@1.23 CY -- 44.58 1.93 46.51
Deduct for 2,500 PSI concrete --@.000 CY -4.64 -- -- -4.64
Add for 3,500 PSI concrete --@.000 CY 4.64 -- -- 4.64
Add for 4,000 PSI concrete --@.000 CY 9.12 -- -- 9.12
Add for 4,500 PSI concrete --@.000 CY 13.60 -- -- 13.60
Add for 5,000 PSI concrete --@.000 CY 18.20 -- -- 18.20
2015 Heavy Construction Estimator, All Rights Reserved Page 290

Add for type V cement concrete --@.000 CY 22.40 -- -- 22.40


Add for white cement concrete --@.000 CY 20.60 -- -- 20.60

Pouring concrete with a concrete pump


Based on 3,000 PSI concrete with 3% waste, using a portable 55 KW 120/240 volt generator, a 117 CY
per hour concrete pump truck with 75’ boom, two 25" diameter concrete vibrators and small tools.
Pile caps to 5 CY (5m3) bu@.377 CY 111.00 13.64 6.56 131.20
Pile caps over 5 CY (5m3) bu@.161 CY 111.00 5.83 2.80 119.63
Continuous shallow footings bu@.267 CY 111.00 9.66 4.64 125.30
Continuous deep footings bu@.320 CY 111.00 11.58 5.56 128.14
Spread footings to 5 CY (5m3) bu@.640 CY 111.00 23.16 11.10 145.26
Spread footings over 5 CY (5m3) bu@.305 CY 111.00 11.03 5.30 127.33
Mat foundations bu@.106 CY 111.00 3.84 1.84 116.68
Grade beams bu@.246 CY 111.00 8.90 4.28 124.18
Slabs on grade under 6" (15 cm) bu@.274 CY 111.00 9.91 4.76 125.67
Slabs on grade 6" (15 cm) or more bu@.205 CY 111.00 7.42 3.56 121.98
Small elevated beams bu@.821 CY 111.00 29.70 14.30 155.00
Large elevated beams bu@.533 CY 111.00 19.28 9.27 139.55
Stairs on grade bu@1.45 CY 111.00 52.46 25.20 188.66
Elevated slabs under 6" (15 cm) bu@.291 CY 111.00 10.53 5.06 126.59
Elevated slabs 6" (15 cm) or more bu@.246 CY 119.00 8.90 4.28 132.18
12" (31cm) square or round columns bu@.711 CY 119.00 25.72 12.40 157.12
18" (46cm) square or round columns bu@.533 CY 119.00 19.28 9.27 147.55
24" (61cm) square or round columns bu@.400 CY 119.00 14.47 6.96 140.43
36" (91cm) square or round columns bu@.267 CY 119.00 9.66 4.64 133.30
8" (21cm) thick building walls bu@.377 CY 119.00 13.64 6.56 139.20
12" (31cm) thick building walls bu@.337 CY 119.00 12.19 5.86 137.05
15" (38cm) thick building walls bu@.320 CY 119.00 11.58 5.56 136.14
Elevated stairs bu@1.33 CY 119.00 48.12 23.10 190.22
Deduct for 2,500 PSI concrete --@.000 CY -4.64 -- -- -4.64
Add for 3,500 PSI concrete --@.000 CY 4.64 -- -- 4.64
Add for 4,000 PSI concrete --@.000 CY 9.12 -- -- 9.12
Add for 4,500 PSI concrete --@.000 CY 13.60 -- -- 13.60
Add for 5,000 PSI concrete --@.000 CY 18.20 -- -- 18.20
Add for type V cement concrete --@.000 CY 22.40 -- -- 22.40
Add for white cement concrete --@.000 CY 20.60 -- -- 20.60

Pouring concrete in duct banks


Type V concrete, using a portable 55 KW 120/240 volt generator, a 25" diameter concrete vibrator and
small tools.
Poured direct from chute bq@.320 CY 115.00 11.60 0.50 127.10

Concrete finishes

Concrete slab finishes


Using small tools, using a portable 55 KW 120/240 volt generator, a 25" diameter concrete vibrator and
small tools.
Screed be@.014 SF -- 0.60 -- 0.60
Darby be@.017 SF -- 0.72 -- 0.72

Concrete slab finishes


Using miscellaneous power tools and small tools.
Final float bg@.012 SF -- 0.51 0.02 0.53
Broom bg@.013 SF -- 0.55 0.02 0.57
Steel trowel bg@.017 SF -- 0.72 0.03 0.75
Aluminum oxide abrasive,
0.25 lbs. per square foot bg@.012 SF 0.14 0.51 0.02 0.67
Silicon carbide abrasive,
2015 Heavy Construction Estimator, All Rights Reserved Page 290 (part 2)

0.25 lbs. per square foot bg@.012 SF 0.17 0.51 0.02 0.70

Concrete wall finishes


Using small tools, using miscellaneous power tools and small tools.
Burlap rub with cement paste be@.022 SF 0.14 0.94 -- 1.08
1/16" float finish be@.033 SF 0.21 1.41 0.01 1.63
Etch with acid be@.017 SF 0.77 0.72 -- 1.49
Hammer green concrete be@.061 SF 0.07 2.60 0.01 2.68
Bush hammer cured concrete be@.091 SF 0.14 3.88 0.02 4.04
Break ties and patch be@.019 SF 0.18 0.81 -- 0.99
Carborundum dry rub be@.037 SF 0.18 1.58 0.01 1.77
Carborundum wet rub be@.057 SF 0.18 2.43 0.01 2.62
2015 Heavy Construction Estimator, All Rights Reserved Page 291

Sandblasted wall finishes


Using a 375 CFM, 100 PSI compressor, and 100’ of 1" air hose.
Light sandblast bj@.042 SF 0.13 1.66 0.22 2.01
Heavy sandblast bj@.105 SF 0.54 4.15 0.54 5.23

Patching concrete floors, small area


Using small tools.
1/4" regular mortar mix be@.059 SF 1.72 2.51 0.01 4.24
1/4" epoxy be@.100 SF 8.99 4.26 0.02 13.27

Patching walls with epoxy grout


Including chip and clean, using small tools.
Minimum be@.154 SF 0.22 6.56 0.03 6.81
Average be@.200 SF 0.33 8.52 0.04 8.89
Maximum be@.250 SF 0.53 10.65 0.05 11.23

Floor hardeners
Using miscellaneous power tools and small tools.
Metallic, light duty,
0.3 lbs. per square foot bg@.010 SF 0.26 0.43 0.02 0.71
Metallic, heavy duty,
0.65 lbs. per square foot bg@.014 SF 0.58 0.60 0.03 1.21
Non-metallic, light duty,
0.3 lbs. per square foot bg@.010 SF 0.19 0.43 0.02 0.64
Non-metallic, heavy duty,
0.65 lbs. per square foot bg@.014 SF 0.41 0.60 0.03 1.04

Tilt-up concrete

Pouring tilt-up wall panels


Includes 3,000 PSI concrete, typical reinforcing steel and all labor, using a portable 55 KW 120/240 volt
generator, a 117 CY per hour concrete pump truck with 75’ boom, two 25" diameter concrete vibrators
and small tools.
5-1/2" smooth finish bu@.122 SF 4.64 4.41 2.12 11.17
7-1/2" smooth finish bu@.137 SF 4.90 4.96 2.38 12.24
9-1/2" smooth finish bu@.144 SF 5.25 5.21 2.50 12.96

CSI 03-320, Concrete topping

Integral concrete topping


Including hard trowel finish, 1:1:2 mix, using miscellaneous power tools and small tools.
1/8" (3mm) thick bh@.026 SF 0.14 1.05 0.03 1.22
1/2" (13mm) thick bh@.027 SF 0.31 1.09 0.03 1.43
3/4" (19mm) thick bh@.031 SF 0.45 1.25 0.04 1.74
1" (25mm) thick bh@.035 SF 0.66 1.41 0.04 2.11
2" (51mm) thick bh@.044 SF 1.32 1.77 0.06 3.15
2-1/2" (63mm) thick bh@.031 SF 1.63 1.25 0.04 2.92
3" (76mm) thick bh@.033 SF 1.98 1.33 0.04 3.35

Granolithic concrete topping


Laid after finish, 1:1:1-1/2 mix, using miscellaneous power tools and small tools.
1/2" (13mm) thick bh@.044 SF 0.28 1.77 0.06 2.11
1" (25mm) thick bh@.045 SF 0.51 1.81 0.06 2.38
2" (51mm) thick bh@.052 SF 1.06 2.09 0.07 3.22
2015 Heavy Construction Estimator, All Rights Reserved Page 291 (part 2)

CSI 03-351, Exposed aggregate concrete

Exposed aggregate finish


Add to formwork cost, using small tools.
Uniform finish, 1 use be@.037 SF 0.50 1.58 0.01 2.09

CSI 03-352, Rusticated concrete finish

Rusticated concrete finish


Add to formwork cost, using miscellaneous power tools and small tools.
Beveled edge, 1 use ax@.067 LF 0.45 2.70 0.05 3.20
Square edge, 1 use ax@.089 LF 0.47 3.59 0.07 4.13

CSI 03-353, Solid board concrete finish

Solid board concrete finish


Add to formwork cost, using miscellaneous power tools and small tools.
Uniform, 1 use ax@.133 SF 1.12 5.37 0.11 6.60
Non-uniform, 1 use ax@.160 SF 1.01 6.45 0.13 7.59
2015 Heavy Construction Estimator, All Rights Reserved Page 292

CSI 03-354, Flexural concrete

Flexural concrete placed on grade


Poured direct from chute, using a portable 55 KW 120/240 volt generator, a 25" diameter concrete
vibrator and small tools.
500 PSI bq@.369 CY 113.00 13.37 0.58 126.95
650 PSI bq@.369 CY 111.00 13.37 0.58 124.95
750 PSI bq@.369 CY 110.00 13.37 0.58 123.95

Flexural concrete placed above grade


Pumped in place, using a portable 55 KW 120/240 volt generator, a 117 CY per hour concrete pump
truck with 75’ boom, two 25" diameter concrete vibrators and small tools.
500 PSI bu@.582 CY 113.00 21.06 10.10 144.16
650 PSI bu@.582 CY 111.00 21.06 10.10 142.16
750 PSI bu@.582 CY 110.00 21.06 10.10 141.16

Flexural concrete, material only


Plain Portland cement,
bulk truckloads --@.000 CF 7.74 -- -- 7.74
Calcium chloride admixture,
100 pound bag --@.000 Bag 27.80 -- -- 27.80
Concrete sealer,
hardener and dust-proofer --@.000 Gal 12.90 -- -- 12.90
Concrete integral colors --@.000 CY 23.20 -- -- 23.20

Non-shrink column grout


Using small tools.
1" thick column grout bq@.114 SF 5.61 4.13 0.18 9.92

CSI 03-356, Grooved concrete surface

Grooved concrete roadway finish


Using a 24,500 lb. 2-axle truck, with 7’ wide towed street sweeper, a 120" wide asphalt profiler, a 200
gallon asphalt seal coater and small tools.
Continuous grooving kh@.117 SY -- 4.20 6.83 11.03

CSI 03-363, Specially placed concrete

Second pour concrete


Using a portable 55 KW 120/240 volt generator, a 25" diameter concrete vibrator and small tools.
3,000 PSI bq@3.20 CY 98.90 116.00 5.02 219.92

CSI 03-364, Gunite (shotcrete)

Gunite
Flat surface. Add the cost of mesh reinforcing and finishing, using a 250 CFM, 100 PSI air compressor,
100’ of 1" air hose, a 20 GPM grout pump and mixer and small tools.
1" thick bk@.055 SF 2.27 2.06 0.34 4.67
2" thick bk@.107 SF 4.54 4.01 0.65 9.20
3" thick bk@.116 SF 5.11 4.35 0.71 10.17
4" thick bk@.128 SF 5.68 4.80 0.78 11.26
Wire mesh reinforcing,
2" x 2", W.9 x W.9 bk@.030 SF 0.47 1.13 0.18 1.78
Wall pins for attaching mesh bq@.003 Ea 0.21 0.11 -- 0.32
Add for radius or irregular surface ---@--- % -- 50.00 -- 5.41
2015 Heavy Construction Estimator, All Rights Reserved Page 292 (part 2)

Pressure injected concrete grout


Using a 12 CY per hour shotcrete gun and mixer rig and small tools.
Per cubic foot of grout bv@.560 CF 9.75 20.98 1.22 31.95

CSI 03-365, Roller compacted concrete

Placing roller compacted concrete - By crane


Add the cost of concrete, using 100-ton crawler mounted mechanical crane with 210’ boom, with three 8
CY concrete buckets.
200' radius w6@.023 CY -- 0.72 0.87 1.59

Placing roller compacted concrete - By truck, to 18 cubic yards


Add the cost of concrete, using a 14 to 19 CY off highway dump truck.
5 minutes per cycle xk@.005 CY -- 0.20 0.35 0.55
10 minutes per cycle xk@.010 CY -- 0.40 0.69 1.09
2015 Heavy Construction Estimator, All Rights Reserved Page 293

15 minutes per cycle xk@.016 CY -- 0.64 1.11 1.75

Placing roller compacted concrete - By loader, to 4 cubic yards


Add the cost of concrete, using a 4 CY front end wheel loader.
4 minutes per cycle zq@.017 CY -- 0.75 1.54 2.29
8 minutes per cycle zq@.033 CY -- 1.46 2.99 4.45
12 minutes per cycle zq@.050 CY -- 2.21 4.54 6.75

Placing roller compacted concrete - By scraper, to 17 cubic yards


Add the cost of concrete, using a 14 to 20 CY self-propelled elevating scraper.
5 minutes per cycle zv@.006 CY -- 0.27 0.77 1.04
10 minutes per cycle zv@.011 CY -- 0.49 1.40 1.89
15 minutes per cycle zv@.017 CY -- 0.75 2.17 2.92
20 minutes per cycle zv@.023 CY -- 1.02 2.93 3.95

Spreading and compacting concrete - To 1' final thickness


Using a D-6H power shift crawler tractor dozer, with angle tilt blade, and a 11-ton double drum self
propelled vibratory roller.
1' layer h4@.013 CY -- 0.48 0.85 1.33

Spreading and compacting concrete - To 2' final thickness


Add the cost of concrete, using a D7-H crawler tractor dozer, with blade, and a 11-ton double drum self
propelled vibratory roller.
In 6" layers h2@.010 CY -- 0.37 0.92 1.29

Formed, vertical face, roller compacted concrete


Including compaction but no concrete, using a compactor rammer with 13" x 11" shoe, and a walk
behind vibratory 8-ton double roller.
1' lift, formed hy@.060 CY -- 2.09 0.36 2.45
6" lift, formed hy@.120 CY -- 4.19 0.72 4.91

Non-formed, sloped face, roller compacted concrete


Including compaction but no concrete, using a Cat 12-G motor grader.
1' lift, non-formed hw@.021 CY -- 0.78 1.01 1.79
6" lift, non-formed hw@.042 CY -- 1.56 2.01 3.57

Surface preparation of previous roller compacted concrete


Using 750 CFM 5,000 gallon vacuum truck.
Vacuum lift by vacuum truck t8@.006 SY -- 0.22 0.07 0.29

Surface preparation of previous roller compacted concrete


Using a 6" 1,950 GPM submersible pump, and a 6,000 gallon off highway water wagon.
Water clean jv@.005 SY -- 0.20 0.35 0.55

Surface preparation of previous roller compacted concrete


Using a 6" 1,950 GPM submersible pump, a 3,000 PSI water blaster, and a 6,000 gallon off highway
water wagon.
Water blast jx@.020 SY -- 0.77 1.21 1.98

Joint bedding placement for compacted concrete


Using a 1.38 CY wheeled loader-backhoe.
1" thick y8@.012 SY -- 0.53 0.27 0.80

Water curing for compacted concrete


Using a 6" 1,950 GPM submersible pump.
2015 Heavy Construction Estimator, All Rights Reserved Page 293 (part 2)

Small job, under 500 CY jz@1.00 HR -- 34.88 11.30 46.18

Water curing for compacted concrete


Using a 6" 1,950 GPM submersible pump, and a 6,000 gallon off highway water wagon.
Large job, over 500 CY jw@3.00 HR -- 111.60 114.00 225.60

CSI 03-411, Precast wall panels

Setting precast wall panels with 50-ton hydraulic crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the panel cost and the cost of
grouting and caulking below, using a truck-mounted 50-ton hydraulic crane with 115’ boom, a 200-amp
trailer mounted welder and small tools.
To 1 ton per piece, 100' (30m) qn@2.79 Ea -- 136.10 42.30 178.40
2015 Heavy Construction Estimator, All Rights Reserved Page 294

1 to 3 tons per piece, 65' (20m) qn@3.11 Ea -- 151.70 47.10 198.80


3 to 5 tons per piece, 50' (15m) qn@3.50 Ea -- 170.70 53.00 223.70
5 to 7 tons per piece, 40' (12m) qn@3.74 Ea -- 182.40 56.70 239.10
7 to 9 tons per piece, 33' (10m) qn@4.00 Ea -- 195.10 60.60 255.70
9 to 11 tons per piece, 30' (9m) qn@4.30 Ea -- 209.70 65.10 274.80
11 to 13 tons per piece, 25' (7.5m) qn@4.67 Ea -- 227.80 70.80 298.60
13 to 15 tons per piece, 23' (7m) qn@5.08 Ea -- 247.80 77.00 324.80

Setting precast wall panels with 100-ton mechanical crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the panel cost and the cost of
grouting and caulking below, using a 100-ton crawler mounted mechanical crane with 210’ boom, a
200-amp trailer mounted welder, and two sets of small tools.
To 1 ton per piece, 180' (55m) qt@3.14 Ea -- 155.10 52.00 207.10
1 to 3 tons per piece, 121' (37m) qt@3.50 Ea -- 172.90 58.00 230.90
3 to 5 tons per piece, 89' (27m) qt@3.93 Ea -- 194.20 65.10 259.30
5 to 7 tons per piece, 75' (23m) qt@4.21 Ea -- 208.00 69.80 277.80
7 to 9 tons per piece, 65' (20m) qt@4.50 Ea -- 222.30 74.60 296.90
9 to 11 tons per piece, 55' (17m) qt@4.83 Ea -- 238.70 80.00 318.70
11 to 13 tons per piece, 50' (15m) qt@5.26 Ea -- 259.90 87.20 347.10
13 to 15 tons per piece, 43' (13m) qt@5.71 Ea -- 282.10 94.60 376.70
15 to 20 tons per piece, 36' (11m) qt@6.32 Ea -- 312.30 105.00 417.30
20 to 25 tons per piece, 31' (9.5m) qt@6.99 Ea -- 345.40 116.00 461.40
25 to 30 tons per piece, 26' (8m) qt@7.91 Ea -- 390.80 131.00 521.80
30 to 35 tons per piece, 25' (7.5m) qt@9.00 Ea -- 444.70 149.00 593.70
35 to 40 tons per piece, 23' (7m) qt@10.4 Ea -- 513.90 172.00 685.90

Material costs for precast structural wall panels


3,000 PSI natural gray concrete, ready to erect, including reinforcing steel and imbedded steel. Smooth
or board finish one side. See the cost of setting panels above.
4" (10 cm) thick --@.000 SF 9.10 -- -- 9.10
5" (12.5cm) thick --@.000 SF 11.20 -- -- 11.20
6" (15 cm) thick --@.000 SF 13.50 -- -- 13.50
8" (20 cm) thick --@.000 SF 17.70 -- -- 17.70

Setting precast partition panels with 20-ton crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the panel cost and the cost of
grouting and caulking below, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted
welder, and two sets of small tools.
To 1 ton piece 69' (21m) qi@2.45 Ea -- 120.10 22.90 143.00
1 to 2 tons per piece, 50' (15m) qi@2.72 Ea -- 133.30 25.40 158.70
2 to 3 tons per piece, 41' (12.5m) qi@3.06 Ea -- 149.90 28.60 178.50
3 to 4 tons per piece, 33' (10m) qi@3.50 Ea -- 171.50 32.70 204.20
4 to 5 tons per piece, 30' (9m) qi@3.76 Ea -- 184.20 35.20 219.40
5 to 6 tons per piece, 26' (8m) qi@4.09 Ea -- 200.40 38.20 238.60
6 to 7 tons per piece, 23' (7m) qi@4.44 Ea -- 217.60 41.50 259.10
7 to 8 tons per piece, 20' (6m) qi@4.91 Ea -- 240.60 45.90 286.50

Setting precast partition panels with 50-ton crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the panel cost and the cost of
grouting and caulking below, using a truck-mounted 50-ton hydraulic crane with 115’ boom, a 200-amp
trailer mounted welder and small tools.
To 1 ton piece, 100' (30m) qn@2.79 Ea -- 136.10 42.30 178.40
1 to 2 tons per piece, 82' (25m) qn@3.11 Ea -- 151.70 47.10 198.80
2 to 3 tons per piece, 65' (20m) qn@3.50 Ea -- 170.70 53.00 223.70
3 to 4 tons per piece, 57' (17.5m) qn@4.00 Ea -- 195.10 60.60 255.70
2015 Heavy Construction Estimator, All Rights Reserved Page 294 (part 2)

4 to 5 tons per piece, 50' (15m) qn@4.30 Ea -- 209.70 65.10 274.80


5 to 6 tons per piece, 44' (13.5m) qn@4.67 Ea -- 227.80 70.80 298.60
6 to 7 tons per piece, 40' (12m) qn@5.08 Ea -- 247.80 77.00 324.80
7 to 8 tons per piece, 36' (11m) qn@5.61 Ea -- 273.60 85.00 358.60
8 to 10 tons per piece, 31' (9.5m) qn@6.21 Ea -- 302.90 94.10 397.00
10 to 12 tons per piece, 26' (8m) qn@7.03 Ea -- 342.90 107.00 449.90
12 to 14 tons per piece, 25' (7.5m) qn@8.00 Ea -- 390.20 121.00 511.20
14 to 16 tons per piece, 21' (6.5m) qn@9.28 Ea -- 452.60 141.00 593.60

Material cost for precast concrete partition panels


3,000 PSI natural gray concrete, ready to erect. Smooth or board finish one side.
4" (10 cm) thick --@.000 SF 8.63 -- -- 8.63
2015 Heavy Construction Estimator, All Rights Reserved Page 295

5" (12.5cm) thick --@.000 SF 10.60 -- -- 10.60


6" (15 cm) thick --@.000 SF 12.70 -- -- 12.70
8" (20 cm) thick --@.000 SF 16.80 -- -- 16.80

Setting precast cladding panels with 50-ton crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the cost of grouting and caulking,
using a truck-mounted 50-ton hydraulic crane with 115’ boom, a 200-amp trailer mounted welder and
small tools.
To 1 ton per piece, 100' (30m) qn@2.95 Ea -- 143.90 44.70 188.60
1 to 3 tons per piece, 65' (20m) qn@3.30 Ea -- 160.90 50.00 210.90
3 to 5 tons per piece, 50' (15m) qn@3.74 Ea -- 182.40 56.70 239.10
5 to 7 tons per piece, 40' (12m) qn@4.00 Ea -- 195.10 60.60 255.70
7 to 9 tons per piece, 33' (10m) qn@4.30 Ea -- 209.70 65.10 274.80
9 to 11 tons per piece, 30' (9m) qn@4.67 Ea -- 227.80 70.80 298.60
11 to 13 tons per piece, 25' (7.5m) qn@5.08 Ea -- 247.80 77.00 324.80
13 to 15 tons per piece, 23' (7m) qn@5.61 Ea -- 273.60 85.00 358.60

Setting precast cladding panels with 100-ton crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the cost of grouting and caulking,
using a 100-ton crawler mounted mechanical crane with 210’ boom, a 200-amp trailer mounted welder,
and two sets of small tools.
To 1 ton per piece, 180' (55m) qt@3.32 Ea -- 164.00 55.00 219.00
1 to 3 tons per piece, 121' (37m) qt@3.71 Ea -- 183.30 61.50 244.80
3 to 5 tons per piece, 89' (27m) qt@4.21 Ea -- 208.00 69.80 277.80
5 to 7 tons per piece, 75' (23m) qt@4.50 Ea -- 222.30 74.60 296.90
7 to 9 tons per piece, 65' (20m) qt@4.83 Ea -- 238.70 80.00 318.70
9 to 11 tons per piece, 55' (17m) qt@5.26 Ea -- 259.90 87.20 347.10
11 to 13 tons per piece, 50' (15m) qt@5.71 Ea -- 282.10 94.60 376.70
13 to 15 tons per piece, 43' (13m) qt@6.32 Ea -- 312.30 105.00 417.30
15 to 20 tons per piece, 36' (11m) qt@6.99 Ea -- 345.40 116.00 461.40
20 to 25 tons per piece, 31' (9.5m) qt@7.91 Ea -- 390.80 131.00 521.80
25 to 30 tons per piece, 26' (8m) qt@9.00 Ea -- 444.70 149.00 593.70
30 to 35 tons per piece, 25' (7.5m) qt@10.4 Ea -- 513.90 172.00 685.90

Material cost for precast concrete cladding panels


3,000 PSI natural gray concrete, ready to erect, including reinforcing steel and imbedded steel.
4" (10 cm) thick --@.000 SF 8.63 -- -- 8.63
5" (12.5cm) thick --@.000 SF 10.60 -- -- 10.60
6" (15 cm) thick --@.000 SF 12.70 -- -- 12.70
8" (20 cm) thick --@.000 SF 16.80 -- -- 16.80

Setting precast sandwich panels with 50-ton crane


Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the cost of grouting and caulking,
using a truck-mounted 50-ton hydraulic crane with 115’ boom, a 200-amp trailer mounted welder and
small tools.
To 1 ton per piece, 100' (30m) qn@2.95 Ea -- 143.90 44.70 188.60
1 to 3 tons per piece, 65' (20m) qn@3.30 Ea -- 160.90 50.00 210.90
3 to 5 tons per piece, 50' (15m) qn@3.74 Ea -- 182.40 56.70 239.10
5 to 7 tons per piece, 40' (12m) qn@4.00 Ea -- 195.10 60.60 255.70
7 to 9 tons per piece, 33' (10m) qn@4.30 Ea -- 209.70 65.10 274.80
9 to 11 tons per piece, 30' (9m) qn@4.67 Ea -- 227.80 70.80 298.60
11 to 13 tons per piece, 25' (7.5m) qn@5.08 Ea -- 247.80 77.00 324.80
13 to 15 tons per piece, 23' (7m) qn@5.61 Ea -- 273.60 85.00 358.60

Setting precast sandwich panels with 100-ton crane


2015 Heavy Construction Estimator, All Rights Reserved Page 295 (part 2)

Erection costs based on setting panels at maximum crane radius as listed. Costs include handling,
hoisting, alignment, bracing, and making permanent connections. Add the cost of grouting and caulking,
using a 100-ton crawler mounted mechanical crane with 210’ boom, a 200-amp trailer mounted welder
and small tools.
To 1 ton per piece, 180' (55m) qs@2.95 Ea -- 143.90 54.70 198.60
1 to 3 tons per piece, 121' (37m) qs@3.30 Ea -- 160.90 61.20 222.10
3 to 5 tons per piece, 89' (27m) qs@3.74 Ea -- 182.40 69.30 251.70
5 to 7 tons per piece, 75' (23m) qs@4.00 Ea -- 195.10 74.20 269.30
7 to 9 tons per piece, 65' (20m) qs@4.30 Ea -- 209.70 79.70 289.40
9 to 11 tons per piece, 55' (17m) qs@4.67 Ea -- 227.80 86.60 314.40
11 to 13 tons per piece, 50' (15m) qs@5.08 Ea -- 247.80 94.20 342.00
13 to 15 tons per piece, 43' (13m) qs@5.61 Ea -- 273.60 104.00 377.60
15 to 20 tons per piece, 36' (11m) qs@6.21 Ea -- 302.90 115.00 417.90
20 to 25 tons per piece, 31' (9.5m) qs@7.03 Ea -- 342.90 130.00 472.90
2015 Heavy Construction Estimator, All Rights Reserved Page 296

25 to 30 tons per piece, 26' (8m) qs@8.00 Ea -- 390.20 148.00 538.20


30 to 35 tons per piece, 25' (7.5m) qs@9.28 Ea -- 452.60 172.00 624.60

Material cost for precast concrete sandwich panels


3,000 PSI natural gray concrete, ready to erect, including reinforcing steel and imbedded steel.
4" (10 cm) thick --@.000 SF 11.80 -- -- 11.80
5" (12.5cm) thick --@.000 SF 13.90 -- -- 13.90
6" (15 cm) thick --@.000 SF 16.20 -- -- 16.20
8" (20 cm) thick --@.000 SF 20.50 -- -- 20.50

Additional costs for precast concrete panels


Add for 3,500 PSI (245 kg/cm2) concrete,
per CY --@.000 CY 3.85 -- -- 3.85
Add for 4,000 PSI (280 kg/cm2) concrete,
per CY --@.000 CY 5.77 -- -- 5.77
Add for 4,500 PSI (315 kg/cm2) concrete,
per CY --@.000 CY 7.69 -- -- 7.69
Add for 5,000 PSI (350 kg/cm2) concrete,
per CY --@.000 CY 11.50 -- -- 11.50
Add for white facing on panels --@.000 CSF 38.50 -- -- 38.50
Add for
solid white through thickness --@.000 CSF 38.50 -- -- 38.50
Add for broken rib finish --@.000 CSF 38.50 -- -- 38.50
Add for fluted surface --@.000 CSF 28.80 -- -- 28.80
Add for exposed aggregate finish --@.000 CSF 28.80 -- -- 28.80
Add for sandblasting of surface --@.000 CSF 23.10 -- -- 23.10

CSI 03-412, Precast deck

Setting precast concrete floor plank with 100-ton crane


Erection costs based on setting panels at maximum crane radius as listed, using a 100-ton crawler
mounted mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 2 tons per piece and 150' (46m) qs@2.79 Ea -- 136.10 51.70 187.80
2 to 3
tons per piece and 121' (37m) qs@3.11 Ea -- 151.70 57.70 209.40
3 to 4
tons per piece and 105' (32m) qs@3.30 Ea -- 160.90 61.20 222.10
4 to 5 tons per piece and 88' (27m) qs@3.50 Ea -- 170.70 64.90 235.60
5 to 6 tons per piece and 82' (25m) qs@3.74 Ea -- 182.40 69.30 251.70
6 to 7 tons per piece and 75' (23m) qs@4.00 Ea -- 195.10 74.20 269.30
7 to 8 tons
per piece and 70' (21.5m) qs@4.30 Ea -- 209.70 79.70 289.40
8 to 9 tons per piece and 65' (20m) qs@4.67 Ea -- 227.80 86.60 314.40
9 to 10 tons
per piece and 60' (18.5m) qs@5.08 Ea -- 247.80 94.20 342.00

Material cost for precast floor plank


3,000 PSI concrete, ready to erect.
4" (10 cm) thick --@.000 SF 6.35 -- -- 6.35
5" (12 cm) thick --@.000 SF 7.62 -- -- 7.62
6" (15 cm) thick --@.000 SF 9.30 -- -- 9.30
8" (20 cm) thick --@.000 SF 12.40 -- -- 12.40

Setting precast combination beam and floor plank


Erection costs based on setting panels at maximum crane radius as listed, using a 100-ton crawler
mounted mechanical crane with 210’ boom, a 200-amp trailer mounted welder, and two sets of small
tools.
To 5 tons per piece and 88' (27m) qt@3.50 Ea -- 172.90 58.00 230.90
2015 Heavy Construction Estimator, All Rights Reserved Page 296 (part 2)

5 to 10 tons
per piece and 60' (18.5m) qt@3.81 Ea -- 188.30 63.10 251.40
10 to 15
tons per piece and 43' (13m) qt@4.21 Ea -- 208.00 69.80 277.80
15 to 20
tons per piece and 36' (11m) qt@4.68 Ea -- 231.20 77.50 308.70
20 to 25
tons per piece and 31' (9.5m) qt@5.26 Ea -- 259.90 87.20 347.10

Setting precast combination beam and floor plank


Erection costs based on setting panels at maximum crane radius as listed, using a 240-ton mechanical
crawler crane with 260’ boom, a 200-amp trailer mounted welder, and three sets of small tools.
To 5 tons per piece and 110' (34m) qu@3.88 Ea -- 193.70 134.00 327.70
5 to 10
tons per piece and 75' (23m) qu@4.23 Ea -- 211.20 146.00 357.20
10 to 15
tons per piece and 55' (17m) qu@4.68 Ea -- 233.60 162.00 395.60
15 to 20
tons per piece and 50' (15m) qu@5.19 Ea -- 259.10 180.00 439.10
20 to 25
tons per piece and 40' (12m) qu@5.84 Ea -- 291.50 202.00 493.50
20 to 25
tons per piece and 33' 10m) qu@6.35 Ea -- 317.00 220.00 537.00
20 to 25
tons per piece and 30' (9m) qu@7.02 Ea -- 350.40 243.00 593.40
20 to 25
tons per piece and 28' (8.5m) qu@7.77 Ea -- 387.90 269.00 656.90
20 to 25
tons per piece and 26' (8m) qu@8.79 Ea -- 438.80 304.00 742.80
2015 Heavy Construction Estimator, All Rights Reserved Page 297

Material cost for combination beam and floor plank, 4" (100mm) to 6" (150mm)
Based on 3,000 PSI concrete.
Edge beam only --@.000 CY 1,390.00 -- -- 1,390.00
Edge beam + 1 intermediate beam --@.000 CY 1,390.00 -- -- 1,390.00
Edge beam + 2 intermediate beams --@.000 CY 1,390.00 -- -- 1,390.00

Additional costs for precast deck


Add for 3,500
PSI (245 kg/cm2) concrete --@.000 CY 3.89 -- -- 3.89
Add for 4,000
PSI (280 kg/cm2) concrete --@.000 CY 5.84 -- -- 5.84
Add for 4,500
PSI (315 kg/cm2) concrete --@.000 CY 7.79 -- -- 7.79
Add for 5,000
PSI (350 kg/cm2) concrete --@.000 CY 11.70 -- -- 11.70

CSI 03-413, Precast structural sections

Setting precast beams, girders and joists with 100-ton crane


Based on setting panels at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder, and two sets of small tools.
To 5 tons per piece, 89' (27m) qt@3.93 Ea -- 194.20 65.10 259.30
5 to 10 tons per piece, 60' (18.5m) qt@4.21 Ea -- 208.00 69.80 277.80
10 to 15 tons per piece, 43' (13m) qt@4.50 Ea -- 222.30 74.60 296.90
15 to 20 tons per piece, 36' (11m) qt@4.83 Ea -- 238.70 80.00 318.70

Setting precast beams, girders and joists with 240-ton crane


Based on setting panels at maximum crane radius as listed, using a 240-ton mechanical crawler crane
with 260’ boom, a 200-amp trailer mounted welder, and three sets of small tools.
To 5 tons per piece, 110' (34m) qu@4.37 Ea -- 218.20 151.00 369.20
5 to 10 tons per piece, 75' (23m) qu@4.68 Ea -- 233.60 162.00 395.60
10 to 15 tons per piece, 55' (17m) qu@5.00 Ea -- 249.60 173.00 422.60
15 to 20 tons per piece, 50' (15m) qu@5.37 Ea -- 268.10 186.00 454.10
20 to 25 tons per piece, 40' (12m) qu@5.84 Ea -- 291.50 202.00 493.50
25 to 30 tons per piece, 33' (10m) qu@6.35 Ea -- 317.00 220.00 537.00
30 to 35 tons per piece, 30' (9m) qu@7.02 Ea -- 350.40 243.00 593.40
35 to 40 tons per piece, 28' (8.5m) qu@7.77 Ea -- 387.90 269.00 656.90

Material cost for precast beams, girders and joists - 1,000 lbs. per LF (1488 kg/lm) live load
Based on 3,000 PSI concrete, material cost only.
15’ (4.6m) span --@.000 LF 104.00 -- -- 104.00
20’ (6.1m) span --@.000 LF 130.00 -- -- 130.00
30’ (9.1m) span --@.000 LF 156.00 -- -- 156.00

Material cost for precast beams, girders and joists - 3,000 lbs. per LF (4457 kg/lm) live load
Based on 3,000 PSI concrete, material cost only.
15’ (4.6m) span --@.000 LF 130.00 -- -- 130.00
20’ (6.1m) span --@.000 LF 156.00 -- -- 156.00
30’ (9.1m) span --@.000 LF 208.00 -- -- 208.00

Material cost for precast beams, girders and joists - 5,000 lbs. (7438 kg/lm) live load
Based on 3,000 PSI concrete, material cost only.
15’ (4.6m) span --@.000 LF 182.00 -- -- 182.00
20’ (6.1m) span --@.000 LF 208.00 -- -- 208.00
30’ (9.1m) span --@.000 LF 260.00 -- -- 260.00
2015 Heavy Construction Estimator, All Rights Reserved Page 298

Setting precast concrete columns with 100-ton crane


Based on setting panels at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 3 tons per piece,
121' (37m) radius qs@2.24 Ea -- 109.20 41.50 150.70
3 to 5 tons per piece,
89' (27m) radius qs@2.38 Ea -- 116.10 44.10 160.20
5 to 7 tons per piece,
75' (23m) radius qs@2.55 Ea -- 124.40 47.30 171.70
7 to 9 tons per piece,
65' (20m) radius qs@2.74 Ea -- 133.60 50.80 184.40
9 to 11 tons per piece,
55' (17m) radius qs@2.95 Ea -- 143.90 54.70 198.60
11 to 13 tons per piece,
50' (15m) radius qs@3.20 Ea -- 156.10 59.30 215.40
13 to 15 tons per piece,
43' (13m) radius qs@3.50 Ea -- 170.70 64.90 235.60

Material cost for precast concrete columns - 12" x 12" (.3m x .3m), tied
Maximum reinforced,
500 lbs. per CY (297kg/m3) --@.000 CY 1,240.00 -- -- 1,240.00
Average reinforced,
351 lbs. per CY (209kg/m3) --@.000 CY 1,170.00 -- -- 1,170.00
Minimum reinforced,
205 lbs. per CY (122kg/m3) --@.000 CY 1,100.00 -- -- 1,100.00

Material cost for precast concrete columns - 16" x 16" (.4m x .4m), tied
Maximum reinforced,
558 lbs. per CY (332kg/m3) --@.000 CY 955.00 -- -- 955.00
Average reinforced,
368 lbs. per CY (219kg/m3) --@.000 CY 865.00 -- -- 865.00
Minimum reinforced,
180 lbs. per CY (107kg/m3) --@.000 CY 775.00 -- -- 775.00

Material cost for precast concrete columns - 20" x 20" (.5m x .5m), tied
Maximum reinforced,
553 lbs. per CY (329kg/m3) --@.000 CY 843.00 -- -- 843.00
Average reinforced,
357 lbs. per CY (212kg/m3) --@.000 CY 753.00 -- -- 753.00
Minimum reinforced,
160 lbs. per CY (95 kg/m3) --@.000 CY 660.00 -- -- 660.00

Material cost for precast concrete columns - 24" x 24" (.6m x .6m), tied
Maximum reinforced,
569 lbs. per CY (338kg/m3) --@.000 CY 787.00 -- -- 787.00
Average reinforced,
365 lbs. per CY (217kg/m3) --@.000 CY 691.00 -- -- 691.00
Minimum reinforced,
160 lbs. per CY (95 kg/m3) --@.000 CY 603.00 -- -- 603.00

Material cost for precast concrete columns - 28" x 28" (.7m x .7m), tied
Maximum reinforced,
534 lbs. per CY (317kg/m3) --@.000 CY 758.00 -- -- 758.00
Average reinforced,
347 lbs. per CY (206kg/m3) --@.000 CY 669.00 -- -- 669.00
Minimum reinforced,
2015 Heavy Construction Estimator, All Rights Reserved Page 298 (part 2)

160 lbs. per CY (95 kg/m3) --@.000 CY 579.00 -- -- 579.00

Material cost for precast concrete columns - 32" x 32" (.8m x .8m), tied
Maximum reinforced,
523 lbs. per CY (311kg/m3) --@.000 CY 702.00 -- -- 702.00
Average reinforced,
351 lbs. per CY (209kg/m3) --@.000 CY 618.00 -- -- 618.00
Minimum reinforced,
180 lbs. per CY (107kg/m3) --@.000 CY 539.00 -- -- 539.00

Material cost for precast concrete columns - 36" x 36" (.9m x .9m), tied
Maximum reinforced,
414 lbs. per CY (246kg/m3) --@.000 CY 646.00 -- -- 646.00
Average reinforced,
278 lbs. per CY (165kg/m3) --@.000 CY 582.00 -- -- 582.00
Minimum reinforced,
140 lbs. per CY (83 kg/m3) --@.000 CY 517.00 -- -- 517.00

Additional costs for precast concrete columns


Add for 3,500 PSI (245 kg per cm2) concrete,
per CY --@.000 CY 4.87 -- -- 4.87
Add for 4,000 PSI (280 kg per cm2) concrete,
per CY --@.000 CY 7.31 -- -- 7.31
Add for 4,500 PSI (315 kg per cm2) concrete,
per CY --@.000 CY 9.74 -- -- 9.74
Add for 5,000 PSI (350 kg per cm2) concrete,
per CY --@.000 CY 14.60 -- -- 14.60

CSI 03-414, Miscellaneous precast items

Setting precast concrete stairs with 50-ton crane


Based on setting stairs at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 2 tons per piece,
82' (25m) radius qn@3.11 Ea -- 151.70 47.10 198.80
2 to 3 tons per piece,
65' (20m) radius qn@3.30 Ea -- 160.90 50.00 210.90
3 to 4 tons per piece,
57' (17.5m) radius qn@3.50 Ea -- 170.70 53.00 223.70
4 to 5 tons per piece,
50' (15m) radius qn@3.74 Ea -- 182.40 56.70 239.10
5 to 6 tons per piece,
44' (13.5m) radius qn@4.00 Ea -- 195.10 60.60 255.70
6 to 7 tons per piece,
40' (12m) radius qn@4.30 Ea -- 209.70 65.10 274.80
7 to 8 tons per piece,
36' (11m) radius qn@4.67 Ea -- 227.80 70.80 298.60
8 to 9 tons per piece,
33' (10m) radius qn@5.08 Ea -- 247.80 77.00 324.80
2015 Heavy Construction Estimator, All Rights Reserved Page 299

Setting precast concrete stairs with 100-ton crane


Based on setting stairs at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 2 tons per piece,
151' (46m) radius qs@3.11 Ea -- 151.70 57.70 209.40
2 to 3 tons per piece,
121' (37m) radius qs@3.30 Ea -- 160.90 61.20 222.10
3 to 4 tons per piece,
105' (32m) radius qs@3.50 Ea -- 170.70 64.90 235.60
4 to 5 tons per piece,
89' (27m) radius qs@3.74 Ea -- 182.40 69.30 251.70
5 to 6 tons per piece,
82' (25m) radius qs@4.00 Ea -- 195.10 74.20 269.30
6 to 7 tons per piece,
75' (23m) radius qs@4.30 Ea -- 209.70 79.70 289.40
7 to 8 tons per piece,
70' (21.5m) radius qs@4.67 Ea -- 227.80 86.60 314.40
8 to 9 tons per piece,
65' (20m) radius qs@5.08 Ea -- 247.80 94.20 342.00

Material costs for precast concrete stairs


Stair cost per riser --@.000 Ea 187.00 -- -- 187.00

Setting precast concrete planters


Using a 20-ton hydraulic crane with 70’ boom, and two sets of small tools.
To 4 tons each qh@2.10 Ea -- 101.00 18.20 119.20
4 to 6 tons each qh@2.33 Ea -- 112.00 20.20 132.20
6 to 8 tons each qh@3.00 Ea -- 144.20 26.00 170.20
8 to 10 tons each qh@4.21 Ea -- 202.40 36.50 238.90

Material costs for precast concrete planters


Based on 3,000 PSI concrete.
24" (.6m) diameter, 18" (.45m) high --@.000 Ea 215.00 -- -- 215.00
30" (.75m) diameter, 24" (.6m) high --@.000 Ea 299.00 -- -- 299.00
42" (1.05m) diameter,
30" (.75m) high --@.000 Ea 639.00 -- -- 639.00

Setting precast concrete handrails


Using a 20-ton hydraulic crane with 70’ boom, and two sets of small tools.
To 2 tons per handrail qh@1.40 Ea -- 67.31 12.10 79.41
Over 2 tons per handrail qh@1.68 Ea -- 80.77 14.60 95.37

Material cost for precast concrete handrails


Based on 3,000 PSI concrete.
4" (10 cm) thick --@.000 CY 824.00 -- -- 824.00
5" (12.5cm) thick --@.000 CY 824.00 -- -- 824.00
6" (15 cm) thick --@.000 CY 824.00 -- -- 824.00
8" (20 cm) thick --@.000 CY 824.00 -- -- 824.00

Setting precast concrete sun screens


Using a 20-ton hydraulic crane with 70’ boom, and two sets of small tools.
To 1 ton each qh@.700 Ea -- 33.66 6.07 39.73
1 to 2 tons each qh@.841 Ea -- 40.44 7.29 47.73
2 to 3 tons each qh@1.05 Ea -- 50.48 9.10 59.58

Material cost for precast concrete sun screens


2015 Heavy Construction Estimator, All Rights Reserved Page 299 (part 2)

Based on 3,000 PSI concrete.


4" (10 cm) thick --@.000 CY 1,520.00 -- -- 1,520.00
5" (12.5cm) thick --@.000 CY 1,360.00 -- -- 1,360.00
6" (15 cm) thick --@.000 CY 1,210.00 -- -- 1,210.00
8" (20 cm) thick --@.000 CY 758.00 -- -- 758.00

Setting precast concrete trellis units


Based on setting trellis at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton per unit,
100' (30m) radius qn@2.95 Ea -- 143.90 44.70 188.60
1 to 3 tons per unit,
65' (20m) radius qn@3.30 Ea -- 160.90 50.00 210.90
3 to 5 tons per unit,
50' (15m) radius qn@3.74 Ea -- 182.40 56.70 239.10
5 to 7 tons per unit,
40' (12m) radius qn@4.00 Ea -- 195.10 60.60 255.70

Material cost for precast concrete trellis units


Based on 3,000 PSI concrete.
4" (10 cm) thick --@.000 CY 1,520.00 -- -- 1,520.00
5" (12.5 cm) thick --@.000 CY 1,360.00 -- -- 1,360.00
2015 Heavy Construction Estimator, All Rights Reserved Page 300

6" (15 cm) thick --@.000 CY 1,210.00 -- -- 1,210.00


8" (20 cm) thick --@.000 CY 758.00 -- -- 758.00

Setting precast concrete skylight shells


Using a 100-ton crawler mounted mechanical crane with 210’ boom, a 200-amp trailer mounted welder,
and two sets of small tools.
To 4 tons per piece qt@4.21 Ea -- 208.00 69.80 277.80
4 to 6 tons per piece qt@4.68 Ea -- 231.20 77.50 308.70
6 to 8 tons per piece qt@5.26 Ea -- 259.90 87.20 347.10

Material cost for precast concrete skylight shells


4.4' (1.35m) radius,
3.5" (9cm) thick --@.000 CY 872.00 -- -- 872.00

Setting precast concrete seating benches


Using a 20-ton hydraulic crane with 70’ boom, and two sets of small tools.
To 1 ton per piece qh@1.68 Ea -- 80.77 14.60 95.37
1 to 2 tons per piece qh@2.10 Ea -- 101.00 18.20 119.20
2 to 3 tons per piece qh@2.81 Ea -- 135.10 24.40 159.50

Material cost for precast concrete benches


10' (3m) x 2.5'
(75cm) x 11" (28cm) thick --@.000 CY 440.00 -- -- 440.00

Precast concrete splash blocks


Using small tools.
Most sizes sr@.100 Ea 3.51 3.50 0.02 7.03

Precast concrete minarets set with a 50-ton crane - L-shaped segments


Based on setting segments at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 100' (30m) radius qn@2.87 Ea -- 140.00 43.50 183.50
1 to 3 ton each, 65' (20m) radius qn@3.22 Ea -- 157.00 48.80 205.80
3 to 5 ton each, 50' (15m) radius qn@3.64 Ea -- 177.50 55.10 232.60
5 to 7 ton each, 40' (12m) radius qn@3.88 Ea -- 189.20 58.80 248.00

Precast concrete minarets set with a 50-ton crane - O-shaped segments


Based on setting segments at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 100' (30m) radius qn@3.03 Ea -- 147.80 45.90 193.70
1 to 3 tons each, 65' (20m) radius qn@3.40 Ea -- 165.80 51.50 217.30
3 to 5 tons each, 50' (15m) radius qn@3.86 Ea -- 188.30 58.50 246.80
5 to 7 tons each, 40' (12m) radius qn@4.13 Ea -- 201.40 62.60 264.00

Precast concrete minarets set with a 50-ton crane - Platform segments


Based on setting segments at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 100' (30m) radius qn@5.82 Ea -- 283.80 88.20 372.00
1 to 3 tons each, 65' (20m) radius qn@7.03 Ea -- 342.90 107.00 449.90
3 to 5 tons each, 50' (15m) radius qn@7.80 Ea -- 380.40 118.00 498.40
5 to 7 tons each, 40' (12m) radius qn@8.77 Ea -- 427.70 133.00 560.70

Precast concrete minarets set with a 50-ton crane - Cap segments


Based on setting segments at maximum crane radius as listed, using a truck-mounted 50-ton hydraulic
crane with 115’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 100’ (30m) radius qn@3.18 Ea -- 155.10 48.20 203.30
2015 Heavy Construction Estimator, All Rights Reserved Page 300 (part 2)

1 to 3 tons each, 65’ (20m) radius qn@3.56 Ea -- 173.60 53.90 227.50


3 to 5 tons each, 50’ (15m) radius qn@4.05 Ea -- 197.50 61.40 258.90
5 to 7 tons each, 40’ (12m) radius qn@4.32 Ea -- 210.70 65.40 276.10

Precast concrete minarets set with a 100-ton crane - L-shaped segments


Based on setting segments at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 180’ (55m) radius qs@2.87 Ea -- 140.00 53.20 193.20
1 to 3 tons each, 135’ (41m) radius qs@3.22 Ea -- 157.00 59.70 216.70
2015 Heavy Construction Estimator, All Rights Reserved Page 301

3 to 5 tons each, 100’ (30m) radius qs@3.64 Ea -- 177.50 67.50 245.00


5 to 7 tons each, 79’ (24m) radius qs@3.88 Ea -- 189.20 71.90 261.10

Precast concrete minarets set with a 100-ton crane - O-shaped segments


Based on setting segments at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 180’ (55m) radius qs@3.03 Ea -- 147.80 56.20 204.00
1 to 3 tons each, 135’ (41m) radius qs@3.40 Ea -- 165.80 63.00 228.80
3 to 5 tons each, 100’ (30m) radius qs@3.86 Ea -- 188.30 71.60 259.90
5 to 7 tons each, 79’ (24m) radius qs@4.13 Ea -- 201.40 76.60 278.00

Precast concrete minarets set with a 100-ton crane - Platform segments


Based on setting segments at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 180’ (55m) radius qs@4.64 Ea -- 226.30 86.00 312.30
1 to 3 tons each, 135’ (41m) radius qs@5.61 Ea -- 273.60 104.00 377.60
3 to 5 tons each, 100’ (30m) radius qs@6.21 Ea -- 302.90 115.00 417.90
5 to 7 tons each, 79’ (24m) radius qs@7.03 Ea -- 342.90 130.00 472.90

Precast concrete minarets set with a 100-ton crane - Cap segments


Based on setting segments at maximum crane radius as listed, using a 100-ton crawler mounted
mechanical crane with 210’ boom, a 200-amp trailer mounted welder and small tools.
To 1 ton each, 180’ (55m) radius qs@3.18 Ea -- 155.10 59.00 214.10
1 to 3 tons each, 135’ (41m) radius qs@3.56 Ea -- 173.60 66.00 239.60
3 to 5 tons each, 100’ (30m) radius qs@4.05 Ea -- 197.50 75.10 272.60
5 to 7 tons each, 79’ (24m) radius qs@4.32 Ea -- 210.70 80.10 290.80

Material costs for precast minarets


Based on 3,000 PSI concrete and including post tension cost.
L-shaped segments --@.000 CY 2,250.00 -- -- 2,250.00
O-shaped segments --@.000 CY 2,250.00 -- -- 2,250.00
Platform segments --@.000 CY 2,250.00 -- -- 2,250.00
Cap segments --@.000 CY 2,250.00 -- -- 2,250.00

Precast concrete bearing pads, continuous 2" wide strips


Using small tools.
1/8" thick sq@.008 LF 0.33 0.28 -- 0.61
1/4" thick sq@.008 LF 0.62 0.28 -- 0.90
1/2" thick sq@.008 LF 1.23 0.28 -- 1.51
3/4" thick sq@.009 LF 1.85 0.32 -- 2.17
1" thick sq@.010 LF 2.49 0.35 -- 2.84
1-12" thick sq@.011 LF 3.70 0.39 -- 4.09
Add for 3,500
PSI (245 kg per cm2) concrete --@.000 CY 5.23 -- -- 5.23
Add for 4,000
PSI (280 kg per cm2) concrete --@.000 CY 7.75 -- -- 7.75
Add for 4,500
PSI (315 kg per cm2) concrete --@.000 CY 10.40 -- -- 10.40
Add for 5,000
PSI (350 kg per cm2) concrete --@.000 CY 15.50 -- -- 15.50

CSI 03-420, Precast prestressed concrete

Precast, prestressed slabs, roof and floor members


Using a 40-ton hydraulic crane with 84’ boom and small tools.
4" (10cm) thick, 12’
to 16’ (3.7m to 4.9m) span ql@.025 SF 2.88 1.18 0.29 4.35
2015 Heavy Construction Estimator, All Rights Reserved Page 301 (part 2)

6" (15cm) thick, 16’


to 25’ (4.9m to 7.6m) span ql@.026 SF 3.70 1.23 0.30 5.23
8" (21cm) thick, 25’
to 32’ (7.6m to 9.8m) span ql@.027 SF 4.53 1.28 0.31 6.12
10" (25cm) thick,
32’ to 40’ (9.8m to 12m) span ql@.028 SF 5.37 1.32 0.33 7.02

Precast, prestressed multiple tee roof and floor


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Minimum, less than 40' (12m) span ql@.021 SF 7.51 0.99 0.24 8.74
Maximum, spans 40' (12m) or more ql@.043 SF 8.45 2.03 0.50 10.98

Precast, prestressed double tee wall members


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Minimum, less than 40' (12m) span ql@.036 SF 10.30 1.70 0.42 12.42
Maximum, spans 40' (12m) or more ql@.160 SF 12.20 7.56 1.86 21.62
2015 Heavy Construction Estimator, All Rights Reserved Page 302

Precast, prestressed single tee short span roof members


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Minimum, less than 40' (12m) span ql@.053 SF 9.09 2.51 0.62 12.22
Maximum, spans 40' (12m) or more ql@.064 SF 10.30 3.03 0.74 14.07

Precast, prestressed single tee long span roof members


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Minimum, less than 40' (12m) span ql@.047 SF 11.40 2.22 0.55 14.17
Maximum, spans 40' (12m) or more ql@.064 SF 12.50 3.03 0.74 16.27

CSI 03-470, Precast retaining walls

Tied-back earth walls


Using precast filter fabric, soil reinforcing mesh, and cast in place coping. Add the cost of leveling pad,
select earth fill and engineering fees, using a 40-ton hydraulic crane with 84’ boom, and four sets of
small tools.
10’ to 15’ high b3@.140 SF 14.50 5.56 1.99 22.05
16’ to 20’ high b3@.112 SF 15.60 4.45 1.59 21.64
21’ to 25’ high b3@.093 SF 16.70 3.70 1.32 21.72
26’ to 30’ high b3@.093 SF 18.30 3.70 1.32 23.32
More than 30' high b3@.080 SF 19.70 3.18 1.14 24.02

CSI 03-510, Gypsum concrete deck, class A gypsum fill

Class A gypsum fill for gypsum concrete deck


Using a 12 CY per hour shotcrete gun and mixer rig and small tools.
2" (51mm) thick bv@.008 SF 2.36 0.30 0.02 2.68
2-1/2" (63mm) thick bv@.009 SF 2.95 0.34 0.02 3.31
3" (76mm) thick bv@.010 SF 3.54 0.38 0.02 3.94
3-1/2" (88mm) thick bv@.011 SF 4.13 0.41 0.02 4.56
4" (10cm) thick bv@.012 SF 4.72 0.45 0.03 5.20

Formboard (for lightweight deck)


Using small tools.
1/2" (13mm) thick, sheetrock aw@.012 SF 0.68 0.48 -- 1.16
1" (25mm) thick minimum, fiberboard aw@.013 SF 1.05 0.52 -- 1.57
1-1/2" (37mm) thick minimum,
fiberboard aw@.014 SF 2.91 0.56 -- 3.47
1" (25mm) thick, cement fiberboard aw@.013 SF 0.75 0.52 -- 1.27
1-1/2" (37mm) thick,
cement fiberboard aw@.014 SF 1.01 0.56 -- 1.57
1" (25mm) thick, glass fiberboard aw@.013 SF 1.27 0.52 -- 1.79
1-1/2" (37mm) thick,
glass fiberboard aw@.014 SF 1.69 0.56 -- 2.25

Board deck supports for cementitious decks


Using a 200-amp trailer mounted welder and small tools.
5' (1.5 m) span, 40 lbs. per SF q2@.004 SF 0.49 0.20 0.02 0.71
8' (2.4 m) span, 40 lbs. per SF q2@.006 SF 0.96 0.29 0.03 1.28

CSI 03-520, Insulating concrete roof deck

Poured perlite or vermiculite deck, per cubic yard


Add the cost of forming from CSI section 03-330, using a 12 CY per hour shotcrete gun and mixer rig
and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 302 (part 2)

1:4 mix, field mix bv@1.12 CY 147.00 41.96 2.44 191.40


1:6 mix, field mix bv@1.12 CY 151.00 41.96 2.44 195.40

Poured perlite or vermiculite deck, at 3" thick


Add the cost of forming from CSI section 03-330, using a 12 CY per hour shotcrete gun and mixer rig
and small tools.
1:4 mix bv@.010 SF 1.78 0.38 0.02 2.18
1:6 mix bv@.010 SF 1.53 0.38 0.02 1.93
Add for smooth trowel finish ---@--- % -- 50.00 -- --
Add for building
over 50 feet (15m) high ---@--- % -- 25.00 -- --

Lightweight concrete roof deck


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2" (51mm) thick bl@.021 SF 4.97 0.86 0.32 6.15
2015 Heavy Construction Estimator, All Rights Reserved Page 303

2-1/2" (63mm) thick bl@.024 SF 7.45 0.98 0.37 8.80


3" (76mm) thick bl@.026 SF 5.88 1.06 0.40 7.34
3-1/2" (88mm) thick bl@.028 SF 6.93 1.15 0.43 8.51
4" (10 cm) thick bl@.030 SF 7.19 1.23 0.46 8.88
Add for pitch over 4 in 12 ---@--- % -- 25.00 -- --
Add for pitch over 6 in 12 ---@--- % -- 150.00 -- --

Lightweight channel slab


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2-3/4" (70mm) thick, straight bl@.024 SF 3.86 0.98 0.37 5.21
3-1/2" (88mm) thick, straight bl@.025 SF 4.48 1.02 0.38 5.88
3-3/4" (92mm) thick, straight bl@.026 SF 4.21 1.06 0.40 5.67
4-3/4" (119mm) thick, straight bl@.030 SF 4.48 1.23 0.46 6.17
2-3/4" (70mm) thick, chopped bl@.048 SF 4.65 1.96 0.73 7.34
3-1/2" (88mm) thick, chopped bl@.050 SF 4.48 2.05 0.76 7.29
3-3/4" (92mm) thick, chopped bl@.052 SF 4.48 2.13 0.79 7.40
4-3/4" (119mm) thick, chopped bl@.060 SF 4.65 2.46 0.91 8.02

Gypsum plank
Using small tools.
2" (51mm) thick roof deck bf@.017 SF 3.45 0.72 -- 4.17
3" (76mm) thick roof deck bf@.018 SF 4.13 0.77 -- 4.90

CSI 03-530, Cementitious wood fiber tongue and groove planks

Cementitious wood fiber tongue and groove planks


Using small tools.
1" (25mm) thick am@.016 SF 1.52 0.70 0.01 2.23
1-1/2" (37mm) thick am@.016 SF 1.64 0.70 0.01 2.35
2" (51mm) thick am@.017 SF 1.70 0.75 0.01 2.46
2-1/2" (63mm) thick am@.017 SF 2.12 0.75 0.01 2.88
3" (76mm) thick am@.017 SF 2.51 0.75 0.01 3.27
3-1/2" (88mm) thick am@.018 SF 3.58 0.79 0.01 4.38
4" (10cm) thick am@.019 SF 2.97 0.83 0.01 3.81

Bulb tees, sub-purlins and grout for cementitious roof plank


Using a 200-amp trailer mounted welder and small tools.
6' (1.8m) span q2@.005 SF 0.69 0.25 0.02 0.96
8' (2.4m) span q2@.006 SF 1.20 0.29 0.03 1.52

CSI 03-610, Grout for equipment bases

Grout for equipment bases - Nonshrink, metallic


Using small tools.
1" (25mm) deep be@.286 SF 7.74 12.19 0.06 19.99
2" (51mm) deep be@.400 SF 15.40 17.04 0.08 32.52

Grout for equipment bases - Fluid type, nonmetallic


Using small tools.
1" (25mm) be@.200 SF 4.13 8.52 0.04 12.69
2" (51mm) be@.250 SF 8.28 10.65 0.05 18.98

Grout for equipment bases - Nonshrink, nonmetallic grout


Using small tools.
1" (25mm) be@.286 SF 4.09 12.19 0.06 16.34
2" (51mm) be@.400 SF 8.19 17.04 0.08 25.31
2015 Heavy Construction Estimator, All Rights Reserved Page 303 (part 2)

CSI 03-620, Grouting for joints

Portland cement joint grout - 1/2" (13 mm) joint thickness


3 parts sand, 1 part cement, using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM
grout pump and mixer and small tools.
4" (10 cm) wide bk@.016 LF 0.12 0.60 0.10 0.82
6" (15 cm) wide bk@.020 LF 0.17 0.75 0.12 1.04
8" (20 cm) wide bk@.027 LF 0.22 1.01 0.17 1.40

Portland cement joint grout - 1" (25mm) joint thickness


3 to 1 mix, 3 parts sand, 1 part cement, using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose,
a 20 GPM grout pump and mixer and small tools.
4" (10 cm) wide bk@.021 LF 0.22 0.79 0.13 1.14
6" (15 cm) wide bk@.027 LF 0.31 1.01 0.17 1.49
8" (20 cm) wide bk@.036 LF 0.43 1.35 0.22 2.00
2015 Heavy Construction Estimator, All Rights Reserved Page 304

Nonshrink, nonmetallic joint grout - 1/2" (13mm) joint thickness


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM grout pump and mixer and
small tools.
4" (10cm) wide bk@.016 LF 0.33 0.60 0.10 1.03
6" (15cm) wide bk@.020 LF 0.48 0.75 0.12 1.35
8" (20 cm) wide bk@.027 LF 0.64 1.01 0.17 1.82

Nonshrink, nonmetallic joint grout - 1" (25 mm) joint thickness


Using a 250 CFM, 100 PSI air compressor, 100’ of 1" air hose, a 20 GPM grout pump and mixer and
small tools.
4" (10 cm) wide bk@.021 LF 0.64 0.79 0.13 1.56
6" (15 cm) wide bk@.027 LF 0.95 1.01 0.17 2.13
8" (20 cm) wide bk@.036 LF 1.26 1.35 0.22 2.83

CSI 03-711, Concrete cleaning by mechanical methods

Concrete restoration and cleaning


Using a 375 CFM, 100 PSI compressor, and 100’ of 1" air hose.
Sand blasting bj@.033 SF 0.77 1.30 0.17 2.24

==========================================================================
Masonry
==========================================================================

CSI 04-110, Cement and lime mortars

Grouting bond beams and lintels, 8" (200mm) deep, concrete fill only
Based on grout at $2.90 per cubic foot and 3% waste, using small tools. No pumping included.
6" (0.15 CF per LF) ca@.012 LF 0.76 0.49 -- 1.25
8" (0.20 CF per LF) ca@.020 LF 1.01 0.81 0.01 1.83
10" (0.25 CF per LF) ca@.027 LF 1.27 1.10 0.01 2.38
12" (0.30 CF per LF) ca@.037 LF 1.53 1.50 0.01 3.04

Grouting concrete block cores, concrete fill all block


Based on grout at $2.90 per cubic foot and 3% waste, using small tools. No pumping included.
4" (0.111 CF per SF) ca@.020 SF 0.57 0.81 0.01 1.39
6" (0.222 CF per SF) ca@.025 SF 1.14 1.02 0.01 2.17
8" (0.320 CF per SF) ca@.035 SF 1.63 1.42 0.01 3.06
10" (0.450 CF per SF) ca@.040 SF 2.30 1.63 0.01 3.94
12" (0.590 CF per SF) ca@.042 SF 3.01 1.71 0.01 4.73

Grouting cavity walls, concrete fill


Based on grout at $2.90 per cubic foot and 3% waste, using small tools. No pumping included.
2" space (0.167 CF per SF) ca@.022 SF 0.84 0.89 0.01 1.74
3" space (0.250 CF per SF) ca@.027 SF 1.27 1.10 0.01 2.38
4" space (0.333 CF per SF) ca@.033 SF 1.63 1.34 0.01 2.98
6" space (0.500 CF per SF) ca@.042 SF 2.56 1.71 0.01 4.28

Grouting door frames, concrete fill


Based on grout at $2.90 per cubic foot and 3% waste, using small tools. No pumping included.
3' x 7' opening (2.50 CF per frame) ca@.654 Ea 12.80 26.59 0.20 39.59
6' x 7' opening (3.50 CF per frame) ca@.800 Ea 17.90 32.52 0.25 50.67

Sand fill for cavity walls


Based on sand at $22 per cubic yard (or $.82 per cubic foot), using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 304 (part 2)

2" space (0.167 CF per SF) ca@.022 SF 0.28 0.89 0.01 1.18
3" space (0.250 CF per SF) ca@.027 SF 0.43 1.10 0.01 1.54
4" space (0.333 CF per SF) ca@.033 SF 0.55 1.34 0.01 1.90
6" space (0.500 CF per SF) ca@.042 SF 0.83 1.71 0.01 2.55

CSI 04-160, Masonry accessories, reinforcing

Reinforcing bars for masonry


Using small tools.
Horizontal # 4 rebar b7@.008 LF 0.62 0.36 -- 0.98
2015 Heavy Construction Estimator, All Rights Reserved Page 305

Horizontal # 5 and # 6 rebar b7@.010 LF 0.66 0.45 -- 1.11


Vertical # 4 rebar b7@.010 LF 0.62 0.45 -- 1.07
Vertical # 5 and # 6 rebar b7@.013 LF 0.66 0.58 -- 1.24
Vertical # 7 rebar b7@.018 LF 0.71 0.81 0.01 1.53
Vertical # 8 rebar b7@.021 LF 0.78 0.94 0.01 1.73

Horizontal truss and ladder reinforcing for masonry


Using small tools.
4" wide truss b7@.200 CLF 34.20 8.97 0.07 43.24
6" wide truss b7@.200 CLF 36.50 8.97 0.07 45.54
8" or 10" wide truss b7@.300 CLF 45.60 13.46 0.10 59.16
12" wide truss b7@.400 CLF 52.40 17.94 0.14 70.48
10" wide ladder b7@.300 CLF 45.60 13.46 0.10 59.16
Add for class 1 finish ---@--- % 10.00 -- -- --
Add for hot dip galvanized finish ---@--- % 48.00 -- -- --
Add for cavity wall type
reinforcing with drip section ---@--- % 1.50 10.00 -- --

CSI 04-170, Anchors and tie systems

Rectangular wall ties for masonry


Using small tools.
3/16" diameter x 2" x 6",
galvanized b7@.010 Ea 0.36 0.45 -- 0.81
3/16" diameter x 2" x 8",
galvanized b7@.010 Ea 0.43 0.45 -- 0.88
2" x 8" or 4" x 6", copper weld b7@.010 Ea 1.41 0.45 -- 1.86
3/16" diameter x 2" x 10",
galvanized b7@.010 Ea 0.43 0.45 -- 0.88
3/16" diameter x 2" x 12",
galvanized b7@.010 Ea 0.46 0.45 -- 0.91
3/16" diameter x 4" x 6",
galvanized b7@.010 Ea 0.50 0.45 -- 0.95
3/16" diameter x 4" x 8",
galvanized b7@.010 Ea 0.55 0.45 -- 1.00
3/16" diameter x 4" x 10",
galvanized b7@.010 Ea 0.46 0.45 -- 0.91
3/16" diameter x 4" x 12",
galvanized b7@.010 Ea 0.50 0.45 -- 0.95
1/4" diameter x 2" x 6", galvanized b7@.010 Ea 0.50 0.45 -- 0.95
1/4" diameter x 2" x 8", galvanized b7@.010 Ea 0.57 0.45 -- 1.02
1/4" diameter x 2" x 10",
galvanized b7@.010 Ea 0.66 0.45 -- 1.11
1/4" diameter x 2" x 12",
galvanized b7@.010 Ea 0.78 0.45 -- 1.23
1/4" diameter x 4" x 6", galvanized b7@.010 Ea 0.64 0.45 -- 1.09
1/4" diameter x 4" x 8", galvanized b7@.010 Ea 0.68 0.45 -- 1.13
1/4" diameter x 4" x 10",
galvanized b7@.010 Ea 0.78 0.45 -- 1.23
1/4" diameter x 4" x 12",
galvanized b7@.010 Ea 0.84 0.45 -- 1.29

Wall plugs for nailing to brickwork


Using small tools.
26 ga. galvanized, plain b7@.762 C 59.50 34.18 0.26 93.94
Wood filled b7@.762 C 171.00 34.18 0.26 205.44

Z wall ties for masonry


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 305 (part 2)

1/8" diameter x 6", galvanized b7@.010 Ea 0.27 0.45 -- 0.72


3/16" diameter x 6", galvanized b7@.010 Ea 0.24 0.45 -- 0.69
3/16" diameter x 8", galvanized b7@.010 Ea 0.27 0.45 -- 0.72
3/16" diameter x 10", galvanized b7@.010 Ea 0.53 0.45 -- 0.98
3/16" diameter x 12", galvanized b7@.010 Ea 0.59 0.45 -- 1.04
1/4" diameter x 6", galvanized b7@.010 Ea 1.10 0.45 -- 1.55
1/4" diameter x 8", galvanized b7@.010 Ea 1.30 0.45 -- 1.75
1/4" diameter x 10", galvanized b7@.010 Ea 1.57 0.45 -- 2.02

Dovetail anchor slots for masonry


Using small tools.
24 gauge, galvanized steel, filled al@.020 LF 1.01 0.88 0.01 1.90
20 gauge, galvanized steel, filled al@.021 LF 1.22 0.92 0.01 2.15
16 oz. copper, foam filled al@.022 LF 2.99 0.97 0.01 3.97
2015 Heavy Construction Estimator, All Rights Reserved Page 306

Dovetail anchors for masonry


Using small tools.
16 gauge x 3-1/2" b7@.011 Ea 0.33 0.49 -- 0.82
16 gauge x 5-1/2" b7@.011 Ea 0.44 0.49 -- 0.93
12 gauge x 3-1/2" b7@.011 Ea 0.56 0.49 -- 1.05
12 gauge x 5-1/2" b7@.011 Ea 0.71 0.49 -- 1.20

12 gauge dovetail triangular ties


Using small tools.
3" x 3", galvanized b7@.013 Ea 0.83 0.58 -- 1.41
5" x 5", galvanized b7@.014 Ea 0.89 0.63 -- 1.52
7" x 7", galvanized b7@.014 Ea 1.01 0.63 -- 1.64
7" x 9", galvanized b7@.014 Ea 1.13 0.63 -- 1.76

Corrugated brick anchors, 3-1/2" (89mm) long


Using small tools.
16 gauge b7@.010 Ea 0.30 0.45 -- 0.75
12 gauge b7@.010 Ea 0.48 0.45 -- 0.93

Non-corrugated brick anchors, 3-1/2" (89mm) long


Using small tools.
16 gauge b7@.010 Ea 0.36 0.45 -- 0.81
12 gauge b7@.010 Ea 0.68 0.45 -- 1.13

Cavity wall anchors, galvanized and corrugated, 5" (127mm) long


Using small tools.
16 gauge b7@.010 Ea 0.80 0.45 -- 1.25
12 gauge b7@.010 Ea 1.32 0.45 -- 1.77

Cavity wall anchors, galvanized and corrugated, 7" (178mm) long


Using small tools.
28 gauge b7@.010 Ea 0.87 0.45 -- 1.32
24 gauge b7@.010 Ea 0.91 0.45 -- 1.36
22 gauge b7@.010 Ea 1.14 0.45 -- 1.59
16 gauge b7@.010 Ea 1.37 0.45 -- 1.82

Mesh wall ties for masonry, 16 gauge, 3" wide


Using small tools.
8 inch b7@.014 Ea 1.40 0.63 -- 2.03
12 inch b7@.015 Ea 1.59 0.67 0.01 2.27
16 inch b7@.017 Ea 1.78 0.76 0.01 2.55
20 inch b7@.018 Ea 1.94 0.81 0.01 2.76
24 inch b7@.020 Ea 2.08 0.90 0.01 2.99

CSI 04-180, Control joints

Masonry control joints, rubber or polyvinyl chloride (PVC)


Using small tools.
Minimum b7@.015 LF 3.24 0.67 0.01 3.92
Average b7@.023 LF 8.44 1.03 0.01 9.48
Maximum b7@.034 LF 13.50 1.53 0.01 15.04
Rubber, for 4" wall b7@.015 LF 4.76 0.67 0.01 5.44
Rubber, for 6" wall b7@.021 LF 8.00 0.94 0.01 8.95
Rubber, for 8" wall b7@.026 LF 9.60 1.17 0.01 10.78
PVC, for 4" wall b7@.015 LF 3.62 0.67 0.01 4.30
2015 Heavy Construction Estimator, All Rights Reserved Page 306 (part 2)

PVC, for 6" wall b7@.021 LF 4.40 0.94 0.01 5.35


PVC, for 8" wall b7@.026 LF 5.00 1.17 0.01 6.18

CSI 04-190, Mortar

Masonry cement mortar


Type N, 1:3 mix --@.000 CF 3.74 -- -- 3.74
Type M, 1:1:6 mix --@.000 CF 4.84 -- -- 4.84

Masonry sand (including delivery within 10 miles)


Masonry sand --@.000 CY 48.80 -- -- 48.80
2015 Heavy Construction Estimator, All Rights Reserved Page 307

CSI 04-205, Scaffolding, tubular steel

Tubular steel scaffolding, 1 to 5 stories


Rented, erected and dismantled. Based on 1 use per month, using small tools.
Exterior building scaffolding,
1 to 5 story at@1.62 CSF 58.80 66.44 0.70 125.94

Tubular steel scaffolding, 6 to 12 stories


Rented, erected and dismantled. Based on 1 use per month, using small tools.
Exterior building scaffolding,
6 to 12 story aq@2.21 CSF 44.10 92.18 1.33 137.61

Scaffolding (safety accessories)


Rented, based on 1 use per month, using small tools, safety netting.
3/4 " mesh --@.000 SF 1.59 -- -- 1.59
4" mesh --@.000 SF 3.46 -- -- 3.46
6" mesh --@.000 SF 3.94 -- -- 3.94

Interior building scaffolding


Rented, erected and dismantled. Based on 1 use per month, using small tools.
Interior wall, to 16' (4.9m) high at@1.10 CSF 58.80 45.11 0.47 104.38
Interior wall,
16' (4.9m) to 30' (12m) high at@1.37 CSF 51.00 56.18 0.59 107.77
Interior building,
to 30' (9.1m) high at@.296 CCF 35.70 12.14 0.13 47.97

Interior building scaffolding over 30'


Rented, erected and dismantled. Based on 1 use per month, using small tools.
Interior building,
over 30' (9.1m) high aq@.310 CCF 35.70 12.93 0.19 48.82

CSI 04-210, Brick masonry

Face brick, red, costs per square foot


Standard size brick with running bond, including brick at $.30 each and mortar at $6 per CF. Add the
cost of ties, reinforcing and scaffolding, using small tools.
Veneer (6.4 per SF) cd@.205 SF 2.23 8.48 0.07 10.78
Cavity wall (6.4 per SF) cd@.244 SF 2.23 10.09 0.08 12.40
9"solid wall (12.7 per SF) cd@.326 SF 4.43 13.48 0.11 18.02

Common brick, costs per square foot


Standard size brick with running bond, including brick at $.30 each and mortar at $6 per CF. Add the
cost of ties, reinforcing and scaffolding, using small tools.
For veneer (6.4 per SF) cd@.194 SF 2.36 8.02 0.06 10.44
4" back-up (6.4 per SF) cd@.173 SF 2.36 7.16 0.06 9.58
8" back-up (12.7 per SF) cc@.300 SF 4.73 12.37 0.10 17.20
12" firewall (19 per SF) cc@.420 SF 7.08 17.32 0.14 24.54
16" firewall (26 per SF) cc@.525 SF 9.68 21.65 0.17 31.50

Glazed brick, costs per square foot


Based on brick at $1.10 each and mortar at $6 per CF, using small tools.
Veneer (7.4 per SF) cd@.232 SF 9.85 9.60 0.08 19.53

Buff or gray face brick, costs per square foot


Based on brick at $.35 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 307 (part 2)

Veneer (6.4 per SF) cd@.205 SF 2.84 8.48 0.07 11.39


Cavity wall (6.4 per SF) cd@.205 SF 2.84 8.48 0.07 11.39

Face brick, red, cost per brick


Based on brick at $.30 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
Veneer cd@.032 Ea 0.37 1.32 0.01 1.70
Cavity wall cd@.038 Ea 0.37 1.57 0.01 1.95
9"solid wall cd@.026 Ea 0.37 1.08 0.01 1.46

Common brick, costs per brick


Standard size brick with running bond. Based on $.30 per brick and mortar at $6 per cubic foot. Add
the cost of ties, reinforcing and scaffolding, using small tools.
Veneer cd@.030 Ea 0.38 1.24 0.01 1.63
2015 Heavy Construction Estimator, All Rights Reserved Page 308

4" back-up (6.4 per SF) cd@.027 Ea 0.38 1.12 0.01 1.51
8" back-up (12.7 per SF) cc@.024 Ea 0.38 0.99 0.01 1.38
12" firewall (19 per SF) cc@.022 Ea 0.38 0.91 0.01 1.30
16" firewall (26 per SF) cc@.028 Ea 0.38 1.16 0.01 1.55

Glazed brick, costs per brick


Based on brick at $1.10 each, using small tools.
Veneer (7.4 per SF) cd@.031 Ea 1.28 1.28 0.01 2.57

Face brick, buff or gray, cost per brick


Based on brick at $.35 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
Veneer (6.4 per SF) cd@.032 Ea 0.43 1.32 0.01 1.76
Cavity wall (6.4 per SF) cd@.038 Ea 0.43 1.57 0.01 2.01

Jumbo or oversize brick, red face, running bond, cost per SF


Based on brick at $.55 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
4" veneer (3.12 per SF) cd@.140 SF 2.55 5.79 0.05 8.39
Cavity wall (3.12 per SF) cd@.163 SF 2.55 6.74 0.05 9.34
4" back-up (3.12 per SF) cd@.138 SF 2.55 5.71 0.05 8.31
8" back-up (6.24 per SF) cc@.210 SF 4.20 8.66 0.07 12.93
12" firewall (9.36 per SF) cc@.292 SF 4.28 12.04 0.10 16.42
16" firewall (12.5 per SF) cc@.359 SF 8.19 14.81 0.12 23.12

Jumbo or oversize brick, red face, running bond, cost each


Based on brick at $.55 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
4" veneer (3.0 per SF) cd@.047 Ea 0.66 1.94 0.02 2.62
Cavity wall (3.0 per SF) cd@.054 Ea 0.66 2.23 0.02 2.91
4" back-up (3.0 per SF) cd@.046 Ea 0.66 1.90 0.02 2.58
8" back-up (6.0 per SF) cc@.035 Ea 0.66 1.44 0.01 2.11
12" firewall (9.0 per SF) cc@.032 Ea 0.66 1.32 0.01 1.99
16" firewall (12.0 per SF) cc@.030 Ea 0.66 1.24 0.01 1.91

Norman brick, red face, running bond, cost per SF


Based on brick at $.45 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
4" veneer (4.5 per SF) cd@.200 SF 2.44 8.27 0.07 10.78
Cavity wall (4.5 per SF) cd@.233 SF 2.44 9.64 0.08 12.16
Add for buff or gray face --@.000 SF 0.58 -- -- 0.58
Add for marble chip face --@.000 SF 0.69 -- -- 0.69

Norman brick, red face, running bond, cost per brick


Based on brick at $.45 each and mortar at $6 per CF. Add the cost of ties, reinforcing and scaffolding,
using small tools.
4" veneer cd@.044 Ea 0.54 1.82 0.01 2.37
Cavity wall cd@.052 Ea 0.54 2.15 0.02 2.71

Additional costs for brick masonry


Add for
full header every 6th course ---@--- % -- 4.00 -- --
Add for English,
full header every 2nd course ---@--- % -- 8.00 -- --
Add for Flemish,
alternate header every course ---@--- % -- 12.00 -- --
Add for curved wall sections ---@--- % -- 50.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 308 (part 2)

Add for
interior veneer construction ---@--- % -- 15.00 -- --
Add for stacked bond ---@--- % -- 10.00 -- --
Add for battered walls ---@--- % -- 30.00 -- --
Add for corbels ---@--- % -- 75.00 -- --
Add for colored mortar ---@--- % 10.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 309

Chimney, standard bricks


Per vertical foot of overall height. Add the foundation cost and scaffolding, using small tools.
16" x 16", one 8" x 8" flue cd@.900 VLF 14.80 37.22 0.30 52.32
16" x 20", one 8" x 12" flue cd@1.04 VLF 18.30 43.01 0.34 61.65
16" x 24", two 8" x 8" flue cd@1.53 VLF 21.80 63.28 0.50 85.58
20" x 20", one 12" x 12" flue cd@1.20 VLF 21.80 49.63 0.40 71.83
20" x 24", two 8" x 12" flue cd@1.80 VLF 28.90 74.45 0.59 103.94
20" x 32", two 12" x 12" flue cd@2.00 VLF 36.70 82.72 0.66 120.08

Window sill
Using small tools.
Face brick set on edge ca@.225 LF 2.26 9.15 0.07 11.48

Brick floor pavers


Set with mortar joints. Add the cost of bedding, using small tools.
8" x 4", 1" to 1/4" thick joints cd@.220 SF 2.23 9.10 0.07 11.40

CSI 04-213, Structural glazed tile

6T structural glazed tile, 5-1/3" x 12" - Glazed one side


2.1 pieces per square foot, cost per SF, using small tools.
2" (5cm) thick cc@.215 SF 5.28 8.87 0.07 14.22
4" (10cm) thick cc@.221 SF 6.25 9.11 0.07 15.43
6" (15cm) thick cc@.233 SF 8.80 9.61 0.08 18.49
8" (20cm) thick cc@.271 SF 9.72 11.18 0.09 20.99

6T structural glazed tile, 5-1/3" x 12" - Glazed two sides


2.1 pieces per square foot, cost per SF, using small tools.
4" (10cm) thick cc@.247 SF 9.72 10.19 0.08 19.99
6" (15cm) thick cc@.263 SF 13.30 10.85 0.09 24.24

6T structural glazed tile, 5-1/3" x 12" - Fire rated


Cost per SF, using small tools.
1 hour, 4" (10cm) cc@.233 SF 12.80 9.61 0.08 22.49
2 hour, 6" (15cm) cc@.247 SF 42.20 10.19 0.08 52.47

6T structural glazed tile, 5-1/3" x 12" - Glazed on one side


2.1 pieces per square foot, cost per tile, using small tools.
2" (5cm) cc@.108 Ea 2.51 4.45 0.04 7.00
4" (10cm) cc@.111 Ea 2.97 4.58 0.04 7.59
6" (15cm) cc@.117 Ea 4.19 4.83 0.04 9.06
8" (20cm) cc@.136 Ea 4.63 5.61 0.04 10.28

6T structural glazed tile, 5-1/3" x 12" - Glazed on two sides


2.1 pieces per square foot, cost per tile, using small tools.
4" (10cm) cc@.124 Ea 4.63 5.11 0.04 9.78
6" (15cm) cc@.131 Ea 6.28 5.40 0.04 11.72

6T structural glazed tile, 5-1/3" x 12" - Special shapes


Cost per tile, using small tools.
Group 1 cc@.076 Ea 4.63 3.13 0.03 7.79
Group 2 cc@.080 Ea 6.36 3.30 0.03 9.69
Group 3 cc@.084 Ea 8.21 3.46 0.03 11.70
Group 4 cc@.093 Ea 16.90 3.84 0.03 20.77
2015 Heavy Construction Estimator, All Rights Reserved Page 310

Group 5 cc@.105 Ea 20.50 4.33 0.03 24.86

Structural glazed tile, 8W series, 8" x 16" - Glazed 1 side


Grade SS, 1.12 pieces per SF, costs per SF, using small tools.
2" (5cm) thick cc@.145 SF 5.24 5.98 0.05 11.27
4" (10cm) thick cc@.150 SF 5.69 6.19 0.05 11.93
6" (15cm) thick cc@.156 SF 8.04 6.43 0.05 14.52
8" (20cm) thick cc@.183 SF 9.22 7.55 0.06 16.83

Structural glazed tile, 8W series, 8" x 16" - Glazed 2 sides


Grade SS, 1.12 pieces per SF, costs per SF, using small tools.
4" (10cm) thick cc@.162 SF 8.80 6.68 0.05 15.53
6" (15cm) thick cc@.168 SF 12.50 6.93 0.06 19.49
8" (20cm) thick cc@.195 SF 14.30 8.04 0.06 22.40

Structural glazed tile, 8W series, 8" x 16" - Fire rated


Cost per SF, using small tools.
1 hour, 4" (10cm) cc@.159 SF 12.80 6.56 0.05 19.41

Structural glazed tile, 8W series, 8" x 16" - Glazed 1 side


Grade SS, 1.12 pieces per SF, costs per tile, using small tools.
2" (5cm) cc@.121 Ea 4.64 4.99 0.04 9.67
4" (10cm) cc@.125 Ea 5.05 5.16 0.04 10.25
6" (15cm) cc@.130 Ea 7.15 5.36 0.04 12.55
8" (20cm) cc@.152 Ea 8.20 6.27 0.05 14.52

Structural glazed tile, 8W series, 8" x 16" - Glazed 2 sides


Grade SS, 1.12 pieces per SF, costs per tile, using small tools.
4" (10cm) cc@.135 Ea 7.81 5.57 0.04 13.42
6" (15cm) cc@.140 Ea 11.10 5.77 0.05 16.92
8" (20cm) cc@.163 Ea 12.70 6.72 0.05 19.47

Structural glazed tile, 8W series, 8" x 16" - Special shapes


Cost per tile, using small tools.
Group 1 cc@.130 Ea 12.80 5.36 0.04 18.20
Group 2 cc@.135 Ea 16.60 5.57 0.04 22.21
Group 3 cc@.140 Ea 18.00 5.77 0.05 23.82
Group 4 cc@.147 Ea 47.80 6.06 0.05 53.91
Group 5 cc@.156 Ea 73.40 6.43 0.05 79.88

Structural glazed tile, 8W series, 8" x 16" - Fire rated


Cost per tile, using small tools.
1 hour, 4" (10cm) cc@.132 Ea 11.40 5.44 0.04 16.88

Additional costs for structural glazed tile


Add for
stacked bond with ground ends ---@--- % 5.00 10.00 -- --
Add for colors other than white ---@--- % 10.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 311

CSI 04-220, Concrete unit masonry

Back-up block, costs per square foot


Sand aggregate, 8" H x 16" L. No reinforcing included. 1.125.block per SF, using small tools.
2" (5.1cm) solid core cc@.091 SF 1.17 3.75 0.03 4.95
4" (10cm) regular core cc@.096 SF 1.54 3.96 0.03 5.53
6" (15cm) regular core cc@.108 SF 1.93 4.45 0.04 6.42
8" (21cm) regular core cc@.112 SF 2.24 4.62 0.04 6.90
10" (25cm) regular core cc@.119 SF 3.00 4.91 0.04 7.95
12" (31cm) regular core ce@.151 SF 3.13 6.09 0.05 9.27

Back-up block, costs per block


Sand aggregate, 8" H x 16" L. No reinforcing included. 1.125.block per SF, using small tools.
2" (5.1cm) solid core cc@.080 Ea 1.52 3.30 0.03 4.85
4" (10cm) regular core cc@.084 Ea 2.09 3.46 0.03 5.58
6" (15cm) regular core cc@.097 Ea 2.43 4.00 0.03 6.46
8" (21cm) regular core cc@.099 Ea 2.87 4.08 0.03 6.98
10" (25cm) regular core cc@.105 Ea 3.82 4.33 0.03 8.18
12" (31cm) regular core ce@.138 Ea 4.00 5.56 0.04 9.60

Foundation wall regular block, costs per square foot


Sand aggregate, 8" H x 16" L, regular core, no reinforcing included, using small tools.
6" (15cm) regular core cc@.105 SF 6.23 4.33 0.03 10.59
8" (21cm) regular core cc@.112 SF 7.16 4.62 0.04 11.82
10" (25cm) regular core cc@.124 SF 9.69 5.11 0.04 14.84
12" (31cm) regular core ce@.149 SF 10.20 6.01 0.05 16.26

Foundation wall solid block, costs per square foot


Sand aggregate, 8" H x 16" L, solid block, no reinforcing included, using small tools.
6" (15cm) solid cc@.108 SF 8.34 4.45 0.04 12.83
8" (21cm) solid cc@.117 SF 9.86 4.83 0.04 14.73
10" (25cm) solid cc@.129 SF 12.10 5.32 0.04 17.46
12" (31cm) solid ce@.170 SF 13.10 6.85 0.05 20.00

Foundation wall regular block, costs per block


Sand aggregate, 8" H x 16" L, regular core, no reinforcing included, using small tools.
6" (15cm) regular cc@.093 Ea 2.73 3.84 0.03 6.60
8" (21cm) regular cc@.100 Ea 3.15 4.12 0.03 7.30
10" (25cm) regular cc@.110 Ea 4.26 4.54 0.04 8.84
12" (31cm) regular cc@.120 Ea 4.46 4.95 0.04 9.45

Foundation wall solid block, costs per block


Sand aggregate, 8" H x 16" L, solid block, no reinforcing included, using small tools.
6" (15cm) solid cc@.096 Ea 3.67 3.96 0.03 7.66
8" (21cm) solid cc@.104 Ea 4.33 4.29 0.03 8.65
10" (25cm) solid cc@.115 Ea 5.33 4.74 0.04 10.11
12" (31cm) solid ce@.151 Ea 5.74 6.09 0.05 11.88

Regular core light weight partition block, cost per square foot
Light weight, 8" H x 16" L, regular core, no reinforcing included, using small tools.
4" (10cm) regular cc@.106 SF 1.60 4.37 0.03 6.00
6" (15cm) regular cc@.115 SF 2.10 4.74 0.04 6.88
8" (21cm) regular cc@.124 SF 2.66 5.11 0.04 7.81
10" (25cm) regular cc@.129 SF 3.79 5.32 0.04 9.15
12" (31cm) regular ce@.161 SF 4.06 6.49 0.05 10.60
2015 Heavy Construction Estimator, All Rights Reserved Page 311 (part 2)

Solid core light weight partition block, cost per square foot
Light weight, 8" H x 16" L, solid block, no reinforcing included, using small tools.
4" (10cm) solid cc@.109 SF 2.28 4.50 0.04 6.82
6" (15cm) solid cc@.120 SF 3.22 4.95 0.04 8.21
8" (21cm) solid cc@.127 SF 4.19 5.24 0.04 9.47
10" (25cm) solid cc@.133 SF 5.56 5.49 0.04 11.09
2015 Heavy Construction Estimator, All Rights Reserved Page 312

12" (31cm) solid ce@.167 SF 6.08 6.73 0.05 12.86

Regular core normal weight partition block, cost per square foot
Normal weight, 8" H x 16" L, regular core, no reinforcing included, using small tools.
4" (10cm) regular cc@.109 SF 1.41 4.50 0.04 5.95
6" (15cm) regular cc@.120 SF 1.61 4.95 0.04 6.60
8" (21cm) regular cc@.127 SF 1.85 5.24 0.04 7.13
10" (25cm) regular cc@.133 SF 3.55 5.49 0.04 9.08
12" (31cm) regular ce@.167 SF 3.66 6.73 0.05 10.44

Solid core normal weight partition block, cost per square foot
Normal weight, 8" H x 16" L, solid block, no reinforcing included, using small tools.
4" (10cm) solid cc@.112 SF 1.91 4.62 0.04 6.57
6" (15cm) solid cc@.124 SF 2.65 5.11 0.04 7.80
8" (21cm) solid cc@.131 SF 3.40 5.40 0.04 8.84
10" (25cm) solid cc@.138 SF 4.50 5.69 0.05 10.24
12" (31cm) solid ce@.172 SF 4.87 6.93 0.06 11.86

Regular core light weight partition block, cost per block


Light weight, 8" H x 16" L, regular core, no reinforcing included, using small tools.
4" (10cm) regular cc@.095 Ea 1.42 3.92 0.03 5.37
6" (15cm) regular cc@.102 Ea 1.87 4.21 0.03 6.11
8" (21cm) regular cc@.110 Ea 2.37 4.54 0.04 6.95
10" (25cm) regular cc@.115 Ea 3.36 4.74 0.04 8.14
12" (31cm) regular ce@.143 Ea 3.60 5.76 0.05 9.41

Solid core light weight partition block, cost per block


Light weight, 8" H x 16" L, solid core, no reinforcing included, using small tools.
4" (10cm) solid cc@.097 Ea 2.01 4.00 0.03 6.04
6" (15cm) solid cc@.107 Ea 2.84 4.41 0.04 7.29
8" (21cm) solid cc@.113 Ea 3.67 4.66 0.04 8.37
10" (25cm) solid cc@.119 Ea 4.89 4.91 0.04 9.84
12" (31cm) solid ce@.148 Ea 5.36 5.96 0.05 11.37

Regular core sand aggregate partition block, cost per block


Sand aggregate, 8" H x 16" L, regular core, no reinforcing included, using small tools.
4" (10cm) regular cc@.097 Ea 1.24 4.00 0.03 5.27
6" (15cm) regular cc@.107 Ea 1.41 4.41 0.04 5.86
8" (21cm) regular cc@.113 Ea 1.63 4.66 0.04 6.33
10" (25cm) regular cc@.119 Ea 3.13 4.91 0.04 8.08
12" (31cm) regular ce@.148 Ea 3.24 5.96 0.05 9.25

Solid core sand aggregate partition block, cost per block


Sand aggregate, 8" H x 16" L, solid core, no reinforcing included, using small tools.
4" (10cm) solid cc@.100 Ea 1.68 4.12 0.03 5.83
6" (15cm) solid cc@.110 Ea 2.34 4.54 0.04 6.92
8" (21cm) solid cc@.117 Ea 2.97 4.83 0.04 7.84
10" (25cm) solid cc@.122 Ea 3.96 5.03 0.04 9.03
12" (31cm) solid ce@.153 Ea 4.27 6.17 0.05 10.49

Split face concrete block, 8" L x 16" H - Plain or scored


Costs per square foot, using small tools.
4" (10cm) cc@.133 SF 3.51 5.49 0.04 9.04
6" (15cm) cc@.150 SF 4.11 6.19 0.05 10.35
8" (21cm) cc@.159 SF 5.11 6.56 0.05 11.72
10" (25cm) cc@.168 SF 5.96 6.93 0.06 12.95
12" (31cm) ce@.208 SF 6.28 8.38 0.07 14.73
2015 Heavy Construction Estimator, All Rights Reserved Page 312 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 313

Split face concrete block, 8" L x 16" H - Ground face


Costs per square foot, using small tools.
4" (10cm) cc@.133 SF 5.43 5.49 0.04 10.96
6" (15cm) cc@.150 SF 6.15 6.19 0.05 12.39
8" (21cm) cc@.159 SF 7.28 6.56 0.05 13.89
10" (25cm) cc@.168 SF 8.03 6.93 0.06 15.02
12" (31cm) ce@.208 SF 8.79 8.38 0.07 17.24

Split face concrete block, 8" L x 16" H - Plain or scored


Costs per block, using small tools.
4" (10cm) cc@.119 Ea 3.11 4.91 0.04 8.06
6" (15cm) cc@.133 Ea 3.70 5.49 0.04 9.23
8" (21cm) cc@.141 Ea 4.55 5.82 0.05 10.42
10" (25cm) cc@.150 Ea 5.30 6.19 0.05 11.54
12" (31cm) ce@.185 Ea 5.59 7.46 0.06 13.11

Split face concrete block, 8" L x 16" H - Ground face


Costs per block, using small tools.
4" (10cm) cc@.119 Ea 4.80 4.91 0.04 9.75
6" (15cm) cc@.133 Ea 5.46 5.49 0.04 10.99
8" (21cm) cc@.141 Ea 6.46 5.82 0.05 12.33
10" (25cm) cc@.150 Ea 7.15 6.19 0.05 13.39
12" (31cm) ce@.185 Ea 7.78 7.46 0.06 15.30

Profile unit concrete block, 8" H x 16" L - Split rib, 1" (25mm) deep ribs
1" (25mm) deep ribs, costs per square foot, using small tools.
4" (10cm) cc@.129 SF 3.54 5.32 0.04 8.90
6" (15cm) cc@.140 SF 4.26 5.77 0.05 10.08
8" (21cm) cc@.150 SF 4.99 6.19 0.05 11.23
10" (25cm) cc@.159 SF 5.71 6.56 0.05 12.32
12" (31cm) cc@.165 SF 6.44 6.81 0.05 13.30

Profile unit concrete block, 8" H x 16" L - Hexagonal face


Costs per square foot, using small tools.
4" (10cm) hollow cc@.133 SF 4.02 5.49 0.04 9.55
4" (10cm) solid cc@.150 SF 4.75 6.19 0.05 10.99

Profile unit concrete block, 8" H x 16" L - Split rib


1" deep ribs, costs per block, using small tools.
4" (10cm) cc@.115 Ea 3.14 4.74 0.04 7.92
6" (15cm) cc@.124 Ea 3.78 5.11 0.04 8.93
8" (21cm) cc@.133 Ea 4.44 5.49 0.04 9.97
10" (25cm) cc@.141 Ea 5.07 5.82 0.05 10.94
12" (31cm) cc@.146 Ea 5.73 6.02 0.05 11.80

Profile unit concrete block, 8" H x 16" L - Hexagonal face


Cost per block, using small tools.
4" (10cm) hollow cc@.119 Ea 3.57 4.91 0.04 8.52
4" (10cm) solid cc@.133 Ea 4.22 5.49 0.04 9.75

High strength 3,500 PSI concrete block, 8" H x 16" L


Cost per square foot, using small tools.
2" (51mm) cc@.104 SF 1.67 4.29 0.03 5.99
4" (10cm) cc@.109 SF 1.91 4.50 0.04 6.45
6" (15cm) cc@.120 SF 2.47 4.95 0.04 7.46
2015 Heavy Construction Estimator, All Rights Reserved Page 313 (part 2)

8" (21cm) cc@.127 SF 2.92 5.24 0.04 8.20


10" (25cm) cc@.136 SF 4.06 5.61 0.04 9.71
12" (31cm) cc@.140 SF 4.27 5.77 0.05 10.09

High strength 3,500 PSI concrete block, 8" H x 16" L


Cost per block, using small tools.
2" (51mm) cc@.092 Ea 1.51 3.79 0.03 5.33
4" (10cm) cc@.097 Ea 1.70 4.00 0.03 5.73
6" (15cm) cc@.107 Ea 2.15 4.41 0.04 6.60
2015 Heavy Construction Estimator, All Rights Reserved Page 314

8" (21cm) cc@.113 Ea 2.60 4.66 0.04 7.30


10" (25cm) cc@.120 Ea 3.64 4.95 0.04 8.63
12" (31cm) cc@.124 Ea 3.82 5.11 0.04 8.97

Solar screen concrete block


Cost per square foot, using small tools.
6" x 6" x 4" (10cm), 3.68 per SF cc@.233 SF 3.22 9.61 0.08 12.91
8" x 8" x 4" (10cm), 2.15 per SF cc@.156 SF 2.49 6.43 0.05 8.97
12" x 12" x 4" (10cm), 1 per SF cc@.140 SF 3.62 5.77 0.05 9.44
8" x 16" x 8" (21cm), 1.125 per SF cc@.127 SF 3.94 5.24 0.04 9.22

Solar screen concrete block


Cost per block, using small tools.
6" x 6" x 4" (10cm) cc@.058 Ea 0.88 2.39 0.02 3.29
8" x 8" x 4" (10cm) cc@.069 Ea 1.16 2.85 0.02 4.03
8" x 16" x 8" (21cm) cc@.113 Ea 3.51 4.66 0.04 8.21
12" x 12" x 4" (10cm) cc@.140 Ea 3.62 5.77 0.05 9.44

Bond beam or lintel block, 8" L x 16" H, cost per linear foot
No grout or reinforcing included, using small tools.
6" (15cm) regular cc@.080 LF 1.35 3.30 0.03 4.68
8" (21cm) regular cc@.088 LF 1.72 3.63 0.03 5.38
12" (31cm) regular ce@.115 LF 2.38 4.64 0.04 7.06
6" (15cm) light weight cc@.078 LF 1.61 3.22 0.03 4.86
8" (21cm) light weight cc@.085 LF 1.93 3.51 0.03 5.47
12" (31cm) light weight ce@.111 LF 2.93 4.47 0.04 7.44

Bond beam or lintel block, 8" L x 16" H, cost per block


using small tools.
6" (15cm) regular cc@.089 Ea 1.82 3.67 0.03 5.52
8" (21cm) regular cc@.098 Ea 2.28 4.04 0.03 6.35
12" (31cm) regular cc@.128 Ea 3.17 5.28 0.04 8.49
6" (15cm) light weight cc@.088 Ea 2.14 3.63 0.03 5.80
8" (21cm) light weight cc@.095 Ea 2.57 3.92 0.03 6.52
12" (31cm) light weight cc@.124 Ea 3.89 5.11 0.04 9.04

Additional costs for concrete masonry


Add for special colors ---@--- % 13.00 -- -- --
Add for stacked bond ---@--- % -- 26.00 -- --
Add for bullnose block ---@--- % 11.00 -- -- --
Add for grout fill
and 2 number 5 rebar in cores ---@--- % 100.00 50.00 -- --
Add for
work on 2nd through 4th story ---@--- % 3.00 15.00 -- --
Add for
work on 5th through 6th story ---@--- % 5.00 20.00 -- --

CSI 04-221, Glazed concrete unit masonry

Glazed block, 8" x 16" - Glazed one face, cost per square foot
Using small tools.
4" (10cm) thick cc@.129 SF 8.70 5.32 0.04 14.06
6" (15cm) thick cc@.142 SF 9.12 5.86 0.05 15.03
8" (21cm) thick cc@.150 SF 9.69 6.19 0.05 15.93
10" (25cm) thick cc@.159 SF 10.30 6.56 0.05 16.91
12" (31cm) thick ce@.196 SF 10.80 7.90 0.06 18.76
2015 Heavy Construction Estimator, All Rights Reserved Page 314 (part 2)

Glazed block, 8" x 16" - Glazed on one face, costs per block
Using small tools.
4" (10cm) thick cc@.115 Ea 7.66 4.74 0.04 12.44
6" (15cm) thick cc@.127 Ea 8.03 5.24 0.04 13.31
8" (21cm) thick cc@.133 Ea 8.53 5.49 0.04 14.06
10" (25cm) thick cc@.141 Ea 9.04 5.82 0.05 14.91
12" (31cm) thick ce@.174 Ea 9.49 7.01 0.06 16.56

Glazed block, 8" x 16" - Glazed on two faces, costs per square foot
Using small tools.
4" (10cm) thick cc@.147 SF 15.00 6.06 0.05 21.11
6" (15cm) thick cc@.159 SF 15.40 6.56 0.05 22.01
2015 Heavy Construction Estimator, All Rights Reserved Page 315

8" (21cm) thick cc@.175 SF 16.40 7.22 0.06 23.68

Glazed block, 8" x 16" - Glazed on two faces, cost per block
Using small tools.
4" (10cm) thick cc@.131 Ea 13.20 5.40 0.04 18.64
6" (15cm) thick cc@.141 Ea 13.50 5.82 0.05 19.37
8" (21cm) thick cc@.156 Ea 14.50 6.43 0.05 20.98

Glazed block cove base, 8" (21cm) high


Using small tools.
2" (51mm) thick cc@.168 LF 10.30 6.93 0.06 17.29
4" (10cm) thick cc@.183 LF 10.50 7.55 0.06 18.11
6" (15cm) thick cc@.200 LF 11.00 8.25 0.07 19.32
8" (21cm) thick cc@.215 LF 11.50 8.87 0.07 20.44

Glazed block corner, bullnose or square


Using small tools.
2" (51mm) thick cc@.133 Ea 19.70 5.49 0.04 25.23
4" (10cm) thick cc@.147 Ea 23.60 6.06 0.05 29.71
6" (15cm) thick cc@.162 Ea 26.20 6.68 0.05 32.93
8" (21cm) thick cc@.168 Ea 24.90 6.93 0.06 31.89
10" (25cm) thick cc@.175 Ea 46.00 7.22 0.06 53.28
12" (31cm) thick ce@.217 Ea 51.40 8.75 0.07 60.22

Additional cost for glazed concrete block


Add for special shapes ---@--- % 100.00 -- -- --
Add for work
on 2nd through 4th stories ---@--- % 3.00 15.00 -- --
Add for work
on 5th through 6th stories ---@--- % 5.00 20.00 -- --

CSI 04-222, Precast structural units for masonry construction

Precast stock lintels, 4" (10cm) wide x 8" (20cm) high


Using small tools.
4' to 5' (1.5m) long ca@.103 LF 7.19 4.19 0.03 11.41
5' to 12' (3.7m) long ca@.090 LF 9.72 3.66 0.03 13.41

Precast stock lintels 6" (15cm) wide x 8" (21cm) high


Using small tools.
To 5' (1.5m) long ca@.109 LF 11.10 4.43 0.03 15.56
5' to 12' (3.7m) long ca@.095 LF 13.50 3.86 0.03 17.39

Precast stock lintels 8" (21cm) wide x 8" (21cm) high


Using small tools.
To 5' (1.5m) long ca@.120 LF 17.00 4.88 0.04 21.92
5' to 12' (3.7m) long ca@.103 LF 18.30 4.19 0.03 22.52

Solid stock lintels 8" (21cm) wide x 12" (31cm) high


Using a 20-ton hydraulic crane with 70’ boom and small tools.
To 5' (1.5m) long cg@.299 LF 16.90 12.14 2.43 31.47
5' to 12' (3.7m) long cg@.287 LF 14.50 11.65 2.33 28.48

Solid stock lintels 12" (31cm) wide x 12" (31cm) high


Using a 20-ton hydraulic crane with 70’ boom and small tools.
To 5' (1.5m) long cg@.315 LF 25.30 12.79 2.56 40.65
2015 Heavy Construction Estimator, All Rights Reserved Page 315 (part 2)

5' to 12' (3.7m) long cg@.301 LF 21.70 12.22 2.45 36.37

Solid stock lintels 12" (31cm) wide x 16" (41cm) high


Using a 20-ton hydraulic crane with 70’ boom and small tools.
To 5' (1.5m) long cg@.317 LF 33.80 12.87 2.58 49.25
5' to 12' (3.7m) long cg@.305 LF 29.00 12.38 2.48 43.86

Stock lintels, long span type, U-shaped


Using a 20-ton hydraulic crane with 70’ boom and small tools.
To 14' (4.3m) long cg@.103 LF 63.40 4.18 0.84 68.42
14' to 19' (5.8m) long cg@.095 LF 63.40 3.86 0.77 68.03

Steel angles and plates for masonry


Using small tools.
Minimum b7@.010 LB 2.14 0.45 -- 2.59
Maximum b7@.020 LB 3.21 0.90 0.01 4.12
2015 Heavy Construction Estimator, All Rights Reserved Page 316

Steel angle lintels, various size


Using small tools.
3" x 3" x 1/4" b8@.040 LF 1.09 1.79 0.01 2.89
3" x 3-1/2" x 1/4" b8@.042 LF 1.35 1.88 0.01 3.24
3" x 4" x 3/8" b8@.044 LF 1.89 1.97 0.01 3.87
3-1/2" x 4" x 3/8" b8@.048 LF 2.08 2.15 0.02 4.25
4" x 4" x 3/8" b8@.050 LF 2.12 2.24 0.02 4.38
5" x 3-1/2" x 3/8" b8@.057 LF 2.55 2.56 0.02 5.13
6" x 3-1/2" x 3/8" b8@.067 LF 3.19 3.01 0.02 6.22
6" x 4" x 1/2" b8@.071 LF 4.05 3.18 0.02 7.25
Add for buildup angles --@.000 LF 1.11 -- -- 1.11

Formed steel lintels for masonry - 3-1/2", 12 gauge


Using small tools.
2.5’ (.76m)l b7@.200 Ea 4.44 8.97 0.07 13.48
4.5’ (1.35m)l b7@.222 Ea 21.00 9.96 0.08 31.04

Formed steel lintels for masonry - 4-1/2" x 3-1/2", 9 gauge


Using small tools.
5’ (1.5m) b7@.250 Ea 22.50 11.21 0.09 33.80
9’ (2.7m) b7@.286 Ea 47.30 12.83 0.10 60.23

Coping

Precast concrete stock coping units


Using small tools.
6" (15cm) wide ca@.300 LF 17.30 12.20 0.09 29.59
10" (25cm) wide ca@.327 LF 33.00 13.29 0.10 46.39
14" (36cm) wide ca@.327 LF 42.00 13.29 0.10 55.39

Window sills - Stock section sills


Using small tools.
6" (15cm) wide ca@.200 LF 17.30 8.13 0.06 25.49
10" (25cm) wide ca@.212 LF 33.00 8.62 0.07 41.69
14" (36cm) wide ca@.212 LF 42.00 8.62 0.07 50.69

CSI 04-235, Preassembled masonry panels

Preassembled masonry panels - 4" (10cm) thick wall


Including brick, epoxy mortar and hoisting, using a 40-ton hydraulic crane with 84’ boom and small
tools.
Minimum ql@.083 SF 7.23 3.92 0.97 12.12
Maximum ql@.128 SF 10.10 6.05 1.49 17.64
Add for 2
inch (51mm) concrete back-up ---@--- % 50.00 -- -- --
Add for 1 inch (25mm) urethane plus 3
inch (75mm) concrete back up ---@--- % 75.00 -- -- --

CSI 04-240, Clay backing and partition tile

Terra cotta partition or back up tile, 12" x 12" - Non-load bearing, in walls
12" x 12" scored face, using small tools.
4" (10cm) thick cc@.084 SF 5.47 3.46 0.03 8.96
6" (15cm) thick cc@.093 SF 5.64 3.84 0.03 9.51
8" (21cm) thick cc@.105 SF 7.25 4.33 0.03 11.61
2015 Heavy Construction Estimator, All Rights Reserved Page 316 (part 2)

10" (25cm) thick cc@.120 SF 7.89 4.95 0.04 12.88

Terra cotta partition or back up tile, 12" x 12" - Load bearing, in walls
12" x 12", scored face, using small tools.
4" (10cm) thick cc@.084 SF 5.64 3.46 0.03 9.13
6" (15cm) thick cc@.093 SF 5.80 3.84 0.03 9.67
8" (21cm) thick cc@.105 SF 7.33 4.33 0.03 11.69
10" (25cm) thick cc@.120 SF 8.07 4.95 0.04 13.06
12" (31cm) thick cc@.140 SF 9.79 5.77 0.05 15.61

Terra cotta partition or back up tile, 12" x 12" - In floors


12" x 12", scored, using small tools.
4" (10cm) thick cc@.056 SF 5.64 2.31 0.02 7.97
6" (15cm) thick cc@.062 SF 5.80 2.56 0.02 8.38
8" (21cm) thick cc@.073 SF 7.33 3.01 0.02 10.36
10" (25cm) thick cc@.084 SF 8.07 3.46 0.03 11.56
2015 Heavy Construction Estimator, All Rights Reserved Page 317

12" (31cm) thick cc@.093 SF 9.79 3.84 0.03 13.66


Add for
smooth tile instead of scored ---@--- % 30.00 -- -- --
Add for tile
reinforced with steel rods ---@--- % 15.00 5.00 -- --
Add for
less than carload quantities ---@--- % 10.00 10.00 -- --

CSI 04-251, Terra cotta veneer

Terra cotta coping (veneer)


Using small tools.
8" to 9" wide x 3" thick coping ca@.327 LF 6.94 13.29 0.10 20.33
12" to 13" wide x 3" thick coping ca@.327 LF 11.70 13.29 0.10 25.09

CSI 04-270, Glass unit masonry

Glass block, 4" (10cm) thick, plain - Under 1,000 SF (93m2) order
Using small tools.
6" x 6" cc@.400 SF 12.30 16.50 0.13 28.93
8" x 8" cc@.280 SF 9.10 11.55 0.09 20.74
12" x 12" cc@.255 SF 10.80 10.52 0.08 21.40
6" x 6" cc@.100 Ea 2.89 4.12 0.03 7.04
8" x 8" cc@.124 Ea 3.81 5.11 0.04 8.96
12" x 12" cc@.255 Ea 10.20 10.52 0.08 20.80

Glass block, 4" (10cm) thick, plain - 1,000 SF (93m2) to 5,000 SF (465m2) order
Using small tools.
6" x 6" cc@.336 SF 11.00 13.86 0.11 24.97
8" x 8" cc@.240 SF 8.19 9.90 0.08 18.17
12" x 12" cc@.210 SF 9.69 8.66 0.07 18.42
6" x 6" cc@.084 Ea 2.60 3.46 0.03 6.09
8" x 8" cc@.107 Ea 3.43 4.41 0.04 7.88
12" x 12" cc@.210 Ea 9.14 8.66 0.07 17.87

Glass block, 4" (10cm) thick, plain - Over 5,000 SF (465m2) order
Using small tools.
6" x 6" cc@.311 SF 10.80 12.83 0.10 23.73
8" x 8" cc@.210 SF 8.01 8.66 0.07 16.74
12" x12" cc@.187 SF 9.47 7.71 0.06 17.24
6" x 6" cc@.078 Ea 2.54 3.22 0.03 5.79
8" x 8" cc@.093 Ea 3.35 3.84 0.03 7.22
12" x12" cc@.187 Ea 8.93 7.71 0.06 16.70

Additional costs for glass block


Add for suntrol blocks ---@--- % 15.00 -- -- --
Add for chiaro or intaglio blocks ---@--- % 20.00 -- -- --
For sculptured
blocks add to material ---@--- % 35.00 -- -- --
Add for colored glass ---@--- % 20.00 -- -- --

CSI 04-285, Sound absorbing unit masonry

Acoustical slotted concrete block, NRC


By sound transmission category, using small tools.
NRC .50 , 4" thick (10cm) Type "A" cc@.133 SF 4.53 5.49 0.04 10.06
NRC .65 , 4" thick (10cm) Type "R" cc@.137 SF 4.53 5.65 0.05 10.23
2015 Heavy Construction Estimator, All Rights Reserved Page 317 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 318

NRC .50 , 6" thick (15cm) Type "A" cc@.145 SF 4.70 5.98 0.05 10.73
NRC .65 , 6" thick (15cm) Type "R" cc@.146 SF 6.35 6.02 0.05 12.42
NRC 45 ,
8" thick (15cm) Type "A-1" cc@.151 SF 5.29 6.23 0.05 11.57
NRC .55 , 8" thick (21cm) Type "Q" cc@.153 SF 6.52 6.31 0.05 12.88
NRC .60 , 8" thick (21cm) Type "R" cc@.155 SF 6.52 6.39 0.05 12.96
NRC 65 , 8" thick (21cm) Type "RR" cc@.157 SF 6.69 6.48 0.05 13.22
NRC .70 , 12" thick (27cm) Type "R" cc@.163 SF 6.95 6.72 0.05 13.72
.65 to .75 , 4" thick (10cm),
filled cavities cc@.137 SF 8.62 5.65 0.05 14.32
.50 to .60 , 8" thick (21cm),
filled cavities cc@.153 SF 7.32 6.31 0.05 13.68
.60 to .75 , 8" thick (21cm),
filled cavities cc@.157 SF 8.35 6.48 0.05 14.88
Add for special colors ---@--- % 9.00 -- -- --
Add for stacked bond ---@--- % -- 10.00 -- --

CSI 04-286, Sound absorbing structural glazed tile

Sound absorbing structural glazed tile - 6T series


Using small tools.
4" (10cm) thick cc@.233 SF 17.90 9.61 0.08 27.59
6" (15cm) thick cc@.247 SF 20.00 10.19 0.08 30.27
8" (21cm) thick cc@.290 SF 23.20 11.96 0.10 35.26

Sound absorbing structural glazed tile - 8T series


Using small tools.
4" (10cm) thick cc@.159 SF 33.60 6.56 0.05 40.21
6" (15cm) thick cc@.165 SF 39.90 6.81 0.05 46.76
8" (21cm) thick cc@.205 SF 46.00 8.45 0.07 54.52

CSI 04-410, Stone

Rough stone - Rubble stone walls


Using small tools.
Set in mortar bed,
up to 18" (46cm) thick ca@.412 CF 13.40 16.75 0.13 30.28
Set in mortar bed,
over 18" (46cm) thick ca@.431 CF 16.00 17.52 0.13 33.65

Rough stone - Ashlar veneer


Random size, square cut, typical prices, using small tools.
4" (10cm) thick cc@.323 SF 17.50 13.32 0.11 30.93
6" (15cm) thick cc@.323 SF 26.20 13.32 0.11 39.63

CSI 04-422, Marble

Italian marble - Facing panels


See delivery costs below. Maximum size 3’ (91cm) x 1.5’ (46cm), using a 20-ton hydraulic crane with
70’ boom and small tools.
3/4" (19mm) cg@.413 SF 25.90 16.76 3.36 46.02
1-1/2" (37mm) cg@.424 SF 32.80 17.21 3.45 53.46
2-1/4" (57mm) cg@.500 SF 39.70 20.30 4.07 64.07

Italian marble - Column bases, 1" (25mm) thick


Using small tools.
4" (10cm ) high ca@.984 LF 9.83 40.00 0.31 50.14
2015 Heavy Construction Estimator, All Rights Reserved Page 318 (part 2)

6" (15cm) high ca@1.07 LF 13.60 43.50 0.33 57.43

Italian marble - Columns


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Plain faced, solid cg@38.2 CY 1,740.00 1,551.00 311.00 3,602.00
Fluted, solid, carved cg@38.2 CY 3,620.00 1,551.00 311.00 5,482.00

Italian marble - Flooring


Using small tools.
Travertine ca@.257 SF 8.28 10.45 0.08 18.81
12 x 12" x 1/2" (13mm) standard size,
uniform color ca@.327 SF 10.80 13.29 0.10 24.19
Special design, multi-color,
no circular work ca@.360 SF 13.10 14.63 0.11 27.84

Italian marble - Stairs


Using small tools.
Stair treads, 12" (31cm) cc@.350 LF 28.20 14.43 0.12 42.75
2015 Heavy Construction Estimator, All Rights Reserved Page 319

Stair risers, 6" (15cm) wide cc@.280 LF 21.50 11.55 0.09 33.14

Italian marble - Miscellaneous items


Using small tools.
Plain threshold, 3' (91cm) long x 4-6" (15cm)
wide x 7/8" (22mm) thick ca@.563 Ea 29.90 22.89 0.17 52.96
Beveled threshold, 3' (91cm) long x 4-6" (15cm)
wide x 7/8" (22mm) thick ca@.563 Ea 43.70 22.89 0.17 66.76
Window sill, 6"
(15cm) wide x 2" (51mm) thick ca@.212 LF 42.00 8.62 0.07 50.69
Polished window stool, 5" (15cm)
wide x 7/8" (22mm) thick ca@.258 LF 12.60 10.49 0.08 23.17

Additional costs for marble work


Add for shipping to 30 miles (50km) ---@--- % .60 -- -- --
Add for
shipping to 60 miles (100km) ---@--- % 1.20 -- -- --
Add for
shipping to 300 miles (500km) ---@--- % 6.00 -- -- --
Add for shipping
to 600 miles (1,000km) ---@--- % 12.00 -- -- --

CSI 04-423, Limestone panels

Smooth limestone panels, up to 12' (3.7m) x 5' (1.5m)


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2" ( 51mm) thick cg@.435 SF 18.70 17.66 3.54 39.90
3" (76mm) thick cg@.455 SF 23.20 18.47 3.70 45.37
4" (10cm) thick cg@.500 SF 30.20 20.30 4.07 54.57

Ashlar veneer limestone, random, medium priced stone


Using small tools.
4" (10cm) thick cc@.323 SF 17.90 13.32 0.11 31.33

Miscellaneous limestone items


Using small tools.
14" (36cm) wide x 6" (15cm) deep,
steps, extra hard ca@.400 LF 44.20 16.26 0.12 60.58
Coping, smooth finish ca@.900 CF 44.00 36.59 0.28 80.87
Sill, lintel,
jamb, etc., smooth finish ca@1.20 CF 48.00 48.78 0.37 97.15

Quoins, plain finish


Using small tools.
6"x12"x12" ca@1.23 Ea 109.00 50.00 0.38 159.38
6"x16"x24" ca@1.28 Ea 144.00 52.03 0.40 196.43

Additional costs for limestone panels


Add for shipping to 30 miles (50km) ---@--- % 1.00 -- -- --
Add for
shipping to 60 miles (100km) ---@--- % 2.00 -- -- --
Add for
shipping to 300 miles (500km) ---@--- % 20.00 -- -- --
Add for shipping
to 600 miles (1,000km) ---@--- % 40.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 320

CSI 04-424, Granite panels

Polished granite veneer facing panels


Using a 20-ton hydraulic crane with 70’ boom and small tools.
7/8" (22mm) thick, black cg@.417 SF 36.30 16.93 3.39 56.62
7/8" (22mm) thick, gray cg@.417 SF 30.50 16.93 3.39 50.82

Other granite items


Using small tools.
4" (10cm) high, base ca@.171 LF 13.50 6.95 0.05 20.50
6" (15cm) high, base ca@.225 LF 16.20 9.15 0.07 25.42
6" (15cm) high x 16" (41cm) straight curb,
city type ca@.277 LF 15.00 11.26 0.09 26.35
More than 5' (1.5m) radius curb ca@.462 LF 18.30 18.78 0.14 37.22

Granite pavers, 4" x 4" (10cm)


Using small tools.
Grey, split face finish ca@.277 SF 24.40 11.26 0.09 35.75
Pink, split face finish ca@.277 SF 23.80 11.26 0.09 35.15
Black, split face finish ca@.277 SF 23.60 11.26 0.09 34.95

Building granite
Machine finish for steps, coping, platforms, etc, using small tools.
Minimum cost cc@.840 CF 31.10 34.64 0.28 66.02
Average cost cc@.933 CF 34.10 38.48 0.31 72.89
Maximum cost cc@1.05 CF 36.80 43.30 0.35 80.45

Additional costs for granite


Add for shipping to 30 miles (50km) ---@--- % 1.00 -- -- --
Add for
shipping to 60 miles (100km) ---@--- % 1.50 -- -- --
Add for
shipping to 300 miles (500km) ---@--- % 5.00 -- -- --
Add for shipping
to 600 miles (1000km) ---@--- % 10.00 -- -- --

CSI 04-426, Slate

Slate panels, 3' (91cm) to 6' (1.8m)


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1" (25mm) thick cg@.417 SF 17.40 16.93 3.39 37.72
2" (51mm) thick cg@.417 SF 28.60 16.93 3.39 48.92

Slate sills or stools, 1" thick


Sand finish, 1" (25mm) thick, using small tools.
6" (15cm) wide ca@.212 LF 9.20 8.62 0.07 17.89
10" (25cm) wide ca@.212 LF 16.30 8.62 0.07 24.99

Slate sills or stools, 2" thick


Sand finish, 2" (51mm) thick, using small tools.
6" (15cm) wide ca@.212 LF 15.30 8.62 0.07 23.99
10" (25cm) wide ca@.212 LF 30.70 8.62 0.07 39.39

CSI 04-510, Masonry cleaning


2015 Heavy Construction Estimator, All Rights Reserved Page 320 (part 2)

Washing brick
using small tools.
Smooth brick b7@.018 SF 0.22 0.81 0.01 1.04
Rough brick b7@.024 SF 0.26 1.08 0.01 1.35
Add for muriatic acid --@.000 Gallon 16.40 -- -- 16.40

Steam cleaning masonry, including typical scaffolding


Using miscellaneous power tools and small tools.
Smooth face, minimum cb@.025 SF 0.47 0.96 0.04 1.47
Smooth face, maximum cb@.038 SF 0.71 1.46 0.06 2.23
Brick face, common cb@.032 SF 0.47 1.23 0.05 1.75
Brick face, wire cut cb@.040 SF 0.61 1.53 0.07 2.21

Sand blasting building face, with pedestrian protection


Using a 375 CFM, 100 PSI compressor.
Day shift cf@.080 SF 2.85 3.07 0.42 6.34
Night shift cf@.107 SF 3.10 4.10 0.56 7.76

Cleaning and pointing masonry


Using small tools, using a 375 CFM, 100 PSI compressor.
Brick b7@.020 SF 1.12 0.90 0.01 2.03
Block b7@.013 SF 1.03 0.58 -- 1.61
2015 Heavy Construction Estimator, All Rights Reserved Page 321

CSI 04-520, Masonry restoration

Masonry restoration, cut joint and repoint


Using small tools, using a 375 CFM, 100 PSI compressor.
Hard mortar b7@.222 SF 3.65 9.96 0.08 13.69
Soft mortar b7@.167 SF 3.43 7.49 0.06 10.98
Stone work b7@.063 LF 1.72 2.83 0.02 4.57

Masonry restoration, mask and grout


Using small tools.
Mask and grout weathered joint cd@.063 SF 3.22 2.61 0.02 5.85

Cut joint and recaulk


Using small tools.
Oil base caulking b7@.069 LF 1.96 3.10 0.02 5.08
Butyl caulking b7@.065 LF 1.96 2.92 0.02 4.90
Polysulfide caulking,
including acrylic caulking b7@.087 LF 1.96 3.90 0.03 5.89
Silicone caulking b7@.100 LF 2.20 4.49 0.03 6.72

Cement and sand grout on walls, 1/8" thick


Using small tools.
1/8" (3cm) thick, minimum cd@.028 SF 1.26 1.16 0.01 2.43
1/8" (3cm) thick, maximum cd@.037 SF 2.69 1.53 0.01 4.23

CSI 04-550, Refractories, flue liners

Rectangular flue liners


Including mortar joints, using small tools.
8" (21cm) x 8" (21cm) cd@.119 LF 2.96 4.92 0.04 7.92
8" (21cm) x 12" (31cm) cd@.133 LF 3.80 5.50 0.04 9.34
12" (31cm) x 12" (31cm) cd@.160 LF 4.86 6.62 0.05 11.53
12" (31cm) x 18" (46cm) cd@.176 LF 7.71 7.28 0.06 15.05
18" (46cm) x 18" (46cm) cd@.196 LF 11.80 8.11 0.06 19.97
16" (41cm) x 16" (41cm) cd@.220 LF 9.78 9.10 0.07 18.95
20" (51cm) x 20" (51cm) cd@.251 LF 15.80 10.38 0.08 26.26
24" (61cm) x 24" (61cm) cd@.293 LF 21.10 12.12 0.10 33.32

Round flue liners


Including mortar joints, using small tools.
18" diameter cd@.251 LF 19.50 10.38 0.08 29.96
24" diameter cd@.352 LF 31.10 14.56 0.12 45.78

==========================================================================
Metals
==========================================================================

CSI 05-120, Structural steel metal framing

Steel beams, girders and columns


Based on stock sections and standard bolted beam connections. Primed with red lead paint. Including
shop fabrication into subassemblies and delivery to the site, using a truck-mounted hydraulic crane with
115’ boom and small tools.
Average for 1 and 2 story buildings,
A-36 steel qm@12.5 Ton 1,930.00 609.60 170.00 2,709.60
2015 Heavy Construction Estimator, All Rights Reserved Page 321 (part 2)

To 30 lbs. per LF qm@14.0 Ton 3,040.00 682.80 190.00 3,912.80


30 to 65 lbs. per LF qm@11.0 Ton 2,000.00 536.50 149.00 2,685.50
65 to 100 lbs. per LF qm@9.40 Ton 1,840.00 458.40 127.00 2,425.40
100 to 300 lbs. per LF qm@8.00 Ton 1,690.00 390.20 108.00 2,188.20
Add for welded connections ---@--- % 2.00 -- -- --

Rolled C, MC steel channels


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
To 10 lbs. per LF qm@54.0 Ton 3,170.00 2,634.00 732.00 6,536.00
10 to 20 lbs. per LF qm@18.0 Ton 3,030.00 877.90 244.00 4,151.90
20 to 58 lbs. per LF qm@8.00 Ton 2,660.00 390.20 108.00 3,158.20

Rolled shape steel angles


Using small tools.
To 10 lbs. per LF qb@20.0 Ton 3,780.00 1,092.00 11.60 4,883.60
2015 Heavy Construction Estimator, All Rights Reserved Page 322

10 to 20 lbs. per LF qb@6.67 Ton 2,250.00 364.30 3.87 2,618.17


20 to 58 lbs. per LF qb@2.50 Ton 3,180.00 136.60 1.45 3,318.05

Structural WT, MT, ST tee shapes


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
To 30 lbs. per LF qm@21.3 Ton 3,430.00 1,039.00 289.00 4,758.00
30 to 65 lbs. per LF qm@7.11 Ton 2,620.00 346.80 96.40 3,063.20
65 to 100 lbs. per LF qm@4.00 Ton 2,140.00 195.10 54.20 2,389.30
100 to 365 lbs. per LF qm@2.13 Ton 1,610.00 103.90 28.90 1,742.80

Rolled double l shape steel angles


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
To 20 lbs. per LF qb@16.5 Ton 3,860.00 901.20 9.57 4,770.77
20 to 50 lbs. per LF qb@9.11 Ton 3,630.00 497.60 5.28 4,132.88
50 to 80 lbs. per LF qb@6.00 Ton 2,800.00 327.70 3.48 3,131.18
80 to 115 lbs. per LF qb@4.13 Ton 1,810.00 225.60 2.40 2,038.00

Combination section, W shapes and channels


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
To 30 lbs. per LF qm@21.3 Ton 2,710.00 1,039.00 289.00 4,038.00
30 to 65 lbs. per LF qm@7.11 Ton 2,150.00 346.80 96.40 2,593.20
65 to 100 lbs. per LF qm@4.00 Ton 1,910.00 195.10 54.20 2,159.30
100 to 500 lbs. per LF qm@1.07 Ton 1,310.00 52.18 14.50 1,376.68

Combination section, S shapes and channels


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
30 to 65 lbs. per LF qm@7.11 Ton 2,530.00 346.80 96.40 2,973.20
65 to 100 lbs. per LF qm@4.00 Ton 1,970.00 195.10 54.20 2,219.30

Combination section, channels and angles


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
To 30 lbs. per LF qm@21.3 Ton 3,430.00 1,039.00 289.00 4,758.00
30 to 65 lbs. per LF qm@7.11 Ton 2,780.00 346.80 96.40 3,223.20
65 to 100 lbs. per LF qm@4.00 Ton 2,020.00 195.10 54.20 2,269.30

Pipe columns, standard weight


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
1/2" to 5" diameter qm@64.0 Ton 1,920.00 3,121.00 868.00 5,909.00
6" to 12" diameter qm@8.00 Ton 2,360.00 390.20 108.00 2,858.20

Miscellaneous steel, extra strong


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
1/2" to 5" diameter qm@32.0 Ton 2,780.00 1,561.00 434.00 4,775.00
6" to 12" diameter qm@7.11 Ton 2,480.00 346.80 96.40 2,923.20

Column base plates, A-36 steel


Using small tools.
Up to 150 lbs. (68 kg) each qb@.005 LB 1.21 0.27 -- 1.48
Over 150 lbs. (68 kg) each qb@.007 LB 0.99 0.38 -- 1.37
Up to 150 lbs. each qb@10.0 Ton 2,430.00 546.20 5.80 2,982.00
Over 150 lbs. each qb@14.0 Ton 1,970.00 764.70 8.12 2,742.82

Pipe, double extra strong


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
2" to 5" diameter qm@10.0 Ton 2,320.00 487.70 136.00 2,943.70
6" to 8" diameter qm@8.00 Ton 2,170.00 390.20 108.00 2,668.20
2015 Heavy Construction Estimator, All Rights Reserved Page 322 (part 2)

Structural pipe, extra heavy, A-36 steel


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
3" to 5" OD qm@12.5 Ton 2,890.00 609.60 170.00 3,669.60
6" to 12" OD qm@10.0 Ton 2,720.00 487.70 136.00 3,343.70

Structural tubing, square


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
2" x 2", 4 to 6 lbs. per LF qm@10.0 Ton 2,750.00 487.70 136.00 3,373.70
2.5" x 2.5", 5 to 8 lbs. per LF qm@10.0 Ton 2,750.00 487.70 136.00 3,373.70
3" x 3", 6 to 11 lbs. per LF qm@10.0 Ton 2,750.00 487.70 136.00 3,373.70
3.5" x 3.5", 8 to 13 lbs. per LF qm@10.0 Ton 2,750.00 487.70 136.00 3,373.70
4" x 4", 10 to 22 lbs. per LF qm@10.0 Ton 2,370.00 487.70 136.00 2,993.70
5" x 5", 12 to 30 lbs. per LF qm@10.0 Ton 2,370.00 487.70 136.00 2,993.70
6" x 6", 15 to 35 lbs. per LF qm@10.0 Ton 2,370.00 487.70 136.00 2,993.70
7" x 7", 17 to 42 lbs. per LF qm@8.00 Ton 2,420.00 390.20 108.00 2,918.20
8" x 8", 20 to 60 lbs. per LF qm@8.00 Ton 2,460.00 390.20 108.00 2,958.20
10" x 10", 33 to 77 lbs. per LF qm@6.00 Ton 2,460.00 292.60 81.40 2,834.00
2015 Heavy Construction Estimator, All Rights Reserved Page 323

12" x 12", 40 to 80 lbs. per LF qm@5.50 Ton 2,460.00 268.20 74.60 2,802.80
14" x 14", 57 to 90 lbs. per LF qm@4.25 Ton 2,460.00 207.30 57.60 2,724.90
16" x 16", 65 to 105 lbs. per LF qm@4.00 Ton 2,460.00 195.10 54.20 2,709.30

Structural tube, sections, A-36 steel


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
4" to 6" wide , light square qm@10.0 Ton 2,660.00 487.70 136.00 3,283.70
4" to 6" wide , heavy square qm@10.0 Ton 2,490.00 487.70 136.00 3,113.70
6" wide or less , light rectangle qm@10.0 Ton 2,370.00 487.70 136.00 2,993.70
6" wide or less , heavy rectangle qm@10.0 Ton 2,420.00 487.70 136.00 3,043.70
More than 6" wide , light rectangle qm@8.00 Ton 2,890.00 390.20 108.00 3,388.20
More than 6" wide ,
heavy rectangular qm@6.00 Ton 2,750.00 292.60 81.40 3,124.00

Structural tubing, rectangular


Using a truck-mounted hydraulic crane with 115’ boom and small tools.
3" x 2", 5 to 7 lbs. per LF qm@10.0 Ton 2,660.00 487.70 136.00 3,283.70
4" x 3", 2", 6 to 13 lbs. per LF qm@10.0 Ton 2,660.00 487.70 136.00 3,283.70
5" x 4",2", 8 to 20 lbs. per LF qm@10.0 Ton 2,660.00 487.70 136.00 3,283.70
6" x 4",
3", 2", 9 to 29 lbs. per LF qm@10.0 Ton 2,490.00 487.70 136.00 3,113.70
7" x 5",
4", 3", 12 to 35 lbs. per LF qm@8.00 Ton 2,490.00 390.20 108.00 2,988.20
8" x 6", 4",
3", 2", 11 to 42 lbs. per LF qm@8.00 Ton 2,490.00 390.20 108.00 2,988.20
10" x 6",
4", 2", 15 to 50 lbs. per LF qm@8.00 Ton 2,490.00 390.20 108.00 2,988.20
12" x 6",
4", 2", 17 to 76 lbs. per LF qm@8.00 Ton 2,490.00 390.20 108.00 2,988.20
14" x 10",
6", 4", 29 to 76 lbs. per LF qm@6.00 Ton 2,370.00 292.60 81.40 2,744.00
16" x 12",
8", 4", 40 to 90 lbs. per LF qm@5.25 Ton 2,420.00 256.00 71.20 2,747.20
18" x 6", 48 to 76 lbs. per LF qm@5.00 Ton 2,890.00 243.90 67.80 3,201.70
20" x 12", 8",
4", 48 to 105 lbs. per LF qm@4.25 Ton 2,750.00 207.30 57.60 3,014.90

Miscellaneous structural shapes, A-36 steel


Using small tools.
Steel angles qb@12.0 Ton 1,860.00 655.40 6.96 2,522.36
Steel plates qb@8.00 Ton 2,140.00 437.00 4.64 2,581.64

Trusses, built-up
By average weight per LF of span, using a truck-mounted hydraulic crane with 115’ boom and small
tools.
To 50 LF span, 100 lbs. per LF qm@5.00 Ton 2,530.00 243.90 67.80 2,841.70
50 to 100 LF span, 120 lbs. per LF qm@4.50 Ton 2,270.00 219.50 61.00 2,550.50
100 to 200 LF span, 150 lbs. per LF qm@4.00 Ton 2,280.00 195.10 54.20 2,529.30
Over 200 LF span, 180 lbs. per LF qm@3.50 Ton 2,570.00 170.70 47.50 2,788.20

Field painting for touch-up of shop prime coat


Steel surface treatments, sand blast, onsite, using miscellaneous power tools and small tools.
Commercial c3@.026 SF 0.63 1.12 0.06 1.81
Near white c3@.029 SF 0.94 1.25 0.06 2.25
White c3@.038 SF 1.19 1.63 0.08 2.90
Alkyds (primer) c3@.005 SF 0.10 0.22 0.01 0.33
Alkyds (topcoat) c3@.006 SF 0.10 0.26 0.01 0.37
Latex (primer) c3@.004 SF 0.08 0.17 0.01 0.26
2015 Heavy Construction Estimator, All Rights Reserved Page 323 (part 2)

Latex (topcoat) c3@.006 SF 0.12 0.26 0.01 0.39


Epoxy (primer) c3@.005 SF 0.37 0.22 0.01 0.60
Epoxy (topcoat) c3@.006 SF 0.29 0.26 0.01 0.56
Type 1 red oxide c3@1.25 Ton 76.30 53.69 2.68 132.67

Connection and stiffener plates


Paints & protective coatings
Purchase cost only.
1/8" thick, 6.16 lbs. per SF --@.000 Ton 13,600.00 -- -- 13,600.00
3/16" thick, 8.71 lbs. per SF --@.000 Ton 9,620.00 -- -- 9,620.00
1/4" thick, 11.26 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
5/16" thick, 13.81 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
3/8" thick, 16.37 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
1/2" thick, 21.47 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
9/16" thick, 24.02 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
5/8" thick, 26.58 lbs. per SF --@.000 Ton 7,430.00 -- -- 7,430.00
3/4" thick, 31.68 lbs. per SF --@.000 Ton 6,680.00 -- -- 6,680.00
2015 Heavy Construction Estimator, All Rights Reserved Page 324

7/8" thick, 36.78 lbs. per SF --@.000 Ton 6,680.00 -- -- 6,680.00


1" thick, 41.89 lbs. per SF --@.000 Ton 6,680.00 -- -- 6,680.00

Welding
Using a 200-amp trailer mounted welder and small tools.
Field welding for steel items qc@.067 LF 12.70 3.48 0.24 16.42

Fillet welds, vertical position, welded up


Based on standard operating factor of 50%, using a 300-amp skid mounted welder and small tools.
3/16" weld qy@.053 LF 0.29 2.90 0.15 3.34
1/4" weld qy@.067 LF 0.43 3.66 0.18 4.27
5/16" weld qy@.101 LF 0.58 5.52 0.28 6.38
3/8" weld qy@.098 LF 0.72 5.35 0.27 6.34
7/16" weld qy@.146 LF 0.58 7.98 0.40 8.96
1/2" weld qy@.136 LF 1.01 7.43 0.37 8.81
9/16" weld qy@.196 LF 0.92 10.71 0.54 12.17
5/8" weld qy@.168 LF 1.08 9.18 0.46 10.72
3/4" weld qy@.201 LF 1.83 10.98 0.55 13.36
7/8" weld qy@.410 LF 2.05 22.39 1.12 25.56
1" weld qy@.647 LF 3.44 35.34 1.77 40.55

Fillet welds, horizontal or flat, welded up


Based on standard operating factor of 50%, using a 300-amp skid mounted welder and small tools.
3/16" weld qy@.038 LF 0.31 2.08 0.10 2.49
1/4" weld qy@.057 LF 0.46 3.11 0.16 3.73
5/16" weld qy@.075 LF 0.63 4.10 0.21 4.94
3/8" weld qy@.094 LF 0.75 5.13 0.26 6.14
7/16" weld qy@.110 LF 0.60 6.01 0.30 6.91
1/2" weld qy@.133 LF 1.06 7.26 0.36 8.68
9/16" weld qy@.151 LF 0.96 8.25 0.41 9.62
5/8" weld qy@.181 LF 1.25 9.89 0.50 11.64
3/4" weld qy@.226 LF 1.93 12.34 0.62 14.89
7/8" weld qy@.302 LF 1.93 16.50 0.83 19.26
1" weld qy@.452 LF 3.61 24.69 1.24 29.54

Standard steel accessories


Using small tools.
Welded steel studs, 3/4" x 3" am@.400 Ea 0.60 17.57 0.22 18.39
High strength bolts, 7/8" average am@.500 Ea 1.89 21.96 0.28 24.13
Beam bearing pads sq@1.60 SF 55.30 55.97 0.35 111.62

Additional costs for structural steel


Using small tools.
Bolts, washers and nuts al@.033 Lb 19.90 1.45 0.02 21.37
Add for ASTM A242
type 2 high strength steel ---@--- % 8.00 -- -- --
Add for galvanizing steel ---@--- % 28.00 -- -- --
Add for touch up of galvanizing ---@--- % -- 20.00 -- --
Add for steel
with masonry end bearing ---@--- % -- 30.00 -- --
Add for 3 through 6 story building ---@--- % -- 15.00 -- --
Add for 7 through 15 story building ---@--- % -- 28.00 -- --
Add for over 15 story building ---@--- % -- 46.00 -- --
Add for heavy construction ---@--- % -- 36.00 -- --

CSI 05-130, Structural aluminum

Structural aluminum
2015 Heavy Construction Estimator, All Rights Reserved Page 324 (part 2)

1" to 10" rolled or plate structural members, using a truck-mounted hydraulic crane with 115’ boom and
small tools.
To 2,000 lbs. (907kg) per order qm@.061 LB 2.02 2.98 0.83 5.83
2,000 to 9,999
lbs. (4,535kg) per order qm@.048 LB 1.76 2.34 0.65 4.75

Aluminum extrusions
1" to 10" rolled or plate structural members, using a truck-mounted hydraulic crane with 115’ boom and
small tools.
Stock shapes qm@.048 LB 1.96 2.34 0.65 4.95
Custom shapes qm@.048 LB 2.18 2.34 0.65 5.17
2015 Heavy Construction Estimator, All Rights Reserved Page 325

Aluminum extrusions
Using a 200-amp trailer mounted welder and small tools.
Tubular shapes qc@.067 LB 2.18 3.48 0.24 5.90

CSI 05-150, Wire rope and accessories

6 x 7 class bright wire rope


IPS (Improved Plow Steel), fiber core, under 500 LF, with accessories, using small tools.
3/16" diameter qb@.003 LF 0.42 0.16 -- 0.58
1/4" diameter qb@.003 LF 0.61 0.16 -- 0.77
5/16" diameter qb@.003 LF 0.78 0.16 -- 0.94
3/8" diameter qb@.004 LF 0.95 0.22 -- 1.17
7/16" diameter qb@.006 LF 1.13 0.33 -- 1.46
1/2" diameter qb@.008 LF 1.29 0.44 -- 1.73
9/16" diameter qb@.010 LF 1.54 0.55 0.01 2.10
5/8" diameter qb@.012 LF 1.73 0.66 0.01 2.40
3/4" diameter qb@.017 LF 2.25 0.93 0.01 3.19

6 x 19 class bright wire rope


IPS (Improved Plow Steel), IWRC (Independent Wire Rope Center), under 500 LF, with accessories,
using small tools.
1/4" diameter qb@.002 LF 1.07 0.11 -- 1.18
5/16" diameter qb@.004 LF 1.20 0.22 -- 1.42
3/8" diameter qb@.005 LF 1.38 0.27 -- 1.65
7/16" diameter qb@.007 LF 1.57 0.38 -- 1.95
1/2" diameter qb@.009 LF 1.75 0.49 0.01 2.25
9/16" diameter qb@.012 LF 2.02 0.66 0.01 2.69
5/8" diameter qb@.015 LF 2.25 0.82 0.01 3.08
3/4" diameter qb@.021 LF 3.16 1.15 0.01 4.32
7/8" diameter qb@.029 LF 4.11 1.58 0.02 5.71
1" diameter qb@.038 LF 5.06 2.08 0.02 7.16
1-1/8" diameter qb@.047 LF 6.26 2.57 0.03 8.86
1-1/4" diameter qb@.057 LF 7.38 3.11 0.03 10.52
1-3/8" diameter qb@.070 LF 8.88 3.82 0.04 12.74
1-1/2" diameter qb@.083 LF 10.50 4.53 0.05 15.08
1-5/8" diameter qb@.098 LF 12.70 5.35 0.06 18.11

6 x 19 class bright wire rope


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1-3/4" diameter qg@.152 LF 14.90 7.44 1.56 23.90
1-7/8" diameter qg@.174 LF 17.10 8.52 1.78 27.40
2" diameter qg@.200 LF 19.60 9.79 2.05 31.44
2-1/8" diameter qg@.222 LF 22.30 10.87 2.27 35.44
2-1/4" diameter qg@.250 LF 25.40 12.24 2.56 40.20

6 x 37 class bright wire rope


IPS, IWRC, under 500 LF, with accessories, using small tools.
1/4" diameter qb@.002 LF 1.38 0.11 -- 1.49
5/16" diameter qb@.004 LF 1.59 0.22 -- 1.81
3/8" diameter qb@.005 LF 1.86 0.27 -- 2.13
7/16" diameter qb@.007 LF 2.07 0.38 -- 2.45
1/2" diameter qb@.009 LF 2.33 0.49 0.01 2.83
9/16" diameter qb@.012 LF 2.62 0.66 0.01 3.29
5/8" diameter qb@.015 LF 2.91 0.82 0.01 3.74
3/4" diameter qb@.021 LF 3.79 1.15 0.01 4.95
7/8" diameter qb@.029 LF 4.81 1.58 0.02 6.41
1" diameter qb@.037 LF 5.97 2.02 0.02 8.01
2015 Heavy Construction Estimator, All Rights Reserved Page 325 (part 2)

1-1/8" diameter qb@.048 LF 7.30 2.62 0.03 9.95


1-1/4" diameter qb@.057 LF 8.67 3.11 0.03 11.81
1-3/8" diameter qb@.070 LF 10.10 3.82 0.04 13.96
1-1/2" diameter qb@.083 LF 12.00 4.53 0.05 16.58
1-5/8" diameter qb@.100 LF 14.40 5.46 0.06 19.92

6 x 37 class bright wire rope


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1-3/4" diameter qg@.154 LF 17.10 7.54 1.58 26.22
1-7/8" diameter qg@.174 LF 20.10 8.52 1.78 30.40
2" diameter qg@.200 LF 22.80 9.79 2.05 34.64
2015 Heavy Construction Estimator, All Rights Reserved Page 326

2-1/8" diameter qg@.222 LF 26.00 10.87 2.27 39.14


2-1/4" diameter qg@.250 LF 29.40 12.24 2.56 44.20

6 x 19 and 6 x 37 swaged wire rope


Using small tools.
1/2" diameter qb@.013 LF 3.28 0.71 0.01 4.00
9/16" diameter qb@.014 LF 3.74 0.77 0.01 4.52
5/8" diameter qb@.017 LF 4.64 0.93 0.01 5.58
3/4" diameter qb@.025 LF 5.47 1.37 0.01 6.85
7/8" diameter qb@.033 LF 6.63 1.80 0.02 8.45
1" diameter qb@.044 LF 7.98 2.40 0.03 10.41
1-1/8" diameter qb@.056 LF 10.00 3.06 0.03 13.09
1-1/4" diameter qb@.069 LF 11.80 3.77 0.04 15.61
1-3/8" diameter qb@.084 LF 13.70 4.59 0.05 18.34

6 x 19 and 6 x 37 swaged wire rope


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1-1/2" diameter qg@.133 LF 16.50 6.51 1.36 24.37

Flattened strand wire rope


IPS, fiber core, under 500 LF, using small tools.
5/8"diameter qb@.014 LF 4.43 0.77 0.01 5.21
3/4"diameter qb@.020 LF 5.91 1.09 0.01 7.01
7/8"diameter qb@.028 LF 7.31 1.53 0.02 8.86
1"diameter qb@.036 LF 8.83 1.97 0.02 10.82
1-1/8"diameter qb@.046 LF 10.50 2.51 0.03 13.04
1-1/4"diameter qb@.056 LF 12.70 3.06 0.03 15.79
1-3/8"diameter qb@.068 LF 15.30 3.71 0.04 19.05
1-1/2"diameter qb@.082 LF 18.90 4.48 0.05 23.43
1-5/8"diameter qb@.095 LF 22.70 5.19 0.06 27.95

Flattened strand wire rope


IPS, fiber core, under 500 LF, using a 20-ton hydraulic crane with 70’ boom and small tools.
1-3/4"diameter qg@.146 LF 26.90 7.15 1.50 35.55

Flattened strand wire rope


XIPS (Extra Improved Plow Steel), IWRC, under 500 LF, using small tools.
5/8" diameter qb@.015 LF 4.43 0.82 0.01 5.26
3/4" diameter qb@.021 LF 5.91 1.15 0.01 7.07
7/8" diameter qb@.029 LF 7.31 1.58 0.02 8.91
1" diameter qb@.038 LF 8.83 2.08 0.02 10.93
1-1/8" diameter qb@.048 LF 10.50 2.62 0.03 13.15
1-1/4" diameter qb@.059 LF 12.70 3.22 0.03 15.95
1-3/8" diameter qb@.071 LF 15.30 3.88 0.04 19.22
1-1/2" diameter qb@.085 LF 18.90 4.64 0.05 23.59

Flattened strand wire rope


XIPS (Extra Improved Plow Steel), IWRC, under 500 LF, using a 20-ton hydraulic crane with 70’ boom
and small tools.
1-5/8" diameter qg@.133 LF 22.70 6.51 1.36 30.57
1-3/4" diameter qg@.160 LF 26.90 7.84 1.64 36.38

5 x 19 coated wire rope, bright


IPS, fiber core, less than 500 LF, using small tools.
9/16" diameter, with 1/4" wire core qb@.004 LF 3.69 0.22 -- 3.91
5/8" diameter, with 5/16" wire core qb@.006 LF 4.08 0.33 -- 4.41
11/16" diameter,
2015 Heavy Construction Estimator, All Rights Reserved Page 326 (part 2)

with 3/8" wire core qb@.007 LF 4.35 0.38 -- 4.73


3/4" diameter, with 7/16" wire core qb@.008 LF 4.81 0.44 -- 5.25
13/16" diameter,
with 1/2" wire core qb@.010 LF 5.23 0.55 0.01 5.79
7/8" diameter, with 9/16" wire core qb@.013 LF 5.60 0.71 0.01 6.32
1" diameter, with 5/8" wire core qb@.017 LF 6.68 0.93 0.01 7.62
1-1/8" diameter,
with 3/4" wire core qb@.022 LF 8.09 1.20 0.01 9.30
1-1/4" diameter,
with 7/8" wire core qb@.026 LF 9.51 1.42 0.02 10.95
1-3/8" diameter, with 1" wire core qb@.034 LF 11.20 1.86 0.02 13.08
2015 Heavy Construction Estimator, All Rights Reserved Page 327

1-1/2" diameter,
with 1-1/8" wire core qb@.042 LF 13.00 2.29 0.02 15.31
1-5/8" diameter,
with 1-1/4" wire core qb@.052 LF 15.10 2.84 0.03 17.97
1-3/4" diameter,
with 1-3/8" wire core qb@.063 LF 18.00 3.44 0.04 21.48

19 x 7 rotation resistant wire rope


IPS, less than 500 LF, using small tools.
3/16" diameter qb@.003 LF 1.04 0.16 -- 1.20
1/4" diameter qb@.003 LF 1.25 0.16 -- 1.41
5/16" diameter qb@.004 LF 1.54 0.22 -- 1.76
3/8" diameter qb@.005 LF 1.65 0.27 -- 1.92
7/16" diameter qb@.007 LF 1.86 0.38 -- 2.24
1/2" diameter qb@.007 LF 2.04 0.38 -- 2.42
9/16" diameter qb@.012 LF 2.28 0.66 0.01 2.95
5/8" diameter qb@.014 LF 2.69 0.77 0.01 3.47
3/4" diameter qb@.020 LF 3.93 1.09 0.01 5.03
7/8" diameter qb@.028 LF 5.02 1.53 0.02 6.57
1" diameter qb@.036 LF 6.15 1.97 0.02 8.14
1-1/8" diameter qb@.047 LF 7.39 2.57 0.03 9.99
1-1/4" diameter qb@.057 LF 8.85 3.11 0.03 11.99
1-3/8" diameter qb@.069 LF 10.40 3.77 0.04 14.21
1-1/2" diameter qb@.082 LF 12.00 4.48 0.05 16.53

8 x 19 rotation resistant wire rope, class bright


XIPS, IWRC, less than 500 LF, using small tools.
3/8" diameter qb@.005 LF 1.75 0.27 -- 2.02
7/16" diameter qb@.007 LF 1.99 0.38 -- 2.37
1/2" diameter qb@.009 LF 2.20 0.49 0.01 2.70
9/16" diameter qb@.012 LF 2.52 0.66 0.01 3.19
5/8" diameter qb@.015 LF 2.90 0.82 0.01 3.73
3/4" diameter qb@.021 LF 4.06 1.15 0.01 5.22
7/8" diameter qb@.029 LF 5.31 1.58 0.02 6.91
1" diameter qb@.038 LF 6.55 2.08 0.02 8.65
1-1/8" diameter qb@.048 LF 7.88 2.62 0.03 10.53
1-1/4" diameter qb@.059 LF 9.29 3.22 0.03 12.54
1-3/8" diameter qb@.071 LF 11.20 3.88 0.04 15.12
1-1/2" diameter qb@.087 LF 13.30 4.75 0.05 18.10

8 x 19 wire rope, class bright


IPS, fiber core, under 500', using small tools.
3/16" diameter qb@.003 LF 0.70 0.16 -- 0.86
1/4" diameter qb@.003 LF 1.12 0.16 -- 1.28
5/16" diameter qb@.003 LF 1.28 0.16 -- 1.44
3/8" diameter qb@.004 LF 1.42 0.22 -- 1.64
7/16" diameter qb@.006 LF 1.65 0.33 -- 1.98
1/2" diameter qb@.008 LF 1.83 0.44 -- 2.27
9/16" diameter qb@.010 LF 2.09 0.55 0.01 2.65
5/8" diameter qb@.012 LF 2.52 0.66 0.01 3.19
3/4" diameter qb@.017 LF 3.49 0.93 0.01 4.43
7/8" diameter qb@.024 LF 4.58 1.31 0.01 5.90
1" diameter qb@.032 LF 5.68 1.75 0.02 7.45
1-1/8" diameter qb@.040 LF 6.80 2.19 0.02 9.01
1-1/4" diameter qb@.050 LF 8.40 2.73 0.03 11.16
1-3/8" diameter qb@.060 LF 10.10 3.28 0.03 13.41
1-1/2" diameter qb@.071 LF 12.00 3.88 0.04 15.92

Heavy duty wire rope thimbles


2015 Heavy Construction Estimator, All Rights Reserved Page 327 (part 2)

Using small tools.


1/4" diameter qb@.100 Ea 0.71 5.46 0.06 6.23
5/16" diameter qb@.100 Ea 1.15 5.46 0.06 6.67
3/8" diameter qb@.100 Ea 1.68 5.46 0.06 7.20
7/16" diameter qb@.100 Ea 2.94 5.46 0.06 8.46
1/2" diameter qb@.100 Ea 3.02 5.46 0.06 8.54
2015 Heavy Construction Estimator, All Rights Reserved Page 328

9/16" diameter qb@.100 Ea 3.02 5.46 0.06 8.54


5/8" diameter qb@.100 Ea 3.45 5.46 0.06 8.97
3/4" diameter qb@.154 Ea 7.13 8.41 0.09 15.63
7/8" diameter qb@.189 Ea 8.18 10.32 0.11 18.61
1" diameter qb@.308 Ea 15.20 16.82 0.18 32.20
1-1/8" diameter qb@.417 Ea 22.70 22.78 0.24 45.72
1-1/4" diameter qb@.417 Ea 24.60 22.78 0.24 47.62
1-3/8" diameter qb@.870 Ea 47.00 47.52 0.50 95.02
1-1/2" diameter qb@1.25 Ea 67.00 68.28 0.73 136.01
1-5/8" diameter qb@1.67 Ea 115.00 91.22 0.97 207.19
1-3/4" diameter qb@2.00 Ea 133.00 109.20 1.16 243.36
1-7/8" diameter qb@2.50 Ea 183.00 136.60 1.45 321.05
2" diameter qb@2.50 Ea 199.00 136.60 1.45 337.05
2-1/4" diameter qb@4.00 Ea 258.00 218.50 2.32 478.82

Wire rope clips


Includes fabrication and boring sockets, using small tools.
1/8" diameter qb@.050 Ea 2.19 2.73 0.03 4.95
3/16" diameter qb@.050 Ea 2.35 2.73 0.03 5.11
1/4" diameter qb@.050 Ea 3.32 2.73 0.03 6.08
5/16" diameter qb@.050 Ea 3.42 2.73 0.03 6.18
3/8" diameter qb@.050 Ea 3.66 2.73 0.03 6.42
7/16" diameter qb@.050 Ea 5.82 2.73 0.03 8.58
1/2" diameter qb@.050 Ea 5.82 2.73 0.03 8.58
9/16" diameter qb@.060 Ea 7.43 3.28 0.03 10.74
5/8" diameter qb@.070 Ea 7.43 3.82 0.04 11.29
3/4" diameter qb@.080 Ea 9.61 4.37 0.05 14.03
7/8" diameter qb@.090 Ea 13.80 4.92 0.05 18.77
1" diameter qb@.100 Ea 15.90 5.46 0.06 21.42
1-1/8" diameter qb@.180 Ea 17.70 9.83 0.10 27.63
1-1/4" diameter qb@.360 Ea 26.00 19.66 0.21 45.87
1-3/8" diameter qb@.540 Ea 34.00 29.49 0.31 63.80
1-1/2" diameter qb@.720 Ea 35.10 39.33 0.42 74.85
1-5/8" diameter qb@.900 Ea 62.00 49.16 0.52 111.68
1-3/4" diameter qb@1.00 Ea 81.60 54.62 0.58 136.80
2" diameter qb@1.20 Ea 91.20 65.54 0.70 157.44
2-1/4" diameter qb@1.40 Ea 131.00 76.47 0.81 208.28
2-1/2" diameter qb@1.60 Ea 148.00 87.39 0.93 236.32
2-3/4" diameter qb@1.80 Ea 237.00 98.32 1.04 336.36
3" diameter qb@2.00 Ea 292.00 109.20 1.16 402.36

Open swage sockets


Using small tools.
1/4" diameter qb@.100 Ea 35.50 5.46 0.06 41.02
5/16" diameter qb@.114 Ea 44.00 6.23 0.07 50.30
3/8" diameter qb@.154 Ea 44.00 8.41 0.09 52.50
7/16" diameter qb@.211 Ea 51.40 11.52 0.12 63.04
1/2" diameter qb@.211 Ea 51.40 11.52 0.12 63.04
9/16" diameter qb@.455 Ea 70.10 24.85 0.26 95.21
5/8" diameter qb@.455 Ea 70.10 24.85 0.26 95.21
3/4" diameter qb@.833 Ea 80.00 45.50 0.48 125.98
7/8" diameter qb@1.18 Ea 106.00 64.45 0.68 171.13
1" diameter qb@1.82 Ea 142.00 99.41 1.06 242.47
1-1/8" diameter qb@2.86 Ea 170.00 156.20 1.66 327.86
1-1/4" diameter qb@3.33 Ea 198.00 181.90 1.93 381.83
1-3/8" diameter qb@4.44 Ea 267.00 242.50 2.58 512.08
1-1/2" diameter qb@5.71 Ea 434.00 311.90 3.31 749.21
1-3/4" diameter qb@6.67 Ea 771.00 364.30 3.87 1,139.17
2" diameter qb@13.3 Ea 1,170.00 726.40 7.71 1,904.11
2015 Heavy Construction Estimator, All Rights Reserved Page 328 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 329

Closed swage sockets


Using small tools.
1/4" diameter qb@.100 Ea 20.70 5.46 0.06 26.22
5/16" diameter qb@.100 Ea 29.40 5.46 0.06 34.92
3/8" diameter qb@.100 Ea 35.90 5.46 0.06 41.42
7/16" diameter qb@.143 Ea 35.90 7.81 0.08 43.79
1/2" diameter qb@.154 Ea 39.90 8.41 0.09 48.40
9/16" diameter qb@.286 Ea 46.30 15.62 0.17 62.09
5/8" diameter qb@.333 Ea 46.30 18.19 0.19 64.68
3/4" diameter qb@.500 Ea 54.20 27.31 0.29 81.80
7/8" diameter qb@.741 Ea 66.60 40.47 0.43 107.50
1" diameter qb@1.05 Ea 95.70 57.35 0.61 153.66
1-1/8" diameter qb@1.43 Ea 114.00 78.11 0.83 192.94
1-1/4" diameter qb@2.22 Ea 143.00 121.30 1.29 265.59
1-3/8" diameter qb@2.86 Ea 192.00 156.20 1.66 349.86
1-1/2" diameter qb@4.00 Ea 260.00 218.50 2.32 480.82
1-3/4" diameter qb@5.00 Ea 383.00 273.10 2.90 659.00
2" diameter qb@8.00 Ea 747.00 437.00 4.64 1,188.64

Open spelter sockets, galvanized


Using small tools.
1/4" diameter qb@.100 Ea 47.70 5.46 0.06 53.22
5/16" diameter qb@.132 Ea 47.80 7.21 0.08 55.09
3/8" diameter qb@.132 Ea 53.10 7.21 0.08 60.39
7/16" diameter qb@.233 Ea 50.00 12.73 0.14 62.87
1/2" diameter qb@.233 Ea 55.60 12.73 0.14 68.47
9/16" diameter qb@.400 Ea 62.30 21.85 0.23 84.38
5/8" diameter qb@.400 Ea 69.20 21.85 0.23 91.28
3/4" diameter qb@.606 Ea 75.50 33.10 0.35 108.95
7/8" diameter qb@1.00 Ea 109.00 54.62 0.58 164.20
1" diameter qb@1.54 Ea 208.00 84.11 0.89 293.00
1-1/8" diameter qb@2.50 Ea 219.00 136.60 1.45 357.05
1-1/4" diameter qb@3.33 Ea 297.00 181.90 1.93 480.83
1-3/8" diameter qb@3.33 Ea 330.00 181.90 1.93 513.83
1-1/2" diameter qb@4.44 Ea 632.00 242.50 2.58 877.08
1-5/8" diameter qb@5.71 Ea 711.00 311.90 3.31 1,026.21
1-3/4" diameter qb@8.70 Ea 1,070.00 475.20 5.05 1,550.25
1-7/8" diameter qb@8.70 Ea 1,190.00 475.20 5.05 1,670.25
2" diameter qb@13.3 Ea 1,240.00 726.40 7.71 1,974.11
2-1/8" diameter qb@13.3 Ea 1,370.00 726.40 7.71 2,104.11
2-1/2" diameter qb@16.7 Ea 1,680.00 912.20 9.69 2,601.89
2-3/8" diameter qb@16.7 Ea 1,860.00 912.20 9.69 2,781.89

Closed spelter sockets, galvanized


Using small tools.
1/4" diameter qb@.100 Ea 39.30 5.46 0.06 44.82
5/16" diameter qb@.103 Ea 39.50 5.63 0.06 45.19
3/8" diameter qb@.103 Ea 43.90 5.63 0.06 49.59
7/16" diameter qb@.182 Ea 41.80 9.94 0.11 51.85
1/2" diameter qb@.182 Ea 46.30 9.94 0.11 56.35
9/16" diameter qb@.345 Ea 55.20 18.84 0.20 74.24
5/8" diameter qb@.345 Ea 61.30 18.84 0.20 80.34
3/4" diameter qb@.526 Ea 63.50 28.73 0.31 92.54
7/8" diameter qb@.800 Ea 91.80 43.70 0.46 135.96
1" diameter qb@1.25 Ea 137.00 68.28 0.73 206.01
1-1/8" diameter qb@1.67 Ea 199.00 91.22 0.97 291.19
1-1/4" diameter qb@2.22 Ea 219.00 121.30 1.29 341.59
1-3/8" diameter qb@2.22 Ea 243.00 121.30 1.29 365.59
2015 Heavy Construction Estimator, All Rights Reserved Page 329 (part 2)

1-1/2" diameter qb@2.86 Ea 470.00 156.20 1.66 627.86


1-5/8" diameter qb@3.64 Ea 531.00 198.80 2.11 731.91
1-3/4" diameter qb@5.71 Ea 610.00 311.90 3.31 925.21
1-7/8" diameter qb@5.71 Ea 678.00 311.90 3.31 993.21
2" diameter qb@8.00 Ea 753.00 437.00 4.64 1,194.64
2-1/8" diameter qb@8.00 Ea 836.00 437.00 4.64 1,277.64
2015 Heavy Construction Estimator, All Rights Reserved Page 330

2-1/2" diameter qb@10.8 Ea 929.00 589.90 6.26 1,525.16


2-3/8" diameter qb@10.8 Ea 1,360.00 589.90 6.26 1,956.16

Jaw and jaw turnbuckles


Using small tools.
1/4" x 4" qb@.100 Ea 23.70 5.46 0.06 29.22
5/16" x 4-1/2" qb@.100 Ea 25.80 5.46 0.06 31.32
3/8" x 6" qb@.100 Ea 29.40 5.46 0.06 34.92
1/2" x 6" qb@.168 Ea 30.50 9.18 0.10 39.78
1/2" x 9" qb@.208 Ea 40.60 11.36 0.12 52.08
1/2" x 12" qb@.241 Ea 45.90 13.16 0.14 59.20
5/8" x 6" qb@.308 Ea 44.30 16.82 0.18 61.30
5/8" x 9" qb@.333 Ea 54.40 18.19 0.19 72.78
5/8" x 12" qb@.357 Ea 64.70 19.50 0.21 84.41
3/4" x 6" qb@.426 Ea 59.30 23.27 0.25 82.82
3/4" x 9" qb@.526 Ea 65.70 28.73 0.31 94.74
3/4" x 12" qb@.571 Ea 84.20 31.19 0.33 115.72
3/4" x 18" qb@.690 Ea 101.00 37.69 0.40 139.09
7/8" x 12" qb@.952 Ea 109.00 52.00 0.55 161.55
7/8" x 18" qb@1.11 Ea 134.00 60.63 0.64 195.27
1" x 6" qb@.952 Ea 112.00 52.00 0.55 164.55
1" x 12" qb@1.25 Ea 126.00 68.28 0.73 195.01
1" x 18" qb@1.54 Ea 179.00 84.11 0.89 264.00
1" x 24" qb@1.82 Ea 196.00 99.41 1.06 296.47
1-1/4" x 12" qb@2.22 Ea 212.00 121.30 1.29 334.59
1-1/4" x 18" qb@2.50 Ea 262.00 136.60 1.45 400.05
1-1/4" x 24" qb@2.86 Ea 352.00 156.20 1.66 509.86
1-1/2" x 12" qb@3.08 Ea 340.00 168.20 1.79 509.99
1-1/2" x 18" qb@4.00 Ea 353.00 218.50 2.32 573.82
1-1/2" x 24" qb@5.00 Ea 478.00 273.10 2.90 754.00
1-3/4" x 18" qb@5.00 Ea 709.00 273.10 2.90 985.00
1-3/4" x 24" qb@5.71 Ea 820.00 311.90 3.31 1,135.21
2" x 24" qb@10.0 Ea 1,110.00 546.20 5.80 1,662.00
2-1/2" x 24" qb@13.3 Ea 2,120.00 726.40 7.71 2,854.11
2-3/4" x 24" qb@20.0 Ea 2,750.00 1,092.00 11.60 3,853.60

CSI 05-180, Steel chain and accessories

Alloy steel chain, self colored


Cut length, with accessories, using small tools.
1/4" chain qb@5.00 CLF 2.27 273.10 2.90 278.27
3/8" chain qb@10.0 CLF 3.04 546.20 5.80 555.04
1/2" chain qb@16.7 CLF 4.68 912.20 9.69 926.57
5/8" chain qb@28.6 CLF 7.92 1,562.00 16.60 1,586.52
3/4" chain qb@40.0 CLF 11.10 2,185.00 23.20 2,219.30
7/8" chain qb@50.0 CLF 16.30 2,731.00 29.00 2,776.30
1" chain qb@66.7 CLF 24.90 3,643.00 38.70 3,706.60
1-1/4" chain qb@100. CLF 42.70 5,462.00 58.00 5,562.70

CSI 05-211, Standard steel joists

Open web steel joists


Using a 40-ton hydraulic crane with 84’ boom, two 200-amp trailer mounted welders, and three sets of
small tools.
To 30' (10m) span,
H or J, horizontal bridging qk@6.67 Ton 1,070.00 321.40 81.60 1,473.00
30’ (10m) to 50' (15m) span,
H or J, horizontal bridging qk@5.93 Ton 993.00 285.70 72.50 1,351.20
Less than 96' (30m) span, LJ or LH,
2015 Heavy Construction Estimator, All Rights Reserved Page 330 (part 2)

bolted cross bridging qk@6.15 Ton 1,030.00 296.30 75.20 1,401.50


Less than 144' (44m) span, DLJ or DLH,
bolted cross bridging qk@6.15 Ton 1,070.00 296.30 75.20 1,441.50
Add for welded cross bridging qk@.000 Ton -- -- -- --
Add for shop prime
paint other than manufacturer --@.000 Ton 33.70 -- -- 33.70
2015 Heavy Construction Estimator, All Rights Reserved Page 331

CSI 05-310, Metal roof and floor deck

Cellular steel panels


Galvanized, over 1,500 SF (140m2), using a 200-amp trailer mounted welder, and two sets of small
tools.
1-1/2" deep x 18-18 gauge qd@.024 SF 4.03 1.22 0.04 5.29
1-1/2" deep x 22-18 gauge qd@.023 SF 4.27 1.17 0.04 5.48
3" deep x 16-16 gauge qd@.031 SF 6.71 1.58 0.05 8.34
3" deep x 18-16 gauge qd@.030 SF 6.21 1.53 0.05 7.79
3" deep x 18-18 gauge qd@.027 SF 5.51 1.38 0.05 6.94
3" deep x 20-18 gauge qd@.026 SF 4.61 1.32 0.05 5.98
4-1/2"deep x 16-16 gauge qd@.038 SF 7.76 1.94 0.07 9.77
4-1/2"deep x 18-16 gauge qd@.036 SF 8.25 1.83 0.06 10.14
4-1/2"deep x 18-18 gauge qd@.034 SF 6.73 1.73 0.06 8.52
4-1/2"deep x 20-18 gauge qd@.033 SF 6.73 1.68 0.06 8.47
Add for acoustical deck --@.000 SF 0.21 -- -- 0.21
Add for cells used for ventilation --@.000 SF 0.21 -- -- 0.21
Add for multi
story or congested areas ---@--- % 8.00 50.00 -- --

Metal decking, open type


Galvanized, over 5,000 SF (465m2), using a 200-amp trailer mounted welder, and two sets of small
tools.
1-1/2" deep x 18 gauge qd@.009 SF 1.40 0.46 0.02 1.88
1-1/2" deep x 20 gauge qd@.008 SF 1.10 0.41 0.01 1.52
1-1/2" deep x 22 gauge qd@.008 SF 0.96 0.41 0.01 1.38
3" deep x 16 gauge qd@.011 SF 2.33 0.56 0.02 2.91
3" deep x 18 gauge qd@.010 SF 1.84 0.51 0.02 2.37
3" deep x 20 gauge qd@.010 SF 1.48 0.51 0.02 2.01
3" deep x 22 gauge qd@.009 SF 1.26 0.46 0.02 1.74
4-1/2" deep x 16 gauge qd@.015 SF 4.72 0.76 0.03 5.51
4-1/2" deep x 18 gauge qd@.014 SF 3.71 0.71 0.02 4.44
6" deep x 16 gauge qd@.021 SF 5.64 1.07 0.04 6.75
6" deep x 18 gauge qd@.020 SF 4.50 1.02 0.04 5.56
6" deep x 18 gauge qd@.018 SF 4.50 0.92 0.03 5.45
7-1/2" deep x 16 gauge qd@.027 SF 6.21 1.38 0.05 7.64
7-1/2" deep x 18 gauge qd@.023 SF 4.98 1.17 0.04 6.19
Deduct for painted instead of galvanized deck,
open type decking --@.000 SF 0.10 -- -- 0.10
Add for glass open type decking --@.000 SF 0.39 -- -- 0.39

Metal decking, non-cellular, composite, galvanized


Using a 200-amp trailer mounted welder, and two sets of small tools.
1-1/2" deep x 16 gauge qd@.010 SF 1.95 0.51 0.02 2.48
1-1/2" deep x 18 gauge qd@.010 SF 1.54 0.51 0.02 2.07
1-1/2" deep x 20 gauge qd@.010 SF 1.23 0.51 0.02 1.76
1-1/2" deep x 22 gauge qd@.009 SF 1.03 0.46 0.02 1.51
3" deep x 16 gauge qd@.013 SF 2.22 0.66 0.02 2.90
3" deep x 18 gauge qd@.012 SF 1.72 0.61 0.02 2.35
3" deep x 20 gauge qd@.012 SF 1.38 0.61 0.02 2.01
3" deep x 22 gauge qd@.011 SF 1.23 0.56 0.02 1.81

Slab form floor deck


Using a 200-amp trailer mounted welder, and two sets of small tools.
9/16" deep x 28, uncoated qd@.007 SF 0.59 0.36 0.01 0.96
9/16" deep x 28, galvanized qd@.007 SF 0.68 0.36 0.01 1.05
1-5/16" deep x 24 gauge, uncoated qd@.008 SF 0.80 0.41 0.01 1.22
2015 Heavy Construction Estimator, All Rights Reserved Page 331 (part 2)

1-5/16" deep x 24 gauge, galvanized qd@.008 SF 0.92 0.41 0.01 1.34


1-5/16" deep x 22 gauge, uncoated qd@.009 SF 0.89 0.46 0.02 1.37
1-5/16" deep x 22 gauge, galvanized qd@.009 SF 0.98 0.46 0.02 1.46
3" deep x 22 gauge, galvanized qd@.011 SF 1.02 0.56 0.02 1.60
3" deep x 22 gauge, galvanized qd@.011 SF 1.12 0.56 0.02 1.70

CSI 05-501, Anchor bolts

J-type anchor bolts


Including nut, washer, and template, using small tools.
1/2" diameter x 6" (15cm) long am@.286 Ea 1.56 12.56 0.16 14.28
1/2" diameter x 12" (31cm) long am@.308 Ea 3.16 13.53 0.17 16.86
2015 Heavy Construction Estimator, All Rights Reserved Page 332

1/2" diameter x 18" (46cm) long am@.333 Ea 6.20 14.63 0.18 21.01
5/8" diameter x 12" (31cm) long am@.333 Ea 4.44 14.63 0.18 19.25
5/8" diameter x 18" (46cm) long am@.364 Ea 6.37 15.99 0.20 22.56
5/8" diameter x 24" (61cm) long am@.400 Ea 8.45 17.57 0.22 26.24
3/4" diameter x 8" (21cm) long am@.400 Ea 7.98 17.57 0.22 25.77
3/4" diameter x 12" (31cm) long am@.444 Ea 8.44 19.50 0.24 28.18
3/4" diameter x 18" (46cm) long am@.500 Ea 14.50 21.96 0.28 36.74
7/8" diameter x 12" (31cm) long am@.500 Ea 13.30 21.96 0.28 35.54
7/8" diameter x 18" (46cm) long am@.571 Ea 19.50 25.08 0.31 44.89
7/8" diameter x 24" (61cm) long am@.667 Ea 28.10 29.29 0.37 57.76
1" diameter x 12" (31cm) long am@.571 Ea 21.30 25.08 0.31 46.69
1" diameter x 18" (46cm) long am@.667 Ea 31.60 29.29 0.37 61.26
1" diameter x 24" (61cm) long am@.800 Ea 42.60 35.14 0.44 78.18
1" diameter x 36" (91cm) long am@1.00 Ea 62.00 43.92 0.55 106.47
1-1/2" diameter x 18" (46cm) long am@.909 Ea 40.80 39.92 0.50 81.22
1-1/2" diameter x 24" (61cm) long am@1.25 Ea 49.80 54.90 0.69 105.39
Add for sleeve ---@--- % .75 25.00 -- --
Deduct for bolts without templates ---@--- % -1.00 -60.00 -- --
Add for galvanized bolts ---@--- % 50.00 -- -- --

Hooked type anchor bolts


Including nut (for masonry), using small tools.
1/2" diameter x 8" (21cm) long b7@.050 Ea 0.81 2.24 0.02 3.07
1/2" diameter x 12" (31cm) long b7@.053 Ea 0.78 2.38 0.02 3.18
5/8" diameter x 8" (21cm) long b7@.056 Ea 0.86 2.51 0.02 3.39
5/8" diameter x 12" (31cm) long b7@.059 Ea 1.22 2.65 0.02 3.89
3/4" diameter x 8" (21cm) long b7@.063 Ea 1.33 2.83 0.02 4.18
3/4" diameter x 12" (31cm) long b7@.067 Ea 1.79 3.01 0.02 4.82

L-type anchor bolts


Including hex nut, using small tools.
3/4" diameter x 12" (31cm) long am@.444 Ea 1.79 19.50 0.24 21.53
3/4" diameter x 18" (46cm) long am@.500 Ea 2.40 21.96 0.28 24.64
3/4" diameter x 24" (61cm) long am@.571 Ea 2.85 25.08 0.31 28.24
3/4" diameter x 30" (76cm) long am@.667 Ea 3.64 29.29 0.37 33.30
3/4" diameter x 36" (91cm) long am@.800 Ea 4.25 35.14 0.44 39.83
7/8" diameter x 12" (31cm) long am@.500 Ea 2.03 21.96 0.28 24.27
7/8" diameter x 18" (46cm) long am@.571 Ea 3.03 25.08 0.31 28.42
7/8" diameter x 24" (61cm) long am@.667 Ea 4.07 29.29 0.37 33.73
7/8" diameter x 30" (76cm) long am@.800 Ea 4.98 35.14 0.44 40.56
7/8" diameter x 36" (91cm) long am@1.00 Ea 5.80 43.92 0.55 50.27

L-type anchor bolts


Including hex nut, using small tools.
1" diameter x 12" (31cm) long am@.571 Ea 2.00 25.08 0.31 27.39
1" diameter x 18" (46cm) long am@.667 Ea 3.47 29.29 0.37 33.13
1" diameter x 24" (61cm) long am@.800 Ea 5.32 35.14 0.44 40.90
1" diameter x 30" (76cm) long am@.870 Ea 6.40 38.21 0.48 45.09
1" diameter x 36" (91cm) long am@1.00 Ea 7.50 43.92 0.55 51.97
1" diameter x 42" (107cm) long am@1.11 Ea 8.78 48.75 0.61 58.14
1" diameter x 48" (122cm) long am@1.33 Ea 9.88 58.41 0.73 69.02
1-1/8" diameter x 18" (46cm) long am@.667 Ea 5.10 29.29 0.37 34.76
1-1/8" diameter x 24" (61cm) long am@.800 Ea 6.82 35.14 0.44 42.40
1-1/8" diameter x 30" (76cm) long am@.870 Ea 8.52 38.21 0.48 47.21

L-type anchor bolts


Including hex nut, using small tools.
1-1/4" diameter x 18" (46cm) long am@.800 Ea 6.35 35.14 0.44 41.93
2015 Heavy Construction Estimator, All Rights Reserved Page 332 (part 2)

1-1/4" diameter x 24" (61cm) long am@1.00 Ea 7.90 43.92 0.55 52.37
1-1/4" diameter x 30" (76cm) long am@1.05 Ea 10.60 46.12 0.58 57.30
1-1/4" diameter x 36" (91cm) long am@1.11 Ea 12.70 48.75 0.61 62.06
2015 Heavy Construction Estimator, All Rights Reserved Page 333

1-1/4" diameter x 42" (107cm) long am@1.25 Ea 14.40 54.90 0.69 69.99
1-1/4" diameter x 48" (122cm) long am@1.43 Ea 16.20 62.81 0.79 79.80
1-1/4" diameter x 54" (137cm) long am@1.67 Ea 17.70 73.35 0.92 91.97
1-1/4" diameter x 60" (152cm) long am@2.00 Ea 19.00 87.84 1.10 107.94
1-3/8" diameter x 18" (46cm) long am@.800 Ea 7.74 35.14 0.44 43.32
1-3/8" diameter x 24" (61cm) long am@1.00 Ea 10.30 43.92 0.55 54.77
1-3/8" diameter x 30" (76cm) long am@1.05 Ea 12.90 46.12 0.58 59.60
1-3/8" diameter x 36" (91cm) long am@1.11 Ea 15.50 48.75 0.61 64.86
1-3/8" diameter x 42" (107cm) long am@1.25 Ea 18.10 54.90 0.69 73.69
1-3/8" diameter x 48" (122cm) long am@1.43 Ea 20.60 62.81 0.79 84.20
1-3/8" diameter x 54" (137cm) long am@1.67 Ea 22.80 73.35 0.92 97.07
1-3/8" diameter x 60" (152cm) long am@2.00 Ea 24.90 87.84 1.10 113.84

L-type anchor bolts


Including hex nut, using small tools.
1-1/2" diameter x 18" (46cm) long am@.909 Ea 8.00 39.92 0.50 48.42
1-1/2" diameter x 24" (61cm) long am@1.05 Ea 10.70 46.12 0.58 57.40
1-1/2" diameter x 30" (76cm) long am@1.18 Ea 13.30 51.83 0.65 65.78
1-1/2" diameter x 36" (91cm) long am@1.25 Ea 16.00 54.90 0.69 71.59
1-1/2" diameter x 42" (107cm) long am@1.33 Ea 18.60 58.41 0.73 77.74
1-1/2" diameter x 48" (122cm) long am@1.54 Ea 21.30 67.64 0.85 89.79
1-1/2" diameter x 54" (137cm) long am@1.82 Ea 24.00 79.93 1.00 104.93
1-1/2" diameter x 60" (152cm) long am@2.22 Ea 26.60 97.50 1.22 125.32
1-3/4" diameter x 18" (46cm) long am@1.00 Ea 11.00 43.92 0.55 55.47
1-3/4" diameter x 24" (61cm) long am@1.11 Ea 14.60 48.75 0.61 63.96
1-3/4" diameter x 30" (76cm) long am@1.18 Ea 18.30 51.83 0.65 70.78
1-3/4" diameter x 36" (91cm) long am@1.25 Ea 22.00 54.90 0.69 77.59
1-3/4" diameter x 42" (107cm) long am@1.43 Ea 25.60 62.81 0.79 89.20
1-3/4" diameter x 48" (122cm) long am@1.67 Ea 29.30 73.35 0.92 103.57
1-3/4" diameter x 54" (137cm) long am@2.00 Ea 33.00 87.84 1.10 121.94
1-3/4" diameter x 60" (152cm) long am@2.50 Ea 36.60 109.80 1.38 147.78
2" diameter x 24" (61cm) long am@1.18 Ea 19.00 51.83 0.65 71.48
2" diameter x 30" (76cm) long am@1.33 Ea 23.70 58.41 0.73 82.84
2" diameter x 36" (91cm) long am@1.54 Ea 28.40 67.64 0.85 96.89
2" diameter x 42" (107cm) long am@1.82 Ea 33.20 79.93 1.00 114.13
2" diameter x 48" (122cm) long am@2.00 Ea 38.00 87.84 1.10 126.94
2" diameter x 54" (137cm) long am@2.22 Ea 42.70 97.50 1.22 141.42
2" diameter x 60" (152cm) long am@2.86 Ea 47.50 125.60 1.57 174.67
2" diameter x 66" (167cm) long am@2.86 Ea 52.20 125.60 1.57 179.37
2" diameter x 72" (182cm) long am@3.33 Ea 56.90 146.30 1.83 205.03

Concrete anchors
Includes drilling, material and installation, using miscellaneous power tools and small tools.
1/2" diameter
x 4-1/4" (10.8cm) long ul@.500 Ea 0.75 17.49 2.36 20.60
1/2" diameter x 5-1/4" (14cm) long ul@.526 Ea 0.98 18.40 2.48 21.86
1/2" diameter x 7" (17.8cm) long ul@.541 Ea 1.19 18.92 2.55 22.66
3/4" diameter
x 5-3/4" (14.6cm) long ul@.556 Ea 2.10 19.45 2.62 24.17
3/4" diameter x 7" (17.8cm) long ul@.588 Ea 2.55 20.57 2.78 25.90
3/4" diameter
x 8-1/2" (21.6cm) long ul@.625 Ea 2.91 21.86 2.95 27.72
3/4" diameter x 10" (25.4cm) long ul@.667 Ea 3.49 23.33 3.15 29.97
1" diameter x 7-3/4" (19.7cm) long ul@.606 Ea 5.62 21.20 2.86 29.68
1" diameter x 9" (22.9cm) long ul@.645 Ea 6.54 22.56 3.04 32.14
1" diameter x 12" (30.5cm) long ul@.714 Ea 7.53 24.98 3.37 35.88
1-1/4" diameter x 9" (22.9cm) long ul@.690 Ea 13.30 24.14 3.26 40.70
1-1/4" diameter x 12" (30.5cm) long ul@.769 Ea 13.70 26.90 3.63 44.23
2015 Heavy Construction Estimator, All Rights Reserved Page 333 (part 2)

Concrete anchors
Includes drilling, material, installation, rod and epoxy cartridge, using miscellaneous power tools and
small tools.
1-3/4" diameter x 15" (38.1cm) long ul@.870 Ea 125.00 30.43 4.11 159.54
1-3/4" diameter x 18" (45.7cm) long ul@1.00 Ea 128.00 34.98 4.72 167.70
2" diameter x 18" (45.7cm) long ul@1.05 Ea 133.00 36.73 4.96 174.69
2015 Heavy Construction Estimator, All Rights Reserved Page 334

2" diameter x 24" (61cm) long ul@1.18 Ea 147.00 41.28 5.57 193.85

Chemical anchors, with rod and epoxy cartridge


Using miscellaneous power tools and small tools.
3/4" diameter
x 9-1/2" (24.1cm) long ul@.625 Ea 6.10 21.86 2.95 30.91
7/8" diameter x 10" (25.4cm) long ul@.667 Ea 9.43 23.33 3.15 35.91
1" diameter
x 11-3/4" (29.85cm) long ul@.714 Ea 10.90 24.98 3.37 39.25
1-1/4" diameter x 14" (35.6cm) long ul@.833 Ea 15.30 29.14 3.93 48.37

CSI 05-502, Expansion bolts

Wedge anchors
Including nut and washer, using small tools.
1/4" diameter x 1-3/4" long al@.385 Ea 0.43 16.91 0.20 17.54
1/4" diameter x 2-1/4" long al@.556 Ea 0.50 24.42 0.29 25.21
1/4" diameter x 3-1/4" long al@.833 Ea 0.64 36.59 0.43 37.66
3/8" diameter x 2-1/4" long al@.476 Ea 0.62 20.91 0.25 21.78
3/8" diameter x 3" long al@.714 Ea 0.76 31.36 0.37 32.49
3/8" diameter x 5" long al@1.25 Ea 1.07 54.90 0.65 56.62
1/2" diameter x 4-1/4" long al@1.11 Ea 1.23 48.75 0.58 50.56
1/2" diameter x 5-1/2" long al@1.43 Ea 1.63 62.81 0.74 65.18
1/2" diameter x 7" long al@2.00 Ea 1.97 87.84 1.04 90.85
5/8" diameter x 5" long al@1.25 Ea 2.26 54.90 0.65 57.81
5/8" diameter x 7" long al@2.00 Ea 3.02 87.84 1.04 91.90
5/8" diameter x 8-1/2" long al@2.50 Ea 3.49 109.80 1.30 114.59
3/4" diameter x 5-1/2" long al@1.43 Ea 3.46 62.81 0.74 67.01
3/4" diameter x 8-1/2" long al@2.50 Ea 4.79 109.80 1.30 115.89
3/4" diameter x 10" long al@3.33 Ea 5.74 146.30 1.73 153.77
7/8" diameter x 6" long al@1.43 Ea 7.47 62.81 0.74 71.02
7/8" diameter x 8" long al@2.00 Ea 9.02 87.84 1.04 97.90
7/8" diameter x 10" long al@2.50 Ea 10.10 109.80 1.30 121.20
1" diameter x 6" long al@1.43 Ea 8.51 62.81 0.74 72.06
1" diameter x 9" long al@2.50 Ea 10.70 109.80 1.30 121.80
1" diameter x 112" long al@3.33 Ea 12.40 146.30 1.73 160.43
1-1/4" diameter x 9" long al@1.67 Ea 20.00 73.35 0.87 94.22
1-1/4" diameter x 12" long al@3.33 Ea 22.00 146.30 1.73 170.03

Snap-off self drilling anchors, set in concrete


By diameter and minimum depth in concrete, using small tools.
1/4" diameter x 1-3/32" al@.455 Ea 0.86 19.98 0.24 21.08
5/16" diameter x 1-15/16" al@.526 Ea 1.04 23.10 0.27 24.41
3/8" diameter x 1-17/32" al@.588 Ea 1.19 25.82 0.31 27.32
1/2" diameter x 2-1/32" al@.769 Ea 2.13 33.77 0.40 36.30
5/8" diameter x 2-15/32" al@1.00 Ea 3.86 43.92 0.52 48.30
3/4" diameter x 3-1/4" al@1.25 Ea 5.91 54.90 0.65 61.46
7/8" diameter x 3-11/16" al@1.43 Ea 10.30 62.81 0.74 73.85

Flush self drilling anchors, set in concrete


By diameter and minimum depth in concrete, using small tools.
1/4" diameter x 1-1/4" al@.455 Ea 1.30 19.98 0.24 21.52
5/16" diameter x 1-7/32" al@.526 Ea 1.59 23.10 0.27 24.96
3/8" diameter x 1-7/16" al@.588 Ea 1.80 25.82 0.31 27.93
1/2" diameter x 1-15/16" al@.769 Ea 3.21 33.77 0.40 37.38
5/8" diameter x 2-3/8" al@1.00 Ea 5.29 43.92 0.52 49.73
3/4" diameter x 3" al@1.25 Ea 8.66 54.90 0.65 64.21
2015 Heavy Construction Estimator, All Rights Reserved Page 334 (part 2)

Multi-set anchors, set in concrete


By diameter and minimum depth, using small tools.
1/4" diameter x 1" al@.400 Ea 0.24 17.57 0.21 18.02
3/8" diameter x 1-3/8" al@.556 Ea 0.43 24.42 0.29 25.14
1/2" diameter x 1-3/4" al@.714 Ea 0.79 31.36 0.37 32.52
5/8" diameter x 2-1/4" al@.909 Ea 1.47 39.92 0.47 41.86
2015 Heavy Construction Estimator, All Rights Reserved Page 335

3/4" diameter x 2-1/2" al@1.00 Ea 2.09 43.92 0.52 46.53

Non-drilling anchors
Using small tools.
1/4" diameter
x 1-1/8" drilled depth al@.435 Ea 0.43 19.11 0.23 19.77
3/8" diameter
x 1-9/16" drilled depth al@.588 Ea 0.59 25.82 0.31 26.72
1/2" diameter
x 2-1/16" drilled depth al@.769 Ea 1.07 33.77 0.40 35.24
5/8" diameter
x 2-9/16" drilled depth al@1.00 Ea 1.70 43.92 0.52 46.14
3/4" diameter
x 3-3/16" drilled depth al@1.43 Ea 2.28 62.81 0.74 65.83
Add for drilling holes in walls ---@--- % -- 25.00 -- --
Add for drilling holes overhead ---@--- % -- 100.00 -- --

Eye bolts
Using a 200-amp trailer mounted welder and small tools.
1"x 18" qc@.533 Ea 29.30 27.67 1.88 58.85

CSI 05-503, Anchor rings

Anchor rings
3/8" diameter rod with 2" diameter ring, using small tools.
In concrete wall al@.400 Ea 3.09 17.57 0.21 20.87
In concrete floor al@.400 Ea 3.09 17.57 0.21 20.87
In concrete masonry unit al@.286 Ea 1.10 12.56 0.15 13.81

CSI 05-504, Hex bolts

Hex bolts
A325 high strength structural hex bolts with heavy hex nut, using small tools.
1/2" diameter x 1-1/2" long qa@.083 Ea 0.36 4.53 0.05 4.94
1/2" diameter x 3" long qa@.083 Ea 0.50 4.53 0.05 5.08
5/8" diameter x 2" long qa@.083 Ea 0.54 4.53 0.05 5.12
5/8" diameter x 4" long qa@.091 Ea 0.74 4.97 0.05 5.76
5/8" diameter x 6" long qa@.095 Ea 1.13 5.19 0.06 6.38
3/4" diameter x 2" long qa@.083 Ea 0.80 4.53 0.05 5.38
3/4" diameter x 4" long qa@.091 Ea 1.12 4.97 0.05 6.14
3/4" diameter x 6" long qa@.095 Ea 1.50 5.19 0.06 6.75
3/4" diameter x 8" long qa@.105 Ea 2.09 5.74 0.06 7.89
7/8" diameter x 2" long qa@.091 Ea 1.14 4.97 0.05 6.16
7/8" diameter x 4" long qa@.100 Ea 1.73 5.46 0.06 7.25
7/8" diameter x 6" long qa@.105 Ea 2.15 5.74 0.06 7.95
7/8" diameter x 8" long qa@.111 Ea 2.82 6.06 0.07 8.95
1" diameter x 2" long qa@.095 Ea 1.66 5.19 0.06 6.91
1" diameter x 4" long qa@.105 Ea 2.03 5.74 0.06 7.83
1" diameter x 6" long qa@.111 Ea 2.63 6.06 0.07 8.76
1" diameter x 8" long qa@.118 Ea 3.68 6.45 0.07 10.20
1-1/4" diameter x 3" long qa@.118 Ea 4.15 6.45 0.07 10.67
1-1/4" diameter x 4" long qa@.125 Ea 5.02 6.83 0.07 11.92
1-1/4" diameter x 6" long qa@.133 Ea 5.98 7.26 0.08 13.32
1-1/4" diameter x 8" long qa@.143 Ea 6.97 7.81 0.08 14.86

CSI 05-505, Threaded rods

Threaded rods
2015 Heavy Construction Estimator, All Rights Reserved Page 335 (part 2)

Bright finish, using small tools.


1/4" diameter qa@.040 LF 0.27 2.19 0.02 2.48
5/16" diameter qa@.044 LF 0.39 2.40 0.03 2.82
3/8" diameter qa@.046 LF 0.47 2.51 0.03 3.01
7/16" diameter qa@.048 LF 0.84 2.62 0.03 3.49
1/2" diameter qa@.050 LF 0.84 2.73 0.03 3.60
5/8" diameter qa@.053 LF 1.35 2.90 0.03 4.28
3/4" diameter qa@.056 LF 1.75 3.06 0.03 4.84
7/8" diameter qa@.059 LF 2.62 3.22 0.03 5.87
1" diameter qa@.067 LF 3.57 3.66 0.04 7.27
1-1/4" diameter qa@.083 LF 7.73 4.53 0.05 12.31
2015 Heavy Construction Estimator, All Rights Reserved Page 336

Threaded rods
Stainless steel, 304 grade, using small tools.
1/4" diameter qa@.040 LF 0.50 2.19 0.02 2.71
5/16" diameter qa@.044 LF 0.70 2.40 0.03 3.13
3/8" diameter qa@.046 LF 1.16 2.51 0.03 3.70
7/16" diameter qa@.048 LF 1.97 2.62 0.03 4.62
1/2" diameter qa@.050 LF 2.02 2.73 0.03 4.78
5/8" diameter qa@.053 LF 3.28 2.90 0.03 6.21
3/4" diameter qa@.056 LF 4.80 3.06 0.03 7.89
7/8" diameter qa@.059 LF 6.64 3.22 0.03 9.89
1" diameter qa@.067 LF 9.84 3.66 0.04 13.54
1-1/4" diameter qa@.083 LF 14.00 4.53 0.05 18.58

CSI 05-510, Metal stairs

Steel tread metal stairs


Steel grating tread, safety nosing, pipe handrail, cost per riser, using a 200-amp trailer mounted welder
and small tools.
3'6" (.92m) wide qc@.711 Ea 117.00 36.92 2.50 156.42
4'0" (1.2m) wide qc@.744 Ea 135.00 38.63 2.62 176.25
5'0" (1.5m) wide qc@.781 Ea 157.00 40.55 2.75 200.30
Steel landing
with grating and framing qc@.200 SF 50.10 10.38 0.70 61.18

Cement filled metal pan steel stairs


Rail stock units, including picket handrail, cost per riser, using a 200-amp trailer mounted welder and
small tools.
3'6" (.92m) wide qc@.711 Ea 125.00 36.92 2.50 164.42
4'0" (1.2m) wide qc@.744 Ea 142.00 38.63 2.62 183.25
5'0" (1.5m) wide qc@.781 Ea 163.00 40.55 2.75 206.30
Steel pan conventional landing qc@.200 SF 43.20 10.38 0.70 54.28

Metal stairs, cast iron tread, pipe handrail, steel stringers, stock units
Cost per riser, using a 200-amp trailer mounted welder and small tools.
3'6" (1.07m) wide qc@.711 Ea 202.00 36.92 2.50 241.42
4'0" (1.2m) wide qc@.744 Ea 248.00 38.63 2.62 289.25
5'0" (1.5m) wide qc@.781 Ea 281.00 40.55 2.75 324.30

Abrasive clad metal stair treads, 12" x 3’6",


Excluding stringers, using small tools.
5/16" cast aluminum qa@.533 Ea 82.10 29.11 0.31 111.52
3/8" cast aluminum qa@.533 Ea 89.40 29.11 0.31 118.82
1/2" cast aluminum qa@.533 Ea 103.00 29.11 0.31 132.42
3/8" cast iron qa@.533 Ea 71.10 29.11 0.31 100.52
1/2" cast iron qa@.533 Ea 71.10 29.11 0.31 100.52

CSI 05-521, Pipe and tube railing

Welded pipe handrail, 2 railings, shop painted, mounted on stairs


Using a 200-amp trailer mounted welder and small tools.
1" diameter (25mm) x 3’ high (.92m) qc@.126 LF 18.70 6.54 0.44 25.68
1-1/2" diameter
(37mm) x 3’ high (.92m) qc@.126 LF 28.10 6.54 0.44 35.08
2" diameter (51mm) x 3’ high (.92m) qc@.126 LF 34.30 6.54 0.44 41.28
Add for stainless steel handrail ---@--- % 250.00 -- -- --
Add for aluminum handrail --@.000 LF 1.18 -- -- 1.18
2015 Heavy Construction Estimator, All Rights Reserved Page 336 (part 2)

Add for 6" (150mm) high kick plate --@.000 LF 0.28 -- -- 0.28
Add for curved rail ---@--- % 20.00 30.00 -- --
Deduct for level balcony sections ---@--- % -3.00 -10.00 -- --
Add for galvanizing --@.000 LF 0.56 -- -- 0.56

Welded steel pipe wall handrail


Set on brackets, using a 200-amp trailer mounted welder and small tools.
1" (25mm) diameter qc@.126 LF 14.80 6.54 0.44 21.78
1-1/2" (37mm) diameter qc@.126 LF 15.70 6.54 0.44 22.68
2015 Heavy Construction Estimator, All Rights Reserved Page 337

2" (51mm) diameter qc@.126 LF 21.20 6.54 0.44 28.18


Add for stainless steel hand rail ---@--- % 250.00 -- -- --
Add for aluminum handrail --@.000 VLF 1.18 -- -- 1.18
Add for curved handrail ---@--- % 20.00 30.00 -- --

Steel vertical ladder, primed


Using a 200-amp trailer mounted welder and small tools.
20" (51cm) wide qc@.377 VLF 31.30 19.57 1.33 52.20
20" (51cm )wide, caged qc@.638 VLF 67.30 33.12 2.25 102.67
Add for galvanized steel ladder ---@--- % 11.00 -- -- --
Add for aluminum vertical ladder ---@--- % 33.00 -- -- --

Aluminum vertical ladder, primed


Bolted in place to concrete, using small tools.
20" (51cm) wide qa@.377 VLF 59.00 20.59 0.22 79.81
20" (51cm ) wide, caged qa@.638 VLF 102.00 34.85 0.38 137.23

CSI 05-530, Grating

Aluminum grating
With pressure-locked bearing bars, using a 200-amp trailer mounted welder and small tools.
3/4" x 1/8", 1.7 lbs. per SF qc@.029 SF 10.70 1.51 0.10 12.31
1" x 1/8", 2.1 lbs. per SF qc@.031 SF 11.50 1.61 0.11 13.22
1-1/4" x 1/8", 2.5 lbs. per SF qc@.032 SF 13.20 1.66 0.11 14.97
1-1/4" x 3/16", 3.5 lbs. per SF qc@.032 SF 17.20 1.66 0.11 18.97
1-1/2" x 1/8", 3.0 lbs. per SF qc@.033 SF 13.80 1.71 0.12 15.63
1-3/4" x 3/16", 4.8 lbs. per SF qc@.035 SF 21.70 1.82 0.12 23.64
2-1/4" x 3/16", 6.1 lbs. per SF qc@.038 SF 25.90 1.97 0.13 28.00
Add for safety serrated surfaces --@.000 SF 0.28 -- -- 0.28

Welded steel grating, painted


Using a 200-amp trailer mounted welder and small tools.
3/4" x 1/8", 4.1 lbs. per SF qc@.038 SF 5.36 1.97 0.13 7.46
1" x 1/8", 5.2 lbs. per SF qc@.040 SF 5.89 2.08 0.14 8.11
1-1/4" x 1/8", 6.3 lbs. per SF qc@.043 SF 6.68 2.23 0.15 9.06
1-1/4" x 3/16", 9.1 lbs. per SF qc@.053 SF 7.03 2.75 0.19 9.97
1-1/2" x 1/8", 7.4 lbs. per SF qc@.046 SF 8.29 2.39 0.16 10.84
1-3/4" x 3/16", 12.5 lbs. per SF qc@.071 SF 10.70 3.69 0.25 14.64

Galvanized steel grating


Welded, 2 oz. per SF galvanizing, using a 200-amp trailer mounted welder and small tools.
3/4" x 1/8", 4.1 lbs. per SF qc@.038 SF 8.34 1.97 0.13 10.44
1" x 1/8", 5.2 lbs. per SF qc@.040 SF 8.78 2.08 0.14 11.00
1-1/4" x 1/8", 6.3 lbs. per SF qc@.043 SF 9.85 2.23 0.15 12.23
1-1/4" x 3/16", 9.1 lbs. per SF qc@.053 SF 10.40 2.75 0.19 13.34
1-1/2" x 1/8", 7.4 lbs. per SF qc@.046 SF 10.10 2.39 0.16 12.65
1-3/4" x 3/16", 12.5 lbs. per SF qc@.071 SF 13.90 3.69 0.25 17.84

Trench drain cover


Heavy duty welded steel grating, using a 200-amp trailer mounted welder and small tools, using small
tools.
12" wide au@.130 LF 32.20 5.34 0.04 37.58
18" wide au@.173 LF 50.70 7.11 0.05 57.86
24" wide au@.260 LF 67.30 10.69 0.08 78.07
30" wide au@.347 LF 96.40 14.27 0.11 110.78
36" wide au@.400 LF 128.00 16.44 0.12 144.56
48" wide au@.520 LF 188.00 21.38 0.16 209.54
2015 Heavy Construction Estimator, All Rights Reserved Page 337 (part 2)

Additional costs for welded steel grating


Material costs only, using small tools.
Serrated cutting --@.000 LF 2.01 -- -- 2.01
Circular cutting --@.000 LF 3.07 -- -- 3.07
Serrated banding --@.000 LF 2.91 -- -- 2.91
Circular banding --@.000 LF 3.84 -- -- 3.84
2015 Heavy Construction Estimator, All Rights Reserved Page 338

Serrated toe plate --@.000 LF 7.03 -- -- 7.03


Circular toe plate --@.000 LF 8.78 -- -- 8.78
Add for serrated wearing surface ---@--- % 25.00 -- -- --

CSI 05-540, Castings

Miscellaneous steel castings


Using a 200-amp trailer mounted welder and small tools.
Light section, 15 lbs. or less qc@.010 LB 2.21 0.52 0.04 2.77
Heavy section, more than 15 lbs. qc@.008 LB 5.52 0.42 0.03 5.97
Add for ductile iron --@.000 % 163.00 -- -- 163.00

Manhole covers including frames - Regular city type


Using a 1.38 CY wheeled loader-backhoe and small tools.
18" (46cm)
diameter x 100 lbs. (45kg) ew@2.60 Ea 183.00 92.64 19.30 294.94
24" (61cm)
diameter x 200 lbs. (90kg) ew@2.83 Ea 260.00 100.80 21.10 381.90
24" (61cm)
diameter x 400 lbs. (181kg) ew@3.33 Ea 331.00 118.60 24.80 474.40
26" (66cm)
diameter x 600 lbs. (135kg) ew@3.71 Ea 537.00 132.20 27.60 696.80
30" (76cm)
diameter x 620 lbs. (281kg) ew@3.71 Ea 671.00 132.20 27.60 830.80
36" (91cm)
diameter x 1000 lbs. (450kg) ew@6.00 Ea 814.00 213.80 44.60 1,072.40
8" (21cm) square x 75 lbs. (34kg) ew@1.68 Ea 373.00 59.86 12.50 445.36
24" (61cm) square x 126 lbs. (57kg) ew@2.83 Ea 233.00 100.80 21.10 354.90
24" (61cm)
square x 500 lbs. (227kg) ew@3.33 Ea 342.00 118.60 24.80 485.40

Manhole covers including frames - Watertight


Using a 1.38 CY wheeled loader-backhoe and small tools.
20" (51cm)
diameter x 200 lbs. (90kg) ew@2.83 Ea 472.00 100.80 21.10 593.90
24" (61cm)
diameter x 350 lbs. (159kg) ew@3.33 Ea 569.00 118.60 24.80 712.40
Extra cover gasket kits --@.000 Ea 102.00 -- -- 102.00

Steps for manholes


Using small tools.
7" x 9", iron b7@.250 Ea 10.60 11.21 0.09 21.90
8" x 9", iron b7@.250 Ea 15.50 11.21 0.09 26.80
Standard size , galvanized steel b7@.250 Ea 17.10 11.21 0.09 28.40
Standard size, aluminum b7@.250 Ea 19.50 11.21 0.09 30.80

Aluminum manhole covers, including frame


Using small tools.
12" (31cm) square qa@1.11 Ea 334.00 60.63 0.65 395.28
18" (46cm) square qa@1.25 Ea 641.00 68.28 0.74 710.02
24" (61cm) square qa@1.43 Ea 934.00 78.11 0.84 1,012.95

Steel angle guard corner protection


With anchors, using a 200-amp trailer mounted welder and small tools.
2" x 2" x 3/16" qc@.107 LF 8.75 5.56 0.38 14.69
2" x 3" x 1/4" qc@.111 LF 5.81 5.76 0.39 11.96
3" x 3" x 5/16" qc@.116 LF 10.60 6.02 0.41 17.03
2015 Heavy Construction Estimator, All Rights Reserved Page 338 (part 2)

3" x 4" x 5/16" qc@.124 LF 9.68 6.44 0.44 16.56


4" x 4" x 5/16" qc@.133 LF 15.00 6.91 0.47 22.38
Add for
galvanized angle corner guard --@.000 LF 0.74 -- -- 0.74

Extruded aluminum ventilation boxes


To 4" (100mm) deep, using small tools.
5" x 8" b7@.400 Ea 37.60 17.94 0.14 55.68
8" x 16" b7@.455 Ea 64.70 20.41 0.15 85.26
8" x 2-1/2" b7@.333 Ea 28.00 14.94 0.11 43.05
16" x 2-1/2" b7@.400 Ea 43.70 17.94 0.14 61.78
24" x 5" b7@.455 Ea 68.20 20.41 0.15 88.76
24" x 8" b7@.500 Ea 85.70 22.43 0.17 108.30
Add for cast
aluminum ventilation boxes ---@--- % 12.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 339

CSI 05-560, Cutting and drilling

Cutting steel
Using a 200-amp trailer mounted welder and small tools.
Mild steel, 1/4" thick qc@.160 LF 0.03 8.31 0.56 8.90

CSI 05-570, Cable and accessories

Aircraft cable
Using small tools.
7x7x
1/8 galvanized aircraft cable qb@.000 LF 1.04 -- -- 1.04
Cable clamps, 1/8" qb@.160 Ea 0.86 8.74 0.09 9.69

CSI 05-651, Water control devices

Water control sluice gates, heavy duty


Self contained, including crank operated gear gate lift, anchor bolts and grouting, using a 20-ton
hydraulic crane with 70’ boom and small tools.
18" x 18" qe@18.7 Ea 7,660.00 928.30 272.00 8,860.30
24" x 24" qe@28.0 Ea 10,800.00 1,390.00 407.00 12,597.00
30" x 30" qe@31.1 Ea 13,300.00 1,544.00 452.00 15,296.00
36" x 36" qe@35.0 Ea 15,400.00 1,737.00 509.00 17,646.00
42" x 42" qe@40.0 Ea 17,200.00 1,986.00 581.00 19,767.00
48" x 48" qe@56.0 Ea 19,200.00 2,780.00 814.00 22,794.00
54" x 54" qe@84.7 Ea 31,400.00 4,205.00 1,230.00 36,835.00
60" x 60" qe@140. Ea 35,000.00 6,950.00 2,030.00 43,980.00
66" x 66" qe@140. Ea 42,600.00 6,950.00 2,030.00 51,580.00
72" x 72" qe@186. Ea 43,100.00 9,233.00 2,700.00 55,033.00
78" x 78" qe@186. Ea 50,800.00 9,233.00 2,700.00 62,733.00
84" x 84" qe@280. Ea 59,600.00 13,900.00 4,070.00 77,570.00

Water control sluice gates, heavy duty


Self contained, including crank operated gear gate lift, anchor bolts and grouting, using 40-ton hydraulic
crane with 84’ boom, and two sets of small tools.
90" x 90" qj@280. Ea 72,900.00 14,120.00 3,820.00 90,840.00
96" x 96" qj@280. Ea 84,300.00 14,120.00 3,820.00102,240.00
108" x 108" qj@372. Ea 106,000.00 18,760.00 5,070.00129,830.00
120" x 120" qj@560. Ea 131,000.00 28,240.00 7,640.00166,880.00
132" x 132" qj@560. Ea 164,000.00 28,240.00 7,640.00199,880.00

Water control steel slide gates


Self contained, including anchor bolts and grouting, using a 20-ton hydraulic crane with 70’ boom and
small tools.
12" x 12" qe@7.00 Ea 1,750.00 347.50 102.00 2,199.50
18" x 18" qe@8.00 Ea 2,450.00 397.10 116.00 2,963.10
24" x 24" qe@9.33 Ea 2,780.00 463.10 136.00 3,379.10
30" x 30" qe@11.2 Ea 3,360.00 556.00 163.00 4,079.00
36" x 36" qe@14.0 Ea 4,330.00 695.00 203.00 5,228.00
42" x 42" qe@18.7 Ea 4,880.00 928.30 272.00 6,080.30
48" x 48" qe@28.0 Ea 6,480.00 1,390.00 407.00 8,277.00
54" x 54" qe@35.0 Ea 10,500.00 1,737.00 509.00 12,746.00
60" x 60" qe@56.0 Ea 12,800.00 2,780.00 814.00 16,394.00
72" x 72" qe@93.3 Ea 14,400.00 4,631.00 1,360.00 20,391.00

Canal gates
2015 Heavy Construction Estimator, All Rights Reserved Page 339 (part 2)

Using a 20-ton hydraulic crane with 70’ boom and small tools.
12" (31cm) diameter qe@7.00 Ea 854.00 347.50 102.00 1,303.50
18" (46cm) diameter qe@8.00 Ea 1,400.00 397.10 116.00 1,913.10
24" (61cm) diameter qe@9.33 Ea 2,030.00 463.10 136.00 2,629.10
30" (76cm) diameter qe@11.2 Ea 3,280.00 556.00 163.00 3,999.00
36" (91cm) diameter qe@14.0 Ea 4,030.00 695.00 203.00 4,928.00
42" (106cm) diameter qe@18.7 Ea 7,140.00 928.30 272.00 8,340.30
48" (122cm) diameter qe@28.0 Ea 9,060.00 1,390.00 407.00 10,857.00
54" (137cm) diameter qe@35.0 Ea 13,300.00 1,737.00 509.00 15,546.00
60" (152cm) diameter qe@56.0 Ea 16,200.00 2,780.00 814.00 19,794.00
66" (167cm) diameter qe@70.0 Ea 23,000.00 3,475.00 1,020.00 27,495.00
72" (183cm) diameter qe@93.3 Ea 27,400.00 4,631.00 1,360.00 33,391.00
2015 Heavy Construction Estimator, All Rights Reserved Page 340

Water control aluminum flap gates


Using a 20-ton hydraulic crane with 70’ boom and small tools.
18" (46cm) diameter qe@7.00 Ea 923.00 347.50 102.00 1,372.50
24" (61cm) diameter qe@8.00 Ea 1,240.00 397.10 116.00 1,753.10
30" (76cm) diameter qe@9.33 Ea 1,610.00 463.10 136.00 2,209.10
36" (91cm) diameter qe@11.2 Ea 1,890.00 556.00 163.00 2,609.00
42" (106cm) diameter qe@14.0 Ea 3,550.00 695.00 203.00 4,448.00
48" (122cm) diameter qe@18.7 Ea 4,170.00 928.30 272.00 5,370.30
54" (137cm) diameter qe@28.0 Ea 7,100.00 1,390.00 407.00 8,897.00
60" (152cm) diameter qe@40.0 Ea 10,000.00 1,986.00 581.00 12,567.00
66" (167cm) diameter qe@56.0 Ea 15,200.00 2,780.00 814.00 18,794.00
72" (183cm) diameter qe@93.3 Ea 30,800.00 4,631.00 1,360.00 36,791.00

Water control knife gates


Including handwheel operator for hub, flange or spigot ends, using a 20-ton hydraulic crane with 70’
boom and small tools.
6" (15cm) diameter nh@2.69 Ea 1,200.00 129.90 7.07 1,336.97
8" (20cm) diameter nh@3.13 Ea 1,650.00 151.10 8.23 1,809.33
10" (25cm) diameter nh@4.70 Ea 2,300.00 226.90 12.40 2,539.30
12" (31cm) diameter nh@6.27 Ea 2,830.00 302.70 16.50 3,149.20
14" (36cm) diameter nh@6.71 Ea 3,560.00 324.00 17.60 3,901.60
16" (41cm) diameter nh@7.23 Ea 4,740.00 349.10 19.00 5,108.10
18" (46cm) diameter nh@7.52 Ea 6,500.00 363.10 19.80 6,882.90
20" (51cm) diameter nh@8.55 Ea 8,210.00 412.80 22.50 8,645.30
24" (61cm) diameter nh@9.40 Ea 10,700.00 453.80 24.70 11,178.50
30" (76cm) diameter nh@12.5 Ea 19,800.00 603.50 32.90 20,436.40
36" (91cm) diameter nh@18.8 Ea 26,200.00 907.70 49.40 27,157.10

CSI 05-720, Ornamental metal handrail and railings

Ornamental handrail and railings


Custom fabricated ornamental top handrail above vertical square bars spaced at 6" (150mm). Costs are
medians and will vary widely, using a 200-amp trailer mounted welder and small tools.
Steel qc@.443 LF 54.80 23.00 1.56 79.36
Aluminum qc@.610 LF 69.70 31.67 2.15 103.52
Bronze qc@.976 LF 196.00 50.67 3.44 250.11
Stainless steel qc@.812 LF 131.00 42.16 2.86 176.02

Laminated metal or wood handrail


Round or oval shape handrail with wood supports, using a 200-amp trailer mounted welder and small
tools.
2-1/2"diameter qc@.178 LF 109.00 9.24 0.63 118.87
Add for rake or angle railings ---@--- % 6.60 18.00 -- --
Add for curved railings ---@--- % .25 15.00 -- --

CSI 05-730, Ornamental sheet metal louvers, fixed

Fixed sheet metal louvers


Including frame, painted, using small tools.
4 to 10 SF (to 1.2m2) nw@.263 SF 34.90 13.04 0.15 48.09
More than 10 SF (over 1.2m2) nw@.263 SF 29.60 13.04 0.15 42.79

Movable ornamental sheet metal louvers


Using small tools.
4 to 10 SF (to 1.2m2) nw@.263 SF 48.80 13.04 0.15 61.99
More than 10 SF (over 1.2m2) nw@.263 SF 43.60 13.04 0.15 56.79
2015 Heavy Construction Estimator, All Rights Reserved Page 340 (part 2)

Add for fusible link type --@.000 SF 7.74 -- -- 7.74


Add for galvanized steel --@.000 SF 15.30 -- -- 15.30
Add for aluminum --@.000 SF 18.40 -- -- 18.40
Add for bronze --@.000 SF 23.10 -- -- 23.10
Add for stainless steel --@.000 SF 30.70 -- -- 30.70
2015 Heavy Construction Estimator, All Rights Reserved Page 341

Fixed aluminum louvers


Residential grade, including screen, using small tools.
8" x 8" al@.263 Ea 13.80 11.55 0.14 25.49
12" x 12" al@.263 Ea 16.60 11.55 0.14 28.29
12" x 18" al@.286 Ea 20.70 12.56 0.15 33.41
14" x 24" al@.333 Ea 24.90 14.63 0.17 39.70
18" x 24" al@.370 Ea 27.60 16.25 0.19 44.04
30" x 24" al@.417 Ea 38.70 18.31 0.22 57.23

CSI 05-805, Expansion joint covers

Floor expansion joint cover assemblies - 1" (25mm) opening


Using small tools.
Aluminum qa@.263 LF 20.50 14.37 0.16 35.03
Bronze qa@.263 LF 63.50 14.37 0.16 78.03
Stainless steel qa@.263 LF 48.60 14.37 0.16 63.13

Floor expansion joint cover assemblies - 2" (51mm) opening


Using small tools.
Aluminum qa@.263 LF 30.80 14.37 0.16 45.33
Bronze qa@.263 LF 84.70 14.37 0.16 99.23
Stainless steel qa@.263 LF 72.90 14.37 0.16 87.43

Ceiling and wall expansion joint cover assemblies - 1" (25mm) opening
Using small tools.
Aluminum qa@.263 LF 10.30 14.37 0.16 24.83
Bronze qa@.263 LF 42.30 14.37 0.16 56.83
Stainless steel qa@.263 LF 36.40 14.37 0.16 50.93

Ceiling and wall expansion joint cover assemblies - 2" (51mm) opening
Using small tools.
Aluminum qa@.263 LF 16.40 14.37 0.16 30.93
Bronze qa@.263 LF 52.90 14.37 0.16 67.43
Stainless steel qa@.263 LF 48.60 14.37 0.16 63.13

Exterior aluminum expansion joint cover assemblies - Roof to roof


Using small tools.
1" opening qb@.167 LF 51.40 9.12 0.10 60.62
2" opening qb@.167 LF 61.60 9.12 0.10 70.82

Exterior aluminum expansion joint cover assemblies - Roof to wall


Using small tools.
1" opening qb@.182 LF 30.80 9.94 0.11 40.85
2" opening qb@.182 LF 41.10 9.94 0.11 51.15

Exterior aluminum expansion joint cover assemblies - Flat wall to wall


Using small tools.
1" opening qb@.167 LF 14.40 9.12 0.10 23.62
2" opening qb@.167 LF 20.50 9.12 0.10 29.72

Exterior aluminum expansion joint cover assemblies - Corner to flat wall


Using small tools.
1" opening qb@.182 LF 12.30 9.94 0.11 22.35
2" opening qb@.182 LF 16.40 9.94 0.11 26.45
2015 Heavy Construction Estimator, All Rights Reserved Page 341 (part 2)

Exterior aluminum expansion joint cover assemblies - Gym floor angle covers
Using small tools.
3" X 3" angle qb@.175 LF 18.60 9.56 0.10 28.26
3" X 4" angle qb@.175 LF 22.50 9.56 0.10 32.16

Exterior aluminum expansion joint cover assemblies - Roof closures, aluminum


Using small tools.
1" space, flat roof, low profile qb@.139 LF 18.60 7.59 0.08 26.27
1" space, flat roof, high profile qb@.139 LF 22.50 7.59 0.08 30.17

Exterior aluminum expansion joint cover assemblies - Roof to wall closures, aluminum
Using small tools.
1" space, low profile qb@.139 LF 26.30 7.59 0.08 33.97
1" space, high profile qb@.139 LF 35.90 7.59 0.08 43.57

==========================================================================
Wood and plastic
==========================================================================
2015 Heavy Construction Estimator, All Rights Reserved Page 342

CSI 06-111, Light wood framing

Rafters - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 0.86 1.45 0.04 2.35
2" x 10" to 2" x 12" ap@.023 BF 0.96 1.01 0.03 2.00
Over 2" x 12" ap@.020 BF 1.05 0.88 0.02 1.95

Rafters - Southern yellow pine


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 0.72 1.45 0.04 2.21
2" x 10" to 2" x 12" ap@.023 BF 0.76 1.01 0.03 1.80
Over 2" x 12" ap@.020 BF 0.97 0.88 0.02 1.87

Rafters - Spruce and hemlock


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 0.61 1.45 0.04 2.10
2" x 10" to 2" x 12" ap@.023 BF 0.65 1.01 0.03 1.69
Over 2" x 12" ap@.020 BF 0.87 0.88 0.02 1.77

Floor joists - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 10" ap@.023 BF 0.96 1.01 0.03 2.00
2" x 12" to 2" x 14" ap@.016 BF 1.05 0.70 0.02 1.77

Floor joists - Southern yellow pine


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 10" ap@.023 BF 0.76 1.01 0.03 1.80
2" x 12" to 2" x 14" ap@.016 BF 0.97 0.70 0.02 1.69

Floor joists - Spruce and hemlock


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 10" ap@.023 BF 0.65 1.01 0.03 1.69
2" x 12" to 2" x 14" ap@.016 BF 0.87 0.70 0.02 1.59

Joists or rafters - Redwood


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 1.65 1.45 0.04 3.14
2" x 10" to 2" x 12" ap@.027 BF 1.83 1.19 0.03 3.05
For slopes steeper than 4" in 12",
ADD ---@--- % -- 25.00 -- --
For dormers or complex roofs, ADD ---@--- % -- 50.00 -- --

Joists or rafters - Cedar


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 0.91 1.45 0.04 2.40
2" x 10" to 2" x 12" ap@.027 BF 1.03 1.19 0.03 2.25
For slopes steeper than 4" in 12",
ADD ---@--- % -- 25.00 -- --
For dormers or complex roofs, ADD ---@--- % -- 50.00 -- --

Joists or rafters - Oak


Using miscellaneous power tools and small tools.
2" x 6" to 2" x 8" ap@.033 BF 1.76 1.45 0.04 3.25
2" x 10" to 2" x 12" ap@.027 BF 4.02 1.19 0.03 5.24
2015 Heavy Construction Estimator, All Rights Reserved Page 342 (part 2)

For slopes steeper than 4" in 12",


ADD ---@--- % -- 25.00 -- --
For dormers or complex roofs, ADD ---@--- % -- 50.00 -- --

Joists or rafters - Composition wood - Using miscellaneous power tools and small tools.
Using miscellaneous power tools and small tools.
9 1/2" deep ap@.017 BF 1.86 0.75 0.02 2.63
11 1/2 " deep ap@.017 BF 2.00 0.75 0.02 2.77
14" deep ap@.019 BF 2.45 0.83 0.02 3.30
16" deep ap@.020 BF 2.62 0.88 0.02 3.52

Joists or rafters - open web joist, wood - Using miscellaneous power tools and small tools.
Using miscellaneous power tools and small tools.
12" deep ap@.018 BF 2.47 0.79 0.02 3.28
14 " deep ap@.019 BF 2.50 0.83 0.02 3.35
16" deep ap@.020 BF 2.73 0.88 0.02 3.63
18" deep ap@.021 BF 3.24 0.92 0.03 4.19

Beams, joists and posts - Douglas Fir


Using miscellaneous power tools and small tools.
2" x 6" ap@.036 BF 0.75 1.58 0.04 2.37
2" x 8" ap@.030 BF 0.77 1.32 0.04 2.13
2" x 10" ap@.026 BF 0.87 1.14 0.03 2.04

Beams, joists and posts - Southern pine


Using miscellaneous power tools and small tools.
2" x 6" ap@.036 BF 0.72 1.58 0.04 2.34
2015 Heavy Construction Estimator, All Rights Reserved Page 343

2" x 8" ap@.030 BF 0.73 1.32 0.04 2.09


2" x 10" ap@.026 BF 0.82 1.14 0.03 1.99

Beams, joists and posts - Spruce and hemlock


Using miscellaneous power tools and small tools.
2" x 6" ap@.036 BF 0.61 1.58 0.04 2.23
2" x 8" ap@.030 BF 0.65 1.32 0.04 2.01
2" x 10" ap@.026 BF 0.73 1.14 0.03 1.90

Pre-assembled wood trusses


Fink or king post, 4 in 12 slope with 2"x 4" top and bottom chords, using a 50,000 lb 6x4 3-axle truck
with, a 8’ x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
To 14’ long a5@1.68 Ea 41.40 72.24 57.80 171.44
Over 14’ to 18’ long a5@1.68 Ea 53.30 72.24 57.80 183.34
Over 18’ to 22’ long a5@1.68 Ea 65.10 72.24 57.80 195.14
Over 22’ to 26’ long a5@2.25 Ea 76.90 96.75 77.40 251.05
Over 26’ to 30’ long a5@2.25 Ea 98.70 96.75 77.40 272.85
Over 30’ to 34’ long a5@2.25 Ea 112.00 96.75 77.40 286.15
Over 34’ to 38’ long a5@2.25 Ea 125.00 96.75 77.40 299.15
Over 42' to 48' long a5@2.25 Ea 208.00 96.75 77.40 382.15
Over 52' to 56' long a5@3.00 Ea 277.00 129.00 103.00 509.00
Add for 5 in 12 slope ---@--- % 3.00 -- -- --
Add for 6 in 12 slope ---@--- % 6.00 -- -- --
Add for 7 in 12 slope ---@--- % 8.00 -- -- --
Add for 8 in 12 slope ---@--- % 11.00 -- -- --
Add for 2" x 6" chords ---@--- % 20.00 -- -- --
Add for extra labor
on trusses over 30' long ---@--- % -- 50.00 -- --

Partition wall stud framing - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 3" to 2" x 4" ap@.026 BF 0.81 1.14 0.03 1.98
2" x 6" to 2" x 8" ap@.023 BF 0.86 1.01 0.03 1.90

Partition wall stud framing - Southern pine, #1 and #2


Using miscellaneous power tools and small tools.
2" x 3" to 2" x 4" ap@.026 BF 0.72 1.14 0.03 1.89
2" x 6" to 2" x 8" ap@.023 BF 0.72 1.01 0.03 1.76

Partition wall stud framing - Spruce and hemlock, standard and better
Using miscellaneous power tools and small tools.
2" x 3" to 2" x 4" ap@.026 BF 0.65 1.14 0.03 1.82
2" x 6" to 2" x 8" ap@.023 BF 0.61 1.01 0.03 1.65

Sills and plates - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 4" ap@.023 BF 0.81 1.01 0.03 1.85
2" x 6" to 2" x 8" ap@.020 BF 0.86 0.88 0.02 1.76

Sills and plates - Southern pine, #1 and #2


Using miscellaneous power tools and small tools.
2" x 4" ap@.023 BF 0.72 1.01 0.03 1.76
2" x 6" to 2" x 8" ap@.020 BF 0.72 0.88 0.02 1.62

Sills and plates - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 343 (part 2)

2" x 4" ap@.023 BF 0.65 1.01 0.03 1.69


2" x 6" to 2" x 8" ap@.020 BF 0.61 0.88 0.02 1.51

Suspended ceiling framing - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 3" ap@.036 BF 0.81 1.58 0.04 2.43
2" x 4" ap@.030 BF 0.81 1.32 0.04 2.17

Suspended ceiling framing - Southern pine, #1 and #2


Using miscellaneous power tools and small tools.
2" x 3" ap@.036 BF 0.72 1.58 0.04 2.34
2" x 4" ap@.029 BF 0.72 1.27 0.04 2.03

Suspended ceiling framing - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
2" x 3" ap@.036 BF 0.65 1.58 0.04 2.27
2" x 4" ap@.029 BF 0.65 1.27 0.04 1.96

Posts and girts - Most standard & better lumber


Using miscellaneous power tools and small tools.
4" x 4" ap@.036 BF 1.09 1.58 0.04 2.71
4" x 5" to 6" x 6" ap@.029 BF 1.38 1.27 0.04 2.69
2015 Heavy Construction Estimator, All Rights Reserved Page 344

Posts and girts - Southern pine, #1 and #2


Using miscellaneous power tools and small tools.
4" x 4" ap@.036 BF 0.96 1.58 0.04 2.58
4" x 5" to 6" x 6" ap@.029 BF 1.17 1.27 0.04 2.48

Posts and girts - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
4" x 4" ap@.036 BF 1.28 1.58 0.04 2.90
4" x 5" to 6" x 6" ap@.029 BF 1.32 1.27 0.04 2.63

Stair stringers - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 10" ap@.072 BF 0.96 3.16 0.09 4.21
2" x 12" ap@.060 BF 1.01 2.63 0.07 3.71

Stair stringers - Southern pine, #1 and #2


Using miscellaneous power tools and small tools.
2" x 10" ap@.072 BF 0.76 3.16 0.09 4.01
2" x 12" ap@.060 BF 0.97 2.63 0.07 3.67

Stair stringers - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
2" x 10" ap@.072 BF 0.65 3.16 0.09 3.90
2" x 12" ap@.060 BF 0.87 2.63 0.07 3.57

Treated sleepers - Most utility or #4 grade lumber


Using miscellaneous power tools and small tools.
1" x 2" ap@.060 BF 0.65 2.63 0.07 3.35
1" x 3" ap@.044 BF 0.65 1.93 0.05 2.63
2" x 4" ap@.036 BF 0.73 1.58 0.04 2.35
2" x 6" ap@.026 BF 0.81 1.14 0.03 1.98

Treated sleepers - Southern yellow pine, # 1 and # 2


Using miscellaneous power tools and small tools.
1" x 2" ap@.060 BF 0.75 2.63 0.07 3.45
1" x 3" ap@.045 BF 0.75 1.98 0.05 2.78
2" x 4" ap@.036 BF 0.80 1.58 0.04 2.42
2" x 6" ap@.026 BF 0.86 1.14 0.03 2.03

Treated sleepers - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
1" x 2" ap@.060 BF 0.75 2.63 0.07 3.45
1" x 3" ap@.045 BF 0.75 1.98 0.05 2.78
2" x 4" ap@.036 BF 0.82 1.58 0.04 2.44
2" x 6" ap@.026 BF 0.90 1.14 0.03 2.07

Blocking, 2" x 4" to 2" x 8 " - Most standard & better lumber
Using miscellaneous power tools and small tools.
Blocking to wood an@.050 BF 0.86 2.20 0.06 3.12
Blocking to steel an@.056 BF 0.86 2.46 0.06 3.38
Blocking to concrete an@.039 BF 0.86 1.71 0.05 2.62

Blocking, 2" x 4" to 2" x 8 " - Southern yellow pine, # 1 and # 2


Using miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 344 (part 2)

Blocking to wood an@.050 BF 0.72 2.20 0.06 2.98


Blocking to steel an@.056 BF 0.72 2.46 0.06 3.24
Blocking to concrete an@.039 BF 0.72 1.71 0.05 2.48

Blocking, 2" x 4" to 2" x 8 " - Spruce and hemlock, standard and better
Using miscellaneous power tools and small tools.
Blocking to wood an@.050 BF 0.61 2.20 0.06 2.87
Blocking to steel an@.056 BF 0.61 2.46 0.06 3.13
Blocking to concrete an@.039 BF 0.61 1.71 0.05 2.37

Light canopy framing - Most standard & better lumber


Using miscellaneous power tools and small tools.
2" x 4" ap@.040 BF 0.81 1.76 0.05 2.62
2" x 8" ap@.036 BF 0.86 1.58 0.04 2.48
3" x 8" ap@.030 BF 1.05 1.32 0.04 2.41

Light canopy framing - Southern yellow pine, # 1 and # 2


Using miscellaneous power tools and small tools.
2" x 4" ap@.040 BF 0.72 1.76 0.05 2.53
2" x 8" ap@.036 BF 0.72 1.58 0.04 2.34
3" x 8" ap@.030 BF 1.03 1.32 0.04 2.39

Light canopy framing - Spruce and hemlock, standard and better


Using miscellaneous power tools and small tools.
2" x 4" ap@.040 BF 0.65 1.76 0.05 2.46
2" x 8" ap@.036 BF 0.61 1.58 0.04 2.23
3" x 8" ap@.030 BF 0.99 1.32 0.04 2.35
2015 Heavy Construction Estimator, All Rights Reserved Page 345

Joist cross bridging, per pair at 16" (41cm) O.C. - Wood, nailed
Using miscellaneous power tools and small tools.
1 x 3 cross, per pair an@.040 Ea 0.41 1.76 0.05 2.22
2 x 3 cross, per pair an@.045 Ea 0.67 1.98 0.05 2.70

Joist cross bridging, per pair at 16" (41cm) O.C. - Steel, no nail
Using miscellaneous power tools and small tools.
16" (41cm) OC an@.020 Ea 1.10 0.88 0.02 2.00
24" (61cm) OC an@.020 Ea 1.93 0.88 0.02 2.83

Wall furring on masonry or concrete - Most #4 and better lumber


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 0.78 5.27 0.15 6.20
1" x 4" to 1" x 6" ap@.060 BF 0.89 2.63 0.07 3.59
1" x 8" to 1" x 10" ap@.036 BF 0.85 1.58 0.04 2.47
2" x 4" ap@.050 BF 0.88 2.19 0.06 3.13

Wall furring on masonry or concrete - Redwood, B grade


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 1.75 5.27 0.15 7.17
1" x 4" to 1" x 6" ap@.060 BF 1.89 2.63 0.07 4.59
1" x 8" to 1" x 10" ap@.036 BF 2.10 1.58 0.04 3.72
2" x 4" ap@.050 BF 2.03 2.19 0.06 4.28

Wall furring on masonry or concrete - Cedar, #3 and better


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 0.87 5.27 0.15 6.29
1" x 4" to 1" x 6" ap@.060 BF 0.87 2.63 0.07 3.57
1" x 8" to 1" x 10" ap@.036 BF 0.85 1.58 0.04 2.47
2" x 4", #2 and better ap@.050 BF 0.82 2.19 0.06 3.07

Wall furring on masonry or concrete - Oak


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 2.99 5.27 0.15 8.41
1" x 4" to 1" x 6" ap@.060 BF 2.99 2.63 0.07 5.69
1" x 8" to 1" x 10" ap@.036 BF 2.99 1.58 0.04 4.61
2" x 4" ap@.050 BF 5.85 2.19 0.06 8.10

Wall furring on masonry or concrete - Southern yellow pine, D and better


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 0.80 5.27 0.15 6.22
1" x 4" to 1" x 6" ap@.060 BF 0.81 2.63 0.07 3.51
1" x 8" to 1" x 10" ap@.036 BF 0.97 1.58 0.04 2.59
2" x 4", #1 and #2 ap@.050 BF 0.61 2.19 0.06 2.86

Wall furring on masonry or concrete - Spruce and hemlock, #2 and better


Using miscellaneous power tools and small tools.
1" x 1" to 1" x 2" ap@.120 BF 0.69 5.27 0.15 6.11
1" x 4" to 1" x 6" ap@.060 BF 1.22 2.63 0.07 3.92
1" x 8" to 1" x 10" ap@.036 BF 1.22 1.58 0.04 2.84
2" x 4", standard and better ap@.050 BF 1.22 2.19 0.06 3.47

CSI 06-113, Sheathing, siding, and subflooring

Roof sheathing
2015 Heavy Construction Estimator, All Rights Reserved Page 345 (part 2)

CDX grade exterior plywood machine nailed to wood rafters. Includes 10% waste, using miscellaneous
power tools and small tools.
5/16" thick 4-ply ap@.010 SF 0.67 0.44 0.01 1.12
3/8" thick 4-ply ap@.011 SF 0.72 0.48 0.01 1.21
1/2" thick 4-ply ap@.012 SF 0.72 0.53 0.01 1.26
1/2" thick 5-ply ap@.013 SF 0.74 0.57 0.02 1.33
5/8" thick 4-ply ap@.014 SF 0.87 0.61 0.02 1.50
3/4" thick ap@.015 SF 0.96 0.66 0.02 1.64

Wall sheathing, BD grade interior plywood


Applied to wood studs, using miscellaneous power tools and small tools.
5/16" thick ap@.015 SF 0.76 0.66 0.02 1.44
3/8" thick ap@.015 SF 0.79 0.66 0.02 1.47
1/2" thick ap@.016 SF 0.96 0.70 0.02 1.68
5/8" thick ap@.017 SF 1.18 0.75 0.02 1.95
3/4" thick ap@.019 SF 1.37 0.83 0.02 2.22
Add for shear wall construction ---@--- % -- 20.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 346

Add for exterior C-C grade plywood ---@--- % 15.00 -- -- --


Add for application to metal studs ---@--- % -- 20.00 -- --

Asphalt impregnated gypsum sheets


Applied on walls, using miscellaneous power tools and small tools.
2-5/32" thick, butt edge ap@.015 SF 0.67 0.66 0.02 1.35
1/2" thick, T&G ap@.015 SF 0.67 0.66 0.02 1.35

Plywood floor decking


CD grade, machine nailed to wood floor joist, using miscellaneous power tools and small tools.
1/2" thick ap@.013 SF 0.65 0.57 0.02 1.24
5/8" thick ap@.014 SF 0.83 0.61 0.02 1.46
3/4" thick ap@.014 SF 0.97 0.61 0.02 1.60

Particle board floor underlay


Machine nailed to plywood subfloor, using miscellaneous power tools and small tools.
3/8" thick ap@.012 SF 0.54 0.53 0.01 1.08
5/8" thick ap@.013 SF 0.93 0.57 0.02 1.52
3/4" thick ap@.014 SF 1.09 0.61 0.02 1.72

Plywood sheathing subfloor, CD standard grade


Machine nailed, using miscellaneous power tools and small tools.
1/2" thick ap@.012 SF 0.75 0.53 0.01 1.29
5/8" thick ap@.014 SF 0.96 0.61 0.02 1.59
3/4" thick ap@.014 SF 1.12 0.61 0.02 1.75
1-1/8" thick ap@.017 SF 1.96 0.75 0.02 2.73
Add for tongue and groove edges --@.000 SF 0.06 -- -- 0.06

Plywood underlayment subfloor


Machine nailed, X banded, C grade, using miscellaneous power tools and small tools.
5/8" thick ap@.012 SF 1.11 0.53 0.01 1.65
3/4" thick ap@.016 SF 1.35 0.70 0.02 2.07

Board subflooring, S4S 1" thick, standard and better


Using miscellaneous power tools and small tools.
1" x 8", laid straight ap@.018 SF 0.76 0.79 0.02 1.57
1" x 8", laid diagonal ap@.021 SF 0.76 0.92 0.03 1.71
1" x 10", laid straight ap@.016 SF 0.78 0.70 0.02 1.50
1" x 10", laid diagonal ap@.019 SF 0.78 0.83 0.02 1.63
Add for water resistant
coating or treatment ---@--- % 6.00 -- -- --
Add for foil backing ---@--- % 10.00 -- -- --

Wood sheet siding


Unfinished, ready to paint or stain, using miscellaneous power tools and small tools.
5/8" premium grade fir plywood ap@.015 SF 1.28 0.66 0.02 1.96
5/8" premium grade redwood plywood ap@.015 SF 1.24 0.66 0.02 1.92
8" x 16' splined
textured hardboard siding ap@.027 SF 1.57 1.19 0.03 2.79
12" x 16', hardboard drop siding ap@.026 SF 1.80 1.14 0.03 2.97

Wood lap or drop siding


1/2" or 3/4" x 6" (15 cm) or 8" (20 cm), using miscellaneous power tools and small tools.
Southern yellow pine, D grade au@.030 LF 0.76 1.23 0.01 2.00
Spruce, number 2 and better au@.030 LF 1.05 1.23 0.01 2.29
Western red cedar, B grade au@.030 LF 1.68 1.23 0.01 2.92
2015 Heavy Construction Estimator, All Rights Reserved Page 346 (part 2)

Western red cedar, A grade au@.030 LF 1.91 1.23 0.01 3.15


Clear heart redwood au@.030 LF 1.56 1.23 0.01 2.80

Wood lap or drop siding


Using small tools.
Southern yellow pine, D grade au@.030 LF 0.98 1.23 0.01 2.22
Spruce, number 2 and better au@.030 LF 1.35 1.23 0.01 2.59
2015 Heavy Construction Estimator, All Rights Reserved Page 347

Western red cedar, B grade au@.030 LF 2.18 1.23 0.01 3.42


Western red cedar, A grade au@.030 LF 2.48 1.23 0.01 3.72
Clear heart redwood au@.030 LF 2.03 1.23 0.01 3.27

CSI 06-132, Mill framed structures

Beams for mill framed structures - Most standard and better lumber
Using small tools.
6" x 8" to 6" x 10" ap@.016 BF 1.73 0.70 0.02 2.45
8" x 12" to 8" x 16" ap@.015 BF 1.99 0.66 0.02 2.67

Columns for mill framed structures - Most standard and better lumber
Using small tools.
6" x 6" ap@.028 BF 1.73 1.23 0.03 2.99
8" x 8" ap@.026 BF 1.99 1.14 0.03 3.16
10" x 10" ap@.024 BF 2.18 1.05 0.03 3.26
12" x 12" ap@.023 BF 2.18 1.01 0.03 3.22

CSI 06-220, Mouldings

Base moulding
White pine, using small tools.
1/2" x 1/2" al@.016 LF 0.41 0.70 0.01 1.12
1/2" x 1-1/2" high al@.016 LF 0.66 0.70 0.01 1.37
1" x 3" high al@.016 LF 0.97 0.70 0.01 1.68
1" x 4" high al@.016 LF 1.63 0.70 0.01 2.34
Add for clear birch moulding ---@--- % 20.00 -- -- --
Add for clear mahogany,
oak or walnut moulding ---@--- % 80.00 -- -- --

Cornices
Choice and better white pine, using small tools.
1" x 2" al@.040 LF 0.49 1.76 0.02 2.27
2015 Heavy Construction Estimator, All Rights Reserved Page 348

1" x 4" al@.042 LF 0.75 1.85 0.02 2.62


1" x 6" al@.044 LF 1.17 1.93 0.02 3.12
1" x 8" al@.046 LF 1.32 2.02 0.02 3.36
1" x 10" al@.048 LF 1.79 2.11 0.02 3.92
1" x 12" al@.050 LF 2.25 2.20 0.03 4.48

Redwood trim
Clear select redwood, using miscellaneous power tools and small tools.
1" x 4" to 1" x 6" ap@.042 BF 1.67 1.84 0.05 3.56
1" x 8" to 1" x 10" ap@.044 BF 2.14 1.93 0.05 4.12
1" x 12" ap@.045 BF 2.30 1.98 0.05 4.33

Oak trim
Using miscellaneous power tools and small tools.
1/2" x 2" casing, base or crown an@.067 LF 1.20 2.94 0.08 4.22

Chair rail, shaped, white pine


Using small tools.
5/8" x 2-1/2" al@.021 LF 1.15 0.92 0.01 2.08
5/8" x 3-1/2" al@.021 LF 1.73 0.92 0.01 2.66

Closet poles
Using small tools.
1-1/8" pine al@.057 LF 1.26 2.50 0.03 3.79
1-5/8" pine al@.057 LF 1.49 2.50 0.03 4.02
2" pine al@.057 LF 2.52 2.50 0.03 5.05
Half round, pine 1/4" x 1/2" al@.049 LF 2.86 2.15 0.03 5.04
Half round, pine 1/2" x 1" al@.052 LF 2.86 2.28 0.03 5.17

Lattice, pine
Using small tools.
1/4" x 1 1/8" pine al@.032 LF -- 1.41 0.02 1.43
1/4" x 1 3/4" pine al@.032 LF -- 1.41 0.02 1.43

Railings, oak, with metal supports


See also CSI 05521 for railing with balusters, using small tools.
Wall handrail, 1-1/2" x 4-1/2" oak al@.191 LF 6.36 8.39 0.10 14.85
Horizontal handrail,
2" x 8" red oak al@.197 LF 31.80 8.65 0.10 40.55
Raking handrail, 2" x 8" red oak al@.221 LF 31.80 9.71 0.11 41.62
Horizontal handrail,
2" x 9-1/2" red oak al@.219 LF 46.10 9.62 0.11 55.83
Rake handrail, 2" x 9-1/2" red oak al@.244 LF 46.10 10.72 0.13 56.95

Wood shelving, white pine, choice and better


Using miscellaneous power tools and small tools.
1" x 8" an@.133 LF 1.70 5.84 0.15 7.69
1" x 10" an@.143 LF 2.10 6.28 0.17 8.55
1" x 12" an@.154 LF 2.97 6.76 0.18 9.91
Add for edge band shelving ---@--- % 170.00 -- -- --

Plywood shelf, 3/4", with edge band, AA grade


Using miscellaneous power tools and small tools.
12" (31cm) wide an@.133 LF 2.19 5.84 0.15 8.18
24" (61cm) wide an@.167 LF 4.83 7.34 0.19 12.36
2015 Heavy Construction Estimator, All Rights Reserved Page 348 (part 2)

Adjustable shelf, 12" (31cm) wide


Using miscellaneous power tools.
3' (.9m) to 6' (1.8m) long an@.500 Ea 57.20 21.96 0.58 79.74
5' (1.5m) to 8' (2.4m) long an@.667 Ea 63.90 29.29 0.77 93.96

Wood shelves, with brackets and supports, 1" thick, #3 & btr. Unpainted.
Using miscellaneous power tools.
10" wide an@.133 LF 0.89 5.84 0.15 6.88
12" wide an@.143 LF 1.03 6.28 0.17 7.48
2015 Heavy Construction Estimator, All Rights Reserved Page 349

CSI 06-311, Preservative treated lumber

Creosote preservative treatment


Dosage to 8 lbs. per CF --@.000 MBF 287.00 -- -- 287.00
Dosage to 10 lbs. per CF --@.000 MBF 302.00 -- -- 302.00
Add for each additional
2 pounds per CF dosage --@.000 MBF 11.30 -- -- 11.30

ACZA lumber preservative treatment


Structural timber, 2.5 lbs. Per CF --@.000 MBF 689.00 -- -- 689.00
Boards, .6 lbs. per CF --@.000 MBF 230.00 -- -- 230.00
Non structural timbers,
.4 lbs per CF --@.000 MBF 184.00 -- -- 184.00
All-weather foundation lumber,
.6 lbs. Per CF --@.000 MBF 328.00 -- -- 328.00

CSI 06-312, Fire retardant treated lumber

Fire retardant treatment for lumber


Add the lumber cost.
Interior use "D-blaze" --@.000 MBF 295.00 -- -- 295.00
Exterior use "NCX" --@.000 MBF 689.00 -- -- 689.00

CSI 06-313, Kiln drying treatment

Kiln drying treatment for softwood lumber


Based on carload lots.
1" (25mm) thick --@.000 MBF 177.00 -- -- 177.00
2" (51mm) thick --@.000 MBF 268.00 -- -- 268.00
3" (76mm) thick --@.000 MBF 351.00 -- -- 351.00
4" (100mm) thick --@.000 MBF 435.00 -- -- 435.00
Add for dense
grain softwood or hardwoods ---@--- % 30.00 -- -- --
Add for
less than carload quantities ---@--- % 25.00 10.00 -- --

CSI 06-410, Cabinetwork

Base cabinets - Single drawer, single door


Custom-built prefinished hardwood, 34-1/2" high 24" deep, without tops, using small tools.
To 15" wide am@1.32 LF 101.00 57.97 0.73 159.70
Over 15" to 18" wide am@1.14 LF 119.00 50.07 0.63 169.70
Over 18" to 24" wide am@1.00 LF 117.00 43.92 0.55 161.47
Over 24" to 30" wide am@.813 LF 109.00 35.71 0.45 145.16
Add for 4 drawer unit ---@--- % 10.00 -- -- --

Base cabinets - Double drawer, double door


Prefinished hardwood, 34-1/2" high 24" deep, without tops, using small tools.
To 30" wide am@.744 LF 68.30 32.68 0.41 101.39
Over 30" to 36" wide am@.656 LF 98.40 28.81 0.36 127.57
Over 36" to 42" wide am@.575 LF 93.30 25.25 0.32 118.87
Over 42" to 48" wide am@.531 LF 98.90 23.32 0.29 122.51

Wall cabinets - Single door, 36" high, 13" deep


Prefinished hardwood, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 349 (part 2)

To 15" wide am@1.48 LF 105.00 65.00 0.81 170.81


Over 15" to 18" wide am@1.27 LF 93.20 55.78 0.70 149.68
Over 18" to 24" wide am@.985 LF 83.50 43.26 0.54 127.30
Over 24" to 30" wide am@.803 LF 75.40 35.27 0.44 111.11

Wall cabinets - Double door, 36" high, 13" deep


Prefinished hardwood, using small tools.
To 24" wide am@.966 LF 85.20 42.43 0.53 128.16
Over 24" to 30" wide am@.823 LF 73.70 36.15 0.45 110.30
Over 30" to 36" wide am@.709 LF 69.30 31.14 0.39 100.83
Over 6" to 42" wide am@.615 LF 72.60 27.01 0.34 99.95
Over 42" to 48" wide am@.545 LF 65.00 23.94 0.30 89.24

Wall cabinets - Single door, 24" high, 13" deep


Prefinished hardwood, using small tools.
To 24" wide al@.455 LF 68.60 19.98 0.24 88.82
2015 Heavy Construction Estimator, All Rights Reserved Page 350

Wall cabinets - Double door, 24" high, 13" deep


Prefinished hardwood, using small tools.
24" to 30" wide al@.376 LF 67.20 16.51 0.20 83.91
Over 30" to 36" wide al@.298 LF 64.40 13.09 0.15 77.64
Over 36" to 42" wide al@.270 LF 61.50 11.86 0.14 73.50
Over 42" to 48" wide al@.242 LF 60.10 10.63 0.13 70.86

Wall cabinets - Double door, 18" high, 13" deep


Prefinished hardwood, using small tools.
18" to 30" wide am@.685 LF 58.30 30.09 0.38 88.77
Over 30" wide am@.513 LF 51.20 22.53 0.28 74.01

Wall cabinets - Double door, 12" high, 13" deep


Prefinished hardwood, using small tools.
To 30" wide al@.313 LF 50.10 13.75 0.16 64.01
Over 30" to 33" wide al@.250 LF 48.60 10.98 0.13 59.71
Over 33" to 36" wide al@.233 LF 47.20 10.23 0.12 57.55

Special purpose casework


Prefinished hardwood, costs per cabinet, using small tools.
Wall corner cabinet al@2.50 Ea 94.60 109.80 1.30 205.70
Wall lazy Susan al@2.00 Ea 239.00 87.84 1.04 327.88
Base lazy Susan al@1.67 Ea 332.00 73.35 0.87 406.22
Broom cabinet al@1.43 Ea 379.00 62.81 0.74 442.55
Laminated plastic counter top al@.333 LF 32.00 14.63 0.17 46.80
Counter top cut out al@.833 Ea -- 36.59 0.43 37.02

CSI 06-420, Paneling

Hardboard paneling - Tempered, 1/4" thick


Without furring, fixtures, trim or adhesive, using miscellaneous power tools and small tools.
Natural faced ap@.041 SF 0.73 1.80 0.05 2.58
Plastic faced ap@.048 SF 1.80 2.11 0.06 3.97
Pegboard ap@.041 SF 0.81 1.80 0.05 2.66
Plastic face pegboard ap@.048 SF 1.87 2.11 0.06 4.04

Hardboard paneling - Untempered, 1/4" thick


Without furring, fixtures, trim or adhesive, using miscellaneous power tools and small tools.
Natural faced ap@.041 SF 1.04 1.80 0.05 2.89
Plastic faced ap@.048 SF 3.17 2.11 0.06 5.34
Pegboard ap@.041 SF 1.18 1.80 0.05 3.03
Plastic face pegboard ap@.048 SF 3.31 2.11 0.06 5.48
Add for adhesive ap@.008 SF 0.06 0.35 0.01 0.42
Add for aluminum trim ap@.040 LF 0.18 1.76 0.05 1.99
2015 Heavy Construction Estimator, All Rights Reserved Page 351

Unfinished plywood paneling, 1/4" thick - Birch


Without furring, fixtures or trim, using miscellaneous power tools and small tools.
Birch natural faced ap@.036 SF 0.94 1.58 0.04 2.56
Birch select ap@.036 SF 1.01 1.58 0.04 2.63
Knotty pine grade AA ap@.040 SF 4.23 1.76 0.05 6.04
Knotty pine grade AD ap@.040 SF 4.10 1.76 0.05 5.91

Cedar closet lining,


using miscellaneous power tools and small tools.
Standard grade T& G 3/8" boards ap@.045 SF 1.96 1.98 0.05 3.99
Particle board, 3/16" thick ap@.045 SF 1.00 1.98 0.05 3.03

Prefinished plywood paneling


Top grade veneers, costs vary widely, using miscellaneous power tools and small tools.
1/4" birch ap@.036 SF 2.05 1.58 0.04 3.67
1/4" cherry ap@.036 SF 2.30 1.58 0.04 3.92
1/4" chestnut ap@.036 SF 4.11 1.58 0.04 5.73
1/4" lauan ap@.036 SF 0.74 1.58 0.04 2.36
1/4" Honduras mahogany ap@.036 SF 2.30 1.58 0.04 3.92
1/4" imported red oak ap@.036 SF 2.30 1.58 0.04 3.92
1/4" pecan ap@.036 SF 2.72 1.58 0.04 4.34
1/4" rosewood ap@.036 SF 3.81 1.58 0.04 5.43
1/4" teak ap@.036 SF 4.89 1.58 0.04 6.51
1/4" walnut ap@.036 SF 3.44 1.58 0.04 5.06

Cost modifiers for plywood paneling


Add for flitch matched veneer ---@--- % 50.00 -- -- --
Deduct for second grade veneer ---@--- % -10.00 -- -- --
Deduct for third grade veneer ---@--- % -15.00 -- -- --
Add for waterproof glue ---@--- % 7.00 -- -- --
Add for ceiling installation ---@--- % -- 30.00 -- --
Add for installation
on metal studs or furring ---@--- % -- 11.00 -- --
Add for glue laminated installation ---@--- % 5.00 5.00 -- --
Add for lumber core plywood ---@--- % 11.00 -- -- --
Adjust
for 10 or 12 foot long panels ---@--- % 9.00 -5.00 -- --
Deduct for 1/8" thick paneling ---@--- % -25.00 -7.00 -- --
Add for 1/2" thick paneling ---@--- % 34.00 12.00 -- --
Add for 5/8" thick paneling ---@--- % 45.00 12.00 -- --
Add for 3/4" thick paneling ---@--- % 50.00 12.00 -- --

CSI 06-510, Fiberglass

Green fiberglass grating


Isophthalic resin system for moderately corrosive environment, using small tools.
1" with 1-1/2" square mesh, green qb@.040 SF 21.60 2.19 0.02 23.81
1-1/4" with 1-1/2" square mesh,
green qb@.040 SF 23.10 2.19 0.02 25.31
1-1/2" with 1-1/2" square mesh,
green qb@.040 SF 24.70 2.19 0.02 26.91
2" with 2" x 2" mesh, green qb@.050 SF 25.40 2.73 0.03 28.16
1" with 1" x 4" mesh, green qb@.040 SF 21.60 2.19 0.02 23.81

Orange fiberglass grating


Vi-corr resin system for highly corrosive environment, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 351 (part 2)

1" with 1-1/2"square mesh, orange qb@.040 SF 23.90 2.19 0.02 26.11
1-1/4" with 1-1/2" mesh, orange qb@.040 SF 25.40 2.19 0.02 27.61
1-1/2" with 1-1/2" mesh, orange qb@.040 SF 27.00 2.19 0.02 29.21
2" with 2" x 2" mesh, orange qb@.050 SF 28.50 2.73 0.03 31.26
1" with 1" x 4" mesh, orange qb@.040 SF 23.90 2.19 0.02 26.11

Fiberglass grating, pultruded


Isophthalic resin system for moderately corrosive environment, using small tools.
1" with 1" O.C. bar spacing, green qb@.040 SF 24.50 2.19 0.02 26.71
1" with 1-1/2" O.C. bar spacing,
green qb@.040 SF 18.50 2.19 0.02 20.71
1-1/2" with 1" O.C. bar spacing,
green qb@.050 SF 23.10 2.73 0.03 25.86
2015 Heavy Construction Estimator, All Rights Reserved Page 352

1-1/2" with 1-1/2" O.C. bar spacing,


green qb@.040 SF 21.60 2.19 0.02 23.81

Fiberglass stair treads, 10-1/2" deep


Isophthalic resin system, using small tools.
24" wide qb@.313 Ea 61.60 17.10 0.18 78.88
30" wide qb@.313 Ea 77.00 17.10 0.18 94.28
36" wide qb@.313 Ea 92.40 17.10 0.18 109.68
42" wide qb@.313 Ea 108.00 17.10 0.18 125.28

Fiberglass castings - Grating support legs


Fixed height with base --@.000 Ea 27.00 -- -- 27.00
Fixed height without base --@.000 Ea 11.60 -- -- 11.60
Adjustable to 60" --@.000 Ea 43.40 -- -- 43.40

Fiberglass castings - Threaded rods


Using small tools.
3/8" diameter qb@.050 LF 4.41 2.73 0.03 7.17
1/2" diameter qb@.050 LF 4.86 2.73 0.03 7.62
5/8" diameter qb@.057 LF 5.34 3.11 0.03 8.48
3/4" diameter qb@.057 LF 6.19 3.11 0.03 9.33

Fiberglass castings - Angle, equal legs


Using small tools.
1" x 1" x 1/8" thick qb@.067 LF 1.58 3.66 0.04 5.28
3" x 3" x 1/4" thick qb@.080 LF 6.06 4.37 0.05 10.48
4" x 4" x 1/4" thick qb@.080 LF 7.84 4.37 0.05 12.26
4" x 4" x 3/8" thick qb@.080 LF 12.10 4.37 0.05 16.52
6" x 6" x 1/2" thick qb@.100 LF 24.00 5.46 0.06 29.52

Fiberglass castings - Square tube


Using small tools.
1" x 1" x 1/8" thick qb@.067 LF 2.43 3.66 0.04 6.13
2" x 2" x 1/8" thick qb@.080 LF 4.42 4.37 0.05 8.84
3" x 3" x 1/4" thick qb@.100 LF 12.60 5.46 0.06 18.12

Fiberglass castings - Round tube


Using small tools.
1" diameter x 1/8" thick qb@.067 LF 2.17 3.66 0.04 5.87
2" diameter x 1/4" thick qb@.080 LF 6.82 4.37 0.05 11.24
3" diameter x 1/4" thick qb@.100 LF 9.72 5.46 0.06 15.24

Fiberglass castings - Square bars, solid


Using small tools.
1/2" square qb@.067 LF 1.91 3.66 0.04 5.61
1" square qb@.080 LF 5.45 4.37 0.05 9.87
1-1/2" square qb@.100 LF 11.80 5.46 0.06 17.32

Fiberglass castings - Solid round bars


Using small tools.
1/4" diameter qb@.067 LF 0.42 3.66 0.04 4.12
1/2" diameter qb@.080 LF 1.15 4.37 0.05 5.57
3/4" diameter qb@.080 LF 2.29 4.37 0.05 6.71
1" diameter qb@.100 LF 3.97 5.46 0.06 9.49
1-1/4" diameter qb@.100 LF 6.09 5.46 0.06 11.61
1-1/2" diameter qb@.114 LF 8.55 6.23 0.07 14.85
2015 Heavy Construction Estimator, All Rights Reserved Page 352 (part 2)

Fiberglass castings - Flat sheet


Using small tools.
1/8" thick qb@.114 SF 4.55 6.23 0.07 10.85
1/4" thick qb@.133 SF 8.45 7.26 0.08 15.79
3/8" thick qb@.160 SF 14.10 8.74 0.09 22.93
1/2" thick qb@.200 SF 16.80 10.92 0.12 27.84

Fiberglass castings - Wide flange beams


Using small tools.
4" x 4" x 1/4" qb@.133 LF 10.60 7.26 0.08 17.94
6" x 6" x 1/4" qb@.160 LF 19.30 8.74 0.09 28.13
8" x 8" x 3/8" qb@.200 LF 37.30 10.92 0.12 48.34

Fiberglass castings - Handrail


Pickets at 5" on center, using small tools.
42" high, 2" diameter qb@.500 LF 45.50 27.31 0.29 73.10
2015 Heavy Construction Estimator, All Rights Reserved Page 353

CSI 06-610, Plastic netting

Flexible plastic netting


Oriented flexible netting for control of birds and marine predators, using small tools.
1/8" mesh sx@.008 SF 0.39 0.28 -- 0.67
1/4" mesh sx@.008 SF 0.34 0.28 -- 0.62
1/2" mesh sx@.008 SF 0.39 0.28 -- 0.67
4" mesh sx@.008 SF 0.16 0.28 -- 0.44
5/8" x 3/4" mesh sx@.008 SF 0.16 0.28 -- 0.44
1-1/4" x 1-1/2" mesh sx@.008 SF 0.16 0.28 -- 0.44
Poly clips --@.000 Ea 1.17 -- -- 1.17

CSI 06-710, Fasteners, supports and anchors

Bolts, threaded on two ends, with 2 nuts


Using small tools.
1/8" diameter x 4" long al@.045 Ea 0.81 1.98 0.02 2.81
1/2" diameter x 4" long al@.071 Ea 1.40 3.12 0.04 4.56
1/4" diameter x 6" long al@.045 Ea 1.63 1.98 0.02 3.63
3/8" diameter x 6" long al@.045 Ea 1.72 1.98 0.02 3.72
1/2" diameter x 6" long al@.045 Ea 1.87 1.98 0.02 3.87
1/2" diameter x 7-1/2" long al@.077 Ea 2.34 3.38 0.04 5.76
3/4" diameter x 7-1/2" long al@.077 Ea 2.80 3.38 0.04 6.22
3/4" diameter x 15" long al@.105 Ea 3.35 4.61 0.05 8.01
Add for drilling
holes in wood 1/2" diameter an@.013 Inch -- 0.57 0.02 0.59
Add for drilling
holes in wood 3/4" diameter an@.019 Inch -- 0.83 0.02 0.85
Washers, 2" x 2" x 1/8" al@.022 Ea 1.83 0.97 0.01 2.81
Washers, 3" x 3" x 3/16" al@.022 Ea 3.91 0.97 0.01 4.89
Washers, 3" x 3" x 1/2" al@.022 Ea 4.01 0.97 0.01 4.99

Sheet Metal screws


Using small tools.
# 8, 3/4" long, plain --@.000 C 3.76 -- -- 3.76
# 8, 3/4" long, galvanized --@.000 C 4.61 -- -- 4.61
# 10, 1" long, plain --@.000 C 5.15 -- -- 5.15
# 10, 1" long, galvanized --@.000 C 5.94 -- -- 5.94
# 14, 1" long, plain, with washers --@.000 C 15.20 -- -- 15.20
# 14, 1" long,
galvanized, with washers --@.000 C 16.60 -- -- 16.60
# 14, 2" long, plain, with washers --@.000 C 23.00 -- -- 23.00
# 14, 2" long,
galvanized, with washers --@.000 C 25.00 -- -- 25.00
Self-drilling, # 8, 3/4" long,
plain, with washers --@.000 C 6.58 -- -- 6.58
Self-drilling, # 8, 3/4" long,
galvanized, with washers --@.000 C 9.30 -- -- 9.30
Self-drilling, # 10, 3/4" long,
plain, with washers --@.000 C 8.66 -- -- 8.66
Self-drilling, # 10, 3/4" long,
galvanized, with washers --@.000 C 9.95 -- -- 9.95
Self-drilling, # 14, 1" long, stainless steel,
with washers --@.000 C 24.70 -- -- 24.70
Self-drilling, # 14, 2" long, stainless steel,
with washers --@.000 C 34.30 -- -- 34.30
2015 Heavy Construction Estimator, All Rights Reserved Page 353 (part 2)

Nails
Using small tools.
Common, 3d to 60d, plain --@.000 Lb 1.22 -- -- 1.22
Common, 3d to 60d, galvanized --@.000 Lb 1.81 -- -- 1.81
Common, 3d to 60d, aluminum --@.000 Lb 8.38 -- -- 8.38
Common, 4d to 60d,
plain, spiral thread --@.000 Lb 1.73 -- -- 1.73
Common, 4d to 60d,
galvanized, spiral thread --@.000 Lb 1.97 -- -- 1.97
Drywall nails, plain --@.000 Lb 1.73 -- -- 1.73
Drywall nails, galvanized --@.000 Lb 2.14 -- -- 2.14
Finish nails, 4d to 10d, plain --@.000 Lb 1.59 -- -- 1.59
Finish nails, 4d to 10d, galvanized --@.000 Lb 1.73 -- -- 1.73
Masonry nails,
hardened, 3/4" to 3", plain --@.000 Lb 1.68 -- -- 1.68
Masonry nails, hardened,
3/4" to 3", galvanized --@.000 Lb 2.04 -- -- 2.04
Flooring nails,
hardened, 2d to 10d, plain --@.000 Lb 1.64 -- -- 1.64
Flooring nails, hardened,
2d to 10d, galvanized --@.000 Lb 1.89 -- -- 1.89
Roofing nails, threaded, galvanized --@.000 Lb 1.59 -- -- 1.59
Roofing nails, threaded, aluminum --@.000 Lb 7.89 -- -- 7.89
Roofing nails, compressed lead head,
threaded, galvanized --@.000 Lb 1.68 -- -- 1.68
Siding nails,
plain shank, galvanized --@.000 Lb 1.99 -- -- 1.99
Siding nails, plain shank, aluminum --@.000 Lb 6.57 -- -- 6.57
Add for cement coating --@.000 Lb 0.13 -- -- 0.13
Add for zinc or tin plating --@.000 Lb 0.25 -- -- 0.25
2015 Heavy Construction Estimator, All Rights Reserved Page 354

Joist and beam hangers


Using small tools.
18 gauge for 2 x 4 joist al@.057 Ea 0.67 2.50 0.03 3.20
18 gauge for 2 x 6 to 2 x 10 joist al@.061 Ea 0.84 2.68 0.03 3.55
16 gauge for 3 x 6 to 3 x 9 joist al@.063 Ea 1.50 2.77 0.03 4.30
16 gauge for 3 x 10 to 3 x 14 joist al@.063 Ea 2.07 2.77 0.03 4.87
16 gauge for 4 x 6 to 4 x 8 joist al@.065 Ea 1.86 2.86 0.03 4.75
16 gauge for 4 x 10 to 4 x 14 joist al@.065 Ea 3.00 2.86 0.03 5.89
16 gauge for
(2) 2 x 6 to (2) 2 x 10 joist al@.068 Ea 3.20 2.99 0.04 6.23
16 gauge for (2)
2 x 10 to (2) 2 x 14 joist al@.069 Ea 3.87 3.03 0.04 6.94
3/16" thick for 6 x 8 joist al@.063 Ea 6.64 2.77 0.03 9.44
3/16" thick for 6 x 10 joist al@.063 Ea 7.35 2.77 0.03 10.15
3/16" thick for 6 x 12 joist al@.065 Ea 10.20 2.86 0.03 13.09
1/4" thick for 6 x 14 joist al@.051 Ea 10.20 2.24 0.03 12.47

Plywood clips
Using small tools.
Plywood clips, extruded aluminum,
H clip, 1/2" --@.000 Ea 0.07 -- -- 0.07
Plywood clips, extruded aluminum,
H clip, 5/8" --@.000 Ea 0.11 -- -- 0.11
Plywood clips, extruded aluminum,
H clip, 3/4" --@.000 Ea 0.13 -- -- 0.13

Post framing anchors


Using small tools.
16 gauge with 4 x 4 base al@.077 Ea 6.66 3.38 0.04 10.08
16 gauge with 4 x 4 cap al@.077 Ea 4.02 3.38 0.04 7.44

Rafter anchors
18 gauge, 1-1/2" wide, using small tools.
5-1/4" (13.1cm) long al@.069 Ea 0.48 3.03 0.04 3.55
10-3/4" (26cm) long al@.069 Ea 0.77 3.03 0.04 3.84

CSI 06-720, Supports

Framing connectors and supports


Using small tools.
Shear plates,
2-5/8" (6.7cm) diameter al@.083 Ea 2.70 3.65 0.04 6.39
Shear plates, 4" (10 cm) diameter al@.087 Ea 6.45 3.82 0.05 10.32
Sill anchors, embedded in concrete al@.087 Ea 1.86 3.82 0.05 5.73
Spike grids,
4" x 4", flat or curved al@.083 Ea 2.23 3.65 0.04 5.92
Split rings,
2-1/2" (6.3cm) diameter al@.083 Ea 4.83 3.65 0.04 8.52
Split rings, 4" (10 cm) diameter al@.091 Ea 6.50 4.00 0.05 10.55
Strap ties, 14 gauge,
1-3/8" wide, 12" (31cm) long al@.056 Ea 1.50 2.46 0.03 3.99
Strap ties, 14 gauge,
1-3/8" wide, 18" (46cm) long al@.059 Ea 2.80 2.59 0.03 5.42
Strap ties, 14 gauge,
1-3/8" wide, 24" (61cm) long al@.063 Ea 4.06 2.77 0.03 6.86
Strap ties, 14 gauge,
1-3/8" wide, 36" (91cm) long al@.067 Ea 5.51 2.94 0.03 8.48
2015 Heavy Construction Estimator, All Rights Reserved Page 354 (part 2)

Toothed rings, 2-5/8" or 4" al@.083 Ea 6.83 3.65 0.04 10.52


Washers, 2" x 2" x 1/8" al@.022 Ea 1.63 0.97 0.01 2.61
Washers, 3" x 3" x 3/16" al@.022 Ea 3.47 0.97 0.01 4.45
Bolts, 1/8" x 4" al@.125 Ea 1.63 5.49 0.07 7.19
Bolts, 1/4" x 6" al@.143 Ea 2.57 6.28 0.07 8.92
Bolts, 3/8" x 6" al@.167 Ea 2.43 7.34 0.09 9.86
Bolts, 1/2" x 6" al@.200 Ea 3.34 8.78 0.10 12.22

==========================================================================
Thermal and moisture protection
==========================================================================
2015 Heavy Construction Estimator, All Rights Reserved Page 355

CSI 07-111, Elastomeric membrane waterproofing on walls

Wall membrane waterproofing - Butyl


Using small tools.
1/32" c7@3.51 CSF 112.00 146.50 1.19 259.69
1/16" c7@3.51 CSF 153.00 146.50 1.19 300.69

Wall membrane waterproofing - Butyl with nylon


Using small tools.
1/32" c7@3.51 CSF 139.00 146.50 1.19 286.69
1/16" c7@3.51 CSF 163.00 146.50 1.19 310.69

Wall membrane waterproofing - Neoprene


Using small tools.
1/32" c7@4.51 CSF 226.00 188.20 1.53 415.73
1/16" c7@4.51 CSF 362.00 188.20 1.53 551.73

Wall membrane waterproofing - Neoprene with nylon


Using small tools.
1/32" c7@4.51 CSF 238.00 188.20 1.53 427.73
1/16" c7@4.51 CSF 373.00 188.20 1.53 562.73

Plastic vapor barrier (polyethylene)


Applied to walls, using small tools.
4 mil al@.270 CSF 1.53 11.86 0.14 13.53
6 mil al@.270 CSF 3.14 11.86 0.14 15.14
10 mil al@.270 CSF 6.35 11.86 0.14 18.35
Add for joint taping ---@--- % 5.00 28.00 -- --
Add for each additional ply ---@--- % 80.00 80.00 -- --
Deduct for application
to horizontal surfaces ---@--- % -- -15.00 -- --

CSI 07-112, Bituminous membrane waterproofing on walls

Asphalt felt waterproofing, 15 lbs.


Mopped on walls, using a 400 lb. roofing kettle with pump and small tools.
1 ply c8@2.20 CSF 74.30 86.53 2.38 163.21
2 ply c8@2.63 CSF 91.00 103.40 2.84 197.24
3 ply c8@3.13 CSF 115.00 123.10 3.38 241.48
4 ply c8@3.76 CSF 127.00 147.90 4.06 278.96
5 ply c8@4.52 CSF 144.00 177.80 4.88 326.68
Add for 30 lb. felt ---@--- % 25.00 -- -- --
Deduct for application
to horizontal surfaces ---@--- % -- -15.00 -- --

CSI 07-113, Modified asphalt membrane waterproofing

Fibrous asphalt felt


Mopped on walls, using a 400 lb. roofing kettle with pump and small tools.
1 ply c8@2.67 CSF 79.10 105.00 2.88 186.98
2 ply c8@3.39 CSF 93.40 133.30 3.66 230.36
3 ply c8@3.61 CSF 120.00 142.00 3.90 265.90
4 ply c8@3.86 CSF 134.00 151.80 4.17 289.97
5 ply c8@4.15 CSF 146.00 163.20 4.48 313.68
2015 Heavy Construction Estimator, All Rights Reserved Page 355 (part 2)

Asphalt coated protective board


Applied on vertical surfaces, using small tools.
1/8" c6@2.14 CSF 103.00 89.32 0.73 193.05
1/4" c6@2.22 CSF 146.00 92.66 0.75 239.41
3/8" c6@2.31 CSF 163.00 96.42 0.79 260.21
1/2" c6@2.41 CSF 194.00 100.60 0.82 295.42
Deduct for application
to horizontal surfaces ---@--- % -- -15.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 356

CSI 07-121, Liquid waterproofing

Fluid applied neoprene


Using small tools.
50 mil, 4 coats c7@2.70 CSF 367.00 112.70 0.92 480.62
90 mil, 4 coats c7@2.70 CSF 510.00 112.70 0.92 623.62

Tab extended polyurethane


Using small tools.
.05" thick c7@2.00 CSF 194.00 83.48 0.68 278.16

Fluid applied rubber based polyurethane


Using small tools.
6 mil thick, applied in 2 coats c7@.028 SF 1.12 1.17 0.01 2.30

One part solution of chlorosulfonated polyethylene polymer


Using small tools.
15 mil, finished coat c7@.020 SF 1.74 0.84 0.01 2.59
Deduct for application
to horizontal surfaces ---@--- % -- -15.00 -- --

CSI 07-130, Bentonite waterproofing

Bentonite applied to walls 4' x 4' panels


Using small tools.
3/16" panels c6@2.30 CSF 127.00 96.00 0.78 223.78
1/4" panels c6@2.49 CSF 137.00 103.90 0.85 241.75
5/8" panels c6@2.53 CSF 216.00 105.60 0.86 322.46
3/8" granular Bentonite, troweled c6@2.11 CSF 173.00 88.07 0.72 261.79
Deduct for application
to horizontal surfaces ---@--- % -- -15.00 -- --

Granular admixtures, trowel on, 3/8" thick


Using small tools.
Troweled on 3/8" thick c6@2.50 CSF 183.00 104.40 0.85 288.25

Drain board, expanded polystyrene, binder encapsulated


Using small tools.
1" thick c6@.019 SF 0.71 0.79 0.01 1.51
2" thick c6@.019 SF 1.18 0.79 0.01 1.98
3" thick c6@.019 SF 1.61 0.79 0.01 2.41
4" thick c6@.019 SF 1.95 0.79 0.01 2.75
Filter fabric c6@.019 SF 0.62 0.79 0.01 1.42

CSI 07-140, Metallic oxide waterproofing

Metallic oxide waterproofing


Iron compound troweled flat, using small tools.
5/8" thick be@2.85 CSF 168.00 121.40 0.57 289.97
3/4" thick be@2.94 CSF 196.00 125.30 0.59 321.89
1" (25mm) thick be@3.15 CSF 224.00 134.20 0.63 358.83
Add for surface preparation and cleaning,
if required ---@--- % -- 15.00 -- --

CSI 07-150, Dampproofing


2015 Heavy Construction Estimator, All Rights Reserved Page 356 (part 2)

Patch neoprene roof


Using small tools.
1/16" thick patch on neoprene
roof (5 to 20 square feet) c7@.222 SF 5.10 9.27 0.08 14.45

CSI 07-160, Bituminous dampproofing

Asphalt dampproofing
Using small tools.
Primer plus 1 coat c6@2.50 CSF 10.90 104.40 0.85 116.15
Primer plus 2 coats c6@4.50 CSF 16.10 187.80 1.53 205.43
Primer plus 3 coats c6@5.00 CSF 24.20 208.70 1.70 234.60

Fibrous asphalt dampproofing, troweled on hot


Using small tools.
Hot primer plus 1 coat c6@2.70 CSF 16.60 112.70 0.92 130.22
Hot primer plus 2 coats c6@4.30 CSF 20.70 179.50 1.46 201.66
Hot primer plus 3 coats c6@5.50 CSF 22.70 229.60 1.87 254.17

Asphaltic paint dampproofing, one coat


Using small tools.
Brushed on c6@1.10 CSF 32.60 45.91 0.37 78.88
Sprayed on c6@.909 CSF 54.30 37.94 0.31 92.55
2015 Heavy Construction Estimator, All Rights Reserved Page 357

CSI 07-170, Sprayed silicone dampproofing

Asphaltic paint dampproofing, one coat


Silicone retarder. Add scaffolding cost if required, using miscellaneous power tools and small tools.
1 coat on concrete c9@.667 CSF 73.40 27.84 1.29 102.53
2 coats on concrete c9@.909 CSF 120.00 37.94 1.76 159.70
1 coat on concrete block c9@.807 CSF 73.40 33.68 1.57 108.65
2 coats on concrete block c9@1.11 CSF 120.00 46.33 2.15 168.48
1 coat on brick c9@.909 CSF 81.60 37.94 1.76 121.30
2 coats on brick c9@.694 CSF 147.00 28.97 1.35 177.32

CSI 07-180, Cementitious dampproofing

Cement parging, 2 coats, 1/2" thick


Using small tools.
1/2" on interior faces ca@9.47 CSF 15.00 385.00 2.94 402.94
1/2" on exterior faces ca@9.47 CSF 22.50 385.00 2.94 410.44

CSI 07-210, Building insulation

Fiberglass flexible insulation


Applied between studs or joists 16" O.C, using small tools.
2" kraft faced, R7 al@.008 SF 0.31 0.35 -- 0.66
2-1/2" kraft faced, R8 al@.008 SF 0.35 0.35 -- 0.70
4" kraft faced, R11 al@.009 SF 0.57 0.40 -- 0.97
6" kraft faced, R19 al@.010 SF 0.81 0.44 0.01 1.26
2" foil 1 side, R7 al@.008 SF 0.74 0.35 -- 1.09
3" foil 1 side, R11 al@.008 SF 0.80 0.35 -- 1.15
6-1/2" foil 1 side, R19 al@.010 SF 0.89 0.44 0.01 1.34
10" foil 1 side, R30 al@.011 SF 1.16 0.48 0.01 1.65
2" foil 2 sides, R7 al@.008 SF 0.83 0.35 -- 1.18
3" foil 2 sides, R11 al@.008 SF 1.02 0.35 -- 1.37
4" foil 2 sides, R14 al@.009 SF 1.20 0.40 -- 1.60
6" foil 2 sides, R21 al@.010 SF 1.29 0.44 0.01 1.74
3-1/2" unfaced batt, R11 al@.009 SF 0.50 0.40 -- 0.90
6-1/4" unfaced batt, R19 al@.010 SF 0.81 0.44 0.01 1.26
10" unfaced batt, R30 al@.011 SF 1.29 0.48 0.01 1.78
12" unfaced batt, R38 al@.011 SF 1.37 0.48 0.01 1.86
Deduct for 24" O.C. spacing ---@--- % -- 33.00 -- --

Vinyl backed blanket insulation


Applied between studs or joists, using miscellaneous power tools and small tools.
3" vinyl backed R-10 n4@.010 SF 0.30 0.44 0.01 0.75
4" vinyl backed R-13 n4@.010 SF 0.35 0.44 0.01 0.80
6" vinyl backed R-19 n4@.010 SF 0.55 0.44 0.01 1.00

Mineral wool batts


Applied between studs or joists, using small tools.
2" kraft faced, R6 batt al@.007 SF 0.28 0.31 -- 0.59
4" kraft faced, R12 batt al@.007 SF 0.41 0.31 -- 0.72
6" kraft faced, R19 batt al@.008 SF 0.65 0.35 -- 1.00
9" kraft faced, R-30 batt al@.009 SF 1.13 0.40 -- 1.53

Exterior insulation and finish system (EIFS)


1/4" plaster finish coat over glass fiber mesh bonded with adhesive to insulation board. Add the cost of
scaffolding if needed, using a 6 CF 8 HP portable concrete mixer and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 357 (part 2)

1" polystyrene, R5 ct@.056 SF 2.87 2.38 0.05 5.30


2" polystyrene, R10 ct@.056 SF 3.24 2.38 0.05 5.67
3" polystyrene, R15 ct@.056 SF 3.70 2.38 0.05 6.13

CSI 07-211, Loose fill insulation

Loose insulation, poured type


Per square foot of overall area including joists, using small tools.
3" masonry cavity wall fill al@.006 SF 0.50 0.26 -- 0.76
2015 Heavy Construction Estimator, All Rights Reserved Page 358

4" masonry cavity wall fill al@.006 SF 0.74 0.26 -- 1.00


8" masonry cavity wall fill al@.008 SF 1.09 0.35 -- 1.44
Expanded shale al@.050 SF 3.35 2.20 0.03 5.58
Vermiculite
or perlite poured 3" deep al@.007 SF 1.10 0.31 -- 1.41
R4 polystyrene al@.050 SF 0.80 2.20 0.03 3.03
Add for installation
above the 4th floor ---@--- % -- 33.00 -- --

Blown-in fiberglass or rockwool


Attic application, per cubic foot of overall area including joists, using 24,500 lb. 2-axle truck, with 8' x 16'
flat bed and small tools.
6" (150 mm) R13 ad@.009 SF 0.53 0.41 0.09 1.03
8" (200mm) R19 ad@.011 SF 0.70 0.50 0.11 1.31
10" (250 mm) R22 ad@.014 SF 1.11 0.63 0.13 1.87
12" (300 mm) R26 ad@.015 SF 1.20 0.68 0.14 2.02
15" (375 mm) R30 ad@.016 SF 1.32 0.72 0.15 2.19

CSI 07-213, Rigid insulation for roofs

Rigid roof insulation panels


Using small tools.
1" mineral fiberboard, R4.17 c6@.013 SF 0.68 0.54 -- 1.22
2" mineral fiberboard, R5.26 c6@.013 SF 1.46 0.54 -- 2.00
3" mineral fiberboard c6@.014 SF 1.74 0.58 -- 2.32
1" fiberglass, R3.5 c6@.011 SF 1.04 0.46 -- 1.50
2" fiberglass, R8.2 c6@.013 SF 1.50 0.54 -- 2.04
3" fiberglass, R12.4 c6@.014 SF 2.16 0.58 -- 2.74
1" polystyrene, R4.0 c6@.013 SF 0.74 0.54 -- 1.28
2" polystyrene, R8.0 c6@.013 SF 1.29 0.54 -- 1.83
3" polystyrene, R15.0 c6@.014 SF 2.03 0.58 -- 2.61
3/4" urethane , R5.1 c6@.011 SF 0.81 0.46 -- 1.27
1" urethane , R6.7 c6@.013 SF 1.07 0.54 -- 1.61
1-1/2" urethane , R10 c6@.013 SF 1.44 0.54 -- 1.98
2" urethane , R13.3 c6@.013 SF 1.89 0.54 -- 2.43
3" urethane, R25 c6@.014 SF 3.14 0.58 -- 3.72
1" foam glass, R2.6 c6@.013 SF 2.59 0.54 -- 3.13
1-1/2"foam glass, R3.9 c6@.013 SF 3.51 0.54 -- 4.05
2" foam glass, R5.2 c6@.013 SF 4.25 0.54 -- 4.79
3" foam glass, R7.89 c6@.013 SF 4.99 0.54 -- 5.53
1" wood fiber, R4.0 c6@.013 SF 3.88 0.54 -- 4.42
2" wood fiber, R8.0 c6@.014 SF 4.71 0.58 -- 5.29
2015 Heavy Construction Estimator, All Rights Reserved Page 359

3" wood fiber c6@.017 SF 5.92 0.71 0.01 6.64


3/4"particle board, R2.08 c6@.011 SF 0.83 0.46 -- 1.29
1" particle board, R2.78 c6@.013 SF 1.15 0.54 -- 1.69
2" particle board, R5.20 c6@.014 SF 1.39 0.58 -- 1.97
3" particle board, R7.5 c6@.017 SF 1.66 0.71 0.01 2.38
Add for vapor barrier
integral with insulation --@.000 SF 0.04 -- -- 0.04
Add for foil coating
integral with insulation --@.000 SF 0.09 -- -- 0.09
Add for factory painted on one side --@.000 SF 0.04 -- -- 0.04
Add for tapered roof insulation ---@--- % -- 50.00 -- --
Add for application
on vertical surfaces ---@--- % -- 10.00 -- --

Rigid foil backed polystyrene roof insulation panels


Using small tools.
3/8" polystyrene al@.013 SF 1.04 0.57 0.01 1.62
1/2" polystyrene al@.013 SF 0.74 0.57 0.01 1.32
3/4" polystyrene al@.013 SF 0.89 0.57 0.01 1.47

CSI 07-215, Sprayed on insulation

Sprayed foam insulation


Using a 1/2 CY per hour shotcrete gun and mixer rig and small tools.
1" foam spray, R4 polystyrene cu@.010 SF 0.48 0.40 0.05 0.93
1" foam spray, R7.7 urethane cu@.010 SF 0.74 0.40 0.05 1.19
2" foam spray, R8 polystyrene cu@.015 SF 0.82 0.60 0.07 1.49
2" foam spray, R15.4 urethane cu@.015 SF 1.03 0.60 0.07 1.70
Add for 1" (25mm) thick installation
on vertical surfaces ---@--- % -- 10.00 -- --
Add for 2" (51mm) thick installation
on vertical surfaces ---@--- % -- 17.00 -- --

Sprayed perlite insulation


Using a 1/2 CY per hour shotcrete gun and mixer rig and small tools.
1" perlite, R2.7 cu@.016 SF 0.69 0.64 0.08 1.41

CSI 07-216, Freezer and chiller panel insulation

Polyurethane sandwich panel cold box insulation - 22 gauge galvanized steel


Add the cost of a ceiling suspension system and painting, using small tools.
2", sheet metal both faces n9@.015 SF 2.52 0.70 0.01 3.23
3", sheet metal both faces n9@.015 SF 2.70 0.70 0.01 3.41
4", sheet metal both faces n9@.016 SF 3.30 0.75 0.01 4.06
5", sheet metal both faces n9@.017 SF 3.60 0.80 0.01 4.41
6", sheet metal both faces n9@.018 SF 3.84 0.84 0.01 4.69
2", sheet metal one face (liner) n9@.012 SF 2.28 0.56 0.01 2.85
3", sheet metal one face (liner) n9@.012 SF 2.52 0.56 0.01 3.09
4", sheet metal one face (liner) n9@.012 SF 3.12 0.56 0.01 3.69
5", sheet metal one face (liner) n9@.013 SF 3.00 0.61 0.01 3.62
6", sheet metal one face (liner) n9@.014 SF 3.60 0.66 0.01 4.27

Polyurethane sandwich panel cold box insulation - .040" aluminum


Add the cost of ceiling suspension system. Baked enamel finish, using small tools.
2" aluminum finish both faces n9@.015 SF 2.64 0.70 0.01 3.35
3", aluminum finish both faces n9@.015 SF 2.88 0.70 0.01 3.59
4", aluminum finish both faces n9@.016 SF 3.48 0.75 0.01 4.24
5", aluminum finish both faces n9@.017 SF 3.84 0.80 0.01 4.65
2015 Heavy Construction Estimator, All Rights Reserved Page 359 (part 2)

6", aluminum finish both faces n9@.018 SF 4.08 0.84 0.01 4.93
2", aluminum
finish one face (liner panel) n9@.012 SF 2.40 0.56 0.01 2.97
3", aluminum
finish one face (liner panel) n9@.012 SF 2.64 0.56 0.01 3.21
4", aluminum
finish one face (liner panel) n9@.012 SF 2.88 0.56 0.01 3.45
5", aluminum
finish one face (liner panel) n9@.013 SF 3.48 0.61 0.01 4.10
6", aluminum
finish one face (liner panel) n9@.014 SF 3.84 0.66 0.01 4.51
2015 Heavy Construction Estimator, All Rights Reserved Page 360

CSI 07-310, Shingles

Composition fiberglass roofing shingles


Using small tools.
20 year, 240 lb. c6@1.82 SQ 62.60 75.97 0.62 139.19
25 year architectural shingle c6@2.08 SQ 77.10 86.82 0.71 164.63
30 year architectural shingle c6@2.08 SQ 118.00 86.82 0.71 205.53
40 year architectural shingle c6@2.08 SQ 137.00 86.82 0.71 224.53

Aluminum roofing shingles


Using small tools.
Mill finish, .020 thick c6@1.80 CSF 408.00 75.13 0.61 483.74

Asphalt felt underlayment for roofing


Using small tools.
15 lb. felt c6@.200 CSF 10.90 8.35 0.07 19.32
30 lb. felt c6@.200 CSF 26.20 8.35 0.07 34.62

Wood shingle roofing


Based on 16" shingles with 5" exposure, using miscellaneous power tools and small tools.
Number 1 cedar shingles, cut ap@2.00 SQ 243.00 87.76 2.42 333.18
Number 2 cedar shingles, cut ap@2.00 SQ 171.00 87.76 2.42 261.18

Wood shingle roofing


Based on 18" shingles with 5" exposure, using miscellaneous power tools and small tools, using
miscellaneous power tools and small tools.
Number 1 cedar shingles, cut ap@2.00 SQ 255.00 87.76 2.42 345.18
Number 2 cedar shingles, cut ap@2.00 SQ 199.00 87.76 2.42 289.18

CSI 07-320, Tile roofing

Clay tile
Including typical hip, ridge and rake units, using small tools.
Spanish tile roofing c6@3.50 SQ 112.00 146.10 1.19 259.29
Mission tile roofing c6@5.84 SQ 210.00 243.80 1.99 455.79
French tile roofing c6@5.40 SQ 319.00 225.40 1.84 546.24
Williamsburg tile roofing c6@5.40 SQ 243.00 225.40 1.84 470.24

Concrete tile
Using small tools.
Earthtone colors c6@3.25 SQ 107.00 135.70 1.11 243.81
Blue concrete tile roofing c6@3.25 SQ 175.00 135.70 1.11 311.81
Green concrete tile roofing c6@3.25 SQ 130.00 135.70 1.11 266.81

CSI 07-410, Preformed roofing

Aluminum roof panels - Corrugated, including fasteners


For structural steel framing, including fasteners, using miscellaneous power tools and small tools.
.024", natural n4@.019 SF 2.62 0.83 0.01 3.46
.032", natural n4@.019 SF 3.05 0.83 0.01 3.89
.024", painted n4@.019 SF 3.27 0.83 0.01 4.11
.032", painted n4@.019 SF 4.03 0.83 0.01 4.87

Aluminum roof panels - V-beam aluminum roof panels


Including fasteners, using miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 360 (part 2)

.032",natural n4@.020 SF 2.70 0.87 0.01 3.58


.040",natural n4@.020 SF 3.42 0.87 0.01 4.30
.050",natural n4@.020 SF 4.25 0.87 0.01 5.13
.032", painted n4@.020 SF 3.97 0.87 0.01 4.85
.040", painted n4@.020 SF 5.06 0.87 0.01 5.94
.050", painted n4@.020 SF 5.34 0.87 0.01 6.22

Steel roof panels - Corrugated


Painted, including fasteners. For structural steel framing, using miscellaneous power tools and small
tools.
18 gauge n4@.020 SF 3.92 0.87 0.01 4.80
20 gauge n4@.020 SF 3.44 0.87 0.01 4.32
22 gauge n4@.020 SF 3.05 0.87 0.01 3.93
2015 Heavy Construction Estimator, All Rights Reserved Page 361

Steel roof panels - Box rib, painted, including fasteners


Painted, including fasteners. For structural steel framing, using miscellaneous power tools and small
tools.
18 gauge n4@.020 SF 4.10 0.87 0.01 4.98
20 gauge n4@.020 SF 3.16 0.87 0.01 4.04
22 gauge n4@.020 SF 2.81 0.87 0.01 3.69

Steel roof panels - 4" rib, painted, including fasteners


Painted, including fasteners. For structural steel framing, using miscellaneous power tools and small
tools.
18 gauge n4@.029 SF 4.23 1.26 0.02 5.51
20 gauge n4@.029 SF 3.51 1.26 0.02 4.79
22 gauge n4@.029 SF 3.05 1.26 0.02 4.33

Standing seam copper roofing


2" high seam, painted, using a 20-ton hydraulic crane with 70’ boom, and two sets of small tools.
22 gauge qh@.075 SF 10.60 3.61 0.65 14.86
24 gauge qh@.075 SF 9.88 3.61 0.65 14.14
26 gauge qh@.075 SF 9.11 3.61 0.65 13.37

CSI 07-420, Siding

Aluminum siding panels - Corrugated


Including fasteners, for structural steel framing, using miscellaneous power tools and small tools.
.024", natural n4@.029 SF 1.35 1.26 0.02 2.63
.032", natural n4@.029 SF 1.81 1.26 0.02 3.09
.024", painted n4@.029 SF 1.81 1.26 0.02 3.09
.032", painted n4@.029 SF 2.32 1.26 0.02 3.60

Aluminum siding panels - V beam


Including fasteners, for structural steel framing, using miscellaneous power tools and small tools.
.032", natural n4@.029 SF 1.95 1.26 0.02 3.23
.040", natural n4@.029 SF 2.39 1.26 0.02 3.67
.050", natural n4@.029 SF 2.78 1.26 0.02 4.06
.032", painted n4@.029 SF 2.53 1.26 0.02 3.81
.040", painted n4@.029 SF 2.92 1.26 0.02 4.20
.050", painted n4@.029 SF 3.41 1.26 0.02 4.69

Aluminum siding panels - 4" rib


Including fasteners, for structural steel framing, using miscellaneous power tools and small tools.
.032", natural n4@.029 SF 1.81 1.26 0.02 3.09
.040", natural n4@.029 SF 2.36 1.26 0.02 3.64
.050", natural n4@.029 SF 2.61 1.26 0.02 3.89
.032", painted n4@.029 SF 2.36 1.26 0.02 3.64
.040", painted n4@.029 SF 2.78 1.26 0.02 4.06
.050", painted n4@.029 SF 3.27 1.26 0.02 4.55

Steel siding panels - Corrugated


Painted, including fasteners, for structural steel framing, using miscellaneous power tools and small
tools.
20 gauge n4@.032 SF 2.24 1.39 0.02 3.65
22 gauge n4@.032 SF 1.95 1.39 0.02 3.36
24 gauge n4@.032 SF 1.88 1.39 0.02 3.29
26 gauge n4@.032 SF 0.99 1.39 0.02 2.40

Steel siding panels - Box rib


2015 Heavy Construction Estimator, All Rights Reserved Page 361 (part 2)

Painted, including fasteners, for structural steel framing, using miscellaneous power tools and small
tools.
20 gauge n4@.032 SF 2.02 1.39 0.02 3.43
22 gauge n4@.032 SF 1.79 1.39 0.02 3.20
24 gauge n4@.032 SF 1.64 1.39 0.02 3.05
2015 Heavy Construction Estimator, All Rights Reserved Page 362

26 gauge n4@.032 SF 1.46 1.39 0.02 2.87

Factory assembled sandwich panels - Galvanized steel both sides


Using miscellaneous power tools and small tools.
1" polystyrene, 24 gauge n4@.080 SF 6.39 3.48 0.05 9.92
2" polystyrene, 24 gauge n4@.080 SF 7.51 3.48 0.05 11.04

Field assembled sandwich panels - 1-1/2" fiberglass insulation


Using miscellaneous power tools and small tools.
16 gauge aluminum exterior, 18 gauge
galvanized steel interior n4@.150 SF 11.30 6.52 0.10 17.92
18 gauge galvanized steel exterior, 18 gauge
galvanized steel interior n4@.150 SF 10.50 6.52 0.10 17.12
20 gauge painted steel exterior, 18 gauge
galvanized steel interior n4@.150 SF 9.70 6.52 0.10 16.32
20 gauge stainless steel exterior, 18 gauge
galvanized steel interior n4@.150 SF 13.60 6.52 0.10 20.22

Insulated metal liner panels - Galvanized


1-3/8" thick x 24" wide, using small tools.
22 gauge nw@.033 SF 2.81 1.64 0.02 4.47
20 gauge nw@.033 SF 3.29 1.64 0.02 4.95
18 gauge nw@.033 SF 4.23 1.64 0.02 5.89

Insulated metal liner panels - Primed


1-3/8" thick x 24" wide, using small tools.
22 gauge nw@.033 SF 3.05 1.64 0.02 4.71
20 gauge nw@.033 SF 3.51 1.64 0.02 5.17
18 gauge nw@.033 SF 4.47 1.64 0.02 6.13

Solid PVC panel siding


Using miscellaneous power tools and small tools.
8" wide ap@.036 SF 0.68 1.58 0.04 2.30
10" wide ap@.033 SF 0.74 1.45 0.04 2.23
Double 8" wide ap@.036 SF 0.76 1.58 0.04 2.38
Double 10" wide ap@.033 SF 0.80 1.45 0.04 2.29

Vinyl siding accessories


Using miscellaneous power tools and small tools.
1" J-channel,
starter strip and trim ap@.026 LF 0.33 1.14 0.03 1.50
Outside corner post, 7/8" pocket ap@.026 LF 1.02 1.14 0.03 2.19
Inside corner post, 7/8" pocket ap@.026 LF 0.71 1.14 0.03 1.88
Door and window trim, 7/8" pocket ap@.036 LF 0.71 1.58 0.04 2.33
Fan-fold R1 1/4" underlayment ap@.010 SF 0.24 0.44 0.01 0.69
Waterproofing 50 mil underlayment ap@.005 SF 0.47 0.22 0.01 0.70

Vinyl soffit and fascia


Using miscellaneous power tools and small tools.
Solid soffit and fascia,
1' overhang ap@.030 LF 2.63 1.32 0.04 3.99
Vented soffit and fascia,
1' overhang ap@.030 LF 2.89 1.32 0.04 4.25
Solid soffit and fascia,
2' overhang ap@.030 LF 3.15 1.32 0.04 4.51
Vented soffit and fascia,
2' overhang ap@.030 LF 3.42 1.32 0.04 4.78
2015 Heavy Construction Estimator, All Rights Reserved Page 362 (part 2)

CSI 07-510, Built-up bituminous membrane roofing

Built-up bituminous roofing


No insulation included, using a 400 lb. roofing kettle with pump and small tools.
4 ply asphalt felt c8@2.90 CSF 82.70 114.10 3.13 199.93
4 ply fiberglass roof c8@2.80 CSF 119.00 110.10 3.02 232.12

Built-up bituminous roofing accessories


Using small tools.
4" x 4" foamglass cant strip c6@.020 LF 1.26 0.84 0.01 2.11
2015 Heavy Construction Estimator, All Rights Reserved Page 363

4" x 4" fiber


cant strip (minimum quality) c6@.020 LF 0.50 0.84 0.01 1.35
3' x 6' x 1/2" walkway,
asphalt impregnated fiber c6@.025 SF 5.32 1.04 0.01 6.37
3' x 3' x 1" walkway,
asphalt impregnated fiber c6@.025 SF 7.82 1.04 0.01 8.87

Wood cant strip for built-up roof


Cut diagonally, using small tools.
4" x 4" cant strip, treated wood al@.022 LF 1.28 0.97 0.01 2.26

Gravel ballast for built-up roof


Using a 400 lb. roofing kettle with pump and small tools.
Gravel ballast,
spread to desired thickness c8@3.90 CY 26.30 153.40 4.21 183.91

CSI 07-520, Prepared roll roofing

Asphalt 1-ply roll roofing


No insulation included, applied with fasteners, using small tools.
Smooth surface, 50 lb. c6@1.03 CSF 54.30 42.99 0.35 97.64
Mineral surface, 72 lb. c6@.738 CSF 60.80 30.80 0.25 91.85

CSI 07-530, Elastic sheet roofing

Elastomeric roofing
Using a 400 lb. roofing kettle with pump and small tools.
EPDM 60 mil, single-ply membrane c8@.010 SF 2.01 0.39 0.01 2.41
1/16" neoprene, single-ply membrane c8@.010 SF 3.47 0.39 0.01 3.87
Urethane, 24 mil, 2 coats c8@.010 SF 3.40 0.39 0.01 3.80
EPDM 45 mil, single-ply membrane c8@.010 SF 1.76 0.39 0.01 2.16
PVC 45 mil, single-ply membrane c8@.008 SF 2.25 0.32 0.01 2.58
PVC 60 mil c8@.008 SF 1.86 0.32 0.01 2.19

Elastomeric roofing accessories


Using small tools.
Vulcanizing tape
for membrane 2" x 50' roll --@.000 Ea 67.30 -- -- 67.30
Batten strips, 10' sections --@.000 Ea 8.49 -- -- 8.49
Vulcanizing tape for
batten strips 6" x 100' roll --@.000 Ea 137.00 -- -- 137.00
Adhesive for fully adhered system,
60 S.F. Gal --@.000 Ea 44.00 -- -- 44.00

Pipe flashing - 90 mil thick


Using small tools.
1" diameter pipe c6@.200 Ea 22.30 8.35 0.07 30.72
2" diameter pipe c6@.220 Ea 22.30 9.18 0.07 31.55
3" diameter pipe c6@.240 Ea 22.30 10.02 0.08 32.40
4" diameter pipe c6@.260 Ea 28.20 10.85 0.09 39.14
5" diameter pipe c6@.280 Ea 28.20 11.69 0.10 39.99
6" diameter pipe c6@.300 Ea 28.20 12.52 0.10 40.82
8" diameter pipe c6@.320 Ea 32.30 13.36 0.11 45.77
10" diameter pipe c6@.340 Ea 44.10 14.19 0.12 58.41
12" diameter pipe c6@.360 Ea 44.10 15.03 0.12 59.25

Neoprene flashing - 60 mil thick


2015 Heavy Construction Estimator, All Rights Reserved Page 363 (part 2)

Using small tools.


6" wide strip c6@.061 LF 1.80 2.55 0.02 4.37
12" wide strip c6@.065 LF 3.55 2.71 0.02 6.28
18" wide strip c6@.071 LF 5.36 2.96 0.02 8.34
24" wide strip c6@.080 LF 7.13 3.34 0.03 10.50

Mastic sealer
Applied at lap joints only, using small tools.
1/4" bead at joints c6@.004 LF 0.15 0.17 -- 0.32

CSI 07-540, Fluid applied roofing

Fluid applied roofing


Using a 400 lb. roofing kettle with pump and small tools.
Polyurethane spray-on roofing, 2 components, top membrane 1" (25mm) thick,
R7 minimum c8@1.30 CSF 326.00 51.13 1.40 378.53
Vinyl liquid roofing,
2 coats, 2 mil per coat c8@1.10 CSF 489.00 43.26 1.19 533.45
2015 Heavy Construction Estimator, All Rights Reserved Page 364

Silicone spray-on roofing,


2 coats, 16 mil per coat c8@1.30 CSF 375.00 51.13 1.40 427.53

CSI 07-550, Inverted roof system

Inverted roof system


Using a 400 lb. roofing kettle with pump and small tools.
2" polystyrene membrane roofing, 3 ply with dry course
gravel and 2" polystyrene c8@1.40 CSF 802.00 55.06 1.51 858.57
Add for 12" x 12" x 1-1/2" concrete pavers
instead of dry course gravel --@.000 CSF 96.30 -- -- 96.30

CSI 07-610, Sheet metal roofing

Aluminum roofing on a steel frame - Corrugated


Using miscellaneous power tools and small tools.
.0175" thick, natural finish n4@.023 SF 1.50 1.00 0.02 2.52
.0215" thick n4@.023 SF 1.62 1.00 0.02 2.64
.024" thick n4@.023 SF 2.35 1.00 0.02 3.37
.032" thick n4@.023 SF 3.40 1.00 0.02 4.42

Aluminum roofing on a steel frame - V-beam


Using miscellaneous power tools and small tools.
.032" thick n4@.023 SF 3.91 1.00 0.02 4.93
.040" thick n4@.023 SF 5.25 1.00 0.02 6.27
.050" thick n4@.023 SF 5.16 1.00 0.02 6.18

Aluminum ridge cap


Using miscellaneous power tools and small tools.
.019" thick n4@.028 LF 6.36 1.22 0.02 7.60

Corrugated or ribbed galvanized steel roofing on steel frame


Using miscellaneous power tools and small tools.
29 gauge n4@.023 SF 1.62 1.00 0.02 2.64
26 gauge n4@.023 SF 1.80 1.00 0.02 2.82
24 gauge n4@.023 SF 2.23 1.00 0.02 3.25
22 gauge n4@.023 SF 2.47 1.00 0.02 3.49

Aluminum ridge roll


Using miscellaneous power tools and small tools.
10" (25cm) wide n4@.028 LF 1.32 1.22 0.02 2.56
20" (51cm) wide n4@.030 LF 2.38 1.31 0.02 3.71

CSI 07-620, Flashing and trim

Copper flashing and trim


Using small tools.
16 oz., under 500 lbs. nw@.087 SF 8.50 4.31 0.05 12.86
16 oz., more than 2,000 lbs. nw@.065 SF 7.10 3.22 0.04 10.36
20 oz., less than 500 lbs. nw@.091 SF 10.60 4.51 0.05 15.16
20 oz., more than 2,000 lbs. nw@.069 SF 8.87 3.42 0.04 12.33
24 oz., less than 500 lbs. nw@.095 SF 12.80 4.71 0.05 17.56
24 oz., more than 2,000 lbs. nw@.074 SF 10.60 3.67 0.04 14.31
32 oz., less than 500 lbs. nw@.100 SF 16.50 4.96 0.06 21.52
32 oz., more than 2,000 lbs. nw@.077 SF 13.80 3.82 0.04 17.66
2015 Heavy Construction Estimator, All Rights Reserved Page 364 (part 2)

Copper flashing, paper backed, two sides


Using small tools.
2 oz. nw@.030 SF 2.74 1.49 0.02 4.25
5 oz. nw@.030 SF 6.14 1.49 0.02 7.65

Aluminum flashing and trim


Using small tools.
.019" thick nw@.069 SF 0.85 3.42 0.04 4.31
.032" thick nw@.069 SF 1.03 3.42 0.04 4.49
.040" thick nw@.069 SF 1.74 3.42 0.04 5.20

Stainless steel flashing and trim


Using small tools.
.015" thick nw@.062 SF 4.10 3.08 0.04 7.22

22 gauge T-section water stop


Using small tools.
1-1/2" x 3" nw@.028 LF 2.21 1.39 0.02 3.62
2" x 2" nw@.027 LF 2.00 1.34 0.02 3.36
4" x 3" nw@.041 LF 3.25 2.03 0.02 5.30
6" x 4" nw@.041 LF 3.94 2.03 0.02 5.99
2015 Heavy Construction Estimator, All Rights Reserved Page 365

8" x 4" nw@.052 LF 5.13 2.58 0.03 7.74

Scupper outlets, stainless steel


Using small tools.
10" x 10" x 4" nw@.500 Ea 25.10 24.80 0.29 50.19
22" x 4" x 4" nw@.500 Ea 30.70 24.80 0.29 55.79
4" to 8" x 8" x 5", tapered nw@.500 Ea 25.10 24.80 0.29 50.19

Wall coping
Using small tools.
12" wall coping, aluminum nw@.080 LF 9.21 3.97 0.05 13.23

CSI 07-631, Gutters and downspouts

Aluminum downspouts
Using small tools.
2" x 3", embossed, .020" thick nw@.053 LF 0.88 2.63 0.03 3.54
2" x 3", enameled, .020" thick nw@.053 LF 0.90 2.63 0.03 3.56
3" x 4", enameled, .024" thick nw@.071 LF 1.45 3.52 0.04 5.01
3" diameter, round .20" thick nw@.053 LF 1.07 2.63 0.03 3.73
4" diameter, round .25" thick nw@.071 LF 1.59 3.52 0.04 5.15

Round galvanized steel downspouts, 28 gauge


Using small tools.
2" or 3" diameter nw@.053 LF 0.71 2.63 0.03 3.37
4" diameter nw@.069 LF 0.89 3.42 0.04 4.35
5" diameter nw@.077 LF 1.11 3.82 0.04 4.97
6" diameter nw@.095 LF 1.31 4.71 0.05 6.07

Rectangular galvanized steel downspouts, 28 gauge


Using small tools.
2" x 3" nw@.053 LF 0.66 2.63 0.03 3.32
3" x 4" nw@.069 LF 1.82 3.42 0.04 5.28
3" x 4", epoxy painted nw@.069 LF 1.94 3.42 0.04 5.40
4" x 5", epoxy painted nw@.080 LF 2.24 3.97 0.05 6.26

Copper downspouts, 16 oz.


Using small tools.
2" diameter, round nw@.053 LF 7.48 2.63 0.03 10.14
3" diameter, round nw@.053 LF 10.10 2.63 0.03 12.76
4" diameter, round nw@.069 LF 12.50 3.42 0.04 15.96
5" diameter, round nw@.077 LF 13.00 3.82 0.04 16.86
2" x 3" rectangular nw@.053 LF 10.40 2.63 0.03 13.06
3" x 4" rectangular nw@.069 LF 14.10 3.42 0.04 17.56

Lead-coated copper downspouts


Using small tools.
2" diameter nw@.053 LF 9.83 2.63 0.03 12.49
3" diameter nw@.053 LF 11.90 2.63 0.03 14.56
4" diameter nw@.069 LF 14.60 3.42 0.04 18.06
5" diameter, corrugated nw@.077 LF 19.20 3.82 0.04 23.06
6" diameter, corrugated nw@.095 LF 23.20 4.71 0.05 27.96
2" x 3" rectangular, corrugated nw@.053 LF 16.00 2.63 0.03 18.66
3" x 4" rectangular, corrugated nw@.069 LF 16.80 3.42 0.04 20.26

Aluminum gutters, stock units


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 365 (part 2)

5" box type, .027" thick nw@.073 LF 1.05 3.62 0.04 4.71
5" box type, .032" thick nw@.073 LF 1.25 3.62 0.04 4.91
Custom fabrication,
with gravel stop nw@.167 LF 3.29 8.28 0.10 11.67

Galvanized steel gutters, stock units


Using small tools.
5", 28 gauge nw@.073 LF 0.82 3.62 0.04 4.48
5", 28 gauge, painted nw@.073 LF 1.07 3.62 0.04 4.73
6", 26 gauge nw@.073 LF 1.26 3.62 0.04 4.92

Copper gutters, 16 oz.


Using small tools.
4" wide, half round nw@.083 LF 8.10 4.12 0.05 12.27
5" wide, half round nw@.083 LF 8.21 4.12 0.05 12.38
6" wide, half round nw@.087 LF 9.11 4.31 0.05 13.47
4" wide, type K nw@.083 LF 8.81 4.12 0.05 12.98
5" wide, type K nw@.083 LF 9.59 4.12 0.05 13.76
2015 Heavy Construction Estimator, All Rights Reserved Page 366

Lead-coated copper gutters


Using small tools.
4" wide nw@.083 LF 10.80 4.12 0.05 14.97
6" wide nw@.087 LF 13.20 4.31 0.05 17.56
4" wide type K nw@.083 LF 12.70 4.12 0.05 16.87
5" wide type K nw@.083 LF 13.80 4.12 0.05 17.97

Roof drainage boots, cast iron


Using small tools.
2" x 3" nw@.080 Ea 57.80 3.97 0.05 61.82
3" x 4" nw@.080 Ea 106.00 3.97 0.05 110.02
4" x 5" nw@.080 Ea 120.00 3.97 0.05 124.02
4" x 6" nw@.080 Ea 111.00 3.97 0.05 115.02
5" x 7" nw@.080 Ea 132.00 3.97 0.05 136.02

CSI 07-650, Flashing

Thru-wall flashing - Black polyvinyl chloride (PVC)


Using small tools.
.010" thick b7@.035 SF 0.22 1.57 0.01 1.80
.020" thick b7@.035 SF 0.37 1.57 0.01 1.95
.030" thick b7@.035 SF 0.57 1.57 0.01 2.15
.056" thick b7@.035 SF 1.14 1.57 0.01 2.72

Thru-wall flashing - Copper, 5 oz.


Using small tools.
Paperbacked nw@.030 SF 4.91 1.49 0.02 6.42

Thru-wall flashing - Lead coated copper, 2 sides, 5 oz.


Using small tools.
Mastic backed nw@.030 SF 5.73 1.49 0.02 7.24
Fabric backed nw@.030 SF 5.86 1.49 0.02 7.37
Paper backed nw@.030 SF 5.38 1.49 0.02 6.89

Thru-wall flashing - Stainless steel flashing, 2 sides, .005" thick


Using small tools.
Paper backed nw@.030 SF 2.23 1.49 0.02 3.74

CSI 07-660, Gravel stops

Aluminum gravel stop, mill finish


Using small tools.
.032" thick, 4" face height nw@.025 LF 2.39 1.24 0.01 3.64
.040" thick, 6" face height nw@.026 LF 2.75 1.29 0.01 4.05
.040" thick, 8" face height nw@.027 LF 3.40 1.34 0.02 4.76
.040" thick, 12" face height nw@.030 LF 4.24 1.49 0.02 5.75

Aluminum drip edge


Using small tools.
5" girth, mill finish al@.025 LF 1.08 1.10 0.01 2.19

CSI 07-670, Vents

Aluminum ridge vents


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 366 (part 2)

Vent strips, mill finish nw@.055 LF 3.35 2.73 0.03 6.11

Aluminum soffit vents


Using small tools.
2-1/2" wide, mill finish al@.030 LF 0.41 1.32 0.02 1.75
3" wide, mill finish al@.031 LF 0.43 1.36 0.02 1.81
3" wide, enamel finish al@.031 LF 0.49 1.36 0.02 1.87

Aluminum under eaves vents, mill finish


Using small tools.
4" x 16" al@.133 Ea 3.01 5.84 0.07 8.92
8" x 16" al@.133 Ea 3.40 5.84 0.07 9.31

Aluminum foundation vents


Using small tools.
8" x 16, screened casing al@.133 Ea 4.77 5.84 0.07 10.68
2015 Heavy Construction Estimator, All Rights Reserved Page 367

Galvanized ridge vent


Using small tools.
Strips nw@.070 LF 2.12 3.47 0.04 5.63

CSI 07-811, Plastic skylights

Plastic skylights - Single thickness


Quantity 10 or more. Add the cost of mounting curb, using miscellaneous power tools and small tools.
Less than 10 SF (.9m2) n4@.120 SF 20.90 5.22 0.08 26.20
10 SF (.9m2) through 20 SF (1.9m2) n4@.095 SF 18.80 4.13 0.06 22.99
21 SF (2.0m2)
through 30 SF (2.8m2), n4@.069 SF 15.60 3.00 0.05 18.65
31 SF (2.9m2) through 65 SF (6m2), n4@.053 SF 14.60 2.31 0.03 16.94
Add for integral insulation,
9" (23cm) curb ---@--- % 30.00 -- -- --

Plastic skylights - Double thickness


Quantity 10 or more. Add the cost of mounting curb, using miscellaneous power tools and small tools.
Less than 10 SF (.9m2) n4@.140 SF 27.00 6.09 0.09 33.18
10 SF (.9m2) through 20SF (1.9m2) n4@.102 SF 24.40 4.44 0.07 28.91
21 SF (2.0m2)
through 30 SF (2.8m2), n4@.081 SF 19.10 3.52 0.05 22.67
31 SF (2.9m2) through 65 SF(6m2) n4@.069 SF 16.70 3.00 0.05 19.75
Add for integral insulation,
9" (23cm) curb ---@--- % 30.00 -- -- --

CSI 07-812, Metal framed skylights

Metal framed skylights - Translucent panels 2-1/4" thick


Using miscellaneous power tools and small tools.
Less than 5,000 SF (465m2) n4@.081 SF 22.20 3.52 0.05 25.77
Greater than 5,000 SF (465m2) n4@.069 SF 20.00 3.00 0.05 23.05

Metal framed skylights - Continuous vaulted, semicircular


Using miscellaneous power tools and small tools.
To 8' (2.4m) wide, single glazed n4@.200 SF 34.80 8.70 0.13 43.63
To 8' (2.4m) wide, double glazed n4@.221 SF 55.60 9.61 0.15 65.36
9 ' (2.7m) to 20' (6m) wide,
single glazed n4@.183 SF 44.90 7.96 0.12 52.98
Over 20' (6m) wide, single glazed n4@.160 SF 50.70 6.96 0.11 57.77

Metal framed skylights - Pyramid type, self supporting


Single glazed, using miscellaneous power tools and small tools.
Minimum n4@.160 SF 35.50 6.96 0.11 42.57
Average n4@.194 SF 40.00 8.44 0.13 48.57
Maximum n4@.246 SF 51.80 10.70 0.16 62.66

Metal framed skylights - Grid type, 4" x 10’ modules


Using miscellaneous power tools and small tools.
Minimum n4@.136 SF 27.80 5.92 0.09 33.81
Maximum n4@.123 SF 55.60 5.35 0.08 61.03

Metal framed skylights - Preformed acrylic skylights


Using miscellaneous power tools and small tools.
Minimum n4@.136 SF 20.90 5.92 0.09 26.91
2015 Heavy Construction Estimator, All Rights Reserved Page 367 (part 2)

Maximum n4@.123 SF 50.00 5.35 0.08 55.43

CSI 07-830, Roof hatches

Roof hatches - Steel, plain, primed


Using miscellaneous power tools and small tools.
2' 6" x 3' 0" n4@3.20 Ea 666.00 139.20 2.11 807.31
2' 6" x 4' 6" n4@3.56 Ea 1,000.00 154.80 2.35 1,157.15
2' 6" x 8' 0" n4@4.85 Ea 1,640.00 210.90 3.20 1,854.10

Roof hatches - Galvanized steel


Using miscellaneous power tools and small tools.
2' 6" x 3' 0" n4@3.20 Ea 508.00 139.20 2.11 649.31
2' 6" x 4' 6" n4@3.56 Ea 768.00 154.80 2.35 925.15
2' 6" x 8' 0" n4@4.85 Ea 1,430.00 210.90 3.20 1,644.10

Roof hatches - Aluminum


Using miscellaneous power tools and small tools.
2' 6" x 3' 0" n4@3.20 Ea 534.00 139.20 2.11 675.31
2015 Heavy Construction Estimator, All Rights Reserved Page 368

2' 6" x 4' 6" n4@3.56 Ea 823.00 154.80 2.35 980.15


2' 6" x 8' 0" n4@4.85 Ea 1,660.00 210.90 3.20 1,874.10

CSI 07-835, Access doors

Ceiling access doors - Swing up model, metal frame


Using small tools.
2' 6" x 2' 6" metal n3@.750 Ea 403.00 31.92 0.47 435.39
2' 6" x 3' 0" metal n3@.750 Ea 416.00 31.92 0.47 448.39
2' 6" x 2' 6" aluminum n3@.750 Ea 433.00 31.92 0.47 465.39
2' 6" x 3' 0" aluminum n3@.750 Ea 511.00 31.92 0.47 543.39

Ceiling access doors - Swing down model, metal frame


Using small tools.
2' 6" x 2' 6" metal n3@.750 Ea 549.00 31.92 0.47 581.39
2' 6" x 3' 0" metal n3@.750 Ea 574.00 31.92 0.47 606.39
2' 6" x 2' 6" aluminum n3@.750 Ea 590.00 31.92 0.47 622.39
2' 6" x 3' 0" aluminum n3@.750 Ea 613.00 31.92 0.47 645.39

CSI 07-840, Gravity ventilators

Roof ventilators - Stationary siphon, galvanized


Including curb, base, damper and bird screen, using small tools.
6" (15cm) diameter, 66 CFM ny@.913 Ea 50.20 45.24 0.55 95.99
12" (31cm) diameter, 160 CFM ny@.913 Ea 68.80 45.24 0.55 114.59
24" (61cm) diameter, 900 CFM ny@1.36 Ea 245.00 67.39 0.82 313.21

Roof ventilators - Wind driven spinner, galvanized


Using small tools.
6" (15cm) diameter, 250 CFM ny@.913 Ea 55.30 45.24 0.55 101.09
12" (31cm) diameter, 770 CFM ny@.913 Ea 73.60 45.24 0.55 119.39
24" (61cm) diameter, 3100 CFM ny@1.36 Ea 270.00 67.39 0.82 338.21

Roof ventilators - Stationary mushroom, aluminum


Using small tools.
16" (41cm) diameter ny@1.80 Ea 297.00 89.19 1.08 387.27
24" (61cm) diameter ny@2.00 Ea 566.00 99.10 1.20 666.30
30" (76cm) diameter ny@2.12 Ea 899.00 105.00 1.27 1,005.27
36" (91cm) diameter ny@2.25 Ea 1,310.00 111.50 1.35 1,422.85
42" (106cm) diameter ny@2.40 Ea 1,810.00 118.90 1.44 1,930.34
48" (122cm) diameter ny@2.57 Ea 2,130.00 127.30 1.54 2,258.84

CSI 07-910, Joint fillers and gaskets

Butyl rubber joint filler


Using small tools.
1/4" x 1/4" c6@.020 LF 0.16 0.84 0.01 1.01
1/2" x 1/2" c6@.022 LF 0.65 0.92 0.01 1.58
1/2" x 3/4" c6@.025 LF 0.98 1.04 0.01 2.03
3/4" x 3/4" c6@.029 LF 1.45 1.21 0.01 2.67
1" x 1" c6@.042 LF 2.63 1.75 0.01 4.39

Joint backer rod, polychloroprene


Using small tools.
1/4" (6mm), polyethylene) c6@.016 LF 0.10 0.67 0.01 0.78
1/2" (12mm), polyethylene c6@.018 LF 0.16 0.75 0.01 0.92
2015 Heavy Construction Estimator, All Rights Reserved Page 368 (part 2)

3/4" (18mm), polyethylene c6@.019 LF 0.22 0.79 0.01 1.02


1" (25mm), polyethylene c6@.021 LF 0.24 0.88 0.01 1.13
Add for colored backer rod ---@--- % 12.00 -- -- --

Neoprene joint filler, closed cell


Adhesive gasket, using small tools.
1/8" x 3" c6@1.90 CLF 126.00 79.31 0.65 205.96
1/8" x 6" c6@2.30 CLF 294.00 96.00 0.78 390.78
1/4" x 3" c6@2.20 CLF 147.00 91.83 0.75 239.58
2015 Heavy Construction Estimator, All Rights Reserved Page 369

1/4" x 6" c6@2.50 CLF 306.00 104.40 0.85 411.25


1/2" x 6" c6@2.70 CLF 469.00 112.70 0.92 582.62
1/2" x 9" c6@2.80 CLF 652.00 116.90 0.95 769.85
1/2" x 12" c6@3.00 CLF 867.00 125.20 1.02 993.22

Neoprene seals
O-ring type cord, "J-seal", using small tools.
1/4" wide c7@.042 LF 1.02 1.75 0.01 2.78
1/2" wide c7@.045 LF 3.06 1.88 0.02 4.96
3/4" wide c7@.047 LF 6.63 1.96 0.02 8.61
1" wide c7@.049 LF 10.70 2.05 0.02 12.77
1-1/4" wide c7@.052 LF 13.60 2.17 0.02 15.79
1-1/2" wide c7@.054 LF 18.10 2.25 0.02 20.37
1-3/4" wide c7@.056 LF 23.40 2.34 0.02 25.76
2" wide c7@.057 LF 34.60 2.38 0.02 37.00

Polyethylene joint backing


Using small tools.
1/4" diameter c6@.016 LF 0.04 0.67 0.01 0.72
1/2" diameter c6@.016 LF 0.06 0.67 0.01 0.74
3/4" diameter c6@.016 LF 0.10 0.67 0.01 0.78
1" diameter c6@.016 LF 0.14 0.67 0.01 0.82

Silicon RTV foam penetration seal


Using small tools.
1/4" x 1/2" c6@.008 LF 0.72 0.33 -- 1.05
1/2" x 1/2" c6@.015 LF 1.26 0.63 0.01 1.90
1/2" x 3/4" c6@.023 LF 1.98 0.96 0.01 2.95
3/4" x 3/4" c6@.031 LF 3.00 1.29 0.01 4.30
1/8" x 1" c6@.008 LF 0.72 0.33 -- 1.05
1/8" x 3" c6@.023 LF 1.98 0.96 0.01 2.95
1/4" x 3" c6@.034 LF 4.02 1.42 0.01 5.45
1/4" x 6" c6@.068 LF 8.10 2.84 0.02 10.96
1/2" x 6" c6@.122 LF 15.90 5.09 0.04 21.03
1/2" x 9" c6@.191 LF 24.00 7.97 0.06 32.03
1/2" x 12" c6@.305 LF 31.80 12.73 0.10 44.63

CSI 07-920, Sealants and caulking

Oil base caulk joint filler


Using small tools.
1/4" x 1/4" joint c6@1.60 CLF 12.00 66.78 0.54 79.32
1/4" x 3/8" joint c6@1.70 CLF 17.20 70.96 0.58 88.74
1/4" x 1/2" joint c6@1.70 CLF 22.30 70.96 0.58 93.84
3/8" x 3/8" joint c6@1.70 CLF 25.80 70.96 0.58 97.34
3/8" x 1/2" joint c6@1.80 CLF 34.40 75.13 0.61 110.14
3/8" x 5/8" joint c6@1.80 CLF 43.00 75.13 0.61 118.74
3/8" x 3/4" joint c6@1.90 CLF 51.50 79.31 0.65 131.46
1/2" x 1/2" joint c6@1.80 CLF 44.70 75.13 0.61 120.44
1/2" x 5/8" joint c6@2.00 CLF 56.70 83.48 0.68 140.86
1/2" x 3/4" joint c6@2.10 CLF 67.00 87.65 0.71 155.36
1/2" x 7/8" joint c6@2.20 CLF 79.00 91.83 0.75 171.58
1/2" x 1" joint c6@2.20 CLF 89.30 91.83 0.75 181.88
3/4" x 3/4" joint c6@2.50 CLF 82.50 104.40 0.85 187.75
1" x 1" joint c6@3.30 CLF 184.00 137.70 1.12 322.82

Polyurethane compound joint filler


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 369 (part 2)

1/4" x 1/4" joint c6@1.60 CLF 28.00 66.78 0.54 95.32


1/4" x 3/8" joint c6@1.70 CLF 40.00 70.96 0.58 111.54
1/4" x 1/2" joint c6@1.70 CLF 54.00 70.96 0.58 125.54
3/8" x 3/8" joint c6@1.70 CLF 60.00 70.96 0.58 131.54
3/8" x 1/2" joint c6@1.70 CLF 82.00 70.96 0.58 153.54
3/8" x 5/8" joint c6@1.80 CLF 102.00 75.13 0.61 177.74
2015 Heavy Construction Estimator, All Rights Reserved Page 370

3/8" x 3/4" joint c6@1.90 CLF 124.00 79.31 0.65 203.96


1/2" x 1/2" joint c6@1.80 CLF 108.00 75.13 0.61 183.74
1/2" x 5/8" joint c6@2.00 CLF 136.00 83.48 0.68 220.16
1/2" x 3/4" joint c6@2.10 CLF 156.00 87.65 0.71 244.36
1/2" x 7/8" joint c6@2.20 CLF 188.00 91.83 0.75 280.58
1/2" x 1" joint c6@2.20 CLF 214.00 91.83 0.75 306.58
3/4" x 3/4" joint c6@2.30 CLF 242.00 96.00 0.78 338.78
3/4" x 1" joint c6@2.80 CLF 312.00 116.90 0.95 429.85
Add for colored joint compound ---@--- % 15.00 -- -- --

==========================================================================
Doors and windows
==========================================================================

CSI 08-110, Steel doors and frames

Steel door frames, 5-3/4" deep


18 gauge, for 1-3/4" door, add for grouting frames (See CSI 04-110), using small tools.
2' x 7' am@.944 Ea 97.50 41.46 0.52 139.48
2'4" x 7' am@.944 Ea 116.00 41.46 0.52 157.98
2'6" x 7' am@.944 Ea 138.00 41.46 0.52 179.98
2'8" x 7' am@.944 Ea 118.00 41.46 0.52 159.98
3' x 7' am@.944 Ea 121.00 41.46 0.52 162.98
3'4" x 7' am@.944 Ea 130.00 41.46 0.52 171.98
4' x 7' am@.988 Ea 135.00 43.39 0.54 178.93
6' x 7' am@.988 Ea 144.00 43.39 0.54 187.93
8' x 7' am@1.02 Ea 163.00 44.80 0.56 208.36

Steel door frames, 6-3/4" deep


16 gauge, for 6-3/4" X 1-3/4" door, add for grouting frames (See CSI 04-110), using small tools, using
small tools.
2-0' x 7-0' am@.944 Ea 163.00 41.46 0.52 204.98
2'-4" x 7-0' am@.944 Ea 186.00 41.46 0.52 227.98
2-6" x 7-0' am@.944 Ea 225.00 41.46 0.52 266.98
2-8" x 7-0' am@.944 Ea 194.00 41.46 0.52 235.98
3-0' x 7-0' am@.944 Ea 204.00 41.46 0.52 245.98
4-0' x 7-0' am@.988 Ea 230.00 43.39 0.54 273.93
6-0' x 7-0' am@.988 Ea 234.00 43.39 0.54 277.93

Steel transom frame, 6-3/4" sash


18 gauge, for 1-3/4"door, including all hardware, using small tools.
3'4" x 1'6" high am@1.00 Ea 86.70 43.92 0.55 131.17
3'8" x 1'-6" high am@1.00 Ea 87.40 43.92 0.55 131.87
6'4" x 1'-6" high am@1.00 Ea 188.00 43.92 0.55 232.47
3' x 1'4" high am@1.00 Ea 91.90 43.92 0.55 136.37
3'4" x 1'4" high am@1.00 Ea 116.00 43.92 0.55 160.47
6' x 1'4" high am@1.00 Ea 198.00 43.92 0.55 242.47

Steel transom frame, 6-3/4" sash


16 gauge, for 1-3/4"door, including all hardware, using small tools.
3-'4" x 1'-'6" am@1.00 Ea 91.00 43.92 0.55 135.47
3'-'8" x 1'-6" am@1.00 Ea 93.20 43.92 0.55 137.67
6'-4" x 1'-6" am@1.05 Ea 126.00 46.12 0.58 172.70
3-0' x 1'-4" am@1.00 Ea 616.00 43.92 0.55 660.47
3'-4" x 1'-4" am@1.00 Ea 616.00 43.92 0.55 660.47
6-0' x 1'-4" am@1.05 Ea 695.00 46.12 0.58 741.70

Additional costs for 6-3/4" wall steel door frames


2015 Heavy Construction Estimator, All Rights Reserved Page 370 (part 2)

Add for 1 foot (31cm)


extension of door frame --@.000 Ea 14.00 -- -- 14.00
Add for 14 gauge frames --@.000 Ea 13.00 -- -- 13.00
Add for 3 hour fire rated frames --@.000 Ea 29.30 -- -- 29.30
Add for
1-1/2 hour fire rated frames --@.000 Ea 29.30 -- -- 29.30
Add for 3/4 hour fire rated frames --@.000 Ea 29.30 -- -- 29.30
Add for lead lining in frame --@.000 Ea 110.00 -- -- 110.00
2015 Heavy Construction Estimator, All Rights Reserved Page 371

Sidelights for steel door frames, 6-3/4" wall


18 gauge frame, for 1-3/4"door, using small tools.
1' x 7'2" am@1.00 Ea 315.00 43.92 0.55 359.47
1'4" x 7'2" am@1.00 Ea 362.00 43.92 0.55 406.47
1' x 8'8" am@1.00 Ea 394.00 43.92 0.55 438.47
1'6" x 8'8" am@1.00 Ea 480.00 43.92 0.55 524.47
Add for lead lining in frame --@.000 Ea 45.60 -- -- 45.60

Fire label steel frames


16 gauge, B rated, using small tools.
5-3/4" x 4' x 7' am@.944 Ea 147.00 41.46 0.52 188.98
5-3/4"x 8' x 7' am@.944 Ea 167.00 41.46 0.52 208.98
8-3/4" x 8' x 7' am@.944 Ea 203.00 41.46 0.52 244.98

Metal door frames, 4-3/4" wall


18 gauge frame, for 1-3/4" door, using small tools.
2' x 7' am@.944 Ea 120.00 41.46 0.52 161.98
2'4" x 7' am@.944 Ea 121.00 41.46 0.52 162.98
2'6" x 7' am@.944 Ea 123.00 41.46 0.52 164.98
2'8" x 7' am@.944 Ea 125.00 41.46 0.52 166.98
3' x 7' am@.944 Ea 128.00 41.46 0.52 169.98
3'4" x 7' am@.944 Ea 132.00 41.46 0.52 173.98
6' x 7' am@.944 Ea 142.00 41.46 0.52 183.98

Metal door transoms, 4-3/4"sash


18 gauge frame, for 1-3/4"door, including all hardware, using small tools.
3'4" x 1'6" high am@1.00 Ea 125.00 43.92 0.55 169.47
3'8" x 1'6" high am@1.00 Ea 138.00 43.92 0.55 182.47
6'4" x 1'6" high am@1.06 Ea 274.00 46.56 0.58 321.14
3' x 1'4" high am@1.00 Ea 100.00 43.92 0.55 144.47
3'4" x 1'4" high am@1.00 Ea 126.00 43.92 0.55 170.47
6' x 1'4" high am@1.06 Ea 247.00 46.56 0.58 294.14

Additional costs for 4-3/4" wall steel door frames


Add for 1 foot (31cm)
extension of door frame --@.000 Ea 15.30 -- -- 15.30
Add for 14 gauge frames --@.000 Ea 14.20 -- -- 14.20
Add for 3 hour fire rated frames --@.000 Ea 32.00 -- -- 32.00
Add for
1-1/2 hour fire rated frames --@.000 Ea 32.00 -- -- 32.00
Add for 3/4 hour fire rated frames --@.000 Ea 32.00 -- -- 32.00
Add for lead lining in frame --@.000 Ea 45.60 -- -- 45.60

Metal doors - flush hollow - 20 gauge, 1-3/8" thick, 6-8'' high


Using small tools.
2'-6' x 6'-8" am@.889 Ea 255.00 39.04 0.49 294.53
2'-8" x 6'-8" am@.889 Ea 309.00 39.04 0.49 348.53
3-0' x 6'-8" am@.911 Ea 329.00 40.01 0.50 369.51

Metal doors - flush hollow - 20 gauge, 1-3/8" thick, 6-8'' high


Using small tools.
2'-6' x 6'-8" am@.889 Ea 304.00 39.04 0.49 343.53
2'-8" x 6'-8" am@.889 Ea 323.00 39.04 0.49 362.53
3-0' x 6'-8" am@.911 Ea 348.00 40.01 0.50 388.51

Metal doors - flush hollow - 20 gauge, 1-3/8" thick, 7-0'' high


2015 Heavy Construction Estimator, All Rights Reserved Page 371 (part 2)

Using small tools.


2'-6' x 6'-8" am@.941 Ea 324.00 41.33 0.52 365.85
2'-8" x 6'-8" am@.941 Ea 332.00 41.33 0.52 373.85
3-0' x 6'-8" am@.948 Ea 359.00 41.64 0.52 401.16

Metal doors, heavy duty 20 gauge, 1-3/4" thick, 6-8'' high


Using small tools.
2'-8" x 6'-8" am@.889 Ea 337.00 39.04 0.49 376.53
3-0' x 6'-8" am@.911 Ea 356.00 40.01 0.50 396.51
2015 Heavy Construction Estimator, All Rights Reserved Page 372

Metal doors, heavy duty, 20 gauge, 1-3/4" thick, 7-0'' high


Using small tools.
2'-8' x 7'-0" am@.941 Ea 364.00 41.33 0.52 405.85
3'-0" x 7'-0" am@.948 Ea 378.00 41.64 0.52 420.16
3-4' x 7'-0" am@.950 Ea 458.00 41.72 0.52 500.24

Metal doors, heavy duty, 18 gauge, 1-3/4" thick, 7-0'' high


Using small tools.
2-0' x 7-0' am@.889 Ea 361.00 39.04 0.49 400.53
2'-4" x 7-0' am@.889 Ea 380.00 39.04 0.49 419.53
2'-6" x 7-0' am@.911 Ea 389.00 40.01 0.50 429.51
2'-8' x 7-0' am@.941 Ea 403.00 41.33 0.52 444.85
3-0' x 7-0' am@.948 Ea 417.00 41.64 0.52 459.16
3'-4" x 7-0' am@.950 Ea 476.00 41.72 0.52 518.24

Metal doors, heavy duty, 20 gauge, 2" thick, 7-0'' high


Unrated, using small tools.
2-0' x 7-0' am@.889 Ea 364.00 39.04 0.49 403.53
2'-4" x 7-0' am@.889 Ea 383.00 39.04 0.49 422.53
2'-6" x 7-0' am@.911 Ea 395.00 40.01 0.50 435.51
2'-8' x 7-0' am@.941 Ea 410.00 41.33 0.52 451.85
3-0' x 7-0' am@.948 Ea 424.00 41.64 0.52 466.16
3'-4" x 7-0' am@.950 Ea 490.00 41.72 0.52 532.24

Metal doors, heavy duty, 18 gauge, 1-3/4" thick, 7-0'' high


Unrated, using small tools.
2-0' x 7-0' am@.889 Ea 361.00 39.04 0.49 400.53
2'-4" x 7-0' am@.889 Ea 380.00 39.04 0.49 419.53
2'-6" x 7-0' am@.911 Ea 389.00 40.01 0.50 429.51
2'-8' x 7-0' am@.941 Ea 403.00 41.33 0.52 444.85
3-0' x 7-0' am@.948 Ea 417.00 41.64 0.52 459.16
3'-4" x 7-0' am@.950 Ea 476.00 41.72 0.52 518.24

Metal doors, heavy duty, 18 gauge, 2" thick, 7-0'' high


Unrated, using small tools.
2-0' x 7-0' am@.889 Ea 380.00 39.04 0.49 419.53
2'-4" x 7-0' am@.889 Ea 414.00 39.04 0.49 453.53
2'-6" x 7-0' am@.911 Ea 435.00 40.01 0.50 475.51
2'-8' x 7-0' am@.941 Ea 454.00 41.33 0.52 495.85
3-0' x 7-0' am@.948 Ea 476.00 41.64 0.52 518.16
3'-4" x 7-0' am@.950 Ea 518.00 41.72 0.52 560.24

Additional costs for 18 gauge, 7' high 1-3/4" thick metal doors
Add for
8" x 8" vision glass in door --@.000 Ea 120.00 -- -- 120.00
Add for
8" x 48" vision glass in door --@.000 Ea 178.00 -- -- 178.00
Add for light panel in door --@.000 Ea 77.30 -- -- 77.30
Add for fixed metal louver in door --@.000 Ea 163.00 -- -- 163.00
Add for soundproofing in door --@.000 Ea 19.80 -- -- 19.80
Add for 16 gauge doors --@.000 Ea 32.60 -- -- 32.60
Add for 3 hour fire rated doors --@.000 Ea 192.00 -- -- 192.00
Add for 1-1/2 hour fire rated doors --@.000 Ea 80.60 -- -- 80.60
Add for 3/4 hour fire rated doors --@.000 Ea 50.60 -- -- 50.60
Add for Factory Mutual rated doors --@.000 Ea 17.00 -- -- 17.00
Add for 1 foot (31cm) extra height --@.000 Ea 50.10 -- -- 50.10
2015 Heavy Construction Estimator, All Rights Reserved Page 372 (part 2)

Add for 1' 6" extra height --@.000 Ea 95.60 -- -- 95.60


Add for lead lining in doors --@.000 Ea 1,040.00 -- -- 1,040.00
Add for sound
attenuation material in doors --@.000 Ea 48.10 -- -- 48.10

Louver metal doors,18 gauge


Using small tools.
3' x 7' am@1.00 Ea 513.00 43.92 0.55 557.47

Glazed metal doors, not including glass


Using small tools.
3' x 7' am@1.00 Ea 369.00 43.92 0.55 413.47
2015 Heavy Construction Estimator, All Rights Reserved Page 373

Residential steel entry doors


Costs vary widely, using miscellaneous power tools and small tools.
3' x 6'8" ap@1.25 Ea 246.00 54.85 1.51 302.36

Residential metal frames, 5-1/4" deep


18 gauge frame for 2" door, using small tools.
2' x 7' am@1.00 Ea 107.00 43.92 0.55 151.47
2' 4" x 7' am@1.00 Ea 113.00 43.92 0.55 157.47
2' 6" x 7' am@1.00 Ea 118.00 43.92 0.55 162.47
2' 8" x 7' am@1.00 Ea 123.00 43.92 0.55 167.47
3' x 7' am@1.00 Ea 128.00 43.92 0.55 172.47
3' 4" x 7' am@1.00 Ea 135.00 43.92 0.55 179.47
4' x 7' am@1.33 Ea 145.00 58.41 0.73 204.14
5' x 7' am@1.33 Ea 159.00 58.41 0.73 218.14
6' x 7' am@1.33 Ea 165.00 58.41 0.73 224.14
7' x 7' am@1.33 Ea 170.00 58.41 0.73 229.14

Residential metal frames, 5-3/4" deep


18 gauge frame for 2" door, using small tools.
2' x 7' am@1.00 Ea 120.00 43.92 0.55 164.47
2' 4" x 7' am@1.00 Ea 124.00 43.92 0.55 168.47
2' 6" x 7' am@1.00 Ea 128.00 43.92 0.55 172.47
2' 8" x 7' am@1.00 Ea 131.00 43.92 0.55 175.47
3' x 7' am@1.00 Ea 151.00 43.92 0.55 195.47
3' 4" x 7' am@1.00 Ea 158.00 43.92 0.55 202.47
4' x 7' am@1.33 Ea 162.00 58.41 0.73 221.14
5' x 7' am@1.33 Ea 176.00 58.41 0.73 235.14
6' x 7' am@1.33 Ea 198.00 58.41 0.73 257.14
7' x 7' am@1.33 Ea 217.00 58.41 0.73 276.14

Additional costs for residential metal frames


Add for 1 foot (31cm)
extension of door frame --@.000 Ea 21.10 -- -- 21.10
Add for 14 gauge frames --@.000 Ea 21.90 -- -- 21.90
Add for 16 gauge frames --@.000 Ea 15.90 -- -- 15.90
Add for 3 hour fire rated frame --@.000 Ea 56.70 -- -- 56.70
Add for 1-1/2 hour fire rated frame --@.000 Ea 46.10 -- -- 46.10
Add for 3/4 hour fire rated frame --@.000 Ea 40.30 -- -- 40.30
Add for lead lining in frame --@.000 Ea 79.20 -- -- 79.20

Hollow metal frame sections, 16 gauge - Verticals (mullions)


Using small tools.
4-3/4" x 1-3/4" am@.141 LF 8.66 6.19 0.08 14.93
4-3/4" x 2" am@.141 LF 7.80 6.19 0.08 14.07
5-1/4" x 1-3/4" am@.145 LF 8.66 6.37 0.08 15.11
5-1/4" x 2" am@.145 LF 8.66 6.37 0.08 15.11
6-3/4" x 1-3/4" am@.148 LF 9.10 6.50 0.08 15.68
6-3/4" x 2" am@.148 LF 8.08 6.50 0.08 14.66

Hollow metal frame sections, 16 gauge - Horizontals (rails)


Using small tools.
4-3/4" x 1-3/4" am@.141 LF 4.33 6.19 0.08 10.60
4-3/4" x 2" am@.141 LF 4.05 6.19 0.08 10.32
5-1/4" x 1-3/4" am@.145 LF 4.33 6.37 0.08 10.78
5-1/4" x 2" am@.145 LF 4.33 6.37 0.08 10.78
6-3/4" x 1-3/4" am@.148 LF 4.55 6.50 0.08 11.13
2015 Heavy Construction Estimator, All Rights Reserved Page 373 (part 2)

6-3/4" x 2" am@.148 LF 3.61 6.50 0.08 10.19


2015 Heavy Construction Estimator, All Rights Reserved Page 374

Additional costs for 16 gauge hollow metal frames


Add for 14 gauge frame --@.000 LF 0.71 -- -- 0.71
Add for 3 hour fire rated frame --@.000 LF 11.30 -- -- 11.30
Add for 1-1/2 hour fire rated frame --@.000 LF 11.30 -- -- 11.30
Add for 3/4 hour fire rated frame --@.000 LF 11.30 -- -- 11.30

CSI 08-114, Metal semi-circular head doors and frames

Semi-circular head metal door frames


4-1/8" x 3/8" x 1/8", 6'9" opening, using small tools.
2'2" wide am@1.00 Ea 466.00 43.92 0.55 510.47
2'6" wide am@1.00 Ea 466.00 43.92 0.55 510.47

Semi-circular head metal doors


Steel 18 gauge 1-3/4", 6'9" opening, unrated, using small tools.
2'2" wide am@1.00 Ea 482.00 43.92 0.55 526.47
2'6" wide am@1.00 Ea 482.00 43.92 0.55 526.47
Add for 16 gauge door --@.000 Ea 29.00 -- -- 29.00
Add for 3 hour fire rated door --@.000 Ea 15.00 -- -- 15.00
Add for 1-1/2 hour fire rated door --@.000 Ea 15.00 -- -- 15.00
Add for 3/4 hour fire rated door --@.000 Ea 15.00 -- -- 15.00
Add for Factory Mutual label --@.000 Ea 15.00 -- -- 15.00

CSI 08-120, Aluminum doors and frames

Aluminum doors and frames, narrow style


Commercial grade, anodized aluminum. Assembled from stock components. Includes door, frame, trim
and hardware but no glass, using small tools.
2' 6" x 7' qb@8.00 Ea 1,230.00 437.00 4.64 1,671.64
3' x 7' qb@8.00 Ea 1,140.00 437.00 4.64 1,581.64
3' 6" x 7' qb@10.0 Ea 1,330.00 546.20 5.80 1,882.00
5' x 7' qb@12.0 Ea 1,750.00 655.40 6.96 2,412.36
6' x 7' qb@12.5 Ea 1,800.00 682.80 7.25 2,490.05
7' x 7' qb@14.0 Ea 1,960.00 764.70 8.12 2,732.82

Aluminum doors and frames, wide style


Commercial grade, anodized aluminum. Assembled from stock components. Includes door, frame, trim
and hardware but no glass, using small tools.
2' 6" x 7' qb@8.00 Ea 840.00 437.00 4.64 1,281.64
3' x 7' qb@8.00 Ea 885.00 437.00 4.64 1,326.64
3' 6" x 7' qb@10.0 Ea 959.00 546.20 5.80 1,511.00
5' x 7' qb@12.0 Ea 1,150.00 655.40 6.96 1,812.36
6' x 7' qb@12.5 Ea 1,360.00 682.80 7.25 2,050.05
7' x 7' qb@14.0 Ea 1,510.00 764.70 8.12 2,282.82

Additional costs for aluminum doors and frames


Add for special finishes --@.000 Ea 112.00 -- -- 112.00
Add for non-standard sizes --@.000 Ea 43.00 -- -- 43.00
Add for full vision doors,
1/2" glass --@.000 Ea 43.00 -- -- 43.00
Add for 3 foot
(.92m) high transom over door --@.000 Ea 258.00 -- -- 258.00
Add for sidelight beside door ---@--- % 10.00 -- -- --
Add for installation
of non-standard size doors ---@--- % -- 10.00 -- --
Add for installation of sidelights ---@--- % -- 10.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 374 (part 2)

CSI 08-210, Wood doors

Exterior wood door frames


Custom made with threshold and trim, 7' high, using miscellaneous power tools and small tools.
3' pine ap@1.50 Ea 148.00 65.82 1.82 215.64
6' pine ap@1.60 Ea 274.00 70.21 1.94 346.15
3' walnut ap@1.50 Ea 320.00 65.82 1.82 387.64
2015 Heavy Construction Estimator, All Rights Reserved Page 375

6' walnut ap@1.60 Ea 394.00 70.21 1.94 466.15


3' oak ap@1.50 Ea 298.00 65.82 1.82 365.64
6' oak ap@1.60 Ea 343.00 70.21 1.94 415.15

Interior wood door frames


Custom made, with trim, 7' high, using miscellaneous power tools and small tools.
2'4" pine ap@.800 Ea 35.30 35.10 0.97 71.37
2'8" pine ap@.800 Ea 36.60 35.10 0.97 72.67
3' pine ap@.800 Ea 40.50 35.10 0.97 76.57
3'4" pine ap@.800 Ea 45.70 35.10 0.97 81.77
6' pine ap@.800 Ea 49.60 35.10 0.97 85.67
2'6" pine ap@.800 Ea 129.00 35.10 0.97 165.07
Pine interior door frame, 4 9/16" ap@.048 LF 1.75 2.11 0.06 3.92
Add for oak frames --@.000 Ea 26.10 -- -- 26.10
Add for birch frames --@.000 Ea 32.70 -- -- 32.70
Add for mahogany frames --@.000 Ea 78.40 -- -- 78.40
Add for each additional
foot of frame height --@.000 Ea 5.62 -- -- 5.62

Solid core birch interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' birch am@.936 Ea 146.00 41.11 0.51 187.62
2'-8" X 6'-8'' birch am@.936 Ea 155.00 41.11 0.51 196.62
3-0' X 6'-8'' birch am@.982 Ea 161.00 43.13 0.54 204.67
3'-4" X 6'-8'' birch am@.982 Ea 166.00 43.13 0.54 209.67
Pair of 3-0' X 6'-8'' birch doors am@1.50 Pair 332.00 65.88 0.83 398.71

Solid core birch interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' birch am@1.05 Ea 150.00 46.12 0.58 196.70
2'-8" X 7-0" birch am@1.05 Ea 157.00 46.12 0.58 203.70
3-0' X 7-0" birch am@1.10 Ea 163.00 48.31 0.61 211.92
3'-4" X 7-0"' birch am@1.10 Ea 175.00 48.31 0.61 223.92
Pair of 3-0' X 7-0"' birch doors am@2.00 Pair 350.00 87.84 1.10 438.94

Solid core lauan interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' lauan am@.936 Ea 128.00 41.11 0.51 169.62
2'-8" X 6'-8'' lauan am@.936 Ea 135.00 41.11 0.51 176.62
3-0' X 6'-8'' lauan am@.982 Ea 144.00 43.13 0.54 187.67
3'-4" X 6'-8'' lauan am@.982 Ea 154.00 43.13 0.54 197.67
Pair of 3-0' X 6'-8'' lauan doors am@1.50 Pair 308.00 65.88 0.83 374.71

Solid core lauan interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0' lauan am@1.05 Ea 155.00 46.12 0.58 201.70
2'-8" X 7-0'' lauan am@1.05 Ea 165.00 46.12 0.58 211.70
3-0' X 7-0' lauan am@1.10 Ea 171.00 48.31 0.61 219.92
3'-4" X 7-0' lauan am@1.10 Ea 184.00 48.31 0.61 232.92
Pair of 3-0' X 7-0' lauan doors am@2.00 Pair 368.00 87.84 1.10 456.94

Solid core hardboard interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' hardwood am@.936 Ea 127.00 41.11 0.51 168.62
2'-8" X 6'-8'' hardwood am@.936 Ea 135.00 41.11 0.51 176.62
3-0' X 6'-8'' hardwood am@.982 Ea 144.00 43.13 0.54 187.67
3'-4" X 6'-8'' hardwood am@.982 Ea 155.00 43.13 0.54 198.67
2015 Heavy Construction Estimator, All Rights Reserved Page 375 (part 2)

Pair of
3-0' X 6'-8'' hardwood doors am@1.50 Pair 287.00 65.88 0.83 353.71
2015 Heavy Construction Estimator, All Rights Reserved Page 376

Solid core hardboard interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' hardwood am@1.05 Ea 135.00 46.12 0.58 181.70
2'-8" X 7-0' hardwood am@1.05 Ea 144.00 46.12 0.58 190.70
3-0' X 7-0' hardwood am@1.10 Ea 154.00 48.31 0.61 202.92
3'-4" X 7-0' hardwood am@1.10 Ea 166.00 48.31 0.61 214.92
Pair of 3-0' X 7-0' hardwood doors am@2.00 Pair 308.00 87.84 1.10 396.94

Hollow core birch interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' birch am@.936 Ea 49.60 41.11 0.51 91.22
2'-8" X 6'-8'' birch am@.936 Ea 52.20 41.11 0.51 93.82
3-0' X 6'-8'' birch am@.982 Ea 54.90 43.13 0.54 98.57
3'-4" X 6'-8'' birch am@.982 Ea 60.10 43.13 0.54 103.77
Pair of 3-0' X 6'-8'' birch doors am@1.50 Pair 120.00 65.88 0.83 186.71

Hollow core birch interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' birch am@1.05 Ea 77.10 46.12 0.58 123.80
2'-8" X 7-0" birch am@1.05 Ea 82.30 46.12 0.58 129.00
3-0' X 7-0" birch am@1.10 Ea 84.90 48.31 0.61 133.82
3'-4" X 7-0"' birch am@1.10 Ea 92.70 48.31 0.61 141.62
Pair of 3-0' X 7-0"' birch doors am@2.00 Pair 185.00 87.84 1.10 273.94

Hollow core lauan interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' lauan am@.936 Ea 52.20 41.11 0.51 93.82
2'-8" X 6'-8'' lauan am@.936 Ea 54.90 41.11 0.51 96.52
3-0' X 6'-8'' lauan am@.982 Ea 58.80 43.13 0.54 102.47
3'-4" X 6'-8'' lauan am@.982 Ea 64.00 43.13 0.54 107.67
Pair of 3-0' X 6'-8'' lauan doors am@1.50 Pair 128.00 65.88 0.83 194.71

Hollow core lauan interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0' lauan am@1.05 Ea 73.10 46.12 0.58 119.80
2'-8" X 7-0'' lauan am@1.05 Ea 77.10 46.12 0.58 123.80
3-0' X 7-0' lauan am@1.10 Ea 81.00 48.31 0.61 129.92
3'-4" X 7-0' lauan am@1.10 Ea 88.80 48.31 0.61 137.72
Pair of 3-0' X 7-0' lauan doors am@2.00 Pair 178.00 87.84 1.10 266.94

Hollow core hardboard interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' hardwood am@.936 Ea 62.30 41.11 0.51 103.92
2'-8" X 6'-8'' hardwood am@.936 Ea 69.60 41.11 0.51 111.22
3-0' X 6'-8'' hardwood am@.982 Ea 70.90 43.13 0.54 114.57
3'-4" X 6'-8'' hardwood am@.982 Ea 78.80 43.13 0.54 122.47
Pair of
3-0' X 6'-8'' hardwood doors am@1.50 Pair 142.00 65.88 0.83 208.71

Hollow core hardboard interior doors, 1-3/8" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' hardwood am@1.05 Ea 70.50 46.12 0.58 117.20
2'-8" X 7-0' hardwood am@1.05 Ea 73.10 46.12 0.58 119.80
3-0' X 7-0' hardwood am@1.10 Ea 79.70 48.31 0.61 128.62
3'-4" X 7-0' hardwood am@1.10 Ea 84.90 48.31 0.61 133.82
Pair of 3-0' X 7-0' hardwood doors am@2.00 Pair 170.00 87.84 1.10 258.94
2015 Heavy Construction Estimator, All Rights Reserved Page 376 (part 2)

Solid core birch exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' birch am@.936 Ea 165.00 41.11 0.51 206.62
2'-8" X 6'-8'' birch am@.936 Ea 167.00 41.11 0.51 208.62
3-0' X 6'-8'' birch am@.982 Ea 178.00 43.13 0.54 221.67
2015 Heavy Construction Estimator, All Rights Reserved Page 377

3'-4" X 6'-8'' birch am@.982 Ea 189.00 43.13 0.54 232.67


Pair of 3-0' X 6'-8'' birch doors am@1.50 Pair 355.00 65.88 0.83 421.71

Solid core birch exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' birch am@1.05 Ea 175.00 46.12 0.58 221.70
2'-8" X 7-0" birch am@1.05 Ea 179.00 46.12 0.58 225.70
3-0' X 7-0" birch am@1.10 Ea 189.00 48.31 0.61 237.92
3'-4" X 7-0"' birch am@1.10 Ea 208.00 48.31 0.61 256.92
Pair of 3-0' X 7-0"' birch doors am@2.00 Pair 379.00 87.84 1.10 467.94

Solid core lauan exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' lauan am@.936 Ea 145.00 41.11 0.51 186.62
2'-8" X 6'-8'' lauan am@.936 Ea 154.00 41.11 0.51 195.62
3-0' X 6'-8'' lauan am@.982 Ea 178.00 43.13 0.54 221.67
3'-4" X 6'-8'' lauan am@.982 Ea 189.00 43.13 0.54 232.67
Pair of 3-0' X 6'-8'' lauan doors am@1.50 Pair 355.00 65.88 0.83 421.71

Solid core lauan exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0' lauan am@1.05 Ea 154.00 46.12 0.58 200.70
2'-8" X 7-0'' lauan am@1.05 Ea 162.00 46.12 0.58 208.70
3-0' X 7-0' lauan am@1.10 Ea 184.00 48.31 0.61 232.92
3'-4" X 7-0' lauan am@1.10 Ea 201.00 48.31 0.61 249.92
Pair of 3-0' X 7-0' lauan doors am@2.00 Pair 368.00 87.84 1.10 456.94

Solid core hardboard exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 6'-8'' hardwood am@.936 Ea 53.50 41.11 0.51 95.12
2'-8" X 6'-8'' hardwood am@.936 Ea 56.20 41.11 0.51 97.82
3-0' X 6'-8'' hardwood am@.982 Ea 62.70 43.13 0.54 106.37
3'-4" X 6'-8'' hardwood am@.982 Ea 65.30 43.13 0.54 108.97
Pair of
3-0' X 6'-8'' hardwood doors am@1.50 Pair 125.00 65.88 0.83 191.71

Solid core hardboard exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' hardwood am@1.05 Ea 60.10 46.12 0.58 106.80
2'-8" X 7-0' hardwood am@1.05 Ea 62.70 46.12 0.58 109.40
3-0' X 7-0' hardwood am@1.10 Ea 66.60 48.31 0.61 115.52
3'-4" X 7-0' hardwood am@1.10 Ea 69.20 48.31 0.61 118.12
Pair of 3-0' X 7-0' hardwood doors am@2.00 Pair 133.00 87.84 1.10 221.94

Hollow core birch exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0'' birch am@1.05 Ea 77.10 46.12 0.58 123.80
2'-8" X 7-0" birch am@1.05 Ea 82.30 46.12 0.58 129.00
3-0' X 7-0" birch am@1.10 Ea 84.90 48.31 0.61 133.82
3'-4" X 7-0"' birch am@1.10 Ea 92.70 48.31 0.61 141.62
Pair of 3-0' X 7-0"' birch doors am@2.00 Pair 185.00 87.84 1.10 273.94

Hollow core lauan exterior doors, 1-3/4" thick


No hardware included (see CSI 08-700), using small tools.
2'-4" X 7-0' lauan am@1.05 Ea 73.10 46.12 0.58 119.80
2'-8" X 7-0'' lauan am@1.05 Ea 77.10 46.12 0.58 123.80
3-0' X 7-0' lauan am@1.10 Ea 81.00 48.31 0.61 129.92
2015 Heavy Construction Estimator, All Rights Reserved Page 377 (part 2)

3'-4" X 7-0' lauan am@1.10 Ea 88.80 48.31 0.61 137.72


Pair of 3-0' X 7-0' lauan doors am@2.00 Pair 178.00 87.84 1.10 266.94
2015 Heavy Construction Estimator, All Rights Reserved Page 378

Hollow core hardboard exterior doors, 1-3/4" thick


No hardware included. See CSI 08-700, using small tools.
2'-4" X 7-0'' hardwood am@1.05 Ea 75.70 46.12 0.58 122.40
2'-8" X 7-0' hardwood am@1.05 Ea 79.70 46.12 0.58 126.40
3-0' X 7-0' hardwood am@1.10 Ea 82.30 48.31 0.61 131.22
3'-4" X 7-0' hardwood am@1.10 Ea 88.80 48.31 0.61 137.72
Pair of 3-0' X 7-0' hardwood doors am@2.00 Pair 165.00 87.84 1.10 253.94

Fire rated wood entry doors


Birch face, 1-3/4" thick, 90 minute rating, using small tools.
3' x 7' door am@1.10 Ea 189.00 48.31 0.61 237.92
4' x 7' door am@1.25 Ea 224.00 54.90 0.69 279.59

Decorative wood entry doors


Solid core, 3’ x 7’, 2-1/4" thick, using small tools.
Carved one side am@2.00 Ea 519.00 87.84 1.10 607.94
Carved two sides am@2.00 Ea 572.00 87.84 1.10 660.94
Birch facing am@2.00 Ea 814.00 87.84 1.10 902.94
Add for each foot
of additional door height --@.000 Ea 37.30 -- -- 37.30
Add for fixed
metal louver section in door --@.000 Ea 107.00 -- -- 107.00

Combination storm and screen doors


Using small tools.
Pine al@1.25 Ea 272.00 54.90 0.65 327.55

CSI 08-214, Wood semi-circular head doors and frames

Wood semi-circular head doors and frames


Solid core, 1-3/4" thick, 6'9" high, birch faced, using small tools.
2'2" wide am@2.00 Ea 1,660.00 87.84 1.10 1,748.94
2'6" wide am@2.00 Ea 1,660.00 87.84 1.10 1,748.94

CSI 08-310, Sliding metal fire doors

Sliding metal fire doors


Motor operated, 3 hour rating, with fusible link. Add the cost of electrical hookup, using small tools.
3-0' x 6'-8" qb@16.0 Ea 2,990.00 873.90 9.28 3,873.18
3'-'8" x 6'-8" qb@16.0 Ea 3,450.00 873.90 9.28 4,333.18
4-0' x 8-0' qb@16.0 Ea 3,580.00 873.90 9.28 4,463.18
5'-0 x 8-0' qb@16.0 Ea 3,720.00 873.90 9.28 4,603.18
6'-0 x 8-0' qb@16.0 Ea 4,660.00 873.90 9.28 5,543.18

CSI 08-320, Sliding metal clad doors

Sliding metal clad fire doors


Including electric motor, using small tools.
Light duty, minimum qb@.250 SF 35.10 13.66 0.15 48.91
Light duty, maximum qb@.405 SF 63.70 22.12 0.23 86.05
Heavy duty, minimum qb@.600 SF 70.10 32.77 0.35 103.22
Heavy duty, maximum qb@.750 SF 119.00 40.97 0.44 160.41

CSI 08-327, Hanger doors


2015 Heavy Construction Estimator, All Rights Reserved Page 378 (part 2)

Hanger doors - 25’ panels


Including hardware and motorized opener, costs based on 150' wide doors, using a 20-ton hydraulic
crane with 70’ boom and small tools.
To 20’ high qf@.213 SF 31.10 10.72 2.68 44.50
20’ to 40’ high qf@.142 SF 40.40 7.14 1.79 49.33
40’ to 60’ high qf@.085 SF 46.60 4.28 1.07 51.95
60’ to 80’ high qf@.061 SF 55.90 3.07 0.77 59.74
More than 80’ high qf@.047 SF 93.20 2.37 0.59 96.16
2015 Heavy Construction Estimator, All Rights Reserved Page 379

CSI 08-330, Coiling doors

Counter roll-up doors, aluminum


Manual operation, including aluminum frame and hardware, using small tools.
4' high x 4' wide qb@6.75 Ea 904.00 368.70 3.92 1,276.62
4' high x 6' wide qb@6.75 Ea 1,100.00 368.70 3.92 1,472.62
4' high x 8' wide qb@7.25 Ea 1,320.00 396.00 4.21 1,720.21
4' high x 10' wide qb@10.0 Ea 1,530.00 546.20 5.80 2,082.00
4' high x 14' wide qb@11.0 Ea 2,620.00 600.80 6.38 3,227.18
6' high x 4' wide qb@6.75 Ea 1,070.00 368.70 3.92 1,442.62
6' high x 6' wide qb@7.25 Ea 1,320.00 396.00 4.21 1,720.21
6' high x 10' wide qb@9.50 Ea 1,880.00 518.90 5.51 2,404.41
6' high x 14' wide qb@12.0 Ea 2,880.00 655.40 6.96 3,542.36
6' high x 18' wide qb@14.0 Ea 4,080.00 764.70 8.12 4,852.82
Add for steel counter roll-up doors ---@--- % 5.00 -- -- --
Add for stainless
steel counter roll-up doors ---@--- % 50.00 -- -- --
Add for motor operator on aluminum
counter roll-up doors --@.000 Ea 930.00 -- -- 930.00

Service doors, coiling roll up, standard, metal


Manual operation, including metal frame and hardware, using small tools.
8' high x 8' wide qb@5.00 Ea 1,550.00 273.10 2.90 1,826.00
10' high x 10' wide qb@7.50 Ea 2,180.00 409.70 4.35 2,594.05
12' high x 12' wide qb@10.0 Ea 2,790.00 546.20 5.80 3,342.00
14' high x 14' wide qb@15.0 Ea 3,660.00 819.30 8.70 4,488.00
16' high x 14' wide qb@16.0 Ea 4,180.00 873.90 9.28 5,063.18
20' high x 14' wide qb@20.0 Ea 5,410.00 1,092.00 11.60 6,513.60
24' high x 16' wide qb@20.0 Ea 7,330.00 1,092.00 11.60 8,433.60
Add for motor operator on
service doors up to 12' x 12' --@.000 Ea 1,430.00 -- -- 1,430.00
Add for motor operator on
service doors over 12' x 12' --@.000 Ea 1,860.00 -- -- 1,860.00

Radio control for door operation


Typical cost for doors up to 12' x 12', using small tools.
Radio control operator qb@5.00 Ea 1,050.00 273.10 2.90 1,326.00
Radio control receiver qb@1.25 Ea 84.10 68.28 0.73 153.11
Radio control transmitter qb@.333 Ea 35.00 18.19 0.19 53.38

CSI 08-340, Coiling grilles

Top coiling grilles, manually operated


Including frame, factory finished steel or aluminum, using small tools.
4' high x 4' wide qb@3.50 Ea 1,570.00 191.20 2.03 1,763.23
4' high x 6' wide qb@3.50 Ea 1,600.00 191.20 2.03 1,793.23
4' high x 8' wide qb@4.50 Ea 1,670.00 245.80 2.61 1,918.41
4' high x 12' wide qb@6.00 Ea 1,990.00 327.70 3.48 2,321.18
4' high x 16' wide qb@8.00 Ea 2,000.00 437.00 4.64 2,441.64
6' high x 4' wide qb@6.50 Ea 1,600.00 355.00 3.77 1,958.77
6' high x 6' wide qb@7.50 Ea 1,640.00 409.70 4.35 2,054.05
6' high x 8' wide qb@7.75 Ea 1,670.00 423.30 4.50 2,097.80
6' high x 12' wide qb@9.00 Ea 2,180.00 491.60 5.22 2,676.82
6' high x 16' wide qb@12.0 Ea 2,530.00 655.40 6.96 3,192.36
Add for motor operator --@.000 Ea 1,570.00 -- -- 1,570.00
Add for
moderately ornamental grilles ---@--- % 35.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 379 (part 2)

Add for highly ornamental grilles ---@--- % 100.00 -- -- --


2015 Heavy Construction Estimator, All Rights Reserved Page 380

Side coiling grilles, manually operated, aluminum


Including frame and factory finish, using small tools.
8' high x 12' wide qb@92.0 Ea 9,730.00 5,025.00 53.40 14,808.40
8' high x 18' wide qb@98.0 Ea 10,400.00 5,353.00 56.80 15,809.80
8' high x 24' wide qb@108. Ea 12,200.00 5,899.00 62.60 18,161.60
12' high x 12' wide qb@98.0 Ea 8,730.00 5,353.00 56.80 14,139.80
12' high x 18' wide qb@110. Ea 13,200.00 6,008.00 63.80 19,271.80
12' high x 24' wide qb@122. Ea 14,300.00 6,664.00 70.80 21,034.80
Add for stainless
steel side coiling grilles ---@--- % 31.00 -- -- --

CSI 08-345, Telescoping doors

Telescoping doors, enamel finish


No frame or electrical motor included, using small tools.
10' x 10', manually operated qb@15.0 Ea 9,720.00 819.30 8.70 10,548.00

CSI 08-350, Bi-folding and bi-passing doors

Bi-passing closet doors, 1-3/8" thick


Includes track and hardware but no frame, 6'8" high, using small tools.
4' lauan am@2.00 Ea 156.00 87.84 1.10 244.94
4' birch am@2.00 Ea 174.00 87.84 1.10 262.94
4' oak am@2.00 Ea 187.00 87.84 1.10 275.94
4' vinyl clad steel am@2.00 Ea 124.00 87.84 1.10 212.94
6' hardboard am@2.40 Ea 112.00 105.40 1.32 218.72
6' lauan am@2.40 Ea 187.00 105.40 1.32 293.72
6' birch am@2.40 Ea 211.00 105.40 1.32 317.72
6' oak am@2.40 Ea 236.00 105.40 1.32 342.72
6’ vinyl-clad steel am@2.40 Ea 149.00 105.40 1.32 255.72

Bi-folding closet doors, hollow core, 1-3/8" thick


Including hardware but no frame, 8’0" high, unfinished birch or pine, using small tools.
3' wide am@1.50 Ea 165.00 65.88 0.83 231.71
4' wide am@1.60 Ea 174.00 70.27 0.88 245.15
5' wide am@1.80 Ea 287.00 79.06 0.99 367.05
6' wide am@1.90 Ea 330.00 83.45 1.05 414.50
8' wide am@2.00 Ea 457.00 87.84 1.10 545.94
Deduct for
hardboard bi-folding doors ---@--- % -30.00 -- -- --
Add for full
louver pine bi-folding doors ---@--- % 160.00 -- -- --
Add for 8' high bi-folding doors ---@--- % 70.00 10.00 -- --

CSI 08-353, Accordion folding doors

Accordion folding doors, 2 layers


Including track and fittings, using small tools.
Vinyl covered am@.505 SF 13.20 22.18 0.28 35.66
Woven mahogany/vinyl am@.505 SF 16.90 22.18 0.28 39.36
Economy vinyl am@.505 SF 11.30 22.18 0.28 33.76
Rigid PVC am@.505 SF 18.80 22.18 0.28 41.26
Add for custom sizes ---@--- % 25.00 -- -- --
Add for fire retardant
accordion folding doors ---@--- % 15.00 10.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 381

CSI 08-355, Flexible doors

Rubber flexible doors, 7’ high


Including frame and hardware, using small tools.
Pair 2'-6" wide qb@10.0 Pair 2,520.00 546.20 5.80 3,072.00
Pair 3' wide qb@10.5 Pair 2,900.00 573.50 6.09 3,479.59
Pair 4' wide qb@12.0 Pair 3,700.00 655.40 6.96 4,362.36
Add for heights to 8'6" --@.000 Ea 429.00 -- -- 429.00
Add for heights over 8' to 10' --@.000 Ea 1,000.00 -- -- 1,000.00

CSI 08-361, Sectional wood overhead doors

Sectional wood 1-3/4" overhead doors


Heavy duty commercial grade, manual operation, without frame, using small tools.
8' x 8' am@8.00 Ea 902.00 351.40 4.40 1,257.80
10' x 10' am@12.0 Ea 1,390.00 527.00 6.60 1,923.60
12' x 12' am@14.0 Ea 1,880.00 614.90 7.70 2,502.60
14' x 14' with hoist am@18.0 Ea 2,750.00 790.60 9.90 3,550.50
12' x 16' with hoist am@20.0 Ea 2,940.00 878.40 11.00 3,829.40
20' x 8' with hoist am@24.0 Ea 2,550.00 1,054.00 13.20 3,617.20
20' x 16' with hoist am@32.0 Ea 5,890.00 1,405.00 17.60 7,312.60
Deduct for medium duty stock doors ---@--- % -20.00 -- -- --
Deduct for medium duty custom doors ---@--- % -10.00 -- -- --
Add for motor operator to 14' x 14' ---@--- % 60.00 -- -- --
Add for
motor operator over 14' x 14' ---@--- % 65.00 -- -- --
Add for vision panel in door,
per panel --@.000 Ea 40.30 -- -- 40.30

Sectional wood overhead doors - Residential grade, manual, 7’ high


Without frame, using small tools.
9' wide am@4.00 Ea 540.00 175.70 2.20 717.90
16' wide am@6.00 Ea 1,080.00 263.50 3.30 1,346.80
Add for hardboard face --@.000 Ea 185.00 -- -- 185.00
Add for insulated doors --@.000 Ea 282.00 -- -- 282.00
Add for
economy grade motor operator --@.000 Ea 403.00 -- -- 403.00
Add for
deluxe grade motor operator --@.000 Ea 564.00 -- -- 564.00
Add for vision panel,
per glass pane --@.000 Ea 40.30 -- -- 40.30

CSI 08-362, Sectional metal overhead doors

Sectional metal commercial grade overhead doors


Including track and fittings, using small tools.
8' x 8' am@8.00 Ea 695.00 351.40 4.40 1,050.80
10' x 10' am@10.0 Ea 1,040.00 439.20 5.50 1,484.70
12' x 12' am@12.0 Ea 1,390.00 527.00 6.60 1,923.60
20' x 14' with hoist am@24.0 Ea 3,930.00 1,054.00 13.20 4,997.20
Add for motor
operator up to 12' x 12' --@.000 Ea 253.00 -- -- 253.00
Add for motor
operator for over 12' x 12' --@.000 Ea 282.00 -- -- 282.00
Add for insulated door --@.000 Ea 58.40 -- -- 58.40

Sectional metal overhead doors - Residential grade


2015 Heavy Construction Estimator, All Rights Reserved Page 381 (part 2)

Including track and fittings, using small tools.


9' x 7' am@4.00 Ea 429.00 175.70 2.20 606.90
16' x 7' am@6.00 Ea 798.00 263.50 3.30 1,064.80
Add for
aluminum and fiberglass doors ---@--- % 10.00 -- -- --
Add for
economy grade motor operator --@.000 Ea 289.00 -- -- 289.00
Add for deluxe grade motor operator --@.000 Ea 405.00 -- -- 405.00
Add for vision panel in door,
per glass pane. --@.000 Ea 42.80 -- -- 42.80
Add for insulated door --@.000 Ea 34.70 -- -- 34.70
2015 Heavy Construction Estimator, All Rights Reserved Page 382

CSI 08-370, Sliding glass doors

Sliding glass doors - 1/4" tempered float glass


Including frame, trim, and hardware, using small tools.
6' wide economy grade am@2.75 Ea 942.00 120.80 1.51 1,064.31
6' wide premium grade am@2.75 Ea 1,080.00 120.80 1.51 1,202.31
12' wide economy grade am@3.75 Ea 1,500.00 164.70 2.06 1,666.76
12' wide premium grade am@3.75 Ea 2,180.00 164.70 2.06 2,346.76

Sliding glass doors - 5/8" insulating glass


Including frame, trim, and hardware, using small tools.
6' wide economy grade am@2.75 Ea 1,330.00 120.80 1.51 1,452.31
6' wide premium grade am@2.75 Ea 1,610.00 120.80 1.51 1,732.31
12' wide economy grade am@3.75 Ea 1,790.00 164.70 2.06 1,956.76
12' wide premium grade am@3.75 Ea 2,180.00 164.70 2.06 2,346.76

Sliding glass doors - 1" insulating glass


Including frame, trim, and hardware, using small tools.
6' wide economy grade am@2.75 Ea 942.00 120.80 1.51 1,064.31
6' wide premium grade am@2.75 Ea 1,080.00 120.80 1.51 1,202.31
12' wide economy grade am@3.75 Ea 1,500.00 164.70 2.06 1,666.76
12' wide premium grade am@3.75 Ea 2,180.00 164.70 2.06 2,346.76
Add for custom quality ---@--- % 25.00 -- -- --
Add for tempered
glass to 6' (1.8m) wide --@.000 SF 2.15 -- -- 2.15
Add for tempered glass
over 6' to 12' (3.7m) wide --@.000 SF 2.58 -- -- 2.58
Add for anodized
or colored aluminum frames ---@--- % 20.00 -- -- --

CSI 08-378, Vertical lift doors

Vertical lift doors


Channel frame construction, 14 gauge steel facing, 5 panels. Includes wind lock seals, track,
counterweight and supports, electric motor and control panel, using a 50,000 lb 6x4 3-axle truck with, a
8’ x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
16-0' x 16-0' wide a5@18.0 Ea 15,900.00 774.00 619.00 17,293.00
20-0' x 10-0' wide a5@18.0 Ea 13,300.00 774.00 619.00 14,693.00
20-0' x 15-0' wide a5@18.0 Ea 15,200.00 774.00 619.00 16,593.00
20-0' x 20-0' wide a5@24.0 Ea 16,700.00 1,032.00 826.00 18,558.00
20-0' x 25-0' wide a5@24.0 Ea 18,000.00 1,032.00 826.00 19,858.00
25-0' x 20-0' wide a5@24.0 Ea 20,800.00 1,032.00 826.00 22,658.00
25-0' x 25-0' wide a5@36.0 Ea 22,200.00 1,548.00 1,240.00 24,988.00
25-0' x 30-0' wide a5@42.0 Ea 26,400.00 1,806.00 1,440.00 29,646.00
30-0' x 30-0' wide a5@43.0 Ea 27,300.00 1,849.00 1,480.00 30,629.00
30-0' x 35-0' wide a5@45.0 Ea 29,100.00 1,935.00 1,550.00 32,585.00

CSI 08-390, Screen and storm doors

Screen and storm doors, aluminum


Including frame, trim, and hardware, using small tools.
Combination door, tempered glass am@2.00 Ea 195.00 87.84 1.10 283.94
Add for special finishes ---@--- % 33.00 -- -- --

CSI 08-395, Cold storage doors


2015 Heavy Construction Estimator, All Rights Reserved Page 382 (part 2)

Vertical sliding cold storage doors


To be filled with 4" polyurethane insulation. Includes frame, casings and hardware, 20 gauge galvanized
steel, factory finish, using small tools.
7'-0" x 8'-0" single leaf n8@16.0 Ea 6,200.00 814.20 9.60 7,023.80
7'-0" x 9'-0" bi-passing n8@20.0 Ea 7,980.00 1,018.00 12.00 9,010.00

Horizontal sliding cold storage doors


To be filled with 4" polyurethane insulation. Includes frame, casings and hardware, 20 gauge galvanized
steel, factory finish, using small tools.
5'-0" x 7'-0" single leaf n8@10.0 Ea 4,290.00 508.90 6.00 4,804.90
6'-0" x 9'-0" single leaf n8@12.0 Ea 2,800.00 610.70 7.20 3,417.90
7'-0" x 9'-0" single leaf n8@14.0 Ea 3,150.00 712.50 8.40 3,870.90
2015 Heavy Construction Estimator, All Rights Reserved Page 383

7'-0" x 9'-0" bi-passing n8@18.0 Ea 4,050.00 916.00 10.80 4,976.80

Horizontal hinge-type cold storage doors


To be filled with 4" polyurethane insulation. Includes frame, casings and hardware, 20 gauge galvanized
steel, factory finish, using small tools.
3'-0" x 7'-0" swinging door n8@8.00 Ea 2,610.00 407.10 4.80 3,021.90

Air curtains
Does not incl. motor starters, transformers, door switches or temp controls, shipping and receiving
doors, unheated, minimal wind stoppage, using small tools.
8-0' high, multiples of 3-0' wide am@4.40 Ea 189.00 193.20 2.42 384.62
8-0' high, multiples of 5-0' wide am@4.40 Ea 168.00 193.20 2.42 363.62
10-0' high, multiples of 4-0' wide am@4.40 Ea 175.00 193.20 2.42 370.62
12-0' high, multiples of 3'-6" wide am@4.40 Ea 205.00 193.20 2.42 400.62
12-0' high,12-0' wide am@4.80 Ea 225.00 210.80 2.64 438.44
16-0' high, multiples of 3'-6" wide am@5.00 Ea 246.00 219.60 2.75 468.35
16-0' high, 12-0' wide am@5.00 Ea 218.00 219.60 2.75 440.35
10-0' high, multiple of 4-0' wide am@4.40 Ea 350.00 193.20 2.42 545.62
14-0' high, multiple of 4-0' wide am@5.00 Ea 465.00 219.60 2.75 687.35
20-0' high, multiple of 8-0' wide am@5.60 Ea 880.00 246.00 3.08 1,129.08
10-0' high, multiple of 4-0' wide am@5.60 Ea 475.00 246.00 3.08 724.08
14-0' high, multiple of 4-0' wide am@5.80 Ea 650.00 254.70 3.19 907.89
20-0' high, multiple of 8-0' wide am@6.20 Ea 1,180.00 272.30 3.41 1,455.71

CSI 08-420, Storefront entrance doors

All glass storefront entrance doors, tempered


Maximum wind stoppage
Heated, maximum wind stoppage, steam heat
Includes trim and hardware. See also sealants (CSI 07-900), metal doors and frames (CSI 08-100),
metal windows (CSI 08-500), hardware (CSI 08-700), operators (CSI 09-720), glazing (CSI 08-800),
window and curtain wall (CSI 08-900), using small tools.
3' x 7' x 1/2" thick qb@10.0 Ea 2,820.00 546.20 5.80 3,372.00
6' x 7' x 1/2" thick qb@14.0 Pair 5,490.00 764.70 8.12 6,262.82
3' x 7' x 3/4" thick qb@10.0 Ea 3,100.00 546.20 5.80 3,652.00
6' x 7' x 3/4" thick qb@14.0 Pair 5,620.00 764.70 8.12 6,392.82
3' x 7' x 1" thick qb@10.0 Ea 3,520.00 546.20 5.80 4,072.00
6' x 7' x 1" thick qb@14.0 Pair 6,900.00 764.70 8.12 7,672.82
Light weight aluminum frame,
1/8" x 17"shaped jamb-head qb@.153 LF 10.70 8.36 0.09 19.15
Heavy weight aluminum frame,
1/8" x 17"shaped jamb-head qb@.203 LF 13.20 11.09 0.12 24.41
Add for anodized aluminum ---@--- % 30.00 -- -- --

CSI 08-450, Revolving doors

Revolving storefront doors, 6'10" to 7' high


Including frame and hardware, using a truck-mounted hydraulic crane with 115’ boom, miscellaneous
power tools and small tools.
6'6" to 7' diameter, low quality a7@50.0 Ea 14,600.00 2,093.00 913.00 17,606.00
6'6" to 7' diameter,
average quality a7@50.0 Ea 18,300.00 2,093.00 913.00 21,306.00
6'6" to 7' diameter, high quality a7@64.0 Ea 32,300.00 2,679.00 1,170.00 36,149.00
Add for automatic door controls ---@--- % 40.00 44.00 -- --

CSI 08-510, Steel windows

Steel casement windows


2015 Heavy Construction Estimator, All Rights Reserved Page 383 (part 2)

Factory primed, no glass included. See CSI 08-800, using small tools.
50% vented, operable bn@.075 SF 44.50 3.43 0.02 47.95
100% vented, operable bn@.075 SF 52.50 3.43 0.02 55.95
Fixed sash bn@.075 SF 29.40 3.43 0.02 32.85

Industrial casement metal windows


Using small tools.
Horizontal pivot sash bn@.075 SF 39.00 3.43 0.02 42.45
Fixed sash bn@.075 SF 34.00 3.43 0.02 37.45
Operable security sash bn@.075 SF 59.50 3.43 0.02 62.95
Fixed security sash bn@.075 SF 49.50 3.43 0.02 52.95

Projected sash steel casement windows


Using small tools.
Commercial, 40% vented bn@.075 SF 46.50 3.43 0.02 49.95
2015 Heavy Construction Estimator, All Rights Reserved Page 384

Intermediate, 40% vented bn@.075 SF 52.00 3.43 0.02 55.45

Other metal sash windows


No glass included, using small tools.
Double hung window sash bn@.075 SF 57.50 3.43 0.02 60.95
Picture window sash bn@.075 SF 21.00 3.43 0.02 24.45

Steel mullions
No glass included, using small tools.
Open faced bn@.040 LF 11.00 1.83 0.01 12.84
Covered bn@.040 LF 21.40 1.83 0.01 23.24
Add for double glazing sash ---@--- % 50.00 6.00 -- --
Add for bonderized finish ---@--- % 10.00 -- -- --

CSI 08-520, Aluminum windows

Aluminum windows
Standard brushed aluminum finish. No glass included. See CSI 08-800, using small tools.
Casement, fixed bn@.075 SF 8.24 3.43 0.02 11.69
Casement, operable bn@.075 SF 20.10 3.43 0.02 23.55
Single hung bn@.075 SF 10.50 3.43 0.02 13.95
Double hung bn@.075 SF 11.60 3.43 0.02 15.05
Projected bn@.075 SF 18.90 3.43 0.02 22.35
Picture bn@.075 SF 9.25 3.43 0.02 12.70
Sliding bn@.075 SF 12.60 3.43 0.02 16.05
Hopper sash bn@.075 SF 10.10 3.43 0.02 13.55
Add for duranodic
finish on aluminum windows ---@--- % 4.00 -- -- --
Add for installation
in concrete openings ---@--- % -- 80.00 -- --

Mullions for aluminum windows


Using small tools.
Tubular, standard brushed finish bn@.083 LF 3.05 3.80 0.02 6.87

Insect screens for aluminum windows


Including frame, standard brushed aluminum finish, using small tools.
Less than 10 SF (.9m2) area bn@.017 SF 2.47 0.78 -- 3.25
Greater than 10 SF (.9m2) area bn@.013 SF 2.15 0.60 -- 2.75

Special aluminum windows


Using small tools.
Aluminum jalousie windows,
screened and glazed qb@.200 SF 16.50 10.92 0.12 27.54
Thermal barrier windows, with solar shade,
1/2" glass not included qb@.133 SF 30.10 7.26 0.08 37.44

Semicircular head windows


Using small tools.
Fixed, casement qb@.111 SF 19.40 6.06 0.06 25.52
Operable, casement qb@.111 SF 19.40 6.06 0.06 25.52

CSI 08-610, Wood windows

Wood windows - Casement type


Glazed double strength A grade, including screens, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 384 (part 2)

1 leaf, 22" x 38" high am@1.00 Ea 338.00 43.92 0.55 382.47


2 leaf, 50" x 50" high am@1.80 Ea 863.00 79.06 0.99 943.05
3 leaf, 71" x 62" high am@1.80 Ea 1,260.00 79.06 0.99 1,340.05
4 leaf, 95" x 75" high am@2.25 Ea 1,780.00 98.82 1.24 1,880.06
5 leaf, 119" x 75" high am@2.50 Ea 2,320.00 109.80 1.38 2,431.18
Add for insulating glass ---@--- % 20.00 -- -- --
Add for removable
mullions to 50" x 50" --@.000 Ea 26.80 -- -- 26.80
Add for
removable mullions 71" x 62" --@.000 Ea 29.10 -- -- 29.10
Add for removable
mullions over 71" x 62" --@.000 Ea 33.70 -- -- 33.70
2015 Heavy Construction Estimator, All Rights Reserved Page 385

Wood windows - Picture, fixed


Glazed with 7/8" thick insulating glass, using small tools.
54" x 54" am@2.00 Ea 504.00 87.84 1.10 592.94
68" x 54" am@2.22 Ea 568.00 97.50 1.22 666.72
Add for snap-in mullions 54" x 54" --@.000 Ea 38.40 -- -- 38.40
Add for snap-in mullions 68" x 54" --@.000 Ea 52.20 -- -- 52.20

Wood windows - Sliding


Glazed 1/4" clear tempered glass. Including screens, using small tools.
40" x 31" height am@1.50 Ea 279.00 65.88 0.83 345.71
52" x 39" height am@1.65 Ea 398.00 72.47 0.91 471.38
64" x 72" height am@1.67 Ea 648.00 73.35 0.92 722.27

Wood windows - Double hung, standard


Glazed with 1/4" clear tempered glass. With screen, using small tools.
32" x 54" height am@1.00 Ea 273.00 43.92 0.55 317.47
52" x 39" height am@1.50 Ea 309.00 65.88 0.83 375.71
Add for insulating glass ---@--- % 20.00 -- -- --

Wood windows - Awning type


Glazed with 7/8" insulating glass. Including screen, using small tools.
34" x 21" height am@1.00 Ea 230.00 43.92 0.55 274.47
34" x 72" height am@1.50 Ea 513.00 65.88 0.83 579.71
52" x 21" height am@1.00 Ea 291.00 43.92 0.55 335.47
52" x 72" height am@1.75 Ea 742.00 76.86 0.96 819.82

CSI 08-710, Finish hardware

Commercial grade door hardware


Using small tools.
3" x 3" steel butt hinges,
plain bearing am@.377 Pair 8.87 16.56 0.21 25.64
4" x 4" steel butt hinges,
standard ball bearing am@.500 Pair 9.62 21.96 0.28 31.86
5" x 4-1/2" bronze or stainless steel butt hinges,
heavy duty ball bearing am@.625 Pair 78.80 27.45 0.34 106.59
Standard duty cylindrical latch set am@.500 Ea 141.00 21.96 0.28 163.24
Heavy duty cylindrical latch set am@.435 Ea 141.00 19.11 0.24 160.35
Heavy duty mortise latch set am@1.25 Ea 155.00 54.90 0.69 210.59
Standard duty cylindrical lock set am@.500 Ea 159.00 21.96 0.28 181.24
Heavy duty cylindrical lock set am@.435 Ea 159.00 19.11 0.24 178.35
Heavy duty mortise lock set am@1.25 Ea 271.00 54.90 0.69 326.59
Door bumper, bronze wall type am@.250 Ea 3.27 10.98 0.14 14.39
Door bumper, bronze floor type am@.250 Ea 2.25 10.98 0.14 13.37
Door holder, bronze wall type am@.625 Ea 7.73 27.45 0.34 35.52
Door holder, bronze overhead type am@.625 Ea 112.00 27.45 0.34 139.79
Door holder, bronze floor type am@.625 Ea 18.70 27.45 0.34 46.49
Door holder, bronze plunger type am@.625 Ea 45.00 27.45 0.34 72.79
Door closer,
exterior surface mounted am@.894 Ea 158.00 39.26 0.49 197.75
Door closer,
interior surface mounted am@.616 Ea 103.00 27.05 0.34 130.39
Door closer, concealed mount, head am@1.82 Ea 210.00 79.93 1.00 290.93
Door closer, concealed mount, flour am@4.55 Ea 197.00 199.80 2.50 399.30
Door coordinating device am@.741 Pair 212.00 32.54 0.41 244.95
Pivot hinges, top pivot am@1.82 Ea 78.10 79.93 1.00 159.03
Pivot hinges, intermediate pivot am@1.54 Ea 185.00 67.64 0.85 253.49
2015 Heavy Construction Estimator, All Rights Reserved Page 385 (part 2)

Pivot hinges, bottom pivot am@4.55 Ea 179.00 199.80 2.50 381.30


Bronze door push plate am@.190 Ea 15.80 8.35 0.10 24.25
Bronze door pull handle am@.250 Ea 20.60 10.98 0.14 31.72
10" x 34" door kick plate am@.452 Ea 14.50 19.85 0.25 34.60
40" x 34" door armor plate am@.500 Ea 60.20 21.96 0.28 82.44
Door surface plate am@.250 Ea 6.03 10.98 0.14 17.15
Panic device, unlabeled, rim type am@1.50 Ea 476.00 65.88 0.83 542.71
Panic device,
unlabeled, mortise type am@2.41 Ea 695.00 105.80 1.33 802.13
Panic device,
unlabeled, vertical rod am@2.41 Ea 696.00 105.80 1.33 803.13
Panic device, labeled, rim type am@1.50 Ea 824.00 65.88 0.83 890.71
2015 Heavy Construction Estimator, All Rights Reserved Page 386

Panic device, labeled, mortise type am@2.41 Ea 824.00 105.80 1.33 931.13
Panic device,
labeled, vertical rod type am@2.41 Ea 824.00 105.80 1.33 931.13

Specification grade hinges - Wrought steel


Satin chrome plated finish. Meets Building Hardware Manufacturers Association (BHMA) specifications,
using small tools.
3-1/2 x 3-1/2", full mortise,
plain bearing, standard am@.357 Pair 13.20 15.68 0.20 29.08
3-1/2 x 3-1/2", half surface,
plain bearing, standard am@.377 Pair 32.50 16.56 0.21 49.27
3-1/2 x 3-1/2", full mortise,
ball bearing, standard am@.377 Pair 42.30 16.56 0.21 59.07
4" x 4", full mortise,
plain bearing, standard am@.500 Pair 20.30 21.96 0.28 42.54
4" x 4", half surface,
plain bearing, standard am@.500 Pair 16.40 21.96 0.28 38.64
4" x 4", full mortise,
ball bearing, standard am@.500 Pair 48.30 21.96 0.28 70.54
4" x 4", half surface,
ball bearing, standard am@.500 Pair 37.00 21.96 0.28 59.24
4-1/2 x 4-1/2", full mortise,
plain bearing, standard am@.571 Pair 26.40 25.08 0.31 51.79
4-1/2 x 4-1/2", half surface and half mortise,
plain bearing, standard duty am@.571 Pair 65.40 25.08 0.31 90.79
4-1/2 x 4-1/2", full mortise/slide-in,
ball bearing, standard duty am@.571 Pair 205.00 25.08 0.31 230.39
4-1/2 x 4-1/2", full surface and half surface,
ball bearing, standard duty am@.571 Pair 238.00 25.08 0.31 263.39
4-1/2 x 4-1/2", full mortise,
ball bearing, heavy duty am@.571 Pair 146.00 25.08 0.31 171.39
4-1/2 x 4-1/2", half mortise, full and half surface,
ball bearing, heavy duty am@.571 Pair 162.00 25.08 0.31 187.39
5" x 5", full mortise, ball bearing am@.667 Pair 169.00 29.29 0.37 198.66
5" x 5", half mortise, full and half surface,
ball bearing, heavy duty am@.667 Pair 229.00 29.29 0.37 258.66

Specification grade hinges - Brass or bronze


Satin brass clear finish. Meets Building Hardware Manufacturers Association (BHMA) specifications,
using small tools.
3-1/2 x 3-1/2", full mortise,
plain bearing, standard am@.357 Pair 23.60 15.68 0.20 39.48
3-1/2 x 3-1/2", full mortise,
ball bearing, standard am@.377 Pair 22.80 16.56 0.21 39.57
4" x 4", full mortise,
plain bearing, standard am@.500 Pair 101.00 21.96 0.28 123.24
4" x 4", full mortise,
ball bearing, standard am@.500 Pair 118.00 21.96 0.28 140.24
4-1/2 x 4-1/2", full mortise,
plain bearing, standard am@.571 Pair 106.00 25.08 0.31 131.39
4-1/2 x 4-1/2", full mortise/slide-in,
ball bearing, standard duty am@.571 Pair 128.00 25.08 0.31 153.39
4-1/2 x 4-1/2", half mortise,
ball bearing, standard am@.571 Pair 49.90 25.08 0.31 75.29
4-1/2 x 4-1/2", full mortise,
ball bearing, heavy duty am@.571 Pair 72.10 25.08 0.31 97.49
4-1/2 x 4-1/2", full and half surface,
ball bearing, heavy duty am@.571 Pair 64.90 25.08 0.31 90.29
5" x 5", full mortise,
2015 Heavy Construction Estimator, All Rights Reserved Page 386 (part 2)

ball bearing, heavy duty am@.667 Pair 103.00 29.29 0.37 132.66
5" x 5", full mortise ,full and half surface,
ball bearing, heavy duty am@.667 Pair 144.00 29.29 0.37 173.66
5" x 4-1/2", full mortise,
ball bearing, heavy duty am@.667 Pair 83.30 29.29 0.37 112.96
5" x 4-1/2", half mortise, full and half surface,
ball bearing, heavy duty am@.667 Pair 103.00 29.29 0.37 132.66
Deduct
for satin brass plated hinges ---@--- % -20.00 -- -- --
Deduct for primed for paint finish ---@--- % -20.00 -- -- --
Add for bright chrome plated finish ---@--- % 20.00 -- -- --
Add for satin chrome plated finish ---@--- % 20.00 -- -- --

Door accessory hardware


Using small tools.
Aluminum door bumper, floor type,
semi-automatic hold-open am@.250 Ea 1.86 10.98 0.14 12.98
Brass door bumper, floor type,
semi-automatic hold-open am@.250 Ea 8.81 10.98 0.14 19.93
Aluminum door bumper, 4" diameter, wall type,
with convex rubber pad am@.250 Ea 3.24 10.98 0.14 14.36
Aluminum door holder, floor type,
automatic hold-open am@.625 Ea 4.11 27.45 0.34 31.90
Aluminum door holder, wall type,
semi-automatic hold-open am@.625 Ea 12.00 27.45 0.34 39.79
Aluminum door holder, plunger type
with replaceable rubber tip am@.625 Ea 13.00 27.45 0.34 40.79
Brass door holder, plunger type
with replaceable rubber tip am@.625 Ea 31.90 27.45 0.34 59.69
Rubber door silencers,
for metal frames am@.250 Ea 0.25 10.98 0.14 11.37
Brass dust proof strike with plate am@.400 Ea 15.20 17.57 0.22 32.99
Brass flush bolt,
lever extension, UL rated am@.250 Ea 28.70 10.98 0.14 39.82
6" long brass
surface bolt with strike am@.250 Ea 21.40 10.98 0.14 32.52
2015 Heavy Construction Estimator, All Rights Reserved Page 387

Exit devices, brass


Satin chrome plated finish, using small tools.
Rim type, with thumb piece am@3.13 Ea 587.00 137.50 1.72 726.22
Surface vertical rod,
with thumb piece am@3.13 Ea 824.00 137.50 1.72 963.22
Mortise, with thumb piece am@3.13 Ea 824.00 137.50 1.72 963.22
Concealed vertical rod,
with lever handle am@6.67 Ea 1,140.00 292.90 3.67 1,436.57
Door coordinator, UL label am@1.00 Ea 69.20 43.92 0.55 113.67
Deduct for satin brass finish ---@--- % -10.00 -- -- --

Door kick plates


.050" aluminum, with three beveled edges, using small tools.
10" x 28" am@.452 Ea 11.00 19.85 0.25 31.10
10" x 30" am@.452 Ea 11.70 19.85 0.25 31.80
10" x 34" am@.452 Ea 13.10 19.85 0.25 33.20
10" x 38" am@.452 Ea 12.50 19.85 0.25 32.60

Door push and pull plates


4" x 16", .050", using small tools.
Aluminum door push plate am@.550 Ea 32.70 24.16 0.30 57.16
Bronze door push plate am@.550 Ea 60.00 24.16 0.30 84.46
Stainless steel push plate am@.550 Ea 46.40 24.16 0.30 70.86

Door pull handles


Using small tools.
Aluminum door pull handle am@.550 Ea 51.80 24.16 0.30 76.26
Bronze door pull handle am@.550 Ea 79.10 24.16 0.30 103.56
Stainless steel pull handle am@.550 Ea 65.50 24.16 0.30 89.96

Door hasps, bronze


Using small tools.
3" hasp assembly am@.189 Pair 2.84 8.30 0.10 11.24
4-1/2" hasp assembly am@.286 Pair 4.20 12.56 0.16 16.92
6" hasp assembly am@.333 Pair 4.97 14.63 0.18 19.78
Add for stainless steel ---@--- % 10.00 -- -- --
Add for brass ---@--- % 20.00 -- -- --

Mortise locks and latch sets


Wrought steel case, 2" satin chrome plated knob with brass base and bolt, using small tools.
Passage latch set, closet,
lever or knob operated am@1.00 Ea 155.00 43.92 0.55 199.47
Privacy lock set, bath or bedroom,
lever or knob operated am@1.00 Ea 167.00 43.92 0.55 211.47
Entry lock set, latch bolt operated am@1.00 Ea 208.00 43.92 0.55 252.47
Outside key operated lock set,
classroom am@1.00 Ea 208.00 43.92 0.55 252.47
Lock set, storeroom,
lever or knob operated am@1.00 Ea 208.00 43.92 0.55 252.47
Lock set, front door,
lever or knob operated am@1.00 Ea 222.00 43.92 0.55 266.47
Lock set, dormitory exit,
lever or knob operated am@1.00 Ea 208.00 43.92 0.55 252.47
Add for bright brass, clear coated finish with brass base,
BHMA 605 ---@--- % 2.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 387 (part 2)

Preassembled locks and latches


Brass bolt, brass case, clear coated bright brass finish or satin chrome plated with brass base, using
small tools.
Passage latch set,
closet, latch bolt operated am@1.00 Ea 199.00 43.92 0.55 243.47
Privacy lock set, bath or bedroom,
latch bolt operated am@1.00 Ea 217.00 43.92 0.55 261.47
Entry lock set, latch bolt operated am@1.00 Ea 248.00 43.92 0.55 292.47
Outside key operated lock set, classroom,
latch bolt operated am@1.00 Ea 248.00 43.92 0.55 292.47
Lock set, storeroom,
lever or knob operated am@1.00 Ea 248.00 43.92 0.55 292.47

Bored locks and latches


Satin chrome plated with bright brass base, using small tools.
Passage latch set,
closet, latch bolt operated am@1.00 Ea 126.00 43.92 0.55 170.47
Privacy lock set, bath or bedroom,
latch bolt operated am@1.00 Ea 156.00 43.92 0.55 200.47
Entry lock set,
dead locking latch bolt am@1.00 Ea 181.00 43.92 0.55 225.47
Outside key operated lock set, classroom,
dead locking latch bolt am@1.00 Ea 181.00 43.92 0.55 225.47
Lock set for corridor,
dead locking latch bolt am@1.00 Ea 181.00 43.92 0.55 225.47
Lock set for store door,
dead locking latch bolt am@1.00 Ea 181.00 43.92 0.55 225.47
Add for bright brass, clear coated finish with brass base,
BHMA 605 ---@--- % 2.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 388

Miscellaneous locks
Using small tools.
Steel exit lock with alarm, single door,
satin chrome plated am@5.00 Ea 226.00 219.60 2.75 448.35
Exit lock with alarm, active leaf, with alarm and vertical rod, rod for inactive leaf per pair of doors, steel
with satin chrome plating am@10.0 Ea 604.00 439.20 5.50 1,048.70
Electrical strike, rim mounted with switch, wrought
steel with bronze plating am@3.33 Ea 415.00 146.30 1.83 563.13
Electrical strike, mortised with switch, wrought steel with bronze plating,
BHMA E89322 am@5.00 Ea 113.00 219.60 2.75 335.35
Dead lock, bored, double cylinder,
wrought brass am@1.25 Ea 45.30 54.90 0.69 100.89
Dead lock, mortised,
double cylinder, cast brass am@1.25 Ea 75.50 54.90 0.69 131.09
Cipher lock set, mechanical am@1.50 Ea 453.00 65.88 0.83 519.71

Door closers
Using small tools.
Surface mounted standard duty door closer, traditional parallel arm,
primed for paint am@.900 Ea 157.00 39.53 0.50 197.03
Surface mounted heavy duty door closer traditional parallel arm,
primed for paint am@.900 Ea 199.00 39.53 0.50 239.03
Surface mounted standard door closer modern type parallel arm,
primed for paint am@.900 Ea 157.00 39.53 0.50 197.03
Surface mounted heavy duty door closer modern type parallel arm,
primed for paint am@.900 Ea 199.00 39.53 0.50 239.03
Overhead concealed door closer, interior,
pivot hung, single acting am@1.16 Ea 375.00 50.95 0.64 426.59
Overhead concealed door closer, exterior,
pivot hung, single acting am@1.16 Ea 469.00 50.95 0.64 520.59
Floor concealed door closer, interior, offset pivoted,
single acting am@2.25 Ea 505.00 98.82 1.24 605.06
Floor concealed door closer, exterior, offset pivoted,
single acting am@2.25 Ea 546.00 98.82 1.24 646.06
Offset pivot hinges, top pivot, mortised in door and frame, chrome plated or
bright brass with brass base am@1.75 Ea 47.20 76.86 0.96 125.02
Offset intermediate pivot hinge, surface mounted, mortised in door and frame, satin chrome plated or
bright brass with brass base am@1.75 Ea 108.00 76.86 0.96 185.82
Offset pivot hinges, bottom pivot, mortise at door/floor mounted in cement case in floor, satin chrome
plated or
bright brass with brass base am@2.25 Ea 104.00 98.82 1.24 204.06
Electro-magnetic door holder, wall mounted, satin chrome or bright brass plated or
bright brass with brass base am@5.00 Ea 231.00 219.60 2.75 453.35
Electro-magnetic door holder, floor mounted, satin chrome or bright
brass plated with brass base am@5.00 Ea 354.00 219.60 2.75 576.35
Photo electric smoke detector, suitable
for door holder release am@5.00 Ea 394.00 219.60 2.75 616.35
Ionization type smoke detector, suitable
for door holder release am@5.00 Ea 530.00 219.60 2.75 752.35

CSI 08-720, Door operators

Pneumatic door operators, electric sensor activated


Using small tools.
Single swinging door am@24.0 Ea 3,840.00 1,054.00 13.20 4,907.20
Single sliding door,
including special frame am@32.0 Ea 6,700.00 1,405.00 17.60 8,122.60
Pair of swinging doors,
2015 Heavy Construction Estimator, All Rights Reserved Page 388 (part 2)

double simultaneous am@16.0 Pair 7,690.00 702.70 8.80 8,401.50


Pair of 3' (.92m)
bi-parting sliding doors am@40.0 Pair 10,000.00 1,757.00 22.00 11,779.00

Rubber mat activators for pneumatic door operators


Add these cost to the door operator costs above, using small tools.
Single swing door am@6.00 Ea 682.00 263.50 3.30 948.80
Double swinging doors am@8.00 Pair 910.00 351.40 4.40 1,265.80
Single sliding door am@6.00 Ea 682.00 263.50 3.30 948.80
Double sliding doors am@8.00 Pair 910.00 351.40 4.40 1,265.80
Add for wall
button or pull cord operator ---@--- % 10.00 30.00 -- --
Add for sliding door operation
from either direction ---@--- % 100.00 60.00 -- --
Add for swinging door operation from either direction,
with double swing hinges ---@--- % 100.00 60.00 -- --

CSI 08-730, Weatherstripping and seals

Door weather-stripping
Using small tools.
Spring type for wood doors,
per opening al@1.50 Ea 22.90 65.88 0.78 89.56
Spring type for metal doors,
per opening al@2.25 Ea 52.90 98.82 1.17 152.89
Sponge type with adhesive backing,
per opening al@.006 LF 0.43 0.26 -- 0.69
Bronze astragal mortise mounted,
adjustable al@.064 LF 13.50 2.81 0.03 16.34
1-3/8" x 5/8" oak astragal al@.083 LF 4.51 3.65 0.04 8.20
Metal weatherstrip with neoprene bulb,
for head and jamb am@.074 LF 3.58 3.25 0.04 6.87
Metal weatherstrip for door bottom, surface
mounted with vinyl bulb am@.210 LF 4.29 9.22 0.12 13.63
Removable mullion for 7' door am@1.25 Ea 150.00 54.90 0.69 205.59

CSI 08-740, Thresholds

Door thresholds
Using small tools.
Bronze al@.080 LF 31.90 3.51 0.04 35.45
Plain aluminum al@.080 LF 7.78 3.51 0.04 11.33
2015 Heavy Construction Estimator, All Rights Reserved Page 389

Aluminum with grit al@.800 LF 13.80 35.14 0.42 49.36


Interlocking al@.840 LF 34.40 36.89 0.44 71.73
Plain steel al@.333 LF 6.14 14.63 0.17 20.94
Aluminum, built-up or complex al@.333 LF 19.70 14.63 0.17 34.50

CSI 08-811, Plate and float glass

Clear float glass


Including setting blocks, spacers and elastomeric sealant, using small tools.
3/16" thick,
less than 35 SF (3.3m2) bn@.102 SF 2.12 4.67 0.02 6.81
1/4" thick,
35 to 55 SF (3.3 to 5m2) bn@.102 SF 1.79 4.67 0.02 6.48
1/4" tempered bn@.102 SF 2.28 4.67 0.02 6.97
3/8" thick bn@.128 SF 3.59 5.86 0.03 9.48
1/2" thick bn@.157 SF 6.27 7.19 0.03 13.49
5/8" thick bn@.170 SF 7.31 7.78 0.03 15.12
3/4" thick bn@.225 SF 9.21 10.30 0.05 19.56
1" thick bn@.270 SF 15.60 12.36 0.05 28.01

Tinted glass, polished float, twin ground


Using small tools.
3/16" thick bn@.102 SF 3.23 4.67 0.02 7.92
1/4" thick bn@.102 SF 3.88 4.67 0.02 8.57
3/8" thick bn@.128 SF 6.47 5.86 0.03 12.36
1/2" thick bn@.157 SF 15.10 7.19 0.03 22.32

Total (full) vision all glass window system


Suspended annealed float glass with silicone structural seal, 3/4" glass mullions, using small tools.
Up to 10' high, 3/4" (3m) thick bn@.250 SF 17.80 11.45 0.05 29.30
10' to 20' (3m to 6m) high,
minimum, 3/4" thick bn@.250 SF 23.50 11.45 0.05 35.00
10' to 20' (3 to 6m) high,
average, 3/4" thick bn@.250 SF 27.50 11.45 0.05 39.00
10' to 20' (3 to 6m) high,
maximum, 3/4" thick bn@.250 SF 34.70 11.45 0.05 46.20

CSI 08-812, Sheet glass

Clear window glass


Type II, using small tools.
1/8" thick, up to 12 SF,
double strength, grade A bn@.050 SF 1.83 2.29 0.01 4.13
3/16" thick, 12 to 35 SF bn@.050 SF 2.61 2.29 0.01 4.91

CSI 08-813, Tempered safety-glass

Clear tempered sheet glass


Using small tools.
1/8" thick, up to 15 SF bn@.050 SF 3.14 2.29 0.01 5.44
3/16" thick, over 15 SF bn@.050 SF 3.63 2.29 0.01 5.93

Specialty float glass, 1/4"


Using small tools.
Bronze or gray float, quality 3 bn@.105 SF 2.92 4.81 0.02 7.75
Obscure float bn@.105 SF 4.24 4.81 0.02 9.07
Heat absorbing float bn@.105 SF 4.57 4.81 0.02 9.40
2015 Heavy Construction Estimator, All Rights Reserved Page 389 (part 2)

Safety laminated float bn@.105 SF 5.08 4.81 0.02 9.91


Spandrel, plain bn@.105 SF 6.18 4.81 0.02 11.01
Tempered reflective bn@.105 SF 7.11 4.81 0.02 11.94

Specialty float glass


Using small tools.
3/8" tinted float bn@.105 SF 6.61 4.81 0.02 11.44
3/8" obscure tempered float bn@.105 SF 7.11 4.81 0.02 11.94
3/8" corrugated float bn@.128 SF 6.10 5.86 0.03 11.99
1/2" tempered float bn@.157 SF 17.80 7.19 0.03 25.02

CSI 08-814, Wired glass

Pinstripe steel wired glass


Using small tools.
1/4" thick bn@.105 SF 9.61 4.81 0.02 14.44
2015 Heavy Construction Estimator, All Rights Reserved Page 390

Square or diamond steel wired glass


Using small tools.
1/4" thick bn@.105 SF 8.49 4.81 0.02 13.32

Rough obscure glass


Using small tools.
1/4" thick bn@.105 SF 9.19 4.81 0.02 14.02

CSI 08-815, Rough and figured glass

Patterned glass
Using small tools.
1/8" thick, up to 6.5 SF per sash bn@.100 SF 5.25 4.58 0.02 9.85
7/32" thick, up to 6.5 SF per sash bn@.105 SF 6.13 4.81 0.02 10.96

CSI 08-816, Bullet resistant glass

Multiple layer float glass


With interleaved vinyl layers, using small tools.
1-3/16" thick,
15 SF (1.4 m2) or less bn@1.25 SF 22.10 57.23 0.25 79.58
1-3/16" thick,
more than 15 SF (1.4 m2) bn@1.25 SF 29.50 57.23 0.25 86.98
2" thick, 15 SF (1.4 m2) or less bn@1.67 SF 37.60 76.45 0.33 114.38
2" thick, more than 15 SF (1.4 m2) bn@1.67 SF 48.10 76.45 0.33 124.88

CSI 08-817, Spandrel glass

Spandrel glass - Monolithic float glass panels


Ceramic back, 1/4" to 5/16" thick, using small tools.
To 1,000 SF (93 m2) bn@.105 SF 7.01 4.81 0.02 11.84
Over 1,000 SF
(93 m2) to 20,000 SF (1859m2) bn@.105 SF 5.50 4.81 0.02 10.33
Over 20,000 SF (1859 m2) bn@.105 SF 6.27 4.81 0.02 11.10

Spandrel glass - Insulating float glass panels


Ceramic back, tempered, 1/4" thick, 1" fiberglass insulation and aluminum foil vapor barrier, using small
tools.
To 20,000 SF (1859m2) bn@.167 SF 8.58 7.65 0.03 16.26
Over 20,000 SF (1859m2) bn@.167 SF 6.87 7.65 0.03 14.55

Spandrel glass - 1/4" thick, 3/4 to 7/8" insulation


Using small tools.
24 gauge steel interfacing bn@.167 SF 8.21 7.65 0.03 15.89
16 gauge steel interfacing bn@.167 SF 11.50 7.65 0.03 19.18

CSI 08-821, Coated glass

Coated float glass, reflective coating


Two lites of float glass or 1/8" sheet glass laminated with an inner layer of polyvinyl plastic, using small
tools.
1/4", double 1/8" glass,
poly inner layer bn@.160 SF 4.54 7.33 0.03 11.90

Coated monolithic float glass


2015 Heavy Construction Estimator, All Rights Reserved Page 390 (part 2)

Single lite, annealed or tempered, reflective coating, using small tools.


1/4" to 5/16" clear bn@.105 SF 6.02 4.81 0.02 10.85
1/4" to 5/16" tint bn@.105 SF 7.02 4.81 0.02 11.85

Coated insulating glass


Two 1/4" thick lites of annealed or tempered float glass, with reflective coating, using small tools.
1-1/16" thick, 1/2" air space bn@.160 SF 7.02 7.33 0.03 14.38

Coated spandrel glass


Monolithic float, tempered, reflective coated, 1/4" to 5/16" thick, includes 1" fiberglass insulation with
aluminum foil backing, using small tools.
To 20,000 SF (1859m2) job bn@.102 SF 6.85 4.67 0.02 11.54
Over 20,000 SF (1859m2) job bn@.102 SF 5.13 4.67 0.02 9.82

Lead lined glass


Using small tools.
Lead lined x-ray window, 1/4" bn@.417 SF 109.00 19.09 0.08 128.17
2015 Heavy Construction Estimator, All Rights Reserved Page 391

CSI 08-822, Laminated glass

Laminated float safety glass - 1/4" thick


With polyvinyl plastic interlayer, using small tools.
Two lites of 1/8" thick clear glass bn@.133 SF 4.01 6.09 0.03 10.13

Laminated float safety glass - 1/2" thick float


With polyvinyl plastic interlayer, using small tools.
Clear, up to 20 SF(1.9m2) bn@.166 SF 9.63 7.60 0.03 17.26
Clear, 20 to 50 SF(1.9 to 4 6m2) bn@.166 SF 9.19 7.60 0.03 16.82
Tinted, up to 20 SF(1.9m2) bn@.166 SF 10.60 7.60 0.03 18.23
Tinted, 20 to 50 SF(1.9 to 4 6m2) bn@.166 SF 10.20 7.60 0.03 17.83

CSI 08-823, Insulating glass

Clear insulating glass


Two lites of glass separated by sealed air or gas space, organic seal, using small tools.
3/8" thick, seal edge bn@.166 SF 5.69 7.60 0.03 13.32
1/2" thick, under 15 SF (1.4m2),
1/8" lites, 1/4" air space bn@.166 SF 13.20 7.60 0.03 20.83
5/8" thick, 30 to 50 SF (2.8 to 4.6m2),
3/16" lites,1/4" air space bn@.166 SF 13.50 7.60 0.03 21.13
3/4" thick,
1/4" lites, 1/4" air space bn@.166 SF 13.80 7.60 0.03 21.43
7/8" thick, 25 to 30 SF (2.3m2 to 2.8m2),
3/16" lites,1/2"air space bn@.166 SF 14.00 7.60 0.03 21.63
1" thick, 60 to 70 SF (5.6 to 6.5m2),
1/4" lites,1/2"air space bn@.166 SF 14.50 7.60 0.03 22.13

Wire reinforced insulating glass, clear


Two lites of glass separated by sealed air or gas space, organic seal, using small tools.
1" thick, 1/4" lites,
1/2" air space, clear bn@.166 SF 17.40 7.60 0.03 25.03
1" thick, 1/4" lites,
1/2" air space, hammered bn@.166 SF 18.40 7.60 0.03 26.03
1" thick, 1/4" lites,
1/2" air space, obscure bn@.166 SF 21.10 7.60 0.03 28.73

Tempered insulating glass, clear


Two lites of glass separated by sealed air or gas space, organic seal, using small tools.
1" thick,
1/4" lites, 1/2" air space bn@.166 SF 9.97 7.60 0.03 17.60

Tempered and wire reinforced insulating glass, clear


1 tempered lite and 1 wired lite separated by sealed air or gas space, organic seal, using small tools.
1" thick,
1/4" lites, 1/2" air space bn@.166 SF 11.60 7.60 0.03 19.23

Tinted insulating glass


Two lites of glass separated by sealed air or gas space, organic seal, using small tools.
1/2" thick, under 15 SF (1.4m2),
1/8" lites, 1/4" air space bn@.166 SF 8.85 7.60 0.03 16.48
5/8" thick, 30 to 50 SF (2.8 to 4.6m2),
3/16" lites, 1/4" air space bn@.166 SF 7.38 7.60 0.03 15.01
1" thick, 30 to 50 SF (2.8 to 4.6m2),
1/4" lites, 1/2" air space bn@.166 SF 7.72 7.60 0.03 15.35
2015 Heavy Construction Estimator, All Rights Reserved Page 391 (part 2)

CSI 08-830, Mirror glass

Plate mirror glass, without frames


Using small tools.
1/4", through
15 SF (1.4m2) wall type bn@.160 SF 7.57 7.33 0.03 14.93
1/4", over 15 SF (1.4m2) wall type bn@.125 SF 7.92 5.72 0.03 13.67
1/4", over 12 SF (1.1m2) door type bn@.125 SF 8.52 5.72 0.03 14.27
1/4", one-way vision, transparent bn@.160 SF 14.90 7.33 0.03 22.26
Mirror cut-out for receptacle bn@.378 Ea 7.57 17.30 0.08 24.95
Mirror cut-out for switch bn@.378 Ea 4.82 17.30 0.08 22.20

Sheet mirror glass, without frames


Using small tools.
1/8", through 10 SF bn@.125 SF 4.36 5.72 0.03 10.11
3/16", through 10 SF bn@.133 SF 5.56 6.09 0.03 11.68

Mirror wall tiles


Using small tools.
12" x 12" clear bn@.103 SF 2.44 4.72 0.02 7.18
2015 Heavy Construction Estimator, All Rights Reserved Page 392

12" x 12" veined bn@.103 SF 3.44 4.72 0.02 8.18


24" x 24" clear bn@.109 SF 5.28 4.99 0.02 10.29
24" x 24" veined bn@.109 SF 8.66 4.99 0.02 13.67

CSI 08-840, Plastic glazing

Plate material, without frames, using small tools.


Plexiglass acrylic clear, masked, using small tools.
1/8" thick, cut sheets bn@.090 SF 3.18 4.12 0.02 7.32
1/8" thick, full sheets bn@.080 SF 2.12 3.66 0.02 5.80
1/4" thick, cut sheets bn@.097 SF 5.30 4.44 0.02 9.76
1/4" thick, full sheets bn@.085 SF 3.18 3.89 0.02 7.09
3/8" thick, cut sheets bn@.100 SF 10.50 4.58 0.02 15.10
3/8" thick, full sheets bn@.090 SF 6.35 4.12 0.02 10.49
1/2" thick, cut sheets bn@.120 SF 15.00 5.49 0.02 20.51
1/2" thick, full sheets bn@.109 SF 12.00 4.99 0.02 17.01
3/4" thick, cut sheets bn@.140 SF 19.50 6.41 0.03 25.94
3/4" thick, full sheets bn@.125 SF 15.00 5.72 0.03 20.75
1" thick, cut sheets bn@.155 SF 21.50 7.10 0.03 28.63
1" thick, full sheets bn@.130 SF 16.50 5.95 0.03 22.48

CSI 08-850, Glazing accessories

Neoprene glazing gaskets


Tongued section or tongued mullion, using small tools.
1/4" glass bn@.077 LF 2.39 3.53 0.02 5.94
3/8" glass bn@.080 LF 2.94 3.66 0.02 6.62
1/2" glass bn@.082 LF 3.68 3.75 0.02 7.45
3/4" glass bn@.085 LF 5.04 3.89 0.02 8.95
1" glass bn@.089 LF 5.75 4.07 0.02 9.84

Mullion section
By glass sizes listed, using small tools.
1/4" glass bn@.038 LF 0.26 1.74 0.01 2.01
3/8" glass bn@.045 LF 0.33 2.06 0.01 2.40
1/2" glass bn@.049 LF 0.52 2.24 0.01 2.77
3/4" glass bn@.058 LF 0.74 2.66 0.01 3.41
1" glass bn@.066 LF 1.00 3.02 0.01 4.03
Molded corners bn@1.00 Ea 0.97 45.78 0.20 46.95

CSI 08-912 Glazed curtain walls

Aluminum curtain wall - Framing sections


Based on stock sizes and bronze finish. Non-standard sizes, alternate finishes and larger tube sizes
will cost more. Add the components below to find the complete cost, using small tools.
2" x 3" jamb qb@.067 LF 15.70 3.66 0.04 19.40
2" x 3" head qb@.067 LF 15.70 3.66 0.04 19.40
2" x 3" mullion qb@.067 LF 15.70 3.66 0.04 19.40
2" x 4" jamb qb@.100 LF 18.80 5.46 0.06 24.32
2" x 4" horizontal qb@.100 LF 18.80 5.46 0.06 24.32
2" x 4" mullion qb@.100 LF 18.80 5.46 0.06 24.32
4" corner mullion qb@.133 LF 31.40 7.26 0.08 38.74
3 x 5-1/2" jamb qb@.100 LF 22.40 5.46 0.06 27.92
3 x 5-1/2" horizontal qb@.100 LF 22.40 5.46 0.06 27.92
3" x 5-1/2"mullion qb@.100 LF 22.40 5.46 0.06 27.92

Aluminum curtain wall - Coping sections


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 392 (part 2)

1/8" x 8", shaped 3" qb@.133 LF 10.70 7.26 0.08 18.04


1/8" x 9", shaped 4" qb@.133 LF 11.30 7.26 0.08 18.64
1/8 x 12-1/2", shaped 5-1/2" qb@.160 LF 13.40 8.74 0.09 22.23

Aluminum curtain wall - Sill section, shaped


Using small tools.
1/8" x 6" qb@.080 LF 9.28 4.37 0.05 13.70
1/8" x 7" qb@.080 LF 9.28 4.37 0.05 13.70
2015 Heavy Construction Estimator, All Rights Reserved Page 393

1/8 x 8-1/2" qb@.080 LF 11.30 4.37 0.05 15.72

Aluminum curtain wall - Column covers, shaped


Using small tools.
1/8" x 26" qb@.213 LF 23.40 11.63 0.12 35.15
1/8" x 34" qb@.215 LF 29.80 11.74 0.12 41.66
1/8" x 38" qb@.215 LF 32.50 11.74 0.12 44.36

Aluminum curtain wall - Spandrel covers


Using small tools.
1", aluminum both faces qb@.084 SF 10.10 4.59 0.05 14.74
1", aluminum exterior,
hardboard interior qb@.084 SF 8.63 4.59 0.05 13.27
2", aluminum both faces qb@.106 SF 11.10 5.79 0.06 16.95
2", aluminum exterior,
hardboard interior qb@.106 SF 9.70 5.79 0.06 15.55
Stick pin insulation
on hardboard interior qb@.041 SF 0.78 2.24 0.02 3.04

Curtain wall and storefront frame, complete


Using small tools.
Colored aluminum qb@.083 SF 18.90 4.53 0.05 23.48
Bronze qb@.083 SF 47.80 4.53 0.05 52.38
Plain tube, clear 4-1/2" x 4-1/2" qb@.089 SF 16.90 4.86 0.05 21.81

Tempered glass doors for curtain wall


3/4" thick standard door. Includes pull handle, push bar, pivot hinge, security lock and door closer but
no frame, using small tools.
3' x 7' qb@7.14 Ea 2,250.00 390.00 4.14 2,644.14
3'6" x 7' qb@7.14 Ea 2,610.00 390.00 4.14 3,004.14

Aluminum framed glass doors, narrow stile


Includes pull handle, push bar, pivot hinge, security lock door closer and flush bolts for the inactive leaf
on a pair of doors, using small tools.
3' x 7' qb@7.14 Ea 468.00 390.00 4.14 862.14
3'6" x 7' qb@7.14 Ea 501.00 390.00 4.14 895.14

Aluminum framed glass doors, medium stile


Includes pull handle, push bar, pivot hinge, security lock door closer and flush bolts for the inactive leaf
on a pair of doors, using small tools.
3' x 7' qb@7.14 Ea 867.00 390.00 4.14 1,261.14
3'-6" x 7' qb@7.14 Ea 967.00 390.00 4.14 1,361.14

Flush panel doors for curtain wall


These door panels are made to match the 1" and 2" thick aluminum spandrel covers above, using small
tools.
3' x 7' qb@7.14 Ea 2,090.00 390.00 4.14 2,484.14
3'6" x 7' qb@7.14 Ea 2,190.00 390.00 4.14 2,584.14
Pair 2'6" x 7' , per opening qb@10.5 Ea 3,070.00 573.50 6.09 3,649.59
Pair 3' x 7', per opening qb@10.5 Ea 3,500.00 573.50 6.09 4,079.59
Add for bronze anodized aluminum ---@--- % 15.00 -- -- --
Add for stainless steel ---@--- % 23.00 5.00 -- --

==========================================================================
Finishes
==========================================================================
2015 Heavy Construction Estimator, All Rights Reserved Page 393 (part 2)

CSI 09-110, Partition and wall systems for lath and plaster

Metal studs - With tracks and runners


Cold rolled metal stud, 12" - 24" on center, non-load bearing. No lath included, using small tools.
Metal stud, 25 ga.,
1-5/8" (41 mm), 12"oc b5@.020 SF 0.25 0.81 0.01 1.07
Metal stud, 25 ga.,
1-5/8", (41 mm), 16"oc b5@.018 SF 0.21 0.73 0.01 0.95
Metal stud, 25 ga.,
1-5/8",(41 mm), 24"oc b5@.015 SF 0.19 0.61 0.01 0.81
Metal stud, 20 ga.,
2-1/2", (63mm), 12"oc b5@.020 SF 0.27 0.81 0.01 1.09
Metal stud, 20 ga.,
2-1/2", (63mm), 16"oc b5@.018 SF 0.25 0.73 0.01 0.99
Metal stud, 25 ga.,
2-1/2", (63mm), 12"oc b5@.020 SF 0.44 0.81 0.01 1.26
2015 Heavy Construction Estimator, All Rights Reserved Page 394

Metal stud, 25 ga.,


2-1/2", (63mm), 16"oc b5@.018 SF 0.31 0.73 0.01 1.05
Metal stud, 25 ga.,
2-1/2", (63mm), 24"oc b5@.015 SF 0.22 0.61 0.01 0.84
Metal stud, 20 ga.,
3-5/8", (92mm), 12"oc b5@.020 SF 0.76 0.81 0.01 1.58
Metal stud, 20 ga.,
3-5/8", (92mm), 16"oc b5@.018 SF 0.64 0.73 0.01 1.38
Metal stud, 20 ga.,
3-5/8", (92mm), 24"oc b5@.015 SF 0.52 0.61 0.01 1.14
Metal stud, 25 ga.,
3-5/8", (92mm), 12"oc b5@.020 SF 0.43 0.81 0.01 1.25
Metal stud, 25 ga.,
3-5/8", (92mm), 16"oc b5@.018 SF 0.36 0.73 0.01 1.10
Metal stud, 25 ga.,
3-5/8", (92mm), 24"oc b5@.015 SF 0.30 0.61 0.01 0.92
Metal stud,
20 ga., 4", (10cm), 12"oc b5@.020 SF 0.87 0.81 0.01 1.69
Metal stud,
20 ga., 4", (10cm), 16"oc b5@.018 SF 0.70 0.73 0.01 1.44
Metal stud,
20 ga., 4", (10cm), 24"oc b5@.015 SF 0.57 0.61 0.01 1.19
Metal stud,
25 ga., 4", (10cm), 12"oc b5@.020 SF 0.52 0.81 0.01 1.34
Metal stud,
25 ga., 4", (10cm), 16"oc b5@.018 SF 0.43 0.73 0.01 1.17
Metal stud,
25 ga., 4", (10cm), 24"oc b5@.015 SF 0.35 0.61 0.01 0.97
Metal stud,
20 ga., 6", (15cm), 12"oc b5@.020 SF 1.06 0.81 0.01 1.88
Metal stud,
20 ga., 6", (15cm), 16"oc b5@.018 SF 0.87 0.73 0.01 1.61
Metal stud,
20 ga., 6", (15cm), 24"oc b5@.015 SF 0.69 0.61 0.01 1.31
Metal stud,
25 ga., 6", (15cm), 12"oc b5@.020 SF 0.64 0.81 0.01 1.46
Metal stud,
25 ga., 6", (15cm), 16"oc b5@.018 SF 0.54 0.73 0.01 1.28
Metal stud,
25 ga., 6", (15cm), 24"oc b5@.015 SF 0.44 0.61 0.01 1.06

Furring channel, 16" (41cm) center to center - On solid walls


No lath included, using small tools.
3/4", (19 mm), 12"oc, cold rolled b5@.034 SF 0.33 1.38 0.01 1.72
3/4", (19 mm), 16"oc, cold rolled b5@.030 SF 0.31 1.21 0.01 1.53
3/4", (19 mm), 24"oc, cold rolled b5@.023 SF 0.24 0.93 0.01 1.18
1-1/2" (41 mm), 12"oc, cold rolled b5@.038 SF 0.45 1.54 0.02 2.01
1-1/2" (41 mm), 16"oc, cold rolled b5@.033 SF 0.38 1.33 0.01 1.72
1-1/2" (41 mm), 24"oc, cold rolled b5@.026 SF 0.33 1.05 0.01 1.39
3-5/8" (92 mm), 12"OC,
cold rolled, 25 gauge b5@.040 SF 0.77 1.62 0.02 2.41
3-5/8" (92 mm), 16"OC,
cold rolled, 25 gauge b5@.035 SF 0.61 1.42 0.01 2.04
3-5/8" (92 mm), 24"OC,
cold rolled, 25 gauge b5@.029 SF 0.57 1.17 0.01 1.75

Furring channel, 16" (41cm) center to center - On columns and beams


No lath included, using small tools.
7/8" (22 mm) b5@.059 LF 0.31 2.39 0.02 2.72
2015 Heavy Construction Estimator, All Rights Reserved Page 394 (part 2)

1-5/8" (41 mm) b5@.059 LF 0.39 2.39 0.02 2.80

Load bearing metal studs - At 16" (41cm) center to center


With tracks and runners but no lath, using small tools.
Metal stud, load bearing,
16 ga, 2-1/2", (63mm), 12"oc b5@.027 SF 1.25 1.09 0.01 2.35
Metal stud, load bearing,
16 ga, 2-1/2", (63mm), 16"oc b5@.023 SF 1.03 0.93 0.01 1.97
Metal stud, load bearing,
16 ga, 3-5/8", (92mm), 12"oc b5@.028 SF 1.63 1.13 0.01 2.77
Metal stud, load bearing,
16 ga, 3-5/8, (92mm), 16"oc b5@.023 SF 1.37 0.93 0.01 2.31
Metal stud, load bearing,
18 ga, 3-5/8, (92mm), 12"oc b5@.024 SF 1.49 0.97 0.01 2.47
Metal stud, load bearing,
18 ga, 3-5/8, (92mm), 16"oc b5@.029 SF 1.25 1.17 0.01 2.43
Metal stud, load bearing,
16 ga, 4", (10cm), 12"oc b5@.026 SF 1.83 1.05 0.01 2.89
Metal stud, load bearing,
16 ga, 4", (10cm), 16"oc b5@.031 SF 1.60 1.25 0.01 2.86
Metal stud, load bearing,
16 ga, 6", (15cm), 12"oc b5@.034 SF 2.25 1.38 0.01 3.64
Metal stud, load bearing,
16 ga, 6", (15cm), 16"oc b5@.030 SF 1.92 1.21 0.01 3.14

Metal lath on walls


Galvanized, self-furring, including normal waste, using small tools.
2.5 lb. (1.13kg), paper-backed b5@.107 SY 3.91 4.33 0.04 8.28
2.5 lb. (1.13kg), foil-backed b5@.107 SY 3.86 4.33 0.04 8.23
2.5 lb. (1.13kg), diamond lath b5@.107 SY 3.26 4.33 0.04 7.63
3.4 lb. (1.54kg), paper-backed b5@.114 SY 4.95 4.61 0.05 9.61
2015 Heavy Construction Estimator, All Rights Reserved Page 395

3.4 lb. (1.54kg), foil-backed b5@.118 SY 4.04 4.77 0.05 8.86


3.4 lb. (1.54kg), diamond lath b5@.119 SY 4.04 4.81 0.05 8.90
3.4 lb. (1.54kg),
3/8" high ribbed lath b5@.121 SY 4.69 4.89 0.05 9.63
3.4 lb. (1.54kg),
1/8" low ribbed lath b5@.124 SY 4.95 5.01 0.05 10.01

Metal lath on furring, columns and beams


Using small tools.
2.5 lb. (1.13kg), diamond mesh b5@.200 SY 3.26 8.09 0.08 11.43
3.4 lb. (1.54kg), diamond mesh b5@.250 SY 4.04 10.11 0.11 14.26

Metal lath on furring, ceilings


Using small tools.
3.4 lb. (1.54kg), diamond lath b5@.125 SY 4.04 5.05 0.05 9.14

Ceiling suspension system - Without lath


Installed 7' to 9' above floor level with rod hangers attached to structural steel or metal decking, using
small tools.
1-1/2" main at 24" OC with
3/4" cross at 12" (.31m) OC b5@.042 SF 0.35 1.70 0.02 2.07
1-1/2" main at 24" OC with
3/4" cross at 24" (.31m) OC b5@.038 SF 0.35 1.54 0.02 1.91
1-1/2" main at 24" OC with 1
1/2"" cross at 16" (.31m) OC b5@.048 SF 0.35 1.94 0.02 2.31
1-1/2" main at 24" OC with 2
1/2"" cross at 24" (.31m) OC b5@.040 SF 0.35 1.62 0.02 1.99

Furred channel on ceilings, steel joists


Using small tools.
3/4", 12" to 18" OC b5@.035 SF 0.55 1.42 0.01 1.98
3/4", 18" to 24" OC b5@.031 SF 0.29 1.25 0.01 1.55
1"-1/2", 18" to 24" OC b5@.029 SF 0.32 1.17 0.01 1.50

Gypsum lath - Plain or perforated, furred


Using small tools.
3/8" nailed on wood studs b5@.050 SY 9.89 2.02 0.02 11.93
3/8" clipped on metal studs b5@.056 SY 9.89 2.26 0.02 12.17
3/8" firestop,
clipped on metal studs b5@.058 SY 10.90 2.35 0.02 13.27
3/8" foil back,
clipped on metal studs b5@.058 SY 11.00 2.35 0.02 13.37
1/2" clipped on metal studs b5@.075 SY 10.90 3.03 0.03 13.96
1/2" firestop,
clipped on metal studs b5@.075 SY 11.00 3.03 0.03 14.06
1/2" foil back,
clipped on metal studs b5@.075 SY 11.00 3.03 0.03 14.06
Add for application
to columns or beams ---@--- % -- 80.00 -- --
Add for application to ceilings ---@--- % -- 65.00 -- --
Add for galvanized metal lath ---@--- % 15.00 -- -- --

CSI 09-150, Gypsum plaster

Plaster on masonry or concrete walls, 2 coats


No lath, furring or studs included, using a 6 CF 8 HP portable concrete mixer and small tools.
Smooth finish cs@.390 SY 5.87 16.73 0.36 22.96
2015 Heavy Construction Estimator, All Rights Reserved Page 395 (part 2)

With sand aggregate cs@.410 SY 8.55 17.58 0.38 26.51


With vermiculite cs@.435 SY 6.62 18.66 0.40 25.68

Plaster on masonry or concrete walls 3 coats


No lath, furring or studs included, using a 6 CF 8 HP portable concrete mixer and small tools.
Smooth finish cs@.047 SY 6.62 2.02 0.04 8.68
With sand aggregate cs@.500 SY 9.30 21.45 0.47 31.22
With vermiculite cs@.530 SY 8.34 22.73 0.49 31.56
Add for plaster on columns ---@--- % 50.00 50.00 -- --
Add for plaster on chases, fascias,
recesses and soffits ---@--- % 50.00 50.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 396

Add for plaster on beams ---@--- % 50.00 50.00 -- --


Add for
plaster on irregular surfaces ---@--- % 50.00 30.00 -- --

CSI 09-180, Cement plaster

Portland cement plaster (stucco) applied on block, interior, no bonding agents


No lath, furring or studs included, using a 6 CF 8 HP portable concrete mixer and small tools.
1/2" (13mm)
with skip troweled texture cs@.200 SY 2.97 8.58 0.19 11.74
1/2" (13mm) with sand float texture cs@.200 SY 2.97 8.58 0.19 11.74
3/4" (19mm)
with skip troweled texture cs@.200 SY 4.46 8.58 0.19 13.23
3/4" (19mm) with sand float texture cs@.210 SY 4.46 9.01 0.20 13.67
7/8" (22mm)
with skip troweled texture cs@.210 SY 5.27 9.01 0.20 14.48
7/8" (22mm) with sand float texture cs@.220 SY 5.27 9.44 0.20 14.91

Portland cement plaster (stucco)


No lath, furring or accessories included, using a 6 CF 8 HP portable concrete mixer and small tools.
3/4" (19mm) with sand float texture cs@.905 SY 9.31 38.82 0.84 48.97
3/4" (19mm)
with skip troweled texture cs@.952 SY 9.31 40.83 0.89 51.03

Portland cement plaster (stucco), 3 coats


No lath, furring or accessories included, using a 6 CF 8 HP portable concrete mixer and small tools.
7/8" (22mm) with sand float texture cs@.915 SY 11.60 39.24 0.85 51.69
7/8" (22mm)
with skip troweled texture cs@.962 SY 11.60 41.26 0.89 53.75

Keenes cement plaster


Using a 6 CF 8 HP portable concrete mixer and small tools.
2 coats, walls cs@.310 SY 7.68 13.30 0.29 21.27
2 coats, ceilings cs@.365 SY 7.68 15.65 0.34 23.67
3 coats, walls cs@.410 SY 5.56 17.58 0.38 23.52
3 coats, ceilings cs@.485 SY 5.56 20.80 0.45 26.81

Keenes cement plaster


Add for plaster on columns ---@--- % 50.00 50.00 -- --
Add for plaster on chases, fascias,
recesses and soffits ---@--- % 50.00 50.00 -- --
Add for plaster on beams ---@--- % 50.00 50.00 -- --
Add for
plaster on irregular surfaces ---@--- % 50.00 30.00 -- --

Stucco, 3 coats, 7/8" (22mm) thick


Interior or exterior, on metal lath, measured one side only, based on ASTM C-926, Table 4, vertical wall,
using a 6 CF 8 HP portable concrete mixer and small tools.
7/8" (22mm) with sand float texture cs@.923 SY 11.60 39.59 0.86 52.05
7/8" (22mm)
with skip troweled texture cs@.970 SY 11.60 41.60 0.90 54.10
Add for color additives ---@--- SY .32 -- -- --
Add for soffits ---@--- SY 2.00 16.00 -- --
Deduct for stucco on masonry wall ---@--- SY .75 -10.00 -- --

CSI 09-195, Accessories for exterior cement plaster (stucco)


2015 Heavy Construction Estimator, All Rights Reserved Page 396 (part 2)

Plastering accessories, PVC - Casing bead


Perforated flange, for exterior cement plaster (stucco), using small tools.
1-3/4" flange, 1/2" bead b5@.180 LF 0.21 7.28 0.08 7.57
1-3/4" flange, 3/4" bead b5@.180 LF 0.25 7.28 0.08 7.61
1-3/4" flange, 7/8" bead b5@.180 LF 0.26 7.28 0.08 7.62

Plastering accessories, PVC - Band maker casing bead


Perforated flange, for exterior cement plaster (stucco), using small tools.
1-3/4" flange, 1" bead b5@.025 LF 0.28 1.01 0.01 1.30
1-3/4" flange, 1-1/4" bead b5@.025 LF 0.35 1.01 0.01 1.37
1-3/4" flange, 1-1/2" bead b5@.025 LF 0.43 1.01 0.01 1.45
1-3/4" flange, 2" bead b5@.025 LF 0.48 1.01 0.01 1.50
2015 Heavy Construction Estimator, All Rights Reserved Page 397

Plastering accessories, PVC - Control joints


Perforated flange, using small tools.
4" flange, 1/2" joint b5@.035 LF 0.59 1.42 0.01 2.02
4" flange, 5/8" joint b5@.035 LF 0.61 1.42 0.01 2.04
4" flange, 3/4" joint b5@.035 LF 0.64 1.42 0.01 2.07
4" flange, 7/8" joint b5@.035 LF 0.79 1.42 0.01 2.22

Plastering accessories, PVC - Expansion joints


Slip type, for exterior cement plaster (stucco), using small tools.
1/4 to 5/8" adjustment,
1/2" to 3/4" deep b5@.035 LF 1.48 1.42 0.01 2.91
1/4 to 5/8" adjustment, 7/8" deep b5@.035 LF 1.59 1.42 0.01 3.02
5/8" to 1-1/8" adjustment,
1/2" to 3/4" deep b5@.035 LF 1.54 1.42 0.01 2.97
5/8" to 1-1/8" adjustment,
7/8" deep b5@.035 LF 1.59 1.42 0.01 3.02
1-1/8" to 1-5/8" adjustment,
1/2" to 3/4" deep b5@.035 LF 1.54 1.42 0.01 2.97
1-1/8" to 1-5/8" adjustment,
7/8" deep b5@.035 LF 1.60 1.42 0.01 3.03

Plastering accessories, PVC - Corner bead


Perforated flange, for exterior cement plaster (stucco), using small tools.
2-1/2" x 2-1/2" b5@.025 LF 0.18 1.01 0.01 1.20
2-3/4" x 2-3/4" b5@.025 LF 0.20 1.01 0.01 1.22

Metal accessories for exterior plaster


Zinc coated (galvanized), using small tools.
3/4" control joint, expanded wing b5@.037 LF 1.75 1.50 0.02 3.27
3/4" casing bead, expanded wing b5@.037 LF 0.72 1.50 0.02 2.24
2-1/2" x 2-1/2" corner bead b5@.037 LF 0.61 1.50 0.02 2.13
Stud clips for gypsum lath,
field clip b5@.004 Ea 0.07 0.16 -- 0.23
3/4" galvanized expansion joint b5@.037 LF 0.46 1.50 0.02 1.98
Joint clips for lath b5@.005 Ea 0.07 0.20 -- 0.27
2-1/2" metal base,
galvanized and painted b5@.042 LF 0.41 1.70 0.02 2.13
Tie wire, 18 gauge,
galvanized 25 lb. each hank --@.000 Ea 36.20 -- -- 36.20

CSI 09-260, Gypsum wallboard

Gypsum drywall on metal studs or furring


Screwed on vertical surfaces at heights to 10'. Add finishing costs below. See CSI 09-100 for ceiling
suspension systems for drywall, using small tools.
3/8" (9 mm), one layer am@.007 SF 0.44 0.31 -- 0.75
3/8" (9 mm), two layers am@.014 SF 0.90 0.62 0.01 1.53
1/2" (13mm), one layer am@.007 SF 0.44 0.31 -- 0.75
1/2" (13mm), two layer am@.014 SF 0.89 0.62 0.01 1.52
5/8" (16mm), one layer am@.008 SF 0.46 0.35 -- 0.81
5/8" (16mm) type X, one layer am@.008 SF 0.49 0.35 -- 0.84
5/8" (16mm) type X, two layer am@.016 SF 0.96 0.70 0.01 1.67
Tape joints and finish (three-coat) am@.007 SF 0.05 0.31 -- 0.36
One coat veneer plaster finish,
smooth am@.018 SF 0.09 0.79 0.01 0.89
One coat veneer plaster finish,
skip texture am@.008 SF 0.09 0.35 -- 0.44
2015 Heavy Construction Estimator, All Rights Reserved Page 397 (part 2)

Add for heights over 8' to 12' ---@--- % -- 30.00 -- --


Add for heights over 12' to 16' ---@--- % -- 75.00 -- --
Add for heights over 16' to 20' ---@--- % -- 150.00 -- --
Add for heights over 20' to 24' ---@--- % -- 300.00 -- --
Add for resilient clip installation
instead of screws ---@--- % 42.00 -- -- --
Add for
foil back (insulating) board ---@--- % 30.00 -- -- --
Add for water-resistant
drywall (greenboard) ---@--- % 65.00 -- -- --
Add for textured spray finish ---@--- % 30.00 100.00 -- --
Add for ceiling application to 8' ---@--- % -- 34.00 -- --
Add for ceiling application
over 8' (2.4m) high ---@--- % 4.00 50.00 -- --

Drywall on beams, columns, soffits, chases, shafts and recesses


Screwed to metal studs or furring. Add finishing costs below, using small tools.
5/8" (16mm) type X, two layer am@.028 SF 0.85 1.23 0.02 2.10
1/2" (13mm), one layer am@.030 SF 0.38 1.32 0.02 1.72
5/8" (16mm), one layer am@.032 SF 0.39 1.41 0.02 1.82
2015 Heavy Construction Estimator, All Rights Reserved Page 398

Tape joints and finish (three-coat) am@.010 SF 0.05 0.44 0.01 0.50
Add for thin coat
of plaster instead of tapping ---@--- % 30.00 100.00 -- --
Add for resilient clip installation
instead of screws ---@--- % 42.00 -- -- --
Add for fire resistant drywall ---@--- % 33.00 -- -- --
Add for
foil back (insulating) board ---@--- % 30.00 -- -- --
Add for water-resistant
drywall (greenboard) ---@--- % 65.00 -- -- --
Add for textured spray finish ---@--- % 30.00 100.00 -- --
Add for ceiling
application to 8' high ---@--- % -- 34.00 -- --
Add for ceiling application
over 8' (2.4m) high ---@--- % 4.00 50.00 -- --

Miscellaneous drywall
Using small tools.
Vinyl faced
3/8" to 5/8" (9mm-16mm) thick am@.019 SF 0.96 0.83 0.01 1.80
Vinyl faced 5/8"
(16mm) thick fire resistant am@.019 SF 0.97 0.83 0.01 1.81
1/4" (6mm),
gypsum sound deadening board am@.009 SF 0.27 0.40 -- 0.67
1/2" (12mm),
wood sound deadening board am@.009 SF 0.38 0.40 -- 0.78

Lead backed 5/8" type X drywall


With screw taps and a one-coat smooth veneer finish, to 7' high, 4' x 8' drywall, using small tools.
1/32" lead al@.073 SF 6.92 3.21 0.04 10.17
3/64" lead al@.073 SF 7.61 3.21 0.04 10.86
1/16" lead al@.079 SF 8.89 3.47 0.04 12.40
3/32" lead al@.079 SF 11.40 3.47 0.04 14.91
1/8" lead al@.083 SF 14.60 3.65 0.04 18.29

CSI 09-280, Gypsum wallboard accessories

Gypsum wallboard casing and corner bead


Galvanized, per 100 linear feet (CLF), using small tools.
J trim, 1/2" al@1.67 CLF 19.50 73.35 0.87 93.72
J trim, 5/8" al@1.70 CLF 20.30 74.66 0.88 95.84
U trim al@1.70 CLF 21.70 74.66 0.88 97.24
L trim al@3.24 CLF 20.30 142.30 1.68 164.28
Screws, # 6 X 1" A --@.000 M 10.50 -- -- 10.50
Screws, # 6 X 1-5/8" A --@.000 M 11.90 -- -- 11.90
Z Stud, galvanized, 1-1/2" wide al@3.07 CLF 35.90 134.80 1.60 172.30
Z Stud, galvanized, 2" wide al@3.12 CLF 40.50 137.00 1.62 179.12

Furring channel for gypboard


Galvanized steel 7/8" (22mm) deep, using small tools.
Standard al@3.07 CLF 22.10 134.80 1.60 158.50
Resilient al@3.12 CLF 24.30 137.00 1.62 162.92

Lead shielding for gypsum drywall


Using small tools.
1/4" lead shielding am@.061 SF 38.40 2.68 0.03 41.11
1/2" lead shielding am@.104 SF 76.80 4.57 0.06 81.43
2015 Heavy Construction Estimator, All Rights Reserved Page 398 (part 2)

CSI 09-310, Ceramic tile

Glazed ceramic wall tile - 4-1/4" x 4-1/4" set in cement bed


Including white grout and typical trim pieces, using small tools.
Unmounted cushion edge de@.150 SF 2.09 6.34 0.04 8.47
Back mounted cushion edge de@.120 SF 2.87 5.08 0.03 7.98

Glazed ceramic wall tile - 4-1/4" x 4-1/4" on organic adhesive bed (thin set)
Including white grout and typical trim pieces, using small tools.
Unmounted cushion edge de@.130 SF 2.09 5.50 0.04 7.63
Back mounted cushion edge de@.098 SF 2.87 4.14 0.03 7.04
2015 Heavy Construction Estimator, All Rights Reserved Page 399

Glazed ceramic base tile - 4-1/4" x 4-1/4", including white grout


No base is required when tile wainscot is used, using small tools.
Set in Portland cement bed de@.200 LF 2.61 8.46 0.05 11.12
Set in organic adhesive bed,
thin set de@.147 LF 2.61 6.22 0.04 8.87

CSI 09-320, Unglazed tile

Unglazed floor tile - Set in Portland cement bed


Cushion edge, face mounted, including white grout, group 1 colors only, using small tools.
1" x 1" de@.130 SF 3.22 5.50 0.04 8.76
1" x 2" de@.130 SF 4.06 5.50 0.04 9.60
2" x 2" de@.130 SF 3.54 5.50 0.04 9.08
Add for group 2 colors --@.000 SF 0.40 -- -- 0.40
Add for group 3 colors --@.000 SF 0.67 -- -- 0.67
Add for abrasive surface tile --@.000 SF 0.67 -- -- 0.67
Add for Portland cement dry set bed ---@--- % 10.00 10.00 -- --

Unglazed floor tile - Organic adhesive bed, face mounted


Cushion edge, including white grout, group 1 colors only, using small tools.
1" x 1" de@.130 SF 3.22 5.50 0.04 8.76
1" x 2" de@.130 SF 4.06 5.50 0.04 9.60
2" x 2" de@.130 SF 3.22 5.50 0.04 8.76
Add for group 2 colors --@.000 SF 0.40 -- -- 0.40
Add for group 3 colors --@.000 SF 0.67 -- -- 0.67
Add for abrasive surface tile --@.000 SF 0.67 -- -- 0.67

Unglazed floor tile - Organic adhesive bed, back mounted


Cushion edge, including white grout, group 1 colors only, using small tools.
1" x 1" de@.130 SF 3.22 5.50 0.04 8.76
1" x 2" de@.130 SF 4.06 5.50 0.04 9.60
2" x 2" de@.130 SF 3.22 5.50 0.04 8.76
Add for group 2 colors --@.000 SF 0.40 -- -- 0.40
Add for group 3 colors --@.000 SF 0.67 -- -- 0.67
Add for abrasive surface tile --@.000 SF 0.67 -- -- 0.67
Add for Portland cement dry set bed ---@--- % 10.00 10.00 -- --

Unglazed wall tile - Face mounted


Organic adhesive bed, including white grout, using small tools.
1" x 1" de@.130 SF 3.49 5.50 0.04 9.03
1" x 2" de@.130 SF 3.76 5.50 0.04 9.30
2" x 2" de@.130 SF 3.77 5.50 0.04 9.31
Add for glazed finish --@.000 SF 0.67 -- -- 0.67
Add for glazed mosaic tile --@.000 SF 2.33 -- -- 2.33
Add for metallic colors --@.000 SF 2.66 -- -- 2.66
Add for exterior walls ---@--- % 5.00 22.00 -- --
Add for exterior soffits ---@--- % 5.00 23.00 -- --
Add for Portland cement bed ---@--- % 25.00 25.00 -- --
Add for dry set Portland cement bed ---@--- % 10.00 15.00 -- --

Unglazed wall tile - Back mounted


Organic adhesive bed, including white grout, using small tools.
1" x 1" de@.130 SF 3.49 5.50 0.04 9.03
1" x 2" de@.130 SF 3.76 5.50 0.04 9.30
2" x 2" de@.130 SF 3.77 5.50 0.04 9.31
Add for glazed finish --@.000 SF 0.67 -- -- 0.67
2015 Heavy Construction Estimator, All Rights Reserved Page 399 (part 2)

Add for glazed mosaic tile --@.000 SF 2.33 -- -- 2.33


Add for metallic colors --@.000 SF 2.66 -- -- 2.66
Add for exterior walls ---@--- % 5.00 22.00 -- --
Add for exterior soffits ---@--- % 5.00 23.00 -- --
Add for Portland cement bed ---@--- % 25.00 25.00 -- --
Add for dry set Portland cement bed ---@--- % 10.00 15.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 400

CSI 09-330, Quarry tile

Quarry tile - Floor applied


On flat surfaces, 3/4" Portland cement bed, red, using small tools.
4" x 4" x 1/2", 1/8" joint de@.123 SF 3.73 5.20 0.03 8.96
6" x 6" x 1/2", 1/4" joint de@.133 SF 3.78 5.63 0.04 9.45
6" x 6" x 3/4", 1/4" joint de@.145 SF 4.40 6.13 0.04 10.57
Add for abrasive surface tile --@.000 SF 0.52 -- -- 0.52

Quarry tile - Wall applied


On flat surfaces, 3/4" Portland cement bed, red, using small tools.
4" x 4" x 1/2", 1/8" joint de@.160 SF 3.37 6.77 0.04 10.18
6" x 6" x 3/4", 1/4" joint de@.133 SF 4.25 5.63 0.04 9.92

Quarry tile - Trim pieces


On flat surfaces, 3/4" Portland cement bed, red, using small tools.
Cove base, 3/4" Portland cement bed de@.140 LF 2.88 5.92 0.04 8.84
5" x 6" x 1/2", straight top de@.140 LF 3.37 5.92 0.04 9.33
6" x 6" x 3/4", round top de@.140 LF 3.52 5.92 0.04 9.48
6" x 6" x 3/4", stair tread de@.220 LF 5.96 9.30 0.06 15.32
6" x 6" x 3/4", window sill de@.200 LF 4.82 8.46 0.05 13.33

CSI 09-380, Conductive tile

Conductive floor tile


Unglazed, square edged. Set in Portland cement or epoxy bed, with non-conductive waterproof flush
joints, using small tools.
1" x 1" x 1/4" de@.167 SF 3.75 7.06 0.05 10.86
1-9/16" x 1-9/16" x 1/4" de@.167 SF 2.99 7.06 0.05 10.10
Add for 2" x 2",
16x16 wire mesh bed --@.000 SF 1.14 -- -- 1.14
Add for abrasive surface tile --@.000 SF 0.36 -- -- 0.36

CSI 09-410, Portland cement terrazzo

Terrazzo - Floors, bonded to concrete


1-3/4" thick, 5/8" topping. See divider strips below. See CSI 09-430 for conductive terrazzo, using a 6
CF 8 HP portable concrete mixer, small tools, and a terrazzo grinder.
Gray cement dk@.123 SF 2.23 4.78 0.47 7.48
White cement dk@.123 SF 2.33 4.78 0.47 7.58
Add for
abrasive heavy duty terrazzo ---@--- % 10.00 -- -- --

Terrazzo - Floors not bonded to concrete


3" thick, 5/8" topping. See divider strips below. See CSI 09-430 for conductive terrazzo, using a 6 CF 8
HP portable concrete mixer, small tools, and a terrazzo grinder.
Gray cement, 1/4" sand cushion dk@.139 SF 2.95 5.40 0.53 8.88
White cement, 1/4" sand cushion dk@.139 SF 3.24 5.40 0.53 9.17
Monolithic terrazzo, 3-1/2" base, 4' to 5' square topping panels,
including mesh and felt dk@.058 SF 3.81 2.25 0.22 6.28

Cast in place terrazzo wainscot


Using a 6 CF 8 HP portable concrete mixer, small tools, and a terrazzo grinder.
12" X 12", 1" thick,
bonded to concrete or masonry dk@.280 SF 24.80 10.88 1.07 36.75
2015 Heavy Construction Estimator, All Rights Reserved Page 400 (part 2)

16" X 16", 1-1/2" thick,


bonded to concrete or masonry dk@.350 SF 30.80 13.60 1.34 45.74
18" X 18", 1-1/2" thick,
bonded to concrete or masonry dk@.500 SF 38.00 19.43 1.92 59.35
2015 Heavy Construction Estimator, All Rights Reserved Page 401

Cast in place terrazzo curb and base


Using a 6 CF 8 HP portable concrete mixer, small tools, and a terrazzo grinder.
Cover base, 6" cove type dk@.400 LF 1.80 15.54 1.53 18.87
Curb, 6" x 6",
polished top, 2 faces dk@1.33 LF 5.26 51.67 5.09 62.02

Divider strip for terrazzo


14 gauge, 1-1/4" thick, zinc alloy de@.021 LF 1.23 0.89 0.01 2.13
14 gauge, 1-1/4" thick,
half hard brass de@.021 LF 2.53 0.89 0.01 3.43
1/4" thick, 1-1/4" deep,
zinc - white alloy de@.021 LF 1.31 0.89 0.01 2.21
1/4" thick,
1-1/4" deep half hard brass de@.021 LF 2.27 0.89 0.01 3.17
Vinyl plastic de@.021 LF 0.63 0.89 0.01 1.53

Cast in place terrazzo stairs


Heavy strips, zinc top and galvanized bottom
Topping applied to concrete or metal, using a 6 CF 8 HP portable concrete mixer, small tools, and a
terrazzo grinder.
1-1/2" thick x 12" wide dk@.450 LF 3.32 17.48 1.72 22.52
Tread and riser dk@.850 LF 5.08 33.02 3.26 41.36
Stringer and fascia dk@.640 SF 3.53 24.86 2.45 30.84
Add for abrasive surface finish --@.000 SF 0.48 -- -- 0.48
Add for embedded abrasive strips --@.000 LF 1.58 -- -- 1.58
Add for abrasive metal nosing --@.000 LF 3.54 -- -- 3.54
Add for landings --@.000 SF 0.57 -- -- 0.57

CSI 09-420, Precast terrazzo

Precast terrazzo - Thin set floor tiles


1/16" polyester matrix or 1/2" cement matrix, 12" x 12", using small tools.
1/4" to 1/2"chips de@.154 SF 7.40 6.51 0.04 13.95
3/8" to 1" chips de@.154 SF 8.26 6.51 0.04 14.81

Precast terrazzo - Non-slip thin set floor tiles


1/16" polyester matrix or 1/2" cement matrix, using small tools.
9" x 9" x 1" de@.167 SF 30.30 7.06 0.05 37.41
12" x 12" x 1" de@.154 SF 32.80 6.51 0.04 39.35
12" x 12" x 1-1/2" de@.167 SF 34.20 7.06 0.05 41.31
18" x 18" x 1-1/2" de@.154 SF 44.70 6.51 0.04 51.25
24" x 24" x 1-1/2" de@.133 SF 57.50 5.63 0.04 63.17
Add for white cement --@.000 SF 0.67 -- -- 0.67
For Venetian type terrazzo --@.000 SF 2.05 -- -- 2.05

Precast terrazzo - Wainscot, thin set


Using small tools.
12" x 12" x 1" di@.286 SF 53.60 12.13 0.08 65.81
18" x 18" x 1-1/2" di@.300 SF 36.70 12.72 0.09 49.51
18" x 18" x 1-1/2" di@.333 SF 40.20 14.12 0.10 54.42

Precast terrazzo - Thin set base, gray cement


Using small tools.
6" high, straight di@.160 LF 13.80 6.79 0.05 20.64
6" high, coved di@.160 LF 17.20 6.79 0.05 24.04
8" high, straight di@.180 LF 17.20 7.63 0.05 24.88
2015 Heavy Construction Estimator, All Rights Reserved Page 401 (part 2)

8" high, coved di@.180 LF 19.00 7.63 0.05 26.68

Precast terrazzo - Curbs


Using small tools.
8" x 8" di@.533 LF 63.80 22.60 0.15 86.55
6" x 6" di@.485 LF 57.90 20.57 0.14 78.61
4" x 4" di@.421 LF 57.90 17.85 0.12 75.87
Add for white cement --@.000 LF 1.52 -- -- 1.52
Add for zinc toe strip --@.000 LF 4.25 -- -- 4.25

Precast terrazzo - Stair treads, 12" (31cm) wide


Using small tools.
12", 1-1/2" thick, diamond pattern dj@.210 LF 89.10 8.91 0.06 98.07
12", 1-1/2" thick, non-slip surface dj@.210 LF 71.20 8.91 0.06 80.17
2" straight dj@.210 LF 31.20 8.91 0.06 40.17
2015 Heavy Construction Estimator, All Rights Reserved Page 402

2" curved dj@.236 LF 37.40 10.01 0.07 47.48

Precast terrazzo - Stair risers


1" (25mm) thick, to 6" (150mm) high, thin set, using small tools.
Straight section dj@.125 LF 18.70 5.30 0.04 24.04
Straight cove section dj@.125 LF 23.40 5.30 0.04 28.74
Curved vertical section dj@.148 LF 30.50 6.28 0.04 36.82
Curved cove section dj@.148 LF 33.60 6.28 0.04 39.92

Precast terrazzo - Combined stair tread and riser


Using small tools.
1-1/2" thick tread,
3/4" thick riser, straight dj@.308 SF 87.20 13.06 0.09 100.35
3" thick tread,
1" thick riser, straight dj@.308 SF 109.00 13.06 0.09 122.15
2" thick tread, 1" thick riser,
curved section dj@.333 SF 114.00 14.12 0.09 128.21
3" thick tread, 1" thick riser,
curved section dj@.333 SF 151.00 14.12 0.09 165.21

Precast terrazzo - Stringers for terrazzo stairways


Notched for treads and risers, using small tools.
1" thick dj@.286 SF 26.60 12.13 0.08 38.81
2" thick dj@.333 SF 32.70 14.12 0.09 46.91

Precast terrazzo - Stair landings


Structural, nonslip, using small tools.
1-1/2" thick dj@.191 SF 19.90 8.10 0.05 28.05
3" thick dj@.211 SF 25.60 8.95 0.06 34.61

CSI 09-430, Conductive terrazzo

Sparkproof terrazzo industrial floor


Using small tools.
Epoxy system, floor di@.140 SF 9.50 5.94 0.04 15.48
Epoxy system, base di@.190 SF 9.50 8.06 0.06 17.62
Polyacrylate system, floor di@.140 SF 7.66 5.94 0.04 13.64
Polyacrylate system, base di@.190 SF 7.66 8.06 0.06 15.78
Polyester system, floor di@.090 SF 2.69 3.82 0.03 6.54
Polyester system, base di@.120 SF 2.69 5.09 0.03 7.81
Synthetic latex mastic floor di@.140 SF 6.63 5.94 0.04 12.61
Synthetic latex mastic base di@.200 SF 7.11 8.48 0.06 15.65

CSI 09-511, Acoustical ceiling panels

Fiberglass acoustical ceiling lay-in panels


No suspension system included. See CSI 09-540, using small tools.
2' x 2' x 5/8" al@.013 SF 1.05 0.57 0.01 1.63
2' x 4' x 5/8" al@.011 SF 1.05 0.48 0.01 1.54
2' x 2' x 3/4" al@.013 SF 1.27 0.57 0.01 1.85
2' x 4' x 3/4" al@.011 SF 1.27 0.48 0.01 1.76
3/4", glass cloth face al@.016 SF 2.88 0.70 0.01 3.59
1", glass cloth face al@.016 SF 3.20 0.70 0.01 3.91
1-1/2",
glass cloth face, nubby face al@.017 SF 3.20 0.75 0.01 3.96

Mineral fiber acoustical lay-in ceiling panels


2015 Heavy Construction Estimator, All Rights Reserved Page 402 (part 2)

No suspension system included. See CSI 09-540, using small tools.


2' x 2' x 5/8" al@.013 SF 1.15 0.57 0.01 1.73
2' x 4' x 5/8" al@.011 SF 1.15 0.48 0.01 1.64
2' x 2' x 3/4" al@.013 SF 1.52 0.57 0.01 2.10
2' x 4' x 3/4" al@.011 SF 1.52 0.48 0.01 2.01
2015 Heavy Construction Estimator, All Rights Reserved Page 403

Add for aluminum faced panels ---@--- % 88.00 -- -- --


Add for vinyl faced panels ---@--- % 135.00 -- -- --
Add for fire rated panels ---@--- % 75.00 -- -- --

Wood fiber acoustical lay-in ceiling panels


No suspension system included. See CSI 09-540, using small tools.
2' x 2' x 1/2" al@.018 SF 1.97 0.79 0.01 2.77
2' x 4' x 1/2" al@.016 SF 1.97 0.70 0.01 2.68
2' x 2' x 5/8" al@.018 SF 2.17 0.79 0.01 2.97
2' x 4' x 5/8" al@.016 SF 2.17 0.70 0.01 2.88
2' x 2' x 3/4" al@.018 SF 2.34 0.79 0.01 3.14
2' x 4' x 3/4" al@.016 SF 2.34 0.70 0.01 3.05
2' x 2' x 1" al@.018 SF 2.68 0.79 0.01 3.48
2' x 4' x 1" al@.016 SF 2.68 0.70 0.01 3.39
2' x 2' x 2" al@.020 SF 3.11 0.88 0.01 4.00
2' x 4' x 2" al@.018 SF 3.11 0.79 0.01 3.91
Add for flameproof panels --@.000 SF 0.09 -- -- 0.09
Add for sculptured panels --@.000 SF 0.17 -- -- 0.17

Air distribution acoustical lay-in ceiling panels


No suspension system included. See CSI 09-540, using small tools.
3/4" thick al@.033 SF 3.43 1.45 0.02 4.90
5/8" thick al@.033 SF 2.95 1.45 0.02 4.42
Add for air control slides --@.000 SF 0.25 -- -- 0.25
Add for rooms under 495 SF ---@--- % -- 25.00 -- --

CSI 09-512, Acoustical ceiling tile

Fiberglass acoustical ceiling tile


Stapled or cemented in place, using small tools.
12" x 12" x 5/8" al@.020 SF 1.55 0.88 0.01 2.44
12" x 12" x 3/4" al@.020 SF 1.93 0.88 0.01 2.82
3/4" cloth faced al@.020 SF 2.95 0.88 0.01 3.84
1" cloth faced al@.020 SF 3.32 0.88 0.01 4.21

Mineral fiber acoustical ceiling tile, 12" x 12"


Stapled or cemented in place, using small tools.
12" x 12" x 5/8", standard al@.020 SF 1.65 0.88 0.01 2.54
12" x 12" x 5/8", vinyl faced al@.020 SF 1.96 0.88 0.01 2.85
12" x 12" x 3/4", vinyl faced al@.020 SF 2.20 0.88 0.01 3.09
12" x 12" x 3/4", plain faced al@.020 SF 2.12 0.88 0.01 3.01
12" x 12" x 3/4", mylar faced al@.020 SF 4.40 0.88 0.01 5.29
12" x 12" x 3/4", aluminum faced al@.020 SF 4.71 0.88 0.01 5.60
12 x 12" x 1/2", wood fiber al@.020 SF 1.11 0.88 0.01 2.00
12 x 12" x 3/4" wood fiber al@.020 SF 2.03 0.88 0.01 2.92
Add for flameproofing --@.000 SF 0.39 -- -- 0.39
Add for sculptured tile --@.000 SF 2.29 -- -- 2.29
Add for adhesive application --@.000 SF 0.07 -- -- 0.07

Acoustical metal pan ceiling units


No pads included, using small tools.
12" x 12", 24 gauge steel al@.033 SF 5.89 1.45 0.02 7.36
12" x 24", 24 gauge steel al@.031 SF 6.07 1.36 0.02 7.45
12" x 12", .025" thick, aluminum al@.033 SF 6.27 1.45 0.02 7.74
12" x 24", 24 gauge steel al@.031 SF 6.44 1.36 0.02 7.82
12" x 12", .025" thick,
anodized aluminum al@.033 SF 7.21 1.45 0.02 8.68
12" x 24", .025" thick,
2015 Heavy Construction Estimator, All Rights Reserved Page 403 (part 2)

anodized aluminum al@.031 SF 8.58 1.36 0.02 9.96


12" x 12", 24 gauge stainless al@.033 SF 13.80 1.45 0.02 15.27
12" x 24", 24 gauge stainless al@.031 SF 14.20 1.36 0.02 15.58
2015 Heavy Construction Estimator, All Rights Reserved Page 404

Add for flame proof unwrapped


sound absorbing pads --@.000 SF 0.86 -- -- 0.86
Add for unwrapped
sound absorbing pads --@.000 SF 0.43 -- -- 0.43

CSI 09-513, Metal ceiling systems

Metal ceiling panels 0.020 thick


Using small tools.
10', 12', and 16' lengths al@.040 SF 4.89 1.76 0.02 6.67
Custom lengths 3' to 20' al@.040 SF 2.04 1.76 0.02 3.82
Carriers, black, only 52 SF (4.8m2) --@.000 LF 2.44 -- -- 2.44
Recess filler strip --@.000 LF 0.80 -- -- 0.80
Recess filler strip, custom lengths --@.000 LF 1.08 -- -- 1.08

Metal ceiling panels 0.025 thick


Using small tools.
32', 38' , and 52' lengths al@.044 SF 4.28 1.93 0.02 6.23
Custom 10 SF to 65 SF al@.044 SF 1.97 1.93 0.02 3.92
Carriers, black, only 52 SF (4.8m2) --@.000 LF 2.44 -- -- 2.44
Recess filler strip --@.000 LF 0.80 -- -- 0.80
Recess filler strip, custom lengths --@.000 LF 1.08 -- -- 1.08

CSI 09-530, Acoustical insulation & barriers

Acoustical barriers for wall plenum


Using small tools.
Leaded vinyl acoustical,
48 lbs. per SF, .5" thick. al@.059 SF 3.27 2.59 0.03 5.89
Leaded vinyl acoustical,
87 lbs. per SF, .625" thick. al@.065 SF 3.48 2.86 0.03 6.37
Aluminum foil fiberglass reinforcement, parallel with joists,
1" thick al@.036 SF 0.48 1.58 0.02 2.08
Aluminum foil fiberglass reinforcement, perpendicular with joists,
1" thick al@.065 SF 1.03 2.86 0.03 3.92
Aluminum mesh, kraft paper backed al@.036 SF 2.42 1.58 0.02 4.02
Asbestos sheet, 3/16" thick al@.040 SF 1.80 1.76 0.02 3.58
Sheet lead,
1 lb. per SF, 1/64" thick al@.033 SF 3.25 1.45 0.02 4.72

Sound absorbing panels


Add the cost of ceiling suspension system or wall furring, using small tools.
Perforated steel one side backed with fiberglass or mineral filler,
3" (76mm) thick al@.050 SF 1.28 2.20 0.03 3.51
4' x 8' x 1" fiberglass, with glass cloth face,
for walls al@.065 SF 3.14 2.86 0.03 6.03

Sound attenuation blanket


Using small tools.
1" (25 mm) thick al@.063 SF 0.64 2.77 0.03 3.44
1-1/2" (37 mm) thick al@.063 SF 0.86 2.77 0.03 3.66
2" (51 mm) thick al@.063 SF 1.06 2.77 0.03 3.86
3" (76 mm) thick al@.071 SF 1.28 3.12 0.04 4.44

CSI 09-540, Ceiling suspension systems

Ceiling suspension systems


2015 Heavy Construction Estimator, All Rights Reserved Page 404 (part 2)

For ceiling panels, per SF of ceiling covered, using small tools.


T bar 2' x 4' al@.010 SF 0.99 0.44 0.01 1.44
T bar 2' x 2' al@.013 SF 1.04 0.57 0.01 1.62
Concealed Z bar, 12" module al@.019 SF 1.43 0.83 0.01 2.27
Add for 1-1/2"
carrier channels 4' (1.2m) OC --@.000 SF 0.12 -- -- 0.12
Add for carrier channel for ceilings
with recessed light fixtures --@.000 SF 0.24 -- -- 0.24

CSI 09-560, Wood strip flooring

Wood strip flooring - Fir, C grade


4’ to 20’ long x 1" x 4", unfinished tongue and groove, laid over asphalt felt, using small tools.
V grain al@.039 SF 3.97 1.71 0.02 5.70
Flat grain al@.039 SF 3.33 1.71 0.02 5.06

Wood strip flooring - Oak, 25/32" x 2-1/4"


Using small tools.
Clear quartered, unfinished al@.059 SF 4.67 2.59 0.03 7.29
2015 Heavy Construction Estimator, All Rights Reserved Page 405

Clear plain or select plain,


unfinished al@.059 SF 3.56 2.59 0.03 6.18
# 1 common, unfinished al@.059 SF 2.37 2.59 0.03 4.99
Prefinished prime grade al@.059 SF 5.55 2.59 0.03 8.17

Wood strip flooring - Maple


Unfinished tongue and groove, laid over asphalt felt, using small tools.
First grade, 25/32" x 2-1/4" al@.059 SF 5.53 2.59 0.03 8.15
Second grade or better,
25/32" x 2-1/4" al@.059 SF 4.69 2.59 0.03 7.31
First grade, 33/32" x 3-1/4" al@.059 SF 7.50 2.59 0.03 10.12
Second grade or better,
33/32" x 3-1/4" al@.059 SF 6.92 2.59 0.03 9.54

Additional costs for hardwood strip flooring


Using small tools.
Add for factory finish ---@--- % 10.00 -- -- --
Add for random widths ---@--- % 15.00 20.00 -- --
Add for simulated pegs ---@--- % 5.00 3.00 -- --

CSI 09-570, Wood parquet flooring

Hardwood parquet flooring


Prefinished, using small tools.
Oak, 5/16" thick al@.055 SF 6.37 2.42 0.03 8.82
Walnut, 5/16" thick al@.055 SF 9.56 2.42 0.03 12.01
Teak, 5/16" thick al@.055 SF 19.10 2.42 0.03 21.55
Deduct for unfinished parquet floor ---@--- % 10.00 -- -- --

CSI 09-590, Gym floors

Gym floor - 25/32" thick maple


Including shims and sleepers or screed underfloor, using small tools.
1 ply subfloor al@.133 SF 5.91 5.84 0.07 11.82
2 ply subfloor al@.145 SF 10.60 6.37 0.08 17.05
2 ply subfloor and steel springs al@.175 SF 6.78 7.69 0.09 14.56

CSI 09-600, Wood block industrial flooring

Wood block industrial flooring


Using small tools.
2" (51 mm) thick, creosoted al@.034 SF 4.05 1.49 0.02 5.56
2-1/2" (63 mm) thick, creosoted al@.036 SF 4.69 1.58 0.02 6.29
3" (76 mm) thick, creosoted al@.039 SF 7.12 1.71 0.02 8.85
2" (51 mm) thick,
natural finish, end grain al@.141 SF 4.99 6.19 0.07 11.25

CSI 09-650, Resilient flooring

Asphalt tile flooring


9" x 9" tile 1/8" thick, using small tools.
Medium and light colors de@.021 SF 1.45 0.89 0.01 2.35

Resilient tile flooring - Solid vinyl tile


12" x 12", 1/8" thick, using small tools, using small tools.
Marbleized pattern de@.031 SF 1.74 1.31 0.01 3.06
2015 Heavy Construction Estimator, All Rights Reserved Page 405 (part 2)

Solid colors de@.031 SF 2.25 1.31 0.01 3.57


Travertine pattern de@.031 SF 2.53 1.31 0.01 3.85

Resilient tile flooring - Vinyl composition tile


1/8" thick, using small tools.
Marbleized pattern de@.031 SF 1.23 1.31 0.01 2.55
Travertine pattern de@.031 SF 1.52 1.31 0.01 2.84
Solid color de@.031 SF 1.41 1.31 0.01 2.73
2015 Heavy Construction Estimator, All Rights Reserved Page 406

Vinyl sheet goods, backed


Material prices vary widely. Medians are shown, using small tools.
.070" thick de@.033 SF 1.50 1.40 0.01 2.91
.093" thick de@.033 SF 1.80 1.40 0.01 3.21
.125" thick de@.033 SF 2.00 1.40 0.01 3.41
.250" thick de@.033 SF 2.60 1.40 0.01 4.01

Resilient wall base - Group 1, black, russet and umber


Using small tools.
1/8" x 4" high de@.033 LF 0.60 1.40 0.01 2.01
1/8" x 6" high de@.033 LF 0.75 1.40 0.01 2.16

Resilient wall base - Group 2, all other colors except white


Using small tools.
1/8" x 4" high de@.033 LF 0.45 1.40 0.01 1.86
1/8" x 6" high de@.033 LF 0.75 1.40 0.01 2.16

Resilient wall base - Group 3, white only


Using small tools.
1/8" x 4" high de@.033 LF 0.35 1.40 0.01 1.76

Resilient stair treads


Molded rubber, 12" (31cm) wide, grit safety strip, using small tools.
3/16" thick de@.087 LF 6.40 3.68 0.02 10.10
5/16" thick de@.087 LF 7.90 3.68 0.02 11.60

Resilient stair risers


Molded rubber, 7" high, 1/8" thick, colors, using small tools.
Flat de@.057 LF 1.77 2.41 0.02 4.20
Coved de@.057 LF 2.04 2.41 0.02 4.47

Rubber stair nosing, 3/16" thick


Using small tools.
3" wide, black de@.057 LF 1.77 2.41 0.02 4.20
3" wide, colors de@.057 LF 2.59 2.41 0.02 5.02
6" wide, black de@.086 LF 3.81 3.64 0.02 7.47
6" wide, colors de@.086 LF 3.81 3.64 0.02 7.47

CSI 09-670, Fluid applied resilient flooring

Fluid applied resilient flooring, 3/8" thick


Using small tools.
Polyurethane,
poured in place gym floor ay@.071 SF 9.45 2.69 0.03 12.17

CSI 09-675, Conductive resilient flooring

Conductive resilient flooring


Using small tools.
12" x 12" x 1/8" thick vinyl tiles de@.031 SF 5.78 1.31 0.01 7.10

CSI 09-681, Carpet and padding

Pad for carpeting


2015 Heavy Construction Estimator, All Rights Reserved Page 406 (part 2)

Including tack strip and floor fastening as required, using small tools.
Foam rubber carpet padding sr@.118 SY 4.79 4.13 0.03 8.95
Sponge rubber carpet cushion sr@.118 SY 4.54 4.13 0.03 8.70
Urethane carpet cushion, 3/8" thick sr@.118 SY 3.32 4.13 0.03 7.48

CSI 09-682, Carpet

Carpet, not including pad - Residential grade


Using small tools.
Nylon 15 oz. light traffic sr@.250 SY 19.60 8.75 0.06 28.41
Nylon 20 oz. medium traffic sr@.250 SY 21.60 8.75 0.06 30.41
2015 Heavy Construction Estimator, All Rights Reserved Page 407

Carpet, not including pad - Commercial grade


Using small tools.
Nylon 28 oz. medium traffic sr@.250 SY 23.90 8.75 0.06 32.71
Nylon 35 oz. heavy traffic sr@.250 SY 29.20 8.75 0.06 38.01
Wool 36 oz. medium traffic sr@.250 SY 71.30 8.75 0.06 80.11
Wool 42 oz. heavy traffic sr@.250 SY 89.20 8.75 0.06 98.01

Carpet tile
Using small tools.
Foam backed, needle punched sr@.018 SF 4.56 0.63 -- 5.19
Tufted loop or shag sr@.018 SF 5.02 0.63 -- 5.65

CSI 09-720, Epoxy marble chip flooring

Epoxy marble chip flooring


Using a 6 CF 8 HP portable concrete mixer, small tools, and a terrazzo grinder.
Colored quartz chips in 1/4" base dk@.055 SF 12.30 2.14 0.21 14.65
3/16" thick, chips,
topping, heavy duty epoxy dk@.055 SF 10.70 2.14 0.21 13.05

Epoxy terrazzo flooring


Using a 6 CF 8 HP portable concrete mixer, small tools, and a terrazzo grinder.
Chemical resistant, 1/4" thick dk@.055 SF 12.40 2.14 0.21 14.75

CSI 09-750, Brick flooring

Clay brick flooring


Including mortar joints and mortar bed, using small tools.
8" x 3-3/4" x 2-1/4", glazed cc@.170 SF 22.10 7.01 0.06 29.17
9" x 4-1/2" x 3", glazed cc@.140 SF 23.70 5.77 0.05 29.52
8" x 4" x 3/4", unglazed cc@.150 SF 7.83 6.19 0.05 14.07
8" x 4" x 3/4", glazed cc@.150 SF 8.07 6.19 0.05 14.31
Add for basket weave pattern ---@--- % -- 15.00 -- --
Add for herringbone pattern ---@--- % -- 20.00 -- --

CSI 09-760, Floor mats

Floor mats
Rubber mat in a metal frame, stock sizes, using small tools.
Recessed floor mat,
1/2" thick, perforated as@.560 SF 15.90 22.34 0.16 38.40

CSI 09-841, Sprayed fireproofing

Sprayed fireproofing - Ceiling, metal decking, corrugated or fluted


Using a 1/2 CY per hour shotcrete gun and mixer rig and small tools.
1/2" thick coverage, 1 hour rated cu@.010 SF 0.33 0.40 0.05 0.78
7/8" thick coverage, 2 hour rated cu@.012 SF 0.56 0.48 0.06 1.10

Sprayed fireproofing - Roofs and beams


Using a 1/2 CY per hour shotcrete gun and mixer rig and small tools.
1-3/8" thick coverage,
1 hour rated, and decking cu@.015 SF 1.04 0.60 0.07 1.71
1-1/2" thick coverage,
2 hour rated, and decking cu@.016 SF 1.13 0.64 0.08 1.85
2015 Heavy Construction Estimator, All Rights Reserved Page 407 (part 2)

1-5/8" thick coverage, 2 hour rated cu@.016 SF 1.25 0.64 0.08 1.97

Sprayed fireproofing - Beams


Requires minimum of W8 x 24 wire mesh reinforcing, using a 1/2 CY per hour shotcrete gun and mixer
rig and small tools.
7/16" thick coverage, 1 hour rated cu@.007 SF 0.33 0.28 0.03 0.64
2-1/2" thick coverage, 2 hour rated cu@.007 SF 0.38 0.28 0.03 0.69
7/8" thick coverage, 3 hour rated cu@.012 SF 0.66 0.48 0.06 1.20
1-1/4" thick coverage, 4 hour rated cu@.015 SF 0.95 0.60 0.07 1.62

Sprayed fireproofing - Columns


Requires W10 x 49 wire mesh reinforcing, using a 1/2 CY per hour shotcrete gun and mixer rig and
small tools.
1-3/16" thick coverage,
1 hour rated cu@.012 SF 1.04 0.48 0.06 1.58
1-1/4" thick coverage, 2 hour rated cu@.015 SF 1.10 0.60 0.07 1.77
1-7/8" thick coverage, 3 hour rated cu@.016 SF 1.65 0.64 0.08 2.37
2-1/2" thick coverage, 4 hour rated cu@.021 SF 2.21 0.84 0.10 3.15
2015 Heavy Construction Estimator, All Rights Reserved Page 408

Sprayed fireproofing - Columns


Requires W14 x 228 wire mesh reinforcing, using a 1/2 CY per hour shotcrete gun and mixer rig and
small tools.
5/8" thick coverage, 2 hour rated cu@.006 SF 0.56 0.24 0.03 0.83
7/8" thick coverage, 3 hour rated cu@.012 SF 0.77 0.48 0.06 1.31
1-1/4" thick coverage, 4 hour rated cu@.015 SF 1.10 0.60 0.07 1.77

CSI 09-910, Exterior painting

Exterior painting
Includes one coat of acrylic latex, latex or alkyd primer and two finish coats, using small tools.
Door and frame,
hollow metal or wood cx@2.00 Ea 4.33 87.86 0.90 93.09
Windows cx@.010 SF 0.09 0.44 -- 0.53
Trim cx@.010 LF 0.22 0.44 -- 0.66
Siding cx@.007 SF 0.15 0.31 -- 0.46

Paint hardboard surfaces


Heavy duty, using small tools.
One coat
primer and two finish coats cx@.015 SF 0.22 0.66 0.01 0.89

Paint asbestos cement surfaces


Using small tools.
One coat
primer and two finish coats cx@.018 SF 0.25 0.79 0.01 1.05

Paint galvanized surfaces


Primer and linseed oil or acrylic latex, using small tools.
One coat of
primer and two finish coats cx@.015 SF 0.22 0.66 0.01 0.89

Paint aluminum surfaces


Includes pretreatment primer and alkyd enamel paint, using small tools.
One coat
primer and two finish coats cx@.015 SF 0.22 0.66 0.01 0.89

Paint stucco surfaces


Acrylic primer and acrylic latex finish coat, using small tools.
One coat
primer and two finish coats cx@.020 SF 0.22 0.88 0.01 1.11

Paint concrete block


Using a brush, filler-primer and acrylic latex paint, using small tools.
1 coat filler and 1 finish coat cx@.015 SF 0.22 0.66 0.01 0.89
1 coat filler and 2 finish coats cx@.019 SF 0.26 0.84 0.01 1.11
Texture coat cx@.013 SF 0.35 0.57 0.01 0.93

Paint concrete block, brush work


Using small tools.
1 filler coat, 2 epoxy coats cx@.021 SF 0.38 0.92 0.01 1.31

Paint concrete surfaces, brush work


Primer-filler and acrylic latex finish coat, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 408 (part 2)

1 coat filler and 1 finish coat cx@.017 SF 0.22 0.75 0.01 0.98
1 coat filler and 2 finish coats cx@.020 SF 0.29 0.88 0.01 1.18

Paint ferrous (iron) surfaces


Two coats of alkyd enamel paint, using small tools.
Stair pipe rail, 2 rails cx@.016 LF 0.20 0.70 0.01 0.91
Stair hand rail, 1 rail cx@.008 LF 0.12 0.35 -- 0.47
Metal stairs to 4' wide,
including rail, per riser cx@.180 Ea 0.73 7.91 0.08 8.72
Gratings and frames cx@.050 SF 0.19 2.20 0.02 2.41
Ladders or cages, metal, to 4' wide cx@.040 LF 0.22 1.76 0.02 2.00
Miscellaneous exposed metal cx@.020 SF 0.19 0.88 0.01 1.08

Paint steel pipes


One coat primer, one finish coat, using small tools.
4" diameter cx@.009 LF 0.09 0.40 -- 0.49
2015 Heavy Construction Estimator, All Rights Reserved Page 409

6" to 8" diameter cx@.015 LF 0.22 0.66 0.01 0.89


10" to 12" diameter cx@.020 LF 0.40 0.88 0.01 1.29

Paint structural steel - One field coat, brush work


Using small tools.
300 to 500 SF per ton cz@.008 SF 0.06 0.43 -- 0.49
50 to 100 SF per ton cz@.004 SF 0.06 0.22 -- 0.28

Paint structural steel - One field coat, spray work


Using small tools.
300 to 500 SF per ton cz@.002 SF 0.05 0.11 -- 0.16
50 to 100 SF per ton cz@.003 SF 0.05 0.16 -- 0.21

Miscellaneous steel painting, spray work


Using small tools.
Exposed decking, 1 finish coat cx@.007 SF 0.06 0.31 -- 0.37
Joists, 1 finish coat cx@1.33 Ton 0.07 58.43 0.60 59.10
Columns, 1 finish coat cx@1.00 Ton 0.06 43.93 0.45 44.44

CSI 09-920, Interior painting

Interior painting - Concrete and masonry, brush work


Using small tools.
One coat filler cx@.006 SF 0.10 0.26 -- 0.36
One coat primer,
one finish coat paint cx@.010 SF 0.18 0.44 -- 0.62
One coat primer,
two finish coats paint cx@.016 SF 0.25 0.70 0.01 0.96

Interior painting - Plaster or drywall


Brush work, emulsion primer, latex or alkyd paint, using small tools.
One coat primer,
two finish coats paint cx@.015 SF 0.25 0.66 0.01 0.92
One coat primer,
three finish coats paint cx@.020 SF 0.35 0.88 0.01 1.24

Interior painting - Roller work


PVA emulsion primer, latex or alkyd paint, using small tools.
One coat primer,
two finish coats paint cx@.015 SF 0.25 0.66 0.01 0.92

Interior painting - Roll and brush plaster or drywall


Using small tools.
One coat filler,
two finish coats of epoxy cx@.015 SF 0.29 0.66 0.01 0.96

Interior painting - Paint wood surfaces, brush work,


Enamel primer, latex or alkyd paint, using small tools.
1 prime coat,1 finish coat cx@.011 SF 0.18 0.48 -- 0.66
1 prime coat, 2 finish coats cx@.015 SF 0.25 0.66 0.01 0.92
1 prime coat, 3 finish coats cx@.020 SF 0.35 0.88 0.01 1.24
1 prime coat, 2 finish coats,
per LF of trim cx@.015 LF 0.12 0.66 0.01 0.79

Interior painting - Paint cabinets and casework


Enamel primer, latex or alkyd finish coats, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 409 (part 2)

1 prime coat, 1 finish coat cx@.005 SF 0.14 0.22 -- 0.36


1 prime coat, 2 finish coats cx@.007 SF 0.22 0.31 -- 0.53

Interior painting - Wood door and wood frame


Using small tools.
Stain and natural finish sealer cx@1.63 Ea 11.70 71.61 0.73 84.04
Primer and two finish coats cx@1.50 Ea 11.70 65.90 0.68 78.28
2015 Heavy Construction Estimator, All Rights Reserved Page 410

Interior painting - Wood doors and hollow metal frames


Using small tools.
Stain and seal door, prime and paint frame,
per SF of door cx@.039 SF 0.29 1.71 0.02 2.02
Add for fire retardant paint ---@--- % 35.00 -- -- --
Add and deduct for spray
painting rather than brush ---@--- % 50.00 -10.00 -- --

CSI 09-930, Transparent finishes

Interior painting - Varnish finish, wood trim


Using small tools.
One coat sealer, one coat varnish cx@.011 SF 0.27 0.48 -- 0.75

CSI 09-940, Hydraulic structure and appurtenant work

Paint applied to metal, material costs only


Single coat. See paint application costs below.
V-102e, aluminum vinyl,
per average 1 mil thickness --@.000 SF 0.24 -- -- 0.24
V-103c, black vinyl,
high build additive --@.000 SF 0.19 -- -- 0.19
V-106d, dark red oxide,
per average 1 mil thickness --@.000 SF 0.16 -- -- 0.16
V-106d, dark red oxide,
added abrasive --@.000 SF 0.16 -- -- 0.16
V-106d, dark red oxide,
high build additive --@.000 SF 0.16 -- -- 0.16
V-106d, light red oxide,
per average 1 mil thickness --@.000 SF 0.16 -- -- 0.16
V-106d, light red oxide,
added abrasive --@.000 SF 0.16 -- -- 0.16
V-106d, light red oxide,
high build additive --@.000 SF 0.16 -- -- 0.16
VZ-108d, white vinyl, zinc rich --@.000 SF 0.29 -- -- 0.29
V-766e, gray vinyl,
per average 1 mil thickness --@.000 SF 0.19 -- -- 0.19
V-766e, gray vinyl, added abrasive --@.000 SF 0.19 -- -- 0.19
V-766e, white vinyl,
per average 1 mil thickness --@.000 SF 0.19 -- -- 0.19
V-766e, white vinyl, added abrasive --@.000 SF 0.19 -- -- 0.19
Structural, TT-P-86 type I,
covers 600 SF per gallon --@.000 SF 0.09 -- -- 0.09
Structural, TT-P-615 type II,
covers 450 SF per gallon --@.000 SF 0.09 -- -- 0.09
Structural, TT-E-496 type II, black,
covers 300 SF per gallon --@.000 SF 0.13 -- -- 0.13
Structural, TT-P-1046,
covers 300 SF per gallon --@.000 SF 0.18 -- -- 0.18
Aluminum heat resistant, TT-P-28,
covers 300 SF per gallon --@.000 SF 0.22 -- -- 0.22
Aluminum, TT-P-38,
covers 450 SF per gallon --@.000 SF 0.09 -- -- 0.09
Type I, TT-P-615,
covers 600 SF per gallon --@.000 SF 0.09 -- -- 0.09
Class a, TT-E-489,
covers 250 SF per gallon --@.000 SF 0.09 -- -- 0.09
Type II, TT-P-86,
2015 Heavy Construction Estimator, All Rights Reserved Page 410 (part 2)

covers 450 SF per gallon --@.000 SF 0.09 -- -- 0.09


Coal tar epoxy, C-200A
per average 1 mil thickness --@.000 SF 0.21 -- -- 0.21
Zinc rich epoxy, E-303B
per average 1 mil thickness --@.000 SF 0.25 -- -- 0.25
Coal tar base, MIL-C-18480
per average 1 mil thickness --@.000 SF 0.25 -- -- 0.25
SSPC paint 25 system,
covers 500 SF per gallon --@.000 SF 0.07 -- -- 0.07

Metal preparation for painting


Using small tools.
Hand scraping and sanding,
280 to 800 SF per day cz@.019 SF -- 1.03 0.01 1.04
Hand wire brush,
280 to 800 SF per day cz@.019 SF -- 1.03 0.01 1.04
Power tool cleaning (SSPC-3), cz@.010 SF -- 0.54 -- 0.54
Pressure washing,
2800 to 6000 SF per day cz@.002 SF -- 0.11 -- 0.11
Steam cleaning,
2000 to 4000 SF per day cz@.003 SF -- 0.16 -- 0.16
Water blast cz@.003 SF -- 0.16 -- 0.16

Sandblasting
Using a 375 CFM, 100 PSI compressor, 200’ of 1.25" hardrock air hose, a 1,400 pound sandblaster,
and two sets of small tools.
Brush off blast c5@.005 SF 0.10 0.24 0.07 0.41
Commercial blast, loose mill scale, with fine powder 2 lbs.
per SF = 800 lbs. per hour c5@.008 SF 0.16 0.38 0.11 0.65
Commercial blast, tight mill scale, with fine powder rust 3 lbs.
per SF = 900 lbs. per hour c5@.010 SF 0.24 0.48 0.13 0.85
Commercial blast, exterior coating blistered, pitted, rust SC 4 lbs.
per SF = 800 lbs. per hour c5@.015 SF 0.32 0.71 0.20 1.23
Commercial blast, badly pitted with rust, nodules 6.7 lbs.
per SF = 800 lbs. per hour c5@.025 SF 0.55 1.19 0.33 2.07
Near white blast, loose mill scale, with fine powder rust, 5.6 lbs. per SF,
896 lbs. per hour c5@.019 SF 0.43 0.90 0.25 1.58
Near white blast, tight mill scale, little rust, 6.9 lbs. per SF,
896 lbs. per hour c5@.023 SF 0.55 1.09 0.30 1.94
Near white blast, exterior coat blistered, pitted rust, 9 lbs. per SF,
900 lbs. per hour c5@.030 SF 0.71 1.43 0.40 2.54
Near white blast, badly pitted, rust nodules, 11.3 lbs. per SF,
904 lbs. per hour c5@.038 SF 0.87 1.81 0.50 3.18
2015 Heavy Construction Estimator, All Rights Reserved Page 411

Painting labor only - Metals


Single coat on structural steel, machinery or equipment.
Brush work, light to medium coating cz@.006 SF -- 0.32 -- 0.32
Brush work, heavy coat cz@.007 SF -- 0.38 -- 0.38
Mitt, or glove,
light to medium coating cz@.007 SF -- 0.38 -- 0.38
Roll, heavy coating cz@.003 SF -- 0.16 -- 0.16
Spray, light, one coat cz@.002 SF -- 0.11 -- 0.11
Spray, medium, one coat cz@.002 SF -- 0.11 -- 0.11
Spray, machinery and equipment,
one coat cz@.003 SF -- 0.16 -- 0.16
Spray, heavy, one coat cz@.003 SF -- 0.16 -- 0.16

Painting labor only - Miscellaneous exterior metals


Single coat applications.
Vertical metal siding, brush cx@.006 SF -- 0.26 -- 0.26
Vertical metal siding, roll cx@.003 SF -- 0.13 -- 0.13
Vertical metal siding, spray cx@.002 SF -- 0.09 -- 0.09
Metal decking and refinishing,
spray cx@.003 SF -- 0.13 -- 0.13
Metal trim, brush cx@.004 SF -- 0.18 -- 0.18
Chain link fencing, spray cx@.003 SF -- 0.13 -- 0.13

Painting labor only - Pipe or duct


Single coat.
Brush, no insulation, one coat cz@.004 SF -- 0.22 -- 0.22
Brush, with insulation, one coat cz@.006 SF -- 0.32 -- 0.32
Roll, mitt or glove, no insulation cz@.005 SF -- 0.27 -- 0.27
Roll, mitt or glove,
with insulation cz@.007 SF -- 0.38 -- 0.38
Spray pipe or small ductwork cz@.003 SF -- 0.16 -- 0.16
Spray larger ductwork cz@.003 SF -- 0.16 -- 0.16

Painting labor only - Conduit, hangers and fasteners


Single coat.
Brush cz@.007 SF -- 0.38 -- 0.38
Mitt or glove cz@.006 SF -- 0.32 -- 0.32
Spray cz@.003 SF -- 0.16 -- 0.16

Painting labor only - Coal tar epoxy and mastic


Based on 8 to 10 mil film, one coat application.
Brush, Coal tar Epoxy cz@.016 SF -- 0.86 0.01 0.87
Roll, Coal tar Epoxy cz@.006 SF -- 0.32 -- 0.32
Spray, Coal tar Epoxy cz@.004 SF -- 0.22 -- 0.22
Brush, mastic cz@.019 SF -- 1.03 0.01 1.04
Roll, mastic cz@.008 SF -- 0.43 -- 0.43
Spray, mastic cz@.005 SF -- 0.27 -- 0.27

Painting labor only - Interior metals


Single coat.
Joists and decking, spray cx@.003 SF -- 0.13 -- 0.13
Hollow metal items, brush cx@.013 SF -- 0.57 0.01 0.58
Hollow metal items, roll cx@.006 SF -- 0.26 -- 0.26
Hollow metal items, spray cx@.006 SF -- 0.26 -- 0.26

Painting labor only - Tanks and spheres


2015 Heavy Construction Estimator, All Rights Reserved Page 411 (part 2)

Single coat.
Exterior shell, rolled cz@.004 SF -- 0.22 -- 0.22
Exterior roof, rolled cz@.004 SF -- 0.22 -- 0.22
Exterior shell, sprayed cz@.003 SF -- 0.16 -- 0.16
Exterior roof, sprayed cz@.003 SF -- 0.16 -- 0.16
2015 Heavy Construction Estimator, All Rights Reserved Page 412

Concrete and masonry paint


Material cost only. Single coat. See applications costs below.
TT-E-506 or 505 ,
covers 300 SF per gallon --@.000 SF 0.12 -- -- 0.12
TT-E-508 or 509,
covers 300 SF per gallon --@.000 SF 0.12 -- -- 0.12
TT-E-545 or 543,
covers 300 SF per gallon --@.000 SF 0.10 -- -- 0.10
TT-P-29, covers 300 SF per gallon --@.000 SF 0.06 -- -- 0.06
TT-P-30, covers 300 SF per gallon --@.000 SF 0.12 -- -- 0.12
E-303D-zinc rich,
per average mil thickness --@.000 SF 0.29 -- -- 0.29
MIL-P-2444 ships,
covers 130 SF per gallon --@.000 SF 0.45 -- -- 0.45
TT-P-91 , covers 250 SF per gallon --@.000 SF 0.18 -- -- 0.18

Surface preparation for masonry - Acid etch concrete floor


200 to 400 SF per hour, using small tools.
Acid etching cx@.004 SF -- 0.18 -- 0.18

Surface preparation for masonry - Water blasting


400 to 600 SF per hour, using a 375 CFM, 100 PSI compressor, and 100’ of 1" air hose.
Water blasting bj@.009 SF -- 0.36 0.05 0.41

Paint application only - Concrete walls


Single coat, using small tools.
Tilt up plaster walls, roll cx@.004 SF -- 0.18 -- 0.18
Tilt up plaster walls, spray cx@.003 SF -- 0.13 -- 0.13
Stucco walls, roll cx@.005 SF -- 0.22 -- 0.22
Stucco walls, spray cx@.003 SF -- 0.13 -- 0.13
Form poured concrete wall, roll cx@.004 SF -- 0.18 -- 0.18
Form poured concrete wall, spry cx@.003 SF -- 0.13 -- 0.13
Elastomerics and mastics, brush cx@.019 SF -- 0.84 0.01 0.85
Elastomerics and mastics, roll cx@.008 SF -- 0.35 -- 0.35
Elastomerics and mastics, spray cx@.005 SF -- 0.22 -- 0.22
Epoxy and other catalyzed metal,
brush cx@.014 SF -- 0.62 0.01 0.63
Epoxy and other catalyzed metal,
roll cx@.007 SF -- 0.31 -- 0.31
Epoxy and other catalyzed metal,
spray cx@.005 SF -- 0.22 -- 0.22

Paint application only - Exterior concrete floor


Single coat, using small tools.
Concrete deck, spray cx@.003 SF -- 0.13 -- 0.13
Concrete floor and steps,
brush, small area cx@.006 SF -- 0.26 -- 0.26
Concrete floor and steps,
roll, small area cx@.005 SF -- 0.22 -- 0.22

Paint application only - Interior masonry walls


Single coat, using small tools.
Concrete block, roll cx@.004 SF -- 0.18 -- 0.18
Concrete block, spray cx@.003 SF -- 0.13 -- 0.13
Scored block and brick, roll cx@.008 SF -- 0.35 -- 0.35
Scored block and brick, spray cx@.004 SF -- 0.18 -- 0.18
2015 Heavy Construction Estimator, All Rights Reserved Page 412 (part 2)

Block filler, brush cx@.019 SF -- 0.84 0.01 0.85


Block filler, roll cx@.008 SF -- 0.35 -- 0.35
Block filler, spray cx@.005 SF -- 0.22 -- 0.22

Paint application only - Exterior masonry wall


Single coat, using small tools.
Concrete block, brush cx@.008 SF -- 0.35 -- 0.35
Concrete block, roll cx@.004 SF -- 0.18 -- 0.18
Concrete block, spray cx@.003 SF -- 0.13 -- 0.13
Fluted masonry, spray cx@.006 SF -- 0.26 -- 0.26
Scored block and brick, roll cx@.008 SF -- 0.35 -- 0.35
Scored block and brick, spray cx@.003 SF -- 0.13 -- 0.13
Block filler, brush cx@.019 SF -- 0.84 0.01 0.85
2015 Heavy Construction Estimator, All Rights Reserved Page 413

Block filler, roll cx@.008 SF -- 0.35 -- 0.35


Block filler, spray cx@.005 SF -- 0.22 -- 0.22

Paint application only - Swim pool paint, elastomerics and mastics


Single coat, using small tools.
Brush cx@.008 SF -- 0.35 -- 0.35
Roller cx@.005 SF -- 0.22 -- 0.22
Conventional spray cx@.003 SF -- 0.13 -- 0.13
Airless spray cx@.002 SF -- 0.09 -- 0.09

Paint application only - Floor systems, polyurethane epoxy


Using small tools.
Concrete etching and neutralizing cx@.006 SF -- 0.26 -- 0.26
Base coat, 18" roller cx@.006 SF -- 0.26 -- 0.26
First flood coat, 18" roller cx@.006 SF -- 0.26 -- 0.26
Chip coat, by hand cx@.003 SF -- 0.13 -- 0.13
Sanding and wiping, by machine cx@.003 SF -- 0.13 -- 0.13
Second flood coat, 18" roller cx@.002 SF -- 0.09 -- 0.09
First finish glaze, 18" roller cx@.002 SF -- 0.09 -- 0.09
Second finish glaze, 18" roller cx@.002 SF -- 0.09 -- 0.09
Third finish glaze, 18" roller cx@.002 SF -- 0.09 -- 0.09

Paint application only - Interior concrete walls and floors


Single coat, using small tools.
Ceiling, rolled cx@.005 SF -- 0.22 -- 0.22
Ceiling, sprayed cx@.003 SF -- 0.13 -- 0.13
Wall, rolled cx@.004 SF -- 0.18 -- 0.18
Wall, sprayed cx@.002 SF -- 0.09 -- 0.09
Floor and steps, brushed cx@.007 SF -- 0.31 -- 0.31
Floor and steps, sprayed cx@.003 SF -- 0.13 -- 0.13

Painting interiors, material cost only


One coat. Approximately 300 SF per gallon. See application costs below.
TT-E-506 or 505 --@.000 SF 0.12 -- -- 0.12
TT-E-508 or 509 --@.000 SF 0.12 -- -- 0.12
TT-E-545 or 543 --@.000 SF 0.10 -- -- 0.10
TT-P-29 --@.000 SF 0.06 -- -- 0.06
TT-P-30 --@.000 SF 0.12 -- -- 0.12

Interior surface preparation for painting


Using small tools.
Basic drop cloth cx@.078 CSF 0.18 3.43 0.04 3.65
Masking with paper cx@.013 LF 0.07 0.57 0.01 0.65
Cover up with plastic cx@.031 CSF 0.18 1.36 0.01 1.55
Cover up with paper cx@.031 CSF 0.18 1.36 0.01 1.55
Sanding trim cx@.013 SF 0.05 0.57 0.01 0.63
Sanding paneling,
75 SF to 200 SF per hour cx@.009 SF 0.05 0.40 -- 0.45
Light hand washing,
200 to 500 SF per hour cx@.004 SF 0.04 0.18 -- 0.22
Wash to remove calcimine,
100 to 200 SF per hour cx@.008 SF 0.07 0.35 -- 0.42

Interior paint application - Walls


Single coat applications, using small tools.
Smooth wallboard or plastic, brush cx@.006 SF -- 0.26 -- 0.26
Smooth wallboard or plastic, roll cx@.004 SF -- 0.18 -- 0.18
2015 Heavy Construction Estimator, All Rights Reserved Page 413 (part 2)

Smooth wallboard or plastic, spray cx@.002 SF -- 0.09 -- 0.09


Plaster or sand finish, roll cx@.004 SF -- 0.18 -- 0.18
Plaster or sand finish, spray cx@.003 SF -- 0.13 -- 0.13
Rough sand finish, roll cx@.005 SF -- 0.22 -- 0.22
Rough sand finish, spray cx@.003 SF -- 0.13 -- 0.13
2015 Heavy Construction Estimator, All Rights Reserved Page 414

Ply paneling and veneer, brush cx@.006 SF -- 0.26 -- 0.26


Ply paneling and veneer, spray cx@.003 SF -- 0.13 -- 0.13

Interior paint application - Wood floor


Stain, fill and finish tongue and groove wood flooring, using small tools.
Brush, stain and fill,
shellac and varnish cx@.004 SF -- 0.18 -- 0.18
Applicator, stain and fill,
shellac and varnish cx@.003 SF -- 0.13 -- 0.13
Mop, stain and fill,
shellac and varnish cx@.002 SF -- 0.09 -- 0.09
Machine buff, stain and fill,
shellac and varnish cx@.003 SF -- 0.13 -- 0.13

Interior paint application - Casework or shelving


Using small tools.
Brush one coat cx@.008 SF -- 0.35 -- 0.35
Spray one coat cx@.006 SF -- 0.26 -- 0.26

Interior paint application - Ceilings


Single coat applications, using small tools.
Acoustical, roll cx@.007 SF -- 0.31 -- 0.31
Acoustical, spray cx@.004 SF -- 0.18 -- 0.18
Acoustical metal pan, roll cx@.004 SF -- 0.18 -- 0.18
Acoustical metal pan, spray cx@.002 SF -- 0.09 -- 0.09
Wallboard and smooth plastic, roll cx@.004 SF -- 0.18 -- 0.18
Wallboard and smooth plastic, spray cx@.003 SF -- 0.13 -- 0.13
Wood, open construction, spray cx@.003 SF -- 0.13 -- 0.13
Wood, tongue and groove, roll cx@.005 SF -- 0.22 -- 0.22
Wood, tongue and groove, spray cx@.003 SF -- 0.13 -- 0.13

Paint applied on exteriors - Vertical surfaces


Single coat. Application only, using small tools.
Shingles and rough siding, brush cx@.010 SF -- 0.44 -- 0.44
Shingles and rough siding, roll cx@.006 SF -- 0.26 -- 0.26
Shingles and rough siding, spray cx@.003 SF -- 0.13 -- 0.13
Mineral fiber shingle, brush cx@.010 SF -- 0.44 -- 0.44
Mineral fiber shingle, roll cx@.008 SF -- 0.35 -- 0.35
Mineral fiber shingle, spray cx@.003 SF -- 0.13 -- 0.13
Shake siding, brush cx@.010 SF -- 0.44 -- 0.44
Shake siding, spray cx@.006 SF -- 0.26 -- 0.26
Rustic siding and shiplap, brush cx@.009 SF -- 0.40 -- 0.40
Rustic siding and shiplap, roll cx@.007 SF -- 0.31 -- 0.31
Rustic siding and shiplap, spray cx@.004 SF -- 0.18 -- 0.18
Board and batten (text T1-11), roll cx@.006 SF -- 0.26 -- 0.26
Board and batten (text T-11),
applicator cx@.005 SF -- 0.22 -- 0.22
Board and batten (text T-11), spray cx@.003 SF -- 0.13 -- 0.13
Smooth fiberwood siding, roll cx@.004 SF -- 0.18 -- 0.18
Smooth fiberwood siding, spray cx@.003 SF -- 0.13 -- 0.13

Paint applied on exteriors - Horizontal surfaces


Single coat. Application only, using small tools.
Wood porch floor, brush cx@.006 SF -- 0.26 -- 0.26
Wood porch floor, spry/roll cx@.005 SF -- 0.22 -- 0.22
Wood steps,
brush, risers and stringers cx@.008 SF -- 0.35 -- 0.35
Shingle roof, brush cx@.008 SF -- 0.35 -- 0.35
2015 Heavy Construction Estimator, All Rights Reserved Page 414 (part 2)

Shingle roof, roll cx@.006 SF -- 0.26 -- 0.26


Shingle roof, spray cx@.003 SF -- 0.13 -- 0.13

Paint applied on exteriors - Fences and trim


Single coat. Application only, using small tools.
Wood fencing and benches, brush cx@.008 SF -- 0.35 -- 0.35
2015 Heavy Construction Estimator, All Rights Reserved Page 415

Wood fencing and benches, spray cx@.003 SF -- 0.13 -- 0.13


Wood trim, brush cx@.008 SF -- 0.35 -- 0.35
Large post and beam, brush cx@.010 SF -- 0.44 -- 0.44

CSI 09-952, Vinyl wall coverings

Vinyl wall coverings


Using small tools.
13 oz. light weight cn@.016 SF 1.48 0.53 -- 2.01
25 oz. medium weight cn@.021 SF 1.65 0.69 -- 2.34
34 oz. heavy weight cn@.023 SF 2.06 0.76 -- 2.82

CSI 09-953, Cork wall coverings

Cork wall covering


1’ x 3’ squares, using small tools.
1/4" (7mm) thick cn@.042 SF 2.91 1.39 0.01 4.31
1/2" (13mm) thick cn@.042 SF 3.49 1.39 0.01 4.89
3/4" (19mm) thick cn@.042 SF 4.07 1.39 0.01 5.47

CSI 09-955, Wall fabrics

Wall fabrics
Using small tools.
Natural fabric, grass cloth cn@.027 SF 1.91 0.89 0.01 2.81
Grass cloth, minimum cn@.025 SF 1.33 0.82 0.01 2.16
Grass cloth, maximum cn@.029 SF 3.05 0.96 0.01 4.02
Flexible heavy
weight gypsum coated fabric cn@.014 SF 1.16 0.46 -- 1.62

CSI 09-956, Corner guards

Vinyl corner guards


Using small tools.
3/4" x 3/4" x 8' cn@.208 Ea 5.37 6.86 0.04 12.27
2-3/4" x 2-3/4" x 4' cn@.208 Ea 4.09 6.86 0.04 10.99

CSI 09-960, Flexible wood sheets

Flexible wood sheets


Using small tools.
Walnut 1/84" thick cn@.100 SF 4.37 3.30 0.02 7.69
Exotic wood 1/84" thick cn@.100 SF 9.60 3.30 0.02 12.92

==========================================================================
Specialties
==========================================================================

CSI 10-151, Hospital cubicles

Hospital cubicle track, with curtain hooks


Using small tools.
Ceiling hung al@.119 LF 4.99 5.23 0.06 10.28
Suspended al@.185 LF 5.66 8.13 0.10 13.89

Hospital metal dividers - Steel, baked enamel finish


Rounded edges. No molding required, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 415 (part 2)

54" (1.4m) high,


10" (25cm) glass light am@.595 LF 119.00 26.13 0.33 145.46
54" (1.4m) high,
14" (36cm) glass light am@.595 LF 119.00 26.13 0.33 145.46
54" (1.4m) high,
24" (61cm) glass light am@.595 LF 114.00 26.13 0.33 140.46
60" (1.5m) high,
10" (25cm) glass light am@.595 LF 126.00 26.13 0.33 152.46
60" (1.5m) high,
14" (36cm) glass light am@.595 LF 126.00 26.13 0.33 152.46
60" (1.5m) high,
24" (61cm) glass light am@.595 LF 118.00 26.13 0.33 144.46

Hospital metal dividers - Stainless steel


Using small tools.
54" (1.4m) high ,
10" (25cm) glass light am@.595 LF 206.00 26.13 0.33 232.46
54" (1.4m) high ,
14" (36cm) glass light am@.595 LF 225.00 26.13 0.33 251.46
54" (1.4m) high ,
24" (61cm) glass light am@.595 LF 265.00 26.13 0.33 291.46
60" (1.5m) high ,
10" (25cm) glass light am@.625 LF 230.00 27.45 0.34 257.79
60" (1.5m) high ,
14" (36cm) glass light am@.625 LF 230.00 27.45 0.34 257.79
60" (1.4m) high ,
24" (61cm) glass light am@.692 LF 290.00 30.39 0.38 320.77
2015 Heavy Construction Estimator, All Rights Reserved Page 416

CSI 10-160, Toilet partitions and urinal screens

Laminated plastic toilet partitions


Front door and one side divider per stall, using small tools.
Floor mounted am@2.85 Ea 695.00 125.20 1.57 821.77
Ceiling mounted,
including concealed steel am@3.33 Ea 743.00 146.30 1.83 891.13
Add for single toilet paper holder --@.000 Ea 16.00 -- -- 16.00
Add for double toilet paper holder --@.000 Ea 25.20 -- -- 25.20
Add for coat hook --@.000 Ea 8.80 -- -- 8.80
Add for
handicapped (wheelchair) unit --@.000 Ea 4.03 -- -- 4.03

Laminated plastic urinal screens


Using small tools.
Floor mounted al@1.35 Ea 287.00 59.29 0.70 346.99
Wall mounted al@1.35 Ea 331.00 59.29 0.70 390.99

Laminated plastic dividers


Using small tools.
Floor mounted panel, 7' (2.1m) high al@.102 LF 38.60 4.48 0.05 43.13

CSI 10-162, Metal toilet partitions and urinal screens

Metal toilet partitions


Front door and one side divider per stall, floor mounted, using small tools.
Porcelain enameled steel partition am@2.85 Ea 1,390.00 125.20 1.57 1,516.77
Painted steel partition am@2.85 Ea 775.00 125.20 1.57 901.77
Stainless steel partition am@2.85 Ea 1,840.00 125.20 1.57 1,966.77
Add for single toilet paper holder --@.000 Ea 13.60 -- -- 13.60
Add for double toilet paper holder --@.000 Ea 21.20 -- -- 21.20
Add for coat hook --@.000 Ea 6.92 -- -- 6.92
Add for
handicapped (wheelchair) unit --@.000 Ea 6.50 -- -- 6.50

Metal urinal screens, floor mounted


Using small tools.
Porcelain enameled steel am@1.33 Ea 567.00 58.41 0.73 626.14
Painted steel am@1.33 Ea 382.00 58.41 0.73 441.14
Stainless steel am@1.33 Ea 816.00 58.41 0.73 875.14
Add for overhead post support --@.000 Ea 47.30 -- -- 47.30
Add for wall mounted unit --@.000 Ea 37.80 -- -- 37.80
Add for wall
mounted government type unit --@.000 Ea 94.40 -- -- 94.40
Add for
wall mounted wedge type unit --@.000 Ea 37.80 -- -- 37.80

Floor mounted panels - 7’ (2.1m) high


Using small tools.
Porcelain enameled steel panel al@.485 LF 48.90 21.30 0.25 70.45
Painted metal panel al@.333 LF 34.60 14.63 0.17 49.40
Stainless steel panel al@.333 LF 32.80 14.63 0.17 47.60

CSI 10-170, Shower and dressing compartments

Shower compartments, floor mounted - Single entry type


2015 Heavy Construction Estimator, All Rights Reserved Page 416 (part 2)

Complete with composition receptor. Add plumbing rough-in and connection, using small tools.
Porcelain enamel, single opening nx@10.0 Ea 2,540.00 456.30 5.80 3,002.10
2015 Heavy Construction Estimator, All Rights Reserved Page 417

Baked enamel, single opening nx@10.0 Ea 1,460.00 456.30 5.80 1,922.10


Stainless steel, single opening nx@10.0 Ea 2,930.00 456.30 5.80 3,392.10

Shower compartments, floor mounted - Double entry type


Using small tools.
Porcelain enamel , double opening nx@12.0 Ea 7,230.00 547.60 6.96 7,784.56
Baked enamel, double opening nx@12.0 Ea 4,690.00 547.60 6.96 5,244.56
Stainless steel, double opening nx@12.0 Ea 7,320.00 547.60 6.96 7,874.56
Add for overhead bracing ---@--- % 5.00 10.00 -- --
Add for hung types ---@--- % 5.00 40.00 -- --
Add for soap dishes --@.000 Ea 20.70 -- -- 20.70
Add for sauna (steam) unit
built into shower compartment --@.000 Ea 2,000.00 -- -- 2,000.00

Shower receptors
Furnished and set, using small tools.
32" x 32" precast terrazzo ck@.600 Ea 758.00 26.66 0.16 784.82
32" x 48" precast terrazzo ck@.800 Ea 960.00 35.55 0.22 995.77
32" x 32" concrete ck@.600 Ea 378.00 26.66 0.16 404.82
48" x 48" concrete ck@.800 Ea 455.00 35.55 0.22 490.77

Shower doors
Including trim and hardware, using small tools.
24" (61cm) chrome shower frame,
tempered glass, economy nw@.800 Ea 404.00 39.67 0.46 444.13
Porcelain enamel steel shower frame, flush,
24" (61cm) wide, economy nw@.800 Ea 683.00 39.67 0.46 723.13
Baked enamel steel shower frame, flush,
24" (61cm) wide, economy nw@.800 Ea 397.00 39.67 0.46 437.13
Aluminum shower door w/frame, 24" (61cm),
tempered glass, sliding nw@.800 Ea 934.00 39.67 0.46 974.13
Aluminum shower door w/frame, 24" (61cm),
tempered glass, folding nw@.800 Ea 884.00 39.67 0.46 924.13
Molded plastic door, aluminum frame, 48" (122cm),
tempered glass, folding nw@.950 Ea 816.00 47.11 0.54 863.65

Shower compartments, complete with receptor and door


Using small tools.
32" x 32" nx@2.00 Ea 1,160.00 91.26 1.16 1,252.42
36" x 36" nx@2.00 Ea 1,310.00 91.26 1.16 1,402.42
40" x 40" nx@2.20 Ea 1,470.00 100.40 1.28 1,571.68

CSI 10-182, Turnstiles

Turnstiles, impenetrable, access control


7'0" high, indoor or outdoor, using small tools.
One way, remote/card access, type B aj@15.6 Ea 6,610.00 695.00 8.42 7,313.42
Free access, remote/card, type B aj@15.6 Ea 6,100.00 695.00 8.42 6,803.42
One way,
remote/card access, type AA aj@18.4 Ea 8,650.00 819.70 9.94 9,479.64
Free access, remote/card, type AA aj@18.4 Ea 7,880.00 819.70 9.94 8,709.64

CSI 10-290, Pest control

Under slab termite pretreatment spraying


Commercial grade, using small tools.
Soil poisoning under slab sq@.004 SF 0.24 0.14 -- 0.38
2015 Heavy Construction Estimator, All Rights Reserved Page 417 (part 2)

Slab and wall termite spraying


Residential grade, using small tools.
General spraying walls and slabs sq@.004 SF 0.24 0.14 -- 0.38

CSI 10-350, Flagpoles

Flagpoles - Fiberglass, non-tapered


Including all rigging. Add the cost of a 2 CY concrete base, using a 50,000 lb 6x4 3-axle truck with, a 8’
x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
25' (7.6m) high a5@5.00 Ea 1,420.00 215.00 172.00 1,807.00
50' (15m) high a5@13.0 Ea 6,820.00 559.00 447.00 7,826.00
2015 Heavy Construction Estimator, All Rights Reserved Page 418

Flagpoles - Aluminum, non-tapered


Including all rigging. Add the cost of a 2 CY concrete base, using a 50,000 lb 6x4 3-axle truck with, a 8’
x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
25' (7.6m) high a5@5.00 Ea 1,320.00 215.00 172.00 1,707.00
50' (15m) high a5@13.0 Ea 4,560.00 559.00 447.00 5,566.00

Flagpoles - Bonderized steel, non-tapered


Including all rigging. Add the cost of a 2 CY concrete base, using a 50,000 lb 6x4 3-axle truck with, a 8’
x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
25' (7.6m) high a5@6.00 Ea 4,870.00 258.00 206.00 5,334.00
50' (15m) high a5@16.0 Ea 12,400.00 688.00 550.00 13,638.00

Flagpoles - Freestanding tapered, fiberglass


Including all rigging. Add the cost of a 2 CY concrete base, using a 50,000 lb 6x4 3-axle truck with, a 8’
x 16’ flat bed, a 8-ton hydraulic crane with 85’ boom and small tools.
30' (9m) high a5@5.70 Ea 1,270.00 245.10 196.00 1,711.10
40' (12m) high a5@7.20 Ea 2,210.00 309.60 248.00 2,767.60
50' (15m) high a5@8.00 Ea 4,070.00 344.00 275.00 4,689.00
60' (18m) high a5@9.00 Ea 5,420.00 387.00 310.00 6,117.00

Flagpoles - Wall mounted, vertical


With collar and brushed aluminum finish, using a 50,000 lb 6x4 3-axle truck with, a 8’ x 16’ flat bed, a
8-ton hydraulic crane with 85’ boom and small tools.
15' (4.6m) high a5@4.00 Ea 806.00 172.00 138.00 1,116.00
18' (5.5m) high a5@4.00 Ea 938.00 172.00 138.00 1,248.00
20' (6.1m) high a5@4.20 Ea 1,020.00 180.60 144.00 1,344.60
24' (7.3m) high a5@4.70 Ea 1,100.00 202.10 162.00 1,464.10

Flagpoles - Outrigger wall mounted aluminum pole


Including base, using a 50,000 lb 6x4 3-axle truck with, a 8’ x 16’ flat bed, a 8-ton hydraulic crane with
85’ boom and small tools.
10' (3m) high a5@5.30 Ea 420.00 227.90 182.00 829.90
20' (6.1m) high a5@6.60 Ea 530.00 283.80 227.00 1,040.80
Add for cast eagle top --@.000 Ea 110.00 -- -- 110.00
Add for rope lock box --@.000 Ea 166.00 -- -- 166.00
Deduct for tapered steel poles ---@--- % -24.00 -- -- --
Add for stainless steel poles ---@--- % 33.00 -- -- --
Add for brass finished poles ---@--- % 125.00 -- -- --

CSI 10-410, Directory and bulletin boards

Open face directory boards, with felt back


No glass cover. Includes letters. Attached to masonry wall, using small tools.
Hardwood framed am@.650 SF 44.90 28.55 0.36 73.81
Chrome plated steel frame am@.650 SF 23.70 28.55 0.36 52.61
Aluminum framed am@.650 SF 20.80 28.55 0.36 49.71
Bronze framed am@.650 SF 23.00 28.55 0.36 51.91
Stainless steel framed am@.650 SF 44.60 28.55 0.36 73.51
Aluminum framed chalk board am@.650 SF 30.70 28.55 0.36 59.61
Aluminum framed tack board am@.650 SF 32.60 28.55 0.36 61.51
Aluminum framed visual aid am@.650 SF 93.10 28.55 0.36 122.01

Glass encased directory boards


Hinged and keyed, letters on felt back, using small tools.
Aluminum framed am@1.00 SF 99.20 43.92 0.55 143.67
Bronze frame am@1.00 SF 103.00 43.92 0.55 147.47
2015 Heavy Construction Estimator, All Rights Reserved Page 418 (part 2)

Stainless steel framed am@1.00 SF 181.00 43.92 0.55 225.47


Chrome plated steel framed am@1.00 SF 172.00 43.92 0.55 216.47

Additional costs for directory boards


Add for directory attached
to gypsum board walls ---@--- % 10.00 50.00 -- --
Add for illuminated board ---@--- % 25.00 50.00 -- --
Add for exterior board,
water- proof ---@--- % 12.00 25.00 -- --
Add for free standing directory,
including foundation ---@--- 25.00 25.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 419

CSI 10-420, Plaques

Plaques - Cast metal


Including custom lettering and emblem casing. 1 to 4 SF each, using small tools.
Bronze al@.660 SF 426.00 28.99 0.34 455.33
Aluminum al@.660 SF 399.00 28.99 0.34 428.33

Plaques - Engraved metal, etched


Including custom lettering. 1 to 4 SF each, using small tools.
Porcelainized steel al@.660 SF 535.00 28.99 0.34 564.33
Stainless steel al@.660 SF 490.00 28.99 0.34 519.33
Brass al@.660 SF 535.00 28.99 0.34 564.33
Aluminum al@.660 SF 245.00 28.99 0.34 274.33

Plaques - Built-up metal


Including custom lettering. 1 to 4 SF each, using small tools.
Bronze al@.800 SF 417.00 35.14 0.42 452.56
Copper and bronze al@.800 SF 431.00 35.14 0.42 466.56
Copper and aluminum al@.800 SF 471.00 35.14 0.42 506.56

Plaques - Metal nameplate plaques


Including custom lettering, using small tools.
Cast bronze am@.500 SF 417.00 21.96 0.28 439.24
Cast aluminum am@.500 SF 377.00 21.96 0.28 399.24
1-1/2" x 6" engraved bronze am@.500 Ea 130.00 21.96 0.28 152.24
1-1/2" x 6" engraved aluminum am@.500 Ea 130.00 21.96 0.28 152.24
Deduct for sizes from 5 to 10 SF ---@--- % -11.00 -10.00 -- --
Deduct for sizes over 10 SF ---@--- % -21.00 -10.00 -- --

CSI 10-440, Signs

Cast metal letters - Aluminum, satin finish


Cost for separate raised letters, mounted on masonry or concrete, using small tools.
1/2" thick x 2" high al@.300 Ea 15.40 13.18 0.16 28.74
1/2" thick x 4" high al@.400 Ea 17.40 17.57 0.21 35.18
1/2" thick x 6" high al@.450 Ea 22.70 19.76 0.23 42.69
3/4" thick x 8" high al@.500 Ea 29.90 21.96 0.26 52.12
3/4" thick x 10" high al@.600 Ea 38.20 26.35 0.31 64.86
1" thick x 12" high al@.600 Ea 49.90 26.35 0.31 76.56
1" thick x 14" high al@.800 Ea 56.30 35.14 0.42 91.86
1"thick x 16" high al@1.00 Ea 78.00 43.92 0.52 122.44
Add for polished aluminum ---@--- % 12.00 -- -- --
Add for clear anodized aluminum ---@--- % 12.00 -- -- --
Add for colored anodic aluminum add ---@--- % 30.00 -- -- --
Add for profiled
and color enameled letters ---@--- % 50.00 -- -- --

Cast metal letters - Bronze, satin finish


Cost for separate raised letters, mounted on masonry or concrete, using small tools.
3/8" thick x 2" high al@.300 Ea 28.10 13.18 0.16 41.44
3/8" thick x 4" high al@.400 Ea 30.50 17.57 0.21 48.28
1/2" thick x 6" high al@.440 Ea 39.50 19.32 0.23 59.05
5/8" thick x 8" high al@.500 Ea 51.20 21.96 0.26 73.42
1" thick x 10" high al@.660 Ea 77.30 28.99 0.34 106.63
1" thick x 12" high al@.800 Ea 99.00 35.14 0.42 134.56
1" thick 14" high al@1.00 Ea 111.00 43.92 0.52 155.44
2015 Heavy Construction Estimator, All Rights Reserved Page 419 (part 2)

1" thick x 16" high al@1.25 Ea 139.00 54.90 0.65 194.55


Add for polished bronze ---@--- % 5.00 -- -- --
Add for oxidized bronze ---@--- % 22.00 -- -- --
Deduct for flush wall mounting ---@--- % -5.00 -15.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 420

Cast metal letters - Special medallion construction


Using small tools.
3' (.9m) diameter,
federal specification am@5.00 Ea 1,120.00 219.60 2.75 1,342.35
4 SF (.37m2) custom die am@5.26 Ea 1,400.00 231.00 2.89 1,633.89
Sculptured symbology, die cast am@.444 SF 4,950.00 19.50 0.24 4,969.74

Interior custom door signs - Flexible, adhesive back, without frame


Using small tools.
2" x 8" sq@.200 Ea 19.10 7.00 0.04 26.14
4" x 4" sq@.200 Ea 19.10 7.00 0.04 26.14
6" x 7" sq@.200 Ea 24.90 7.00 0.04 31.94
6" x 9" sq@.200 Ea 32.60 7.00 0.04 39.64
10" x 9" sq@.200 Ea 43.20 7.00 0.04 50.24
10" x 12" sq@.200 Ea 56.30 7.00 0.04 63.34

Interior custom door signs - Hard plastic type, without frame


Adhesive back, using small tools.
3" x 8" sq@.200 Ea 40.00 7.00 0.04 47.04
4" x 4" sq@.200 Ea 40.00 7.00 0.04 47.04
4" x 12" sq@.200 Ea 47.80 7.00 0.04 54.84

Interior custom door signs - Hard plastic type, with frame


Adhesive back, using small tools.
3" x 8" sq@.200 Ea 124.00 7.00 0.04 131.04
4" x 4" sq@.200 Ea 105.00 7.00 0.04 112.04
4" x 12" sq@.200 Ea 166.00 7.00 0.04 173.04

Projection screens
Using small tools.
Projection screen, motorized, 50 SF am@5.00 Ea 3,490.00 219.60 2.75 3,712.35
Projection screen, ridged, wall mounted,
acrylic, 1/4" thick am@.055 SF 35.00 2.42 0.03 37.45
Projection screen, ridged, wall mounted,
acrylic, 1/2" thick am@.055 SF 41.00 2.42 0.03 43.45
Theater projection screen, matte white,
including frames am@.065 SF 3.85 2.86 0.04 6.75

CSI 10-501, Wardrobe lockers

Wire mesh wardrobe lockers


Cost per locker, using small tools.
Floor mounted,
open front, varsity type al@.500 Ea 188.00 21.96 0.26 210.22
Add for security box ---@--- Ea 20.40 -- -- --
Add for integrated bench/seat ---@--- Ea 10.60 -- -- --

Locker benches, with iron legs


Using small tools.
Hardwood nw@.100 LF 36.50 4.96 0.06 41.52
Pine nw@.100 LF 32.60 4.96 0.06 37.62
Fabricated steel nw@.100 LF 126.00 4.96 0.06 131.02
Plastic capped nw@.100 LF 38.00 4.96 0.06 43.02
Presswood capped steel nw@.100 LF 34.10 4.96 0.06 39.12

CSI 10-502, Box lockers


2015 Heavy Construction Estimator, All Rights Reserved Page 420 (part 2)

Athletic or book locker boxes - Single tier type


72" high (1.8m), using small tools.
12" x 15", 72" high (1.8m) nw@.800 Ea 190.00 39.67 0.46 230.13
18" x 15", 72" high (1.8m) nw@.800 Ea 237.00 39.67 0.46 277.13
12" x 18", 72" high (1.8m) nw@.800 Ea 219.00 39.67 0.46 259.13
18" x 18", 72" high (1.8m) nw@.900 Ea 259.00 44.63 0.51 304.14
2015 Heavy Construction Estimator, All Rights Reserved Page 421

Athletic or book locker boxes - Double tier type


36" high (.9m), using small tools.
12" x 15", 36" high nw@.400 Ea 134.00 19.84 0.23 154.07
18" x 15", 36" high nw@.400 Ea 138.00 19.84 0.23 158.07
12" x 18", 36" high nw@.400 Ea 124.00 19.84 0.23 144.07
18" x 18", 36" high nw@.500 Ea 143.00 24.80 0.29 168.09

Two person locker boxes, athletic or book


Using small tools.
18" x 15" x 72" high nx@1.30 Ea 374.00 59.32 0.75 434.07
18" x 18" x 72" high nx@1.60 Ea 393.00 73.01 0.93 466.94

Duplex locker boxes


Using small tools.
15" x 15" x 72" high nw@.800 Ea 363.00 39.67 0.46 403.13
15" x 21" x 72" high nw@.800 Ea 393.00 39.67 0.46 433.13
Add for steel mesh door ---@--- % 25.00 -- -- --
Add for perforated door ---@--- % 5.00 -- -- --
Add for 100% louvered door ---@--- % 2.00 -- -- --
Add for auto keyed lock ---@--- % 9.00 -- -- --
Add for combination lock --@.000 Ea 5.73 -- -- 5.73
Add for interior
partition shelf and rod --@.000 Ea 5.40 -- -- 5.40
Add for
stainless steel construction ---@--- % 12.00 -- -- --

CSI 10-503, Basket lockers

Locker baskets racks


Enameled steel rack with wire mesh baskets, mounted on concrete, using small tools.
With 24 wire mesh basket rack nw@4.00 Set 780.00 198.40 2.28 980.68
With 30 wire mesh basket rack nw@6.00 Set 938.00 297.50 3.42 1,238.92
With 36 wire mesh basket rack nw@7.60 Set 1,050.00 376.90 4.33 1,431.23
With 42 wire mesh basket rack nw@9.00 Set 1,200.00 446.30 5.13 1,651.43
Add for steel locked baskets ---@--- % 12.00 -- -- --

CSI 10-520 Fire extinguishers, cabinets and accessories

Portable fire extinguishers - Water pump tank type


Using small tools.
2.5 gallon, red enameled galvanized al@.500 Ea 95.00 21.96 0.26 117.22
2.5 gallon, red enameled copper al@.500 Ea 109.00 21.96 0.26 131.22
2.5 gallon, polished copper al@.500 Ea 170.00 21.96 0.26 192.22

Portable fire extinguishers - Carbon dioxide, hand grip type


Squeeze grip with hose and horn, red enamel steel, using small tools.
2.5 lbs. (1.1kg) al@.500 Ea 42.00 21.96 0.26 64.22
5 lbs. (2.3kg) al@.600 Ea 123.00 26.35 0.31 149.66
10 lbs. (4.6kg) al@.800 Ea 192.00 35.14 0.42 227.56
15 lbs. (6.8kg) al@1.00 Ea 240.00 43.92 0.52 284.44
20 lbs. (9kg) al@1.00 Ea 261.00 43.92 0.52 305.44

Portable fire extinguishers - Carbon dioxide, 16" wheels


Using small tools.
125 lbs. al@1.60 Ea 1,120.00 70.27 0.83 1,191.10
250 lbs. al@1.60 Ea 1,120.00 70.27 0.83 1,191.10
2015 Heavy Construction Estimator, All Rights Reserved Page 421 (part 2)

500 lbs. al@1.60 Ea 2,160.00 70.27 0.83 2,231.10

Portable fire extinguishers - Dry chemical, pressurized


Using small tools.
2.5 lbs. (1.1kg), red steel al@.667 Ea 23.00 29.29 0.35 52.64
2.5 lbs. (1.1kg),
chrome plated steel al@.667 Ea 50.00 29.29 0.35 79.64
5 lbs. (2.3kg), red steel al@.769 Ea 35.00 33.77 0.40 69.17
10 lbs. (4.6kg), red steel al@1.00 Ea 49.00 43.92 0.52 93.44
20 lbs. (9kg), red steel al@1.25 Ea 85.00 54.90 0.65 140.55
30 lbs. (14kg), red steel al@1.25 Ea 230.00 54.90 0.65 285.55
2015 Heavy Construction Estimator, All Rights Reserved Page 422

Portable fire extinguishers - Other fire extinguishers


Using small tools.
2.5 gallons steel press H2O tank al@.500 Ea 49.00 21.96 0.26 71.22
2.5 gallons steel soda and acid al@.500 Ea 95.50 21.96 0.26 117.72
2.5 gallons steel foam type . al@.500 Ea 76.00 21.96 0.26 98.22
40 gallons wheeled foam al@1.60 Ea 3,380.00 70.27 0.83 3,451.10

CSI 10-522, Fire extinguisher cabinets

Fire extinguisher cabinets


Using small tools.
8" x 12" x 27" enamel steel al@2.17 Ea 208.00 95.31 1.13 304.44
8" x 16" x 38" enamel steel al@2.38 Ea 279.00 104.50 1.24 384.74
8" x 12" x 27" aluminum al@2.17 Ea 279.00 95.31 1.13 375.44
8" x 16" x 38" aluminum al@2.38 Ea 461.00 104.50 1.24 566.74
8" x 12" x 27" stainless steel fire al@2.17 Ea 602.00 95.31 1.13 698.44

CSI 10-551, Mail chutes

Mail chutes - Single chute, cost per floor


Using small tools.
Finished aluminum al@2.00 Floor 757.00 87.84 1.04 845.88
Bronze al@2.00 Floor 1,110.00 87.84 1.04 1,198.88

Single mail chute receiving box, 36" x 20" x 12"


Using small tools.
Aluminum al@4.00 Ea 963.00 175.70 2.08 1,140.78
Bronze al@4.00 Ea 1,790.00 175.70 2.08 1,967.78

Mail chutes - Twin chute, double parallel


Cost per floor, using small tools.
Finished aluminum al@4.00 Floor 1,140.00 175.70 2.08 1,317.78
Bronze al@4.00 Floor 1,790.00 175.70 2.08 1,967.78

Twin mail chute receiving box


36" x 40" x 12", using small tools.
Aluminum al@6.60 Ea 2,000.00 289.90 3.43 2,293.33
Bronze al@6.60 Ea 2,850.00 289.90 3.43 3,143.33

Locked receiving mail box


36" x 20" x 12", using small tools.
Finished aluminum al@4.00 Ea 1,190.00 175.70 2.08 1,367.78
Bronze al@4.00 Ea 2,020.00 175.70 2.08 2,197.78

Accessories for mail chutes


Brass, for installation in wall or partition, using small tools.
Letter slot al@1.25 Ea 307.00 54.90 0.65 362.55
Bulk mail slot al@1.25 Ea 907.00 54.90 0.65 962.55

CSI 10-552, Mail boxes

Residential postal accessories


Using small tools.
Residential mail box, letter slot al@.400 Ea 116.00 17.57 0.21 133.78
2015 Heavy Construction Estimator, All Rights Reserved Page 422 (part 2)

Residential rural letter mail box,


post mounted al@1.00 Ea 82.40 43.92 0.52 126.84
Apartment mail box, 3.5" x 4'5" x 16",
keyed for each tenant al@.300 Ea 97.70 13.18 0.16 111.04
Ranch style mail boxes al@.400 Ea 126.00 17.57 0.21 143.78

Commercial mail boxes


Using small tools.
With combination lock,
wall or partition type al@.313 Ea 79.60 13.75 0.16 93.51
With key lock al@.313 Ea 72.60 13.75 0.16 86.51
2015 Heavy Construction Estimator, All Rights Reserved Page 423

CSI 10-610, Demountable partitions

Demountable partitions, 2-1/2" thick


Baked enamel one side and gypsum board on the other, with door frame each 20' of partition. Add the
door cost, using small tools.
8' (2.7m) high metal cubicles am@.500 LF 103.00 21.96 0.28 125.24
Add for vinyl wall surfacing --@.000 SF 4.61 -- -- 4.61
Add for plastic laminated surface --@.000 SF 1.69 -- -- 1.69
Add for glazed
sidelites or vision panels --@.000 SF 99.80 -- -- 99.80
Add for full height chalkboard --@.000 SF 202.00 -- -- 202.00
Add for full height tackboard --@.000 SF 202.00 -- -- 202.00
Add for soundproofing --@.000 SF 4.61 -- -- 4.61

CSI 10-617, Metal partitions, movable

Office cubicle partitions, 8’0" high - Steel framed steel panels


With baked enamel panels, using small tools.
100% flush am@.200 LF 144.00 8.78 0.11 152.89
75% flush, 25% glass am@.200 LF 175.00 8.78 0.11 183.89
50% flush, 50% glass am@.200 LF 252.00 8.78 0.11 260.89
100% glass am@.200 LF 305.00 8.78 0.11 313.89

Office cubicle partitions, 8’0" high - Steel framed natural hardwood panels
Using small tools.
100% flush am@.260 LF 149.00 11.42 0.14 160.56
75% flush, 25% glass am@.260 LF 173.00 11.42 0.14 184.56
50% flush, 50% glass am@.260 LF 207.00 11.42 0.14 218.56

Office cubicle partitions, 8’0" high - Steel framed plastic laminated panels
Using small tools.
100% flush am@.260 LF 172.00 11.42 0.14 183.56
75% flush, 25% glass am@.260 LF 217.00 11.42 0.14 228.56
50% flush, 50% glass am@.280 LF 248.00 12.30 0.15 260.45

Office cubicle partitions, 8’0" high - Steel framed vinyl covered panels
Using small tools.
100% flush am@.270 LF 162.00 11.86 0.15 174.01
75% flush, 25% glass am@.290 LF 216.00 12.74 0.16 228.90
50% flush, 50% glass am@.290 LF 256.00 12.74 0.16 268.90

Office cubicle partitions, 8’0" high - Enameled or anodized aluminum panels


Aluminum frames, using small tools.
100% flush am@.200 LF 128.00 8.78 0.11 136.89
75% flush, 25% glass am@.200 LF 121.00 8.78 0.11 129.89
50% flush, 50% glass am@.200 LF 111.00 8.78 0.11 119.89

Office cubicle partitions, 8’0" high - Vinyl covered panels


Aluminum frames, using small tools.
100% flush am@.220 LF 135.00 9.66 0.12 144.78
75% flush, 25% glass am@.270 LF 169.00 11.86 0.15 181.01
50% flush, 50% glass am@.290 LF 200.00 12.74 0.16 212.90
Add for soundproofing --@.000 LF 2.70 -- -- 2.70
Deduct for heights
less than 8' 0" (2.4m) ---@--- % 10.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 423 (part 2)

Office dwarf partitions, 60" (152cm) high - Steel framed panels


Using small tools.
Enameled panels am@.180 LF 101.00 7.91 0.10 109.01
Hardwood panels, 2 sides am@.180 LF 298.00 7.91 0.10 306.01
Plastic laminated panels am@.180 LF 148.00 7.91 0.10 156.01
Vinyl covered panels am@.180 LF 189.00 7.91 0.10 197.01

Office dwarf partitions, 60" (152cm) high - Aluminum framed panels


Using small tools.
Anodized or baked enamel panels am@.180 LF 80.90 7.91 0.10 88.91
Natural hardwood panels am@.180 LF 243.00 7.91 0.10 251.01
Plastic laminated panels am@.180 LF 121.00 7.91 0.10 129.01
2015 Heavy Construction Estimator, All Rights Reserved Page 424

Vinyl covered panels am@.180 LF 162.00 7.91 0.10 170.01

Office dwarf partitions, 60" (152cm) high - Fabricated office workstations


Steel frame, using small tools.
4' office workstation am@5.00 Ea 2,500.00 219.60 2.75 2,722.35
5' office workstation am@5.00 Ea 2,660.00 219.60 2.75 2,882.35
7' office workstation am@8.00 Ea 3,630.00 351.40 4.40 3,985.80
4' reception workstation am@5.00 Ea 2,500.00 219.60 2.75 2,722.35
7' conference workstation am@13.3 Ea 3,630.00 584.10 7.32 4,221.42

CSI 10-618, Wire mesh partitions

Wire mesh wall panels


4' wide, using small tools.
7' (2.1m) high am@.500 Ea 175.00 21.96 0.28 197.24
8' (2.4m) high am@.550 Ea 196.00 24.16 0.30 220.46
10' (3m) high am@.600 Ea 243.00 26.35 0.33 269.68

Wire mesh wall filler panels


Using small tools.
1' x 7' am@.500 Ea 105.00 21.96 0.28 127.24
1' x 8' am@.500 Ea 110.00 21.96 0.28 132.24
1' x 10' am@.500 Ea 138.00 21.96 0.28 160.24
2' x 7' am@.500 Ea 108.00 21.96 0.28 130.24
2' x 8' am@.500 Ea 115.00 21.96 0.28 137.24
2' x 10' am@.500 Ea 147.00 21.96 0.28 169.24
3' x 7' am@.500 Ea 129.00 21.96 0.28 151.24
3' x 8' am@.500 Ea 141.00 21.96 0.28 163.24
3' x 10' am@.500 Ea 173.00 21.96 0.28 195.24

Wire mesh ceiling panels


Using small tools.
10' x 2' am@1.10 Ea 123.00 48.31 0.61 171.92
10' x 4' am@1.60 Ea 225.00 70.27 0.88 296.15

Wire mesh wall panel with service window


Using small tools.
5' wide x 7' high am@.500 Ea 563.00 21.96 0.28 585.24
5' wide x 8' high am@.500 Ea 615.00 21.96 0.28 637.24
5' wide x 10' high am@.500 Ea 697.00 21.96 0.28 719.24

Sliding doors for wire mesh enclosures


Full partition height, using small tools.
3' x 7' am@2.00 Ea 616.00 87.84 1.10 704.94
3' x 8' am@2.20 Ea 642.00 96.62 1.21 739.83
3' x 10' am@3.20 Ea 655.00 140.50 1.76 797.26
4' x 7' am@2.30 Ea 657.00 101.00 1.27 759.27
4' x 8' am@3.20 Ea 671.00 140.50 1.76 813.26
4' x 10' am@4.00 Ea 736.00 175.70 2.20 913.90
5' x 7' am@3.20 Ea 704.00 140.50 1.76 846.26
5' x 8' am@4.00 Ea 848.00 175.70 2.20 1,025.90
5' x 10' am@4.00 Ea 989.00 175.70 2.20 1,166.90

Swinging doors for wire mesh enclosures


Full partition height, using small tools.
3' x 7' am@2.00 Ea 503.00 87.84 1.10 591.94
4' x 7' am@2.20 Ea 568.00 96.62 1.21 665.83
2015 Heavy Construction Estimator, All Rights Reserved Page 424 (part 2)

3' x 7' with 1' transom am@2.20 Ea 553.00 96.62 1.21 650.83
4' x 7' with 1' transom am@3.20 Ea 623.00 140.50 1.76 765.26
2015 Heavy Construction Estimator, All Rights Reserved Page 425

3' x 7' with 3' transom am@3.20 Ea 487.00 140.50 1.76 629.26
4' x 7' with 3' transom am@4.00 Ea 539.00 175.70 2.20 716.90

CSI 10-671, Metal storage shelving

Baked enamel steel shelving - 3 shelf unit - Enclosed side and back
using small tools.
10" (25cm) x 36" (91cm) wide shelf qa@1.25 Ea 105.00 68.28 0.74 174.02
12" (31cm) x 36" (91cm) wide shelf qa@1.60 Ea 111.00 87.39 0.94 199.33

Baked enamel steel shelving - 5 shelf unit - Enclosed side and back
using small tools.
10" (25cm) x 36" (91cm) wide shelf qa@1.40 Ea 129.00 76.47 0.83 206.30
12" (31cm) x 36" (91cm) wide shelf qa@1.80 Ea 143.00 98.32 1.06 242.38

Baked enamel steel shelving - 8 shelf unit - Open side and back
using small tools.
10" (25cm) x 36" (91cm) wide shelf qa@1.40 Ea 103.00 76.47 0.83 180.30
12" (31cm) x 36" (91cm) wide shelf qa@1.90 Ea 108.00 103.80 1.12 212.92

Baked enamel steel shelving - 7 shelf unit


Full height, 72" high, open type, using small tools.
10" (25cm) wide shelf qa@1.06 LF 52.70 57.90 0.63 111.23
12" (31cm) wide shelf qa@1.12 LF 54.20 61.17 0.66 116.03
15" (38cm) wide shelf qa@1.22 LF 62.40 66.64 0.72 129.76
18" (46cm) wide shelf qa@1.30 LF 62.40 71.01 0.77 134.18
24" (61cm) wide shelf qa@1.39 LF 71.60 75.92 0.82 148.34
30" (76cm) wide shelf qa@1.47 LF 77.20 80.29 0.87 158.36
36" (91cm) wide shelf qa@1.56 LF 91.90 85.21 0.92 178.03

Baked enamel steel shelving - 3 shelf unit, base unit only


Adjustable shelves, 32" high, enclosed, using small tools.
10" (25cm) wide shelf qa@.508 LF 37.10 27.75 0.30 65.15
12" (31cm) wide shelf qa@.546 LF 37.10 29.82 0.32 67.24
15" (38cm) wide shelf qa@.578 LF 41.00 31.57 0.34 72.91
18" (46cm) wide shelf qa@.614 LF 43.20 33.54 0.36 77.10
24" (61cm) wide shelf qa@.654 LF 48.80 35.72 0.39 84.91

Baked enamel steel shelving - 4 shelf unit


40" high unit, enclosed, using small tools.
10" (25cm) wide shelf qa@.833 LF 44.90 45.50 0.49 90.89
12" (31cm) wide shelf qa@.901 LF 47.50 49.21 0.53 97.24
15" (38cm) wide shelf qa@.980 LF 59.50 53.53 0.58 113.61
18" (46cm) wide shelf qa@1.04 LF 59.50 56.80 0.61 116.91
24" (61cm) wide shelf qa@1.11 LF 66.40 60.63 0.65 127.68

Baked enamel steel shelving - Single shelf unit, attached to masonry walls with brackets
Using small tools.
10" (25cm) wide shelf qa@.150 LF 12.80 8.19 0.09 21.08
12" (31cm) wide shelf qa@.150 LF 14.60 8.19 0.09 22.88
15" (38cm) wide shelf qa@.160 LF 15.10 8.74 0.09 23.93
18" (46cm) wide shelf qa@.160 LF 17.00 8.74 0.09 25.83
24" (61cm) wide shelf qa@.163 LF 21.40 8.90 0.10 30.40

Baked enamel steel shelving - Additional costs for steel shelving


Add for stainless steel ---@--- % 150.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 425 (part 2)

Add for mesh lined shelf ---@--- % 30.00 -- -- --


Add for sheet metal lined shelf ---@--- % 33.00 -- -- --
Add for attachment
to gypsum board walls ---@--- % -- 50.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 426

CSI 10-672, Wood shelving

Wood shelving - Built-in


Using miscellaneous power tools and small tools.
Post and trimmed plywood an@.143 LF 2.35 6.28 0.17 8.80
Post and solid clear pine an@.154 LF 3.99 6.76 0.18 10.93
Closet shelf of pine, with rod an@.154 SF 2.68 6.76 0.18 9.62
Add for lumber edge band on shelf --@.000 LF 1.37 -- -- 1.37
Add for prefinished shelves ---@--- % 225.00 -- -- --

CSI 10-800, Toilet and bath accessories

Toilet and bath accessories - Surface mounted


Good quality chrome plated, commercial and residential quality, using small tools.
Chrome plated soap dish al@.400 Ea 56.30 17.57 0.21 74.08
Single clothes hook al@.400 Ea 9.10 17.57 0.21 26.88
Double clothes hook al@.400 Ea 13.60 17.57 0.21 31.38
6" (15cm) deep crystal shelf al@.667 LF 30.80 29.29 0.35 60.44
6" (15cm)
deep stainless steel shelf al@.667 LF 45.50 29.29 0.35 75.14
12" (31cm) long towel bar, chrome al@.667 Ea 31.80 29.29 0.35 61.44
18" (46cm) long towel bar, chrome al@.667 Ea 40.90 29.29 0.35 70.54
24" (61cm) long towel bar al@.667 Ea 50.00 29.29 0.35 79.64
Soap and grab bar combined al@.400 Ea 52.30 17.57 0.21 70.08
Towel ring al@.400 Ea 36.40 17.57 0.21 54.18
Tumbler and toothbrush holder al@.400 Ea 40.90 17.57 0.21 58.68
1 roll toilet paper holder al@.400 Ea 31.80 17.57 0.21 49.58
2 roll toilet paper holder al@.400 Ea 40.90 17.57 0.21 58.68
Toilet paper dispenser, box type al@.400 Ea 37.00 17.57 0.21 54.78
Globe soap dispenser al@.667 Ea 56.90 29.29 0.35 86.54
Box soap dispenser al@.667 Ea 70.00 29.29 0.35 99.64
Towel pin al@.400 Ea 15.50 17.57 0.21 33.28
Towel ladder and bar al@1.00 Ea 25.90 43.92 0.52 70.34
18" x 24" mirror al@.667 Ea 150.00 29.29 0.35 179.64
18" x 24" mirror and shelf al@.667 Ea 216.00 29.29 0.35 245.64
48" (121 cm) grab bar al@.500 Ea 111.00 21.96 0.26 133.22

Toilet and bath accessories - Recessed


Good quality chrome plated, commercial and residential quality, using small tools.
Single toilet paper holder al@.400 Ea 40.00 17.57 0.21 57.78
Soap dish al@.400 Ea 14.60 17.57 0.21 32.38
Soap and grab bar combined al@.400 Ea 29.10 17.57 0.21 46.88
Tumbler holder al@.400 Ea 27.30 17.57 0.21 45.08
Tumbler and toothbrush hold al@.400 Ea 41.80 17.57 0.21 59.58
Paper towel dispenser al@.400 Ea 180.00 17.57 0.21 197.78

CSI 10-820, Dispensers and receptacles

Bathroom accessories
Using small tools.
Recessed towel
dispenser and receptacle al@1.00 Ea 500.00 43.92 0.52 544.44
Recessed towel dispenser al@1.25 Ea 185.00 54.90 0.65 240.55
Recessed 12 gallon waste receptacle al@1.67 Ea 346.00 73.35 0.87 420.22
12 gallon waste receptacle al@1.00 Ea 455.00 43.92 0.52 499.44
Sanitary napkin dispenser with receptor,
coin al@1.00 Ea 440.00 43.92 0.52 484.44
2015 Heavy Construction Estimator, All Rights Reserved Page 426 (part 2)

Sanitary napkin dispenser with receptor,


free al@1.00 Ea 440.00 43.92 0.52 484.44
2015 Heavy Construction Estimator, All Rights Reserved Page 427

Recessed Sanitary napkin dispenser al@1.67 Ea 440.00 73.35 0.87 514.22


Recessed Sanitary napkin receptacle al@1.25 Ea 243.00 54.90 0.65 298.55
Sanitary napkin receptacle al@.833 Ea 212.00 36.59 0.43 249.02
Facial tissue dispenser al@.685 Ea 66.70 30.09 0.36 97.15
Towel and soap dispenser
with recessed mirror al@1.25 Ea 358.00 54.90 0.65 413.55
Recessed box type soap dispenser al@.714 Ea 71.50 31.36 0.37 103.23
Box type soap dispenser al@.588 Ea 57.50 25.82 0.31 83.63
Stainless steel 18" x 24" mirror al@.500 Ea 144.00 21.96 0.26 166.22
Stainless steel
18" x 24" mirror with shelf al@.500 Ea 182.00 21.96 0.26 204.22
Stainless steel 18" x 18" 6" shelf al@.400 Ea 114.00 17.57 0.21 131.78
Folding utility shelf al@.667 Ea 47.50 29.29 0.35 77.14
Single paper holder, roll type al@.400 Ea 22.70 17.57 0.21 40.48
Double paper holder, roll type al@.400 Ea 44.00 17.57 0.21 61.78
Toilet paper holder, box type al@.400 Ea 39.40 17.57 0.21 57.18
24" (61 cm) straight grab bar al@.667 Ea 48.50 29.29 0.35 78.14
16" x 32" angular grab bar al@.833 Ea 72.80 36.59 0.43 109.82
30" x 33" wall to floor grab bar al@.667 Ea 33.70 29.29 0.35 63.34
Straddle grab bar al@.833 Ea 114.00 36.59 0.43 151.02

CSI 10-830, Medicine cabinets

Medicine cabinets, 18" x 24"


Using small tools.
Chrome plate al@1.00 Ea 83.40 43.92 0.52 127.84
White enamel al@1.00 Ea 46.30 43.92 0.52 90.74
Stainless steel al@1.00 Ea 246.00 43.92 0.52 290.44
Add for illumination --@.000 LF 108.00 -- -- 108.00
Add for double illumination --@.000 LF 192.00 -- -- 192.00

CSI 10-840, Ash trays

Ash trays, stainless steel, wall urn


Using small tools.
Recessed al@.833 Ea 102.00 36.59 0.43 139.02
Surface mounted, box type al@.556 Ea 126.00 24.42 0.29 150.71
Surface mounted, compact type al@.500 Ea 118.00 21.96 0.26 140.22
Surface mounted, bowl type al@.556 Ea 123.00 24.42 0.29 147.71

CSI 10-850, Shower curtain rod

Shower curtain rod


Using small tools.
Stainless, shower size al@.455 Ea 47.50 19.98 0.24 67.72
Chrome plated al@.455 Ea 80.40 19.98 0.24 100.62
Stainless steel, tub size al@.769 Ea 89.50 33.77 0.40 123.67
Chrome plated, tub size al@.769 Ea 95.00 33.77 0.40 129.17

CSI 10-860, Janitorial accessories

Janitorial accessories
Using small tools.
24" (61 cm) long stainless steel mop holder,
3 mops al@.417 Ea 37.00 18.31 0.22 55.53
Utility hook strip and hook al@.500 Ea 14.30 21.96 0.26 36.52
Utility hook strip and hook,
with shelf al@.588 Ea 17.70 25.82 0.31 43.83
2015 Heavy Construction Estimator, All Rights Reserved Page 427 (part 2)

Pail and ladder hook al@.400 Ea 13.10 17.57 0.21 30.88

CSI 10-870, Hand dryers

Hand dryers - Electrically operated


Add the cost of electrical connection, using small tools.
110V electric hand dryer,
surface mounted al@2.50 Ea 391.00 109.80 1.30 502.10
220V electric hand dryer,
surface mounted al@2.50 Ea 511.00 109.80 1.30 622.10
2015 Heavy Construction Estimator, All Rights Reserved Page 428

CSI 10-880, Hospital accessories

Hospital accessories
Stainless steel, using small tools.
Hospital bed pan holder al@.625 Ea 202.00 27.45 0.33 229.78
Hospital utility cabinet al@2.50 Ea 61.00 109.80 1.30 172.10
Foot operated soap dispenser al@1.67 Ea 93.50 73.35 0.87 167.72

CSI 10-900, Wardrobe specialties

Hospital wardrobe units


24" x 24" x 76" with door, using small tools.
Baked enamel steel al@3.70 Ea 1,540.00 162.50 1.92 1,704.42
Hardwood al@3.70 Ea 824.00 162.50 1.92 988.42
Stainless steel al@3.70 Ea 2,590.00 162.50 1.92 2,754.42
Plastic laminate al@3.70 Ea 919.00 162.50 1.92 1,083.42

Dormitory wardrobe units


24" x 24" x 76", with door, using small tools.
Hardwood al@3.70 Ea 1,110.00 162.50 1.92 1,274.42
Plastic laminate al@3.70 Ea 978.00 162.50 1.92 1,142.42

Hat and coat racks - Single tier


Using small tools.
Baked enameled steel al@.227 LF 141.00 9.97 0.12 151.09
Stainless steel al@.227 LF 167.00 9.97 0.12 177.09
Aluminum al@.227 LF 152.00 9.97 0.12 162.09

Hat and coat racks - Double tier


Using small tools.
Baked enameled steel al@.281 LF 243.00 12.34 0.15 255.49
Stainless steel al@.281 LF 334.00 12.34 0.15 346.49
Aluminum al@.281 LF 288.00 12.34 0.15 300.49
Add for custom made units ---@--- % 60.00 25.00 -- --

CSI 10-950, Window treatments

Venetian blinds
Using small tools.
Horizontal blinds, with tilt rod al@.020 SF 7.89 0.88 0.01 8.78

==========================================================================
Equipment
==========================================================================

CSI 11-051, Vacuum cleaning system

Vacuum cleaning system


Built in. Costs per system, using small tools.
3 valves, 1.5 HP ui@8.00 Ea 1,140.00 279.80 1.60 1,421.40
3 valves, 2.5 HP ui@11.0 Ea 1,750.00 384.80 2.20 2,137.00
5 valves ui@16.0 Ea 2,020.00 559.70 3.20 2,582.90
7 valves ui@20.0 Ea 2,560.00 699.60 4.00 3,263.60

CSI 11-100, Bank and vault equipment


2015 Heavy Construction Estimator, All Rights Reserved Page 428 (part 2)

Teller windows, bullet resistant


Using small tools.
44" x 48" qb@17.6 Ea 7,270.00 961.30 10.20 8,241.50
60" x 48" qb@17.6 Ea 8,690.00 961.30 10.20 9,661.50
44" x 60" qb@17.7 Ea 5,160.00 966.80 10.30 6,137.10
48" X 60" qb@18.1 Ea 5,630.00 988.60 10.50 6,629.10

Bank counter
Using small tools.
Minimum qb@2.50 LF 1,250.00 136.60 1.45 1,388.05
Maximum qb@5.00 LF 1,610.00 273.10 2.90 1,886.00

Bank doors and windows, bullet resistant


Using small tools.
3' x 7' door with frame qb@12.0 Ea 5,990.00 655.40 6.96 6,652.36
12" x 12" vision panel qb@5.00 Ea 3,750.00 273.10 2.90 4,026.00
Package receiver, 13" deep qb@6.25 Ea 1,880.00 341.40 3.63 2,225.03
Package receiver, 24" deep qb@8.33 Ea 2,850.00 455.00 4.83 3,309.83
2015 Heavy Construction Estimator, All Rights Reserved Page 429

Bank drive-up windows


Including drawer and mike but no glass. See CSI 08-816, using small tools.
Minimum qb@11.0 Ea 10,400.00 600.80 6.38 11,007.18
Maximum qb@26.0 Ea 48,200.00 1,420.00 15.10 49,635.10

Night bank depository, with chest


Using small tools.
Minimum qb@11.0 Ea 11,900.00 600.80 6.38 12,507.18
Maximum qb@26.0 Ea 26,200.00 1,420.00 15.10 27,635.10

Bank partitions, bullet resistant


Using small tools.
1' to 12' high, 2.5" thick qb@.093 SF 99.30 5.08 0.05 104.43

Bank service windows


Pass through, painted steel, bullet resistant, using small tools.
24" x 36 qb@10.0 Ea 7,280.00 546.20 5.80 7,832.00
48" x 40" qb@12.0 Ea 10,800.00 655.40 6.96 11,462.36
72" x 40" qb@16.0 Ea 12,300.00 873.90 9.28 13,183.18

Bank video surveillance system


Using small tools.
Minimum ui@15.0 Ea 3,750.00 524.70 3.00 4,277.70
Maximum ui@72.0 Ea 44,900.00 2,519.00 14.40 47,433.40

Twenty four hour automated teller


Wall mounted, using small tools.
Single unit, automated deposit,
cash and memo a3@47.9 Ea 59,900.00 2,205.00 30.20 62,135.20

Office safes
Using small tools.
30" x 20" x 20", 1 hour rating sr@2.00 Ea 3,240.00 69.96 0.46 3,310.42
30" x 16" x 15", 2 hour rating sr@2.00 Ea 3,070.00 69.96 0.46 3,140.42
30" x 20" x 20", 2 hour rating sr@2.50 Ea 3,430.00 87.45 0.58 3,518.03
48" x 20" x 20", 4 hour rating sr@3.00 Ea 4,010.00 104.90 0.69 4,115.59
60" x 33" x 20",4 hour rating sr@4.00 Ea 7,370.00 139.90 0.92 7,510.82
14" x 14" x 12", H&G rating sr@2.00 Ea 10,100.00 69.96 0.46 10,170.42
30" x 28" x 20", H&G rating sr@2.50 Ea 14,400.00 87.45 0.58 14,488.03

Vault doors
Complete assembly including bar gate time clock and ventilator. All doors are 6'6" high and 3’ wide.
With frame. Not fire rated, using a 20-ton hydraulic crane with 70’ boom and small tools.
3-1/2" thick qg@160. Ea 28,000.00 7,835.00 1,640.00 37,475.00
7" thick qg@200. Ea 34,100.00 9,794.00 2,050.00 45,944.00
10" thick qg@266. Ea 40,200.00 13,030.00 2,720.00 55,950.00

File room doors, insulated


Using a 20-ton hydraulic crane with 70’ boom and small tools.
78" x 32", 1 hour rating qf@8.00 Ea 4,240.00 402.50 101.00 4,743.50
78" x 40", 1 hour rating qf@9.00 Ea 4,550.00 452.80 113.00 5,115.80

Vault door, fire rated


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 429 (part 2)

32" x 78", 2 hour rating qf@11.9 Ea 4,310.00 598.70 150.00 5,058.70


40" x 78", 2 hour rating qf@20.8 Ea 5,640.00 1,046.00 262.00 6,948.00
32" x 78", 4 hour rating qf@11.9 Ea 4,870.00 598.70 150.00 5,618.70
40" x 78", 4 hour rating qf@20.8 Ea 6,320.00 1,046.00 262.00 7,628.00
32" x 78", 6 hour rating qf@11.9 Ea 5,690.00 598.70 150.00 6,438.70
40" x 78", 6 hour rating qf@20.8 Ea 6,810.00 1,046.00 262.00 8,118.00
2015 Heavy Construction Estimator, All Rights Reserved Page 430

CSI 11-175, Motorized checkroom equipment

Checkroom equipment - No shelf type, electric, 6' 4" height


Using small tools.
7.5' (2.3m) long sw@10.0 Ea 3,270.00 350.50 6.50 3,627.00
14.5' (4.4m) long sw@10.0 Ea 3,520.00 350.50 6.50 3,877.00
28' (8.5m) long sw@10.0 Ea 5,050.00 350.50 6.50 5,407.00

Checkroom equipment - One shelf, electric, 6'8" height


Using small tools.
7.5' (2.3m) long sw@10.0 Ea 4,020.00 350.50 6.50 4,377.00
14.5' (4.4m) long sw@10.0 Ea 4,850.00 350.50 6.50 5,207.00
28' (8.5m) long sw@10.0 Ea 7,170.00 350.50 6.50 7,527.00

Checkroom equipment - Two shelves, electric, 7'5" height


Using small tools.
7.5' (2.3m) long sw@10.0 Ea 4,710.00 350.50 6.50 5,067.00
14' (4.4m) long sw@10.0 Ea 5,800.00 350.50 6.50 6,157.00
28' (8.5m) long sw@10.0 Ea 8,330.00 350.50 6.50 8,687.00

Checkroom equipment - Three shelves 8’ height


Using small tools.
7.5' (2.3m) long sw@16.0 Ea 5,070.00 560.80 10.40 5,641.20
14.5' (4.4m) long sw@16.0 Ea 6,120.00 560.80 10.40 6,691.20
28' (8.5m) long sw@16.0 Ea 8,660.00 560.80 10.40 9,231.20

Checkroom equipment - Four shelves, electric, 8’'7" height


Using small tools.
7.5' (2.3m) long sw@16.0 Ea 5,070.00 560.80 10.40 5,641.20
14.5' (4.4m) long sw@16.0 Ea 6,340.00 560.80 10.40 6,911.20
28' (8.5m) long sw@16.0 Ea 8,660.00 560.80 10.40 9,231.20

CSI 11-180, Darkroom equipment

Darkroom sinks - With stand, 5" (12cm) deep


Using small tools.
24" x 48" nb@2.00 Ea 827.00 104.60 1.14 932.74
32" x 63-1/2" nb@2.50 Ea 1,030.00 130.80 1.43 1,162.23
37-1/2" x 51-1/2" nb@3.33 Ea 1,030.00 174.20 1.90 1,206.10
41-1/2" x 132-1/2" nb@4.00 Ea 1,290.00 209.20 2.28 1,501.48
48-1/2" x 51-1/2" nb@4.00 Ea 1,190.00 209.20 2.28 1,401.48

Darkroom sinks - With cabinet, 5" (12cm) deep


Using small tools.
24" x 48" nb@2.00 Ea 1,550.00 104.60 1.14 1,655.74
32" x 63-1/2" nb@2.50 Ea 1,760.00 130.80 1.43 1,892.23
37-1/2" x 51-1/2" nb@3.33 Ea 1,760.00 174.20 1.90 1,936.10
41-1/2" x 132-1/2" nb@4.00 Ea 3,620.00 209.20 2.28 3,831.48
48-1/2" x 51-1/2" nb@4.00 Ea 2,270.00 209.20 2.28 2,481.48

Darkroom sinks - With stand, 10" (25cm) deep


Using small tools.
24" x 48" nb@2.00 Ea 1,030.00 104.60 1.14 1,135.74
32" x 63-1/2" nb@2.30 Ea 1,140.00 120.30 1.31 1,261.61
37-1/2" x 51-1/2" nb@2.50 Ea 1,140.00 130.80 1.43 1,272.23
2015 Heavy Construction Estimator, All Rights Reserved Page 430 (part 2)

Darkroom sinks - With cabinet, 10" (25cm) deep


Using small tools.
24" x 48" nb@2.00 Ea 1,550.00 104.60 1.14 1,655.74
32" x 63-1/2" nb@2.40 Ea 1,760.00 125.50 1.37 1,886.87
37-1/2" x 51-1/2" nb@2.80 Ea 1,960.00 146.40 1.60 2,108.00

Darkroom sink and cabinet


Using small tools.
Without temperature control nb@3.33 Ea 827.00 174.20 1.90 1,003.10
With recirculating heat nb@5.00 Ea 1,910.00 261.50 2.85 2,174.35
With refrigerating unit nb@5.00 Ea 3,120.00 261.50 2.85 3,384.35
2015 Heavy Construction Estimator, All Rights Reserved Page 431

Darkroom dryers
Using small tools.
36" x 25-1/2" x 68-1/2" lj@5.00 Ea 7,240.00 250.50 1.95 7,492.45
48" x 25-1/2" x 68-1/2" lj@5.00 Ea 7,500.00 250.50 1.95 7,752.45

Film processors
Using small tools.
Black and white lj@5.00 Ea 10,300.00 250.50 1.95 10,552.45
Color negatives lj@5.00 Ea 11,900.00 250.50 1.95 12,152.45
Color prints lj@5.00 Ea 13,400.00 250.50 1.95 13,652.45
Color transparencies lj@5.00 Ea 15,000.00 250.50 1.95 15,252.45

CSI 11-415, Unit kitchens

Compact kitchen - 30" (76cm) wide unit


Using small tools.
With refrigerator, range and sink ne@5.00 Ea 2,190.00 261.50 2.85 2,454.35
With refrigerator and sink ne@3.33 Ea 2,060.00 174.20 1.90 2,236.10
With refrigerator and range ne@2.50 Ea 1,840.00 130.80 1.43 1,972.23

Compact kitchen - 30" wide unit wall cabinet


Using small tools.
Cabinet for upper wall section al@1.43 Ea 255.00 62.81 0.74 318.55

Compact kitchen - Stainless steel wall shields


For 30" wide unit, using small tools.
Shield for rear wall sq@.400 Ea 88.00 13.99 0.09 102.08
Shield for side wall sq@.400 Ea 72.40 13.99 0.09 86.48

Compact kitchen - 42" (106cm) wide unit


Using small tools.
With refrigerator, range and sink ne@5.56 Ea 2,630.00 290.80 3.17 2,923.97
With refrigerator and sink ne@5.00 Ea 2,510.00 261.50 2.85 2,774.35

Compact kitchen - 42" wide unit wall cabinet


Using small tools.
Cabinet for upper wall section al@1.67 Ea 376.00 73.35 0.87 450.22

Compact kitchen - Stainless steel wall shields


For 42" wide unit, using small tools.
Shield for rear wall sq@.417 Ea 117.00 14.59 0.09 131.68
Shield for side wall sq@.417 Ea 85.80 14.59 0.09 100.48

Compact kitchen - 54" (106cm) wide unit


Using small tools.
With refrigerator,
oven, range and sink ne@7.14 Ea 3,630.00 373.40 4.07 4,007.47

Compact kitchen - 54" wide unit wall cabinet


Using small tools.
Cabinet for upper wall section al@2.00 Ea 451.00 87.84 1.04 539.88

Compact kitchen - Stainless steel wall shields


For 54" wide unit, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 431 (part 2)

Shield for rear wall sq@.455 Ea 141.00 15.92 0.10 157.02


Shield for side wall sq@.455 Ea 85.80 15.92 0.10 101.82

Compact kitchen - 60" (152cm) wide unit


Using small tools.
With refrigerator,
oven, range, and sink ne@7.14 Ea 3,720.00 373.40 4.07 4,097.47

Compact kitchen - 60" wide unit wall cabinet


Using small tools.
Cabinet for upper wall section al@2.00 Ea 482.00 87.84 1.04 570.88
2015 Heavy Construction Estimator, All Rights Reserved Page 432

Compact kitchen - Stainless steel wall shields


For 60" wide unit, using small tools.
Shield for rear wall sq@.455 Ea 154.00 15.92 0.10 170.02
Shield for side wall sq@.455 Ea 85.80 15.92 0.10 101.82

Compact kitchen - 72" (152cm) wide unit


Using small tools.
With refrigerator,
oven, range and sink ne@8.33 Ea 4,030.00 435.70 4.75 4,470.45

Compact kitchen - 72" wide unit wall cabinet


Using small tools.
Cabinet for upper wall section al@2.00 Ea 583.00 87.84 1.04 671.88

Compact kitchen - Stainless steel wall shields


For 72" wide unit, using small tools.
Shield for rear wall sq@.500 Ea 185.00 17.49 0.11 202.60
Shield for side wall sq@.500 Ea 85.80 17.49 0.11 103.40

CSI 11-420, Cooking equipment

Cooking equipment - Bake ovens


Single deck, minimum ll@1.20 Ea 2,270.00 48.88 -- 2,318.88
Single deck, maximum ll@2.20 Ea 4,550.00 89.61 -- 4,639.61
Double deck, minimum ll@1.50 Ea 2,580.00 61.10 -- 2,641.10
Double deck, maximum ll@2.50 Ea 9,090.00 101.80 -- 9,191.80
Triple deck, minimum ll@1.70 Ea 3,790.00 69.24 -- 3,859.24
Triple deck, maximum ll@2.70 Ea 10,600.00 110.00 -- 10,710.00

Cooking equipment - Electric convection type ovens


40" x 45" x 57".
Minimum ll@4.00 Ea 3,910.00 162.90 -- 4,072.90
Maximum ll@6.84 Ea 7,130.00 278.60 -- 7,408.60

Cooking equipment - Broilers, without oven


69" x 26" x 39".
Minimum ll@3.25 Ea 5,440.00 132.40 -- 5,572.40
Maximum ll@4.33 Ea 6,950.00 176.40 -- 7,126.40

Cooking equipment - Coffee urns, 10 gallon


Using small tools.
Minimum ne@2.00 Ea 3,260.00 104.60 1.14 3,365.74
Maximum ne@3.00 Ea 7,980.00 156.90 1.71 8,138.61

Cooking equipment - Fryers, with submerger


Single, minimum ll@2.00 Ea 1,400.00 81.46 -- 1,481.46
Single, maximum ll@2.00 Ea 3,860.00 81.46 -- 3,941.46
Double, minimum ll@3.00 Ea 6,000.00 122.20 -- 6,122.20
Double, maximum ll@3.00 Ea 6,020.00 122.20 -- 6,142.20
Fryer battery with filter
unit (single 42 lb. capacity) ll@5.20 Ea 9,150.00 211.80 -- 9,361.80
Fryer battery with filter
unit (triple 42 lb. capacity) ll@6.50 Ea 22,100.00 264.70 -- 22,364.70

Cooking equipment - Griddles, counter type


2015 Heavy Construction Estimator, All Rights Reserved Page 432 (part 2)

3’ (.9m) long, minimum ll@1.50 Ea 1,890.00 61.10 -- 1,951.10


3’ (.9m) long, maximum ll@2.89 Ea 5,680.00 117.70 -- 5,797.70
5’ (1.5m) long, maximum ll@2.00 Ea 3,030.00 81.46 -- 3,111.46
5’ (1.5m) long, maximum ll@5.20 Ea 7,200.00 211.80 -- 7,411.80
2015 Heavy Construction Estimator, All Rights Reserved Page 433

Cooking equipment - Kettles, steam jacketed


Using small tools.
20 gallon, minimum nd@2.20 Ea 3,030.00 115.00 0.79 3,145.79
20 gallon, maximum nd@4.40 Ea 6,970.00 229.90 1.58 7,201.48
40 gallon, minimum nd@2.20 Ea 3,480.00 115.00 0.79 3,595.79
40 gallon, maximum nd@4.40 Ea 7,590.00 229.90 1.58 7,821.48
60 gallon, minimum nd@2.20 Ea 4,620.00 115.00 0.79 4,735.79
60 gallon, maximum nd@4.40 Ea 10,300.00 229.90 1.58 10,531.48

Cooking equipment - Kettles, steam jacketed, with stand


Using small tools.
5 gallons kettle n8@2.00 Ea 3,030.00 101.80 1.20 3,133.00

Cooking equipment - Range with hood and 34" open top oven
Minimum ll@2.00 Ea 1,430.00 81.46 -- 1,511.46
Maximum ll@4.33 Ea 4,910.00 176.40 -- 5,086.40

Cooking equipment - Ranges with fry top


Minimum ll@2.00 Ea 3,330.00 81.46 -- 3,411.46
Maximum ll@4.33 Ea 6,820.00 176.40 -- 6,996.40

Cooking equipment - Steamers, electric


27 KW, minimum ll@2.00 Ea 9,240.00 81.46 -- 9,321.46
27 KW, maximum ll@2.50 Ea 19,700.00 101.80 -- 19,801.80
18 KW or 100,000 Btu, minimum ll@2.00 Ea 7,270.00 81.46 -- 7,351.46
18 KW or 100,000 Btu, maximum ll@2.50 Ea 12,400.00 101.80 -- 12,501.80

Cooking equipment - Gas convection steamers


Using small tools.
Steamer ne@2.50 Ea 7,880.00 130.80 1.43 8,012.23

Cooking equipment - Electric convection steamers


Steamer, 48 KW ll@3.42 Ea 12,000.00 139.30 -- 12,139.30

CSI 11-425, Ventilation hoods

Ventilation hoods, extractor type - Wall canopy


Using small tools.
Vent hood with fire protection a3@3.00 LF 1,260.00 138.10 1.89 1,399.99
Vent hood without fire protection a3@2.00 LF 913.00 92.08 1.26 1,006.34

Island canopy vent hoods


Using small tools.
With fire protection a3@3.50 LF 1,430.00 161.10 2.21 1,593.31
Without fire protection a3@2.50 LF 1,030.00 115.10 1.58 1,146.68

Back shelf vent hoods


Using small tools.
With fire protection a3@1.00 LF 685.00 46.04 0.63 731.67
Without fire protection a3@1.00 LF 628.00 46.04 0.63 674.67

Dish machine vent hoods


Using small tools.
Canopy type dish machine hood a3@1.20 LF 434.00 55.25 0.76 490.01
2015 Heavy Construction Estimator, All Rights Reserved Page 433 (part 2)

CSI 11-428, Bakery equipment

Bakery equipment - Proofers


2 compartment ll@4.48 Ea 7,170.00 182.50 -- 7,352.50

Bakery equipment - Sheeters


Small ll@2.00 Ea 4,600.00 81.46 -- 4,681.46
Large ll@2.89 Ea 15,100.00 117.70 -- 15,217.70
2015 Heavy Construction Estimator, All Rights Reserved Page 434

Conveyor fryer, small ll@1.73 Ea 1,940.00 70.46 -- 2,010.46

CSI 11-430, Dishwashing equipment

Dishwashing equipment - Rack type


Using small tools.
1 tank, 190 racks per hour ne@5.00 Ea 10,100.00 261.50 2.85 10,364.35
2 tanks, 234 racks per hour ne@5.56 Ea 15,100.00 290.80 3.17 15,393.97
2 tanks, 265 racks per hour ne@6.67 Ea 16,100.00 348.80 3.80 16,452.60
Automatic, 100 meals per hour ne@3.33 Ea 44,300.00 174.20 1.90 44,476.10

Clean and soiled dish tables


Automatic, using small tools.
Basic table nf@.833 LF 324.00 37.79 0.47 362.26
Dish table with trough nf@1.25 LF 519.00 56.71 0.70 576.41
Maximum cost nf@1.67 LF 602.00 75.77 0.94 678.71

CSI 11-435, Garbage disposals

Garbage disposals
Using small tools.
3 HP, 100 gallon per hour ne@3.00 Ea 1,940.00 156.90 1.71 2,098.61
5 HP, 120 gallon per hour ne@3.40 Ea 2,850.00 177.80 1.94 3,029.74
5 HP, 250 gallon per hour ne@3.50 Ea 3,620.00 183.10 2.00 3,805.10

Dishwasher exhaust hoods


Stainless steel, gutter on all sides, using small tools.
4’ x 4’ x 2' a3@3.00 Ea 799.00 138.10 1.89 938.99
4’ x 4’ x 7' a3@3.00 Ea 1,230.00 138.10 1.89 1,369.99

Juicers
Using small tools.
100 RPM ne@.120 Ea 400.00 6.28 0.07 406.35

Trash compactors
Small ll@6.05 Ea 5,750.00 246.40 -- 5,996.40
Large ll@6.84 Ea 7,200.00 278.60 -- 7,478.60

CSI 11-436, Sprays and hoses

Sprays, fillers
Using small tools.
Pre-rinse spray nd@1.47 Ea 198.00 76.81 0.53 275.34
Kettle fillers nd@1.47 Ea 173.00 76.81 0.53 250.34

Hoses
Using small tools.
Hose reel nd@.750 Ea 74.10 39.19 0.27 113.56
Wash-down hose nd@.750 Ea 40.50 39.19 0.27 79.96

CSI 11-437, Pot and pan washing

Pot sinks
Using small tools.
103" long, 3 tubs, 2 drainboards nd@2.00 Ea 829.00 104.50 0.72 934.22
2015 Heavy Construction Estimator, All Rights Reserved Page 434 (part 2)

Pot wash machine


Using small tools.
Small ne@5.00 Ea 7,410.00 261.50 2.85 7,674.35
Large ne@6.67 Ea 9,880.00 348.80 3.80 10,232.60

CSI 11-440, Food preparation machines

Food preparation machines - Vertical cutter mixers


25 quart ll@2.50 Ea 5,090.00 101.80 -- 5,191.80
40 quart ll@3.25 Ea 8,350.00 132.40 -- 8,482.40
80 quart ll@5.00 Ea 15,600.00 203.70 -- 15,803.70
2015 Heavy Construction Estimator, All Rights Reserved Page 435

130 quart ll@8.00 Ea 19,700.00 325.80 -- 20,025.80

Food preparation machines - Choppers


5 lbs. (2.3kg) ll@3.71 Ea 2,040.00 151.10 -- 2,191.10
16 lbs. (7.3kg) ll@5.20 Ea 3,010.00 211.80 -- 3,221.80
35 lbs.
to 40 lbs. (15.8 kg to 18 kg) ll@6.50 Ea 6,100.00 264.70 -- 6,364.70

Food preparation machines - Mixers, floor models


20 quart ll@2.25 Ea 4,750.00 91.64 -- 4,841.64
60 quart ll@3.00 Ea 9,660.00 122.20 -- 9,782.20
80 quart ll@4.50 Ea 14,900.00 183.30 -- 15,083.30
140 quart ll@7.00 Ea 17,600.00 285.10 -- 17,885.10

Food preparation machines - Slicers


Slicer with table ll@2.89 Ea 3,480.00 117.70 -- 3,597.70

Food preparation machines - Peelers


Small peeler ll@3.25 Ea 2,280.00 132.40 -- 2,412.40
Large peeler ll@4.33 Ea 2,340.00 176.40 -- 2,516.40

CSI 11-450, Food preparation tables

Food preparation tables - Basic table


Using small tools.
Minimum sq@.250 LF 211.00 8.75 0.06 219.81
Maximum sq@.500 LF 457.00 17.49 0.11 474.60

Food preparation tables - Table with sink


Using small tools.
Minimum nf@.830 LF 288.00 37.66 0.46 326.12
Maximum nf@1.12 LF 570.00 50.81 0.63 621.44

CSI 11-460, Food serving units, ice machines

Ice cube maker


Using small tools.
50 lbs. per day, minimum n8@10.0 Ea 1,310.00 508.90 6.00 1,824.90
50 lbs. per day, maximum n8@10.0 Ea 1,620.00 508.90 6.00 2,134.90
250 lbs. per day, minimum n8@13.3 Ea 1,630.00 676.80 7.98 2,314.78
500 lbs. per day, minimum n8@16.7 Ea 2,340.00 849.90 10.00 3,199.90
500 lbs. per day, maximum n8@16.7 Ea 7,520.00 849.90 10.00 8,379.90
500 lbs. per day, with bin n8@13.3 Ea 1,740.00 676.80 7.98 2,424.78
1,000 lbs. per day, with bin n8@16.0 Ea 3,450.00 814.20 9.60 4,273.80

Ice flakers
Using small tools.
300 lbs. per day n8@9.00 Ea 2,160.00 458.00 5.40 2,623.40
600 lbs. per day n8@12.0 Ea 2,470.00 610.70 7.20 3,087.90
1,000 lbs. per day n8@15.0 Ea 5,540.00 763.40 9.00 6,312.40
2,000 lbs. per day n8@18.0 Ea 6,890.00 916.00 10.80 7,816.80

CSI 11-463, Serving equipment

Food serving counters


2015 Heavy Construction Estimator, All Rights Reserved Page 435 (part 2)

Straight ll@.500 LF 197.00 20.37 -- 217.37


Curved section ll@.780 LF 253.00 31.77 -- 284.77

Toasters
Pop-up toaster. 4 slot ll@.250 Ea 704.00 10.18 -- 714.18
Conveyor toaster ll@3.00 Ea 879.00 122.20 -- 1,001.20

Drop-in equipment
Hot food well,60" long ll@1.00 Ea 2,060.00 40.73 -- 2,100.73
Hot food well, circular, table top ll@.250 Ea 164.00 10.18 -- 174.18
2015 Heavy Construction Estimator, All Rights Reserved Page 436

Refrigerated well, 2 compartment ll@2.60 Ea 520.00 105.90 -- 625.90


Refrigerated well, 3 compartment ll@2.89 Ea 612.00 117.70 -- 729.70
Refrigerated well, 4 compartment ll@3.25 Ea 720.00 132.40 -- 852.40
Glass and plate chiller ll@2.00 Ea 1,220.00 81.46 -- 1,301.46

CSI 11-465, Dispensing equipment

Beverage dispensers
Using small tools.
Coffee urn, 10 gallon, minimum ne@2.50 Ea 6,370.00 130.80 1.43 6,502.23
Coffee urn, 10 gallon, maximum ne@4.00 Ea 10,600.00 209.20 2.28 10,811.48
Coffee brewer, 3 burner ne@1.50 Ea 387.00 78.45 0.86 466.31
Hot chocolate dispenser, for liquid ne@1.00 Ea 906.00 52.30 0.57 958.87
Iced tea brewer ne@1.00 Ea 246.00 52.30 0.57 298.87
Juice dispenser, cooler, 5 gallon ll@2.00 Ea 1,000.00 81.46 -- 1,081.46
Jet spray dispenser ll@3.50 Ea 950.00 142.60 -- 1,092.60
Carbonated beverage dispenser ll@8.13 Ea 1,840.00 331.10 -- 2,171.10
Carbonated beverage dispenser
with 90 lb. ice capacity ll@9.29 Ea 3,160.00 378.40 -- 3,538.40
Carbonated beverage dispenser
with 150 lb. ice capacity ll@13.0 Ea 6,070.00 529.50 -- 6,599.50
Milk dispenser, bulk, 2 flavor ll@3.25 Ea 898.00 132.40 -- 1,030.40
Milk dispenser, bulk, 3 flavor ll@3.25 Ea 1,300.00 132.40 -- 1,432.40

Dish dispensers
Using small tools.
12", drop-in sq@.714 Ea 402.00 24.98 0.16 427.14
Mobile dish dispensers sq@.833 Ea 1,330.00 29.14 0.18 1,359.32
Cup and glass dispenser, drop-in sq@2.22 Ea 630.00 77.66 0.49 708.15
Disposable cup dispenser, drop-in sq@.500 Ea 246.00 17.49 0.11 263.60

Tray and silverware dispensers


Using small tools.
Mobile unit sq@.500 Ea 1,700.00 17.49 0.11 1,717.60

Beverage chillers
Using small tools.
Small nf@12.0 Ea 1,720.00 544.40 6.72 2,271.12
Large nf@12.0 Ea 3,570.00 544.40 6.72 4,121.12

Condiment dispensers
Using small tools.
Butter pat dispenser sq@.625 Ea 66.10 21.86 0.14 88.10
Bread dispensers, counter top sq@.625 Ea 250.00 21.86 0.14 272.00

Soft serve ice cream machines


Medium ll@2.36 Ea 3,180.00 96.12 -- 3,276.12
Large ll@2.89 Ea 4,970.00 117.70 -- 5,087.70

CSI 11-470, Refrigerated cases

Dairy product refrigerated cases


Using small tools.
Multi-deck n8@5.00 LF 629.00 254.50 3.00 886.50
Add for rear sliding doors --@.000 LF 22.80 -- -- 22.80
2015 Heavy Construction Estimator, All Rights Reserved Page 436 (part 2)

Delicatessen cases, service deli


Using small tools.
Single-deck n8@4.00 LF 2,500.00 203.60 2.40 2,706.00
Multi-deck n8@4.00 LF 3,410.00 203.60 2.40 3,616.00

Meat cases
Using small tools.
Single-deck n8@4.00 LF 371.00 203.60 2.40 577.00
Multi-deck n8@4.00 LF 457.00 203.60 2.40 663.00

Produce cases
Using small tools.
Single deck n8@4.00 L.F. 400.00 203.60 2.40 606.00
Multi-deck n8@4.00 L.F. 486.00 203.60 2.40 692.00
2015 Heavy Construction Estimator, All Rights Reserved Page 437

Bottle coolers
Using small tools.
50" Stainless n8@12.0 Ea 1,140.00 610.70 7.20 1,757.90
65" Stainless n8@12.0 Ea 1,430.00 610.70 7.20 2,047.90
80" Stainless n8@16.0 Ea 1,600.00 814.20 9.60 2,423.80
95" Stainless n8@16.0 Ea 1,890.00 814.20 9.60 2,713.80

CSI 11-471, Refrigerated boxes

Frozen food cases


Using small tools.
Chest type n8@7.00 Ea 2,880.00 356.20 4.20 3,240.40
Reach-in, glass door n8@7.00 Ea 3,710.00 356.20 4.20 4,070.40
Island type n8@5.00 Ea 629.00 254.50 3.00 886.50
Multi-deck n8@5.00 Ea 1,060.00 254.50 3.00 1,317.50

Ice storage bins


Using small tools.
500 lbs. capacity n8@3.00 Ea 1,230.00 152.70 1.80 1,384.50
1000 lbs. capacity n8@3.00 Ea 1,780.00 152.70 1.80 1,934.50

Refrigeration boxes, prefabricated


Walk-in, 7'-6" high, aluminum, includes door and floor only. Add the cost of refrigeration and partitions,
using miscellaneous power tools and small tools.
6’ x 6’ ap@11.3 Ea 2,320.00 495.80 13.70 2,829.50
10’ x 6’ ap@30.0 Ea 4,530.00 1,316.00 36.30 5,882.30
12’ x 14’ ap@60.0 Ea 6,550.00 2,633.00 72.60 9,255.60
12’ x 20’ ap@90.0 Ea 8,350.00 3,949.00 109.00 12,408.00
Add for 8’ 6" high box ---@--- % 12.00 -- -- --

Range hoods with Co2 fire protection system


Using small tools.
Minimum a3@3.00 Ea 2,810.00 138.10 1.89 2,949.99
Maximum a3@8.00 Ea 20,700.00 368.30 5.04 21,073.34

Cold boxes and freezers


Walk-in type, 7'6" high, with refrigeration equipment, prefabricated, using miscellaneous power tools and
small tools.
Refrigerator, 8' x 8' overall ap@36.0 Ea 7,260.00 1,580.00 43.60 8,883.60
Refrigerator, 8' x 12' overall ap@45.0 Ea 8,000.00 1,975.00 54.50 10,029.50
Refrigerator, 8' x 16' overall ap@60.0 Ea 9,360.00 2,633.00 72.60 12,065.60
Refrigerator, 8' x 20' overall ap@90.0 Ea 11,200.00 3,949.00 109.00 15,258.00
Freezer, 8' x 8' overall ap@36.0 Ea 7,620.00 1,580.00 43.60 9,243.60
Freezer,
8' x 12' overall, backdraft ap@45.0 Ea 8,400.00 1,975.00 54.50 10,429.50
Freezer,
8' x 16' overall, backdraft ap@60.0 Ea 9,830.00 2,633.00 72.60 12,535.60
Freezer, 8' x 20' overall ap@90.0 Ea 11,700.00 3,949.00 109.00 15,758.00

Refrigerator cases
Reach-in, 1 compartment ll@4.00 Ea 1,000.00 162.90 -- 1,162.90
Reach-in, 2 compartment ll@4.00 Ea 1,430.00 162.90 -- 1,592.90
Reach-in, 3 compartment ll@4.64 Ea 2,690.00 189.00 -- 2,879.00
Pass-thru, roll-in, 1 compartment ll@3.33 Ea 3,020.00 135.60 -- 3,155.60
Pass-thru, roll-in, 2 compartment ll@4.19 Ea 4,090.00 170.70 -- 4,260.70
Pass-thru, roll-in, 3 compartment ll@4.64 Ea 5,620.00 189.00 -- 5,809.00
2015 Heavy Construction Estimator, All Rights Reserved Page 437 (part 2)

Reach-in freezers
1 compartment ll@3.33 Ea 2,090.00 135.60 -- 2,225.60
2 compartment ll@4.19 Ea 2,890.00 170.70 -- 3,060.70

Reach-in refrigerator-freezers
1 compartment ll@4.64 Ea 2,690.00 189.00 -- 2,879.00
2 compartment ll@5.42 Ea 4,710.00 220.80 -- 4,930.80

Refrigerated cabinets
Using small tools.
Mobile cabinet sq@1.25 Ea 514.00 43.73 0.28 558.01
2015 Heavy Construction Estimator, All Rights Reserved Page 438

Refrigerator compressor/evaporators
Using small tools.
1 hp compressor/evaporator nf@6.67 Ea 2,190.00 302.60 3.74 2,496.34
1 1/2 hp compressor/evaporator nf@6.67 Ea 2,770.00 302.60 3.74 3,076.34
2 hp compressor/evaporator nf@6.67 Ea 2,960.00 302.60 3.74 3,266.34
3 hp compressor/evaporator nf@6.67 Ea 3,990.00 302.60 3.74 4,296.34

CSI 11-473, Heated and holding cabinets

Heated cabinets, reach-in


Reach-in, 1 compartment ll@3.33 Ea 3,410.00 135.60 -- 3,545.60
Reach-in, 2 compartment ll@4.19 Ea 4,950.00 170.70 -- 5,120.70
Roll-in, 1 compartment ll@3.33 Ea 3,580.00 135.60 -- 3,715.60
Roll-in 2 compartment ll@4.19 Ea 5,200.00 170.70 -- 5,370.70

Heated cabinets, mobile


Using small tools.
Heated cabinet, mobile sq@1.25 Ea 4,010.00 43.73 0.28 4,054.01

CSI 11-475, Shelving and racks

Shelving - Stainless steel, louvered, 4-tier


Using small tools.
20" x 3' sq@1.25 Ea 428.00 43.73 0.28 472.01
20" x 4' sq@1.25 Ea 502.00 43.73 0.28 546.01
20" x 6' sq@1.25 Ea 640.00 43.73 0.28 684.01
24" x 3' sq@1.25 Ea 537.00 43.73 0.28 581.01
24" x 4' sq@1.25 Ea 591.00 43.73 0.28 635.01
24" x 6' sq@1.25 Ea 800.00 43.73 0.28 844.01

Shelving - Stainless steel, flat, 4-tier


Using small tools.
20" x 3' sq@1.25 Ea 424.00 43.73 0.28 468.01
20" x 4' sq@1.25 Ea 488.00 43.73 0.28 532.01
20" x 5' sq@1.25 Ea 576.00 43.73 0.28 620.01
24" x 3' sq@1.25 Ea 488.00 43.73 0.28 532.01
24" x 4' sq@1.25 Ea 581.00 43.73 0.28 625.01
24" x 6' sq@1.25 Ea 650.00 43.73 0.28 694.01

Shelving - Galvanized steel, louvered, 4-tier


Using small tools.
20" x 3' sq@1.25 Ea 184.00 43.73 0.28 228.01
20" x 4' sq@1.25 Ea 225.00 43.73 0.28 269.01
20" x 6' sq@1.25 Ea 320.00 43.73 0.28 364.01
24" x 3' sq@1.25 Ea 215.00 43.73 0.28 259.01
24" x 4' sq@1.25 Ea 246.00 43.73 0.28 290.01
24" x 6' sq@1.25 Ea 305.00 43.73 0.28 349.01

Shelving - Galvanized steel, flat, 4-tier


Using small tools.
20" x 3' sq@1.25 Ea 184.00 43.73 0.28 228.01
20" x 4' sq@1.25 Ea 197.00 43.73 0.28 241.01
20" x 6' sq@1.25 Ea 271.00 43.73 0.28 315.01
24" x 3' sq@1.25 Ea 197.00 43.73 0.28 241.01
24" x 4' sq@1.25 Ea 236.00 43.73 0.28 280.01
24" x 6' sq@1.25 Ea 286.00 43.73 0.28 330.01
2015 Heavy Construction Estimator, All Rights Reserved Page 438 (part 2)

Shelving - Stainless steel dunnage rack


Using small tools.
24" x 3' sq@1.00 Ea 232.00 34.98 0.22 267.20
24" x 4' sq@1.00 Ea 246.00 34.98 0.22 281.20

Shelving - Galvanized steel dunnage rack


Using small tools.
24" x 3' sq@1.00 Ea 422.00 34.98 0.22 457.20
24" x 4' sq@1.00 Ea 464.00 34.98 0.22 499.20
2015 Heavy Construction Estimator, All Rights Reserved Page 439

Shelving - Mobile racks


Using small tools.
Mobile rack with pan slide sq@1.00 Ea 1,130.00 34.98 0.22 1,165.20

CSI 11-510, Gymnasium athletic equipment

Gymnasium equipment - Basketball backstops


Using small tools.
6' wall mounted, fixed, wood as@8.00 Ea 356.00 319.20 2.32 677.52
6' wall mounted, swing-up, wood as@10.0 Ea 940.00 399.00 2.90 1,341.90
Portable, manual,
heavy duty and hydraulic as@5.00 Ea 7,840.00 199.50 1.45 8,040.95
Suspended, wood, manual as@16.0 Ea 2,070.00 638.40 4.64 2,713.04
Add for glass backstop --@.000 Ea 732.00 -- -- 732.00
Add for electrically operated --@.000 Ea 686.00 -- -- 686.00

Gymnasium equipment - Bleachers


Telescoping, manual, using small tools.
15 tier, 22" row spacing am@.187 Seat 47.20 8.21 0.10 55.51
15 tier, 30" row spacing am@.200 Seat 63.90 8.78 0.11 72.79
20 tier, 22" row spacing am@.250 Seat 52.30 10.98 0.14 63.42
20 tier, 30" row spacing am@.250 Seat 69.70 10.98 0.14 80.82
30 tier, 22" row spacing am@.333 Seat 58.10 14.63 0.18 72.91
30 tier, 30" row spacing am@.333 Seat 75.50 14.63 0.18 90.31

Elevated boxing rings


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
22’ x 22', including corner posts, ropes, removable stairway,
10" (25cm) gong, two stools s4@240. Ea 3,600.00 8,412.00 751.00 12,763.00

Floor level boxing rings


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed and small tools.
20 x 20', including
only posts and ropes s2@4.80 Ea 3,370.00 168.20 10.10 3,548.30

Boxing ring accessories


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
Padding, 22’ x 22',
cellular plastic foam s4@30.0 Ea 2,890.00 1,052.00 93.90 4,035.90
Canvas, 30’ x 30' s4@4.80 Ea 2,700.00 168.20 15.00 2,883.20

Gym divider curtain


Mesh top, vinyl bottom, using small tools.
Manual am@.010 SF 4.07 0.44 0.01 4.52
Electric roll up am@.010 SF 5.52 0.44 0.01 5.97

Scoreboards, gymnasium type


Wall mounted, using small tools.
Minimum au@7.01 Ea 1,370.00 288.20 2.17 1,660.37
Maximum au@21.6 Ea 3,010.00 888.00 6.70 3,904.70

Wall mounted gymnasium equipment


Using small tools.
Parallel bars as@12.0 Set 1,530.00 478.80 3.48 2,012.28
Exercise ladder as@7.50 Ea 1,040.00 299.30 2.18 1,341.48
2015 Heavy Construction Estimator, All Rights Reserved Page 439 (part 2)

Gymnasium wall pads


Using small tools.
1-1/2" thick wall pads am@.031 SF 4.88 1.36 0.02 6.26

CSI 11-520, Bowling alley equipment

Bowling alley equipment


Costs per lane, using small tools.
Complete, minimum aq@110. Lane 40,700.00 4,588.00 66.00 45,354.00
Complete, average aq@133. Lane 43,000.00 5,547.00 79.80 48,626.80
Complete, maximum aq@160. Lane 47,100.00 6,674.00 96.00 53,870.00
2015 Heavy Construction Estimator, All Rights Reserved Page 440

CSI 11-551, Paint spray booths

Vehicle paint spray booths, solid back


Using small tools.
14'4" x 9'6" x 24' st@26.0 Ea 23,400.00 907.90 7.28 24,315.18
14'4" x 9'6" x 26' st@26.0 Ea 28,400.00 907.90 7.28 29,315.18
14'4" x 9'6" x 28' st@26.0 Ea 27,100.00 907.90 7.28 28,015.18

Vehicular paint spray booths, drive through, 14’


Using small tools.
14'4" x 9'6" x 24' st@26.0 Ea 17,200.00 907.90 7.28 18,115.18
14'4" x 9'6" x 26' st@26.0 Ea 17,400.00 907.90 7.28 18,315.18
14'4" x 9'6" x 28' st@26.0 Ea 17,700.00 907.90 7.28 18,615.18

Water wash paint spray booths


Using small tools.
5’ x 11'2" x 10'8" st@26.0 Ea 18,000.00 907.90 7.28 18,915.18
6’ x 11'2" x 10'8" st@26.0 Ea 22,300.00 907.90 7.28 23,215.18
8’ x 11'2" x 10'8" st@26.0 Ea 23,300.00 907.90 7.28 24,215.18
10’ x 11'2" x 11'2" st@26.0 Ea 24,300.00 907.90 7.28 25,215.18
12’ x 12'2" x 11'2" st@26.0 Ea 33,000.00 907.90 7.28 33,915.18
14’ x 12'2" x 11'2" st@26.0 Ea 38,500.00 907.90 7.28 39,415.18
16’ x 12'2" x 11'2" st@26.0 Ea 39,600.00 907.90 7.28 40,515.18
20’ x 12'2" x 11'2" st@26.0 Ea 45,900.00 907.90 7.28 46,815.18

Dry type spray booths with paint arrestors


Using small tools.
5’ x 7’ x 7' st@26.0 Ea 4,910.00 907.90 7.28 5,825.18
6’ x 7’ x 7' st@26.0 Ea 5,510.00 907.90 7.28 6,425.18
8’ x 7’ x 9' st@26.0 Ea 6,110.00 907.90 7.28 7,025.18
10’ x 7’ x 9' st@26.0 Ea 6,800.00 907.90 7.28 7,715.18
12’ x 7’ x 9' st@26.0 Ea 7,720.00 907.90 7.28 8,635.18
14’ x 7’ x 10' st@26.0 Ea 11,400.00 907.90 7.28 12,315.18
16’ x 7’ x 10' st@26.0 Ea 13,100.00 907.90 7.28 14,015.18
20’ x 7’ x 11' st@26.0 Ea 14,800.00 907.90 7.28 15,715.18

CSI 11-570, Shop equipment

Auto care equipment, purchase only


1/4" hand drill --@.000 Ea 50.90 -- -- 50.90
3/8" hand drill --@.000 Ea 78.50 -- -- 78.50
1/2" hand drill --@.000 Ea 101.00 -- -- 101.00
3/4" heavy duty drill --@.000 Ea 157.00 -- -- 157.00
1/2" hammer drill --@.000 Ea 186.00 -- -- 186.00
5/8" hammer drill --@.000 Ea 289.00 -- -- 289.00

Fuel dispensers
Using small tools.
Gasoline pump st@5.93 Ea 2,250.00 207.10 1.66 2,458.76

Air compressors, electric


Using small tools.
1-1/2 HP, 115v st@5.54 Ea 2,590.00 193.50 1.55 2,785.05
5 HP, 115v st@6.00 Ea 2,900.00 209.50 1.68 3,111.18
1-1/2 HP, 230v st@7.74 Ea 3,410.00 270.30 2.17 3,682.47
5 HP, 230v st@8.00 Ea 3,740.00 279.40 2.24 4,021.64
2015 Heavy Construction Estimator, All Rights Reserved Page 440 (part 2)

Hydraulic lifts
Add the excavation cost, using small tools.
8,000 lbs. (3,629 kg) st@188. Ea 6,710.00 6,565.00 52.60 13,327.60
11,000 lbs. (4,990 kg) st@188. Ea 8,210.00 6,565.00 52.60 14,827.60
24,000 lbs. (10,886 kg) st@188. Ea 15,100.00 6,565.00 52.60 21,717.60

Band saws
Using small tools.
10" (25cm) sq@.714 Ea 2,150.00 24.98 0.16 2,175.14
14" (36cm) sq@.850 Ea 3,120.00 29.73 0.19 3,149.92
2015 Heavy Construction Estimator, All Rights Reserved Page 441

Motorized shaper sq@.769 Ea 650.00 26.90 0.17 677.07


Motorized lathe sq@.833 Ea 790.00 29.14 0.18 819.32

Bench saws
Using small tools.
9" (23cm) sq@.667 Ea 1,430.00 23.33 0.15 1,453.48
10" (25cm) sr@.710 Ea 2,120.00 24.84 0.16 2,145.00
12" (31cm) sr@.910 Ea 2,310.00 31.83 0.21 2,342.04

Electric bench grinders


Using small tools.
1/3 HP sq@.500 Ea 246.00 17.49 0.11 263.60
1/2 HP sq@.526 Ea 323.00 18.40 0.12 341.52
3/4 HP sq@.556 Ea 397.00 19.45 0.12 416.57

CSI 11-610, Steel laboratory equipment

Steel laboratory cabinets - Base cabinets


Using small tools.
With doors am@1.11 LF 182.00 48.75 0.61 231.36
With drawers am@1.11 LF 340.00 48.75 0.61 389.36

Steel laboratory cabinets - Tall storage cabinets


Using small tools.
Open (no door) am@1.00 LF 293.00 43.92 0.55 337.47
With doors am@1.00 LF 471.00 43.92 0.55 515.47

Steel laboratory cabinets - Wall cabinets, 12" x 31"


Using small tools.
Open (no door) am@1.33 LF 122.00 58.41 0.73 181.14
With glass door am@1.33 LF 189.00 58.41 0.73 248.14

Counter tops for steel laboratory cabinets


Using small tools.
Minimum am@.120 SF 22.20 5.27 0.07 27.54
Maximum am@.120 SF 62.20 5.27 0.07 67.54
Stainless steel am@.120 SF 77.80 5.27 0.07 83.14

Steel laboratory tables


Using small tools.
Open underneath am@.667 LF 97.90 29.29 0.37 127.56
Doors underneath am@.800 LF 200.00 35.14 0.44 235.58

CSI 11-620, Medical laboratory equipment

Medical laboratory equipment


Using a 3/4-ton pickup truck and small tools.
Analyzer, CLO2/TCO2 compact unit,
tabletop. sz@1.20 Ea 4,900.00 42.06 2.11 4,944.17
Analyzer, bun/glucose,
with filter photometer system sz@1.60 Ea 8,490.00 56.08 2.82 8,548.90
Analyzer, blood gas 6 functions sz@1.60 Ea 9,350.00 56.08 2.82 9,408.90
Test tube bath for heating with metal rack, electric with insulated tanks,
countertop lj@.833 Ea 1,090.00 41.73 0.32 1,132.05
Hot plate, with ring heater and temperature regulator, countertop, cast aluminum
plate with monel encased ll@1.30 Ea 199.00 52.95 -- 251.95
2015 Heavy Construction Estimator, All Rights Reserved Page 441 (part 2)

Hot plate, stirrer, countertop, device for heat and stirring fluid materials, utilizing
magnetic stirring bar devices ll@1.30 Ea 331.00 52.95 -- 383.95
Anaerobic chamber, 23" x 23" x 36" lj@4.44 Ea 5,010.00 222.40 1.73 5,234.13
Incubator, dry heat with 5.5 CF cap., with
various size heating blocks lj@1.33 Ea 269.00 66.63 0.52 336.15
Bacteria incinerator, tabletop, for sterilizing inoculating loops and
needles with infrared heat sz@.160 Ea 319.00 5.61 0.28 324.89
Serum protein meter, microscope, for direct refractometric measurement of serum protein,
urine specific gravity, etc. sz@.240 Ea 488.00 8.41 0.42 496.83
Meter, pH analog, general purpose sz@.267 Ea 278.00 9.36 0.47 287.83
Refrigerator, blood bank,
under-counter type 153 liters sz@4.00 Ea 3,740.00 140.20 7.04 3,887.24
Refrigerator,
5.4 CF, under-counter type sz@4.00 Ea 1,190.00 140.20 7.04 1,337.24
Refrigerator/freezer,
4.4 CF, under-counter type sz@4.00 Ea 1,190.00 140.20 7.04 1,337.24
2015 Heavy Construction Estimator, All Rights Reserved Page 442

Medical laboratory equipment


Using small tools.
Impulse sealer, 20" x 12" x 4",
free standing bench mounted ui@.667 Ea 1,380.00 23.33 0.13 1,403.46
Electric timer, 1 to 60 minimum, benchtop,
bench or wall mounted lj@.500 Ea 429.00 25.05 0.20 454.25
Automatic coagulation timer, benchtop, for prothrombin time,
countertop unit lj@2.86 Ea 4,280.00 143.30 1.12 4,424.42
Glassware washer/dryer, electric, under-counter with adjustable
thermostatic control ne@12.5 Ea 5,630.00 653.80 7.13 6,290.93
Coulter counter desk,
355 x 405 x 480 mm high a2@27.5 Ea 35.00 1,248.00 15.70 1,298.70

CSI 11-621, Laboratory instruments

Laboratory instruments
Using a 3/4-ton pickup truck and small tools.
4.5 lbs. capacity tabletop balance,
with torsion suspension sz@1.33 Ea 951.00 46.62 2.34 999.96
2 pair weight loading balance, for tabletop
with top loading instrument sz@2.00 Ea 193.00 70.10 3.52 266.62
Microscope, binocular head at 30", for tabletop
with base illuminator lj@1.00 Ea 1,390.00 50.10 0.39 1,440.49

Laboratory centrifuge
Using a 3/4-ton pickup truck and small tools.
Centrifuge,
17" x 14" x 21" tabletop sz@.800 Ea 2,340.00 28.04 1.41 2,369.45
Clinical centrifuge, 3 speed, with 4 trunnions and 4 mode push-button control,
for serum separation devices sz@.480 Ea 569.00 16.82 0.84 586.66

Laboratory spectrophotometer
Using small tools.
Flame spectrophotometer,
without printer, for desktop st@22.2 Ea 12,200.00 775.20 6.22 12,981.42

CSI 11-630, Laundry equipment

Laundry equipment - Washer extractors


Heavy duty, high capacity equipment, using small tools.
135 lbs. 240V nj@8.00 Ea 57,500.00 329.80 5.52 57,835.32
135 lbs. 240V, pass through nj@8.00 Ea 66,000.00 329.80 5.52 66,335.32
200 lbs. 240V nj@8.00 Ea 63,900.00 329.80 5.52 64,235.32
200 lbs. 240V, pass through nj@8.00 Ea 73,100.00 329.80 5.52 73,435.32
110 lbs. 240V, with dryer nj@8.00 Ea 11,600.00 329.80 5.52 11,935.32
Hand operated press nj@12.0 Ea 6,360.00 494.60 8.28 6,862.88
Mushroom press, 115V nj@12.0 Ea 5,040.00 494.60 8.28 5,542.88

Laundry equipment - Spreader feeders


Heavy duty, high capacity equipment, using small tools.
2 station 240V nj@8.00 Ea 73,800.00 329.80 5.52 74,135.32
4 station 240V nj@16.0 Ea 83,600.00 659.50 11.00 84,270.50

Laundry equipment - Laundry delivery carts


Using small tools.
12 bushel capacity sw@.100 Ea 483.00 3.51 0.07 486.58
2015 Heavy Construction Estimator, All Rights Reserved Page 442 (part 2)

16 bushel capacity sw@.100 Ea 582.00 3.51 0.07 585.58


18 bushel capacity sw@.100 Ea 625.00 3.51 0.07 628.58
30 bushel capacity sw@.150 Ea 866.00 5.26 0.10 871.36
40 bushel capacity sw@.150 Ea 1,050.00 5.26 0.10 1,055.36

Laundry equipment - Hospital linen washers


Heavy duty, high capacity equipment, using small tools.
30 bed capacity sw@.960 Ea 2,350.00 33.65 0.62 2,384.27
24 bed capacity sw@.960 Ea 1,640.00 33.65 0.62 1,674.27

Laundry equipment, high capacity - Pressers


Using small tools.
Air operated nj@6.80 Ea 5,090.00 280.30 4.69 5,374.99
Hand operated nj@6.80 Ea 4,260.00 280.30 4.69 4,544.99
Extractors nj@6.80 Ea 5,900.00 280.30 4.69 6,184.99
Ironer 48" (122cm) 240V nj@3.40 Ea 19,400.00 140.10 2.35 19,542.45
Coin operated dry cleaner, 20 lbs. nj@6.80 Ea 21,700.00 280.30 4.69 21,984.99

Laundry equipment, high capacity - Coin operated washers


Using small tools.
10 lbs. (4.6kg) capacity nj@3.40 Ea 1,560.00 140.10 2.35 1,702.45
20 lbs. (9kg) capacity nj@3.40 Ea 3,080.00 140.10 2.35 3,222.45
30 lbs. (13kg) capacity nj@3.40 Ea 4,620.00 140.10 2.35 4,762.45
2015 Heavy Construction Estimator, All Rights Reserved Page 443

Laundry equipment, high capacity - Coin operated drier


Using small tools.
Dryer, clothes, electric s4@1.50 Ea 1,110.00 52.58 4.70 1,167.28

Laundry storage rack


Using a 24,500 lb. 2-axle truck, with a 8' by 16" flat bed, a 4-ton hoist, and small tools.
Clean laundry motorized storage rack, 216 coats and 36 hat capacity, electric foot
operated 10’8" x 4’4" x 6'1" s4@30.0 Ea 4,380.00 1,052.00 93.90 5,525.90

Laundry ticket rack


Using small tools.
Laundry ticket register rack,
5-1/2" x 8-1/2" sz@.039 Ea 27.60 1.37 0.07 29.04

CSI 11-701, Medical equipment

Medical equipment - Buckets


Using small tools.
12 gauge stainless steel kick bucket, 12 quart, with removable bucket in a balanced tip-resistant
stainless steel frame with sanitized bumper ring
and four 2" steel casters sz@.240 Ea 311.00 8.41 0.42 319.83

Medical equipment - Carts


Using small tools.
Supply cart, stainless steel, 400 lbs. capacity, with swivel casters, 17" x 28" x 33", 4" deep top pan,
wrap around bumper and 4" to 6" polished
aluminum die cast casters sz@1.33 Ea 396.00 46.62 2.34 444.96
Portable wire cart, chrome plated, stainless steel tubing frame, 18" x 36" x 69", bearing three guard
swivel casters, 3", chrome plated wire baskets, 24: x 14", one at
6" depth and one at 17" depth sz@1.33 Ea 290.00 46.62 2.34 338.96
Utility cart, 3-tier, stainless steel, 400 lbs. capacity, 22" x 39" x 37", 16 gauge legs with 4"
casters and push bar bumper sz@1.33 Ea 1,230.00 46.62 2.34 1,278.96

Medical equipment - Holders


Using small tools.
Chart holder, 250 page, 3 ring, with sheet cap,
9" x 13" x 2" sz@.086 Ea 6.41 3.01 0.15 9.57
Patient ID holder, plastic, tiered with 20 slots,
12" x 15" x 5" sz@.300 Ea 7.56 10.52 0.53 18.61

Medical equipment - Lights


Using small tools.
Examination light, floor model, on casters with 15" reflector,
center post in rotary arm sz@1.60 Ea 1,800.00 56.08 2.82 1,858.90

Medical equipment - Flow meters


Using small tools.
Air flow meter with adapters, for general hospital use, with control valve, gauge, and facility to
connect with other equipment ne@.556 Ea 79.20 29.08 0.32 108.60
Oxygen flowmeter, with adapters,
needle flow control valve ne@.417 Ea 89.80 21.81 0.24 111.85

Medical equipment - Flow detectors


Using a 3/4-ton pickup truck and small tools.
Flow detector, ultrasonic Doppler, portable, hand held, battery operated, device for audio monitoring the
fetal heart rate,
2015 Heavy Construction Estimator, All Rights Reserved Page 443 (part 2)

includes accessories sz@.533 Ea 379.00 18.68 0.94 398.62

Medical equipment - Chart racks


Using small tools.
Revolving chart rack, 40 charts, two rows high, tubular steel on ball bearing swivel
casters with desk type top sz@1.60 Ea 591.00 56.08 2.82 649.90

Medical equipment - Hospital stands


Using small tools.
Mayo stand, push button adjust, stainless steel, with tray, 16" x 21", friction lock
type unit with fork type base sz@.800 Ea 1,550.00 28.04 1.41 1,579.45
Mayo stand, foot operated sz@.800 Ea 1,840.00 28.04 1.41 1,869.45
Solution stand, with 14" stainless steel basin, 15" x 14" x 33", basin brackets, four 2" double
ball bearing swivel casters sz@.960 Ea 831.00 33.65 1.69 866.34

Medical equipment - Scales


Using small tools.
Dual reading scale, with height rod, pound/metric platform 10" x 14",
348 lbs. capacity sz@2.00 Ea 224.00 70.10 3.52 297.62

Miscellaneous hospital equipment


Using small tools.
Cervical traction unit, over-door, including 12" spreader
bar and 20 lbs. weight sz@2.00 Ea 97.20 70.10 3.52 170.82
Syringe disposal unit, wall unit, tamper-resistant and autoclavable,
4" x 4" x 5 " sz@.069 Ea 103.00 2.42 0.12 105.54
Waste receptacle, stainless steel 20 quart capacity, step-on action, 12" x 12" x 18", rubberized lid
bumper,
20 quart capacity sz@.300 Ea 458.00 10.52 0.53 469.05

CSI 11-702, Hospital cardiac care equipment

Hospital cardiac care equipment - Carts


Using small tools.
Cardiac crash cart with monitor, defibrillation or synchronous cardioversion, 36" x 22" x 39" high,
including accessories lk@25.0 Ea 1,250.00 1,253.00 4.75 2,507.75

Hospital cardiac care equipment - EKG systems


Using a 3/4-ton pickup truck and small tools.
3-channel EKG system, aluminum frame, with chart mounted monitoring device, 39" x 21" x 16",
including accessories sz@6.00 Ea 3,990.00 210.30 10.60 4,210.90
2015 Heavy Construction Estimator, All Rights Reserved Page 444

Hospital cardiac care equipment - Treadmills


Using small tools.
Portable with remote control, aluminum frame,
0 to 7 MPH speed lk@25.0 Ea 2,910.00 1,253.00 4.75 4,167.75

CSI 11-703, Hospital medication equipment

Medicine carts
Using a 3/4-ton pickup truck and small tools.
Medicine cart, stainless steel, 31" x 22" x 40", with double drawer and 2 quart pitcher,
with all accessories sz@1.33 Ea 1,830.00 46.62 2.34 1,878.96

Medicine preparation centers


Using small tools.
Stainless steel medicine preparation center, 20" deep x 80" high, stationary, nonremovable base, sink,
hot/cold water,
electric light switch, etc. am@6.90 Ea 612.00 303.00 3.80 918.80

CSI 11-704, Optical care equipment

Optical care equipment


Using a 3/4-ton pickup truck and small tools.
Examination chair and stand sz@6.00 Ea 26,800.00 210.30 10.60 27,020.90
Chart, amsler bookform sz@.030 Ea 56.70 1.05 0.05 57.80
Drum, opticokinetic sz@.057 Ea 88.70 2.00 0.10 90.80
Exophthalmometer sz@.057 Ea 17.70 2.00 0.10 19.80
Gonioscope sz@.057 Ea 879.00 2.00 0.10 881.10
Hyfector, desk mounted, with handle and needle,
surgical unit sz@.060 Ea 567.00 2.10 0.11 569.21
Light, muscle wall sz@.060 Ea 129.00 2.10 0.11 131.21
Desk mounted slit lamp with microscope
and inclined eyetubes sz@2.00 Ea 140.00 70.10 3.52 213.62
Hand held magnifier light, with 3X ground and polished lens,
white fluorescent light sz@.060 Ea 103.00 2.10 0.11 105.21
Ultramatic phoropter sz@.800 Ea 3,120.00 28.04 1.41 3,149.45
1 meter compact screen tangent sz@.308 Ea 67.40 10.80 0.54 78.74
Anodized aluminum trial set,
color coded sz@.800 Ea 1,320.00 28.04 1.41 1,349.45
Desk mounted vision tester sz@3.00 Ea 56.00 105.20 5.28 166.48

CSI 11-705, Physical therapy equipment

Paraffin baths
Using small tools.
15" x 7" x 27" x 10", 115V for hand and foot,
mobile a2@7.33 Ea 478.00 332.70 4.18 814.88

Physical therapy equipment


Using a 3/4-ton pickup truck and small tools.
Hydrotherapy adjustable chair,
with mobile whirlpool bath sz@.300 Ea 63.70 10.52 0.53 74.75
Diathermy, short-wave and portable sz@1.00 Ea 2,330.00 35.05 1.76 2,366.81
Exercise bike, 35" x 15" portable sz@.800 Ea 330.00 28.04 1.41 359.45
Hydrocollator, 129" x 90" x 160",
4 pack portable sz@.333 Ea 486.00 11.67 0.59 498.26
Lamp, infrared
2015 Heavy Construction Estimator, All Rights Reserved Page 444 (part 2)

with 3 heat variable control lj@.667 Ea 960.00 33.42 0.26 993.68


Lamp, tubular ultra violet with 425 watts,
base mounted with casters lj@.667 Ea 590.00 33.42 0.26 623.68

Physical therapy equipment


Using a 3/4-ton pickup truck and small tools.
Mirror, posture type 1 section, 27" wide
x 72" high mounted on casters sz@.571 Ea 592.00 20.01 1.00 613.01
Parallel bars, 12' (3.7m) long, portable,
adjustable with platform sz@2.67 Ea 979.00 93.58 4.70 1,077.28
Exercise mat, 4' wide x 10' long x 1"deep, urethane foam, nylon with handles, side walls, heavy duty
nylon stitching,
etc. sz@.400 Ea 203.00 14.02 0.70 217.72
Wall pulley,
duplex and wall mounted sz@6.86 Ea 1,840.00 240.40 12.10 2,092.50
Crutch rack,
66" x 16" x 13" wall mounted sz@2.40 Ea 297.00 84.12 4.22 385.34

Physical therapy equipment


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
Prefabricated physical therapy room, 72" x 76" x 78" high inside, single wall
construction and soundproof s4@60.0 Ea 2,760.00 2,103.00 188.00 5,051.00

Sandbag sets
Using a 3/4-ton pickup truck and small tools.
With Velcro straps, saddle bag type sz@.300 Ea 239.00 10.52 0.53 250.05

Whirlpools
Using small tools.
Whirlpool low-boy, mobile stainless steel, 18" deep x 24" wide x 60" long,
with accessories n8@5.00 Ea 1,140.00 254.50 3.00 1,397.50
Whirlpool (arm, leg and hip), stainless steel, 28" deep x 42" long x 20" wide with accessories,
65 gallon capacity n8@5.00 Ea 1,010.00 254.50 3.00 1,267.50

Dumbbell racks
Using a 3/4-ton pickup truck and small tools.
Wagon, dumbbell storage, 46"
x 25" x 41" size dumbbells sz@1.00 Ea 404.00 35.05 1.76 440.81
2015 Heavy Construction Estimator, All Rights Reserved Page 445

CSI 11-706, Radiology equipment

Radiology generators
Using a 40-ton hydraulic crane with 84’ boom and small tools.
Radiology generator, 3 phase 12 pulse,
480V for two X-ray tubes lr@118. Ea 139,000.00 5,904.00 362.00145,266.00
Radiology generator, 3 phase 12 pulse, 480V for two X-ray tubes,1 per table, over table .02" to .05" in
focal spot X-ray tube and
one pair high tension cables lr@138. Ea 160,000.00 6,904.00 424.00167,328.00

Radiology equipment
Using a line truck with aerial platform and small tools.
Radiograph and fluoroscopic table, motor operated with 15 to 90 degree vertical tilting,
Trendelenburg lt@160. Ea 182,000.00 7,946.00 1,780.00191,726.00
Radiographic table, motor driven, with 12 to 90 degree vertical tilting,
Trendelenburg lt@80.0 Ea 42,900.00 3,973.00 892.00 47,765.00
Fluoroscope image/TV system, dual mode 5"/9" high performance image intensifier system with iodide
input
screens and collimator lens lt@200. Ea 64,400.00 9,932.00 2,230.00 76,562.00

Radiology processors
Using small tools.
Developing processor, complete, 385 sheets of film per hour, includes replenisher pumps, developer,
fixer and water filter unit,
30" x 48-1/2" x 37-1/2" ne@25.0 Ea 26,400.00 1,308.00 14.30 27,722.30

Radiology cabinets
Using a 3/4-ton pickup truck and small tools.
Cassette transfer cabinet, 4 door, 22" x 22" x 22" with 1/16" lead lining, components 18" x 8" x 18"
each, lined with grooved rubber pad,
including manual interlock sz@2.00 Ea 2,650.00 70.10 3.52 2,723.62

Radiology storage cabinets


Using small tools.
Base storage cabinet, sectional, carbon steel or plastic laminate particle board with doors and counter
top with backsplash,
24" deep x 35" high am@1.13 LF 1,020.00 49.63 0.62 1,070.25
Wall storage cabinet with door, carbon steel or plastic
laminate particle board am@1.53 LF 1,240.00 67.20 0.84 1,308.04
Bucky wall stand, vertical, floor/wall mounted with cassette tray 30" deep x 16" high, adjustable
controls,
counter balanced am@.939 LF 12,400.00 41.24 0.52 12,441.76
Ceiling tube mount, 59" deep am@.084 SF 31,900.00 3.69 0.05 31,903.74

CSI 11-710, Medical sterilizing equipment

Medical sterilizing equipment - Steam sterilizers


Using small tools.
With rack and tray, size 13"
x 15" x 9" 120V with controls sq@2.50 Ea 2,670.00 87.45 0.55 2,758.00
With rack and tray sq@2.00 Ea 1,750.00 69.96 0.44 1,820.40
Fast drying with
time and temperature control sq@2.50 Ea 1,860.00 87.45 0.55 1,948.00
Compact unit sq@2.50 Ea 1,310.00 87.45 0.55 1,398.00
Semi-automatic ne@5.00 Ea 1,910.00 261.50 2.85 2,174.35
Floor load 1 door ne@8.33 Ea 67,500.00 435.70 4.75 67,940.45
2015 Heavy Construction Estimator, All Rights Reserved Page 445 (part 2)

Floor load 2 door ne@10.0 Ea 103,000.00 523.00 5.70103,528.70


Utensil washer ne@6.67 Ea 19,900.00 348.80 3.80 20,252.60
Auto wash and sterilizer ne@20.0 Ea 17,100.00 1,046.00 11.40 18,157.40
General purpose one door, including steam generator and accessories,
chamber size 73" x 33" x 26" ne@35.7 Ea 22,900.00 1,867.00 20.30 24,787.30
Steam generator,
electric, 10 KW to 180 KW ne@20.0 Ea 39,700.00 1,046.00 11.40 40,757.40

Medical sterilizing equipment - Surgical scrub


Using small tools.
Sink, single ne@3.33 Ea 1,670.00 174.20 1.90 1,846.10
Sink, triple ne@3.33 Ea 3,350.00 174.20 1.90 3,526.10

Medical sterilizing equipment - Gas sterilizers.


Using small tools.
Auto, bench mounted,
chamber size 12" x 12" x 24" ne@8.93 Ea 29,200.00 467.00 5.09 29,672.09

CSI 11-720, Surgical equipment

Surgical equipment - Surgical tables


Using small tools.
Standard qa@14.3 Ea 78,300.00 781.10 8.44 79,089.54
Deluxe qa@20.0 Ea 93,900.00 1,092.00 11.80 95,003.80

Surgical equipment - Lights


Using small tools.
General lk@66.7 Ea 18,600.00 3,342.00 12.70 21,954.70
5 lamp 22" diameter, ceiling lk@15.4 Ea 56,900.00 771.50 2.93 57,674.43
8 lamp 30" diameter, ceiling lk@18.2 Ea 68,200.00 911.80 3.46 69,115.26

Surgical equipment - Water stills


Using small tools.
H2O, 4 liters per hour nb@3.33 Ea 1,460.00 174.20 1.90 1,636.10
H2O, 8 liters per hour nb@3.33 Ea 2,280.00 174.20 1.90 2,456.10
H2O, 19 liters per hour,
wall mounted ne@7.58 Ea 8,270.00 396.40 4.32 8,670.72
Gas aerator, bench mounted, 26" x 25",
chamber 16" x 24" x 18" ne@16.7 Ea 1,540.00 873.40 9.52 2,422.92
2015 Heavy Construction Estimator, All Rights Reserved Page 446

Surgical equipment - Water cleaners


Using small tools.
Ultrasonic cleaner a2@9.17 Ea 873.00 416.20 5.23 1,294.43
H2O deionizer,10 gallons per minute,
floor mounted a2@5.50 Ea 5,080.00 249.60 3.14 5,332.74

CSI 11-730, X-ray equipment

X-ray equipment
Using small tools.
Mobile unit, minimum st@13.0 Ea 5,620.00 454.00 3.64 6,077.64
Mobile unit, maximum st@26.0 Ea 27,100.00 907.90 7.28 28,015.18

X-ray viewers
Using small tools.
Film viewer, single qa@1.43 Ea 192.00 78.11 0.84 270.95
Film viewer, 4 bank qa@5.00 Ea 825.00 273.10 2.95 1,101.05

CSI 11-740, Autopsy equipment

Autopsy tables
Using small tools.
Standard table nb@10.0 Ea 4,080.00 523.00 5.70 4,608.70
Deluxe table nb@10.0 Ea 8,160.00 523.00 5.70 8,688.70

CSI 11-750, Patient care equipment

Hospital patient care equipment - Incubators


Using small tools.
Incubator, 15 CF lj@4.35 Ea 2,680.00 217.90 1.70 2,899.60
Incubator, 29 CF lj@6.67 Ea 10,100.00 334.20 2.60 10,436.80
Incubator, infant, intensive care unit with accessories,
34" x 18" x 16" lj@5.00 Ea 9,390.00 250.50 1.95 9,642.45

Hospital patient care equipment - Beds


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
Youth bed, 80" long x 36" wide, with IV pole positions
including accessories s4@6.40 Ea 1,730.00 224.30 20.00 1,974.30
Stretcher bed, 86" long x 35" wide, with blanket shelf, full circumference rubber
bumper including accessories s4@6.40 Ea 4,590.00 224.30 20.00 4,834.30

Hospital patient care equipment - Headwalls


Using small tools.
Aluminum , with back
frame and console assembly st@10.4 Ea 1,740.00 363.20 2.91 2,106.11

CSI 11-760, Dental care equipment

Dental chairs
Using small tools.
Complete chair for dental
examination and treatment sz@12.0 Ea 31,200.00 420.60 21.10 31,641.70

Dental drill consoles


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 446 (part 2)

Console with accessories ui@30.3 Ea 4,410.00 1,060.00 6.06 5,476.06

Specialized dental equipment


Using a 3/4-ton pickup truck and small tools.
Amalgamator, can triturate all alloys, composites,
silicates, and cements sz@1.20 Ea 501.00 42.06 2.11 545.17
Lath finish polish,
with 1/4 HP two-speed sz@.800 Ea 453.00 28.04 1.41 482.45
Lathe, 1/4 HP, heavy duty,
for grinding and polishing sz@1.60 Ea 453.00 56.08 2.82 511.90
Model trimmer,
1/2 HP, bench mounted sz@1.00 Ea 641.00 35.05 1.76 677.81
Wall mounted delivery system, auto control of 3 to 5 hand pieces,
13,0000 RPM sz@1.00 Ea 4,160.00 35.05 1.76 4,196.81
Sandblaster, 110V, bench mounted,
9" x 9" x 9" air operated sz@1.33 Ea 413.00 46.62 2.34 461.96
Ultrasonic cleaner, desk mounted, with heater and timer,
plastic sz@2.18 Ea 724.00 76.41 3.84 804.25
Curing unit, bench mounted ,
17" x 17" x 16" sz@4.00 Ea 1,980.00 140.20 7.04 2,127.24
Dental equipment, oral evacuation system, dual 2 HP pump,
16" x 24" x 24" sz@3.00 Ea 6,700.00 105.20 5.28 6,810.48
Sterilizer, 2 trays, with chamber 11" wide x 5" high x 7" deep, with safety feature
arrangements and accessories sz@1.33 Ea 828.00 46.62 2.34 876.96

Dental patient lighting


Using small tools.
Floor or ceiling mounted ui@8.33 Ea 4,880.00 291.40 1.67 5,173.07
Fixed ceiling mounted lj@2.50 Ea 6,070.00 125.30 0.98 6,196.28

Dental X-ray units


Using small tools.
Dental X-ray unit, mobile ui@5.26 Ea 5,830.00 184.00 1.05 6,015.05
Dental X-ray unit,
76", wall mounted ui@16.7 Ea 11,000.00 584.20 3.34 11,587.54

Remote dental X-ray units


Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
72", with remote,
including all accessories s4@35.3 Ea 8,500.00 1,237.00 110.00 9,847.00
2015 Heavy Construction Estimator, All Rights Reserved Page 447

Dental X-ray illuminators


Using small tools.
Dental X-ray unit, illuminator for desk or wall,
5" x 14" screen ui@.586 Ea 524.00 20.50 0.12 544.62

Dental X-ray accessories


Using a 3/4-ton pickup truck and small tools.
X-ray film processor,
desk top with daylight loader sz@20.0 Ea 8,960.00 701.00 35.20 9,696.20
X-ray unit shield, 33" x 74" x 7",
lead lined, portable sz@1.60 Ea 8,330.00 56.08 2.82 8,388.90

Other dental equipment.


Using a 3/4-ton pickup truck and small tools.
Chair, X-ray utility, electric sz@.133 Ea 25,700.00 4.66 0.23 25,704.89
Motors, 3 section arm with foot rheostat at 40000 RPM,
slip on wrist joint sz@.800 Ea 1,090.00 28.04 1.41 1,119.45
Auto glazing furnace, 110V, 6" wide x 11" high x 6" diameter, including all features of maximum
temperature,
automatic controls, etc. sz@1.20 Ea 1,190.00 42.06 2.11 1,234.17
Dental cabinet, 6" x 4" x 7", with three large drawers on left side, large fold-in door, one pull out shelf,
and two
large drawers on right side sz@1.20 Ea 3,810.00 42.06 2.11 3,854.17

CSI 11-770, General medical equipment

General medical equipment - Audiometers


Using small tools.
Dual channel audiometer sz@.960 Ea 5,830.00 33.65 1.69 5,865.34
Acoustic impedance meter for calibrating audiometers,
including accessories sz@.960 Ea 849.00 33.65 1.69 884.34

General medical equipment - Cabinets


Using small tools.
Stainless steel cabinet, 46" x 21" x 28", for ear/nose/throat, floor mounted with casters, electric panel
for transilluminator, suction, and pressure pumps, otoscope holder, etc.,
including all accessories st@32.5 Ea 4,860.00 1,135.00 9.10 6,004.10

General medical equipment - Illuminators


Using small tools.
Single panel illuminator surface mounted
and non-explosion proof lp@.666 Ea 152.00 33.03 0.13 185.16
Dual panel illuminator lp@.981 Ea 284.00 48.66 0.20 332.86
4-panel illuminator lp@1.17 Ea 580.00 58.03 0.23 638.26

General medical equipment - Systems tools


Using a 3/4-ton pickup truck and small tools.
Biomedical engineer equipment storage consisting of oscilloscope storage, dual power supply, function
generator, universal counter, multimeter digital power module, portable oscilloscope, digital volt meter,
and
analyzer safety leakage test sz@26.7 Ea 12,200.00 935.80 47.00 13,182.80

CSI 11-780, Medical furnishings

Medical chairs
2015 Heavy Construction Estimator, All Rights Reserved Page 447 (part 2)

Using small tools.


Ear/nose/throat treatment chair, maxi-recliner, 6
position with swing-away tray sz@2.00 Ea 6,060.00 70.10 3.52 6,133.62
Adult wheelchair,
self-propelled, collapsible sz@.600 Ea 3,580.00 21.03 1.06 3,602.09

Medical stools
Using small tools.
Examination room stool, pneumatic with backrest and adjustment from 19" to 31",
hooded swivel casters sz@.200 Ea 1,060.00 7.01 0.35 1,067.36
Ear/nose/throat physician stool, square seat with backrest and
adjustment from 18" to 24" sz@.200 Ea 1,120.00 7.01 0.35 1,127.36
Platform stool, stackable sz@.150 Ea 494.00 5.26 0.26 499.52
Revolving stool with footrest with 3" thick seat cushion,
adj. sz@.200 Ea 945.00 7.01 0.35 952.36
Revolving stool with solid stainless steel seat, conductive rubber insert, 15" diameter seat,
adjustable from 19" to 31" sz@.200 Ea 878.00 7.01 0.35 885.36

Stretchers
Using a 24,500 lb. 2-axle truck, with a 8’ x 16’ flat bed, and a 4-ton hoist and small tools.
Emergency room and minor surgery stretcher, stainless steel top with 6 IV pole positions,
including accessories s4@6.40 Ea 11,400.00 224.30 20.00 11,644.30

Medical examination tables


Using small tools.
Electric, foot operated,
54" x 26-1/2" to 35-1/2" high s4@4.00 Ea 7,240.00 140.20 12.50 7,392.70
Hydraulic, foot operated, 75" x 24" x 19" to 38" high,
including accessories s4@6.00 Ea 7,880.00 210.30 18.80 8,109.10

CSI 11-790, Medical instruments

Cast cutting saws


Using small tools.
Hand saw with 11 liter canister vacuum and vacuum hose attachment,
four wheels sz@1.33 Ea 528.00 46.62 2.34 576.96

Medical equipment
Using small tools.
Headlight, halogen with headband, with wall mounted
transformer at 110V to 130V lk@.833 Ea 256.00 41.73 0.16 297.89
Otoscope/ophthalmoscope,
wall mounted lk@.833 Ea 444.00 41.73 0.16 485.89
Otoscope operating head, 3.5V lk@.833 Ea 72.00 41.73 0.16 113.89
Otoscope/ophthalmoscope set, portable
with rechargeable handle lk@.833 Ea 245.00 41.73 0.16 286.89
2015 Heavy Construction Estimator, All Rights Reserved Page 448

Medical equipment
Using small tools.
Resuscitation bag, adults,
hand operated and portable sz@.069 Ea 125.00 2.42 0.12 127.54
Resuscitation bag, pediatrics,
hand operated and portable sz@.069 Ea 125.00 2.42 0.12 127.54
Sphygmomanometer, wall mercurial, Velcro
cuff with 8' coiling tubing sz@1.00 Ea 78.00 35.05 1.76 114.81
Sphygmomanometer, portable sz@.133 Ea 93.90 4.66 0.23 98.79
Spreader, cast with round guard,
hand held, 18" (46cm) long sz@.053 Ea 125.00 1.86 0.09 126.95
Suction set, dual-purpose with 128 oz. collection bottle, 115V, pump for use in patient drainage, after
thoracic or abdominal surgery, with
adjustable timer and pressure sz@2.00 Ea 1,570.00 70.10 3.52 1,643.62
Suction set, intermittent with 128 oz. collection bottle,
120V sz@1.33 Ea 657.00 46.62 2.34 705.96

CSI 11-861, Packaged incinerators

Packaged incinerators - Electric


Using small tools.
100 lbs. per hour minimum sw@24.0 Ea 13,100.00 841.20 15.60 13,956.80
100 lbs. per hour maximum sw@24.0 Ea 23,100.00 841.20 15.60 23,956.80
400 lbs. per hour minimum sw@48.0 Ea 34,500.00 1,682.00 31.20 36,213.20
400 lbs. per hour maximum sw@48.0 Ea 39,800.00 1,682.00 31.20 41,513.20
1000 lbs. per hour minimum sw@72.6 Ea 100,000.00 2,545.00 47.20102,592.20
1000 lbs. per hour maximum sw@72.6 Ea 159,000.00 2,545.00 47.20161,592.20

Packaged incinerators - Medical-waste


Using small tools.
25 lbs. per hour size 2'7" x 4'0" sw@48.0 Ea 22,300.00 1,682.00 31.20 24,013.20
50 lbs. per hour size 2'11" x 4'11" sw@48.0 Ea 26,400.00 1,682.00 31.20 28,113.20
75 lbs. per hour size 3'8" x 5'0" sw@95.8 Ea 35,800.00 3,358.00 62.30 39,220.30
100 lbs. hour size 3'8" x 6'0" sw@95.8 Ea 41,000.00 3,358.00 62.30 44,420.30

CSI 11-862, Waste compactors

Waste compactors - 110 volt


Using small tools.
Waste compactor,
110V at 75 lbs. per hour st@10.8 Ea 7,090.00 377.10 3.02 7,470.12
Waste compactor,
110V at 250 lbs. per hour st@23.6 Ea 8,500.00 824.10 6.61 9,330.71

Waste compactors - 230 volt


Using small tools.
Waste compactor, 230V at 600 lbs. per hour,
hand fed st@32.5 Ea 8,120.00 1,135.00 9.10 9,264.10
Waste compactor, 230V at 600 lbs. per hour,
chute fed st@43.3 Ea 8,880.00 1,512.00 12.10 10,404.10

Waste compactors - Heavy duty industrial


Using small tools.
Industrial waste compactor,
1 CY (.76m3) heavy duty st@28.9 Ea 8,120.00 1,009.00 8.09 9,137.09
Industrial waste compactor,
2015 Heavy Construction Estimator, All Rights Reserved Page 448 (part 2)

3 CY (2.3m3) heavy duty st@37.1 Ea 12,800.00 1,296.00 10.40 14,106.40


Industrial waste compactor,
5CY (3.8m3) heavy duty st@52.0 Ea 32,600.00 1,816.00 14.60 34,430.60

CSI 11-871, Loading dock levelers

Dock levelers - Hinged, for trucks, 10 ton capacity


Using small tools.
6'2" x 10'0" st@3.00 Ea 3,690.00 104.80 0.84 3,795.64
7' x 8' st@3.00 Ea 4,060.00 104.80 0.84 4,165.64

CSI 11-873, Portable platforms

Portable dock platforms


5000 lb. (2268kg) capacity, using small tools.
6' x 6' sr@2.25 Ea 9,600.00 78.71 0.52 9,679.23

CSI 11-874, Seals and shelters

Dock seals - For door perimeter


Using small tools.
Perimeter dock seal, 1’ x 1' vinyl al@.400 LF 49.70 17.57 0.21 67.48

Lights for loading dock


Using small tools.
Single arm, 24" (61cm) long lj@2.63 Ea 131.00 131.80 1.03 263.83
Double arm, 60" (152cm) long lj@2.63 Ea 172.00 131.80 1.03 304.83
2015 Heavy Construction Estimator, All Rights Reserved Page 449

Fabric enclosures for truck or train loading


Scissors arms, using small tools.
Minimum al@9.91 Ea 1,200.00 435.20 5.15 1,640.35
Maximum al@20.0 Ea 1,950.00 878.40 10.40 2,838.80

CSI 11-875, Dock bumpers

Dock bumpers - Rubber blocks


Using small tools.
10" x 14", 4-1/2" thick al@.248 Ea 77.40 10.89 0.13 88.42
10" x 14", 6" thick al@.299 Ea 105.00 13.13 0.16 118.29
10" x 24", 4-1/2" thick al@.269 Ea 89.80 11.81 0.14 101.75
10" x 36", 4-1/2" thick al@.416 Ea 106.00 18.27 0.22 124.49
10" x 36", 6" thick al@.499 Ea 153.00 21.92 0.26 175.18
12" x 36", 4-1/2" thick al@.432 Ea 132.00 18.97 0.22 151.19

Dock bumpers - Extruded rubber bumpers


Using small tools.
T-section, 22" x 22" x 3" thick al@.244 Ea 114.00 10.72 0.13 124.85

Dock bumpers - Molded rubber bumpers


Using small tools.
12" x 24" x 3" thick al@.500 Ea 89.40 21.96 0.26 111.62

Dock boards, heavy duty


Aluminum, 60" x 60", using small tools.
5000 lbs. (2268kg) capacity qb@6.00 Ea 930.00 327.70 3.48 1,261.18
9000 lbs. (4082kg) capacity qb@6.00 Ea 1,610.00 327.70 3.48 1,941.18
15000 lbs. (6804kg) capacity qb@6.00 Ea 1,850.00 327.70 3.48 2,181.18

CSI 11-910, Residential kitchen equipment

Free standing residential cooking ranges


Using small tools.
30" free standing with 1 oven sr@2.00 Ea 852.00 69.96 0.46 922.42
30" free standing with 2 ovens sr@2.00 Ea 1,120.00 69.96 0.46 1,190.42
21" free standing with 1 oven sr@2.00 Ea 794.00 69.96 0.46 864.42

Built-in residential cooking ranges


Using small tools.
30" built-in with 1 oven am@1.67 Ea 748.00 73.35 0.92 822.27
30" built-in with 2 ovens am@1.67 Ea 932.00 73.35 0.92 1,006.27
Counter top standard with 4 burners lj@.903 Ea 250.00 45.24 0.35 295.59
Counter top standard
with 4 burners and with grill lj@.903 Ea 315.00 45.24 0.35 360.59

Combination range, refrigerator, and sink


Using small tools.
30" (76cm) wide unit ne@5.00 Ea 2,250.00 261.50 2.85 2,514.35
60" (152cm) wide unit ne@7.14 Ea 3,510.00 373.40 4.07 3,887.47
72" (183cm) wide unit ne@8.33 Ea 3,740.00 435.70 4.75 4,180.45
48" (122cm) wide unit ne@5.00 Ea 3,290.00 261.50 2.85 3,554.35
48" (122cm) wide unit,
without range ne@4.17 Ea 3,160.00 218.10 2.38 3,380.48
2015 Heavy Construction Estimator, All Rights Reserved Page 449 (part 2)

Residential kitchen equipment


Using small tools.
4 to 1 trash compactor al@3.33 Ea 1,010.00 146.30 1.73 1,158.03
18 CF refrigerator with ice maker sr@5.00 Ea 1,050.00 174.90 1.15 1,226.05
Dishwasher, 2 cycles ne@4.00 Ea 362.00 209.20 2.28 573.48
Dishwasher, 7 cycles ne@4.00 Ea 718.00 209.20 2.28 929.48
2015 Heavy Construction Estimator, All Rights Reserved Page 450

Garbage disposer, 1/2 HP insulated ne@2.39 Ea 119.00 125.00 1.36 245.36


Range hood, 30" (76cm) wide a3@1.42 Ea 49.60 65.38 0.89 115.87
Range hood, 40" (106cm) wide a3@1.42 Ea 56.50 65.38 0.89 122.77
Ice maker, 30 lbs. per day nb@1.43 Ea 797.00 74.79 0.82 872.61
Ice maker, 50 lbs. per day nb@2.00 Ea 882.00 104.60 1.14 987.74

CSI 11-920, Residential washing equipment

Residential washer/dryers
Using small tools.
Washer, 4 cycle sr@5.00 Ea 350.00 174.90 1.15 526.05
Dryer, electric sr@5.00 Ea 286.00 174.90 1.15 462.05
Dryer, gas sr@5.00 Ea 315.00 174.90 1.15 491.05

Residential water softeners, automatic


Using small tools.
30 grains per gallon nc@4.00 Ea 1,780.00 196.70 2.24 1,978.94
70 grains per gallon nc@5.00 Ea 3,490.00 245.90 2.80 3,738.70

CSI 11-930, Residential environment equipment

Residential electric heaters, built-in


1,250 watt, ceiling type lj@3.33 Ea 188.00 166.80 1.30 356.10
1,250 watt, wall mounted lj@3.33 Ea 188.00 166.80 1.30 356.10
1,500 watt, wall type with blower lj@2.50 Ea 221.00 125.30 0.98 347.28
3,000 watt, wall type with blower lj@3.33 Ea 382.00 166.80 1.30 550.10

CSI 11-940, Access stairs

Folding access stairs, disappearing - Metal stairs and frame


Using small tools.
24" x 48" x 8' n3@2.33 Ea 1,430.00 99.16 1.44 1,530.60
24" x 48" x 9' n3@2.33 Ea 1,480.00 99.16 1.44 1,580.60
24" x 48" x 11' n3@2.33 Ea 1,480.00 99.16 1.44 1,580.60
24" x 48" x 12' n3@2.33 Ea 2,090.00 99.16 1.44 2,190.60
24" x 54" x 10' n3@2.33 Ea 1,530.00 99.16 1.44 1,630.60
24" x 54" x 11' n3@2.33 Ea 2,040.00 99.16 1.44 2,140.60
28" x 54" x 10' n3@2.33 Ea 1,530.00 99.16 1.44 1,630.60
28" x 54" x 11' n3@2.33 Ea 2,040.00 99.16 1.44 2,140.60

Folding access stairs, disappearing - Wood stairs and frame


Using small tools.
24" x 54" x 9' as@3.00 Ea 440.00 119.70 0.87 560.57
25" x 54" x 9' as@3.00 Ea 548.00 119.70 0.87 668.57
25" x 54" x 10' as@3.86 Ea 591.00 154.00 1.12 746.12

CSI 11-970, Stage equipment

Roll out stages, steel frame, wood floor


Using small tools.
Manual sr@.050 SF 45.30 1.75 0.01 47.06
Electric ll@.080 SF 48.90 3.26 -- 52.16

Portable stages
With steps, stock units, using small tools.
8" (21cm) high sr@.040 SF 14.10 1.40 0.01 15.51
2015 Heavy Construction Estimator, All Rights Reserved Page 450 (part 2)

18" (46cm) high sr@.040 SF 16.30 1.40 0.01 17.71


32" (81cm) high sr@.040 SF 17.90 1.40 0.01 19.31
48" (132cm) high sr@.040 SF 19.00 1.40 0.01 20.41
2015 Heavy Construction Estimator, All Rights Reserved Page 451

Telescoping stage platforms, aluminum


Aluminum, using small tools.
Straight, minimum sr@.133 SF 51.70 4.65 0.03 56.38
Straight, maximum sr@.133 SF 61.60 4.65 0.03 66.28
Pie shaped, minimum sr@.200 SF 59.10 7.00 0.05 66.15
Pie shaped, maximum sr@.200 SF 71.40 7.00 0.05 78.45

Band risers
Steel frame, plywood deck, using small tools.
Minimum sr@.100 SF 66.40 3.50 0.02 69.92
Maximum sr@.100 SF 78.10 3.50 0.02 81.62

Chairs for band risers, self storing


Using small tools.
Minimum sq@.111 Ea 154.00 3.88 0.02 157.90
Maximum sq@.111 Ea 229.00 3.88 0.02 232.90

Auditorium seating
Using small tools.
Fixed folding auditorium seats sq@.500 Ea 187.00 17.49 0.11 204.60

CSI 11-980, Rifle range equipment

600" USAR firing ranges


Using small tools.
3 position range au@26.0 Ea 16,300.00 1,069.00 8.06 17,377.06
4 position range au@40.0 Ea 20,600.00 1,644.00 12.40 22,256.40
5 position range au@45.0 Ea 24,900.00 1,850.00 14.00 26,764.00
6 position range au@47.0 Ea 29,100.00 1,932.00 14.60 31,046.60

CSI 11-990, Warehouse equipment

Warehouse scales, 8,000 lb. capacity, non-electric


Using small tools.
60" x 48" n6@45.0 Ea 7,400.00 2,290.00 27.00 9,717.00

==========================================================================
Furnishings
==========================================================================

CSI 12-500, Drapery

Drapery track - Traverse rods, basic


Wall or ceiling mounted metal track, using small tools.
30" to 50" extension as@.900 Ea 16.80 35.91 0.26 52.97
50" to 90" extension as@.900 Ea 25.60 35.91 0.26 61.77
84" to 156" extension as@1.00 Ea 33.20 39.90 0.29 73.39
136" to 250" extension as@1.00 Ea 60.80 39.90 0.29 100.99
165" to 312" extension as@1.13 Ea 59.70 45.09 0.33 105.12

Drapery track - Traverse rods with stationary curtain rod


Wall or ceiling mounted metal track, using small tools.
30" to 50" extension as@.900 Ea 25.20 35.91 0.26 61.37
50" to 90" extension as@.900 Ea 31.00 35.91 0.26 67.17
84" to 156" extension as@1.00 Ea 46.60 39.90 0.29 86.79
2015 Heavy Construction Estimator, All Rights Reserved Page 451 (part 2)

136" to 250" extension as@1.13 Ea 54.40 45.09 0.33 99.82

Drapery track - Double traverse rods


Wall or ceiling mounted metal track, using small tools.
30" to 50 " extension as@.900 Ea 39.80 35.91 0.26 75.97
50" to 90 " extension as@.900 Ea 57.10 35.91 0.26 93.27
84" to 156" extension as@1.00 Ea 76.90 39.90 0.29 117.09
136" to 250 " extension as@1.13 Ea 81.50 45.09 0.33 126.92

CSI 12-600, Blinds

Wall or ceiling mounted metal track, using small tools.


Venetian blinds, basic, using small tools.
Venetian Blinds, 1" slats an@.023 SF 4.06 1.01 0.03 5.10
Venetian Blinds, 2" slats an@.023 SF 5.52 1.01 0.03 6.56
2015 Heavy Construction Estimator, All Rights Reserved Page 452

CSI 12-700 Floor Mats

Using small tools.


Recessed Entry Mats, using small tools.
Recessed entrance mat,
3/8" thk, aluminum link an@.590 Ea 20.20 25.91 0.68 46.79
Recessed entrance mat,
3/8" thk, steel link an@.591 Ea 10.20 25.96 0.69 36.85

CSI 12-800 Landscape Partitions

Fabric Panels, Include S-hook, Using small tools.


Panels and Dividers, using small tools.
40" high, 24" - 60" wide,
NRC.95, STC 28, fabric an@.352 Ea 265.00 15.46 0.41 280.87
50" high, 24" - 60" wide,
NRC.95, STC 28, fabric an@.352 Ea 280.00 15.46 0.41 295.87
60" high, 24" - 60" wide,
NRC.95, STC 28, fabric an@.394 Ea 295.00 17.30 0.46 312.76
72" high, 24" - 60" wide,
NRC.95, STC 28, fabric an@.394 Ea 333.00 17.30 0.46 350.76
40" high, 24" - 60" wide, fabric an@.410 Ea 288.00 18.01 0.48 306.49
50" high, 24" - 60" wide, fabric an@.410 Ea 310.00 18.01 0.48 328.49
60" high, 24" - 60" wide, fabric an@.410 Ea 355.00 18.01 0.48 373.49
72" high, 24" - 60" wide, fabric an@.410 Ea 386.00 18.01 0.48 404.49

CSI 12-900 Furniture

Fabric Panels, Include S-hook, Using small tools.


Hardwood Edged Panels, Using small tools.
Furniture, installed, using small tools.
Dormitory, minimum,
rule of thumb, each student --@.000 Ea 2,010.00 -- -- 2,010.00
Dormitory, maximum,
rule of thumb, each student --@.000 Ea 3,800.00 -- -- 3,800.00
Hospital, minimum,
rule of thumb, each room --@.000 Ea 845.00 -- -- 845.00
Hospital, maximum,
rule of thumb, each room --@.000 Ea 1,580.00 -- -- 1,580.00
Hotel, minimum,
rule of thumb, each room --@.000 Ea 2,880.00 -- -- 2,880.00
Hotel, maximum,
rule of thumb, each room --@.000 Ea 8,100.00 -- -- 8,100.00
General office,
minimum, rule of thumb --@.000 Ea 3,540.00 -- -- 3,540.00
General office,
maximum, rule of thumb --@.000 Ea 6,580.00 -- -- 6,580.00

==========================================================================
Special construction
==========================================================================

CSI 13-150, Access and pedestal floors

Open access flooring - Panels, no covering included


Using small tools.
2’ x 2' sr@.020 SF 8.69 0.70 -- 9.39
2015 Heavy Construction Estimator, All Rights Reserved Page 452 (part 2)

2’ x 2', perforated sr@.020 SF 17.40 0.70 -- 18.10

Open access flooring - Pedestals


Using small tools.
6" (150mm) to 12" (31cm) high sr@.160 Ea 13.00 5.60 0.04 18.64

Open access flooring - Stringers


Using small tools.
2’ (.61m) sr@.070 LF 1.89 2.45 0.02 4.36
6' (1.83m) sr@.070 LF 1.83 2.45 0.02 4.30

Open access flooring - Accessories


Using small tools.
Ramp assembly sr@.080 SF 10.40 2.80 0.02 13.22
Elevated floor assembly sr@.070 SF 16.80 2.45 0.02 19.27
Handrail sr@.130 LF 30.60 4.55 0.03 35.18
Fascia plate sr@.140 LF 11.30 4.90 0.03 16.23
Add for carpet covering --@.000 SF 14.60 -- -- 14.60
Add for vinyl floor covering --@.000 SF 13.70 -- -- 13.70

CSI 13-162, Radio frequency shielding components

Floor radio frequency protection


Using two 200-amp trailer mounted welders and small tools.
14 gauge q3@.060 SF 1.29 2.95 0.48 4.72
11 gauge q3@.190 SF 1.43 9.35 1.53 12.31
2015 Heavy Construction Estimator, All Rights Reserved Page 453

Wall radio frequency protection


Using two 200-amp trailer mounted welders and small tools.
14 gauge q3@.140 SF 1.29 6.89 1.13 9.31
11 gauge q3@.190 SF 1.43 9.35 1.53 12.31
1/4" plate q3@.290 SF 1.63 14.27 2.34 18.24

Ceiling radio frequency protection


Using two 200-amp trailer mounted welders and small tools.
14 gauge q3@.140 SF 1.29 6.89 1.13 9.31

Modular radio frequency shielding panels


Including typical framing, using two 200-amp trailer mounted welders and small tools.
Walls and ceilings q3@.140 SF 4.89 6.89 1.13 12.91
Ceiling hangers q3@.570 Ea 3.82 28.06 4.60 36.48
Wall supports q3@.570 Ea 4.47 28.06 4.60 37.13

Radiation protection transition assemblies


Using two 200-amp trailer mounted welders and small tools.
11 gauge preformed angles q3@.020 LF 0.66 0.98 0.16 1.80
11 gauge galvanized
with steel bar support q3@.030 LF 0.30 1.48 0.24 2.02

Tubing sub frames for radiation protection


Using two 200-amp trailer mounted welders and small tools.
Single door q3@18.6 Ea 9.84 915.50 150.00 1,075.34
Double door q3@28.9 Ea 11.60 1,422.00 233.00 1,666.60

Door radiation protection


Using miscellaneous power tools and small tools.
Single door n4@38.1 Ea 583.00 1,657.00 25.10 2,265.10
Double door n4@57.1 Ea 1,370.00 2,483.00 37.70 3,890.70

Wave guide vents


Using miscellaneous power tools and small tools.
2" diameter n4@.480 Ea 0.54 20.88 0.32 21.74
12" diameter n4@1.90 Ea 1.63 82.63 1.25 85.51
12" x 6" n4@1.90 Ea 0.76 82.63 1.25 84.64
12" x 12" n4@1.90 Ea 1.14 82.63 1.25 85.02
15" x 15" n4@1.90 Ea 1.29 82.63 1.25 85.17
30" x 14" n4@2.86 Ea 2.25 124.40 1.89 128.54
48" x 15" n4@3.81 Ea 3.05 165.70 2.51 171.26
60" x 14" n4@3.81 Ea 3.05 165.70 2.51 171.26

Radio frequency filters


Using miscellaneous power tools and small tools.
2 x 30 amp n4@4.78 Ea 996.00 207.90 3.15 1,207.05
3 x 60 amp n4@4.78 Ea 1,490.00 207.90 3.15 1,701.05
6 x 10 amp n4@4.78 Ea 1,990.00 207.90 3.15 2,201.05
4 x 200 amp n4@4.78 Ea 11,300.00 207.90 3.15 11,511.05
4 x 100 amp n4@4.78 Ea 9,630.00 207.90 3.15 9,841.05
3 x 100 amp n4@4.78 Ea 8,960.00 207.90 3.15 9,171.05
2 x 100 amp n4@4.78 Ea 6,970.00 207.90 3.15 7,181.05

Prefabricated radio frequency shielded modules


Using two 200-amp trailer mounted welders and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 453 (part 2)

24' x 12' x 8' high q3@288. Ea 1,640.00 14,180.00 2,320.00 18,140.00

Miscellaneous radio frequency protection accessories


Using miscellaneous power tools and small tools.
Signal entry box, 18" x 14" n4@2.39 Ea 91.20 103.90 1.58 196.68
Pull boxes n4@.950 Ea 30.10 41.32 0.63 72.05
Hi-hats for lighting n4@2.39 Ea 34.60 103.90 1.58 140.08
Set-up panels n4@2.39 Ea 51.10 103.90 1.58 156.58
2015 Heavy Construction Estimator, All Rights Reserved Page 454

CSI 13-205, Above ground storage tanks

Above Ground Storage Tanks


For leak detection see CSI 02-680. using a 20-ton hydraulic crane with 70’ boom and small tools.
Tanks erected in place, Does not include the cost of concrete foundation or pad, excavation, piping or
pumps
Prestressed Concrete, using miscellaneous power tools and small tools.
250,000 gallons --@.000 Gal 1.00 -- -- 1.00
500,000 gallons --@.000 Gal 0.70 -- -- 0.70
1,000,000 gallons --@.000 Gal 0.48 -- -- 0.48
2,000,000 gallons --@.000 Gal 0.36 -- -- 0.36
4,000,000 gallons --@.000 Gal 0.39 -- -- 0.39
6,000,000 gallons --@.000 Gal 0.26 -- -- 0.26
8,000,000 gallons --@.000 Gal 0.25 -- -- 0.25
10,000,000 gallons --@.000 Gal 0.24 -- -- 0.24

Steel, ground level, no foundations


using miscellaneous power tools and small tools.
100,000 gallons --@.000 Gal 0.84 -- -- 0.84
250,000 gallons --@.000 Gal 0.42 -- -- 0.42
500,000 gallons --@.000 Gal 0.36 -- -- 0.36
750,000 gallons --@.000 Gal 0.28 -- -- 0.28
1,000,000 gallons --@.000 Gal 0.27 -- -- 0.27
2,000,000 gallons --@.000 Gal 0.26 -- -- 0.26
4,000,000 gallons --@.000 Gal 0.20 -- -- 0.20
6,000,000 gallons --@.000 Gal 0.18 -- -- 0.18
8,000,000 gallons --@.000 Gal 0.18 -- -- 0.18
10,000,000 gallons --@.000 Gal 0.17 -- -- 0.17

Steel standpipes, 100' overflow, no foundations


using miscellaneous power tools and small tools.
500,000 gallons --@.000 Gal 0.49 -- -- 0.49
750,000 gallons --@.000 Gal 0.41 -- -- 0.41
1,000,000 gallons --@.000 Gal 0.36 -- -- 0.36
1,500,000 gallons --@.000 Gal 0.33 -- -- 0.33
2,000,000 gallons --@.000 Gal 0.30 -- -- 0.30

CSI 13-215, Underground storage tanks

Underground storage tanks - Fiberglass, double walled, with 22" manway


For leak detection see CSI 02-680. Add the cost of concrete pad and excavation, using a 20-ton
hydraulic crane with 70’ boom and small tools.
600 gallon pl@8.60 Ea 7,130.00 377.50 34.80 7,542.30
1,000 gallon pl@10.8 Ea 9,560.00 474.00 43.70 10,077.70
2,500 gallon pl@15.0 Ea 13,700.00 658.40 60.80 14,419.20
4,000 gallon pl@43.0 Ea 17,500.00 1,887.00 174.00 19,561.00
6,000 gallon pl@45.8 Ea 19,200.00 2,010.00 185.00 21,395.00
8,000 gallon pl@49.1 Ea 21,300.00 2,155.00 199.00 23,654.00
10,000 gallon pl@53.8 Ea 24,500.00 2,361.00 218.00 27,079.00
12,000 gallon pl@60.0 Ea 30,000.00 2,633.00 243.00 32,876.00
15,000 gallon pl@67.4 Ea 39,300.00 2,958.00 273.00 42,531.00
20,000 gallon pm@86.0 Ea 48,000.00 3,775.00 348.00 52,123.00
25,000 gallon pm@95.6 Ea 63,000.00 4,196.00 387.00 67,583.00
30,000 gallon pm@108. Ea 75,700.00 4,740.00 437.00 80,877.00

CSI 13-271, Preliminary treatment of hazardous waste


2015 Heavy Construction Estimator, All Rights Reserved Page 454 (part 2)

Preliminary hazardous waste treatment - Wastewater stationary screening units


Includes equipment purchase and installation costs, using small tools. Add the cost of operation and
maintenance.
1-1/2' width, 90 GPM w4@12.7 Ea 7,430.00 362.70 8.38 7,801.08
2-1/2' width, 90 GPM w4@12.7 Ea 9,730.00 362.70 8.38 10,101.08
3' width, 280 GPM w4@16.9 Ea 12,100.00 482.70 11.20 12,593.90
4' width, 400 GPM w4@16.9 Ea 15,200.00 482.70 11.20 15,693.90
6' width, 600 GPM w4@16.9 Ea 21,200.00 482.70 11.20 21,693.90
6' wide,
1,200 GPM, back to back unit w4@16.9 Ea 37,900.00 482.70 11.20 38,393.90
8' width, 800 GPM w4@16.9 Ea 26,800.00 482.70 11.20 27,293.90
8' wide,
1,600 GPM, back to back unit w4@25.4 Ea 46,100.00 725.40 16.80 46,842.20
10' width, 1,000 GPM w4@25.4 Ea 32,500.00 725.40 16.80 33,242.20
10' wide,
2,000 GPM, back to back unit w4@25.4 Ea 58,700.00 725.40 16.80 59,442.20
2015 Heavy Construction Estimator, All Rights Reserved Page 455

Preliminary hazardous waste treatment - Vibrating solids screen


Includes equipment purchase and installation costs. Add the cost of operation and maintenance, using
a 20-ton hydraulic crane with 70’ boom and small tools.
3' x 6' single tray unit up@30.0 Ea 23,000.00 1,041.00 212.00 24,253.00
3' x 12' single tray unit up@34.7 Ea 24,600.00 1,204.00 245.00 26,049.00
4' x 6' single tray unit up@30.0 Ea 23,300.00 1,041.00 212.00 24,553.00
4' x 12' single tray unit up@34.7 Ea 25,700.00 1,204.00 245.00 27,149.00
5' x 10' double tray unit up@39.9 Ea 31,000.00 1,385.00 282.00 32,667.00
5' x 16' double tray unit up@39.9 Ea 33,400.00 1,385.00 282.00 35,067.00
6' x 12' triple tray unit up@50.0 Ea 40,700.00 1,735.00 353.00 42,788.00
6' x 20' triple tray unit up@69.4 Ea 66,000.00 2,408.00 490.00 68,898.00
7' x 24' triple tray unit up@98.7 Ea 89,600.00 3,425.00 697.00 93,722.00
8' x 20' triple tray unit up@75.0 Ea 92,500.00 2,603.00 530.00 95,633.00

Preliminary hazardous waste treatment - Vibrating screen accessories


Add to material cost shown above.
Motor base --@.000 Ea 1,630.00 -- -- 1,630.00
Drive guard --@.000 Ea 1,150.00 -- -- 1,150.00
4' wide feed box --@.000 Ea 1,340.00 -- -- 1,340.00
5' wide feed box --@.000 Ea 1,450.00 -- -- 1,450.00
6' wide feed box --@.000 Ea 1,790.00 -- -- 1,790.00
7' wide feed box --@.000 Ea 2,540.00 -- -- 2,540.00
Deck liners --@.000 Ea 634.00 -- -- 634.00
Tension plate liner, per deck --@.000 Ea 906.00 -- -- 906.00
Discharge slip, per deck --@.000 Ea 996.00 -- -- 996.00
Wire cloth, per deck --@.000 Ea 272.00 -- -- 272.00

Preliminary hazardous waste treatment - Rotary drum blenders


Pricing reflects equipment purchase and installation costs based on using a 20-ton hydraulic crane with
70’ boom and small tools. Costs for operation and maintenance not included.
10 HP blender,
50 CF mixing capacity uq@10.0 Ea 119,000.00 350.00 57.20119,407.20
15 HP blender,
75 CF mixing capacity uq@11.4 Ea 148,000.00 399.00 65.20148,464.20
20 HP blender,
100 CF mixing capacity uq@13.3 Ea 190,000.00 465.50 76.10190,541.60
30 HP blender,
150 CF mixing capacity uq@20.0 Ea 219,000.00 700.00 114.00219,814.00

Preliminary hazardous waste treatment - Portable mixers, clamp mounted


Purchase cost only.
1/4 HP mixer, 48" long shaft,
3-1/4" propeller --@.000 Ea 1,160.00 -- -- 1,160.00
1/3 HP mixer, 48" long shaft,
3-3/4" propeller --@.000 Ea 1,280.00 -- -- 1,280.00
1/2 HP mixer,
48" long shaft, 4" propeller --@.000 Ea 1,960.00 -- -- 1,960.00
3/4 HP mixer, 48" long shaft,
4-1/2" propeller --@.000 Ea 2,140.00 -- -- 2,140.00
1 HP mixer, 48" long shaft,
4-3/4" propeller --@.000 Ea 2,320.00 -- -- 2,320.00
1-1/2 HP mixer,
66" shaft, 5-1/4" propeller --@.000 Ea 3,070.00 -- -- 3,070.00

Hazardous waste material shredding - Rotary shear shredders


Shredding may be used to consolidate all contaminated bulk items ranging from cardboard boxes to
railroad ties and steel drums. Shredders are hydraulic unless otherwise noted. Purchase costs only.
2015 Heavy Construction Estimator, All Rights Reserved Page 455 (part 2)

Portable, 60 to 100 drum per hour throughput,


one week rental --@.000 Ea 18,100.00 -- -- 18,100.00
Portable, 60 to 100 drum per hour throughput,
daily rental after first week --@.000 Ea 3,620.00 -- -- 3,620.00
Portable, one month rental --@.000 Ea 67,900.00 -- -- 67,900.00
Operator costs for portable,
based on 8 hour day --@.000 Ea 1,090.00 -- -- 1,090.00
Electric, with 3 ton per hour throughput for soil and mixed debris, no drums or pallets,
one month rental --@.000 Ea 25,000.00 -- -- 25,000.00
Electric, with 3 ton per hour throughput for soil and mixed debris, no drums or pallets, second
and additional months rental --@.000 Ea 9,020.00 -- -- 9,020.00
With 50 drum per hour throughput,
one month rental --@.000 Ea 41,500.00 -- -- 41,500.00
With 50 drum per hour throughput, second
and additional months rental --@.000 Ea 19,600.00 -- -- 19,600.00
With 60 to 100 drum per hour throughput,
one month rental --@.000 Ea 70,100.00 -- -- 70,100.00
With 60 to 100 drum per hour throughput, second
and additional months rental --@.000 Ea 29,600.00 -- -- 29,600.00
Operator costs, based on 8 hour day --@.000 Ea 724.00 -- -- 724.00
En route travel for shredder start-up,
costs based on 8 hour day --@.000 Ea 362.00 -- -- 362.00
Mobilization and
demobilization of shredder --@.000 Ea 7,240.00 -- -- 7,240.00
2015 Heavy Construction Estimator, All Rights Reserved Page 456

Hazardous waste material shredding - Rotary shear shredders


Using miscellaneous power tools and small tools.
Portable shredder operator costs mg@2.25 Hour -- 45.68 9.70 55.38
Electric shredder, minimum rental 1 month,
50 to 75 tons per hour output --@.000 Ea 70,100.00 -- -- 70,100.00
Electric shredder, monthly rental after 1 month,
50 to 75 tons per hour output --@.000 Ea 29,600.00 -- -- 29,600.00
Electric shredder, purchase,
35 tons per hour output --@.000 Ea 371,000.00 -- --371,000.00
Portable drum shredder,
60 to 100 drums per hour --@.000 Ea 371,000.00 -- --371,000.00
Hammermill operational labor cost,
per hour mt@2.50 Hour -- 89.75 7.60 97.35

Hazardous waste solids packing


Used for packing maximum dry bulk material into minimum container space. Pricing reflects equipment
purchase and installation costs, using small tools. Costs for operation and maintenance not included.
Rigid container packer, contents
weighing from 15 to 75 lbs. st@5.00 Ea 6,510.00 174.60 1.40 6,686.00
Rigid container packer, contents weighing
from 100 to 1000 lbs. st@15.0 Ea 10,100.00 523.80 4.20 10,628.00
Bag packer, contents
weighing from 15 to 75 lbs. st@5.00 Ea 5,250.00 174.60 1.40 5,426.00
Bag packer, contents
weighing from 50 to 150 lbs. st@10.0 Ea 8,840.00 349.20 2.80 9,192.00

Equipment for compaction in cask containers


Purchase costs only.
Roll through 30 ton compactor with self-contained
ventilation system --@.000 Ea 275,000.00 -- --275,000.00
Anti-springback devices, 50 per shipment,
packed in reusable box --@.000 Ea 8,820.00 -- -- 8,820.00
Anti-springback devices, 50 per shipment, packed
in wood non-reusable crate --@.000 Ea 8,060.00 -- -- 8,060.00
4" drum extension to simplify seating of compacting discs
on anti-springback device --@.000 Ea 335.00 -- -- 335.00

CSI 13-272, Primary treatment of hazardous waste

Hazardous waste chemical precipitation - Polyethylene tank mixer/feeder


Packaged polyethylene tank unit with steel overpack. In rated gallons per hour (GPH) capacity. Includes
equipment and installation costs but no operation or maintenance, using small tools.
7.5 GPH, 860 PSI, 55 gallon tank n8@16.0 Ea 4,970.00 814.20 9.60 5,793.80
20.8 GPH, 150 PSI, 55 gallon tank n8@16.0 Ea 6,320.00 814.20 9.60 7,143.80
7.5 GPH, 860 PSI, 102 gallon tank n8@20.0 Ea 6,740.00 1,018.00 12.00 7,770.00
20.8 GPH, 150 PSI, 102 gallon tank n8@20.0 Ea 7,490.00 1,018.00 12.00 8,520.00
7.5 GPH, 860 PSI, 167 gallon tank n8@20.0 Ea 6,780.00 1,018.00 12.00 7,810.00
20.8 GPH, 150 PSI, 167 gallon tank n8@20.0 Ea 7,930.00 1,018.00 12.00 8,960.00
7.5 GPH, 860 PSI, 260 gallon tank n8@20.0 Ea 8,000.00 1,018.00 12.00 9,030.00
20.8 GPH, 150 PSI, 260 gallon tank n8@20.0 Ea 8,870.00 1,018.00 12.00 9,900.00
7.5 GPH, 860 PSI, 550 gallon tank ph@21.3 Ea 11,700.00 945.70 14.30 12,660.00
20.8 GPH, 150 PSI, 550 gallon tank ph@21.3 Ea 11,400.00 945.70 14.30 12,360.00

Stainless steel tank mixer/feeder, packaged, Type 304 stainless, in gallons per hour (GPH)
Packaged polyethylene tank unit with steel overpack. In rated gallons per hour (GPH) capacity.
Includes equipment and installation costs but no operation or maintenance, using small tools.
7.5 GPH, 860 PSI, 50 gallon tank n8@16.0 Ea 6,140.00 814.20 9.60 6,963.80
2015 Heavy Construction Estimator, All Rights Reserved Page 456 (part 2)

20.8 GPH, 150 PSI, 50 gallon tank n8@16.0 Ea 7,260.00 814.20 9.60 8,083.80
7.5 GPH, 860 PSI, 100 gallon tank n8@20.0 Ea 6,630.00 1,018.00 12.00 7,660.00
20.8 GPH, 150 PSI, 100 gallon tank n8@20.0 Ea 7,680.00 1,018.00 12.00 8,710.00
7.5 GPH, 860 PSI, 150 gallon tank n8@20.0 Ea 7,910.00 1,018.00 12.00 8,940.00
20.8 GPH, 150 PSI, 150 gallon tank n8@20.0 Ea 8,670.00 1,018.00 12.00 9,700.00
7.5 GPH, 860 PSI, 250 gallon tank n8@20.0 Ea 10,800.00 1,018.00 12.00 11,830.00
20.8 GPH, 150 PSI, 250 gallon tank n8@20.0 Ea 10,800.00 1,018.00 12.00 11,830.00

Hazardous waste chemical precipitation - Liquid chemical feed system


Liquid chemicals, includes feeder, water network, fiberglass tank, feed pump, motor control, three
position level situation control, slow speed mixer and control center, using small tools.
7.5 gallons per hour, 860 PSI, 500 gallon tank,
304 stainless steel tank n8@13.3 Ea 14,800.00 676.80 7.98 15,484.78
20.8 gallons per hour, 150 PSI, 500 gallon tank,
304 stainless steel tank n8@13.3 Ea 12,900.00 676.80 7.98 13,584.78
3.2 gallons per hour, 85 PSI feeder pump, no mixer included,
55 gallon polyethylene tank n8@14.3 Ea 2,780.00 727.70 8.58 3,516.28
7.0 gallons per hour, 925 PSI pump, no mixer included,
55 gallon polyethylene tank n8@14.3 Ea 3,050.00 727.70 8.58 3,786.28
Liquid polymer blender, 0 to 9 gallons per hour, polymer delivery, dilution, water supply
10 gallons per minute maximum n8@20.0 Ea 43,200.00 1,018.00 12.00 44,230.00
Dissolving basket,
0.7 cubic feet, PVC n8@.830 Ea 273.00 42.24 0.50 315.74
Dissolving basket, 1.0 cubic feet,
304 stainless steel n8@.830 Ea 340.00 42.24 0.50 382.74
Dissolving basket, 2.0 cubic feet,
304 stainless steel n8@.830 Ea 581.00 42.24 0.50 623.74
2015 Heavy Construction Estimator, All Rights Reserved Page 457

Dissolving basket, 1.25 cubic feet,


304 stainless steel n8@.830 Ea 681.00 42.24 0.50 723.74
Level switch and pump protection n8@4.00 Ea 327.00 203.60 2.40 533.00

Hazardous waste chemical precipitation - Dry chemical feed system


Includes feeder, water network, fiberglass tank, feed pump, motor control, three position level situation
control, slow speed mixer and center, using a 20-ton hydraulic crane with 70’ boom and small tools.
One 750 gallon tank,
1.25 cubic foot hopper pb@16.6 Ea 43,600.00 765.40 63.40 44,428.80
One 1,000 gallon tank,
1.25 cubic foot hopper pb@24.0 Ea 48,400.00 1,107.00 91.70 49,598.70
One 1,500 gallon tank,
1.25 cubic foot hopper pb@27.0 Ea 49,400.00 1,245.00 103.00 50,748.00

Hazardous waste chemical precipitation - Dry chemical feed system


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Two 450 gallon tanks,
1.25 cubic foot hopper pc@44.8 Ea 58,500.00 2,051.00 261.00 60,812.00
Two 750 gallon tanks,
3 cubic foot hopper pc@56.0 Ea 60,300.00 2,564.00 326.00 63,190.00
Two 1000 gallon tanks,
3 cubic foot hopper pc@56.0 Ea 66,200.00 2,564.00 326.00 69,090.00
Two 1500 gallon tanks,
3 cubic foot hopper pc@74.7 Ea 71,400.00 3,421.00 435.00 75,256.00

Hazardous waste chemical precipitation - Liquid and dry chemical feed system
Includes feeder, water network, fiberglass tank, feed pump, motor control, three position level situation
control, slow speed mixer and control center, using a 20-ton hydraulic crane with 70’ boom and small
tools.
One 450 gallon tank,
1.25 cubic foot hopper pb@15.4 Ea 47,100.00 710.10 58.80 47,868.90
One 750 gallon tank,
1.25 cubic foot hopper pb@16.6 Ea 47,300.00 765.40 63.40 48,128.80
One 1,000 gallon tank,
1.25 cubic foot hopper pb@24.0 Ea 52,200.00 1,107.00 91.70 53,398.70
One 1,500 gallon tank,
1.25 cubic foot hopper pb@27.0 Ea 53,200.00 1,245.00 103.00 54,548.00

Hazardous waste chemical precipitation - Liquid and dry chemical feed system
Using a 20-ton hydraulic crane with 70’ boom and small tools.
Two 450 gallon tank,
1.25 cubic foot hopper pc@44.8 Ea 62,300.00 2,051.00 261.00 64,612.00
Two 750 gallon tanks,
3 cubic foot hopper pc@56.0 Ea 64,100.00 2,564.00 326.00 66,990.00
Two 1,000 gallon tanks,
3 cubic foot hopper pc@56.0 Ea 70,600.00 2,564.00 326.00 73,490.00
Two 1,500 gallon tanks,
3 cubic foot hopper pc@74.7 Ea 75,700.00 3,421.00 435.00 79,556.00

Hazardous waste chemical precipitation - Chemical metering pumps


In gallons per hour (GPH). Includes equipment and installation costs but not operation and
maintenance, using small tools.
7.5 GPH, 860 PSI,
simplex, packed plunger n8@13.3 Ea 1,810.00 676.80 7.98 2,494.78
1.0 GPH, 2000 PSI,
simplex, packed plunger n8@13.3 Ea 1,810.00 676.80 7.98 2,494.78
20.8 GPH, 150 PSI,
simplex, diaphragm type n8@13.3 Ea 3,500.00 676.80 7.98 4,184.78
2015 Heavy Construction Estimator, All Rights Reserved Page 457 (part 2)

41.6 GPH, 150 PSI,


duplex, diaphragm type n8@13.3 Ea 5,080.00 676.80 7.98 5,764.78
105 GPH, 50 PSI,
simplex, diaphragm type n8@13.3 Ea 3,690.00 676.80 7.98 4,374.78

Hazardous waste chemical precipitation - Stainless steel chemical metering pumps


316 stainless steel, liquid end, in gallons per hour (GPH). Includes equipment and installation costs
but no operation and maintenance, using small tools.
.86 GPH, 700 PSI, simplex n8@13.3 Ea 2,000.00 676.80 7.98 2,684.78
.86 GPH, 700 PSI, duplex n8@13.3 Ea 2,990.00 676.80 7.98 3,674.78
2.70 GPH, 1100 PSI, simplex n8@13.3 Ea 2,000.00 676.80 7.98 2,684.78
2.70 GPH, 1100 PSI, duplex n8@13.3 Ea 2,990.00 676.80 7.98 3,674.78
7.0 GPH, 925 PSI, simplex n8@13.3 Ea 2,000.00 676.80 7.98 2,684.78
7.0 GPH, 925 PSI, duplex n8@13.3 Ea 2,990.00 676.80 7.98 3,674.78
18.0 GPH, 350 PSI, simplex n8@13.3 Ea 2,060.00 676.80 7.98 2,744.78
18.0 GPH, 350 PSI, duplex n8@13.3 Ea 3,300.00 676.80 7.98 3,984.78

Sedimentation flocculants - Montmorillonite clay


Powdered or granular, in 50 pound bags.
2,000 to 6,000 lbs. --@.000 Lb 0.22 -- -- 0.22
Over 6,000 to 20,000 lbs. --@.000 Lb 0.20 -- -- 0.20
Over 20,000 lbs. --@.000 Lb 0.18 -- -- 0.18
Bulk quantities of one ton --@.000 Lb 0.14 -- -- 0.14

Sedimentation flocculants - Sodium hectorite clay


Finely ground, 50 pound bags.
2,000 to 6,000 lbs. --@.000 Lb 0.63 -- -- 0.63
Over 6,000 to 20,000 lbs. --@.000 Lb 0.53 -- -- 0.53
Over 20,000 lbs. --@.000 Lb 0.51 -- -- 0.51
Bulk quantities of one ton --@.000 Lb 0.47 -- -- 0.47

Sedimentation flocculants - Super dispersible sodium Bentonite


Granulated, 50 pound bags.
2,000 to 6,000 lbs. --@.000 Lb 0.34 -- -- 0.34
2015 Heavy Construction Estimator, All Rights Reserved Page 458

Over 6,000 to 20,000 lbs. --@.000 Lb 0.32 -- -- 0.32


Over 20,000 lbs. --@.000 Lb 0.30 -- -- 0.30
Bulk quantities of one ton --@.000 Lb 0.26 -- -- 0.26

Sedimentation flocculants - Primary coagulants, bulk quantities


Aluminum sulfate --@.000 Ton 245.00 -- -- 245.00
Ferric sulfate --@.000 Ton 333.00 -- -- 333.00
Ferric chloride --@.000 Ton 326.00 -- -- 326.00

Clarification with flocculation - Solid contact clarifier


Unit combines flash mixing, flocculation, clarification and sludge thickening into one operation. Also
provides for selective removal of turbidity, color, organic matter, taste, odor, iron, manganese, hardness
and alkalinity. Purchase and install only, using a truck mounted hydraulic crane with 115’ boom, a 200
amp trailer mounted welder and three sets of small tools.
9' diameter, 25 GPM waste flow qp@786. Ea 81,500.00 38,330.00 9,740.00129,570.00
12' diameter, 45 GPM waste flow qp@786. Ea 109,000.00 38,330.00 9,740.00157,070.00
15' diameter, 70 GPM waste flow qp@786. Ea 103,000.00 38,330.00 9,740.00151,070.00
20' diameter, 130 GPM waste flow qp@1000 Ea 138,000.00 48,760.00 12,400.00199,160.00
25' diameter, 208 GPM waste flow qp@1000 Ea 172,000.00 48,760.00 12,400.00233,160.00
30' diameter, 305 GPM waste flow qp@1000 Ea 206,000.00 48,760.00 12,400.00267,160.00
40' diameter, 546 GPM waste flow qp@1375 Ea 275,000.00 67,050.00 17,000.00359,050.00
50' diameter, 850 GPM waste flow qp@1833 Ea 344,000.00 89,390.00 22,700.00456,090.00
60' diameter, 1194 GPM waste flow qp@2200 Ea 413,000.00107,300.00 27,300.00547,600.00
70' diameter, 1645 GPM waste flow qp@2750 Ea 482,000.00134,100.00 34,100.00650,200.00
80' diameter, 2053 GPM waste flow qp@2750 Ea 616,000.00134,100.00 34,100.00784,200.00
90' diameter, 2730 GPM waste flow qp@2750 Ea 694,000.00134,100.00 34,100.00862,200.00
100' diameter, 3400 GPM waste flow qp@3666 Ea 770,000.00178,800.00 45,400.00994,200.00
120' diameter, 4938 GPM waste flow qp@3666 Ea 924,000.00178,800.00 45,400.001,148,200.00
150' diameter, 7690 GPM waste flow qp@5500 Ea 1,160,000.00268,200.00 68,100.001,496,300.00

Hazardous waste gravity oil separation - Oil skimmers with 12" container
Powered by 1-1/2 HP electric motor. Units with 12" belt width have a removal capacity of 25 GPH.
Units with a 24" belt width have a removal capacity of 50 GPH, using small tools.
Open, 230/460V n7@11.7 Ea 6,260.00 547.90 7.02 6,814.92
Open, 230/460V, explosion-proof n7@11.7 Ea 6,680.00 547.90 7.02 7,234.92
Open, 115/220V n7@11.7 Ea 6,330.00 547.90 7.02 6,884.92
Open, 115/220V, explosion-proof n7@11.7 Ea 6,820.00 547.90 7.02 7,374.92
Enclosed, 230/460V n7@13.3 Ea 6,740.00 622.80 7.98 7,370.78
Enclosed, 230/460V, explosion-proof n7@13.3 Ea 7,120.00 622.80 7.98 7,750.78
Enclosed, 115/220V n7@13.3 Ea 6,820.00 622.80 7.98 7,450.78
Enclosed, 115/220V, explosion-proof n7@13.3 Ea 7,310.00 622.80 7.98 7,940.78

Hazardous waste gravity oil separation - Oil skimmers with 24" container
Powered by 1-1/2 HP electric motor. Units with 12" belt width have a removal capacity of 25 GPH.
Units with a 24" belt width have a removal capacity of 50 GPH, using small tools.
Open, 230/460V n7@15.3 Ea 6,730.00 716.50 9.18 7,455.68
Open, 230/460V, explosion-proof n7@15.3 Ea 7,120.00 716.50 9.18 7,845.68
Open, 115/220V n7@15.3 Ea 6,820.00 716.50 9.18 7,545.68
Open, 115/220V, explosion-proof n7@15.3 Ea 7,410.00 716.50 9.18 8,135.68
Enclosed, 230/460V n7@16.7 Ea 7,750.00 782.10 10.00 8,542.10
Enclosed, 230/460V, explosion-proof n7@16.7 Ea 8,160.00 782.10 10.00 8,952.10
Enclosed, 115/220V n7@16.7 Ea 7,840.00 782.10 10.00 8,632.10
Enclosed, 115/220V, explosion proof n7@16.7 Ea 8,430.00 782.10 10.00 9,222.10

Hazardous waste gravity oil separation - Additional belt protection


Using small tools.
12" wide belt --@.000 LF 17.20 -- 6.48 23.68
24" wide belt --@.000 LF 31.70 -- 6.48 38.18
2015 Heavy Construction Estimator, All Rights Reserved Page 458 (part 2)

Hazardous waste gravity oil separation - Additional belt protection


Using small tools.
Spacer stands for 12" skimmer n7@1.00 LF 283.00 46.83 0.60 330.43
Spacer stands for 24" skimmer n7@1.00 LF 204.00 46.83 0.60 251.43
2015 Heavy Construction Estimator, All Rights Reserved Page 459

Hazardous waste - Conventional gravity filtration


Including vessel, immediate piping, controls, integral back wash storage compartment, air blower and
filter media. Structural steel supports, concrete foundation and sump not included, using a 20-ton
hydraulic crane with 70’ boom and small tools.
94 GPM, 4' (122cm) diameter pj@16.0 Ea 382,000.00 704.80 47.50382,752.30
376 GPM, 8' (244cm) diameter pj@16.8 Ea 69,900.00 740.00 49.90 70,689.90
847 GPM, 12' (366cm) diameter pj@30.6 Ea 109,000.00 1,348.00 90.90110,438.90
1,908 GPM, 18' (549cm) diameter pj@112. Ea 155,000.00 4,934.00 333.00160,267.00

Hazardous waste - Conventional gravity filtration


Using a 20-ton hydraulic crane with 70’ boom, a 300-amp skid mounted welder and small tools.
2,356 GPM, 20' (240cm) diameter pk@112. Ea 169,000.00 4,934.00 412.00174,346.00

Hazardous waste - Deep bed filtration using nut shell media


Includes vessel, screening, valve, piping, pumps, control panel and media for start-up. Includes
equipment and installation but no feed pump discharge, motor starter, operation or maintenance. By
vessel diameter and GPH of flow, using a 20-ton hydraulic crane with 70’ boom and small tools.
30" vessel, 2,000 GPH flow pm@139. Ea 167,000.00 6,101.00 563.00173,664.00
36" vessel, 3,000 GPH flow pm@139. Ea 178,000.00 6,101.00 563.00184,664.00
48" vessel, 5,000 GPH flow pm@172. Ea 209,000.00 7,549.00 697.00217,246.00
60" vessel, 8,000 GPH flow pm@172. Ea 236,000.00 7,549.00 697.00244,246.00
72" vessel, 12,000 GPH flow pm@172. Ea 282,000.00 7,549.00 697.00290,246.00

Hazardous waste - Deep bed filtration using nut shell media


Using a 40-ton hydraulic crane with 84’ boom, a 300-amp skid mounted welder and small tools.
84" vessel, 17,000 GPH flow pr@263. Ea 318,000.00 11,300.00 1,280.00330,580.00
96" vessel, 23,000 GPH flow pr@263. Ea 354,000.00 11,300.00 1,280.00366,580.00
108" vessel, 29,000 GPH flow pr@263. Ea 390,000.00 11,300.00 1,280.00402,580.00
120" vessel, 35,000 GPH flow pr@263. Ea 436,000.00 11,300.00 1,280.00448,580.00
132" vessel, 43,000 GPH flow pr@263. Ea 490,000.00 11,300.00 1,280.00502,580.00
144" vessel, 51,000 GPH flow pr@263. Ea 535,000.00 11,300.00 1,280.00547,580.00
156" vessel, 60,000 GPH flow pr@385. Ea 543,000.00 16,550.00 1,870.00561,420.00
168" vessel, 70,000 GPH flow pr@385. Ea 589,000.00 16,550.00 1,870.00607,420.00
180" vessel, 80,000 GPH flow pr@385. Ea 634,000.00 16,550.00 1,870.00652,420.00
50 lb. bag of pecan shell media --@.000 Ea 106.00 -- -- 106.00
2,000 lb. bag of pecan shell media --@.000 Ea 1,630.00 -- -- 1,630.00
50 lb. bag of walnut shell media --@.000 Ea 136.00 -- -- 136.00
2,000 lb. bag walnut shell media --@.000 Ea 2,530.00 -- -- 2,530.00
Daily rental rate
for pilot filtration unit --@.000 Ea 906.00 -- -- 906.00

Hazardous waste treatment - Air sparging blowers


Using small tools.
98 SCFM, 3.2 HP, 5 PSI ph@32.0 Ea 5,230.00 1,421.00 21.40 6,672.40
170 SCFM, 10.3 HP, 10 PSI ph@32.0 Ea 5,270.00 1,421.00 21.40 6,712.40
163 SCFM, 15 HP, 15 PSI ph@32.0 Ea 5,610.00 1,421.00 21.40 7,052.40
426 SCFM, 84 HP, 30 PSI ph@32.0 Ea 13,400.00 1,421.00 21.40 14,842.40

CSI 13-273, Secondary hazardous waste treatment

Hazardous waste biological reactors - Cylinder shaped air flow units


Purchase cost only.
5 lbs., 18 CFM maximum airflow --@.000 Ea 39,300.00 -- -- 39,300.00
10 lbs., 28 CFM maximum airflow --@.000 Ea 50,600.00 -- -- 50,600.00
40 lbs., 95 CFM maximum airflow --@.000 Ea 96,800.00 -- -- 96,800.00
100 lbs., 250 CFM maximum airflow --@.000 Ea 154,000.00 -- --154,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 459 (part 2)

Fixed film bioreactors


In rated per day organic capacity. Purchase cost only.
1 to 10 GPM, 3000 gallon --@.000 Ea 76,100.00 -- -- 76,100.00
11 to 23 GPM, 5000 gallon --@.000 Ea 96,000.00 -- -- 96,000.00
24 to 33 GPM, 9000 gallon --@.000 Ea 132,000.00 -- --132,000.00
34 to 45 GPM, 11500 gallon --@.000 Ea 170,000.00 -- --170,000.00
46 to 60 GPM, 17500 gallon --@.000 Ea 203,000.00 -- --203,000.00
61 to 82 GPM, 17500 gallon --@.000 Ea 212,000.00 -- --212,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 460

83 to 100 GPM, 18500 gallon --@.000 Ea 232,000.00 -- --232,000.00


Over 100 GPM, 24000 gallon --@.000 Ea 255,000.00 -- --255,000.00
Over 100 GPM, 27000 gallon --@.000 Ea 273,000.00 -- --273,000.00
Over 100 GPM, 29500 gallon --@.000 Ea 288,000.00 -- --288,000.00

Soil bioremediation stimulation - Soil contaminated with petroleum products


This is a treatment process for petroleum and organic contaminated soils. TSCA and RCRA regulated
soils need a treatability study before firm prices can be established.
7,000 to
10,000 CY treated, large unit --@.000 CY 90.60 -- -- 90.60
2,500 to
6,500 CY treated, large unit --@.000 CY 109.00 -- -- 109.00
1,500 to
2,000 CY treated, large unit --@.000 CY 127.00 -- -- 127.00
Less than
1,000 CY treated, small unit --@.000 CY 181.00 -- -- 181.00

Soil bioremediation stimulation - Mobilization and demobilization


Small unit --@.000 LS 11,800.00 -- -- 11,800.00
Large unit --@.000 LS 27,200.00 -- -- 27,200.00

Floating lagoon covers - High density polyethylene covers.


Purchase cost only.
30 mil --@.000 SF 0.47 -- -- 0.47
40 mil --@.000 SF 0.60 -- -- 0.60
50 mil --@.000 SF 0.76 -- -- 0.76
60 mil --@.000 SF 0.92 -- -- 0.92
80 mil --@.000 SF 1.16 -- -- 1.16
100 mil --@.000 SF 1.52 -- -- 1.52
120 mil --@.000 SF 1.83 -- -- 1.83
140 mil --@.000 SF 2.12 -- -- 2.12

Self buoyant bioseparators. Constructed of heavy duty polyester.


Purchase cost only.
3' (91cm) depth --@.000 LF 31.30 -- -- 31.30
4' (122cm) depth --@.000 LF 35.30 -- -- 35.30
5' (152cm) depth --@.000 LF 39.20 -- -- 39.20

Air stripping - Packed tower treatment units


Using small tools.
1' diameter, 14.5' packing height,
30 GPM, 850 CFM, FRP shell ph@97.6 Ea 11,000.00 4,333.00 65.40 15,398.40
1' diameter, 19.0' packing height,
30 GPM, 800 CFM, FRP shell ph@128. Ea 11,800.00 5,683.00 85.80 17,568.80
1' diameter, 23.5' packing height,
30 GPM, 750 CFM, FRP shell ph@129. Ea 13,500.00 5,728.00 86.40 19,314.40
1.5' diameter, 14.5' packing height,
50 GPM, 1050 CFM, FRP shell ph@128. Ea 15,300.00 5,683.00 85.80 21,068.80
1.5' diameter, 19.0' packing height,
50 GPM, 1000 CFM, FRP shell ph@128. Ea 16,400.00 5,683.00 85.80 22,168.80
1.5' diameter, 23.5' packing height,
50 GPM, 950 CFM, FRP shell ph@128. Ea 18,200.00 5,683.00 85.80 23,968.80
2' diameter, 14.5' packing height,
90 GPM, 1600 CFM, FRP shell ph@128. Ea 22,500.00 5,683.00 85.80 28,268.80
2' diameter, 19.0' packing height,
90 GPM, 1550 CFM, FRP shell ph@128. Ea 25,000.00 5,683.00 85.80 30,768.80
2' diameter, 23.5' packing height,
90 GPM, 1550 CFM, FRP shell ph@160. Ea 27,900.00 7,104.00 107.00 35,111.00
2015 Heavy Construction Estimator, All Rights Reserved Page 460 (part 2)

3' diameter, 5.5' packing height,


90 GPM, 4800 CFM, PE shell ph@96.9 Ea 11,600.00 4,302.00 64.90 15,966.90
3' diameter, 5.5' packing height, 90 GPM,
4800 CFM, PE shell, truss ph@104. Ea 16,200.00 4,618.00 69.70 20,887.70

Air stripping - Packed tower treatment units


Using a 20 ton hydraulic crane with 70’ boom and small tools.
3' diameter, 9.5' packing height, 90 GPM,
4,600 CFM, PE shell, truss pl@172. Ea 21,100.00 7,549.00 697.00 29,346.00
3' diameter, 13.5' packing height, 90 GPM,
5,000 CFM, PE shell, truss pl@172. Ea 26,100.00 7,549.00 697.00 34,346.00
3' diameter, 17.5' packing height, 90 GPM,
4,800 CFM, PE shell, truss pl@172. Ea 31,100.00 7,549.00 697.00 39,346.00
4' diameter, 6.5' packing height, 150 GPM,
7,500 CFM, PE shell, truss pl@104. Ea 23,100.00 4,565.00 421.00 28,086.00
4' diameter, 9.5' packing height, 150 GPM,
7,300 CFM, PE shell, truss pl@172. Ea 25,700.00 7,549.00 697.00 33,946.00
4' diameter, 12.5' packing height, 150 GPM,
8,400 CFM, PE shell, truss pl@172. Ea 31,800.00 7,549.00 697.00 40,046.00
4' diameter, 15.5' packing height, 150 GPM,
8,200 CFM, PE shell, truss pl@172. Ea 34,600.00 7,549.00 697.00 42,846.00
2015 Heavy Construction Estimator, All Rights Reserved Page 461

4' diameter, 18.5' packing height, 150 GPM,


8,000 CFM, PE shell, truss pl@172. Ea 40,400.00 7,549.00 697.00 48,646.00
1" to 3.5"
packing for air strip tower --@.000 CF 13.60 -- -- 13.60
Internal parts for air
stripper less than 20' high --@.000 SF 90.60 -- -- 90.60
Internal parts for
air stripper 20' high or more --@.000 SF 118.00 -- -- 118.00

Air stripping - Install air strip tower


Using a 20 ton hydraulic crane with 70’ boom and small tools.
1' to 3' diameter, 12' high or less pl@89.6 Ea -- 3,933.00 363.00 4,296.00
1' to 3' diameter, 13' to 20' high pl@97.7 Ea -- 4,288.00 396.00 4,684.00
1' to 3' diameter, 21' to 30' high pl@105. Ea -- 4,608.00 425.00 5,033.00
1' to 3' diameter, over 30' high pl@113. Ea -- 4,960.00 458.00 5,418.00
4' to 8' diameter, 12' high or less pl@100. Ea -- 4,389.00 405.00 4,794.00
4' to 8' diameter, 13' to 20' high pl@105. Ea -- 4,608.00 425.00 5,033.00
4' to 8' diameter, 21' to 30' high pl@139. Ea -- 6,101.00 563.00 6,664.00
4' to 8' diameter, over 30' high pl@179. Ea -- 7,856.00 725.00 8,581.00
9' to 12' diameter,
12' high or less pl@105. Ea -- 4,608.00 425.00 5,033.00
9' to 12' diameter, 13' to 20' high pl@165. Ea -- 7,242.00 668.00 7,910.00
9' to 12' diameter, 21' to 30' high pl@287. Ea -- 12,600.00 1,160.00 13,760.00
9' to 12' diameter, over 30' high pl@430. Ea -- 18,870.00 1,740.00 20,610.00

Air stripping - Packed tower blower motors


Using small tools.
1,050 SCFM, 1.5 HP ph@83.3 Ea 545.00 3,699.00 55.80 4,299.80
1,020 SCFM, 2 HP ph@129. Ea 946.00 5,728.00 86.40 6,760.40
2,560 SCFM, 3 HP ph@129. Ea 928.00 5,728.00 86.40 6,742.40
4,800 SCFM, 2 HP ph@129. Ea 1,730.00 5,728.00 86.40 7,544.40
5,000 SCFM, 3 HP ph@129. Ea 1,810.00 5,728.00 86.40 7,624.40
7,500 SCFM, 3 HP ph@129. Ea 2,240.00 5,728.00 86.40 8,054.40
9,050 SCFM, 5 HP ph@250. Ea 2,020.00 11,100.00 168.00 13,288.00
11,000 SCFM, 5 HP ph@250. Ea 2,320.00 11,100.00 168.00 13,588.00
10,000 SCFM, 7.5 HP ph@250. Ea 2,730.00 11,100.00 168.00 13,998.00

Air stripping - Packed tower skid mounts


Material cost only. Based on skid mounts installed by Tower manufacturer prior to shipment.
For 1.0' diameter tower --@.000 Ea 1,040.00 -- -- 1,040.00
For 1.5' diameter tower --@.000 Ea 1,180.00 -- -- 1,180.00
For 2.0' diameter tower --@.000 Ea 1,920.00 -- -- 1,920.00
For 3.0' diameter tower --@.000 Ea 3,910.00 -- -- 3,910.00
For 4.0' diameter tower --@.000 Ea 5,870.00 -- -- 5,870.00

Air stripping - Packed tower miscellaneous controls


Using a 20 ton hydraulic crane with 70’ boom and small tools.
Liquid level control package for control
of effluent water levels pl@17.2 Ea 2,290.00 754.90 69.70 3,114.60

Air stripping - Packed tower miscellaneous controls


Using small tools.
Air flow switch, to indicate loss of
air flow due to motor failure --@.000 Ea 1,210.00 -- -- 1,210.00
High sump level switch,
for avoiding overflow --@.000 Ea 1,100.00 -- -- 1,100.00
Differential pressure gauge to indicate
packing pressure loss ph@8.00 Ea 896.00 355.20 5.36 1,256.56
2015 Heavy Construction Estimator, All Rights Reserved Page 461 (part 2)

Vibration switch for shut-off


during excessive vibration --@.000 Ea 792.00 -- -- 792.00
Drain valve actuator to prevent freezing
during system shutdown ph@5.33 Ea 1,310.00 236.70 3.57 1,550.27
Well liquid level control monitor to control
pump exposure in draw down ph@8.00 Ea 1,650.00 355.20 5.36 2,010.56
High water flow pump, 3' diameter tower,
90 to 150 GPM range --@.000 Ea 478.00 -- -- 478.00
High water flow pump, 4' diameter tower,
150 to 350 GPM range --@.000 Ea 1,100.00 -- -- 1,100.00

Air stripping - Packed tower safety ladder and cage


Aluminum, truss mounted towers, using a 20-ton hydraulic crane with 70’ boom and small tools.
12' high qf@17.2 Ea 4,780.00 865.30 217.00 5,862.30
15’ to 19' high qf@22.9 Ea 5,280.00 1,152.00 289.00 6,721.00
19’ to 25' high qf@34.4 Ea 5,780.00 1,731.00 433.00 7,944.00

Air stripping - Packed tower blower protection


Using small tools.
Blower weather enclosure,
3' to 4' diameter ph@3.20 Ea 677.00 142.10 2.14 821.24
Mastic coating of blower,
1' to 3' diameter --@.000 Ea 1,180.00 -- -- 1,180.00
Mastic coating of blower,
4' diameter --@.000 Ea 1,610.00 -- -- 1,610.00
2015 Heavy Construction Estimator, All Rights Reserved Page 462

PVC coating of blower,


1' to 2' diameter --@.000 Ea 1,240.00 -- -- 1,240.00
PVC coating of blower, 3' diameter --@.000 Ea 2,930.00 -- -- 2,930.00
PVC coating of blower, 4' diameter --@.000 Ea 4,090.00 -- -- 4,090.00

Air stripping - Packed tower transfer pumps


Used in lieu of gravity drainage, using small tools.
Transfer pump, 30 GPM, 1 HP ph@8.00 Ea 996.00 355.20 5.36 1,356.56
Transfer pump, 50 GPM, 1.5 HP ph@10.7 Ea 1,270.00 475.10 7.17 1,752.27
Transfer pump, 90 GPM, 3 HP ph@16.0 Ea 1,660.00 710.40 10.70 2,381.10
Transfer pump, 150 GPM, 5 HP ph@32.0 Ea 2,060.00 1,421.00 21.40 3,502.40
Transfer pump, 350 GPM, 10 HP ph@32.0 Ea 3,180.00 1,421.00 21.40 4,622.40

Air stripping - Packed tower transfer pumps


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Packing reconditioning ts@32.0 Ea -- 1,349.00 1,460.00 2,809.00

Air stripping - Packed tower transfer pumps


Using a 4" 465 GPM centrifugal pump.
Rework motor gasket,
bearings and shaft jr@12.0 Ea -- 441.00 118.00 559.00

Air stripping - Low profile air stripper units


To adequately size the influent and effluent capacity, contaminant levels must be known prior to
treatment, using small tools.
1 tray unit,
135 CFM required air flow ph@32.0 Ea 17,400.00 1,421.00 21.40 18,842.40
2 tray unit,
140 CFM required airflow ph@32.0 Ea 19,400.00 1,421.00 21.40 20,842.40
3 tray unit,
210 CFM required airflow ph@37.6 Ea 21,400.00 1,669.00 25.20 23,094.20
4 tray unit,
280 CFM required airflow ph@37.6 Ea 23,600.00 1,669.00 25.20 25,294.20
5 tray unit,
350 CFM required airflow ph@42.6 Ea 27,200.00 1,891.00 28.50 29,119.50
6 tray unit,
420 CFM required airflow ph@42.6 Ea 30,000.00 1,891.00 28.50 31,919.50
7 tray unit,
490 CFM required airflow ph@42.6 Ea 32,700.00 1,891.00 28.50 34,619.50
8 tray unit,
560 CFM required airflow ph@42.6 Ea 35,500.00 1,891.00 28.50 37,419.50

Air stripping - De-gasifiers


Includes equipment and installation but no operation or maintenance, using small tools.
10" diameter, 12 GPM flow, 55 SCFM ph@42.6 Ea 19,300.00 1,891.00 28.50 21,219.50
16" diameter, 25 GPM flow, 140 SCFM ph@42.6 Ea 20,600.00 1,891.00 28.50 22,519.50
20" diameter, 60 GPM flow, 220 SCFM ph@42.6 Ea 22,600.00 1,891.00 28.50 24,519.50
24" diameter, 90 GPM flow, 315 SCFM ph@63.5 Ea 25,900.00 2,819.00 42.50 28,761.50
30" diameter, 125 GPM, 500 SCFM ph@63.5 Ea 31,200.00 2,819.00 42.50 34,061.50
36" diameter, 185 GPM, 700 SCFM ph@63.5 Ea 37,400.00 2,819.00 42.50 40,261.50
42" diameter, 250 GPM, 965 SCFM ph@63.5 Ea 45,600.00 2,819.00 42.50 48,461.50
48" diameter, 330 GPM, 1260 SCFM ph@63.5 Ea 50,600.00 2,819.00 42.50 53,461.50
60" diameter, 520 GPM, 1965 SCFM ph@105. Ea 66,400.00 4,662.00 70.40 71,132.40

In-situ vapor extraction of soil


Security fence for vapor extractor --@.000 Ea 1,090.00 -- -- 1,090.00
Operations procedure training
2015 Heavy Construction Estimator, All Rights Reserved Page 462 (part 2)

for mechanical system --@.000 Ea 4,890.00 -- -- 4,890.00

In-situ vapor extraction of soil


Using a 300-amp skid mounted welder and small tools.
Operation labor cost
for in-situ vapor extraction pa@20.0 Day -- 936.60 36.00 972.60

In-situ vapor recovery system


Includes equipment and installation but no operation, maintenance, yard piping or extraction wells,
using small tools.
1 HP, 115v, 98 SCFM bi@12.0 Ea 7,610.00 486.80 3.84 8,100.64
1 HP, 230v, 98 SCFM bi@12.0 Ea 7,610.00 486.80 3.84 8,100.64
1-1/2 HP, 230v, 127 SCFM bi@12.0 Ea 7,970.00 486.80 3.84 8,460.64
2 HP, 230v, 160 SCFM bi@12.0 Ea 9,420.00 486.80 3.84 9,910.64
5 HP, 230v, 280 SCFM bi@12.0 Ea 13,600.00 486.80 3.84 14,090.64

In-situ vapor extractor


Includes equipment and installation but no operation, maintenance, yard piping or extraction wells,
using small tools.
70 SCFM ph@32.0 Ea 60,900.00 1,421.00 21.40 62,342.40
150 SCFM ph@32.0 Ea 70,500.00 1,421.00 21.40 71,942.40
250 SCFM ph@42.6 Ea 78,200.00 1,891.00 28.50 80,119.50
350 SCFM ph@42.6 Ea 85,800.00 1,891.00 28.50 87,719.50
500 SCFM ph@63.5 Ea 93,500.00 2,819.00 42.50 96,361.50
2015 Heavy Construction Estimator, All Rights Reserved Page 463

Propane conversion
for soil vapor extractor --@.000 Ea 136.00 -- -- 136.00
Modulating motor
for automatic fuel adjustment --@.000 Ea 3,260.00 -- -- 3,260.00
Container monitoring
and recording of air flow --@.000 Ea 17,400.00 -- -- 17,400.00
Trailer mounting
for vapor extractor unit --@.000 Ea 1,180.00 -- -- 1,180.00

Vapor recovery system rental


Vapor recovery system, 1 HP, 230v,
98 SCFM, rental, per week --@.000 Week 608.00 -- -- 608.00
Vapor recovery system, 1 HP, 230v,
98 SCFM, rental, per month --@.000 Mo 1,520.00 -- -- 1,520.00

Vapor extraction blower monthly rental


5 HP, 90 SCFM --@.000 Mo 815.00 -- -- 815.00
7.5 HP 140 SCFM --@.000 Mo 906.00 -- -- 906.00
10 HP, 190 SCFM --@.000 Mo 1,090.00 -- -- 1,090.00
15 HP, 290 SCFM --@.000 Mo 1,720.00 -- -- 1,720.00
30 HP, 580 SCFM --@.000 Mo 2,630.00 -- -- 2,630.00

On site recovery system service


100,000 gallons per day flow --@.000 Gal 0.02 -- -- 0.02
10,000 gallons per day flow --@.000 Gal 0.04 -- -- 0.04

Steam boiler monthly rental


1700 pph 100 HP --@.000 Mo 6,350.00 -- -- 6,350.00
3450 pph, 100 HP --@.000 Mo 7,390.00 -- -- 7,390.00
5000 pph 150 HP --@.000 Mo 10,000.00 -- -- 10,000.00
12000 pph 350 HP --@.000 Mo 17,900.00 -- -- 17,900.00

Vapor condenser
Includes equipment and installation. Based on using a 20-ton hydraulic crane with 70’ boom, a 300-amp
skid mounted welder and small tools.
500 pph pk@22.7 Ea 13,400.00 999.90 83.50 14,483.40
1,500 pph pk@24.1 Ea 19,400.00 1,062.00 88.70 20,550.70

Horizontal vapor extraction points, 5' depth maximum


Includes excavation, back fill, and vent pipe. Removal or salvage value not included. Based on using a 6"
to 18" wide chain boom wheel trencher to 60" deep.
2" PVC vent pipe ej@.100 LF 12.70 3.68 1.74 18.12
4" PVC vent pipe ej@.100 LF 23.50 3.68 1.74 28.92
2" stainless steel vent pipe ej@.100 LF 67.90 3.68 1.74 73.32
4" stainless steel vent pipe ej@.100 LF 79.90 3.68 1.74 85.32

Vapor condensers
Using a 20-ton hydraulic crane with 70’ boom, a 300-amp skid mounted welder and small tools.
2,500 pph vapor condenser pk@26.6 Ea 19,000.00 1,172.00 97.90 20,269.90
6,000 pph vapor condenser pk@35.1 Ea 34,600.00 1,546.00 129.00 36,275.00
10,000 pph vapor condenser pk@39.2 Ea 52,400.00 1,727.00 144.00 54,271.00

Air stripping towers


Pre-fabricated air stripping columns, shell only, per linear foot of height. Purchase costs only.
1' diameter --@.000 LF 267.00 -- -- 267.00
1.5' diameter --@.000 LF 417.00 -- -- 417.00
2015 Heavy Construction Estimator, All Rights Reserved Page 463 (part 2)

2' diameter --@.000 LF 582.00 -- -- 582.00


3' diameter --@.000 LF 953.00 -- -- 953.00
4' diameter --@.000 LF 1,380.00 -- -- 1,380.00
5' diameter --@.000 LF 1,880.00 -- -- 1,880.00
6' diameter --@.000 LF 2,430.00 -- -- 2,430.00
8' diameter --@.000 LF 3,750.00 -- -- 3,750.00
10' diameter --@.000 LF 5,370.00 -- -- 5,370.00
12' diameter --@.000 LF 7,290.00 -- -- 7,290.00

Blowers for air stripping


Using small tools.
100 CFM, 6" pressure, 1/3 HP nz@3.63 Ea 435.00 165.60 2.11 602.71
150 CFM, 6" pressure, 1/2 HP nz@4.00 Ea 724.00 182.50 2.32 908.82
250 CFM, 6" pressure, 3/4 HP nz@4.65 Ea 924.00 212.20 2.70 1,138.90
500 CFM, 6" pressure, 1 HP nz@5.26 Ea 1,090.00 240.00 3.05 1,333.05
750 CFM, 8" pressure, 1.5 HP nz@6.08 Ea 1,460.00 277.40 3.53 1,740.93
1,000 CFM, 8" pressure, 2.5 HP nz@6.56 Ea 1,950.00 299.30 3.80 2,253.10
2015 Heavy Construction Estimator, All Rights Reserved Page 464

1,500 CFM, 8" pressure, 4 HP nz@8.04 Ea 2,280.00 366.90 4.66 2,651.56


2,000 CFM, 7" pressure, 6 HP nz@15.3 Ea 2,590.00 698.10 8.87 3,296.97
3,000 CFM, 6" pressure, 7.5 HP nz@15.3 Ea 3,030.00 698.10 8.87 3,736.97
4,000 CFM, 6" pressure, 10 HP nz@16.7 Ea 3,500.00 762.00 9.69 4,271.69
5,000 CFM, 6" pressure, 10 HP nz@16.7 Ea 4,530.00 762.00 9.69 5,301.69
8,000 CFM, 6" pressure, 15 HP nz@17.9 Ea 5,090.00 816.80 10.40 5,917.20
11,000 CFM, 6" pressure, 20 HP nz@17.9 Ea 6,470.00 816.80 10.40 7,297.20
15,000 CFM, 6" pressure, 25 HP nz@19.2 Ea 8,000.00 876.10 11.10 8,887.20
18,000 CFM, 6" pressure, 25 HP nz@19.2 Ea 9,050.00 876.10 11.10 9,937.20
20,000 CFM, 6" pressure, 30 HP nz@20.8 Ea 10,600.00 949.10 12.10 11,561.20

Soil washing treatment, including residual water


Fine and coarse soil particles are separated with finer particles receiving a more intensive treatment.
Add the cost of treatment plant operation and disposal of residue. Trailer mounted system, using a 1.38
CY wheeled loader-backhoe.
5,000 tons of soil et@.080 Ton 199.00 2.94 1.22 203.16
10,000 tons of soil et@.080 Ton 154.00 2.94 1.22 158.16
15,000 tons of soil et@.080 Ton 136.00 2.94 1.22 140.16
20,000 tons of soil et@.080 Ton 127.00 2.94 1.22 131.16
25,000 tons of soil et@.080 Ton 123.00 2.94 1.22 127.16
30,000 tons of soil et@.080 Ton 122.00 2.94 1.22 126.16
35,000 tons of soil et@.080 Ton 121.00 2.94 1.22 125.16
40,000 tons of soil et@.080 Ton 120.00 2.94 1.22 124.16
45,000 tons of soil et@.080 Ton 120.00 2.94 1.22 124.16
50,000 tons of soil et@.080 Ton 119.00 2.94 1.22 123.16
55,000 tons of soil et@.080 Ton 118.00 2.94 1.22 122.16
60,000 tons of soil et@.080 Ton 117.00 2.94 1.22 121.16

Contaminated groundwater recovery - Dual pump recovery system


Includes recovery pump, controls and probe. Operation and maintenance not included, using small
tools.
1/3 HP, 230v single phase st@13.0 Ea 12,300.00 454.00 3.64 12,757.64
1/3 HP, 115v single phase st@13.0 Ea 12,900.00 454.00 3.64 13,357.64
1/3 HP, for highly corrosive liquids,
230v st@13.0 Ea 14,200.00 454.00 3.64 14,657.64
1/2 HP narrow well, 115v or 230v st@13.0 Ea 13,400.00 454.00 3.64 13,857.64

Contaminated groundwater recovery - Groundwater draw down unit, 230v


Includes controls and probes, using small tools.
1/3 HP unit st@13.0 Ea 8,400.00 454.00 3.64 8,857.64
3/4 HP unit st@13.0 Ea 10,900.00 454.00 3.64 11,357.64
1 HP unit st@13.0 Ea 16,800.00 454.00 3.64 17,257.64
1-1/2 HP unit st@13.0 Ea 20,500.00 454.00 3.64 20,957.64
2 HP unit st@13.0 Ea 22,800.00 454.00 3.64 23,257.64
5 HP unit st@13.0 Ea 24,400.00 454.00 3.64 24,857.64
3/4 HP unit for highly corrosive liquids
and contaminated water st@13.0 Ea 13,400.00 454.00 3.64 13,857.64

Contaminated groundwater recovery - Groundwater/product recovery pumps


With sensors and accessories.
50' section of gasoline grade
discharge hose extension --@.000 Ea 788.00 -- -- 788.00
Groundwater or product recovery probe,
100' probe wire only --@.000 Ea 1,380.00 -- -- 1,380.00
Multi well dual pump probe,
100' of cable --@.000 Ea 1,260.00 -- -- 1,260.00

Contaminated groundwater recovery - Groundwater/product recovery pumps


2015 Heavy Construction Estimator, All Rights Reserved Page 464 (part 2)

Using small tools.


4 pump multi well control panel,
4 product and 4 groundwater st@13.0 Ea 11,900.00 454.00 3.64 12,357.64
3 pump multi well control panel,
3 product and 3 groundwater st@13.0 Ea 10,000.00 454.00 3.64 10,457.64
Multi well control panel,
1 product and 4 groundwater st@13.0 Ea 9,120.00 454.00 3.64 9,577.64
Multi well control panel,
2 product and 2 groundwater st@13.0 Ea 8,200.00 454.00 3.64 8,657.64

Contaminated groundwater recovery - Product recovery pumps with sensors


Without controls, includes probe and 50' discharge hose, using small tools.
1/3 HP st@13.0 Ea 3,910.00 454.00 3.64 4,367.64
2015 Heavy Construction Estimator, All Rights Reserved Page 465

Contaminated groundwater recovery - Groundwater recovery pumps


With sensors, without controls, includes 50' discharge hose, using small tools.
3/4 HP pump st@13.0 Ea 4,020.00 454.00 3.64 4,477.64
1-1/2 HP pump st@13.0 Ea 6,340.00 454.00 3.64 6,797.64
5 HP pump st@13.0 Ea 7,390.00 454.00 3.64 7,847.64

Contaminated groundwater recovery - Mobile groundwater/product recovery unit


Includes two compressors and air receivers, one control panel, 450 gallon oil/water separator tank,
transfer pump, three dual pump recovery systems and two fluid ejectors. Cost shown are cost for
leasing only. Add startup and training costs.
1 year lease --@.000 Ea 145,000.00 -- --145,000.00
3 month lease --@.000 Ea 45,300.00 -- -- 45,300.00
1 month lease --@.000 Ea 17,200.00 -- -- 17,200.00
1 week lease --@.000 Ea 5,430.00 -- -- 5,430.00
Start-up and training visits --@.000 Ea 1,810.00 -- -- 1,810.00

Contaminated groundwater recovery - Mobile groundwater/product recovery unit


Using small tools.
Unit operation, cost per
day with material allowance st@26.0 Ea 181.00 907.90 7.28 1,096.18

In situ vitrification treatment


Vitrify soil, 20% moisture, electricity at $0.05 per kWh,
94 pcf --@.000 Ton 634.00 -- -- 634.00
Set-up and move vitrification
equipment between settings --@.000 Ea 5,030.00 -- -- 5,030.00
Mobilize in
situ vitrification equipment --@.000 Mile 22.60 -- -- 22.60
Demobilize in
situ vitrification equipment --@.000 Mile 22.60 -- -- 22.60
Initial set-up of in
situ vitrification equipment --@.000 LS 226,000.00 -- --226,000.00

Soil flushing chemical additives


Surfactant (alkylbenzene sulfonate) --@.000 Lb 1.81 -- -- 1.81

Petroleum biocultures
L-103 light petroleum biocultures --@.000 Lb 30.90 -- -- 30.90
L-103 light petroleum biocultures,
per 100 lb. bag --@.000 Ea 2,820.00 -- -- 2,820.00
L-103 light petroleum biocultures,
per 1000 lb. --@.000 Ea 26,400.00 -- -- 26,400.00
L-104 heavy petroleum/creosote
biocultures --@.000 Lb 32.10 -- -- 32.10
L-104 heavy petroleum/creosote biocultures,
per 100 lb. bag --@.000 Ea 2,940.00 -- -- 2,940.00
L-104 heavy petroleum/creosote biocultures,
per 1000 lb. --@.000 Ea 27,600.00 -- -- 27,600.00

Bionutrients
Bionutrients, 50 lb. bag --@.000 Ea 90.60 -- -- 90.60

CSI 13-274, Tertiary treatment

Acid-base neutralization of highly toxic wastes - Batch neutralization systems


Includes equipment and installation. Excludes operation and maintenance costs, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 465 (part 2)

10 gallon sj@12.8 Ea 21,800.00 606.70 1.92 22,408.62


25 gallon sj@12.8 Ea 39,300.00 606.70 1.92 39,908.62
50 gallon sj@12.8 Ea 40,000.00 606.70 1.92 40,608.62
100 gallon sj@12.8 Ea 42,600.00 606.70 1.92 43,208.62
200 gallon sj@12.8 Ea 46,500.00 606.70 1.92 47,108.62
Pump system added to system --@.000 Ea 20,700.00 -- -- 20,700.00

Acid-base neutralization of highly toxic wastes - Sodium hydroxide for acid neutralization
50% solution. Concentration affects the cost.
500 ml bottle --@.000 Ea 66.70 -- -- 66.70
1 liter bottle --@.000 Ea 75.10 -- -- 75.10
4 liter bottle --@.000 Ea 140.00 -- -- 140.00
20 liter bottle --@.000 Ea 351.00 -- -- 351.00
190 lb. drummed liquid --@.000 Lb 0.34 -- -- 0.34
700 lb. drummed liquid --@.000 Lb 0.31 -- -- 0.31
500 lb. container, beads --@.000 Lb 0.81 -- -- 0.81
100 lb. container, flakes --@.000 Lb 1.09 -- -- 1.09
400 lb. container, flakes --@.000 Lb 0.87 -- -- 0.87

Acid-base neutralization of highly toxic wastes - Sulfuric acid for base neutralization
1 liter, 1N --@.000 Ea 30.70 -- -- 30.70
4 liter, 1N --@.000 Ea 61.40 -- -- 61.40
20 liter, 1N --@.000 Ea 126.00 -- -- 126.00
2015 Heavy Construction Estimator, All Rights Reserved Page 466

220 lb. drummed liquid --@.000 Lb 0.22 -- -- 0.22


750 lb. drummed liquid --@.000 Lb 0.16 -- -- 0.16

Acid-base neutralization of highly toxic wastes - Magnesium hydroxide slurry


Used for acid neutralization.
55 gallon drum,
less than 40 drum order --@.000 Ea 260.00 -- -- 260.00
55 gallon drum, 40 to 71 drum order --@.000 Ea 233.00 -- -- 233.00
55 gallon drum,
more than 72 drum order --@.000 Ea 211.00 -- -- 211.00
Bulk quantity, minimum 20 ton order --@.000 Ton 418.00 -- -- 418.00

Acid-base neutralization of highly toxic wastes - Soda ash, powdered


Used for acid neutralization.
50 lb. bag --@.000 Lb 0.27 -- -- 0.27
100 lb. bag --@.000 Lb 0.27 -- -- 0.27

Acid-base neutralization of highly toxic wastes - Lime


Used for acid neutralization.
Quicklime,
1/4" nominal granules, bulk --@.000 Ton 99.60 -- -- 99.60
Quicklime,
3/4" nominal granules, bulk --@.000 Ton 99.60 -- -- 99.60
Quicklime, combination of 1/4" and 3/4" granules,
bulk quantity --@.000 Ton 99.60 -- -- 99.60
Hydrated lime, powdered, bulk --@.000 Ton 99.60 -- -- 99.60
Hydrated lime, powdered, 50 lb. bag --@.000 Ton 183.00 -- -- 183.00
Hydrated lime, powdered, 50 lb. bag --@.000 Ea 4.89 -- -- 4.89

Modular carbon adsorbers, liquid phase


All units are epoxy/phenolic lined steel U.O.N. Units can be refilled. Prices based on general purpose
coal based fill, using small tools.
5 GPM, 85 lb. fill,
DOT 5B drum, disposable nm@2.00 Ea 743.00 92.08 1.22 836.30
5 GPM, 85 lb. fill,
HDPE DOT spec 34, disposable nm@2.00 Ea 743.00 92.08 1.22 836.30
15 GPM, 165 lb. fill,
DOT 5B drum, disposable nm@2.67 Ea 1,130.00 122.90 1.63 1,254.53
15 GPM, 165 lb. fill,
HDPE DOT spec 34, disposable nm@2.67 Ea 1,120.00 122.90 1.63 1,244.53
20 GPM, 250 lb. fill, disposable nm@5.33 Ea 1,760.00 245.40 3.25 2,008.65
25 GPM, 330 lb. fill, disposable nm@8.00 Ea 2,540.00 368.30 4.88 2,913.18
25 GPM, 330 lb. fill,
HDPE, disposable nm@8.00 Ea 3,420.00 368.30 4.88 3,793.18

Modular carbon adsorbers, liquid phase


Using a 20-ton hydraulic crane with 70’ boom and small tools.
25 GPM, 330 lb. fill,
HDPE steel lined, permanent nt@2.80 Ea 6,020.00 126.70 20.40 6,167.10
25 GPM, 330 lb. fill, 316L stainless steel,
permanent nt@2.80 Ea 7,700.00 126.70 20.40 7,847.10
35 GPM, 1050 lb. fill, disposable nt@7.00 Ea 5,800.00 316.80 51.10 6,167.90
35 GPM, 660 lb. fill,
HDPE steel lined, permanent nt@7.00 Ea 8,330.00 316.80 51.10 8,697.90
35 GPM, 660 lb. fill, 316L,
stainless steel, permanent nt@7.00 Ea 10,300.00 316.80 51.10 10,667.90
50 GPM, 1650 lb. fill, disposable nt@9.33 Ea 7,530.00 422.20 68.10 8,020.30
50 GPM, 1050 lb. fill,
2015 Heavy Construction Estimator, All Rights Reserved Page 466 (part 2)

HDPE, disposable nt@9.33 Ea 6,610.00 422.20 68.10 7,100.30


50 GPM, 1050 lb. fill,
HDPE, permanent nt@9.33 Ea 8,010.00 422.20 68.10 8,500.30
50 GPM, 880 lb. fill,
HDPE steel lined, permanent nt@9.33 Ea 10,700.00 422.20 68.10 11,190.30
50 GPM, 880 lb. fill, 316L,
stainless steel, permanent nt@9.33 Ea 13,300.00 422.20 68.10 13,790.30
75 GPM, 1650 lb. fill,
HDPE steel lined, permanent nt@14.0 Ea 15,400.00 633.50 102.00 16,135.50
75 GPM, 1650 lb. fill, 316L,
stainless steel, permanent nt@14.0 Ea 19,700.00 633.50 102.00 20,435.50
100 GPM, 3000 lb. fill, disposable nt@14.0 Ea 12,400.00 633.50 102.00 13,135.50
100 GPM, 3000 lb. fill,
HDPE steel lined, permanent nt@14.0 Ea 22,300.00 633.50 102.00 23,035.50
100 GPM, 3000 lb. fill, 316L,
stainless steel, permanent nt@14.0 Ea 28,800.00 633.50 102.00 29,535.50
200 GPM, 6000 lb. fill, disposable nt@28.0 Ea 23,900.00 1,267.00 204.00 25,371.00
200 GPM, 6000 lb. fill,
HDPE steel lined nt@28.0 Ea 40,600.00 1,267.00 204.00 42,071.00
200 GPM, 6000 lb. fill, 316L,
stainless steel, permanent nt@28.0 Ea 53,800.00 1,267.00 204.00 55,271.00
Dual bed, 50 GPM series, 100 GPM parallel,
1760 lb. fill, 316I nt@28.0 Ea 23,900.00 1,267.00 204.00 25,371.00
Dual bed, 75 GPM series, 150 GPM parallel, 3300 lb. fill,
316L stainless steel nt@28.0 Ea 36,900.00 1,267.00 204.00 38,371.00
Prefilter/post filter housing and cartridge,
to 20 GPM nt@1.75 Ea 344.00 79.19 12.80 435.99
Replacement high capacity
Pre-filter cartridges --@.000 Ea 52.50 -- -- 52.50
Dual bed, 65 GPM series, 130 parallel,
4' diameter, 2000 lb. carbon nt@215. Ea 110,000.00 9,729.00 1,570.00121,299.00
Dual bed, 175 series, 350 parallel,
7.5' diameter, 10000 lb. pt@337. Ea 210,000.00 14,160.00 1,700.00225,860.00

Modular carbon adsorbers, liquid phase


Using a 40-ton hydraulic crane with 84’ boom and small tools.
Dual bed, 350 series, 700 parallel,
10' diameter, 20000 lb. pu@399. Ea 346,000.00 16,630.00 3,020.00365,650.00
Dual bed, 350 series, 700 parallel,
12' diameter, 20000 lb. pu@399. Ea 364,000.00 16,630.00 3,020.00383,650.00
2015 Heavy Construction Estimator, All Rights Reserved Page 467

Bulk liquid phase activated carbon adsorbers


Coal based general purpose carbons are a broad spectrum absorbent for removal of organics in water
applications.
Coal based general purpose, 8 x 30 sieve, 900 iodine,
less than 2000 lbs. --@.000 Lb 2.63 -- -- 2.63
Coal based general purpose, 8 x 30 sieve, 900 iodine,
2000 to 10000 lbs. --@.000 Lb 1.77 -- -- 1.77
Coal based general purpose, 8 x 30 sieve, 1100 iodine,
more than10000 lbs. --@.000 Lb 1.59 -- -- 1.59
Coconut based, high capacity, 12 x 30 sieve, 1100 iodine,
less than 2000 lbs. --@.000 Lb 3.04 -- -- 3.04
Coconut based, high capacity, 12 x 30 sieve, 1100 iodine,
2000 to 10000 lbs. --@.000 Lb 2.88 -- -- 2.88
Coconut based, high capacity, 12 x 30 sieve, 1100 iodine,
less than 10000 lbs. --@.000 Lb 2.54 -- -- 2.54
Activated aluminas, for highly
oxidizable contaminants --@.000 Lb 3.80 -- -- 3.80
Reactivation or thermal
regeneration of carbon --@.000 Lb 1.27 -- -- 1.27
Remove carbon from vessels, 10k lbs. to 20k lbs. minimum,
transport and reactivate --@.000 Lb 2.26 -- -- 2.26

Chemical oxidation
Using hydrogen peroxide and ultraviolet light to destroy dissolved organic contaminants.
60 KW, flow to 160 GPM, 8' x 2' x 6',
purchase and install --@.000 Ea 217,000.00 -- --217,000.00
60 KW, flow to 160 GPM,
8' x 2' x 6', monthly rental --@.000 Ea 9,060.00 -- -- 9,060.00
120 KW, flow to 320 GPM, 7' x 4' x 8',
purchase and install --@.000 Ea 292,000.00 -- --292,000.00
120 KW, flow to 320 GPM,
7' x 4' x 8', monthly rental --@.000 Ea 9,060.00 -- -- 9,060.00
180 KW, flow to 500 GPM, 8' x 7' x 8',
purchase and install --@.000 Ea 366,000.00 -- --366,000.00
180 KW, flow to 500 GPM,
8' x 7' x 8', monthly rental --@.000 Ea 11,800.00 -- -- 11,800.00
360 KW, flow to 500 GPM, 15.5' x 7' x 8.5',
purchase and install --@.000 Ea 601,000.00 -- --601,000.00
360 KW, flow to 500 GPM,
15.5' x 7' x 8.5', monthly --@.000 Ea 18,100.00 -- -- 18,100.00
540 KW, flow to 1500 GPM, 19' x 7' x 9',
purchase and install --@.000 Ea 909,000.00 -- --909,000.00
540 KW, flow to 1500 GPM, 19' x 7' x 9',
monthly rental --@.000 Ea 24,400.00 -- -- 24,400.00
810 KW, flow to 1500 GPM,
purchase and install --@.000 Ea 1,360,000.00 -- --1,360,000.00
810 KW, flow to 1500 GPM,
monthly rental --@.000 Ea 359,000.00 -- --359,000.00
Bench scale testing, groundwater --@.000 Ea 6,340.00 -- -- 6,340.00
Bench scale testing, process water --@.000 Ea 9,060.00 -- -- 9,060.00
Hydrogen peroxide,
50% solution, 500 ml --@.000 Ea 54.30 -- -- 54.30
Hydrogen peroxide, 50% solution,
case of 6 x 500 ml --@.000 Ea 228.00 -- -- 228.00
Hydrogen peroxide,
50% solution, 145 lb. drum --@.000 Lb 0.98 -- -- 0.98
Hydrogen peroxide,
50% solution, 500 lb. drum --@.000 Lb 0.85 -- -- 0.85
2015 Heavy Construction Estimator, All Rights Reserved Page 467 (part 2)

Hydrogen peroxide,
35% solution, 145 lb. drum --@.000 Lb 0.72 -- -- 0.72
Hydrogen peroxide,
35% solution, 500 lb. drum --@.000 Lb 0.62 -- -- 0.62

Chemical oxidation
Using small tools.
Chlorine dioxide generator, 25 to 400 lb. per day output,
25% sodium chloride precursor n7@10.0 Ea 28,500.00 468.30 6.00 28,974.30
Chlorine dioxide generator, 200 to 600 lb. per day output,
25% sodium chloride precursor n7@13.3 Ea 33,900.00 622.80 7.98 34,530.78
Chlorine dioxide generator, 500 to 900 lb. per day output,
25% sodium chloride precursor n7@20.0 Ea 53,900.00 936.60 12.00 54,848.60
25% sodium chlorite solution, 1 to 10 drum purchase,
565 lb. drum n7@20.0 Lb 1.03 936.60 12.00 949.63
25% sodium chlorite solution, 11 to 20 drum purchase,
565 lb. drum n7@20.0 Lb 1.01 936.60 12.00 949.61
25% sodium chlorite solution, 21 or more drum purchase,
565 lb. drum n7@20.0 Lb 0.92 936.60 12.00 949.52
25% sodium chlorite solution,
bulk quantity in tank trucks n7@20.0 Lb 0.83 936.60 12.00 949.43
Potassium permanganate, 25 kg (55
lb.) or 50 kg (110 lb.) pail n7@20.0 Lb 3.28 936.60 12.00 951.88
Potassium permanganate, 150 kg (110.25 lb.) drum, minimum order 1 to 4 drums,
$1.81 per lb. n7@20.0 Lb 3.28 936.60 12.00 951.88

Chlorination - Chlorine gas cylinder


150 lb. empty without valves --@.000 Ea 495.00 -- -- 495.00

Disinfection - Gas feeders


System is designed to feed chlorine, sulfur dioxide, ammonia and carbon dioxide for wastewater
treatment. Pricing includes equipment and installation, using a 200-amp trailer mounted-amp welder
and small tools.
100 lbs. per day capacity,
vacuum regulator and injector pd@26.0 Ea 2,630.00 1,113.00 114.00 3,857.00
100 lbs. per day capacity, vacuum regulator, injector
and separate meter panel pd@26.0 Ea 3,100.00 1,113.00 114.00 4,327.00
200 lbs. per day capacity,
vacuum regulator and injector pd@32.5 Ea 2,900.00 1,391.00 143.00 4,434.00
200 lbs. per day capacity, vacuum regulator, injector
and separate meter panel pd@32.5 Ea 3,440.00 1,391.00 143.00 4,974.00
500 lbs. per day capacity,
vacuum regulator and injector pd@43.3 Ea 3,980.00 1,854.00 190.00 6,024.00
500 lbs. per day capacity, vacuum regulator, injector
and separate meter panel pd@43.3 Ea 4,620.00 1,854.00 190.00 6,664.00
2015 Heavy Construction Estimator, All Rights Reserved Page 468

Disinfection - Auto switchover gas feeders


Feeding chlorine, sulfur dioxide, ammonia and carbon dioxide for wastewater treatment. Includes
vacuum regulators, switchover module, remote meter panel and ejector but no the gas cylinders, using a
200-amp trailer mounted-amp welder and small tools.
100 lbs. per day capacity pd@32.5 Ea 4,740.00 1,391.00 143.00 6,274.00
200 lbs. per day capacity pd@32.5 Ea 5,230.00 1,391.00 143.00 6,764.00
500 lbs. per day capacity pd@43.3 Ea 6,160.00 1,854.00 190.00 8,204.00
1000 lbs. per day capacity pd@65.0 Ea 11,800.00 2,783.00 285.00 14,868.00

Disinfection - Disinfection compounds


Anhydrous ammonia, 150 lb. cylinder, plus cylinder
rental of $6.00 per month --@.000 Ea 401.00 -- -- 401.00
Sulfur dioxide, cylinder,
full truckload equals 12 tons --@.000 Ton 375.00 -- -- 375.00
Sulfur dioxide, bulk, by 20
ton truck or 90 ton rail car --@.000 Ton 275.00 -- -- 275.00
Carbon dioxide,
282 cubic feet cylinder --@.000 Ea 29.80 -- -- 29.80
Carbon dioxide,
165 liter dewar tank --@.000 Ea 105.00 -- -- 105.00

Distillation - Solvent reclamation optional


Using small tools.
Separator tank, allows separating of solvents
prior to distillation ph@8.00 Ea 543.00 355.20 5.36 903.56
Clarifier tank, helps stabilize
solvents after recovery ph@8.00 Ea 453.00 355.20 5.36 813.56
Activated carbon fume scrubber ph@1.78 Ea 109.00 79.03 1.19 189.22
Automatic drum probe, shuts down unit
when receiving drum is full ph@1.78 Ea 299.00 79.03 1.19 379.22
Lid interlock, shuts down unit
if drum lid is not secure ph@1.78 Ea 1,540.00 79.03 1.19 1,620.22
Lid mounted sensor, allows unit shutdown
on vapor temperature rise ph@1.78 Ea 543.00 79.03 1.19 623.22
In-line 5 micron water filter ph@1.78 Ea 72.40 79.03 1.19 152.62
Electrical drum pump ph@1.78 Ea 2,260.00 79.03 1.19 2,340.22
Mobility option allowing
unit to become portable ph@8.00 Ea 1,350.00 355.20 5.36 1,710.56
Water recirculator allowing
continuous water supply ph@8.00 Ea 3,660.00 355.20 5.36 4,020.56
Air cooled condenser ph@8.00 Ea 2,360.00 355.20 5.36 2,720.56
Teflon still chamber lines for temperature
greater than 250 degrees ph@8.00 Ea 114.00 355.20 5.36 474.56
Flame arrestor ph@8.00 Ea 634.00 355.20 5.36 994.56
Liquid level control for 2
and 5 gallons per hour units ph@8.00 Ea 896.00 355.20 5.36 1,256.56
Liquid level control for 8
and 20 gallons per hour units ph@8.00 Ea 3,780.00 355.20 5.36 4,140.56

Evaporation services, by a LUWA thin film evaporator


Organics, stripped as overhead --@.000 Gal 1.81 -- -- 1.81
Organics, stripped as bottom --@.000 Gal 2.72 -- -- 2.72

Ion exchange - Cation exchange resins


Strongly acidic, sulfonated polystyrene.
Gel type, sodium form, 10% DVB --@.000 CF 197.00 -- -- 197.00
Gel type, hydrogen form, 10% DVB --@.000 CF 190.00 -- -- 190.00
2015 Heavy Construction Estimator, All Rights Reserved Page 468 (part 2)

Gel type, sodium form, 8% DVB --@.000 CF 167.00 -- -- 167.00


Gel type, hydrogen form, 8% DVB --@.000 CF 163.00 -- -- 163.00
Macroporous type,
sodium form, 20% DVB --@.000 CF 263.00 -- -- 263.00
Macroporous type,
sodium form, 14% DVB --@.000 CF 263.00 -- -- 263.00

Ion exchange - Weakly acidic


Gel type, hydrogen form --@.000 CF 436.00 -- -- 436.00
Macroporous type, sodium form --@.000 CF 326.00 -- -- 326.00
Macroporous type, hydrogen form --@.000 CF 449.00 -- -- 449.00

Ion exchange - Strongly basic


Gel type, chloride form, 8% DVB --@.000 CF 516.00 -- -- 516.00
Gel type, hydroxide form, 8% DVB --@.000 CF 552.00 -- -- 552.00
Gel type, chloride form, 6% DVB --@.000 CF 474.00 -- -- 474.00
Gel type, hydroxide form, 6% DVB --@.000 CF 511.00 -- -- 511.00
Macroporous type, chloride form --@.000 CF 552.00 -- -- 552.00
Macroporous type, chloride form,
very high pore structure --@.000 CF 1,370.00 -- -- 1,370.00
Macroporous type, hydroxide form,
very high pore structure --@.000 CF 1,680.00 -- -- 1,680.00

Ion exchange - Weakly basic


Gel type, free base form --@.000 CF 498.00 -- -- 498.00
Macroporous type, free base form --@.000 CF 547.00 -- -- 547.00
2015 Heavy Construction Estimator, All Rights Reserved Page 469

Ion exchange - Miscellaneous ion exchangers and adsorbents


Mixed bed resins,
hydrogen/hydroxide form --@.000 CF 384.00 -- -- 384.00
Polymeric adsorbents, non-ionic --@.000 CF 706.00 -- -- 706.00
Polymeric adsorbents,
non-ionic, high capacity --@.000 CF 869.00 -- -- 869.00
Nuclear grade mixed bed exchangers,
hydrogen/hydroxide form --@.000 CF 489.00 -- -- 489.00
Nuclear grade mixed bed exchangers, hydrogen/hydroxide
free base form --@.000 CF 623.00 -- -- 623.00

Ion exchange - Demineralization


Two bed co-current equipment, strong base. Nominal capacity listed in KGR. Pricing includes
equipment and installation, using small tools.
53 KGR, 7 GPM service ph@32.0 Ea 22,100.00 1,421.00 21.40 23,542.40
83 KGR, 11 GPM service ph@64.0 Ea 25,500.00 2,842.00 42.90 28,384.90
135 KGR, 18 GPM service ph@80.0 Ea 29,000.00 3,552.00 53.60 32,605.60

Metal precipitation - Hexavalent chromate removal


Approximately 4 lbs. iron anode will remove one pound of hexavalent chrome. Power and water required
for operation. Minimal labor required. Pricing includes equipment and installation. Operation and
maintenance excluded. CR+6 removal, using small tools.
25 lbs. FE ion
generation per 6 lbs. CR+6 ph@42.6 Ea 57,900.00 1,891.00 28.50 59,819.50
100 lbs.
FE ion generation per 25 lbs. ph@42.6 Ea 97,700.00 1,891.00 28.50 99,619.50
150 lbs.
FE ion generation per 38 lbs. ph@53.3 Ea 114,000.00 2,367.00 35.70116,402.70
200 lbs.
FE ion generation per 50 lbs. ph@53.3 Ea 130,000.00 2,367.00 35.70132,402.70
250 lbs.
FE ion generation per 62 lbs. ph@53.3 Ea 155,000.00 2,367.00 35.70157,402.70
300 lbs.
FE ion generation per 75 lbs. ph@64.0 Ea 179,000.00 2,842.00 42.90181,884.90
350 lbs.
FE ion generation per 90 lbs. ph@63.5 Ea 203,000.00 2,819.00 42.50205,861.50
400 lbs. FE
ion generation per 100 lbs. ph@63.5 Ea 228,000.00 2,819.00 42.50230,861.50
450 lbs. FE
ion generation per 115 lbs. ph@63.5 Ea 252,000.00 2,819.00 42.50254,861.50
500 lbs. FE
ion generation per 125 lbs. ph@63.5 Ea 277,000.00 2,819.00 42.50279,861.50
550 lbs. FE
ion generation per 137 lbs. ph@63.5 Ea 301,000.00 2,819.00 42.50303,861.50
600 lbs. FE
ion generation per 150 lbs. ph@80.0 Ea 326,000.00 3,552.00 53.60329,605.60
650 lbs. FE
ion generation per 163 lbs. ph@80.0 Ea 350,000.00 3,552.00 53.60353,605.60
700 lbs. FE
ion generation per 175 lbs. ph@80.0 Ea 375,000.00 3,552.00 53.60378,605.60
750 lbs. FE
ion generation per 185 lbs. ph@105. Ea 398,000.00 4,662.00 70.40402,732.40
800 lbs. FE
ion generation per 200 lbs. ph@105. Ea 424,000.00 4,662.00 70.40428,732.40
850 lbs. FE
ion generation per 210 lbs. ph@105. Ea 447,000.00 4,662.00 70.40451,732.40
900 lbs. FE
ion generation per 225 lbs. ph@160. Ea 473,000.00 7,104.00 107.00480,211.00
2015 Heavy Construction Estimator, All Rights Reserved Page 469 (part 2)

950 lbs. FE
ion generation per 235 lbs. ph@160. Ea 496,000.00 7,104.00 107.00503,211.00
1000 lbs.
FE generation per 250 lbs. ph@160. Ea 522,000.00 7,104.00 107.00529,211.00
Replacement iron electrodes,
1' x 4' x 11 gauge --@.000 Ea 21.70 -- -- 21.70
Replacement iron per cell,
50 electrodes per cell --@.000 Ea 991.00 -- -- 991.00

Metal precipitation - Magnesium hydroxide slurry


55 gallon drum,
less than 40 drum order --@.000 Ea 298.00 -- -- 298.00
55 gallon drum, 40 to 71 drum order --@.000 Ea 298.00 -- -- 298.00
55 gallon drum,
more than 72 drum order --@.000 Ea 267.00 -- -- 267.00
Bulk quantity, minimum 20 ton order --@.000 Ton 521.00 -- -- 521.00

Ozonation treatment services, 40,000 GPD UV/ozone plant


Contaminated waste, per gallon --@.000 Gal 0.02 -- -- 0.02
Contaminated waste, per hour --@.000 Hour 436.00 -- -- 436.00

PCB spill remediation - Cleanup to 1" deep in porous surface such as concrete
Applicator foamer, purchase --@.000 Ea 6,550.00 -- -- 6,550.00
5 gallon pail of cleanup liquid --@.000 Ea 416.00 -- -- 416.00
55 gallon drum of cleanup liquid --@.000 Ea 4,500.00 -- -- 4,500.00

PCB spill remediation - PCB cleaning


Using small tools.
100 prm per 100cm2 or less concentration,
one application cycle uj@.010 SF 0.56 0.35 -- 0.91
100 prm per 100cm2 to 1000 prm per 100 concentration,
two application cycles uj@.010 SF 1.12 0.35 -- 1.47
1000 prm per 100cm2 to 3000 prm per 100 concentration,
three application cycles uj@.020 SF 1.68 0.70 -- 2.38
2015 Heavy Construction Estimator, All Rights Reserved Page 470

PCB spill remediation - Surface treatment liquid


For migration and leaching of contaminants.
5 gallon pail --@.000 Ea 369.00 -- -- 369.00
55 gallon drum --@.000 Ea 4,010.00 -- -- 4,010.00
Surface treatment per SF uj@.010 SF 0.49 0.35 -- 0.84

Resin adsorption - Adsorbents


Amberlite XAD-2 polystyrene --@.000 CF 717.00 -- -- 717.00
Amberlite XAD-4 polystyrene --@.000 CF 880.00 -- -- 880.00
Amberlite XAD-7 polystyrene --@.000 CF 681.00 -- -- 681.00
Amberlite XAD-8 acrylic ester --@.000 CF 761.00 -- -- 761.00
Amberlite XAD-16 acrylic ester --@.000 CF 1,010.00 -- -- 1,010.00

Resin adsorption - Resin adsorption services


Extreme contamination,
such as phenol recovery --@.000 Gal 0.14 -- -- 0.14
Heavy contamination --@.000 Gal 0.09 -- -- 0.09
Moderate contamination --@.000 Gal 0.05 -- -- 0.05
Light contamination such as
chlorinated pesticide removal --@.000 Gal 0.11 -- -- 0.11

Reverse osmosis - Single reverse osmosis units.


Capacity is based on operation at 77degrees Fahrenheit. Includes equipment and installation. Excludes
operation and maintenance, using a 200-amp trailer mounted-amp welder and small tools.
1/3 HP,
166 gallons per day capacity pd@26.0 Ea 4,280.00 1,113.00 114.00 5,507.00
1/3 HP,
318 gallons per day capacity pd@26.0 Ea 5,260.00 1,113.00 114.00 6,487.00
1/3 HP,
459 gallons per day capacity pd@26.0 Ea 6,240.00 1,113.00 114.00 7,467.00
1/3 HP,
587 gallons per day capacity pd@26.0 Ea 7,210.00 1,113.00 114.00 8,437.00
1/3 HP,
705 gallons per day capacity pd@26.0 Ea 8,190.00 1,113.00 114.00 9,417.00
1/3 HP,
814 gallons per day capacity pd@26.0 Ea 9,180.00 1,113.00 114.00 10,407.00
3/4 HP,
438 gallons per day capacity pd@26.0 Ea 8,660.00 1,113.00 114.00 9,887.00
3/4 HP,
857 gallons per day capacity pd@26.0 Ea 10,700.00 1,113.00 114.00 11,927.00
3/4 HP, 1,261
gallons per day capacity pd@26.0 Ea 12,800.00 1,113.00 114.00 14,027.00
3/4 HP, 1,621
gallons per day capacity pd@26.0 Ea 14,900.00 1,113.00 114.00 16,127.00
3/4 HP, 1,965
gallons per day capacity pd@26.0 Ea 17,000.00 1,113.00 114.00 18,227.00
3/4 HP, 2,219
gallons per day capacity pd@34.7 Ea 18,700.00 1,486.00 152.00 20,338.00
2 HP, 3,229
gallons per day capacity pd@34.7 Ea 19,200.00 1,486.00 152.00 20,838.00
2 HP, 4,756
gallons per day capacity pd@34.7 Ea 22,900.00 1,486.00 152.00 24,538.00
2 HP, 6,330
gallons per day capacity pd@34.7 Ea 26,600.00 1,486.00 152.00 28,238.00
2 HP, 7,735
gallons per day capacity pd@34.7 Ea 29,700.00 1,486.00 152.00 31,338.00
2 HP, 9,078
2015 Heavy Construction Estimator, All Rights Reserved Page 470 (part 2)

gallons per day capacity pd@34.7 Ea 33,400.00 1,486.00 152.00 35,038.00

Reverse osmosis - Single reverse osmosis optional equipment


Conductivity meter and alarm --@.000 Ea 1,970.00 -- -- 1,970.00
PH meter and alarm --@.000 Ea 2,780.00 -- -- 2,780.00
Reject flush system,
1/3 HP and 3/4 HP units --@.000 Ea 656.00 -- -- 656.00
Reject flush system, 2 HP units --@.000 Ea 915.00 -- -- 915.00
SD1 test kits --@.000 Ea 1,000.00 -- -- 1,000.00
Pre-treatment interlock --@.000 Ea 190.00 -- -- 190.00
Product and reject flow meter,
1/3 HP unit only --@.000 Ea 259.00 -- -- 259.00
Anti-corrosion package,
1/3 HP and 3/4 HP units --@.000 Ea 2,520.00 -- -- 2,520.00
Anti-corrosion package, 2 HP unit --@.000 Ea 3,860.00 -- -- 3,860.00
Low pressure switch,
1/3 HP unit only --@.000 Ea 415.00 -- -- 415.00
Product tank level controller --@.000 Ea 449.00 -- -- 449.00
Carbon pre-filter, cartridge type,
1/3 HP unit only --@.000 Ea 156.00 -- -- 156.00
Recycle system, 1/3 HP unit only --@.000 Ea 603.00 -- -- 603.00
Recycle flow meter, 3/4 HP unit --@.000 Ea 275.00 -- -- 275.00
Recycle flow meter, 2 HP unit only --@.000 Ea 310.00 -- -- 310.00
Stainless steel pump,
1/3 HP unit only --@.000 Ea 328.00 -- -- 328.00
Stainless steel pump,
3/4 HP unit only --@.000 Ea 518.00 -- -- 518.00
Percent rejection meter and alarm --@.000 Ea 2,570.00 -- -- 2,570.00
2015 Heavy Construction Estimator, All Rights Reserved Page 471

Wet air oxidation treatment


Minimal oxygen demand,
minimal contamination --@.000 Ton 217.00 -- -- 217.00
Low oxygen demand,
low contamination --@.000 Ton 489.00 -- -- 489.00
Moderate oxygen demand,
moderate contamination --@.000 Ton 743.00 -- -- 743.00
High oxygen demand,
high contamination --@.000 Ton 1,010.00 -- -- 1,010.00
Maximum oxygen demand,
maximum contamination --@.000 Ton 1,270.00 -- -- 1,270.00

Super critical fluid oxidation (SCFD) treatment - Oxidation services, process capacity
20 ton per day, batch operation,
low quantities --@.000 Ton 869.00 -- -- 869.00
20 ton per day, project operation,
medium quantities --@.000 Ton 598.00 -- -- 598.00
20 ton per day, continuous operation,
high quantities --@.000 Ton 326.00 -- -- 326.00
40 ton per day, batch operation,
low quantities --@.000 Ton 391.00 -- -- 391.00
40 ton per day, project operation,
medium quantities --@.000 Ton 304.00 -- -- 304.00
40 ton per day, continuous operation,
high quantities --@.000 Ton 217.00 -- -- 217.00
80 ton per day, batch operation,
low quantities --@.000 Ton 270.00 -- -- 270.00
80 ton per day, project operation,
medium quantities --@.000 Ton 214.00 -- -- 214.00
80 ton per day, continuous operation,
high quantities --@.000 Ton 156.00 -- -- 156.00
120 ton per day, batch operation,
low quantities --@.000 Ton 252.00 -- -- 252.00
120 ton per day, project operation,
medium quantities --@.000 Ton 196.00 -- -- 196.00
120 ton per day, continuous operation,
high quantities --@.000 Ton 139.00 -- -- 139.00

Chlorolysis treatment services


Off site plant, 600 degrees --@.000 Ton 2,720.00 -- -- 2,720.00

Cyanide destruction - Chlorine dioxide generation.


All generators use a 25% sodium chlorite precursor, using small tools.
25 to 199 lbs. per day output n8@20.0 Ea 28,500.00 1,018.00 12.00 29,530.00
200 to 499 lbs. per day output n8@20.0 Ea 33,900.00 1,018.00 12.00 34,930.00
500 to 900 lbs. per day output n8@20.0 Ea 53,800.00 1,018.00 12.00 54,830.00

Cyanide destruction - Precursor chemicals


Hydrochloric acid,
500 lb. (227kg) drum --@.000 Lb 0.42 -- -- 0.42
Sodium hypochlorite,
50 gallon drum 189L --@.000 Gal 1.90 -- -- 1.90
Sodium hypochlorite, bulk,
truckload up to 4,000 gallons --@.000 Gal 1.27 -- -- 1.27
Sodium chlorite, 31.25 solution,
560 lb. (254kg) drum --@.000 Lb 2.61 -- -- 2.61
2015 Heavy Construction Estimator, All Rights Reserved Page 471 (part 2)

Air and process gas purification - Modular carbon adsorbers. Closed up-flow
Epoxy/phenolic lined steel U.O.N. 50 and 100 CFM units are DOT 5B compliant. Prices based on
general use coconum base fill, using small tools.
50 CFM, 110 lb. fill,
7.0" pressure drop ph@2.00 Ea 806.00 88.80 1.34 896.14
50 CFM, 110 lb. fill,
HDPE, 7.0" pressure drop ph@2.00 Ea 806.00 88.80 1.34 896.14
100 CFM, 150 lb. fill,
5.0" pressure drop ph@2.67 Ea 1,140.00 118.50 1.79 1,260.29
100 CFM, 200 lb. fill,
6.8" pressure drop ph@2.67 Ea 1,300.00 118.50 1.79 1,420.29
100 CFM, 200 lb. fill,
HDPE, 6.8" pressure drop ph@2.67 Ea 1,300.00 118.50 1.79 1,420.29
150 CFM, 300 lb. fill,
7.9" pressure drop ph@5.33 Ea 2,150.00 236.70 3.57 2,390.27
250 CFM, 400 lb. fill,
11.3" pressure drop ph@8.00 Ea 2,950.00 355.20 5.36 3,310.56
250 CFM, 400 lb. fill,
HDPE,11.3" pressure drop ph@8.00 Ea 4,090.00 355.20 5.36 4,450.56

Air and process gas purification - Modular carbon adsorbers


Using a 20-ton hydraulic crane with 70’ boom and small tools.
500 CFM, 1200 lb. fill,
HDPE, 8.5" pressure drop pl@8.60 Ea 10,000.00 377.50 34.80 10,412.30
500 CFM, 1400 lb. fill,
11.5" pressure drop pl@17.2 Ea 14,600.00 754.90 69.70 15,424.60

Air and process gas purification - Modular carbon adsorbers


Using small tools.
500 CFM, 200 lb. fill, radial flow,
4.8" pressure drop ph@5.33 Ea 2,440.00 236.70 3.57 2,680.27

Air and process gas purification - Modular carbon adsorbers


Using a 20-ton hydraulic crane with 70’ boom and small tools.
750 CFM, 3200 lb. fill, closed up-flow,
11.5" pressure drop pl@17.2 Ea 23,000.00 754.90 69.70 23,824.60
2015 Heavy Construction Estimator, All Rights Reserved Page 472

Air and process gas purification - Modular carbon adsorbers. Closed up-flow
Using small tools.
1000 CFM, 400 lb. fill, radial flow,
4.8" pressure drop ph@8.00 Ea 4,570.00 355.20 5.36 4,930.56

Air and process gas purification - Modular carbon adsorbers


Using a 20-ton hydraulic crane with 70’ boom and small tools.
1500 CFM, 5700 lb. fill, closed up-flow,
11.5" pressure drop pl@34.4 Ea 37,400.00 1,510.00 139.00 39,049.00

Air and process gas purification - Modular carbon adsorbers


Using small tools.
1500 CFM, 300 lb. fill, radial flow,
4.8" pressure drop ph@5.33 Ea 4,480.00 236.70 3.57 4,720.27

Air and process gas purification - Modular carbon adsorbers.


Using a 20-ton hydraulic crane with 70’ boom and small tools.
3000 CFM, 1600 lb. fill, radial flow,
4.8" pressure drop pl@17.2 Ea 14,600.00 754.90 69.70 15,424.60
5000 CFM,
4700 lb. fill, radial flow pl@17.2 Ea 32,300.00 754.90 69.70 33,124.60
8000 CFM,
6300 lb. fill, radial flow pl@34.4 Ea 39,500.00 1,510.00 139.00 41,149.00
2200 CFM, 3000 lb. fill, 6 x 6 closed traverse,
8" pressure drop pl@17.2 Ea 26,400.00 754.90 69.70 27,224.60
4000 CFM, 5300 lb. fill, 8 x 8 closed traverse,
8" pressure drop pl@34.4 Ea 39,800.00 1,510.00 139.00 41,449.00
Dual bed, 500 CFM series per 1000 CFM parallel, 2000 lb. fill,
316L stainless steel pl@17.2 Ea 25,400.00 754.90 69.70 26,224.60
Dual bed, 1000 CFM series per 1000 CFM parallel, 2000 lb. fill,
316L stainless steel pl@34.4 Ea 39,900.00 1,510.00 139.00 41,549.00
Saturation indicator --@.000 Ea 136.00 -- -- 136.00

Air and process gas purification - Modular carbon adsorber cabinets


Using a 20-ton hydraulic crane with 70’ boom and small tools.
500 CFM radial
unit accumulator cabinet pl@8.60 Ea 1,430.00 377.50 34.80 1,842.30
1,000 CFM and 1500 CFM radial
unit accumulator cabinet pl@8.60 Ea 1,990.00 377.50 34.80 2,402.30
3,000 CFM radial
unit accumulator cabinet pl@17.2 Ea 4,170.00 754.90 69.70 4,994.60

Air and process gas purification - Vapor phase activated carbon, media types
Coal based, 4 mm pellets, for solvent recovery,
less than 2000 lbs. --@.000 Lb 3.88 -- -- 3.88
Coal based, 4 mm pellets, for solvent recovery,
2000 to 10000 lbs. --@.000 Lb 2.95 -- -- 2.95
Coal based, 4 mm pellets, for solvent recovery,
more than 10000 lbs. --@.000 Lb 2.81 -- -- 2.81
Koh impregnated for H2S, acidic gases or mercaptans,
less than 2000 lbs. --@.000 Lb 4.20 -- -- 4.20
Koh impregnated for H2S, acidic gases or mercaptans,
2000 to 10000 lbs. --@.000 Lb 3.28 -- -- 3.28
Koh impregnated for H2S, acidic gases or mercaptans,
more than 10000 lbs. --@.000 Lb 3.11 -- -- 3.11
Coconut base, 4 x 8 sieve, general purpose,
2015 Heavy Construction Estimator, All Rights Reserved Page 472 (part 2)

less than 2,000 lbs. --@.000 Lb 3.04 -- -- 3.04


Coconut base, 4 x 8 sieve, general purpose,
2000 to 10000 lbs. --@.000 Lb 2.88 -- -- 2.88
Coconut base, 4 x 8 sieve, general purpose,
more than 10000 lbs. --@.000 Lb 2.54 -- -- 2.54

Packaged high pressure carbon absorption blower systems - Belt drive blowers
Using small tools.
250 CFM, 12" pressure,
1-1/2 HP, 4625 rpm, blower nz@4.65 Ea 833.00 212.20 2.70 1,047.90
500 CFM, 9" pressure,
2 HP, 3500 rpm, blower nz@5.26 Ea 985.00 240.00 3.05 1,228.05
750 CFM, 12" pressure,
5 HP, 3920 rpm, blower nz@10.0 Ea 1,120.00 456.30 5.80 1,582.10
1000 CFM, 5" pressure,
1-1/2 HP, 2670 rpm, blower nz@4.65 Ea 983.00 212.20 2.70 1,197.90
1500 CFM, 5" pressure,
3 HP, 3340 rpm, blower nz@6.67 Ea 1,070.00 304.40 3.87 1,378.27
300 CFM, 7" pressure,
3/4 HP, 3500 rpm, blower nz@4.00 Ea 687.00 182.50 2.32 871.82
325 CFM, 8" pressure,
3/4 HP, 3750 rpm, blower nz@4.00 Ea 687.00 182.50 2.32 871.82

Packaged high pressure carbon absorption blower systems - Radial blade belt drive blowers
Using small tools.
500 CFM, 12" pressure,
5 HP, 3870 rpm, blower nz@10.0 Ea 1,900.00 456.30 5.80 2,362.10
1500 CFM, 12" pressure,
10 HP, 3180 rpm, blower nz@15.3 Ea 2,430.00 698.10 8.87 3,136.97
2200 CFM, 8" pressure,
7 1/2 HP, 2920 rpm, blower nz@15.3 Ea 2,280.00 698.10 8.87 2,986.97
3000 CFM, 5" pressure,
7 1/2 HP, 2125 rpm, blower nz@15.3 Ea 2,560.00 698.10 8.87 3,266.97
4000 CFM, 8" pressure,
15 HP, 2590 rpm, blower n7@12.5 Ea 3,020.00 585.40 7.50 3,612.90
5000 CFM, 8" pressure,
20 HP, 2090 rpm, blower n7@15.3 Ea 4,540.00 716.50 9.18 5,265.68
8000 CFM, 8" pressure,
25 HP, 1860 rpm, blower n7@11.1 Ea 4,630.00 519.80 6.66 5,156.46

Packaged high pressure carbon absorption blower systems - Direct drive blowers
Using small tools.
165 CFM, 5" pressure,
1/3 HP, 3450 rpm, blower nz@3.63 Ea 418.00 165.60 2.11 585.71
500 CFM, 5" pressure,
1 HP, 3450 rpm, blower nz@4.65 Ea 525.00 212.20 2.70 739.90

Carbon adsorption packaged air heater unit


Using miscellaneous power tools and small tools.
7.5 KW, 25600 Btu,
1/4 HP, hazardous air heater n4@20.0 Ea 7,110.00 869.80 13.20 7,993.00
2015 Heavy Construction Estimator, All Rights Reserved Page 473

10 KW, 34150 Btu,


1/4 HP, hazardous air heater n4@20.0 Ea 7,520.00 869.80 13.20 8,403.00
15 KW, 51200 Btu,
1/4 HP, hazardous air heater n4@21.3 Ea 7,820.00 926.30 14.10 8,760.40
20 KW, 68300 Btu,
1/4 HP, hazardous air heater n4@21.3 Ea 8,280.00 926.30 14.10 9,220.40

CSI 13-275, Chemical fixation and stabilization

Chemical fixation of hazardous materials - Portland cement, FOB plant.


For fixation cement processes, only Type I and Type K (non-expansion) are used.
Type I, 95 lb. (43 kg) bag --@.000 Ea 7.74 -- -- 7.74
Type I, bulk --@.000 Ton 107.00 -- -- 107.00
Type K, 95 lb. (43 kg) bag --@.000 Ea 9.01 -- -- 9.01
Type K, bulk --@.000 Ton 144.00 -- -- 144.00

Chemical fixation of hazardous materials - Gypsum


High industrial grade, hydro-cal --@.000 Ton 647.00 -- -- 647.00
Ultra high industrial grade,
ultra-cal 30 --@.000 Ton 728.00 -- -- 728.00

Chemical fixation of hazardous materials - Lime


Quicklime, 1/4" nominal granules,
bulk quantity --@.000 Ton 145.00 -- -- 145.00
Quicklime, 3/4" nominal granules,
bulk quantity --@.000 Ton 145.00 -- -- 145.00
Quicklime, combination of 1/4" and 3/4" granules,
bulk quantity --@.000 Ton 145.00 -- -- 145.00
Hydrated lime,
powdered, bulk quantity --@.000 Ton 202.00 -- -- 202.00
Hydrated lime,
powdered, 50 lb. bags --@.000 Ton 199.00 -- -- 199.00
Hydrated lime,
powdered, 50 lb. bags --@.000 Ea 7.79 -- -- 7.79
Lime (crushed limestone) bulk --@.000 Ton 74.90 -- -- 74.90

Chemical fixation of hazardous materials - Bitumen


Bitumen (bulk) --@.000 Ton 88.30 -- -- 88.30

Chemical fixation of hazardous materials - Sodium silicate.


Cement based processes fixation call only for soluble silicates as additives; therefore, only meta-soluble
is priced.
4 liter container --@.000 Ea 34.50 -- -- 34.50
Bulk by CWT, 44,000 lb. minimum truckload,
FOB plant --@.000 Lb 0.21 -- -- 0.21

Chemical fixation of hazardous materials - Vermiculite.


FOB manufacturer plant. As the density of the source ore varies so does the weight of each cubic foot
of final product. However, the price does not fluctuate. Packaged in 4 cubic foot bags.
Vermiculite --@.000 CF 3.09 -- -- 3.09

Chemical fixation of hazardous materials - Magnesium hydroxide slurry


55 gallon (208 liters) drum --@.000 Ea 487.00 -- -- 487.00
Bulk quantity, minimum order 20 ton --@.000 Ton 683.00 -- -- 683.00

Chemical fixation of hazardous materials - Soda ash


2015 Heavy Construction Estimator, All Rights Reserved Page 473 (part 2)

50 lb. (23kg) bag --@.000 Lb 0.54 -- -- 0.54


100 lb. (45kg) bag --@.000 Lb 0.54 -- -- 0.54

Chemical fixation of hazardous materials - Caustic soda


Liquid, 190 lb. (86kg) drum --@.000 Lb 0.61 -- -- 0.61
Beads in 500 lb. (227kg) container --@.000 Lb 1.43 -- -- 1.43
Flakes in 400 lb. (181kg) container --@.000 Lb 1.53 -- -- 1.53

Pozzolanic based fixation - Fly ash


This product can be adversely affected by project location.
Class C, bulk quantities --@.000 Ton 26.90 -- -- 26.90
Class F, bulk quantities --@.000 Ton 16.10 -- -- 16.10
Bottom ash, bulk quantities --@.000 Ton 5.37 -- -- 5.37

Pozzolanic based fixation - Cement kiln dust


Bulk quantities --@.000 Ton 103.00 -- -- 103.00

Organic polymer-based processes - Unsaturated polyesters, ludopal


55 gallon (208 liter) drum.
Pg-extra, per drum --@.000 Ea 1,270.00 -- -- 1,270.00
P26, per drum --@.000 Ea 1,270.00 -- -- 1,270.00
U150, per drum --@.000 Ea 1,310.00 -- -- 1,310.00
2015 Heavy Construction Estimator, All Rights Reserved Page 474

Thermoplastic based processes - Paraffin


Industrial grade, pelletized, delivered on 2,000 lb. pallet.
Midmelt 140 --@.000 Lb 1.70 -- -- 1.70

On site waste stabilization and fixation - Mobile waste mixing equipment


Includes equipment but no operation or maintenance.
2 CY mixer, gasoline, skid mount --@.000 Ea 112,000.00 -- --112,000.00
10 CY mixer, diesel, skid mount --@.000 Ea 141,000.00 -- --141,000.00
10 CY mixer, electric, skid mount --@.000 Ea 108,000.00 -- --108,000.00
2 CY mixer, gasoline, trailer mount --@.000 Ea 101,000.00 -- --101,000.00
10 CY mixer, diesel, trailer mount --@.000 Ea 128,000.00 -- --128,000.00
10 CY mixer,
electric, trailer mount --@.000 Ea 124,000.00 -- --124,000.00
2 CY mixer, 3 month rental,
trailer mount --@.000 Ea 12,000.00 -- -- 12,000.00
10 CY mixer, 3 month rental,
diesel, trailer mount --@.000 Ea 34,800.00 -- -- 34,800.00
10 CY mixer, 3 month rental,
electric, trailer mount --@.000 Ea 33,900.00 -- -- 33,900.00
2 CY mixer, 6 month rental,
trailer mount --@.000 Ea 18,100.00 -- -- 18,100.00
10 CY mixer, 6 month rental,
diesel, trailer mount --@.000 Ea 54,600.00 -- -- 54,600.00
10 CY mixer, 6 month rental,
electric, trailer mount --@.000 Ea 53,100.00 -- -- 53,100.00
2 CY mixer, 12 month rental,
trailer mount --@.000 Ea 29,700.00 -- -- 29,700.00
10 CY mixer, 12 month rental,
diesel, trailer mount --@.000 Ea 92,300.00 -- -- 92,300.00
10 CY mixer, 12 month rental,
electric, trailer mount --@.000 Ea 89,700.00 -- -- 89,700.00
2 CY mixer, 24 month rental,
trailer mount --@.000 Ea 48,200.00 -- -- 48,200.00
10 CY mixer, 24 month rental,
diesel, trailer mount --@.000 Ea 153,000.00 -- --153,000.00
10 CY mixer, 24 month rental,
electric, trailer mount --@.000 Ea 148,000.00 -- --148,000.00
High pressure water system for 2 CY mixer,
28 gallon capacity --@.000 Ea 4,140.00 -- -- 4,140.00
Non-pressurized water system for 10 CY mixer,
100 gallon capacity --@.000 Ea 2,980.00 -- -- 2,980.00
Barrel loader for 2 CY mixer --@.000 Ea 9,260.00 -- -- 9,260.00
Belt feeder for 10 CY mixer,
13' long --@.000 Ea 18,400.00 -- -- 18,400.00
Decumulative batch plant, 8 CY capacity, 912 cubic feet dry material silo,
50 CY per hour --@.000 Ea 150,000.00 -- --150,000.00
Upgrade in-truss silo from 912 to 1040 cubic feet,
50 CY per hour batch plant --@.000 Ea 5,370.00 -- -- 5,370.00
Dust collect with 2 HP blower and controls,
50 CY per hour batch plant --@.000 Ea 5,370.00 -- -- 5,370.00
Upgrade water meter from 2" to 3",
50 CY per hour batch plant --@.000 Ea 2,270.00 -- -- 2,270.00
Water pump, 2" self-priming with 5 HP motor,
50 CY per hour batch plant --@.000 Ea 5,590.00 -- -- 5,590.00
Water pump, 3" self-priming with 10 HP motor,
50 CY per hour batch plant --@.000 Ea 6,930.00 -- -- 6,930.00
Upgrade air compressor from 5 HP to 10 HP,
50 CY per hour batch plant --@.000 Ea 3,960.00 -- -- 3,960.00
2015 Heavy Construction Estimator, All Rights Reserved Page 474 (part 2)

Screw feeder for charging in-truss silo, 35' long,


10 HP with controls --@.000 Ea 18,800.00 -- -- 18,800.00
Radial stacking conveyor with 2 CY hopper, 55' long,
50 CY per hour batch plant --@.000 Ea 39,400.00 -- -- 39,400.00
2 CY mixer, mobilization
and demobilization --@.000 Ea 1,790.00 -- -- 1,790.00
100 CY mixer, annual rental charge --@.000 Year209,000.00 -- --209,000.00
15 CY mixer, annual rental charge --@.000 Year 89,600.00 -- -- 89,600.00
Solidification and stabilization
ancillary equipment --@.000 Ea 10,700.00 -- -- 10,700.00
5 CY mixer, annual rental charge --@.000 Year 29,900.00 -- -- 29,900.00

On site waste stabilization and fixation - Metal stabilization units


Stabilization
of metals in incineration ash --@.000 Ton 125.00 -- -- 125.00

CSI 13-276, Sludge treatment

On site waste stabilization and fixation - Sludge treatment accessories


Truck scale rental --@.000 Mo 1,440.00 -- -- 1,440.00

On site waste stabilization and fixation - Sludge depth metering


Using small tools.
Meter with display,
48" probe, 33' cable lk@4.00 Ea 7,540.00 200.40 0.76 7,741.16
Meter for dissolved air floatation tank,
48" probe, 33' cable lk@4.00 Ea 7,720.00 200.40 0.76 7,921.16
Meter for light floc sludges,
48" probe, 33' cable lk@4.00 Ea 9,690.00 200.40 0.76 9,891.16
Meter, two 48" probes, 66' cable lk@5.26 Ea 11,300.00 263.50 1.00 11,564.50
Additional cable lk@.010 LF 1.70 0.50 -- 2.20
2015 Heavy Construction Estimator, All Rights Reserved Page 475

Aerobic sludge digestion - Reaction bacteria, bio-culture formulation


C-102, 25 lb. (11kg) pails --@.000 Lb 30.50 -- -- 30.50
C-102, bulk in 100 or 1000 lb. lots --@.000 Lb 27.90 -- -- 27.90
I-107, 25 lb. (11kg) pails --@.000 Lb 30.80 -- -- 30.80
I-107, bulk in 100 or 1000 lb. lots --@.000 Lb 28.10 -- -- 28.10
L-103, 25 lb. (11kg) pails --@.000 Lb 30.50 -- -- 30.50
L-103, bulk in 100 or 1000 lb. lots --@.000 Lb 27.90 -- -- 27.90
L-104, 25 lb. (11kg) pails --@.000 Lb 31.80 -- -- 31.80
L-104, bulk in 100 or 1000 lb. lots --@.000 Lb 29.10 -- -- 29.10
P-105, 25 lb. (11kg) pails --@.000 Lb 31.10 -- -- 31.10
P-105, bulk in 100 or 1000 lb. lots --@.000 Lb 28.40 -- -- 28.40

Anaerobic sludge digestion - Reaction bacteria, bio-culture formula


M-101, 10 lb. (4.5kg)
or 25 lb. (11kg) pails --@.000 Lb 22.40 -- -- 22.40
M-101, bulk in 100 or 1000 lb. lots --@.000 Lb 17.90 -- -- 17.90
An-106, 10 lb. or 25 lb. pails --@.000 Lb 26.00 -- -- 26.00
An-106,
bulk in 100 or 1000 lb. lots --@.000 Lb 21.50 -- -- 21.50

Pure oxygen aerobic sludge digestion - Oxygen


192 liter oxygen gas, dewar --@.000 Ea 216.00 -- -- 216.00
282 CF cylinder --@.000 Ea 19.90 -- -- 19.90
Ultra pure composition,
282 CF cylinder --@.000 Ea 293.00 -- -- 293.00

Acidic sludge neutralization - Using hydrated lime


Bulk quantity --@.000 Ton 127.00 -- -- 127.00
50 lb. (23kg) bag --@.000 Ea 5.62 -- -- 5.62

Oxidation/cyanide sludge destruction - Chlorine dioxide generators


Using a 25% sodium chlorite precursor, using small tools.
25 to 199 lbs. per day output n8@20.0 Ea 28,100.00 1,018.00 12.00 29,130.00
200 to 499 lbs. per day output n8@20.0 Ea 33,500.00 1,018.00 12.00 34,530.00
500 to 900 lbs. per day output n8@20.0 Ea 53,200.00 1,018.00 12.00 54,230.00

Precursor chemicals for sludge destruction


Hydrochloric acid,
500 lb. (227kg) drum --@.000 Lb 0.63 -- -- 0.63
Sodium hypochlorite, 50 gallon (189l) drum,
small orders --@.000 Gal 2.86 -- -- 2.86
Sodium hypochlorite, bulk,
truckload up to 4000 gallons --@.000 Gal 1.90 -- -- 1.90
Sodium chlorite, 31.25 solution,
560 lb. (254kg) drum --@.000 Lb 5.50 -- -- 5.50

Disinfection - Gas feeders, automatic feed, 2 cylinder, regular, injector


200 lbs. per day --@.000 Ea 8,280.00 -- -- 8,280.00
400 lbs. per day --@.000 Ea 9,090.00 -- -- 9,090.00
1000 lbs. per day --@.000 Ea 5,460.00 -- -- 5,460.00

Disinfection - Disinfection compounds


Anhydrous ammonia, 150 lb. (68kg) cylinder, plus cylinder
rent of $6.00 per month --@.000 Ea 596.00 -- -- 596.00
Sulfur dioxide, cylinders,
2015 Heavy Construction Estimator, All Rights Reserved Page 475 (part 2)

full truckload equals 12 tons --@.000 Ton 626.00 -- -- 626.00


Sulfur dioxide, bulk, by 20 ton
truck or 90 ton by railcar --@.000 Ton 3.04 -- -- 3.04
Sulfur dioxide,
165 liter dewar tank --@.000 Ea 200.00 -- -- 200.00
Carbon dioxide, 282 CF cylinder --@.000 Ea 66.80 -- -- 66.80

Solvent extraction - Solvents


Propane, 100 lb. (45kg) cylinder,
plus rental of $ 6.10/month --@.000 Ea 368.00 -- -- 368.00
Carbon dioxide,
165 liter dewar tank --@.000 Ea 228.00 -- -- 228.00
Carbon dioxide, 282 CF cylinder --@.000 Ea 66.80 -- -- 66.80

Solvent extraction - Solvent extraction process systems


1,500 CY/m unit,
site preparation charge --@.000 Ea 215,000.00 -- --215,000.00
6,000 CY/m unit,
site preparation charge --@.000 Ea 430,000.00 -- --430,000.00
18,000 CY/m unit,
site preparation charge --@.000 Ea 716,000.00 -- --716,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 476

1,500 CY/m unit,


mobilization and assembly --@.000 Ea 287,000.00 -- --287,000.00
6,000 CY/m unit,
mobilization and assembly --@.000 Ea 860,000.00 -- --860,000.00
18,000 CY/m unit,
mobilization and assembly --@.000 Ea 2,010,000.00 -- --2,010,000.00
1,500 CY/m unit, start-up charge --@.000 Ea 57,300.00 -- -- 57,300.00
6,000 CY/m unit, start-up charge --@.000 Ea 115,000.00 -- --115,000.00
18,000 CY/m unit, start-up charge --@.000 Ea 229,000.00 -- --229,000.00
1,500 CY/m unit, demobilization --@.000 Ea 129,000.00 -- --129,000.00
6,000 CY/m unit, demobilization --@.000 Ea 258,000.00 -- --258,000.00
18,000 CY/m unit, demobilization --@.000 Ea 444,000.00 -- --444,000.00
1,500 CY/m unit, consumables --@.000 CY 58.70 -- -- 58.70
6,000 CY/m unit, consumables --@.000 CY 38.20 -- -- 38.20
18,000 CY/m unit, consumables --@.000 CY 32.30 -- -- 32.30
1,500 CY/m unit, pretreatment unit --@.000 Ea 95,800.00 -- -- 95,800.00
6,000 CY/m unit, pretreatment unit --@.000 Ea 120,000.00 -- --120,000.00
18,000 CY/m unit, pretreatment unit --@.000 Ea 180,000.00 -- --180,000.00

Solvent extraction - Solvent extraction services.


See EPA/540/AS-90/002 August 1990 for process applications analysis report.
Large mass,
low concentration PCB sludge --@.000 Ton 127.00 -- -- 127.00
Small mass,
high concentration PCB sludge --@.000 Ton 450.00 -- -- 450.00

Sludge dewatering - Rotary vacuum drum filter


Includes purchase and installation costs, excludes maintenance and operations, using small tools.
3 HP, 3.1, 1' drum diameter pe@28.0 Ea 43,400.00 1,215.00 17.90 44,632.90
3 HP, 6.2 SF, 2' drum diameter pe@28.0 Ea 51,600.00 1,215.00 17.90 52,832.90
9 HP, 12.6 SF, 2' drum diameter pe@37.3 Ea 57,700.00 1,619.00 23.90 59,342.90
9 HP, 18.8 SF, 2' drum diameter pe@37.3 Ea 64,900.00 1,619.00 23.90 66,542.90
11 HP, 25.1 SF, 2' drum diameter pe@46.7 Ea 72,000.00 2,027.00 29.90 74,056.90
11 HP, 28.3 SF, 3' drum diameter pe@46.7 Ea 75,700.00 2,027.00 29.90 77,756.90
13 HP, 37.7 SF, 3' drum diameter pe@46.7 Ea 90,100.00 2,027.00 29.90 92,156.90
24 HP, 56.5 SF, 3' drum diameter pe@56.0 Ea 103,000.00 2,431.00 35.80105,466.80
33 HP, 75.4 SF, 6' drum diameter pe@56.0 Ea 114,000.00 2,431.00 35.80116,466.80
38 HP, 94.2 SF, 6' drum diameter pe@70.0 Ea 121,000.00 3,039.00 44.80124,083.80
49 HP, 113 SF, 6' drum diameter pe@70.0 Ea 135,000.00 3,039.00 44.80138,083.80
60 HP, 170 SF, 6' drum diameter pe@85.4 Ea 210,000.00 3,707.00 54.70213,761.70
79 HP, 226 SF, 6' drum diameter pe@85.4 Ea 253,000.00 3,707.00 54.70256,761.70
99 HP, 302 SF, 8' drum diameter pe@113. Ea 283,000.00 4,905.00 72.30287,977.30
120 HP, 402 SF, 8' drum diameter pe@125. Ea 315,000.00 5,426.00 80.00320,506.00
140 HP, 503 SF, 8' drum diameter pe@140. Ea 360,000.00 6,077.00 89.60366,166.60
Month rental, 9 HP, 12.6 SF nominal filtering area,
2' drum diameter --@.000 Ea 3,580.00 -- -- 3,580.00
Additional weekly rental, 9 HP, 12.6 SF nominal filtering area,
2' drum diameter --@.000 Ea 806.00 -- -- 806.00
Mobilization and demobilization of 9 HP, 12.6 SF nominal filtering area,
2' drum diameter --@.000 Ea 8,060.00 -- -- 8,060.00
Equipment operator costs,
based on 8 hour day --@.000 Ea 358.00 -- -- 358.00

Sludge dewatering - Drum filter operations and maintenance crew


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2-man crew up@3.75 Hour -- 130.10 26.50 156.60

Sludge dewatering - Mobile filter belt press


Electrically powered, trailer mounted press, includes installation cost but no operation.
2015 Heavy Construction Estimator, All Rights Reserved Page 476 (part 2)

23.5" belt width, 3/4 HP --@.000 Hour 59.60 -- -- 59.60


35.5" belt width, 3/4 HP --@.000 Hour 60.40 -- -- 60.40
47" belt width, 1-1/2 HP --@.000 Hour 68.10 -- -- 68.10
63" belt width, 1-1/2 HP --@.000 Hour 70.60 -- -- 70.60
78-3/4" belt width, 2 HP --@.000 Hour 78.20 -- -- 78.20
98-1/2" belt width, 3 HP --@.000 Hour 65.40 -- -- 65.40
118" belt width, 3 HP --@.000 Hour 91.70 -- -- 91.70
Retrofitted filter belt press,
dewatering solid waste --@.000 Ton 98.50 -- -- 98.50
2015 Heavy Construction Estimator, All Rights Reserved Page 477

Sludge dewatering - Low flow continuous filter belt press


Electrically powered, rating in lbs. per hour dry solid output. The range of output of dry solids is based
on 2% to 3% slurry feed. Labor pricing reflects installation only, using a 20-ton hydraulic crane with 70’
boom and small tools.
23-1/2" (.6m) belt width,
overhead, 60 to 250 rating pp@24.0 Ea 162,000.00 1,046.00 145.00163,191.00
35.5" (1.0m) belt width,
110 to 420 rating pp@23.9 Ea 186,000.00 1,042.00 145.00187,187.00
47" (1.25m) belt width,
175 to 660 rating pp@28.9 Ea 219,000.00 1,260.00 175.00220,435.00
63" (1.5m) belt width,
265 to 990 rating pp@28.9 Ea 233,000.00 1,260.00 175.00234,435.00

Sludge dewatering - High flow continuous filter belt press


Electrically powered, rating in lbs. per hour dry solid output. The range for the sludge inlet flow depends
on the sludge type. The range of output of dry solids is 2% to 3% slurry feed. Labor pricing reflects
installation only, using a 20-ton hydraulic crane with 70’ boom and small tools.
78-3/4" (2.0m) belt width,
370 to 1320 rating pp@36.0 Ea 260,000.00 1,570.00 218.00261,788.00
98-1/2" (2.5m) belt width,
520 to 1760 rating pp@36.0 Ea 315,000.00 1,570.00 218.00316,788.00
118" (3.0m) belt width,
650 to 2200 rating pp@36.0 Ea 405,000.00 1,570.00 218.00406,788.00

Centrifugal sludge dryer - Medium capacity only


1,700 RPM fixed speed, dry weight capacity. Labor pricing reflects installation, using a 20-ton hydraulic
crane with 70’ boom and small tools.
35 lb. capacity pp@71.4 Ea 16,900.00 3,113.00 433.00 20,446.00
35 lb. capacity, explosion-proof pp@71.4 Ea 30,600.00 3,113.00 433.00 34,146.00
60 lb. capacity pp@71.4 Ea 22,000.00 3,113.00 433.00 25,546.00
60 lb. capacity, explosion-proof pp@71.4 Ea 37,500.00 3,113.00 433.00 41,046.00
100 lb. capacity pp@71.4 Ea 26,400.00 3,113.00 433.00 29,946.00
100 lb. capacity, explosion-proof pp@71.4 Ea 45,000.00 3,113.00 433.00 48,546.00

Centrifugal sludge dryer - High capacity


130 lbs. dry weight capacity. Cycles per hour unlimited. Labor pricing reflects installation only, using a
20-ton hydraulic crane with 70’ boom and small tools.
900 maximum speed pp@144. Ea 23,600.00 6,278.00 873.00 30,751.00
1700 fixed speed pp@144. Ea 28,200.00 6,278.00 873.00 35,351.00
Variable speed with controls pp@144. Ea 36,800.00 6,278.00 873.00 43,951.00
Variable speed with remote control pp@144. Ea 76,100.00 6,278.00 873.00 83,251.00
1200 RPM fixed, explosion-proof pp@144. Ea 35,200.00 6,278.00 873.00 42,351.00

Filter press - Mobile filter press, trailer mounted


25 CF (800mm2) conventional --@.000 Hour 52.80 -- -- 52.80
25 CF (1200mm2) conventional --@.000 Hour 38.30 -- -- 38.30
25 CF (1200mm2) membrane --@.000 Hour 44.90 -- -- 44.90
50 CF (1200mm2) conventional --@.000 Hour 43.00 -- -- 43.00
50 CF (1200mm2) membrane --@.000 Hour 55.60 -- -- 55.60
75 CF (1200mm2) conventional --@.000 Hour 46.30 -- -- 46.30
75 CF (1200mm2) membrane --@.000 Hour 64.20 -- -- 64.20
100 CF (1200mm2) conventional --@.000 Hour 47.60 -- -- 47.60
100 CF (1200mm2) membrane --@.000 Hour 66.30 -- -- 66.30
125 CF (1200mm2) conventional --@.000 Hour 50.50 -- -- 50.50
125 CF (1200mm2) membrane --@.000 Hour 73.10 -- -- 73.10
150 CF (1200mm2) conventional --@.000 Hour 53.20 -- -- 53.20
150 CF (1200mm2) membrane --@.000 Hour 81.30 -- -- 81.30
2015 Heavy Construction Estimator, All Rights Reserved Page 477 (part 2)

181 CF (1500mm2) conventional --@.000 Hour 93.70 -- -- 93.70


370 CF (1.5m x 2.0m) conventional --@.000 Hour 172.00 -- -- 172.00

Filter press - Low capacity, air powered


Using a 20-ton hydraulic crane with 70’ boom and small tools.
25 CF (800mm2) conventional pp@36.0 Ea 130,000.00 1,570.00 218.00131,788.00
25 CF (1000mm2)conventional pp@36.0 Ea 52,400.00 1,570.00 218.00 54,188.00
25 CF (1000mm2)membrane pp@36.0 Ea 88,800.00 1,570.00 218.00 90,588.00
50 CF (1200mm2)conventional pp@36.0 Ea 77,400.00 1,570.00 218.00 79,188.00
50 CF (1200mm2)membrane pp@47.9 Ea 147,000.00 2,088.00 290.00149,378.00
75 CF (1200mm2)conventional pp@47.9 Ea 93,900.00 2,088.00 290.00 96,278.00
75 CF (1200mm2)membrane pp@47.9 Ea 193,000.00 2,088.00 290.00195,378.00

Filter press - High capacity


Using a 20-ton hydraulic crane with 70’ boom and small tools.
100 CF (1200mm2) conventional,
air powered pp@47.9 Ea 99,300.00 2,088.00 290.00101,678.00
100 CF (1200mm2) membrane,
air powered pp@47.9 Ea 202,000.00 2,088.00 290.00204,378.00
125 CF (1200mm2) conventional,
air powered pp@47.9 Ea 113,000.00 2,088.00 290.00115,378.00
125 CF (1200mm2) membrane,
air powered pp@47.9 Ea 238,000.00 2,088.00 290.00240,378.00
150 CF (1200mm2) conventional,
air powered pp@53.6 Ea 128,000.00 2,337.00 325.00130,662.00
2015 Heavy Construction Estimator, All Rights Reserved Page 478

150 CF (1200mm2) membrane,


air powered pp@53.6 Ea 285,000.00 2,337.00 325.00287,662.00
180 CF (1500mm 2) conventional,
electric operation pp@72.0 Ea 410,000.00 3,139.00 436.00413,575.00
370 CF (1.5 x 2.0m) conventional,
electric operation pp@109. Ea 808,000.00 4,752.00 661.00813,413.00

Filter press optional equipment


Fully mechanized plate shifting unit,
no labor for cake discharge ll@52.0 Ea 22,500.00 2,118.00 -- 24,618.00
PLC control panel, allows full
automation of all functions ll@65.0 Ea 7,520.00 2,647.00 -- 10,167.00
PVC piping manifold ll@3.25 Ea 1,050.00 132.40 -- 1,182.40

Mobile pusher screw press


Trailer mounted, electrically operated, excludes electrical generator and 60,000 lb. GVW truck.
7.5 HP --@.000 Hour 60.40 -- -- 60.40
10 HP --@.000 Hour 75.70 -- -- 75.70
15 HP --@.000 Hour 98.80 -- -- 98.80
20 HP --@.000 Hour 128.00 -- -- 128.00

Low capacity screw presses


Using a 20-ton hydraulic crane with 70’ boom and small tools, electrically operated.
7.5 HP, 250mm screw diameter pp@36.0 Ea 153,000.00 1,570.00 218.00154,788.00
10 HP, 400mm screw diameter pp@36.0 Ea 252,000.00 1,570.00 218.00253,788.00

High capacity screw presses, electrically operated


Using a 20-ton hydraulic crane with 70’ boom and small tools.
15 HP, 600mm screw diameter pm@68.8 Ea 380,000.00 3,020.00 279.00383,299.00
20 HP, 800mm screw diameter pm@68.8 Ea 566,000.00 3,020.00 279.00569,299.00

Cement/pozzolan processes sludge solidification - Solidification agents


Portland cement,
Type K, 95 lb. (43kg) bag --@.000 Ea 10.70 -- -- 10.70
Portland cement,
Type K, bulk quantity --@.000 Ton 172.00 -- -- 172.00
Class C flyash, bulk quantity --@.000 Ton 22.40 -- -- 22.40
Class F flyash, bulk quantity --@.000 Ton 13.40 -- -- 13.40
Cement kiln dust, bulk quantity --@.000 Ton 26.90 -- -- 26.90

Cement/pozzolan processes sludge solidification - Reagents and additives


Chloranan by Em-Tech --@.000 Ton 1,070.00 -- -- 1,070.00
Activated carbon, granule or powder, 50 lb. (23kg) bag,
small quantities --@.000 Lb 2.06 -- -- 2.06
Activated carbon, granule or powder form,
bulk quantity, truckload --@.000 Lb 1.34 -- -- 1.34
Urrichem by Soliditech --@.000 Ton 1,440.00 -- -- 1,440.00
P4 reagent (bulk) --@.000 Ton 1,070.00 -- -- 1,070.00
P27 reagent (bulk) --@.000 Ton 403.00 -- -- 403.00

Sludge solidification services.


Reference EPA/540/A5-89/001 May 1989 for a complete process applications analysis report.
Heavy metal content sludge,
chloranan/cement process --@.000 Ton 107.00 -- -- 107.00
Heavy organic content sludge,
chloranan/cement process --@.000 Ton 179.00 -- -- 179.00
Contaminated sludge,
2015 Heavy Construction Estimator, All Rights Reserved Page 478 (part 2)

Urrichem/cement process --@.000 Ton 112.00 -- -- 112.00

Silicate compound processes sludge solidification


4 liter container --@.000 Ea 20.80 -- -- 20.80
Bulk quantity --@.000 Lb 0.13 -- -- 0.13
Activated carbon, granule or powder form, 50 lb. (23kg) bag,
small quantities --@.000 Lb 2.06 -- -- 2.06
Activated carbon, granule or powder form,
bulk quantity --@.000 Lb 1.34 -- -- 1.34

Thermal in-situ vitrification of sludge, non-radioactive


Minimal contamination --@.000 Ton 672.00 -- -- 672.00
Moderate contamination --@.000 Ton 716.00 -- -- 716.00
Heavy contamination --@.000 Ton 761.00 -- -- 761.00
2015 Heavy Construction Estimator, All Rights Reserved Page 479

Minimal contamination --@.000 Ton 896.00 -- -- 896.00


Moderate contamination --@.000 Ton 985.00 -- -- 985.00
Heavy contamination --@.000 Ton 1,070.00 -- -- 1,070.00

Equipment mobilization and demobilization for sludge vitrification


Average base
cost of on site operations --@.000 Ea 448,000.00 -- --448,000.00
Average cost of travel operations --@.000 Mile 134.00 -- -- 134.00
Material treatability testing --@.000 Mile 107,000.00 -- --107,000.00

Indirect vitrification costs.


Technical support activities provided by the vitrification contractor range from $25,000 to 75,000 and
should be considered an indirect job cost. Use the lines below as a checklist of possible costs.
Technical
support for remedial design --@.000 Ea -- -- -- --
Remedial action --@.000 Ea -- -- -- --
ARAR compliance --@.000 Ea -- -- -- --
Community relations --@.000 Ea -- -- -- --
Site preparation --@.000 Ea -- -- -- --
Post process sampling,
monitoring and delisting --@.000 Ea -- -- -- --

Treatability testing for toxic substances


PCB and dioxins,
excluding analysis costs --@.000 Ea 53,700.00 -- -- 53,700.00
Hazardous waste --@.000 Ea 44,800.00 -- -- 44,800.00

Sludge pumping - Single stage pump, steel baseplate with gear motor coupled to pump
Progressive cavity standard sludge pump designed to handle sludges, viscous and shear-sensitive
slurries, heavy pastes, and abrasive media. Cast iron housing and tool steel internals. By maximum
particle size and pumping element, using small tools.
.18" max., 1/4 HP, size 15 element n7@7.99 Ea 3,580.00 374.20 4.79 3,958.99
.18" max., 1/2 HP, size 15 element n7@8.70 Ea 3,760.00 407.40 5.22 4,172.62
.18" max., 3/4 HP, size 15 element n7@8.70 Ea 3,940.00 407.40 5.22 4,352.62
.24" max., 3/4 HP, size 20 element n7@9.52 Ea 4,840.00 445.80 5.71 5,291.51
.24" max., 1 HP, size 20 element n7@9.52 Ea 5,190.00 445.80 5.71 5,641.51
.35" max., 3/4 HP, size 30 element n7@10.5 Ea 5,910.00 491.70 6.30 6,408.00
.35" max., 1 HP, size 30 element n7@10.5 Ea 6,090.00 491.70 6.30 6,588.00
.83" max., 5 HP, size 60 element n7@12.5 Ea 9,310.00 585.40 7.50 9,902.90
1" max., 7.5 HP, size 70 element n7@13.3 Ea 14,000.00 622.80 7.98 14,630.78
1" max., 10 HP, size 70 element n7@13.3 Ea 14,900.00 622.80 7.98 15,530.78
1" max., 15 HP, size 70 element n7@14.3 Ea 16,300.00 669.70 8.58 16,978.28
1.4" max., 20 HP, size 100 element pb@14.4 Ea 26,700.00 664.00 55.00 27,419.00
1.7" max., 30 HP, size 120 element pb@15.4 Ea 50,900.00 710.10 58.80 51,668.90
2" max., 40 HP, size 150 element pb@18.0 Ea 84,500.00 830.00 68.80 85,398.80
2" max., 50 HP, size 150 element pb@18.0 Ea 86,000.00 830.00 68.80 86,898.80
2" max., 60 HP, size 150 element pb@18.0 Ea 95,500.00 830.00 68.80 96,398.80
2" max., 75 HP, size 150 element pb@24.0 Ea 98,500.00 1,107.00 91.70 99,698.70
2.8" max., 50 HP, size 200 element pb@24.0 Ea 136,000.00 1,107.00 91.70137,198.70
2.8" max., 60 HP, size 200 element pb@24.0 Ea 146,000.00 1,107.00 91.70147,198.70
2.8" max., 75 HP, size 200 element pb@24.0 Ea 149,000.00 1,107.00 91.70150,198.70
2.8" max., 100 HP, size 200 element pb@27.0 Ea 165,000.00 1,245.00 103.00166,348.00
2.8" max., 125 HP, size 200 element pb@30.9 Ea 176,000.00 1,425.00 118.00177,543.00
2.8" max., 150 HP, size 200 element pb@36.0 Ea 183,000.00 1,660.00 138.00184,798.00

Sludge pumping - Two stage pump, steel baseplate with gear motor coupled to pump
Progressive cavity standard sludge pump designed to handle sludges, viscous and shear-sensitive
slurries, heavy pastes, and abrasive media. Cast iron housing and tool steel internals. By maximum
particle size and pumping element, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 479 (part 2)

.35" maximum, 1 HP, size 30 element n7@10.5 Ea 6,810.00 491.70 6.30 7,308.00
.35" maximum,
1.5 HP, size 30 element n7@10.5 Ea 7,160.00 491.70 6.30 7,658.00
.47" maximum, 2 HP, size 40 element n7@11.1 Ea 7,880.00 519.80 6.66 8,406.46
.47" maximum, 3 HP, size 40 element n7@11.1 Ea 8,600.00 519.80 6.66 9,126.46
.47" maximum, 5 HP, size 40 element n7@11.1 Ea 8,960.00 519.80 6.66 9,486.46
.70" maximum, 3 HP, size 50 element n7@12.5 Ea 10,000.00 585.40 7.50 10,592.90
.70" maximum, 5 HP, size 50 element n7@12.5 Ea 10,400.00 585.40 7.50 10,992.90
.70" maximum,
7.5 HP, size 50 element n7@12.5 Ea 12,000.00 585.40 7.50 12,592.90
1" maximum, 7.5 HP, size 70 element n7@13.3 Ea 15,000.00 622.80 7.98 15,630.78
1" maximum, 10 HP, size 70 element n7@13.3 Ea 15,900.00 622.80 7.98 16,530.78
1" maximum, 15 HP, size 70 element n7@13.3 Ea 17,400.00 622.80 7.98 18,030.78
2015 Heavy Construction Estimator, All Rights Reserved Page 480

1" maximum, 20 HP, size 70 element n7@13.3 Ea 19,000.00 622.80 7.98 19,630.78
1.4" maximum,
15 HP, size 100 element pb@14.4 Ea 27,200.00 664.00 55.00 27,919.00
1.4" maximum,
20 HP, size 100 element pb@14.4 Ea 29,000.00 664.00 55.00 29,719.00
1.4" maximum,
25 HP, size 100 element pb@14.4 Ea 30,400.00 664.00 55.00 31,119.00
1.4" maximum,
30 HP, size 100 element pb@15.4 Ea 32,600.00 710.10 58.80 33,368.90
1.7" maximum,
30 HP, size 130 element pb@15.4 Ea 54,800.00 710.10 58.80 55,568.90
1.7" maximum,
40 HP, size 140 element pb@16.6 Ea 59,800.00 765.40 63.40 60,628.80
1.7" maximum,
50 HP, size 120 element pb@18.0 Ea 61,300.00 830.00 68.80 62,198.80
1.7" maximum,
60 HP, size 120 element pb@18.0 Ea 70,700.00 830.00 68.80 71,598.80
2" maximum, 50 HP, size 150 element pb@18.0 Ea 97,300.00 830.00 68.80 98,198.80
2" maximum, 60 HP, size 150 element pb@18.0 Ea 107,000.00 830.00 68.80107,898.80
2" maximum, 75 HP, size 150 element pb@23.9 Ea 110,000.00 1,102.00 91.30111,193.30
2" maximum,
100 HP, size 150 element pb@27.0 Ea 126,000.00 1,245.00 103.00127,348.00

Sludge pumping - Open throat single stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using small tools.
.47" maximum, 2 HP, size 40 element n7@11.1 Ea 7,880.00 519.80 6.66 8,406.46
.47" maximum,
1.5 HP, size 40 element n7@11.1 Ea 8,240.00 519.80 6.66 8,766.46
.47" maximum, 2 HP, size 40 element n7@11.1 Ea 8,780.00 519.80 6.66 9,306.46
.47" maximum, 3 HP, size 40 element n7@11.1 Ea 9,490.00 519.80 6.66 10,016.46
.47" maximum, 5 HP, size 40 element n7@11.1 Ea 9,850.00 519.80 6.66 10,376.46
1" maximum, 7.5 HP, size 70 element n7@13.3 Ea 15,800.00 622.80 7.98 16,430.78
1" maximum, 10 HP, size 70 element n7@13.3 Ea 16,700.00 622.80 7.98 17,330.78
1" maximum, 15 HP, size 70 element n7@13.3 Ea 18,300.00 622.80 7.98 18,930.78

Sludge pumping - Open throat single stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using a 20-ton hydraulic crane with 70’ boom and small
tools.
1.7" maximum,
15 HP, size 120 element pb@16.6 Ea 50,000.00 765.40 63.40 50,828.80
1.7" maximum,
20 HP, size 120 element pb@16.6 Ea 51,600.00 765.40 63.40 52,428.80
1.7" maximum,
25 HP, size 120 element pb@16.6 Ea 53,400.00 765.40 63.40 54,228.80
1.7" maximum,
30 HP, size 120 element pb@16.6 Ea 55,300.00 765.40 63.40 56,128.80
2" maximum, 50 HP, size 150 element pb@18.0 Ea 96,200.00 830.00 68.80 97,098.80
2" maximum, 75 HP, size 150 element pb@27.0 Ea 110,000.00 1,245.00 103.00111,348.00
2.8" maximum,
50 HP, size 200 element pb@18.0 Ea 152,000.00 830.00 68.80152,898.80
2.8" maximum,
75 HP, size 200 element pb@24.0 Ea 166,000.00 1,107.00 91.70167,198.70
2.8" maximum,
125 HP, size 200 element pb@31.0 Ea 197,000.00 1,429.00 118.00198,547.00
2015 Heavy Construction Estimator, All Rights Reserved Page 480 (part 2)

Sludge pumping - Open throat two stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using small tools.
.47" maximum, 2 HP, size 40 element n7@11.1 Ea 9,130.00 519.80 6.66 9,656.46
.47" maximum, 3 HP, size 40 element n7@11.1 Ea 9,850.00 519.80 6.66 10,376.46
.47" maximum, 5 HP, size 40 element n7@11.1 Ea 10,200.00 519.80 6.66 10,726.46

Sludge pumping - Open throat two stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using a 20-ton hydraulic crane with 70’ boom and small
tools.
1.4" maximum,
15 HP, size 100 element pb@15.4 Ea 30,400.00 710.10 58.80 31,168.90
1.4" maximum,
25 HP, size 100 element pb@15.4 Ea 34,000.00 710.10 58.80 34,768.90
1.4" maximum,
30 HP, size 100 element pb@15.4 Ea 36,500.00 710.10 58.80 37,268.90
1.7" maximum,
30 HP, size 120 element pb@16.6 Ea 61,300.00 765.40 63.40 62,128.80
1.7" maximum,
40 HP, size 120 element pb@16.6 Ea 66,300.00 765.40 63.40 67,128.80
1.7" maximum,
50 HP, size 120 element pb@16.6 Ea 67,700.00 765.40 63.40 68,528.80
1.7" maximum,
60 HP, size 120 element pb@16.6 Ea 77,200.00 765.40 63.40 78,028.80
2" maximum, 50 HP, size 150 element pb@18.0 Ea 109,000.00 830.00 68.80109,898.80
2" maximum, 60 HP, size 120 element pb@18.0 Ea 119,000.00 830.00 68.80119,898.80
2" maximum, 75 HP, size 150 element pb@27.0 Ea 123,000.00 1,245.00 103.00124,348.00
2" maximum,
100 HP, size 150 element pb@27.0 Ea 141,000.00 1,245.00 103.00142,348.00

Sludge pumping - Bridge breaker, single stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using small tools.
.70" maximum, 1.5 HP, 50 element n7@12.5 Ea 14,500.00 585.40 7.50 15,092.90
2015 Heavy Construction Estimator, All Rights Reserved Page 481

.70" maximum, 2 HP, 50 element n7@12.5 Ea 15,200.00 585.40 7.50 15,792.90


.70" maximum, 3 HP, 50 element n7@12.5 Ea 15,900.00 585.40 7.50 16,492.90
.70" maximum, 5 HP, 50 element n7@12.5 Ea 16,300.00 585.40 7.50 16,892.90

Sludge pumping - Bridge breaker, single stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using a 20-ton hydraulic crane with 70’ boom and small
tools.
1.4" maximum, 15 HP, 100 element pb@15.4 Ea 27,800.00 710.10 58.80 28,568.90
1.4" maximum, 20 HP, 100 element pb@15.4 Ea 30,300.00 710.10 58.80 31,068.90
1.4" maximum, 25 HP, 100 element pb@15.4 Ea 32,100.00 710.10 58.80 32,868.90
1.4" maximum, 30 HP, 100 element pb@15.4 Ea 34,400.00 710.10 58.80 35,168.90
2" maximum, 40 HP, 150 element pb@18.0 Ea 95,500.00 830.00 68.80 96,398.80
2" maximum, 50 HP, 150 element pb@18.0 Ea 96,900.00 830.00 68.80 97,798.80
2" maximum, 60 HP, 150 element pb@18.0 Ea 106,000.00 830.00 68.80106,898.80
2" maximum, 75 HP, 150 element pb@24.0 Ea 109,000.00 1,107.00 91.70110,198.70
2.8" maximum, 50 HP, 200 element pb@24.0 Ea 152,000.00 1,107.00 91.70153,198.70
2.8" maximum, 75 HP, 200 element pb@23.9 Ea 166,000.00 1,102.00 91.30167,193.30
2.8" maximum, 100 HP, 200 element pb@27.0 Ea 184,000.00 1,245.00 103.00185,348.00
2.8" maximum, 150 HP, 200 element pb@36.0 Ea 204,000.00 1,660.00 138.00205,798.00

Sludge pumping - Bridge breaker two stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using small tools.
.70" maximum, 3 HP, 50 element n7@3.13 Ea 16,500.00 146.60 1.88 16,648.48
.70" maximum, 5 HP, 50 element n7@3.13 Ea 16,800.00 146.60 1.88 16,948.48
.70" maximum, 7.5 HP, 50 element n7@3.13 Ea 18,400.00 146.60 1.88 18,548.48

Sludge pumping - Bridge breaker two stage pump


Steel baseplate with gear motor coupled to pump designed to handle high viscosity, high solids content
materials with virtually no flow characteristics. Pumps constructed with cast iron housing, tool steel
internals, BUNA-N stator and Kevlar packing, using a 20-ton hydraulic crane with 70’ boom and small
tools.
1.4" maximum, 15 HP, 100 element pb@15.4 Ea 28,800.00 710.10 58.80 29,568.90
1.4" maximum, 20 HP, 100 element pb@15.4 Ea 31,300.00 710.10 58.80 32,068.90
1.4" maximum, 25 HP, 100 element pb@15.4 Ea 33,100.00 710.10 58.80 33,868.90
1.4" maximum, 30 HP, 100 element pb@15.4 Ea 35,600.00 710.10 58.80 36,368.90
2" maximum, 40 HP, 150 element pb@18.0 Ea 98,700.00 830.00 68.80 99,598.80
2" maximum, 50 HP, 150 element pb@18.0 Ea 100,000.00 830.00 68.80100,898.80
2" maximum, 60 HP, 150 element pb@18.0 Ea 110,000.00 830.00 68.80110,898.80
2" maximum, 75 HP, 150 element pb@24.0 Ea 113,000.00 1,107.00 91.70114,198.70
2" maximum, 100 HP, 150 element pb@27.0 Ea 126,000.00 1,245.00 103.00127,348.00

CSI 13-277, Thermal treatment and destruction

Catalytic fume incineration system


Includes catalyst burner, 60% effective heat exchangers, system fan and combustion control panel with
safeties. Pricing reflects purchase and installation of equipment. Excludes operation and maintenance,
using a 20-ton hydraulic crane with 70’ boom and small tools.
1000 SCFM unit pb@86.3 Ea 112,000.00 3,979.00 330.00116,309.00
2000 SCFM unit pb@86.3 Ea 146,000.00 3,979.00 330.00150,309.00
3000 SCFM unit pb@108. Ea 160,000.00 4,980.00 413.00165,393.00
4000 SCFM unit pb@108. Ea 215,000.00 4,980.00 413.00220,393.00
5000 SCFM unit pb@108. Ea 224,000.00 4,980.00 413.00229,393.00
7500 SCFM unit pb@127. Ea 276,000.00 5,856.00 485.00282,341.00
10000 SCFM unit pb@127. Ea 336,000.00 5,856.00 485.00342,341.00
2015 Heavy Construction Estimator, All Rights Reserved Page 481 (part 2)

15000 SCFM unit pb@166. Ea 422,000.00 7,654.00 634.00430,288.00


20000 SCFM unit pb@196. Ea 483,000.00 9,038.00 749.00492,787.00
25000 SCFM unit pb@196. Ea 612,000.00 9,038.00 749.00621,787.00
30000 SCFM unit pb@196. Ea 707,000.00 9,038.00 749.00716,787.00
35000 SCFM unit pb@216. Ea 776,000.00 9,960.00 825.00786,785.00
40000 SCFM unit pb@216. Ea 801,000.00 9,960.00 825.00811,785.00

Regenerative fume incineration system


For paint booth or similar exhaust stream emissions. Includes equipment purchase, site assembly, and
start-up by equipment manufacturer. Excludes site preparation, concrete, electrical, permits, and
ductwork from the process.
5000 SCFM --@.000 Ea 629,000.00 -- --629,000.00
10000 SCFM --@.000 Ea 808,000.00 -- --808,000.00
15000 SCFM --@.000 Ea 1,080,000.00 -- --1,080,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 482

20000 SCFM --@.000 Ea 1,260,000.00 -- --1,260,000.00

Mobile soil volatilization


Using a mobile rotary kiln incinerator to treat soils contaminated by petroleum products such as
gasoline and diesel fuel. Prime contractor is responsible for handling all contaminated and treated soils.
Southeast region et@.060 Ton 98.50 2.21 0.92 101.63
Midwest region et@.060 Ton 107.00 2.21 0.92 110.13
Northeast region et@.060 Ton 134.00 2.21 0.92 137.13
Western region et@.060 Ton 152.00 2.21 0.92 155.13
Mobilization and demobilization based per mile
to destination and return --@.000 Ea 8.96 -- -- 8.96
Permitting for site --@.000 Ea 1,340.00 -- -- 1,340.00

Mobile rotary kiln incineration


8 to 10 MM BTU units capable of processing from 1,000 to 5,000 lbs. per hour depending on the waste.
Mobilization/demobilization for semi-trailer mounted,
1000 to 5000 lbs. per hour --@.000 Ea 269,000.00 -- --269,000.00
Mobilization/demobilization for multi-unit plant type,
12000 to 16000 lbs. per hour --@.000 Ea 269,000.00 -- --269,000.00
Work plan --@.000 Ea 4,480.00 -- -- 4,480.00
Site safety plan --@.000 Ea 4,480.00 -- -- 4,480.00
Standard operating procedures --@.000 Ea 4,480.00 -- -- 4,480.00
Site layout plan --@.000 Ea 4,480.00 -- -- 4,480.00
QA/QC plan Q --@.000 Ea 4,480.00 -- -- 4,480.00
Trail burn plan --@.000 Ea 8,960.00 -- -- 8,960.00
Sampling and analysis plan --@.000 Ea 4,480.00 -- -- 4,480.00
Equipment decontamination plan --@.000 Ea 4,480.00 -- -- 4,480.00
Trial burn, TSCA or RCRA, 3 to 4 hour
runs minimum with analysis --@.000 Ea 215,000.00 -- --215,000.00
Standby time, per day --@.000 Ea 17,900.00 -- -- 17,900.00
Incineration of hazardous waste
(from $300 to $800 per ton) --@.000 Ton 985.00 -- -- 985.00

Mobile rotary kiln incineration


8 to 10 MM BTU units capable of processing from 1,000 to 5,000 lbs. per hour depending on the waste,
using a 2.5 CY front end wheel loader.
Materials handling by subcontractor fp@.800 Ton -- 37.82 17.30 55.12
Equipment decontamination --@.000 Ea 179,000.00 -- --179,000.00
Off-site disposal of residual ash, does
not require stabilization --@.000 Ton 340.00 -- -- 340.00

Mobile hazardous waste incineration units


1,000 mile limit, minimum mobilization
and demobilization charge --@.000 Ea 761,000.00 -- --761,000.00
Additional mobilization and demobilization charge for
mileage greater than 1,000 --@.000 Mile 50.10 -- -- 50.10
Rotary kiln, without mobilization or demobilization
or pretreatment --@.000 Ton 448.00 -- -- 448.00
Rotary kiln, fixed cost, with unit installation, monitor,
operation and maintenance --@.000 Ea 1,880,000.00 -- --1,880,000.00
Infrared furnace, without mobilization and demobilization
or pretreatment --@.000 Ton 417.00 -- -- 417.00
Infrared furnace, fixed cost for unit installation, monitor,
operation and maintenance --@.000 Ea 573,000.00 -- --573,000.00
Vitrification, glass melters, without mobilization or demobilization
or pretreatment --@.000 Ton 605.00 -- -- 605.00
Vitrification, glass melters, fixed cost with unit installation, monitor,
operation and maintenance --@.000 Ea 1,500,000.00 -- --1,500,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 482 (part 2)

Liquid injection, without mobilization, demobilization


or pretreatment --@.000 Ton 690.00 -- -- 690.00
Liquid injection, fixed cost with unit installation, monitor,
operation and maintenance --@.000 Ea 1,880,000.00 -- --1,880,000.00
Circulating bed combustor, without mobilization or demobilization
or pretreatment --@.000 Ton 788.00 -- -- 788.00
Circular bed combustor, fixed cost with unit installation, monitor,
operation and maintenance --@.000 Ea 1,790,000.00 -- --1,790,000.00
Supercritical water oxidation, without mobilization and demobilization
or pretreatment --@.000 Ton 484.00 -- -- 484.00
Supercritical water oxide, fixed cost with unit install, monitor,
operation and maintenance --@.000 Ea 1,860,000.00 -- --1,860,000.00
Adv electric reactor, without mobilization, demobilization
or pretreatment --@.000 Ton 964.00 -- -- 964.00
Adv electric reactor, fixed cost with unit install, monitor,
operation and maintenance --@.000 Ea 6,320,000.00 -- --6,320,000.00

In-situ waste vitrification - Contamination by non-radioactive materials


Minimal contamination --@.000 Ton 672.00 -- -- 672.00
Moderate contamination --@.000 Ton 716.00 -- -- 716.00
Heavy contamination --@.000 Ton 761.00 -- -- 761.00

In-situ waste vitrification - Contamination by low level radiation


Minimal contamination --@.000 Ton 896.00 -- -- 896.00
2015 Heavy Construction Estimator, All Rights Reserved Page 483

Moderate contamination --@.000 Ton 985.00 -- -- 985.00


Heavy contamination --@.000 Ton 1,070.00 -- -- 1,070.00

In-situ waste vitrification - Equipment mobilization and demobilization


Average cost --@.000 Ton 448,000.00 -- --448,000.00
Average mileage cost --@.000 Mile 134.00 -- -- 134.00

In-situ waste vitrification - Technical support


Provided by vitrification contractor. Typically, these costs range from $25,000 to $75,000 and should be
considered an indirect job cost.
Remedial design --@.000 Ea 89,600.00 -- -- 89,600.00
Remedial action --@.000 Ea 44,800.00 -- -- 44,800.00
ARAR compliance --@.000 Ea 44,800.00 -- -- 44,800.00
Community relations --@.000 Ea 44,800.00 -- -- 44,800.00
Site preparation --@.000 Ea 44,800.00 -- -- 44,800.00
Post process sampling,
monitoring, and delisting --@.000 Ea 44,800.00 -- -- 44,800.00
Treatability testing for PCB and dioxins,
excludes analytical costs --@.000 Ea 53,700.00 -- -- 53,700.00
Treatability testing for hazardous waste,
excludes analytical costs --@.000 Ea 44,800.00 -- -- 44,800.00

Off-site commercial incineration, regional - Incineration of drummed waste, 55 gallon drums


Solid waste, energetic,
amenable to bulking --@.000 Ea 1,340.00 -- -- 1,340.00
Solid waste, non-energetic,
amenable to bulking --@.000 Ea 896.00 -- -- 896.00
Solid waste, energetic,
requiring repacking, --@.000 Ea 1,340.00 -- -- 1,340.00
Solid waste,
non-energetic, requiring --@.000 Ea 896.00 -- -- 896.00
Reactive or corrosive solids,
per pound --@.000 Lb 3.58 -- -- 3.58
Liquids, amenable to bulking --@.000 Ea 806.00 -- -- 806.00
Liquids requiring repacking --@.000 Ea 1,520.00 -- -- 1,520.00
Reactive or corrosive liquids --@.000 Ea 1,070.00 -- -- 1,070.00
Sludge, energetic,
amenable to bulking --@.000 Ea 851.00 -- -- 851.00
Sludge, non-energetic,
amenable to bulking --@.000 Ea 627.00 -- -- 627.00
Sludge requiring repacking --@.000 Ea 1,520.00 -- -- 1,520.00
Lean water incineration
for non-PCB waste --@.000 Ea 806.00 -- -- 806.00

Off-site commercial incineration, regional - Incineration of waste


Lab packs containing
non-reactive material --@.000 Lb 3.31 -- -- 3.31
Aerosol cans, fluorinated --@.000 Lb 3.94 -- -- 3.94
Aerosol cans, non-fluorinated --@.000 Lb 3.04 -- -- 3.04

Off-site commercial incineration, regional - Incineration of drummed waste, extra charges


For waste containing over 5% halogen,
55 gallon drums --@.000 Ea 10.70 -- -- 10.70
For waste containing over 10% ash,
55 gallon drums --@.000 Ea 4.93 -- -- 4.93
For waste packed
in metal 85 gallon overpack --@.000 Ea 89.60 -- -- 89.60
For waste
2015 Heavy Construction Estimator, All Rights Reserved Page 483 (part 2)

packed in plastic 85 gallon --@.000 Ea 179.00 -- -- 179.00


Minimum charges for shipment --@.000 Ea 537.00 -- -- 537.00
Initial waste stream evaluation,
incineration --@.000 Ea 1,790.00 -- -- 1,790.00

Off-site commercial incineration, regional - Incineration of bulk waste


Reactive of
corrosive bulk solid per lb. --@.000 Lb 4.48 -- -- 4.48
Bulk liquids,
2000 Btu to 12000 Btu per lb. --@.000 Lb 0.99 -- -- 0.99
Reactive or corrosive bulk liquids --@.000 Gal 17.90 -- -- 17.90
Lean water incineration
for non-PCB bulk liquids --@.000 Gal 6.27 -- -- 6.27
Aqueous liquids, approx. 90% water --@.000 Lb 0.99 -- -- 0.99
Extra charges of chlorine content of 26% to 50%,
55 gallon drum --@.000 Ea 261.00 -- -- 261.00
Extra charges of chlorine content greater than 50%,
55 gallon drum --@.000 Ea 408.00 -- -- 408.00
Extra charges for waste containing
over 5% halogen by weight --@.000 Gal 0.20 -- -- 0.20
Extra charges for waste containing
over 10% ash by weight --@.000 Gal 0.09 -- -- 0.09
Minimum charges for shipment --@.000 Ea 537.00 -- -- 537.00
Initial waste stream evaluation fee not including
50% rebate on first shipment --@.000 Ea 1,070.00 -- -- 1,070.00
Incinerate bulk solid waste --@.000 Lb 1.07 -- -- 1.07

Off-site commercial incineration, regional - Incineration of gas cylinders


Class "A" and experimental waste cylinders, 3" (7.62cm) or less in diameter, 12"
(30.48cm) or less in length --@.000 Ea 627.00 -- -- 627.00
Class "B" waste cylinders, 3" (7.62cm) or less in diameter, 12"
(30.48cm) or less in length --@.000 Ea 269.00 -- -- 269.00
Class "B" waste cylinders, 4" (10.16 cm) or less in diameter,
24" (61cm) or less in length --@.000 Ea 627.00 -- -- 627.00
Class "B" waste flammable cylinders, 3" (7.62cm) or less in diameter, 12"
(30.48cm) or less in length --@.000 Ea 269.00 -- -- 269.00
Class "B" waste flammable cylinders, 4" (10.16 cm) or less in diameter,
24" (61cm) or less in length --@.000 Ea 627.00 -- -- 627.00
Class "B" waste flammable cylinders, 7" (17.78cm) or less in diameter,
33" (84)cm or less in length --@.000 Ea 896.00 -- -- 896.00
2015 Heavy Construction Estimator, All Rights Reserved Page 484

Class "B" waste containing up to 2 cubic feet internal volume, exceeding 7" (17.78cm) diameter
and 33" (84cm) in length --@.000 Ea 896.00 -- -- 896.00
Minimum order
per shipment of cylinders --@.000 Ea 448.00 -- -- 448.00

PCB destruction, regional outline - Incineration of drummed PCB waste


Drummed or boxed PCB capacitors --@.000 Lb 2.69 -- -- 2.69
Drummed PCB debris,
clothing, rags, etc. --@.000 Lb 2.24 -- -- 2.24
Drummed PCB contaminated soil --@.000 Lb 2.69 -- -- 2.69
Drummed PCB light ballasts --@.000 Lb 2.69 -- -- 2.69
Drummed PCB transformer,
55 gallon drum --@.000 Ea 896.00 -- -- 896.00
Drummed PCB solid waste,
55 gallon drum --@.000 Ea 233.00 -- -- 233.00
Drummed PCB solid waste,
30 gallon drum --@.000 Ea 134.00 -- -- 134.00
Drummed PCB solid waste,
5 gallon pail --@.000 Ea 71.60 -- -- 71.60
Drummed PCB liquids less than 100000 PPM,
55 gallon drum --@.000 Ea 537.00 -- -- 537.00
Drummed PCB liquids greater than 100000 PPM,
55 gallon drum --@.000 Ea 672.00 -- -- 672.00
Lean water incineration for drummed waste,
55 gallon drum --@.000 Ea 448.00 -- -- 448.00
Palletized PCB solid waste,
single layer stack --@.000 Ea 949.00 -- -- 949.00
Drummed or boxed capacitors in storage up to 180 days,
gross weight of container --@.000 Lb 2.20 -- -- 2.20
Drummed or boxed capacitors in storage from 180 days to 270 days,
gross weight of container --@.000 Lb 4.48 -- -- 4.48
Drummed or boxed capacitors in storage over 270 days,
gross weight of container --@.000 Lb 6.27 -- -- 6.27
Minimum charge for drummed capacitors
stored over 270 days --@.000 Ea 2,510.00 -- -- 2,510.00
Minimum charge
on shipment of drummed waste --@.000 Ea 403.00 -- -- 403.00
Empty drums,
not crushed, 55 gallon drum --@.000 Ea 89.60 -- -- 89.60
Initial waste stream evaluation fee --@.000 Ea 716.00 -- -- 716.00
Incinerate drummed PCB solid waste,
55 gallon --@.000 Ea 1,160.00 -- -- 1,160.00
Lean water incinerator,
drummed PCB waste, 55 gallon --@.000 Ea 537.00 -- -- 537.00

PCB destruction, regional outline - Incineration of bulk PCB waste


Bulk PCB solid waste, based
on 2000 lbs. per cubic yard --@.000 Ea 439.00 -- -- 439.00
Lean water incineration
of bulk PCB waste --@.000 Ea 0.81 -- -- 0.81
Boxes and
non-drummed PCB solid waste --@.000 CF 17.90 -- -- 17.90
Minimum charge for each shipment --@.000 Ea 3,940.00 -- -- 3,940.00
Lean water incineration
of bulk PCB waste --@.000 Gal 6.27 -- -- 6.27
Incinerate bulk PCB solid waste --@.000 CY 2,690.00 -- -- 2,690.00

PCB destruction, regional outline - PCB transformer processing costs


Includes incineration of liquids.
2015 Heavy Construction Estimator, All Rights Reserved Page 484 (part 2)

PCB transformer greater than 10,0000 PPM,


flush only, askarel unit --@.000 Gal 19.70 -- -- 19.70
PCB transformer greater than 100,000 PPM, drain and flush,
askarel unit --@.000 Gal 35.80 -- -- 35.80
PCB transformer less than 100,000 PPM, flush only,
over 500 PPM to 100,000 PPM --@.000 Gal 19.70 -- -- 19.70
PCB transformer less than 100,000 PPM, drain and flush,
over 500 PPM --@.000 Gal 32.20 -- -- 32.20
PCB contaminated transformer, drain only, less
than 500 PPM to 100,000 PPM --@.000 Gal 14.30 -- -- 14.30
Landfill disposal of transformer carcass,
dimensions to outside of fins --@.000 CF 17.90 -- -- 17.90

Rotary kiln incineration services


Costs based on average of different capacity plants with varying productivity.
Aqueous waste --@.000 Ton 734.00 -- -- 734.00
Organic waste --@.000 Ton 1,020.00 -- -- 1,020.00
Sludges/solids --@.000 Ton 1,790.00 -- -- 1,790.00
Drummed liquids, 55 gallon drum --@.000 Ea 69.80 -- -- 69.80
Drummed sludges and solids,
55 gallon drum --@.000 Ea 224.00 -- -- 224.00

Liquid injection incineration services


Costs based on average of different capacity plants with varying productivities.
Aqueous waste --@.000 Ton 645.00 -- -- 645.00
Organic waste --@.000 Ton 958.00 -- -- 958.00
Drummed liquid waste,
55 gallon drum --@.000 Ea 84.70 -- -- 84.70

Energy recovery system Nebraska mobile boilers


Includes electrical switch gear, main steam stop valve, regulator, fuel oil tanks, preheated feed water
system with pumps and blowdown. Boilers are natural gas/fuel oil fired. Nebraska units. In pounds per
hour at listed design pressure. Rental.
60,000 lbs., 1 month, 350 PSI --@.000 Total 27,800.00 -- -- 27,800.00
60,000 lbs., 3 months, 350 PSI --@.000 Total 75,000.00 -- -- 75,000.00
60,000 lbs., 6 months, 350 PSI --@.000 Total135,000.00 -- --135,000.00
2015 Heavy Construction Estimator, All Rights Reserved Page 485

30,000 lbs., 1 month, 300 PSI --@.000 Total 18,800.00 -- -- 18,800.00


30,000 lbs., 3 months, 300 PSI --@.000 Total 50,800.00 -- -- 50,800.00
30,000 lbs., 6 months, 300 PSI --@.000 Total 91,300.00 -- -- 91,300.00

Energy recovery system mobile boilers


Includes electrical switch gear, main steam stop valve, propane hose, regulator, and operation manual.
Includes 6' flanged stub stack section and gas pressure regulator. In pounds per hour at listed design
pressure. Rental.
12,075 lbs., 10 day rental,
350 HP, 250 PSI --@.000 Ea 10,000.00 -- -- 10,000.00
12,075 lbs.,
1 month, 350 HP, 250 PSI --@.000 Ea 18,300.00 -- -- 18,300.00
12,075 lbs.,
3 months, 350 HP, 250 PSI --@.000 Ea 49,300.00 -- -- 49,300.00
12,075 lbs.,
6 months, 350 HP, 250 PSI --@.000 Ea 88,800.00 -- -- 88,800.00
8,625 lbs.,
10 days, 250 HP, 150 PSI --@.000 Ea 8,240.00 -- -- 8,240.00
8,625 lbs.,
1 month, 250 HP, 150 PSI --@.000 Ea 15,600.00 -- -- 15,600.00
8,625 lbs.,
3 months, 250 HP, 150 PSI --@.000 Ea 42,100.00 -- -- 42,100.00
8,625 lbs.,
6 months, 250 HP, 150 PSI --@.000 Ea 75,800.00 -- -- 75,800.00
5,175 lbs.,
10 days, 150 HP, 150 PSI --@.000 Ea 5,730.00 -- -- 5,730.00
5,175 lbs.,
1 month, 150 HP, 150 PSI --@.000 Ea 10,200.00 -- -- 10,200.00
5,175 lbs.,
3 months, 150 HP, 150 PSI --@.000 Ea 27,600.00 -- -- 27,600.00
5,175 lbs.,
6 months, 150 HP, 150 PSI --@.000 Ea 49,600.00 -- -- 49,600.00
3,450 lbs.,
10 days, 100 HP, 150 PSI --@.000 Ea 4,660.00 -- -- 4,660.00
3,450 lbs.,
1 month, 100 HP, 150 PSI --@.000 Ea 6,770.00 -- -- 6,770.00
3,450 lbs.,
3 months, 100 HP, 150 PSI --@.000 Ea 18,300.00 -- -- 18,300.00
3,450 lbs.,
6 months, 100 HP, 150 PSI --@.000 Ea 32,900.00 -- -- 32,900.00
1,725 lbs., 10 days, 50 HP, 150 PSI --@.000 Ea 2,690.00 -- -- 2,690.00
1,725 lbs., 1 month, 50 HP, 150 PSI --@.000 Ea 6,450.00 -- -- 6,450.00
1,725 lbs.,
3 months, 50 HP, 150 PSI --@.000 Ea 17,400.00 -- -- 17,400.00
1,725 lbs.,
6 months, 50 HP, 150 PSI --@.000 Ea 31,400.00 -- -- 31,400.00
30,000 and 60,000 lb. boilers,
freight per mile plus permits --@.000 Mile 6.27 -- -- 6.27
1,725 to 12,075 lb. boilers,
freight per mile plus permits --@.000 Mile 4.48 -- -- 4.48
Feed water chemical treatment --@.000 Gal 27.80 -- -- 27.80

Mobile low temp desorption unit


Minimum mobilization and demobilization charge,
up to 1000 miles --@.000 Ea 448,000.00 -- --448,000.00
Additional mobilization and demobilization charge,
per mile over 1,000 miles --@.000 Mile 50.10 -- -- 50.10
Permitting site with treatability studies,
interfacing with regulator --@.000 Ea 53,700.00 -- -- 53,700.00
2015 Heavy Construction Estimator, All Rights Reserved Page 485 (part 2)

Mobile low temp desorption unit


Direct firing desorption unit, waste destruction, without
pre-treatment or excavation et@.000 Ton 152.00 -- -- 152.00
Indirect firing unit, waste destruction, without
pretreatment or excavation et@.000 Ton 198.00 -- -- 198.00

CSI 13-278, Disposal of hazardous waste

Disposal of drummed hazardous waste - Solids


Disposal in commercial RCRA landfills.
30 gallons or less drums --@.000 Ea 146.00 -- -- 146.00
55 gallon drum --@.000 Ea 195.00 -- -- 195.00
Greater than 55 gallons drums --@.000 Ea 303.00 -- -- 303.00

Disposal of drummed hazardous waste - Non-hazardous solids


30 gallons or less drums --@.000 Ea 125.00 -- -- 125.00
55 gallon drum --@.000 Ea 167.00 -- -- 167.00
Greater than 55 gallons drums --@.000 Ea 258.00 -- -- 258.00

Disposal of drummed hazardous waste - Solid, requiring stabilization


30 gallons or less drums --@.000 Ea 336.00 -- -- 336.00
55 gallon drum --@.000 Ea 448.00 -- -- 448.00
Greater than 55 gallons drums --@.000 Ea 694.00 -- -- 694.00

Disposal of drummed hazardous waste - Solid and sludge, requiring stabilization


30 gallons or less drums --@.000 Ea 336.00 -- -- 336.00
55 gallon drum --@.000 Ea 448.00 -- -- 448.00
Greater than 55 gallons drums --@.000 Ea 694.00 -- -- 694.00

Disposal of drummed hazardous waste - Liquid, no stabilization


30 gallons or less drums --@.000 Ea 222.00 -- -- 222.00
55 gallon drum --@.000 Ea 296.00 -- -- 296.00
Greater than 55 gallons drums --@.000 Ea 404.00 -- -- 404.00
2015 Heavy Construction Estimator, All Rights Reserved Page 486

Disposal of drummed hazardous waste - Liquid, requiring stabilization


30 gallons or less drums --@.000 Ea 336.00 -- -- 336.00
55 gallon drum --@.000 Ea 448.00 -- -- 448.00
Greater than 55 gallons drums --@.000 Ea 693.00 -- -- 693.00

Disposal of drummed hazardous waste - Liquid, treated by solar evaporation, pH above 2.0
30 gallons or less drums --@.000 Ea 276.00 -- -- 276.00
55 gallon drum --@.000 Ea 276.00 -- -- 276.00
Greater than 55 gallons drums --@.000 Ea 346.00 -- -- 346.00

Disposal of drummed hazardous waste - Inorganic or organic non-hazardous liquid and sludge
30 gallons or less drums --@.000 Ea 222.00 -- -- 222.00
55 gallon drum --@.000 Ea 296.00 -- -- 296.00
Greater than 55 gallons drums --@.000 Ea 458.00 -- -- 458.00

Disposal of drummed hazardous waste - Organic liquid and sludge


30 gallons or less drums --@.000 Ea 537.00 -- -- 537.00
55 gallon drum --@.000 Ea 716.00 -- -- 716.00
Greater than 55 gallons drums --@.000 Ea 1,110.00 -- -- 1,110.00

Disposal of drummed hazardous waste - Liquid and sludge treated by solar evaporation
PH above 2.0.
30 gallons or less drums --@.000 Ea 315.00 -- -- 315.00
55 gallon drum --@.000 Ea 315.00 -- -- 315.00
Greater than 55 gallons drums --@.000 Ea 385.00 -- -- 385.00

Disposal of drummed hazardous waste - Mineral acids with concentration of 0% to 40%


30 gallons or less drums --@.000 Ea 410.00 -- -- 410.00
55 gallon drum --@.000 Ea 546.00 -- -- 546.00
Greater than 55 gallons drums --@.000 Ea 847.00 -- -- 847.00

Disposal of drummed hazardous waste - Mineral acids with concentration of 41% to 60%
30 gallons or less drums --@.000 Ea 645.00 -- -- 645.00
55 gallon drum --@.000 Ea 860.00 -- -- 860.00
Greater than 55 gallons drums --@.000 Ea 1,330.00 -- -- 1,330.00

Disposal of drummed hazardous waste - Mineral acids with concentration of greater than 61%
30 gallons or less drums --@.000 Ea 833.00 -- -- 833.00
55 gallon drum --@.000 Ea 1,110.00 -- -- 1,110.00
Greater than 55 gallons drums --@.000 Ea 1,720.00 -- -- 1,720.00

Disposal of drummed hazardous waste - Fuels substitution of 0% to 10% solids


30 gallons or less drums --@.000 Ea 60.40 -- -- 60.40
55 gallon drum --@.000 Ea 80.60 -- -- 80.60
Greater than 55 gallons drums --@.000 Ea 125.00 -- -- 125.00

Disposal of drummed hazardous waste - Fuels substitution of 10.1% to 25% solids


30 gallons or less drums --@.000 Ea 242.00 -- -- 242.00
55 gallon drum --@.000 Ea 322.00 -- -- 322.00
Greater than 55 gallons drums --@.000 Ea 500.00 -- -- 500.00

Disposal of drummed hazardous waste - Fuels substitution of 25.1% to 50% solids


30 gallons or less drums --@.000 Ea 242.00 -- -- 242.00
55 gallon drum --@.000 Ea 322.00 -- -- 322.00
2015 Heavy Construction Estimator, All Rights Reserved Page 486 (part 2)

Greater than 55 gallons drums --@.000 Ea 500.00 -- -- 500.00

Disposal of drummed hazardous waste - Fuels substitution of 50.1% to 75% solids


30 gallons or less drums --@.000 Ea 383.00 -- -- 383.00
55 gallon drum --@.000 Ea 510.00 -- -- 510.00
Greater than 55 gallons drums --@.000 Ea 791.00 -- -- 791.00

Disposal of drummed hazardous waste - Fuels substitution of 75.1% to 100% solids


30 gallons or less drums --@.000 Ea 470.00 -- -- 470.00
55 gallon drum --@.000 Ea 627.00 -- -- 627.00
Greater than 55 gallons drums --@.000 Ea 972.00 -- -- 972.00

Disposal of drummed hazardous waste - Packaged lab chemicals


5 to 25 gallon drums --@.000 Ea 179.00 -- -- 179.00
30 to 40 gallon drums --@.000 Ea 269.00 -- -- 269.00
Greater than 45 gallon drums --@.000 Ea 358.00 -- -- 358.00

Disposal of drummed hazardous waste - Packaged lab chemicals, requiring stabilization


5 to 25 gallon drums --@.000 Ea 394.00 -- -- 394.00
30 to 40 gallon drums --@.000 Ea 484.00 -- -- 484.00
Greater than 45 gallon drums --@.000 Ea 573.00 -- -- 573.00
2015 Heavy Construction Estimator, All Rights Reserved Page 487

Disposal of drummed hazardous waste - Extra charges


For 85 gallon overpack --@.000 Ea 53.70 -- -- 53.70
For leaking drums --@.000 Ea 269.00 -- -- 269.00
Minimum
charges for drummed shipments --@.000 Ea 403.00 -- -- 403.00

Disposal of drummed hazardous waste - Extra charges for drums less than 90% full
30 gallons or less drums --@.000 Ea 35.80 -- -- 35.80
55 gallon drum --@.000 Ea 35.80 -- -- 35.80
Greater than 55 gallon drums --@.000 Ea 35.80 -- -- 35.80

Disposal of drummed hazardous waste - Disposal of bulk hazardous waste


Solid, based
on 2,000 lbs. per cubic yard --@.000 Ton 340.00 -- -- 340.00
Solid, less than
2,000 lbs. per cubic yard --@.000 CY 340.00 -- -- 340.00
Solid, requiring stabilization, based
on 2,000 lbs. per cubic yard --@.000 Ton 493.00 -- -- 493.00
Solid, in odd shaped containers and boxes, less than
10 cubic feet per container --@.000 CF 12.50 -- -- 12.50
Solid, in odd shaped containers and boxes, greater than or equal to
10 cubic feet per container --@.000 CF 14.80 -- -- 14.80
Solid, requiring stabilization, in odd
shaped containers or boxes --@.000 CF 75.20 -- -- 75.20
Solid, based
on 2,000 lbs. per cubic yard --@.000 Ton 161.00 -- -- 161.00
Solid, less than
2,000 lbs. per cubic yard --@.000 CY 340.00 -- -- 340.00
Jumbo bags, direct landfill --@.000 Ea 293.00 -- -- 293.00
Jumbo bags, requiring stabilization --@.000 Ea 672.00 -- -- 672.00
Liquid --@.000 Gal 3.13 -- -- 3.13
Non-hazardous liquid --@.000 Gal 3.13 -- -- 3.13
Liquid, requiring stabilization --@.000 Gal 3.13 -- -- 3.13
Liquid, treated by solar evaporation,
pH above 2.0 --@.000 Gal 3.13 -- -- 3.13
Non-fuel liquid/sludge --@.000 Gal 3.13 -- -- 3.13
Non-hazardous,
non-fuel liquid/sludge --@.000 Gal 3.13 -- -- 3.13
Fuel substitution liquids --@.000 Gal 1.34 -- -- 1.34
Minimum charges for bulk shipments --@.000 Ea 2,690.00 -- -- 2,690.00
Minimum charges for bulk shipments, requiring
treatment or stabilization --@.000 Ea 2,690.00 -- -- 2,690.00
Minimum charges on non-fuel
bulk liquid shipments --@.000 Ea 2,690.00 -- -- 2,690.00
Extra charges for leaking loads,
per drum --@.000 Ea 269.00 -- -- 269.00
Truck washout --@.000 Ea 269.00 -- -- 269.00
Non-hazardous bulk
solid waste sanitary landfill --@.000 CY 71.60 -- -- 71.60

Disposal of drummed hazardous waste - Disposal of palletized hazardous waste


Solid --@.000 Ea 781.00 -- -- 781.00
Liquid or sludge --@.000 Ea 1,180.00 -- -- 1,180.00

Disposal of drummed hazardous waste - Additional landfill disposal costs


Waste stream evaluation fee, not including
50% rebate on first shipment --@.000 Ea 537.00 -- -- 537.00
2015 Heavy Construction Estimator, All Rights Reserved Page 487 (part 2)

Manifest discrepancies --@.000 Ea 448.00 -- -- 448.00


Lab pack profile evaluation fee --@.000 Ea 537.00 -- -- 537.00
Priority
waste stream evaluation fee --@.000 Ea 1,340.00 -- -- 1,340.00
Disposal of empty drums,
metal 55 gallon RCRA empty --@.000 Ea 80.60 -- -- 80.60
Disposal of empty drums,
metal 85 gallon RCRA empty --@.000 Ea 80.60 -- -- 80.60
Disposal of empty drums,
plastic 55 gallon RCRA empty --@.000 Ea 80.60 -- -- 80.60

Transportation of non-hazardous bulk liquid waste, including loading and unloading


Using a 6" 1,950 GPM submersible pump and a 6,000 gallon off highway water wagon.
6,000 gallons of wastewater jv@.140 Mile -- 5.59 9.78 15.37

State hazardous waste taxes and fees


Use the lines below as a checklist of possible costs, using a 6" 1,950 GPM submersible pump and a
6,000 gallon off highway water wagon.
State HTW
disposal tax/fee (bulk solid) --@.000 CY -- -- -- --
State HTW disposal
tax/fee (bulk liquid) --@.000 Gal -- -- -- --
State HTW disposal tax/fee (drums) --@.000 Drum -- -- -- --

State hazardous waste taxes and fees - Regional outline


Land disposal tax, in-state wastes --@.000 Ton 35.80 -- -- 35.80
Land disposal tax, out-of-state wastes, higher
of origin or host state --@.000 Ton 35.80 -- -- 35.80
Incineration tax, in-state waste --@.000 Ton 35.80 -- -- 35.80
Incineration tax,
out-of-state wastes --@.000 Ton 35.80 -- -- 35.80
Deep well injection tax,
in-state waste --@.000 Ton 1.79 -- -- 1.79
Deep well injection tax,
out-of-state wastes --@.000 Ton 1.79 -- -- 1.79
2015 Heavy Construction Estimator, All Rights Reserved Page 488

Storage of hazardous wastes --@.000 Ton 1.79 -- -- 1.79

Commercial hazardous waste disposal - Low level radioactive waste


Solid material, all disposal packages. In rems per hour at container surface.
Up to .20 rems, minimum charge --@.000 CF 2,170.00 -- -- 2,170.00
Add to minimum
charge - .201 to 1.00 rems --@.000 CF 43.50 -- -- 43.50
Add to minimum
charge - 1.01 to 2.00 rems --@.000 CF 64.30 -- -- 64.30
Add to minimum
charge - 2.01 to 5.00 rems --@.000 CF 77.90 -- -- 77.90
Add to minimum
charge - 5.01 to 10.00 rems --@.000 CF 76.50 -- -- 76.50
Add to minimum
charge - 10.01 to 20.00 rems --@.000 CF 86.00 -- -- 86.00
Add to minimum
charge - 20.01 to 40.00 rems --@.000 CF 93.40 -- -- 93.40
Liners removed from shield,
up to 40 rems --@.000 CF 66.30 -- -- 66.30

Commercial hazardous waste disposal - Surcharge for removing liners from shield
In rems per hour at container surface.
.201 - 1.00 rems --@.000 Ea 663.00 -- -- 663.00
1.10 - 2.00 rems --@.000 Ea 1,490.00 -- -- 1,490.00
2.01 - 5.00 rems --@.000 Ea 2,510.00 -- -- 2,510.00
5.01 - 10.00 rems --@.000 Ea 4,010.00 -- -- 4,010.00
10.01 - 20.00 rems --@.000 Ea 5,250.00 -- -- 5,250.00
20.01 - 40.00 rems --@.000 Ea 6,020.00 -- -- 6,020.00

Commercial hazardous waste disposal - Other hazardous waste


Biological waste, animal carcasses --@.000 CF 75.90 -- -- 75.90
Absorbed aqueous liquids --@.000 CF 70.60 -- -- 70.60
Absorbed aqueous vials --@.000 CF 74.70 -- -- 74.70

Commercial hazardous waste disposal - Surcharge for heavy containers


1001 to 5000 lbs. --@.000 Ea 1,050.00 -- -- 1,050.00
5001 to 10000 lbs. --@.000 Ea 896.00 -- -- 896.00
10001 to 20000 lbs. --@.000 Ea 1,790.00 -- -- 1,790.00
20001 to 30000 lbs. --@.000 Ea 3,380.00 -- -- 3,380.00
30001 to 40000 lbs. --@.000 Ea 4,960.00 -- -- 4,960.00
40001 to 50000 lbs. --@.000 Ea 6,520.00 -- -- 6,520.00

Commercial hazardous waste disposal - Surcharge for shipment containing


0 to 5 curies --@.000 Ea 6,470.00 -- -- 6,470.00
6 to 15 curies --@.000 Ea 7,330.00 -- -- 7,330.00
16 to 25 curies --@.000 Ea 9,710.00 -- -- 9,710.00
26 to 50 curies --@.000 Ea 14,700.00 -- -- 14,700.00
51 to 75 curies --@.000 Ea 20,700.00 -- -- 20,700.00
76 to 100 curies --@.000 Ea 24,200.00 -- -- 24,200.00
101 to 150 curies --@.000 Ea 41,300.00 -- -- 41,300.00
151 to 250 curies --@.000 Ea 59,100.00 -- -- 59,100.00
251 to 500 curies --@.000 Ea 60,600.00 -- -- 60,600.00
501 to 1000 curies --@.000 Ea 62,000.00 -- -- 62,000.00

Commercial hazardous waste disposal - Hazardous waste handling fees


Cask handling fee --@.000 Ea 2,290.00 -- -- 2,290.00
Surcharge for polyethylene HIC liner, maximum 82" diameter,
2015 Heavy Construction Estimator, All Rights Reserved Page 488 (part 2)

79" height --@.000 Ea 45,700.00 -- -- 45,700.00


Surcharge for polyethylene HIC overpack, maximum 33" diameter,
79" height --@.000 Ea 5,820.00 -- -- 5,820.00
Surcharge for polyethylene HIC drum, 55 gallon maximum 25-1/2" diameter,
36" height --@.000 Ea 1,120.00 -- -- 1,120.00
Special nuclear material surcharge,
price per gram --@.000 Ea 15.30 -- -- 15.30
Minimum charge for shipment --@.000 Ea 1,790.00 -- -- 1,790.00

Hazardous waste transportation fees - Demurrage


Demurrage vacuum,
dump and tanker, hourly --@.000 Hour 62.70 -- -- 62.70
Demurrage van trailer, hourly --@.000 Hour 89.60 -- -- 89.60
Overnight demurrage --@.000 Ea 313.00 -- -- 313.00
Maximum 24 hour demurrage --@.000 Ea 806.00 -- -- 806.00

Hazardous waste transportation fees - In route transport expenses


Additional stops up to 3 --@.000 Ea 89.60 -- -- 89.60
Additional stops over 3 --@.000 Ea 179.00 -- -- 179.00

Hazardous waste transportation fees - On-site trailer drops


Tanker trailer drop, daily --@.000 Day 179.00 -- -- 179.00
2015 Heavy Construction Estimator, All Rights Reserved Page 489

Tanker trailer drop, monthly --@.000 Mo 170.00 -- -- 170.00


Dump trailer drop, daily --@.000 Day 71.60 -- -- 71.60
Dump trailer drop, monthly --@.000 Mo 62.70 -- -- 62.70
Van trailer drop, daily --@.000 Day 62.70 -- -- 62.70
Van trailer drop, monthly --@.000 Mo 53.70 -- -- 53.70

Transportation mileage fees - Hazardous waste in dump truck


Minimum charge --@.000 Ea 985.00 -- -- 985.00
200 to 299 miles --@.000 Mile 4.93 -- -- 4.93
300 to 399 miles --@.000 Mile 4.75 -- -- 4.75
400 to 499 miles --@.000 Mile 4.57 -- -- 4.57
500 to 599 miles --@.000 Mile 4.48 -- -- 4.48
600 to 699 miles --@.000 Mile 4.39 -- -- 4.39
700 to 799 miles --@.000 Mile 4.30 -- -- 4.30
800 to 899 miles --@.000 Mile 4.21 -- -- 4.21
900 to 999 miles --@.000 Mile 4.12 -- -- 4.12
1000+ miles --@.000 Mile 4.03 -- -- 4.03

Transportation mileage fees - Explosive waste in dump truck


Minimum charge --@.000 Ea 1,160.00 -- -- 1,160.00
200 to 299 miles --@.000 Mile 5.82 -- -- 5.82
300 to 399 miles --@.000 Mile 5.64 -- -- 5.64
400 to 499 miles --@.000 Mile 5.46 -- -- 5.46
500 to 599 miles --@.000 Mile 5.37 -- -- 5.37
600 to 699 miles --@.000 Mile 5.28 -- -- 5.28
700 to 799 miles --@.000 Mile 5.19 -- -- 5.19
800 to 899 miles --@.000 Mile 5.10 -- -- 5.10
900 to 999 miles --@.000 Mile 5.01 -- -- 5.01
1000+ miles --@.000 Mile 4.93 -- -- 4.93

Transportation mileage fees - Hazardous waste in van trailer


Minimum charge --@.000 Ea 1,160.00 -- -- 1,160.00
200 to 299 miles --@.000 Mile 6.00 -- -- 6.00
300 to 399 miles --@.000 Mile 4.93 -- -- 4.93
400 to 499 miles --@.000 Mile 4.30 -- -- 4.30
500 to 599 miles --@.000 Mile 4.21 -- -- 4.21
600 to 699 miles --@.000 Mile 4.12 -- -- 4.12
700 to 799 miles --@.000 Mile 4.03 -- -- 4.03
800 to 899 miles --@.000 Mile 3.94 -- -- 3.94
900 to 999 miles --@.000 Mile 3.85 -- -- 3.85
1000 to 1099 miles --@.000 Mile 3.76 -- -- 3.76
1100 to 1199 miles --@.000 Mile 3.67 -- -- 3.67
1200+ miles --@.000 Mile 3.58 -- -- 3.58

Transportation mileage fees - Explosive waste in van trailer


Minimum charge --@.000 Ea 1,340.00 -- -- 1,340.00
200 to 299 miles --@.000 Mile 6.90 -- -- 6.90
300 to 399 miles --@.000 Mile 5.82 -- -- 5.82
400 to 499 miles --@.000 Mile 5.19 -- -- 5.19
500 to 599 miles --@.000 Mile 5.10 -- -- 5.10
600 to 699 miles --@.000 Mile 5.01 -- -- 5.01
700 to 799 miles --@.000 Mile 4.93 -- -- 4.93
800 to 899 miles --@.000 Mile 4.84 -- -- 4.84
900 to 999 miles --@.000 Mile 4.75 -- -- 4.75
1000 to 1099 miles --@.000 Mile 4.66 -- -- 4.66
1100 to 1199 miles --@.000 Mile 4.57 -- -- 4.57
1200+ miles --@.000 Mile 4.48 -- -- 4.48
2015 Heavy Construction Estimator, All Rights Reserved Page 490

Transportation mileage fees - Explosive waste in tanker trailer


Minimum charge --@.000 Ea 1,160.00 -- -- 1,160.00
200 to 299 miles --@.000 Mile 6.72 -- -- 6.72
300 to 399 miles --@.000 Mile 6.27 -- -- 6.27
400 to 499 miles --@.000 Mile 6.27 -- -- 6.27
500 to 599 miles --@.000 Mile 5.82 -- -- 5.82
600 to 699 miles --@.000 Mile 5.73 -- -- 5.73
700 to 799 miles --@.000 Mile 5.64 -- -- 5.64
800 to 899 miles --@.000 Mile 5.55 -- -- 5.55
900 to 999 miles --@.000 Mile 5.46 -- -- 5.46
1000+ miles --@.000 Mile 5.37 -- -- 5.37

Hazardous waste in vacuum trailer


Minimum charge --@.000 Ea 1,340.00 -- -- 1,340.00
200 to 299 miles --@.000 Mile 6.00 -- -- 6.00
300 to 399 miles --@.000 Mile 5.82 -- -- 5.82
400 to 899 miles --@.000 Mile 5.37 -- -- 5.37
900+ miles --@.000 Mile 5.10 -- -- 5.10

Explosive waste in vacuum trailer


Minimum charge --@.000 Ea 1,520.00 -- -- 1,520.00
200 to 299 miles --@.000 Mile 6.90 -- -- 6.90
300 to 399 miles --@.000 Mile 6.72 -- -- 6.72
400 to 899 miles --@.000 Mile 6.27 -- -- 6.27
900+ miles --@.000 Mile 6.00 -- -- 6.00

CSI 13-281, Special nuclear construction, hot cell services

Hot cell window refurbishment


Extraction table --@.000 Ea 17,900.00 -- -- 17,900.00
Shipment of extraction tools --@.000 Ea 1,430.00 -- -- 1,430.00
Window shipment
to shop less than 1,000 miles --@.000 Ea 2,690.00 -- -- 2,690.00
Window shipment to
shop greater than 1,000 miles --@.000 Ea 6,270.00 -- -- 6,270.00
Refurbish cold side or hot side cover glass,
3/4" to 1" thick --@.000 Ea 2,150.00 -- -- 2,150.00
Refurbish internal glass sheets --@.000 Ea 5,370.00 -- -- 5,370.00
Decontamination of window --@.000 Ea 5,370.00 -- -- 5,370.00
Shielding oil,
55 gallon drum, 1 to 4 drums --@.000 Ea 1,190.00 -- -- 1,190.00
Shielding oil,
55 gallon drum, 5 to 9 drums --@.000 Ea 1,060.00 -- -- 1,060.00
Shielding oil, 55 gallon drum,
10 or more drums --@.000 Ea 1,010.00 -- -- 1,010.00
Oil fill and drain kit --@.000 Ea 14,300.00 -- -- 14,300.00
Neoprene bellows, 3 liter --@.000 Ea 114.00 -- -- 114.00
Ura - rad seal gasket --@.000 LF 33.10 -- -- 33.10
Ura - rad compression gasket --@.000 LF 25.50 -- -- 25.50
Window cleaner specific to hot cell windows,
case of 12 cans --@.000 Case 66.40 -- -- 66.40
Window cleaner concentrate specific to hot cell windows,
makes 32 gallons --@.000 Gal 63.10 -- -- 63.10

Hot cell window services


Window engineer
per day plus expenses --@.000 Ea 1,070.00 -- -- 1,070.00
2015 Heavy Construction Estimator, All Rights Reserved Page 490 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 491

Window engineer
per week plus expenses --@.000 Ea 5,730.00 -- -- 5,730.00
Window technician
per day plus expenses --@.000 Ea 824.00 -- -- 824.00
Window technician
per week plus expenses --@.000 Ea 4,480.00 -- -- 4,480.00

Hot cell window replacement and refurbishment


Using small tools.
Window changeout
installation or removal sx@5.00 Hour 110.00 174.90 1.60 286.50

Hot cell window replacement and refurbishment


Using miscellaneous power tools and small tools.
Hot cell window port temporary
closure with plywood ap@.050 SF 17.90 2.19 0.06 20.15

Hot cell shielding - Interlocking lead bricks


Using miscellaneous power tools and small tools.
2" x 4" x 4" standard --@.000 Ea 64.50 -- -- 64.50
2" x 4" x 4" base --@.000 Ea 72.70 -- -- 72.70
2" x 4" x 4" top --@.000 Ea 45.80 -- -- 45.80
2" x 4" x 4" corner --@.000 Ea 64.50 -- -- 64.50
2" x 4" x 4" corner base --@.000 Ea 73.40 -- -- 73.40
2" x 4" x 4" corner top --@.000 Ea 55.50 -- -- 55.50
2" x 4" x 4" reverse corner --@.000 Ea 64.50 -- -- 64.50
2" x 4" x 2" reverse corner top --@.000 Ea 55.50 -- -- 55.50
2" x 4" x 2" end top, right hand --@.000 Ea 45.80 -- -- 45.80
2" x 2" x 2" end top, left hand --@.000 Ea 48.40 -- -- 48.40
2" x 4" x 4" end base, right hand --@.000 Ea 73.40 -- -- 73.40
2" x 2" x 4" end base, left hand --@.000 Ea 74.90 -- -- 74.90
2" x 4" x 4" end,
left hand or right hand --@.000 Ea 64.50 -- -- 64.50

Hot cell shielding - Lead glass bricks


Mounted in stainless steel frame with granulated lead.
4" x 8" x 2" --@.000 Ea 734.00 -- -- 734.00
8" x 8" x 2" --@.000 Ea 1,320.00 -- -- 1,320.00
8" x 12" x 2" --@.000 Ea 820.00 -- -- 820.00
12" x 12" x 2" --@.000 Ea 2,190.00 -- -- 2,190.00
12" x 16" x 2" --@.000 Ea 3,780.00 -- -- 3,780.00
4" x 8" x 4" --@.000 Ea 1,120.00 -- -- 1,120.00
8" x 8" x 4" --@.000 Ea 2,190.00 -- -- 2,190.00
8" x 12" x 4" --@.000 Ea 3,230.00 -- -- 3,230.00
12" x 12" x 4" --@.000 Ea 4,380.00 -- -- 4,380.00
12" x 16" x 4" --@.000 Ea 6,080.00 -- -- 6,080.00

Hot cell shielding - Installation


Using small tools.
Interlocking lead brick, small crew ca@.450 SF -- 18.29 0.14 18.43
Interlocking
lead brick - large crew cc@.300 SF -- 12.37 0.10 12.47
Lead glass brick, 4" x 8" face,
2" or 4" thickness cc@.420 SF -- 17.32 0.14 17.46
Lead glass brick, 8" x 8" face,
2" or 4" thickness cc@.280 SF -- 11.55 0.09 11.64
Lead glass brick, 12" x 12" face,
2" or 4" thickness cc@.240 SF -- 9.90 0.08 9.98
2015 Heavy Construction Estimator, All Rights Reserved Page 491 (part 2)

Hot cell cleanout operations - Remote hot cell cleanout


Using small tools.
Contamination survey m4@26.0 Day 878.00 1,646.00 50.40 2,574.40
Remote hot cell manipulator operations, e.g. equipment moving,
cutting, spraying m5@18.0 Day 878.00 1,104.00 33.70 2,015.70

Hot cell cleanout operations - Manned-entry hot cell cleanout


Using three sets of small tools.
Manned-entry cell washing m3@26.0 Day 878.00 1,588.00 50.40 2,516.40
Manned-entry airlock transferring m2@34.0 Day 878.00 2,130.00 50.30 3,058.30
Manned-entry
cell surface spot washing mz@34.0 Day 878.00 2,072.00 67.30 3,017.30

Hot cell cleanout operations - Airlock operations


Using three sets of small tools.
Airlock operations hot cell cleanout, e.g. waste packaging, container decontamination,
contamination survey m2@34.0 Day -- 2,130.00 50.30 2,180.30
Airlock shipping dock hot cell cleanout, e.g. loading cask to truck,
accepting shipment my@42.0 Day -- 2,615.00 67.20 2,682.20
Airlock shipping dock hot cell cleanout,
e.g. contaminated shipments mx@50.0 Day -- 3,157.00 67.00 3,224.00
2015 Heavy Construction Estimator, All Rights Reserved Page 492

Hot cell equipment operations - Manipulator maintenance


Using three sets of small tools.
Manipulator repairing,
gallery access ai@10.0 Day -- 445.50 5.40 450.90

CSI 13-600, Air supported structures

Includes erection on an existing graded site and anchor placement.


Add plumbing and electrical hookup
Using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic crane with 84’ boom,
Trailer mounted 200-amp welder, miscellaneous power and small tools
Warehouse, polyester/vinyl fabric, 24 oz. Over 10 yr. Life, welded seams, tension cables, primary &
auxiliary inflation system, airlock, personnel doors and liner, using three sets of small tools.
5,000 sqft a6@.005 SF 9.38 0.20 0.05 9.63
12,000 sqft a6@.004 SF 6.51 0.16 0.04 6.71
24,000 sqft a8@.004 SF 4.98 0.16 0.05 5.19
50,000 sqft a8@.004 SF 3.86 0.16 0.05 4.07
3,000 sqft a6@.008 SF 8.81 0.33 0.09 9.23
12,000 sqft a6@.004 SF 5.25 0.16 0.04 5.45
24,000 sqft a8@.004 SF 4.80 0.16 0.05 5.01
3,000 sqft a6@.008 SF 3.86 0.33 0.09 4.28
12,000 sqft a6@.004 SF 3.15 0.16 0.04 3.35
24,000 sqft a8@.004 SF 2.10 0.16 0.05 2.31
7,200 sqft a6@.004 SF 10.20 0.16 0.04 10.40
13,000 sqft a6@.004 SF 9.10 0.16 0.04 9.30
Over 24,000 sqft a8@.004 SF 6.25 0.16 0.05 6.46

CSI 13-601, Pre-engineered buildings

Temporary buildings - Housing, 1 to 6 year life


Tedlar/vinyl fabric, 17 oz. With liner, over 10 yr. Life, includes overhead and personnel doors
Greenhouse shelter, woven polyethylene with liner, 2 yr. Life, sewn seams, with doors.
Tennis gymnasium, polyester/vinyl fabric, 24 oz., over 10 yr. Life, including thermal liner, heat and lights
Housing on an existing concrete grade beam or block foundation. Add the cost of furnishings, internal
wiring and plumbing, using a portable 55 KW 120/240 volt generator, a 20-ton hydraulic crane with 70’
boom, miscellaneous power tools and a trailer mounted 200-amp welder.
10' x 24', 2 man quarters with bath a9@63.2 Ea 2,730.00 2,538.00 503.00 5,771.00
10' x 24', 4 man quarters with bath a9@63.2 Ea 2,860.00 2,538.00 503.00 5,901.00
24' x 90', 32 man quarters with bath, mobilization camp type,
including HVAC a9@514. Ea 16,900.00 20,640.00 4,090.00 41,630.00
28' x 100',
64 man quarters with bath a9@720. Ea 21,300.00 28,920.00 5,730.00 55,950.00

Temporary buildings - Semi-permanent, quick construct housing


Erected on an existing concrete grade beam or block foundation. Includes air conditioning, electric strip
heaters, furnishings and internal wiring. Add electric and plumbing hookup, using a portable 55 KW
120/240 volt generator, a 20-ton hydraulic crane with 70’ boom, miscellaneous power tools and a trailer
mounted 200-amp welder.
10' x 30', one officer billet with bedroom, bath, kitchen and living room,
21.3 KW required a9@72.0 Ea 3,480.00 2,892.00 573.00 6,945.00
30' x 40', 4 NCO billet with 4 one-man bedrooms, gang bath, kitchen, living room and dining room,
42.4 KW required a9@257. Ea 11,400.00 10,320.00 2,050.00 23,770.00
90' x 28', 16 man EM billet with16 one-man bedrooms,
gang bath, 61.9 KW required a9@552. Ea 21,000.00 22,170.00 4,390.00 47,560.00
90' x 28', 32 man TDY billet with 16 two-man bedrooms,
gang bath, 61.9 KW required a9@552. Ea 21,600.00 22,170.00 4,390.00 48,160.00
2015 Heavy Construction Estimator, All Rights Reserved Page 492 (part 2)

Temporary buildings - Laundry, mobile camp type


With exterior fan. Includes erection, equipment, internal wiring and plumbing. Erected on an existing
foundation, using a portable 55 KW 120/240 volt generator and miscellaneous power tools.
10' x 20',
50 man laundry, heavy duty a4@21.1 Ea 2,850.00 1,031.00 72.40 3,953.40
10’ x 24',
100 man laundry, light duty a4@21.1 Ea 2,090.00 1,031.00 72.40 3,193.40
10' x 28', 100 man laundry with exhaust fan, medium duty,
88.4 KW required a4@21.1 Ea 5,130.00 1,031.00 72.40 6,233.40

Temporary buildings - Kitchen and diner, mobile camp type


Includes erection on an existing concrete beam or block foundation. Includes all furnishings, internal
wiring, HVAC, and plumbing. Add plumbing and electrical hookup, using a portable 55 KW 120/240 volt
generator, a 40-ton hydraulic crane with 84’ boom, miscellaneous power tools and a trailer mounted
200-amp welder.
30' x 96', 250 man, including kitchen unit, bakery unit, refrigerator/freezer unit, dry storage unit,
and utensils ba@514. Ea 3,060.00 21,210.00 6,510.00 30,780.00
30' x 64' 150 man, including kitchen unit, refrigerator/freezer unit,
dry storage, and utensils ba@411. Ea 22,900.00 16,960.00 5,210.00 45,070.00
30' x 40', 50 man, including kitchen unit, two 45 CF refrigerators, two 45 CF freezers, dry storage unit,
and utensils ba@257. Ea 14,200.00 10,610.00 3,260.00 28,070.00

Temporary buildings - Kitchen, diner and recreation building combination


Excludes foundation. Includes all furnishings, internal wiring and plumbing. Add plumbing and electrical
hookup, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic crane with 84’ boom,
miscellaneous power tools and a trailer mounted 200-amp welder.
30' x 96', 100 man, including kitchen unit, refrigerator/freezer unit, dry storage unit, 3 diner units,
3 recreation units ba@514. Ea 29,800.00 21,210.00 6,510.00 57,520.00

Temporary buildings - Recreation buildings


Excludes foundation. Includes erection on an existing concrete or block foundation, all internal wiring,
HVAC, and plumbing, using a portable 55 KW 120/240 volt generator, a 20-ton hydraulic crane with 70’
boom, miscellaneous power tools and a trailer mounted 200-amp welder.
40' x 60', 250 man, including 4 pool tables,
2 ping pong tables, bar a9@514. Ea 14,300.00 20,640.00 4,090.00 39,030.00
2015 Heavy Construction Estimator, All Rights Reserved Page 493

Temporary buildings - Offices


Excluding foundation. Includes erection on an existing concrete grade beam or block foundation plus all
furnishings, internal wiring, plumbing and HVAC, using a 20-ton hydraulic crane with 70’ boom,
miscellaneous power tools and small tools.
10' x 12', 1
two-man office with 1/2 bath a6@17.5 Ea 1,550.00 714.00 186.00 2,450.00

Temporary buildings - Offices


Excluding foundation. Includes erection on an existing concrete grade beam or block foundation plus all
furnishings, internal wiring, plumbing and HVAC, using a portable 55 KW 120/240 volt generator, a
20-ton hydraulic crane with 70’ boom, miscellaneous power tools and a trailer mounted 200-amp welder.
24' x 110', 20 man executive office with 1/2 bath, one office per man,
tea room and reception area a9@909. Ea 20,000.00 36,510.00 7,240.00 63,750.00
12' x 40', office as specified, 480 square feet (SP-9.2)
portable field office a9@269. Ea 7,220.00 10,800.00 2,140.00 20,160.00
30' x 70, 30-man general office
with 1/2 bath and tea room a9@874. Ea 15,800.00 35,100.00 6,960.00 57,860.00
30' x 90' administration office with 4 private offices, conference room, 2-1/2 baths and open office
area with movable partitions a9@1125 Ea 20,800.00 45,180.00 8,960.00 74,940.00
30' x 90', 50' x 30' open engineering office, 30' x 10' post exchange/office, 30' x 10' storage, reception
area,
2 private offices, bath a9@1125 Ea 19,800.00 45,180.00 8,960.00 73,940.00

Temporary buildings - Hospitals and infirmary/wards


Excluding medicine and doctor’s equipment. Includes erection on an existing concrete grade beam or
block foundation plus all furnishings, internal wiring, plumbing, and HVAC, using a portable 55 KW
120/240 volt generator, a 20-ton hydraulic crane with 70’ boom, miscellaneous power tools and a trailer
mounted 200-amp welder.
20' x 34', four bed infirmary/ward without medicine
and doctor's equipment a9@126. Ea 4,820.00 5,060.00 1,000.00 10,880.00
130m2, five bed infirmary/ward with dentist office and dental equipment but no doctor's
equipment or dental supplies a9@49.6 Ea 17,800.00 1,992.00 395.00 20,187.00
10' x 28', one bed ward with bath but
without medicine or equipment a9@72.0 Ea 3,100.00 2,892.00 573.00 6,565.00

Temporary buildings - Re-erecting of temporary buildings


Using a portable 55 KW 120/240 volt generator, miscellaneous power tools and three sets of small
tools, 50,000 lb 6x4 3-axle truck, with a 7CY transit mix body.
Deduct for erection of building which
has been erected previously ---@--- % -- -- -85.00 --

Temporary buildings - Concrete foundations for temporary buildings


Using a portable 55 KW 120/240 volt generator, miscellaneous power tools and three sets of small
tools, 50,000 lb 6x4 3-axle truck, with a 7CY transit mix body.
Concrete grade beam footing, .5m wide x 1m deep with concrete forms, rebar,
excavation and backfill bt@.440 LF 5.70 18.40 1.44 25.54

Disassembly of temporary buildings - Housing


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic
crane with 84’ boom and miscellaneous power tools.
10' x 24', 2 man quarters a8@63.2 Ea 533.00 2,545.00 712.00 3,790.00
10' x 24',
4 man quarters, with bath a8@63.2 Ea 533.00 2,545.00 712.00 3,790.00
24' x 90',
32 man quarters, with bath a8@378. Ea 2,340.00 15,220.00 4,260.00 21,820.00
28' x 100',
2015 Heavy Construction Estimator, All Rights Reserved Page 493 (part 2)

64 man quarters, with bath a8@566. Ea 2,940.00 22,790.00 6,380.00 32,110.00

Disassembly of temporary buildings - Laundry


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator and miscellaneous
power tools.
50 man a4@21.1 Ea -- 1,031.00 72.40 1,103.40
100 man a4@21.1 Ea -- 1,031.00 72.40 1,103.40

Disassembly of temporary buildings - Mess halls, kitchen and diner


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic
crane with 84’ boom and miscellaneous power tools.
30' x 96', 250 man a8@378. Ea 3,060.00 15,220.00 4,260.00 22,540.00
30' x 64', 150 man a8@304. Ea 2,240.00 12,240.00 3,430.00 17,910.00
30' x 40', 50 man a8@189. Ea 1,560.00 7,611.00 2,130.00 11,301.00

Disassembly of temporary buildings - Recreation hall


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic
crane with 84’ boom and miscellaneous power tools.
40' x 60', 250 man a8@378. Ea 2,410.00 15,220.00 4,260.00 21,890.00

Disassembly of temporary buildings - Offices


Includes repackaging for shipping, using a 20-ton hydraulic crane with 70’ boom, miscellaneous power
tools and small tools.
10' x 12',
1 to 2 man office with bath a6@17.5 Ea 390.00 714.00 186.00 1,290.00

Disassembly of temporary buildings - Offices


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic
crane with 84’ boom and miscellaneous power tools.
24'x 100', 20 man executive office a8@566. Ea 2,600.00 22,790.00 6,380.00 31,770.00
12' x 40' field office a8@269. Ea -- 10,830.00 3,030.00 13,860.00
30' x 70', 30 man general office a8@662. Ea 2,460.00 26,660.00 7,460.00 36,580.00

Disassembly of temporary buildings - Hospitals and infirmary/wards


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 40-ton hydraulic
crane with 84’ boom and miscellaneous power tools.
20' x 34', 4 bed hospital a8@63.2 Ea 976.00 2,545.00 712.00 4,233.00
2015 Heavy Construction Estimator, All Rights Reserved Page 494

Disassembly of temporary buildings - Hospitals and infirmary/wards


Includes repackaging for shipping, using a portable 55 KW 120/240 volt generator, a 20-ton hydraulic
crane with 70’ boom, miscellaneous power tools and a trailer mounted 200-amp welder.
130 m2, 5 bed
hospital with dentist office a9@72.0 Ea 117.00 2,892.00 573.00 3,582.00

Butler type permanent buildings


10 to 35 year life. Shell only. 16' sides, 30 lbs. per SF roof live load, 25 lbs. per SF side wind load. Two
3' entry doors, one 12' x 12' roll door, aluminum roof, but no foundation, electrical wiring, plumbing,
HVAC or interior finish, using a truck-mounted hydraulic crane with 115’ boom and small tools.
50' x 70' building qm@447. Ea 11,200.00 21,800.00 6,060.00 39,060.00
50' x 80' building qm@447. Ea 35,400.00 21,800.00 6,060.00 63,260.00

CSI 13-602, Metal building systems

Pre-engineered metal buildings - 14’ eave height


Includes primed structural frame, painted 26 gauge exterior wall and roof, painted 26 gauge galvanized
steel gutter and downspout system. Excluding foundation and slab. 12 PSF roof load, 15 PSF wind
load, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of
small tools.
40 x 100, 4,000 SF (372m2) qi@280. Ea 9,470.00 13,720.00 2,620.00 25,810.00
60 x 100, 6,000 SF (558m2) qi@417. Ea 13,200.00 20,430.00 3,900.00 37,530.00
80 x 100, 8,000 SF (744m2) qi@519. Ea 17,500.00 25,430.00 4,850.00 47,780.00
100 x 100, 10,000 SF (929m2) qi@642. Ea 21,100.00 31,460.00 6,000.00 58,560.00
100 x 150, 15,000 SF (1394m2) qi@886. Ea 29,600.00 43,410.00 8,280.00 81,290.00
100 x 200, 20,000 SF (1859m2) qi@1093 Ea 38,100.00 53,590.00 10,200.00101,890.00
140 x 175, 24,500 SF (2277m2) qi@1206 Ea 42,900.00 59,140.00 11,300.00113,340.00
160 x 200, 32,000 SF (2974m2) qi@1428 Ea 52,700.00 70,000.00 13,400.00136,100.00
200 x 200, 40,000 SF (3717m2) qi@1590 Ea 65,500.00 77,950.00 14,900.00158,350.00

Pre-engineered metal buildings - 16’ eave height


Includes primed structural frame, painted 26 gauge exterior wall and roof, painted 26 gauge galvanized
steel gutter and downspout system. Excluding foundation and slab. 12 PSF roof load, 15 PSF wind
load, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of
small tools.
40 x 100, 4,000 SF (372m2) qi@311. Ea 10,300.00 15,240.00 2,910.00 28,450.00
60 x 100, 6,000 SF (558m2) qi@464. Ea 13,900.00 22,740.00 4,340.00 40,980.00
80 x 100, 8,000 SF (744m2) qi@569. Ea 17,700.00 27,880.00 5,320.00 50,900.00
100 x 100, 10,000 SF (929m2) qi@707. Ea 21,800.00 34,640.00 6,610.00 63,050.00
100 x 150, 15,000 SF (1394m2) qi@986. Ea 30,500.00 48,310.00 9,220.00 88,030.00
100 x 200, 20,000 SF (1859m2) qi@1206 Ea 39,100.00 59,140.00 11,300.00109,540.00
140 x 175, 24,500 SF (2277m2) qi@1320 Ea 43,800.00 64,720.00 12,300.00120,820.00
160 x 200, 32,000 SF (2974m2) qi@1555 Ea 54,400.00 76,220.00 14,500.00145,120.00
200 x 200, 40,000 SF (3717m2) qi@1750 Ea 67,200.00 85,750.00 16,400.00169,350.00

Pre-engineered metal buildings - 18' eave height


Includes primed structural frame, painted 26 gauge exterior wall and roof, painted 26 gauge galvanized
steel gutter and downspout system. Excluding foundation and slab. 12 PSF roof load, 15 PSF wind
load, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of
small tools.
40 x 100, 4,000 SF (372m2) qi@333. Ea 10,600.00 16,320.00 3,110.00 30,030.00
60 x 100, 6,000 SF (558m2) qi@490. Ea 14,300.00 24,010.00 4,580.00 42,890.00
2015 Heavy Construction Estimator, All Rights Reserved Page 495

80 x 100, 8,000 SF (744m2) qi@606. Ea 18,500.00 29,690.00 5,670.00 53,860.00


100 x 100, 10,000 SF (929m2) qi@750. Ea 22,500.00 36,750.00 7,010.00 66,260.00
100 x 150, 15,000 SF (1394m2) qi@1050 Ea 31,300.00 51,450.00 9,820.00 92,570.00
100 x 200, 20,000 SF (1859m2) qi@1290 Ea 40,600.00 63,210.00 12,100.00115,910.00
140 x 175, 24,500 SF (2277m2) qi@1435 Ea 44,800.00 70,320.00 13,400.00128,520.00
160 x 200, 32,000 SF (2974m2) qi@1666 Ea 56,400.00 81,630.00 15,600.00153,630.00
200 x 200, 40,000 SF (3717m2) qi@1884 Ea 69,700.00 92,320.00 17,600.00179,620.00

Pre-engineered metal buildings - 20’ eave height


Includes primed structural frame, painted 26 gauge exterior wall and roof, painted 26 gauge galvanized
steel gutter and downspout system. Excluding foundation and slab. 12 PSF roof load, 15 PSF wind
load, using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of
small tools.
40 x 100, 4,000 SF (372m2) qi@350. Ea 11,300.00 17,150.00 3,270.00 31,720.00
60 x 100, 6,000 SF (558m2) qi@519. Ea 14,900.00 25,430.00 4,850.00 45,180.00
80 x 100, 8,000 SF (744m2) qi@642. Ea 19,200.00 31,460.00 6,000.00 56,660.00
100 x 100, 10,000 SF (929m2) qi@795. Ea 23,600.00 38,960.00 7,430.00 69,990.00
100 x 150, 15,000 SF (1394m2) qi@1093 Ea 32,500.00 53,590.00 10,200.00 96,290.00
100 x 200, 20,000 SF (1859m2) qi@1372 Ea 42,100.00 67,250.00 12,800.00122,150.00
140 x 175, 24,500 SF (2277m2) qi@1521 Ea 45,600.00 74,570.00 14,200.00134,370.00
160 x 200, 32,000 SF (2974m2) qi@1750 Ea 58,200.00 85,750.00 16,400.00160,350.00
200 x 200, 40,000 SF (3717m2) qi@2000 Ea 71,900.00 98,000.00 18,700.00188,600.00

Additional costs for pre-engineered metal buildings


using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of small
tools.
Add for roof
slope over 1 in 12 to 4 in 12 ---@--- % 3.00 -- -- --
Add for 20
PSF roof load and wind load ---@--- % 15.00 -- -- --
Add for 30
PSF roof load and wind load ---@--- % 28.00 -- -- --
Add for 3' x 7' hollow metal
door and frame with hardware --@.000 Ea 574.00 -- -- 574.00
Add for 6' x 7' hollow metal
door and frame with hardware --@.000 Ea 775.00 -- -- 775.00
Add for 8' x 8' manual
sectional steel overhead door --@.000 Ea 639.00 -- -- 639.00
Add for 10' x 10' manual
sectional steel overhead door --@.000 Ea 760.00 -- -- 760.00
Add for 12' x 12' manual
sectional steel overhead door --@.000 Ea 953.00 -- -- 953.00
Add for 8' x
8' manual roll-up steel door --@.000 Ea 928.00 -- -- 928.00
Add for 10' x
10' manual roll-up steel door --@.000 Ea 1,180.00 -- -- 1,180.00
Add for 12' x
12' manual roll-up steel door --@.000 Ea 1,460.00 -- -- 1,460.00
Add for gravity ridge ventilator with bird screen,
9" throat x 10' long --@.000 Ea 428.00 -- -- 428.00
Add for gravity ridge ventilator with bird screen,
12" throat x 10' long --@.000 Ea 477.00 -- -- 477.00
For 20 in rotary vent
with damper add to material --@.000 Ea 187.00 -- -- 187.00
Add for 4' x 3' fixed louver --@.000 Ea 213.00 -- -- 213.00
Add for 4' x 3' aluminum
sliding window glazed DSB --@.000 Ea 226.00 -- -- 226.00
Add for 3'
x 9' fiberglass roof panels --@.000 Ea 84.10 -- -- 84.10
2015 Heavy Construction Estimator, All Rights Reserved Page 495 (part 2)

Add for aluminized steel 24 gage standing seam roof,


class 90 --@.000 SF 0.19 -- -- 0.19
Add for 1-1/2" fiberglass insulated
UL listed vinyl film facing --@.000 SF 0.52 -- -- 0.52
Add for 2" fiberglass insulated
UL listed vinyl film facing --@.000 SF 0.65 -- -- 0.65

CSI 13-800, Vaults

Floor safes
Using small tools.
Class C 1.0 cubic feet sr@2.45 Ea 822.00 85.70 0.56 908.26
Class C 1.3 cubic feet sr@2.50 Ea 796.00 87.45 0.58 884.03
Class C 1.9 cubic feet sr@3.33 Ea 872.00 116.50 0.77 989.27
Class C 5.2 cubic feet sr@3.33 Ea 3,790.00 116.50 0.77 3,907.27
Class D 1.0 cubic feet sr@1.67 Ea 1,330.00 58.42 0.38 1,388.80

CSI 13-850, Swimming pool equipment

Swimming pool equipment - Diving stand


See CSI 15-471 for circulation and filtration equipment, using small tools.
3m galvanized steel am@50.0 Ea 9,770.00 2,196.00 27.50 11,993.50
3m stainless steel am@50.0 Ea 12,700.00 2,196.00 27.50 14,923.50
1m galvanized steel am@20.0 Ea 6,260.00 878.40 11.00 7,149.40
1m stainless steel am@20.0 Ea 8,440.00 878.40 11.00 9,329.40
2015 Heavy Construction Estimator, All Rights Reserved Page 496

Swimming pool equipment - Diving boards


Using small tools.
14' (4.3m) long, aluminum am@7.41 Ea 1,350.00 325.40 4.08 1,679.48
14' (4.3m) long, fiberglass am@7.41 Ea 974.00 325.40 4.08 1,303.48

Swimming pool equipment - Ladders, heavy duty


Using small tools.
2 steps, galvanized steel,
frame and treads am@2.86 Ea 518.00 125.60 1.57 645.17
2 steps, stainless steel,
frame and treads am@2.86 Ea 942.00 125.60 1.57 1,069.17
4 steps, galvanized steel,
frame and treads am@3.33 Ea 592.00 146.30 1.83 740.13
4 steps, stainless steel,
frame and treads am@3.33 Ea 1,170.00 146.30 1.83 1,318.13

Swimming pool equipment - Lifeguard chair


Using small tools.
Galvanized am@7.41 Ea 1,210.00 325.40 4.08 1,539.48
Stainless steel am@7.41 Ea 2,070.00 325.40 4.08 2,399.48

Swimming pool equipment - Underwater lights


Using small tools.
12V, with transformer lj@2.50 Ea 430.00 125.30 0.98 556.28
110V, minimum lj@2.50 Ea 394.00 125.30 0.98 520.28
110V, maximum lj@2.50 Ea 1,380.00 125.30 0.98 1,506.28
Add for color lens covers --@.000 Ea 63.90 -- -- 63.90
Add for lens
occolating unit (110V only) --@.000 Ea 259.00 -- -- 259.00
Replacement bulbs for 12v units --@.000 Ea 7.95 -- -- 7.95
Replacement bulbs for 110v units --@.000 Ea 14.30 -- -- 14.30
Ground fault interrupter,
110V per light lj@.670 Ea 162.00 33.57 0.26 195.83

Swimming pool equipment - Pool covers


Using small tools.
Reinforced polyethylene sr@.150 SF 0.36 5.25 0.03 5.64
Vinyl water tube, minimum sr@.150 SF 0.63 5.25 0.03 5.91
Vinyl water tube, maximum sr@.150 SF 0.90 5.25 0.03 6.18

Swimming pool equipment - Slides with water tube


Using small tools.
Minimum am@12.5 Ea 1,170.00 549.00 6.88 1,725.88
Maximum am@12.5 Ea 2,600.00 549.00 6.88 3,155.88

CSI 13-860 Filtering Systems

Swimming Pool filtering systems


Using small tools.
Sand or diatomaceous earth type,, using small tools.
Including pump, 6,000 gal per hour nf@8.89 Ea 935.00 403.30 4.98 1,343.28
Add for clorination unit,
800sf, pool nf@5.55 Ea 297.00 251.80 3.11 551.91

CSI 13-870 Pool Systems


2015 Heavy Construction Estimator, All Rights Reserved Page 496 (part 2)

Swimming Pool Systems


Includes material, equipment purchase and installation costs. Add the cost of excavation, operation
and maintenance,
Using a 20-ton hydraulic crane with 70’ boom and small tools.
Residential in ground, vinyl lined, concrete sides, using small tools.
Including equipment, sand bottom nn@.165 SF 11.20 7.39 0.73 19.32

Gunite bottom and sides, white plaster finish


Includes material, equipment purchase and installation costs. Add the cost of excavation, operation
and maintenance,
Using a shotcrete gun & mixer rig, 12cy, on trailer and small tools, using small tools.
12' X 30' pool bv@.361 SF 18.00 13.52 0.79 32.31
16' X 32' pool bv@.320 SF 12.20 11.99 0.70 24.89
20' X 40' pool bv@.244 SF 10.00 9.14 0.53 19.67

Concrete bottom and sides, white plaster finish


Includes material, equipment purchase and installation costs. Add the cost of local permit cost,
excavation, operation and maintenance,
Using a shotcrete gun & mixer rig, 12cy, on trailer and small tools, using small tools.
12' X 30' pool bv@.685 SF 18.60 25.66 1.49 45.75
16' X 32' pool bv@.556 SF 15.10 20.83 1.21 37.14
20' X 40' pool bv@.431 SF 12.00 16.15 0.94 29.09
2015 Heavy Construction Estimator, All Rights Reserved Page 497

CSI-13-875 Therapeutic Pools

Concrete bottom and sides, white plaster finish


Whirlpool, bath w/vented overflow, molded fiberglass, using small tools.
66" x 48" x 24" nf@15.5 Ea 2,160.00 703.20 8.68 2,871.88
72" x 36" x 24" nf@15.5 Ea 1,940.00 703.20 8.68 2,651.88
60" x 30" x 21" nf@15.5 Ea 1,750.00 703.20 8.68 2,461.88
72" x 42" x 22" nf@15.5 Ea 2,310.00 703.20 8.68 3,021.88
83" x 65" x 36" nf@21.5 Ea 4,200.00 975.50 12.00 5,187.50

Redwood Hot tub system


Using small tools.
Bath w/vented overflow, natural redwood, preformed, using small tools.
4' diameter x 4' deep nf@16.1 Ea 855.00 730.50 9.02 1,594.52
5' diameter x 4' deep nf@16.1 Ea 1,190.00 730.50 9.02 1,929.52
6' diameter x 4' deep nf@18.4 Ea 1,750.00 834.80 10.30 2,595.10
8' diameter x 4' deep nf@18.4 Ea 2,010.00 834.80 10.30 2,855.10

CSI 13-947, Automatic energy monitoring and control systems

Energy monitoring and control systems - Submittals


Add: rough in, supply, waste and vent, for all tubs
Use the price shown plus $5 per point.
Large system --@.000 Ea 12,500.00 -- -- 12,500.00
Medium system --@.000 Ea 12,500.00 -- -- 12,500.00
Small system --@.000 Ea 6,230.00 -- -- 6,230.00

Energy monitoring and control systems - System reviews


All system reviews --@.000 Ea 5,420.00 -- -- 5,420.00

Energy monitoring and control systems - Training


Large systems --@.000 Ea 16,200.00 -- -- 16,200.00
Medium systems --@.000 Ea 16,200.00 -- -- 16,200.00
Small systems --@.000 Ea 8,100.00 -- -- 8,100.00

Energy monitoring and control systems - Factory tests


Large systems --@.000 Ea 8,730.00 -- -- 8,730.00
Medium systems --@.000 Ea 8,730.00 -- -- 8,730.00
Small systems --@.000 Ea 6,610.00 -- -- 6,610.00

Energy monitoring and control systems - Operational acceptance tests


Price per point.
Operational acceptance tests --@.000 Ea 15,300.00 -- -- 15,300.00

Energy monitoring and control systems - Checkout and startup of existing controls
Price per point --@.000 Ea 44.90 -- -- 44.90

Energy monitoring and control system - Digital point common costs


Using small tools.
Wiring 100' (30m) ll@.030 LF 0.26 1.22 -- 1.48
1/2" (13mm) conduit 100' (30m) ll@.060 LF 0.41 2.44 -- 2.85
Function --@.000 Ea 118.00 -- -- 118.00

Energy monitoring and control system - Analog input common costs


2015 Heavy Construction Estimator, All Rights Reserved Page 497 (part 2)

Using small tools.


Wiring 100' (30m) ll@.050 LF 0.43 2.04 -- 2.47
1/2" (13mm)conduit 100' (30m) ll@.060 LF 0.41 2.44 -- 2.85
Input function --@.000 Ea 438.00 -- -- 438.00
Calibration ll@1.02 Ea -- 41.54 -- 41.54

Energy monitoring and control system - Analog output common costs


Using small tools.
Wiring 100' (30m) ll@.030 LF 0.43 1.22 -- 1.65
1/2" (13mm) conduit 100' (30m) ll@.060 LF 0.41 2.44 -- 2.85
Output function --@.000 Ea 464.00 -- -- 464.00
Calibration ll@1.02 Ea -- 41.54 -- 41.54

Energy monitoring and control system total costs - Start/stop control


Using small tools.
Control relay lk@1.61 Ea 37.60 80.66 0.31 118.57
2015 Heavy Construction Estimator, All Rights Reserved Page 498

Digital point common costs lk@9.13 Ea 202.00 457.40 1.73 661.13

Energy monitoring and control system total costs - Open/close damper control
Using small tools.
Pneumatic damper actuator sm@1.00 Ea 200.00 46.59 0.15 246.74
Control relay sm@1.51 Ea 37.60 70.35 0.23 108.18
EP valve sm@1.00 Ea 108.00 46.59 0.15 154.74
Digital point common costs sm@8.50 Ea 202.00 396.00 1.28 599.28

Energy monitoring and control system total costs - Equipment on/off status
Using small tools.
Auxiliary contacts lk@1.08 Ea 35.30 54.11 0.21 89.62
Digital point common costs lk@9.13 Ea 202.00 457.40 1.73 661.13

Energy monitoring and control system total costs - Water flow status
Using small tools.
Differential pressure switch nb@1.07 Ea 106.00 55.96 0.61 162.57
Digital point common costs nb@9.09 Ea 202.00 475.40 5.18 682.58

Energy monitoring and control system total costs - Air flow status
Using small tools.
Differential pressure switch nx@1.08 Ea 82.30 49.28 0.63 132.21
Digital point common costs nx@9.13 Ea 202.00 416.60 5.30 623.90

Energy monitoring and control system total costs - Control point adjustment
Using small tools.
Pneumatic controller nc@1.61 Ea 306.00 79.16 0.90 386.06
EP transducer nc@1.61 Ea 357.00 79.16 0.90 437.06
Analog output common costs nc@10.3 Ea 602.00 506.50 5.77 1,114.27

Energy monitoring and control system total costs - Economizer control


Using small tools.
Pneumatic damper actuators (2) nc@1.61 Ea 324.00 79.16 0.90 404.06
Mixed air controller nc@1.61 Ea 306.00 79.16 0.90 386.06
Miscellaneous relays and piping nc@3.77 Ea 212.00 185.40 2.11 399.51
EP valve nc@1.08 Ea 108.00 53.10 0.60 161.70
Analog output common costs nc@10.3 Ea 602.00 506.50 5.77 1,114.27

Energy monitoring and control system total costs - Hot/cold deck reset (5 zones)
Using small tools.
High, or low, pressure selector nw@.850 Ea 160.00 42.15 0.48 202.63
Piping from 5 zones nc@7.14 Ea 70.50 351.10 4.00 425.60
PE transducers (2) nb@1.60 Ea 705.00 83.68 0.91 789.59
Pneumatic controllers (2) nb@1.60 Ea 306.00 83.68 0.91 390.59
EP transducers (2) nb@1.60 Ea 357.00 83.68 0.91 441.59
Analog wiring (400') lk@.040 LF 0.47 2.00 0.01 2.48
3/4" conduit (200') lk@.070 LF 0.70 3.51 0.01 4.22
Analog input function (2) --@.000 Ea 482.00 -- -- 482.00
Analog output function (2) --@.000 Ea 510.00 -- -- 510.00
Checkout and calibration lk@7.17 Ea -- 359.20 1.36 360.56

Energy monitoring and control system total costs - Space temperature


Using small tools.
Sensor sm@.600 Ea 179.00 27.95 0.09 207.04
Analog input common costs sm@11.6 Ea 574.00 540.40 1.74 1,116.14
2015 Heavy Construction Estimator, All Rights Reserved Page 498 (part 2)

Energy monitoring and control system total costs - Duct temperature


Using small tools.
Sensor sm@1.00 Ea 148.00 46.59 0.15 194.74
Analog input common costs sk@11.6 Ea 574.00 549.80 1.74 1,125.54

Energy monitoring and control system total costs - Water temperature


Using small tools.
Sensor sk@.800 Ea 157.00 37.92 0.12 195.04
Thermowell sk@4.51 Ea 47.00 213.80 0.68 261.48
Analog input common costs sk@11.6 Ea 574.00 549.80 1.74 1,125.54

Energy monitoring and control system total costs - Relative humidity


Using small tools.
Sensor sk@1.51 Ea 259.00 71.57 0.23 330.80
Analog input common costs sk@11.6 Ea 574.00 549.80 1.74 1,125.54
2015 Heavy Construction Estimator, All Rights Reserved Page 499

Electrical metering (3 phase, under 600V)


Using small tools.
Meter lk@6.87 Ea 2,660.00 344.20 1.31 3,005.51
Digital wiring 200' lk@.010 LF 0.28 0.50 -- 0.78
1/2" conduit 200' lk@.060 LF 0.45 3.01 0.01 3.47
Checkout and connection lk@1.08 Ea -- 54.11 0.21 54.32
Pulse accumulator lk@.000 Ea 296.00 -- -- 296.00

Energy monitoring and control system total costs - Dew point


Using small tools.
Sensor sm@1.51 Ea 682.00 70.35 0.23 752.58
Analog input common costs sm@11.6 Ea 574.00 540.40 1.74 1,116.14

Energy monitoring and control system total costs - Position measurement


Using small tools.
Sensor sm@1.51 Ea 141.00 70.35 0.23 211.58
Analog input common costs sm@11.6 Ea 574.00 540.40 1.74 1,116.14

Energy monitoring and control system total costs - Point costs summary
For use in preliminary cost estimates, includes assumptions for wiring, conduit, etc, using small tools.
Start/stop control lk@10.8 Ea 240.00 541.10 2.05 783.15
Open/close damper control sm@12.0 Ea 548.00 559.10 1.80 1,108.90
Equipment on/off status lk@10.2 Ea 237.00 511.00 1.94 749.94
Water flow status nb@10.2 Ea 308.00 533.50 5.81 847.31
Air flow status nx@10.2 Ea 284.00 465.40 5.92 755.32
Control point adjustment nc@13.5 Ea 1,260.00 663.80 7.56 1,931.36
Economizer control nc@20.0 Ea 1,880.00 983.40 11.20 2,874.60
Hot/cold deck reset, 5 zones nw@57.9 Ea 5,280.00 2,871.00 33.00 8,184.00
Space temperature sm@12.3 Ea 752.00 573.10 1.85 1,326.95
Duct temperature sm@12.6 Ea 722.00 587.00 1.89 1,310.89
Water temperature sk@17.1 Ea 778.00 810.50 2.57 1,591.07
Relative humidity sk@13.1 Ea 832.00 620.90 1.97 1,454.87
Electrical metering lk@21.9 Ea 3,100.00 1,097.00 4.16 4,201.16
Dew point sm@13.1 Ea 1,260.00 610.30 1.97 1,872.27
Position measurement sm@13.1 Ea 715.00 610.30 1.97 1,327.27

Energy monitoring and control system equipment - Central control units


Using small tools.
Large --@.000 Ea 23,400.00 -- -- 23,400.00
Medium --@.000 Ea 19,500.00 -- -- 19,500.00
Small --@.000 Ea 15,600.00 -- -- 15,600.00

Energy monitoring and control system equipment - System real time clock
Using small tools.
Medium --@.000 Ea 1,880.00 -- -- 1,880.00
Small --@.000 Ea 1,880.00 -- -- 1,880.00
Large --@.000 Ea 1,880.00 -- -- 1,880.00

Energy monitoring and control system equipment - Communication devices


Using small tools.
Large --@.000 Ea 9,380.00 -- -- 9,380.00

Energy monitoring and control system equipment - Link termination


Price for sixteen channel assembly, using small tools.
Large --@.000 Ea 4,770.00 -- -- 4,770.00
2015 Heavy Construction Estimator, All Rights Reserved Page 499 (part 2)

Medium --@.000 Ea 4,770.00 -- -- 4,770.00


Small --@.000 Ea 4,770.00 -- -- 4,770.00

Energy monitoring and control system equipment - Failover controller


using small tools.
Large --@.000 Ea 4,690.00 -- -- 4,690.00

Energy monitoring and control system equipment - Logging printer


using small tools.
Large --@.000 Ea 2,740.00 -- -- 2,740.00
Medium --@.000 Ea 2,740.00 -- -- 2,740.00

Energy monitoring and control system equipment - Alarm printer


Only one printer required in small system.
Large --@.000 Ea 2,740.00 -- -- 2,740.00
Medium --@.000 Ea 2,740.00 -- -- 2,740.00
Small --@.000 Ea 2,740.00 -- -- 2,740.00
2015 Heavy Construction Estimator, All Rights Reserved Page 500

Energy monitoring and control system equipment - Operators console


Large --@.000 Ea 4,300.00 -- -- 4,300.00
Medium --@.000 Ea 4,300.00 -- -- 4,300.00

Energy monitoring and control system equipment - System terminals


Large --@.000 Ea 2,340.00 -- -- 2,340.00
Medium --@.000 Ea 2,340.00 -- -- 2,340.00
Small --@.000 Ea 2,340.00 -- -- 2,340.00

Energy monitoring and control system equipment - Bulk loaders


Large --@.000 Ea 3,130.00 -- -- 3,130.00
Medium --@.000 Ea 3,130.00 -- -- 3,130.00
Small --@.000 Ea 3,130.00 -- -- 3,130.00

Energy monitoring and control system equipment - Tape


Large --@.000 Ea 11,100.00 -- -- 11,100.00
Medium --@.000 Ea 11,100.00 -- -- 11,100.00

Energy monitoring and control system equipment - Flexible disk


Small systems (optional) --@.000 Ea 5,240.00 -- -- 5,240.00

Energy monitoring and control system equipment - Rigid disk


Price of two disk systems of 10 megabytes each.
Large --@.000 Ea 5,400.00 -- -- 5,400.00
Medium --@.000 Ea 5,400.00 -- -- 5,400.00

Energy monitoring and control system equipment - Installation of central gear


Using a 20-ton hydraulic crane with 70’ boom, small tools.
Large ln@137. Ea 1,970.00 6,824.00 190.00 8,984.00
Medium ln@78.1 Ea 1,160.00 3,890.00 109.00 5,159.00
Small ln@59.6 Ea 883.00 2,969.00 82.80 3,934.80

Energy monitoring and control system equipment - Memory protect power supply
Price for one power supply, double for large system.
Large --@.000 Ea 1,330.00 -- -- 1,330.00
Medium --@.000 Ea 1,330.00 -- -- 1,330.00
Small --@.000 Ea 1,330.00 -- -- 1,330.00

Energy monitoring and control software - Basic operating system


Large --@.000 Ea 44,600.00 -- -- 44,600.00
Medium --@.000 Ea 44,600.00 -- -- 44,600.00
Small --@.000 Ea 27,000.00 -- -- 27,000.00

Energy monitoring and control software - CCC software


Large --@.000 Ea 6,760.00 -- -- 6,760.00

Energy monitoring and control software - FID software


Price per each FID.
Large --@.000 Ea 12,200.00 -- -- 12,200.00
Medium --@.000 Ea 12,200.00 -- -- 12,200.00
Small --@.000 Ea 12,200.00 -- -- 12,200.00

Energy monitoring and control software - Command software


2015 Heavy Construction Estimator, All Rights Reserved Page 500 (part 2)

Large --@.000 Ea 31,100.00 -- -- 31,100.00


Medium --@.000 Ea 31,100.00 -- -- 31,100.00
Small --@.000 Ea 17,600.00 -- -- 17,600.00

Energy monitoring and control software - Initial data base generation


Price per point, based on .65 hours per point.
Large --@.000 Ea 16.20 -- -- 16.20
Medium --@.000 Ea 16.20 -- -- 16.20
Small --@.000 Ea 16.20 -- -- 16.20

Energy monitoring and control software - Color graphics generation


Price for design and input of each initial graphic display.
Large --@.000 Ea 135.00 -- -- 135.00
Medium --@.000 Ea 135.00 -- -- 135.00
Small --@.000 Ea 135.00 -- -- 135.00
2015 Heavy Construction Estimator, All Rights Reserved Page 501

Energy monitoring and control system applications programs


Includes program inputs, command priorities, analog commands, alarms, calculated points, analog
monitoring and totalization, reports, data environment, restart, predictor correction software, time
programs, and event programs.
Basic package --@.000 Ea 20,300.00 -- -- 20,300.00
Optimum start/stop --@.000 Ea 4,320.00 -- -- 4,320.00
Duty cycling --@.000 Ea 4,320.00 -- -- 4,320.00
Demand limiting --@.000 Ea 4,730.00 -- -- 4,730.00
Economizer --@.000 Ea 4,320.00 -- -- 4,320.00
Enthalpy --@.000 Ea 6,350.00 -- -- 6,350.00
Hot deck, cold deck reset --@.000 Ea 4,320.00 -- -- 4,320.00
Boiler optimization --@.000 Ea 7,030.00 -- -- 7,030.00
Chiller optimization --@.000 Ea 8,780.00 -- -- 8,780.00
Lighting control --@.000 Ea 3,380.00 -- -- 3,380.00
Remote boiler monitoring --@.000 Ea 3,380.00 -- -- 3,380.00

Energy monitoring and control field equipment - Processing devices


At least one of each required for each EMCS project.
FID prom programmer --@.000 Ea 3,840.00 -- -- 3,840.00
Portable diagnostic
and bulk loading device --@.000 Ea 2,540.00 -- -- 2,540.00
FID test set --@.000 Ea 25,400.00 -- -- 25,400.00

Energy monitoring and control field equipment - Processing devices


Cost includes price of data terminal cabinet and a point capacity of 200 points, using small tools.
Field interface device lk@10.8 Ea 6,850.00 541.10 2.05 7,393.15
Multiplexer lk@3.22 Ea 4,310.00 161.30 0.61 4,471.91
Intelligent multiplexer lk@3.22 Ea 4,310.00 161.30 0.61 4,471.91

Energy monitoring and control field equipment - Input/output devices


Price is per each point assuming half full cards and 15% expansion capability of the system.
Analog input --@.000 Ea 260.00 -- -- 260.00
Analog output --@.000 Ea 275.00 -- -- 275.00
Digital input --@.000 Ea 69.80 -- -- 69.80
Digital output --@.000 Ea 69.80 -- -- 69.80
Pulse accumulator, labor cost is included
in point cost derivations --@.000 Ea 160.00 -- -- 160.00

Energy Management and Control devices - Sensors


Using small tools.
Space temperature sensor sm@.600 Ea 117.00 27.95 0.09 145.04
Outside air temperature sensor sm@.600 Ea 90.50 27.95 0.09 118.54
Duct temperature sensor sm@1.00 Ea 96.70 46.59 0.15 143.44
Average temperature sensor sm@2.00 Ea 58.30 93.18 0.30 151.78
Liquid temperature sensor,
including thermowell sm@.800 Ea 103.00 37.27 0.12 140.39
Relative humidity sensor sm@1.51 Ea 169.00 70.35 0.23 239.58
Dew point sensor sm@1.51 Ea 445.00 70.35 0.23 515.58
Solar radiation sensor sm@1.00 Ea 1,380.00 46.59 0.15 1,426.74
Wind speed and direction sm@2.51 Ea 614.00 116.90 0.38 731.28
Position measurement sm@1.51 Ea 92.00 70.35 0.23 162.58
O2 analyzer sm@12.2 Ea 6,290.00 568.40 1.83 6,860.23
Freezestat sm@1.51 Ea 96.70 70.35 0.23 167.28

Energy Management and Control devices - Electric meters


Price includes required current and potential transformers, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 501 (part 2)

One phase, under 600V lk@3.65 Ea 1,360.00 182.90 0.69 1,543.59


Three phase, under 600V lk@6.87 Ea 1,740.00 344.20 1.31 2,085.51
Three phase, 600V to 25KV lk@10.8 Ea 6,380.00 541.10 2.05 6,923.15
For more or less than 12 KV,
add or subtract per KV --@.000 Ea 124.00 -- -- 124.00
Three phase,
over 25kV, see note 2, 4 lk@10.8 Ea 35,500.00 541.10 2.05 36,043.15
Based on 34.5 K, for more or less than 34.5 KV,
add or subtract per KV --@.000 Ea 342.00 -- -- 342.00

Energy Management and Control devices - Switches


Using small tools.
Temperature sm@1.00 Ea 61.40 46.59 0.15 108.14
Air pressure sm@1.00 Ea 53.70 46.59 0.15 100.44
2015 Heavy Construction Estimator, All Rights Reserved Page 502

Water pressure sm@1.00 Ea 69.00 46.59 0.15 115.74


Barometric pressure sm@1.51 Ea 1,960.00 70.35 0.23 2,030.58

Energy Management and Control devices - Miscellaneous devices


Using small tools.
Copper thermowell sm@4.51 Ea 30.70 210.10 0.68 241.48
Stainless steel thermowell sm@4.51 Ea 107.00 210.10 0.68 317.78
Contactor 60 amp lk@3.76 Ea 385.00 188.40 0.71 574.11
Contactor 100 amp lk@4.29 Ea 591.00 214.90 0.82 806.72
EP valve sk@1.00 Ea 70.60 47.40 0.15 118.15
EP transducer sk@1.51 Ea 233.00 71.57 0.23 304.80
PE transducer sk@1.51 Ea 460.00 71.57 0.23 531.80

Energy Management and Control devices - Relay devices


More poles require proportionally more labor, using small tools.
Control, dual pole, dual throw lk@1.61 Ea 24.50 80.66 0.31 105.47
Power lk@1.61 Ea 76.70 80.66 0.31 157.67
Time delay lk@1.61 Ea 61.40 80.66 0.31 142.37
Latching lk@1.61 Ea 92.00 80.66 0.31 172.97
Reed device lk@1.61 Ea 15.30 80.66 0.31 96.27
Auxiliary contacts lk@1.08 Ea 23.00 54.11 0.21 77.32

Energy Management and Control devices - Damper actuators


Using small tools.
Pneumatic damper actuator nc@1.08 Ea 130.00 53.10 0.60 183.70
Pneumatic with positioner nc@1.18 Ea 212.00 58.02 0.66 270.68
2 position electric sk@1.31 Ea 230.00 62.09 0.20 292.29
Modulating electric sk@1.31 Ea 460.00 62.09 0.20 522.29
Pneumatic controller nc@1.18 Ea 199.00 58.02 0.66 257.68
Electronic controller sk@1.00 Ea 215.00 47.40 0.15 262.55

Energy Management and Control wire and cable - Control wiring


Using small tools.
Digital lk@.010 LF 0.28 0.50 -- 0.78
Analog (18 AWG) lk@.010 LF 0.47 0.50 -- 0.97
Analog (20 AWG) lk@.010 LF 0.34 0.50 -- 0.84

Energy Management and Control wire and cable - Conduit, electrical metallic tubing
Installation on exposed walls and ceilings, using small tools.
1/2 " (13mm) lk@.060 LF 0.45 3.01 0.01 3.47
3/4 " (19mm) lk@.070 LF 0.72 3.51 0.01 4.24
1 " (25mm) lk@.080 LF 1.09 4.01 0.02 5.12
1-1/2 " (38mm) lk@.100 LF 1.73 5.01 0.02 6.76

Energy Management and Control wire and cable - Surge protection


Cost per surge suppressor box, using small tools.
Power line surge suppressor box lk@2.79 Ea 594.00 139.80 0.53 734.33
Sensor wiring protection on both ends, only required for outside wiring,
including metallic enclosure lk@5.36 Ea 209.00 268.50 1.02 478.52
Communications links, protection on both ends,
including metallic box lk@5.36 Ea 209.00 268.50 1.02 478.52

EMCS Data transmission media - Phone lines


Most EMCS systems use phone lines for data transmission. See costs below for other methods of data
transmission, using a line truck with aerial platform and small tools.
Aerial lines lt@17.4 MLF 1,550.00 864.10 194.00 2,608.10
2015 Heavy Construction Estimator, All Rights Reserved Page 502 (part 2)

EMCS Data transmission media - Phone lines


Most EMCS systems use phone lines for data transmission. See costs below for other methods of data
transmission, using a 20-ton hydraulic crane with 70’ boom.
Direct burial lm@40.0 MLF 1,660.00 1,978.00 119.00 3,757.00
Existing duct bank lm@41.4 MLF 1,550.00 2,047.00 123.00 3,720.00
Indoor ll@47.4 MLF 1,320.00 1,931.00 -- 3,251.00
Modem lj@1.60 Ea 1,220.00 80.16 0.62 1,300.78
Line driver lj@1.60 Ea 772.00 80.16 0.62 852.78
2015 Heavy Construction Estimator, All Rights Reserved Page 503

EMCS Data transmission media - Coaxial cable


Using a line truck with aerial platform and small tools.
Aerial lt@17.4 MLF 1,040.00 864.10 194.00 2,098.10

EMCS Data transmission media - Coaxial cable


Using a 20-ton hydraulic crane with 70’ boom.
Direct burial lm@40.0 MLF 1,070.00 1,978.00 119.00 3,167.00
Existing duct bank lm@41.4 MLF 1,040.00 2,047.00 123.00 3,210.00
Indoor ll@47.4 MLF 946.00 1,931.00 -- 2,877.00
Modem lj@1.60 Ea 941.00 80.16 0.62 1,021.78
Amplifier lj@1.60 Ea 1,990.00 80.16 0.62 2,070.78

EMCS Data transmission media - Power line carrier


Using small tools.
Multiplexer lk@1.61 Ea 577.00 80.66 0.31 657.97
Transmitter lk@1.61 Ea 442.00 80.66 0.31 522.97
Receiver relay lk@1.08 Ea 155.00 54.11 0.21 209.32
Repeater lk@1.61 Ea 351.00 80.66 0.31 431.97
Modem lk@1.61 Ea 1,400.00 80.66 0.31 1,480.97

EMCS Data transmission media - Radio frequency carrier


Using small tools.
Head end transceiver lj@.530 Ea 7,140.00 26.55 0.21 7,166.76
Head end antenna (9 dB) qb@2.45 Ea 797.00 133.80 1.42 932.22

EMCS Data transmission media - Radio frequency carrier


Using a 20-ton hydraulic crane with 70’ boom and small tools.
Radio tower 100 ' (30m) qf@32.0 Ea 3,880.00 1,610.00 403.00 5,893.00

EMCS Data transmission media - Radio frequency carrier


Using small tools.
Coax cable to tower,
1-1/2 " foam installed lk@.050 LF 2.00 2.51 0.01 4.52
Duplexer lj@1.60 Ea 1,060.00 80.16 0.62 1,140.78
Remote antenna (A duplexer can be used on two-way systems
in lieu of two antennae.) lj@1.07 Ea 311.00 53.61 0.42 365.03
Remote antenna, 2.5 dB whip antenna (used when FID is 2 to
5 miles from central control) lj@1.07 Ea 79.70 53.61 0.42 133.73
Remote transceiver, 25 watts,
FIC (two-way system only) lj@1.60 Ea 981.00 80.16 0.62 1,061.78
Receiver relay,
receiver with audio output lj@1.07 Ea 147.00 53.61 0.42 201.03
Repeater,
receiver with audio output lj@1.60 Ea 9,610.00 80.16 0.62 9,690.78

EMCS Data transmission media - Fiber optics


Using small tools.
Modem, two modems are required for two-way communication between
central control and FID. lk@1.61 Ea 2,050.00 80.66 0.31 2,130.97
Repeater lk@1.61 Ea 753.00 80.66 0.31 833.97
Transmitter module lk@1.08 Ea 205.00 54.11 0.21 259.32
Receiver module lk@1.08 Ea 205.00 54.11 0.21 259.32

EMCS Data transmission media - Fiber optic cable overhead


Using a line truck with aerial platform and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 503 (part 2)

Aerial lt@17.1 MLF 2,690.00 849.20 191.00 3,730.20

EMCS Data transmission media - Fiber optic cable under ground


Using small tools.
Trench lm@36.4 MLF 2,690.00 1,800.00 108.00 4,598.00
Existing duct bank ll@32.4 MLF 2,690.00 1,320.00 -- 4,010.00

==========================================================================
Conveying systems
==========================================================================

CSI 14-204, Collective elevators

Selective, collective passenger elevators


Enamel shaft doors and plastic laminated 5' x 8' cab, 6 stops and 6 openings. 2,000 lb capacity, using
three sets of small tools.
AC rheostatic, 2000
lbs. x 50 feet per minute lv@72.7 Ea 87,400.00 2,995.00 50.90 90,445.90
AC rheostatic, 2000
lbs. x 100 feet per minute lv@80.0 Ea 88,900.00 3,296.00 56.00 92,252.00
AC rheostatic, 2000
lbs. x 150 feet per minute lv@86.7 Ea 90,600.00 3,572.00 60.70 94,232.70
Variable voltage, 2500
lbs. x 150 feet per minute lv@90.0 Ea 75,100.00 3,708.00 63.00 78,871.00
Variable voltage, 3000
lbs. x 150 feet per minute lv@97.3 Ea 77,500.00 4,009.00 68.10 81,577.10
Variable voltage, 4000
lbs. x 150 feet per minute lv@107. Ea 79,200.00 4,408.00 74.90 83,682.90
Variable voltage, 2500
lbs. x 200 feet per minute lv@96.0 Ea 81,600.00 3,955.00 67.20 85,622.20
Variable voltage, 3000
lbs. x 200 feet per minute lv@100. Ea 84,900.00 4,120.00 70.00 89,090.00
Variable voltage, 4000
lbs. x 200 feet per minute lv@111. Ea 89,800.00 4,573.00 77.70 94,450.70
Variable voltage, 2500
lbs. x 250 feet per minute lv@96.0 Ea 82,400.00 3,955.00 67.20 86,422.20
Variable voltage, 3000
lbs. x 250 feet per minute lv@100. Ea 85,700.00 4,120.00 70.00 89,890.00
Variable voltage, 4000
lbs. x 250 feet per minute lv@111. Ea 90,600.00 4,573.00 77.70 95,250.70
Variable voltage, 2500
lbs. x 300 feet per minute lv@97.3 Ea 83,200.00 4,009.00 68.10 87,277.10
2015 Heavy Construction Estimator, All Rights Reserved Page 504

Variable voltage, 3000


lbs. x 300 feet per minute lv@104. Ea 86,500.00 4,285.00 72.80 90,857.80
Variable voltage, 4000
lbs. x 300 feet per minute lv@114. Ea 91,400.00 4,697.00 79.80 96,176.80
Add for each
additional 50 feet per minute --@.000 Ea 2,670.00 -- -- 2,670.00
Add for each
additional 500 lbs. capacity --@.000 Ea 2,670.00 -- -- 2,670.00
Add for each additional opening --@.000 Ea 6,680.00 -- -- 6,680.00
Add for each additional stop --@.000 Ea 4,940.00 -- -- 4,940.00
Add for bonderized steel doors,
per stop --@.000 Ea 185.00 -- -- 185.00
Add for colored aluminum doors,
per stop --@.000 Ea 1,050.00 -- -- 1,050.00
Add for stainless steel doors,
per stop --@.000 Ea 2,000.00 -- -- 2,000.00
Add for cast bronze doors, per stop --@.000 Ea 4,010.00 -- -- 4,010.00
Add for two speed doors, per stop --@.000 Ea 668.00 -- -- 668.00
Add for two speed bi-parting doors,
per stop --@.000 Ea 668.00 -- -- 668.00
Add for custom plastic laminated doors,
per stop --@.000 Ea 2,000.00 -- -- 2,000.00
Add for custom half plastic laminate doors,
per stop --@.000 Ea 12,700.00 -- -- 12,700.00
Add for
stainless steel cab interior --@.000 Ea 16,000.00 -- -- 16,000.00

CSI 14-205, Automatic elevators

Selectomatic automatic passenger elevators


Baked enamel shaft doors and plastic laminated trimmed cab, based on shaft of 8 stops and 8
openings, using three sets of small tools.
3000 lbs. x 300 feet per minute lv@48.0 Ea 133,000.00 1,978.00 33.60135,011.60
3500 lbs. x 300 feet per minute lv@48.0 Ea 136,000.00 1,978.00 33.60138,011.60
4000 lbs. x 300 feet per minute lv@53.0 Ea 143,000.00 2,184.00 37.10145,221.10
5000 lbs. x 300 feet per minute lv@57.0 Ea 161,000.00 2,348.00 39.90163,387.90
3000 lbs. x 400 feet per minute lv@48.0 Ea 141,000.00 1,978.00 33.60143,011.60
3500 lbs. x 400 feet per minute lv@48.0 Ea 143,000.00 1,978.00 33.60145,011.60
4000 lbs. x 400 feet per minute lv@53.0 Ea 151,000.00 2,184.00 37.10153,221.10
5000 lbs. x 400 feet per minute lv@57.0 Ea 172,000.00 2,348.00 39.90174,387.90
3000 lbs. x 600 feet per minute lv@53.0 Ea 201,000.00 2,184.00 37.10203,221.10
3500 lbs. x 600 feet per minute lv@57.0 Ea 204,000.00 2,348.00 39.90206,387.90
4000 lbs. x 600 feet per minute lv@58.0 Ea 205,000.00 2,390.00 40.60207,430.60
5000 lbs. x 600 feet per minute lv@60.0 Ea 215,000.00 2,472.00 42.00217,514.00
3000 lbs. x 800 feet per minute lv@53.0 Ea 237,000.00 2,184.00 37.10239,221.10
3500 lbs. x 800 feet per minute lv@57.0 Ea 240,000.00 2,348.00 39.90242,387.90
4000 lbs. x 800 feet per minute lv@58.0 Ea 243,000.00 2,390.00 40.60245,430.60
5000 lbs. x 800 feet per minute lv@60.0 Ea 252,000.00 2,472.00 42.00254,514.00
Add for each additional
100 feet per minute --@.000 Ea 13,600.00 -- -- 13,600.00
Add for each
additional 500 lbs. capacity --@.000 Ea 6,790.00 -- -- 6,790.00
Add for each additional opening --@.000 Ea 13,600.00 -- -- 13,600.00
Add for each additional stop --@.000 Ea 5,930.00 -- -- 5,930.00
Add for bonderized steel doors,
per stop --@.000 Ea 185.00 -- -- 185.00
Add for colored aluminum doors,
per stop --@.000 Ea 1,050.00 -- -- 1,050.00
Add for stainless steel doors,
per stop --@.000 Ea 741.00 -- -- 741.00
2015 Heavy Construction Estimator, All Rights Reserved Page 504 (part 2)

Add for cast bronze doors, per stop --@.000 Ea 741.00 -- -- 741.00
Add for two speed doors, per stop --@.000 Ea 1,240.00 -- -- 1,240.00
Add for two speed bi-parting doors,
per stop --@.000 Ea 1,240.00 -- -- 1,240.00
Add for custom plastic laminated doors,
per stop --@.000 Ea 2,000.00 -- -- 2,000.00

CSI 14-206, Hydraulic elevators

Hydraulic passenger elevators


Baked enamel shaft doors and plastic trimmed cab, based on shaft of 3 stops and 3 openings, using
three sets of small tools.
2000 lbs. x 50 feet per minute lv@20.0 Ea 53,100.00 824.00 14.00 53,938.00
2500 lbs. x 50 feet per minute lv@20.0 Ea 55,600.00 824.00 14.00 56,438.00
3000 lbs. x 50 feet per minute lv@21.0 Ea 60,500.00 865.20 14.70 61,379.90
2000 lbs. x 100 feet per minute lv@20.0 Ea 58,700.00 824.00 14.00 59,538.00
2500 lbs. x 100 feet per minute lv@21.0 Ea 61,800.00 865.20 14.70 62,679.90
3000 lbs. x 100 feet per minute lv@22.0 Ea 64,800.00 906.40 15.40 65,721.80
2000 lbs. x 150 feet per minute lv@20.0 Ea 63,600.00 824.00 14.00 64,438.00
2500 lbs. x 150 feet per minute lv@21.0 Ea 69,200.00 865.20 14.70 70,079.90
2015 Heavy Construction Estimator, All Rights Reserved Page 505

3000 lbs. x 150 feet per minute lv@23.0 Ea 74,100.00 947.60 16.10 75,063.70
Add for each
additional 50 feet per minute --@.000 Ea 4,320.00 -- -- 4,320.00
Add for each
additional 500 lbs. capacity --@.000 Ea 4,320.00 -- -- 4,320.00
Add for each additional opening --@.000 Ea 5,190.00 -- -- 5,190.00
Add for each additional stop --@.000 Ea 6,550.00 -- -- 6,550.00
Add for bonderized steel doors,
per stop --@.000 Ea 494.00 -- -- 494.00
Add for colored aluminum doors,
per stop --@.000 Ea 1,850.00 -- -- 1,850.00
Add for stainless steel doors,
per stop --@.000 Ea 803.00 -- -- 803.00
Add for cast bronze doors, per stop --@.000 Ea 1,480.00 -- -- 1,480.00
Add for two speed doors, per stop --@.000 Ea 494.00 -- -- 494.00
Add for two speed bi-parting doors,
per stop --@.000 Ea 1,110.00 -- -- 1,110.00
Add for custom plastic laminated doors,
per stop --@.000 Ea 2,000.00 -- -- 2,000.00

CSI 14-207, Small elevators

Small elevators, 4 to 6 passenger capacity, electric


Using small tools.
2 stop per shaft lw@20.0 Ea 19,100.00 828.40 10.00 19,938.40
3 stop per shaft lw@21.0 Ea 23,500.00 869.80 10.50 24,380.30
4 stop per shaft lw@24.0 Ea 27,200.00 994.10 12.00 28,206.10

CSI 14-210, Freight elevators

Freight elevators
Manual control, automatic leveling, AC rheostatic, painted metal shaft doors and steel painted cab.
Based on a shaft of 6 stops and 6 openings with power doors, using three sets of small tools.
3500 lbs. x 50 feet per minute lv@26.5 Ea 154,000.00 1,092.00 18.60155,110.60
4000 lbs. x 50 feet per minute lv@26.7 Ea 155,000.00 1,100.00 18.70156,118.70
5000 lbs. x 50 feet per minute lv@30.0 Ea 156,000.00 1,236.00 21.00157,257.00
3500 lbs. x 100 feet per minute lv@30.0 Ea 159,000.00 1,236.00 21.00160,257.00
4000 lbs. x 100 feet per minute lv@30.0 Ea 161,000.00 1,236.00 21.00162,257.00
5000 lbs. x 100 feet per minute lv@34.0 Ea 163,000.00 1,401.00 23.80164,424.80
3500 lbs. x 200 feet per minute lv@34.0 Ea 160,000.00 1,401.00 23.80161,424.80
4000 lbs. x 200 feet per minute lv@34.0 Ea 161,000.00 1,401.00 23.80162,424.80
5000 lbs. x 200 feet per minute lv@40.0 Ea 162,000.00 1,648.00 28.00163,676.00
Deduct for
elevators with manual doors ---@--- % -15.00 -- -- --
Add for variable voltage control ---@--- % 10.00 -- -- --

CSI 14-211, Collective elevators

Selective, collective freight elevators


AC rheostatic, painted metal shaft doors and steel painted cab, based on shaft of 8 stops and 8
openings with power doors, using three sets of small tools.
4000 lbs. x 100 feet per minute lv@30.0 Ea 157,000.00 1,236.00 21.00158,257.00
6000 lbs. x 100 feet per minute lv@31.0 Ea 161,000.00 1,277.00 21.70162,298.70
8000 lbs. x 100 feet per minute lv@32.0 Ea 163,000.00 1,318.00 22.40164,340.40
4000 lbs. x 150 feet per minute lv@34.0 Ea 157,000.00 1,401.00 23.80158,424.80
6000 lbs. x 150 feet per minute lv@35.0 Ea 161,000.00 1,442.00 24.50162,466.50
8000 lbs. x 150 feet per minute lv@37.5 Ea 162,000.00 1,545.00 26.30163,571.30
4000 lbs. x 200 feet per minute lv@40.0 Ea 158,000.00 1,648.00 28.00159,676.00
2015 Heavy Construction Estimator, All Rights Reserved Page 505 (part 2)

6000 lbs. x 200 feet per minute lv@41.5 Ea 162,000.00 1,710.00 29.10163,739.10
8000 lbs. x 200 feet per minute lv@43.5 Ea 169,000.00 1,792.00 30.50170,822.50
For each additional 50
feet per minute add per stop --@.000 Ea 2,470.00 -- -- 2,470.00
Add for each additional
500 lb capacity add per stop --@.000 Ea 741.00 -- -- 741.00
Opening, add per stop --@.000 Ea 8,650.00 -- -- 8,650.00
Stop, add per stop --@.000 Ea 6,790.00 -- -- 6,790.00
Add for
variable voltage construction ---@--- % 4.00 -- -- --

CSI 14-212, Hydraulic freight elevators

Hydraulic freight elevators


Painted metal shaft doors and steel painted cab. Based on shaft of 3 stops and 3 openings with power
doors, using three sets of small tools.
3000 lbs. x 50 feet per minute lv@17.0 Ea 65,500.00 700.40 11.90 66,212.30
4000 lbs. x 50 feet per minute lv@18.0 Ea 71,600.00 741.60 12.60 72,354.20
6000 lbs. x 50 feet per minute lv@18.5 Ea 84,000.00 762.20 13.00 84,775.20
3000 lbs. x 100 feet per minute lv@17.0 Ea 74,100.00 700.40 11.90 74,812.30
4000 lbs. x 100 feet per minute lv@18.0 Ea 79,000.00 741.60 12.60 79,754.20
2015 Heavy Construction Estimator, All Rights Reserved Page 506

6000 lbs. x 100 feet per minute lv@18.5 Ea 92,600.00 762.20 13.00 93,375.20
3000 lbs. x 150 feet per minute lv@17.0 Ea 81,500.00 700.40 11.90 82,212.30
4000 lbs. x 150 feet per minute lv@18.0 Ea 87,700.00 741.60 12.60 88,454.20
6000 lbs. x 150 feet per minute lv@18.5 Ea 100,000.00 762.20 13.00100,775.20
For each additional 50
feet per minute add per stop --@.000 Ea 2,470.00 -- -- 2,470.00
For each additional 500
lbs. capacity add per stop --@.000 Ea 741.00 -- -- 741.00
Opening, add per stop --@.000 Ea 6,680.00 -- -- 6,680.00
Stop, add per stop --@.000 Ea 6,680.00 -- -- 6,680.00
Deduct for
elevator with manual doors ---@--- % -10.00 -- -- --

CSI 14-301, Industrial hoists

Light duty industrial hoists


AC, electrically operated, beams excluded, using small tools.
500 lbs. (227kg) capacity lx@4.00 Ea 8,170.00 168.60 3.88 8,342.48
1,000 lbs. (454kg) capacity lx@4.20 Ea 8,640.00 177.00 4.07 8,821.07
2,000 lbs. (908kg) capacity lx@4.50 Ea 8,810.00 189.70 4.37 9,004.07
3,000 lbs. (1360kg) capacity lx@4.70 Ea 8,980.00 198.10 4.56 9,182.66
4,000 lbs. (1814kg) capacity lx@5.00 Ea 10,200.00 210.80 4.85 10,415.65
5,000 lbs. (2268kg) capacity lx@5.30 Ea 14,300.00 223.40 5.14 14,528.54
6,000 lbs. (2722kg) capacity lx@5.50 Ea 14,700.00 231.80 5.34 14,937.14
7,500 lbs. (3402kg) capacity lx@5.70 Ea 15,700.00 240.30 5.53 15,945.83

Medium duty industrial hoists


AC, electrically operated, beams excluded, using small tools.
10,000 lbs. (4536kg) capacity lw@5.91 Ea 26,800.00 244.80 2.96 27,047.76
15,000 lbs. (6804kg) capacity lw@6.20 Ea 39,700.00 256.80 3.10 39,959.90
20,000 lbs. (9072kg) capacity lw@6.60 Ea 46,600.00 273.40 3.30 46,876.70
25,000 lbs. (11340kg) capacity lw@7.20 Ea 50,100.00 298.20 3.60 50,401.80
30,000 lbs. (13608kg) capacity lw@8.00 Ea 50,900.00 331.40 4.00 51,235.40
Deduct for hand-operated hoists ---@--- % -- -- 5.00 --
Add for DC electric operated hoists ---@--- % -- -- 25.00 --

CSI 14-302, Heavy duty industrial hoists

Heavy duty industrial hoists


AC, electrically operated, beams excluded, using small tools.
500 lbs. (227kg) capacity lx@4.00 Ea 11,900.00 168.60 3.88 12,072.48
1,000 lbs. (454kg) capacity lx@4.20 Ea 12,400.00 177.00 4.07 12,581.07
2,000 lbs. (908kg) capacity lx@4.44 Ea 13,800.00 187.10 4.31 13,991.41
3,000 lbs. (1360kg) capacity lx@4.70 Ea 14,600.00 198.10 4.56 14,802.66
4,000 lbs. (1814kg) capacity lx@5.00 Ea 15,400.00 210.80 4.85 15,615.65
5,000 lbs. (2268kg) capacity lx@5.33 Ea 16,100.00 224.70 5.17 16,329.87
6,000 lbs. (2722kg) capacity lx@5.50 Ea 16,400.00 231.80 5.34 16,637.14
7,500 lbs. (3402kg) capacity lx@5.70 Ea 22,500.00 240.30 5.53 22,745.83
10,000 lbs. (4536kg) capacity lw@5.90 Ea 23,700.00 244.40 2.95 23,947.35
15,000 lbs. (6804kg) capacity lw@6.10 Ea 25,900.00 252.70 3.05 26,155.75
20,000 lbs. (9072kg) capacity lw@6.66 Ea 32,300.00 275.90 3.33 32,579.23
25,000 lbs. (11340kg) capacity lw@7.20 Ea 46,600.00 298.20 3.60 46,901.80
30,000 lbs. (13608kg) capacity lw@8.00 Ea 48,400.00 331.40 4.00 48,735.40
Add for
DC electrical operated hoists ---@--- % 25.00 -- -- --
Structural steel beams --@.000 Lb 1.09 -- -- 1.09
2015 Heavy Construction Estimator, All Rights Reserved Page 507

CSI 14-310, Overhead traveling bridge cranes

Overhead traveling bridge cranes - Single girder, 20’ span


Under hung hoist, AC, electrically pendant operated, using a 20-ton hydraulic crane with 70’ boom and
two sets of small tools.
3 ton l3@12.0 Ea 23,200.00 503.00 46.30 23,749.30
5 ton l3@12.0 Ea 25,300.00 503.00 46.30 25,849.30
7.5 ton l3@12.0 Ea 32,200.00 503.00 46.30 32,749.30
10 ton l3@15.0 Ea 32,200.00 628.80 57.90 32,886.70
15 ton l3@15.0 Ea 39,800.00 628.80 57.90 40,486.70

Overhead traveling bridge cranes - Single girder 30’ span


Using a 20-ton hydraulic crane with 70’ boom and two sets of small tools.
3 ton l3@12.0 Ea 24,600.00 503.00 46.30 25,149.30
5 ton l3@12.0 Ea 27,200.00 503.00 46.30 27,749.30
10 ton l3@15.0 Ea 34,700.00 628.80 57.90 35,386.70
15 ton l3@15.0 Ea 41,500.00 628.80 57.90 42,186.70

Overhead traveling bridge cranes - Double girder, 40’ span


Using a 40-ton hydraulic crane with 84’ boom and two sets of small tools.
3 ton l4@27.0 Ea 47,700.00 1,148.00 171.00 49,019.00
5 ton l4@27.0 Ea 49,000.00 1,148.00 171.00 50,319.00
10 ton l4@34.0 Ea 53,200.00 1,445.00 216.00 54,861.00
15 ton l4@34.0 Ea 59,900.00 1,445.00 216.00 61,561.00
25 ton l4@34.0 Ea 88,600.00 1,445.00 216.00 90,261.00
7.5 ton l4@27.0 Ea 50,500.00 1,148.00 171.00 51,819.00

Overhead traveling bridge cranes - Double girder, 50’ span


Using a 40-ton hydraulic crane with 84’ boom and two sets of small tools.
3 ton l4@27.0 Ea 51,900.00 1,148.00 171.00 53,219.00
5 ton l4@27.0 Ea 53,800.00 1,148.00 171.00 55,119.00
7.5 ton l4@27.0 Ea 55,800.00 1,148.00 171.00 57,119.00
10 ton l4@34.0 Ea 60,600.00 1,445.00 216.00 62,261.00
15 ton l4@34.0 Ea 70,300.00 1,445.00 216.00 71,961.00
25 ton l4@34.0 Ea 96,100.00 1,445.00 216.00 97,761.00

Rail for bridge cranes


Using a 20-ton hydraulic crane with 70’ boom and small tools.
With splice bars qf@.000 Lb 0.56 -- -- 0.56

CSI 14-402, Chair lifts

Chair lifts and stair climbers, per story


Using small tools.
Residential (stair climber) lx@6.66 Ea 5,520.00 280.70 6.46 5,807.16
Residential (chair lift) lx@6.70 Ea 4,990.00 282.40 6.50 5,278.90
Residential (stair lift) lx@6.70 Ea 8,600.00 282.40 6.50 8,888.90

CSI 14-403, Vehicular lifts

Auto and truck lifts, two post, hydraulic


Using small tools.
11,000 lb capacity lw@188. Ea 8,210.00 7,787.00 94.00 16,091.00
13,000 lb capacity lw@188. Ea 8,400.00 7,787.00 94.00 16,281.00
18,500 lb capacity lw@188. Ea 11,200.00 7,787.00 94.00 19,081.00
2015 Heavy Construction Estimator, All Rights Reserved Page 507 (part 2)

24,000 lb capacity lw@188. Ea 15,100.00 7,787.00 94.00 22,981.00


2015 Heavy Construction Estimator, All Rights Reserved Page 508

26,000 lb capacity lw@188. Ea 17,400.00 7,787.00 94.00 25,281.00

CSI 14-404, Ash hoists

Ash hoists
Using small tools.
250 lbs. capacity hand cranked lx@10.5 Ea 1,260.00 442.60 10.20 1,712.80
250 lbs. capacity
electrically operated lx@17.2 Ea 2,200.00 725.00 16.70 2,941.70

CSI 14-405, Commercial lifts

Commercial office lifts


Vertical transport of office papers, mail, parcels, etc, using small tools.
100 lb. capacity hand operated lx@22.3 Ea 3,220.00 939.90 21.60 4,181.50
100 lb. capacity
electrically operated lx@57.9 Ea 5,760.00 2,440.00 56.20 8,256.20
150 lb. capacity hand operated lx@22.3 Ea 3,380.00 939.90 21.60 4,341.50
150 lb. capacity
electrically operated lx@57.9 Ea 6,570.00 2,440.00 56.20 9,066.20

CSI 14-501, Misc. material handling transportation systems

Monorail cart transportation system


With automatic switches, stops, turnovers and controls, using three sets of small tools.
Overhead monorail system lv@.090 LF 91.20 3.71 0.06 94.97

Carts for monorail transportation system


Using small tools.
Monorail carts lw@.290 Ea 3,140.00 12.01 0.15 3,152.16

CSI 14-561, Linen chutes

Linen chutes
Stainless steel, with supports, 10' - 12' height, using small tools.
20" (46cm) diameter lz@5.85 Ea 879.00 271.40 3.86 1,154.26
24" (61cm) diameter lz@5.85 Ea 1,010.00 271.40 3.86 1,285.26
30" (76cm) diameter lz@5.85 Ea 1,220.00 271.40 3.86 1,495.26
Hopper lz@.700 Ea 2,280.00 32.47 0.46 2,312.93
Skylight lz@1.10 Ea 1,060.00 51.03 0.73 1,111.76
Sprinkler unit at top lz@1.27 Ea 352.00 58.92 0.84 411.76
Deduct for galvanized metal ---@--- -25.00 -- -- --
Deduct for aluminum ---@--- -35.00 -- -- --

CSI 14-564, Trash chutes

Galvanized trash chutes


18 gauge, duct with supports, using small tools.
18" (46cm) diameter lz@.060 LF 117.00 2.78 0.04 119.82
24" (61cm) diameter lz@.060 LF 156.00 2.78 0.04 158.82
30" (76cm) diameter lz@.070 LF 156.00 3.25 0.05 159.30
Hopper lz@.560 Ea 1,710.00 25.98 0.37 1,736.35
Skylight lz@1.10 Ea 110.00 51.03 0.73 161.76
Sprinkler unit at top lz@1.27 Ea 48.10 58.92 0.84 107.86
Sprinkler unit at intake hopper lz@.420 Ea 8.25 19.48 0.28 28.01
Refuse type bottom storage,
hopper unit lz@1.59 Ea 244.00 73.76 1.05 318.81
2015 Heavy Construction Estimator, All Rights Reserved Page 508 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 509

Hopper for trash chutes


Steel, 18" diameter, using small tools.
Refuse bottom hopper cw@6.67 Ea 1,270.00 255.90 1.20 1,527.10
Add for aluminum hopper ---@--- % 10.00 -- -- --
Add for stainless steel hopper ---@--- % 35.00 -- -- --

CSI 14-565, Waste handling systems

Waste handling systems - Automatic conveyors


Horizontal 24" belt, center drive and take-up, using miscellaneous power tools.
41.5' long ak@40.0 Ea 5,440.00 1,778.00 304.00 7,522.00
61.5' long ak@52.6 Ea 7,190.00 2,338.00 400.00 9,928.00

Waste handling systems - Inclined conveyors, 25 degree


Inclined 24" belt, with horizontal loading section, using miscellaneous power tools.
34' long ak@53.3 Ea 5,490.00 2,369.00 405.00 8,264.00

CSI 14-610, Escalators

Escalators
Stainless steel construction, prices are medians, using three sets of small tools.
32" wide
x 12' floor to floor height lv@40.0 Ea 101,000.00 1,648.00 28.00102,676.00
32" wide
x 15' floor to floor height lv@48.0 Ea 110,000.00 1,978.00 33.60112,011.60
32" wide
x 18' floor to floor height lv@60.0 Ea 119,000.00 2,472.00 42.00121,514.00
32" wide
x 22' floor to floor height lv@80.0 Ea 130,000.00 3,296.00 56.00133,352.00
38" wide
x 25' floor to floor height lv@96.0 Ea 144,000.00 3,955.00 67.20148,022.20
48" wide
x 12' floor to floor height lv@41.0 Ea 114,000.00 1,689.00 28.70115,717.70
48" wide
x 15' floor to floor height lv@50.0 Ea 124,000.00 2,060.00 35.00126,095.00
48" wide
x 18' floor to floor height lv@63.0 Ea 132,000.00 2,596.00 44.10134,640.10
48" wide
x 22' floor to floor height lv@86.0 Ea 148,000.00 3,543.00 60.20151,603.20
48" wide
x 25' floor to floor height lv@96.0 Ea 158,000.00 3,955.00 67.20162,022.20
Escalator fire shutter,
fusible link lv@8.41 Ea 17,300.00 346.50 5.89 17,652.39

CSI 14-620, Moving sidewalks

Moving sidewalks
Excludes safety rails. Prices are medians, using three sets of small tools.
36" wide x 500' lv@240. Ea 881,000.00 9,888.00 168.00891,056.00
48" wide x 500' lv@257. Ea 923,000.00 10,590.00 180.00933,770.00
54" wide x 500' lv@277. Ea 828,000.00 11,410.00 194.00839,604.00
Add for each
additional foot at 36" wide --@.000 LF 2,370.00 -- -- 2,370.00
Ad for each
additional foot at 48" wide --@.000 LF 2,370.00 -- -- 2,370.00
Add for each
2015 Heavy Construction Estimator, All Rights Reserved Page 509 (part 2)

additional foot at 54" wide --@.000 LF 2,960.00 -- -- 2,960.00

CSI 14-710, Pneumatic message systems

Pneumatic tube message systems


Tube stations in a loop system. Includes tubing equipment. Based on conventional 20-station job with
up to 600" maximum length between the most remote stations, using three sets of small tools.
3" round l2@72.0 Ea 329,000.00 3,067.00 54.70332,121.70
4" round l2@80.0 Ea 411,000.00 3,408.00 60.80414,468.80
6" round l2@89.0 Ea 622,000.00 3,791.00 67.60625,858.60
4" x 7" oval l2@160. Ea 648,000.00 6,816.00 122.00654,938.00
Add for electric operated system ---@--- % 10.00 -- -- --

CSI 14-750, Pneumatic trash handling systems

Pneumatic trash handling systems


Pneumatic trash and linen tube systems, 48" diameter galvanized tube system, including blowers,
panels, collectors, fittings, and dampers, using three sets of small tools.
10 station l2@120. Ea 210,000.00 5,112.00 91.20215,203.20
15 station l2@160. Ea 265,000.00 6,816.00 122.00271,938.00
20 station l2@185. Ea 357,000.00 7,881.00 141.00365,022.00
30 station l2@218. Ea 466,000.00 9,287.00 166.00475,453.00

==========================================================================
Mechanical
==========================================================================

CSI 15-041, Valve tags

Valve tag identification


Using small tools.
2" diameter identification tag nb@.220 Ea 2.03 11.51 0.13 13.67
2015 Heavy Construction Estimator, All Rights Reserved Page 510

Deduct for work in mechanical rooms ---@--- % -- 50.00 -- --

CSI 15-042, Piping systems identification

Snap-on pipe markers


Plastic, includes insulation, outside diameters, using small tools.
1/2" pipe nb@.110 Ea 3.63 5.75 0.06 9.44
3/4" pipe nb@.110 Ea 3.63 5.75 0.06 9.44
1" pipe nb@.110 Ea 3.63 5.75 0.06 9.44
1-1/4" pipe nb@.110 Ea 3.63 5.75 0.06 9.44
1-1/2" pipe nb@.110 Ea 3.63 5.75 0.06 9.44
2" pipe nb@.120 Ea 4.31 6.28 0.07 10.66
2-1/2" pipe nb@.120 Ea 4.62 6.28 0.07 10.97
3" pipe nb@.130 Ea 7.57 6.80 0.07 14.44
3-1/2" pipe nb@.130 Ea 7.57 6.80 0.07 14.44
4" pipe nb@.140 Ea 7.57 7.32 0.08 14.97
4-/12" pipe nb@.140 Ea 7.63 7.32 0.08 15.03
5" pipe nb@.140 Ea 7.63 7.32 0.08 15.03
6" pipe nb@.140 Ea 8.25 7.32 0.08 15.65
7" pipe nb@.140 Ea 8.25 7.32 0.08 15.65
8" pipe nb@.150 Ea 11.50 7.85 0.09 19.44
10" pipe nb@.150 Ea 11.50 7.85 0.09 19.44

Stick-on pipe markers


Pressure-sensitive labels, includes arrow tape and insulation, outside diameter, using small tools.
1/2" pipe nb@.100 Ea 1.97 5.23 0.06 7.26
3/4" pipe nb@.100 Ea 2.03 5.23 0.06 7.32
1" pipe nb@.110 Ea 2.09 5.75 0.06 7.90
1-1/4" pipe nb@.110 Ea 2.09 5.75 0.06 7.90
1-1/2" pipe nb@.110 Ea 2.09 5.75 0.06 7.90
2" pipe nb@.120 Ea 2.15 6.28 0.07 8.50
2-1/2" pipe nb@.120 Ea 2.46 6.28 0.07 8.81
3" pipe nb@.130 Ea 2.77 6.80 0.07 9.64
3-1/2" pipe nb@.130 Ea 2.77 6.80 0.07 9.64
4" pipe nb@.140 Ea 2.77 7.32 0.08 10.17
4-1/2" pipe nb@.140 Ea 2.77 7.32 0.08 10.17
5" pipe nb@.140 Ea 2.77 7.32 0.08 10.17
6" pipe nb@.140 Ea 2.77 7.32 0.08 10.17
7" pipe nb@.150 Ea 3.26 7.85 0.09 11.20
8" pipe nb@.150 Ea 4.92 7.85 0.09 12.86
10" pipe nb@.150 Ea 4.92 7.85 0.09 12.86

CSI 15-043, Balancing of HVAC systems

Air balancing of HVAC systems - Air handling units


Work done by balancing technicians, using small tools.
Central station nw@6.00 Ea -- 297.50 3.42 300.92
Multi-zone air conditioning nw@4.00 Ea -- 198.40 2.28 200.68
Single-zone air conditioning nw@3.00 Ea -- 148.80 1.71 150.51
Package air conditioning nw@2.50 Ea -- 124.00 1.43 125.43
Roof-top unit, heat and cool nw@3.50 Ea -- 173.60 2.00 175.60
Built-up, low pressure nw@4.50 Ea -- 223.20 2.57 225.77
Built-up, high pressure nw@6.00 Ea -- 297.50 3.42 300.92
Built-up, high pressure,
variable air velocity nw@8.50 Ea -- 421.50 4.85 426.35
Built-up, high pressure, dual duct nw@8.00 Ea -- 396.70 4.56 401.26

Air balancing of HVAC systems - Terminal boxes


2015 Heavy Construction Estimator, All Rights Reserved Page 510 (part 2)

Work done by balancing technicians, using small tools.


Terminal box and all downstream diffusers,
cost per zone nw@1.75 Ea -- 86.78 1.00 87.78
Variable air volume box nw@.400 Ea -- 19.84 0.23 20.07
Constant volume box nw@.400 Ea -- 19.84 0.23 20.07
Dual duct Box nw@.700 Ea -- 34.71 0.40 35.11
2015 Heavy Construction Estimator, All Rights Reserved Page 511

Air balancing of HVAC systems - Diffusers


Work done by balancing technicians, using small tools.
Ceiling diffuser, to 500 CFM nw@.250 Ea -- 12.40 0.14 12.54
Ceiling diffuser, over 500 CFM nw@.350 Ea -- 17.36 0.20 17.56
Perforated diffuser nw@.370 Ea -- 18.35 0.21 18.56
Sidewall diffuser nw@.250 Ea -- 12.40 0.14 12.54
Linear slot diffuser, 2 slot nw@.060 LF -- 2.98 0.03 3.01
Linear slot diffuser, 3 slot nw@.070 LF -- 3.47 0.04 3.51
Linear slot diffuser, 4 slot nw@.080 LF -- 3.97 0.05 4.02
Plug-in Diffuser nw@.250 Ea -- 12.40 0.14 12.54
Light troffer, single slot nw@.195 Ea -- 9.67 0.11 9.78
Light troffer, double slot nw@.220 Ea -- 10.91 0.13 11.04
Laminar flow diffuser nw@.750 Ea -- 37.19 0.43 37.62
Diffuser with high
efficiency particle filter nw@3.00 Ea -- 148.80 1.71 150.51

Air balancing of HVAC systems - Grilles


Work done by balancing technicians, using small tools.
Return air grille, to 800 CFM nw@.250 Ea -- 12.40 0.14 12.54
Return air grille, over 800 CFM nw@.350 Ea -- 17.36 0.20 17.56
Bar type return air grille, 2 slot nw@.060 LF -- 2.98 0.03 3.01
Bar type return air grille, 4 slot nw@.070 LF -- 3.47 0.04 3.51
Bar type return air grille, 6 slot nw@.080 LF -- 3.97 0.05 4.02

Air balancing of HVAC systems - Centrifugal fans


Work done by balancing technicians, using small tools.
Supply and return air, 3,000 CFM nw@1.00 Ea -- 49.59 0.57 50.16
Supply and return air, 5,000 CFM nw@1.50 Ea -- 74.39 0.86 75.25
Supply and return air, 10,000 CFM nw@2.00 Ea -- 99.18 1.14 100.32
Supply and return air, 20,000 CFM nw@2.75 Ea -- 136.40 1.57 137.97
Roof exhaust, 6,000 CFM nw@.725 Ea -- 35.95 0.41 36.36
Roof exhaust, 10,000 CFM nw@.925 Ea -- 45.87 0.53 46.40
Roof exhaust, 20,000 CFM nw@1.50 Ea -- 74.39 0.86 75.25
Range hood exhaust, 10,000 CFM nw@1.75 Ea -- 86.78 1.00 87.78
Range hood exhaust, 20,000 CFM nw@2.50 Ea -- 124.00 1.43 125.43

Air balancing of HVAC systems - Fan coil units


Work done by balancing technicians, using small tools.
Floor mounted nw@.500 Ea -- 24.80 0.29 25.09
Ceiling mounted nw@.650 Ea -- 32.23 0.37 32.60

Air balancing of HVAC systems - Induction units


Work done by balancing technicians, using small tools.
Floor mounted nw@.300 Ea -- 14.88 0.17 15.05
Ceiling mounted nw@.500 Ea -- 24.80 0.29 25.09

Air balancing of HVAC systems - Fume hoods


Work done by balancing technicians, using small tools.
Lab fume hood nw@2.00 Ea -- 99.18 1.14 100.32
General purpose hood nw@.450 Ea -- 22.32 0.26 22.58
Dust collectors nw@1.50 Ea -- 74.39 0.86 75.25

Balancing of HVAC systems - Wet balancing


Work done by balancing technicians, using small tools.
Boiler n8@1.65 Ea -- 83.97 0.99 84.96
Chiller n8@3.50 Ea -- 178.10 2.10 180.20
2015 Heavy Construction Estimator, All Rights Reserved Page 511 (part 2)

Cooling tower n8@2.00 Ea -- 101.80 1.20 103.00


Circulating pump n8@1.65 Ea -- 83.97 0.99 84.96
Heat exchanger n8@1.75 Ea -- 89.06 1.05 90.11
Air handling unit water coil n8@2.50 Ea -- 127.20 1.50 128.70
2015 Heavy Construction Estimator, All Rights Reserved Page 512

Reheat coil n8@.450 Ea -- 22.90 0.27 23.17


Wall fin radiation n8@.350 Ea -- 17.81 0.21 18.02
Radiant heat panels n8@.450 Ea -- 22.90 0.27 23.17
Fan coil unit, 2 pipe n8@.350 Ea -- 17.81 0.21 18.02
Fan coil unit, 4 pipe n8@.450 Ea -- 22.90 0.27 23.17
Unit ventilator n8@.450 Ea -- 22.90 0.27 23.17
Unit heater n8@.350 Ea -- 17.81 0.21 18.02
Cabinet heater n8@.350 Ea -- 17.81 0.21 18.02

CSI 15-048, Testing, startup and checkout

X -ray testing of pipe welds


Using small tools.
2" diameter pipe n6@1.00 Ea 30.00 50.89 0.60 81.49
3" diameter pipe n6@1.00 Ea 30.00 50.89 0.60 81.49
4" diameter pipe n6@1.00 Ea 30.00 50.89 0.60 81.49
6" diameter pipe n6@1.00 Ea 30.00 50.89 0.60 81.49
8" diameter pipe n6@1.25 Ea 30.00 63.61 0.75 94.36
10" diameter pipe n6@1.25 Ea 30.00 63.61 0.75 94.36

Testing liquid penetration of pipe welds


Using small tools.
2" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44
3" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44
4" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44
6" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44
8" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44
10" diameter pipe n6@.630 Ea 20.00 32.06 0.38 52.44

Hydrostatic test of piping systems


Using small tools.
To 250', 1" to 4" pipe n6@11.0 Ea -- 559.80 6.60 566.40
Over 250' to 500', 1" to 4" pipe n6@12.5 Ea -- 636.10 7.50 643.60
Over 500' to 1,000', 1" to 4" pipe n6@16.0 Ea -- 814.20 9.60 823.80
Over 1,000'
to 2,000', 1" to 4" pipe n6@30.3 Ea -- 1,542.00 18.20 1,560.20
To 250', 6" to 10" pipe n6@15.4 Ea -- 783.70 9.24 792.94
Over 250' to 500', 6" to 10" pipe pe@48.3 Ea -- 2,097.00 30.90 2,127.90
Over 500' to 1,000', 6" to 10" pipe pe@75.6 Ea -- 3,282.00 48.40 3,330.40
Over 1,000'
to 2,000', 6" to 10" pipe pe@147. Ea -- 6,381.00 94.10 6,475.10

Pneumatic test of piping systems


Includes soaping joints, using small tools.
To 250', 1" to 4" pipe n6@17.9 Ea 0.55 910.90 10.70 922.15
Over 250' to 500', 1" to 4" pipe n7@29.0 Ea 0.55 1,358.00 17.40 1,375.95
Over 500' to 1,000', 1" to 4" pipe n7@35.1 Ea 0.55 1,644.00 21.10 1,665.65
Over 1,000'
to 2,000', 1" to 4" pipe n7@68.9 Ea 0.55 3,227.00 41.30 3,268.85
To 250 LF, 6" to 10" pipe n7@35.7 Ea 0.55 1,672.00 21.40 1,693.95
Over 250' to 500', 6" to 10" pipe pe@54.9 Ea 0.55 2,383.00 35.10 2,418.65
Over 500' to 1,000', 6" to 10" pipe pe@87.5 Ea 0.55 3,798.00 56.00 3,854.55
Over 1,000'
to 2,000', 6" to 10" pipe pe@175. Ea 0.55 7,597.00 112.00 7,709.55

CSI 15-061, Steel pipe

Black pipe, (A-53), installed horizontal, threaded and coupled


2015 Heavy Construction Estimator, All Rights Reserved Page 512 (part 2)

Horizontally hung schedule 40 black steel pipe, including a hanger every 7' (2.1m) and 125 lb. maleable
iron fitting every 10' (3m). Use these figures for preliminary estimates, using small tools.
1/2" (12mm) nb@.130 LF 4.62 6.80 0.07 11.49
3/4" (18mm) nb@.140 LF 5.26 7.32 0.08 12.66
1" (25mm) nb@.160 LF 7.33 8.37 0.09 15.79
1-1/4" (32mm) nb@.200 LF 8.92 10.46 0.11 19.49
1-1/2" (38mm) nb@.250 LF 10.00 13.08 0.14 23.22
2" (50mm) nb@.300 LF 13.50 15.69 0.17 29.36
2015 Heavy Construction Estimator, All Rights Reserved Page 513

Black pipe, (A-53), installed horizontal, butt welded


Horizontally hung schedule 40 black steel pipe, including a hanger every 10' and carbon steel butt weld
fitting every 30'. Use these figures for preliminary estimates, using a 300-amp skid mounted welder and
small tools.
2-1/2" (65mm) pa@.350 LF 21.30 16.39 0.63 38.32
3" (75mm) pa@.400 LF 27.40 18.73 0.72 46.85
4" (100mm) pa@.500 LF 39.80 23.42 0.90 64.12
6" (150mm) pa@.800 LF 68.50 37.46 1.44 107.40

Black pipe (A-53), installed risers, threaded and coupled


Schedule 40 pipe installed vertically in buildings with a tee at every floor and a riser clamp at every other
floor. Make additional allowances for floor sleeving or coring as required. Use these figures for
preliminary estimates, using small tools.
1/2" (12mm) diameter nb@.070 LF 2.01 3.66 0.04 5.71
3/4" (18mm) diameter nb@.090 LF 2.52 4.71 0.05 7.28
1" (25mm) diameter nb@.100 LF 3.34 5.23 0.06 8.63
1-1/4" (32mm) diameter nb@.120 LF 4.46 6.28 0.07 10.81
1-1/2" (38mm) diameter nb@.130 LF 5.32 6.80 0.07 12.19
2" (50mm) diameter nb@.160 LF 7.33 8.37 0.09 15.79

Black pipe, (A-53), installed risers, butt welded


Schedule 40 pipe installed vertically in buildings with a tee at every floor and a riser clamp at every other
floor. Make additional allowances for floor sleeving or coring as required. Use these figures for
preliminary estimates, using a 300-amp skid mounted welder and small tools.
2-1/2" (65mm) diameter pa@.340 LF 13.10 15.92 0.61 29.63
3" (75mm) diameter pa@.360 LF 17.00 16.86 0.65 34.51
4" (100mm) diameter pa@.450 LF 29.00 21.07 0.81 50.88
6" (150mm) diameter pa@.600 LF 46.50 28.10 1.08 75.68
8" (200mm) diameter pa@.750 LF 83.60 35.12 1.35 120.07
10" (250mm) diameter pa@.930 LF 123.00 43.55 1.67 168.22
Add for schedule 80 pipe ---@--- % 48.00 10.00 -- --

Black pipe, (A-53), installed horizontal, roll grooved (victaulic)


Schedule 40, standard weight, including hangers every 10' and a fitting every 33'. Use these figures for
preliminary estimates, using small tools.
2" (50mm) ph@.160 LF 12.40 7.10 0.11 19.61
2-1/2" (65mm) ph@.180 LF 17.50 7.99 0.12 25.61
3" (75mm) ph@.210 LF 22.30 9.32 0.14 31.76
4" (10cm) ph@.300 LF 30.30 13.32 0.20 43.82
6" (15cm) ph@.450 LF 60.40 19.98 0.30 80.68
8" (20cm) ph@.630 LF 90.00 27.97 0.42 118.39
10" (25cm) ph@.750 LF 174.00 33.30 0.50 207.80
12" (25cm) ph@.800 LF 181.00 35.52 0.54 217.06

Black pipe, (A-53), installed risers, roll grooved (victaulic)


Schedule 40, standard weight, installed vertically in buildings with a tee at every floor and a riser clamp
at every other floor. Make additional allowances for floor sleeving or coring as required. Use these figures
for preliminary estimates, using small tools.
2" (50mm) ph@.110 LF 11.90 4.88 0.07 16.85
2-1/2" (65mm) ph@.120 LF 16.00 5.33 0.08 21.41
3" (75mm) ph@.150 LF 19.10 6.66 0.10 25.86
4" (10cm) ph@.190 LF 27.20 8.44 0.13 35.77
6" (15cm) ph@.300 LF 56.10 13.32 0.20 69.62
8" (20cm) ph@.400 LF 88.10 17.76 0.27 106.13
10" (25cm) ph@.510 LF 137.00 22.64 0.34 159.98
12" (25cm) ph@.560 LF 166.00 24.86 0.38 191.24
2015 Heavy Construction Estimator, All Rights Reserved Page 513 (part 2)

Black pipe, (A-53), installed horizontal, roll grooved, thin wall, sprinkler, (victaulic)
Schedule 10, light weight, including hangers at 10' and a fitting every 33'. Use these figures for
preliminary estimates, using small tools.
2" (50mm) py@.160 LF 10.30 8.51 0.10 18.91
2-1/2" (65mm) py@.180 LF 13.10 9.57 0.11 22.78
3" (75mm) py@.210 LF 15.40 11.17 0.13 26.70
4" (10cm) py@.300 LF 21.90 15.96 0.18 38.04
6" (15cm) py@.450 LF 45.00 23.94 0.27 69.21
8" (20cm) py@.630 LF 82.80 33.51 0.38 116.69

Black pipe, (A-53), installed risers, roll grooved, thin wall, sprinkler (victaulic)
Schedule 10 pipe installed vertically in buildings with a tee at every floor and a riser clamp at every other
floor. Make additional allowances for floor sleeving or coring as required. Use these figures for
preliminary estimates, using small tools.
2" (50mm) py@.110 LF 10.80 5.85 0.07 16.72
2-1/2" (65mm) py@.120 LF 13.00 6.38 0.07 19.45
2015 Heavy Construction Estimator, All Rights Reserved Page 514

3" (75mm) py@.150 LF 15.10 7.98 0.09 23.17


4" (10cm) py@.190 LF 21.20 10.11 0.11 31.42
6" (15cm) py@.300 LF 44.70 15.96 0.18 60.84
8" (20cm) py@.400 LF 87.00 21.28 0.24 108.52

Black pipe, (ASTM A-53), pipe only, threaded and coupled


Schedule 40, no hangers or fittings included (see CSI 15-094), using small tools.
1/2" (12mm) nb@.060 LF 1.85 3.14 0.03 5.02
3/4" (18mm) nb@.070 LF 2.23 3.66 0.04 5.93
1" (25mm) nb@.090 LF 2.80 4.71 0.05 7.56
1-1/4" (32mm) nb@.100 LF 3.79 5.23 0.06 9.08
1-1/2" (38mm) nb@.110 LF 4.55 5.75 0.06 10.36
2" (50mm) nb@.120 LF 6.15 6.28 0.07 12.50

Black pipe, (ASTM A-53), pipe only, butt welded


Schedule 40, no hangers or fittings included (see CSI 15-094), using a 300-amp skid mounted welder
and small tools.
2-1/2" (65mm) pa@.160 LF 10.90 7.49 0.29 18.68
3" (75mm) pa@.190 LF 12.10 8.90 0.34 21.34
4" (10cm) pa@.300 LF 17.20 14.05 0.54 31.79
6" (15cm) pa@.420 LF 27.40 19.67 0.76 47.83
8" (20cm) pa@.510 LF 41.40 23.88 0.92 66.20
10" (25cm) pa@.720 LF 60.20 33.72 1.30 95.22
12" (30cm) pa@.910 LF 84.70 42.62 1.64 128.96
14" (36cm) pipe ps@1.00 LF 97.50 41.48 14.90 153.88
16" (41cm) pipe ps@1.25 LF 113.00 51.85 18.70 183.55
18" (46cm) pipe ps@1.50 LF 127.00 62.22 22.40 211.62
20" (51cm) pipe ps@1.70 LF 142.00 70.52 25.40 237.92
24" (61cm) pipe ps@1.90 LF 168.00 78.81 28.40 275.21
Add for Schedule 80 pipe ---@--- % 40.00 17.50 -- --
Add for Schedule 40 yoloy pipe ---@--- % 101.00 -- -- --
Add for Schedule 80 yoloy pipe ---@--- % 183.00 11.00 -- --
Add for Schedule
40 galvanized yoloy pipe ---@--- % 122.00 -- -- --
Add for Schedule
80 galvanized yoloy pipe ---@--- % 204.00 11.00 -- --

Black pipe, (ASTM A-53), pipe only, roll grooved, (victaulic)


Schedule 40, no hangers or fittings included (see CSI 15-094), using small tools.
2" (65mm) ph@.070 LF 6.15 3.11 0.05 9.31
2-1/2" (65mm) ph@.070 LF 10.90 3.11 0.05 14.06
3" (75mm) ph@.090 LF 12.10 4.00 0.06 16.16
4" (10cm) ph@.130 LF 17.20 5.77 0.09 23.06
6" (15cm) ph@.160 LF 27.40 7.10 0.11 34.61
8" (20cm) ph@.210 LF 41.40 9.32 0.14 50.86
10" (25cm) ph@.280 LF 60.20 12.43 0.19 72.82
12" (30cm) ph@.340 LF 84.70 15.10 0.23 100.03
14" (36cm) pipe pp@.400 LF 97.50 17.44 2.42 117.36
16" (41cm) pipe pp@.550 LF 113.00 23.98 3.33 140.31

Black pipe, (ASTM A-53), pipe only, roll grooved, thin wall, sprinkler (victaulic)
Schedule 10, no hangers or fittings included (see CSI 15-094), using small tools.
2" (65mm) py@.070 LF 4.62 3.72 0.04 8.38
2-1/2" (65mm) py@.070 LF 8.12 3.72 0.04 11.88
3" (75mm) py@.090 LF 9.05 4.79 0.05 13.89
4" (10cm) py@.130 LF 12.90 6.92 0.08 19.90
6" (15cm) py@.160 LF 20.50 8.51 0.10 29.11
8" (20cm) py@.210 LF 35.20 11.17 0.13 46.50
2015 Heavy Construction Estimator, All Rights Reserved Page 514 (part 2)

10" (25cm) py@.280 LF 51.20 14.89 0.17 66.26


12" (30cm) py@.340 LF 72.00 18.08 0.20 90.28
14" (36cm) pipe pp@.400 LF 82.80 17.44 2.42 102.66
16" (41cm) pipe pp@.550 LF 96.40 23.98 3.33 123.71
2015 Heavy Construction Estimator, All Rights Reserved Page 515

Galvanized steel pipe (ASTM A-53), installed horizontally, threaded


Schedule 40. Prices include hangers every 8' and an elbow or tee every 20'. Use the figures for
preliminary estimates, using small tools.
1/2" (12mm) diameter nb@.100 LF 6.53 5.23 0.06 11.82
3/4" (18mm) diameter nb@.110 LF 8.19 5.75 0.06 14.00
1" (25mm) diameter nb@.140 LF 9.36 7.32 0.08 16.76
1-1/4" (32mm) diameter nb@.160 LF 12.00 8.37 0.09 20.46
1-1/2" (38mm) diameter nb@.170 LF 13.30 8.89 0.10 22.29
2" (50mm) diameter nb@.190 LF 16.80 9.94 0.11 26.85

Galvanized steel pipe (ASTM A-53), installed horizontally, butt welded


Schedule 40. Prices include hangers every 8' and an elbow or tee every 20'. Use the figures for
preliminary estimates, using a 300-amp skid mounted welder and small tools.
2-1/2" (65mm) diameter pa@.270 LF 29.00 12.64 0.49 42.13
3" (75mm) diameter pa@.330 LF 33.40 15.45 0.59 49.44
4" (10cm) diameter pa@.470 LF 51.00 22.01 0.85 73.86
6" (20cm) diameter pa@.630 LF 122.00 29.50 1.13 152.63
Add for 225 lb (102kg)
malleable iron fittings ---@--- % 7.00 -- -- --
Add for Schedule 80 pipe with 225 lb.
(102kg) cast iron fittings ---@--- % 46.00 -- -- --

Galvanized steel pipe (ASTM A-53), installed risers, threaded and coupled
Schedule 40. Installed vertically in buildings with a tee at every floor and a riser clamp at every other
floor. Make additional allowances for floor sleeving or coring as required. Use these figures for
preliminary estimates, using small tools.
1/2" (12mm) diameter nb@.070 LF 3.12 3.66 0.04 6.82
3/4" (18mm) diameter nb@.090 LF 3.82 4.71 0.05 8.58
1" (25mm) diameter nb@.100 LF 4.97 5.23 0.06 10.26
1-1/4" (32mm) diameter nb@.120 LF 6.69 6.28 0.07 13.04
1-1/2" (38mm) diameter nb@.130 LF 7.96 6.80 0.07 14.83
2" (50mm) diameter nb@.160 LF 11.00 8.37 0.09 19.46

Galvanized steel pipe (ASTM A-53), installed risers, butt welded


Schedule 40. Installed vertically in buildings with a tee at every floor and a riser clamp at every other
floor. Make additional allowances for floor sleeving or coring as required. Use these figures for
preliminary estimates, using a 300-amp skid mounted welder and small tools.
2-1/2" (65mm) diameter pa@.340 LF 23.00 15.92 0.61 39.53
3" (75mm) diameter pa@.360 LF 25.60 16.86 0.65 43.11
4" (100mm) diameter pa@.450 LF 49.70 21.07 0.81 71.58
6" (150mm) diameter pa@.600 LF 70.40 28.10 1.08 99.58
8" (200mm) diameter pa@.750 LF 99.40 35.12 1.35 135.87
10" (250mm) diameter pa@.930 LF 158.00 43.55 1.67 203.22
Add for schedule 80 pipe ---@--- % 48.00 10.00 -- --

Galvanized steel pipe (ASTM A-53), pipe only, threaded and coupled
Schedule 40. No hangers or fittings included (see CSI 15-094), using small tools.
1/2" (12mm) diameter nb@.060 LF 2.45 3.14 0.03 5.62
3/4" (18mm) diameter nb@.070 LF 2.93 3.66 0.04 6.63
1" (25mm) diameter nb@.090 LF 3.69 4.71 0.05 8.45
1-1/4" (32mm) diameter nb@.100 LF 5.00 5.23 0.06 10.29
1-1/2" (38mm) diameter nb@.110 LF 5.99 5.75 0.06 11.80
2" (50mm) diameter nb@.120 LF 8.09 6.28 0.07 14.44

Galvanized steel pipe (ASTM A-53), pipe only, butt welded


Schedule 40. No hangers or fittings included (see CSI 15-094), using a 300-amp skid mounted welder
and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 515 (part 2)

2-1/2" (65mm) diameter pa@.150 LF 15.10 7.03 0.27 22.40


3" (75mm) diameter pa@.190 LF 15.90 8.90 0.34 25.14
4" (100mm) diameter pa@.300 LF 17.20 14.05 0.54 31.79
6" (150mm) diameter pa@.420 LF 36.10 19.67 0.76 56.53

CSI 15-061, Steel pipe fittings

90 degree ells, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" ell nb@.120 Ea 1.53 6.28 0.07 7.88
3/4" ell nb@.130 Ea 1.87 6.80 0.07 8.74
1" ell nb@.180 Ea 3.25 9.41 0.10 12.76
1-1/4" ell nb@.240 Ea 5.30 12.55 0.14 17.99
1-1/2" ell nb@.300 Ea 6.99 15.69 0.17 22.85
2015 Heavy Construction Estimator, All Rights Reserved Page 516

2" ell nb@.380 Ea 11.90 19.87 0.22 31.99


2-1/2" ell ph@.800 Ea 27.40 35.52 0.54 63.46
3" ell ph@1.05 Ea 40.90 46.62 0.70 88.22
4" ell ph@1.17 Ea 87.60 51.95 0.78 140.33
6" ell ph@1.27 Ea 254.00 56.39 0.85 311.24

90 degree ells, butt welded, long radius, 150 lb. carbon steel, black
Using a 300-amp skid mounted welder and small tools.
2-1/2" ell pa@1.20 Ea 14.80 56.20 2.16 73.16
3" ell pa@1.33 Ea 17.70 62.28 2.39 82.37
4" ell pa@1.78 Ea 30.00 83.36 3.20 116.56
6" ell pa@2.67 Ea 72.70 125.00 4.81 202.51
8" ell pa@3.20 Ea 135.00 149.90 5.76 290.66
10" ell pa@4.00 Ea 234.00 187.30 7.20 428.50
12" ell pa@4.80 Ea 344.00 224.80 8.64 577.44
14" ell ps@5.70 Ea 484.00 236.40 85.20 805.60
16" ell ps@6.60 Ea 667.00 273.80 98.60 1,039.40
18" ell ps@7.40 Ea 851.00 307.00 111.00 1,269.00
20" ell ps@8.25 Ea 1,270.00 342.20 123.00 1,735.20
24" ell ps@8.60 Ea 1,650.00 356.70 128.00 2,134.70

90 degree reducing ells, threaded, 150 lb. malleable iron, black


Using small tools.
3/4" x 1/2" nb@.130 Ea 2.94 6.80 0.07 9.81
1" x 3/4" nb@.180 Ea 3.82 9.41 0.10 13.33
1" x 1/2" nb@.180 Ea 3.82 9.41 0.10 13.33
1-1/4" x 1" nb@.240 Ea 6.20 12.55 0.14 18.89
1-1/4" x 3/4" nb@.240 Ea 6.59 12.55 0.14 19.28
1-1/4" x 1/2" nb@.240 Ea 7.64 12.55 0.14 20.33
1-1/2" x 1-1/4" nb@.300 Ea 8.37 15.69 0.17 24.23
1-1/2" x 1" nb@.300 Ea 8.37 15.69 0.17 24.23
1-1/2" x 3/4" nb@.300 Ea 9.59 15.69 0.17 25.45
2" x 1-1/2" nb@.380 Ea 12.10 19.87 0.22 32.19
2" x 1-1/4" nb@.380 Ea 13.80 19.87 0.22 33.89
2" x 1" nb@.380 Ea 13.80 19.87 0.22 33.89
2" x 3/4" nb@.380 Ea 13.80 19.87 0.22 33.89
2-1/2" x 2" ph@.800 Ea 33.30 35.52 0.54 69.36
2-1/2" x 1-1/2" ph@.800 Ea 33.30 35.52 0.54 69.36
3" x 2-1/2" ph@1.05 Ea 53.80 46.62 0.70 101.12
3" x 2" ph@1.05 Ea 53.80 46.62 0.70 101.12
4" x 3" ph@1.17 Ea 92.00 51.95 0.78 144.73

45 degree ells, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" ell nb@.120 Ea 2.49 6.28 0.07 8.84
3/4" ell nb@.130 Ea 3.05 6.80 0.07 9.92
1" ell nb@.180 Ea 3.89 9.41 0.10 13.40
1-1/4" ell nb@.240 Ea 6.84 12.55 0.14 19.53
1-1/2" ell nb@.300 Ea 8.46 15.69 0.17 24.32
2" ell nb@.380 Ea 12.70 19.87 0.22 32.79
2-1/2" ell ph@.800 Ea 27.40 35.52 0.54 63.46
3" ell ph@1.05 Ea 40.90 46.62 0.70 88.22
4" ell ph@1.17 Ea 87.60 51.95 0.78 140.33
6" ell ph@1.27 Ea 259.00 56.39 0.85 316.24

45 degree ells, butt welded, 150 lb. carbon steel, black


Using a 300-amp skid mounted welder and small tools.
2-1/2" ell pa@1.20 Ea 10.30 56.20 2.16 68.66
2015 Heavy Construction Estimator, All Rights Reserved Page 516 (part 2)

3" ell pa@1.33 Ea 12.40 62.28 2.39 77.07


4" ell pa@1.78 Ea 21.00 83.36 3.20 107.56
6" ell pa@2.67 Ea 50.90 125.00 4.81 180.71
8" ell pa@3.20 Ea 94.70 149.90 5.76 250.36
10" ell pa@4.00 Ea 163.00 187.30 7.20 357.50
12" ell pa@4.80 Ea 241.00 224.80 8.64 474.44
2015 Heavy Construction Estimator, All Rights Reserved Page 517

14" ell ps@5.70 Ea 339.00 236.40 85.20 660.60


16" ell ps@6.60 Ea 467.00 273.80 98.60 839.40
18" ell ps@7.40 Ea 595.00 307.00 111.00 1,013.00
20" ell ps@8.25 Ea 887.00 342.20 123.00 1,352.20

Straight tees, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" tee nb@.180 Ea 2.07 9.41 0.10 11.58
3/4" tee nb@.190 Ea 2.97 9.94 0.11 13.02
1" tee nb@.230 Ea 5.04 12.03 0.13 17.20
1-1/4" tee nb@.310 Ea 8.17 16.21 0.18 24.56
1-1/2" tee nb@.390 Ea 10.20 20.40 0.22 30.82
2" tee nb@.490 Ea 17.20 25.63 0.28 43.11
2-1/2" tee ph@1.05 Ea 37.50 46.62 0.70 84.82
3" tee ph@1.25 Ea 55.00 55.50 0.84 111.34
4" tee ph@1.47 Ea 133.00 65.27 0.98 199.25
6" tee ph@2.00 Ea 384.00 88.80 1.34 474.14

Straight tees, butt welded, 150 lb. carbon steel, black


Using a 300-amp skid mounted welder and small tools.
2-1/2" tee pa@1.85 Ea 34.30 86.64 3.33 124.27
3" tee pa@2.00 Ea 39.40 93.66 3.60 136.66
4" tee pa@2.67 Ea 54.90 125.00 4.81 184.71
6" tee pa@4.00 Ea 100.00 187.30 7.20 294.50
8" tee pa@4.80 Ea 185.00 224.80 8.64 418.44
10" tee pa@6.00 Ea 310.00 281.00 10.80 601.80
12" tee pa@7.20 Ea 474.00 337.20 13.00 824.20
14" tee ps@8.50 Ea 709.00 352.60 127.00 1,188.60
16" tee ps@10.0 Ea 884.00 414.80 149.00 1,447.80
18" tee ps@11.0 Ea 1,400.00 456.30 164.00 2,020.30
20" tee ps@12.0 Ea 2,130.00 497.80 179.00 2,806.80
24" tee ps@13.0 Ea 2,630.00 539.20 194.00 3,363.20

Reducing tees, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" tee nb@.170 Ea 3.40 8.89 0.10 12.39
3/4" tee nb@.180 Ea 4.39 9.41 0.10 13.90
1" tee nb@.210 Ea 5.59 10.98 0.12 16.69
1-1/4" tee nb@.540 Ea 9.66 28.24 0.31 38.21
1-1/2" tee nb@.360 Ea 11.30 18.83 0.21 30.34
2" tee nb@.460 Ea 19.00 24.06 0.26 43.32
2-1/2" tee ph@1.05 Ea 49.20 46.62 0.70 96.52
3" tee ph@1.25 Ea 76.70 55.50 0.84 133.04
4" tee ph@1.47 Ea 155.00 65.27 0.98 221.25
6" tee ph@2.00 Ea 317.00 88.80 1.34 407.14
8" tee ph@3.50 Ea 414.00 155.40 2.35 571.75

Reducing tees, butt welded, 150 lb. carbon steel, black


Using a 300-amp skid mounted welder and small tools.
2-1/2" reducing tee pa@1.60 Ea 49.20 74.93 2.88 127.01
3" reducing tee pa@1.89 Ea 52.20 88.51 3.40 144.11
4" reducing tee pa@2.44 Ea 64.90 114.30 4.39 183.59
6" reducing tee pa@3.78 Ea 129.00 177.00 6.80 312.80
8" reducing tee pa@4.40 Ea 249.00 206.10 7.92 463.02
10" reducing tee pa@5.60 Ea 420.00 262.20 10.10 692.30
12" reducing tee pa@6.80 Ea 617.00 318.40 12.20 947.60
14" reducing tee ps@7.90 Ea 1,180.00 327.70 118.00 1,625.70
16" reducing tee ps@9.00 Ea 1,430.00 373.30 134.00 1,937.30
2015 Heavy Construction Estimator, All Rights Reserved Page 517 (part 2)

18" reducing tee ps@10.3 Ea 2,340.00 427.20 154.00 2,921.20

Couplings, threaded 150 lb. malleable iron, black


Using small tools.
1/2" coupling nb@.120 Ea 2.09 6.28 0.07 8.44
3/4" coupling nb@.130 Ea 2.47 6.80 0.07 9.34
1" coupling nb@.180 Ea 3.74 9.41 0.10 13.25
2015 Heavy Construction Estimator, All Rights Reserved Page 518

1-1/4" coupling nb@.240 Ea 4.77 12.55 0.14 17.46


1-1/2" coupling nb@.300 Ea 6.39 15.69 0.17 22.25
2" coupling nb@.380 Ea 9.31 19.87 0.22 29.40
2-1/2" coupling ph@.800 Ea 27.20 35.52 0.54 63.26
3" coupling ph@1.05 Ea 35.90 46.62 0.70 83.22
4" coupling ph@1.17 Ea 72.60 51.95 0.78 125.33
6" coupling ph@1.27 Ea 159.00 56.39 0.85 216.24

Reducing couplings, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" reducing coupling nb@.120 Ea 2.17 6.28 0.07 8.52
3/4" reducing coupling nb@.130 Ea 2.50 6.80 0.07 9.37
1" reducing coupling nb@.180 Ea 3.89 9.41 0.10 13.40
1-1/4" reducing coupling nb@.240 Ea 4.82 12.55 0.14 17.51
1-1/2" reducing coupling nb@.300 Ea 6.71 15.69 0.17 22.57
2" reducing coupling nb@.380 Ea 8.87 19.87 0.22 28.96
2-1/2" reducing coupling ph@.800 Ea 25.90 35.52 0.54 61.96
3" reducing coupling ph@1.05 Ea 34.40 46.62 0.70 81.72
4" reducing coupling ph@1.17 Ea 77.60 51.95 0.78 130.33
6" reducing coupling ph@1.27 Ea 175.00 56.39 0.85 232.24

Eccentric reducers, butt welded, 150 lb. carbon steel, black


Using a 300-amp skid mounted welder and small tools.
3" x 2" pa@2.40 Ea 27.50 112.40 4.32 144.22
4" x 3" pa@3.30 Ea 33.30 154.50 5.94 193.74
4" x 2" pa@2.90 Ea 42.70 135.80 5.22 183.72
6" x 4" pa@4.70 Ea 67.40 220.10 8.46 295.96
6" x 3" pa@4.20 Ea 123.00 196.70 7.56 327.26
8" x 6" pa@6.40 Ea 101.00 299.70 11.50 412.20
8" x 4" pa@5.50 Ea 173.00 257.60 9.90 440.50
10" x 8" pa@8.00 Ea 119.00 374.60 14.40 508.00
10" x 6" pa@7.20 Ea 210.00 337.20 13.00 560.20
12" x 10" pa@9.70 Ea 187.00 454.30 17.50 658.80
12" x 8" pa@8.90 Ea 294.00 416.80 16.00 726.80
14" x 12" ps@11.5 Ea 434.00 477.00 172.00 1,083.00
14" x 10" ps@10.7 Ea 513.00 443.80 160.00 1,116.80
16" x 14" ps@13.3 Ea 590.00 551.70 199.00 1,340.70
16" x 12" ps@12.5 Ea 792.00 518.50 187.00 1,497.50
18" x 16" ps@15.3 Ea 959.00 634.60 229.00 1,822.60
Add for 300 lb reducers ---@--- % 42.00 10.00 -- --
Deduct for concentric reducers ---@--- % -28.00 -- -- --

Unions, threaded, 150 lb. malleable iron, black


Using small tools.
1/2" union nb@.140 Ea 6.79 7.32 0.08 14.19
3/4" union nb@.150 Ea 7.81 7.85 0.09 15.75
1" union nb@.210 Ea 10.20 10.98 0.12 21.30
1-1/4" union nb@.280 Ea 14.60 14.64 0.16 29.40
1-1/2" union nb@.360 Ea 18.20 18.83 0.21 37.24
2" union nb@.450 Ea 20.90 23.54 0.26 44.70
2-1/2" union ph@.870 Ea 68.40 38.63 0.58 107.61
3" union ph@1.05 Ea 82.60 46.62 0.70 129.92

Flanges, threaded, 125 lb. cast iron, black


Using small tools.
1" flange nb@.680 Ea 6.52 35.56 0.39 42.47
1-1/4" flange nb@.700 Ea 7.42 36.61 0.40 44.43
1-1/2" flange nb@.760 Ea 7.31 39.75 0.43 47.49
2015 Heavy Construction Estimator, All Rights Reserved Page 518 (part 2)

2" flange nb@.800 Ea 7.76 41.84 0.46 50.06


2-1/2" flange ph@.920 Ea 8.59 40.85 0.62 50.06
3" flange ph@1.17 Ea 11.70 51.95 0.78 64.43
4" flange ph@1.60 Ea 15.70 71.04 1.07 87.81
6" flange ph@2.19 Ea 25.10 97.24 1.47 123.81
2015 Heavy Construction Estimator, All Rights Reserved Page 519

Flanges, weld neck, butt welded, 150 lb. carbon steel, black
Using a 300-amp skid mounted welder and small tools.
3" welded flange pa@.730 Ea 37.20 34.19 1.31 72.70
4" welded flange pa@.980 Ea 35.50 45.89 1.76 83.15
6" welded flange pa@1.47 Ea 68.20 68.84 2.65 139.69
8" welded flange pa@1.77 Ea 108.00 82.89 3.19 194.08
10" welded flange pa@2.20 Ea 195.00 103.00 3.96 301.96
12" welded flange pa@2.64 Ea 285.00 123.60 4.75 413.35
14" welded flange ps@2.80 Ea 425.00 116.10 41.80 582.90
16" welded flange ps@3.20 Ea 784.00 132.70 47.80 964.50
18" welded flange ps@3.60 Ea 1,060.00 149.30 53.80 1,263.10
20" welded flange ps@4.50 Ea 1,330.00 186.70 67.20 1,583.90
24" welded flange ps@5.00 Ea 1,740.00 207.40 74.70 2,022.10
Add for 300 lb flanges ---@--- % 10.50 33.00 -- --

Flanges, slip on, welded, 150 lb. Black


Using a 300-amp skid mounted welder and small tools.
3" flange pa@.730 Ea 28.40 34.19 1.31 63.90
4" flange pa@.980 Ea 35.50 45.89 1.76 83.15
6" flange pa@1.47 Ea 57.70 68.84 2.65 129.19
Deduct for blind flanges ---@--- % -3.50 -20.00 -- --

Caps, threaded 150 lb. malleable iron, black


Using small tools.
1/2" cap nb@.090 Ea 1.15 4.71 0.05 5.91
3/4" cap nb@.100 Ea 2.09 5.23 0.06 7.38
1" cap nb@.140 Ea 2.57 7.32 0.08 9.97
1-1/4" cap nb@.180 Ea 3.30 9.41 0.10 12.81
1-1/2" cap nb@.230 Ea 4.50 12.03 0.13 16.66
2" cap nb@.290 Ea 6.66 15.17 0.17 22.00
2-1/2" cap nb@.300 Ea 14.00 15.69 0.17 29.86
3" cap nb@.320 Ea 22.00 16.74 0.18 38.92
4" cap nb@.400 Ea 34.30 20.92 0.23 55.45

Caps, butt welded, 150 lb. carbon steel, black


Using a 300-amp skid mounted welder and small tools.
3" cap pa@.930 Ea 10.50 43.55 1.67 55.72
4" cap pa@1.25 Ea 13.90 58.54 2.25 74.69
6" cap pa@1.87 Ea 25.50 87.57 3.37 116.44
8" cap pa@2.24 Ea 39.40 104.90 4.03 148.33
10" cap pa@2.80 Ea 69.40 131.10 5.04 205.54
12" cap pa@3.36 Ea 85.90 157.30 6.05 249.25
14" cap ps@3.95 Ea 161.00 163.80 59.00 383.80
16" cap ps@4.37 Ea 187.00 181.30 65.30 433.60
18" cap ps@4.80 Ea 215.00 199.10 71.70 485.80

Square head plugs, threaded, 125 lb. cast iron, black


Using small tools.
1/2" plug nb@.110 Ea 0.43 5.75 0.06 6.24
3/4" plug nb@.110 Ea 1.08 5.75 0.06 6.89
1" plug nb@.160 Ea 1.22 8.37 0.09 9.68
1-1/4" plug nb@.160 Ea 1.33 8.37 0.09 9.79
1-1/2" plug nb@.160 Ea 1.88 8.37 0.09 10.34
2" plug nb@.220 Ea 2.44 11.51 0.13 14.08
2-1/2" plug ph@.270 Ea 3.54 11.99 0.18 15.71
3" plug ph@.320 Ea 5.67 14.21 0.21 20.09
4" plug ph@.400 Ea 6.66 17.76 0.27 24.69
2015 Heavy Construction Estimator, All Rights Reserved Page 519 (part 2)

6" plug ph@.600 Ea 15.20 26.64 0.40 42.24

Thread-o-lets, 300 lb. forged steel


Using a 300-amp skid mounted welder and small tools.
1/2" thread-o-let pa@.670 Ea 7.09 31.38 1.21 39.68
3/4" thread-o-let pa@.800 Ea 8.34 37.46 1.44 47.24
1" thread-o-let pa@.910 Ea 9.42 42.62 1.64 53.68
1-1/4 to 1-1/2" thread-o-let pa@1.00 Ea 14.30 46.83 1.80 62.93
2" thread-o-let pa@1.11 Ea 16.70 51.98 2.00 70.68
2015 Heavy Construction Estimator, All Rights Reserved Page 520

2-1/2" thread-o-let pa@1.43 Ea 52.50 66.97 2.57 122.04


3" thread-o-let pa@2.00 Ea 82.60 93.66 3.60 179.86
4" thread-o-let pa@2.67 Ea 119.00 125.00 4.81 248.81

Weld-o-lets, 300 bl. forged steel


Using a 300-amp skid mounted welder and small tools.
2" weld-o-let pa@1.30 Ea 18.30 60.88 2.34 81.52
2-1/2" weld-o-let pa@1.50 Ea 42.10 70.25 2.70 115.05
3" weld-o-let pa@1.90 Ea 49.60 88.98 3.42 142.00
4" weld-o-let pa@2.50 Ea 62.60 117.10 4.50 184.20
6" weld-o-let pa@3.75 Ea 173.00 175.60 6.75 355.35
8" weld-o-let pa@5.25 Ea 309.00 245.90 9.45 564.35
10" weld-o-let pa@6.00 Ea 350.00 281.00 10.80 641.80
12" weld-o-let pa@7.00 Ea 450.00 327.80 12.60 790.40

Nipples, threaded steel, Schedule 40, 4" (10cm) long, black


Using small tools.
1/2" nipples nb@.140 Ea 0.55 7.32 0.08 7.95
3/4" nipples nb@.140 Ea 0.68 7.32 0.08 8.08
1" nipples nb@.150 Ea 0.98 7.85 0.09 8.92
1-1/4" nipples nb@.170 Ea 1.23 8.89 0.10 10.22
1-1/2" nipples nb@.170 Ea 1.48 8.89 0.10 10.47
2" nipples nb@.220 Ea 1.98 11.51 0.13 13.62
2-1/2" nipples ph@.270 Ea 4.65 11.99 0.18 16.82
3" nipples ph@.320 Ea 5.74 14.21 0.21 20.16
4" nipples ph@.400 Ea 6.92 17.76 0.27 24.95

Bolt, nut and gasket sets (A-307 MB)


Using small tools.
1" pipe nb@.700 Ea 3.72 36.61 0.40 40.73
1-1/4" pipe nb@.710 Ea 3.89 37.13 0.40 41.42
1-1/2" pipe nb@.720 Ea 3.95 37.66 0.41 42.02
2" pipe nb@.790 Ea 5.22 41.32 0.45 46.99
2-1/2" pipe ph@.880 Ea 5.44 39.07 0.59 45.10
3" pipe ph@1.00 Ea 5.60 44.40 0.67 50.67
4" pipe ph@1.15 Ea 10.80 51.06 0.77 62.63
6" pipe ph@1.99 Ea 17.00 88.36 1.33 106.69
8" (8 bolts at
3/4" diameter x 3-1/4" long) ph@1.25 Ea 18.50 55.50 0.84 74.84
10" (12 bolts at
7/8" diameter x 3-3/4" long) ph@1.70 Ea 38.20 75.48 1.14 114.82
12" (12 bolts
at 7/8" diameter x 4" long) ph@2.20 Ea 40.90 97.68 1.47 140.05
14" (12 bolts
at 1" diameter x 4-1/4" long) ph@2.50 Ea 67.10 111.00 1.68 179.78
16" (16 bolts
at 1" diameter x 4-1/4" long) ph@3.33 Ea 90.30 147.90 2.23 240.43
18" (16 bolts
at 1-1/8" diameter x 6" long) ph@4.00 Ea 122.00 177.60 2.68 302.28
2015 Heavy Construction Estimator, All Rights Reserved Page 521

CSI 15-061, Roll grooved steel pipe fittings, (victaulic)

90 degree ells, roll grooved, style #10 (victaulic)


Using small tools.
2" ell ph@.410 Ea 16.30 18.20 0.27 34.77
2-1/2" ell ph@.430 Ea 16.30 19.09 0.29 35.68
3" ell ph@.500 Ea 21.60 22.20 0.34 44.14
4" ell ph@.690 Ea 33.50 30.64 0.46 64.60
6" ell ph@1.19 Ea 83.30 52.84 0.80 136.94
8" ell ph@1.69 Ea 143.00 75.04 1.13 219.17
10" ell ph@2.23 Ea 274.00 99.01 1.49 374.50
12" ell ph@2.48 Ea 434.00 110.10 1.66 545.76

45 degree ells, roll grooved, style #11 (victaulic)


Using small tools.
2" ell ph@.410 Ea 16.30 18.20 0.27 34.77
2-1/2" ell ph@.430 Ea 16.30 19.09 0.29 35.68
3" ell ph@.500 Ea 21.60 22.20 0.34 44.14
4" ell ph@.690 Ea 33.50 30.64 0.46 64.60
6" ell ph@1.19 Ea 83.30 52.84 0.80 136.94
8" ell ph@1.69 Ea 143.00 75.04 1.13 219.17
10" ell ph@2.23 Ea 274.00 99.01 1.49 374.50
12" ell ph@2.48 Ea 434.00 110.10 1.66 545.76

22-1/2 degree ells, roll grooved, style #12 (victaulic)


Using small tools.
2" ell ph@.410 Ea 19.20 18.20 0.27 37.67
2-1/2" ell ph@.430 Ea 19.20 19.09 0.29 38.58
3" ell ph@.500 Ea 20.30 22.20 0.34 42.84
4" ell ph@.690 Ea 38.20 30.64 0.46 69.30
6" ell ph@1.19 Ea 95.40 52.84 0.80 149.04
8" ell ph@1.69 Ea 195.00 75.04 1.13 271.17
10" ell ph@2.23 Ea 275.00 99.01 1.49 375.50
12" ell ph@2.48 Ea 294.00 110.10 1.66 405.76

Tees, roll grooved, style #20 (victaulic)


Using small tools.
2" tee ph@.510 Ea 31.40 22.64 0.34 54.38
2-1/2" tee ph@.540 Ea 31.40 23.98 0.36 55.74
3" tee ph@.630 Ea 37.90 27.97 0.42 66.29
4" tee ph@.860 Ea 53.10 38.18 0.58 91.86
6" tee ph@1.49 Ea 141.00 66.16 1.00 208.16
8" tee ph@2.11 Ea 238.00 93.68 1.41 333.09
10" tee ph@2.79 Ea 419.00 123.90 1.87 544.77
12" tee ph@3.10 Ea 490.00 137.60 2.08 629.68

Reducing tees, roll grooved, style #25 (victaulic)


Using small tools.
2" reducing tee ph@.510 Ea 31.40 22.64 0.34 54.38
2-1/2" reducing tee ph@.540 Ea 41.30 23.98 0.36 65.64
3" reducing tee ph@.630 Ea 37.50 27.97 0.42 65.89
4" reducing tee ph@.860 Ea 64.20 38.18 0.58 102.96
6" reducing tee ph@1.49 Ea 136.00 66.16 1.00 203.16
8" reducing tee ph@2.11 Ea 247.00 93.68 1.41 342.09
10" reducing tee ph@2.79 Ea 325.00 123.90 1.87 450.77
12" reducing tee ph@3.10 Ea 359.00 137.60 2.08 498.68
2015 Heavy Construction Estimator, All Rights Reserved Page 522

Reducers, roll grooved, style #50 (victaulic)


Using small tools.
2" reducer ph@.410 Ea 10.30 18.20 0.27 28.77
2-1/2" reducer ph@.430 Ea 10.30 19.09 0.29 29.68
3" reducer ph@.500 Ea 14.60 22.20 0.34 37.14
4" reducer ph@.690 Ea 24.20 30.64 0.46 55.30
6" reducer ph@1.19 Ea 40.40 52.84 0.80 94.04
8" reducer ph@1.69 Ea 71.70 75.04 1.13 147.87
10" reducer ph@2.23 Ea 150.00 99.01 1.49 250.50

Caps, roll grooved, style #60 (victaulic)


Using small tools.
2" cap ph@.270 Ea 9.17 11.99 0.18 21.34
2-1/2" cap ph@.280 Ea 9.17 12.43 0.19 21.79
3" cap ph@.330 Ea 11.50 14.65 0.22 26.37
4" cap ph@.450 Ea 13.30 19.98 0.30 33.58
6" cap ph@.770 Ea 29.90 34.19 0.52 64.61
8" cap ph@1.10 Ea 48.40 48.84 0.74 97.98
10" cap ph@1.45 Ea 81.70 64.38 0.97 147.05
12" cap ph@1.61 Ea 207.00 71.48 1.08 279.56

Mechanical tees (saddle tee), roll grooved, style #920 (victaulic)


Using small tools.
3" mechanical tee ph@.750 Ea 31.70 33.30 0.50 65.50
4" mechanical tee ph@1.00 Ea 35.90 44.40 0.67 80.97
6" mechanical tee ph@1.30 Ea 49.20 57.72 0.87 107.79
8" mechanical tee ph@1.50 Ea 78.10 66.60 1.01 145.71

Couplings, roll grooved, 800 psi, style #77 (victaulic)


Labor included with fittings.
3" coupling ph@.000 Ea 15.80 -- -- 15.80
4" coupling ph@.000 Ea 26.70 -- -- 26.70
6" coupling ph@.000 Ea 46.00 -- -- 46.00
8" coupling ph@.000 Ea 68.40 -- -- 68.40
10" coupling ph@.000 Ea 91.70 -- -- 91.70
12" coupling ph@.000 Ea 122.00 -- -- 122.00

Couplings, roll grooved, light weight, style #75 (victaulic)


Labor included with fittings.
3" coupling py@.000 Ea 13.00 -- -- 13.00
4" coupling py@.000 Ea 14.00 -- -- 14.00
6" coupling py@.000 Ea 28.80 -- -- 28.80
8" coupling py@.000 Ea 43.90 -- -- 43.90

Couplings, roll grooved, zeroflex, style #07 (victaulic)


Labor included with fittings.
3" coupling ph@.000 Ea 15.00 -- -- 15.00
4" coupling ph@.000 Ea 19.40 -- -- 19.40
6" coupling ph@.000 Ea 33.40 -- -- 33.40
8" coupling ph@.000 Ea 50.50 -- -- 50.50
10" coupling ph@.000 Ea 74.20 -- -- 74.20
12" coupling ph@.000 Ea 102.00 -- -- 102.00

Flanges, roll grooved, style #741 (victaulic)


Labor includes installing fitting, using small tools.
3" flange ph@.500 Ea 48.80 22.20 0.34 71.34
2015 Heavy Construction Estimator, All Rights Reserved Page 522 (part 2)

4" flange ph@.690 Ea 68.40 30.64 0.46 99.50


6" flange ph@1.19 Ea 96.30 52.84 0.80 149.94
8" flange ph@1.69 Ea 111.00 75.04 1.13 187.17
10" flange ph@2.23 Ea 165.00 99.01 1.49 265.50
12" flange ph@2.48 Ea 225.00 110.10 1.66 336.76
2015 Heavy Construction Estimator, All Rights Reserved Page 523

CSI 15-061, Galvanized steel pipe fittings

90 degree threaded ells, 150 lb. malleable iron, galvanized


Using small tools.
1/2" ell nb@.120 Ea 1.77 6.28 0.07 8.12
3/4" ell nb@.130 Ea 2.14 6.80 0.07 9.01
1" ell nb@.180 Ea 3.74 9.41 0.10 13.25
1-1/4" ell nb@.240 Ea 7.01 12.55 0.14 19.70
1-1/2" ell nb@.300 Ea 8.02 15.69 0.17 23.88
2" ell nb@.380 Ea 13.70 19.87 0.22 33.79

90 degree reducing ells, threaded, 150 lb. malleable iron, galvanized


Using small tools.
3/4" x 1/2" nb@.210 Ea 3.72 10.98 0.12 14.82
1" x 3/4" or 1/2" nb@.270 Ea 4.77 14.12 0.15 19.04
1-1/4" x 1/2", 3/4" or 1" nb@.380 Ea 7.99 19.87 0.22 28.08
1-1/2" x 3/4" or 1" nb@.430 Ea 11.60 22.49 0.25 34.34
2" x 1-1/4" or 1-1/2" nb@.540 Ea 14.00 28.24 0.31 42.55
2" x 3/4", 1" or 1-1/4" nb@.540 Ea 16.00 28.24 0.31 44.55

90 degree butt welded ells, 150 lb. carbon steel, galvanized


Using a 300-amp skid mounted welder and small tools.
2-1/2" ell pa@.800 Ea 32.90 37.46 1.44 71.80
3" ell pa@1.05 Ea 49.00 49.17 1.89 100.06
4" ell pa@1.17 Ea 105.00 54.79 2.11 161.90
6" ell pa@1.27 Ea 310.00 59.47 2.29 371.76

45 degree threaded ells, 150 lb. malleable iron, galvanized


Using small tools.
1/2" ell nb@.120 Ea 2.99 6.28 0.07 9.34
3/4" ell nb@.130 Ea 3.67 6.80 0.07 10.54
1" ell nb@.180 Ea 4.67 9.41 0.10 14.18
1-1/4" ell nb@.240 Ea 8.21 12.55 0.14 20.90
1-1/2" ell nb@.390 Ea 10.10 20.40 0.22 30.72
2" ell nb@.380 Ea 15.20 19.87 0.22 35.29

45 degree butt welded ells, 150 lb. carbon steel, galvanized


Using a 300-amp skid mounted welder and small tools.
2-1/2" ell pa@.800 Ea 46.00 37.46 1.44 84.90
3" ell pa@1.05 Ea 60.00 49.17 1.89 111.06
4" ell pa@1.17 Ea 117.00 54.79 2.11 173.90
6" ell pa@1.27 Ea 414.00 59.47 2.29 475.76

Tees, straight, threaded,150 lb. malleable iron, galvanized


Using small tools.
1/2" tee nb@.180 Ea 2.49 9.41 0.10 12.00
3/4" tee nb@.190 Ea 3.57 9.94 0.11 13.62
1" tee nb@.230 Ea 6.04 12.03 0.13 18.20
1-1/4" tee nb@.310 Ea 9.81 16.21 0.18 26.20
1-1/2" tee nb@.390 Ea 12.20 20.40 0.22 32.82
2" tee nb@.380 Ea 20.60 19.87 0.22 40.69

Tees, straight, butt welded, 150 lb. carbon steel, galvanized


Using a 300-amp skid mounted welder and small tools.
2-1/2" tee pa@.870 Ea 46.00 40.74 1.57 88.31
3" tee pa@1.05 Ea 67.10 49.17 1.89 118.16
2015 Heavy Construction Estimator, All Rights Reserved Page 523 (part 2)

4" tee pa@1.47 Ea 162.00 68.84 2.65 233.49


6" tee pa@2.00 Ea 462.00 93.66 3.60 559.26

Tees, reducing, threaded, 150 lb. malleable iron, galvanized


Using small tools.
1/2" tee nb@.170 Ea 2.49 8.89 0.10 11.48
3/4" tee nb@.190 Ea 3.57 9.94 0.11 13.62
1" tee nb@.230 Ea 6.04 12.03 0.13 18.20
1-1/4" tee nb@.310 Ea 9.81 16.21 0.18 26.20
1-1/2" tee nb@.360 Ea 13.50 18.83 0.21 32.54
2" tee nb@.460 Ea 22.80 24.06 0.26 47.12
2015 Heavy Construction Estimator, All Rights Reserved Page 524

Tees, reducing, butt welded, 150 lb. carbon steel, galvanized


Using a 300-amp skid mounted welder and small tools.
2-1/2" tee pa@.550 Ea 60.00 25.76 0.99 86.75
3" tee pa@.870 Ea 93.10 40.74 1.57 135.41
4" tee pa@1.47 Ea 187.00 68.84 2.65 258.49
6" tee pa@2.00 Ea 390.00 93.66 3.60 487.26

Couplings, straight, threaded, 150 lb. malleable iron, galvanized


Using small tools.
1/2" coupling nb@.120 Ea 2.50 6.28 0.07 8.85
3/4" coupling nb@.130 Ea 2.97 6.80 0.07 9.84
1" coupling nb@.180 Ea 4.49 9.41 0.10 14.00
1-1/4" coupling nb@.240 Ea 5.72 12.55 0.14 18.41
1-1/2" coupling nb@.300 Ea 7.66 15.69 0.17 23.52
2" coupling nb@.380 Ea 11.20 19.87 0.22 31.29

Reducing couplings, threaded, 150 lb. malleable iron, galvanized


Using small tools.
1/2" reducing coupling nb@.270 Ea 3.40 14.12 0.15 17.67
3/4" reducing coupling nb@.300 Ea 3.92 15.69 0.17 19.78
1" reducing coupling nb@.330 Ea 5.20 17.26 0.19 22.65
1-1/4" reducing coupling nb@.380 Ea 7.01 19.87 0.22 27.10
1-1/2" reducing coupling nb@.430 Ea 9.52 22.49 0.25 32.26
2" reducing coupling nb@.540 Ea 13.60 28.24 0.31 42.15

Caps, threaded, 150 lb. malleable iron, galvanized


Using small tools.
1/2" cap nb@.090 Ea 1.38 4.71 0.05 6.14
3/4" cap nb@.100 Ea 2.50 5.23 0.06 7.79
1" cap nb@.140 Ea 3.09 7.32 0.08 10.49
1-1/4" cap nb@.180 Ea 3.95 9.41 0.10 13.46
1-1/2" cap nb@.230 Ea 5.40 12.03 0.13 17.56
2" cap nb@.290 Ea 7.99 15.17 0.17 23.33

Caps, butt welded, 150 lb. carbon steel, galvanized


Using a 300-amp skid mounted welder and small tools.
2-1/2" cap pa@.270 Ea 21.30 12.64 0.49 34.43
3" cap pa@.320 Ea 24.90 14.99 0.58 40.47
4" cap pa@.400 Ea 54.20 18.73 0.72 73.65
6" cap pa@.600 Ea 187.00 28.10 1.08 216.18

Unions, threaded, 150 lb. malleable iron, galvanized


Using small tools.
1/2" union nb@.140 Ea 8.14 7.32 0.08 15.54
3/4" union nb@.150 Ea 9.37 7.85 0.09 17.31
1" union nb@.210 Ea 12.20 10.98 0.12 23.30
1-1/4" union nb@.280 Ea 17.50 14.64 0.16 32.30
1-1/2" union nb@.360 Ea 21.80 18.83 0.21 40.84
2" union nb@.450 Ea 25.00 23.54 0.26 48.80
2-1/2" union ph@.870 Ea 79.60 38.63 0.58 118.81
3" union ph@1.05 Ea 95.90 46.62 0.70 143.22

Nipples, galvanized steel, 4" (10cm) long, Schedule 40


Using small tools.
1/2" nipple nb@.140 Ea 1.78 7.32 0.08 9.18
3/4" nipple nb@.140 Ea 2.22 7.32 0.08 9.62
2015 Heavy Construction Estimator, All Rights Reserved Page 524 (part 2)

1" nipple nb@.150 Ea 3.10 7.85 0.09 11.04


1-1/4" nipple nb@.170 Ea 3.89 8.89 0.10 12.88
1-1/2" nipple nb@.170 Ea 4.77 8.89 0.10 13.76
2015 Heavy Construction Estimator, All Rights Reserved Page 525

2" nipple nb@.220 Ea 6.39 11.51 0.13 18.03

Square head plugs, galvanized, cast iron, threaded


Using small tools.
1/2" plug nb@.110 Ea 0.92 5.75 0.06 6.73
3/4" plug nb@.110 Ea 1.93 5.75 0.06 7.74
1" plug nb@.160 Ea 1.92 8.37 0.09 10.38
1-1/4" plug nb@.160 Ea 2.40 8.37 0.09 10.86
1-1/2" plug nb@.160 Ea 3.15 8.37 0.09 11.61
2" plug nb@.220 Ea 4.54 11.51 0.13 16.18

Flanges, galvanized, threaded, 125 lb. cast iron


Using small tools.
1" flange nb@.680 Ea 12.60 35.56 0.39 48.55
1-1/4" flange nb@.700 Ea 13.80 36.61 0.40 50.81
1-1/2" flange nb@.760 Ea 15.40 39.75 0.43 55.58
2" flange nb@.800 Ea 15.10 41.84 0.46 57.40
2-1/2" flange nb@.920 Ea 16.70 48.12 0.52 65.34

Flanges, galvanized, weld neck, 125 lb. carbon steel


Using a 300-amp skid mounted welder and small tools.
3" flange pa@1.17 Ea 21.40 54.79 2.11 78.30
4" flange pa@1.60 Ea 29.20 74.93 2.88 107.01
6" flange pa@2.19 Ea 49.00 102.60 3.94 155.54

CSI 15-062, Cast iron pipe

Cast iron service weight bell and spigot soil pipe, straight runs installed below grade
Installed in an open trench. Make additional allowances for trench excavation, backfill and fittings, if
required. Use mechanical joint cast iron pipe for above ground applications, using small tools.
2" (50mm) nf@.060 LF 5.82 2.72 0.03 8.57
3" (75mm) nf@.070 LF 8.12 3.18 0.04 11.34
4" (10cm) nf@.090 LF 10.60 4.08 0.05 14.73
6" (15cm) nk@.110 LF 18.20 4.96 0.07 23.23
8" (20cm) nm@.140 LF 29.10 6.45 0.09 35.64
10" (25cm) nm@.180 LF 48.60 8.29 0.11 57.00
12" (31cm) nm@.230 LF 83.90 10.59 0.14 94.63
15" (38cm) nm@.280 LF 123.00 12.89 0.17 136.06

Cast iron service weight bell and spigot soil pipe and fittings, installed below grade
Installed in an open trench, including four 45 degree elbows and two wyes every 100'. Make additional
allowances for trench excavation and backfill. Use mechanical joint cast iron pipe for above ground
applications, using small tools.
3" (75mm) nb@.120 LF 12.20 6.28 0.07 18.55
4" (100mm) nb@.160 LF 16.10 8.37 0.09 24.56
6" (150mm) nb@.220 LF 31.60 11.51 0.13 43.24
8" (200mm) nb@.300 LF 55.70 15.69 0.17 71.56
10" (250mm) nb@.390 LF 88.40 20.40 0.22 109.02
12" (300mm) nb@.440 LF 129.00 23.01 0.25 152.26
15" (375mm) nb@.530 LF 205.00 27.72 0.30 233.02
2015 Heavy Construction Estimator, All Rights Reserved Page 526

Extra heavy cast iron soil pipe, straight run, installed below grade
Bell and spigot installed as straight runs (no fittings) below grade in an open trench. Make additional
allowances for trench excavation and backfill. Use mechanical joint cast iron pipe for above ground
applications, using small tools.
2" (50mm) nf@.070 LF 10.10 3.18 0.04 13.32
3" (75mm) nf@.080 LF 13.90 3.63 0.04 17.57
4" (10cm) nk@.100 LF 18.20 4.51 0.06 22.77
6" (15cm) nk@.120 LF 31.10 5.41 0.07 36.58
8" (20cm) nm@.150 LF 50.40 6.91 0.09 57.40
10" (25cm) nm@.200 LF 82.80 9.21 0.12 92.13
12" (31cm) nm@.250 LF 121.00 11.51 0.15 132.66

Cast iron soil pipe tees, bell and spigot


Using small tools.
3" sanitary tee nf@.400 Ea 43.20 18.15 0.22 61.57
3" x 2" sanitary tee nf@.400 Ea 36.40 18.15 0.22 54.77
4" x 2" sanitary tee nf@.550 Ea 43.60 24.95 0.31 68.86
4" x 3" sanitary tee nf@.550 Ea 47.80 24.95 0.31 73.06
4" sanitary tee nf@.550 Ea 52.80 24.95 0.31 78.06
6" sanitary tee nk@.700 Ea 113.00 31.56 0.43 144.99
8" sanitary tee nm@1.15 Ea 297.00 52.95 0.70 350.65
10" sanitary tee nm@1.40 Ea 470.00 64.46 0.85 535.31
12" sanitary tee nm@1.80 Ea 734.00 82.87 1.10 817.97
6" x 2" sanitary tee nk@1.80 Ea 78.30 81.16 1.10 160.56
6" x 3" sanitary tee nk@1.80 Ea 82.90 81.16 1.10 165.16
6" x 4" sanitary tee nk@1.92 Ea 91.10 86.57 1.17 178.84
8" x 4" sanitary tee nm@1.95 Ea 191.00 89.78 1.19 281.97
8" x 6" sanitary tee nm@1.95 Ea 251.00 89.78 1.19 341.97
2" tapped sanitary tee nf@.480 Ea 12.40 21.78 0.27 34.45
3" tapped sanitary tee nf@.250 Ea 14.00 11.34 0.14 25.48
4" tapped sanitary tee nf@.690 Ea 17.30 31.31 0.39 49.00
2" vent tee nf@.480 Ea 11.10 21.78 0.27 33.15
3" vent tee nf@.520 Ea 19.30 23.59 0.29 43.18
4" vent tee nf@.680 Ea 26.10 30.85 0.38 57.33
6" vent tee nk@1.05 Ea 50.30 47.34 0.64 98.28
8" vent tee nm@1.35 Ea 117.00 62.15 0.82 179.97

Cast iron soil pipe bends, bell and spigot


Using small tools.
2", 1/4 bend nf@.220 Ea 13.60 9.98 0.12 23.70
3", 1/4 bend nf@.240 Ea 25.20 10.89 0.13 36.22
4", 1/4 bend nf@.320 Ea 37.00 14.52 0.18 51.70
6", 1/4 bend nk@.450 Ea 64.70 20.29 0.27 85.26
8", 1/4 bend nm@.570 Ea 197.00 26.24 0.35 223.59
10", 1/4 bend nm@.700 Ea 288.00 32.23 0.43 320.66
12", 1/4 bend nm@.820 Ea 386.00 37.75 0.50 424.25
15", 1/4 bend nm@1.30 Ea 1,090.00 59.85 0.79 1,150.64
2", 1/8 bend nf@.210 Ea 11.00 9.53 0.12 20.65
3", 1/8 bend nf@.270 Ea 19.80 12.25 0.15 32.20
4", 1/8 bend nf@.360 Ea 29.60 16.33 0.20 46.13
6", 1/8 bend nk@.520 Ea 49.80 23.45 0.32 73.57
8", 1/8 bend nm@.680 Ea 142.00 31.31 0.41 173.72
10", 1/8 bend nm@.850 Ea 220.00 39.13 0.52 259.65
12", 1/8 bend nm@1.10 Ea 362.00 50.64 0.67 413.31
15", 1/8 bend nm@1.30 Ea 426.00 59.85 0.79 486.64
2" short sweep nf@.210 Ea 17.40 9.53 0.12 27.05
3" short sweep nf@.270 Ea 31.00 12.25 0.15 43.40
4" short sweep nf@.360 Ea 43.40 16.33 0.20 59.93
2015 Heavy Construction Estimator, All Rights Reserved Page 526 (part 2)

6" short sweep nk@.500 Ea 40.90 22.55 0.31 63.76


8" short sweep nm@.620 Ea 87.40 28.54 0.38 116.32
10"short sweep nm@.770 Ea 154.00 35.45 0.47 189.92
12"short sweep nm@1.07 Ea 275.00 49.26 0.65 324.91
2" long sweep nf@.210 Ea 9.85 9.53 0.12 19.50
3" long sweep nf@.270 Ea 15.20 12.25 0.15 27.60
4" long sweep nf@.360 Ea 23.20 16.33 0.20 39.73
2015 Heavy Construction Estimator, All Rights Reserved Page 527

6" long sweep nk@.500 Ea 39.00 22.55 0.31 61.86


8" long sweep nm@.630 Ea 105.00 29.01 0.38 134.39
10" long sweep nm@.770 Ea 160.00 35.45 0.47 195.92
12" long sweep nm@1.07 Ea 248.00 49.26 0.65 297.91
15" long sweep nm@1.50 Ea 415.00 69.06 0.92 484.98

Cast iron combinations, bell and spigot


Using small tools.
2" combination nf@.480 Ea 27.40 21.78 0.27 49.45
3" combination nf@.540 Ea 41.60 24.50 0.30 66.40
4" combination nf@.680 Ea 56.10 30.85 0.38 87.33
6" combination nk@1.05 Ea 129.00 47.34 0.64 176.98
8" combination nm@1.35 Ea 296.00 62.15 0.82 358.97
3" x 2" combination nf@.500 Ea 30.60 22.69 0.28 53.57
4" x 2" combination nf@.620 Ea 89.90 28.13 0.35 118.38
4" x 3" combination nf@.630 Ea 119.00 28.58 0.35 147.93
6" x 2" combination nk@.860 Ea 204.00 38.78 0.52 243.30
6" x 3" combination nk@.870 Ea 219.00 39.23 0.53 258.76
6" x 4" combination nk@.930 Ea 226.00 41.93 0.57 268.50
8" x 2" combination nm@1.02 Ea 362.00 46.96 0.62 409.58
8" x 4" combination nm@1.08 Ea 387.00 49.72 0.66 437.38
8" x 6" combination nm@1.20 Ea 528.00 55.25 0.73 583.98
3" reducing combination nf@.540 Ea 31.20 24.50 0.30 56.00
4" reducing combination nf@.680 Ea 43.00 30.85 0.38 74.23
6" reducing combination nk@1.05 Ea 108.00 47.34 0.64 155.98
8" reducing combination nm@1.36 Ea 151.00 62.61 0.83 214.44
2" double combination nf@1.07 Ea 46.60 48.55 0.60 95.75
3" double combination nf@.770 Ea 64.50 34.93 0.43 99.86
4" double combination nf@.960 Ea 91.90 43.56 0.54 136.00
6" double combination nk@1.65 Ea 287.00 74.40 1.01 362.41
3" x 2" double combination nf@.690 Ea 127.00 31.31 0.39 158.70
4" x 2" double combination nf@.780 Ea 140.00 35.39 0.44 175.83
4" x 3" double combination nf@.870 Ea 182.00 39.47 0.49 221.96
6" x 4" double combination nk@1.23 Ea 544.00 55.46 0.75 600.21

Cast iron reducers, bell and spigot


Using small tools.
3" x 2" reducer nf@.270 Ea 14.30 12.25 0.15 26.70
4" x 3" reducer nf@.360 Ea 19.00 16.33 0.20 35.53
6" x 4" reducer nk@.470 Ea 32.20 21.19 0.29 53.68
8" x 6" reducer nm@.630 Ea 61.80 29.01 0.38 91.19
10" x 8" reducer nm@.770 Ea 104.00 35.45 0.47 139.92
12" x 10"reducer nm@1.28 Ea 176.00 58.93 0.78 235.71
4" x 2" reducer nf@.360 Ea 14.50 16.33 0.20 31.03
6" x 2" reducer nk@.450 Ea 27.20 20.29 0.27 47.76
6" x 3" reducer nk@.450 Ea 31.30 20.29 0.27 51.86
8" x 2" reducer nk@.480 Ea 59.10 21.64 0.29 81.03
8" x 3" reducer nm@.580 Ea 60.90 26.70 0.35 87.95
8" x 4" reducer nm@.600 Ea 60.90 27.62 0.37 88.89
10" x 4" reducer nm@.700 Ea 89.70 32.23 0.43 122.36
10" x 6" reducer nm@.730 Ea 98.10 33.61 0.45 132.16
12" x 4" reducer nm@.830 Ea 147.00 38.21 0.51 185.72
12" x 6" reducer nm@.950 Ea 158.00 43.74 0.58 202.32
12" x 8" reducer nm@1.11 Ea 164.00 51.10 0.68 215.78
15" x 6" reducer nm@1.28 Ea 283.00 58.93 0.78 342.71
15" x 8" reducer nm@1.38 Ea 296.00 63.54 0.84 360.38
15" x 10" reducer nm@1.46 Ea 304.00 67.22 0.89 372.11
15" x 12" reducer nm@1.55 Ea 321.00 71.36 0.95 393.31
2015 Heavy Construction Estimator, All Rights Reserved Page 528

Cast iron soil pipe wyes, bell and spigot


Using small tools.
2" wye nf@.480 Ea 22.10 21.78 0.27 44.15
3" wye nf@.520 Ea 41.40 23.59 0.29 65.28
4" wye nf@.690 Ea 55.10 31.31 0.39 86.80
6" wye nk@.690 Ea 124.00 31.11 0.42 155.53
8" wye nm@1.26 Ea 304.00 58.01 0.77 362.78
10" wye nm@1.43 Ea 482.00 65.84 0.87 548.71
12" wye nm@1.74 Ea 777.00 80.11 1.06 858.17
15" wye nm@1.95 Ea 1,330.00 89.78 1.19 1,420.97
3" x 2" wye nf@.500 Ea 79.50 22.69 0.28 102.47
4" x 2" wye nf@.600 Ea 94.90 27.22 0.34 122.46
4" x 3" wye nf@.630 Ea 116.00 28.58 0.35 144.93
6" x 2" wye nk@.860 Ea 192.00 38.78 0.52 231.30
6" x 3" wye nk@.860 Ea 199.00 38.78 0.52 238.30
6" x 4" wye nk@.930 Ea 204.00 41.93 0.57 246.50
8" x 2" wye nm@1.01 Ea 356.00 46.50 0.62 403.12
8" x 3" wye nm@1.03 Ea 378.00 47.42 0.63 426.05
8" x 4" wye nm@1.08 Ea 383.00 49.72 0.66 433.38
8" x 6" wye nm@1.22 Ea 466.00 56.17 0.74 522.91
10" x 3" wye nm@1.13 Ea 634.00 52.03 0.69 686.72
10" x 4" wye nm@1.17 Ea 659.00 53.87 0.71 713.58
10" x 6" wye nm@1.30 Ea 716.00 59.85 0.79 776.64
10" x 8" wye nm@1.38 Ea 1,000.00 63.54 0.84 1,064.38
12" x 4" wye nm@1.38 Ea 1,040.00 63.54 0.84 1,104.38
12" x 6" wye nm@1.50 Ea 1,070.00 69.06 0.92 1,139.98
12" x 8" wye nm@1.57 Ea 1,290.00 72.28 0.96 1,363.24
12" x 10" wye nm@1.62 Ea 1,620.00 74.58 0.99 1,695.57
15" x 4" wye nm@1.52 Ea 2,870.00 69.98 0.93 2,940.91
15" x 6" wye nm@1.65 Ea 2,990.00 75.97 1.01 3,066.98
15" x 8" wye nm@1.72 Ea 3,040.00 79.19 1.05 3,120.24
15" x 10" wye nm@1.77 Ea 3,120.00 81.49 1.08 3,202.57
15" x 12" wye nm@1.77 Ea 3,190.00 81.49 1.08 3,272.57
2" double wye nf@.580 Ea 38.00 26.31 0.32 64.63
3" double wye nf@.730 Ea 63.70 33.12 0.41 97.23
4" double wye nf@.620 Ea 91.50 28.13 0.35 119.98
6" double wye nk@1.48 Ea 203.00 66.73 0.90 270.63
8" double wye nm@1.70 Ea 494.00 78.27 1.04 573.31
10"double wye nm@1.90 Ea 681.00 87.48 1.16 769.64
12"double wye nm@2.27 Ea 759.00 104.50 1.38 864.88
3" x 2" double wye nf@.680 Ea 31.30 30.85 0.38 62.53
4" x 2" double wye nf@.770 Ea 37.40 34.93 0.43 72.76
4" x 3" double wye nf@.820 Ea 43.30 37.20 0.46 80.96
6" x 2" double wye nk@1.02 Ea 64.70 45.99 0.62 111.31
6" x 3" double wye nk@1.06 Ea 70.80 47.80 0.65 119.25
6" x 4" double wye nk@1.15 Ea 88.00 51.85 0.70 140.55
8" x 4" double wye nm@1.31 Ea 195.00 60.31 0.80 256.11
8" x 6" double wye nm@1.55 Ea 200.00 71.36 0.95 272.31
10" x 4" double wye nm@1.40 Ea 207.00 64.46 0.85 272.31
10" x 6" double wye nm@1.65 Ea 240.00 75.97 1.01 316.98
10" x 8" double wye nm@1.90 Ea 318.00 87.48 1.16 406.64
12" x 6" double wye nm@1.84 Ea 326.00 84.71 1.12 411.83
12" x 8" double wye nm@2.00 Ea 453.00 92.08 1.22 546.30

Cast iron fittings, bell and spigot


Using small tools.
2" tapped sanitary cross nf@.480 Ea 26.90 21.78 0.27 48.95
3" tapped sanitary cross nf@.530 Ea 31.40 24.05 0.30 55.75
2015 Heavy Construction Estimator, All Rights Reserved Page 528 (part 2)

4" tapped sanitary cross nf@.690 Ea 41.40 31.31 0.39 73.10


2" P-trap nf@.220 Ea 24.30 9.98 0.12 34.40
3" P-trap nf@.270 Ea 35.00 12.25 0.15 47.40
4" P-trap nf@.360 Ea 49.90 16.33 0.20 66.43
2015 Heavy Construction Estimator, All Rights Reserved Page 529

6" P-trap nk@.500 Ea 151.00 22.55 0.31 173.86


8" P-trap nm@.620 Ea 401.00 28.54 0.38 429.92
10" P-trap nm@.770 Ea 433.00 35.45 0.47 468.92
2" P-trap, deep seal nf@.220 Ea 33.10 9.98 0.12 43.20
3" P-trap, deep seal nf@.270 Ea 51.40 12.25 0.15 63.80
4" P-trap, deep seal nf@.360 Ea 80.80 16.33 0.20 97.33
6" P-trap, deep seal nk@.530 Ea 162.00 23.90 0.32 186.22

Joints for bell and spigot cast iron soil pipe


Material cost only. Labor costs for installation of dual tite gaskets are included in installation costs for
fittings, using small tools.
2" dual tite rubber gasket --@.000 Ea 2.44 -- -- 2.44
3" dual tite rubber gasket --@.000 Ea 3.44 -- -- 3.44
4" dual tite rubber gasket --@.000 Ea 4.24 -- -- 4.24
6" dual tite rubber gasket --@.000 Ea 7.08 -- -- 7.08
8" dual tite rubber gasket --@.000 Ea 14.90 -- -- 14.90
10" dual tite rubber gasket --@.000 Ea 23.70 -- -- 23.70
12" dual tite rubber gasket --@.000 Ea 30.30 -- -- 30.30
15" dual tite rubber gasket --@.000 Ea 36.40 -- -- 36.40

Cast iron no hub (mechanical joint) soil pipe, installed horizontal


Horizontally hung, service weight cast iron (MJ) soil pipe, Includes fittings, couplings, hangers and rod.
Based on two wyes, four 45 degree elbows and fifteen hangers every 100 feet. Labor includes layout,
complete installation and hydronic testing. Use these figures for preliminary estimates, using small
tools.
1-1/2" (38mm) nb@.120 LF 5.37 6.28 0.07 11.72
2" (50mm) nb@.140 LF 8.43 7.32 0.08 15.83
3" (75mm) nb@.170 LF 10.20 8.89 0.10 19.19
4" (100mm) nb@.200 LF 13.60 10.46 0.11 24.17
6" (150mm) nb@.270 LF 26.50 14.12 0.15 40.77
8" (200mm) nb@.340 LF 51.80 17.78 0.19 69.77
10" (250mm) nb@.420 LF 84.20 21.97 0.24 106.41
12" (300mm) nb@.460 LF 108.00 24.06 0.26 132.32

Cast iron no hub (mechanical joint) soil pipe, installed risers


Installed service weight cast iron (MJ) soil pipe risers Includes a sanitary TY every floor and a riser
clamp every other floor. Make additional allowances for floor sleeving or coring as required. Use these
figures for preliminary estimates, using small tools.
2" (50mm) nb@.100 LF 8.26 5.23 0.06 13.55
3" (75mm) nb@.130 LF 9.06 6.80 0.07 15.93
4" (100mm) nb@.170 LF 11.30 8.89 0.10 20.29
6" (150mm) nb@.240 LF 23.00 12.55 0.14 35.69
8" (200mm) nb@.300 LF 46.80 15.69 0.17 62.66
10" (250mm) nb@.420 LF 79.60 21.97 0.24 101.81

Cast iron no hub (mechanical joint) soil pipe, pipe only


Service weight. No hangers or fittings included (see CSI 15-094 for pipe supports), using small tools.
2" (50mm) nc@.050 LF 5.82 2.46 0.03 8.31
3" (75mm) nc@.060 LF 8.12 2.95 0.03 11.10
4" (10cm) nc@.080 LF 10.60 3.93 0.04 14.57
5" (38mm) nc@.090 LF 14.90 4.43 0.05 19.38
6" (15cm) nc@.110 LF 18.20 5.41 0.06 23.67
8" (20cm) nc@.130 LF 29.10 6.39 0.07 35.56
10" (25cm) nc@.140 LF 48.60 6.88 0.08 55.56

Couplings for no hub soil pipe


Material cost only. Labor cost for installing couplings is included with the pipe, using small tools.
2" coupling --@.000 Ea 9.60 -- -- 9.60
2015 Heavy Construction Estimator, All Rights Reserved Page 529 (part 2)

3" coupling --@.000 Ea 11.40 -- -- 11.40


4" coupling --@.000 Ea 13.60 -- -- 13.60
5" coupling --@.000 Ea 33.20 -- -- 33.20
6" coupling --@.000 Ea 34.60 -- -- 34.60
8" coupling --@.000 Ea 53.50 -- -- 53.50
10" coupling --@.000 Ea 69.80 -- -- 69.80
2015 Heavy Construction Estimator, All Rights Reserved Page 530

1/8 bends for no hub soil pipe


Using small tools.
2" bend nc@.250 Ea 9.52 12.29 0.14 21.95
3" bend nc@.350 Ea 12.90 17.21 0.20 30.31
4" bend nc@.500 Ea 16.30 24.59 0.28 41.17
5" bend nc@.580 Ea 34.90 28.52 0.32 63.74
6" bend nc@.650 Ea 37.80 31.96 0.36 70.12
8" bend nc@.710 Ea 109.00 34.91 0.40 144.31
10" bend nc@.800 Ea 203.00 39.34 0.45 242.79

1/4" bends for no hub soil pipe


Using small tools.
2" bend nc@.250 Ea 11.20 12.29 0.14 23.63
3" bend nc@.350 Ea 15.50 17.21 0.20 32.91
4" bend nc@.500 Ea 22.20 24.59 0.28 47.07
5" bend nc@.580 Ea 50.10 28.52 0.32 78.94
6" bend nc@.650 Ea 56.50 31.96 0.36 88.82
8" bend nc@.710 Ea 155.00 34.91 0.40 190.31
10" bend nc@.800 Ea 228.00 39.34 0.45 267.79

1/4 sweep bends for no hub soil pipe


Using small tools.
2" bend nc@.250 Ea 24.10 12.29 0.14 36.53
3" bend nc@.350 Ea 28.70 17.21 0.20 46.11
4" bend nc@.500 Ea 45.70 24.59 0.28 70.57
5" bend nc@.580 Ea 84.10 28.52 0.32 112.94
6" bend nc@.650 Ea 103.00 31.96 0.36 135.32

Low heel outlet 1/4 bend


Using small tools.
2" bend nc@.470 Ea 24.40 23.11 0.26 47.77
3" bend nc@.650 Ea 29.70 31.96 0.36 62.02

Closet bends
Using small tools.
3" bend nc@.350 Ea 56.50 17.21 0.20 73.91
4" bend nc@.500 Ea 57.60 24.59 0.28 82.47

Closet flanges
Using small tools.
4" diameter nc@.130 Ea 32.60 6.39 0.07 39.06

P-traps for no hub soil pipe


Using small tools.
2" P-trap nc@.250 Ea 16.30 12.29 0.14 28.73
3" P-trap nc@.350 Ea 36.10 17.21 0.20 53.51
4" P-trap nc@.500 Ea 62.60 24.59 0.28 87.47
6" P-trap nc@.650 Ea 152.00 31.96 0.36 184.32

Straight wyes for no hub soil pipe


Using small tools.
2" wye nc@.380 Ea 14.60 18.68 0.21 33.49
3" wye nc@.520 Ea 20.70 25.57 0.29 46.56
4" wye nc@.700 Ea 33.50 34.42 0.39 68.31
5" wye nc@.800 Ea 77.70 39.34 0.45 117.49
2015 Heavy Construction Estimator, All Rights Reserved Page 530 (part 2)

6" wye nc@.900 Ea 89.30 44.25 0.50 134.05


8" wye nc@1.15 Ea 210.00 56.55 0.64 267.19
10" wye nc@1.50 Ea 457.00 73.76 0.84 531.60

Reducing wyes for no hub soil pipe


Using small tools.
3" x 2" wye nc@.470 Ea 15.50 23.11 0.26 38.87
4" x 3" wye nc@.650 Ea 29.10 31.96 0.36 61.42
5" x 4" wye nc@.770 Ea 85.60 37.86 0.43 123.89
6" x 2", 3", 4" wye nc@.800 Ea 53.80 39.34 0.45 93.59
8" x 2", 3", 4" wye nc@1.00 Ea 83.20 49.17 0.56 132.93
8 x 5", 6" wye nc@1.10 Ea 148.00 54.09 0.62 202.71
2015 Heavy Construction Estimator, All Rights Reserved Page 531

Upright wyes for no hub soil pipe


Using small tools.
2" wye nc@.380 Ea 21.50 18.68 0.21 40.39
3" wye nc@.520 Ea 28.60 25.57 0.29 54.46
4" wye nc@.700 Ea 89.90 34.42 0.39 124.71
5" wye nc@.840 Ea 162.00 41.30 0.47 203.77

Reducing upright wyes for no hub soil pipe


Using small tools.
3" x 2" wye nc@.470 Ea 24.20 23.11 0.26 47.57
4" x 2" wye nc@.600 Ea 32.00 29.50 0.34 61.84
4" x 3" wye nc@.650 Ea 45.40 31.96 0.36 77.72
5" x 2" wye nc@.720 Ea 147.00 35.40 0.40 182.80
5" x 3" wye nc@.770 Ea 151.00 37.86 0.43 189.29

Double wyes for no hub soil pipe


Using small tools.
2" double wye nc@.500 Ea 22.30 24.59 0.28 47.17
3" double wye nc@.700 Ea 41.00 34.42 0.39 75.81
4" double wye nc@.950 Ea 84.10 46.71 0.53 131.34
6" double wye nc@1.10 Ea 148.00 54.09 0.62 202.71
8" double wye nc@1.45 Ea 422.00 71.30 0.81 494.11
3" x 2" double wye nc@.520 Ea 56.70 25.57 0.29 82.56
4" x 2" double wye nc@.740 Ea 68.40 36.39 0.41 105.20
4" x 3" double wye nc@1.00 Ea 57.60 49.17 0.56 107.33
6" x 4" double wye nc@1.30 Ea 115.00 63.92 0.73 179.65
8" x 4" double wye nc@1.75 Ea 191.00 86.05 0.98 278.03

Straight combinations for no hub soil pipe


Using small tools.
2" straight combination nc@.380 Ea 16.30 18.68 0.21 35.19
3" straight combination nc@.520 Ea 24.90 25.57 0.29 50.76
4" straight combination nc@.700 Ea 45.40 34.42 0.39 80.21
5" straight combination nc@.800 Ea 99.80 39.34 0.45 139.59
6" straight combination nc@.900 Ea 120.00 44.25 0.50 164.75
8" straight combination nc@1.15 Ea 314.00 56.55 0.64 371.19

Reducing combinations for no hub soil pipe


Using small tools.
3" x 2" reducing combination nc@.470 Ea 17.20 23.11 0.26 40.57
4" x 2" reducing combination nc@.600 Ea 25.80 29.50 0.34 55.64
4" x 3" reducing combination nc@.650 Ea 32.90 31.96 0.36 65.22
5" x 2",
3", 4" reducing combination nc@.770 Ea 92.00 37.86 0.43 130.29
6" x 2",
3", 4" reducing combination nc@.770 Ea 80.30 37.86 0.43 118.59
6" x 5" reducing combination nc@1.00 Ea 108.00 49.17 0.56 157.73
8" x 4" reducing combination nc@1.20 Ea 164.00 59.00 0.67 223.67
8" x 5" reducing combination nc@1.50 Ea 244.00 73.76 0.84 318.60

Double combinations for no hub soil pipe


Using small tools.
2" double combination nc@.500 Ea 35.80 24.59 0.28 60.67
3" double combination nc@.700 Ea 50.10 34.42 0.39 84.91
4" double combination nc@.950 Ea 68.10 46.71 0.53 115.34
2015 Heavy Construction Estimator, All Rights Reserved Page 531 (part 2)

Reducing double combinations for no hub soil pipe


Using small tools.
3" x 2" reducing double combination nc@.600 Ea 44.50 29.50 0.34 74.34
4" x 2" reducing double combination nc@1.25 Ea 73.30 61.46 0.70 135.46
4" x 3" reducing double combination nc@1.35 Ea 76.80 66.38 0.76 143.94

Straight sanitary tees for no hub soil pipe


Using small tools.
2" tee nc@.380 Ea 15.50 18.68 0.21 34.39
3" tee nc@.520 Ea 18.90 25.57 0.29 44.76
4" tee nc@.700 Ea 29.10 34.42 0.39 63.91
5" tee nc@.800 Ea 83.20 39.34 0.45 122.99
6" tee nc@.900 Ea 85.00 44.25 0.50 129.75
8" tee nc@1.15 Ea 265.00 56.55 0.64 322.19
2015 Heavy Construction Estimator, All Rights Reserved Page 532

Reducing sanitary tees for no hub soil pipe


Using small tools.
3" x 2" nc@.470 Ea 17.20 23.11 0.26 40.57
4" x 2" nc@.600 Ea 22.30 29.50 0.34 52.14
4" x 3" nc@.650 Ea 26.80 31.96 0.36 59.12
5" x 2 nc@.720 Ea 58.20 35.40 0.40 94.00
5" x 3" nc@.770 Ea 62.60 37.86 0.43 100.89
5" x 4" nc@.770 Ea 64.30 37.86 0.43 102.59
6" x 2", 3", 4" nc@.800 Ea 64.30 39.34 0.45 104.09
8" x 3", 8" x 4" nc@1.00 Ea 182.00 49.17 0.56 231.73
8" x 6" nc@1.10 Ea 198.00 54.09 0.62 252.71

Tapped sanitary tees for no hub soil pipe


Using small tools.
2' X 1-12" tee nc@.200 Ea 17.00 9.83 0.11 26.94
2" x 2" tee nc@.250 Ea 18.90 12.29 0.14 31.33
3" x 2" tee nc@.350 Ea 24.20 17.21 0.20 41.61
4" x 2" tee nc@.430 Ea 24.20 21.14 0.24 45.58
5" x 2" tee nc@.550 Ea 48.30 27.04 0.31 75.65
6" x 2" tee nc@.700 Ea 51.20 34.42 0.39 86.01

Test tees for no hub soil pipe


Using small tools.
2" test tee nc@.370 Ea 13.80 18.19 0.21 32.20
3" test tee nc@.520 Ea 21.50 25.57 0.29 47.36
4" test tee nc@.750 Ea 36.10 36.88 0.42 73.40
5" test tee nc@.900 Ea 69.50 44.25 0.50 114.25
6" test tee nc@1.12 Ea 86.70 55.07 0.63 142.40
8" test tee nc@1.25 Ea 188.00 61.46 0.70 250.16

Crosses for no hub soil pipe


Using small tools.
2" cross nc@.500 Ea 25.90 24.59 0.28 50.77
3" cross nc@.700 Ea 40.20 34.42 0.39 75.01
4" cross nc@.950 Ea 76.00 46.71 0.53 123.24
6" cross nc@1.30 Ea 161.00 63.92 0.73 225.65
3" x 2" reducing cross nc@.600 Ea 35.80 29.50 0.34 65.64
4" x 2", 3" reducing cross nc@.900 Ea 61.70 44.25 0.50 106.45
5", 6" x 4" reducing cross nc@1.20 Ea 108.00 59.00 0.67 167.67
8" x 4" reducing cross nc@1.20 Ea 256.00 59.00 0.67 315.67

Reducers for no hub soil pipe


Using small tools.
2" reducer nc@.120 Ea 8.06 5.90 0.07 14.03
3" reducer nc@.130 Ea 7.77 6.39 0.07 14.23
4" reducer nc@.150 Ea 12.10 7.38 0.08 19.56
5" reducer nc@.180 Ea 22.30 8.85 0.10 31.25
6" reducer nc@.200 Ea 32.30 9.83 0.11 42.24
8" reducer nc@.400 Ea 49.80 19.67 0.22 69.69
10" reducer nc@.650 Ea 104.00 31.96 0.36 136.32

Caps for no hub soil pipe


Using small tools.
2" cap nc@.130 Ea 3.55 6.39 0.07 10.01
3" cap nc@.180 Ea 6.17 8.85 0.10 15.12
4" cap nc@.250 Ea 8.15 12.29 0.14 20.58
2015 Heavy Construction Estimator, All Rights Reserved Page 532 (part 2)

5" cap nc@.300 Ea 15.00 14.75 0.17 29.92


6" cap nc@.380 Ea 15.00 18.68 0.21 33.89
8" cap nc@.500 Ea 48.00 24.59 0.28 72.87
10" cap nc@.750 Ea 60.20 36.88 0.42 97.50

Acid resistant soil pipe


7' long, using small tools.
2" pipe nf@.100 LF 84.60 4.54 0.06 89.20
3" pipe nf@.140 LF 121.00 6.35 0.08 127.43
4" pipe nf@.180 LF 168.00 8.17 0.10 176.27
2015 Heavy Construction Estimator, All Rights Reserved Page 533

6" pipe nf@.240 LF 255.00 10.89 0.13 266.02

1/4 bends for acid resistant soil pipe


Using small tools.
2" 1/4 bend nf@.430 Ea 115.00 19.51 0.24 134.75
3" 1/4 bend nf@.480 Ea 173.00 21.78 0.27 195.05
4" 1/4 bend nf@.640 Ea 224.00 29.04 0.36 253.40
6" 1/4 bend nf@.800 Ea 733.00 36.30 0.45 769.75

1/8 bends for acid resistant soil pipe


Using small tools.
2" 1/8 bend nf@.430 Ea 115.00 19.51 0.24 134.75
3" 1/8 bend nf@.480 Ea 173.00 21.78 0.27 195.05
4" 1/8 bend nf@.640 Ea 224.00 29.04 0.36 253.40
6" 1/8 bend nf@.800 Ea 495.00 36.30 0.45 531.75

Short sweeps for acid resistant soil pipe


Using small tools.
2" short sweep nf@.430 Ea 198.00 19.51 0.24 217.75
3" short sweep nf@.480 Ea 426.00 21.78 0.27 448.05
4" short sweep nf@.640 Ea 467.00 29.04 0.36 496.40
6" short sweep nf@.800 Ea 963.00 36.30 0.45 999.75

Sanitary tap tees for acid resistant soil pipe


Using small tools.
2" x 1-1/2" nf@.960 Ea 141.00 43.56 0.54 185.10
3" x 1-1/2" nf@1.05 Ea 179.00 47.64 0.59 227.23
3" x 2" nf@1.05 Ea 214.00 47.64 0.59 262.23
4" x 2" nf@1.38 Ea 278.00 62.61 0.77 341.38
4" x 3" nf@1.67 Ea 320.00 75.77 0.94 396.71

Sanitary wyes for acid resistant soil pipe


Using small tools.
2" sanitary wye nf@.960 Ea 150.00 43.56 0.54 194.10
3" sanitary wye nf@1.05 Ea 253.00 47.64 0.59 301.23
4" sanitary wye nf@1.38 Ea 339.00 62.61 0.77 402.38
6" sanitary wye nf@2.35 Ea 617.00 106.60 1.32 724.92
3" x 2" sanitary we nf@1.05 Ea 192.00 47.64 0.59 240.23
4" x 2" sanitary wye nf@1.38 Ea 227.00 62.61 0.77 290.38
4" x 3" sanitary wye nf@1.38 Ea 307.00 62.61 0.77 370.38
6" x 3" sanitary wye nf@1.96 Ea 538.00 88.93 1.10 628.03
6" x 4" sanitary wye nf@1.96 Ea 562.00 88.93 1.10 652.03

Sanitary tees for acid resistant soil pipe


Using small tools.
2" sanitary tee nf@.960 Ea 211.00 43.56 0.54 255.10
3" sanitary tee nf@1.05 Ea 266.00 47.64 0.59 314.23
4" sanitary tee nf@1.38 Ea 445.00 62.61 0.77 508.38
6" sanitary tee nf@1.96 Ea 693.00 88.93 1.10 783.03

Sanitary reducing tees for acid resistant soil pipe


Using small tools.
3" x 2" nf@.960 Ea 224.00 43.56 0.54 268.10
4" x 2" nf@1.38 Ea 301.00 62.61 0.77 364.38
4" x 3" nf@1.38 Ea 362.00 62.61 0.77 425.38
6" x 3" nf@1.96 Ea 623.00 88.93 1.10 713.03
6" x 4" nf@1.96 Ea 582.00 88.93 1.10 672.03
2015 Heavy Construction Estimator, All Rights Reserved Page 533 (part 2)

Test tees for acid resistant soil pipe


Using small tools.
2" test tee nf@.960 Ea 602.00 43.56 0.54 646.10
3" test tee nf@1.05 Ea 730.00 47.64 0.59 778.23
4" test tee nf@1.38 Ea 880.00 62.61 0.77 943.38
6" test tee nf@1.96 Ea 1,410.00 88.93 1.10 1,500.03

Reducers for acid resistant soil pipe


Using small tools.
2" x 1-1/2" nf@.540 Ea 89.60 24.50 0.30 114.40
3" x 1-1/2" nf@.540 Ea 102.00 24.50 0.30 126.80
2015 Heavy Construction Estimator, All Rights Reserved Page 534

3" x 2" nf@.540 Ea 122.00 24.50 0.30 146.80


4" x 2" nf@.540 Ea 253.00 24.50 0.30 277.80
4" x 3" nf@.540 Ea 242.00 24.50 0.30 266.80
6" x 3" nf@.730 Ea 262.00 33.12 0.41 295.53
6" x 4" nf@.730 Ea 370.00 33.12 0.41 403.53

Clean out plugs for acid resistant soil pipe


Using small tools.
2" clean out plug nf@.290 Ea 128.00 13.16 0.16 141.32
3" clean out plug nf@.290 Ea 214.00 13.16 0.16 227.32
4" clean out plug nf@.290 Ea 387.00 13.16 0.16 400.32
6" clean out plug nf@.360 Ea 800.00 16.33 0.20 816.53

P-traps for acid resistant soil pipe


Using small tools.
2" P-trap nf@.430 Ea 467.00 19.51 0.24 486.75
3" P-trap nf@.540 Ea 576.00 24.50 0.30 600.80
4" P-trap nf@.720 Ea 704.00 32.67 0.40 737.07

Hub strainers for acid resistant soil pipe


Using small tools.
2" hub strainer nf@.430 Ea 166.00 19.51 0.24 185.75
3" hub strainer nf@.540 Ea 202.00 24.50 0.30 226.80
4" hub strainer nf@.720 Ea 227.00 32.67 0.40 260.07

CSI 15-063, Copper pipe

Type L copper pipe and fittings, installed horizontal


Complete installation, including twelve wrought copper tees and twelve wrought copper elbows every
100', and hangers spaced to meet plumbing code. Sweat joints with lead-free solder. Use these figures
for preliminary estimates, using small tools.
1/4" (6mm) nb@.110 LF 2.36 5.75 0.06 8.17
3/8" (9mm) nb@.110 LF 2.55 5.75 0.06 8.36
1/2" (12mm) nb@.110 LF 3.28 5.75 0.06 9.09
3/4" (18mm) nb@.120 LF 5.15 6.28 0.07 11.50
1" (25mm) nb@.140 LF 7.32 7.32 0.08 14.72
1-1/4" (32mm) nb@.160 LF 10.90 8.37 0.09 19.36
1-1/2" (38mm) nb@.180 LF 13.80 9.41 0.10 23.31
2" (50mm) nb@.210 LF 21.10 10.98 0.12 32.20
2-1/2" (65mm) nf@.240 LF 34.10 10.89 0.13 45.12
3" (75mm) nf@.270 LF 61.10 12.25 0.15 73.50
4" (10cm) nf@.310 LF 88.70 14.06 0.17 102.93
Deduct for residential work ---@--- % -- 20.00 -- --

Type L copper pipe and fittings, installed risers


Complete installation, including a wrought copper tee every floor and a riser clamp every other floor.
Make additional allowances for floor sleeving or coring as required. Use these figures for preliminary
estimates, using small tools.
1/2" (12mm) nb@.060 LF 2.22 3.14 0.03 5.39
3/4" (18mm) nb@.070 LF 3.44 3.66 0.04 7.14
1" (25mm) nb@.070 LF 5.28 3.66 0.04 8.98
1-1/4" (32mm) nb@.080 LF 7.97 4.18 0.05 12.20
1-1/2" (38mm) nb@.100 LF 10.50 5.23 0.06 15.79
2" (50mm) nb@.130 LF 18.10 6.80 0.07 24.97
2-1/2" (65mm) nb@.150 LF 29.20 7.85 0.09 37.14
3" (75mm) nb@.170 LF 42.10 8.89 0.10 51.09
4" (100mm) nb@.190 LF 69.80 9.94 0.11 79.85
2015 Heavy Construction Estimator, All Rights Reserved Page 534 (part 2)

Type L copper pipe, pipe only


No hangers or fittings included. Add the cost of fittings below. See pipe supports in CSI 15-094. Sweat
joints. Type M copper pressure tubing has the thinnest wall and is suitable for above grade interior
applications only. Type L has a thicker wall and is suitable for refrigeration and institutional potable
water (rigid specification) applications. Type K has the thickest wall and is suitable for above or below
grade, interior or exterior applications, using small tools.
1/4" (6mm) nb@.040 LF 1.50 2.09 0.02 3.61
3/8" (9mm) nb@.040 LF 1.60 2.09 0.02 3.71
1/2" (12mm) nb@.040 LF 2.09 2.09 0.02 4.20
3/4" (18mm) nb@.050 LF 3.31 2.62 0.03 5.96
1" (25mm) nb@.060 LF 4.22 3.14 0.03 7.39
1-1/4" (32mm) nb@.070 LF 6.31 3.66 0.04 10.01
2015 Heavy Construction Estimator, All Rights Reserved Page 535

1-1/2" (38mm) nb@.090 LF 7.88 4.71 0.05 12.64


2" (50mm) nb@.110 LF 12.00 5.75 0.06 17.81
2-1/2" (65mm) nf@.130 LF 17.40 5.90 0.07 23.37
3" (75mm) nf@.150 LF 32.50 6.81 0.08 39.39
4" (10cm) nf@.170 LF 41.40 7.71 0.10 49.21
Add for Type K copper pipe ---@--- % 27.00 5.00 -- --
Add for 95/5
(lead/silver) solder joints ---@--- % 5.00 5.00 -- --
Add for silver solder joints ---@--- % 7.50 5.00 -- --
Deduct for Type M copper pipe ---@--- % -17.00 -5.00 -- --

Type L annealed soft copper tubing


Using small tools.
1/4" tubing nb@.040 LF 1.60 2.09 0.02 3.71
3/8" tubing nb@.040 LF 2.34 2.09 0.02 4.45
1/2" tubing nb@.040 LF 2.69 2.09 0.02 4.80
3/4" tubing nb@.060 LF 4.56 3.14 0.03 7.73
1" tubing nb@.060 LF 6.41 3.14 0.03 9.58
1-1/2" tubing nb@.080 LF 11.30 4.18 0.05 15.53

Straight tees for copper pressure pipe


Wrought copper pressure tees with sweat joints, using small tools.
1/4" straight tee nb@.150 Ea 0.86 7.85 0.09 8.80
3/8" straight tee nb@.150 Ea 1.36 7.85 0.09 9.30
1/2" straight tee nb@.170 Ea 1.85 8.89 0.10 10.84
3/4" straight tee nb@.180 Ea 4.19 9.41 0.10 13.70
1" straight tee nb@.230 Ea 12.20 12.03 0.13 24.36
1-1/4" straight tee nb@.290 Ea 18.50 15.17 0.17 33.84
1-1/2" straight tee nb@.340 Ea 25.10 17.78 0.19 43.07
2" straight tee nb@.450 Ea 39.70 23.54 0.26 63.50
2-1/2" straight tee nf@.550 Ea 80.10 24.95 0.31 105.36
3" straight tee nf@.660 Ea 122.00 29.94 0.37 152.31
4" straight tee nf@.860 Ea 264.00 39.02 0.48 303.50

Reducing tees for copper pressure pipe


Wrought copper reducing tees with sweat joints, using small tools.
3/8" x 1/2" reducing tee nb@.150 Ea 8.13 7.85 0.09 16.07
1/2" x 3/4" reducing tee nb@.170 Ea 3.70 8.89 0.10 12.69
3/4" x 1-1/4" reducing tee nb@.230 Ea 17.90 12.03 0.13 30.06
1" x 1-1/4" reducing tee nb@.290 Ea 17.90 15.17 0.17 33.24
1-1/2" x 1-1/4" reducing tee nb@.340 Ea 19.70 17.78 0.19 37.67
1" x 2" reducing tee nb@.400 Ea 29.80 20.92 0.23 50.95
2" x 1-1/2" reducing tee nb@.420 Ea 34.50 21.97 0.24 56.71
2-1/2" reducing tee nf@.550 Ea 93.60 24.95 0.31 118.86
3" reducing tee nf@.660 Ea 101.00 29.94 0.37 131.31
4" reducing tee nf@.860 Ea 180.00 39.02 0.48 219.50

90 degree elbows for copper pressure pipe


Wrought copper elbows with sweat joints, using small tools.
3/8" ell nb@.110 Ea 0.86 5.75 0.06 6.67
1/2" ell nb@.110 Ea 1.11 5.75 0.06 6.92
3/4" ell nb@.150 Ea 2.24 7.85 0.09 10.18
1" ell nb@.190 Ea 5.20 9.94 0.11 15.25
1-1/4" ell nb@.240 Ea 7.91 12.55 0.14 20.60
1-1/2" ell nb@.280 Ea 12.30 14.64 0.16 27.10
2" ell nb@.370 Ea 22.50 19.35 0.21 42.06
2-1/2" ell nf@.460 Ea 43.10 20.87 0.26 64.23
3" ell nf@.540 Ea 59.90 24.50 0.30 84.70
2015 Heavy Construction Estimator, All Rights Reserved Page 535 (part 2)

4" ell nf@.710 Ea 138.00 32.21 0.40 170.61


2015 Heavy Construction Estimator, All Rights Reserved Page 536

45 degree elbows for copper pressure pipe


Wrought copper 45 degree elbows with sweat joints, using small tools.
3/8" ell nb@.110 Ea 1.08 5.75 0.06 6.89
1/2" ell nb@.110 Ea 1.77 5.75 0.06 7.58
3/4" ell nb@.150 Ea 3.01 7.85 0.09 10.95
1" ell nb@.190 Ea 7.59 9.94 0.11 17.64
1-1/4" ell nb@.240 Ea 10.30 12.55 0.14 22.99
1-1/2" ell nb@.280 Ea 12.40 14.64 0.16 27.20
2" ell nb@.370 Ea 20.80 19.35 0.21 40.36
2-1/2" ell nf@.460 Ea 44.40 20.87 0.26 65.53
3" ell nf@.540 Ea 65.80 24.50 0.30 90.60
4" ell nf@.710 Ea 137.00 32.21 0.40 169.61

Straight couplings for copper pressure pipe


Wrought copper pressure couplings with sweat joints, using small tools.
3/8" coupling nb@.110 Ea 0.74 5.75 0.06 6.55
1/2" coupling nb@.110 Ea 0.79 5.75 0.06 6.60
3/4" coupling nb@.150 Ea 1.50 7.85 0.09 9.44
1" coupling nb@.190 Ea 3.94 9.94 0.11 13.99
1-1/4" coupling nb@.240 Ea 5.20 12.55 0.14 17.89
1-1/2" coupling nb@.280 Ea 6.90 14.64 0.16 21.70
2" coupling nb@.370 Ea 11.50 19.35 0.21 31.06
2-1/2" coupling nf@.460 Ea 24.40 20.87 0.26 45.53
3" coupling nf@.540 Ea 38.20 24.50 0.30 63.00
4" coupling nf@.710 Ea 72.20 32.21 0.40 104.81

Reducing couplings for copper pressure tube


Wrought copper reducing couplings with sweat joints, using small tools.
3/8" reducing coupling nb@.110 Ea 1.75 5.75 0.06 7.56
1/2" reducing coupling nb@.110 Ea 2.71 5.75 0.06 8.52
3/4" reducing coupling nb@.150 Ea 4.31 7.85 0.09 12.25
1" reducing coupling nb@.190 Ea 4.44 9.94 0.11 14.49
1-1/4" reducing coupling nb@.240 Ea 7.27 12.55 0.14 19.96
1-1/2" reducing coupling nb@.280 Ea 9.61 14.64 0.16 24.41
2" reducing coupling nb@.370 Ea 17.20 19.35 0.21 36.76
2-1/2" reducing coupling nf@.420 Ea 18.00 19.06 0.24 37.30
3" reducing coupling nf@.500 Ea 45.10 22.69 0.28 68.07
4" reducing coupling nf@.710 Ea 90.20 32.21 0.40 122.81

Male adapters for copper pressure pipe


Copper to male pipe thread, using small tools.
3/8" adapter nb@.070 Ea 1.72 3.66 0.04 5.42
1/2" adapter nb@.080 Ea 2.14 4.18 0.05 6.37
3/4" adapter nb@.110 Ea 3.57 5.75 0.06 9.38
1" adapter nb@.130 Ea 8.72 6.80 0.07 15.59
1-1/4" adapter nb@.160 Ea 12.90 8.37 0.09 21.36
1-1/2" adapter nb@.190 Ea 14.80 9.94 0.11 24.85
2" adapter nb@.260 Ea 25.10 13.60 0.15 38.85
2015 Heavy Construction Estimator, All Rights Reserved Page 537

2-1/2" adapter nb@.320 Ea 76.90 16.74 0.18 93.82


3" adapter nb@.380 Ea 91.90 19.87 0.22 111.99
4" adapter nb@.500 Ea 157.00 26.15 0.29 183.44

Female adapters for copper pressure pipe


Copper to female pipe thread, using small tools.
3/8" adapter nb@.070 Ea 1.85 3.66 0.04 5.55
1/2" adapter nb@.080 Ea 3.20 4.18 0.05 7.43
3/4" adapter nb@.110 Ea 4.41 5.75 0.06 10.22
1" adapter nb@.130 Ea 8.72 6.80 0.07 15.59
1-1/4" adapter nb@.160 Ea 12.90 8.37 0.09 21.36
1-1/2" adapter nb@.190 Ea 23.20 9.94 0.11 33.25
2" adapter nb@.260 Ea 31.50 13.60 0.15 45.25
2-1/2" adapter nf@.320 Ea 87.20 14.52 0.18 101.90
3" adapter nf@.380 Ea 126.00 17.24 0.21 143.45
4" adapter nb@.500 Ea 215.00 26.15 0.29 241.44

Unions for copper pressure pipe


Straight, coupled x coupled, using small tools.
3/8" union nb@.100 Ea 6.78 5.23 0.06 12.07
1/2" union nb@.120 Ea 9.41 6.28 0.07 15.76
3/4" union nb@.170 Ea 11.80 8.89 0.10 20.79
1" union nb@.220 Ea 21.00 11.51 0.13 32.64
1-1/4" union nb@.270 Ea 36.50 14.12 0.15 50.77
1-1/2" union nb@.320 Ea 47.80 16.74 0.18 64.72
2" union nb@.420 Ea 81.60 21.97 0.24 103.81
2-1/2" union nf@.520 Ea 122.00 23.59 0.29 145.88
3" union nf@.750 Ea 185.00 34.03 0.42 219.45

Sweat caps for copper pressure pipe


Using small tools.
3/8" cap nb@.070 Ea 0.62 3.66 0.04 4.32
1/2" cap nb@.070 Ea 0.71 3.66 0.04 4.41
3/4" cap nb@.100 Ea 1.23 5.23 0.06 6.52
1" cap nb@.120 Ea 2.96 6.28 0.07 9.31
1-1/4" cap nb@.150 Ea 4.14 7.85 0.09 12.08
1-1/2" cap nb@.180 Ea 6.04 9.41 0.10 15.55
2" cap nf@.240 Ea 11.10 10.89 0.13 22.12
2-1/2" cap nf@.290 Ea 34.20 13.16 0.16 47.52
3" cap nf@.350 Ea 46.80 15.88 0.20 62.88
4" cap nf@.460 Ea 91.90 20.87 0.26 113.03

Flanges for copper pressure pipe


Using small tools.
3" flange nf@.460 Ea 151.00 20.87 0.26 172.13
4" flange nf@.600 Ea 226.00 27.22 0.34 253.56

Brass compression fittings - Unions


Using small tools.
3/8" outside diameter nb@.160 Ea 0.58 8.37 0.09 9.04
1/2" outside diameter nb@.160 Ea 0.90 8.37 0.09 9.36
5/8" outside diameter nb@.160 Ea 1.00 8.37 0.09 9.46

Brass compression fittings - Union elbow


Using small tools.
3/8" elbow nb@.160 Ea 0.95 8.37 0.09 9.41
1/2" elbow nb@.160 Ea 1.55 8.37 0.09 10.01
2015 Heavy Construction Estimator, All Rights Reserved Page 537 (part 2)

5/8" elbow nb@.160 Ea 2.30 8.37 0.09 10.76

Brass compression fittings - Union tees


Using small tools.
3/8" outside diameter nb@.160 Ea 1.30 8.37 0.09 9.76
2015 Heavy Construction Estimator, All Rights Reserved Page 538

1/2" outside diameter nb@.160 Ea 2.19 8.37 0.09 10.65


5/8" outside diameter nb@.160 Ea 3.19 8.37 0.09 11.65

Brass compression fittings - Male connectors


Using small tools.
3/8" outside diameter nb@.160 Ea 0.67 8.37 0.09 9.13
1/2" outside diameter nb@.160 Ea 0.73 8.37 0.09 9.19
5/8" outside diameter nb@.160 Ea 1.30 8.37 0.09 9.76

Brass compression fittings - Female connectors


Using small tools.
3/8" outside diameter nb@.160 Ea 0.58 8.37 0.09 9.04
1/2" outside diameter nb@.160 Ea 0.80 8.37 0.09 9.26
5/8" outside diameter nb@.160 Ea 1.07 8.37 0.09 9.53

Copper drain, waste and vent tubing (DWV), installed horizontal


Includes a hanger each 5' and a fitting each 10'. Use these figures for preliminary estimates, using small
tools.
1-1/4" (32mm) nb@.130 LF 8.08 6.80 0.07 14.95
1-1/2" (38mm) nb@.130 LF 9.58 6.80 0.07 16.45
2" (50mm) nb@.150 LF 11.80 7.85 0.09 19.74
3" (75mm) nb@.210 LF 25.10 10.98 0.12 36.20
4" (10cm) nb@.250 LF 50.00 13.08 0.14 63.22

Copper drain, waste and vent tubing (DWV), installed risers


Complete installation, including a sanitary wye every floor and a riser clamp every other floor. Make
additional allowances for floor sleeving or coring as required. Use these figures for preliminary estimates,
using small tools.
1-1/4" (32mm) nb@.110 LF 6.85 5.75 0.06 12.66
1-1/2" (38mm) nb@.110 LF 8.01 5.75 0.06 13.82
2" (50mm) nb@.120 LF 10.70 6.28 0.07 17.05
3" (75mm) nb@.170 LF 21.90 8.89 0.10 30.89
4" (10cm) nb@.190 LF 47.40 9.94 0.11 57.45

Copper drain, waste and vent tubing (DWV), pipe only


No hangers or fittings included. Add the cost of fittings. See pipe supports in CSI 15-094. Sweat joints,
using small tools.
1-1/4" (32mm) nb@.060 LF 4.14 3.14 0.03 7.31
1-1/2" (38mm) nb@.060 LF 5.17 3.14 0.03 8.34
2" (50mm) nb@.070 LF 6.90 3.66 0.04 10.60
3" (75mm) nb@.080 LF 10.80 4.18 0.05 15.03
4" (10cm) nb@.090 LF 21.60 4.71 0.05 26.36

Annealed soft copper refrigeration tubing


Dehydrated and sealed, purchased in 50' or 100' rolls, silfos brazed joints, by outside pipe diameter,
using small tools.
1/8" tubing nb@.040 LF 0.59 2.09 0.02 2.70
3/16" tubing nb@.040 LF 0.63 2.09 0.02 2.74
1/4" tubing nb@.040 LF 0.79 2.09 0.02 2.90
5/16" tubing nb@.040 LF 0.95 2.09 0.02 3.06
3/8" tubing nb@.040 LF 1.14 2.09 0.02 3.25
1/2" tubing nb@.050 LF 1.50 2.62 0.03 4.15
5/8" tubing nb@.050 LF 1.85 2.62 0.03 4.50
3/4" tubing nb@.060 LF 2.17 3.14 0.03 5.34
7/8" tubing nb@.060 LF 3.19 3.14 0.03 6.36
1-1/8" tubing nb@.070 LF 4.53 3.66 0.04 8.23
1-3/8" tubing nb@.080 LF 6.31 4.18 0.05 10.54
2015 Heavy Construction Estimator, All Rights Reserved Page 538 (part 2)

1 5/8" tubing nb@.080 LF 19.50 4.18 0.05 23.73

ACR soft copper tubing, annealed


Straight length, cleaned and ends capped, by outside pipe diameter, silfos brazed joints, using small
tools.
3/8" tubing nb@.040 LF 1.14 2.09 0.02 3.25
1/2" tubing nb@.040 LF 1.70 2.09 0.02 3.81
5/8" tubing nb@.040 LF 2.17 2.09 0.02 4.28
3/4" tubing n6@.060 LF 4.69 3.05 0.04 7.78
7/8" tubing n6@.070 LF 5.48 3.56 0.04 9.08
1 1/8" tubing n6@.070 LF 7.77 3.56 0.04 11.37
1 3/8" tubing n6@.080 LF 10.70 4.07 0.05 14.82
2015 Heavy Construction Estimator, All Rights Reserved Page 539

1 5/8" tubing n6@.090 LF 13.50 4.58 0.05 18.13


2 1/8" tubing n6@.110 LF 20.60 5.60 0.07 26.27
2 5/8" tubing n8@.270 LF 29.20 13.74 0.16 43.10
3 1/8" tubing n8@.310 LF 40.40 15.78 0.19 56.37
4 1/8" tubing n8@.400 LF 70.20 20.36 0.24 90.80

ACR wrought copper pressure tees


Silfos brazed joints, straight, by outside pipe diameter, using small tools.
5/8" tee nb@.340 Ea 1.97 17.78 0.19 19.94
3/4" tee nb@.340 Ea 12.90 17.78 0.19 30.87
7/8" tee nb@.340 Ea 4.97 17.78 0.19 22.94
1 1/8" tee nb@.460 Ea 14.30 24.06 0.26 38.62
1 3/8" tee nb@.550 Ea 22.90 28.77 0.31 51.98
1 5/8" tee nb@.660 Ea 31.80 34.52 0.38 66.70
2 1/8" tee nb@.880 Ea 49.50 46.02 0.50 96.02
2 5/8" tee nb@1.91 Ea 99.50 99.89 1.09 200.48
3 1/8" tee nb@2.11 Ea 153.00 110.40 1.20 264.60
4 1/8" tee nb@2.34 Ea 328.00 122.40 1.33 451.73

ACR wrought copper pressure 90 degree elbows


Silfos brazed joints, by outside pipe diameter, using small tools.
5/8" elbow nb@.170 Ea 6.62 8.89 0.10 15.61
3/4" elbow nb@.220 Ea 7.14 11.51 0.13 18.78
7/8" elbow nb@.230 Ea 8.99 12.03 0.13 21.15
1-1/8" elbow nb@.280 Ea 12.90 14.64 0.16 27.70
1-3/8" elbow nb@.390 Ea 20.70 20.40 0.22 41.32
1-5/8" elbow nb@.460 Ea 26.00 24.06 0.26 50.32
2-1/8" elbow nb@.550 Ea 46.00 28.77 0.31 75.08
2-5/8" elbow nb@.840 Ea 103.00 43.93 0.48 147.41
3-1/8" elbow nb@1.11 Ea 145.00 58.05 0.63 203.68
4-1/8" elbow nb@1.32 Ea 369.00 69.04 0.75 438.79

ACR wrought copper pressure couplings


Silfos brazed joints, by outside pipe diameter, using small tools.
5/8" coupling nb@.170 Ea 1.10 8.89 0.10 10.09
3/4" coupling nb@.220 Ea 2.96 11.51 0.13 14.60
7/8" coupling nb@.230 Ea 1.97 12.03 0.13 14.13
1-1/8" coupling nb@.280 Ea 4.02 14.64 0.16 18.82
1-3/8" coupling nb@.390 Ea 7.06 20.40 0.22 27.68
1-5/8" coupling nb@.460 Ea 9.38 24.06 0.26 33.70
2-1/8" coupling nb@.550 Ea 14.00 28.77 0.31 43.08
2-5/8" coupling nb@.840 Ea 25.00 43.93 0.48 69.41
3-1/8" coupling nb@1.11 Ea 46.00 58.05 0.63 104.68
4-1/8" coupling nb@1.32 Ea 89.30 69.04 0.75 159.09

Brass flare fittings - Unions


Using small tools.
3/8" outside diameter nb@.160 Ea 0.20 8.37 0.09 8.66
1/2" outside diameter nb@.160 Ea 0.34 8.37 0.09 8.80
5/8" outside diameter nb@.160 Ea 0.56 8.37 0.09 9.02

Brass flare fittings - 90 degree elbow unions


Using small tools.
3/8" elbow union nb@.160 Ea 0.46 8.37 0.09 8.92
1/2" elbow union nb@.160 Ea 0.70 8.37 0.09 9.16
5/8" elbow union nb@.160 Ea 1.36 8.37 0.09 9.82

Brass flare fittings - Three way tees


2015 Heavy Construction Estimator, All Rights Reserved Page 539 (part 2)

Using small tools.


3/8"outside diameter nb@.270 Ea 0.64 14.12 0.15 14.91
1/2"outside diameter nb@.270 Ea 0.90 14.12 0.15 15.17
5/8"outside diameter nb@.270 Ea 1.38 14.12 0.15 15.65

Brass flare fittings - Crosses


Using small tools.
3/8" outside diameter nb@.360 Ea 0.96 18.83 0.21 20.00
2015 Heavy Construction Estimator, All Rights Reserved Page 540

1/2" outside diameter nb@.360 Ea 1.50 18.83 0.21 20.54


5/8" outside diameter nb@.360 Ea 1.80 18.83 0.21 20.84

Brass flare fittings - Male connectors, half union


Using small tools.
3/8"outside diameter nb@.160 Ea 0.24 8.37 0.09 8.70
1/2"outside diameter nb@.160 Ea 0.36 8.37 0.09 8.82
5/8"outside diameter nb@.160 Ea 0.56 8.37 0.09 9.02

Brass flare fittings - Female connectors, half union


Using small tools.
3/8"outside diameter nb@.160 Ea 0.28 8.37 0.09 8.74
1/2"outside diameter nb@.160 Ea 0.54 8.37 0.09 9.00
5/8"outside diameter nb@.160 Ea 0.54 8.37 0.09 9.00

Brass flare fittings - Long forged nuts


Using small tools.
3/8" outside diameter nb@.160 Ea 0.54 8.37 0.09 9.00
1/2" outside diameter nb@.160 Ea 0.68 8.37 0.09 9.14
5/8" outside diameter nb@.160 Ea 1.04 8.37 0.09 9.50

Brass flare fittings - Short forged nuts


Using small tools.
3/8" outside diameter nb@.160 Ea 0.14 8.37 0.09 8.60
1/2" outside diameter nb@.160 Ea 0.22 8.37 0.09 8.68
5/8" outside diameter nb@.160 Ea 0.34 8.37 0.09 8.80

CSI 15-064, Plastic pipe

Fiberglass reinforced pipe, general service


Using small tools.
2" (50mm) nf@.110 LF 10.20 4.99 0.06 15.25
3" (75mm) nf@.130 LF 14.10 5.90 0.07 20.07
4" (10cm) nf@.100 LF 17.40 4.54 0.06 22.00
6" (15cm) nf@.140 LF 27.10 6.35 0.08 33.53
8" (20cm) nk@.300 LF 45.00 13.53 0.18 58.71
10" (25cm) nk@.360 LF 67.40 16.23 0.22 83.85
12" (31cm) nk@.450 LF 86.80 20.29 0.27 107.36

Fiberglass reinforced pipe fittings, general strength - 90 degree ells, flanged


Using small tools.
2" pipe nf@1.08 Ea 58.00 49.00 0.60 107.60
3" pipe nf@1.29 Ea 72.90 58.53 0.72 132.15
4" pipe nf@1.07 Ea 179.00 48.55 0.60 228.15
6" pipe nk@2.00 Ea 292.00 90.18 1.22 383.40
8" pipe nk@2.50 Ea 414.00 112.70 1.53 528.23
10" pipe nk@3.01 Ea 480.00 135.70 1.84 617.54
12" pipe nk@3.73 Ea 659.00 168.20 2.28 829.48

Fiberglass reinforced pipe fittings, general strength - 45 degree ells, flanged


Using small tools.
2" ell nf@1.08 Ea 58.00 49.00 0.60 107.60
3" ell nf@1.29 Ea 72.90 58.53 0.72 132.15
4" ell nf@1.07 Ea 179.00 48.55 0.60 228.15
6" ell nk@2.00 Ea 292.00 90.18 1.22 383.40
8" ell nk@2.50 Ea 414.00 112.70 1.53 528.23
10" ell nk@3.01 Ea 480.00 135.70 1.84 617.54
2015 Heavy Construction Estimator, All Rights Reserved Page 540 (part 2)

12" ell nk@3.73 Ea 659.00 168.20 2.28 829.48

Fiberglass reinforced pipe fittings, general strength - Tees, flanged


Using small tools.
2" tee nf@1.61 Ea 113.00 73.05 0.90 186.95
3" tee nf@1.28 Ea 132.00 58.07 0.72 190.79
4" tee nf@1.61 Ea 160.00 73.05 0.90 233.95
6" tee nk@3.01 Ea 348.00 135.70 1.84 485.54
8" tee nk@3.73 Ea 452.00 168.20 2.28 622.48
10" tee nk@4.52 Ea 772.00 203.80 2.76 978.56
12" tee nk@5.49 Ea 941.00 247.50 3.35 1,191.85

Fiberglass reinforced pipe fittings, general strength - Wyes, flanged


Using small tools.
2" wye nf@1.61 Ea 179.00 73.05 0.90 252.95
2015 Heavy Construction Estimator, All Rights Reserved Page 541

3" wye nf@1.29 Ea 245.00 58.53 0.72 304.25


4" wye nf@1.61 Ea 320.00 73.05 0.90 393.95
6" wye nk@3.01 Ea 423.00 135.70 1.84 560.54
8" wye nk@3.73 Ea 659.00 168.20 2.28 829.48
10" wye nk@4.52 Ea 941.00 203.80 2.76 1,147.56
12" wye nk@5.49 Ea 1,460.00 247.50 3.35 1,710.85

Fiberglass reinforced pipe fittings, general strength - Concentric reducers, flanged


Using small tools.
2" reducer nf@1.08 Ea 62.00 49.00 0.60 111.60
3" reducer nf@1.29 Ea 85.50 58.53 0.72 144.75
4" reducer nf@1.07 Ea 89.60 48.55 0.60 138.75
6" reducer nk@2.00 Ea 117.00 90.18 1.22 208.40
8" reducer nk@2.50 Ea 164.00 112.70 1.53 278.23
10" reducer nk@3.01 Ea 218.00 135.70 1.84 355.54
12" reducer nk@3.73 Ea 316.00 168.20 2.28 486.48

Fiberglass reinforced pipe fittings, general strength - Adapters, bell x male or female
Using small tools.
2" adapter nf@1.08 Ea 39.90 49.00 0.60 89.50
3" adapter nf@1.29 Ea 43.20 58.53 0.72 102.45
4" adapter nf@1.07 Ea 47.30 48.55 0.60 96.45
6" adapter nk@2.00 Ea 76.90 90.18 1.22 168.30
8" adapter nk@2.50 Ea 52.10 112.70 1.53 166.33
10" adapter nk@3.01 Ea 74.80 135.70 1.84 212.34
12" adapter nk@3.73 Ea 163.00 168.20 2.28 333.48

Fiberglass reinforced pipe fittings, general strength - Nipples


Using small tools.
2" x 6" nf@.130 Ea 7.15 5.90 0.07 13.12
2" x 12" nf@.260 Ea 10.80 11.80 0.15 22.75
3" x 8" nf@.200 Ea 10.80 9.07 0.11 19.98
3" x 12" nk@.360 Ea 10.80 16.23 0.22 27.25
4" x 8" nk@.200 Ea 10.80 9.02 0.12 19.94
4" x 12" nk@.260 Ea 11.80 11.72 0.16 23.68
6" x 12" nk@.360 Ea 27.30 16.23 0.22 43.75
8" x 18" nk@.200 Ea 75.30 9.02 0.12 84.44
8" x 24" nk@.600 Ea 90.30 27.05 0.37 117.72
10" x 18" nk@.430 Ea 90.30 19.39 0.26 109.95
10" x 24" nk@.640 Ea 122.00 28.86 0.39 151.25
12" x 18" nk@.440 Ea 122.00 19.84 0.27 142.11
12" x 24" nk@.660 Ea 141.00 29.76 0.40 171.16

Fiberglass pipe fittings - Sleeve couplings


Using small tools.
2" coupling nf@1.08 Ea 17.90 49.00 0.60 67.50
3" coupling nf@1.29 Ea 32.90 58.53 0.72 92.15
4" coupling nf@1.07 Ea 37.60 48.55 0.60 86.75
6" coupling nk@2.00 Ea 65.90 90.18 1.22 157.30
8" coupling nk@2.50 Ea 122.00 112.70 1.53 236.23
10" coupling nk@3.01 Ea 188.00 135.70 1.84 325.54
12" coupling nk@3.73 Ea 235.00 168.20 2.28 405.48

Fiberglass pipe fittings - Flanges for fiberglass pipe


Using small tools.
2" flange nf@1.08 Ea 22.80 49.00 0.60 72.40
3" flange nf@1.29 Ea 27.90 58.53 0.72 87.15
4" flange nk@1.50 Ea 37.80 67.64 0.92 106.36
2015 Heavy Construction Estimator, All Rights Reserved Page 541 (part 2)

6" flange nk@2.00 Ea 63.00 90.18 1.22 154.40


8" flange nk@2.39 Ea 113.00 107.80 1.46 222.26
10" flange nk@3.01 Ea 169.00 135.70 1.84 306.54
12" flange nk@3.73 Ea 216.00 168.20 2.28 386.48
2015 Heavy Construction Estimator, All Rights Reserved Page 542

ABS or PVC drain, waste and vent (DWV) pipe and fittings, installed horizontal
Solvent weld. Based on one fitting every 7' and one hanger every 5'. Use these figures for preliminary
estimates, using small tools.
1-1/2" (38mm) nb@.200 LF 1.28 10.46 0.11 11.85
2" (50mm) nb@.220 LF 1.98 11.51 0.13 13.62
3" (80mm) nb@.270 LF 3.52 14.12 0.15 17.79
4" (10cm) nb@.310 LF 5.98 16.21 0.18 22.37
6" (15cm) nb@.370 LF 15.00 19.35 0.21 34.56

ABS or PVC drain, waste and vent pipe, pipe only


Solvent weld. Not including fittings and hangers. See pipe supports in CSI 15-094, using small tools.
1-1/2" (38mm) nb@.060 LF 0.98 3.14 0.03 4.15
2" (50mm) nb@.070 LF 1.56 3.66 0.04 5.26
3" (75mm) nb@.030 LF 2.67 1.57 0.02 4.26
4" (10cm) nb@.040 LF 4.39 2.09 0.02 6.50
6" (15cm) nb@.060 LF 8.07 3.14 0.03 11.24
8" (20cm) nb@.070 LF 10.60 3.66 0.04 14.30
10" (25cm) pipe nb@.090 LF 15.00 4.71 0.05 19.76

ABS or PVC DWV 1/4 bends


Solvent weld 90 degree elbows, using small tools.
1-1/2" bend nf@.120 Ea 1.62 5.44 0.07 7.13
2" bend nf@.130 Ea 2.06 5.90 0.07 8.03
3" bend nf@.180 Ea 6.39 8.17 0.10 14.66
4" bend nk@.250 Ea 13.60 11.27 0.15 25.02
6" bend nk@.330 Ea 82.60 14.88 0.20 97.68
8" bend nk@.440 Ea 157.00 19.84 0.27 177.11
10" bend nk@.500 Ea 187.00 22.55 0.31 209.86

ABS or PVC DWV 1/8 bends


Solvent weld 45 degree elbow, using small tools.
1-1/2" bend nf@.120 Ea 2.01 5.44 0.07 7.52
2" bend nf@.130 Ea 2.03 5.90 0.07 8.00
3" bend nf@.180 Ea 5.82 8.17 0.10 14.09
4" bend nk@.250 Ea 10.80 11.27 0.15 22.22
6" bend nk@.330 Ea 75.60 14.88 0.20 90.68
8" bend nk@.440 Ea 125.00 19.84 0.27 145.11
10" bend nk@.500 Ea 139.00 22.55 0.31 161.86
12" bend nk@.550 Ea 159.00 24.80 0.34 184.14

ABS or PVC DWV sanitary TY tees


Solvent weld, using small tools.
1-1/2" tee nf@.150 Ea 2.91 6.81 0.08 9.80
2" tee nf@.190 Ea 4.16 8.62 0.11 12.89
3" tee nf@.260 Ea 11.00 11.80 0.15 22.95
4" tee nk@.350 Ea 21.10 15.78 0.21 37.09
6" tee nk@.450 Ea 122.00 20.29 0.27 142.56

ABS or PVC DWV sanitary reducing TY tees


Solvent weld, using small tools.
2" x 1-1/2" x 1-1/2" nf@.160 Ea 5.24 7.26 0.09 12.59
2" x 1-1/2" x 2" nf@.160 Ea 7.24 7.26 0.09 14.59
2" x 2" x 1-1/2" nf@.160 Ea 4.16 7.26 0.09 11.51
3" x 3" x 1-1/2" nf@.210 Ea 8.47 9.53 0.12 18.12
3" x 3" x 2" nf@.280 Ea 8.05 12.70 0.16 20.91
4" x 4" x 1-1/2" nk@.300 Ea 11.40 13.53 0.18 25.11
2015 Heavy Construction Estimator, All Rights Reserved Page 542 (part 2)

4" x 4" x 2" nk@.300 Ea 28.60 13.53 0.18 42.31


4" x 4" x 3" nk@.330 Ea 38.80 14.88 0.20 53.88
6" x 6" x 4" nk@.400 Ea 118.00 18.04 0.24 136.28
2015 Heavy Construction Estimator, All Rights Reserved Page 543

ABS or PVC DWV wyes


Solvent weld, using small tools.
1-1/2" wye nf@.150 Ea 5.80 6.81 0.08 12.69
2" wye nf@.190 Ea 5.82 8.62 0.11 14.55
3" wye nf@.260 Ea 13.20 11.80 0.15 25.15
4" wye nk@.350 Ea 24.60 15.78 0.21 40.59
6" wye nk@.450 Ea 123.00 20.29 0.27 143.56

ABS or PVC DWV reducers


Solvent weld, using small tools.
2" x 1-1/2" nf@.130 Ea 3.25 5.90 0.07 9.22
3" x 1-1/2" nf@.150 Ea 10.40 6.81 0.08 17.29
3" x 2" nf@.150 Ea 8.66 6.81 0.08 15.55
4" x 2" nk@.190 Ea 17.20 8.57 0.12 25.89
4" x 3" nk@.210 Ea 17.90 9.47 0.13 27.50
6" x 4" nk@.300 Ea 72.80 13.53 0.18 86.51

ABS or PVC DWV P-traps


Solvent weld, using small tools.
1-1/2" P-trap nf@.150 Ea 6.19 6.81 0.08 13.08
2" P-trap nf@.190 Ea 10.00 8.62 0.11 18.73
3" P-trap nf@.260 Ea 45.90 11.80 0.15 57.85
4" P-trap nk@.350 Ea 93.90 15.78 0.21 109.89
6" P-trap nk@.430 Ea 162.00 19.39 0.26 181.65

ABS or PVC DWV closet flanges


Solvent weld, using small tools.
4" flange nf@.130 Ea 8.64 5.90 0.07 14.61

ABS or PVC DWV double sanitary tees


Solvent weld, using small tools.
1-1/2" tee nf@.210 Ea 8.37 9.53 0.12 18.02
2" tee nf@.250 Ea 12.50 11.34 0.14 23.98
3" tee nf@.350 Ea 35.00 15.88 0.20 51.08
4" tee nf@.470 Ea 56.30 21.32 0.26 77.88

ABS or PVC DWV long sweep 1/4 bends


Solvent weld 90 degree elbow, using small tools.
1-1/2" bend nf@.120 Ea 6.17 5.44 0.07 11.68
2" bend nf@.130 Ea 4.67 5.90 0.07 10.64
3" bend nf@.180 Ea 13.10 8.17 0.10 21.37
4" bend nf@.250 Ea 25.90 11.34 0.14 37.38
6" bend nf@.330 Ea 58.70 14.97 0.18 73.85
8" bend nf@.440 Ea 110.00 19.96 0.25 130.21
10" bend nf@.500 Ea 186.00 22.69 0.28 208.97
12" bend nf@.600 Ea 269.00 27.22 0.34 296.56

ABS or PVC DWV standard wyes


Solvent weld, using small tools.
1-1/2" wye nf@.150 Ea 5.80 6.81 0.08 12.69
2" wye nf@.190 Ea 5.82 8.62 0.11 14.55
3" wye nf@.260 Ea 13.20 11.80 0.15 25.15
4" wye nf@.350 Ea 24.60 15.88 0.20 40.68
6" wye nk@.450 Ea 109.00 20.29 0.27 129.56
8" wye nk@.580 Ea 97.90 26.15 0.35 124.40
10" wye nk@.710 Ea 139.00 32.01 0.43 171.44
2015 Heavy Construction Estimator, All Rights Reserved Page 543 (part 2)

12" wye nk@.100 Ea 198.00 4.51 0.06 202.57


15" wye nf@1.11 Ea 587.00 50.36 0.62 637.98

ABS or PVC DWV reducing wyes


Solvent weld, using small tools.
2" x 1-1/2" x 1-1/2" nf@.160 Ea 10.40 7.26 0.09 17.75
2015 Heavy Construction Estimator, All Rights Reserved Page 544

2" x 2" x 1" nf@.490 Ea 10.30 22.23 0.27 32.80


3" x 3" x 2" nf@.650 Ea 10.20 29.49 0.36 40.05
4" x 4" x 2" nf@.300 Ea 19.70 13.61 0.17 33.48
4" x 4" x 3" nf@.320 Ea 23.10 14.52 0.18 37.80

ABS or PVC DWV double wyes


Solvent weld, using small tools.
1-1/2" wye nf@.210 Ea 12.40 9.53 0.12 22.05
2" wye nf@.250 Ea 15.90 11.34 0.14 27.38
3" wye nf@.350 Ea 41.00 15.88 0.20 57.08
4" wye nf@.470 Ea 83.20 21.32 0.26 104.78
2" x 2" x 1-1/2" x 1-1/2 nf@.250 Ea 14.50 11.34 0.14 25.98
3" x 3" x 2" x 2" nf@.290 Ea 30.50 13.16 0.16 43.82
4" x 4" x 3" x 3" nf@.340 Ea 65.90 15.43 0.19 81.52

ABS or PVC DWV combination wye and 1/8 bend


Solvent weld, using small tools.
1-1/2" bend nf@.160 Ea 9.42 7.26 0.09 16.77
2" wye and bend nf@.490 Ea 11.50 22.23 0.27 34.00
3" wye and bend nf@.650 Ea 30.20 29.49 0.36 60.05
4" wye and bend nf@.300 Ea 62.60 13.61 0.17 76.38
2" x 2" x 1-1/2" nf@.250 Ea 23.80 11.34 0.14 35.28
3" x 3" x 1-1/2" nf@.290 Ea 9.03 13.16 0.16 22.35
3" x 3" x 2" nf@.340 Ea 17.80 15.43 0.19 33.42
4" x 4" x 2" nf@.380 Ea 12.60 17.24 0.21 30.05
4" x 4" x 3" nf@.380 Ea 42.20 17.24 0.21 59.65

ABS or PVC DWV double combination wye and 1/8 bend


Solvent weld, using small tools.
1-1/2" nf@.210 Ea 15.20 9.53 0.12 24.85
2" combination nf@.250 Ea 16.20 11.34 0.14 27.68
3" combination nf@.350 Ea 28.10 15.88 0.20 44.18
4" combination nf@.470 Ea 148.00 21.32 0.26 169.58

ABS or PVC DWV double combination wye and 1/8 bend


Solvent weld, using small tools.
6" combination nk@.560 Ea 53.80 25.25 0.34 79.39
8" combination nk@.660 Ea 97.90 29.76 0.40 128.06
10" combination nk@.750 Ea 137.00 33.82 0.46 171.28
12" combination nk@.820 Ea 198.00 36.97 0.50 235.47

ABS or PVC DWV clean out tees with plug


Solvent weld, using small tools.
1-1/2" tee w4@.120 Ea 10.60 3.43 0.08 14.11
2" tee w4@.130 Ea 13.40 3.71 0.09 17.20
3" tee w4@.180 Ea 23.00 5.14 0.12 28.26
4" tee w4@.250 Ea 42.90 7.14 0.17 50.21

Gasketed PVC drain and sewer pipe


Bell and spigot, using small tools.
4" pipe nf@.050 LF 1.56 2.27 0.03 3.86
6" pipe nf@.070 LF 3.44 3.18 0.04 6.66
8" pipe nf@.090 LF 6.14 4.08 0.05 10.27

90 degree elbows for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4" ell nf@.320 Ea 3.19 14.52 0.18 17.89
2015 Heavy Construction Estimator, All Rights Reserved Page 544 (part 2)

6" ell nf@.400 Ea 5.91 18.15 0.22 24.28


8" ell nf@.480 Ea 15.90 21.78 0.27 37.95
2015 Heavy Construction Estimator, All Rights Reserved Page 545

45 degree elbows for bell and spigot gasketed PVC drain and sewer pipe
Using small tools.
4" ell nf@.320 Ea 2.18 14.52 0.18 16.88
6" ell nf@.400 Ea 4.34 18.15 0.22 22.71
8" ell nf@.480 Ea 12.10 21.78 0.27 34.15

22-1/2 degree elbows for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4" ell nf@.320 Ea 2.30 14.52 0.18 17.00
6" ell nf@.400 Ea 4.51 18.15 0.22 22.88

Tees and wyes for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4" tee nf@.470 Ea 1.05 21.32 0.26 22.63
6" tee nf@.560 Ea 2.32 25.41 0.31 28.04
8" tee nf@.610 Ea 4.07 27.68 0.34 32.09
4" sanitary tee nf@.650 Ea 2.04 29.49 0.36 31.89
6" sanitary tee nf@.800 Ea 3.95 36.30 0.45 40.70
4" wye nf@.480 Ea 4.16 21.78 0.27 26.21
6" wye nf@.600 Ea 9.56 27.22 0.34 37.12
8" wye nf@.720 Ea 26.20 32.67 0.40 59.27
6" x 6" x 4" wye nf@1.05 Ea 8.44 47.64 0.59 56.67

Couplings and reducers for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4" coupling nf@.320 Ea 2.97 14.52 0.18 17.67
6" coupling nf@.400 Ea 5.97 18.15 0.22 24.34
8" coupling nf@.480 Ea 10.10 21.78 0.27 32.15
4" x 3" reducer nf@.260 Ea 3.50 11.80 0.15 15.45
6" x 4" reducer nf@.360 Ea 4.34 16.33 0.20 20.87
8" x 6" reducer nf@.440 Ea 13.30 19.96 0.25 33.51
10" x 4" reducer nf@.560 Ea 29.20 25.41 0.31 54.92
10" x 6" reducer nf@.600 Ea 30.50 27.22 0.34 58.06
10" x 8" reducer nf@.640 Ea 36.20 29.04 0.36 65.60

Adapters for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4" male, polypropylene x mip nf@.400 Ea 29.00 18.15 0.22 47.37
2" x 3" x 3" downspout nf@.800 Ea 2.40 36.30 0.45 39.15
2" x 3" x 4" downspout nf@.800 Ea 3.44 36.30 0.45 40.19
3" x 4" x 4" downspout nf@.800 Ea 6.16 36.30 0.45 42.91
4" hub, cast iron x polypropylene nf@1.05 Ea 5.19 47.64 0.59 53.42
4"spigot, clay x polypropylene nf@1.05 Ea 3.74 47.64 0.59 51.97
4" hub, cast iron x polypropylene nf@1.67 Ea 5.53 75.77 0.94 82.24
4"spigot, clay x polypropylene nf@1.67 Ea 7.06 75.77 0.94 83.77
4"spigot, fiber x polypropylene nf@1.67 Ea 1.35 75.77 0.94 78.06

Miscellaneous fittings for gasketed bell and spigot PVC drain and sewer pipe
Using small tools.
4"cap nf@.160 Ea 1.54 7.26 0.09 8.89
6"cap nf@.200 Ea 2.91 9.07 0.11 12.09
8"cap nf@.240 Ea 7.89 10.89 0.13 18.91
4" plug nf@.160 Ea 1.17 7.26 0.09 8.52
6" x 4" reducing bushing nf@.360 Ea 4.34 16.33 0.20 20.87
4" drain grate nf@.540 Ea 2.70 24.50 0.30 27.50
3" FlP x polypropylene cleanout nf@.430 Ea 16.10 19.51 0.24 35.85
2015 Heavy Construction Estimator, All Rights Reserved Page 545 (part 2)

4" FlP x polypropylene cleanout nf@.640 Ea 27.90 29.04 0.36 57.30


6" FlP x polypropylene cleanout nf@.850 Ea 48.20 38.56 0.48 87.24
8" FlP x polypropylene cleanout nf@1.05 Ea 50.70 47.64 0.59 98.93

PVC pressure pipe, socket weld, Schedule 40, installed horizontal


Installed PVC pressure pipe including a hanger every 5' and elbow and tee every 20'. Use these figures
for preliminary estimates, using small tools.
1/2" pipe ne@.062 LF 3.39 3.24 0.04 6.67
3/4" pipe ne@.073 LF 3.48 3.82 0.04 7.34
2015 Heavy Construction Estimator, All Rights Reserved Page 546

1" pipe ne@.084 LF 4.55 4.39 0.05 8.99


1-1/4" pipe ne@.099 LF 4.78 5.18 0.06 10.02
1-1/2" pipe ne@.102 LF 5.50 5.34 0.06 10.90
2" pipe ne@.114 LF 5.91 5.96 0.06 11.93
2-1/2" pipe ne@.130 LF 8.00 6.80 0.07 14.87
3" pipe ne@.146 LF 8.77 7.64 0.08 16.49
4" pipe ne@.173 LF 12.30 9.05 0.10 21.45
6" pipe ne@.250 LF 23.30 13.08 0.14 36.52
8" pipe ne@.303 LF 34.80 15.85 0.17 50.82

PVC pressure pipe, socket weld, Schedule 40, pipe only


Add the cost of fittings below. Add the cost of hangers and supports from CSI 15-094, using small tools.
1/2" pipe nf@.020 LF 0.24 0.91 0.01 1.16
3/4" pipe nf@.030 LF 0.32 1.36 0.02 1.70
1" pipe nf@.030 LF 0.47 1.36 0.02 1.85
1-1/4" pipe nf@.040 LF 0.62 1.82 0.02 2.46
1-1/2" pipe nf@.040 LF 0.73 1.82 0.02 2.57
2" pipe nf@.050 LF 1.04 2.27 0.03 3.34
2-1/2" pipe nf@.050 LF 1.64 2.27 0.03 3.94
3" pipe nf@.060 LF 2.13 2.72 0.03 4.88
4" pipe nf@.070 LF 3.05 3.18 0.04 6.27
6" pipe nf@.120 LF 5.34 5.44 0.07 10.85
8" pipe nf@.160 LF 8.09 7.26 0.09 15.44

90 degree elbows for Schedule 40 socket weld PVC pressure pipe,


Using small tools.
1/2" ell nf@.100 Ea 0.38 4.54 0.06 4.98
3/4" ell nf@.120 Ea 0.56 5.44 0.07 6.07
1" ell nf@.120 Ea 1.02 5.44 0.07 6.53
1-1/4" ell nf@.160 Ea 1.81 7.26 0.09 9.16
1-1/2" ell nf@.180 Ea 1.92 8.17 0.10 10.19
2" ell nf@.200 Ea 3.03 9.07 0.11 12.21
2-1/2" ell nf@.250 Ea 9.20 11.34 0.14 20.68
3" ell nf@.300 Ea 11.00 13.61 0.17 24.78
4" ell nf@.500 Ea 19.80 22.69 0.28 42.77
6" ell nf@.550 Ea 62.70 24.95 0.31 87.96
8" ell nf@.650 Ea 74.30 29.49 0.36 104.15

45 degree elbows for Schedule 40 socket weld PVC pressure pipe


Using small tools.
1/2" ell nf@.100 Ea 0.83 4.54 0.06 5.43
3/4" ell nf@.120 Ea 1.28 5.44 0.07 6.79
1" ell nf@.120 Ea 1.54 5.44 0.07 7.05
1-1/4" ell nf@.160 Ea 2.18 7.26 0.09 9.53
1-1/2" ell nf@.180 Ea 2.71 8.17 0.10 10.98
2" ell nf@.200 Ea 3.54 9.07 0.11 12.72
2-1/2" ell nf@.250 Ea 9.20 11.34 0.14 20.68
3" ell nf@.300 Ea 14.30 13.61 0.17 28.08
4" ell nf@.500 Ea 25.60 22.69 0.28 48.57
6" ell nf@.600 Ea 63.40 27.22 0.34 90.96
8" ell nf@.800 Ea 70.20 36.30 0.45 106.95

Tees for Schedule 40 socket weld PVC pressure pipe


Using small tools.
1/2" tee nf@.130 Ea 0.62 5.90 0.07 6.59
3/4" tee nf@.140 Ea 0.72 6.35 0.08 7.15
1" tee nf@.170 Ea 1.36 7.71 0.10 9.17
1-1/4" tee nf@.220 Ea 2.13 9.98 0.12 12.23
2015 Heavy Construction Estimator, All Rights Reserved Page 546 (part 2)

1-1/2" tee nf@.250 Ea 2.58 11.34 0.14 14.06


2" tee nf@.280 Ea 3.73 12.70 0.16 16.59
2-1/2" tee nf@.350 Ea 12.30 15.88 0.20 28.38
2015 Heavy Construction Estimator, All Rights Reserved Page 547

3" tee nf@.420 Ea 16.10 19.06 0.24 35.40


4" tee nf@.560 Ea 29.20 25.41 0.31 54.92
6" tee nf@.840 Ea 98.40 38.11 0.47 136.98
8" tee nf@1.00 Ea 142.00 45.37 0.56 187.93

Reducing bushings for Schedule 40 PVC pressure pipe


Socket weld x socket weld, using small tools.
3/4" insert nf@.050 Ea 0.53 2.27 0.03 2.83
1" insert nf@.060 Ea 0.98 2.72 0.03 3.73
1-1/4" insert nf@.080 Ea 1.28 3.63 0.04 4.95
1-1/2" insert nf@.100 Ea 1.36 4.54 0.06 5.96
2" insert nf@.110 Ea 2.24 4.99 0.06 7.29
2-1/2" insert nf@.130 Ea 3.61 5.90 0.07 9.58
3" insert nf@.150 Ea 5.36 6.81 0.08 12.25
4" insert nf@.200 Ea 12.00 9.07 0.11 21.18
6" insert nf@.300 Ea 29.50 13.61 0.17 43.28
8" insert nf@.400 Ea 41.40 18.15 0.22 59.77

PVC reducing inserts, weld and thread, for Schedule 40 PVC pipe
Male or female thread, using small tools.
1/2" insert nf@.080 Ea 0.47 3.63 0.04 4.14
3/4" insert nf@.090 Ea 0.62 4.08 0.05 4.75
1" insert nf@.100 Ea 0.73 4.54 0.06 5.33
1-1/4" insert nf@.150 Ea 1.19 6.81 0.08 8.08
1-1/2" insert nf@.170 Ea 1.36 7.71 0.10 9.17
2" inserts nf@.180 Ea 1.88 8.17 0.10 10.15
2-1/2" insert nf@.200 Ea 4.89 9.07 0.11 14.07
3" insert nf@.450 Ea 6.68 20.42 0.25 27.35
4" insert nf@.630 Ea 11.10 28.58 0.35 40.03

PVC male adapters for Schedule 40 PVC pipe


Socket weld and male thread, using small tools.
1/2" adapter nf@.050 Ea 0.45 2.27 0.03 2.75
3/4" adapter nf@.060 Ea 0.51 2.72 0.03 3.26
1" adapter nf@.070 Ea 0.90 3.18 0.04 4.12
1-1/4" adapter nf@.100 Ea 1.09 4.54 0.06 5.69
1-1/2" adapter nf@.110 Ea 1.49 4.99 0.06 6.54
2" adapter nf@.120 Ea 1.94 5.44 0.07 7.45
2-1/2" adapter nf@.150 Ea 5.72 6.81 0.08 12.61
3" adapter nf@.180 Ea 8.37 8.17 0.10 16.64
4" adapter nf@.240 Ea 10.70 10.89 0.13 21.72

PVC female adapters for Schedule 40 PVC pipe


Socket weld and female thread, using small tools.
1/2" adapter nf@.110 Ea 0.56 4.99 0.06 5.61
3/4" adapter nf@.120 Ea 0.72 5.44 0.07 6.23
1" adapter nf@.130 Ea 0.83 5.90 0.07 6.80
1-1/4" adapter nf@.170 Ea 1.28 7.71 0.10 9.09
1-1/2" adapter nf@.210 Ea 1.49 9.53 0.12 11.14
2" adapter nf@.290 Ea 1.99 13.16 0.16 15.31
2-1/2" adapter nf@.330 Ea 5.02 14.97 0.18 20.17
3" adapter nf@.470 Ea 6.76 21.32 0.26 28.34
4" adapter nf@.630 Ea 11.20 28.58 0.35 40.13

Couplings for PVC Schedule 40 pressure pipe


Using small tools.
1/2" coupling nf@.100 Ea 0.34 4.54 0.06 4.94
3/4" coupling nf@.110 Ea 0.45 4.99 0.06 5.50
2015 Heavy Construction Estimator, All Rights Reserved Page 547 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 548

1" coupling nf@.120 Ea 0.79 5.44 0.07 6.30


1-1/4" coupling nf@.160 Ea 1.09 7.26 0.09 8.44
1-1/2" coupling nf@.180 Ea 1.17 8.17 0.10 9.44
2" coupling nf@.200 Ea 1.83 9.07 0.11 11.01
2-1/2" coupling nf@.250 Ea 3.99 11.34 0.14 15.47
3" coupling nf@.300 Ea 6.27 13.61 0.17 20.05
4" coupling nf@.500 Ea 9.03 22.69 0.28 32.00
6" coupling nf@.600 Ea 28.60 27.22 0.34 56.16
8" coupling nf@.800 Ea 36.70 36.30 0.45 73.45

Unions for Schedule 40 PVC pressure pipe


Using small tools.
1/2" union nf@.130 Ea 4.95 5.90 0.07 10.92
3/4" union nf@.140 Ea 5.65 6.35 0.08 12.08
1" union nf@.160 Ea 5.80 7.26 0.09 13.15
1-1/4" union nf@.200 Ea 18.70 9.07 0.11 27.88
1-1/2" union nf@.230 Ea 19.60 10.44 0.13 30.17
2" union nf@.250 Ea 26.20 11.34 0.14 37.68
2-1/2" union nf@.300 Ea 32.90 13.61 0.17 46.68
3" union nf@.400 Ea 42.30 18.15 0.22 60.67
4" union nf@.600 Ea 64.90 27.22 0.34 92.46
6" union nf@.800 Ea 89.40 36.30 0.45 126.15
8" union nf@1.00 Ea 147.00 45.37 0.56 192.93

Caps for Schedule 40 PVC pressure pipe


Using small tools.
1/2" cap nf@.060 Ea 0.45 2.72 0.03 3.20
3/4" cap nf@.070 Ea 0.53 3.18 0.04 3.75
1" cap nf@.070 Ea 0.85 3.18 0.04 4.07
1-1/4" cap nf@.100 Ea 1.17 4.54 0.06 5.77
1-1/2" cap nf@.110 Ea 1.28 4.99 0.06 6.33
2" cap nf@.120 Ea 1.54 5.44 0.07 7.05
2-1/2" cap nf@.150 Ea 4.95 6.81 0.08 11.84
3" cap nf@.180 Ea 5.42 8.17 0.10 13.69
4" cap nf@.240 Ea 12.30 10.89 0.13 23.32
6" cap nf@.420 Ea 29.50 19.06 0.24 48.80
8" cap nf@.500 Ea 43.70 22.69 0.28 66.67

Flanges for PVC pressure pipe, 150 lb. socket weld


Using small tools.
1/2" flange nf@.070 Ea 4.71 3.18 0.04 7.93
3/4" flange nf@.080 Ea 5.65 3.63 0.04 9.32
1" flange nf@.100 Ea 9.41 4.54 0.06 14.01
1-1/4" flange nf@.110 Ea 12.20 4.99 0.06 17.25
1-1/2" flange nf@.120 Ea 14.10 5.44 0.07 19.61
2" flange nf@.140 Ea 22.80 6.35 0.08 29.23
2-1/2" flange nf@.180 Ea 35.20 8.17 0.10 43.47
3" flange nf@.210 Ea 38.80 9.53 0.12 48.45
4" flange nf@.280 Ea 49.10 12.70 0.16 61.96
6" flange nf@.420 Ea 77.20 19.06 0.24 96.50
8" flange nf@.500 Ea 119.00 22.69 0.28 141.97

Schedule 80 PVC pressure pipe, socket weld


Using small tools.
1/2" pipe nf@.020 LF 0.32 0.91 0.01 1.24
3/4" pipe nf@.030 LF 0.45 1.36 0.02 1.83
1" pipe nf@.030 LF 0.66 1.36 0.02 2.04
1-1/4" pipe nf@.040 LF 0.90 1.82 0.02 2.74
2015 Heavy Construction Estimator, All Rights Reserved Page 548 (part 2)

1-1/2" pipe nf@.040 LF 1.09 1.82 0.02 2.93


2" pipe nf@.050 LF 1.54 2.27 0.03 3.84
2-1/2" pipe nf@.050 LF 2.30 2.27 0.03 4.60
3" pipe nf@.060 LF 3.07 2.72 0.03 5.82
4" pipe nf@.070 LF 4.50 3.18 0.04 7.72
2015 Heavy Construction Estimator, All Rights Reserved Page 549

6" pipe nf@.160 LF 8.58 7.26 0.09 15.93


8" pipe nf@.190 LF 13.10 8.62 0.11 21.83

90 degree elbows for Schedule 80 socket weld PVC pipe


Using small tools.
1/2" ell nf@.110 Ea 2.48 4.99 0.06 7.53
3/4" ell nf@.120 Ea 3.20 5.44 0.07 8.71
1" ell nf@.130 Ea 5.14 5.90 0.07 11.11
1-1/4" ell nf@.170 Ea 6.85 7.71 0.10 14.66
1-1/2" ell nf@.190 Ea 7.36 8.62 0.11 16.09
2" ell nf@.210 Ea 8.88 9.53 0.12 18.53
2-1/2" ell nf@.260 Ea 20.70 11.80 0.15 32.65
3" ell nf@.320 Ea 23.30 14.52 0.18 38.00
4" ell nf@.520 Ea 35.60 23.59 0.29 59.48
6" ell nf@.630 Ea 101.00 28.58 0.35 129.93
8" ell nf@1.00 Ea 149.00 45.37 0.56 194.93

45 degree elbows for Schedule 80 socket weld PVC pressure pipe


Using small tools.
1/2" ell nf@.110 Ea 4.72 4.99 0.06 9.77
3/4" ell nf@.120 Ea 7.15 5.44 0.07 12.66
1" ell nf@.130 Ea 10.70 5.90 0.07 16.67
1-1/4" ell nf@.170 Ea 13.70 7.71 0.10 21.51
1-1/2" ell nf@.190 Ea 16.20 8.62 0.11 24.93
2" ell nf@.210 Ea 21.10 9.53 0.12 30.75
2-1/2" ell nf@.260 Ea 44.00 11.80 0.15 55.95
3" ell nf@.320 Ea 53.60 14.52 0.18 68.30
4" ell nf@.520 Ea 96.50 23.59 0.29 120.38
6" ell nf@.630 Ea 122.00 28.58 0.35 150.93
8" ell nf@1.00 Ea 181.00 45.37 0.56 226.93

Tees for Schedule 80 socket weld PVC pressure pipe


Using small tools.
1/2" tee nf@.140 Ea 2.48 6.35 0.08 8.91
3/4" tee nf@.150 Ea 3.20 6.81 0.08 10.09
1" tee nf@.180 Ea 5.14 8.17 0.10 13.41
1-1/4" tee nf@.230 Ea 6.85 10.44 0.13 17.42
1-1/2" tee nf@.270 Ea 7.36 12.25 0.15 19.76
2" tee nf@.300 Ea 8.88 13.61 0.17 22.66
2-1/2" tee nf@.370 Ea 20.70 16.79 0.21 37.70
3" tee nf@.440 Ea 23.30 19.96 0.25 43.51
4" tee nf@.590 Ea 35.60 26.77 0.33 62.70
6" tee nf@.880 Ea 101.00 39.93 0.49 141.42
8" tee nf@1.20 Ea 151.00 54.44 0.67 206.11

Reducing inserts for Schedule 80 PVC pressure pipe


Socket weld x socket weld, using small tools.
3/4" insert nf@.050 Ea 1.45 2.27 0.03 3.75
1" insert nf@.060 Ea 4.16 2.72 0.03 6.91
1-1/4" insert nf@.080 Ea 6.53 3.63 0.04 10.20
1-1/2" insert nf@.110 Ea 8.88 4.99 0.06 13.93
2" insert nf@.120 Ea 12.70 5.44 0.07 18.21
2-1/2" insert nf@.140 Ea 21.80 6.35 0.08 28.23
3" insert nf@.160 Ea 35.00 7.26 0.09 42.35
4" insert nf@.210 Ea 48.40 9.53 0.12 58.05
6" insert nf@.310 Ea 67.20 14.06 0.17 81.43
8" insert nf@.420 Ea 96.90 19.06 0.24 116.20
2015 Heavy Construction Estimator, All Rights Reserved Page 549 (part 2)

PVC reducing inserts, weld and thread, for Schedule 80 PVC pipe
Male or female thread, using small tools.
1/2" insert nf@.160 Ea 4.14 7.26 0.09 11.49
3/4" insert nf@.220 Ea 6.12 9.98 0.12 16.22
1" insert nf@.270 Ea 8.94 12.25 0.15 21.34
2015 Heavy Construction Estimator, All Rights Reserved Page 550

1-1/4" insert nf@.380 Ea 14.30 17.24 0.21 31.75


1-1/2" insert nf@.430 Ea 17.80 19.51 0.24 37.55
2" insert nf@.540 Ea 31.10 24.50 0.30 55.90
2-1/2" insert nf@.800 Ea 50.10 36.30 0.45 86.85
3" insert nf@1.05 Ea 55.90 47.64 0.59 104.13
4" insert nf@1.25 Ea 96.00 56.71 0.70 153.41

PVC male adapters for Schedule 80 PVC pipe


Socket weld and male thread, using small tools.
1/2" adapter nf@.060 Ea 5.27 2.72 0.03 8.02
3/4" adapter nf@.070 Ea 5.82 3.18 0.04 9.04
1" adapter nf@.080 Ea 10.10 3.63 0.04 13.77
1-1/4" adapter nf@.100 Ea 11.80 4.54 0.06 16.40
1-1/2" adapter nf@.110 Ea 16.90 4.99 0.06 21.95
2" adapter nf@.130 Ea 24.50 5.90 0.07 30.47
2-1/2" adapter nf@.160 Ea 27.90 7.26 0.09 35.25
3" adapter nf@.190 Ea 30.90 8.62 0.11 39.63
4" adapter nf@.250 Ea 54.80 11.34 0.14 66.28

PVC female adapters for Schedule 80 PVC pipe


Socket weld and female thread, using small tools.
1/2" adapter nf@.120 Ea 4.23 5.44 0.07 9.74
3/4" adapter nf@.130 Ea 6.27 5.90 0.07 12.24
1" adapter nf@.140 Ea 9.22 6.35 0.08 15.65
1-1/4" adapter nf@.180 Ea 15.00 8.17 0.10 23.27
1-1/2" adapter nf@.220 Ea 18.40 9.98 0.12 28.50
2" adapter nf@.310 Ea 32.00 14.06 0.17 46.23
2-1/2" adapter nf@.350 Ea 50.60 15.88 0.20 66.68
3" adapter nf@.490 Ea 56.80 22.23 0.27 79.30
4" adapter nf@.650 Ea 97.90 29.49 0.36 127.75

Couplings for PVC Schedule 80 pressure pipe


Using small tools.
1/2" coupling nf@.110 Ea 4.42 4.99 0.06 9.47
3/4" coupling nf@.120 Ea 4.63 5.44 0.07 10.14
1" coupling nf@.130 Ea 8.24 5.90 0.07 14.21
1-1/4" coupling nf@.170 Ea 9.97 7.71 0.10 17.78
1-1/2" coupling nf@.190 Ea 9.97 8.62 0.11 18.70
2" coupling nf@.210 Ea 19.80 9.53 0.12 29.45
2-1/2" coupling nf@.260 Ea 40.30 11.80 0.15 52.25
3" coupling nf@.320 Ea 47.10 14.52 0.18 61.80
4" coupling nf@.520 Ea 79.20 23.59 0.29 103.08
6" coupling nf@.630 Ea 120.00 28.58 0.35 148.93
8" coupling nf@1.00 Ea 171.00 45.37 0.56 216.93

Unions for Schedule 80 PVC pressure pipe


Using small tools.
1/2" union nf@.130 Ea 9.24 5.90 0.07 15.21
3/4" union nf@.140 Ea 11.70 6.35 0.08 18.13
1" union nf@.160 Ea 13.40 7.26 0.09 20.75
1-1/4" union nf@.200 Ea 26.70 9.07 0.11 35.88
1-1/2" union nf@.230 Ea 30.10 10.44 0.13 40.67
2" union nf@.250 Ea 40.80 11.34 0.14 52.28
2-1/2" union nf@.260 Ea 60.60 11.80 0.15 72.55
3" union nf@.280 Ea 76.00 12.70 0.16 88.86
4" union nf@.600 Ea 98.80 27.22 0.34 126.36
6" union nf@.750 Ea 138.00 34.03 0.42 172.45
8" union nf@1.25 Ea 190.00 56.71 0.70 247.41
2015 Heavy Construction Estimator, All Rights Reserved Page 550 (part 2)

Caps for Schedule 80 PVC pressure pipe


Using small tools.
1/2" cap nf@.060 Ea 4.42 2.72 0.03 7.17
3/4" cap nf@.070 Ea 4.63 3.18 0.04 7.85
2015 Heavy Construction Estimator, All Rights Reserved Page 551

1" cap nf@.080 Ea 8.24 3.63 0.04 11.91


1-1/4" cap nf@.110 Ea 9.97 4.99 0.06 15.02
1-1/2" cap nf@.120 Ea 9.97 5.44 0.07 15.48
2" cap nf@.130 Ea 19.80 5.90 0.07 25.77
2-1/2" cap nf@.160 Ea 40.30 7.26 0.09 47.65
3" cap nf@.190 Ea 47.10 8.62 0.11 55.83
4" cap nf@.250 Ea 79.20 11.34 0.14 90.68
6" cap nf@.300 Ea 120.00 13.61 0.17 133.78
8" cap nf@.500 Ea 177.00 22.69 0.28 199.97

Flanges for PVC pressure pipe, 150 lb. socket weld


Using small tools.
1/2" flange nf@.270 Ea 11.80 12.25 0.15 24.20
3/4" flange nf@.320 Ea 12.40 14.52 0.18 27.10
1" flange nf@.430 Ea 13.80 19.51 0.24 33.55
1-1/4" flange nf@.540 Ea 14.10 24.50 0.30 38.90
1-1/2" flange nf@.650 Ea 14.60 29.49 0.36 44.45
2" flange nf@.140 Ea 22.80 6.35 0.08 29.23
2-1/2" flange nf@.180 Ea 35.20 8.17 0.10 43.47
3" flange nf@.210 Ea 39.00 9.53 0.12 48.65
4" flange nf@.280 Ea 49.10 12.70 0.16 61.96
6" flange nf@.420 Ea 77.20 19.06 0.24 96.50
8" flange nf@.750 Ea 66.00 34.03 0.42 100.45

Polypropylene acid resistant DWV pipe, Schedule 40


For fuseal fittings, solvent weld, using small tools.
1-1/2" pipe nf@.040 LF 4.57 1.82 0.02 6.41
2" pipe nf@.050 LF 6.18 2.27 0.03 8.48
3" pipe nf@.060 LF 11.10 2.72 0.03 13.85
4" pipe nf@.080 LF 15.80 3.63 0.04 19.47
6" pipe nf@.110 LF 28.50 4.99 0.06 33.55

1/4 bends for polypropylene acid resistant DWV pipe, Schedule 40


Solvent weld 90 degree elbows, using small tools.
1-1/2" bend nf@.350 Ea 20.20 15.88 0.20 36.28
2" bend nf@.400 Ea 25.10 18.15 0.22 43.47
3" bend nf@.450 Ea 42.60 20.42 0.25 63.27
4" bend nf@.500 Ea 67.90 22.69 0.28 90.87
6" bend nf@.750 Ea 167.00 34.03 0.42 201.45

1/8 bends for polypropylene acid resistant DWV pipe, Schedule 40


Solvent weld 45 degree elbows, using small tools.
1-1/2" bend nf@.320 Ea 19.90 14.52 0.18 34.60
2" bend nf@.430 Ea 24.20 19.51 0.24 43.95
3" bend nf@.490 Ea 44.40 22.23 0.27 66.90
4" bend nf@.650 Ea 50.40 29.49 0.36 80.25
6" bend nf@.950 Ea 140.00 43.10 0.53 183.63

Sanitary TY tees for polypropylene acid resistant DWV pipe, Schedule 40


Using small tools.
1-1/2" tee nf@.690 Ea 25.10 31.31 0.39 56.80
2" tee nf@.870 Ea 30.10 39.47 0.49 70.06
3" tee nf@.950 Ea 60.20 43.10 0.53 103.83
4" tee nf@1.25 Ea 90.20 56.71 0.70 147.61
6" tee nf@2.00 Ea 179.00 90.74 1.12 270.86

Reducing sanitary TY tees for polypropylene acid resistant DWV pipe, Schedule 40
Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 551 (part 2)

2" x 2" x 1-1/2" nf@.870 Ea 30.00 39.47 0.49 69.96


3" x 3" x 2" nf@.950 Ea 56.00 43.10 0.53 99.63
3" x 3" x 1-1/2" nf@.950 Ea 52.30 43.10 0.53 95.93
4" x 4" x 2" nf@1.25 Ea 80.60 56.71 0.70 138.01
4" x 4" x 3" nf@1.25 Ea 84.20 56.71 0.70 141.61
2015 Heavy Construction Estimator, All Rights Reserved Page 552

6" x 6" x 4" nf@2.00 Ea 153.00 90.74 1.12 244.86

Cleanout tees with plug for polypropylene acid resistant DWV pipe, Schedule 40
Using small tools.
1-1/2" tee nf@.690 Ea 37.40 31.31 0.39 69.10
2" tee nf@.870 Ea 33.10 39.47 0.49 73.06
3" tee nf@.950 Ea 69.30 43.10 0.53 112.93
4" tee nf@1.25 Ea 94.30 56.71 0.70 151.71
6" tee nf@2.00 Ea 128.00 90.74 1.12 219.86

Wyes for polypropylene acid resistant DWV pipe, Schedule 40


Using small tools.
1-1/2" wye nf@.690 Ea 32.00 31.31 0.39 63.70
2" wye nf@.870 Ea 36.50 39.47 0.49 76.46
3" wye nf@.950 Ea 64.00 43.10 0.53 107.63
4" wye nf@1.25 Ea 93.30 56.71 0.70 150.71
6" wye nf@2.00 Ea 237.00 90.74 1.12 328.86

Reducing wyes for polypropylene acid resistant DWV pipe, Schedule 40


Using small tools.
3" x 3" x 1-1/2" nf@.950 Ea 59.70 43.10 0.53 103.33
3" x 3" x 2" nf@.950 Ea 59.70 43.10 0.53 103.33
4" x 4" x 2" nf@1.25 Ea 89.60 56.71 0.70 147.01
4" x 4" x 3" nf@1.25 Ea 89.60 56.71 0.70 147.01
6" x 6" x 2" nf@2.00 Ea 187.00 90.74 1.12 278.86
6" x 6" x 3" nf@2.00 Ea 190.00 90.74 1.12 281.86
6" x 6" x 4" nf@2.00 Ea 154.00 90.74 1.12 245.86

Combination wye and 1/8 bend for polypropylene acid resistant DWV pipe
Using small tools.
1-1/2" combination nf@.690 Ea 33.40 31.31 0.39 65.10
2" combination nf@.870 Ea 22.90 39.47 0.49 62.86
3" combination nf@.950 Ea 42.80 43.10 0.53 86.43
4" combination nf@1.25 Ea 66.50 56.71 0.70 123.91
2" x 2" x 1-1/2" nf@.870 Ea 23.50 39.47 0.49 63.46
3" x 3" x 1-1/2" nf@.950 Ea 38.80 43.10 0.53 82.43
3" x 3" x 2" nf@.950 Ea 40.40 43.10 0.53 84.03
4" x 4" x 2" nf@1.25 Ea 60.60 56.71 0.70 118.01
4" x 4" x 3" nf@1.25 Ea 61.60 56.71 0.70 119.01

P-traps for polypropylene acid resistant DWV pipe


With fuseal connection, using small tools.
1-1/2" P-trap nf@.800 Ea 28.70 36.30 0.45 65.45
2" P-trap nf@1.05 Ea 39.50 47.64 0.59 87.73
3" P-trap nf@1.43 Ea 77.60 64.88 0.80 143.28
4" P-trap nf@1.82 Ea 130.00 82.57 1.02 213.59

Hub adapters for polypropylene acid resistant DWV pipe


Using small tools.
1-1/2" adapter nf@.320 Ea 19.30 14.52 0.18 34.00
2" adapter nf@.430 Ea 20.10 19.51 0.24 39.85
3" adapter nf@.490 Ea 24.90 22.23 0.27 47.40
4" adapter nf@.650 Ea 35.80 29.49 0.36 65.65
6" adapter nf@.950 Ea 53.70 43.10 0.53 97.33

Mechanical joint adapters for polypropylene acid resistant DWV pipe


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 552 (part 2)

1-1/2" adapter nf@.320 Ea 16.90 14.52 0.18 31.60


2" adapter nf@.430 Ea 21.90 19.51 0.24 41.65
3" adapter nf@.490 Ea 28.20 22.23 0.27 50.70
4" adapter nf@.650 Ea 39.10 29.49 0.36 68.95

Couplings for polypropylene acid resistant DWV pipe


Using small tools.
1-1/2" coupling nf@.320 Ea 13.80 14.52 0.18 28.50
2" coupling nf@.430 Ea 16.50 19.51 0.24 36.25
2015 Heavy Construction Estimator, All Rights Reserved Page 553

3" coupling nf@.490 Ea 20.00 22.23 0.27 42.50


4" coupling nf@.650 Ea 26.50 29.49 0.36 56.35
6" coupling nf@.950 Ea 38.50 43.10 0.53 82.13

Polyethylene pipe, SDR-21


Standard dimension ratio 21, using small tools.
1" pipe nj@.090 LF 1.31 3.71 0.06 5.08
2" pipe nj@.090 LF 1.74 3.71 0.06 5.51
3" pipe nf@.100 LF 2.07 4.54 0.06 6.67
4" pipe nf@.110 LF 2.96 4.99 0.06 8.01
6" pipe nf@.110 LF 6.44 4.99 0.06 11.49

Polyethylene pipe, SDR-21


Using misc. power tools and small tools.
8" pipe nr@.150 LF 10.80 6.79 0.86 18.45
10" pipe nr@.150 LF 16.60 6.79 0.86 24.25
12" pipe nr@.150 LF 23.70 6.79 0.86 31.35
14" pipe nr@.170 LF 28.10 7.69 0.97 36.76
16" pipe nr@.170 LF 36.50 7.69 0.97 45.16
18" pipe nr@.170 LF 46.10 7.69 0.97 54.76
20" pipe nr@.210 LF 57.20 9.50 1.20 67.90
22" pipe nr@.210 LF 82.00 9.50 1.20 92.70
24" pipe nr@.210 LF 97.90 9.50 1.20 108.60

90 degree elbows for polyethylene pipe


Using small tools.
3" ell nf@.490 Ea 17.70 22.23 0.27 40.20
4" ell nf@.650 Ea 27.70 29.49 0.36 57.55
6" ell nf@.950 Ea 59.40 43.10 0.53 103.03

90 degree elbows for polyethylene pipe


Using misc. power tools and small tools.
8" ell nr@1.63 Ea 82.90 73.72 9.32 165.94
10" ell nr@1.86 Ea 127.00 84.13 10.60 221.73
12" ell nr@2.43 Ea 181.00 109.90 13.90 304.80
14" ell nr@2.86 Ea 242.00 129.40 16.40 387.80
16" ell nr@3.35 Ea 287.00 151.50 19.20 457.70
18" ell nr@3.74 Ea 391.00 169.20 21.40 581.60
20" ell nr@4.19 Ea 493.00 189.50 24.00 706.50
22" ell nr@4.24 Ea 635.00 191.80 24.30 851.10
24" ell nr@4.35 Ea 748.00 196.80 24.90 969.70

45 degree elbows for polyethylene pipe


Using small tools.
3" ell nf@.490 Ea 54.20 22.23 0.27 76.70
4" ell nf@.650 Ea 30.30 29.49 0.36 60.15
6" ell nf@.950 Ea 64.90 43.10 0.53 108.53

45 degree elbows for polyethylene pipe


Using misc. power tools and small tools.
8" ell nr@1.63 Ea 165.00 73.72 9.32 248.04
10" ell nr@1.86 Ea 240.00 84.13 10.60 334.73
12" ell nr@2.43 Ea 378.00 109.90 13.90 501.80
14" ell nr@2.86 Ea 490.00 129.40 16.40 635.80
16" ell nr@3.35 Ea 632.00 151.50 19.20 802.70
18" ell nr@3.74 Ea 868.00 169.20 21.40 1,058.60
20" ell nr@4.19 Ea 1,150.00 189.50 24.00 1,363.50
2015 Heavy Construction Estimator, All Rights Reserved Page 553 (part 2)

22" ell nr@4.24 Ea 1,170.00 191.80 24.30 1,386.10


24" ell nr@4.35 Ea 1,310.00 196.80 24.90 1,531.70

Tees for polyethylene pipe


Using small tools.
3" tee nf@.950 Ea 19.20 43.10 0.53 62.83
4" tee nf@1.25 Ea 30.30 56.71 0.70 87.71
6" tee nf@2.00 Ea 75.30 90.74 1.12 167.16

Tees for polyethylene pipe


Using misc. power tools and small tools.
8" tee nr@3.23 Ea 115.00 146.10 18.50 279.60
10" tee nr@3.74 Ea 161.00 169.20 21.40 351.60
2015 Heavy Construction Estimator, All Rights Reserved Page 554

12" tee nr@4.82 Ea 233.00 218.00 27.60 478.60


14" tee nr@5.68 Ea 265.00 256.90 32.50 554.40
16" tee nr@6.77 Ea 393.00 306.20 38.70 737.90
18" tee nr@7.49 Ea 487.00 338.80 42.80 868.60
20" tee nr@8.38 Ea 569.00 379.00 47.90 995.90
24" tee nr@8.38 Ea 669.00 379.00 47.90 1,095.90
26" tee nr@8.38 Ea 794.00 379.00 47.90 1,220.90

45 degree wyes for polyethylene pipe


Using small tools.
3" wye nf@.950 Ea 69.30 43.10 0.53 112.93
4" wye nf@1.25 Ea 75.20 56.71 0.70 132.61
6" wye nf@2.00 Ea 123.00 90.74 1.12 214.86

45 degree wyes for polyethylene pipe


Using misc. power tools and small tools.
8" wye nr@3.23 Ea 155.00 146.10 18.50 319.60
10" wye nr@3.74 Ea 198.00 169.20 21.40 388.60
12" wye nr@4.82 Ea 344.00 218.00 27.60 589.60
14" wye nr@5.68 Ea 391.00 256.90 32.50 680.40
16" wye nr@6.77 Ea 618.00 306.20 38.70 962.90
18" wye nr@7.49 Ea 771.00 338.80 42.80 1,152.60
20" wye nr@8.38 Ea 905.00 379.00 47.90 1,331.90
22" wye nr@8.38 Ea 1,060.00 379.00 47.90 1,486.90
24" wye nr@8.38 Ea 1,290.00 379.00 47.90 1,716.90

Reducers for polyethylene pipe


Using small tools.
4" x 3" nf@.650 Ea 30.90 29.49 0.36 60.75
6" x 4" nf@.950 Ea 67.00 43.10 0.53 110.63

Reducers for polyethylene pipe


Using misc. power tools and small tools.
8" x 6" nr@1.74 Ea 84.80 78.70 9.95 173.45
10" x 8" nr@2.00 Ea 114.00 90.46 11.40 215.86
12" x 10" nr@2.48 Ea 145.00 112.20 14.20 271.40
14" x 12" nr@2.89 Ea 157.00 130.70 16.50 304.20
16" x 14" nr@3.26 Ea 163.00 147.40 18.60 329.00
18" x 16" nr@3.71 Ea 189.00 167.80 21.20 378.00
20" x 18" nr@4.14 Ea 195.00 187.30 23.70 406.00
22" x 20" nr@4.24 Ea 202.00 191.80 24.30 418.10
24" x 22" nr@4.29 Ea 208.00 194.00 24.50 426.50

Caps for polyethylene pipe


Using small tools.
3" cap nf@.200 Ea 9.11 9.07 0.11 18.29
4" cap nf@.350 Ea 15.50 15.88 0.20 31.58
6" cap nf@.580 Ea 21.80 26.31 0.32 48.43

Caps for polyethylene pipe


Using misc. power tools and small tools.
8" cap nr@.980 Ea 35.90 44.33 5.61 85.84

Flange assemblies for polyethylene pipe


Using small tools.
3" flange nf@.490 Ea 32.80 22.23 0.27 55.30
4" flange nf@.650 Ea 46.80 29.49 0.36 76.65
2015 Heavy Construction Estimator, All Rights Reserved Page 554 (part 2)

6" flange nf@.950 Ea 61.20 43.10 0.53 104.83

Flange assemblies for polyethylene pipe


Using misc. power tools and small tools.
8" flange nr@1.05 Ea 77.70 47.49 6.01 131.20
10" flange nr@1.32 Ea 102.00 59.70 7.55 169.25
12" flange nr@1.50 Ea 148.00 67.85 8.58 224.43
14" flange nr@1.82 Ea 186.00 82.32 10.40 278.72
16" flange nr@2.11 Ea 250.00 95.44 12.10 357.54
18" flange nr@2.36 Ea 338.00 106.70 13.50 458.20
20" flange nr@3.01 Ea 407.00 136.10 17.20 560.30
22" flange nr@3.12 Ea 471.00 141.10 17.80 629.90
24" flange nr@3.26 Ea 534.00 147.40 18.60 700.00
2015 Heavy Construction Estimator, All Rights Reserved Page 555

Screened pipe, polyethylene


4" SDR-17 --@.000 LF 13.90 -- -- 13.90
6" SDR-17 --@.000 LF 17.40 -- -- 17.40

Flange assemblies for polyethylene pipe


3", polyethylene SDR-17 --@.000 Ea 59.00 -- -- 59.00
4", polyethylene SDR-17 --@.000 Ea 71.40 -- -- 71.40
6", polyethylene SDR-17 --@.000 Ea 86.50 -- -- 86.50

CSI 15-065, Glass pipe

Glass drainage pipe including couplings, hangers and fittings


Based on a fitting each 10' (3m). Use these figures for preliminary estimates, using small tools.
1-1/2" (38mm) nf@.430 LF 13.50 19.51 0.24 33.25
2" (50mm) nf@.510 LF 17.70 23.14 0.29 41.13
3" (75mm) nf@.590 LF 31.60 26.77 0.33 58.70
4" (10cm) nf@.800 LF 45.30 36.30 0.45 82.05
6" (15cm) nf@.950 LF 85.10 43.10 0.53 128.73

Glass pipe, no fittings or hangers included. See pipe supports in CSI 15-094
Using small tools.
2" diameter nf@.180 LF 15.40 8.17 0.10 23.67
3" diameter nf@.200 LF 27.40 9.07 0.11 36.58
4" diameter nf@.230 LF 39.40 10.44 0.13 49.97

Sweeps for glass pipe


Using small tools.
2" diameter nf@1.67 Ea 20.00 75.77 0.94 96.71
3" diameter nf@2.00 Ea 33.60 90.74 1.12 125.46
4" diameter nf@2.50 Ea 51.90 113.40 1.40 166.70

Tees for glass pipe


Using small tools.
3" diameter nf@2.50 Ea 38.10 113.40 1.40 152.90
4" diameter nf@3.33 Ea 67.20 151.10 1.86 220.16

Stainless steel couplings for glass pipe


2" diameter --@.000 Ea 13.30 -- -- 13.30
3" diameter --@.000 Ea 17.70 -- -- 17.70
4" diameter --@.000 Ea 29.90 -- -- 29.90

CSI 15-066, Stainless steel pipe

Stainless steel pipe and fittings, installed horizontal


Type 304, Schedule 10S pipe, with 150 lb. screwed fittings. Includes hangers and fittings each 10' (3m).
Use these figures for preliminary estimates, using small tools.
1/2" (12mm) nb@.160 LF 5.43 8.37 0.09 13.89
3/4" (18mm) nb@.190 LF 6.61 9.94 0.11 16.66
1" (25mm) nb@.210 LF 8.72 10.98 0.12 19.82
1-1/4" (32mm) nf@.280 LF 10.90 12.70 0.16 23.76
1-1/2" (38mm) nf@.290 LF 12.80 13.16 0.16 26.12
2" (50mm) nf@.380 LF 16.50 17.24 0.21 33.95
2-1/2" (65mm) nf@.470 LF 25.10 21.32 0.26 46.68
3" (75mm) nf@.540 LF 32.30 24.50 0.30 57.10
Add for
2015 Heavy Construction Estimator, All Rights Reserved Page 555 (part 2)

Type 316 stainless steel pipe ---@--- % -- -- 26.00 1000.00

Stainless steel pipe, pipe only


Type 304, Schedule 40 pipe. no fittings or hangers included. See pipe supports in CSI 15-094, using
small tools.
1/2" pipe n8@.090 LF 11.90 4.58 0.05 16.53
3/4" pipe n8@.110 LF 14.40 5.60 0.07 20.07
1" pipe n8@.130 LF 18.30 6.62 0.08 25.00
1-1/4" pipe n8@.150 LF 22.80 7.63 0.09 30.52
1-1/2" pipe n8@.170 LF 27.00 8.65 0.10 35.75
2" pipe n8@.220 LF 35.10 11.20 0.13 46.43
2-1/2" pipe n8@.260 LF 54.10 13.23 0.16 67.49
3" pipe n8@.320 LF 68.00 16.28 0.19 84.47
4" pipe n8@.430 LF 94.20 21.88 0.26 116.34
2015 Heavy Construction Estimator, All Rights Reserved Page 556

90 degree elbows for Type 304 threaded stainless steel pipe


Using small tools.
1/2" ell n8@.320 Ea 6.66 16.28 0.19 23.13
3/4" ell n8@.430 Ea 7.56 21.88 0.26 29.70
1" ell n8@.540 Ea 10.00 27.48 0.32 37.80
1-1/4" ell n8@.740 Ea 15.10 37.66 0.44 53.20
1-1/2" ell n8@.870 Ea 17.10 44.27 0.52 61.89
2" ell n8@1.05 Ea 24.70 53.43 0.63 78.76
2-1/2" ell n8@1.67 Ea 68.30 84.99 1.00 154.29
3" ell n8@2.15 Ea 86.20 109.40 1.29 196.89
4" ell n8@2.67 Ea 169.00 135.90 1.60 306.50
6" ell n8@2.50 Ea 301.00 127.20 1.50 429.70
8" ell n8@2.50 Ea 504.00 127.20 1.50 632.70

45 degree elbows for threaded Type 304 stainless steel pipe


Using small tools.
1/2" ell n8@.320 Ea 9.10 16.28 0.19 25.57
3/4" ell n8@.430 Ea 9.87 21.88 0.26 32.01
1" ell n8@.540 Ea 10.90 27.48 0.32 38.70
1-1/4" ell n8@.740 Ea 14.10 37.66 0.44 52.20
1-1/2" ell n8@.870 Ea 18.20 44.27 0.52 62.99
2" ell n8@1.05 Ea 25.70 53.43 0.63 79.76
2-1/2" ell n8@1.67 Ea 89.00 84.99 1.00 174.99
3" ell n8@2.15 Ea 126.00 109.40 1.29 236.69
4" ell n8@2.67 Ea 227.00 135.90 1.60 364.50

Tees for threaded Type 304 stainless steel pipe


Using small tools.
1/2" tee n8@.490 Ea 9.98 24.94 0.29 35.21
3/4" tee n8@.650 Ea 10.60 33.08 0.39 44.07
1" tee n8@.800 Ea 12.60 40.71 0.48 53.79
1-1/4" tee n8@1.11 Ea 20.60 56.49 0.67 77.76
1-1/2" tee n8@1.25 Ea 25.90 63.61 0.75 90.26
2" tee n8@1.67 Ea 31.20 84.99 1.00 117.19
2-1/2" tee n8@2.41 Ea 103.00 122.60 1.45 227.05
3" tee n8@3.23 Ea 157.00 164.40 1.94 323.34
4" tee n8@4.00 Ea 253.00 203.60 2.40 459.00

Reducers for threaded Type 304 stainless steel pipe


Using small tools.
3/4" x 1" n8@.430 Ea 6.26 21.88 0.26 28.40
1" x 3/4" n8@.540 Ea 9.27 27.48 0.32 37.07
1-1/4" x 1" n8@.740 Ea 19.00 37.66 0.44 57.10
1-1/2" x 1-1/4" n8@.870 Ea 20.90 44.27 0.52 65.69
2" x 1-1/2" n8@1.05 Ea 32.60 53.43 0.63 86.66
2-1/2" x 2" n8@1.67 Ea 68.50 84.99 1.00 154.49
3" x 2-1/2" n8@2.15 Ea 73.30 109.40 1.29 183.99
4" x 3" n8@2.67 Ea 143.00 135.90 1.60 280.50

Unions for threaded Type 304 stainless steel pipe


Using small tools.
1/2" union n8@.490 Ea 13.90 24.94 0.29 39.13
3/4" union n8@.650 Ea 19.00 33.08 0.39 52.47
1" union n8@.800 Ea 27.60 40.71 0.48 68.79
1-1/4" union n8@1.11 Ea 50.70 56.49 0.67 107.86
1-1/2" union n8@1.25 Ea 59.60 63.61 0.75 123.96
2" union n8@1.67 Ea 75.30 84.99 1.00 161.29
2015 Heavy Construction Estimator, All Rights Reserved Page 556 (part 2)

Flanges for Type 304 stainless steel pipe


Using small tools.
2-1/2" flange n8@1.67 Ea 60.70 84.99 1.00 146.69
3" flange n8@2.15 Ea 66.20 109.40 1.29 176.89
4" flange n8@2.67 Ea 95.10 135.90 1.60 232.60
2015 Heavy Construction Estimator, All Rights Reserved Page 557

Caps for Type 304 stainless steel pipe


Using small tools.
1/2" cap n8@.160 Ea 2.55 8.14 0.10 10.79
3/4" cap n8@.220 Ea 3.73 11.20 0.13 15.06
1" cap n8@.270 Ea 5.47 13.74 0.16 19.37
1-1/4" cap n8@.380 Ea 14.30 19.34 0.23 33.87
1-1/2" cap n8@.430 Ea 16.50 21.88 0.26 38.64
2" cap n8@.540 Ea 20.90 27.48 0.32 48.70
2-1/2" cap n8@.800 Ea 35.50 40.71 0.48 76.69
3" cap n8@1.05 Ea 49.10 53.43 0.63 103.16
4" cap n8@1.33 Ea 90.70 67.68 0.80 159.18

Type 304 Schedule 10 stainless steel pipe with butt weld fittings
Using a 300-amp skid mounted welder and small tools.
1" pipe pa@.130 LF 18.20 6.09 0.23 24.52
1-1/4" pipe pa@.160 LF 22.20 7.49 0.29 29.98
1-1/2" pipe pa@.180 LF 24.80 8.43 0.32 33.55
2" pipe pa@.230 LF 30.60 10.77 0.41 41.78
2-1/2" pipe pa@.260 LF 38.20 12.18 0.47 50.85
3" pipe pa@.290 LF 47.80 13.58 0.52 61.90
4" pipe pa@.340 LF 62.40 15.92 0.61 78.93
6" pipe pa@.450 LF 107.00 21.07 0.81 128.88

90 degree elbows for Type 304 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" ell pa@2.67 Ea 14.10 125.00 4.81 143.91
1-1/4" ell pa@3.35 Ea 26.20 156.90 6.03 189.13
1-1/2" ell pa@4.02 Ea 20.50 188.30 7.24 216.04
2" ell pa@5.30 Ea 27.50 248.20 9.54 285.24
2-1/2" ell pa@5.99 Ea 39.00 280.50 10.80 330.30
3" ell pa@6.80 Ea 49.20 318.40 12.20 379.80
4" ell pa@8.00 Ea 91.80 374.60 14.40 480.80
6" ell pa@10.1 Ea 262.00 473.00 18.20 753.20

45 degree elbows for Type 304 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" ell pa@2.67 Ea 22.90 125.00 4.81 152.71
1-1/4" ell pa@3.34 Ea 39.30 156.40 6.01 201.71
1-1/2" ell pa@3.99 Ea 20.50 186.90 7.18 214.58
2" ell pa@5.30 Ea 23.50 248.20 9.54 281.24
2-1/2" ell pa@5.97 Ea 39.00 279.60 10.70 329.30
3" ell pa@6.76 Ea 41.00 316.60 12.20 369.80
4" ell pa@7.97 Ea 72.10 373.20 14.30 459.60
6" ell pa@10.0 Ea 154.00 468.30 18.00 640.30

Tees for Type 304 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" tee pa@4.02 Ea 49.20 188.30 7.24 244.74
1-1/4" tee pa@5.00 Ea 86.80 234.20 9.00 330.00
1-1/2" tee pa@5.99 Ea 54.10 280.50 10.80 345.40
2" tee pa@7.97 Ea 55.70 373.20 14.30 443.20
2-1/2" tee pa@8.97 Ea 164.00 420.10 16.10 600.20
3" tee pa@10.2 Ea 107.00 477.70 18.40 603.10
4" tee pa@12.0 Ea 151.00 562.00 21.60 734.60
6" tee pa@15.2 Ea 455.00 711.80 27.40 1,194.20

Reducers for Type 304 Schedule 10 stainless steel pipe


2015 Heavy Construction Estimator, All Rights Reserved Page 557 (part 2)

Using a 300-amp skid mounted welder and small tools.


1" x 3/4" pa@2.35 Ea 41.50 110.10 4.23 155.83
1-1/4" x 1" pa@3.02 Ea 63.90 141.40 5.44 210.74
1-1/2" x 1-1/4" pa@3.66 Ea 32.80 171.40 6.59 210.79
2" x 1-1/2" pa@4.75 Ea 26.20 222.40 8.55 257.15
2-1/2" x 2" pa@5.38 Ea 98.30 251.90 9.68 359.88
3" x 2-1/2" pa@6.21 Ea 39.30 290.80 11.20 341.30
4" x 3" pa@7.49 Ea 42.60 350.80 13.50 406.90
6" x 4" pa@9.13 Ea 72.10 427.60 16.40 516.10
2015 Heavy Construction Estimator, All Rights Reserved Page 558

Slip-on flanges for Type 304 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" flange pa@1.33 Ea 47.50 62.28 2.39 112.17
1-1/4" flange pa@1.67 Ea 58.60 78.21 3.01 139.82
1-1/2" flange pa@1.82 Ea 69.70 85.23 3.28 158.21
2" flange pa@2.67 Ea 90.30 125.00 4.81 220.11
2-1/2" flange pa@2.94 Ea 131.00 137.70 5.29 273.99
3" flange pa@3.39 Ea 138.00 158.80 6.10 302.90
4" flange pa@4.00 Ea 192.00 187.30 7.20 386.50
6" flange pa@4.88 Ea 298.00 228.50 8.78 535.28

Caps for Type 304 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" cap pa@1.33 Ea 45.90 62.28 2.39 110.57
1-1/4" cap pa@1.67 Ea 118.00 78.21 3.01 199.22
1-1/2" cap pa@1.82 Ea 49.20 85.23 3.28 137.71
2" cap pa@2.67 Ea 41.00 125.00 4.81 170.81
2-1/2" cap pa@2.94 Ea 59.00 137.70 5.29 201.99
3" cap pa@3.39 Ea 50.80 158.80 6.10 215.70
4" cap pa@4.00 Ea 65.50 187.30 7.20 260.00
6" cap pa@4.88 Ea 115.00 228.50 8.78 352.28

Type 316 Schedule 40 stainless steel pipe


With 150 lb. threaded fitting, using small tools.
1/2" pipe n8@.090 LF 14.20 4.58 0.05 18.83
3/4" pipe n8@.110 LF 16.00 5.60 0.07 21.67
1" pipe n8@.130 LF 21.10 6.62 0.08 27.80
1-1/4" pipe n8@.150 LF 26.80 7.63 0.09 34.52
1-1/2" pipe n8@.170 LF 31.70 8.65 0.10 40.45
2" pipe n8@.220 LF 41.70 11.20 0.13 53.03
2-1/2" pipe n8@.260 LF 62.20 13.23 0.16 75.59
3" pipe n8@.320 LF 82.90 16.28 0.19 99.37
4" pipe n8@.430 LF 112.00 21.88 0.26 134.14

90 degree elbows for Type 316 Schedule 40 stainless steel pipe


Using small tools.
1/2" ell n8@.320 Ea 14.50 16.28 0.19 30.97
3/4" ell n8@.430 Ea 18.20 21.88 0.26 40.34
1" ell n8@.540 Ea 21.40 27.48 0.32 49.20
1-1/4" ell n8@.740 Ea 35.30 37.66 0.44 73.40
1-1/2" ell n8@.870 Ea 37.20 44.27 0.52 81.99
2" ell n8@1.05 Ea 57.80 53.43 0.63 111.86
2-1/2" ell n8@1.67 Ea 140.00 84.99 1.00 225.99
3" ell n8@2.15 Ea 187.00 109.40 1.29 297.69
4" ell n8@2.67 Ea 355.00 135.90 1.60 492.50

45 degree elbows for Type 316 Schedule 40 stainless steel pipe


Using small tools.
1/2" ell n8@.320 Ea 19.60 16.28 0.19 36.07
3/4" ell n8@.430 Ea 24.10 21.88 0.26 46.24
1" ell n8@.540 Ea 24.40 27.48 0.32 52.20
1-1/4" ell n8@.740 Ea 32.30 37.66 0.44 70.40
1-1/2" ell n8@.870 Ea 38.80 44.27 0.52 83.59
2" ell n8@1.05 Ea 56.50 53.43 0.63 110.56
2-1/2" ell n8@1.67 Ea 184.00 84.99 1.00 269.99
3" ell n8@2.15 Ea 271.00 109.40 1.29 381.69
4" ell n8@2.67 Ea 490.00 135.90 1.60 627.50
2015 Heavy Construction Estimator, All Rights Reserved Page 558 (part 2)

Tees for Type 316 Schedule 40 stainless steel pipe


Using small tools.
1/2" tee n8@.490 Ea 20.50 24.94 0.29 45.73
3/4" tee n8@.650 Ea 25.30 33.08 0.39 58.77
1" tee n8@.800 Ea 26.60 40.71 0.48 67.79
1-1/4" tee n8@1.11 Ea 47.40 56.49 0.67 104.56
1-1/2" tee n8@1.25 Ea 55.40 63.61 0.75 119.76
2015 Heavy Construction Estimator, All Rights Reserved Page 559

2" tee n8@1.67 Ea 75.20 84.99 1.00 161.19


2-1/2" tee n8@2.41 Ea 220.00 122.60 1.45 344.05
3" tee n8@3.23 Ea 339.00 164.40 1.94 505.34
4" tee n8@4.00 Ea 549.00 203.60 2.40 755.00

Reducers for Type 316 Schedule 40 stainless steel pipe


Using small tools.
3/4" x 1/2" n8@.430 Ea 13.50 21.88 0.26 35.64
1" x 3/4" n8@.540 Ea 21.80 27.48 0.32 49.60
1-1/4" x 1" n8@.740 Ea 33.20 37.66 0.44 71.30
1-1/2" x 1-1/4" n8@.870 Ea 42.30 44.27 0.52 87.09
2" x 1-1/2" n8@1.05 Ea 60.60 53.43 0.63 114.66
2-1/2" x 2" n8@1.67 Ea 143.00 84.99 1.00 228.99
3" x 2-1/2" n8@2.15 Ea 195.00 109.40 1.29 305.69
4" x 3" n8@2.67 Ea 304.00 135.90 1.60 441.50

Unions for Type 316 Schedule 40 stainless steel pipe


Using small tools.
1/2" union n8@.490 Ea 28.90 24.94 0.29 54.13
3/4" union n8@.650 Ea 36.80 33.08 0.39 70.27
1" union n8@.800 Ea 58.70 40.71 0.48 99.89
1-1/4" union n8@1.11 Ea 105.00 56.49 0.67 162.16
1-1/2" union n8@1.25 Ea 126.00 63.61 0.75 190.36
2" union n8@1.67 Ea 166.00 84.99 1.00 251.99

Flanges for Type 316 Schedule 40 stainless steel pipe


Using small tools.
2-1/2" flange n8@1.67 Ea 142.00 84.99 1.00 227.99
3" flange n8@2.15 Ea 157.00 109.40 1.29 267.69
4" flange n8@2.67 Ea 225.00 135.90 1.60 362.50

Caps for Type 316 Schedule 40 stainless steel pipe


Using small tools.
1/2" cap n8@.160 Ea 5.23 8.14 0.10 13.47
3/4" cap n8@.220 Ea 7.62 11.20 0.13 18.95
1" cap n8@.270 Ea 11.20 13.74 0.16 25.10
1-1/4" cap n8@.380 Ea 29.30 19.34 0.23 48.87
1-1/2" cap n8@.430 Ea 33.80 21.88 0.26 55.94
2" cap n8@.540 Ea 42.90 27.48 0.32 70.70
2-1/2" cap n8@.800 Ea 69.10 40.71 0.48 110.29
3" cap n8@1.05 Ea 95.40 53.43 0.63 149.46
4" cap n8@1.33 Ea 176.00 67.68 0.80 244.48

Type 316 Schedule 10 stainless steel pipe


With butt weld fittings, using a 300-amp skid mounted welder and small tools.
1" pipe pa@.130 LF 16.30 6.09 0.23 22.62
1-1/4" pipe pa@.160 LF 20.10 7.49 0.29 27.88
1-1/2" pipe pa@.180 LF 22.70 8.43 0.32 31.45
2" pipe pa@.230 LF 29.00 10.77 0.41 40.18
2-1/2" pipe pa@.260 LF 35.60 12.18 0.47 48.25
3" pipe pa@.290 LF 46.00 13.58 0.52 60.10
4" pipe pa@.340 LF 56.70 15.92 0.61 73.23
6" pipe pa@.450 LF 91.30 21.07 0.81 113.18

90 degree elbows for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" ell pa@2.67 Ea 18.50 125.00 4.81 148.31
2015 Heavy Construction Estimator, All Rights Reserved Page 559 (part 2)

1-1/4" ell pa@3.35 Ea 33.50 156.90 6.03 196.43


1-1/2" ell pa@4.02 Ea 27.00 188.30 7.24 222.54
2" ell pa@5.30 Ea 34.80 248.20 9.54 292.54
2-1/2" ell pa@5.99 Ea 53.60 280.50 10.80 344.90
3" ell pa@6.80 Ea 60.10 318.40 12.20 390.70
4" ell pa@8.00 Ea 121.00 374.60 14.40 510.00
2015 Heavy Construction Estimator, All Rights Reserved Page 560

6" ell pa@10.1 Ea 335.00 473.00 18.20 826.20

45 degree elbows for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" ell pa@2.67 Ea 28.40 125.00 4.81 158.21
1-1/4" ell pa@3.34 Ea 49.20 156.40 6.01 211.61
1-1/2" ell pa@3.99 Ea 27.00 186.90 7.18 221.08
2" ell pa@5.30 Ea 28.60 248.20 9.54 286.34
2-1/2" ell pa@5.97 Ea 53.60 279.60 10.70 343.90
3" ell pa@6.76 Ea 48.20 316.60 12.20 377.00
4" ell pa@7.97 Ea 90.30 373.20 14.30 477.80
6" ell pa@10.0 Ea 190.00 468.30 18.00 676.30

Tees for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" tee pa@4.02 Ea 58.20 188.30 7.24 253.74
1-1/4" tee pa@5.00 Ea 115.00 234.20 9.00 358.20
1-1/2" tee pa@5.99 Ea 68.00 280.50 10.80 359.30
2" tee pa@7.97 Ea 70.40 373.20 14.30 457.90
2-1/2" tee pa@8.97 Ea 205.00 420.10 16.10 641.20
3" tee pa@10.2 Ea 133.00 477.70 18.40 629.10
4" tee pa@12.0 Ea 197.00 562.00 21.60 780.60
6" tee pa@15.2 Ea 569.00 711.80 27.40 1,308.20

Reducers for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" reducer pa@2.35 Ea 45.90 110.10 4.23 160.23
1-1/4" reducer pa@3.02 Ea 80.30 141.40 5.44 227.14
1-1/2" reducer pa@3.66 Ea 31.80 171.40 6.59 209.79
2" reducer pa@4.75 Ea 31.50 222.40 8.55 262.45
2-1/2" reducer pa@5.38 Ea 123.00 251.90 9.68 384.58

Slip-on flanges for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" flange pa@1.33 Ea 60.20 62.28 2.39 124.87
1-1/4" flange pa@1.67 Ea 69.70 78.21 3.01 150.92
1-1/2" flange pa@1.82 Ea 80.80 85.23 3.28 169.31
2" flange pa@2.67 Ea 108.00 125.00 4.81 237.81
2-1/2" flange pa@2.94 Ea 155.00 137.70 5.29 297.99
3" flange pa@3.39 Ea 166.00 158.80 6.10 330.90
4" flange pa@4.00 Ea 233.00 187.30 7.20 427.50
6" flange pa@4.88 Ea 361.00 228.50 8.78 598.28

Caps for Type 316 Schedule 10 stainless steel pipe


Using a 300-amp skid mounted welder and small tools.
1" cap pa@1.33 Ea 62.30 62.28 2.39 126.97
1-1/4" cap pa@1.67 Ea 157.00 78.21 3.01 238.22
1-1/2" cap pa@1.82 Ea 65.50 85.23 3.28 154.01
2" cap pa@2.67 Ea 50.80 125.00 4.81 180.61
2-1/2" cap pa@2.94 Ea 78.60 137.70 5.29 221.59
3" cap pa@3.39 Ea 67.20 158.80 6.10 232.10
4" cap pa@4.00 Ea 81.90 187.30 7.20 276.40
6" cap pa@4.88 Ea 147.00 228.50 8.78 384.28

.035 wall Type 304 stainless steel tubing


Using small tools.
1/4" tube n8@.050 LF 2.03 2.55 0.03 4.61
2015 Heavy Construction Estimator, All Rights Reserved Page 560 (part 2)

3/8" tube n8@.060 LF 2.10 3.05 0.04 5.19


1/2" tube n8@.080 LF 2.70 4.07 0.05 6.82
5/8" tube n8@.090 LF 8.23 4.58 0.05 12.86
3/4" tube n8@.100 LF 3.96 5.09 0.06 9.11
7/8" tube n8@.110 LF 11.40 5.60 0.07 17.07
1" tube n8@.130 LF 11.70 6.62 0.08 18.40
2015 Heavy Construction Estimator, All Rights Reserved Page 561

.049 wall Type 304 stainless steel tubing


Using small tools.
1/4" tube n8@.060 LF 5.99 3.05 0.04 9.08
3/8" tube n8@.080 LF 6.31 4.07 0.05 10.43
1/2" tube n8@.090 LF 8.06 4.58 0.05 12.69
5/8" tube n8@.110 LF 10.30 5.60 0.07 15.97
3/4" tube n8@.130 LF 11.20 6.62 0.08 17.90
7/8" tube n8@.150 LF 12.00 7.63 0.09 19.72
1" tube n8@.170 LF 14.10 8.65 0.10 22.85

.065 wall Type 304 stainless steel tubing


Using small tools.
1/4" tube n8@.080 LF 6.97 4.07 0.05 11.09
3/8" tube n8@.090 LF 8.09 4.58 0.05 12.72
1/2" tube n8@.110 LF 9.81 5.60 0.07 15.48
5/8" tube n8@.130 LF 11.20 6.62 0.08 17.90
3/4" tube n8@.150 LF 13.50 7.63 0.09 21.22
7/8" tube n8@.170 LF 15.70 8.65 0.10 24.45
1" tube n8@.190 LF 17.70 9.67 0.11 27.48

.035 wall Type 316 stainless steel tubing


Using small tools.
1/4" tube n8@.050 LF 2.21 2.55 0.03 4.79
3/8" tube n8@.060 LF 3.43 3.05 0.04 6.52
1/2" tube n8@.080 LF 3.43 4.07 0.05 7.55
5/8" tube n8@.090 LF 10.10 4.58 0.05 14.73
3/4" tube n8@.100 LF 11.50 5.09 0.06 16.65
7/8" tube n8@.110 LF 16.20 5.60 0.07 21.87
1" tube n8@.130 LF 15.30 6.62 0.08 22.00

.049 wall Type 316 stainless steel tubing


Using small tools.
1/4" tube n8@.060 LF 6.90 3.05 0.04 9.99
3/8" tube n8@.080 LF 7.25 4.07 0.05 11.37
1/2" tube n8@.090 LF 8.83 4.58 0.05 13.46
5/8" tube n8@.110 LF 12.00 5.60 0.07 17.67
3/4" tube n8@.130 LF 13.30 6.62 0.08 20.00
7/8" tube n8@.150 LF 18.50 7.63 0.09 26.22
1" tube n8@.170 LF 17.10 8.65 0.10 25.85

.065 wall Type 316 stainless steel tubing


Using small tools.
1/4" tube n8@.080 LF 8.06 4.07 0.05 12.18
3/8" tube n8@.090 LF 8.80 4.58 0.05 13.43
1/2" tube n8@.110 LF 11.00 5.60 0.07 16.67
5/8" tube n8@.130 LF 13.10 6.62 0.08 19.80
3/4" tube n8@.150 LF 16.40 7.63 0.09 24.12
7/8" tube n8@.170 LF 17.60 8.65 0.10 26.35
1" tube n8@.190 LF 21.20 9.67 0.11 30.98

Type 316 stainless steel tube fittings - 90 degree elbows


Using small tools.
1/4" tube n8@.220 Ea 21.70 11.20 0.13 33.03
3/8" tube n8@.240 Ea 27.40 12.21 0.14 39.75
1/2" tube n8@.270 Ea 49.10 13.74 0.16 63.00
5/8" tube n8@.300 Ea 51.20 15.27 0.18 66.65
2015 Heavy Construction Estimator, All Rights Reserved Page 561 (part 2)

3/4" tube n8@.320 Ea 58.30 16.28 0.19 74.77


7/8" tube n8@.360 Ea 87.00 18.32 0.22 105.54
1" tube n8@.430 Ea 113.00 21.88 0.26 135.14

Type 316 stainless steel tube fittings - Union tees


Using small tools.
1/4" tee n8@.320 Ea 36.10 16.28 0.19 52.57
3/8" tee n8@.360 Ea 46.80 18.32 0.22 65.34
2015 Heavy Construction Estimator, All Rights Reserved Page 562

1/2" tee n8@.400 Ea 71.80 20.36 0.24 92.40


5/8" tee n8@.450 Ea 75.10 22.90 0.27 98.27
3/4" tee n8@.490 Ea 104.00 24.94 0.29 129.23
7/8" tee n8@.540 Ea 187.00 27.48 0.32 214.80
1" tee n8@.650 Ea 224.00 33.08 0.39 257.47

Type 316 stainless steel tube fittings - Unions


Using small tools.
1/4" union n8@.320 Ea 17.00 16.28 0.19 33.47
3/8" union n8@.360 Ea 24.80 18.32 0.22 43.34
1/2" union n8@.400 Ea 37.30 20.36 0.24 57.90
5/8" union n8@.450 Ea 46.90 22.90 0.27 70.07
3/4" union n8@.490 Ea 58.50 24.94 0.29 83.73
7/8" union n8@.540 Ea 99.50 27.48 0.32 127.30
1" union n8@.650 Ea 103.00 33.08 0.39 136.47

Type 316 stainless steel tube fittings - Male connectors


Using small tools.
1/4" x 1/4" n8@.220 Ea 11.30 11.20 0.13 22.63
3/8" x 3/8" n8@.240 Ea 17.10 12.21 0.14 29.45
1/2" x 1/2" n8@.270 Ea 25.60 13.74 0.16 39.50
5/8" x 5/8" n8@.300 Ea 29.00 15.27 0.18 44.45
3/4" x 3/4" n8@.320 Ea 38.40 16.28 0.19 54.87
7/8" x 7/8" n8@.360 Ea 69.30 18.32 0.22 87.84
1" x 1" n8@.430 Ea 68.00 21.88 0.26 90.14

Type 316 stainless steel valves - Gate valves


Using small tools.
1/4" valve n8@.320 Ea 193.00 16.28 0.19 209.47
3/8" valve n8@.380 Ea 348.00 19.34 0.23 367.57
1/2" valve n8@.430 Ea 348.00 21.88 0.26 370.14
3/4" valve n8@.490 Ea 383.00 24.94 0.29 408.23
1" valve n8@.650 Ea 328.00 33.08 0.39 361.47

Type 316 stainless steel valves - Globe valves


Using small tools.
1/4" valve n8@.320 Ea 196.00 16.28 0.19 212.47
3/8" valve n8@.380 Ea 115.00 19.34 0.23 134.57
1/2" valve n8@.430 Ea 223.00 21.88 0.26 245.14
3/4" valve n8@.490 Ea 246.00 24.94 0.29 271.23
1" valve n8@.650 Ea 367.00 33.08 0.39 400.47

Type 316 stainless steel valves - Check valves


Using small tools.
1/4" valve n8@.320 Ea 289.00 16.28 0.19 305.47
3/8" valve n8@.380 Ea 289.00 19.34 0.23 308.57
1/2" valve n8@.430 Ea 161.00 21.88 0.26 183.14
3/4" valve n8@.490 Ea 164.00 24.94 0.29 189.23
1" valve n8@.650 Ea 168.00 33.08 0.39 201.47

Type 316L Schedule 10 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" pipe pj@.760 LF 124.00 33.48 2.26 159.74
10" pipe pj@.840 LF 164.00 37.00 2.49 203.49
12" pipe pj@.930 LF 213.00 40.97 2.76 256.73
14" pipe pj@1.05 LF 276.00 46.25 3.12 325.37
16" pipe pj@1.20 LF 298.00 52.86 3.56 354.42
2015 Heavy Construction Estimator, All Rights Reserved Page 562 (part 2)

18" pipe pj@1.40 LF 328.00 61.67 4.16 393.83


20" pipe pj@1.68 LF 309.00 74.00 4.99 387.99
24" pipe pj@2.10 LF 647.00 92.51 6.24 745.75
2015 Heavy Construction Estimator, All Rights Reserved Page 563

90 degree elbows for Type 316L Schedule 10 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" ell pj@17.0 Ea 288.00 748.90 50.50 1,087.40
10" ell pj@19.1 Ea 534.00 841.40 56.70 1,432.10
12" ell pj@21.8 Ea 838.00 960.30 64.70 1,863.00
14" ell pj@25.5 Ea 1,130.00 1,123.00 75.70 2,328.70
16" ell pj@30.6 Ea 1,480.00 1,348.00 90.90 2,918.90
18" ell pj@38.2 Ea 1,900.00 1,683.00 113.00 3,696.00
20" ell pj@50.9 Ea 3,360.00 2,242.00 151.00 5,753.00
24" ell pj@76.4 Ea 4,600.00 3,365.00 227.00 8,192.00

45 degree elbows for Type 316L Schedule 10 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" ell pj@17.0 Ea 168.00 748.90 50.50 967.40
10" ell pj@19.1 Ea 276.00 841.40 56.70 1,174.10
12" ell pj@21.8 Ea 441.00 960.30 64.70 1,466.00
14" ell pj@25.5 Ea 585.00 1,123.00 75.70 1,783.70
16" ell pj@30.6 Ea 768.00 1,348.00 90.90 2,206.90
18" ell pj@38.2 Ea 1,120.00 1,683.00 113.00 2,916.00
20" ell pj@50.9 Ea 2,150.00 2,242.00 151.00 4,543.00
24" ell pj@76.4 Ea 2,830.00 3,365.00 227.00 6,422.00

Tees for Type 316L Schedule 10 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" pipe pj@19.2 Ea 419.00 845.80 57.00 1,321.80
10" pipe pj@21.7 Ea 601.00 955.90 64.40 1,621.30
12" pipe pj@24.9 Ea 1,300.00 1,097.00 74.00 2,471.00
14" pipe pj@29.2 Ea 1,710.00 1,286.00 86.70 3,082.70
16" pipe pj@35.4 Ea 1,820.00 1,559.00 105.00 3,484.00
18" pipe pj@44.8 Ea 2,170.00 1,973.00 133.00 4,276.00
20" pipe pj@61.1 Ea 2,890.00 2,691.00 181.00 5,762.00
24" pipe pj@95.9 Ea 4,310.00 4,224.00 285.00 8,819.00

Reducers for Type 316L Schedule 10 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" pipe pj@17.0 Ea 160.00 748.90 50.50 959.40
10" pipe pj@19.1 Ea 222.00 841.40 56.70 1,120.10
12" pipe pj@21.8 Ea 294.00 960.30 64.70 1,319.00
14" pipe pj@25.5 Ea 396.00 1,123.00 75.70 1,594.70
16" pipe pj@30.6 Ea 494.00 1,348.00 90.90 1,932.90
18" pipe pj@38.2 Ea 608.00 1,683.00 113.00 2,404.00
20" pipe pj@50.9 Ea 1,050.00 2,242.00 151.00 3,443.00
24" pipe pj@76.4 Ea 1,720.00 3,365.00 227.00 5,312.00

Flanges, ductile iron


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" diameter pj@6.72 Ea 31.50 296.00 20.00 347.50
10" diameter pj@7.47 Ea 54.60 329.10 22.20 405.90
12" diameter pj@8.40 Ea 80.60 370.00 24.90 475.50
14" diameter pj@9.60 Ea 109.00 422.90 28.50 560.40
16" diameter pj@11.2 Ea 149.00 493.40 33.30 675.70
18" diameter pj@13.4 Ea 151.00 590.30 39.80 781.10
20" diameter pj@16.8 Ea 214.00 740.00 49.90 1,003.90
22" diameter pj@22.4 Ea 528.00 986.70 66.50 1,581.20

Type 316L Schedule 40 stainless steel pipe


With welded butt fittings, using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 563 (part 2)

8" pipe pj@.760 LF 299.00 33.48 2.26 334.74


10" pipe pj@.840 LF 443.00 37.00 2.49 482.49
12" pipe pj@.930 LF 549.00 40.97 2.76 592.73
2015 Heavy Construction Estimator, All Rights Reserved Page 564

90 degree elbows for Type 316L Schedule 40 stainless steel pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" pipe pj@17.0 Ea 919.00 748.90 50.50 1,718.40
10" pipe pj@19.1 Ea 2,090.00 841.40 56.70 2,988.10
12" pipe pj@21.8 Ea 2,790.00 960.30 64.70 3,815.00

45 degree elbows for Type 316L Schedule 40 stainless steel pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" ell pj@17.0 Ea 696.00 748.90 50.50 1,495.40
10" ell pj@19.1 Ea 1,470.00 841.40 56.70 2,368.10
12" ell pj@21.8 Ea 2,060.00 960.30 64.70 3,085.00

Tees for Type 316L Schedule 40 stainless steel pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" pipe pj@19.2 Ea 1,730.00 845.80 57.00 2,632.80
10" pipe pj@21.7 Ea 3,220.00 955.90 64.40 4,240.30
12" pipe pj@24.9 Ea 4,150.00 1,097.00 74.00 5,321.00

Reducers for Type 316L Schedule 40 stainless steel pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" reducer pj@17.0 Ea 455.00 748.90 50.50 1,254.40
10" reducer pj@19.1 Ea 766.00 841.40 56.70 1,664.10
12" reducer pj@21.8 Ea 803.00 960.30 64.70 1,828.00

Flanges for Type 316L Schedule 40 stainless steel pipe


Using a 20-ton hydraulic crane with 70’ boom and small tools.
8" flange pj@6.72 Ea 670.00 296.00 20.00 986.00
10" flange pj@7.47 Ea 965.00 329.10 22.20 1,316.30
12" flange pj@8.40 Ea 1,420.00 370.00 24.90 1,814.90

CSI 15-075, Rubber hose

Rubber hose
General purpose hose for medium pressure water applications requiring excellent resistance to air, oil,
and heat, using small tools.
3/8" inside diameter nd@.090 LF 0.36 4.70 0.03 5.09
1/2" inside diameter nd@.090 LF 0.47 4.70 0.03 5.20
5/8" inside diameter nd@.090 LF 0.73 4.70 0.03 5.46
3/4" inside diameter nd@.090 LF 0.66 4.70 0.03 5.39
1" inside diameter nd@.110 LF 1.28 5.75 0.04 7.07
1-1/4" inside diameter nd@.120 LF 1.95 6.27 0.04 8.26
1-1/2" inside diameter nd@.140 LF 2.34 7.32 0.05 9.71

Serrated shank nipples for rubber hose medium pressure coupling


Using small tools.
3/8" inside diameter
x 1/2" male pipe thread nd@.210 Ea 0.59 10.97 0.08 11.64
1/2" inside diameter
x 5/8" male pipe thread nd@.210 Ea 0.50 10.97 0.08 11.55
5/8" inside diameter
x 3/4" male pipe thread nd@.210 Ea 0.50 10.97 0.08 11.55
3/4" inside diameter
x 1" male pipe thread nd@.260 Ea 3.97 13.59 0.09 17.65
1" inside diameter
x 1-1/4" male pipe thread nd@.270 Ea 1.38 14.11 0.10 15.59
1-1/4" inside diameter
2015 Heavy Construction Estimator, All Rights Reserved Page 564 (part 2)

x 1-1/2" male pipe thread nd@.520 Ea 1.82 27.17 0.19 29.18


1-1/2" inside diameter
x 2" male pipe thread nd@.650 Ea 1.82 33.96 0.23 36.01

Worm-drive clamps for rubber hose


Using small tools.
3/8" inside diameter,
1" outside diameter nd@.100 Ea 0.32 5.23 0.04 5.59
1/2" inside diameter,
1-1/6" outside diameter nd@.100 Ea 0.34 5.23 0.04 5.61
5/8" inside diameter,
1-1/2" outside diameter nd@.110 Ea 0.34 5.75 0.04 6.13
3/4" inside diameter,
2" outside diameter nd@.120 Ea 0.35 6.27 0.04 6.66
1" inside diameter,
2-1/2" outside diameter nd@.130 Ea 0.35 6.79 0.05 7.19
1-1/4" inside diameter,
2-3/4" outside diameter nd@.140 Ea 0.42 7.32 0.05 7.79
1-1/2" inside diameter,
3" outside diameter nd@.150 Ea 0.44 7.84 0.05 8.33

Chemical resistant 6" flexible rubber hoses, 50' long


Using small tools.
Brown gum rubber,
chemical resistant nz@4.90 Ea 1,250.00 223.60 2.84 1,476.44
Nitrile rubber, low pH resistance nz@4.90 Ea 2,080.00 223.60 2.84 2,306.44

Rubber water pump hose, 2" diameter


Using small tools.
Discharge hose, 20' long nd@1.22 Ea 151.00 63.75 0.44 215.19
2015 Heavy Construction Estimator, All Rights Reserved Page 565

Intake hose, 20' long nd@1.22 Ea 163.00 63.75 0.44 227.19

1-1/2" high pressure hose, including rack and supports


Using small tools.
Hose reel with 100' hose nd@2.20 Ea 1,360.00 115.00 0.79 1,475.79

Wash rack equipment


Using a 300-amp skid mounted welder and small tools.
Wash station support qy@4.00 Ea 380.00 218.50 11.00 609.50

Wash rack equipment


Using a 20-ton hydraulic crane with 70’ boom, a 200-amp trailer mounted welder and two sets of small
tools.
Wash station overhead support qi@56.0 Ea 435.00 2,744.00 524.00 3,703.00

CSI 15-080, Piping specialties

Automatic air vents, cast iron


With guided free floating lever, by nominal pipe thread (NPT), using small tools.
1/2" nominal pipe thread,
3-1/2" diameter n6@.590 Ea 124.00 30.03 0.35 154.38
3/4" nominal pipe thread,
6-3/8" diameter n6@.770 Ea 589.00 39.19 0.46 628.65
1-1/4 nominal pipe thread,
10-3/16" diameter n6@1.23 Ea 1,250.00 62.59 0.74 1,313.33
2" nominal pipe thread,
12-3/16" diameter n6@1.75 Ea 827.00 89.06 1.05 917.11

Dial thermometers
Bi-metal, various ranges, steel case, brass stem, using small tools.
2" diameter dial and 4" to 9" stem n6@.630 Ea 29.80 32.06 0.38 62.24
2.5" diameter
dial and 4" to 9" stem n6@.630 Ea 44.10 32.06 0.38 76.54
3.5" diameter
dial and 4" to 9" stem n6@.630 Ea 44.10 32.06 0.38 76.54

Mercury filled industrial thermometers with union connection


Various ranges, using small tools.
7" scale and angle stem n6@.630 Ea 58.40 32.06 0.38 90.84
9" scale and angle stem n6@.630 Ea 58.40 32.06 0.38 90.84
12" scale and angle stem n6@.630 Ea 88.20 32.06 0.38 120.64
7" scale and straight stem n6@.630 Ea 62.30 32.06 0.38 94.74
9" scale and straight stem n6@.630 Ea 68.80 32.06 0.38 101.24
12" scale and straight stem n6@.630 Ea 92.10 32.06 0.38 124.54

Mercury filled industrial thermometers with separable socket


Various ranges, using small tools.
7" scale and angle stem, adjustable n6@.630 Ea 58.40 32.06 0.38 90.84
9" scale and angle stem n6@.630 Ea 58.40 32.06 0.38 90.84
12" scale and angle stem n6@.630 Ea 88.20 32.06 0.38 120.64
7" scale and straight stem n6@.630 Ea 75.30 32.06 0.38 107.74
9" scale and straight stem n6@.630 Ea 88.20 32.06 0.38 120.64
12" scale and straight stem n6@.630 Ea 91.50 32.06 0.38 123.94

Pressure gauges - Steel case, to 300 PSI


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 565 (part 2)

2" diameter dial n6@.630 Ea 8.30 32.06 0.38 40.74


4" diameter dial n6@.630 Ea 16.00 32.06 0.38 48.44

Pressure gauges - Aluminum case, to 300 PSI


Using small tools.
3.5" diameter dial n6@.630 Ea 68.80 32.06 0.38 101.24
4.5" diameter dial n6@.630 Ea 68.80 32.06 0.38 101.24
6.0" diameter dial n6@.630 Ea 92.10 32.06 0.38 124.54
8.5" diameter dial n6@.630 Ea 230.00 32.06 0.38 262.44

Pressure gauges - Brass case, to 300 PSI


Using small tools.
2" diameter dial n6@.630 Ea 27.20 32.06 0.38 59.64
4.5" diameter dial n6@.630 Ea 12.00 32.06 0.38 44.44

Pressure gauges - Steel case, high pressure, to 10k PSI


Using small tools.
4.5" diameter dial n6@1.25 Ea 232.00 63.61 0.75 296.36
6.5" diameter dial n6@1.25 Ea 232.00 63.61 0.75 296.36
2015 Heavy Construction Estimator, All Rights Reserved Page 566

8.5" diameter dial n6@1.25 Ea 232.00 63.61 0.75 296.36

Temperature and pressure gauge specialties


Using small tools.
Brass gauge cock,
1/4" female pipe thread n6@.310 Ea 13.60 15.78 0.19 29.57
Brass gauge cock,
1/4" male pipe thread n6@.310 Ea 7.50 15.78 0.19 23.47
Pigtail, steam siphon 1/4" n6@.310 Ea 3.90 15.78 0.19 19.87
Nipple, 1/4", black steel 3" (76mm) n6@.210 Ea 0.50 10.69 0.13 11.32
Snubber valve, 1/4" air input n6@.530 Ea 15.60 26.97 0.32 42.89
Thread-o-let, 1/4" steel n6@.630 Ea 3.91 32.06 0.38 36.35
Union, 1/4" black steel n6@.370 Ea 3.59 18.83 0.22 22.64
Coupling, 1/4" black steel n6@.370 Ea 2.04 18.83 0.22 21.09
Plug, 1/4" black steel n6@.320 Ea 1.40 16.28 0.19 17.87
Cap, 1/4" black steel n6@.320 Ea 1.95 16.28 0.19 18.42
Pete's plug n6@.330 Ea 56.60 16.79 0.20 73.59

Differential pressure gauges


Magnehelic pressure gauge, using small tools.
To 2" gauge with air filter kit nb@2.50 Ea 74.00 130.80 1.43 206.23

CSI 15-082, Swivel joints

Straight through carbon steel swivel joints


BUNA-N seat, for oils, gasoline, water, air, gas, and chemicals, using small tools.
1" threaded n6@1.06 Ea 224.00 53.94 0.64 278.58
1-1/2" threaded n6@1.35 Ea 311.00 68.70 0.81 380.51
2" threaded n6@1.67 Ea 391.00 84.99 1.00 476.99
3" threaded n6@2.00 Ea 442.00 101.80 1.20 545.00
3" flanged n6@2.22 Ea 601.00 113.00 1.33 715.33
4" flanged n6@2.50 Ea 811.00 127.20 1.50 939.70

CSI 15-083, Strainers, filters and dryers

Strainers - Iron body, Y-type, 250 lbs. (113kg), flanged ends


Using small tools.
1/4" and 3/8" strainer n6@.150 Ea 13.40 7.63 0.09 21.12
1/2" strainer n6@.200 Ea 15.40 10.18 0.12 25.70
3/4" strainer n6@.260 Ea 17.70 13.23 0.16 31.09
1" strainer n6@.330 Ea 22.20 16.79 0.20 39.19
1-1/4" strainer n6@.440 Ea 31.00 22.39 0.26 53.65
2015 Heavy Construction Estimator, All Rights Reserved Page 567

1-1/2" strainer n6@.500 Ea 36.80 25.45 0.30 62.55


2" strainer n6@.500 Ea 342.00 25.45 0.30 367.75
Add for galvanized body strainers ---@--- % 50.00 -- -- --

Strainers - Iron body strainer, Y-type, 125 lbs. (58kg), flanged ends
Using small tools.
1-1/2" strainer n8@.350 Ea 150.00 17.81 0.21 168.02
2" strainer n8@.500 Ea 249.00 25.45 0.30 274.75
3" strainer n8@.750 Ea 298.00 38.17 0.45 336.62
4" strainer n8@1.35 Ea 531.00 68.70 0.81 600.51
5" strainer pe@2.00 Ea 819.00 86.82 1.28 907.10
6" strainer pe@2.50 Ea 1,090.00 108.50 1.60 1,200.10
8" strainer pe@3.00 Ea 1,740.00 130.20 1.92 1,872.12
10" strainer pe@4.00 Ea 2,470.00 173.60 2.56 2,646.16
12" strainer pe@5.00 Ea 3,700.00 217.10 3.20 3,920.30
Add for galvanized body strainers ---@--- % 50.00 -- -- --

Strainers - Bronze body strainer, Y-type, 150 lbs. (68kg) screwed ends
Using small tools.
1" strainer n6@.330 Ea 38.90 16.79 0.20 55.89
1-1/2" strainer n6@.500 Ea 63.00 25.45 0.30 88.75
2" strainer n6@.550 Ea 102.00 27.99 0.33 130.32
3" strainer n8@.750 Ea 306.00 38.17 0.45 344.62
4" strainer n8@1.25 Ea 380.00 63.61 0.75 444.36
Add for 300 lb (136kg) rating ---@--- 17.00 -- -- --

Strainers - Bronze body strainer, Y-type, 150 lbs. (68kg), threaded ends
Using small tools.
1/2" strainer n6@.230 Ea 23.70 11.70 0.14 35.54
3/4" strainer n8@.260 Ea 30.70 13.23 0.16 44.09
1" strainer n8@.330 Ea 38.90 16.79 0.20 55.89
1-1/4" strainer pe@.440 Ea 48.60 19.10 0.28 67.98
1-1/2" strainer pe@.500 Ea 63.00 21.71 0.32 85.03
2" strainer pe@.550 Ea 102.00 23.88 0.35 126.23
Add for 300 lbs. (136kg) rating ---@--- % 36.00 -- -- --

CSI 15-084, Basket strainers

Bronze basket strainers, screwed ends


Using small tools.
1" strainer n6@.550 Ea 244.00 27.99 0.33 272.32
1-1/2" strainer n6@.650 Ea 373.00 33.08 0.39 406.47
2" strainer n6@.800 Ea 649.00 40.71 0.48 690.19
2-1/2" strainer n8@1.05 Ea 862.00 53.43 0.63 916.06
3" strainer n8@1.10 Ea 1,250.00 55.98 0.66 1,306.64

Bronze basket strainers, flared ends


Using small tools.
3" strainer n8@2.22 Ea 1,490.00 113.00 1.33 1,604.33
4" strainer n8@2.86 Ea 2,700.00 145.50 1.72 2,847.22
6" strainer pe@5.60 Ea 4,610.00 243.10 3.58 4,856.68
8" strainer pe@7.00 Ea 5,330.00 303.90 4.48 5,638.38

CSI 15-086, Vacuum breakers

Brass vacuum breakers


With stainless steel ball and spring, by inlet nominal pipe thread, anti-siphon, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 567 (part 2)

1/2" vacuum breaker nb@.210 Ea 30.10 10.98 0.12 41.20


3/4" vacuum breaker nb@.250 Ea 35.60 13.08 0.14 48.82
1" vacuum breaker nb@.300 Ea 52.50 15.69 0.17 68.36
1-1/2" vacuum breaker nb@.450 Ea 115.00 23.54 0.26 138.80
2015 Heavy Construction Estimator, All Rights Reserved Page 568

CSI 15-087, Shock absorbers

Bellows type water shock absorbers


By nominal pipe thread, female, using small tools.
3/4", 11 fixture unit nb@.650 Ea 30.20 34.00 0.37 64.57
1", 32 fixture unit nb@.900 Ea 59.40 47.07 0.51 106.98
1", 60 fixture unit nb@.950 Ea 67.70 49.69 0.54 117.93
1", 113 fixture unit nb@1.25 Ea 628.00 65.38 0.71 694.09
1", 154 fixture unit nb@1.25 Ea 968.00 65.38 0.71 1,034.09
1-1/2", 300 fixture unit nb@1.75 Ea 752.00 91.53 1.00 844.53

CSI 15-088, Medical gas system specialties

Medical gas vacuum system - Alarm panel


Using small tools.
Outlet alarm panel nb@2.50 Ea 1,180.00 130.80 1.43 1,312.23

Medical gas vacuum system - Nitrogen and oxygen pipe manifold


Using small tools.
5 cylinders nb@10.0 Ea 2,190.00 523.00 5.70 2,718.70
10 cylinders nb@19.8 Ea 3,710.00 1,036.00 11.30 4,757.30

Medical gas vacuum system - Outlets and valves


Using small tools.
Recessed wall mounted,
single outlet nb@2.50 Ea 81.80 130.80 1.43 214.03
Ceiling type, 6 outlets nb@3.33 Ea 185.00 174.20 1.90 361.10
2" zone valve with box nb@2.50 Ea 262.00 130.80 1.43 394.23

Medical gas vacuum system - Gas or vacuum alarm panel


Using small tools.
Medical
gases and vacuum alarm panel nb@2.50 Ea 1,180.00 130.80 1.43 1,312.23

CSI 15-092, Wall seals, sleeves, holes

Ductile iron wall sleeves


With rubber gasket and seal, using small tools.
3" sleeve nf@.180 Ea 14.10 8.17 0.10 22.37
4" sleeve nf@.220 Ea 21.50 9.98 0.12 31.60
6" sleeve nf@.270 Ea 27.90 12.25 0.15 40.30
8" sleeve nf@.270 Ea 32.80 12.25 0.15 45.20
10" sleeve nf@.290 Ea 36.20 13.16 0.16 49.52
12" sleeve nf@.310 Ea 41.70 14.06 0.17 55.93

Steel pipe sleeves, galvanized


With 12" long link seals, by inside sleeve diameter, using a 300-amp skid mounted welder and small
tools.
2" inside diameter pa@.130 Ea 5.07 6.09 0.23 11.39
3" inside diameter pa@.180 Ea 5.28 8.43 0.32 14.03
4" inside diameter pa@.220 Ea 6.01 10.30 0.40 16.71
5" inside diameter pa@.250 Ea 7.45 11.71 0.45 19.61
6" inside diameter pa@.270 Ea 8.05 12.64 0.49 21.18
8" inside diameter pa@.270 Ea 9.26 12.64 0.49 22.39
10" inside diameter pa@.290 Ea 10.80 13.58 0.52 24.90
2015 Heavy Construction Estimator, All Rights Reserved Page 568 (part 2)

12" inside diameter pa@.310 Ea 14.60 14.52 0.56 29.68


14" inside diameter pa@.330 Ea 27.30 15.45 0.59 43.34

Split-ring type escutcheons, chrome plated


Using small tools.
1/2" pipe nd@.050 Ea 8.39 2.61 0.02 11.02
3/4" pipe nd@.060 Ea 8.39 3.14 0.02 11.55
1" pipe nd@.060 Ea 10.00 3.14 0.02 13.16
1-1/4" pipe nd@.070 Ea 10.00 3.66 0.03 13.69
1-1/2" pipe nd@.070 Ea 10.00 3.66 0.03 13.69
2" pipe nd@.080 Ea 12.40 4.18 0.03 16.61
2-1/2" pipe nd@.090 Ea 68.70 4.70 0.03 73.43
3" pipe nd@.090 Ea 73.30 4.70 0.03 78.03
3-1/2" pipe nd@.100 Ea 113.00 5.23 0.04 118.27
2015 Heavy Construction Estimator, All Rights Reserved Page 569

4" pipe nd@.100 Ea 77.40 5.23 0.04 82.67


5" pipe nd@.110 Ea 126.00 5.75 0.04 131.79
6" pipe nd@.120 Ea 159.00 6.27 0.04 165.31

CSI 15-093, Flashing and safing

Lead boot roof flashing


For built up roofing, 4 lb. lead. For EPDM flashing and boot, see CSI 07-530, using small tools.
2" vent through roof nb@.350 Ea 33.60 18.31 0.20 52.11
4" vent through roof nb@.710 Ea 40.40 37.13 0.40 77.93
6" vent through roof nb@.710 Ea 47.10 37.13 0.40 84.63
8" vent through roof nb@.710 Ea 57.90 37.13 0.40 95.43

Galvanized metal roof flashing


For shingle roofing, with neoprene collar, using small tools.
2" vent through roof nb@.250 Ea 6.43 13.08 0.14 19.65
3" vent through roof nb@.250 Ea 7.44 13.08 0.14 20.66
4" vent through roof nb@.250 Ea 8.19 13.08 0.14 21.41
6" vent through roof nb@.350 Ea 8.91 18.31 0.20 27.42

Sheet lead roof drain for built-up roofing


Using small tools.
4 lbs. per square foot lead drain nb@1.49 Ea 83.70 77.93 0.85 162.48

Composite water proofing membrane


For tub and shower enclosures, using small tools.
Shower pan liner,
composite membrane nd@.500 SF 1.53 26.13 0.18 27.84

CSI 15-094, Hangers and supports

Clevis pipe hangers


Hanger sizes are based on pipe sizes. Add an allowance for insulation, if required. For example, 4" pipe
with 1" insulation requires a 6" hanger minimum. Add the cost of hanger rod and clamp below, using
small tools.
3/4" hanger nb@.160 Ea 0.65 8.37 0.09 9.11
1" hanger nb@.160 Ea 0.70 8.37 0.09 9.16
2" hanger nb@.170 Ea 0.80 8.89 0.10 9.79
3" hanger nb@.190 Ea 2.10 9.94 0.11 12.15
4" hanger nb@.190 Ea 2.87 9.94 0.11 12.92
6" hanger nb@.190 Ea 5.40 9.94 0.11 15.45
8" hanger nb@.200 Ea 10.20 10.46 0.11 20.77
10" hanger nb@.250 Ea 14.80 13.08 0.14 28.02
12" hanger nb@.250 Ea 20.60 13.08 0.14 33.82
14" hanger ph@.300 Ea 32.80 13.32 0.20 46.32
16" hanger ph@.300 Ea 41.70 13.32 0.20 55.22
18" hanger ph@.350 Ea 65.90 15.54 0.23 81.67
20" hanger ph@.350 Ea 96.60 15.54 0.23 112.37

Clevis roller pipe hangers


Hanger sizes are based on pipe sizes. Add an allowance for insulation, if required. For example, 4" pipe
with 1" insulation requires a 6" hanger minimum. Add the cost of hanger rod and clamp below, using
small tools.
2" hanger n6@.260 Ea 12.70 13.23 0.16 26.09
3" hanger n6@.290 Ea 13.30 14.76 0.17 28.23
4" hanger n6@.290 Ea 18.70 14.76 0.17 33.63
6" hanger n6@.290 Ea 31.70 14.76 0.17 46.63
2015 Heavy Construction Estimator, All Rights Reserved Page 569 (part 2)

8" hanger n6@.300 Ea 50.00 15.27 0.18 65.45


10" hanger n6@.380 Ea 73.40 19.34 0.23 92.97
12" hanger n6@.380 Ea 98.40 19.34 0.23 117.97
14" hanger n6@.450 Ea 133.00 22.90 0.27 156.17
16" hanger n6@.450 Ea 183.00 22.90 0.27 206.17

Adjustable band pipe hangers


Hanger sizes are based on pipe sizes. Add an allowance for insulation, if required. For example, 4" pipe
with 1" insulation requires a 6" hanger minimum. Add the cost of hanger rod and clamp below, using
small tools.
1/2" hanger nc@.050 Ea 0.98 2.46 0.03 3.47
2015 Heavy Construction Estimator, All Rights Reserved Page 570

3/4" hanger nc@.050 Ea 1.08 2.46 0.03 3.57


1" hanger nc@.050 Ea 2.50 2.46 0.03 4.99
1-1/4" hanger nc@.050 Ea 3.34 2.46 0.03 5.83
1-1/2" hanger nc@.050 Ea 4.00 2.46 0.03 6.49
2" hanger nc@.050 Ea 6.09 2.46 0.03 8.58
2-1/2" hanger nc@.050 Ea 6.26 2.46 0.03 8.75
3" hanger nc@.050 Ea 6.51 2.46 0.03 9.00
4" hanger nc@.050 Ea 6.67 2.46 0.03 9.16

Riser clamp pipe hangers


Hanger sizes are based on pipe sizes. Add an allowance for insulation, if required. For example, 4" pipe
with 1" insulation requires a 6" hanger minimum. Add the cost of hanger rod and clamp below, using
small tools.
1" hanger nc@.100 Ea 5.50 4.92 0.06 10.48
2" hanger nc@.110 Ea 7.42 5.41 0.06 12.89
3" hanger nc@.120 Ea 8.56 5.90 0.07 14.53
4" hanger nc@.130 Ea 10.80 6.39 0.07 17.26
5" hanger nc@.150 Ea 14.20 7.38 0.08 21.66
6" hanger nc@.200 Ea 17.80 9.83 0.11 27.74
8" hanger nc@.200 Ea 29.00 9.83 0.11 38.94
10" hanger nc@.250 Ea 43.20 12.29 0.14 55.63
12" hanger nc@.250 Ea 51.20 12.29 0.14 63.63

Split malleable iron pipe hangers


Hanger sizes are based on pipe sizes. Add an allowance for insulation, if required. For example, 4" pipe
with 1" insulation requires a 6" hanger minimum. Add the cost of hanger rod and clamp below, using
small tools.
1/2" hanger nb@.040 Ea 1.17 2.09 0.02 3.28
3/4" hanger nb@.040 Ea 1.17 2.09 0.02 3.28
1" hanger nb@.040 Ea 2.50 2.09 0.02 4.61
1-1/4" hanger nb@.050 Ea 3.50 2.62 0.03 6.15
1-1/2" hanger nb@.050 Ea 3.84 2.62 0.03 6.49
2" hanger nb@.060 Ea 6.09 3.14 0.03 9.26
2-1/2" hanger nb@.060 Ea 6.26 3.14 0.03 9.43
3" hanger nb@.070 Ea 6.42 3.66 0.04 10.12
4" hanger nb@.070 Ea 6.67 3.66 0.04 10.37

Single pipe roll hangers


Not including rod and nuts. Hanger sizes are based on pipe sizes. Add an allowance for insulation, if
required. Add the cost of hanger rod and clamp below, using small tools.
1" hanger n7@.270 Ea 14.20 12.64 0.16 27.00
1-1/2" hanger n7@.290 Ea 14.60 13.58 0.17 28.35
2" hanger n7@.310 Ea 15.80 14.52 0.19 30.51
2-1/2" hanger n7@.330 Ea 18.30 15.45 0.20 33.95
3" hanger n7@.400 Ea 19.30 18.73 0.24 38.27
4" hanger n7@.520 Ea 20.20 24.35 0.31 44.86
6" hanger n7@.520 Ea 20.20 24.35 0.31 44.86
8" hanger n7@.580 Ea 37.50 27.16 0.35 65.01
10" hanger n7@.650 Ea 53.40 30.44 0.39 84.23

Pipe strap hangers, plain


Two hole type. Strap sizes are based on pipe sizes. Add an allowance for insulation, if required, using
small tools.
1/2" hanger nb@.070 Ea 0.12 3.66 0.04 3.82
3/4" hanger nb@.080 Ea 0.18 4.18 0.05 4.41
1" hanger nb@.080 Ea 0.18 4.18 0.05 4.41
1-1/4" hanger nb@.100 Ea 0.35 5.23 0.06 5.64
1-1/2" hanger nb@.100 Ea 0.35 5.23 0.06 5.64
2015 Heavy Construction Estimator, All Rights Reserved Page 570 (part 2)

2" hanger nb@.110 Ea 0.47 5.75 0.06 6.28


2-1/2" hanger nb@.120 Ea 2.47 6.28 0.07 8.82
3" hanger nb@.130 Ea 3.19 6.80 0.07 10.06

Complete hangers for insulated pipe


Includes clevis hanger with saddle for insulated pipe. Hanger sizes are based on pipe sizes. Add an
allowance for the appropriate insulation thickness. Use these figures for preliminary estimates, using
small tools.
1/2" hanger nb@.150 Ea 3.85 7.85 0.09 11.79
1" hanger nb@.200 Ea 3.90 10.46 0.11 14.47
2015 Heavy Construction Estimator, All Rights Reserved Page 571

2" hanger nb@.200 Ea 4.04 10.46 0.11 14.61


3" hanger nb@.250 Ea 5.34 13.08 0.14 18.56
4" hanger nb@.250 Ea 7.79 13.08 0.14 21.01
6" hanger nb@.300 Ea 10.30 15.69 0.17 26.16
8" hanger nb@.300 Ea 16.70 15.69 0.17 32.56
10" hanger nb@.400 Ea 21.30 20.92 0.23 42.45
12" hanger nb@.400 Ea 29.30 20.92 0.23 50.45

Threaded rod for pipe hangers


Using small tools.
3/8" rod nb@.030 LF 0.26 1.57 0.02 1.85
1/2" rod nb@.030 LF 0.46 1.57 0.02 2.05
5/8" rod n6@.030 LF 0.85 1.53 0.02 2.40
3/4" rod n6@.040 LF 1.49 2.04 0.02 3.55
7/8" rod n6@.050 LF 1.75 2.55 0.03 4.33
1" rod n6@.070 LF 2.45 3.56 0.04 6.05
1-1/8" rod n6@.100 LF 3.62 5.09 0.06 8.77

Rod couplings for pipe hangers


Using small tools.
3/8" coupling nc@.130 Ea 3.01 6.39 0.07 9.47
1/2" coupling nc@.150 Ea 3.58 7.38 0.08 11.04
5/8" coupling n7@.170 Ea 6.01 7.96 0.10 14.07
3/4" coupling n7@.180 Ea 10.70 8.43 0.11 19.24
7/8" coupling n7@.200 Ea 11.40 9.37 0.12 20.89
1" coupling n7@.250 Ea 12.20 11.71 0.15 24.06
1-1/8" coupling n7@.500 Ea 12.90 23.42 0.30 36.62

Flat washers for pipe hangers


Using small tools.
3/8" washer nb@.030 Ea 0.07 1.57 0.02 1.66
1/2" washer nb@.040 Ea 0.10 2.09 0.02 2.21
5/8" washer n6@.040 Ea 0.16 2.04 0.02 2.22
3/4" washer n6@.040 Ea 0.29 2.04 0.02 2.35
7/8" washer n6@.050 Ea 0.30 2.55 0.03 2.88
1" washer n6@.060 Ea 0.31 3.05 0.04 3.40
1-1/8" washer n6@.070 Ea 0.36 3.56 0.04 3.96

Eye sockets for pipe hangers


Using small tools.
3/8" eye socket nb@.030 Ea 2.15 1.57 0.02 3.74
1/2" eye socket nb@.040 Ea 2.50 2.09 0.02 4.61
5/8" eye socket n6@.040 Ea 5.01 2.04 0.02 7.07
3/4" eye socket n6@.040 Ea 8.59 2.04 0.02 10.65
7/8" eye socket n6@.050 Ea 11.40 2.55 0.03 13.98

Hex nuts for pipe hangers


Using small tools.
1/2" hex nut n6@.040 Ea 0.21 2.04 0.02 2.27
3/8" hex nut nb@.040 Ea 0.17 2.09 0.02 2.28
5/8" hex nut n6@.050 Ea 0.43 2.55 0.03 3.01
3/4" hex nut n6@.060 Ea 0.62 3.05 0.04 3.71
7/8" hex nut n6@.070 Ea 1.32 3.56 0.04 4.92
1" hex nut n6@.060 Ea 2.25 3.05 0.04 5.34
1-1/8" hex nut n6@.070 Ea 2.52 3.56 0.04 6.12

Turnbuckles for pipe hangers


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 571 (part 2)

3/8" turnbuckle nb@.200 Ea 19.50 10.46 0.11 30.07


1/2" turnbuckle nb@.200 Ea 23.90 10.46 0.11 34.47
5/8" turnbuckle n6@.250 Ea 25.20 12.72 0.15 38.07
3/4" turnbuckle n6@.250 Ea 33.30 12.72 0.15 46.17
7/8" turnbuckle n6@.250 Ea 49.20 12.72 0.15 62.07
1" turnbuckle n6@.250 Ea 57.20 12.72 0.15 70.07
1-1/8" turnbuckle n6@.600 Ea 68.70 30.53 0.36 99.59
2015 Heavy Construction Estimator, All Rights Reserved Page 572

Welded eye rod for pipe hangers


Using small tools.
3/8" rod nb@.140 Ea 2.32 7.32 0.08 9.72
1/2" rod n6@.170 Ea 2.68 8.65 0.10 11.43
5/8" rod n6@.200 Ea 5.57 10.18 0.12 15.87
3/4" rod n6@.250 Ea 9.41 12.72 0.15 22.28
7/8" rod n6@.330 Ea 12.60 16.79 0.20 29.59
1" rod n6@.500 Ea 15.90 25.45 0.30 41.65

Welded linked eye rod for pipe hangers


Using small tools.
3/8" rod nb@.140 Ea 4.92 7.32 0.08 12.32
1/2" rod n6@.170 Ea 7.57 8.65 0.10 16.32
5/8" rod n6@.200 Ea 9.96 10.18 0.12 20.26
3/4" rod n6@.250 Ea 14.60 12.72 0.15 27.47
7/8" rod n6@.330 Ea 19.70 16.79 0.20 36.69
1" rod n6@.500 Ea 22.40 25.45 0.30 48.15

Welded beam attachments for pipe hangers


Using a 300-amp skid mounted welder and small tools.
3/8" attachment pa@.120 Ea 17.70 5.62 0.22 23.54
1/2" attachment pa@.120 Ea 18.80 5.62 0.22 24.64
5/8" attachment pa@.150 Ea 20.30 7.03 0.27 27.60
3/4" attachment pa@.150 Ea 27.50 7.03 0.27 34.80
7/8" attachment pa@.200 Ea 34.70 9.37 0.36 44.43
1" attachment pa@.290 Ea 52.80 13.58 0.52 66.90

C clamps for pipe hangers


Using small tools.
3/8" clamp nb@.070 Ea 3.01 3.66 0.04 6.71
1/2" clamp n6@.070 Ea 3.65 3.56 0.04 7.25
5/8" clamp n6@.070 Ea 7.39 3.56 0.04 10.99
3/4" clamp n6@.070 Ea 10.70 3.56 0.04 14.30
7/8" clamp n6@.070 Ea 14.30 3.56 0.04 17.90

Beam clamps for pipe hangers


Using small tools.
Size 1 for 3/8" bolt nb@.070 Ea 2.65 3.66 0.04 6.35
Size 3 for 1/2" bolt n6@.070 Ea 4.31 3.56 0.04 7.91
Size 4 for 5/8" bolt n6@.070 Ea 5.28 3.56 0.04 8.88
Size 5 for 3/4" bolt n6@.070 Ea 7.73 3.56 0.04 11.33
Size 6 for 7/8" bolt n6@.070 Ea 10.10 3.56 0.04 13.70

Light duty U-bolts with 4 hex nuts


Using small tools.
1/2" U-bolt nb@.090 Ea 2.62 4.71 0.05 7.38
3/4" U-bolt nb@.090 Ea 2.79 4.71 0.05 7.55
1" U-bolt nb@.090 Ea 2.92 4.71 0.05 7.68
1-1/4" U-bolt nb@.090 Ea 3.29 4.71 0.05 8.05
1-1/2" U-bolt nb@.090 Ea 3.36 4.71 0.05 8.12
2" U-bolt nb@.090 Ea 4.02 4.71 0.05 8.78
2-1/2" U-bolt nb@.090 Ea 4.22 4.71 0.05 8.98
3" U-bolt nb@.090 Ea 6.01 4.71 0.05 10.77
4" U-bolt nb@.090 Ea 6.41 4.71 0.05 11.17

Copper standoff brackets with flange, for pipe hangers


2015 Heavy Construction Estimator, All Rights Reserved Page 572 (part 2)

Using small tools.


Clamp size 1/2" n6@.290 Ea 2.74 14.76 0.17 17.67
Clamp size 3/4" n6@.290 Ea 2.90 14.76 0.17 17.83
Clamp size 1" n6@.290 Ea 3.07 14.76 0.17 18.00
Clamp size 1-1/4" n6@.300 Ea 3.40 15.27 0.18 18.85
Clamp size 1-1/2" n6@.300 Ea 3.74 15.27 0.18 19.19

Pipe covering protection shields


Length varies with pipe size, by outside diameter, using small tools.
Less than 3-1/2", 18 gauge nb@.030 Ea 1.37 1.57 0.02 2.96
2015 Heavy Construction Estimator, All Rights Reserved Page 573

3-1/2" to 6", 18 gauge nb@.040 Ea 1.95 2.09 0.02 4.06


6" to 9", 16 gauge nb@.040 Ea 4.27 2.09 0.02 6.38
9" to 11",14 gauge n6@.040 Ea 8.32 2.04 0.02 10.38
11" to 14", 14 gauge n6@.050 Ea 9.19 2.55 0.03 11.77
14" to 17", 14 gauge n6@.050 Ea 12.30 2.55 0.03 14.88
17" to 20", 12 gauge n6@.060 Ea 18.10 3.05 0.04 21.19
20" to 22", 12 gauge n6@.060 Ea 21.70 3.05 0.04 24.79
22" to 26", 12 gauge n6@.070 Ea 23.90 3.56 0.04 27.50

Pipe covering protection saddles - For 1" insulation


Using a 300-amp skid mounted welder and small tools.
3/4" pipe pa@.130 Ea 4.28 6.09 0.23 10.60
1" pipe pa@.140 Ea 4.28 6.56 0.25 11.09
1-1/4" pipe pa@.150 Ea 4.28 7.03 0.27 11.58
1-1/2" pipe pa@.170 Ea 4.28 7.96 0.31 12.55
2" pipe pa@.180 Ea 6.70 8.43 0.32 15.45
2-1/2" pipe pa@.200 Ea 8.48 9.37 0.36 18.21
3" pipe pa@.220 Ea 8.55 10.30 0.40 19.25
4" pipe pa@.250 Ea 9.98 11.71 0.45 22.14

Pipe covering protection saddles - For 1-1/2" insulation


Using a 300-amp skid mounted welder and small tools.
1-1/2" pipe pa@.130 Ea 8.48 6.09 0.23 14.80
2" pipe pa@.130 Ea 8.55 6.09 0.23 14.87
2-1/2" pipe pa@.150 Ea 9.62 7.03 0.27 16.92
3" pipe pa@.170 Ea 9.98 7.96 0.31 18.25
4" pipe pa@.180 Ea 14.30 8.43 0.32 23.05
6" pipe pa@.200 Ea 18.50 9.37 0.36 28.23
8" pipe pa@.220 Ea 20.00 10.30 0.40 30.70
10" pipe pa@.250 Ea 21.40 11.71 0.45 33.56
12" pipe pa@.290 Ea 27.10 13.58 0.52 41.20

Pipe covering protection saddles - For 2" insulation


Using a 300-amp skid mounted welder and small tools.
2-1/2" pipe pa@.130 Ea 9.98 6.09 0.23 16.30
3" pipe pa@.140 Ea 14.30 6.56 0.25 21.11
4" pipe pa@.150 Ea 15.00 7.03 0.27 22.30
6" pipe pa@.170 Ea 20.00 7.96 0.31 28.27
8" pipe pa@.180 Ea 21.40 8.43 0.32 30.15
10" pipe pa@.200 Ea 22.10 9.37 0.36 31.83
12" pipe pa@.220 Ea 32.80 10.30 0.40 43.50
14" pipe pa@.250 Ea 48.50 11.71 0.45 60.66
16" pipe pa@.290 Ea 61.30 13.58 0.52 75.40

Pipe covering protection saddles - For 2-1/2" insulation


Using a 300-amp skid mounted welder and small tools.
3" pipe pa@.130 Ea 14.30 6.09 0.23 20.62
4" pipe pa@.140 Ea 19.20 6.56 0.25 26.01
6" pipe pa@.150 Ea 20.00 7.03 0.27 27.30
8" pipe pa@.170 Ea 21.40 7.96 0.31 29.67
10" pipe pa@.180 Ea 27.10 8.43 0.32 35.85
12" pipe pa@.200 Ea 41.30 9.37 0.36 51.03
14" pipe pa@.220 Ea 52.70 10.30 0.40 63.40
16" pipe pa@.250 Ea 62.00 11.71 0.45 74.16
18" pipe pa@.290 Ea 67.00 13.58 0.52 81.10

Steel shapes for hanger devices - Angle iron


Using a 200-amp trailer mounted welder and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 573 (part 2)

1/2" x 1/2" x 1/8" pw@.090 LF 0.65 3.94 0.42 5.01


3/4" x 3/4" x 1/8" pw@.110 LF 0.72 4.82 0.51 6.05
1" x 1" x 1/8" pw@.140 LF 0.87 6.13 0.65 7.65
1-1/4" x 1-1/4" x 3/16" pw@.160 LF 1.01 7.00 0.74 8.75
1-1/2" x 1-1/2" x 3/16" pw@.180 LF 1.09 7.88 0.84 9.81
2015 Heavy Construction Estimator, All Rights Reserved Page 574

2" x 2" x 1/4" pw@.200 LF 1.16 8.75 0.93 10.84


2-1/2" x 2-1/2" x 1/4" pw@.250 LF 1.52 10.94 1.16 13.62
3" x 2" x 3/8" pw@.270 LF 2.13 11.82 1.26 15.21
3" x 3" x 3/8" pw@.320 LF 2.60 14.01 1.49 18.10

Steel shapes for hanger devices - Channels


Using a 200-amp trailer mounted welder and small tools.
C2 x 1.78, 2" wide pw@.160 LF 0.65 7.00 0.74 8.39
C3 x 4.1, 3" wide pw@.230 LF 1.45 10.07 1.07 12.59
C4 x 5.4, 4" wide pw@.270 LF 1.95 11.82 1.26 15.03
C5 x 6.7, 5" wide pw@.320 LF 2.46 14.01 1.49 17.96
C6 x 8.2, 6" wide pw@.340 LF 2.97 14.88 1.58 19.43
C7 x 9.8, 7" wide pw@.450 LF 3.55 19.70 2.09 25.34
C8 x 11.5, 8" wide pw@.490 LF 4.20 21.45 2.28 27.93

Steel shapes for hanger devices - Structural bar tees


Using a 200-amp trailer mounted welder and small tools.
3/4" x 3/4" x 1/8" pw@.110 LF 0.51 4.82 0.51 5.84
1" x 1" x 1/8" pw@.140 LF 0.59 6.13 0.65 7.37
1-1/2" x 1-1/2" x 1/4" pw@.160 LF 1.78 7.00 0.74 9.52
2" x 2" x 1/4" pw@.200 LF 2.32 8.75 0.93 12.00
2-1/2" x 2-1/2" x 3/8" pw@.250 LF 4.27 10.94 1.16 16.37
3" x 3" x 3/8" pw@.320 LF 5.21 14.01 1.49 20.71

Steel shapes for hanger devices - Structural zees


Using a 200-amp trailer mounted welder and small tools.
1-1/4" x 1-3/4" x 1-3/4" pw@.160 LF 1.79 7.00 0.74 9.53
2-11/16" x 3" x 2-11/16" pw@.160 LF 2.16 7.00 0.74 9.90
3-1/16" x 4" x 3-1/16" pw@.140 LF 5.27 6.13 0.65 12.05
3-1/4" x 5" x 3-1/4" pw@.140 LF 7.45 6.13 0.65 14.23
3-1/2" x 6" x 3-1/2" pw@.110 LF 10.10 4.82 0.51 15.43

Steel shapes for hanger devices - Junior I-beams


Using a 200-amp trailer mounted welder and small tools.
3" beam (S3x5.7) pw@.230 LF 2.10 10.07 1.07 13.24
4" beam (S4x7.7) pw@.250 LF 2.82 10.94 1.16 14.92
5" beam (S5x10) pw@.270 LF 3.62 11.82 1.26 16.70
6" beam (S6x12.5) pw@.290 LF 4.56 12.69 1.35 18.60
7" beam (S7x15.3) pw@.320 LF 5.57 14.01 1.49 21.07
8" beam (S8x18.4) pw@.340 LF 6.66 14.88 1.58 23.12

Steel shapes for hanger devices - Expanded metal


Using small tools.
1/4"-20 gauge nx@.020 SF 1.16 0.91 0.01 2.08
1/4"-18 gauge nx@.020 SF 1.09 0.91 0.01 2.01
1/2"-18 gauge nx@.020 SF 0.56 0.91 0.01 1.48
1/2"-16 gauge nx@.020 SF 0.54 0.91 0.01 1.46

CSI 15-100, Valves, cocks and faucets

Plug valves, screwed


Lubricated, semi-steel screwed, wrench operated, using small tools.
1/2" diameter nb@.450 Ea 114.00 23.54 0.26 137.80
3/4" diameter nb@.450 Ea 124.00 23.54 0.26 147.80
1" diameter nb@.560 Ea 153.00 29.29 0.32 182.61
1-1/4" diameter nb@.710 Ea 181.00 37.13 0.40 218.53
1-1/2" diameter nb@.830 Ea 191.00 43.41 0.47 234.88
2015 Heavy Construction Estimator, All Rights Reserved Page 574 (part 2)

2" diameter nb@1.00 Ea 229.00 52.30 0.57 281.87


2-1/2" diameter nf@1.27 Ea 343.00 57.62 0.71 401.33
3" diameter nf@1.54 Ea 429.00 69.87 0.86 499.73

Plug valves, flanged


Lubricated, semi-steel flanged, using small tools.
4" diameter, wrench operated nf@5.00 Ea 648.00 226.90 2.80 877.70
6" diameter, gear operated nk@7.50 Ea 1,130.00 338.20 4.58 1,472.78
2015 Heavy Construction Estimator, All Rights Reserved Page 575

10" diameter, gear operated nk@10.0 Ea 2,050.00 450.90 6.10 2,507.00

Foot valves - Single poppet


Metal to metal seat construction, using small tools.
1" diameter n6@.500 Ea 28.10 25.45 0.30 53.85
1-1/4" diameter n6@.560 Ea 30.70 28.50 0.34 59.54
1-1/2" diameter n6@.630 Ea 52.20 32.06 0.38 84.64
2" diameter n6@.710 Ea 82.80 36.13 0.43 119.36
2-1/2" diameter n8@1.18 Ea 267.00 60.05 0.71 327.76
3" diameter n8@1.43 Ea 365.00 72.77 0.86 438.63

Foot valves - Double poppet


Metal to metal seat construction, using small tools.
1" diameter n6@.500 Ea 35.80 25.45 0.30 61.55
1-1/4" diameter n6@.560 Ea 56.00 28.50 0.34 84.84
1-1/2" diameter n6@.630 Ea 48.80 32.06 0.38 81.24
2" diameter n6@.710 Ea 72.60 36.13 0.43 109.16
3" diameter n8@1.18 Ea 153.00 60.05 0.71 213.76
4" diameter n8@1.43 Ea 216.00 72.77 0.86 289.63

Float valves - Bronze body, threaded ends


Single seated, balanced for air, oil, or water, with arm ball and bracket, using small tools.
1/2" valve nb@.780 Ea 30.20 40.79 0.44 71.43
3/4" valve nb@.860 Ea 39.10 44.98 0.49 84.57
1" valve nb@.950 Ea 61.80 49.69 0.54 112.03
1-1/4" valve nb@1.54 Ea 111.00 80.54 0.88 192.42
1-1/2" valve nb@1.75 Ea 112.00 91.53 1.00 204.53
2" valve nb@2.17 Ea 114.00 113.50 1.24 228.74

Float valves - Cast iron body, flanged


Single seated, balanced for air, oil, or water, with arm ball and bracket, using small tools.
2-1/2" valve nf@2.30 Ea 39.30 104.40 1.29 144.99
3" valve nf@2.56 Ea 47.60 116.10 1.43 165.13

Float operated valves, cast iron body - Self-contained float, in-line mount
For condensation receivers, tanks and vessels, using small tools.
1" inlet nb@.950 Ea 391.00 49.69 0.54 441.23

Float operated valves, cast iron body - External float, tank mount, flanged
Using small tools.
3/4" inlet nf@1.90 Ea 457.00 86.20 1.06 544.26

Quick disconnect valves, air-service


Single seated, with arm ball and bracket, combination steel and brass, using small tools.
1/2" valve nb@.380 Ea 6.03 19.87 0.22 26.12
3/4" valve nb@.420 Ea 7.50 21.97 0.24 29.71

CSI 15-101, Gate valves

Gate valves - Bronze body, non-rising stem, solid wedge


Threaded or solder, 125 psi steam or 200 psi cold water, standard commercial quality valve. Based on
"Red & White" valves, using small tools.
1/4" valve nb@.240 Ea 9.35 12.55 0.14 22.04
3/8" valve nb@.240 Ea 9.35 12.55 0.14 22.04
1/2" valve nb@.240 Ea 9.12 12.55 0.14 21.81
3/4" valve nb@.300 Ea 11.40 15.69 0.17 27.26
2015 Heavy Construction Estimator, All Rights Reserved Page 575 (part 2)

1" valve nb@.360 Ea 15.70 18.83 0.21 34.74


2015 Heavy Construction Estimator, All Rights Reserved Page 576

1-1/4" valve nb@.480 Ea 20.20 25.10 0.27 45.57


1-1/2" valve nb@.540 Ea 27.10 28.24 0.31 55.65
2" valve nb@.600 Ea 45.30 31.38 0.34 77.02
2-1/2" valve nb@1.00 Ea 75.00 52.30 0.57 127.87
3" valve nb@1.50 Ea 108.00 78.45 0.86 187.31
4" valve nb@1.65 Ea 304.00 86.30 0.94 391.24
Add for 150 lb (68kg) rated valves ---@--- % 15.00 -- 1.00 1.00
Add for 200 lb (91kg) rated valves ---@--- % 35.00 -- 1.00 1.00
Add for 300 lb (136kg) rated valves ---@--- % 55.00 -- 1.00 1.00
Add for rigid specifications ---@--- % 100.00 -- 1.00 1.00

Gate valves - Iron body, bronze trim, non-rising stem


Flanged, 125 psi steam or 200 psi cold water. Based on "Red & White" valves, using small tools.
1-1/2" valve ph@.600 Ea 168.00 26.64 0.40 195.04
2" valve ph@.600 Ea 192.00 26.64 0.40 219.04
2-1/2" valve ph@.600 Ea 262.00 26.64 0.40 289.04
3" valve ph@.750 Ea 282.00 33.30 0.50 315.80
4" valve ph@1.35 Ea 414.00 59.94 0.90 474.84
5" valve ph@2.00 Ea 795.00 88.80 1.34 885.14
6" valve ph@2.50 Ea 795.00 111.00 1.68 907.68
8" valve ph@3.00 Ea 1,280.00 133.20 2.01 1,415.21
10" valve ph@4.00 Ea 2,130.00 177.60 2.68 2,310.28
12" valve ph@4.50 Ea 2,950.00 199.80 3.02 3,152.82
Add for rigid specifications ---@--- % 35.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 577

Gate valves - Iron body, bronze trim, flanged


Outside stem and yoke, flanged, 125 psi steam or 200 psi cold water. Based on "Red & White" valves,
using small tools.
1-1/2" valve ph@1.61 Ea 184.00 71.48 1.08 256.56
2" valve ph@1.65 Ea 227.00 73.26 1.11 301.37
2-1/2" valve ph@1.67 Ea 289.00 74.15 1.12 364.27
3" valve ph@1.82 Ea 337.00 80.81 1.22 419.03
4" valve ph@4.26 Ea 408.00 189.10 2.85 599.95
5" valve ph@4.52 Ea 890.00 200.70 3.03 1,093.73
6" valve ph@5.00 Ea 890.00 222.00 3.35 1,115.35
8" valve ph@5.71 Ea 1,500.00 253.50 3.83 1,757.33
10" valve ph@7.00 Ea 2,220.00 310.80 4.69 2,535.49
12" valve ph@8.48 Ea 3,080.00 376.50 5.68 3,462.18
Add for rigid specifications ---@--- % 30.00 -- 1.00 --

Gate valves - Iron body, bronze trim, flanged


Outside stem and yoke, flanged, 125 psi steam or 200 psi cold water. Based on "Red & White" valves,
using a 20-ton hydraulic crane with 70’ boom and small tools.
14" valve nn@8.64 Ea 5,280.00 386.80 38.40 5,705.20
16" valve nn@10.8 Ea 7,020.00 483.50 48.00 7,551.50
18" valve nn@12.0 Ea 7,630.00 537.20 53.30 8,220.50
20" valve nn@13.5 Ea 9,720.00 604.40 59.90 10,384.30
24" valve nn@16.6 Ea 20,200.00 743.20 73.70 21,016.90
30" valve nn@27.0 Ea 23,900.00 1,209.00 120.00 25,229.00
36" valve nn@54.0 Ea 30,100.00 2,418.00 240.00 32,758.00
Add for 175 lb gate valves ---@--- % 31.00 -- -- --
Add for 250 lb gate valves ---@--- % 100.00 -- -- --

CSI 15-102, Flap and flush valves

Cast iron body flap valves, flanged


Using small tools.
4" valve nk@4.31 Ea 568.00 194.30 2.63 764.93
6" valve nk@5.00 Ea 631.00 225.50 3.05 859.55
8" valve nk@5.71 Ea 954.00 257.50 3.48 1,214.98
10" valve nk@7.00 Ea 1,300.00 315.60 4.27 1,619.87
12" valve nk@8.00 Ea 1,560.00 360.70 4.88 1,925.58

Mud valves
Drain plug valves, for settling basins, waterworks, sewage treatment plants where sedimentary material
must be flushed from system, using a 20-ton hydraulic crane with 70’ boom and small tools.
4" diameter nh@2.35 Ea 836.00 113.50 6.18 955.68
8" diameter nh@3.13 Ea 1,250.00 151.10 8.23 1,409.33
10" diameter nh@4.70 Ea 1,810.00 226.90 12.40 2,049.30
12" diameter nh@6.27 Ea 2,230.00 302.70 16.50 2,549.20
18" diameter nh@7.52 Ea 4,300.00 363.10 19.80 4,682.90
24" diameter nh@9.40 Ea 7,180.00 453.80 24.70 7,658.50
30" diameter nh@12.5 Ea 15,000.00 603.50 32.90 15,636.40
36" diameter nh@18.8 Ea 13,800.00 907.70 49.40 14,757.10

CSI 15-103, Butterfly valves

Butterfly valves - Cast iron body, lug type, 200 PSIG


Using small tools.
2" valve nb@.200 Ea 148.00 10.46 0.11 158.57
2-1/2" valve nb@.300 Ea 154.00 15.69 0.17 169.86
3" valve nf@.400 Ea 171.00 18.15 0.22 189.37
2015 Heavy Construction Estimator, All Rights Reserved Page 577 (part 2)

4" valve nf@.500 Ea 229.00 22.69 0.28 251.97


5" valve nf@.600 Ea 259.00 27.22 0.34 286.56
6" valve nf@.750 Ea 311.00 34.03 0.42 345.45
8" valve nf@.950 Ea 406.00 43.10 0.53 449.63
10" valve nf@1.40 Ea 625.00 63.52 0.78 689.30
2015 Heavy Construction Estimator, All Rights Reserved Page 578

12" valve nf@1.80 Ea 910.00 81.67 1.01 992.68

Butterfly valves - Cast iron body, wafer type, 200 PSIG


Using small tools.
4" valve nf@4.00 Ea 189.00 181.50 2.24 372.74
5" valve nf@4.30 Ea 243.00 195.10 2.41 440.51
6" valve nf@4.80 Ea 294.00 217.80 2.69 514.49
8" valve nf@7.00 Ea 417.00 317.60 3.92 738.52
10" valve nf@8.00 Ea 586.00 363.00 4.48 953.48
12" valve nf@9.33 Ea 823.00 423.30 5.22 1,251.52

Butterfly valves - Cast iron body, bronze disc, gear operated, 150 PSI
Using small tools.
14" valve nf@14.0 Ea 2,780.00 635.20 7.84 3,423.04
16" valve nf@16.0 Ea 3,980.00 725.90 8.96 4,714.86
18" valve nf@18.7 Ea 4,770.00 848.40 10.50 5,628.90
20" valve nf@28.0 Ea 5,860.00 1,270.00 15.70 7,145.70
24" valve nf@56.0 Ea 8,350.00 2,541.00 31.40 10,922.40

CSI 15-104, Ball valves

Ball valves - Bronze body, chrome ball, full port, threaded or solder
150 psi steam or 600 psi cold water. Based on Grinnell valves, using small tools.
1/4" valve nb@.240 Ea 5.92 12.55 0.14 18.61
3/8" valve nb@.240 Ea 5.92 12.55 0.14 18.61
1/2" valve nb@.240 Ea 5.92 12.55 0.14 18.61
3/4" valve nb@.240 Ea 8.16 12.55 0.14 20.85
1" valve nb@.300 Ea 10.80 15.69 0.17 26.66
1-1/4" valve nb@.430 Ea 19.50 22.49 0.25 42.24
1-1/2" valve nb@.450 Ea 27.60 23.54 0.26 51.40
2" valve nb@.500 Ea 40.30 26.15 0.29 66.74
2-1/2" valve nb@.600 Ea 93.70 31.38 0.34 125.42
3" valve nb@.680 Ea 145.00 35.56 0.39 180.95
4" valve nb@.900 Ea 250.00 47.07 0.51 297.58
Add for rigid specifications ---@--- % 20.00 -- 187.00 --
Add for stainless steel ball ---@--- % 150.00 -- 187.00 --

CSI 15-105, Globe valves

Globe valves - Bronze body, screwed bonnet, bronze disc


Threaded or solder, 125 psi steam, 200 psi cold water. Based on "Red & White" valves, using small
tools.
1/8" valve nb@.200 Ea 12.80 10.46 0.11 23.37
1/4" valve nb@.200 Ea 12.80 10.46 0.11 23.37
3/8" valve nb@.200 Ea 12.80 10.46 0.11 23.37
1/2" valve nb@.200 Ea 12.80 10.46 0.11 23.37
3/4" valve nb@.250 Ea 17.50 13.08 0.14 30.72
1" valve nb@.300 Ea 27.50 15.69 0.17 43.36
1-1/4" valve nb@.400 Ea 36.50 20.92 0.23 57.65
1-1/2" valve nb@.450 Ea 59.60 23.54 0.26 83.40
2" valve nb@.500 Ea 78.70 26.15 0.29 105.14
2-1/2" valve nf@.550 Ea 139.00 24.95 0.31 164.26
3" valve nf@.600 Ea 185.00 27.22 0.34 212.56
Add for rigid specifications ---@--- % 100.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 579

CSI 15-105, Globe valves

Globe valves - Bronze body, union bonnet, teflon disc


Threaded or solder, 150 psi steam, 300 psi cold water, based on "Red & White" valves, using small
tools.
1/8" valve nb@.200 Ea 22.30 10.46 0.11 32.87
1/4" valve nb@.200 Ea 22.30 10.46 0.11 32.87
3/8" valve nb@.200 Ea 22.30 10.46 0.11 32.87
1/2" valve nb@.200 Ea 22.30 10.46 0.11 32.87
3/4" valve nb@.250 Ea 30.20 13.08 0.14 43.42
1" valve nb@.300 Ea 43.10 15.69 0.17 58.96
1-1/4" valve nb@.400 Ea 60.60 20.92 0.23 81.75
1-1/2" valve nb@.450 Ea 81.40 23.54 0.26 105.20
2" valve nb@.500 Ea 132.00 26.15 0.29 158.44
2-1/2" valve nb@.550 Ea 247.00 28.77 0.31 276.08
3" valve nb@.600 Ea 351.00 31.38 0.34 382.72
Add for rigid specifications ---@--- % 30.00 -- -- --

Globe valves - Iron body, threaded, outside stem and yoke


125 PSI, using small tools.
2" valve nb@.910 Ea 290.00 47.59 0.52 338.11
2-1/2" valve nf@1.33 Ea 351.00 60.34 0.74 412.08
3" valve nf@1.54 Ea 421.00 69.87 0.86 491.73
4" valve nf@1.67 Ea 562.00 75.77 0.94 638.71
Add for
250 lb. (113kg) rated valves ---@--- % 83.00 -- -- --
Add for chain operated valves ---@--- % 30.00 -- -- --

Globe valves - Iron body, flanged, outside stem and yoke, 125 PSI
Using small tools.
2" valve nb@1.13 Ea 255.00 59.10 0.64 314.74
2-1/2" valve nf@1.67 Ea 311.00 75.77 0.94 387.71
3" valve nf@1.82 Ea 373.00 82.57 1.02 456.59
4" valve nf@4.26 Ea 498.00 193.30 2.39 693.69
5" valve nk@4.52 Ea 692.00 203.80 2.76 898.56
6" valve nk@5.00 Ea 875.00 225.50 3.05 1,103.55
8" valve nk@5.71 Ea 1,350.00 257.50 3.48 1,610.98
10" valve nk@7.00 Ea 2,050.00 315.60 4.27 2,369.87
12" valve nk@8.47 Ea 3,880.00 381.90 5.17 4,267.07
Add for
250 lb. (113kg) rated valves ---@--- 45.00 -- -- --
Add for chain operated valves ---@--- 20.00 -- -- --

Globe valves - Bronze angle, threaded, brazed or soldered, 125 lb.


Using small tools.
1/8" valve nb@.200 Ea 30.30 10.46 0.11 40.87
1/4" valve nb@.200 Ea 30.30 10.46 0.11 40.87
3/8" valve nb@.200 Ea 30.30 10.46 0.11 40.87
1/2" valve nb@.200 Ea 32.30 10.46 0.11 42.87
3/4" valve nb@.250 Ea 44.80 13.08 0.14 58.02
1" valve nb@.300 Ea 58.80 15.69 0.17 74.66
1-1/4" valve nb@.400 Ea 87.40 20.92 0.23 108.55
1-1/2" valve nb@.450 Ea 102.00 23.54 0.26 125.80
2" valve nb@.500 Ea 154.00 26.15 0.29 180.44
2-1/2" valve nb@.550 Ea 277.00 28.77 0.31 306.08
3" valve nb@.600 Ea 870.00 31.38 0.34 901.72
Add for 150 lb. valves ---@--- % 65.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 579 (part 2)

Add for 200 lb. valves ---@--- % 102.00 -- -- --


Add for 300 lb. valves ---@--- % 188.00 -- -- --

Globe valves - Brass valve, gas stop, less check


Using small tools.
3/4" diameter nb@.360 Ea 19.70 18.83 0.21 38.74
1-1/4" diameter nb@.530 Ea 37.90 27.72 0.30 65.92
2015 Heavy Construction Estimator, All Rights Reserved Page 580

2" diameter nb@.730 Ea 104.00 38.18 0.42 142.60

Globe valves - Iron body angle, flanged, 125 lb.


Using small tools.
2" valve nb@1.11 Ea 734.00 58.05 0.63 792.68
2-1/2" valve nf@2.86 Ea 776.00 129.80 1.60 907.40
3" valve nf@3.33 Ea 915.00 151.10 1.86 1,067.96
4" valve nf@4.26 Ea 1,310.00 193.30 2.39 1,505.69
5" valve nk@4.52 Ea 2,340.00 203.80 2.76 2,546.56
6" valve nk@5.00 Ea 2,340.00 225.50 3.05 2,568.55
8" valve nk@5.71 Ea 4,580.00 257.50 3.48 4,840.98
Add for
250 lb. (113kg) rated valves ---@--- % 49.00 -- -- --
Add for chain operated valves ---@--- % 35.00 -- -- --

Globe valves - Iron body 150 lb. flanged


Using small tools.
3" valve nf@3.33 Ea 1,380.00 151.10 1.86 1,532.96
4" valve nf@4.55 Ea 2,030.00 206.40 2.55 2,238.95

CSI 15-109, Wall hydrants

Wall hydrants
3/4" nominal pipe thread male and 1/2" nominal pipe thread female inlet connection, 3/4" hose thread
outlet, using small tools.
6" (15cm) thick wall nb@.570 Ea 124.00 29.81 0.32 154.13
12" (31cm) thick wall nb@.670 Ea 132.00 35.04 0.38 167.42
18" (46cm) thick wall nb@.670 Ea 144.00 35.04 0.38 179.42

Cast bronze box type wall hydrants


3/4" nominal pipe thread female out and 1" nominal pipe thread male inlet connection, using small tools.
3/4" hose threaded outlet nb@.570 Ea 394.00 29.81 0.32 424.13
1" hose threaded outlet nb@.670 Ea 437.00 35.04 0.38 472.42

Cast bronze non-freezing wall hydrants


With 3/4 nominal pipe thread female out and 1" nominal pipe thread male inlet connection, 3/4" hose
thread outlet and wall clamp, using small tools.
3" (76mm) thick nb@1.25 Ea 215.00 65.38 0.71 281.09
4" (10cm) thick nb@1.25 Ea 222.00 65.38 0.71 288.09
6" (15cm) thick nb@1.25 Ea 230.00 65.38 0.71 296.09
8" (21cm) thick nb@1.25 Ea 256.00 65.38 0.71 322.09
9" (23cm) thick nb@1.25 Ea 169.00 65.38 0.71 235.09
Add for 3/4"
nozzle type vacuum breaker --@.000 Ea 52.70 -- -- 52.70
Add for 1" hose thread outlet --@.000 Ea 39.80 -- -- 39.80

Yard hydrants, 1" galvanized column


With 3/4" threaded hose outlet, using small tools.
2' (.61m) bury depth nb@1.00 Ea 390.00 52.30 0.57 442.87
4' (1.2m) bury depth nb@1.00 Ea 435.00 52.30 0.57 487.87
6' (1.8m) bury depth nb@1.14 Ea 480.00 59.62 0.65 540.27

Fire hydrants - Standard one piece model


With 5’ (1.5m) burial section, bell and spigot connections, using small tools.
4" hydrant nk@8.00 Ea 2,210.00 360.70 4.88 2,575.58
6" hydrant nk@8.00 Ea 2,210.00 360.70 4.88 2,575.58
8" hydrant nk@8.00 Ea 3,030.00 360.70 4.88 3,395.58
2015 Heavy Construction Estimator, All Rights Reserved Page 580 (part 2)

Fire hydrants - Safe-top model with breakable section


With 5’ (1.5m) burial section, bell and spigot connections, using small tools.
4" hydrant nk@8.00 Ea 2,680.00 360.70 4.88 3,045.58
6" hydrant nk@8.00 Ea 2,680.00 360.70 4.88 3,045.58
8" hydrant nk@8.00 Ea 3,090.00 360.70 4.88 3,455.58
Add for
mechanical joint connections --@.000 Ea 47.70 -- -- 47.70
2015 Heavy Construction Estimator, All Rights Reserved Page 581

CSI 15-110, Check valves

Check valves - Iron body, 125 lb. single disc type


Using small tools.
2" valve n6@.740 Ea 374.00 37.66 0.44 412.10
2-1/2" valve n9@.780 Ea 283.00 36.53 0.47 320.00
3" valve n9@.950 Ea 473.00 44.49 0.57 518.06
4" valve n9@2.11 Ea 641.00 98.81 1.27 741.08

Check valves - Iron body, 125 lb. single disc type


Using a 20-ton hydraulic crane with 70’ boom and small tools.
6" valve pb@3.22 Ea 1,000.00 148.50 12.30 1,160.80
8" valve pb@5.68 Ea 1,540.00 261.90 21.70 1,823.60
10" valve pb@8.00 Ea 2,460.00 368.90 30.60 2,859.50

Check valves - Twin disc type


Using small tools.
2" valve n6@.740 Ea 259.00 37.66 0.44 297.10
2-1/2" valve n9@.780 Ea 287.00 36.53 0.47 324.00
3" valve n9@.950 Ea 331.00 44.49 0.57 376.06
4" valve n9@2.11 Ea 395.00 98.81 1.27 495.08

Check valves - Twin disc type


Using a 20-ton hydraulic crane with 70’ boom and small tools.
6" valve pb@3.22 Ea 583.00 148.50 12.30 743.80
8" valve pb@5.68 Ea 950.00 261.90 21.70 1,233.60
10" valve pb@8.00 Ea 1,540.00 368.90 30.60 1,939.50
12" valve pb@9.39 Ea 2,350.00 433.00 35.90 2,818.90
14" valve pc@13.2 Ea 7,660.00 604.40 76.80 8,341.20
16" valve pc@13.6 Ea 10,800.00 622.70 79.20 11,501.90
18" valve pc@14.0 Ea 14,100.00 641.10 81.50 14,822.60
20" valve pc@14.9 Ea 1,600.00 682.30 86.70 2,369.00
24" valve pc@17.2 Ea 21,000.00 787.60 100.00 21,887.60

CSI 15-111, Swing check valves

Swing check valves - Bronze, for threaded, brazed or soldered, 125 lb.
Using small tools.
1/8" valve nb@.240 Ea 51.20 12.55 0.14 63.89
1/4" valve nb@.240 Ea 51.20 12.55 0.14 63.89
3/8" valve nb@.240 Ea 51.20 12.55 0.14 63.89
1/2" valve nb@.240 Ea 51.20 12.55 0.14 63.89
3/4" valve nb@.300 Ea 64.20 15.69 0.17 80.06
1" valve nb@.360 Ea 86.50 18.83 0.21 105.54
1-1/4" valve nb@.480 Ea 113.00 25.10 0.27 138.37
1-1/2" valve nb@.540 Ea 149.00 28.24 0.31 177.55
2" valve nb@.600 Ea 219.00 31.38 0.34 250.72
2-1/2" valve nf@1.00 Ea 348.00 45.37 0.56 393.93
3" valve nf@1.50 Ea 516.00 68.06 0.84 584.90
Add for
300 lb. (136kg) rated valves ---@--- 100.00 -- -- --

Swing check valves - Iron body, bronze mounted, flanged, 125 lb.
Using small tools.
1" valve nb@1.06 Ea 216.00 55.44 0.60 272.04
1-1/4" valve nb@1.33 Ea 237.00 69.56 0.76 307.32
2015 Heavy Construction Estimator, All Rights Reserved Page 581 (part 2)

1-1/2" valve nb@1.61 Ea 257.00 84.20 0.92 342.12


2" valve nb@.500 Ea 358.00 26.15 0.29 384.44
2-1/2" valve nf@.600 Ea 455.00 27.22 0.34 482.56
3" valve nf@.750 Ea 494.00 34.03 0.42 528.45
4" valve nf@1.35 Ea 778.00 61.25 0.76 840.01
5" valve nk@2.00 Ea 1,120.00 90.18 1.22 1,211.40
6" valve nk@2.50 Ea 1,330.00 112.70 1.53 1,444.23
8" valve nk@3.00 Ea 2,510.00 135.30 1.83 2,647.13
10" valve nk@4.00 Ea 4,280.00 180.40 2.44 4,462.84
12" valve nk@4.50 Ea 6,690.00 202.90 2.75 6,895.65

Swing check valves - Iron body, bronze mounted, flanged, 125 lb.
Using a 20-ton hydraulic crane with 70’ boom and small tools.
14" valve nn@5.00 Ea 10,300.00 223.90 22.20 10,546.10
16" valve nn@5.50 Ea 13,200.00 246.20 24.40 13,470.60
18" valve nn@6.00 Ea 15,000.00 268.60 26.60 15,295.20
2015 Heavy Construction Estimator, All Rights Reserved Page 582

20" valve nn@6.50 Ea 16,700.00 291.00 28.90 17,019.90


24" valve nn@7.00 Ea 19,200.00 313.40 31.10 19,544.50
Add for
250 lb. (113kg) rated valves ---@--- % 241.00 -- -- --

CSI 15-112, Backwater valves

Backwater valves - Sewer line, cast iron


Offset type, with bronze swing check assembly, threaded bronze cover, bell and spigot connections,
using small tools.
2" valve nb@1.25 Ea 196.00 65.38 0.71 262.09
3" valve nf@1.67 Ea 306.00 75.77 0.94 382.71
4" valve nf@2.15 Ea 377.00 97.55 1.20 475.75
6" valve nk@2.55 Ea 542.00 115.00 1.56 658.56
8" valve nk@3.01 Ea 763.00 135.70 1.84 900.54

Backwater valves - Drainage control, cast iron


Offset type with bronze, manually operated shear gate, non-rising stem, bell and spigot connections,
using small tools.
3" valve nf@2.15 Ea 838.00 97.55 1.20 936.75
4" valve nf@2.67 Ea 838.00 121.10 1.50 960.60
5" valve nk@3.01 Ea 1,290.00 135.70 1.84 1,427.54
6" valve nk@3.73 Ea 1,290.00 168.20 2.28 1,460.48

Backflow preventers, double check, Y pattern


Consisting of two gates and two check valves, automatic differential relief valve, using small tools.
3/4" screwed nb@.500 Ea 420.00 26.15 0.29 446.44
1" screwed nb@.570 Ea 519.00 29.81 0.32 549.13
1-1/2"screwed nb@.800 Ea 832.00 41.84 0.46 874.30
2" screwed nb@1.10 Ea 1,000.00 57.53 0.63 1,058.16
1" flanged nb@1.61 Ea 1,190.00 84.20 0.92 1,275.12
1-1/2"flanged nb@2.13 Ea 1,400.00 111.40 1.21 1,512.61
2" flanged nb@2.70 Ea 1,650.00 141.20 1.54 1,792.74
3" flanged nf@3.50 Ea 3,710.00 158.80 1.96 3,870.76
4" flanged nf@5.30 Ea 4,940.00 240.50 2.97 5,183.47
6" flanged nk@8.00 Ea 7,740.00 360.70 4.88 8,105.58
8" flanged, with 2 gate
valves and 2 check valves nk@12.0 Ea 15,700.00 541.10 7.32 16,248.42

CSI 15-115, Faucets (hose bibbs)

Bronze garden hose valves with screwed ends, 125 lb.


Using small tools.
3/4" valve, medium quality nb@.350 Ea 41.20 18.31 0.20 59.71
3/4" valve, high quality nb@.350 Ea 46.10 18.31 0.20 64.61

CSI 15-116, Washer and dryer outlets

Washer box for plastic drain


With 1/2" supply valves and connection, wall mounted, using small tools.
1-1/2" drain nb@2.00 Ea 39.70 104.60 1.14 145.44
2" drain nb@2.00 Ea 40.40 104.60 1.14 146.14

Washer box drain


With 1/2" supply valve connections, flush mounted, using small tools.
1-1/2", plastic nb@2.00 Ea 46.10 104.60 1.14 151.84
1-1/2", plastic with receptor,
2015 Heavy Construction Estimator, All Rights Reserved Page 582 (part 2)

15 amp DX outlet nb@2.00 Ea 74.10 104.60 1.14 179.84


1-1/2", receptor, wash and dry,
15 amp DX outlet nb@2.00 Ea 85.40 104.60 1.14 191.14
2", plastic nb@2.00 Ea 63.90 104.60 1.14 169.64
2", plastic with receptor,
15 amp DX outlet nb@2.00 Ea 75.00 104.60 1.14 180.74
2", receptor, wash and dry,
15 amp DX outlet nb@2.00 Ea 86.30 104.60 1.14 192.04

Dryer vent kits


With 4" flexible tubing, including 2 flex hose clamps and inside plate, using small tools.
With tube 5' long nb@.440 Ea 19.10 23.01 0.25 42.36
2015 Heavy Construction Estimator, All Rights Reserved Page 583

With tube 8' long nb@.440 Ea 23.20 23.01 0.25 46.46

CSI 15-119, Flow control valves

Flow control valves, stainless steel, 150 or 300 lb.


Using small tools.
2" valve n6@2.75 Ea 9,340.00 139.90 1.65 9,481.55
3" valve n9@3.80 Ea 15,000.00 178.00 2.28 15,180.28
4" valve n9@4.30 Ea 20,300.00 201.40 2.58 20,503.98
6" valve pb@5.35 Ea 36,800.00 246.70 20.40 37,067.10

CSI 15-121, Pressure regulating valves

Water pressure reducing valves, threaded


For building service, iron construction, using small tools.
1/2" valve nb@.210 Ea 35.50 10.98 0.12 46.60
3/4" valve nb@.250 Ea 40.80 13.08 0.14 54.02
1" valve nb@.300 Ea 195.00 15.69 0.17 210.86
1-1/4" valve nb@.400 Ea 219.00 20.92 0.23 240.15
1-1/2" valve nb@.450 Ea 381.00 23.54 0.26 404.80
2" valve nf@.500 Ea 715.00 22.69 0.28 737.97
3" valve nf@.550 Ea 858.00 24.95 0.31 883.26

Steam pressure regulators and reducers


Threaded, iron body, single seated spring loaded direct acting diaphragm, using small tools.
1/2" valve n6@.670 Ea 338.00 34.10 0.40 372.50
3/4" valve n6@.950 Ea 400.00 48.35 0.57 448.92
1" valve n6@1.16 Ea 593.00 59.03 0.70 652.73
1-1/4" valve n6@1.35 Ea 788.00 68.70 0.81 857.51
1-1/2" valve n6@1.54 Ea 1,140.00 78.37 0.92 1,219.29
2" valve nk@4.00 Ea 1,580.00 180.40 2.44 1,762.84
2-1/2" valve nk@2.38 Ea 2,030.00 107.30 1.45 2,138.75
3" valve nk@2.70 Ea 4,870.00 121.70 1.65 4,993.35
4" valve nk@5.13 Ea 5,630.00 231.30 3.13 5,864.43
6" valve nk@5.00 Ea 13,000.00 225.50 3.05 13,228.55

CSI 15-122, Pressure relief valves

Bronze body pressure relief valves, threaded


Using small tools.
1/2" x 1/2" nb@.230 Ea 79.10 12.03 0.13 91.26
3/4" x 3/4" nb@.280 Ea 89.60 14.64 0.16 104.40
1" x 1" nb@.330 Ea 137.00 17.26 0.19 154.45
1-1/4" x 1-1/4" nb@.400 Ea 315.00 20.92 0.23 336.15
1-1/2" x 1-1/2" nb@.440 Ea 556.00 23.01 0.25 579.26
2" x 2" nf@.500 Ea 609.00 22.69 0.28 631.97
2-1/2" x 2-1/2" nf@.550 Ea 671.00 24.95 0.31 696.26

CSI 15-124, Solenoid valves

Brass body solenoid valves, general purpose


Using small tools.
1/4" valve nb@.420 Ea 74.40 21.97 0.24 96.61
1/2" valve nb@.420 Ea 114.00 21.97 0.24 136.21
3/4" valve nb@.500 Ea 159.00 26.15 0.29 185.44
1" valve nb@.670 Ea 256.00 35.04 0.38 291.42
2" valve nb@.770 Ea 915.00 40.27 0.44 955.71
2015 Heavy Construction Estimator, All Rights Reserved Page 583 (part 2)

CSI 15-125, Steam traps

Inverted bucket steam traps, cast iron, 125 PSI


Using small tools.
1/2" trap n6@.500 Ea 212.00 25.45 0.30 237.75
3/4" trap n6@.500 Ea 267.00 25.45 0.30 292.75
1" trap n6@.570 Ea 667.00 29.01 0.34 696.35
1-1/4" trap n6@.600 Ea 934.00 30.53 0.36 964.89
1-1/2" trap n6@.650 Ea 1,140.00 33.08 0.39 1,173.47
2" trap n6@.800 Ea 1,500.00 40.71 0.48 1,541.19
2015 Heavy Construction Estimator, All Rights Reserved Page 584

Inverted bucket steam traps, 15 PSI


Using small tools.
3/4" trap n6@.630 Ea 165.00 32.06 0.38 197.44
1" trap n6@.670 Ea 290.00 34.10 0.40 324.50
1-1/4" trap n6@.910 Ea 353.00 46.31 0.55 399.86
1-1/2" trap n6@1.11 Ea 513.00 56.49 0.67 570.16
2" trap n6@1.67 Ea 934.00 84.99 1.00 1,019.99

Thermostatic steam traps, 25 PSI


Using small tools.
1/2" trap n6@.630 Ea 47.80 32.06 0.38 80.24
3/4" trap n6@.630 Ea 80.20 32.06 0.38 112.64

CSI 15-130, Tempering controllers

Tempering valves
Using small tools.
3/4" controller nb@2.00 Ea 90.60 104.60 1.14 196.34
1" controller nb@2.50 Ea 226.00 130.80 1.43 358.23
1-1/4" controller nb@3.03 Ea 280.00 158.50 1.73 440.23
1-1/2" controller nb@3.57 Ea 378.00 186.70 2.03 566.73

Bathroom shower mixing valves


Water temperature range 65 to 115 degrees Fahrenheit, failure of cold water supply shuts off built-in
valve, 7-1/2 gallons per minute at 45 PSI, using small tools.
1/2" check stop without strainer nb@1.64 Ea 297.00 85.77 0.93 383.70
1/2" check stop with strainer nb@1.64 Ea 436.00 85.77 0.93 522.70

Stainless steel hose racks


With heavy duty bronze hot and cold water mix control valve, thermometer gauge, vacuum breaker,
using small tools.
3/4" with hose adapter nb@5.00 Ea 604.00 261.50 2.85 868.35

CSI 15-131, Trap primers

Trap primers
Using small tools.
1/2" inlet and outlet, P1 primer nf@.500 Ea 73.00 22.69 0.28 95.97
1/2" inlet and outlet, P2 primer nf@.500 Ea 69.60 22.69 0.28 92.57
Distribution unit for 2 openings nb@1.25 Ea 78.30 65.38 0.71 144.39

CSI 15-140, Pumps

Positive displacement pumps


200 PSI, neoprene packing, using small tools.
Adjustable flow, 0 to 100% (25 GPH) --@.000 Ea 2,010.00 -- -- 2,010.00
Adjustable flow,
0 to 100% (28 GPH) 250 PSI --@.000 Ea 2,480.00 -- -- 2,480.00

CSI 15-141, Centrifugal pumps

Cast iron, single stage centrifugal pumps


Horizontal mounted, vertical split case, end suction, 125 lb. flanged, 1,750 RPM drip-proof motor,
common base plate, 100' head, packed stuffing box, vibration isolators for alignment only. Add for
housekeeping pad, suction guides, pipe and electrical connection. For general service, in gallons per
minute (GPM), using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 584 (part 2)

100 GPM, 1-1/2"discharge, 5 HP n7@8.00 Ea 2,580.00 374.60 4.80 2,959.40


200 GPM, 2" discharge, 10 HP n7@8.00 Ea 2,700.00 374.60 4.80 3,079.40
250 GPM, 3" discharge, 10 HP n7@8.00 Ea 2,870.00 374.60 4.80 3,249.40
300 GPM, 2" discharge, 15 HP n7@8.50 Ea 3,720.00 398.10 5.10 4,123.20
500 GPM, 4" discharge, 20 HP n7@10.0 Ea 5,070.00 468.30 6.00 5,544.30
750 GPM, 4" discharge, 30 HP n7@12.5 Ea 6,420.00 585.40 7.50 7,012.90
1,050 GPM, 5" discharge, 40 HP n7@12.5 Ea 7,100.00 585.40 7.50 7,692.90

Cast iron single stage centrifugal pumps


Horizontal mounted, vertical split case, end suction, 125 lb. flanged, 1,750 RPM drip-proof motor,
common base plate, 100' head, packed stuffing box, vibration isolators for alignment only. Add for
housekeeping pad, suction guides, pipe and electrical connection. For general service, in gallons per
minute (GPM), using a 20-ton hydraulic crane with 70’ boom and small tools.
1,500 GPM, 6" discharge, 60 HP pj@14.0 Ea 7,610.00 616.70 41.60 8,268.30
2,000 GPM, 6" discharge, 75 HP pj@16.0 Ea 12,200.00 704.80 47.50 12,952.30
3,000 GPM, 8" discharge, 100HP pj@18.0 Ea 16,100.00 792.90 53.50 16,946.40
2015 Heavy Construction Estimator, All Rights Reserved Page 585

Cast iron close coupled single stage centrifugal pumps


Horizontal mounted, vertical split case, end suction, 125 lb. flanged, 1,750 RPM drip-proof motor,
common base plate, 100' head, packed stuffing box. Includes bolt vibration isolators and alignment. Add
for suction guides, valves, connection to piping and electrical system and housekeeping pad. For
general service, in gallons per minute (GPM), using small tools.
50 GPM, 2 HP n7@4.00 Ea 1,270.00 187.30 2.40 1,459.70
90 GPM, 3 HP n7@4.00 Ea 1,680.00 187.30 2.40 1,869.70
225 GPM, 5 HP n7@4.00 Ea 2,370.00 187.30 2.40 2,559.70
350 GPM, 7 1/2 HP n7@4.50 Ea 2,700.00 210.70 2.70 2,913.40
600 GPM, 10 HP n7@6.00 Ea 3,800.00 281.00 3.60 4,084.60

Cast iron horizontal split case single stage centrifugal pumps


Horizontal mounted, 125 lb. flanged, 1750 RPM drip-proof motor, common base plate, 100' head except
as noted, packed stuffing box. Includes bolt vibration isolators and alignment. Add the cost of suction
guides, valves, connection to the piping and electrical system. For general service, using small tools.
100 GPM, 1-1/2"discharge, 7.5 HP n7@8.00 Ea 4,900.00 374.60 4.80 5,279.40
250 GPM, 2-1/2"discharge, 15 HP n7@8.50 Ea 6,700.00 398.10 5.10 7,103.20
500 GPM, 4" discharge, 20 HP n7@10.0 Ea 6,980.00 468.30 6.00 7,454.30
750 GPM, 5" discharge, 25 HP pe@10.0 Ea 7,880.00 434.10 6.40 8,320.50
1,000 GPM, 5" discharge, 40 HP pe@12.5 Ea 8,710.00 542.60 8.00 9,260.60

Cast iron horizontal split case single stage centrifugal pumps


Horizontal mounted, 125 lb. flanged, 1750 RPM drip-proof motor, common base plate, 100' head except
as noted, packed stuffing box. Includes bolt vibration isolators and alignment. Add the cost of suction
guides, valves, connection to the piping and electrical system. For general service, using a 20-ton
hydraulic crane with 70’ boom and small tools.
1,500 GPM, 6" discharge, 50 HP pj@14.0 Ea 11,000.00 616.70 41.60 11,658.30
2,000 GPM, 8" discharge, 75 HP pj@16.0 Ea 12,200.00 704.80 47.50 12,952.30
3,000 GPM, 10" discharge, 100 HP pj@18.0 Ea 17,800.00 792.90 53.50 18,646.40
3,500 GPM, 10" discharge,
125' head, 150 HP pj@22.0 Ea 35,400.00 969.10 65.30 36,434.40
4,000 GPM, 10" discharge,
150' head, 200 HP pj@24.0 Ea 37,100.00 1,057.00 71.30 38,228.30

Cast iron two stage horizontal split case centrifugal pumps


125 lbs. flanged, 3,500 RPM drip-proof motor, common base plate, 500' head, packed stuffing box.
Includes bolt vibration isolators and alignment. Add the cost of suction guides, valves and connection to
the electrical and piping system. For boiler feed water service, using small tools.
100 GPM, 1-1/2"discharge, 40 HP n7@14.0 Ea 7,480.00 655.60 8.40 8,144.00
200 GPM, 1-1/2"discharge, 50 HP n7@14.0 Ea 8,110.00 655.60 8.40 8,774.00

Cast iron two stage horizontal split case centrifugal pumps


125 lbs. flanged, 3,500 RPM drip-proof motor, common base plate, 500' head, packed stuffing box.
Includes bolt vibration isolators and alignment. Add the cost of suction guides, valves and connection to
the electrical and piping system. For boiler feed water service, using a 20-ton hydraulic crane with 70’
boom and small tools.
300 GPM, 2" discharge, 75 HP pc@16.0 Ea 17,700.00 732.60 93.10 18,525.70
400 GPM, 3" discharge, 100 HP pc@18.0 Ea 19,500.00 824.20 105.00 20,429.20
800 GPM, 4" discharge, 200 HP pc@24.0 Ea 21,300.00 1,099.00 140.00 22,539.00

Booster pumps - Standard capacity


All bronze in-the-line centrifugal circulating booster pumps, 1,750 RPM drip-proof motor. Includes mating
flanges and supports but no electrical work, using small tools.
15 GPM, 3/4" discharge,
6' head, 1/8 HP nc@2.25 Ea 443.00 110.60 1.26 554.86
20 GPM, 1" discharge,
2015 Heavy Construction Estimator, All Rights Reserved Page 585 (part 2)

5-1/2' head, 1/8 HP nc@2.25 Ea 560.00 110.60 1.26 671.86


25 GPM, 1-1/4" discharge,
4-1/2' head, 1/8 HP nc@2.50 Ea 560.00 122.90 1.40 684.30
30 GPM, 1-1/2" discharge,
2' head, 1/8 HP nc@2.50 Ea 560.00 122.90 1.40 684.30
30 GPM, 1" discharge,
7' head, 1/8 HP nc@2.25 Ea 560.00 110.60 1.26 671.86
35 GPM, 1-1/4" discharge,
4' head, 1/8 HP nc@2.50 Ea 560.00 122.90 1.40 684.30
35 GPM, 1-1/2" discharge,
5' head, 1/8 HP nc@2.50 Ea 560.00 122.90 1.40 684.30

Booster pumps - High head


All bronze in-the-line centrifugal circulating booster pumps, 1,750 RPM drip-proof motor. Complete
in-line installation including pump, mating flanges and supports. Add the cost of electrical connection,
using small tools.
10 GPM, 1-1/2" discharge,
9' head, 1/8 HP n7@2.50 Ea 560.00 117.10 1.50 678.60
10 GPM, 2" discharge,
10' head, 1/6 HP n7@2.50 Ea 585.00 117.10 1.50 703.60
10 GPM, 1" discharge,
16' head, 1/3 HP n7@2.50 Ea 852.00 117.10 1.50 970.60

All iron single stage vertical in-line close coupled centrifugal pumps
125 lbs. flanged, 3,550 RPM TEFC motor, flange to flange bolt-up installation. Add the cost of mating
flanges, supports and electrical connection. For general service, using small tools.
50 GPM, 1-1/2" discharge,
100' head, 3 HP n7@3.00 Ea 2,540.00 140.50 1.80 2,682.30
75 GPM, 1-1/2" discharge,
100' head, 5 HP n7@3.00 Ea 2,730.00 140.50 1.80 2,872.30
2015 Heavy Construction Estimator, All Rights Reserved Page 586

100 GPM, 1-1/2" discharge,


150’ head, 7-1/2 HP n7@4.00 Ea 3,140.00 187.30 2.40 3,329.70
125 GPM, 1-1/2" discharge,
150' head, 10 HP n7@4.00 Ea 3,220.00 187.30 2.40 3,409.70
150 GPM, 1-1/2" discharge,
200' head, 15 HP n7@4.50 Ea 3,920.00 210.70 2.70 4,133.40
200 GPM, 1-1/2" discharge,
300' head, 30 HP n7@6.00 Ea 6,220.00 281.00 3.60 6,504.60
250 GPM, 2" discharge,
300' head, 40 HP n7@6.00 Ea 7,230.00 281.00 3.60 7,514.60
300 GPM, 3" discharge,
300' head, 50 HP n7@6.00 Ea 9,010.00 281.00 3.60 9,294.60
400 GPM, 3" discharge,
400' head, 75 HP pe@6.00 Ea 13,500.00 260.50 3.84 13,764.34
600 GPM, 3" discharge,
400' head, 100 HP pe@8.00 Ea 14,500.00 347.30 5.12 14,852.42

Polypropylene body pumps


Polypropylene housing and impeller, 115/230 volts, using small tools.
1/3 HP pump, 22 GPM, 40 foot head n6@2.85 Ea 612.00 145.00 1.71 758.71
1/2 HP pump, 33 GPM, 40 foot head n6@3.03 Ea 638.00 154.20 1.82 794.02
3/4 HP pump, 53 GPM, 40 foot head n6@3.22 Ea 667.00 163.90 1.93 832.83

Connection assemblies for close coupled end suction centrifugal pumps


Includes schedule 40 buttwelded steel pipe, carbon steel fittings, pipe insulation, valves & gauges.
Based on 5' run to the distribution system, using a 300-amp skid-mounted welder and small tools.
2-1/2" supply and return pa@12.0 Ea 1,660.00 562.00 21.60 2,243.60
3" supply and return pa@13.5 Ea 1,900.00 632.20 24.30 2,556.50
4" supply and return pa@16.0 Ea 2,620.00 749.30 28.80 3,398.10
6" supply and return pa@22.0 Ea 4,350.00 1,030.00 39.60 5,419.60
8" supply and return pa@28.0 Ea 6,340.00 1,311.00 50.40 7,701.40

Connection assemblies for horizontal split case centrifugal pumps


Includes schedule 40 buttwelded steel pipe, carbon steel fittings, pipe insulation, valves & gauges.
Based on 5' run to the distribution system, using a 300-amp skid-mounted welder and small tools.
8" supply and return pa@22.0 Ea 4,610.00 1,030.00 39.60 5,679.60
6" supply and return pa@26.0 Ea 6,730.00 1,218.00 46.80 7,994.80
10" supply and return pa@35.0 Ea 10,400.00 1,639.00 63.00 12,102.00
12" supply and return pa@42.0 Ea 13,800.00 1,967.00 75.60 15,842.60

CSI 15-142, Rotary pumps

Cast iron internal gear rotary fuel oil pumps


Heavy duty, with high efficiency drip-proof motor, common base plate. Make additional allowances for
pipe connections to the distribution system and electrical work. For viscosity to 20 centipoise - diesel
oil and light oil, using small tools.
20 psi, 10 gpm, 1hp, 1200 rpm pd@4.00 Ea 2,910.00 171.20 17.60 3,098.80
40 psi, 10 gpm, 1hp, 1200 rpm pd@4.00 Ea 2,910.00 171.20 17.60 3,098.80
20 psi, 20 gpm, 2hp, 1200 rpm pd@4.00 Ea 3,200.00 171.20 17.60 3,388.80
40 psi, 30 gpm, 3hp, 1800 rpm pd@4.00 Ea 3,360.00 171.20 17.60 3,548.80
60 psi, 40 gpm, 5hp, 1800 rpm pd@4.00 Ea 4,320.00 171.20 17.60 4,508.80

Connection for simplex fuel oil pump, copper pipe


Includes 5' average run to distribution system with copper Type L pipe, wrought fittings and valves, using
small tools.
1" suction and discharge n7@4.20 Ea 739.00 196.70 2.52 938.22
2015 Heavy Construction Estimator, All Rights Reserved Page 587

1-1/4" suction and discharge n7@4.50 Ea 998.00 210.70 2.70 1,211.40


1-1/2" suction and discharge n7@4.85 Ea 1,280.00 227.10 2.91 1,510.01
2" suction and discharge n7@5.25 Ea 1,590.00 245.90 3.15 1,839.05

Connection for simplex fuel oil pump, steel pipe


Includes 5' average run to distribution system with steel threaded and coupled pipe, malleable fittings
and valves, using small tools.
1" suction and discharge n7@4.85 Ea 469.00 227.10 2.91 699.01
1-1/4" suction and discharge n7@5.40 Ea 574.00 252.90 3.24 830.14
1-1/2" suction and discharge n7@5.90 Ea 647.00 276.30 3.54 926.84
2" suction and discharge n7@6.40 Ea 803.00 299.70 3.84 1,106.54

Connection for duplex fuel oil pump, copper pipe


Includes 5' average run to distribution system with copper Type L pipe, wrought fittings and valves, using
small tools.
1" suction and discharge n7@7.00 Ea 2,590.00 327.80 4.20 2,922.00
1-1/4" suction and discharge n7@8.20 Ea 3,450.00 384.00 4.92 3,838.92
1-1/2" suction and discharge n7@8.75 Ea 4,000.00 409.80 5.25 4,415.05
2" suction and discharge n7@9.50 Ea 5,050.00 444.90 5.70 5,500.60

Connection for duplex fuel oil pump, steel pipe


Includes 5' average run to distribution system with steel threaded and coupled pipe, malleable fittings
and valves, using small tools.
1" suction and discharge n7@12.8 Ea 2,040.00 599.40 7.68 2,647.08
1-1/4" suction and discharge n7@14.8 Ea 2,760.00 693.10 8.88 3,461.98
1-1/2" suction and discharge n7@16.6 Ea 3,090.00 777.40 9.96 3,877.36
2" suction and discharge n7@17.5 Ea 3,720.00 819.50 10.50 4,550.00

CSI 15-143, Turbine pumps

Cast iron, bronze fitted vertical turbine wet sump pumps


For water supply, cooling towers and process liquids, multi-stage 1,750 RPM drip-proof motor, for 1' to
5' sump depth, using small tools.
50 GPM, 3" discharge,
100' head, 10 stage, 2 HP n7@22.2 Ea 8,230.00 1,040.00 13.30 9,283.30
100 GPM, 4" discharge,
100' head, 7 stage, 3 HP n7@25.0 Ea 8,700.00 1,171.00 15.00 9,886.00

Cast iron, bronze fitted vertical turbine wet sump pumps


For water supply, cooling towers and process liquids, multi-stage 1,750 RPM drip-proof motor, for 1' to
5' sump depth, using a 20-ton hydraulic crane with 70’ boom and small tools.
250 GPM, 6" discharge,
150' head, 5 stage, 15 HP pj@22.4 Ea 10,300.00 986.70 66.50 11,353.20
500 GPM, 6" discharge,
150' head, 3 stage, 25 HP pj@25.9 Ea 11,300.00 1,141.00 76.90 12,517.90
1,000 GPM, 8" discharge,
150' head, 2 stage, 50 HP pj@28.0 Ea 14,200.00 1,233.00 83.20 15,516.20
2,000 GPM, 10" discharge,
150' head, 3 stage, 100 HP pj@33.6 Ea 23,700.00 1,480.00 99.80 25,279.80
3,000 GPM, 10" discharge,
150' head, 2 stage, 150 HP pj@42.0 Ea 28,200.00 1,850.00 125.00 30,175.00
4,000 GPM, 12" discharge,
150' head, 2 stage, 200 HP pj@48.0 Ea 47,200.00 2,114.00 143.00 49,457.00
6,000 GPM, 14" discharge,
150' head, 2 stage, 300 HP pj@56.0 Ea 62,600.00 2,467.00 166.00 65,233.00
10,000 GPM, 18" discharge,
100' head, 2 stage, 300 HP pj@67.2 Ea 88,900.00 2,960.00 200.00 92,060.00
2015 Heavy Construction Estimator, All Rights Reserved Page 587 (part 2)

CSI 15-145, Sump pumps

Cast iron single stage vertical sump pumps


Mounted on steel support plate and supplied with cast iron strainer, 1750 RPM drip-proof motor, using
small tools.
25 GPM, 1-1/2" discharge,
40' head, 1 HP n7@28.5 Ea 3,010.00 1,335.00 17.10 4,362.10
75 GPM, 2" discharge,
40' head, 1-1/2 HP n7@28.5 Ea 3,100.00 1,335.00 17.10 4,452.10
100 GPM, 2-1/2" discharge,
40' head, 2 HP n7@28.5 Ea 3,510.00 1,335.00 17.10 4,862.10
150 GPM,
3" discharge, 40' head, 3 HP n7@28.5 Ea 3,610.00 1,335.00 17.10 4,962.10
200 GPM,
3" discharge, 40' head, 3 HP n7@28.5 Ea 3,790.00 1,335.00 17.10 5,142.10
300 GPM, 4" discharge,
70' head, 10 HP n7@33.5 Ea 4,480.00 1,569.00 20.10 6,069.10
500 GPM, 5" discharge,
70' head, 15 HP pe@33.5 Ea 5,410.00 1,454.00 21.40 6,885.40
2015 Heavy Construction Estimator, All Rights Reserved Page 588

Cast iron single stage vertical sump pumps


Mounted on steel support plate and supplied with cast iron strainer, 1750 RPM drip-proof motor, using a
20-ton hydraulic crane with 70’ boom and small tools.
800 GPM, 6" discharge,
70' head, 20 HP pj@28.5 Ea 6,400.00 1,255.00 84.60 7,739.60
1000 GPM, 6" discharge,
70' head, 30 HP pj@28.5 Ea 6,760.00 1,255.00 84.60 8,099.60
1600 GPM, 8" discharge,
70' head, 50 HP pj@33.6 Ea 18,100.00 1,480.00 99.80 19,679.80
2000 GPM, 8" discharge,
70' head, 60 HP pj@37.3 Ea 13,700.00 1,643.00 111.00 15,454.00
Add for each extra
column assembly 60" or less --@.000 Ea -- -- 23.00 23.00
Add for general purpose
copper coated float switch --@.000 Ea 188.00 -- -- 188.00
Add for 24" square steel sump cover --@.000 Ea 200.00 -- -- 200.00
Add for 36" square steel sump cover --@.000 Ea 167.00 -- -- 167.00
Add for 48" square steel sump cover --@.000 Ea 464.00 -- -- 464.00
Add for 60" square steel sump cover --@.000 Ea 1,020.00 -- -- 1,020.00
Add for 72" square steel sump cover --@.000 Ea 1,280.00 -- -- 1,280.00

Submersible sump pumps, 15’ head, 1-1/2" discharge


Using small tools.
15 gallons per minute nb@1.67 Ea 136.00 87.34 0.95 224.29
42 gallons per minute nb@1.67 Ea 356.00 87.34 0.95 444.29
52 gallons per minute nb@2.00 Ea 665.00 104.60 1.14 770.74

CSI 15-146, Submersible pumps

Well pumps, 4" discharge


Installed in wells to 180' (55m) deep, using a 20-ton hydraulic crane with 70’ boom and small tools.
250 to 770 gallons per hour nt@12.2 Ea 592.00 552.10 89.10 1,233.20
550 to 1,600 gallons per hour nt@14.0 Ea 769.00 633.50 102.00 1,504.50
800 to 2,200 gallons per hour nt@14.0 Ea 1,340.00 633.50 102.00 2,075.50

Submersible pump rental


using a 20-ton hydraulic crane with 70’ boom and small tools.
2", per day --@.000 Day -- -- 32.00 32.00
2", per week --@.000 Week -- -- 102.00 102.00
2", per month --@.000 Mo -- -- 287.00 287.00
4", per day --@.000 Day -- -- 72.00 72.00
4", per week --@.000 Week -- -- 230.00 230.00
4", per month --@.000 Mo -- -- 659.00 659.00

Well pumps, 6" discharge


Using a 20-ton hydraulic crane with 70’ boom and small tools.
50 to 125 gallons per hour,
for wells, 50-150' deep nt@20.0 Ea 1,770.00 905.00 146.00 2,821.00
15 to 135 gallons per hour,
for wells, 200-500' deep nt@28.0 Ea 2,540.00 1,267.00 204.00 4,011.00

CSI 15-147, Pneumatic ejectors

Duplex steel ejector receivers


Electronic level controls, inlet and outlet check valves, gate valves, and standard cross connections.
Costs exclude air compressor, air receiver, and air piping and fittings. See CSI 15-310 for submersible
sewage ejectors, using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 588 (part 2)

30 gallons per hour nt@14.0 Ea 15,000.00 633.50 102.00 15,735.50


50 gallons per hour nt@15.6 Ea 15,000.00 705.90 114.00 15,819.90
100 gallons per hour nt@18.7 Ea 18,000.00 846.20 137.00 18,983.20
150 gallons per hour nt@21.5 Ea 21,000.00 972.90 157.00 22,129.90
200 gallons per hour nt@28.0 Ea 26,900.00 1,267.00 204.00 28,371.00
250 gallons per hour nt@35.0 Ea 29,900.00 1,584.00 256.00 31,740.00
300 gallons per hour nt@56.0 Ea 37,400.00 2,534.00 409.00 40,343.00
Add for cast iron receivers ---@--- % 20.00 -- -- --
Add for mechanical level control ---@--- % 20.00 -- -- --

CSI 15-148, Pneumatic pumps

Pneumatic powered pumps


Excludes air compressor cost, using small tools.
Pumping unit,
oil and gear lubrication nb@1.67 Ea 1,140.00 87.34 0.95 1,228.29
Pumping unit, grease nb@1.67 Ea 1,590.00 87.34 0.95 1,678.29

Pneumatic powered pumping unit accessories


Using small tools, using small tools.
Hose reel, 1,000
PSI, oil and lubrication nb@1.25 Ea 775.00 65.38 0.71 841.09
Hose reel, 5,000 PSI, grease nb@1.25 Ea 891.00 65.38 0.71 957.09
2015 Heavy Construction Estimator, All Rights Reserved Page 589

Hose reel, 160 PSI, air nb@1.25 Ea 572.00 65.38 0.71 638.09
Control valve, oil and lubrication nb@.630 Ea 322.00 32.95 0.36 355.31
Control valve, grease nb@.630 Ea 163.00 32.95 0.36 196.31

CSI 15-151, Vacuum pumps

Medical vacuum pumps, with receiver


Using small tools, using small tools.
20 SCFM, duplex pe@20.6 Ea 8,810.00 894.20 13.20 9,717.40
Vacuum pump, 60 CFM, 10 HP nb@23.0 Ea 9,120.00 1,203.00 13.10 10,336.10
180 SCFM, triplex pe@28.0 Ea 14,400.00 1,215.00 17.90 15,632.90

Dental oral vacuum pumps


Using small tools, using small tools.
165 SCFM, duplex with 30" x 66",
77 gallon separator pe@21.0 Ea 10,800.00 911.60 13.40 11,725.00

CSI 15-152, Air compressors. See also CSI 15-915

Medical air compressors


Using small tools, using small tools.
100 SCFM, duplex pe@14.0 Ea 9,060.00 607.70 8.96 9,676.66
160 SCFM, duplex pe@28.0 Ea 12,100.00 1,215.00 17.90 13,332.90
Vacuum air compressor nb@16.7 Ea 7,130.00 873.40 9.52 8,012.92

CSI 15-160, Pumps

Centrifugal pumps, stainless steel


Based on gallons per minute delivery at 100' head, using small tools.
50 GPM, 3 HP n7@9.52 Ea 6,080.00 445.80 5.71 6,531.51
250 GPM, 10 HP n7@12.5 Ea 6,760.00 585.40 7.50 7,352.90
500 GPM, 20 HP n7@16.7 Ea 10,100.00 782.10 10.00 10,892.10

Vertical turbine pumps, stainless steel


Using small tools.
100 GPM 100' head - 7.5 HP n7@23.0 Ea 16,900.00 1,077.00 13.80 17,990.80

Vertical turbine pumps, stainless steel


Using a 20-ton hydraulic crane with 70’ boom and small tools.
250 GPM 100' head - 15 HP pj@25.0 Ea 22,000.00 1,101.00 74.30 23,175.30
500 GPM 100' head - 20 HP pj@25.9 Ea 27,000.00 1,141.00 76.90 28,217.90
750 GPM 100' head - 30 HP pj@26.5 Ea 28,700.00 1,167.00 78.70 29,945.70
1000 GPM 100' head - 40 HP pj@28.0 Ea 30,400.00 1,233.00 83.20 31,716.20
100 GPM 200' head - 15 HP pj@23.0 Ea 20,300.00 1,013.00 68.30 21,381.30
250 GPM 200' head - 25 HP pj@25.0 Ea 22,000.00 1,101.00 74.30 23,175.30
500 GPM 200' head - 40 HP pj@25.9 Ea 33,800.00 1,141.00 76.90 35,017.90
750 GPM 200' head - 60 HP pj@26.5 Ea 37,200.00 1,167.00 78.70 38,445.70
1000 GPM 200' head - 75 HP pj@28.0 Ea 42,300.00 1,233.00 83.20 43,616.20

CSI 15-161, Vibration isolation

Flexible hose vibration isolation connectors


Bronze hose with hex threaded nipple ends, using small tools.
3/8" diameter x 9" long n6@.320 Ea 44.70 16.28 0.19 61.17
1/2" diameter x 10" long n6@.430 Ea 44.70 21.88 0.26 66.84
3/4" diameter x 11" long n6@.530 Ea 55.90 26.97 0.32 83.19
2015 Heavy Construction Estimator, All Rights Reserved Page 589 (part 2)

1" diameter x 12" long n6@.630 Ea 63.30 32.06 0.38 95.74


1-1/2" diameter x 14" long n6@.830 Ea 78.20 42.24 0.50 120.94
2" diameter x 17" long n6@1.06 Ea 112.00 53.94 0.64 166.58

Unhoused stable steel spring isolators


With leveling adjustment, cast top, base plate and pad, for use with floor mounted equipment only,
using small tools.
115 lbs. (52kg), maximum nb@.560 Ea 13.90 29.29 0.32 43.51
1,130 lbs. (590kg), maximum nb@.560 Ea 28.30 29.29 0.32 57.91

Molded rubber vibration isolators


With helical wire reinforcement, 150 PSI, using small tools.
1-1/2" diameter x 12" n6@1.00 Ea 48.70 50.89 0.60 100.19
2" diameter x 12" n6@1.11 Ea 53.00 56.49 0.67 110.16
2015 Heavy Construction Estimator, All Rights Reserved Page 590

3" diameter x 12" n8@3.33 Ea 77.10 169.50 2.00 248.60


4" diameter x 12" n8@4.26 Ea 104.00 216.80 2.56 323.36
6" diameter x 18" pe@5.00 Ea 183.00 217.10 3.20 403.30
8" diameter x 24" pe@5.71 Ea 239.00 247.90 3.65 490.55
10" diameter x 24" pe@6.80 Ea 337.00 295.20 4.35 636.55
12" diameter x 24" pe@8.51 Ea 483.00 369.40 5.45 857.85

Metal wire braid vibration isolators


Metal braid over corrugated stainless steel, 150 PSI, using small tools.
2-1/2" diameter x 9" n8@2.75 Ea 79.30 139.90 1.65 220.85
3" diameter x 9" n8@3.33 Ea 83.90 169.50 2.00 255.40
4" diameter x 9" n8@4.26 Ea 107.00 216.80 2.56 326.36
6" diameter x 11" pe@5.00 Ea 176.00 217.10 3.20 396.30
8" diameter x 12" pe@5.71 Ea 400.00 247.90 3.65 651.55
10" diameter x 13" pe@6.80 Ea 480.00 295.20 4.35 779.55
12" diameter x 14" pe@8.51 Ea 723.00 369.40 5.45 1,097.85

Molded Teflon vibration isolators


Teflon on stainless steel flange, 150 PSI, using small tools.
2-1/2" diameter x 3-3/16" n8@2.75 Ea 429.00 139.90 1.65 570.55
3" diameter x 3-5/8" n8@3.33 Ea 475.00 169.50 2.00 646.50
4" diameter x 3-5/8" n8@4.26 Ea 698.00 216.80 2.56 917.36
6" diameter x 4" pe@5.00 Ea 843.00 217.10 3.20 1,063.30
8" diameter x 6" pe@5.71 Ea 1,160.00 247.90 3.65 1,411.55

Spring and rubber vibration isolation hangers


Allows 1" deflection, using small tools.
50 to 500 lb.
with 3/4" maximum rod size n6@.360 Ea 46.50 18.32 0.22 65.04
600 to 1,000 lb.
with 7/8" maximum rod size n6@.400 Ea 117.00 20.36 0.24 137.60

Rubber-in-shear vibration isolation hangers


Using small tools.
45 to 340 lb.,
less than .38" deflection n6@.670 Ea 37.80 34.10 0.40 72.30
130 to 700 lb.,
less than .43" deflection n6@.670 Ea 64.30 34.10 0.40 98.80
550 to 1,920 lbs.,
less than .48" deflection n6@.670 Ea 155.00 34.10 0.40 189.50

Two-piece spring type vibration isolators


For equipment support, aluminum construction, 1/2" adjusting and leveling bolt 1" deflection, using
small tools.
50 to 1,000 lb. rated load n6@.670 Ea 35.10 34.10 0.40 69.60
1,100 to 1,600 lb. rated load n6@.670 Ea 37.70 34.10 0.40 72.20

Open double spring type vibration isolators


For equipment support, 1" deflection neoprene pad and 5/8" stud bolt, using small tools.
150 to 450 lb. rated load n6@.330 Ea 32.50 16.79 0.20 49.49
500 to 1000 lb. rated load n6@.330 Ea 32.50 16.79 0.20 49.49
1100 to 1600 lb. rated load n6@.330 Ea 39.50 16.79 0.20 56.49
1700 to 2400 lb. rated load n6@.330 Ea 39.50 16.79 0.20 56.49
2015 Heavy Construction Estimator, All Rights Reserved Page 591

2500 to 3400 lb. rated load n6@.330 Ea 32.30 16.79 0.20 49.29

Laminated neoprene and cork isolation pads


For equipment, using small tools.
1" thick n6@1.10 SF 50.50 55.98 0.66 107.14

CSI 15-162, Piping expansion joints

Bellows type, stainless steel expansion joints - Male thread ends


Internal sleeves and external covers, pressure rating 150 lb (68kg), using small tools.
1/2" joint n6@1.61 Ea 139.00 81.93 0.97 221.90
3/4" joint n6@1.82 Ea 152.00 92.62 1.09 245.71
1" joint n6@2.08 Ea 198.00 105.90 1.25 305.15
1-1/4" joint n6@2.33 Ea 238.00 118.60 1.40 358.00
1-1/2" joint n6@2.50 Ea 264.00 127.20 1.50 392.70
2" joint n6@2.94 Ea 278.00 149.60 1.76 429.36

Bellows type, stainless steel expansion joints - Flanged ends


Internal sleeves and external covers, pressure rating 150 lb (68kg), using small tools.
1-1/2" joint n7@1.10 Ea 339.00 51.51 0.66 391.17
3" joint n7@1.30 Ea 364.00 60.88 0.78 425.66
4" joint n7@1.40 Ea 425.00 65.56 0.84 491.40
6" joint pe@1.60 Ea 542.00 69.46 1.02 612.48
8" joint pe@1.80 Ea 703.00 78.14 1.15 782.29
10" joint pe@2.00 Ea 909.00 86.82 1.28 997.10
12" joint pe@2.20 Ea 1,230.00 95.50 1.41 1,326.91

CSI 15-173, Flow measuring devices

Conditioned water balancing valves


Working pressures up to 300 PSIG, iron and bronze body construction, using small tools.
1/2" nominal pipe thread n6@.630 Ea 95.00 32.06 0.38 127.44
3/4" nominal pipe thread n6@.830 Ea 104.00 42.24 0.50 146.74
1" nominal pipe thread n6@.950 Ea 132.00 48.35 0.57 180.92
1-1/4" nominal pipe thread n6@1.18 Ea 178.00 60.05 0.71 238.76
1-1/2" nominal pipe thread n6@1.25 Ea 215.00 63.61 0.75 279.36
2" nominal pipe thread n6@1.43 Ea 310.00 72.77 0.86 383.63

Conditioned water balancing valves


Working pressures up to 300 PSIG, iron and bronze body construction, using a 20-ton hydraulic crane
with 70’ boom and small tools.
2-1/2" nominal pipe thread pb@2.70 Ea 601.00 124.50 10.30 735.80
3" nominal pipe thread pb@3.09 Ea 892.00 142.50 11.80 1,046.30
3" flange pb@3.60 Ea 1,240.00 166.00 13.80 1,419.80
6" flanged flow control valve pb@3.86 Ea 1,660.00 178.00 14.70 1,852.70
8" flanged flow control valve pb@4.41 Ea 2,990.00 203.30 16.80 3,210.10
10" flanged flow control valve pb@5.40 Ea 5,270.00 249.00 20.60 5,539.60

Read out meters


For use with conditioned water balancing valves, portable.
0.5 to 25% accuracy --@.000 Ea 1,170.00 -- -- 1,170.00
0.5 to 50% accuracy --@.000 Ea 1,580.00 -- -- 1,580.00
0.5 to 75% accuracy --@.000 Ea 1,580.00 -- -- 1,580.00
0.5 to 100% accuracy --@.000 Ea 1,580.00 -- -- 1,580.00
2015 Heavy Construction Estimator, All Rights Reserved Page 592

Brass flow venturi, threaded


Using small tools.
3/4" venturi n6@.830 Ea 232.00 42.24 0.50 274.74
1" venturi n6@1.00 Ea 246.00 50.89 0.60 297.49
1 to 1/4" venturi n6@1.11 Ea 270.00 56.49 0.67 327.16
1 to 1/2" venturi n6@1.25 Ea 305.00 63.61 0.75 369.36
2" venturi n6@1.43 Ea 371.00 72.77 0.86 444.63

Carbon steel flow venturi, butt weld


Using small tools.
2-1/2" venturi brass flow venturi,
threaded pj@2.40 Ea 249.00 105.70 7.13 361.83
3" venturi pj@2.80 Ea 5,670.00 123.30 8.32 5,801.62
4" venturi pj@3.36 Ea 8,130.00 148.00 9.98 8,287.98
5" venturi pj@4.20 Ea 10,800.00 185.00 12.50 10,997.50
6" venturi pj@5.60 Ea 12,500.00 246.70 16.60 12,763.30
8" venturi pj@6.72 Ea 19,100.00 296.00 20.00 19,416.00
10" venturi pj@8.40 Ea 32,700.00 370.00 24.90 33,094.90
12" venturi pj@11.2 Ea 49,500.00 493.40 33.30 50,026.70
14" venturi pj@16.8 Ea 68,800.00 740.00 49.90 69,589.90
16" venturi pj@19.2 Ea 107,000.00 845.80 57.00107,902.80
Add for portable
meter for flow venturi --@.000 Ea 1,620.00 -- -- 1,620.00
Add for flanged ends flow venturi ---@--- % 65.00 -- -- --

CSI 15-176, Steel tanks

Above ground storage tanks


Steel, 3/16" shell, includes supports, coating and fittings. Excludes pumps and piping, using small
tools.
275 gallons n8@2.98 Ea 509.00 151.70 1.79 662.49
550 gallons n8@4.00 Ea 1,060.00 203.60 2.40 1,266.00
1,000 gallons ph@7.70 Ea 1,800.00 341.90 5.16 2,147.06
1,500 gallons ph@8.29 Ea 1,950.00 368.10 5.55 2,323.65

Above ground storage tanks


Steel, 3/16" shell, includes supports, coating and fittings. Excludes pumps and piping, using a 20-ton
hydraulic crane with 70’ boom and small tools.
2,000 gallons pl@10.5 Ea 2,540.00 460.80 42.50 3,043.30
3,000 gallons pl@25.3 Ea 3,290.00 1,110.00 102.00 4,502.00
5,000 gallons pl@29.6 Ea 6,990.00 1,299.00 120.00 8,409.00
8,000 gallons pl@35.8 Ea 7,200.00 1,571.00 145.00 8,916.00
10,000 gallons pl@39.1 Ea 7,450.00 1,716.00 158.00 9,324.00
12,000 gallons pl@43.0 Ea 8,010.00 1,887.00 174.00 10,071.00
15,000 gallons pl@47.8 Ea 8,860.00 2,098.00 194.00 11,152.00
20,000 gallons pm@61.4 Ea 11,000.00 2,695.00 249.00 13,944.00
30,000 gallons pm@71.7 Ea 15,300.00 3,147.00 290.00 18,737.00

Underground steel storage tanks


Coated, includes setting in place and hold down bars. Excludes excavation, pad, pumps, and piping,
using small tools.
1,000 gallons, with 7 gauge shell ph@20.0 Ea 1,750.00 888.00 13.40 2,651.40

Underground steel storage tanks


Coated, includes setting in place and hold down bars. Excludes excavation, pad, pumps, and piping,
using a 20-ton hydraulic crane with 70’ boom and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 592 (part 2)

5,000 gallons, with 1/4" shell pl@24.0 Ea 5,960.00 1,053.00 97.20 7,110.20
10,000 gallons, with 1/4" shell pl@37.3 Ea 6,460.00 1,637.00 151.00 8,248.00
10,000 gallons, with 5/6" shell pl@37.3 Ea 10,200.00 1,637.00 151.00 11,988.00
20,000 gallons, with 5/6" shell pm@68.8 Ea 12,800.00 3,020.00 279.00 16,099.00
30,000 gallons, with 3/8" shell pm@86.0 Ea 19,500.00 3,775.00 348.00 23,623.00

Underground steel storage tanks


Coated, includes setting in place and hold down bars. Excludes excavation, pad, pumps, and piping,
using small tools.
500 gallons, with 10 gauge shell ph@4.70 Ea 1,210.00 208.70 3.15 1,421.85
550 gallon single wall ph@4.86 Ea 1,430.00 215.80 3.26 1,649.06
2015 Heavy Construction Estimator, All Rights Reserved Page 593

Underground steel storage tanks


Coated, includes setting in place and hold down bars. Excludes excavation, pad, pumps, and piping,
using a 20-ton hydraulic crane with 70’ boom and small tools.
2,000 gallon, single wall pl@16.8 Ea 3,070.00 737.40 68.00 3,875.40
2,500 gallons, single wall pl@18.5 Ea 3,320.00 812.00 74.90 4,206.90
3,000 gallon, single wall pl@23.0 Ea 4,040.00 1,009.00 93.20 5,142.20
8,000 gallon, single wall pl@35.2 Ea 8,200.00 1,545.00 143.00 9,888.00
10,000 gallon, single wall pl@37.3 Ea 10,200.00 1,637.00 151.00 11,988.00
12,000 gallon, single wall pl@47.8 Ea 11,000.00 2,098.00 194.00 13,292.00
15,000 gallon, single wall pl@53.8 Ea 13,500.00 2,361.00 218.00 16,079.00
Add for 20 to year
warranty galvanic protection ---@--- % 100.00 -- -- --

Above ground fuel oil storage tanks


Steel, cone roof, includes material, fabrication, field erection, 1/4" bottom, 3/1 roof, shell and roof
manways, ladder, level indicator, nozzles, and gauge hatch. Excludes foundation, sandblasting and
painting. Capacities are nominal barrels, using a truck-mounted hydraulic crane with 115’ boom, a
200-amp trailer mounted welder and three sets of small tools.
500 bbls., 15' diameter x16’ high qp@556. Ea 37,600.00 27,110.00 6,890.00 71,600.00
2,000 bbls.,
25’ diameter x 24’ high qp@1122 Ea 60,700.00 54,730.00 13,900.00129,330.00
5,000 bbls.,
40’ diameter x 24’ high qp@1486 Ea 94,300.00 72,480.00 18,400.00185,180.00
12,000 bbls.,
60’ diameter x 24’ high qp@2444 Ea 132,000.00119,200.00 30,300.00281,500.00
20,000 bbls.,
60’ diameter x 40’ high qp@3333 Ea 217,000.00162,500.00 41,300.00420,800.00
24,000 bbls.,
70’ diameter x 32’ high qp@3548 Ea 236,000.00173,000.00 44,000.00453,000.00
36,000 bbls.,
80’ diameter x 40’ high qp@4782 Ea 272,000.00233,200.00 59,300.00564,500.00
45,000 bbls.,
90’ diameter x 40’ high qp@5789 Ea 324,000.00282,300.00 71,700.00678,000.00
56,000 bbls.,
100’ diameter x 40’ high qp@6875 Ea 386,000.00335,200.00 85,200.00806,400.00
64,000 bbls.,
120’ diameter x 32’ high qp@7857 Ea 449,000.00383,100.00 97,300.00929,400.00
80,000 bbls.,
120’ diameter x 40’ high qp@1000 Ea 515,000.00487,600.00124,000.001,126,600.00
88,000 bbls.,
140’ diameter x 32’ high qp@1000 Ea 712,000.00487,600.00124,000.001,323,600.00
11,0000 bbls.,
140' diameter x 40’ high qp@1000 Ea 794,000.00487,600.00124,000.001,405,600.00
143,000 bbls.,
160' diameter x 40’ high qp@1100 Ea 940,000.00536,400.00136,000.001,612,400.00
18,0000 bbls.,
180' diameter x 40’ high qp@1375 Ea 1,170,000.00670,500.00170,000.002,010,500.00
22,4000 bbls.,
200' diameter x 40’ high qp@1833 Ea 1,430,000.00893,900.00227,000.002,550,900.00

Underground double wall storage tanks


Steel, coated, includes setting in place with hold down bars. Excludes excavation, pad, plastic lining,
pumps, and piping, using a 20-ton hydraulic crane with 70’ boom and small tools.
500 gallons pl@8.60 Ea 2,830.00 377.50 34.80 3,242.30
1,000 gallons pl@10.8 Ea 3,640.00 474.00 43.70 4,157.70
2,000 gallons pl@13.2 Ea 4,580.00 579.30 53.50 5,212.80
3,000 gallon pl@14.8 Ea 5,990.00 649.60 59.90 6,699.50
4,000 gallons pl@43.0 Ea 7,410.00 1,887.00 174.00 9,471.00
2015 Heavy Construction Estimator, All Rights Reserved Page 593 (part 2)

5,000 gallons pl@43.0 Ea 8,750.00 1,887.00 174.00 10,811.00


6,000 gallons pl@45.8 Ea 9,020.00 2,010.00 185.00 11,215.00
8,000 gallons pl@49.1 Ea 11,000.00 2,155.00 199.00 13,354.00
10,000 gallons pl@53.8 Ea 12,800.00 2,361.00 218.00 15,379.00
12,000 gallon pm@68.8 Ea 19,600.00 3,020.00 279.00 22,899.00
15,000 gallons pm@67.4 Ea 20,200.00 2,958.00 273.00 23,431.00
20,000 gallons pm@86.0 Ea 24,200.00 3,775.00 348.00 28,323.00
25,000 gallons pm@95.6 Ea 29,600.00 4,196.00 387.00 34,183.00
30,000 gallons pm@108. Ea 35,000.00 4,740.00 437.00 40,177.00
40,000 gallons pm@143. Ea 45,800.00 6,276.00 579.00 52,655.00
48,000 gallons pm@181. Ea 63,300.00 7,944.00 733.00 71,977.00

Expansion tanks
Steel, ASME code stamp, 150 PSI with gauge glass and gauge cocks, using small tools.
10 gallons n6@1.60 Ea 374.00 81.42 0.96 456.38
15 gallons n6@1.75 Ea 569.00 89.06 1.05 659.11
30 gallons n8@2.00 Ea 621.00 101.80 1.20 724.00
40 gallons n8@2.30 Ea 674.00 117.00 1.38 792.38
60 gallons pe@3.00 Ea 763.00 130.20 1.92 895.12

Monitoring systems for underground tanks


Continuous leak detection system, includes electronic control module and probes, excludes samples,
wells, electrical power supply, and sensor cable, using a 20-ton hydraulic crane with 70’ boom, small
tools.
Single channel ln@8.20 Ea 2,190.00 408.40 11.40 2,609.80
2015 Heavy Construction Estimator, All Rights Reserved Page 594

Multi channel ln@10.9 Ea 2,960.00 542.90 15.20 3,518.10


3 channel ln@11.7 Ea 4,320.00 582.80 16.30 4,919.10
4 channel ln@16.4 Ea 4,500.00 816.90 22.80 5,339.70
Control panel, 1 to 8 tanks, single wall,
material cost only --@.000 Ea 3,520.00 -- -- 3,520.00
Control panel,
1 to 4 tanks, double wall --@.000 Ea 3,180.00 -- -- 3,180.00
Control panel,
1 to 8 tanks, double wall --@.000 Ea 4,180.00 -- -- 4,180.00
Tank leak detection probe --@.000 Ea 1,300.00 -- -- 1,300.00
Secondary containment collar probe --@.000 Ea 156.00 -- -- 156.00
Interstitial
leak detection stainless --@.000 Ea 284.00 -- -- 284.00

Liquid oxygen storage tanks


Stainless steel inner tank, suitable for 320 Fahrenheit, multiple layer insulation, using small tools.
3,000 gallon lox tank n6@33.3 Ea 178,000.00 1,695.00 20.00179,715.00
6,000 gallon lox tank n6@50.0 Ea 210,000.00 2,545.00 30.00212,575.00

Oxygen vaporizers, ambient air type


Using small tools.
5,000 SCF per hour n6@25.0 Ea 14,300.00 1,272.00 15.00 15,587.00

Secondary containment dikes for liquid oxygen tanks


Steel dike, uncoated, material cost only, using small tools.
550 gallon --@.000 Ea 2,000.00 -- -- 2,000.00
1,000 gallon --@.000 Ea 2,410.00 -- -- 2,410.00
2,000 gallon --@.000 Ea 5,380.00 -- -- 5,380.00
3,000 gallon --@.000 Ea 5,860.00 -- -- 5,860.00
5,000 gallon --@.000 Ea 8,370.00 -- -- 8,370.00
6,000 gallon --@.000 Ea 9,380.00 -- -- 9,380.00
8,000 gallon --@.000 Ea 12,400.00 -- -- 12,400.00
10,000 gallon --@.000 Ea 14,500.00 -- -- 14,500.00
12,000 gallon --@.000 Ea 16,500.00 -- -- 16,500.00
15,000 gallon --@.000 Ea 20,100.00 -- -- 20,100.00
20,000 gallon --@.000 Ea 25,800.00 -- -- 25,800.00

CSI 15-177, Plastic tanks

Chemical storage tanks, polyethylene


Using small tools.
15 gallon n6@1.54 Ea 60.00 78.37 0.92 139.29

Single wall fiberglass tanks


Horizontal cylindrical, single wall. Made of glass fiber reinforcement and isophthalic resin. Includes
fittings and anchor straps. Excludes excavation and backfill, using small tools.
550 gallon ph@8.36 Ea 3,280.00 371.20 5.60 3,656.80
1,000 gallon ph@16.8 Ea 5,910.00 745.90 11.30 6,667.20

Single wall fiberglass tanks


Horizontal cylindrical, single wall. Made of glass fiber reinforcement and isophthalic resin. Includes
fittings and anchor straps. Excludes excavation and backfill, using a 20-ton hydraulic crane with 70’
boom and small tools.
2,000 gallon pl@16.8 Ea 6,680.00 737.40 68.00 7,485.40
3,000 gallon pl@20.5 Ea 7,430.00 899.70 83.00 8,412.70
5,000 gallon pl@29.4 Ea 8,560.00 1,290.00 119.00 9,969.00
8,000 gallon pl@33.5 Ea 10,200.00 1,470.00 136.00 11,806.00
2015 Heavy Construction Estimator, All Rights Reserved Page 594 (part 2)

10,000 gallon pl@33.5 Ea 11,200.00 1,470.00 136.00 12,806.00


12,000 gallon pl@84.4 Ea 13,800.00 3,704.00 342.00 17,846.00
15,000 gallon pl@89.0 Ea 16,000.00 3,906.00 360.00 20,266.00
20,000 gallon pl@89.0 Ea 19,000.00 3,906.00 360.00 23,266.00
30,000 gallon pl@89.0 Ea 46,900.00 3,906.00 360.00 51,166.00

Double wall fiberglass tanks


Horizontal cylindrical, single wall. Made of glass fiber reinforcement and isophthalic resin. Includes
fittings and anchor straps. Excludes excavation and backfill, using a 20-ton hydraulic crane with 70’
boom and small tools.
550 gallons pl@8.60 Ea 5,070.00 377.50 34.80 5,482.30
2,000 gallons pl@17.0 Ea 9,600.00 746.10 68.90 10,415.00
3,000 gallons pl@21.0 Ea 10,400.00 921.70 85.10 11,406.80
5,000 gallons pl@30.0 Ea 11,200.00 1,317.00 122.00 12,639.00
8,000 gallons pl@34.0 Ea 15,100.00 1,492.00 138.00 16,730.00
2015 Heavy Construction Estimator, All Rights Reserved Page 595

10,000 gallons pl@34.0 Ea 17,300.00 1,492.00 138.00 18,930.00


12,000 gallons pl@85.0 Ea 21,100.00 3,731.00 344.00 25,175.00
15,000 gallons pm@90.0 Ea 27,500.00 3,950.00 365.00 31,815.00
20,000 gallons pm@90.0 Ea 33,800.00 3,950.00 365.00 38,115.00
30,000 gallons pm@90.0 Ea 53,800.00 3,950.00 365.00 58,115.00

CSI 15-178, Gas storage tanks

Nitrous oxide storage tanks


Liquid inner tank, stainless steel, multi-layer insulation, controls and vaporizer, using small tools.
6 ton capacity n6@19.8 Ea 43,900.00 1,008.00 11.90 44,919.90

CSI 15-182, Piping Insulation

Rigid, pre-formed fiberglass steel pipe insulation, 1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 1.04 2.01 0.02 3.07
3/4" diameter pipe ac@.040 LF 1.13 2.01 0.02 3.16
1" diameter pipe ac@.050 LF 1.28 2.51 0.03 3.82
1-1/4" diameter pipe ac@.050 LF 1.44 2.51 0.03 3.98
1-1/2" diameter pipe ac@.050 LF 1.58 2.51 0.03 4.12
2" diameter pipe ac@.050 LF 1.82 2.51 0.03 4.36
2-1/2" diameter pipe ac@.060 LF 2.03 3.01 0.03 5.07
3" diameter pipe ac@.060 LF 2.27 3.01 0.03 5.31
4" diameter pipe ac@.060 LF 3.02 3.01 0.03 6.06
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --
Deduct for no jacket ---@--- % -7.00 -- -- --

Rigid, pre-formed fiberglass steel pipe insulation, 1" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 1.16 2.01 0.02 3.19
3/4" diameter pipe ac@.040 LF 1.27 2.01 0.02 3.30
1" diameter pipe ac@.050 LF 1.42 2.51 0.03 3.96
1-1/4" diameter pipe ac@.050 LF 1.58 2.51 0.03 4.12
1-1/2" diameter pipe ac@.050 LF 1.75 2.51 0.03 4.29
2" diameter pipe ac@.050 LF 1.89 2.51 0.03 4.43
2-1/2" diameter pipe ac@.060 LF 2.10 3.01 0.03 5.14
3" diameter pipe ac@.060 LF 2.76 3.01 0.03 5.80
4" diameter pipe ac@.060 LF 3.16 3.01 0.03 6.20
6" diameter pipe ac@.080 LF 4.22 4.01 0.05 8.28
8" diameter pipe ac@.100 LF 5.79 5.02 0.06 10.87
10" diameter pipe ac@.100 LF 6.84 5.02 0.06 11.92
12" diameter pipe ac@.120 LF 7.89 6.02 0.07 13.98
14" diameter pipe ac@.120 LF 9.07 6.02 0.07 15.16
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --
Deduct for no jacket ---@--- % -7.00 -- -- --

Rigid, pre-formed fiberglass steel pipe insulation, 1-1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 2.43 2.01 0.02 4.46
2015 Heavy Construction Estimator, All Rights Reserved Page 595 (part 2)

3/4" diameter pipe ac@.040 LF 2.59 2.01 0.02 4.62


1" diameter pipe ac@.050 LF 2.72 2.51 0.03 5.26
1-1/4" diameter pipe ac@.050 LF 2.95 2.51 0.03 5.49
1-1/2" diameter pipe ac@.060 LF 3.16 3.01 0.03 6.20
2" diameter pipe ac@.060 LF 3.37 3.01 0.03 6.41
2-1/2" diameter pipe ac@.070 LF 3.70 3.51 0.04 7.25
3" diameter pipe ac@.070 LF 4.01 3.51 0.04 7.56
2015 Heavy Construction Estimator, All Rights Reserved Page 596

4" diameter pipe ac@.080 LF 4.62 4.01 0.05 8.68


6" diameter pipe ac@.080 LF 5.79 4.01 0.05 9.85
8" diameter pipe ac@.100 LF 7.10 5.02 0.06 12.18
10" diameter pipe ac@.100 LF 8.69 5.02 0.06 13.77
12" diameter pipe ac@.120 LF 9.73 6.02 0.07 15.82
14" diameter pipe ac@.140 LF 11.10 7.02 0.08 18.20
16" diameter pipe ac@.160 LF 14.20 8.03 0.09 22.32
18" diameter pipe ac@.180 LF 15.70 9.03 0.10 24.83
20" diameter pipe ac@.180 LF 18.50 9.03 0.10 27.63
22" diameter pipe ac@.200 LF 21.10 10.03 0.11 31.24
24" diameter pipe ac@.220 LF 23.60 11.04 0.13 34.77
Add for working around equipment
or in congested areas ---@15.0 % -- 15.00 -- --
Deduct for no jacket ---@--- % -7.00 -- -- --

Rigid, pre-formed fiberglass steel pipe insulation, 2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 4.56 2.01 0.02 6.59
3/4" diameter pipe ac@.040 LF 4.82 2.01 0.02 6.85
1" diameter pipe ac@.050 LF 4.84 2.51 0.03 7.38
1-1/4" diameter pipe ac@.050 LF 5.15 2.51 0.03 7.69
1-1/2" diameter pipe ac@.060 LF 5.43 3.01 0.03 8.47
2" diameter pipe ac@.060 LF 5.73 3.01 0.03 8.77
2-1/2" diameter pipe ac@.070 LF 6.02 3.51 0.04 9.57
3" diameter pipe ac@.070 LF 6.59 3.51 0.04 10.14
4" diameter pipe ac@.070 LF 7.72 3.51 0.04 11.27
6" diameter pipe ac@.080 LF 9.73 4.01 0.05 13.79
8" diameter pipe ac@.100 LF 11.50 5.02 0.06 16.58
10" diameter pipe ac@.100 LF 13.70 5.02 0.06 18.78
12" diameter pipe ac@.120 LF 15.50 6.02 0.07 21.59
14" diameter pipe ac@.140 LF 17.20 7.02 0.08 24.30
16" diameter pipe ac@.160 LF 21.70 8.03 0.09 29.82
18" diameter pipe ac@.180 LF 23.70 9.03 0.10 32.83
20" diameter pipe ac@.180 LF 26.40 9.03 0.10 35.53
22" diameter pipe ac@.200 LF 30.30 10.03 0.11 40.44
24" diameter pipe ac@.220 LF 36.30 11.04 0.13 47.47
Deduct for no jacket ---@--- % -7.00 -- -- --
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --

Rigid, pre-formed fiberglass steel pipe insulation, 2-1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
1-1/2" diameter pipe ac@.070 LF 6.23 3.51 0.04 9.78
2" diameter pipe ac@.070 LF 6.77 3.51 0.04 10.32
2-1/2" diameter pipe ac@.080 LF 7.30 4.01 0.05 11.36
3" diameter pipe ac@.080 LF 7.86 4.01 0.05 11.92
4" diameter pipe ac@.090 LF 9.28 4.52 0.05 13.85
6" diameter pipe ac@.090 LF 12.30 4.52 0.05 16.87
8" diameter pipe ac@.110 LF 14.60 5.52 0.06 20.18
10" diameter pipe ac@.120 LF 17.50 6.02 0.07 23.59
12" diameter pipe ac@.140 LF 19.50 7.02 0.08 26.60
14" diameter pipe ac@.140 LF 21.80 7.02 0.08 28.90
16" diameter pipe ac@.160 LF 27.70 8.03 0.09 35.82
18" diameter pipe ac@.180 LF 30.30 9.03 0.10 39.43
20" diameter pipe ac@.180 LF 34.80 9.03 0.10 43.93
2015 Heavy Construction Estimator, All Rights Reserved Page 596 (part 2)

22" diameter pipe ac@.200 LF 39.30 10.03 0.11 49.44


2015 Heavy Construction Estimator, All Rights Reserved Page 597

24" diameter pipe ac@.220 LF 43.70 11.04 0.13 54.87


Deduct for no jacket ---@--- % -7.00 -- -- --
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --

Rigid, pre-formed fiberglass steel pipe insulation, 3" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
2-1/2" diameter pipe ac@.090 LF 9.25 4.52 0.05 13.82
3" diameter pipe ac@.090 LF 10.10 4.52 0.05 14.67
4" diameter pipe ac@.100 LF 11.30 5.02 0.06 16.38
6" diameter pipe ac@.100 LF 14.20 5.02 0.06 19.28
8" diameter pipe ac@.120 LF 17.50 6.02 0.07 23.59
10" diameter pipe ac@.130 LF 21.60 6.52 0.07 28.19
12" diameter pipe ac@.150 LF 24.00 7.53 0.09 31.62
14" diameter pipe ac@.150 LF 27.80 7.53 0.09 35.42
16" diameter pipe ac@.170 LF 35.00 8.53 0.10 43.63
18" diameter pipe ac@.190 LF 36.90 9.53 0.11 46.54
20" diameter pipe ac@.190 LF 42.60 9.53 0.11 52.24
22" diameter pipe ac@.210 LF 49.10 10.54 0.12 59.76
24" diameter pipe ac@.230 LF 53.50 11.54 0.13 65.17
Deduct for no jacket ---@--- % -7.00 -- -- --
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --

Rigid, pre-formed fiberglass steel pipe insulation, 3 1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
6" diameter pipe ac@.100 LF 15.50 5.02 0.06 20.58
8" diameter pipe ac@.120 LF 20.70 6.02 0.07 26.79
10" diameter pipe ac@.130 LF 26.00 6.52 0.07 32.59
12" diameter pipe ac@.150 LF 28.80 7.53 0.09 36.42
14" diameter pipe ac@.150 LF 31.60 7.53 0.09 39.22
16" diameter pipe ac@.170 LF 39.30 8.53 0.10 47.93
18" diameter pipe ac@.190 LF 43.40 9.53 0.11 53.04
20" diameter pipe ac@.190 LF 49.10 9.53 0.11 58.74
22" diameter pipe ac@.210 LF 56.80 10.54 0.12 67.46
24" diameter pipe ac@.230 LF 64.40 11.54 0.13 76.07
Deduct for no jacket ---@--- % -7.00 -- -- --
Add for working around equipment
or in congested areas ---@--- % -- 15.00 -- --

Rigid, pre-formed fiberglass steel pipe insulation, 4" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 850 degrees F.
per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each
flanged joint, using small tools.
6" diameter pipe ac@.100 LF 17.50 5.02 0.06 22.58
8" diameter pipe ac@.120 LF 24.20 6.02 0.07 30.29
10" diameter pipe ac@.130 LF 30.60 6.52 0.07 37.19
12" diameter pipe ac@.150 LF 35.60 7.53 0.09 43.22
14" diameter pipe ac@.150 LF 38.20 7.53 0.09 45.82
16" diameter pipe ac@.170 LF 46.90 8.53 0.10 55.53
18" diameter pipe ac@.190 LF 52.40 9.53 0.11 62.04
20" diameter pipe ac@.190 LF 60.00 9.53 0.11 69.64
22" diameter pipe ac@.210 LF 67.70 10.54 0.12 78.36
24" diameter pipe ac@.230 LF 75.30 11.54 0.13 86.97
Deduct for no jacket ---@--- % -7.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 597 (part 2)

Add for working around equipment


or in congested areas ---@--- % -- 15.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 598

Rigid, pre-formed fiberglass copper pipe insulation, 1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. per linear foot excluding fittings.
Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 1.02 2.01 0.02 3.05
3/4" diameter pipe ac@.040 LF 1.02 2.01 0.02 3.05
1" diameter pipe ac@.050 LF 1.11 2.51 0.03 3.65
1-1/4" diameter pipe ac@.050 LF 1.25 2.51 0.03 3.79
1-1/2" diameter pipe ac@.050 LF 1.40 2.51 0.03 3.94
2" diameter pipe ac@.050 LF 1.78 2.51 0.03 4.32
2-1/2" diameter pipe ac@.060 LF 1.98 3.01 0.03 5.02
3" diameter pipe ac@.060 LF 2.21 3.01 0.03 5.25
4" diameter pipe ac@.060 LF 2.97 3.01 0.03 6.01

Rigid, pre-formed fiberglass copper pipe insulation, 1" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. per linear foot excluding fittings.
Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 1.20 2.01 0.02 3.23
3/4" diameter pipe ac@.040 LF 1.20 2.01 0.02 3.23
1" diameter pipe ac@.050 LF 1.30 2.51 0.03 3.84
1-1/4" diameter pipe ac@.050 LF 1.47 2.51 0.03 4.01
1-1/2" diameter pipe ac@.050 LF 1.63 2.51 0.03 4.17
2" diameter pipe ac@.050 LF 1.95 2.51 0.03 4.49
2-1/2" diameter pipe ac@.060 LF 2.18 3.01 0.03 5.22
3" diameter pipe ac@.060 LF 2.46 3.01 0.03 5.50
4" diameter pipe ac@.060 LF 3.27 3.01 0.03 6.31

Rigid, pre-formed fiberglass copper pipe insulation, 1-1/2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. per linear foot excluding fittings.
Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small tools.
1/2" diameter pipe ac@.040 LF 2.66 2.01 0.02 4.69
3/4" diameter pipe ac@.040 LF 2.66 2.01 0.02 4.69
1" diameter pipe ac@.050 LF 2.82 2.51 0.03 5.36
1-1/4" diameter pipe ac@.050 LF 2.99 2.51 0.03 5.53
1-1/2" diameter pipe ac@.050 LF 3.22 2.51 0.03 5.76
2" diameter pipe ac@.050 LF 3.68 2.51 0.03 6.22
2-1/2" diameter pipe ac@.060 LF 4.03 3.01 0.03 7.07
3" diameter pipe ac@.060 LF 4.39 3.01 0.03 7.43
4" diameter pipe ac@.060 LF 5.07 3.01 0.03 8.11

Rigid, pre-formed fiberglass copper pipe insulation, 2" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. per linear foot excluding fittings.
Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small tools.
2" diameter pipe ac@.060 LF 6.02 3.01 0.03 9.06
2-1/2" diameter pipe ac@.070 LF 6.32 3.51 0.04 9.87
3" diameter pipe ac@.070 LF 6.91 3.51 0.04 10.46
4" diameter pipe ac@.070 LF 8.10 3.51 0.04 11.65

Closed cell elastomeric copper pipe insulation, 1/2" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 0.57 2.01 0.02 2.60
3/4" diameter pipe ac@.040 LF 0.65 2.01 0.02 2.68
1" diameter pipe ac@.050 LF 0.71 2.51 0.03 3.25
1-1/4" diameter pipe ac@.050 LF 0.78 2.51 0.03 3.32
1-1/2" diameter pipe ac@.050 LF 0.93 2.51 0.03 3.47
2" diameter pipe ac@.050 LF 1.21 2.51 0.03 3.75
2-1/2" diameter pipe ac@.060 LF 1.50 3.01 0.03 4.54
3" diameter pipe ac@.060 LF 1.82 3.01 0.03 4.86
2015 Heavy Construction Estimator, All Rights Reserved Page 598 (part 2)

4" diameter pipe ac@.060 LF 2.30 3.01 0.03 5.34


Add for pre-slit material ---@--- % 2.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 599

Closed cell elastomeric copper pipe insulation, 3/4" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 0.89 2.01 0.02 2.92
3/4" diameter pipe ac@.040 LF 1.06 2.01 0.02 3.09
1" diameter pipe ac@.050 LF 1.28 2.51 0.03 3.82
1-1/4" diameter pipe ac@.050 LF 1.46 2.51 0.03 4.00
1-1/2" diameter pipe ac@.050 LF 1.99 2.51 0.03 4.53
2" diameter pipe ac@.050 LF 2.53 2.51 0.03 5.07
2-1/2" diameter pipe ac@.060 LF 3.00 3.01 0.03 6.04
3" diameter pipe ac@.060 LF 3.59 3.01 0.03 6.63
4" diameter pipe ac@.060 LF 4.56 3.01 0.03 7.60
Add for pre-slit material ---@--- % 2.00 -- -- --

Closed cell elastomeric copper pipe insulation, 1" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 1.64 2.01 0.02 3.67
3/4" diameter pipe ac@.040 LF 2.03 2.01 0.02 4.06
1" diameter pipe ac@.050 LF 2.46 2.51 0.03 5.00
1-1/4" diameter pipe ac@.050 LF 2.87 2.51 0.03 5.41
1-1/2" diameter pipe ac@.050 LF 3.24 2.51 0.03 5.78
2" diameter pipe ac@.050 LF 3.99 2.51 0.03 6.53
2-1/2" diameter pipe ac@.060 LF 5.68 3.01 0.03 8.72
3" diameter pipe ac@.060 LF 6.89 3.01 0.03 9.93
Add for pre-slit material ---@--- % 2.00 -- -- --

Closed cell elastomeric steel pipe insulation, 1/2" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 0.65 2.01 0.02 2.68
3/4" diameter pipe ac@.040 LF 0.71 2.01 0.02 2.74
1" diameter pipe ac@.050 LF 0.78 2.51 0.03 3.32
1-1/4" diameter pipe ac@.050 LF 0.93 2.51 0.03 3.47
1-1/2" diameter pipe ac@.050 LF 1.21 2.51 0.03 3.75
2" diameter pipe ac@.050 LF 1.50 2.51 0.03 4.04
2-1/2" diameter pipe ac@.060 LF 1.82 3.01 0.03 4.86
3" diameter pipe ac@.060 LF 2.30 3.01 0.03 5.34
4" diameter pipe ac@.060 LF 2.77 3.01 0.03 5.81
Add for pre-slit material ---@--- % 2.00 -- -- --

Closed cell elastomeric steel pipe insulation, 3/4" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 1.06 2.01 0.02 3.09
3/4" diameter pipe ac@.040 LF 1.28 2.01 0.02 3.31
1" diameter pipe ac@.050 LF 1.46 2.51 0.03 4.00
1-1/4" diameter pipe ac@.050 LF 1.99 2.51 0.03 4.53
1-1/2" diameter pipe ac@.050 LF 2.53 2.51 0.03 5.07
2" diameter pipe ac@.050 LF 3.00 2.51 0.03 5.54
2-1/2" diameter pipe ac@.060 LF 3.59 3.01 0.03 6.63
3" diameter pipe ac@.060 LF 4.56 3.01 0.03 7.60
4" diameter pipe ac@.060 LF 4.99 3.01 0.03 8.03
Add for pre-slit material ---@--- % 2.00 -- -- --

Closed cell elastomeric steel pipe insulation, 1" thick


Using small tools.
1/2" diameter pipe ac@.040 LF 2.03 2.01 0.02 4.06
3/4" diameter pipe ac@.040 LF 2.46 2.01 0.02 4.49
1" diameter pipe ac@.050 LF 2.87 2.51 0.03 5.41
1-1/4" diameter pipe ac@.050 LF 3.24 2.51 0.03 5.78
2015 Heavy Construction Estimator, All Rights Reserved Page 599 (part 2)

1-1/2" diameter pipe ac@.050 LF 3.99 2.51 0.03 6.53


2" diameter pipe ac@.050 LF 5.68 2.51 0.03 8.22
2-1/2" diameter pipe ac@.060 LF 6.89 3.01 0.03 9.93
3" diameter pipe ac@.060 LF 7.37 3.01 0.03 10.41
2015 Heavy Construction Estimator, All Rights Reserved Page 600

Add for pre-slit material ---@--- % 2.00 -- -- --

Moulded high density calcium silicate pipe insulation, 1" thick


All Service Jacket (ASJ), Self Sealing Lap Joint (SSL) Fire retardant. Applications up to 1382 degrees F.
Does not contain asbestos, per linear foot excluding fittings. Add 3 linear feet (.92m) for each fitting and
4 linear feet (1.2m) for each flanged joint, using small tools.
1/2" diameter pipe ac@.050 LF 3.30 2.51 0.03 5.84
3/4" diameter pipe ac@.060 LF 3.30 3.01 0.03 6.34
1" diameter pipe ac@.060 LF 3.32 3.01 0.03 6.36
1-1/4" diameter pipe ac@.060 LF 3.32 3.01 0.03 6.36
1-1/2" diameter pipe ac@.060 LF 3.37 3.01 0.03 6.41
2" diameter pipe ac@.070 LF 3.93 3.51 0.04 7.48
2-1/2" diameter pipe ac@.070 LF 4.24 3.51 0.04 7.79
3" diameter pipe ac@.070 LF 4.55 3.51 0.04 8.10
4" diameter pipe ac@.070 LF 5.26 3.51 0.04 8.81
6" diameter pipe ac@.070 LF 6.67 3.51 0.04 10.22

Moulded high density calcium silicate pipe insulation, 1-1/2" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
1/2" diameter pipe ac@.050 LF 3.76 2.51 0.03 6.30
3/4" diameter pipe ac@.060 LF 3.84 3.01 0.03 6.88
1" diameter pipe ac@.060 LF 4.16 3.01 0.03 7.20
1-1/4" diameter pipe ac@.060 LF 4.50 3.01 0.03 7.54
1-1/2" diameter pipe ac@.060 LF 4.75 3.01 0.03 7.79
2" diameter pipe ac@.070 LF 5.15 3.51 0.04 8.70
2-1/2" diameter pipe ac@.070 LF 5.69 3.51 0.04 9.24
3" diameter pipe ac@.070 LF 5.92 3.51 0.04 9.47
4" diameter pipe ac@.070 LF 6.86 3.51 0.04 10.41
6" diameter pipe ac@.070 LF 8.00 3.51 0.04 11.55
8" diameter pipe ac@.080 LF 10.90 4.01 0.05 14.96
10" diameter pipe ac@.080 LF 13.20 4.01 0.05 17.26
12" diameter pipe ac@.100 LF 22.30 5.02 0.06 27.38
14" diameter pipe ac@.100 LF 25.10 5.02 0.06 30.18
16" diameter pipe ac@.120 LF 27.70 6.02 0.07 33.79
18" diameter pipe ac@.120 LF 30.30 6.02 0.07 36.39
20" diameter pipe ac@.140 LF 36.50 7.02 0.08 43.60

Moulded high density calcium silicate pipe insulation, 2" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
1/2" diameter pipe ac@.050 LF 6.01 2.51 0.03 8.55
3/4" diameter pipe ac@.060 LF 6.27 3.01 0.03 9.31
1" diameter pipe ac@.060 LF 6.58 3.01 0.03 9.62
1-1/4" diameter pipe ac@.060 LF 7.14 3.01 0.03 10.18
1-1/2" diameter pipe ac@.060 LF 7.41 3.01 0.03 10.45
2" diameter pipe ac@.070 LF 7.80 3.51 0.04 11.35
2-1/2" diameter pipe ac@.070 LF 8.60 3.51 0.04 12.15
3" diameter pipe ac@.070 LF 9.06 3.51 0.04 12.61
4" diameter pipe ac@.070 LF 10.60 3.51 0.04 14.15
6" diameter pipe ac@.070 LF 13.70 3.51 0.04 17.25
8" diameter pipe ac@.080 LF 16.40 4.01 0.05 20.46
10" diameter pipe ac@.080 LF 19.30 4.01 0.05 23.36
12" diameter pipe ac@.100 LF 22.30 5.02 0.06 27.38
14" diameter pipe ac@.100 LF 25.10 5.02 0.06 30.18
16" diameter pipe ac@.120 LF 27.70 6.02 0.07 33.79
18" diameter pipe ac@.140 LF 30.30 7.02 0.08 37.40
2015 Heavy Construction Estimator, All Rights Reserved Page 600 (part 2)

20" diameter pipe ac@.140 LF 36.50 7.02 0.08 43.60


22" diameter pipe ac@.160 LF 50.80 8.03 0.09 58.92
24" diameter pipe ac@.160 LF 53.90 8.03 0.09 62.02
26" diameter pipe ac@.180 LF 54.10 9.03 0.10 63.23
2015 Heavy Construction Estimator, All Rights Reserved Page 601

28" diameter pipe ac@.180 LF 55.30 9.03 0.10 64.43


30" diameter pipe ac@.200 LF 59.00 10.03 0.11 69.14

Moulded high density calcium silicate pipe insulation, 2-1/2" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
1/2" diameter pipe ac@.050 LF 7.49 2.51 0.03 10.03
3/4" diameter pipe ac@.060 LF 7.61 3.01 0.03 10.65
1" diameter pipe ac@.060 LF 7.80 3.01 0.03 10.84
1-1/4" diameter pipe ac@.060 LF 8.09 3.01 0.03 11.13
1-1/2" diameter pipe ac@.060 LF 8.51 3.01 0.03 11.55
2" diameter pipe ac@.070 LF 8.86 3.51 0.04 12.41
2-1/2" diameter pipe ac@.070 LF 10.20 3.51 0.04 13.75
3" diameter pipe ac@.070 LF 10.60 3.51 0.04 14.15
4" diameter pipe ac@.070 LF 13.10 3.51 0.04 16.65
6" diameter pipe ac@.070 LF 17.90 3.51 0.04 21.45
8" diameter pipe ac@.080 LF 20.90 4.01 0.05 24.96
10" diameter pipe ac@.080 LF 25.50 4.01 0.05 29.56
12" diameter pipe ac@.100 LF 28.50 5.02 0.06 33.58
14" diameter pipe ac@.100 LF 31.90 5.02 0.06 36.98
16" diameter pipe ac@.120 LF 35.50 6.02 0.07 41.59
18" diameter pipe ac@.140 LF 37.10 7.02 0.08 44.20
20" diameter pipe ac@.140 LF 47.00 7.02 0.08 54.10
22" diameter pipe ac@.160 LF 50.80 8.03 0.09 58.92
24" diameter pipe ac@.160 LF 53.90 8.03 0.09 62.02
26" diameter pipe ac@.180 LF 59.10 9.03 0.10 68.23
28" diameter pipe ac@.180 LF 62.60 9.03 0.10 71.73
30" diameter pipe ac@.200 LF 67.80 10.03 0.11 77.94

Moulded high density calcium silicate pipe insulation, 3" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
1/2" diameter pipe ac@.060 LF 9.21 3.01 0.03 12.25
3/4" diameter pipe ac@.070 LF 9.74 3.51 0.04 13.29
1" diameter pipe ac@.070 LF 9.92 3.51 0.04 13.47
1-1/4" diameter pipe ac@.070 LF 10.30 3.51 0.04 13.85
1-1/2" diameter pipe ac@.070 LF 11.10 3.51 0.04 14.65
2" diameter pipe ac@.080 LF 11.60 4.01 0.05 15.66
2-1/2" diameter pipe ac@.080 LF 12.40 4.01 0.05 16.46
3" diameter pipe ac@.080 LF 13.40 4.01 0.05 17.46
4" diameter pipe ac@.080 LF 17.60 4.01 0.05 21.66
6" diameter pipe ac@.090 LF 21.60 4.52 0.05 26.17
8" diameter pipe ac@.090 LF 25.60 4.52 0.05 30.17
10" diameter pipe ac@.090 LF 31.20 4.52 0.05 35.77
12" diameter pipe ac@.110 LF 34.50 5.52 0.06 40.08
14" diameter pipe ac@.110 LF 38.80 5.52 0.06 44.38
16" diameter pipe ac@.130 LF 42.80 6.52 0.07 49.39
18" diameter pipe ac@.150 LF 47.10 7.53 0.09 54.72
20" diameter pipe ac@.150 LF 53.00 7.53 0.09 60.62
22" diameter pipe ac@.170 LF 60.60 8.53 0.10 69.23
24" diameter pipe ac@.180 LF 65.20 9.03 0.10 74.33
26" diameter pipe ac@.190 LF 79.90 9.53 0.11 89.54
28" diameter pipe ac@.190 LF 85.70 9.53 0.11 95.34
30" diameter pipe ac@.210 LF 93.20 10.54 0.12 103.86

Moulded high density calcium silicate pipe insulation, 3 1/2" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 601 (part 2)

1" diameter pipe ac@.070 LF 13.00 3.51 0.04 16.55


1-1/4" diameter pipe ac@.070 LF 13.10 3.51 0.04 16.65
2015 Heavy Construction Estimator, All Rights Reserved Page 602

1-1/2" diameter pipe ac@.070 LF 14.90 3.51 0.04 18.45


2" diameter pipe ac@.080 LF 16.10 4.01 0.05 20.16
2-1/2" diameter pipe ac@.080 LF 17.50 4.01 0.05 21.56
3" diameter pipe ac@.080 LF 19.30 4.01 0.05 23.36
4" diameter pipe ac@.080 LF 22.00 4.01 0.05 26.06
6" diameter pipe ac@.090 LF 27.30 4.52 0.05 31.87
8" diameter pipe ac@.090 LF 31.40 4.52 0.05 35.97
10" diameter pipe ac@.090 LF 36.10 4.52 0.05 40.67
12" diameter pipe ac@.110 LF 40.80 5.52 0.06 46.38
14" diameter pipe ac@.110 LF 47.10 5.52 0.06 52.68
16" diameter pipe ac@.130 LF 55.30 6.52 0.07 61.89
18" diameter pipe ac@.150 LF 64.30 7.53 0.09 71.92
20" diameter pipe ac@.150 LF 74.30 7.53 0.09 81.92
22" diameter pipe ac@.170 LF 77.30 8.53 0.10 85.93
24" diameter pipe ac@.180 LF 97.20 9.03 0.10 106.33
26" diameter pipe ac@.190 LF 100.00 9.53 0.11 109.64
28" diameter pipe ac@.190 LF 107.00 9.53 0.11 116.64
30" diameter pipe ac@.210 LF 113.00 10.54 0.12 123.66

Moulded high density calcium silicate pipe insulation, 4" thick


No jacket. Applications up to 1382 degrees F. Does not contain asbestos, per linear foot excluding
fittings. Add 3 linear feet (.92m) for each fitting and 4 linear feet (1.2m) for each flanged joint, using small
tools.
1-1/2" diameter pipe ac@.070 LF 18.10 3.51 0.04 21.65
2" diameter pipe ac@.080 LF 19.20 4.01 0.05 23.26
2-1/2" diameter pipe ac@.080 LF 20.80 4.01 0.05 24.86
3" diameter pipe ac@.080 LF 22.60 4.01 0.05 26.66
4" diameter pipe ac@.080 LF 26.10 4.01 0.05 30.16
6" diameter pipe ac@.090 LF 32.00 4.52 0.05 36.57
8" diameter pipe ac@.090 LF 37.30 4.52 0.05 41.87
10" diameter pipe ac@.090 LF 43.50 4.52 0.05 48.07
12" diameter pipe ac@.110 LF 49.00 5.52 0.06 54.58
14" diameter pipe ac@.110 LF 55.70 5.52 0.06 61.28
16" diameter pipe ac@.130 LF 64.80 6.52 0.07 71.39
18" diameter pipe ac@.150 LF 70.10 7.53 0.09 77.72
20" diameter pipe ac@.150 LF 77.70 7.53 0.09 85.32
22" diameter pipe ac@.170 LF 89.10 8.53 0.10 97.73
24" diameter pipe ac@.180 LF 97.30 9.03 0.10 106.43

Pipe insulation jackets


Add to the cost of non jacketed pipe insulation, using small tools.
Canvas jacket ac@.030 Yard 8.38 1.51 0.02 9.91
Vapor barrier (ASJ) ac@.020 LF 0.27 1.00 0.01 1.28
Aluminum jacket 26 gage ac@.030 SF 0.78 1.51 0.02 2.31
Aluminum jacket 24 gage ac@.030 SF 0.95 1.51 0.02 2.48
Aluminum jacket 22 gage ac@.030 SF 1.17 1.51 0.02 2.70
Aluminum strapping ac@.000 LF 0.11 -- -- 0.11
Stainless steel jacket Type 304 ac@.040 SF 3.14 2.01 0.02 5.17
Stainless steel jacket Type 316 ac@.040 SF 4.03 2.01 0.02 6.06
Stainless steel strapping ac@.000 LF 0.35 -- -- 0.35
Vapor barrier sealant ac@1.50 Gal 39.10 75.26 0.86 115.22
Weather barrier sealant ac@1.50 Gal 90.70 75.26 0.86 166.82
2015 Heavy Construction Estimator, All Rights Reserved Page 603

CSI 15-183, Insulated tempered water piping, prefabricated

Pre-insulated plastic water pipe - Fiberglass reinforced carrier and casing


1" polyurethane insulation, using small tools.
4" pipe n8@.330 LF 45.60 16.79 0.20 62.59
6" pipe n8@.330 LF 60.20 16.79 0.20 77.19
8" pipe n8@.370 LF 89.40 18.83 0.22 108.45
10" pipe n8@.450 LF 127.00 22.90 0.27 150.17
12" pipe n8@.560 LF 163.00 28.50 0.34 191.84

Pre-insulated plastic water pipe - Fiberglass reinforced carrier and PVC casing
Using small tools.
4" pipe n8@.330 LF 12.90 16.79 0.20 29.89
6" pipe n8@.330 LF 17.20 16.79 0.20 34.19
8" pipe n8@.330 LF 21.20 16.79 0.20 38.19
10" pipe n8@.400 LF 25.60 20.36 0.24 46.20
12" pipe n8@.500 LF 29.70 25.45 0.30 55.45

Pre-insulated plastic water pipe - PVC reinforced carrier and PVC casing
Using small tools.
4" pipe n8@.330 LF 10.40 16.79 0.20 27.39
6" pipe n8@.330 LF 13.90 16.79 0.20 30.89
8" pipe n8@.330 LF 17.20 16.79 0.20 34.19
10" pipe n8@.400 LF 20.70 20.36 0.24 41.30
12" pipe n8@.500 LF 24.00 25.45 0.30 49.75
2015 Heavy Construction Estimator, All Rights Reserved Page 604

CSI 15-189, Insulation foam rubber

Foam rubber sheet insulation for pipe


For domestic cold water, chilled water and refrigerant piping, see CSI 15-182, using small tools.
1" thick ac@.140 SF 1.21 7.02 0.08 8.31

CSI 15-190, Duct insulation

Fiberglass blanket duct insulation


3/4 lb. density, with reinforced foil and kraft facing, lapped and joints sealed, vapor tight, using small
tools.
1" thick ac@.020 SF 1.11 1.00 0.01 2.12
1-1/2" thick ac@.020 SF 1.48 1.00 0.01 2.49
2" thick ac@.030 SF 1.85 1.51 0.02 3.38
Deduct for plain blanket
fiberglass with no facing ---@--- % -10.00 -- -- --

Rigid fiberglass duct insulation


Foil facing, vapor sealed, attached to ducts with mechanical fasteners, 3 lbs. per cubic foot, using small
tools.
1" thick nz@.060 SF 1.66 2.74 0.03 4.43
1-1/2" thick nz@.070 SF 1.85 3.19 0.04 5.08
2" thick nz@.080 SF 2.13 3.65 0.05 5.83
2015 Heavy Construction Estimator, All Rights Reserved Page 605

CSI 15-230, Water booster pumping equipment

Water pressure booster pumps


Variable speed base, including control cubicle and starter, gallons per minute (GPM) rating at 100'
head, using 20-ton hydraulic crane with 70’ boom, small tools.
400 GPM, 4" discharge,
7-1/2 HP duplex nq@13.5 Ea 8,260.00 610.60 68.00 8,938.60

Water pressure booster pumps


Variable speed base, including control cubicle and starter, gallons per minute (GPM) rating at 100'
head, using 20-ton hydraulic crane with 70’ boom, small tools, 300-amp skid mounted welder.
1,000 GPM,
6" discharge, 15 HP, triplex nr@16.8 Ea 13,300.00 759.90 96.10 14,156.00
1,700 GPM,
6" discharge, 30 HP, triplex nr@20.7 Ea 16,600.00 936.30 118.00 17,654.30

CSI 15-240, Water reservoirs and tanks

Steel water tanks


Ground level, per AWWA, low pitch cone roof, includes material, fabrication, and field erection. Add the
cost of foundation and pads, using a 40-ton hydraulic crane with 84’ boom, two 200-amp trailer mounted
welders and three sets of small tools.
100,000 to 249,999 gallons qk@9.09 MGAL 524.00 438.00 111.00 1,073.00
250,000 to 499,999 gallons qk@5.33 MGAL 419.00 256.80 65.20 741.00
500,000 to 749,999 gallons qk@4.08 MGAL 284.00 196.60 49.90 530.50
750,000 to 999,999 gallons qk@3.85 MGAL 269.00 185.50 47.10 501.60
1,000,000 to 199,999,999 gallons qk@3.70 MGAL 240.00 178.30 45.30 463.60
2,000,000 to 399,999,999 gallons qk@3.13 MGAL 206.00 150.80 38.30 395.10
4,000,000 to 599,999,999 gallons qk@2.78 MGAL 206.00 133.90 34.00 373.90
6,000,000 to 7,999,999 gallons qk@2.78 MGAL 187.00 133.90 34.00 354.90
8,000,000 gallons and above qk@2.50 MGAL 178.00 120.50 30.60 329.10

Fabricated storage tanks, purchase material cost only


Galvanized steel, vertical sides with flat bottom, using a 40-ton hydraulic crane with 84’ boom, two
200-amp trailer mounted welders and three sets of small tools.
5,000 gallon --@.000 Ea 5,960.00 -- -- 5,960.00
10,000 gallon --@.000 Ea 9,790.00 -- -- 9,790.00
20,000 gallon --@.000 Ea 14,300.00 -- -- 14,300.00
35,000 gallon --@.000 Ea 21,800.00 -- -- 21,800.00

Elevated water tanks


Steel, 100’ (30m) to bottom capacity line, includes material, fabrication, and field erection but no
foundation, using a truck-mounted hydraulic crane with 115’ boom, a 200-amp trailer mounted welder
and three sets of small tools.
50,000 to 99,999 gallons qp@53.7 MGAL 2,890.00 2,618.00 665.00 6,173.00
100,000 to 249,999 gallons qp@33.3 MGAL 2,390.00 1,624.00 413.00 4,427.00
250,000 to 499,999 gallons qp@19.1 MGAL 2,350.00 931.30 237.00 3,518.30
500,000 to 749,999 gallons qp@14.7 MGAL 1,670.00 716.80 182.00 2,568.80
750,000 to 999,999 gallons qp@14.7 MGAL 1,250.00 716.80 182.00 2,148.80
1,000,000 gallons and above qp@13.8 MGAL 1,050.00 672.90 171.00 1,893.90

Steel towers for small tanks


Using a 40-ton mechanical crawler crane with 50’ boom.
5,000 gallons qx@510. Ea 13,000.00 20,420.00 4,610.00 38,030.00
10,000 gallons qx@750. Ea 16,200.00 30,030.00 6,770.00 53,000.00
20,000 gallons qx@805. Ea 18,900.00 32,230.00 7,270.00 58,400.00
2015 Heavy Construction Estimator, All Rights Reserved Page 605 (part 2)

35,000 gallons qx@933. Ea 23,700.00 37,360.00 8,420.00 69,480.00


2015 Heavy Construction Estimator, All Rights Reserved Page 606

CSI 15-251, Filtration equipment

Pressure filters for pre-treatment of raw water


Schedule 40 steel pipe with cast iron fittings. Includes radial slotted PVC pipe lateral under-drain with
gravel support bed, manual gate valves, manual operation, sand media, influent and effluent pressure
gauges and sampling connections.
Add the cost of raw water or backwash pumps, loss-of-head indicator, sight glasses, backwash flow
rate indicator, and pre-treatment equipment such as flash mixer, clarifiers, and chemical feed
equipment, using a 20-ton hydraulic crane with 70’ boom and small tools.
3’ diameter, 36 gallons per minute nu@63.8 Ea 3,520.00 2,852.00 644.00 7,016.00
4’ diameter, 65 gallons per minute nu@71.4 Ea 6,510.00 3,192.00 720.00 10,422.00
5’ diameter, 100 gallons per minute nu@71.4 Ea 9,250.00 3,192.00 720.00 13,162.00
6’ diameter, 140 gallons per minute nu@79.0 Ea 13,800.00 3,532.00 797.00 18,129.00
7’ diameter, 200 gallons per minute nu@79.0 Ea 18,900.00 3,532.00 797.00 23,229.00
8’ diameter, 250 gallons per minute nu@96.7 Ea 23,400.00 4,323.00 976.00 28,699.00

CSI 15-253, Water softening equipment

Water softeners, automatic


Rated exchange capacity in gallons per minute (GPM), using small tools.
To 40m grains, 14 GPM nc@3.60 Ea 457.00 177.00 2.02 636.02
To 60m grains, 17 GPM nc@3.60 Ea 547.00 177.00 2.02 726.02
To 90m grains, 25 GPM nc@5.00 Ea 824.00 245.90 2.80 1,072.70
To 50m grains, 58 GPM nc@5.71 Ea 1,110.00 280.80 3.20 1,394.00

CSI 15-254, Water deionizers

Water deionizers
Complete with controls and chemical mixing tanks, using small tools.
37 kg nc@13.3 Ea 6,990.00 654.00 7.45 7,651.45
55 kg nc@13.3 Ea 7,170.00 654.00 7.45 7,831.45
73 kg nc@13.3 Ea 9,990.00 654.00 7.45 10,651.45
110 kg nc@13.3 Ea 10,100.00 654.00 7.45 10,761.45

CSI 15-261, Chlorinating equipment

Gas chlorinators
100 PPD, with metering tube supply indicator, rate valve, and diffuser/ejector, using small tools.
Wall or cylinder mounted nb@9.09 Ea 1,020.00 475.40 5.18 1,500.58
Add for booster pump,
add to material and to crew ---@--- % 14.00 50.00 -- --

CSI 15-262, Chemical feeders

Bypass shot chemical feeders - In line mount, 125 PSIG


Using small tools.
1.7 gallon n9@8.58 Ea 212.00 401.80 5.15 618.95

Bypass shot chemical feeders - Floor mount, 175 PSIG


Using small tools.
5 gallon n9@12.9 Ea 270.00 604.10 7.74 881.84
12 gallon n9@17.1 Ea 343.00 800.80 10.30 1,154.10

Bypass shot chemical feeders - Floor mount, 150 lb. ASME code
Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 606 (part 2)

5 gallon n9@12.9 Ea 270.00 604.10 7.74 881.84


10 gallon n9@17.1 Ea 343.00 800.80 10.30 1,154.10

Bypass shot chemical feeders - Floor mount, 300 lb. ASME code
Using small tools.
5 gallon n9@12.9 Ea 833.00 604.10 7.74 1,444.84
10 gallon n9@17.1 Ea 928.00 800.80 10.30 1,739.10

CSI 15-263, Water filters

Water filters
High flow water filter with cartridges, 5 micron, 210 Fahrenheit, using small tools.
24 gallons per minute n6@3.33 Ea 899.00 169.50 2.00 1,070.50
48 gallons per minute n6@3.63 Ea 1,060.00 184.70 2.18 1,246.88
72 gallons per minute n6@3.99 Ea 1,130.00 203.10 2.39 1,335.49
2015 Heavy Construction Estimator, All Rights Reserved Page 607

CSI 15-270, Water metering

Water supply meters


Bronze, screwed connections, in rated gallons per minute (GPM), using small tools.
5/8" diameter, to 20 GPM, screwed nb@.530 Ea 98.80 27.72 0.30 126.82
3/4" diameter, to 30 GPM, screwed nb@.630 Ea 171.00 32.95 0.36 204.31
1" diameter, to 50 GPM, screwed nb@.710 Ea 244.00 37.13 0.40 281.53
1-1/2" diameter, to 100 GPM,
screwed or flanged nb@1.06 Ea 606.00 55.44 0.60 662.04
2" diameter, to 160 GPM,
screwed or flanged nb@1.39 Ea 857.00 72.70 0.79 930.49

Water service meters


Compound type, flanged, in rated gallons per minute (GPM), using small tools.
3" diameter, to 360 GPM, bronze nf@4.65 Ea 1,160.00 211.00 2.60 1,373.60
4" diameter, to 500 GPM, bronze nf@6.45 Ea 1,790.00 292.60 3.61 2,086.21
6" diameter, to 1,000 GPM, bronze nf@9.52 Ea 9,110.00 431.90 5.33 9,547.23
8" diameter,
to 1,000 GPM, cast iron nf@12.5 Ea 12,000.00 567.10 7.00 12,574.10

Fire service water meters


Cast iron housing, flanged, using small tools.
6" diameter,
to 1600 gallons per minute nk@18.7 Ea 9,830.00 843.20 11.40 10,684.60

Fire service water meters


Cast iron housing, flanged, using a 20-ton hydraulic crane with 70’ boom and small tools.
8" diameter,
to 2,800 gallons per minute nn@15.4 Ea 16,000.00 689.50 68.40 16,757.90

CSI 15-310, Sewage ejectors, submersible

Sewage ejector pumps, simplex


Includes starter level control, high water alarm, basin and cover. In gallons per minute at 10' head. 230
volt, using small tools.
1/2 HP motor nf@12.7 Ea 583.00 576.20 7.11 1,166.31
3/4 HP motor nf@15.1 Ea 1,390.00 685.10 8.46 2,083.56
1 HP motor nf@24.0 Ea 1,510.00 1,089.00 13.40 2,612.40

Sewage ejector pumps, duplex


Includes starter level control, high water alarm, alternator, basin and cover. In gallons per minute at 10'
head. 230 volt. See CSI 15-147 for pneumatic ejectors, using small tools.
1/2 HP motor nk@24.3 Ea 2,240.00 1,096.00 14.80 3,350.80
3/4 HP motor nk@29.1 Ea 2,920.00 1,312.00 17.80 4,249.80
1 HP motor nk@45.6 Ea 3,290.00 2,056.00 27.80 5,373.80
5 HP motor nk@55.0 Ea 12,100.00 2,480.00 33.60 14,613.60

CSI 15-320, Grease interceptors

Grease interceptors - Semi-automatic grease draw-off


Cast iron, painted inside and out, with internal air relief, grease draw-off piping and valve and flow control
fitting, using small tools.
4 gallons per minute, 8 lbs. nb@3.24 Ea 456.00 169.50 1.85 627.35
10 gallons per minute, 20 lbs. nb@4.13 Ea 635.00 216.00 2.35 853.35
15 gallons per minute, 30 lbs. nb@5.63 Ea 745.00 294.40 3.21 1,042.61
2015 Heavy Construction Estimator, All Rights Reserved Page 607 (part 2)

20 gallons per minute, 40 lbs. nb@16.8 Ea 1,110.00 878.60 9.58 1,998.18


25 gallons per minute, 50 lbs. nb@18.9 Ea 2,250.00 988.50 10.80 3,249.30
2015 Heavy Construction Estimator, All Rights Reserved Page 608

35 gallons per minute, 70 lbs. nb@23.5 Ea 2,520.00 1,229.00 13.40 3,762.40


50 gallons per minute, 100 lbs. nb@27.0 Ea 2,990.00 1,412.00 15.40 4,417.40
75 gallons per minute, 150 lbs. nb@35.0 Ea 3,230.00 1,831.00 20.00 5,081.00
Add for porcelain
coating inside and out --@.000 Ea 725.00 -- -- 725.00
Add for porcelain coating
either inside or outside --@.000 Ea 652.00 -- -- 652.00

Grease interceptors - Manual grease draw-off


Cast iron, painted inside and out, internal air relief and flow control fitting, using small tools.
4 gallons per minute, 8 lbs. nb@4.00 Ea 583.00 209.20 2.28 794.48
7 gallons per minute, 14 lbs. nb@4.35 Ea 811.00 227.50 2.48 1,040.98
10 gallons per minute, 20 lbs. nb@5.00 Ea 951.00 261.50 2.85 1,215.35
15 gallons per minute, 30 lbs. nb@7.00 Ea 1,410.00 366.10 3.99 1,780.09
20 gallons per minute, 40 lbs. nb@8.00 Ea 1,730.00 418.40 4.56 2,152.96
25 gallons per minute, 50 lbs. nb@9.00 Ea 1,940.00 470.70 5.13 2,415.83
35 gallons per minute, 70 lbs. nb@10.0 Ea 2,390.00 523.00 5.70 2,918.70
50 gallons per minute, 100 lbs. nb@11.0 Ea 3,170.00 575.30 6.27 3,751.57
75 gallons per minute, 150 lbs. nf@12.5 Ea 6,060.00 567.10 7.00 6,634.10
100 gallons per minute, 200 lbs. nf@15.4 Ea 6,810.00 698.70 8.62 7,517.32
150 gallons per minute, 300 lbs. nf@16.7 Ea 7,570.00 757.70 9.35 8,337.05
200 gallons per minute, 400 lbs. nf@20.0 Ea 11,000.00 907.40 11.20 11,918.60
250 gallons per minute, 500 lbs. nf@21.5 Ea 12,800.00 975.50 12.00 13,787.50
350 gallons per minute, 700 lbs. nf@25.6 Ea 16,700.00 1,161.00 14.30 17,875.30
Add for porcelain
coating inside and out --@.000 Ea 529.00 -- -- 529.00
Add for porcelain coating
either inside or outside --@.000 Ea 481.00 -- -- 481.00
Add for sediment bucket --@.000 Ea 194.00 -- -- 194.00
Add for anchor flange ---@--- % 8.00 -- -- --
Add for anchor
flange and clamp device ---@--- % 13.70 -- -- --

Grease interceptors - Acid neutralization tank


Using small tools.
30 gallon capacity nb@5.00 Ea 556.00 261.50 2.85 820.35
55 gallon capacity nb@6.65 Ea 823.00 347.80 3.79 1,174.59
100 gallon capacity nb@10.0 Ea 1,040.00 523.00 5.70 1,568.70

CSI 15-380, Sewage treatment equipment

Packaged sewage treatment plants


Steel sewage and wastewater treatment plants, extended aeration. Add the cost of external piping and
fencing, using a 20-ton hydraulic crane with 70’ boom and small tools.
5,000 gallons per day nu@250. Ea 57,800.00 11,180.00 2,520.00 71,500.00
15,000 gallons per day nu@375. Ea 66,400.00 16,770.00 3,780.00 86,950.00
30,000 gallons per day nu@750. Ea 75,100.00 33,530.00 7,570.00116,200.00
50,000 gallons per day nu@987. Ea 107,000.00 44,130.00 9,960.00161,090.00
200,000 gallons per day, purchase --@.000 Ea 421,000.00 -- --421,000.00
500,000 gallons per day, purchase --@.000 Ea 1,160,000.00 -- --1,160,000.00
800,000 gallons per day, purchase --@.000 Ea 1,610,000.00 -- --1,610,000.00

Sewage lift stations


Using a truck-mounted hydraulic crane with 115’ boom, a 200-amp trailer mounted welder and two sets
of small tools.
200,000 gallons per day qq@520. Ea 39,000.00 25,920.00 2,790.00 67,710.00
500,000 gallons per day qq@684. Ea 44,900.00 34,100.00 3,670.00 82,670.00
800,000 gallons per day qq@813. Ea 53,300.00 40,530.00 4,360.00 98,190.00
2015 Heavy Construction Estimator, All Rights Reserved Page 608 (part 2)

CSI 15-390, Aeration equipment

High speed mechanical surface aerators


Includes electric motor, ductile iron deflector, carbon steel core, stainless steel impeller and shaft,
fiberglass float, Moreflex radial coupling and cutless rubber bearing, using a 20-ton hydraulic crane with
70’ boom and small tools.
5 HP, 1800 RPM tq@30.0 Ea 8,360.00 1,061.00 250.00 9,671.00
7.5 HP, 1800 RPM tq@30.0 Ea 8,780.00 1,061.00 250.00 10,091.00
10 HP, 1800 RPM tq@40.0 Ea 10,900.00 1,414.00 334.00 12,648.00
15 HP, 1200 RPM tq@40.0 Ea 11,700.00 1,414.00 334.00 13,448.00
20 HP, 1200 RPM tq@40.0 Ea 14,200.00 1,414.00 334.00 15,948.00
25 HP, 1200 RPM tq@53.3 Ea 15,000.00 1,884.00 445.00 17,329.00
30 HP, 1200 RPM tq@53.3 Ea 20,900.00 1,884.00 445.00 23,229.00
2015 Heavy Construction Estimator, All Rights Reserved Page 609

40 HP, 1200 RPM tq@60.0 Ea 25,100.00 2,121.00 500.00 27,721.00


50 HP, 900 RPM tq@68.6 Ea 30,900.00 2,425.00 572.00 33,897.00
60 HP, 900 RPM tq@68.6 Ea 35,900.00 2,425.00 572.00 38,897.00
75 HP, 900 RPM tq@80.0 Ea 39,300.00 2,828.00 667.00 42,795.00
100 HP, 900 RPM tq@96.0 Ea 41,000.00 3,394.00 801.00 45,195.00
Add for stainless
steel deflector and core ---@--- % 32.00 -- -- --

Fixed low speed mechanical surface aerator


Includes electric motor gear reduction box, coupling, impeller and shaft, and adjusting studs, using a
20-ton hydraulic crane with 70’ boom and small tools.
15 HP tq@40.0 Ea 21,200.00 1,414.00 334.00 22,948.00
20 HP tq@40.0 Ea 24,100.00 1,414.00 334.00 25,848.00
25 HP tq@48.0 Ea 28,500.00 1,697.00 400.00 30,597.00
30 HP tq@48.0 Ea 32,200.00 1,697.00 400.00 34,297.00
40 HP tq@53.3 Ea 35,800.00 1,884.00 445.00 38,129.00
50 HP tq@53.3 Ea 38,700.00 1,884.00 445.00 41,029.00
60 HP tq@60.0 Ea 43,800.00 2,121.00 500.00 46,421.00
75 HP tq@60.0 Ea 49,700.00 2,121.00 500.00 52,321.00
100 HP tq@68.6 Ea 58,500.00 2,425.00 572.00 61,497.00
125 HP tq@80.0 Ea 66,500.00 2,828.00 667.00 69,995.00
150 HP tq@80.0 Ea 84,800.00 2,828.00 667.00 88,295.00
Add for floating unit, including
platform with ballast system ---@--- % 80.00 20.00 -- --

CSI 15-421, Floor and shower drains

Floor or shower drains - Round top


Satin bronze finish, using small tools.
1-1/2" outlet nf@1.00 Ea 87.10 45.37 0.56 133.03
2" outlet nf@1.17 Ea 106.00 53.08 0.66 159.74
3" outlet nf@1.17 Ea 106.00 53.08 0.66 159.74
4" outlet nf@1.17 Ea 106.00 53.08 0.66 159.74

Floor or shower drains - Square top


Satin bronze finish, using small tools.
1-1/2" outlet nf@1.00 Ea 116.00 45.37 0.56 161.93
2" outlet nf@1.17 Ea 130.00 53.08 0.66 183.74
3" outlet nf@1.17 Ea 130.00 53.08 0.66 183.74
4" outlet nf@1.17 Ea 130.00 53.08 0.66 183.74

Floor or shower drains - Funnel type


Rough bronze finish, using small tools.
1-1/2" outlet nf@1.00 Ea 164.00 45.37 0.56 209.93
2" outlet nf@1.17 Ea 183.00 53.08 0.66 236.74
3" outlet nf@1.17 Ea 183.00 53.08 0.66 236.74
4" outlet nf@1.17 Ea 183.00 53.08 0.66 236.74

Floor drains with sediment bucket


Bottom outlet, rough satin bronze top, excludes trap, using small tools.
2" outlet nf@2.15 Ea 369.00 97.55 1.20 467.75
3" outlet nf@2.41 Ea 492.00 109.30 1.35 602.65
4" outlet nf@2.67 Ea 492.00 121.10 1.50 614.60
5" outlet nf@2.94 Ea 492.00 133.40 1.65 627.05
6" outlet nf@3.23 Ea 492.00 146.50 1.81 640.31
Add for galvanized body ---@--- % 20.00 -- -- --
Add for chrome plated top ---@--- % 10.00 -- -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 609 (part 2)

Acid resistant floor drains


Using small tools.
2" acid resistant strainer nf@2.15 Ea 1,590.00 97.55 1.20 1,688.75
3" acid resistant strainer nf@2.41 Ea 1,590.00 109.30 1.35 1,700.65
2015 Heavy Construction Estimator, All Rights Reserved Page 610

4" acid resistant strainer nf@2.67 Ea 1,590.00 121.10 1.50 1,712.60

CSI 15-422, Roof drains

Roof drains - Polypropylene dome, cast iron body


Free area is 116 square inches, using small tools.
2" outlet nf@1.15 Ea 137.00 52.18 0.64 189.82
3" outlet nf@1.15 Ea 137.00 52.18 0.64 189.82
4" outlet nf@1.15 Ea 137.00 52.18 0.64 189.82
5" outlet nf@1.50 Ea 195.00 68.06 0.84 263.90
6" outlet nf@1.50 Ea 195.00 68.06 0.84 263.90
Add for galvanized iron parts --@.000 Ea 19.40 -- -- 19.40
Add for deck clamp --@.000 Ea 21.60 -- -- 21.60
Add for bronze dome --@.000 Ea 9.44 -- -- 9.44
Add for drain receiver --@.000 Ea 24.00 -- -- 24.00

Roof drains - Bronze promenade top, cast iron body


14" square bronze promenade top, using small tools.
2"outlet nf@1.15 Ea 143.00 52.18 0.64 195.82
3"outlet nf@1.15 Ea 143.00 52.18 0.64 195.82
4"outlet nf@1.15 Ea 143.00 52.18 0.64 195.82
5"outlet nf@1.50 Ea 154.00 68.06 0.84 222.90
6"outlet nf@1.50 Ea 154.00 68.06 0.84 222.90
Add for galvanized iron parts --@.000 Ea 90.00 -- -- 90.00
Add for deck clamp --@.000 Ea 25.90 -- -- 25.90
Add for drain receiver --@.000 Ea 28.80 -- -- 28.80

Roof drains - Cast iron scupper drain


With L-shaped bronze grate, using small tools.
2" outlet nf@1.33 Ea 84.20 60.34 0.74 145.28
3" outlet nf@1.67 Ea 84.20 75.77 0.94 160.91
4" outlet nf@1.82 Ea 84.20 82.57 1.02 167.79
5" outlet nf@2.41 Ea 95.40 109.30 1.35 206.05
6" outlet nf@2.94 Ea 95.40 133.40 1.65 230.45
Add for galvanized iron drain ---@--- % 20.00 -- -- --

Roof drains - Flat cast iron grate


Grate free area 27 square inches, using small tools.
4" outlet nf@1.00 Ea 143.00 45.37 0.56 188.93
6" outlet nf@1.15 Ea 145.00 52.18 0.64 197.82
8" outlet nf@1.25 Ea 154.00 56.71 0.70 211.41
Add for galvanized iron parts --@.000 Ea 66.30 -- -- 66.30
Add for bronze grate --@.000 Ea 101.00 -- -- 101.00
Add for deck clamp --@.000 Ea 17.30 -- -- 17.30

Roof drains - Aluminum dome


Using small tools.
2" diameter nf@1.33 Ea 121.00 60.34 0.74 182.08
3" diameter nf@1.67 Ea 122.00 75.77 0.94 198.71
4" diameter nf@2.00 Ea 129.00 90.74 1.12 220.86
6" diameter nf@2.86 Ea 220.00 129.80 1.60 351.40
2015 Heavy Construction Estimator, All Rights Reserved Page 611

Roof drain downspout, bronze


Using small tools.
2" outlet nf@.400 Ea 0.90 18.15 0.22 19.27
3" outlet nf@.400 Ea 1.14 18.15 0.22 19.51
4" outlet nf@.500 Ea 1.60 22.69 0.28 24.57
5" outlet nf@.500 Ea 1.61 22.69 0.28 24.58
6" outlet nf@.750 Ea 2.09 34.03 0.42 36.54
8" outlet nf@.800 Ea 2.21 36.30 0.45 38.96

CSI 15-423, Clean-outs

Plumbing waste line clean-outs - Cast iron ferrule


With cast brass screw plug and nickel bronze cover for floor installation, using small tools.
2" floor cleanout nb@.930 Ea 23.90 48.64 0.53 73.07
3" floor cleanout nb@1.10 Ea 41.20 57.53 0.63 99.36
4" floor cleanout nb@1.25 Ea 73.90 65.38 0.71 139.99

Wall cover for clean-outs, chrome


Cover and screw only, using small tools.
2" diameter nb@1.21 Ea 31.70 63.28 0.69 95.67
4" diameter nb@1.42 Ea 52.90 74.27 0.81 127.98
6" diameter nb@1.47 Ea 119.00 76.88 0.84 196.72

Stainless steel wall cleanout covers


Using small tools.
3" diameter nb@.300 Ea 6.26 15.69 0.17 22.12
5" diameter nb@.250 Ea 6.26 13.08 0.14 19.48
8" diameter nb@.200 Ea 6.07 10.46 0.11 16.64

CSI 15-424, Domestic water heaters

Electric water heaters


Automatic, glass lined. Add the cost of wiring and hook-up, using small tools.
30 gallons, 1,600W ne@5.20 Ea 862.00 272.00 2.96 1,136.96
40 gallons, 2,000W ne@5.20 Ea 931.00 272.00 2.96 1,205.96
52 gallons, 2,500W ne@5.20 Ea 954.00 272.00 2.96 1,228.96
66 gallons, 3,250W ne@5.20 Ea 1,070.00 272.00 2.96 1,344.96
82 gallons, 4,000W ne@5.20 Ea 1,180.00 272.00 2.96 1,454.96

Instantaneous electric water heaters


480 volt, includes non-automatic circuit interrupter and low water cutoff, using small tools.
12 KW nf@8.00 Ea 2,300.00 363.00 4.48 2,667.48
30 KW nf@20.0 Ea 2,420.00 907.40 11.20 3,338.60
96 KW nf@40.0 Ea 42,600.00 1,815.00 22.40 44,437.40
300 KW nf@66.7 Ea 62,700.00 3,026.00 37.40 65,763.40
5761 KW nf@133. Ea 285,000.00 6,034.00 74.50291,108.50

Gas fired water heaters


Automatic, glass lined, using small tools.
30 gallons ne@5.95 Ea 1,010.00 311.20 3.39 1,324.59
40 gallons ne@5.95 Ea 1,070.00 311.20 3.39 1,384.59
50 gallons ne@5.95 Ea 1,160.00 311.20 3.39 1,474.59
66 gallons ne@5.95 Ea 1,610.00 311.20 3.39 1,924.59
82 gallons ne@5.95 Ea 1,710.00 311.20 3.39 2,024.59
100 gallons, 480 GPH ne@5.95 Ea 8,880.00 311.20 3.39 9,194.59
2015 Heavy Construction Estimator, All Rights Reserved Page 611 (part 2)

Instantaneous hot water dispensers


115V AC, 190 degree water, using small tools.
40 cup nd@1.10 Ea 272.00 57.48 0.40 329.88
60 cup nd@1.10 Ea 386.00 57.48 0.40 443.88
2015 Heavy Construction Estimator, All Rights Reserved Page 612

Oil fired water heaters


Glass lined, using small tools.
30 gallons ne@2.50 Ea 846.00 130.80 1.43 978.23
40 gallons ne@2.86 Ea 1,010.00 149.60 1.63 1,161.23
50 gallons ne@3.33 Ea 1,180.00 174.20 1.90 1,356.10
70 gallons ne@4.00 Ea 2,150.00 209.20 2.28 2,361.48
85 gallons ne@5.00 Ea 2,990.00 261.50 2.85 3,254.35
120 gallons ne@10.0 Ea 9,910.00 523.00 5.70 10,438.70

Water heater tanks


Using small tools.
325 gallon, 36" diameter ne@10.0 Ea 6,570.00 523.00 5.70 7,098.70

CSI 15-425, Commercial water heaters

Commercial grade gas fired water heaters


Fast recovery, gallons per minute based on 100 degree F temperature rise, add the cost of connection
piping below, using small tools.
50 gallons, 55 gallons per hour ne@1.75 Ea 1,660.00 91.53 1.00 1,752.53
68 gallons, 75 gallons per hour ne@1.85 Ea 2,320.00 96.76 1.05 2,417.81
76 gallons, 228 gallons per hour ne@2.00 Ea 6,410.00 104.60 1.14 6,515.74
66 gallons, 455 gallons per hour ne@1.85 Ea 10,700.00 96.76 1.05 10,797.81
98 gallons, 164 gallons per hour ne@2.50 Ea 5,750.00 130.80 1.43 5,882.23

Commercial water heater connection assembly


Includes water supply and return, recirculation and relief piping, valves and thermometers using copper
pipe and wrought fittings. Based on 5' run to distribution piping. Add the cost of a recirculation pump,
gas or steam piping, if required, using small tools.
3/4" supply and relief,
no recirculation ne@2.75 Ea 493.00 143.80 1.57 638.37
1" supply and return,
3/4" relief and recirculation ne@3.20 Ea 653.00 167.40 1.82 822.22
1-1/4" supply and return,
3/4" relief and recirculation ne@3.85 Ea 801.00 201.40 2.19 1,004.59
1-1/2" supply and return,
3/4" relief and recirculation ne@4.00 Ea 825.00 209.20 2.28 1,036.48
2" supply and return,
3/4" relief and recirculation ne@4.40 Ea 862.00 230.10 2.51 1,094.61
2-1/2" supply and return,
3/4" relief and recirculation ne@5.82 Ea 1,910.00 304.40 3.32 2,217.72
3" supply and return,
3/4" relief and recirculation ne@6.70 Ea 2,820.00 350.40 3.82 3,174.22

CSI 15-428, Sediment interceptors and oil separators

Oil and water separators


Coalescing type complete with diffusion baffle, tube pack, sheen baffle, effluent overwire, rotary skimmer
and access hatches, using a 300-amp skid mounted welder and small tools.
20 gallons per minute ni@26.0 Ea 4,890.00 1,278.00 45.80 6,213.80
50 gallons per minute ni@26.0 Ea 7,420.00 1,278.00 45.80 8,743.80
100 gallons per minute ni@26.0 Ea 8,420.00 1,278.00 45.80 9,743.80
200 gallons per minute ni@34.5 Ea 11,900.00 1,696.00 60.70 13,656.70
300 gallons per minute ni@34.5 Ea 13,600.00 1,696.00 60.70 15,356.70
400 gallons per minute ni@52.6 Ea 15,600.00 2,586.00 92.60 18,278.60
8" separator, flanged, 500 GPM ni@52.1 Ea 24,300.00 2,562.00 91.70 26,953.70
2015 Heavy Construction Estimator, All Rights Reserved Page 612 (part 2)

Oil stop valves


Using a 300-amp skid mounted welder and small tools.
20 gallons per minute ni@8.70 Ea 1,580.00 427.80 15.30 2,023.10
50 gallons per minute ni@8.70 Ea 1,580.00 427.80 15.30 2,023.10
100 gallons per minute ni@8.70 Ea 1,580.00 427.80 15.30 2,023.10
200 gallons per minute ni@12.5 Ea 1,980.00 614.60 22.00 2,616.60
300 gallons per minute ni@12.5 Ea 1,980.00 614.60 22.00 2,616.60
400 gallons per minute ni@16.7 Ea 2,480.00 821.10 29.40 3,330.50
500 gallons per minute ni@16.7 Ea 2,260.00 821.10 29.40 3,110.50

Pump out units with controls


Using a 300-amp skid mounted welder and small tools.
20 gallons per minute ni@19.4 Ea 3,940.00 953.90 34.10 4,928.00
50 gallons per minute ni@19.4 Ea 3,940.00 953.90 34.10 4,928.00
100 gallons per minute ni@19.4 Ea 3,940.00 953.90 34.10 4,928.00
200 gallons per minute ni@25.6 Ea 5,310.00 1,259.00 45.10 6,614.10
300 gallons per minute ni@25.6 Ea 5,310.00 1,259.00 45.10 6,614.10
400 gallons per minute ni@34.5 Ea 5,310.00 1,696.00 60.70 7,066.70
500 gallons per minute ni@34.5 Ea 5,090.00 1,696.00 60.70 6,846.70
2015 Heavy Construction Estimator, All Rights Reserved Page 613

Sediment strainers
Using small tools.
2" strainer, pump suction side nd@1.22 Ea 13.50 63.75 0.44 77.69

CSI 15-430, Waste and vent piping

Cast iron vent through roof - Hub type


Includes roof flashing, gaskets, 2 linear feet of cast iron pipe. Use these figures for preliminary
estimates, using small tools.
2" vent pipe nb@2.50 Ea 21.80 130.80 1.43 154.03
3" vent pipe nb@2.86 Ea 29.30 149.60 1.63 180.53
4" vent pipe nb@3.13 Ea 38.90 163.70 1.78 204.38

Cast iron vent through roof - No hub


Includes roof flashing, gaskets, 2 linear feet of cast iron pipe. Use these figures for preliminary
estimates, using small tools.
2" vent nb@2.22 Ea 24.00 116.10 1.27 141.37
3" vent nb@2.50 Ea 30.50 130.80 1.43 162.73
4" vent nb@2.50 Ea 37.10 130.80 1.43 169.33

Commercial plumbing fixture rough-in


Includes copper supply pipe and copper DWV (to 2-1/2") or cast iron DWV (over 2-1/2"). Cost per fixture
excluding the cost of the fixture itself. See fixture costs below. Use these figures for preliminary
estimates, using small tools.
Water closet, wall hung,
flush valve, with carrier ne@2.25 Ea 466.00 117.70 1.28 584.98
Water closet, wall hung,
flush valve, no carrier ne@1.95 Ea 170.00 102.00 1.11 273.11
Water closet,
floor mounted, flush valve ne@2.75 Ea 379.00 143.80 1.57 524.37
Water closet,
floor mounted, tank type ne@2.25 Ea 288.00 117.70 1.28 406.98
Bidet, floor mounted ne@2.00 Ea 202.00 104.60 1.14 307.74
Urinal, wall hung,
flush valve, with carrier ne@3.10 Ea 510.00 162.10 1.77 673.87
Urinal, wall hung,
flush valve, without carrier ne@2.35 Ea 288.00 122.90 1.34 412.24
Lavatory, wall hung, with carrier ne@3.40 Ea 572.00 177.80 1.94 751.74
Lavatory for vanity mounting ne@1.90 Ea 202.00 99.37 1.08 302.45
Sink for mounting in counter ne@1.90 Ea 217.00 99.37 1.08 317.45
Bath tub ne@2.35 Ea 310.00 122.90 1.34 434.24
Shower ne@2.60 Ea 365.00 136.00 1.48 502.48
Mop sink ne@2.40 Ea 259.00 125.50 1.37 385.87
Slop sink ne@2.60 Ea 185.00 136.00 1.48 322.48
Laundry tub ne@1.95 Ea 219.00 102.00 1.11 322.11
Wash fountain ne@2.10 Ea 237.00 109.80 1.20 348.00
Lab sink (glass drainage) ne@3.80 Ea 936.00 198.70 2.17 1,136.87
Lab sink (acid
resistant plastic drainage) ne@2.65 Ea 148.00 138.60 1.51 288.11
Water cooler drinking fountain ne@2.20 Ea 160.00 115.10 1.25 276.35
Emergency eyewash and shower ne@1.75 Ea 61.60 91.53 1.00 154.13
Washing machine ne@2.25 Ea 234.00 117.70 1.28 352.98

Residential plumbing fixture rough-in


Includes copper supply pipe and ABS waste and vent pipe. Cost per fixture excluding the cost of the
fixture itself. See fixture costs below. Use these figures for preliminary estimates, using small tools.
Water closet,
2015 Heavy Construction Estimator, All Rights Reserved Page 613 (part 2)

floor mounted, tank type ne@2.00 Ea 71.50 104.60 1.14 177.24


Bidet, floor mounted ne@1.85 Ea 54.20 96.76 1.05 152.01
Lavatory for vanity mounting ne@1.75 Ea 54.20 91.53 1.00 146.73
Counter sink ne@1.75 Ea 59.10 91.53 1.00 151.63
Bath tub ne@2.10 Ea 54.20 109.80 1.20 165.20
Shower ne@2.45 Ea 78.80 128.10 1.40 208.30
Laundry tub ne@1.75 Ea 49.30 91.53 1.00 141.83
Washing machine ne@2.00 Ea 61.60 104.60 1.14 167.34

CSI 15-450, Plumbing fixtures and trim

Water closets
Elongated, vitreous china, with syphon jet, standard commercial quality, including trim. Add the cost of
rough-in plumbing above, using small tools.
Wall hung,
flush valve, with carrier ne@3.55 Ea 368.00 185.70 2.02 555.72
Wall hung,
flush valve, with no carrier ne@3.05 Ea 236.00 159.50 1.74 397.24
Wall hung, flush valve, bed pan cleanser,
with carrier ne@5.05 Ea 551.00 264.10 2.88 817.98
Wall hung, flush valve, bed pan cleanser,
with no carrier ne@4.45 Ea 421.00 232.70 2.54 656.24
Wall hung, electric flush valve,
with carrier ne@3.80 Ea 586.00 198.70 2.17 786.87
2015 Heavy Construction Estimator, All Rights Reserved Page 614

Wall hung, electric flush valve,


with no carrier ne@3.20 Ea 455.00 167.40 1.82 624.22
Wall hung, flush tank, with carrier ne@3.00 Ea 590.00 156.90 1.71 748.61
Wall hung, flush tank, no carrier ne@2.65 Ea 459.00 138.60 1.51 599.11
Floor mounted, flush valve ne@2.60 Ea 216.00 136.00 1.48 353.48
Floor mounted, flush valve,
meets ADA requirements ne@2.60 Ea 357.00 136.00 1.48 494.48
Floor mounted, flush valve,
with bed pan cleanser ne@4.10 Ea 434.00 214.40 2.34 650.74
Floor mounted, flush valve, bed pan cleanser,
meets ADA requirements ne@4.10 Ea 456.00 214.40 2.34 672.74
Floor mounted, electric flush valve ne@2.85 Ea 566.00 149.10 1.62 716.72
Floor mounted, flush tank ne@2.10 Ea 146.00 109.80 1.20 257.00
Floor mounted, flush tank,
meets ADA requirements ne@2.10 Ea 271.00 109.80 1.20 382.00

Water closets, Eastern (Asian) style


Vitreous china, including trim. Add the cost of rough-in plumbing above, using small tools.
Flush valve, with wash hose nf@3.70 Ea 909.00 167.90 2.07 1,078.97
Tank type, with wash hose nf@3.70 Ea 863.00 167.90 2.07 1,032.97
Bidet nf@3.70 Ea 277.00 167.90 2.07 446.97

Urinals
Standard commercial quality, vitreous china, including trim. Add the cost of rough-in plumbing from CSI
15-430, using small tools.
Wall hung, flush valve,
wash out, with carrier ne@3.65 Ea 367.00 190.90 2.08 559.98
Wall hung, flush valve,
wash out, without carrier ne@3.10 Ea 310.00 162.10 1.77 473.87
Wall hung, flush valve,
siphon jet, with carrier ne@3.65 Ea 437.00 190.90 2.08 629.98
Wall hung, flush valve,
siphon jet, without carrier ne@3.15 Ea 383.00 164.70 1.80 549.50
Floor mounted,
flush valve, blow out ne@5.25 Ea 820.00 274.60 2.99 1,097.59
Wall hung, flush tank,
wash out, with carrier ne@4.50 Ea 379.00 235.40 2.57 616.97
Wall hung, flush tank,
wash out, with no carrier ne@4.00 Ea 328.00 209.20 2.28 539.48

Trough type urinals


Enameled cast iron, includes strainer, trap, flush valve and trim. Add the rough-in cost from CSI 15-430,
using small tools.
36" long ng@6.05 Ea 824.00 269.20 1.82 1,095.02
48" long ng@6.05 Ea 1,010.00 269.20 1.82 1,281.02
60" long ng@7.03 Ea 1,240.00 312.80 2.11 1,554.91
72" long ng@7.03 Ea 1,650.00 312.80 2.11 1,964.91

Lavatories
Standard commercial quality, including trim. Add the cost of rough-in plumbing from CSI 15-430, using
small tools.
Wall hung,
vitreous china, with carrier ne@2.70 Ea 315.00 141.20 1.54 457.74
Wall hung, vitreous china,
with no carrier ne@2.20 Ea 224.00 115.10 1.25 340.35
Wall hung, vitreous china, with carrier,
meets ADA requirements ne@2.70 Ea 462.00 141.20 1.54 604.74
Wall hung, vitreous china, with no carrier,
2015 Heavy Construction Estimator, All Rights Reserved Page 614 (part 2)

meets ADA requirements ne@2.20 Ea 364.00 115.10 1.25 480.35


Vanity mounted, vitreous china ne@2.00 Ea 221.00 104.60 1.14 326.74
Vanity mounted, vitreous china, hands free
infra red sensor operation ne@2.50 Ea 457.00 130.80 1.43 589.23
Vanity mounted, enameled steel ne@2.00 Ea 202.00 104.60 1.14 307.74
Add for colored fixtures ---@--- % 30.00 -- -- --

Wash fountains
Includes trim and trap. Foot or hand control operated. Add the rough-in plumbing cost from CSI 15-430,
using small tools.
36" stainless steel, semi circular ne@3.50 Ea 1,560.00 183.10 2.00 1,745.10
36" stainless steel, full circle ne@3.50 Ea 1,790.00 183.10 2.00 1,975.10
54" stainless steel, semi circular ne@3.65 Ea 2,000.00 190.90 2.08 2,192.98
36" terrazzo, semi circular ne@3.65 Ea 1,580.00 190.90 2.08 1,772.98
36" terrazzo, full circle ne@3.65 Ea 1,710.00 190.90 2.08 1,902.98
54" terrazzo, semi circular ne@3.85 Ea 1,900.00 201.40 2.19 2,103.59
54" terrazzo, full circle ne@3.85 Ea 2,120.00 201.40 2.19 2,323.59

Kitchen sinks
Standard quality, including trim. Add the cost of rough-in plumbing from CSI 15-430, using small tools.
21" x 24" x 7",
enameled cast iron, 1 bowl nf@2.00 Ea 272.00 90.74 1.12 363.86
21" x 32" x 7",
enameled cast iron, 2 bowls nf@2.30 Ea 449.00 104.40 1.29 554.69
21" x 24" x 7",
stainless steel, 1 bowl ne@1.90 Ea 136.00 99.37 1.08 236.45
2015 Heavy Construction Estimator, All Rights Reserved Page 615

21" x 32" x 7",


stainless steel, double bowl ne@2.20 Ea 176.00 115.10 1.25 292.35

Service sinks
Commercial quality, including trim. Add the cost of rough-in plumbing from CSI 15-430, using small
tools, using small tools.
Mop sink, terrazzo, floor mounted ne@2.60 Ea 601.00 136.00 1.48 738.48
Slop sink, enameled cast iron,
with P-trap standard ne@3.30 Ea 612.00 172.60 1.88 786.48
Laundry tub, enameled steel ne@2.50 Ea 213.00 130.80 1.43 345.23

Combination tray and sink


Enameled cast iron, including trim. Add the cost of rough-in plumbing from CSI 15-430, using small
tools.
Counter top nf@4.00 Ea 171.00 181.50 2.24 354.74
Leg supported nf@4.00 Ea 362.00 181.50 2.24 545.74

Laboratory sinks
Standard quality, including trim. Add the cost of rough-in plumbing from CSI 15-430, using small tools.
Lab or science sink, single compartment,
stainless steel ne@1.90 Ea 284.00 99.37 1.08 384.45
Exam or nurse type, single compartment,
stainless steel ne@1.90 Ea 240.00 99.37 1.08 340.45
Lab sink, 21" x 15" x 7", acrylic ne@2.00 Ea 123.00 104.60 1.14 228.74
Lab sink, 25" x 16" x 10", acrylic ne@2.20 Ea 153.00 115.10 1.25 269.35
250 gallon laboratory sink,
6' length, recessed ne@15.0 Ea 796.00 784.50 8.55 1,589.05

Scullery sinks, stainless steel


Including trim but not the cost of rough-in plumbing. See CSI 15-430, using small tools.
1 compartment and drainboard nf@2.00 Ea 700.00 90.74 1.12 791.86
2 compartment and drainboard nf@2.35 Ea 902.00 106.60 1.32 1,009.92
3 compartment and drainboard nf@2.65 Ea 1,010.00 120.20 1.48 1,131.68

Bathtubs
Residential quality, including trim. Add the cost of rough-in plumbing cost from CSI 15-430, using small
tools, using small tools.
Bathtub, enameled steel, 60" long ne@2.50 Ea 489.00 130.80 1.43 621.23
Enameled cast iron, 60" long ne@3.50 Ea 721.00 183.10 2.00 906.10
Non-metallic, 60" long ne@2.20 Ea 481.00 115.10 1.25 597.35
Porcelain bathtub, 6' recessed ne@3.00 Ea 1,240.00 156.90 1.71 1,398.61

Fiberglass tub and shower combinations


Standard quality shower fixtures. With diverter valves, shower head and trim. Add the cost of rough-in
plumbing from CSI 15-430, using small tools.
1 piece, 60" x 32" x 72" ng@4.75 Ea 506.00 211.40 1.43 718.83
2 piece, 60" x 31" x 72" ng@5.75 Ea 596.00 255.90 1.73 853.63
4 piece, 60" x 32" x 75-1/2" ng@6.50 Ea 769.00 289.30 1.95 1,060.25

Drinking fountains
Add the cost of rough-in plumbing from CSI 15-430, using small tools, using small tools.
Surface mounted, vitreous china ne@2.50 Ea 350.00 130.80 1.43 482.23
Recessed, vitreous china ne@3.25 Ea 628.00 170.00 1.85 799.85
Surface mounted, stainless steel ne@2.50 Ea 328.00 130.80 1.43 460.23
Semi-recessed, stainless steel ne@3.25 Ea 481.00 170.00 1.85 652.85

Emergency eyewash stations


2015 Heavy Construction Estimator, All Rights Reserved Page 615 (part 2)

Add the cost of rough-in plumbing from CSI 15-430, using small tools.
Counter mounted eyewash ne@1.25 Ea 240.00 65.38 0.71 306.09
Wall mounted eyewash ne@2.25 Ea 164.00 117.70 1.28 282.98
Eyewash and shower, free standing ne@3.00 Ea 749.00 156.90 1.71 907.61

Chemical toilets
Includes toilet, urinal, holding tank, and ventilation system. Add the structure cost, using small tools.
Small tank, 7,000 uses per year nc@40.0 Ea 395.00 1,967.00 22.40 2,384.40
Medium tank, 13,000 uses per year nc@47.6 Ea 448.00 2,340.00 26.70 2,814.70
Large tank, 28,000 uses per year nc@54.0 Ea 1,420.00 2,655.00 30.20 4,105.20
Add for chemical
toilets with extra urinal ---@--- % 10.00 3.00 -- --
2015 Heavy Construction Estimator, All Rights Reserved Page 616

CSI 15-452, Plumbing fixture carriers

Plumbing fixture wall carriers


Coated cast iron hub and spigot, vertical fitting with extension and chrome plated trim, using small
tools.
Single water closet carrier nf@1.59 Ea 192.00 72.14 0.89 265.03
Double water closet carrier nf@2.35 Ea 359.00 106.60 1.32 466.92
Lavatory carrier, single nf@1.16 Ea 120.00 52.63 0.65 173.28
Sink carrier, single nf@1.16 Ea 99.70 52.63 0.65 152.98
Cooler carrier, single nf@1.16 Ea 101.00 52.63 0.65 154.28
Urinal carrier, single nf@1.16 Ea 101.00 52.63 0.65 154.28

CSI 15-455, Domestic water coolers

Water coolers
Add the cost of rough-in plumbing from CSI 15-430, using small tools.
Floor standing, 8 gallons per hour nf@2.75 Ea 1,240.00 124.80 1.54 1,366.34
Wall mounted, 8 gallons per hour nf@2.75 Ea 1,280.00 124.80 1.54 1,406.34
Floor standing,14 gallons per hour nf@2.75 Ea 1,420.00 124.80 1.54 1,546.34
Wall mounted,14 gallons per hour nf@2.75 Ea 1,350.00 124.80 1.54 1,476.34
Remote cooler nf@2.75 Ea 930.00 124.80 1.54 1,056.34
Wall mounted, wheelchair,
8 gallons per hour nf@2.75 Ea 1,310.00 124.80 1.54 1,436.34
Wall mounted, wheelchair,
14 gallons per hour nf@2.75 Ea 1,380.00 124.80 1.54 1,506.34
Remote wheelchair nf@4.00 Ea 3,110.00 181.50 2.24 3,293.74

CSI 15-457, Bath and shower valves and spray heads

Shower and bath trim


Add the cost of rough-in plumbing from CSI 15-430, using small tools.
Wall mounted concealed mixer valve nf@5.00 Ea 131.00 226.90 2.80 360.70
Column fixtures, 6 head nf@20.0 Ea 191.00 907.40 11.20 1,109.60
Bathtub valve, with diverter nf@1.18 Ea 273.00 53.54 0.66 327.20
Shower cabinet, with receptor nf@9.52 Ea 328.00 431.90 5.33 765.23
Emergency shower with eye wash nf@6.45 Ea 2,270.00 292.60 3.61 2,566.21
Exterior emergency
shower with eye wash nb@4.00 Ea 7,810.00 209.20 2.28 8,021.48
Shower head, 3.0 GPM nf@5.00 Ea 55.60 226.90 2.80 285.30
Built in mixing valve nf@5.00 Ea 73.20 226.90 2.80 302.90

CSI 15-458, Shower receptors and enclosures

Shower receptors
Using small tools.
Plastic, 36"x 36" ne@1.25 Ea 102.00 65.38 0.71 168.09
Plastic, simulated terrazzo ne@1.25 Ea 182.00 65.38 0.71 248.09
Acrylic, 36"x 36" ne@1.25 Ea 161.00 65.38 0.71 227.09
Terrazzo, 34" x48" ne@1.25 Ea 265.00 65.38 0.71 331.09
Enameled steel ne@1.25 Ea 303.00 65.38 0.71 369.09

Shower enclosures, clear plastic


Add the cost of rough-in plumbing from CSI 15-430
Corner model, with receptor, valves, stops, shower head and trim but not the cost of rough-in plumbing.
See CSI 15-430, using small tools.
36" enclosure ne@4.00 Ea 275.00 209.20 2.28 486.48
2015 Heavy Construction Estimator, All Rights Reserved Page 616 (part 2)

48" enclosure nc@4.50 Ea 321.00 221.30 2.52 544.82


60" enclosure, handicapped access nc@8.00 Ea 2,680.00 393.40 4.48 3,077.88
Front only, no receptor nf@2.00 Ea 95.60 90.74 1.12 187.46

CSI 15-470, Swimming pool equipment

Electric swimming pool heaters


Based on 1 degree Fahrenheit per hour rise. For commercial pools. Add the cost of wiring, hookup,
external piping, heater base or pad, using small tools.
12 KW, 4800 gallon pool n9@6.67 Ea 3,580.00 312.40 4.00 3,896.40
18 KW, 7200 gallon pool nf@7.14 Ea 4,040.00 323.90 4.00 4,367.90
24 KW, 9600 gallon pool n9@8.33 Ea 4,440.00 390.10 5.00 4,835.10
30 KW, 12000 gallon pool nf@10.0 Ea 4,570.00 453.70 5.60 5,029.30
36 KW, 14400 gallon pool nf@12.5 Ea 4,710.00 567.10 7.00 5,284.10
60 KW, 24000 gallon pool nf@16.7 Ea 4,970.00 757.70 9.35 5,737.05
2015 Heavy Construction Estimator, All Rights Reserved Page 617

Gas fired swimming pool heaters


Using small tools.
120,000 Btu per hour output nm@16.0 Ea 2,980.00 736.60 9.76 3,726.36
180,000 Btu per hour output nm@18.8 Ea 3,360.00 865.60 11.50 4,237.10
240,000 Btu per hour output nm@21.3 Ea 3,810.00 980.70 13.00 4,803.70
300,000 Btu per hour output nm@64.0 Ea 4,120.00 2,947.00 39.00 7,106.00

Gas fired swimming pool heaters


Using a 300-amp skid mounted welder and small tools.
360,000 Btu per hour output pi@160. Ea 4,120.00 7,104.00 224.00 11,448.00

Gas fired swimming pool heaters


Using a 20-ton hydraulic crane with 70’ boom and small tools.
400,000 Btu per hour output pj@168. Ea 4,580.00 7,400.00 499.00 12,479.00

Swimming pool surge tanks


100 gallons per minute vertical pump and electric float switch. 2 HP motor and electronic float switch.
Based on 1' to 5' sump depth for pump, using small tools.
1,000 gallons ph@32.0 Ea 6,090.00 1,421.00 21.40 7,532.40
1,500 gallons ph@32.7 Ea 6,960.00 1,452.00 21.90 8,433.90

Swimming pool surge tanks


Using a 20-ton hydraulic crane with 70’ boom and small tools.
2,000 gallons pl@37.4 Ea 8,270.00 1,641.00 151.00 10,062.00
5,000 gallons pl@60.4 Ea 10,400.00 2,651.00 245.00 13,296.00

CSI 15-471, Swimming pool circulation and filtration equipment

Swimming pool diatomite filter systems


Using small tools.
35,000 gallons nc@100. Ea 1,690.00 4,917.00 56.00 6,663.00

Swimming pool diatomite filter systems


Using a 20-ton hydraulic crane with 70’ boom and small tools.
45,000 gallons nh@94.0 Ea 1,960.00 4,538.00 247.00 6,745.00

CSI 15-473, Swimming pool cleaning equipment

Pool vacuum cleaners


Electric powered portable vacuum cleaner pump with 75' of 3-wire electric safety cord, using small tools.
1 HP pump nf@2.00 Ea 209.00 90.74 1.12 300.86
1-1/2 HP pump nf@2.00 Ea 573.00 90.74 1.12 664.86

Gasoline driven portable vacuum cleaner pump


Using small tools.
3 HP pump nf@2.00 Ea 3,670.00 90.74 1.12 3,761.86
2015 Heavy Construction Estimator, All Rights Reserved Page 618

CSI 15-475, Chemical treatment equipment

Swimming pool chlorinators


Direct cylinder mounted gas chlorinator, using small tools.
50 to 100 PPD nf@5.71 Ea 507.00 259.10 3.20 769.30

CSI 15-501, Wet automatic sprinkler systems

Wet automatic sprinkler systems - Ordinary hazard, cost per head


Complete sprinkler system. Add the cost of special alarm valves, Siamese connections, standpipes, fire
pumps, detector check valves and tanks. No fees included. Not for use on final estimates when
drawings show piping and heads, using small tools.
Exposed piping --@.000 Ea 212.00 -- -- 212.00
Concealed piping --@.000 Ea 144.00 -- -- 144.00

Wet automatic sprinkler systems - Extra hazard, prices per head


Using small tools.
Exposed piping --@.000 Ea 180.00 -- -- 180.00
Concealed piping --@.000 Ea 196.00 -- -- 196.00

CSI 15-502, Dry automatic sprinkler systems

Dry automatic fire sprinkler systems - Ordinary hazard, cost per head
Complete sprinkler system. Add the cost of special alarm valves, Siamese connections, standpipes, fire
pumps, detector check valves and tanks. No fees included. Not for use on final estimates when
drawings show piping and heads, using small tools.
Exposed piping --@.000 Ea 177.00 -- -- 177.00
Concealed piping --@.000 Ea 317.00 -- -- 317.00

Dry automatic fire sprinkler systems - Extra hazard, prices per head
Using small tools.
Exposed piping --@.000 Ea 353.00 -- -- 353.00
Concealed piping --@.000 Ea 376.00 -- -- 376.00

CSI 15-503, Pre-action sprinkler system

Pre-action sprinklers, ordinary hazard warehouse


Based on 125 square feet per head, cost per head, using small tools.
Exposed piping --@.000 Ea 239.00 -- -- 239.00

Pre-action sprinklers, extra hazard warehouse


90 square feet per head, using small tools.
Exposed piping --@.000 Ea 286.00 -- -- 286.00

CSI 15-504, Deluge automatic sprinkler systems

Deluge sprinkler equipment - Nozzles


For pipe and fittings See CSI 15-061, using small tools.
3/8", automatic py@.860 Ea 5.79 45.74 0.52 52.05
1/2", pendant, open head py@.860 Ea 5.79 45.74 0.52 52.05
1/2", pendant,
open head with canopy py@.860 Ea 5.79 45.74 0.52 52.05

Deluge sprinkler equipment - Wet pipe alarm valve


Includes required trim and contacts, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 618 (part 2)

4" valve py@11.1 Ea 2,160.00 590.40 6.66 2,757.06


6" valve py@12.5 Ea 2,380.00 664.90 7.50 3,052.40
8" valve py@18.2 Ea 2,750.00 968.10 10.90 3,729.00

Deluge sprinkler equipment - Deluge valves


Includes all required trim and release equipment, using small tools.
3" valve py@11.1 Ea 3,810.00 590.40 6.66 4,407.06
4" valve py@12.5 Ea 4,390.00 664.90 7.50 5,062.40
6" valve py@18.2 Ea 5,250.00 968.10 10.90 6,229.00

CSI 15-506, Foam fire protection systems

Foam fire protection equipment


Using small tools.
3" foam control valve py@11.1 Ea 1,010.00 590.40 6.66 1,607.06
2-1/2" foam supply valve py@12.5 Ea 784.00 664.90 7.50 1,456.40
2015 Heavy Construction Estimator, All Rights Reserved Page 619

8" foam proportioner py@18.2 Ea 250.00 968.10 10.90 1,229.00


Oscillating foam monitor py@2.50 Ea 1,500.00 133.00 1.50 1,634.50

CSI 15-508, Halon fire protection systems

Halon fire protection system equipment.


Using small tools.
250 lb. cylinder n8@3.23 Ea 3,850.00 164.40 1.94 4,016.34
Halon gas n8@.030 Lb 15.30 1.53 0.02 16.85
Master cylinder n8@1.08 Ea 4,720.00 54.96 0.65 4,775.61
Shuttle check valve n8@1.50 Ea 434.00 76.34 0.90 511.24
Flex head cylinder n8@1.61 Ea 423.00 81.93 0.97 505.90
Nozzles n8@.860 Ea 133.00 43.77 0.52 177.29
Cylinder support n8@1.08 Ea 75.00 54.96 0.65 130.61
Solenoid valve n8@1.61 Ea 587.00 81.93 0.97 669.90
Battery back-up n8@4.26 Ea 198.00 216.80 2.56 417.36

Halon system controls


Using small tools.
Control panel n8@6.45 Ea 2,220.00 328.20 3.87 2,552.07
Smoke detector n8@1.61 Ea 96.70 81.93 0.97 179.60
Annunciator n8@6.06 Ea 2,240.00 308.40 3.64 2,552.04
Pressure switch n8@1.61 Ea 116.00 81.93 0.97 198.90
Alarm horn n8@1.61 Ea 94.90 81.93 0.97 177.80
Testing n8@4.26 Ea 862.00 216.80 2.56 1,081.36

Complete halon fire protection system costs


Subcontract cost per square foot protected, using small tools.
Small area,
less than 300 square feet --@.000 SF 28.50 -- -- 28.50
Large area,
more than 300 square feet --@.000 SF 22.80 -- -- 22.80

CSI 15-510, Fire sprinkler equipment

Sprinkler heads and alarm valves


Using small tools.
Pendant chrome sprinkler heads px@1.25 Ea 8.98 66.49 0.75 76.22
Upright brass sprinkler heads px@1.25 Ea 8.53 66.49 0.75 75.77
4" alarm valve, wet system p3@24.6 Ea 1,110.00 1,132.00 16.00 2,258.00
4" alarm valve, dry system p3@29.1 Ea 1,250.00 1,339.00 18.90 2,607.90
6" alarm valve, wet system p3@29.1 Ea 1,210.00 1,339.00 18.90 2,567.90
6" alarm valve, dry system p3@32.0 Ea 1,950.00 1,472.00 20.80 3,442.80

Complete fire sprinkler system costs - Light hazard


Based on one head each 180 SF for light hazard areas and one head each 130 SF for extra hazard
conditions. Add for cost of special alarm valves, Siamese connections, standpipes, fire pumps, tanks,
outside mains, fees and valves. Cost per head, using small tools.
Wet system,
exposed light hazard piping p3@.450 Ea 80.80 20.70 0.29 101.79
Wet system,
concealed light hazard pipe p3@.600 Ea 89.80 27.61 0.39 117.80
Wet system,
exposed ordinary hazard pipe p3@.450 Ea 80.80 20.70 0.29 101.79
Wet system, concealed
ordinary hazard piping p3@.600 Ea 89.80 27.61 0.39 117.80
Wet system,
exposed extra hazard piping p3@.450 Ea 135.00 20.70 0.29 155.99
2015 Heavy Construction Estimator, All Rights Reserved Page 619 (part 2)

Wet system,
concealed extra hazard piping p3@.600 Ea 144.00 27.61 0.39 172.00
Dry system, air compressor, with alarm valve,
flange with gauge p3@.600 Ea 1,270.00 27.61 0.39 1,298.00
Add for dry system in office building
or single story structure ---@--- % 10.00 5.00 -- --

CSI 15-522, Carbon dioxide equipment

Carbon dioxide cylinders


Using small tools.
Simplex cylinder, 75 lbs. nf@3.33 Ea 594.00 151.10 1.86 746.96
Duplex cylinder, 75 lbs. each nf@6.67 Ea 1,190.00 302.60 3.74 1,496.34
Cylinder, heat/ion detector,
with brackets lj@1.61 Ea 43.60 80.66 0.63 124.89

Carbon dioxide cylinders


Using small tools.
Cylinder dispersion nozzle n6@.560 Ea 25.60 28.50 0.34 54.44
Cylinder 1/2" rubber tubing n6@.230 LF 3.50 11.70 0.14 15.34
2015 Heavy Construction Estimator, All Rights Reserved Page 620

CSI 15-530, Standpipe and fire hose equipment

Simplex fire pumps


Using small tools.
20HP, 500 gallons per minute pz@33.3 Ea 41,400.00 1,605.00 20.00 43,025.00
30HP, 500 gallons per minute pz@42.5 Ea 43,100.00 2,049.00 25.50 45,174.50
40HP, 750 gallons per minute pz@64.4 Ea 43,600.00 3,105.00 38.60 46,743.60

Simplex fire pumps


Using a 20-ton hydraulic crane with 70’ boom and small tools.
50HP, 1000 gallons per minute p2@86.7 Ea 44,500.00 4,204.00 214.00 48,918.00
75HP, 1000 gallons per minute p2@109. Ea 47,200.00 5,285.00 269.00 52,754.00
Add for duplex pumping system ---@--- % 100.00 -- -- --
Add for jockey pump --@.000 Ea 1,520.00 -- -- 1,520.00
Add for jockey pump installation ---@--- % -- 11.00 -- --

Roof manifold
Using small tools.
2-1/2" x 2-1/2" x 2-1/2"x4",
vertical, brass pz@8.00 Ea 873.00 385.70 4.80 1,263.50

Fire department valves


Using small tools.
2-1/2" fire department valve pz@3.23 Ea 183.00 155.70 1.94 340.64

Fire department connections


Using small tools.
4" x 2-1/2"
x 2-1/2" Siamese connections pz@4.88 Ea 509.00 235.30 2.93 747.23
Sidewalk type connections
with plug and chain pz@6.45 Ea 828.00 311.00 3.87 1,142.87
Wall type connections with plate,
plug and chain pz@4.88 Ea 475.00 235.30 2.93 713.23

Diesel driven fire pumps


Stand alone units meeting NFPA-20 specifications, using a 20-ton hydraulic crane with 70’ boom and
small tools.
500 gallons per minute p2@20.8 Ea 27,800.00 1,009.00 51.40 28,860.40
750 gallons per minute p2@20.8 Ea 37,200.00 1,009.00 51.40 38,260.40
1,000 gallons per minute p2@20.8 Ea 42,700.00 1,009.00 51.40 43,760.40
1,500 gallons per minute p2@20.8 Ea 46,100.00 1,009.00 51.40 47,160.40
2,500 gallons per minute p2@20.8 Ea 58,100.00 1,009.00 51.40 59,160.40
3,000 gallons per minute p2@20.8 Ea 65,700.00 1,009.00 51.40 66,760.40
4,000 gallons per minute p2@20.8 Ea 91,800.00 1,009.00 51.40 92,860.40
5,000 gallons per minute p2@20.8 Ea 127,000.00 1,009.00 51.40128,060.40

CSI 15-532, Fire hose cabinets

Fire hose cabinets - For 75’ linen hose, 1-1/2" diameter


Using small tools.
Painted steel cabinet pz@1.55 Ea 490.00 74.73 0.93 565.66
Stainless steel cabinet pz@1.55 Ea 337.00 74.73 0.93 412.66

Fire hose cabinets - For 100’ linen hose, 1-1/2" diameter


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 620 (part 2)

Painted steel cabinet pz@1.55 Ea 577.00 74.73 0.93 652.66


Stainless steel pz@1.55 Ea 511.00 74.73 0.93 586.66

Fire hose cabinets - For 75’ linen hose, 1-1/2", and extinguisher
Using small tools.
Painted steel cabinet pz@1.90 Ea 633.00 91.60 1.14 725.74
Stainless steel cabinet pz@1.90 Ea 527.00 91.60 1.14 619.74

Fire hose cabinets - For 100’ linen hose, 2-1/2" fire department valve, and extinguisher
Using small tools.
Painted steel cabinet pz@1.90 Ea 688.00 91.60 1.14 780.74
Stainless steel cabinet pz@1.90 Ea 572.00 91.60 1.14 664.74

Fire hose cabinet accessories


Using small tools.
2-1/2" angle valve px@1.11 Ea 228.00 59.04 0.67 287.71
Hose coupling with 1-1/2" pin lug px@.500 Ea 55.60 26.60 0.30 82.50
Hose coupling with 2-1/2" pin lug px@.560 Ea 96.10 29.79 0.34 126.23
1-1/2" x 10" brass straight nozzle px@.400 Ea 54.40 21.28 0.24 75.92
2-1/2" x 12" brass straight nozzle px@.430 Ea 152.00 22.87 0.26 175.13
1-1/2" brass fog type nozzle px@.400 Ea 114.00 21.28 0.24 135.52
2-1/2" brass fog type nozzle px@.430 Ea 181.00 22.87 0.26 204.13
1-1/2" brass 100’ hose rack px@1.67 Ea 152.00 88.83 1.00 241.83
2-1/2" brass 100’ hose rack px@1.67 Ea 291.00 88.83 1.00 380.83
2015 Heavy Construction Estimator, All Rights Reserved Page 621

CSI 15-534, Fire hose

Fire hose
1-1/2" rubber lining. No couplings included, using small tools.
1-1/2" linen px@.020 LF 0.45 1.06 0.01 1.52
2-1/2" linen px@.030 LF 0.62 1.60 0.02 2.24
1-1/2"cotton, 300 lb. test px@.020 LF 0.84 1.06 0.01 1.91
2-1/2"cotton, 300 lb. test px@.030 LF 1.34 1.60 0.02 2.96
1-1/2"cotton, 400 lb. test px@.020 LF 0.95 1.06 0.01 2.02
2-1/2"cotton, 400 lb. test px@.030 LF 1.59 1.60 0.02 3.21

Portable fire extinguishers


Using small tools.
All purpose dry chemical,
5 lb. Purchase only --@.000 Ea 127.00 -- -- 127.00
Mounted on masonry wall px@.490 Ea 127.00 26.06 0.29 153.35

CSI 15-605, Fuel handling systems

Fuel unloading hose - Two braid hose, 25’ long


Braided rayon cord, neoprene cover, and end couplings, using small tools.
3/4" x 1-3/4" n9@1.61 Ea 61.20 75.40 0.97 137.57
1" x 1-1/2" n9@1.61 Ea 86.10 75.40 0.97 162.47
1-1/4" x 1-3/4" n9@1.61 Ea 156.00 75.40 0.97 232.37

Fuel unloading hose - Two braid hose, 50’ long


Braided rayon cord, neoprene cover, and end couplings, using small tools.
3/4" x 1-3/4" n9@3.23 Ea 121.00 151.30 1.94 274.24
1" x 1-1/2" n9@3.23 Ea 170.00 151.30 1.94 323.24
1-1/4" x 1-3/4" n9@3.23 Ea 311.00 151.30 1.94 464.24

Fuel unloading hose - Three braid hose, 25’ long


Braided rayon cord, neoprene cover, and end couplings, using small tools.
1-1/2" x 2-3/32" n9@1.61 Ea 285.00 75.40 0.97 361.37
2" x 2-21/32" n9@2.15 Ea 346.00 100.70 1.29 447.99
2-1/2" x 3-3/16" n9@2.67 Ea 506.00 125.00 1.60 632.60
3" x 3-3/4" n9@3.23 Ea 643.00 151.30 1.94 796.24

Fuel unloading hose - Three braid hose, 50’ long


Braided rayon cord, neoprene cover, and end couplings, using small tools.
1-1/2" x 2-3/32" n9@3.23 Ea 491.00 151.30 1.94 644.24
2" x 2-21/32" n9@4.29 Ea 582.00 200.90 2.57 785.47
2-1/2" x 3-3/16" n9@5.41 Ea 804.00 253.40 3.25 1,060.65
3" x 3-3/4" n9@6.45 Ea 990.00 302.10 3.87 1,295.97

Fuel unloading hose - Tank car fuel unloading hose assemblies


Flexible galvanized steel, complete with female coupling each end, using small tools.
2" inside diameter x 10' n9@1.43 Ea 210.00 66.97 0.86 277.83
2-1/2" inside diameter x 10' n9@1.43 Ea 267.00 66.97 0.86 334.83
3" inside diameter x 10' n9@1.43 Ea 326.00 66.97 0.86 393.83
4" inside diameter x 10' n9@1.43 Ea 557.00 66.97 0.86 624.83

Gas or oil tank accessories


Using small tools.
Manhole spill containment n9@5.00 Ea 381.00 234.20 3.00 618.20
2015 Heavy Construction Estimator, All Rights Reserved Page 621 (part 2)

Fill adapter, 4" n9@1.50 Ea 48.00 70.25 0.90 119.15


Fill cap, 4" n9@.750 Ea 37.20 35.12 0.45 72.77
Vent cap, 2" n9@.500 Ea 18.90 23.42 0.30 42.62
4" x 2" extractor fitting n9@.750 Ea 130.00 35.12 0.45 165.57
Float vent valve n9@1.25 Ea 68.80 58.54 0.75 128.09
Vapor hose adapter n9@.750 Ea 105.00 35.12 0.45 140.57
Dust cap n9@.500 Ea 37.10 23.42 0.30 60.82
2015 Heavy Construction Estimator, All Rights Reserved Page 622

1" double poppet foot valve n9@.750 Ea 154.00 35.12 0.45 189.57
10' wood gage stick --@.000 Ea 14.50 -- -- 14.50

Underground storage tank pump enclosures


Purchase only.
Secondary containment collar --@.000 Ea 609.00 -- -- 609.00
Turbine enclosure with lid,
4' long x 42" diameter --@.000 Ea 609.00 -- -- 609.00
Fitting kit for turbine enclosure --@.000 Ea 122.00 -- -- 122.00
Grommet kits
for plumbing and electrical --@.000 Ea 243.00 -- -- 243.00
Turbine electrical coupling kit --@.000 Ea 304.00 -- -- 304.00

Gas station fuel dispensing pumps


Polished stainless steel dial frame, stainless steel side panel, four wheel, self-timing meter, cable
retractor, 120 mesh cartridge strainer (60 mesh for diesel fuels), internal gear high speed pump, reverse
flow air separator, 1/2" connector, using a 300-amp skid mounted welder and small tools.
3/4 HP motor,
1" hose and standard nozzle ni@6.67 Ea 1,910.00 328.00 11.70 2,249.70

CSI 15-620, Boilers

Electric steam boilers, 15 psi, 575 volts


Packaged, non-skid mounted, includes controls, condensate tank, pump, etc. Labor includes setting in
place, leveling and installation of loose accessories. Add the cost of pipe connections, valves,
thermometers and gauges, using small tools.
18 KW, 55 mbh n9@10.0 Ea 6,570.00 468.30 6.00 7,044.30
30 KW, 110 mbh n9@12.0 Ea 6,770.00 562.00 7.20 7,339.20
48 KW, 165 mbh n9@16.0 Ea 7,570.00 749.30 9.60 8,328.90
60 KW, 215 mbh n9@16.0 Ea 7,970.00 749.30 9.60 8,728.90
150KW, 510 mbh n9@24.0 Ea 12,900.00 1,124.00 14.40 14,038.40
400KW, 1,350 mbh n9@36.0 Ea 20,900.00 1,686.00 21.60 22,607.60

Electric hot water boilers, 15 psi, 208 volts


Packaged, non-skid mounted, includes controls, condensate tank, pump, etc. Labor includes setting in
place, leveling and installation of loose accessories. Add the cost of pipe connections, valves,
thermometers and gauges, using small tools.
12 KW, 20 to 40 mbh pd@10.0 Ea 6,970.00 428.10 43.90 7,442.00
20 KW, 40 to 60 mbh pd@12.0 Ea 7,770.00 513.70 52.70 8,336.40
28 KW, 95 mbh pd@16.0 Ea 8,170.00 685.00 70.20 8,925.20
40 KW, 135 mbh pd@16.0 Ea 8,460.00 685.00 70.20 9,215.20

Steel package hot water boiler


Oil fired, flush jacketed steel shell, includes standard accessories, safety controls and set-up. Add the
cost of tankless heater, circulator, flue piping, fuel piping, boiler base and pad, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using small tools.
140 mbh n9@16.0 Ea 3,750.00 749.30 9.60 4,508.90
300 mbh ni@22.0 Ea 6,000.00 1,082.00 38.70 7,120.70
550 mbh ni@30.0 Ea 10,300.00 1,475.00 52.80 11,827.80
735 mbh ni@38.0 Ea 13,700.00 1,868.00 66.90 15,634.90

Steel package hot water boiler


Oil fired, flush jacketed steel shell, includes standard accessories, safety controls and set-up. Add the
cost of tankless heater, circulator, flue piping, fuel piping, boiler base and pad, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using a 20-ton hydraulic crane with 70’
boom and small tools.
1,050 mbh pl@40.0 Ea 16,900.00 1,756.00 162.00 18,818.00
2015 Heavy Construction Estimator, All Rights Reserved Page 622 (part 2)

1,168 mbh pl@44.0 Ea 19,700.00 1,931.00 178.00 21,809.00


1,460 mbh pl@47.0 Ea 22,500.00 2,063.00 190.00 24,753.00
2,044 mbh pl@50.0 Ea 30,000.00 2,195.00 203.00 32,398.00
2,300 mbh pl@56.0 Ea 33,800.00 2,458.00 227.00 36,485.00
3,150 mbh pl@60.0 Ea 54,400.00 2,633.00 243.00 57,276.00
5,256 mbh pl@100. Ea 88,200.00 4,389.00 405.00 92,994.00
6,000 mbh pl@120. Ea 93,800.00 5,267.00 486.00 99,553.00
7,130 mbh pl@130. Ea 107,000.00 5,706.00 527.00113,233.00
9,800 mbh pl@140. Ea 150,000.00 6,145.00 567.00156,712.00
10,900 mbh pl@144. Ea 158,000.00 6,320.00 583.00164,903.00
12,200 mbh pl@150. Ea 186,000.00 6,584.00 608.00193,192.00
13,500 mbh pl@160. Ea 225,000.00 7,022.00 648.00232,670.00

Steel packaged fire tube hot water boiler, 125 psi


Gas fired, flush jacketed steel shell, includes standard accessories, safety controls and set-up. Add the
cost of tankless heater, circulator, flue piping, fuel piping, boiler base and pad, pipe connection, valves,
thermometers and gauges, using a 20-ton hydraulic crane with 70’ boom and small tools.
1,168 mbh pl@32.0 Ea 32,900.00 1,404.00 130.00 34,434.00
2015 Heavy Construction Estimator, All Rights Reserved Page 623

1,460 mbh pl@36.0 Ea 33,500.00 1,580.00 146.00 35,226.00


2,044 mbh pl@40.0 Ea 40,200.00 1,756.00 162.00 42,118.00
5,256 mbh pl@60.0 Ea 65,800.00 2,633.00 243.00 68,676.00
6,200 mbh pl@70.0 Ea 76,200.00 3,072.00 284.00 79,556.00
7,130 mbh pl@80.0 Ea 78,000.00 3,511.00 324.00 81,835.00
9,800 mbh pl@90.0 Ea 98,500.00 3,950.00 365.00102,815.00
10,900 mbh pl@90.0 Ea 111,000.00 3,950.00 365.00115,315.00
12,200 mbh pl@100. Ea 120,000.00 4,389.00 405.00124,794.00
13,500 mbh pl@100. Ea 135,000.00 4,389.00 405.00139,794.00
Add for zone control package,
per zone ---@--- % 10.00 -- -- --
Add for boiler with tankless heater ---@--- % 15.00 -- -- --

High efficiency packaged gas boiler


For natural gas with smartvalve electronic ignition only. Add the cost of connection from CSI 15-527,
using small tools.
52 MBH n9@10.0 Ea 2,380.00 468.30 6.00 2,854.30
80 MBH n9@12.0 Ea 2,630.00 562.00 7.20 3,199.20
108 MBH n9@12.0 Ea 2,980.00 562.00 7.20 3,549.20
136 MBH n9@12.0 Ea 3,430.00 562.00 7.20 3,999.20

CSI 15-621, Cast iron boilers

Packaged oil fired cast iron hot water boilers


Includes insulating jacket, circulator, controls, safety devices and set-up. Add the cost of flue piping,
fuel piping, boiler base and pad, pipe connection, valves, thermometers and gauges. See connection
costs in CSI 15-627, using small tools.
115 mbh, with tankless heater n9@16.0 Ea 3,060.00 749.30 9.60 3,818.90
175 mbh, with tankless heater n9@18.0 Ea 3,680.00 842.90 10.80 4,533.70
235 mbh ni@22.0 Ea 4,750.00 1,082.00 38.70 5,870.70

Packaged oil fired cast iron hot water boilers


Includes insulating jacket, circulator, controls, safety devices and set-up. Add the cost of flue piping,
fuel piping, boiler base and pad and pipe connection. See connection costs in CSI 15-627, using a
20-ton hydraulic crane with 70’ boom and small tools.
940 mbh pl@40.0 Ea 14,400.00 1,756.00 162.00 16,318.00
1,600 mbh pl@48.0 Ea 24,500.00 2,107.00 194.00 26,801.00
3,000 mbh pl@60.0 Ea 42,900.00 2,633.00 243.00 45,776.00
Add for steam system ---@--- % 20.00 -- -- --

Packaged gas and oil fired hot water boilers


Sectional cast iron construction, includes insulating jacket, circulator, controls, safety devices, and
tankless heater. Add the cost of flue piping, fuel piping, boiler base and pad, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using small tools.
200 mbh ni@14.0 Ea 6,770.00 688.40 24.60 7,483.00
300 mbh ni@16.0 Ea 7,810.00 786.70 28.20 8,624.90

Packaged gas and oil fired hot water boilers


Sectional cast iron construction, includes insulating jacket, circulator, controls, safety devices, and
tankless heater. Add the cost of flue piping, fuel piping, boiler base and pad, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using a 20-ton hydraulic crane with 70’
boom and small tools.
400 mbh pl@20.0 Ea 9,080.00 877.80 81.00 10,038.80
500 mbh pl@24.0 Ea 9,930.00 1,053.00 97.20 11,080.20
600 mbh pl@24.0 Ea 10,700.00 1,053.00 97.20 11,850.20
700 mbh pl@26.0 Ea 11,500.00 1,141.00 105.00 12,746.00
800 mbh pl@26.0 Ea 12,300.00 1,141.00 105.00 13,546.00
900 mbh pl@30.0 Ea 13,000.00 1,317.00 122.00 14,439.00
2015 Heavy Construction Estimator, All Rights Reserved Page 623 (part 2)

1000 mbh pl@32.0 Ea 14,800.00 1,404.00 130.00 16,334.00

CSI 15-622, Firebox boilers

Packaged oil fired steam or hot water boilers


15 PSI steam or 30 PSI water, includes burner and basic controls. Add the cost of flue piping, fuel
piping, boiler base and pad, pipe connection, valves, thermometers and gauges. See connections costs
in CSI 15-627, using a 20-ton hydraulic crane with 70’ boom and small tools.
80 BHP, 2680 mbh pt@42.0 Ea 38,300.00 1,764.00 211.00 40,275.00
125 BHP, 4185 mbh pt@60.0 Ea 49,000.00 2,521.00 302.00 51,823.00
200 BHP, 6695 mbh pt@80.0 Ea 68,900.00 3,361.00 402.00 72,663.00
300 BHP, 10040 mbh pt@90.0 Ea 84,300.00 3,781.00 453.00 88,534.00
400 BHP, 13392 mbh pt@100. Ea 103,000.00 4,201.00 503.00107,704.00
2015 Heavy Construction Estimator, All Rights Reserved Page 624

500 BHP, 16740 mbh pt@120. Ea 115,000.00 5,041.00 604.00120,645.00

Packaged oil fired steam or hot water boilers


15 PSI steam or 30 PSI water, includes burner and basic controls. Add the cost of flue piping, fuel
piping, boiler base and pad. Add the cost of pipe connection, valves, thermometers and gauges from
CSI 15-627, using a 40-ton hydraulic crane with 84’ boom and small tools.
600 BHP, 20088 mbh pu@140. Ea 116,000.00 5,835.00 1,060.00122,895.00
750 BHP, 25770 mbh pu@160. Ea 126,000.00 6,669.00 1,210.00133,879.00

CSI 15-623, Scotch marine boilers

Scotch marine firetube gas boiler, 30 PSIG


Packaged unit, includes standard controls and setting boilers but no flue piping, fuel piping, boiler base
or pad, pipe connection, valves, thermometers or gauges. See connection costs in CSI 15-627, using a
20-ton hydraulic crane with 70’ boom and small tools.
30 HP, 1,005 mbh pt@32.0 Ea 24,800.00 1,344.00 161.00 26,305.00
50 HP, 1,675 mbh pt@36.0 Ea 27,300.00 1,512.00 181.00 28,993.00
100 HP, 3,350 mbh pt@52.0 Ea 41,800.00 2,185.00 262.00 44,247.00
150 HP, 5,025 mbh pt@60.0 Ea 48,200.00 2,521.00 302.00 51,023.00
200 HP, 6,700 mbh pt@75.0 Ea 57,100.00 3,151.00 377.00 60,628.00
250 HP, 8,375 mbh pt@85.0 Ea 62,700.00 3,571.00 428.00 66,699.00
300 HP, 10,050 mbh pt@90.0 Ea 67,500.00 3,781.00 453.00 71,734.00

Scotch marine fire tube steam boiler, 150 PSI, #2 fuel oil fired
Packaged unit, includes standard controls and setting boilers but no flue piping, fuel piping, boiler base
or pad, pipe connection, valves, thermometers or gauges. See connection costs in CSI 15-627, using a
20-ton hydraulic crane with 70’ boom and small tools.
30 HP, 1,005 mbh pt@32.0 Ea 31,400.00 1,344.00 161.00 32,905.00
50 HP, 1,675 mbh pt@36.0 Ea 37,100.00 1,512.00 181.00 38,793.00
100 HP, 3,350 mbh pt@52.0 Ea 51,700.00 2,185.00 262.00 54,147.00
150 HP, 5,025 mbh pt@60.0 Ea 66,200.00 2,521.00 302.00 69,023.00
200 HP, 6,700 mbh pt@75.0 Ea 71,100.00 3,151.00 377.00 74,628.00
250 HP, 6,700 mbh pt@85.0 Ea 87,800.00 3,571.00 428.00 91,799.00
300 HP, 10,050 mbh pt@90.0 Ea 94,100.00 3,781.00 453.00 98,334.00

Scotch marine fire tube steam boiler, 15 PSI, #2 fuel oil fired
Packaged unit, includes standard controls and setting boilers but no flue piping, fuel piping, boiler base
or pad, pipe connection, valves, thermometers or gauges. See connection costs in CSI 15-627, using a
20-ton hydraulic crane with 70’ boom and small tools.
50 HP, 1,675 mbh pt@36.0 Ea 25,900.00 1,512.00 181.00 27,593.00
100 HP, 3,350 mbh pt@52.0 Ea 31,400.00 2,185.00 262.00 33,847.00
150 HP, 5,025 mbh pt@60.0 Ea 42,300.00 2,521.00 302.00 45,123.00
200 HP, 6,700 mbh pt@75.0 Ea 53,400.00 3,151.00 377.00 56,928.00
250 HP, 8,375 mbh pt@85.0 Ea 61,200.00 3,571.00 428.00 65,199.00
300 HP, 10,050 mbh pt@90.0 Ea 70,700.00 3,781.00 453.00 74,934.00
400 HP, 13,400 mbh pt@100. Ea 82,200.00 4,201.00 503.00 86,904.00

Scotch marine fire tube steam boiler, 150 PSI, #6 fuel oil fired
Packaged unit, includes standard controls and setting boilers but no flue piping, fuel piping, boiler base
or pad, pipe connection, valves, thermometers or gauges. See connection costs in CSI 15-627, using a
20-ton hydraulic crane with 70’ boom and small tools.
50 HP, 1,675 mbh pt@36.0 Ea 43,300.00 1,512.00 181.00 44,993.00
100 HP, 3,350 mbh pt@52.0 Ea 53,700.00 2,185.00 262.00 56,147.00
150 HP, 5,025 mbh pt@60.0 Ea 69,200.00 2,521.00 302.00 72,023.00
200 HP, 6,700 mbh pt@75.0 Ea 75,200.00 3,151.00 377.00 78,728.00
250 HP, 8,375 mbh pt@85.0 Ea 86,800.00 3,571.00 428.00 90,799.00
300 HP, 10,050 mbh pt@90.0 Ea 94,600.00 3,781.00 453.00 98,834.00
400 HP, 13,400 mbh pt@100. Ea 113,000.00 4,201.00 503.00117,704.00
2015 Heavy Construction Estimator, All Rights Reserved Page 624 (part 2)

Scotch marine fire tube steam boiler, 15 PSI, #6 fuel oil fired
Packaged unit, includes standard controls and setting boilers but no flue piping, fuel piping, boiler base
or pad, pipe connection, valves, thermometers or gauges, using a 20-ton hydraulic crane with 70’ boom
and small tools.
50 HP, 1,675 mbh pl@36.0 Ea 37,800.00 1,580.00 146.00 39,526.00
100 HP, 3,350 mbh pl@52.0 Ea 49,800.00 2,282.00 211.00 52,293.00
150 HP, 5,025 mbh pl@60.0 Ea 60,700.00 2,633.00 243.00 63,576.00
200 HP, 6,700 mbh pl@75.0 Ea 67,700.00 3,292.00 304.00 71,296.00
250 HP, 8,375 mbh pl@85.0 Ea 74,700.00 3,731.00 344.00 78,775.00
300 HP, 10,050 mbh pl@90.0 Ea 86,600.00 3,950.00 365.00 90,915.00
400 HP, 13,400 mbh pl@100. Ea 107,000.00 4,389.00 405.00111,794.00
2015 Heavy Construction Estimator, All Rights Reserved Page 625

CSI 15-624, Water tube boilers

Tube type oil fired hot water boilers


Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using small tools.
200 mbh pe@14.0 Ea 8,820.00 607.70 8.96 9,436.66
275 mbh pe@16.0 Ea 10,900.00 694.60 10.20 11,604.80
360 mbh pe@18.0 Ea 12,900.00 781.40 11.50 13,692.90
520 mbh pe@24.0 Ea 13,400.00 1,042.00 15.40 14,457.40
600 mbh pe@24.0 Ea 14,800.00 1,042.00 15.40 15,857.40

Tube type oil fired hot water boilers


Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges, using a 20-ton hydraulic crane with 70’ boom and small tools.
720 mbh pl@26.0 Ea 16,400.00 1,141.00 105.00 17,646.00
960 mbh pl@32.0 Ea 17,300.00 1,404.00 130.00 18,834.00
1,200 mbh pl@34.0 Ea 18,300.00 1,492.00 138.00 19,930.00
1,440 mbh pl@34.0 Ea 18,800.00 1,492.00 138.00 20,430.00
1,680 mbh pl@36.0 Ea 25,300.00 1,580.00 146.00 27,026.00
1,920 mbh pl@40.0 Ea 26,800.00 1,756.00 162.00 28,718.00
2,160 mbh pl@40.0 Ea 31,500.00 1,756.00 162.00 33,418.00
2,400 mbh pl@40.0 Ea 36,600.00 1,756.00 162.00 38,518.00

Water tube type oil fired hot water boilers, 160 psi, #2 fuel
Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges, using a 20-ton hydraulic crane with 70’ boom and small tools.
1,500 mbh pl@34.0 Ea 23,500.00 1,492.00 138.00 25,130.00
1,680 mbh pl@36.0 Ea 24,300.00 1,580.00 146.00 26,026.00
1,200 mbh pl@40.0 Ea 24,400.00 1,756.00 162.00 26,318.00
2,160 mbh pl@40.0 Ea 25,000.00 1,756.00 162.00 26,918.00
2,500 mbh pl@40.0 Ea 26,800.00 1,756.00 162.00 28,718.00

Water tube type oil fired steam boilers, 15 psi, #2 fuel


Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges, using a 20-ton hydraulic crane with 70’ boom and small tools.
1,500 mbh pl@34.0 Ea 25,400.00 1,492.00 138.00 27,030.00
1,680 mbh pl@36.0 Ea 26,100.00 1,580.00 146.00 27,826.00
1,200 mbh pl@40.0 Ea 26,800.00 1,756.00 162.00 28,718.00
2,160 mbh pl@40.0 Ea 27,400.00 1,756.00 162.00 29,318.00
2,500 mbh pl@40.0 Ea 28,700.00 1,756.00 162.00 30,618.00
Add for steam system ---@--- % 20.00 -- -- --

Water tube type gas fired hot water boilers


Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges. See connection costs in CSI 15-627, using a 20-ton hydraulic crane with 70’
boom and small tools.
200 mbh pl@14.0 Ea 8,690.00 614.50 56.70 9,361.20
275 mbh pl@16.0 Ea 10,700.00 702.20 64.80 11,467.00
360 mbh pl@18.0 Ea 12,600.00 790.00 72.90 13,462.90
520 mbh pl@24.0 Ea 13,100.00 1,053.00 97.20 14,250.20
600 mbh pl@24.0 Ea 14,400.00 1,053.00 97.20 15,550.20
720 mbh pl@26.0 Ea 15,900.00 1,141.00 105.00 17,146.00
2015 Heavy Construction Estimator, All Rights Reserved Page 625 (part 2)

960 mbh pl@32.0 Ea 17,300.00 1,404.00 130.00 18,834.00


1,220 mbh pl@34.0 Ea 19,500.00 1,492.00 138.00 21,130.00
1,440 mbh pl@34.0 Ea 22,500.00 1,492.00 138.00 24,130.00
1,680 mbh pl@36.0 Ea 28,000.00 1,580.00 146.00 29,726.00
1,920 mbh pl@40.0 Ea 30,800.00 1,756.00 162.00 32,718.00
2,160 mbh pl@40.0 Ea 32,800.00 1,756.00 162.00 34,718.00
2,400 mbh pl@40.0 Ea 37,500.00 1,756.00 162.00 39,418.00

Water tube type gas fired hot water boilers, 160 psi
Packaged, steel shell with insulating jacket. lncludes standard controls, burner and safety devices,
set-up and wiring. Add the cost of flue piping, fuel piping, circulator, pipe connection, valves,
thermometers and gauges, using a 20-ton hydraulic crane with 70’ boom and small tools.
1,500 mbh pl@34.0 Ea 24,600.00 1,492.00 138.00 26,230.00
1,680 mbh pl@36.0 Ea 26,200.00 1,580.00 146.00 27,926.00
2,000 mbh pl@40.0 Ea 26,900.00 1,756.00 162.00 28,818.00
2,160 mbh pl@40.0 Ea 27,900.00 1,756.00 162.00 29,818.00
2,500 mbh pl@40.0 Ea 29,300.00 1,756.00 162.00 31,218.00
2015 Heavy Construction Estimator, All Rights Reserved Page 626

CSI 15-625, Cast iron boilers

Steam boilers, gas and oil fired


Includes setting in place, leveling, installation of loose shipped accessories but not pipe connections,
valves, thermometers or gauges. Add the cost of flue piping, fuel piping, pipe connection and circulator.
See connection costs in CSI 15-627, using a 20-ton hydraulic crane with 70’ boom and small tools.
720 mbh pt@26.0 Ea 12,600.00 1,092.00 131.00 13,823.00
1,160 mbh pt@34.0 Ea 14,900.00 1,428.00 171.00 16,499.00
1,600 mbh pt@36.0 Ea 18,700.00 1,512.00 181.00 20,393.00
2,480 mbh pt@44.0 Ea 26,700.00 1,848.00 221.00 28,769.00
2,920 mbh pt@48.0 Ea 30,600.00 2,016.00 241.00 32,857.00
3,770 mbh pt@54.0 Ea 47,300.00 2,269.00 272.00 49,841.00
4,650 mbh pt@56.0 Ea 58,500.00 2,353.00 282.00 61,135.00
5,810 mbh pt@68.0 Ea 73,800.00 2,857.00 342.00 76,999.00
6,680 mbh pt@75.0 Ea 87,900.00 3,151.00 377.00 91,428.00

Cast iron natural gas or propane fired hot water boilers


Includes standard controls, insulated jacket, setting in place, leveling, installation of loose shipped
accessories but no pipe connections, valves, thermometers, gauges, flue piping, fuel piping or circulator.
See connection costs in CSI 15-627, using small tools.
80 mbh gross output pe@12.0 Ea 1,540.00 520.90 7.68 2,068.58
320 mbh gross output pe@16.0 Ea 3,820.00 694.60 10.20 4,524.80
1,088 mbh gross output n7@32.0 Ea 11,800.00 1,499.00 19.20 13,318.20
1,400 mbh gross output n7@34.0 Ea 14,300.00 1,592.00 20.40 15,912.40
2,000 mbh gross output n7@40.0 Ea 19,900.00 1,873.00 24.00 21,797.00

Cast iron natural gas or propane fired hot water boilers


Includes standard controls, insulated jacket, setting in place, leveling, installation of loose shipped
accessories but no pipe connections, valves, thermometers, gauges, flue piping, fuel piping or circulator.
See connection costs in CSI 15-627, using a 20-ton hydraulic crane with 70’ boom and small tools.
3,264 mbh gross output pt@52.0 Ea 27,900.00 2,185.00 262.00 30,347.00
4,500 mbh gross output pt@56.0 Ea 46,300.00 2,353.00 282.00 48,935.00
6,100 mbh gross output pt@70.0 Ea 64,700.00 2,941.00 352.00 67,993.00
6,970 mbh gross output pt@75.0 Ea 73,000.00 3,151.00 377.00 76,528.00

CSI 15-627, Boiler connection

Boiler connection - Residential hot water boiler, screwed fittings


Includes valves, pipe and fittings to connect boiler to distribution system. Based on typical residential
layout, using small tools.
1-1/4" connection n7@2.00 Ea 281.00 93.66 1.20 375.86
1-1/2" connection n7@2.25 Ea 328.00 105.40 1.35 434.75
2" connection n7@2.50 Ea 375.00 117.10 1.50 493.60

Boiler connection - Commercial steam boiler, screwed fittings


Includes schedule 40 threaded and coupled pipe with malleable fittings, water feed and pressure relief
(drains). Based on Mechanical Contractors Association layout with 5' run from boiler to distribution
system, using small tools.
1-1/4" connection ne@16.0 Ea 1,600.00 836.80 9.12 2,445.92
1-1/2" connection ne@17.3 Ea 1,670.00 904.80 9.86 2,584.66
2" connection ne@18.5 Ea 1,990.00 967.60 10.50 2,968.10

Boiler connection - Commercial steam boiler, butt weld fittings


Includes schedule 40 buttweld steel pipe with carbon steel fittings, water feed and pressure relief
(drains), pipe insulation, valves, gauges, vents and thermometers. Based on Mechanical Contractors
Association layout with 5' run from boiler to distribution system, using a 300-amp skid-mounted welder
and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 626 (part 2)

2-1/2" supply pa@34.0 Ea 3,530.00 1,592.00 61.20 5,183.20


3" supply pa@38.0 Ea 3,720.00 1,780.00 68.40 5,568.40
4" supply pa@43.0 Ea 4,290.00 2,014.00 77.40 6,381.40
6" supply pa@53.0 Ea 5,890.00 2,482.00 95.40 8,467.40
8" supply pa@62.0 Ea 7,600.00 2,903.00 112.00 10,615.00
10" supply pa@70.0 Ea 10,400.00 3,278.00 126.00 13,804.00
12" supply pa@82.0 Ea 13,100.00 3,840.00 148.00 17,088.00

Boiler connection - Commercial hot water boiler, buttweld fittings


Includes schedule 40 buttweld steel pipe with carbon steel fittings, water feed and pressure relief
(drains), pipe insulation, valves, gauges, vents and thermometers. Based on Mechanical Contractors
Association layout with 5' run from boiler to distribution system, using a 300-amp skid-mounted welder
and small tools.
2-1/2" supply pa@18.0 Ea 2,180.00 842.90 32.40 3,055.30
3" supply pa@20.5 Ea 2,560.00 960.00 36.90 3,556.90
4" supply pa@26.0 Ea 3,720.00 1,218.00 46.80 4,984.80
6" supply pa@32.0 Ea 5,420.00 1,499.00 57.60 6,976.60
8" supply pa@39.5 Ea 7,260.00 1,850.00 71.10 9,181.10
10" supply pa@48.0 Ea 10,400.00 2,248.00 86.40 12,734.40
2015 Heavy Construction Estimator, All Rights Reserved Page 627

12" supply pa@54.0 Ea 12,800.00 2,529.00 97.20 15,426.20

CSI 15-639, Boiler accessories

Compression tanks
ASME steel non-insulated tanks with gauge glass tappings, 125 PSI, 240 degrees Fahrenheit, sized by
capacity, diameter and height. Includes the cost of hanging the tank but no pipe connection, using
small tools.
15 gallons, 13" x 34-1/2" n8@1.00 Ea 595.00 50.89 0.60 646.49
24 gallons, 13" x 51" n8@1.50 Ea 603.00 76.34 0.90 680.24
30 gallons, 13" x 61-1/2" n8@2.00 Ea 675.00 101.80 1.20 778.00
40 gallons, 16-1/4" x 53" n8@2.50 Ea 753.00 127.20 1.50 881.70
60 gallons, 16-1/4" x 76-1/2" n8@2.94 Ea 910.00 149.60 1.76 1,061.36
80 gallons, 20-1/4" x 68" n8@3.23 Ea 946.00 164.40 1.94 1,112.34
100 gallons, 20-1/4" x 82" n8@3.51 Ea 1,220.00 178.60 2.11 1,400.71
120 gallons, 24-1/4" x 71-1/2" n8@3.77 Ea 1,330.00 191.90 2.26 1,524.16
144 gallons, 24-1/4" x 83-1/2" n8@4.26 Ea 1,910.00 216.80 2.56 2,129.36
180 gallons, 30" x 60" n8@4.88 Ea 2,220.00 248.30 2.93 2,471.23
202 gallons, 30" x 72" n8@5.41 Ea 2,220.00 275.30 3.25 2,498.55
230 gallons, 30" x 84" n8@5.88 Ea 2,600.00 299.20 3.53 2,902.73
280 gallons, 30" x 96" n8@6.45 Ea 5,560.00 328.20 3.87 5,892.07
306 gallons, 30" x 108" n8@6.90 Ea 6,110.00 351.10 4.14 6,465.24
340 gallons, 36" x 84" n8@7.41 Ea 6,910.00 377.10 4.45 7,291.55
550 gallons, 36" x 96" n8@8.70 Ea 17,000.00 442.70 5.22 17,447.92

Compression tank air connections


Includes valves, pipe and fittings needed to connect tank to distribution system. Based on common
designs and layouts, using small tools.
For 15 to 40 gallon tanks n6@2.00 Ea 183.00 101.80 1.20 286.00
For 60 to 100 gallon tanks n6@4.00 Ea 402.00 203.60 2.40 608.00
For 120 gallon tanks and larger n6@8.00 Ea 691.00 407.10 4.80 1,102.90

Air separator connection, screwed fittings


Includes valves, pipe and fittings to connect separator to distribution system. Based on normal layout
and configuration, using small tools.
1-1/4" connection n6@2.00 Ea 281.00 101.80 1.20 384.00
1-1/2" connection n6@2.00 Ea 306.00 101.80 1.20 409.00
2" connection n6@2.50 Ea 402.00 127.20 1.50 530.70

Air separator connection, flanged


Includes valves, pipe and fittings to connect separator to distribution system. Based on normal layout
and configuration, using small tools.
2-1/2" connection n6@8.00 Ea 643.00 407.10 4.80 1,054.90
3" connection n6@8.50 Ea 764.00 432.60 5.10 1,201.70
4" connection n6@10.0 Ea 965.00 508.90 6.00 1,479.90
6" connection n6@14.0 Ea 1,210.00 712.50 8.40 1,930.90
8" connection n6@14.0 Ea 1,570.00 712.50 8.40 2,290.90
10" connection n6@16.0 Ea 2,250.00 814.20 9.60 3,073.80
12" connection n6@22.0 Ea 3,220.00 1,120.00 13.20 4,353.20
2015 Heavy Construction Estimator, All Rights Reserved Page 628

Rolairtrol type air separators


Priced by capacity in gallons per minute (GPM) and by boiler connection sizes and types. Includes
hanging separator but no connection, using small tools.
56 GPM,
2" inlet and outlet, screwed n6@2.50 Ea 675.00 127.20 1.50 803.70
90 GPM, 2-1/2" inlet and outlet,
flanged n6@2.50 Ea 733.00 127.20 1.50 861.70
170 GPM,
3" inlet and outlet, flanged n6@3.00 Ea 962.00 152.70 1.80 1,116.50
300 GPM,
4" inlet and outlet, flanged n7@3.50 Ea 1,430.00 163.90 2.10 1,596.00
500 GPM,
6" inlet and outlet, flanged pe@4.75 Ea 1,880.00 206.20 3.04 2,089.24
700 GPM,
6" inlet and outlet, flanged pe@4.75 Ea 2,440.00 206.20 3.04 2,649.24
1300 GPM,
8" inlet and outlet, flanged pe@6.00 Ea 3,280.00 260.50 3.84 3,544.34
2000 GPM, 10" inlet and outlet,
flanged pe@6.00 Ea 4,580.00 260.50 3.84 4,844.34
2750 GPM, 12" inlet and outlet,
flanged pe@12.0 Ea 5,930.00 520.90 7.68 6,458.58

CSI 15-655, Refrigerant compressors

Reciprocating open compressors, R-12 refrigeration


Includes reversible oil pump and automatic pressure regulator. Excludes muffler, vibration isolators,
crank case oil heaters, couplings and flywheel. Labor includes leveling and bolt-up. Add the cost of
piping and electrical connection, start-up and adjustment, using small tools.
5 ton pe@16.0 Ea 7,140.00 694.60 10.20 7,844.80
10 ton pe@18.0 Ea 9,280.00 781.40 11.50 10,072.90
15 ton pe@22.0 Ea 9,280.00 955.00 14.10 10,249.10
20 ton pe@24.0 Ea 11,800.00 1,042.00 15.40 12,857.40
25 ton pe@24.0 Ea 11,800.00 1,042.00 15.40 12,857.40
30 ton pe@28.0 Ea 11,800.00 1,215.00 17.90 13,032.90
50 ton pe@28.0 Ea 11,400.00 1,215.00 17.90 12,632.90

Reciprocating open compressors, R-12 refrigeration


Includes reversible oil pump and automatic pressure regulator. Excludes muffler, vibration isolators,
crank case oil heaters, couplings and flywheel. Labor includes leveling and bolt-up. Add the cost of
piping and electrical connection, start-up and adjustment, using a 20-ton hydraulic crane with 70’ boom
and small tools.
100 ton pm@36.0 Ea 15,200.00 1,580.00 146.00 16,926.00
150 ton pm@40.0 Ea 26,600.00 1,756.00 162.00 28,518.00

Reciprocating open compressors, R-22 refrigerant


Includes reversible oil pump and automatic pressure regulator. Excludes muffler, vibration isolators,
crank case oil heaters, couplings and flywheel. Labor includes leveling and bolt-up. Add the cost of
piping and electrical connection, start-up and adjustment, using small tools.
5 ton pe@16.0 Ea 719.00 694.60 10.20 1,423.80
10 ton pe@18.0 Ea 7,480.00 781.40 11.50 8,272.90
15 ton pe@22.0 Ea 7,480.00 955.00 14.10 8,449.10
20 ton pe@24.0 Ea 9,280.00 1,042.00 15.40 10,337.40
25 ton pe@24.0 Ea 9,280.00 1,042.00 15.40 10,337.40
30 ton pe@28.0 Ea 9,280.00 1,215.00 17.90 10,512.90
50 ton pe@28.0 Ea 8,340.00 1,215.00 17.90 9,572.90
100 ton pe@36.0 Ea 11,900.00 1,563.00 23.00 13,486.00
2015 Heavy Construction Estimator, All Rights Reserved Page 628 (part 2)

Reciprocating open compressors, R-22 refrigerant


Includes reversible oil pump and automatic pressure regulator. Excludes muffler, vibration isolators,
crank case oil heaters, couplings and flywheel. Labor includes leveling and bolt-up. Add the cost of
piping and electrical connection, start-up and adjustment, using a 20-ton hydraulic crane with 70’ boom
and small tools.
150 ton pm@40.0 Ea 16,000.00 1,756.00 162.00 17,918.00
200 ton pm@42.0 Ea 18,400.00 1,843.00 170.00 20,413.00
250 ton pm@46.0 Ea 23,000.00 2,019.00 186.00 25,205.00
Add for direct drive couplings ---@--- % 5.00 -- -- --
Add for belt drive couplings ---@--- % 5.00 -- -- --
Add for flywheel ---@--- % 3.00 -- -- --
Add for muffler ---@--- % 1.00 -- -- --

Reciprocating hermetic type compressors, R-12 refrigerant


Includes automatic reversible oil pump, suction and discharge shut-off valves, device for loading and
unloading compressor cylinders and crank case oil heater. Excludes mufflers and vibration isolators.
Labor includes leveling and bolt-up. Add the cost of piping and electrical connection, start-up and
adjustment, using small tools.
5 ton pe@8.00 Ea 671.00 347.30 5.12 1,023.42
10 ton pe@10.0 Ea 1,440.00 434.10 6.40 1,880.50
2015 Heavy Construction Estimator, All Rights Reserved Page 629

15 ton pe@12.0 Ea 10,700.00 520.90 7.68 11,228.58


20 ton pe@14.0 Ea 11,400.00 607.70 8.96 12,016.66
25 ton pe@15.6 Ea 13,900.00 677.20 9.98 14,587.18
30 ton pe@17.5 Ea 19,200.00 759.70 11.20 19,970.90

Reciprocating hermetic type compressors, R-22 refrigerant


Includes automatic reversible oil pump, suction and discharge shut-off valves, device for loading and
unloading compressor cylinders and crank case oil heater. Excludes mufflers and vibration isolators.
Labor includes leveling and bolt-up. Add the cost of pipe and electrical connection, start-up and
adjustment, using small tools.
5 ton pe@8.00 Ea 519.00 347.30 5.12 871.42
10 ton pe@10.0 Ea 1,110.00 434.10 6.40 1,550.50
15 ton pe@12.2 Ea 7,830.00 529.60 7.81 8,367.41
20 ton pe@14.0 Ea 9,280.00 607.70 8.96 9,896.66
25 ton pe@15.6 Ea 11,300.00 677.20 9.98 11,987.18
30 ton pe@17.5 Ea 15,200.00 759.70 11.20 15,970.90
35 ton pe@20.0 Ea 16,500.00 868.20 12.80 17,381.00
50 ton pe@23.3 Ea 18,700.00 1,011.00 14.90 19,725.90
100 ton pe@30.1 Ea 29,300.00 1,307.00 19.30 30,626.30
Add for muffler ---@--- % 4.50 -- -- --

CSI 15-661, Air cooled condensing units

Air cooled refrigeration compressors


With compressor, condenser, fan and motor. Add the cost of pipe and electrical connection, start-up
and adjustment, using small tools.
5 ton n7@10.5 Ea 1,170.00 491.70 6.30 1,668.00
7.5 ton n7@10.5 Ea 1,930.00 491.70 6.30 2,428.00
10 ton n7@10.5 Ea 2,580.00 491.70 6.30 3,078.00
15 ton n7@12.0 Ea 4,100.00 562.00 7.20 4,669.20
20 ton n7@16.0 Ea 5,320.00 749.30 9.60 6,078.90
25 ton n7@16.0 Ea 5,940.00 749.30 9.60 6,698.90

Air cooled refrigeration compressors


With compressor, condenser, fan and motor. Add the cost of pipe and electrical connection, start-up
and adjustment, using a 20-ton hydraulic crane with 70’ boom and small tools.
40 ton pc@20.0 Ea 6,660.00 915.80 116.00 7,691.80
50 ton pc@26.0 Ea 7,680.00 1,191.00 151.00 9,022.00
75 ton pc@32.0 Ea 10,100.00 1,465.00 186.00 11,751.00

Air cooled refrigeration compressors


With compressor, condenser, fan, motor, and standard controls, using small tools.
1.5 ton ny@4.00 Ea 508.00 198.20 2.40 708.60
2 ton ny@4.00 Ea 534.00 198.20 2.40 734.60
2.5 ton ny@4.00 Ea 648.00 198.20 2.40 848.60
3 ton ny@4.00 Ea 733.00 198.20 2.40 933.60
3.5 ton ny@4.00 Ea 869.00 198.20 2.40 1,069.60
4 ton ny@4.00 Ea 1,140.00 198.20 2.40 1,340.60

High efficiency condensing units


Includes setting and levelings. Add the cost of pipe and electrical connection, start-up, using small
tools.
2 ton nz@2.15 Ea 999.00 98.10 1.25 1,098.35
2.5 ton nz@2.67 Ea 1,030.00 121.80 1.55 1,153.35
3 ton nz@3.23 Ea 1,320.00 147.40 1.87 1,469.27
4 ton nz@3.77 Ea 1,900.00 172.00 2.19 2,074.19
5 ton nz@4.87 Ea 2,150.00 222.20 2.82 2,375.02
2015 Heavy Construction Estimator, All Rights Reserved Page 629 (part 2)

Evaporator coils with case


Add the cost of condensate drain, using small tools.
2 ton nz@1.43 Ea 322.00 65.25 0.83 388.08
2.5 ton nz@1.78 Ea 369.00 81.22 1.03 451.25
3 ton nz@2.15 Ea 379.00 98.10 1.25 478.35
4 ton nz@2.51 Ea 443.00 114.50 1.46 558.96
5 ton nz@3.25 Ea 539.00 148.30 1.89 689.19
2015 Heavy Construction Estimator, All Rights Reserved Page 630

Refrigerant line set, 25'


Includes typical line installation, purge, charge and test. Add the cost of refrigerant, using small tools.
2 ton nz@1.07 Ea 159.00 48.82 0.62 208.44
2.5 to 3 ton nz@1.61 Ea 193.00 73.46 0.93 267.39
4 to 5 ton nz@2.46 Ea 242.00 112.20 1.43 355.63

Refrigeration compressors
Includes leveling and bolt-up. Add the cost of pipe and electrical connection, startup and adjustment,
using small tools.
5 ton, low temperature n7@10.5 Ea 7,120.00 491.70 6.30 7,618.00
5 ton, medium temperature n7@10.5 Ea 8,140.00 491.70 6.30 8,638.00
7-1/2 ton, medium temperature n7@12.5 Ea 8,760.00 585.40 7.50 9,352.90

Reciprocating compressor units


Semi-hermetic, auto reverse oil pump, suction and discharge valves, low temperature. Add the cost of
pipe and electrical connection, start-up and adjustment, using a 20-ton hydraulic crane with 70’ boom.
10 ton, low temperature pc@10.0 Ea 2,460.00 457.90 58.20 2,976.10
15 ton, low temperature pc@12.2 Ea 3,020.00 558.60 71.00 3,649.60
35 ton, medium temperature pc@20.0 Ea 9,380.00 915.80 116.00 10,411.80
40 ton, medium temperature pc@21.5 Ea 12,500.00 984.50 125.00 13,609.50

CSI 15-662, Water cooled condensing units

Water cooled reciprocating condensers


With compressor, condenser and motor. Add the cost of pipe and electrical connection, start-up and
adjustment, using small tools.
5 ton n7@10.0 Ea 2,270.00 468.30 6.00 2,744.30
10 ton n7@10.0 Ea 3,460.00 468.30 6.00 3,934.30
15 ton n7@12.0 Ea 4,000.00 562.00 7.20 4,569.20
20 ton n7@16.0 Ea 4,980.00 749.30 9.60 5,738.90

Water cooled condensers


With compressor, condenser and motor. Add the cost of pipe and electrical connection, start-up and
adjustment, using a 20-ton hydraulic crane with 70’ boom and small tools.
30 ton pc@22.0 Ea 5,310.00 1,007.00 128.00 6,445.00
60 ton pc@28.0 Ea 11,800.00 1,282.00 163.00 13,245.00
80 ton pc@32.0 Ea 14,700.00 1,465.00 186.00 16,351.00
120 ton pc@36.0 Ea 20,800.00 1,648.00 210.00 22,658.00

CSI 15-669, Evaporative coolers

Side and bottom draft evaporative coolers


Two speed, rating in cubic feet per minute (CFM), using small tools.
3,000 CFM, 1/3 HP n7@5.00 Ea 407.00 234.20 3.00 644.20
4,000 CFM, 1/3 HP n7@6.06 Ea 514.00 283.80 3.64 801.44
5,500 CFM, 1/2 HP n7@6.25 Ea 798.00 292.70 3.75 1,094.45
6,500 CFM, 1/2 HP n7@7.14 Ea 1,120.00 334.40 4.28 1,458.68
8,000 CFM, 1-1/2 HP n7@8.70 Ea 1,230.00 407.40 5.22 1,642.62
8,000 CFM, 1-1/2 HP, 3 phase n7@10.0 Ea 1,670.00 468.30 6.00 2,144.30
9,000 CFM, 2 HP, 3 phase n7@10.3 Ea 1,840.00 482.30 6.18 2,328.48

CSI 15-670, Chillers

Direct expansion liquid cooled chillers


Shell and tube type for built-up systems. Chilled water temperature rise is 12 degrees Fahrenheit.
Based on R-12 refrigerant. Increase capacities by 46% if R-22 refrigerant is used. By rated cooling
capacity in tons. Add the cost of pipe and electrical connection, start-up and adjustment, using small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 630 (part 2)

1 ton pe@2.00 Ea 737.00 86.82 1.28 825.10


5 ton pe@6.00 Ea 10,200.00 260.50 3.84 10,464.34
10 ton pe@8.00 Ea 18,700.00 347.30 5.12 19,052.42
15 ton pe@16.0 Ea 22,300.00 694.60 10.20 23,004.80
20 ton pe@18.0 Ea 26,600.00 781.40 11.50 27,392.90

Direct expansion liquid cooled chillers


Shell and tube type for built-up systems. Chilled water temperature rise is 12 degrees Fahrenheit.
Based on R-12 refrigerant. Increase capacities by 46% if R-22 refrigerant is used. By rated cooling
capacity in tons, using a 20-ton hydraulic crane with 70’ boom and small tools.
25 ton pn@20.0 Ea 29,400.00 872.00 121.00 30,393.00
30 ton pn@22.0 Ea 30,100.00 959.20 133.00 31,192.20
50 ton pn@26.0 Ea 34,500.00 1,134.00 158.00 35,792.00
100 ton pn@32.0 Ea 55,300.00 1,395.00 194.00 56,889.00
2015 Heavy Construction Estimator, All Rights Reserved Page 631

CSI 15-671, Reciprocating chillers

Water cooled reciprocating chillers


Packaged electric unit including water cooler and integral heat exchanger. By rated by cooling capacity
in tons. Add the cost of pipe and electrical connection, start-up and adjustment, using a 300-amp skid
mounted welder and small tools.
2 ton pi@6.00 Ea 2,350.00 266.40 8.40 2,624.80
10 ton pi@8.00 Ea 9,790.00 355.20 11.20 10,156.40
15 ton pi@16.0 Ea 13,700.00 710.40 22.40 14,432.80

Water cooled reciprocating chillers


Packaged electric unit including water cooler and integral heat exchanger. By rated by cooling capacity
in tons. Add the cost of pipe and electrical connection, start-up and adjustment, using a 20-ton
hydraulic crane with 70’ boom and small tools.
20 ton pj@18.0 Ea 17,600.00 792.90 53.50 18,446.40
30 ton pj@22.0 Ea 24,500.00 969.10 65.30 25,534.40
40 ton pj@20.0 Ea 28,700.00 881.00 59.40 29,640.40
60 ton pj@30.0 Ea 39,200.00 1,322.00 89.10 40,611.10
80 ton pj@32.0 Ea 49,600.00 1,410.00 95.00 51,105.00
100 ton pj@36.0 Ea 58,700.00 1,586.00 107.00 60,393.00
120 ton pj@36.0 Ea 66,600.00 1,586.00 107.00 68,293.00
160 ton pj@40.0 Ea 83,500.00 1,762.00 119.00 85,381.00
225 ton pj@44.0 Ea 110,000.00 1,938.00 131.00112,069.00
250 ton pj@46.0 Ea 117,000.00 2,026.00 137.00119,163.00

CSI 15-672, Air cooled chillers

Reciprocating air cooled chillers


Packaged electric unit with integral heat exchanger. By rated cooling capacity in tons. Add the cost of
pipe and electrical connection, using a 20-ton hydraulic crane with 70’ boom and small tools.
20 ton pj@18.0 Ea 17,000.00 792.90 53.50 17,846.40
30 ton pj@20.0 Ea 23,500.00 881.00 59.40 24,440.40
40 ton pj@22.0 Ea 29,100.00 969.10 65.30 30,134.40
55 ton pj@30.0 Ea 36,500.00 1,322.00 89.10 37,911.10
65 ton pj@30.0 Ea 43,100.00 1,322.00 89.10 44,511.10
75 ton pj@32.0 Ea 47,000.00 1,410.00 95.00 48,505.00
80 ton pj@32.0 Ea 50,100.00 1,410.00 95.00 51,605.00
90 ton pj@36.0 Ea 52,200.00 1,586.00 107.00 53,893.00
95 ton pj@36.0 Ea 54,200.00 1,586.00 107.00 55,893.00
100 ton pj@36.0 Ea 56,100.00 1,586.00 107.00 57,793.00
105 ton pj@36.0 Ea 58,100.00 1,586.00 107.00 59,793.00

Centrifugal air cooled chillers


460 volt, ambient operation with starter and insulated evaporator, using a 20-ton hydraulic crane with 70’
boom, a 300-amp skid mounted welder and small tools.
130 ton pk@36.0 Ea 102,000.00 1,586.00 132.00103,718.00
160 ton pk@42.0 Ea 120,000.00 1,850.00 155.00122,005.00
180 ton pk@44.0 Ea 129,000.00 1,938.00 162.00131,100.00
210 ton pk@44.0 Ea 144,000.00 1,938.00 162.00146,100.00
270 ton pk@48.0 Ea 170,000.00 2,114.00 177.00172,291.00
320 ton pk@56.0 Ea 191,000.00 2,467.00 206.00193,673.00

CSI 15-674, Centrifugal water cooled chillers

Centrifugal water cooled chillers


Packaged unit with integral H-XS, controls, 460V motor. Includes accessories and start-up. Excludes
motor starters. By rated cooling capacity in tons. Add the cost of pipe and electrical connection, using
a 20-ton hydraulic crane with 70’ boom, a 300-amp skid mounted welder and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 631 (part 2)

80 ton pk@40.0 Ea 70,500.00 1,762.00 147.00 72,409.00


100 ton pk@40.0 Ea 81,600.00 1,762.00 147.00 83,509.00
150 ton pk@42.0 Ea 115,000.00 1,850.00 155.00117,005.00
200 ton pk@46.0 Ea 150,000.00 2,026.00 169.00152,195.00
250 ton pk@48.0 Ea 170,000.00 2,114.00 177.00172,291.00
300 ton pk@52.0 Ea 196,000.00 2,291.00 191.00198,482.00
350 ton pk@58.0 Ea 222,000.00 2,555.00 213.00224,768.00
400 ton pk@64.0 Ea 248,000.00 2,819.00 236.00251,055.00
2015 Heavy Construction Estimator, All Rights Reserved Page 632

500 ton pk@70.0 Ea 300,000.00 3,084.00 258.00303,342.00


600 ton pk@80.0 Ea 352,000.00 3,524.00 294.00355,818.00
800 ton pk@90.0 Ea 418,000.00 3,965.00 331.00422,296.00

Centrifugal water cooled chillers


Packaged unit with integral H-XS, controls, 460V motor. Includes accessories and start-up. Excludes
motor starters. By rated cooling capacity in tons. Add the cost of pipe and electrical connection, using
a 40-ton hydraulic crane with 84’ boom, a 300-amp skid mounted welder and small tools.
1,000 ton pr@110. Ea 483,000.00 4,728.00 534.00488,262.00
2,000 ton pr@140. Ea 900,000.00 6,017.00 679.00906,696.00
2,500 ton pr@160. Ea 979,000.00 6,877.00 776.00986,653.00

Connection assembly for centrifugal water cooled chillers


Includes schedule 40 buttweld pipe with carbon steel fittings, pipe insulation, valves, thermometers and
gauges. Based on a 5' run to the distribution system, using a 300-amp skid mounted welder and small
tools.
2-1/2" chilled water connection pa@36.0 Ea 1,960.00 1,686.00 64.80 3,710.80
3" chilled water connection pa@38.0 Ea 2,150.00 1,780.00 68.40 3,998.40
4" chilled water connection pa@51.0 Ea 2,870.00 2,388.00 91.80 5,349.80
6" chilled water connection pa@65.0 Ea 4,800.00 3,044.00 117.00 7,961.00
8" chilled water connection pa@77.0 Ea 7,280.00 3,606.00 139.00 11,025.00
10" chilled water connection pa@100. Ea 13,400.00 4,683.00 180.00 18,263.00
12" chilled water connection pa@125. Ea 15,500.00 5,854.00 225.00 21,579.00

CSI 15-675, Absorption chillers

Absorption chillers
Add the cost of pipe and electrical connection, start-up and adjustment, using a 40-ton hydraulic crane
with 84’ boom, a 300-amp skid mounted welder and small tools.
100 ton pr@36.0 Ea 72,400.00 1,547.00 175.00 74,122.00
150 ton pr@42.0 Ea 93,400.00 1,805.00 204.00 95,409.00
200 ton pr@46.0 Ea 104,000.00 1,977.00 223.00106,200.00
250 ton pr@48.0 Ea 117,000.00 2,063.00 233.00119,296.00
350 ton pr@58.0 Ea 143,000.00 2,493.00 281.00145,774.00
750 ton pr@85.0 Ea 255,000.00 3,653.00 412.00259,065.00
850 ton pr@90.0 Ea 274,000.00 3,868.00 437.00278,305.00
950 ton pr@100. Ea 294,000.00 4,298.00 485.00298,783.00
1125 ton pr@110. Ea 338,000.00 4,728.00 534.00343,262.00

CSI 15-680, Propeller type cooling towers

Propeller cooling towers


Packaged axial unit, single flow with pump, includes 20' piping and motor. Add the cost of motor starter.
Based on incoming water at 95 degrees F, outgoing water at 85 degrees F. Flow of 3 GPM per ton of
draft. By rated by cooling capacity in tons, using a 300-amp skid mounted welder and small tools.
10 ton pi@13.9 Ea 3,670.00 617.20 19.50 4,306.70
20 ton pi@17.8 Ea 4,430.00 790.30 24.90 5,245.20
30 ton pi@24.6 Ea 5,370.00 1,092.00 34.40 6,496.40
40 ton pi@29.1 Ea 5,970.00 1,292.00 40.70 7,302.70
2015 Heavy Construction Estimator, All Rights Reserved Page 633

50 ton pi@35.9 Ea 7,160.00 1,594.00 50.30 8,804.30


60 ton pi@37.7 Ea 8,150.00 1,674.00 52.80 9,876.80
75 ton pi@40.0 Ea 9,720.00 1,776.00 56.00 11,552.00

Propeller cooling towers


Packaged axial unit, single flow with pump, includes 20' piping and motor. Add the cost of motor starter.
Based on incoming water at 95 degrees F, outgoing water at 85 degrees F. Flow of 3 GPM per ton of
draft. By rated by cooling capacity in tons, using a 20-ton hydraulic crane with 70’ boom, a 300-amp
skid mounted welder and small tools.
100 ton pk@51.7 Ea 11,900.00 2,277.00 190.00 14,367.00
120 ton pk@60.0 Ea 13,000.00 2,643.00 221.00 15,864.00

Packaged double flow propeller cooling tower with pump


Includes 20’ piping and motor but no motor starter. Based on 3 gallons per minute per ton draft, using a
20-ton hydraulic crane with 70’ boom, a 300-amp skid mounted welder and small tools.
100 ton pk@40.0 Ea 11,900.00 1,762.00 147.00 13,809.00
200 ton pk@48.0 Ea 20,500.00 2,114.00 177.00 22,791.00
300 ton pk@60.0 Ea 30,500.00 2,643.00 221.00 33,364.00
400 ton pk@71.4 Ea 35,000.00 3,145.00 263.00 38,408.00
500 ton pk@80.0 Ea 45,200.00 3,524.00 294.00 49,018.00
700 ton pk@90.7 Ea 60,500.00 3,995.00 334.00 64,829.00
900 ton pk@98.8 Ea 73,300.00 4,352.00 364.00 78,016.00

CSI 15-681, Centrifugal cooling towers

Centrifugal type cooling towers


Including pump, 20’ piping and motor but no motor starter. Design temperature 95 degrees F in and 85
degrees F out. By rated cooling capacity in tons, using a 20-ton hydraulic crane with 70’ boom, a
300-amp skid mounted welder and small tools.
50 ton pk@40.0 Ea 7,590.00 1,762.00 147.00 9,499.00
75 ton pk@48.0 Ea 10,700.00 2,114.00 177.00 12,991.00
100 ton pk@56.0 Ea 13,200.00 2,467.00 206.00 15,873.00
200 ton pk@68.5 Ea 22,200.00 3,017.00 252.00 25,469.00
300 ton pk@74.6 Ea 30,700.00 3,286.00 275.00 34,261.00
400 ton pk@84.0 Ea 38,400.00 3,700.00 309.00 42,409.00
600 ton pk@95.9 Ea 59,700.00 4,224.00 353.00 64,277.00

Centrifugal type cooling towers


Including pump, 20’ piping and motor but no motor starter. Design temperature 95 degrees F in and 85
degrees F out. By rated cooling capacity in tons, using a 40-ton hydraulic crane with 84’ boom, a
300-amp skid mounted welder and small tools.
800 ton pq@111. Ea 71,600.00 4,949.00 855.00 77,404.00
1000 ton pq@118. Ea 88,700.00 5,262.00 909.00 94,871.00

CSI 15-695, Condensers

Air cooled condensers


Belt driven propeller fan with vertical copper coils. Based on 20 degree F difference between input and
output. Excludes motor starter. By rated cooling capacity in tons, using small tools.
2 ton pe@4.00 Ea 2,290.00 173.60 2.56 2,466.16
3 ton pe@5.00 Ea 2,550.00 217.10 3.20 2,770.30
4 ton pe@5.96 Ea 3,150.00 258.70 3.81 3,412.51
5 ton pe@7.00 Ea 3,150.00 303.90 4.48 3,458.38
6 ton pe@8.00 Ea 3,150.00 347.30 5.12 3,502.42
7-1/2 ton pe@9.03 Ea 3,150.00 392.00 5.78 3,547.78
10 ton pe@10.0 Ea 4,360.00 434.10 6.40 4,800.50
12-1/2 ton pe@12.2 Ea 4,360.00 529.60 7.81 4,897.41
15 ton pe@14.0 Ea 6,690.00 607.70 8.96 7,306.66
2015 Heavy Construction Estimator, All Rights Reserved Page 633 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 634

25 ton pe@17.5 Ea 11,300.00 759.70 11.20 12,070.90

Air cooled condensers


Belt driven propeller fan with vertical copper coils. Based on 20 degree F difference between input and
output. Excludes motor starter. By rated cooling capacity in tons, using a 20-ton hydraulic crane with
70’ boom and small tools.
50 ton pn@24.0 Ea 21,000.00 1,046.00 145.00 22,191.00
100 ton pn@36.0 Ea 40,800.00 1,570.00 218.00 42,588.00
150 ton pn@43.9 Ea 44,800.00 1,914.00 266.00 46,980.00
200 ton pn@54.6 Ea 57,700.00 2,381.00 331.00 60,412.00
250 ton pn@72.0 Ea 99,500.00 3,139.00 436.00103,075.00
300 ton pn@83.6 Ea 103,000.00 3,645.00 507.00107,152.00
Add for liquid receiver ---@--- % 4.00 -- -- --

Water cooled condensers


Shell and tube type. Includes relief device, liquid line shut-off valve and angle valve with pressure
connection for water regulating valve, using small tools.
15 ton pe@5.96 Ea 7,210.00 258.70 3.81 7,472.51
20 ton pe@8.00 Ea 9,350.00 347.30 5.12 9,702.42
25 ton pe@10.0 Ea 12,300.00 434.10 6.40 12,740.50
30 ton pe@12.2 Ea 12,800.00 529.60 7.81 13,337.41
40 ton pe@15.6 Ea 15,200.00 677.20 9.98 15,887.18
50 ton pe@17.5 Ea 17,300.00 759.70 11.20 18,070.90
60 ton pe@20.0 Ea 21,200.00 868.20 12.80 22,081.00
75 ton pe@23.3 Ea 26,300.00 1,011.00 14.90 27,325.90
100 ton pe@30.1 Ea 28,500.00 1,307.00 19.30 29,826.30
150 ton pe@35.9 Ea 41,800.00 1,558.00 23.00 43,381.00
Add for saddle legs ---@--- % 3.20 -- -- --

CSI 15-699, Refrigeration specialties

Sight glass, moisture and liquid indicator, solder connections


Using small tools.
1/4 outside diameter n9@.310 Ea 16.40 14.52 0.19 31.11
3/8 outside diameter n9@.370 Ea 16.70 17.33 0.22 34.25
1/2 outside diameter n9@.430 Ea 20.90 20.14 0.26 41.30
5/8 outside diameter n9@.500 Ea 21.30 23.42 0.30 45.02
7/8 outside diameter n9@.630 Ea 28.90 29.50 0.38 58.78
1-1/8 outside diameter n9@.770 Ea 30.40 36.06 0.46 66.92
1-3/8 outside diameter n9@.910 Ea 58.40 42.62 0.55 101.57
1-5/8 outside diameter n9@1.25 Ea 65.70 58.54 0.75 124.99
2-1/8 outside diameter n9@1.56 Ea 83.00 73.05 0.94 156.99

Filter dryers, solder connections - Replaceable core type


Using small tools.
1/2 outside diameter n9@.770 Ea 124.00 36.06 0.46 160.52
5/8 outside diameter n9@.910 Ea 124.00 42.62 0.55 167.17
7/8 outside diameter n9@1.25 Ea 167.00 58.54 0.75 226.29
1-1/8 outside diameter n9@1.67 Ea 195.00 78.21 1.00 274.21
1-3/8 outside diameter n9@2.00 Ea 177.00 93.66 1.20 271.86
1-5/8 outside diameter n9@2.50 Ea 207.00 117.10 1.50 325.60
2-1/8 outside diameter n9@3.33 Ea 377.00 155.90 2.00 534.90
2-5/8 outside diameter n9@4.00 Ea 739.00 187.30 2.40 928.70
3-1/8 outside diameter n9@5.00 Ea 807.00 234.20 3.00 1,044.20

Filter dryers, solder connections - Sealed in-line, replaceable core


Using small tools.
1/4", 3 cubic inches n9@.630 Ea 13.20 29.50 0.38 43.08
2015 Heavy Construction Estimator, All Rights Reserved Page 634 (part 2)

3/8", 5 cubic inches n9@.800 Ea 16.40 37.46 0.48 54.34


1/2", 9 cubic inches n9@1.00 Ea 20.10 46.83 0.60 67.53
1/2", 16 cubic inches n9@1.11 Ea 27.60 51.98 0.67 80.25
5/8", 16 cubic inches n9@1.25 Ea 28.30 58.54 0.75 87.59
5/8", 30 cubic inches n9@1.25 Ea 45.00 58.54 0.75 104.29
7/8", 30 cubic inches n9@1.43 Ea 48.30 66.97 0.86 116.13
7/8", 41 cubic inches n9@1.43 Ea 59.40 66.97 0.86 127.23
1-1/8", 60 cubic inches n9@1.67 Ea 71.00 78.21 1.00 150.21
2015 Heavy Construction Estimator, All Rights Reserved Page 635

P-traps, suction line, soldered


Using small tools.
5/8", outside diameter n9@.370 Ea 10.00 17.33 0.22 27.55
3/4", outside diameter n9@.430 Ea 14.30 20.14 0.26 34.70
7/8", outside diameter n9@.420 Ea 11.80 19.67 0.25 31.72
1-1/8", outside diameter n9@.560 Ea 16.60 26.22 0.34 43.16
1-3/8", outside diameter n9@.910 Ea 26.30 42.62 0.55 69.47
1-5/8", outside diameter n9@1.11 Ea 39.80 51.98 0.67 92.45
2-1/8", outside diameter n9@1.43 Ea 81.10 66.97 0.86 148.93

Thermostatic expansion valves


Sporlan TP-S, using small tools.
1/2 to 3 ton, 3/8" inside
x 5/8" outside diameter n9@.910 Ea 67.40 42.62 0.55 110.57
4 to 5 ton, 1/2" inside
x 7/8" outside diameter n9@1.25 Ea 81.20 58.54 0.75 140.49
6 to 8 ton, 5/8" inside
x 7/8" outside diameter n9@1.67 Ea 81.20 78.21 1.00 160.41
7 to 12 ton, 7/8" inside
x 1-1/8" outside diameter n9@2.00 Ea 124.00 93.66 1.20 218.86
15 to 20 ton, 7/8" inside
x 1-3/8" outside diameter n9@2.50 Ea 124.00 117.10 1.50 242.60

Vibration absorbers, packless, flex hose


using small tools.
1/4" outside diameter n9@.250 Ea 18.60 11.71 0.15 30.46
3/8" outside diameter n9@.310 Ea 19.60 14.52 0.19 34.31
1/2" outside diameter n9@.380 Ea 21.50 17.80 0.23 39.53
5/8" outside diameter n9@.450 Ea 22.40 21.07 0.27 43.74
3/4" outside diameter n9@.560 Ea 22.70 26.22 0.34 49.26
7/8" outside diameter n9@.630 Ea 27.80 29.50 0.38 57.68
1-1/8" outside diameter n9@.910 Ea 33.00 42.62 0.55 76.17
1-3/8" outside diameter n9@1.11 Ea 49.30 51.98 0.67 101.95
1-5/8" outside diameter n9@1.25 Ea 68.20 58.54 0.75 127.49
2-1/8" outside diameter n9@1.43 Ea 128.00 66.97 0.86 195.83
2-5/8" outside diameter n9@2.00 Ea 202.00 93.66 1.20 296.86
3-1/8" outside diameter n9@2.50 Ea 283.00 117.10 1.50 401.60

Refrigeration valves - Packless


Using small tools.
1/2" valve n6@.210 Ea 28.30 10.69 0.13 39.12
5/8" valve n6@.230 Ea 38.30 11.70 0.14 50.14
7/8" valve n6@.310 Ea 91.60 15.78 0.19 107.57

Refrigeration valves - Packed


Using small tools.
1-1/8" valve n6@.450 Ea 171.00 22.90 0.27 194.17
1-3/8" valve n6@.560 Ea 233.00 28.50 0.34 261.84
1-5/8" valve n6@.630 Ea 289.00 32.06 0.38 321.44
2-1/8" valve n6@.710 Ea 428.00 36.13 0.43 464.56
2-5/8" valve n8@2.00 Ea 640.00 101.80 1.20 743.00
3-1/8" valve n8@2.50 Ea 851.00 127.20 1.50 979.70
4-1/8" valve n8@3.33 Ea 1,230.00 169.50 2.00 1,401.50

Refrigeration valves - Check


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 635 (part 2)

5/8" valve n6@.230 Ea 30.70 11.70 0.14 42.54


7/8" valve n6@.310 Ea 147.00 15.78 0.19 162.97
1-1/8" valve n6@.450 Ea 169.00 22.90 0.27 192.17
1-3/8" valve n6@.560 Ea 231.00 28.50 0.34 259.84
1-5/8" valve n6@.630 Ea 313.00 32.06 0.38 345.44
2-1/8" valve n6@.710 Ea 484.00 36.13 0.43 520.56
2-5/8" valve n8@2.00 Ea 675.00 101.80 1.20 778.00
3-1/8" valve n8@2.50 Ea 911.00 127.20 1.50 1,039.70

Refrigeration valves - Solenoid valve, 24 volt coil


Using small tools.
1/2" valve n9@.430 Ea 100.00 20.14 0.26 120.40
5/8" valve n9@.500 Ea 103.00 23.42 0.30 126.72
3/4" valve n9@.560 Ea 125.00 26.22 0.34 151.56
7/8" valve n9@.630 Ea 125.00 29.50 0.38 154.88
1-1/8" valve n9@.770 Ea 180.00 36.06 0.46 216.52
1-3/8" valve n9@.910 Ea 301.00 42.62 0.55 344.17
2015 Heavy Construction Estimator, All Rights Reserved Page 636

1-5/8" valve n9@1.25 Ea 583.00 58.54 0.75 642.29


2-1/8" valve n9@1.67 Ea 583.00 78.21 1.00 662.21

Refrigerant suction line accumulator


Using small tools.
3/4" accumulator n9@.910 Ea 37.00 42.62 0.55 80.17
7/8" accumulator n9@1.25 Ea 74.80 58.54 0.75 134.09
1-1/8" accumulator n9@1.67 Ea 107.00 78.21 1.00 186.21
1-3/8" accumulator n9@2.00 Ea 135.00 93.66 1.20 229.86
1-5/8" accumulator n9@2.50 Ea 191.00 117.10 1.50 309.60
2-1/8" accumulator n9@3.33 Ea 232.00 155.90 2.00 389.90

Refrigerant chemicals
Glycol ethylene n6@.250 Gal 12.50 12.72 0.15 25.37

Refrigerant
R-12, 50 lb. cylinder,
dichlorodifluoromethane --@.000 Lb 9.41 -- -- 9.41
R-22, 50 lb. cylinder,
monochlorodifluoromethane --@.000 Lb 4.75 -- -- 4.75
R-502, 50 lb. cylinder --@.000 Lb 10.60 -- -- 10.60
R-11, 30 lb. cylinder,
trichlorominofluoromethane --@.000 Lb 9.49 -- -- 9.49
R-13, 30 lb. cylinder,
monochlorotrifluoromethane --@.000 Lb 69.20 -- -- 69.20
R-113, 200 lb. drum,
trichlorotrifluoroethane --@.000 Lb 106.00 -- -- 106.00
R-114, 150 lb. drum,
dichlorotetrafluoroethane --@.000 Lb 13.20 -- -- 13.20
R-12/152A, R-500, 30 lb. drum --@.000 Lb 11.20 -- -- 11.20

CSI 15-715, Steam specialties

Ric-Wil system steam pipe and casing


Based on schedule 40 pipe for 8" steam supply and schedule 80 pipe on 4" condensate return.
Including condensate return but no excavation. Units are custom fabricated (insulated) and costs will
vary with design specifications, using a 300-amp skid mounted welder and small tools.
1-1/4" and 1-1/2", 10"case ni@.190 LF 290.00 9.34 0.33 299.67
1-1/4" and 2", 10" case ni@.210 LF 338.00 10.33 0.37 348.70
1-1/2" and 3", 10" case ni@.250 LF 347.00 12.29 0.44 359.73
6" and 3", 15" case ni@.300 LF 526.00 14.75 0.53 541.28
4" and 8", 16-1/2" case ni@.350 LF 627.00 17.21 0.62 644.83

Steam supply or condensate return pipe only


Factory custom fabricated (insulated) to design specifications. Based on schedule steel 80 pipe. Single
pipe only. No excavation or backfill included, using a 300-amp skid mounted welder and small tools.
2", 8" case ni@.210 LF 121.00 10.33 0.37 131.70
2", 6" case ni@.210 LF 125.00 10.33 0.37 135.70
3", 8" case ni@.240 LF 140.00 11.80 0.42 152.22
4", 10" case ni@.280 LF 175.00 13.77 0.49 189.26
6", 11-1/2" case ni@.350 LF 196.00 17.21 0.62 213.83

CSI 15-720, Condensate pump and receiver sets

Simplex pump and motor


Pump unit with cast iron receiver, including float switch, controls, valves, pipe and fittings for connection.
Add the connection cost below, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 636 (part 2)

3/4 HP,15 gallons per minute n9@10.0 Ea 3,660.00 468.30 6.00 4,134.30

Duplex, 2 pumps and motors


Pump unit with cast iron receiver, including float switch, alternator assembly, controls, valves, pipe and
fittings for connection. Add the connection cost below, using small tools.
3/4 HP, 15 gallons per minute n9@13.3 Ea 5,820.00 622.80 7.98 6,450.78
1 HP, 25 gallons per minute n9@13.3 Ea 6,120.00 622.80 7.98 6,750.78
1-1/2 HP, 45 gallons per minute n9@13.3 Ea 7,550.00 622.80 7.98 8,180.78
1-1/2 HP, 60 gallons per minute n9@16.0 Ea 11,000.00 749.30 9.60 11,758.90

Connection assembly for condensate receiver - Simplex pump, screwed fittings


Includes schedule 40 threaded and coupled steel pipe with malleable fittings, pipe insulation, valves,
gauges, vents and thermometers. Based on 5' run to the distribution system, using small tools.
1/2" condensate connection ne@3.50 Ea 407.00 183.10 2.00 592.10
3/4" condensate connection ne@4.00 Ea 501.00 209.20 2.28 712.48
1" condensate connection ne@4.90 Ea 647.00 256.30 2.79 906.09
1-1/4" condensate connection ne@5.25 Ea 772.00 274.60 2.99 1,049.59
1-1/2" condensate connection ne@5.50 Ea 845.00 287.70 3.14 1,135.84
2015 Heavy Construction Estimator, All Rights Reserved Page 637

2" condensate connection ne@6.10 Ea 1,020.00 319.00 3.48 1,342.48

Connection assembly for condensate receiver - Duplex package, screwed fittings


Includes schedule 40 threaded and coupled steel pipe with malleable fittings, pipe insulation, valves,
gauges, vents and thermometers. Make an additional allowance for the receiver package. Based on 5'
run to the distribution system, using small tools.
1-1/2" condensate connection ne@7.85 Ea 1,240.00 410.60 4.47 1,655.07
2" condensate connection ne@8.50 Ea 1,300.00 444.60 4.85 1,749.45

Connection assembly for condensate receiver - Duplex package, buttweld fittings


Includes schedule 40 buttweld steel pipe with carbon steel fittings, pipe insulation, valves, gauges, vents
and thermometers. Based on 5' run to the distribution system, using a 300-amp skid mounted welder.
2-1/2" condensate connection pa@12.0 Ea 1,790.00 562.00 21.60 2,373.60
3" condensate connection pa@14.5 Ea 2,000.00 679.00 26.10 2,705.10
4" condensate connection pa@16.8 Ea 2,500.00 786.70 30.20 3,316.90

CSI 15-731, Storage water heaters

Oil-fired cement lined storage water heaters


Indirect fired, includes expansion tank, pressure relief valve, circulator and loose shipped accessories.
Add the cost of flanged or screwed pipe connection to the distribution system and valves, using a 20-ton
hydraulic crane with 70’ boom and small tools.
420 mbh, 310 gallons pn@24.0 Ea 9,410.00 1,046.00 145.00 10,601.00
420 mbh, 640 gallons pn@30.0 Ea 11,800.00 1,308.00 182.00 13,290.00
910 mbh, 430 gallons pn@36.0 Ea 12,900.00 1,570.00 218.00 14,688.00
910 mbh, 640 gallons pn@40.0 Ea 13,900.00 1,744.00 242.00 15,886.00
1470 mbh, 640 gallons pn@40.0 Ea 17,800.00 1,744.00 242.00 19,786.00
1932 mbh, 920 gallons pn@48.0 Ea 21,200.00 2,093.00 291.00 23,584.00

Electric cement lined storage water heaters


Complete factory package. Add the cost of flanged or screwed pipe connection to the distribution
system and valves, using small tools.
36 KW, 120 gallons n9@10.0 Ea 6,180.00 468.30 6.00 6,654.30
180 KW, 300 gallons n9@24.0 Ea 26,400.00 1,124.00 14.40 27,538.40

Electric cement lined storage water heaters


Complete factory package. Add the cost of flanged or screwed pipe connection to the distribution
system and valves, using a 20-ton hydraulic crane with 70’ boom and small tools.
240 KW, 500 gallons pb@36.0 Ea 60,700.00 1,660.00 138.00 62,498.00
480 KW, 1000 gallons pb@48.0 Ea 90,400.00 2,213.00 183.00 92,796.00
480 KW, 2000 gallons pb@60.0 Ea 141,000.00 2,767.00 229.00143,996.00

CSI 15-732, Heat exchangers

10 PSI steam heat exchangers


40 to 180 degrees, 4 passes in 3/4" outside diameter copper tube. Cast iron exchanger head with steel
shell. Add the cost of controls, expansion tanks, accessories and pipe connection to the distribution
system. In rated gallons per minute capacity, using small tools.
8 gallons per minute n8@3.33 Ea 1,300.00 169.50 2.00 1,471.50
10 gallons per minute n8@4.00 Ea 2,040.00 203.60 2.40 2,246.00
40 gallons per minute n8@5.00 Ea 3,140.00 254.50 3.00 3,397.50
64 gallons per minute n8@10.0 Ea 4,840.00 508.90 6.00 5,354.90
96 gallons per minute n8@12.5 Ea 6,410.00 636.10 7.50 7,053.60

10 PSI steam heat exchangers


40 to 180 degrees, 4 passes in 3/4" outside diameter copper tube. Cast iron exchanger head with steel
shell. Add the cost of controls, expansion tanks, accessories and pipe connection to the distribution
system. In rated gallons per minute capacity, using a 20-ton hydraulic crane with 70’ boom and small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 637 (part 2)

120 gallons per minute pb@16.6 Ea 8,370.00 765.40 63.40 9,198.80


168 gallons per minute pb@21.6 Ea 10,300.00 996.00 82.50 11,378.50
240 gallons per minute pb@27.0 Ea 16,100.00 1,245.00 103.00 17,448.00

200 degree water heat exchangers


40 to 140 degrees, 4 passes using 3/4" outside diameter copper tube. Add the cost of pipe connection
to the distribution system, using small tools.
7 gallons per minute n8@3.33 Ea 1,660.00 169.50 2.00 1,831.50
16 gallons per minute n8@4.00 Ea 2,340.00 203.60 2.40 2,546.00
34 gallons per minute n8@5.00 Ea 3,570.00 254.50 3.00 3,827.50
55 gallons per minute n8@6.67 Ea 5,140.00 339.40 4.00 5,483.40
74 gallons per minute n8@8.70 Ea 6,370.00 442.70 5.22 6,817.92
86 gallons per minute n8@10.5 Ea 8,540.00 534.30 6.30 9,080.60
2015 Heavy Construction Estimator, All Rights Reserved Page 638

200 degree water heat exchangers


40 to 140 degrees, 4 passes using 3/4" outside diameter copper tube. Add the cost of pipe connection
to the distribution system, using a 20-ton hydraulic crane with 70’ boom and small tools.
112 gallons per minute pb@14.0 Ea 6,690.00 645.50 53.50 7,389.00
126 gallons per minute pb@16.6 Ea 7,880.00 765.40 63.40 8,708.80
152 gallons per minute pb@19.6 Ea 8,230.00 903.80 74.90 9,208.70

Refrigerant to water heat exchangers


Includes hanging the exchanger but no pipe connection to the distribution system, valves, thermometers
or gauges, using small tools.
10 gallons per minute n8@6.00 Ea 1,570.00 305.30 3.60 1,878.90

Connect heat exchangers - Hot water to hot water


Connection assembly includes schedule 40 buttwelded pipe and carbon steel fittings, pipe insulation,
valves, gauges, vents and thermometers. Based on 5' run to the distribution system, using a 300-amp
skid mounted welder and small tools.
2-1/2" supply and return pa@50.0 Ea 5,530.00 2,342.00 90.00 7,962.00
3" supply and return pa@55.0 Ea 5,840.00 2,576.00 99.00 8,515.00
4" supply and return pa@62.0 Ea 7,090.00 2,903.00 112.00 10,105.00
6" supply and return pa@85.0 Ea 11,500.00 3,981.00 153.00 15,634.00
8" supply and return pa@102. Ea 16,300.00 4,777.00 184.00 21,261.00
10" supply and return pa@130. Ea 21,300.00 6,088.00 234.00 27,622.00

Connect heat exchangers - Steam to hot water


Connection assembly includes schedule 40 buttwelded pipe and carbon steel fittings, pipe insulation,
valves, gauges, vents and thermometers. Based on 5' run to the distribution system, using a 300-amp
skid mounted welder and small tools.
2-1/2" supply and return pa@41.0 Ea 5,740.00 1,920.00 73.80 7,733.80
3" supply and return pa@44.0 Ea 6,650.00 2,061.00 79.20 8,790.20
4" supply and return pa@54.5 Ea 7,530.00 2,552.00 98.10 10,180.10
6" supply and return pa@67.0 Ea 12,100.00 3,138.00 121.00 15,359.00
8" supply and return pa@80.0 Ea 17,000.00 3,746.00 144.00 20,890.00

CSI 15-741, Induction units

Vertical induction units


With electric heating coils and integral thermostat. Includes setting in place, adjustment and connection
to power supply, using a 300-amp skid mounted welder and small tools.
Prim60 CFM n8@6.00 Ea 1,010.00 305.30 3.60 1,318.90
Prim90 CFM n8@6.00 Ea 1,010.00 305.30 3.60 1,318.90
Prim120 CFM n8@6.00 Ea 1,040.00 305.30 3.60 1,348.90
Prim150 CFM n8@6.00 Ea 1,040.00 305.30 3.60 1,348.90
Prim175 CFM n8@6.00 Ea 1,040.00 305.30 3.60 1,348.90

Horizontal induction units


With electric heating coils and integral thermostat. Includes hanging in place, adjustment and
connection to power supply, using a 300-amp skid mounted welder and small tools.
Prim60 CFM n8@7.50 Ea 941.00 381.70 4.50 1,327.20
Prim90 CFM n8@7.50 Ea 941.00 381.70 4.50 1,327.20
Prim120 CFM n8@7.50 Ea 941.00 381.70 4.50 1,327.20

Connect vertical water coil induction units, non-regulated flow


Connection includes Type L copper pipe with wrought fittings, pipe insulation, valves and vents. Based
on 5' average run to the coil, using small tools.
3/4" supply and return ne@2.00 Ea 197.00 104.60 1.14 302.74
1" supply and return ne@2.30 Ea 271.00 120.30 1.31 392.61
2015 Heavy Construction Estimator, All Rights Reserved Page 638 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 639

Connect vertical water coil induction units, 2-way control valve


Connection includes Type L copper pipe with wrought fittings, pipe insulation, valves, vents and
installation of the valve but not the valve itself. Based on 5' average run to the coil, using small tools.
3/4" supply and return ne@2.25 Ea 234.00 117.70 1.28 352.98
1" supply and return ne@2.65 Ea 308.00 138.60 1.51 448.11

Connect vertical water coil induction units, 3-way control valve


Connection includes Type L copper pipe with wrought fittings, pipe insulation, valves, vents and
installation of the valve but not the valve itself. Based on 5' average run to the coil, using small tools.
3/4" supply and return ne@2.95 Ea 382.00 154.30 1.68 537.98
1" supply and return ne@3.30 Ea 468.00 172.60 1.88 642.48

Connect horizontal water coil induction units, 2-way control valve


Connection includes Type L copper pipe with wrought fittings, pipe insulation, valves, vents and
installation of the valve but not the valve itself. Based on 5' average run to the coil, using small tools.
1/2" supply and return ne@1.90 Ea 172.00 99.37 1.08 272.45
3/4" supply and return ne@2.20 Ea 234.00 115.10 1.25 350.35
1" supply and supply return ne@2.50 Ea 296.00 130.80 1.43 428.23

Connect horizontal water coil induction units, 3-way control valve


Connection includes Type L copper pipe with wrought fittings, pipe insulation, valves, vents and
installation of the valve but not the valve itself. Based on 5' average run to the coil, using small tools.
1/2" supply and return ne@2.30 Ea 259.00 120.30 1.31 380.61
3/4" supply and return ne@2.80 Ea 333.00 146.40 1.60 481.00
1" supply and supply return ne@3.10 Ea 394.00 162.10 1.77 557.87

CSI 15-745, Radiant panels and heaters

Infrared gas fired heaters


For spot, localized or total heating. Ceiling hung, no fan required, electric ignition, ceramic combustion,
surface chromized wire screen, aluminized steel housing, with polished aluminum reflector, using small
tools.
37,500 Btu n8@3.33 Ea 534.00 169.50 2.00 705.50
5,0000 Btu n8@3.33 Ea 534.00 169.50 2.00 705.50
75,000 Btu n8@4.00 Ea 685.00 203.60 2.40 891.00
10,0000 Btu n8@4.00 Ea 693.00 203.60 2.40 899.00

Infrared electric heaters


Rolled steel or aluminum housing, anodized aluminum reflector and quartz/tungsten tubular element
with an inner heavy-duty coiled element, using small tools.
1,000 watt nx@3.33 Ea 749.00 151.90 1.93 902.83
3,200 watt nx@3.33 Ea 829.00 151.90 1.93 982.83
5,000 watt nx@3.33 Ea 922.00 151.90 1.93 1,075.83

CSI 15-750, Coils

2 rows of chilled water cooling coils


Flanged construction, 16 gauge galvanized steel casing. Add the cost of connecting coils to the
distribution system from CSI 15-751. Includes coil installation only, using small tools.
12 x 12" n8@1.00 Ea 343.00 50.89 0.60 394.49
12 x 24" n8@1.25 Ea 580.00 63.61 0.75 644.36
24 x 30" n8@2.25 Ea 770.00 114.50 1.35 885.85
24 x 48" n8@4.50 Ea 909.00 229.00 2.70 1,140.70
30 x 48" n8@5.00 Ea 1,050.00 254.50 3.00 1,307.50
30 x 60" n8@5.75 Ea 1,160.00 292.60 3.45 1,456.05
30 x 72" n8@6.75 Ea 1,330.00 343.50 4.05 1,677.55
2015 Heavy Construction Estimator, All Rights Reserved Page 639 (part 2)

4 rows of chilled water cooling coils


Flanged construction, 16 gauge galvanized steel casing. Add the cost of connecting coils to the
distribution system from CSI 15-751. Includes coil installation only, using small tools.
12 x 12" n8@1.50 Ea 418.00 76.34 0.90 495.24
12 x 24" n8@2.00 Ea 683.00 101.80 1.20 786.00
24 x 30" n8@4.00 Ea 907.00 203.60 2.40 1,113.00
24 x 48" n8@6.00 Ea 1,070.00 305.30 3.60 1,378.90
30 x 48" n8@6.75 Ea 1,230.00 343.50 4.05 1,577.55
30 x 60" n8@8.00 Ea 1,450.00 407.10 4.80 1,861.90
30 x 72" n8@10.0 Ea 1,590.00 508.90 6.00 2,104.90

6 rows of chilled water cooling coils


Flanged construction, 16 gauge galvanized steel casing. Add the cost of connecting coils to the
distribution system from CSI 15-751. Includes coil installation only, using small tools.
12 x 12" n8@1.75 Ea 598.00 89.06 1.05 688.11
12 x 24" n8@2.50 Ea 683.00 127.20 1.50 811.70
24 x 30" n8@4.75 Ea 892.00 241.70 2.85 1,136.55
24 x 48" n8@6.75 Ea 1,190.00 343.50 4.05 1,537.55
30 x 48" n8@7.50 Ea 1,580.00 381.70 4.50 1,966.20
30 x 60" n8@10.0 Ea 1,750.00 508.90 6.00 2,264.90
30 x 72" n8@12.0 Ea 2,040.00 610.70 7.20 2,657.90
2015 Heavy Construction Estimator, All Rights Reserved Page 640

8 rows of chilled water cooling coils


Flanged construction, 16 gauge galvanized steel casing. Add the cost of connecting coils to the
distribution system from CSI 15-751. Includes coil installation only, using small tools.
12 x 12" n8@2.25 Ea 754.00 114.50 1.35 869.85
12 x 24" n8@3.00 Ea 892.00 152.70 1.80 1,046.50
24 x 30" n8@5.25 Ea 1,290.00 267.20 3.15 1,560.35
24 x 48" n8@8.00 Ea 1,660.00 407.10 4.80 2,071.90
30 x 48" n8@8.75 Ea 1,980.00 445.30 5.25 2,430.55
30 x 60" n8@12.0 Ea 2,280.00 610.70 7.20 2,897.90
30 x 72" n8@14.5 Ea 2,640.00 737.90 8.70 3,386.60

2 rows of direct expansion cooling coils


Flanged construction, 16 gauge galvanized steel casing. Includes coil installation only, using small
tools.
12 x 12" n8@1.00 Ea 281.00 50.89 0.60 332.49
12 x 24" n8@1.25 Ea 563.00 63.61 0.75 627.36
24 x 30" n8@2.25 Ea 769.00 114.50 1.35 884.85
24 x 48" n8@4.50 Ea 907.00 229.00 2.70 1,138.70
30 x 48" n8@5.00 Ea 1,050.00 254.50 3.00 1,307.50
30 x 60" n8@5.75 Ea 1,160.00 292.60 3.45 1,456.05
30 x 72" n8@6.75 Ea 1,330.00 343.50 4.05 1,677.55

4 rows of direct expansion cooling coils


Flanged construction, 16 gauge galvanized steel casing. Includes coil installation only, using small
tools.
12 x 12" n8@1.50 Ea 479.00 76.34 0.90 556.24
12 x 24" n8@2.00 Ea 683.00 101.80 1.20 786.00
24 x 30" n8@4.00 Ea 907.00 203.60 2.40 1,113.00
24 x 48" n8@6.00 Ea 1,070.00 305.30 3.60 1,378.90
30 x 48" n8@6.75 Ea 1,230.00 343.50 4.05 1,577.55
30 x 60" n8@8.00 Ea 1,450.00 407.10 4.80 1,861.90
30 x 72" n8@10.0 Ea 1,590.00 508.90 6.00 2,104.90

6 rows of direct expansion cooling coils


Flanged construction, 16 gauge galvanized steel casing. Includes coil installation only, using small
tools.
12 x 12" n8@1.75 Ea 613.00 89.06 1.05 703.11
12 x 24" n8@2.50 Ea 683.00 127.20 1.50 811.70
24 x 30" n8@4.75 Ea 963.00 241.70 2.85 1,207.55
24 x 48" n8@6.75 Ea 1,190.00 343.50 4.05 1,537.55
30 x 48" n8@7.50 Ea 1,580.00 381.70 4.50 1,966.20
30 x 60" n8@10.0 Ea 1,750.00 508.90 6.00 2,264.90
30 x 72" n8@12.0 Ea 2,040.00 610.70 7.20 2,657.90

8 rows of direct expansion cooling coils


Flanged construction, 16 gauge galvanized steel casing. Includes coil installation only, using small
tools.
12 x 12" n8@2.25 Ea 769.00 114.50 1.35 884.85
12 x 24" n8@3.00 Ea 892.00 152.70 1.80 1,046.50
24 x 30" n8@5.25 Ea 1,290.00 267.20 3.15 1,560.35
24 x 48" n8@8.00 Ea 1,660.00 407.10 4.80 2,071.90
30 x 48" n8@8.75 Ea 1,980.00 445.30 5.25 2,430.55
30 x 60" n8@12.0 Ea 2,280.00 610.70 7.20 2,897.90
30 x 72" n8@14.5 Ea 2,640.00 737.90 8.70 3,386.60

1 row of hot water heating coils


Flanged construction. Add the cost of connecting coils to the distribution system from CSI 15-751.
Includes coil installation only, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 640 (part 2)

12 x 12" n8@1.00 Ea 269.00 50.89 0.60 320.49


12 x 24" n8@1.25 Ea 415.00 63.61 0.75 479.36
24 x 30" n8@2.25 Ea 489.00 114.50 1.35 604.85
24 x 48" n8@4.50 Ea 548.00 229.00 2.70 779.70
30 x 48" n8@5.00 Ea 611.00 254.50 3.00 868.50
30 x 60" n8@5.75 Ea 699.00 292.60 3.45 995.05
30 x 72" n8@6.75 Ea 781.00 343.50 4.05 1,128.55

2 rows of hot water heating coils


Flanged construction. Add the cost of connecting coils to the distribution system from CSI 15-751.
Includes coil installation only, using small tools.
12 x 12" n8@1.00 Ea 463.00 50.89 0.60 514.49
12 x 24" n8@1.25 Ea 476.00 63.61 0.75 540.36
24 x 30" n8@2.25 Ea 622.00 114.50 1.35 737.85
24 x 48" n8@4.50 Ea 708.00 229.00 2.70 939.70
30 x 48" n8@5.00 Ea 794.00 254.50 3.00 1,051.50
30 x 60" n8@5.75 Ea 794.00 292.60 3.45 1,090.05
2015 Heavy Construction Estimator, All Rights Reserved Page 641

30 x 72" n8@6.75 Ea 880.00 343.50 4.05 1,227.55

1 row of steam heating coils


Flanged construction. Add the cost of connecting coils to the distribution system from CSI 15-752.
Includes coil installation only, using small tools.
12 x 12" n8@1.00 Ea 367.00 50.89 0.60 418.49
12 x 24" n8@1.25 Ea 392.00 63.61 0.75 456.36
24 x 30" n8@2.25 Ea 482.00 114.50 1.35 597.85
24 x 48" n8@4.50 Ea 589.00 229.00 2.70 820.70
30 x 48" n8@5.00 Ea 640.00 254.50 3.00 897.50
30 x 60" n8@5.75 Ea 693.00 292.60 3.45 989.05
30 x 72" n8@6.75 Ea 757.00 343.50 4.05 1,104.55

Hot water preheat coils


For multi-zone air handling, two row coils, sized by air handling unit capacity. Add the cost of
connecting air handling unit coils from CSI 15-751, using small tools.
3,000 CFM n8@2.53 Ea 515.00 128.80 1.52 645.32
4,000 CFM n8@2.53 Ea 687.00 128.80 1.52 817.32
5,000 CFM n8@2.70 Ea 858.00 137.40 1.62 997.02
6,500 CFM n8@2.94 Ea 1,000.00 149.60 1.76 1,151.36
7,500 CFM n8@3.08 Ea 1,000.00 156.70 1.85 1,158.55
9,200 CFM n8@3.23 Ea 1,240.00 164.40 1.94 1,406.34
11,500 CFM n8@3.64 Ea 1,270.00 185.20 2.18 1,457.38
13,200 CFM n8@4.08 Ea 1,400.00 207.60 2.45 1,610.05
16,500 CFM n8@4.88 Ea 1,560.00 248.30 2.93 1,811.23
19,500 CFM n8@5.13 Ea 1,710.00 261.10 3.08 1,974.18
22,000 CFM n8@5.41 Ea 2,240.00 275.30 3.25 2,518.55
27,000 CFM n8@7.41 Ea 2,830.00 377.10 4.45 3,211.55
34,000 CFM n8@9.09 Ea 2,830.00 462.60 5.45 3,298.05
40,000 CFM n8@9.52 Ea 6,870.00 484.50 5.71 7,360.21
47,000 CFM n8@11.1 Ea 8,070.00 564.90 6.66 8,641.56

CSI 15-751, Hot and chilled water coil connection assemblies

Connect booster, reheat, or in-duct coils - One row coil bank, non-regulated flow
Includes copper Type L pipe, pipe insulation, wrought fittings, valves and vents. Based on 5' average run
to the coil, using small tools.
1/2" copper supply and return ne@1.50 Ea 197.00 78.45 0.86 276.31
3/4" copper supply and return ne@1.65 Ea 222.00 86.30 0.94 309.24
1" copper supply and return ne@2.00 Ea 283.00 104.60 1.14 388.74
1-1/4" copper supply and return ne@2.15 Ea 357.00 112.40 1.23 470.63
1-1/2" copper supply and return ne@2.25 Ea 431.00 117.70 1.28 549.98
2" copper supply and return ne@2.55 Ea 616.00 133.40 1.45 750.85

Connect booster, reheat, or in-duct coils - One row coil bank, 2-way control valve design
Includes copper Type L pipe, pipe insulation, wrought fittings, valves and vents. Includes installation of
the control valve but not the control valve itself. See CSI 15-938. Based on 5' average run to the coil,
using small tools.
1/2" copper supply and return ne@1.65 Ea 234.00 86.30 0.94 321.24
3/4" copper supply and return ne@1.90 Ea 271.00 99.37 1.08 371.45
1" copper supply and return ne@2.30 Ea 357.00 120.30 1.31 478.61
1-1/4" copper supply and return ne@2.55 Ea 444.00 133.40 1.45 578.85
1-1/2" copper supply and return ne@2.85 Ea 554.00 149.10 1.62 704.72
2" copper supply and return ne@3.15 Ea 850.00 164.70 1.80 1,016.50

Connect booster, reheat, or in-duct coils - One row coil bank, non-regulated flow
Includes schedule 40 steel threaded and coupled pipe and malleable fittings, pipe insulation, valves and
vents. Based on 5' average run to the coil, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 641 (part 2)

1/2" steel supply and return ne@2.10 Ea 156.00 109.80 1.20 267.00
3/4" steel supply and return ne@2.35 Ea 177.00 122.90 1.34 301.24
1" steel supply and return ne@3.00 Ea 219.00 156.90 1.71 377.61
1-1/4" steel supply and return ne@3.35 Ea 275.00 175.20 1.91 452.11
1-1/2" steel supply and return ne@3.60 Ea 329.00 188.30 2.05 519.35
2" steel supply and return ne@3.90 Ea 437.00 204.00 2.22 643.22

Connect booster, reheat, or in-duct coils - One row coil bank, 2-way control valve design
Includes schedule 40 steel threaded and coupled pipe and malleable fittings, pipe insulation, valves,
gages and vents. Includes installation of the control valve but not the control valve itself. See CSI 15-938.
Based on 5' average run to the coil, using small tools.
1/2" steel supply and return ne@2.25 Ea 181.00 117.70 1.28 299.98
2015 Heavy Construction Estimator, All Rights Reserved Page 642

3/4" supply and return ne@2.50 Ea 212.00 130.80 1.43 344.23


1" steel supply and return ne@3.25 Ea 279.00 170.00 1.85 450.85
1-1/4" steel supply and return ne@3.60 Ea 337.00 188.30 2.05 527.35
1-1/2" steel supply and return ne@3.90 Ea 406.00 204.00 2.22 612.22
2" supply and return ne@4.25 Ea 552.00 222.30 2.42 776.72

Connect booster, reheat, or in-duct coils - One row coil bank, 3-way control valve design
Includes schedule 40 steel threaded and coupled pipe and malleable fittings, pipe insulation, valves,
gages and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil, using small tools.
1/2" steel supply and return ne@2.40 Ea 198.00 125.50 1.37 324.87
3/4" steel supply and return ne@2.70 Ea 237.00 141.20 1.54 379.74
1" steel supply and return ne@3.50 Ea 323.00 183.10 2.00 508.10
1-1/4" steel supply and return ne@3.90 Ea 406.00 204.00 2.22 612.22
1-1/2" steel supply and return ne@4.30 Ea 490.00 224.90 2.45 717.35
2" steel supply and return ne@4.75 Ea 677.00 248.40 2.71 928.11

Connect air handling unit coils - One row coil bank, non-regulated flow
Includes schedule 40 buttwelded steel pipe and carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Based on 5' average run to the coil, using a 300-amp skid mounted welder.
2-1/2" steel supply and return pa@28.0 Ea 3,180.00 1,311.00 50.40 4,541.40
3" steel supply and return pa@31.5 Ea 3,490.00 1,475.00 56.70 5,021.70
4" steel supply and return pa@34.0 Ea 3,750.00 1,592.00 61.20 5,403.20
6" steel supply and return pa@41.0 Ea 5,420.00 1,920.00 73.80 7,413.80

Connect air handling unit coils - One row coil bank, 2-way control valve design
Includes schedule 40 buttwelded steel pipe and carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil, using a 300-amp skid mounted welder.
2-1/2" steel supply and return pa@33.6 Ea 3,440.00 1,573.00 60.50 5,073.50
3" steel supply and return pa@36.0 Ea 3,700.00 1,686.00 64.80 5,450.80
4" steel supply and return pa@43.8 Ea 4,500.00 2,051.00 78.80 6,629.80
6" steel supply and return pa@54.0 Ea 7,190.00 2,529.00 97.20 9,816.20

Connect air handling unit coils - One row coil bank, 3-way control valve design
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' run to the coil, using a 300-amp skid mounted welder.
2-1/2" steel supply and return pa@41.5 Ea 3,960.00 1,943.00 74.70 5,977.70
3" steel supply and return pa@43.8 Ea 4,370.00 2,051.00 78.80 6,499.80
4"steel supply and return pa@54.6 Ea 5,620.00 2,557.00 98.30 8,275.30
6" steel supply and return pa@61.4 Ea 8,020.00 2,875.00 111.00 11,006.00

Connect air handling unit coils - Two row coil bank, non regulated flow
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Based on 5' average run to the coil. Pipe diameter is based on size needed to
serve both rows, using a 300-amp skid mounted welder.
2-1/2" steel supply and return pa@48.0 Ea 4,790.00 2,248.00 86.40 7,124.40
3" steel supply and return pa@51.5 Ea 5,830.00 2,412.00 92.70 8,334.70
4" steel supply and return pa@63.6 Ea 7,710.00 2,978.00 114.00 10,802.00
6" steel supply and return pa@79.2 Ea 11,200.00 3,709.00 143.00 15,052.00

Connect air handling unit coils - Two row coil bank, 2-way control valve design
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil. Pipe diameter is based on size needed to serve both rows,
using a 300-amp skid mounted welder.
2015 Heavy Construction Estimator, All Rights Reserved Page 642 (part 2)

2-1/2" steel supply and return pa@54.0 Ea 5,360.00 2,529.00 97.20 7,986.20
3" steel supply and return pa@58.5 Ea 6,760.00 2,740.00 105.00 9,605.00
4" steel supply and return pa@67.0 Ea 8,300.00 3,138.00 121.00 11,559.00
6" steel supply and return pa@83.5 Ea 11,500.00 3,910.00 150.00 15,560.00

Connect air handling unit coils - Two row coil bank, 3-way control valve design
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil. Pipe diameter is based on size needed to serve both rows,
using a 300-amp skid mounted welder.
2-1/2" steel supply and return pa@58.8 Ea 5,610.00 2,754.00 106.00 8,470.00
3" steel supply and return pa@64.0 Ea 7,080.00 2,997.00 115.00 10,192.00
4" steel supply and return pa@72.0 Ea 8,990.00 3,372.00 130.00 12,492.00
6" steel supply and return pa@87.0 Ea 11,900.00 4,074.00 157.00 16,131.00
2015 Heavy Construction Estimator, All Rights Reserved Page 643

Connect air handling unit coils - Three row coil bank, non-regulated flow
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Based on 5' average run to the coil. Pipe diameter is based on size needed to
serve three rows, using a 300-amp skid mounted welder.
4" steel supply and return pa@72.0 Ea 8,120.00 3,372.00 130.00 11,622.00
6" steel supply and return pa@94.0 Ea 14,200.00 4,402.00 169.00 18,771.00
8" steel supply and return pa@120. Ea 19,200.00 5,620.00 216.00 25,036.00

Connect air handling unit coils - Three row coil bank, 2-way control valve design
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves, gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil. Pipe diameter is based on size needed to serve three rows,
using a 300-amp skid mounted welder.
4" steel supply and return pa@78.0 Ea 8,540.00 3,653.00 140.00 12,333.00
6" steel supply and return pa@105. Ea 15,200.00 4,917.00 189.00 20,306.00
8" steel supply and return pa@132. Ea 21,700.00 6,182.00 238.00 28,120.00

Connect air handling unit coils - Three row coil bank, 3-way control valve design
Includes schedule 40 buttwelded steel pipe with carbon steel fittings, pipe insulation, valves gages,
thermometers and vents. Includes installation of the control valve but not the control valve itself. See CSI
15-938. Based on 5' average run to the coil. Pipe diameter is based on size needed to serve three rows,
using a 300-amp skid mounted welder.
4" steel supply and return pa@82.0 Ea 10,000.00 3,840.00 148.00 13,988.00
6" steel supply and return pa@112. Ea 15,900.00 5,245.00 202.00 21,347.00
8" steel supply and return pa@140. Ea 24,200.00 6,556.00 252.00 31,008.00

CSI 15-752, Low pressure steam coil connection assemblies

Connect low pressure steam coils - One row coil bank, 2-way control valve design
Includes schedule 40 supply and schedule 80 return threaded and coupled steel pipe with malleable
fittings, pipe insulation, valves, gages, traps and thermometers. Includes installation of the control valve
but not the control valve itself. See CSI 15-938. Based on 5' average run to the coil, using small tools.
3/4" steel pipe supply ne@7.20 Ea 668.00 376.60 4.10 1,048.70
1" steel pipe supply ne@8.00 Ea 907.00 418.40 4.56 1,329.96
1-1/4" steel pipe supply ne@9.10 Ea 949.00 475.90 5.19 1,430.09
1-1/2" steel pipe supply ne@10.3 Ea 1,070.00 538.70 5.87 1,614.57
2" steel pipe supply ne@11.2 Ea 1,630.00 585.80 6.38 2,222.18

Connect low pressure steam coils - Two row coil bank, 2-way control valve design
Includes schedule 40 supply and schedule 80 return threaded and coupled steel pipe with malleable
fittings, pipe insulation, valves, gages, traps and thermometers. Includes installation of the control valve
but not the control valve itself. See CSI 15-938. Based on 5' average run to the coil. Pipe diameter is
based on size needed to serve two rows, using small tools.
1" steel pipe supply ne@12.0 Ea 1,250.00 627.60 6.84 1,884.44
1-1/4" steel pipe supply ne@13.2 Ea 1,390.00 690.40 7.52 2,087.92
1-1/2" steel pipe supply ne@14.3 Ea 1,470.00 747.90 8.15 2,226.05
2" steel pipe supply ne@15.4 Ea 1,600.00 805.40 8.78 2,414.18

Connect low pressure steam coils - Two row coil bank, 2-way control valve design
Includes schedule 40 supply and schedule 80 return buttwelded steel pipe with carbon steel fittings,
pipe insulation, valves, gages, traps and thermometers. Includes installation of the control valve but not
the control valve itself. See CSI 15-938. Based on 5' average run to the coil. Pipe diameter is based on
size needed to serve two rows, using a 300-amp skid mounted welder.
2-1/2" steel pipe supply pa@21.0 Ea 3,750.00 983.40 37.80 4,771.20
3" steel pipe supply pa@23.5 Ea 4,540.00 1,101.00 42.30 5,683.30
2015 Heavy Construction Estimator, All Rights Reserved Page 643 (part 2)

Connect low pressure steam coils - Two high coil bank, tandem, 2-way control valve design
Includes schedule 40 supply and schedule 80 return buttwelded steel pipe with carbon steel fittings,
pipe insulation, valves, gages, traps and thermometers. Includes installation of the control valve but not
the control valve itself. See CSI 15-938. Based on 5' average run to the coil. Pipe diameter is based on
size needed to serve two rows, using a 300-amp skid mounted welder.
2-1/2" steel pipe supply pa@23.2 Ea 4,120.00 1,086.00 41.80 5,247.80
3" steel pipe supply pa@26.0 Ea 4,790.00 1,218.00 46.80 6,054.80

CSI 15-753, Baseboard radiant hot water convectors

Baseboard radiation, copper tube, aluminum fins


Add the cost of connection to the distribution system, using small tools.
9-7/8" enclosure and 1-1/4" tube nb@.280 LF 25.60 14.64 0.16 40.40
13-7/8" enclosure
and 1-1/4" tube (2 rows) nb@.320 LF 44.40 16.74 0.18 61.32
9-7/8" 18 gage enclosure only nb@.130 LF 8.03 6.80 0.07 14.90
13-7/8" 18 gage enclosure only nb@.150 LF 12.30 7.85 0.09 20.24
1-1/4" fin tube element only nb@.150 LF 18.00 7.85 0.09 25.94
1" fin tube element only nb@.150 LF 9.13 7.85 0.09 17.07
3/4" fin tube element only nb@.140 LF 7.32 7.32 0.08 14.72
Add per LF for corners,
fillers, caps etc. ---@--- % 15.00 -- -- --
End cap 4" nb@.090 Ea 5.52 4.71 0.05 10.28
End cap 2" nb@.090 Ea 2.76 4.71 0.05 7.52
Valve access door nb@.250 Ea 13.90 13.08 0.14 27.12
Inside corner nb@.120 Ea 5.48 6.28 0.07 11.83
Outside corner nb@.120 Ea 7.81 6.28 0.07 14.16
2015 Heavy Construction Estimator, All Rights Reserved Page 644

Filler sleeve nb@.090 Ea 3.45 4.71 0.05 8.21

Baseboard radiation, steel pipe, steel fins


Add the cost of connection to the distribution system, using small tools.
9 7/8" enclosure and 1-1/4" pipe nb@.330 LF 31.10 17.26 0.19 48.55
9 7/8" 18 gage enclosure only nb@.130 LF 9.33 6.80 0.07 16.20
1-1/4" steel fin tube element nb@.160 LF 21.80 8.37 0.09 30.26
Average per foot add for corners,
fillers, caps etc. ---@--- % 15.00 -- -- --
End cap 4" nb@.090 Ea 11.10 4.71 0.05 15.86
End cap 2" nb@.090 Ea 5.32 4.71 0.05 10.08
Valve access door nb@.250 Ea 14.60 13.08 0.14 27.82
Inside corner nb@.120 Ea 9.74 6.28 0.07 16.09
Outside corner nb@.120 Ea 13.10 6.28 0.07 19.45
Filler sleeve nb@.090 Ea 7.08 4.71 0.05 11.84

Finned tube baseboard convection units


Hot water radiation units complete with enclosure, single 3/4" IPS heating element. Add the cost of
connection to the distribution system, using small tools.
4' long nb@1.89 Ea 159.00 98.85 1.08 258.93
6' long nb@2.27 Ea 239.00 118.70 1.29 358.99
8' long nb@2.50 Ea 318.00 130.80 1.43 450.23

Multi-fin baseboard convectors


For two-pipe hot water radiation baseboard units. Add the cost of connection to the distribution system.
Complete with 6-1/4" deep cabinet enclosure, using small tools.
20" high x 24" long nb@1.67 Ea 286.00 87.34 0.95 374.29
20" high x 36" long nb@1.82 Ea 350.00 95.19 1.04 446.23
20" high x 48" long nb@2.15 Ea 398.00 112.40 1.23 511.63
32" high x 24" long nb@2.67 Ea 350.00 139.60 1.52 491.12
32" high x 36" long nb@3.23 Ea 414.00 168.90 1.84 584.74
32" high x 48" long nb@3.77 Ea 509.00 197.20 2.15 708.35
Add for knob operated damper --@.000 Ea 8.10 -- -- 8.10
Add for metal trim strips --@.000 Ea 1.24 -- -- 1.24
Add for metal trim strips ---@--- % -- 30.00 -- --
Add for snap-on inlet grille --@.000 Ea 15.30 -- -- 15.30
Add for snap-on inlet grille ---@--- % -- 20.00 -- --
Add for hinged access doors --@.000 Ea 24.50 -- -- 24.50
Add for auto vent air chamber --@.000 Ea 23.00 -- -- 23.00

Connect wall fin baseboard convectors - One row hot water coils
Includes copper Type L pipe with wrought fittings, pipe insulation, valves and vents. Includes installation
of the control valve but not the control valve itself. See CSI 15-938. Based on 5' average run to the
element, using small tools.
3/4" copper supply and return ne@1.65 Ea 212.00 86.30 0.94 299.24
1" copper supply and return ne@1.90 Ea 259.00 99.37 1.08 359.45
1-1/4" copper supply and return ne@2.10 Ea 384.00 109.80 1.20 495.00
1-1/2" copper supply and return ne@2.20 Ea 444.00 115.10 1.25 560.35
2" copper supply and return ne@2.40 Ea 567.00 125.50 1.37 693.87
2015 Heavy Construction Estimator, All Rights Reserved Page 645

Connect wall fin baseboard convectors - Two row hot water coils
Includes copper Type L pipe with wrought fittings, pipe insulation, valves and vents. Includes installation
of the control valve but not the control valve itself. Based on 5' run to the element, using small tools.
3/4" copper supply and return ne@2.75 Ea 357.00 143.80 1.57 502.37
1" copper supply and return ne@3.25 Ea 407.00 170.00 1.85 578.85
1-1/4" copper supply and return ne@3.60 Ea 579.00 188.30 2.05 769.35
1-1/2" copper supply and return ne@3.75 Ea 702.00 196.10 2.14 900.24
2" copper supply and return ne@4.50 Ea 961.00 235.40 2.57 1,198.97

Connect wall fin baseboard convectors - One row hot water coils
Includes schedule 40 steel threaded and coupled pipe with malleable fittings, pipe insulation, valves and
vents. Includes installation of the control valve but not the control valve itself. See CSI 15-938. Based on
5' average run to the element, using small tools.
3/4" steel supply and return ne@2.45 Ea 229.00 128.10 1.40 358.50
1" steel supply and return ne@2.90 Ea 292.00 151.70 1.65 445.35
1-1/4" steel supply and return ne@3.35 Ea 407.00 175.20 1.91 584.11
1-1/2" steel supply and return ne@3.45 Ea 428.00 180.40 1.97 610.37
2" steel supply and return ne@4.25 Ea 709.00 222.30 2.42 933.72

Connect wall fin baseboard convectors - Two row hot water coils
Includes schedule 40 steel threaded and coupled pipe with malleable fittings, pipe insulation, valves and
vents. Includes installation of the control valve but not the control valve itself. See CSI 15-938. Based on
5' run to the element, using small tools.
3/4" steel supply and return ne@4.00 Ea 448.00 209.20 2.28 659.48
1" steel supply and return ne@4.50 Ea 501.00 235.40 2.57 738.97
1-1/4" steel supply and return ne@5.25 Ea 751.00 274.60 2.99 1,028.59
1-1/2" steel supply and return ne@5.95 Ea 907.00 311.20 3.39 1,221.59
2" steel supply and return ne@6.50 Ea 1,080.00 340.00 3.71 1,423.71

Connect wall fin baseboard convectors - One row low pressure steam coils
Includes schedule 40 supply and schedule 80 return steel threaded and coupled pipe with malleable
fittings, pipe insulation, valves and traps. Includes installation of the control valve but not the control
valve itself. See CSI 15-938. Based on 5' average run to the element, using small tools.
1" steel supply ne@3.00 Ea 334.00 156.90 1.71 492.61
1-1/4" steel supply ne@3.50 Ea 584.00 183.10 2.00 769.10
1-1/2" steel supply ne@3.75 Ea 647.00 196.10 2.14 845.24
2" steel supply ne@4.35 Ea 720.00 227.50 2.48 949.98

Connect wall fin baseboard convectors - Two row low pressure steam coils
Includes schedule 40 supply and schedule 80 return steel threaded and coupled pipe with malleable
fittings, pipe insulation, valves and traps. Includes installation of the control valve but not the control
valve itself. See CSI 15-938. Based on 5' average run to the element, using small tools.
3/4" steel supply ne@4.20 Ea 302.00 219.70 2.39 524.09
1" steel supply ne@4.85 Ea 375.00 253.70 2.76 631.46
1-1/4" steel supply ne@5.75 Ea 647.00 300.70 3.28 950.98
1-1/2" steel supply ne@6.60 Ea 741.00 345.20 3.76 1,089.96
2" steel supply ne@7.15 Ea 824.00 373.90 4.08 1,201.98

Connect cabinet heater or forceflow convector - Hot water coils


Includes copper Type L supply and return pipe with wrought fittings, pipe insulation, valves and vents.
Unregulated flow (no control valve). Based on 5' average run to the element, using small tools.
3/4" copper supply and return ne@2.00 Ea 283.00 104.60 1.14 388.74
1" copper supply and return ne@2.30 Ea 345.00 120.30 1.31 466.61
1-1/4" copper supply and return ne@2.65 Ea 456.00 138.60 1.51 596.11
1-1/2" copper supply and return ne@2.90 Ea 567.00 151.70 1.65 720.35
2" copper supply and return ne@3.50 Ea 813.00 183.10 2.00 998.10
2015 Heavy Construction Estimator, All Rights Reserved Page 645 (part 2)

Connect cabinet heater or forceflow convector - Hot water coils


Includes schedule 40 threaded and coupled supply and return pipe with malleable fittings, pipe
insulation, valves and vents. Unregulated flow (no control valve). Based on 5' run to the element, using
small tools.
3/4" steel supply and return ne@2.60 Ea 219.00 136.00 1.48 356.48
1" steel supply and return ne@3.20 Ea 261.00 167.40 1.82 430.22
1-1/4" steel supply and return ne@3.60 Ea 313.00 188.30 2.05 503.35
1-1/2" steel supply and return ne@3.95 Ea 375.00 206.60 2.25 583.85
2" steel supply and return ne@4.20 Ea 448.00 219.70 2.39 670.09

Connect cabinet heater or forceflow convector - Low pressure steam coils


Includes schedule 40 supply and schedule 80 return threaded and coupled supply with malleable
fittings, pipe insulation, valves and vents. Unregulated flow (no control valve). Based on 5' average run to
the element, using small tools.
3/4" steel supply ne@3.40 Ea 302.00 177.80 1.94 481.74
1" supply ne@3.75 Ea 344.00 196.10 2.14 542.24
2015 Heavy Construction Estimator, All Rights Reserved Page 646

1-1/4" supply ne@4.50 Ea 396.00 235.40 2.57 633.97


1-1/2" supply ne@4.75 Ea 668.00 248.40 2.71 919.11
2" supply ne@5.25 Ea 782.00 274.60 2.99 1,059.59

CSI 15-754, Convectors, hot water

Cabinet heaters, hot water


Add the cost of connection to the distribution system, using small tools.
6000 btu per hour, recessed nb@2.75 Ea 421.00 143.80 1.57 566.37
6000 btu per hour, surface mtd. nb@2.00 Ea 444.00 104.60 1.14 549.74
10000 btu per hour, recessed nb@2.95 Ea 467.00 154.30 1.68 622.98
10000 btu per hour, surface mtd. nb@2.25 Ea 498.00 117.70 1.28 616.98
12000 btu per hour, recessed nb@3.25 Ea 536.00 170.00 1.85 707.85
12000 btu per hour, surface mtd. nb@2.50 Ea 590.00 130.80 1.43 722.23

Force Flo heaters, hot water


115 volt fan powered convector
Add the cost of connection to the distribution system and electrical connection, using small tools.
6000 btu per hour nb@2.75 Ea 552.00 143.80 1.57 697.37
10000 btu per hour nb@2.95 Ea 575.00 154.30 1.68 730.98
12000 btu per hour nb@3.25 Ea 689.00 170.00 1.85 860.85

CSI 15-760, Unit heaters

Steam unit heaters, horizontal, fan propelled 115V


Add the cost of connection to the distribution system, using small tools.
18 MBH, 237 CFM nb@2.00 Ea 340.00 104.60 1.14 445.74
24 MBH, 363 CFM nb@2.20 Ea 429.00 115.10 1.25 545.35
33 MBH, 582 CFM nb@2.30 Ea 475.00 120.30 1.31 596.61
47 MBH, 725 CFM nb@2.50 Ea 562.00 130.80 1.43 694.23
63 MBH, 1025 CFM nb@3.00 Ea 620.00 156.90 1.71 778.61
86 MBH, 1320 CFM nb@3.50 Ea 674.00 183.10 2.00 859.10
108 MBH, 1842 CFM nb@4.00 Ea 843.00 209.20 2.28 1,054.48
121 MBH, 2090 CFM nb@6.00 Ea 1,180.00 313.80 3.42 1,497.22
165 MBH, 2770 CFM nb@6.00 Ea 1,850.00 313.80 3.42 2,167.22
193 MBH, 3230 CFM nb@6.00 Ea 2,470.00 313.80 3.42 2,787.22
258 MBH, 3840 CFM nb@8.00 Ea 3,030.00 418.40 4.56 3,452.96
290 MBH, 4590 CFM nb@8.00 Ea 3,230.00 418.40 4.56 3,652.96
340 MBH, 5120 CFM nb@8.00 Ea 4,260.00 418.40 4.56 4,682.96

Steam unit heaters, vertical, fan propelled 115v


Add the cost of connection to the distribution system, using small tools.
42 MBH, 685 CFM nb@2.50 Ea 608.00 130.80 1.43 740.23
59 MBH, 1040 CFM nb@3.00 Ea 697.00 156.90 1.71 855.61
78 MBH, 1370 CFM nb@3.75 Ea 935.00 196.10 2.14 1,133.24
95 MBH, 1715 CFM nb@4.00 Ea 1,510.00 209.20 2.28 1,721.48
139 MBH, 2360 CFM nb@6.00 Ea 1,810.00 313.80 3.42 2,127.22
161 MBH, 2900 CFM nb@6.00 Ea 1,870.00 313.80 3.42 2,187.22
193 MBH, 3530 CFM nb@6.00 Ea 2,180.00 313.80 3.42 2,497.22
212 MBH, 4250 CFM nb@8.00 Ea 2,190.00 418.40 4.56 2,612.96
247 MBH, 4450 CFM nb@8.00 Ea 3,140.00 418.40 4.56 3,562.96
279 MBH, 5200 CFM nb@12.0 Ea 3,250.00 627.60 6.84 3,884.44
333 MBH, 5350 CFM nb@14.0 Ea 3,920.00 732.20 7.98 4,660.18

Steam unit heaters, vertical fan propelled, 460v, 3 phase


Add the cost of connection to the distribution system, using small tools.
433 MBH, 3/4 HP fan nb@16.0 Ea 6,130.00 836.80 9.12 6,975.92
520 MBH, 1 HP fan nb@16.0 Ea 7,050.00 836.80 9.12 7,895.92
2015 Heavy Construction Estimator, All Rights Reserved Page 646 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 647

Hot water unit heaters, horizontal, fan propelled 115V


Add the cost of connection to the distribution system, using small tools.
6 MBH nb@2.00 Ea 299.00 104.60 1.14 404.74
12.8 MBH, 237 CFM nb@2.00 Ea 371.00 104.60 1.14 476.74
15.7 MBH, 363 CFM nb@2.00 Ea 400.00 104.60 1.14 505.74
24.5 MBH, 582 CFM nb@2.50 Ea 460.00 130.80 1.43 592.23
29 MBH, 725 CFM nb@3.00 Ea 493.00 156.90 1.71 651.61
47 MBH, 1025 CFM nb@3.50 Ea 571.00 183.10 2.00 756.10
63 MBH, 1320 CFM nb@4.00 Ea 682.00 209.20 2.28 893.48
81 MBH, 1842 CFM nb@4.00 Ea 1,180.00 209.20 2.28 1,391.48
90 MBH, 2090 CFM nb@4.00 Ea 1,550.00 209.20 2.28 1,761.48
133 MBH, 2770 CFM nb@6.00 Ea 2,220.00 313.80 3.42 2,537.22
139 MBH, 3230 CFM nb@6.00 Ea 2,390.00 313.80 3.42 2,707.22
198 MBH, 3840 CFM nb@6.00 Ea 3,200.00 313.80 3.42 3,517.22
224 MBH, 4590 CFM nb@8.00 Ea 3,650.00 418.40 4.56 4,072.96
273 MBH, 5120 CFM nb@8.00 Ea 4,120.00 418.40 4.56 4,542.96

Hot water unit heaters, vertical, fan propelled, 115V


Add the cost of connection to the distribution system, using small tools.
8 MBH nb@2.00 Ea 314.00 104.60 1.14 419.74
12 MBH nb@2.00 Ea 406.00 104.60 1.14 511.74
16 MBH nb@2.00 Ea 429.00 104.60 1.14 534.74
30 MBH, 700 CFM nb@3.00 Ea 573.00 156.90 1.71 731.61
43 MBH, 1040 CFM nb@3.50 Ea 705.00 183.10 2.00 890.10
57 MBH, 1370 CFM nb@4.00 Ea 758.00 209.20 2.28 969.48
68 MBH, 1715 CFM nb@4.00 Ea 1,190.00 209.20 2.28 1,401.48
105 MBH, 2360 CFM nb@5.00 Ea 1,410.00 261.50 2.85 1,674.35
123 MBH, 2900 CFM nb@6.00 Ea 1,810.00 313.80 3.42 2,127.22
140 MBH, 3530 CFM nb@6.00 Ea 2,100.00 313.80 3.42 2,417.22
156 MBH, 4250 CFM nb@6.00 Ea 2,210.00 313.80 3.42 2,527.22
210 MBH, 4450 CFM nb@8.00 Ea 3,920.00 418.40 4.56 4,342.96
123 MBH, 5200 CFM nb@6.00 Ea 3,250.00 313.80 3.42 3,567.22
257 MBH, 5350 CFM nb@8.00 Ea 6,620.00 418.40 4.56 7,042.96

Connect propeller type unit heaters - Hot water coils, copper piping
Includes copper Type L supply and return pipe with wrought fittings, pipe insulation, valves and vents.
Unregulated flow design (no control valve). Based on 5' run to the element, using small tools.
3/4" supply and return ne@1.75 Ea 308.00 91.53 1.00 400.53
1" supply and return ne@2.00 Ea 382.00 104.60 1.14 487.74
1-1/4" supply and return ne@2.50 Ea 480.00 130.80 1.43 612.23
1-1/2" supply and return ne@2.85 Ea 567.00 149.10 1.62 717.72
2" supply and return ne@3.20 Ea 813.00 167.40 1.82 982.22

Connect propeller type unit heaters - Hot water coils, steel piping
Includes schedule 40 threaded and coupled supply and return piping with malleable fittings, pipe
insulation, valves and vents. Unregulated flow design (no control valve). Based on 5' run to the element,
using small tools.
3/4" supply and return ne@2.50 Ea 240.00 130.80 1.43 372.23
1" supply and return ne@3.00 Ea 282.00 156.90 1.71 440.61
1-1/4" supply and return ne@3.30 Ea 334.00 172.60 1.88 508.48
1-1/2" supply and return ne@3.75 Ea 386.00 196.10 2.14 584.24
2" supply and return ne@4.10 Ea 501.00 214.40 2.34 717.74

Connect propeller type unit heaters - Low pressure steam coils


Includes schedule 40 threaded and coupled piping with malleable fittings, pipe insulation, valves, traps
and vents. Based on 5' run to the unit heater, using small tools.
3/4" steel supply piping ne@3.00 Ea 250.00 156.90 1.71 408.61
2015 Heavy Construction Estimator, All Rights Reserved Page 647 (part 2)

1" steel supply piping ne@3.45 Ea 323.00 180.40 1.97 505.37


1-1/4" steel supply piping ne@3.75 Ea 428.00 196.10 2.14 626.24
1-1/2" steel supply piping ne@3.85 Ea 459.00 201.40 2.19 662.59
2" steel supply piping ne@4.15 Ea 647.00 217.00 2.37 866.37
2015 Heavy Construction Estimator, All Rights Reserved Page 648

CSI 15-761, Fan coil units

Horizontal fan coil units with chilled water cooling and electric heating coil (2 pipe)
Ceiling suspended, with baked enamel cabinet. Add the cost of electrical and pipe connections, using
small tools.
200 CFM nb@2.50 Ea 996.00 130.80 1.43 1,128.23
300 CFM nb@2.75 Ea 1,110.00 143.80 1.57 1,255.37
400 CFM nb@3.25 Ea 1,190.00 170.00 1.85 1,361.85
600 CFM nb@3.75 Ea 1,380.00 196.10 2.14 1,578.24
800 CFM nb@4.00 Ea 1,690.00 209.20 2.28 1,901.48
1000 CFM nb@4.00 Ea 2,300.00 209.20 2.28 2,511.48
1200 CFM nb@4.00 Ea 2,760.00 209.20 2.28 2,971.48

Horizontal fan coil units with hydronic heating and cooling coils (4 pipe)
Ceiling suspended, 4-pipe system complete with cabinet, chilled and hot water coils, 3-way valve for
chilled water coil and baked enamel finish. Add the cost of pipe connection below, using small tools.
200 CFM nb@2.50 Ea 1,190.00 130.80 1.43 1,322.23
300 CFM nb@2.75 Ea 1,300.00 143.80 1.57 1,445.37
400 CFM nb@3.25 Ea 1,380.00 170.00 1.85 1,551.85
600 CFM nb@3.75 Ea 1,720.00 196.10 2.14 1,918.24
800 CFM nb@4.00 Ea 1,880.00 209.20 2.28 2,091.48
1,000 CFM nb@4.00 Ea 2,530.00 209.20 2.28 2,741.48
1,200 CFM nb@4.00 Ea 3,060.00 209.20 2.28 3,271.48

Vertical fan coil units, with chilled water cooling and electric heating coil (2 pipe)
Floor mounted, complete with baked enamel cabinet. Add the cost of electrical and connections, using
small tools.
200 CFM nb@2.50 Ea 1,110.00 130.80 1.43 1,242.23
300 CFM nb@2.75 Ea 1,190.00 143.80 1.57 1,335.37
400 CFM nb@3.25 Ea 1,300.00 170.00 1.85 1,471.85
600 CFM nb@3.75 Ea 1,490.00 196.10 2.14 1,688.24
800 CFM nb@4.00 Ea 1,690.00 209.20 2.28 1,901.48
1,000 CFM nb@4.00 Ea 2,420.00 209.20 2.28 2,631.48
1,200 CFM nb@4.00 Ea 2,880.00 209.20 2.28 3,091.48

Vertical fan coil units with hydronic heating and cooling coils (4 pipe)
Floor mounted 4-pipe system complete with cabinet, chilled and hot water coils, 3-way valve for chilled
water coil and baked enamel finish. Add the cost of pipe connection below, using small tools.
200 CFM nb@2.50 Ea 1,260.00 130.80 1.43 1,392.23
300 CFM nb@2.75 Ea 1,340.00 143.80 1.57 1,485.37
400 CFM nb@3.25 Ea 1,460.00 170.00 1.85 1,631.85
600 CFM nb@3.75 Ea 1,840.00 196.10 2.14 2,038.24
800 CFM nb@4.00 Ea 2,070.00 209.20 2.28 2,281.48
1,000 CFM nb@4.00 Ea 2,760.00 209.20 2.28 2,971.48
1,200 CFM nb@4.00 Ea 3,290.00 209.20 2.28 3,501.48

Connect fan coil units - 2-pipe system, one coil, no control valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves, using small tools.
1/2" supply and return ne@2.00 Ea 217.00 104.60 1.14 322.74
3/4" supply and return ne@2.30 Ea 283.00 120.30 1.31 404.61
1" supply and return ne@2.65 Ea 419.00 138.60 1.51 559.11

Connect fan coil units - 2 pipe system, one coil, 2 way control valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves. Includes installation of the control valve but not the control valve itself. See CSI 15-938, using
small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 648 (part 2)

1/2" supply and return ne@2.35 Ea 234.00 122.90 1.34 358.24


3/4" supply and return ne@2.80 Ea 308.00 146.40 1.60 456.00
2015 Heavy Construction Estimator, All Rights Reserved Page 649

1" supply and return ne@3.20 Ea 468.00 167.40 1.82 637.22

Connect fan coil units - 2 pipe system, one coil, 2-way mixing valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves. Includes installation of the control valve but not the control valve itself. See CSI 15-938, using
small tools.
1/2" supply and return ne@2.90 Ea 259.00 151.70 1.65 412.35
3/4" supply and return ne@3.40 Ea 333.00 177.80 1.94 512.74
1" supply and return ne@3.60 Ea 530.00 188.30 2.05 720.35

Connect fan coil units - 2 pipe system, one coil, 3-way mixing valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves. Includes installation of the control valve but not the control valve itself. See CSI 15-938, using
small tools.
1/2" supply and return ne@3.15 Ea 308.00 164.70 1.80 474.50
3/4" supply and return ne@3.70 Ea 407.00 193.50 2.11 602.61
1" supply and return ne@3.95 Ea 628.00 206.60 2.25 836.85

Connect fan coil units - 4 pipe system, dual coils, 2-way control valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves. Includes installation of the control valve but not the control valve itself. See CSI 15-938, using
small tools.
1/2" supply and return ne@4.65 Ea 505.00 243.20 2.65 750.85
3/4" supply and return ne@4.90 Ea 628.00 256.30 2.79 887.09
1" supply and return ne@5.35 Ea 776.00 279.80 3.05 1,058.85

Connect fan coil units - 4 pipe system, dual coils, 3-way mixing valve
Coil connection includes copper Type L pipe and wrought fittings, pipe insulation, condensate drain and
valves. Includes installation of the control valve but not the control valve itself. See CSI 15-938, using
small tools.
1/2" supply and return ne@4.90 Ea 554.00 256.30 2.79 813.09
3/4" supply and return ne@5.45 Ea 801.00 285.00 3.11 1,089.11
1" supply and return ne@5.95 Ea 961.00 311.20 3.39 1,275.59

CSI 15-770, Packaged heating and cooling

Single package room air conditioners


Through-the-wall unit, cooling only, using small tools.
5,000 Btuh, 115v n8@3.23 Ea 692.00 164.40 1.94 858.34
6,000 Btuh, 115v n8@3.51 Ea 736.00 178.60 2.11 916.71
7,800 Btuh, 115v n8@3.77 Ea 994.00 191.90 2.26 1,188.16
9,000 Btuh, 115v n8@4.26 Ea 895.00 216.80 2.56 1,114.36
12,000 Btuh, 115v n8@4.55 Ea 1,010.00 231.50 2.73 1,244.23
14,000 Btuh, 115/230v n8@4.88 Ea 1,260.00 248.30 2.93 1,511.23
17,000 Btuh, 115/230v n8@5.13 Ea 1,140.00 261.10 3.08 1,404.18
21,300 Btuh, 115/230v n8@5.00 Ea 1,490.00 254.50 3.00 1,747.50
29,000 Btuh, 115/230v n8@5.41 Ea 2,290.00 275.30 3.25 2,568.55
Add for electric heat units ---@--- % 15.00 -- -- --

Packaged rooftop HVAC units


DX air-cooled condenser/compressor, including throwaway filters, manual outside air damper, roof curbs
and electric heat approximately 1/2 the cooling capacity. Add the cost of electrical connection, startup
and adjustment, using small tools.
2 ton n8@4.00 Ea 2,870.00 203.60 2.40 3,076.00
3 ton n8@4.00 Ea 3,380.00 203.60 2.40 3,586.00
2015 Heavy Construction Estimator, All Rights Reserved Page 650

4 ton n8@4.00 Ea 4,410.00 203.60 2.40 4,616.00


5 ton n8@4.50 Ea 5,050.00 229.00 2.70 5,281.70
7-1/2 ton n8@5.00 Ea 7,980.00 254.50 3.00 8,237.50

Packaged rooftop HVAC units


DX air-cooled condenser/compressor, including throwaway filters, manual outside air damper, roof curbs
and electric heat approximately 1/2 the cooling capacity. Add the cost of electrical connection, startup
and adjustment, using a 20-ton hydraulic crane with 70’ boom and small tools.
10 ton pt@8.00 Ea 10,400.00 336.10 40.20 10,776.30
12-1/2 ton pt@10.0 Ea 12,700.00 420.10 50.30 13,170.40
15 ton pt@12.0 Ea 15,500.00 504.10 60.40 16,064.50
20 ton pt@16.0 Ea 20,000.00 672.20 80.50 20,752.70
25 ton pt@16.0 Ea 28,800.00 672.20 80.50 29,552.70
30 ton pt@24.0 Ea 33,000.00 1,008.00 121.00 34,129.00
40 ton pt@26.0 Ea 41,500.00 1,092.00 131.00 42,723.00
50 ton pt@32.0 Ea 57,300.00 1,344.00 161.00 58,805.00
60 ton pt@36.0 Ea 69,500.00 1,512.00 181.00 71,193.00
75 ton pt@40.0 Ea 84,100.00 1,680.00 201.00 85,981.00

Gas fired make-up air units


Electric spark, includes two position damper, curb filter and thermostat with capillary. Add the cost of
gas and electrical connection, startup and adjustment, using a 20-ton hydraulic crane with 70’ boom
and small tools.
100,000 Btu, 1/2 HP, 1200 CFM pt@10.0 Ea 3,980.00 420.10 50.30 4,450.40
300,000 Btu, 1-1/2 HP, 3500 CFM pt@14.0 Ea 7,970.00 588.10 70.40 8,628.50
500,000 Btu, 2 HP, 4000 CFM pt@14.0 Ea 9,190.00 588.10 70.40 9,848.50
670,000 Btu, 3 HP, 6000 CFM pt@16.0 Ea 13,000.00 672.20 80.50 13,752.70
800,000 Btu, 5 HP, 7500 CFM pt@18.0 Ea 15,300.00 756.20 90.50 16,146.70
1,200,000 Btu, 10 HP, 10000 CFM pt@20.0 Ea 19,200.00 840.20 101.00 20,141.20

Electric make-up air units


Includes two position damper, curb, filter and thermostat. Add the cost of electrical connection, startup
and adjustment, using a 20-ton hydraulic crane with 70’ boom and small tools.
33 KW, 1/2 HP, 1200 CFM pt@10.0 Ea 8,510.00 420.10 50.30 8,980.40
100 KW, 1-1/2 HP, 3500 CFM pt@14.0 Ea 12,300.00 588.10 70.40 12,958.50
150 KW, 2 HP, 4000 CFM pt@14.0 Ea 15,400.00 588.10 70.40 16,058.50
250 KW, 5 HP, 7500 CFM pt@18.0 Ea 20,000.00 756.20 90.50 20,846.70
400 KW, 10 HP, 10000 CFM pt@20.0 Ea 32,600.00 840.20 101.00 33,541.20

CSI 15-772, Packaged heat pumps

Single package air to air heat pumps


Using small tools.
2 ton nz@4.25 Ea 1,500.00 193.90 2.47 1,696.37
3 ton nz@4.26 Ea 3,680.00 194.40 2.47 3,876.87
4 ton nz@4.26 Ea 4,800.00 194.40 2.47 4,996.87
5 ton nz@5.41 Ea 5,340.00 246.90 3.14 5,590.04
8 ton nz@6.45 Ea 10,500.00 294.30 3.74 10,798.04

Single package air to air heat pumps


Using a 20-ton hydraulic crane with 70’ boom and small tools.
11 ton n2@8.00 Ea 13,300.00 360.00 33.50 13,693.50

Split system heat pumps


Air cooled outdoor section, packaged unit, using a 20-ton hydraulic crane with 70’ boom and small
tools.
2 ton nz@2.15 Ea 2,430.00 98.10 1.25 2,529.35
2015 Heavy Construction Estimator, All Rights Reserved Page 650 (part 2)

2-1/2 ton nz@2.67 Ea 2,570.00 121.80 1.55 2,693.35


3 ton nz@3.23 Ea 2,960.00 147.40 1.87 3,109.27
3-1/2 ton nz@3.77 Ea 3,520.00 172.00 2.19 3,694.19
4 ton nz@4.26 Ea 4,040.00 194.40 2.47 4,236.87
5 ton nz@4.88 Ea 4,580.00 222.70 2.83 4,805.53
2015 Heavy Construction Estimator, All Rights Reserved Page 651

Packaged indoor section heat pumps


Horizontal upflow with electric heat, using a 20-ton hydraulic crane with 70’ boom and small tools.
2 ton nz@2.15 Ea 690.00 98.10 1.25 789.35
2-1/2 ton nz@2.67 Ea 738.00 121.80 1.55 861.35
3 ton nz@3.23 Ea 738.00 147.40 1.87 887.27
3-1/2 ton nz@3.77 Ea 1,040.00 172.00 2.19 1,214.19
4 ton nz@4.26 Ea 1,040.00 194.40 2.47 1,236.87
5 ton nz@4.88 Ea 1,140.00 222.70 2.83 1,365.53

CSI 15-773, Computer room air conditioners

Direct expansion computer room air conditioning


Air cooled direct expansion. Includes compressor sequence switch, mode alert monitor, non-locking
disconnect switch, firestat, auto flush on humidifier, two liquitect sensors, floor stand, and outdoor air
cooled condenser with fan speed control, using a 20-ton hydraulic crane with 70’ boom and small tools.
3 ton nz@10.5 Ea 11,900.00 479.10 6.09 12,385.19
5 ton nz@12.5 Ea 12,300.00 570.40 7.25 12,877.65
8 ton nz@15.4 Ea 20,200.00 702.70 8.93 20,911.63
10 ton nz@16.7 Ea 20,600.00 762.00 9.69 21,371.69
15 ton nz@20.0 Ea 23,500.00 912.60 11.60 24,424.20
18 ton nz@21.5 Ea 27,000.00 981.00 12.50 27,993.50
21 ton nz@25.6 Ea 30,000.00 1,168.00 14.80 31,182.80

Chilled water computer room air conditioners


Excluding chilled water source, using a 20-ton hydraulic crane with 70’ boom and small tools.
6 ton nz@15.4 Ea 8,860.00 702.70 8.93 9,571.63
8 ton nz@16.7 Ea 12,500.00 762.00 9.69 13,271.69
10 ton nz@20.0 Ea 13,800.00 912.60 11.60 14,724.20
12 ton nz@21.5 Ea 14,300.00 981.00 12.50 15,293.50

CSI 15-781, Humidifiers

Steam type humidifiers


Pneumatically controlled for duct or air handling, installation standard unit with integral operator
distribution manifold strainer trap and pneumatic modulating valve. Add for humidistat and piping, using
small tools.
3 to 191 lbs. per hour,
24" manifold n8@4.00 Ea 520.00 203.60 2.40 726.00
3 to 191 lbs. per hour,
48" manifold n8@4.00 Ea 520.00 203.60 2.40 726.00
65 to 334 lbs. per hour,
36" manifold n8@4.00 Ea 816.00 203.60 2.40 1,022.00
65 to 334 lbs. per hour,
72" manifold n8@5.00 Ea 816.00 254.50 3.00 1,073.50
100 to 690 lbs. per hour,
48" manifold n8@4.00 Ea 1,300.00 203.60 2.40 1,506.00
100 to 690 lbs. per hour,
84" manifold n8@5.00 Ea 1,300.00 254.50 3.00 1,557.50
220 to 2000 lbs. per hour,
72" manifold n8@5.00 Ea 2,060.00 254.50 3.00 2,317.50
220 to 2000 lbs. per hour,
144" manifold n8@6.25 Ea 2,060.00 318.10 3.75 2,381.85
Add for
electrically controlled unit --@.000 Ea 617.00 -- -- 617.00

Steam generating humidifiers


Electric, self-steam producing electronic modulating duct or air handling unit installation, 208V to 108V
with 12" to 72" manifolds, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 651 (part 2)

To 96 lbs. per hour n8@6.25 Ea 4,570.00 318.10 3.75 4,891.85


2015 Heavy Construction Estimator, All Rights Reserved Page 652

97 to 168 lbs. per hour n8@6.25 Ea 5,870.00 318.10 3.75 6,191.85


Add for room mounting --@.000 Ea 317.00 -- -- 317.00

CSI 15-785, Dehumidifiers

Free standing dehumidifiers


Self contained unit, sized by moisture removal per 24 hours, using small tools.
10 pints nw@1.64 Ea 263.00 81.33 0.93 345.26
15 pints nw@1.64 Ea 292.00 81.33 0.93 374.26
20 pints nw@1.64 Ea 345.00 81.33 0.93 427.26
30 pints nw@1.64 Ea 409.00 81.33 0.93 491.26
40 pints nw@1.64 Ea 439.00 81.33 0.93 521.26

CSI 15-810, Furnaces

Upflow forced air oil furnaces, with electronic ignition


Belt driven blowers, excludes thermostats, ductwork, supply piping, blower cooling relay, and electrical
hook-up. Units suitable for add-on cooling, using small tools.
105,000 Btu n8@6.50 Ea 2,680.00 330.80 3.90 3,014.70
140,000 Btu n8@6.50 Ea 2,990.00 330.80 3.90 3,324.70
168,000 Btu n8@6.50 Ea 3,290.00 330.80 3.90 3,624.70

Lo-boy pattern forced air oil furnaces


Belt driven blowers, excludes thermostats, ductwork, supply piping, blower cooling relay, and electrical
hook-up. Units suitable for add-on cooling, using small tools.
105,000 Btu n8@6.50 Ea 1,300.00 330.80 3.90 1,634.70
140,000 Btu n8@6.50 Ea 1,760.00 330.80 3.90 2,094.70
189,000 Btu n8@6.50 Ea 2,450.00 330.80 3.90 2,784.70

Down-flow forced air oil furnaces


Belt driven blowers, excludes thermostats, ductwork, supply piping, blower cooling relay, and electrical
hook-up, using small tools.
105,000 Btu n8@6.50 Ea 1,160.00 330.80 3.90 1,494.70
140,000 Btu n8@6.50 Ea 1,420.00 330.80 3.90 1,754.70
168,000 Btu n8@6.50 Ea 1,940.00 330.80 3.90 2,274.70

Horizontal forced-air oil furnace


Belt driven blowers, excludes thermostats, ductwork, supply piping, blower cooling relay, and electrical
hook-up, using small tools.
105000 Btu n8@6.50 Ea 1,640.00 330.80 3.90 1,974.70
140000 Btu n8@6.50 Ea 2,300.00 330.80 3.90 2,634.70
189000 Btu n8@6.50 Ea 2,890.00 330.80 3.90 3,224.70

Forced-air electric furnaces


With direct drive blower. Not including fresh air inlet, thermostats, ductwork, and electrical hook-up. Can
be installed for any discharge direction. Blower suitable for add-on cooling up to 5 tons, using small
tools.
15,700 Btu nz@3.77 Ea 672.00 172.00 2.19 846.19
31,400 Btu nz@4.26 Ea 805.00 194.40 2.47 1,001.87
47,100 Btu nz@5.41 Ea 895.00 246.90 3.14 1,145.04
62,900 Btu nz@5.88 Ea 951.00 268.30 3.41 1,222.71
78,500 Btu nz@6.45 Ea 1,020.00 294.30 3.74 1,318.04
94,200 Btu nz@6.90 Ea 1,080.00 314.80 4.00 1,398.80
110,000 Btu nz@7.41 Ea 1,310.00 338.10 4.30 1,652.40

Horizontal wall furnaces, gas fired


Recessed, with direct drive blower. Not including fresh air inlet, thermostats, ductwork, and electrical
hook-up, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 652 (part 2)

7,700 Btu n8@2.50 Ea 218.00 127.20 1.50 346.70


14,000 Btu n8@2.75 Ea 659.00 139.90 1.65 800.55
24,000 Btu n8@3.25 Ea 1,520.00 165.40 1.95 1,687.35
49,000 Btu n8@3.75 Ea 1,990.00 190.80 2.25 2,183.05
65,000 Btu n8@4.00 Ea 2,040.00 203.60 2.40 2,246.00

Up flow pattern wall furnaces, gas fired


Direct drive blower. Not including fresh air inlet, thermostats, ductwork, and electrical hook-up, using
small tools.
7,700 Btu n8@2.50 Ea 218.00 127.20 1.50 346.70
14,000 Btu n8@2.75 Ea 406.00 139.90 1.65 547.55
24,000 Btu n8@3.25 Ea 587.00 165.40 1.95 754.35
2015 Heavy Construction Estimator, All Rights Reserved Page 653

50,000 Btu n8@4.24 Ea 988.00 215.80 2.54 1,206.34


65,000 Btu n8@4.53 Ea 996.00 230.50 2.72 1,229.22

LP or natural gas direct drive furnaces


Direct drive blower. Not including fresh air inlet, thermostats, ductwork, piping or electrical hook-up,
using small tools.
42 MBtu n8@5.00 Ea 1,260.00 254.50 3.00 1,517.50
63 MBtu n8@5.26 Ea 1,460.00 267.70 3.16 1,730.86
79 MBtu n8@5.56 Ea 936.00 282.90 3.34 1,222.24
84 MBtu n8@5.88 Ea 1,180.00 299.20 3.53 1,482.73
105 MBtu n8@6.25 Ea 1,380.00 318.10 3.75 1,701.85
126 MBtu n8@6.45 Ea 1,610.00 328.20 3.87 1,942.07
160 MBtu n8@6.67 Ea 1,840.00 339.40 4.00 2,183.40
200 MBtu n8@7.14 Ea 4,100.00 363.40 4.28 4,467.68
300 MBtu n8@8.33 Ea 4,930.00 423.90 5.00 5,358.90
400 MBtu n8@10.0 Ea 5,300.00 508.90 6.00 5,814.90
2-3 ton 115 MBtu, high efficiency n8@6.25 Ea 2,270.00 318.10 3.75 2,591.85
4-5 ton 115 MBtu, high efficiency n8@6.67 Ea 2,350.00 339.40 4.00 2,693.40

CSI 15-821, Centrifugal fans

Centrifugal fans - 12-1/4" wheel, 650 to 2,950 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/6 HP nz@3.35 Ea 647.00 152.90 1.94 801.84
1/4 HP nz@3.55 Ea 661.00 162.00 2.06 825.06
1/3 HP nz@3.85 Ea 672.00 175.70 2.23 849.93
1/2 HP nz@4.50 Ea 681.00 205.30 2.61 888.91
3/4 HP nz@4.60 Ea 797.00 209.90 2.67 1,009.57
1 HP nz@4.70 Ea 855.00 214.50 2.73 1,072.23
1-1/2 HP nz@4.80 Ea 873.00 219.00 2.78 1,094.78

Centrifugal fans - 13-1/2" wheel, 734 to 3,343 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@3.64 Ea 781.00 166.10 2.11 949.21
1/3 HP nz@3.95 Ea 792.00 180.20 2.29 974.49
1/2 HP nz@4.55 Ea 828.00 207.60 2.64 1,038.24
3/4 HP nz@4.67 Ea 877.00 213.10 2.71 1,092.81
1 HP nz@4.94 Ea 975.00 225.40 2.87 1,203.27
1-1/2 HP nz@5.15 Ea 1,000.00 235.00 2.99 1,237.99

Centrifugal fans - 15" wheel, 1,258 to 4,146 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@3.77 Ea 903.00 172.00 2.19 1,077.19
1/3 HP nz@4.00 Ea 915.00 182.50 2.32 1,099.82
2015 Heavy Construction Estimator, All Rights Reserved Page 654

1/2 HP nz@5.30 Ea 939.00 241.80 3.07 1,183.87


3/4 HP nz@6.30 Ea 951.00 287.50 3.65 1,242.15
1 HP nz@6.50 Ea 1,110.00 296.60 3.77 1,410.37
1-1/2 HP nz@6.60 Ea 1,130.00 301.20 3.83 1,435.03
2 HP nz@6.70 Ea 1,170.00 305.70 3.89 1,479.59

Centrifugal fans - 16-1/2" wheel, 977 to 4,711 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@4.00 Ea 1,050.00 182.50 2.32 1,234.82
1/3 HP nz@4.17 Ea 1,090.00 190.30 2.42 1,282.72
1/2 HP nz@5.60 Ea 1,130.00 255.50 3.25 1,388.75
3/4 HP nz@6.45 Ea 1,140.00 294.30 3.74 1,438.04
1 HP nz@6.65 Ea 1,150.00 303.40 3.86 1,457.26
1-1/2 HP nz@6.75 Ea 1,170.00 308.00 3.92 1,481.92
2 HP nz@6.85 Ea 1,230.00 312.60 3.97 1,546.57

Centrifugal fans - 18-1/4" wheel, 2,193 to 6,498 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@4.17 Ea 1,090.00 190.30 2.42 1,282.72
1/3 HP nz@4.44 Ea 1,100.00 202.60 2.58 1,305.18
1/2 HP nz@6.25 Ea 1,130.00 285.20 3.63 1,418.83
3/4 HP nz@6.76 Ea 1,140.00 308.50 3.92 1,452.42
1 HP nz@7.07 Ea 1,170.00 322.60 4.10 1,496.70
1-1/2 HP nz@7.35 Ea 1,220.00 335.40 4.26 1,559.66
2 HP nz@7.50 Ea 1,260.00 342.20 4.35 1,606.55

Centrifugal fans - 20" wheel, 2,412 to 7,364 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@4.44 Ea 1,100.00 202.60 2.58 1,305.18
1/3 HP nz@4.65 Ea 1,110.00 212.20 2.70 1,324.90
1/2 HP nz@6.35 Ea 1,140.00 289.80 3.68 1,433.48
3/4 HP nz@6.86 Ea 1,170.00 313.00 3.98 1,486.98
1 HP nz@7.17 Ea 1,230.00 327.20 4.16 1,561.36
1-1/2 HP nz@7.45 Ea 1,340.00 339.90 4.32 1,684.22
2 HP nz@7.60 Ea 1,380.00 346.80 4.41 1,731.21
3 HP nz@7.75 Ea 1,450.00 353.60 4.50 1,808.10

Centrifugal fans - 22-1/4" wheel, 2,265 to 8,483 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/4 HP nz@4.65 Ea 1,340.00 212.20 2.70 1,554.90
1/3 HP nz@5.00 Ea 1,350.00 228.20 2.90 1,581.10
1/2 HP nz@6.55 Ea 1,380.00 298.90 3.80 1,682.70
3/4 HP nz@6.98 Ea 1,400.00 318.50 4.05 1,722.55
1 HP nz@7.59 Ea 1,430.00 346.30 4.40 1,780.70
1-1/2 HP nz@7.71 Ea 1,440.00 351.80 4.47 1,796.27
2 HP nz@7.81 Ea 1,460.00 356.40 4.53 1,820.93
3 HP nz@8.00 Ea 1,490.00 365.00 4.64 1,859.64

Centrifugal fans - 24-1/2" wheel, 3,055 to 11,380 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/3 HP nz@5.07 Ea 1,650.00 231.30 2.94 1,884.24
1/2 HP nz@6.75 Ea 1,670.00 308.00 3.92 1,981.92
3/4 HP nz@7.25 Ea 1,720.00 330.80 4.21 2,055.01
2015 Heavy Construction Estimator, All Rights Reserved Page 654 (part 2)

1 HP nz@7.67 Ea 1,750.00 350.00 4.45 2,104.45


1-1/2 HP nz@7.81 Ea 1,760.00 356.40 4.53 2,120.93
2 HP nz@8.00 Ea 1,780.00 365.00 4.64 2,149.64
3 HP nz@9.00 Ea 1,800.00 410.70 5.22 2,215.92
5 HP nz@10.0 Ea 1,900.00 456.30 5.80 2,362.10
2015 Heavy Construction Estimator, All Rights Reserved Page 655

Centrifugal fans - 27" wheel, 2,734 to 13,266 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/3 HP nz@5.26 Ea 1,850.00 240.00 3.05 2,093.05
1/2 HP nz@6.95 Ea 1,870.00 317.10 4.03 2,191.13
3/4 HP nz@7.43 Ea 1,900.00 339.00 4.31 2,243.31
1 HP nz@7.84 Ea 1,910.00 357.70 4.55 2,272.25
1-1/2 HP nz@8.00 Ea 1,960.00 365.00 4.64 2,329.64
2 HP nz@8.70 Ea 1,990.00 397.00 5.05 2,392.05
3 HP nz@10.0 Ea 2,020.00 456.30 5.80 2,482.10
5 HP nz@11.0 Ea 2,070.00 501.90 6.38 2,578.28

Large industrial centrifugal fans - 30" wheel, 4,926 to 17,456 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/2 HP nz@7.12 Ea 2,300.00 324.90 4.13 2,629.03
3/4 HP nz@7.68 Ea 2,330.00 350.40 4.45 2,684.85
1 HP nz@8.03 Ea 2,360.00 366.40 4.66 2,731.06
1-1/2 HP nz@8.28 Ea 2,400.00 377.80 4.80 2,782.60
2 HP nz@9.10 Ea 2,430.00 415.20 5.28 2,850.48
3 HP nz@10.2 Ea 2,470.00 465.40 5.92 2,941.32
5 HP nz@11.1 Ea 2,510.00 506.50 6.44 3,022.94
7-1/2 HP nz@11.4 Ea 2,540.00 520.20 6.61 3,066.81

Large industrial centrifugal fans - 33" wheel, 5,734 to 19,799 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/2 HP fan nz@7.14 Ea 2,570.00 325.80 4.14 2,899.94
3/4 HP fan nz@7.24 Ea 2,630.00 330.40 4.20 2,964.60
1 HP fan nz@7.31 Ea 2,690.00 333.60 4.24 3,027.84
1-1/2 HP fan nz@7.34 Ea 2,750.00 334.90 4.26 3,089.16
2 HP fan nz@8.20 Ea 2,810.00 374.20 4.76 3,188.96
3 HP fan nz@8.90 Ea 2,870.00 406.10 5.16 3,281.26
5 HP fan nz@10.2 Ea 2,970.00 465.40 5.92 3,441.32
7-1/2 HP fan nz@11.7 Ea 2,990.00 533.90 6.79 3,530.69

Large industrial centrifugal fans - 36-1/2" wheel, 5,388 to 22,500 CFM


Utility backward inclined steel wheel, V-belt driven, CFM rating at 1/8" static pressure, using small
tools.
1/2 HP nz@7.25 Ea 3,030.00 330.80 4.21 3,365.01
3/4 HP nz@7.33 Ea 3,090.00 334.50 4.25 3,428.75
1 HP nz@7.42 Ea 3,130.00 338.60 4.30 3,472.90
1-1/2 HP nz@7.44 Ea 3,150.00 339.50 4.32 3,493.82
2 HP nz@8.30 Ea 3,220.00 378.70 4.81 3,603.51
3 HP nz@9.28 Ea 3,270.00 423.40 5.38 3,698.78
5 HP nz@10.6 Ea 3,330.00 483.70 6.15 3,819.85
7-1/2 HP nz@12.0 Ea 3,350.00 547.60 6.96 3,904.56

Roof exhaust sets


Single speed axial flow, direct drive, aluminum construction for room ventilation, using small tools.
10", 495 CFM, 1/30 HP nz@2.00 Ea 581.00 91.26 1.16 673.42
12", 940 CFM,1/10 HP nz@2.41 Ea 745.00 110.00 1.40 856.40
14", 1,450 CFM, 1/6 HP nz@2.50 Ea 862.00 114.10 1.45 977.55
18", 2,460 CFM, 1/3 HP nz@3.57 Ea 907.00 162.90 2.07 1,071.97

Restaurant kitchen exhaust fans, direct drive


Roof mounted, centrifugal wheel, aluminum housing and wheel, direct-driven, high temperature to 200
Fahrenheit, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 655 (part 2)

9-3/4", two speed,


810/530 CFM, 1/12 HP nz@2.00 Ea 251.00 91.26 1.16 343.42
12-5/8", two speed,
1,900/1,235 CFM, 1/3 HP nz@2.41 Ea 412.00 110.00 1.40 523.40
13-1/2", two speed,
2,260/1,475 CFM, 1/2 HP nz@2.60 Ea 698.00 118.60 1.51 818.11
15", one speed, 2,880 CFM, 3/4 HP nz@2.99 Ea 889.00 136.40 1.73 1,027.13
2015 Heavy Construction Estimator, All Rights Reserved Page 656

Restaurant kitchen exhaust fans, belt drive


Roof mounted, centrifugal wheel, aluminum housing, high temperature to 250 Fahrenheit, using small
tools.
20", 4,205 CFM, 3/4 HP nz@4.76 Ea 1,300.00 217.20 2.76 1,519.96
24-1/2", 7,020 CFM, 1-1/2 HP nz@5.88 Ea 1,470.00 268.30 3.41 1,741.71
30", 10,070 CFM, 1-1/2 HP nz@7.14 Ea 1,930.00 325.80 4.14 2,259.94

CSI 15-824, Propeller fans

Direct drive propeller exhaust fans


With wall shutter, rating at 1/8" static pressure, using small tools.
16", 2,353 CFM, 1/3 HP nz@3.33 Ea 320.00 151.90 1.93 473.83
18", 3,880 CFM, 5/8 HP nz@3.64 Ea 400.00 166.10 2.11 568.21
21", 4,740 CFM, 3/4 HP nz@4.00 Ea 468.00 182.50 2.32 652.82

V-belt drive propeller exhaust fans


With wall shutter, rating at 1/8" static pressure, using small tools.
24", 5795 CFM, 1/2 HP nz@5.71 Ea 966.00 260.50 3.31 1,229.81
30", 9060 CFM, 3/4 HP nz@6.67 Ea 1,100.00 304.40 3.87 1,408.27
36", 11850 CFM, 1 HP nz@8.00 Ea 1,220.00 365.00 4.64 1,589.64
42", 17400 CFM, 1-1/2 HP nz@10.0 Ea 1,770.00 456.30 5.80 2,232.10
48", 19870 CFM, 1-1/2 HP nz@13.3 Ea 2,020.00 606.90 7.71 2,634.61
54", 26000 CFM, 2 HP nz@20.0 Ea 2,720.00 912.60 11.60 3,644.20
60", 35120 CFM, 3 HP nz@25.6 Ea 3,160.00 1,168.00 14.80 4,342.80

Reversible ceiling fans


Heavy duty industrial grade, four blade, reversible, 120v, 60 Hz, using small tools.
5,500 CFM nz@1.50 Ea 63.10 68.45 0.87 132.42
7,600 CFM nz@1.50 Ea 83.90 68.45 0.87 153.22
21,015 CFM nz@20.0 Ea 123.00 912.60 11.60 1,047.20

Waterproof ceiling fans, 3 blade, 20’ diameter


Using small tools.
21,000 CFM nz@20.0 Ea 145.00 912.60 11.60 1,069.20

CSI 15-826, Fly fans

Entrance air curtains


Unheated, complete, including housing and controls, by nominal door size, using small tools.
3’ x 10' nz@11.1 Ea 581.00 506.50 6.44 1,093.94
3.5’ x10' nz@11.1 Ea 594.00 506.50 6.44 1,106.94
4’ x 10' nz@11.1 Ea 600.00 506.50 6.44 1,112.94
5’ x 10' nz@11.1 Ea 871.00 506.50 6.44 1,383.94
6’ x 10' nz@13.3 Ea 1,100.00 606.90 7.71 1,714.61
7’ x 10' nz@13.3 Ea 1,190.00 606.90 7.71 1,804.61
10’ x 10' nz@15.4 Ea 1,740.00 702.70 8.93 2,451.63
12’ x 10' nz@15.4 Ea 2,210.00 702.70 8.93 2,921.63
15’ x 10' nz@15.4 Ea 2,610.00 702.70 8.93 3,321.63

Receiving/service entrance air curtains


Unheated, complete, including housing and controls, by nominal door size, using small tools.
3’ x 8' nz@11.1 Ea 821.00 506.50 6.44 1,333.94
3.5’ x 8' nz@11.1 Ea 585.00 506.50 6.44 1,097.94
4’ x 8' nz@11.1 Ea 596.00 506.50 6.44 1,108.94
5’ x 8' nz@11.1 Ea 852.00 506.50 6.44 1,364.94
6’ x 8' nz@13.3 Ea 941.00 606.90 7.71 1,555.61
2015 Heavy Construction Estimator, All Rights Reserved Page 656 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 657

7’ x 8' nz@13.3 Ea 1,160.00 606.90 7.71 1,774.61


8’ x 8' nz@15.4 Ea 1,190.00 702.70 8.93 1,901.63
10’ x 8' nz@15.4 Ea 1,730.00 702.70 8.93 2,441.63

Service window air curtains


Unheated, complete, including housing and controls, by nominal window size, using small tools.
2.5’ x 5' nz@17.4 Ea 455.00 794.00 10.10 1,259.10

CSI 15-827, Axial flow fans

Direct drive tube-axial duct fans


Constant speed, CFM rating at 1/8" static pressure, using small tools.
12", 1/6 HP, 1,060 CFM nz@6.67 Ea 408.00 304.40 3.87 716.27
12", 1/2 HP, 2,095 CFM nz@6.67 Ea 438.00 304.40 3.87 746.27
16", 1/3 HP, 2,490 CFM nz@6.67 Ea 496.00 304.40 3.87 804.27
20", 3/4 HP, 4,130 CFM nz@6.67 Ea 554.00 304.40 3.87 862.27
22", 3/4 HP, 4,700 CFM nz@8.00 Ea 642.00 365.00 4.64 1,011.64
24", 1 HP, 5,850 CFM nz@8.70 Ea 758.00 397.00 5.05 1,160.05
24", 1-1/2 HP, 7,925 CFM nz@9.52 Ea 788.00 434.40 5.52 1,227.92
30", 1 HP, 10,640 CFM nz@10.0 Ea 933.00 456.30 5.80 1,395.10
30", 2-1/2 HP, 14,765 CFM nz@12.5 Ea 933.00 570.40 7.25 1,510.65
36", 2 HP, 16,780 CFM nz@13.3 Ea 1,520.00 606.90 7.71 2,134.61
36", 5 HP, 22,920 CFM nz@15.4 Ea 1,280.00 702.70 8.93 1,991.63

Belt drive duct fans


Constant speed, rating at 1/8" static pressure, using small tools.
15", 1/3 HP, 2,800 CFM nz@6.45 Ea 473.00 294.30 3.74 771.04
15", 1/2 HP, 3,400 CFM nz@6.67 Ea 779.00 304.40 3.87 1,087.27
18", 1/3 HP, 3,280 CFM nz@6.90 Ea 799.00 314.80 4.00 1,117.80
18", 1/2 HP, 3,900 CFM nz@7.14 Ea 806.00 325.80 4.14 1,135.94
18", 1 HP, 5,250 CFM nz@7.41 Ea 833.00 338.10 4.30 1,175.40
24", 1/2 HP, 4,800 CFM nz@7.69 Ea 997.00 350.90 4.46 1,352.36
24", 1 HP, 6,430 CFM nz@8.00 Ea 997.00 365.00 4.64 1,366.64
30", 1 HP, 9250 CFM nz@8.70 Ea 1,410.00 397.00 5.05 1,812.05
30", 5 HP, 16,900 CFM nz@10.5 Ea 1,660.00 479.10 6.09 2,145.19
36", 3/4 HP, 8,090 CFM nz@11.1 Ea 1,300.00 506.50 6.44 1,812.94
36", 2 HP, 14,475 CFM nz@11.8 Ea 1,660.00 538.40 6.84 2,205.24
36", 7-1/2 HP, 14,475 CFM nz@15.4 Ea 1,890.00 702.70 8.93 2,601.63
42", 7-1/2 HP, 29,000 CFM nz@18.2 Ea 2,660.00 830.50 10.60 3,501.10
24", 2 HP, 8,860 CFM nz@8.00 Ea 553.00 365.00 4.64 922.64
30", 5 HP, 16,150 CFM nz@10.0 Ea 760.00 456.30 5.80 1,222.10
36", 5 HP, 20,080 CFM nz@13.3 Ea 855.00 606.90 7.71 1,469.61

CSI 15-829, Exhaust fans

Light duty exhaust fans


Using small tools.
170 CFM, wall mounted nz@2.00 Ea 96.30 91.26 1.16 188.72
180 CFM, ceiling mounted nz@2.00 Ea 101.00 91.26 1.16 193.42
70 CFM, ceiling mounted,
with heater light nz@2.00 Ea 96.30 91.26 1.16 188.72
70 CFM, ceiling or wall mounted nz@2.00 Ea 61.40 91.26 1.16 153.82
50 CFM, ceiling or wall mounted nz@2.00 Ea 44.90 91.26 1.16 137.32
70 CFM, ceiling mounted, with light nz@2.00 Ea 44.00 91.26 1.16 136.42
70 CFM, ceiling mounted,
with heater bulb receptacle nz@2.00 Ea 85.00 91.26 1.16 177.42

Vent kits for exhaust fans


2015 Heavy Construction Estimator, All Rights Reserved Page 657 (part 2)

For use with the fans above, using small tools.


Roof vent,
including cap and flashing nw@1.00 Ea 38.80 49.59 0.57 88.96
Wall vent, including cap nw@1.00 Ea 20.10 49.59 0.57 70.26
2015 Heavy Construction Estimator, All Rights Reserved Page 658

Ceiling exhaust fans for kitchen area


Includes grille, using small tools.
8", 160 CFM nz@2.00 Ea 70.70 91.26 1.16 163.12
8", 190 CFM nz@2.00 Ea 120.00 91.26 1.16 212.42
10", 430 CFM nz@2.00 Ea 193.00 91.26 1.16 285.42

Bathroom exhaust fans


120v, 60hz, anodized aluminum finish, using small tools.
180 CFM, 225 square feet maximum nz@1.27 Ea 117.00 57.95 0.74 175.69
210 CFM, 260 square feet maximum nz@2.00 Ea 135.00 91.26 1.16 227.42
260 CFM, 325 square feet maximum nz@3.45 Ea 135.00 157.40 2.00 294.40
300 CFM, 375 square feet maximum nz@3.45 Ea 184.00 157.40 2.00 343.40

Bathroom fans with light and heater


Using small tools.
180 CFM nz@3.45 Ea 119.00 157.40 2.00 278.40
210 CFM nz@3.45 Ea 136.00 157.40 2.00 295.40
260 CFM nz@3.45 Ea 145.00 157.40 2.00 304.40
300 CFM nz@3.45 Ea 148.00 157.40 2.00 307.40

CSI 15-830, Power roof ventilators

Power roof ventilators - Direct drive


Centrifugal, aluminum housing, bird screen, backdraft damper, CFM rating at 1/4" static pressure, using
small tools.
420 CFM, 8" x 8" damper nz@3.23 Ea 223.00 147.40 1.87 372.27
675 CFM, 12" x 12" damper nz@3.77 Ea 228.00 172.00 2.19 402.19
770 CFM, 16" x 16" damper nz@4.26 Ea 284.00 194.40 2.47 480.87
2,150 CFM, 20" x 20" damper nz@6.45 Ea 298.00 294.30 3.74 596.04

Power roof ventilators - Belt driven


Centrifugal, aluminum housing, bird screen, backdraft damper, CFM rating at 1/4" static pressure, using
small tools.
1,660 CFM, 12" x 12" damper nz@4.26 Ea 507.00 194.40 2.47 703.87
2,830 CFM, 14" x 14" damper nz@5.41 Ea 704.00 246.90 3.14 954.04
4,600 CFM, 20" x 20" damper nz@6.45 Ea 837.00 294.30 3.74 1,135.04
8,750 CFM, 26" x 26" damper nz@8.00 Ea 1,330.00 365.00 4.64 1,699.64
12,500 CFM, 32" x 32" damper nz@10.0 Ea 2,270.00 456.30 5.80 2,732.10
21,600 CFM, 40" x 40" damper nz@12.5 Ea 2,860.00 570.40 7.25 3,437.65

Roof exhaust propeller fans


Roof mounted, upblast with backdraft damper, bird screen and curb, using small tools.
5 HP, 30,300 CFM at 3/8" static pressure,
belt drive nz@15.4 Ea 2,370.00 702.70 8.93 3,081.63
15 HP, 36,000
CFM at 1/2" static pressure nz@20.0 Ea 4,120.00 912.60 11.60 5,044.20

Supply fans, belt drive


using small tools.
4,500 CFM, 24" x 24" supply fan nz@7.99 Ea 855.00 364.60 4.63 1,224.23
10,000 CFM, 36" x 36" supply fan nz@10.0 Ea 1,190.00 456.30 5.80 1,652.10

CSI 15-831, Power wall ventilators

Centrifugal wall ventilators


2015 Heavy Construction Estimator, All Rights Reserved Page 658 (part 2)

Direct drive, aluminum housing, bird screen, backdraft damper, rating at 1/4" static pressure, using
small tools.
420 CFM, 8" x 8"damper nz@3.23 Ea 201.00 147.40 1.87 350.27
675 CFM, 12" x 12"damper nz@3.77 Ea 246.00 172.00 2.19 420.19
770 CFM, 16" x 16"damper nz@4.26 Ea 246.00 194.40 2.47 442.87
1,220 CFM, 18" x 18" nz@4.76 Ea 391.00 217.20 2.76 610.96
2,150 CFM, 20" x 20"damper nz@6.45 Ea 397.00 294.30 3.74 695.04

CSI 15-832, Roof ventilators

Relief intake roof vents


Mushroom type, aluminum housing, damper, bird screen and curb, by nominal opening size, using
small tools.
12" x 12" damper nz@2.50 Ea 174.00 114.10 1.45 289.55
16" x 16" damper nz@2.50 Ea 247.00 114.10 1.45 362.55
22" x 22" damper nz@3.33 Ea 314.00 151.90 1.93 467.83
2015 Heavy Construction Estimator, All Rights Reserved Page 659

28" x 28" damper nz@4.00 Ea 388.00 182.50 2.32 572.82


32" x 32" damper nz@4.00 Ea 632.00 182.50 2.32 816.82
38" x 38" damper nz@8.00 Ea 762.00 365.00 4.64 1,131.64
46" x 46" damper nz@8.00 Ea 1,040.00 365.00 4.64 1,409.64
52" x 52" damper nz@10.0 Ea 1,180.00 456.30 5.80 1,642.10
60" x 60" damper nz@10.0 Ea 1,740.00 456.30 5.80 2,202.10

CSI 15-833, Fans

Corrosion proof coated exhaust fans


480v, 3 phase explosion proof motor and backdraft damper, using small tools.
1,200 CFM fan, 1/4 HP nz@4.25 Ea 605.00 193.90 2.47 801.37
6,500 CFM fan, 1 HP nz@7.99 Ea 2,360.00 364.60 4.63 2,729.23

CSI 15-834, Air handling units

Single zone built-up air handling units


Horizontal/vertical draw-through fan, motor and cabinet, with motor drive vibration isolators. Based on
units shipped with sections assembled. Add for coil and duct connection, external vibration isolation,
coils, humidification, controls, start-up, testing and balancing, using miscellaneous power tools and
small tools.
1,600 CFM n4@5.50 Ea 2,990.00 239.20 3.63 3,232.83
2,000 CFM n4@7.00 Ea 3,560.00 304.40 4.62 3,869.02
3,000 CFM n4@9.00 Ea 5,020.00 391.40 5.94 5,417.34
4,000 CFM n4@11.0 Ea 6,370.00 478.40 7.26 6,855.66
5,000 CFM n4@13.0 Ea 7,520.00 565.40 8.58 8,093.98
6,500 CFM n4@14.0 Ea 7,990.00 608.90 9.24 8,608.14
7,500 CFM n4@14.5 Ea 9,370.00 630.60 9.57 10,010.17
9,200 CFM n4@15.5 Ea 10,300.00 674.10 10.20 10,984.30
11,500 CFM n4@17.0 Ea 11,700.00 739.30 11.20 12,450.50
13,200 CFM n4@19.0 Ea 13,500.00 826.30 12.50 14,338.80

Single zone built-up air handling units


Horizontal/vertical draw-through fan, motor and cabinet, with motor drive vibration isolators, using a
20-ton hydraulic crane with 70’ boom and small tools.
16,500 CFM pp@24.8 Ea 13,800.00 1,081.00 150.00 15,031.00
19,500 CFM pp@36.0 Ea 14,300.00 1,570.00 218.00 16,088.00
22,000 CFM pp@49.3 Ea 14,900.00 2,149.00 299.00 17,348.00
27,000 CFM pp@63.2 Ea 22,900.00 2,756.00 383.00 26,039.00
34,000 CFM pp@81.8 Ea 28,200.00 3,566.00 496.00 32,262.00
40,000 CFM pp@60.0 Ea 36,300.00 2,616.00 364.00 39,280.00
Add for flat filter
box and throwaway filters ---@--- % 10.00 5.00 -- --
Add for medium capacity filter
box and throwaway filters ---@--- % 20.00 7.00 -- --
Add for combination filter mixing
box and throwaway filters ---@--- % 37.00 10.00 -- --
Add for manual roll filter ---@--- % 55.00 10.00 -- --
Add for automatic roll filter ---@--- % 55.00 10.00 -- --
Add for hot water heating coil ---@--- % 30.00 10.00 -- --
Add for electric heating coil ---@--- % 22.00 10.00 -- --
Add for chilled water cooling coil ---@--- % 60.00 10.00 -- --
Add for
direct expansion cooling coil ---@--- % 60.00 10.00 -- --

Multi-zone air handling units


Horizontal/vertical draw-through fan, motor and cabinet, with motor drive vibration isolators, using
miscellaneous power tools and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 659 (part 2)

3,000 CFM n4@19.1 Ea 6,760.00 830.70 12.60 7,603.30


4,000 CFM n4@20.3 Ea 7,810.00 882.80 13.40 8,706.20
5,000 CFM n4@20.3 Ea 8,710.00 882.80 13.40 9,606.20
6,500 CFM n4@22.2 Ea 10,400.00 965.50 14.70 11,380.20
7,500 CFM n4@21.3 Ea 11,600.00 926.30 14.10 12,540.40
9,200 CFM n4@21.3 Ea 14,000.00 926.30 14.10 14,940.40

Multi-zone air handling units


Horizontal/vertical draw-through fan, motor and cabinet, with motor drive vibration isolators, using a
20-ton hydraulic crane with 70’ boom and small tools.
11,500 CFM pp@30.8 Ea 17,300.00 1,343.00 187.00 18,830.00
2015 Heavy Construction Estimator, All Rights Reserved Page 660

13,200 CFM pp@34.3 Ea 19,800.00 1,495.00 208.00 21,503.00


16,500 CFM pp@32.7 Ea 24,800.00 1,426.00 198.00 26,424.00
19,500 CFM pp@36.0 Ea 31,600.00 1,570.00 218.00 33,388.00
22,000 CFM pp@40.0 Ea 35,000.00 1,744.00 242.00 36,986.00
27,000 CFM pp@48.0 Ea 42,200.00 2,093.00 291.00 44,584.00
34,000 CFM pp@53.7 Ea 51,900.00 2,341.00 325.00 54,566.00
40,000 CFM pp@60.0 Ea 59,800.00 2,616.00 364.00 62,780.00
47,000 CFM pp@65.4 Ea 69,900.00 2,851.00 396.00 73,147.00
Add for flat filter
box and throwaway filters ---@--- % 5.00 -- -- --
Add for medium capacity filter
box and throwaway filters ---@--- % 10.00 -- -- --
Add for combination filter mixing
box and throwaway filters ---@--- % 12.00 -- -- --
Add for manual roll filter ---@--- % 55.00 -- -- --
Add for automatic roll filter ---@--- % 55.00 -- -- --
Add for hot water heating coil ---@--- % 10.00 -- -- --
Add for electric heating coil ---@--- % 10.00 -- -- --
Add for chilled water cooling coil ---@--- % 100.00 -- -- --
Add for
direct expansion cooling coil ---@--- % 100.00 -- -- --

Return air fans


Using miscellaneous power tools and small tools.
9,200 CFM return air fan n4@21.3 Ea 2,830.00 926.30 14.10 3,770.40
13,200 CFM return air fan n4@29.0 Ea 4,620.00 1,261.00 19.10 5,900.10
16,500 CFM return air fan n4@29.0 Ea 4,860.00 1,261.00 19.10 6,140.10
19,500 CFM return air fan n4@32.0 Ea 5,830.00 1,392.00 21.10 7,243.10

CSI 15-840, Ductwork

Galvanized rectangular steel duct


Costs include fabrication, field assembly and installation per pound of duct installed. Includes duct,
cleats, screws, hangar straps, sealant and 10% waste but no insulation, using small tools.
Low pressure duct, field fabricated n3@.100 Lb 0.86 4.26 0.06 5.18
Medium pressure duct,
field fabricated n3@.110 Lb 0.86 4.68 0.07 5.61
High pressure duct,
field fabricated n3@.140 Lb 0.86 5.96 0.09 6.91
Low pressure duct, shop fabricated n3@.050 Lb 0.86 2.13 0.03 3.02
Medium pressure duct,
shop fabricated n3@.110 Lb 0.86 4.68 0.07 5.61
High pressure duct, shop fabricated n3@.120 Lb 0.86 5.11 0.07 6.04

Round steel duct


28 gauge, factory fabricated, field installed, low pressure, using small tools.
4" duct ny@.040 LF 1.03 1.98 0.02 3.03
5" duct ny@.040 LF 1.16 1.98 0.02 3.16
6" duct ny@.040 LF 1.32 1.98 0.02 3.32
7" duct ny@.050 LF 1.62 2.48 0.03 4.13
8" duct ny@.050 LF 2.16 2.48 0.03 4.67
10" duct ny@.060 LF 3.55 2.97 0.04 6.56
12" duct ny@.060 LF 4.52 2.97 0.04 7.53

Round steel adjustable duct elbows


Factory fabricated, field installed, low pressure, using small tools.
4" duct ny@.150 Ea 1.30 7.43 0.09 8.82
5" duct ny@.150 Ea 1.51 7.43 0.09 9.03
2015 Heavy Construction Estimator, All Rights Reserved Page 660 (part 2)

6" duct ny@.150 Ea 1.85 7.43 0.09 9.37


7" duct ny@.170 Ea 3.08 8.42 0.10 11.60
8" duct ny@.170 Ea 3.51 8.42 0.10 12.03
10" duct ny@.190 Ea 4.14 9.42 0.11 13.67
2015 Heavy Construction Estimator, All Rights Reserved Page 661

12" duct ny@.190 Ea 4.87 9.42 0.11 14.40

Aluminum sheet metal duct


Alloy 3003-H14. Costs based on typical commercial or industrial jobs including shop fabrication, field
assembly and installation per pound of duct installed. Includes duct, fittings, cleats, hanger straps and
10% waste. Add the cost of insulation, using small tools.
Low pressure, 22 gauge n3@.250 Lb 4.12 10.64 0.16 14.92
Medium pressure, 20 gauge n3@.250 Lb 2.55 10.64 0.16 13.35

Stainless steel sheet metal duct


Type 304 stainless steel. Costs include field assembly and installation per pound of duct installed. No
allowance for waste included, using small tools.
Low pressure n3@.170 Lb 19.60 7.24 0.11 26.95
Medium pressure n3@.190 Lb 20.20 8.09 0.12 28.41
High pressure n3@.240 Lb 20.20 10.21 0.15 30.56

Stainless steel fire dampers and exhaust hoods


Using small tools.
16 gauge n3@.620 SF 9.40 26.39 0.38 36.17
14 gauge n3@.780 SF 11.70 33.20 0.48 45.38
12 gauge n3@1.08 SF 16.40 45.96 0.67 63.03
10 gauge n3@1.33 SF 21.10 56.60 0.82 78.52

Fiberglass duct
Using small tools.
1" (25mm) thick n3@.080 SF 2.95 3.41 0.05 6.41

Flexible duct
Factory fabricated, preinsulated, using small tools.
4" (100mm) diameter ny@.050 LF 3.18 2.48 0.03 5.69
5" (125mm) diameter ny@.060 LF 3.37 2.97 0.04 6.38
6" (150mm) diameter ny@.070 LF 3.59 3.47 0.04 7.10
7" (178mm) diameter ny@.080 LF 3.90 3.96 0.05 7.91
8" (205mm) diameter ny@.100 LF 4.21 4.96 0.06 9.23
10" (250mm) diameter ny@.130 LF 4.86 6.44 0.08 11.38
12" (310mm) diameter ny@.150 LF 5.79 7.43 0.09 13.31
14" (355mm) diameter ny@.160 LF 7.71 7.93 0.10 15.74
18" (460mm) diameter ny@.180 LF 10.90 8.92 0.11 19.93

Sheet metal collars


Spin-in type, factory fabricated, using small tools.
4" (100mm) diameter ny@.230 Ea 10.80 11.40 0.14 22.34
5" (125mm) diameter ny@.260 Ea 11.40 12.88 0.16 24.44
6" (150mm) diameter ny@.300 Ea 12.30 14.87 0.18 27.35
7" (178mm) diameter ny@.360 Ea 14.00 17.84 0.22 32.06
8" (205mm) diameter ny@.450 Ea 15.60 22.30 0.27 38.17
10" (250mm) diameter ny@.450 Ea 19.40 22.30 0.27 41.97
12" (310mm) diameter ny@.450 Ea 23.60 22.30 0.27 46.17

CSI 15-848, Duct lining

Fiberglass duct liner board


Provides acoustical insulation, using small tools.
1", (25.4mm ) thick,
field installed ny@.050 SF 0.78 2.48 0.03 3.29
1-1/2", (38mm ) thick,
field installed ny@.050 SF 1.13 2.48 0.03 3.64
2015 Heavy Construction Estimator, All Rights Reserved Page 661 (part 2)

2", (51mm ) thick, field installed ny@.060 SF 1.47 2.97 0.04 4.48

Shop installed fiberglass duct liner board


Provides acoustical insulation, 1-1/2 lb. density, using small tools.
1" (25.4mm ) thick ny@.030 SF 0.78 1.49 0.02 2.29
1-1/2" (38mm ) thick ny@.030 SF 1.13 1.49 0.02 2.64
2" (51mm ) thick ny@.040 SF 1.47 1.98 0.02 3.47
2015 Heavy Construction Estimator, All Rights Reserved Page 662

CSI 15-851, Tailpipe exhaust equipment

Overhead tailpipe exhaust system - Direct drive blowers


Using small tools.
495 CFM, 1/3 HP nz@4.26 Ea 1,150.00 194.40 2.47 1,346.87
1445 CFM, 3/4 HP nz@8.70 Ea 1,170.00 397.00 5.05 1,572.05
1840 CFM, 1-1/2 HP nz@10.5 Ea 1,690.00 479.10 6.09 2,175.19

Overhead tailpipe exhaust system - Belt drive blowers


Using small tools.
1400 CFM, 1 HP nz@8.70 Ea 2,940.00 397.00 5.05 3,342.05
2023 CFM, 1-1/2 HP nz@10.5 Ea 2,990.00 479.10 6.09 3,475.19
2750 CFM, 2 HP nz@16.7 Ea 3,130.00 762.00 9.69 3,901.69
4400 CFM, 3 HP nz@21.5 Ea 3,710.00 981.00 12.50 4,703.50
7060 CFM, 5 HP nz@25.6 Ea 4,860.00 1,168.00 14.80 6,042.80

Overhead tailpipe exhaust system - Spiral exhaust duct


26 gauge galvanized steel, slip joint, using small tools.
4" duct nz@.050 LF 1.37 2.28 0.03 3.68
6" duct nz@.060 LF 1.77 2.74 0.03 4.54
8" duct nz@.080 LF 2.22 3.65 0.05 5.92
10" duct nz@.090 LF 2.62 4.11 0.05 6.78
12" duct nz@.100 LF 3.14 4.56 0.06 7.76
14" duct nz@.110 LF 3.54 5.02 0.06 8.62
16" duct nz@.130 LF 4.62 5.93 0.08 10.63
18" duct nz@.150 LF 5.13 6.85 0.09 12.07
20" duct nz@.170 LF 5.65 7.76 0.10 13.51
22" duct nz@.190 LF 54.90 8.67 0.11 63.68
24" duct nz@.220 LF 59.80 10.04 0.13 69.97

Overhead tailpipe exhaust system - 90 degree elbows


Two piece, 26 gauge galvanized steel, slip joint, using small tools.
4" elbow nz@.540 Ea 48.80 24.64 0.31 73.75
6" elbow nz@.800 Ea 64.20 36.50 0.46 101.16
8" elbow nz@1.05 Ea 9.16 47.91 0.61 57.68
10" elbow nz@1.33 Ea 13.40 60.69 0.77 74.86
12" elbow nz@1.67 Ea 16.20 76.20 0.97 93.37
14" elbow nz@1.82 Ea 19.10 83.05 1.06 103.21
16" elbow nz@2.15 Ea 23.60 98.10 1.25 122.95
18" elbow nz@2.67 Ea 27.20 121.80 1.55 150.55
20" elbow nz@3.23 Ea 32.10 147.40 1.87 181.37
22" elbow nz@3.77 Ea 326.00 172.00 2.19 500.19
24" elbow nz@4.26 Ea 402.00 194.40 2.47 598.87

Overhead tailpipe exhaust system - 45 degree elbows


Two piece, 26 gauge galvanized steel, slip joint, using small tools.
4" elbow nz@.540 Ea 42.20 24.64 0.31 67.15
6" elbow nz@.800 Ea 47.40 36.50 0.46 84.36
8" elbow nz@1.05 Ea 63.60 47.91 0.61 112.12
10" elbow nz@1.33 Ea 8.90 60.69 0.77 70.36
12" elbow nz@1.67 Ea 10.30 76.20 0.97 87.47
14" elbow nz@1.82 Ea 11.90 83.05 1.06 96.01
16" elbow nz@2.15 Ea 13.20 98.10 1.25 112.55
18" elbow nz@2.67 Ea 15.40 121.80 1.55 138.75
20" elbow nz@3.23 Ea 17.70 147.40 1.87 166.97
22" elbow nz@3.77 Ea 19.90 172.00 2.19 194.09
24" elbow nz@4.26 Ea 21.00 194.40 2.47 217.87
2015 Heavy Construction Estimator, All Rights Reserved Page 662 (part 2)

Overhead tailpipe exhaust system - 45 degree reducing laterals


26 gauge galvanized steel, slip joint, using small tools.
6" x 6" x 4" nz@1.05 Ea 10.20 47.91 0.61 58.72
8" x 8" x 4" nz@1.67 Ea 10.60 76.20 0.97 87.77
10" x 10" x 4" nz@2.15 Ea 11.70 98.10 1.25 111.05
2015 Heavy Construction Estimator, All Rights Reserved Page 663

12" x 12" x 4" nz@2.67 Ea 12.20 121.80 1.55 135.55


14" x 14" x 4" nz@3.23 Ea 12.60 147.40 1.87 161.87
16" x 16" x 4" nz@3.77 Ea 13.70 172.00 2.19 187.89
18" x 18" x 4" nz@4.26 Ea 14.30 194.40 2.47 211.17
20" x 20" x 4" nz@4.88 Ea 14.80 222.70 2.83 240.33
22" x 22" x 4" nz@5.41 Ea 17.80 246.90 3.14 267.84
24" x 24" x 4" nz@5.88 Ea 18.40 268.30 3.41 290.11

Overhead tailpipe exhaust system - Reducers


26 gauge galvanized steel, slip joint, using small tools.
6" x 4" nz@.800 Ea 3.66 36.50 0.46 40.62
8" x 6" nz@1.05 Ea 4.02 47.91 0.61 52.54
10" x 8" nz@1.33 Ea 4.45 60.69 0.77 65.91
12" x 10" nz@1.67 Ea 4.87 76.20 0.97 82.04
14" x 12" nz@1.82 Ea 5.43 83.05 1.06 89.54
16" x 14" nz@2.15 Ea 9.38 98.10 1.25 108.73
18" x 16" nz@2.67 Ea 10.00 121.80 1.55 133.35
20" x 18" nz@3.23 Ea 10.70 147.40 1.87 159.97
22" x 20" nz@3.77 Ea 11.40 172.00 2.19 185.59
24" x 22" nz@4.26 Ea 12.00 194.40 2.47 208.87

Overhead tailpipe exhaust system - Couplings


26 gauge galvanized steel, slip joint, using small tools.
4" coupling nz@.540 Ea 1.72 24.64 0.31 26.67
6" coupling nz@.800 Ea 1.96 36.50 0.46 38.92
8" coupling nz@1.05 Ea 2.12 47.91 0.61 50.64
10" coupling nz@1.33 Ea 2.27 60.69 0.77 63.73
12" coupling nz@1.67 Ea 2.42 76.20 0.97 79.59
14" coupling nz@1.82 Ea 2.57 83.05 1.06 86.68
16" coupling nz@2.15 Ea 2.84 98.10 1.25 102.19
18" coupling nz@2.67 Ea 3.01 121.80 1.55 126.36
20" coupling nz@3.23 Ea 3.19 147.40 1.87 152.46
22" coupling nz@3.77 Ea 3.30 172.00 2.19 177.49
24" coupling nz@4.26 Ea 3.49 194.40 2.47 200.36

Overhead tailpipe exhaust system - Caps


26 gauge galvanized steel, slip joint, using small tools.
4" cap nz@.270 Ea 2.03 12.32 0.16 14.51
6" cap nz@.400 Ea 2.27 18.25 0.23 20.75
8" cap nz@.530 Ea 2.47 24.18 0.31 26.96
10" cap nz@.670 Ea 2.75 30.57 0.39 33.71
12" cap nz@.830 Ea 3.06 37.87 0.48 41.41
14" cap nz@.910 Ea 3.38 41.52 0.53 45.43
16" cap nz@1.05 Ea 3.90 47.91 0.61 52.42
18" cap nz@1.33 Ea 13.10 60.69 0.77 74.56
20" cap nz@1.67 Ea 14.20 76.20 0.97 91.37
22" cap nz@1.82 Ea 15.30 83.05 1.06 99.41
24" cap nz@2.13 Ea 16.50 97.19 1.24 114.93

Overhead tailpipe exhaust system - Flex hose


With duct coupler, damper and tailpipe adapter, using small tools.
3" x 20' neoprene nz@1.05 Ea 40.60 47.91 0.61 89.12
4" x 20' neoprene nz@1.67 Ea 57.90 76.20 0.97 135.07
3" x 20' galvanized nz@1.05 Ea 22.10 47.91 0.61 70.62
4" x 20' galvanized nz@1.67 Ea 27.00 76.20 0.97 104.17
4" x 15' neoprene nz@1.05 Ea 55.40 47.91 0.61 103.92
5" x 15' neoprene nz@1.67 Ea 68.70 76.20 0.97 145.87
4" x 17' galvanized nz@1.05 Ea 34.00 47.91 0.61 82.52
2015 Heavy Construction Estimator, All Rights Reserved Page 663 (part 2)

5" x 17' galvanized nz@1.67 Ea 37.10 76.20 0.97 114.27


2015 Heavy Construction Estimator, All Rights Reserved Page 664

Overhead tailpipe exhaust system - Flex hose


Using a 300-amp skid mounted welder and small tools.
25' x 6", high pressure,
stainless steel ni@1.43 Ea 1,000.00 70.31 2.52 1,072.83

CSI 15-855, Breeching and smoke pipe

Round galvanized flue and vent pipe


Double wall, using small tools.
3" x 5' nx@.710 Ea 2.79 32.40 0.41 35.60
3" x 4' nx@.590 Ea 2.27 26.92 0.34 29.53
3" x 3' nx@.430 Ea 1.72 19.62 0.25 21.59
3" x 2' nx@.270 Ea 1.33 12.32 0.16 13.81
3" x 1.5' nx@.220 Ea 1.03 10.04 0.13 11.20
3" x 1' nx@.160 Ea 0.83 7.30 0.09 8.22
3" x 1' adjustable nx@.160 Ea 1.13 7.30 0.09 8.52
4" x 5' nx@.800 Ea 3.40 36.50 0.46 40.36
4" x 4' nx@.650 Ea 2.81 29.66 0.38 32.85
4" x 3' nx@.490 Ea 2.18 22.36 0.28 24.82
4" x 2' nx@.320 Ea 1.59 14.60 0.19 16.38
4" x 1.5' nx@.270 Ea 1.22 12.32 0.16 13.70
4" x 1' nx@.160 Ea 1.07 7.30 0.09 8.46
4" x 1', adjustable nx@.160 Ea 1.38 7.30 0.09 8.77
6" x 5' nx@.910 Ea 4.52 41.52 0.53 46.57
6" x 4' nx@.740 Ea 3.88 33.77 0.43 38.08
6" x 3' nx@.540 Ea 2.99 24.64 0.31 27.94
6" x 2' nx@.360 Ea 2.31 16.43 0.21 18.95
6"x1.5' nx@.280 Ea 1.68 12.78 0.16 14.62
6" x 1' nx@.180 Ea 1.46 8.21 0.10 9.77
6" x 1', adjustable nx@.180 Ea 1.75 8.21 0.10 10.06
8" x 5' nx@1.00 Ea 7.72 45.63 0.58 53.93
8" x 4' nx@.800 Ea 6.74 36.50 0.46 43.70
8" x 3' nx@.610 Ea 4.91 27.83 0.35 33.09
8" x 2' nx@.410 Ea 3.84 18.71 0.24 22.79
8" x 1.5' nx@.310 Ea 2.68 14.15 0.18 17.01
8" x 1' nx@.220 Ea 2.46 10.04 0.13 12.63
8" x 1', adjustable nx@.220 Ea 2.60 10.04 0.13 12.77
10" x 3' nx@.740 Ea 9.65 33.77 0.43 43.85

Miscellaneous, sheet metal items


Using small tools.
Fiberglass flex duct, 8" ny@.012 LF 3.56 0.60 0.01 4.17
Splitter damper, with hardware ny@.281 Ea 18.90 13.92 0.17 32.99
2015 Heavy Construction Estimator, All Rights Reserved Page 665

CSI 15-861, Manual dampers

Radial opposed blade duct dampers


Steel construction, round, using small tools.
6" (15cm) diameter ny@.310 Ea 70.50 15.36 0.19 86.05
7" (18cm) diameter ny@.360 Ea 85.70 17.84 0.22 103.76
8" (21cm) diameter ny@.419 Ea 104.00 20.76 0.25 125.01
10" (25cm) diameter ny@.462 Ea 137.00 22.89 0.28 160.17
12" (31cm) diameter ny@.514 Ea 180.00 25.47 0.31 205.78
14" (36cm) diameter ny@.563 Ea 207.00 27.90 0.34 235.24
15" (38cm) diameter ny@.621 Ea 235.00 30.77 0.37 266.14
16" (41cm) diameter ny@.667 Ea 263.00 33.05 0.40 296.45
18" (46cm) diameter ny@.720 Ea 276.00 35.68 0.43 312.11
20" (51cm) diameter ny@.783 Ea 370.00 38.80 0.47 409.27
24" (61cm) diameter ny@.818 Ea 401.00 40.53 0.49 442.02
30" (76cm) diameter ny@.900 Ea 435.00 44.60 0.54 480.14
36" (91cm) diameter ny@.947 Ea 470.00 46.92 0.57 517.49

Rectangular opposed blade duct dampers


Steel construction, using small tools.
8" x 6" ny@.310 Ea 33.00 15.36 0.19 48.55
14" x 10" ny@.360 Ea 43.40 17.84 0.22 61.46
14" x 14" ny@.419 Ea 50.00 20.76 0.25 71.01
16" x 10" ny@.462 Ea 43.40 22.89 0.28 66.57
16" x 16" ny@.514 Ea 50.00 25.47 0.31 75.78
18" x 14" ny@.563 Ea 52.80 27.90 0.34 81.04
18" x 16" ny@.621 Ea 52.80 30.77 0.37 83.94
20" x 18" ny@.667 Ea 66.10 33.05 0.40 99.55
20" x 6" ny@.720 Ea 41.50 35.68 0.43 77.61
20" x 8" ny@.783 Ea 45.30 38.80 0.47 84.57
20" x 20" ny@.818 Ea 66.10 40.53 0.49 107.12
22" x 6" ny@.900 Ea 45.30 44.60 0.54 90.44
22" x 18" ny@.947 Ea 68.00 46.92 0.57 115.49
22" x 20" ny@1.00 Ea 68.00 49.55 0.60 118.15
22" x 22" ny@1.06 Ea 77.40 52.52 0.64 130.56
24" x 20" ny@1.13 Ea 68.00 55.99 0.68 124.67
24" x 24" ny@1.29 Ea 77.40 63.92 0.77 142.09
28" x 28" ny@1.38 Ea 90.60 68.38 0.83 159.81
30" x 30" ny@1.50 Ea 106.00 74.33 0.90 181.23
32" x 32" ny@1.50 Ea 106.00 74.33 0.90 181.23
34" x 34" ny@1.64 Ea 123.00 81.26 0.98 205.24
36" x 32" ny@1.80 Ea 109.00 89.19 1.08 199.27
36" x 34" ny@1.88 Ea 128.00 93.15 1.13 222.28
36" x 36" ny@1.98 Ea 128.00 98.11 1.19 227.30

CSI 15-862, Dampers, motorized

Motorized duct dampers


Using small tools.
48" x 48" nw@4.00 Ea 732.00 198.40 2.28 932.68
6' wide x 14' high nw@12.0 Ea 2,350.00 595.10 6.84 2,951.94

CSI 15-864, Fire dampers

Vertical fire dampers, per square foot of damper


Using small tools.
Vertical curtain type nw@.526 SF 27.20 26.08 0.30 53.58
2015 Heavy Construction Estimator, All Rights Reserved Page 665 (part 2)

Vertical louver type nw@.526 SF 42.00 26.08 0.30 68.38

Folding curtain type duct dampers


Galvanized steel, with 160 degree fusible link. Spring actuated for horizontal mounting. Gravity actuated
for vertical mounting. UL listed, steel construction, 1-1/2 hour rated, installed in the air stream, using
small tools.
6" x 6" nw@.400 Ea 24.50 19.84 0.23 44.57
8" x 8" nw@.400 Ea 29.50 19.84 0.23 49.57
10" x 10" nw@.500 Ea 34.40 24.80 0.29 59.49
12" x 12" nw@.500 Ea 39.30 24.80 0.29 64.39
14" x 14" nw@.602 Ea 51.50 29.85 0.34 81.69
16" x 16" nw@.602 Ea 51.50 29.85 0.34 81.69
18" x 18" nw@.602 Ea 66.30 29.85 0.34 96.49
20" x 20" nw@1.00 Ea 66.30 49.59 0.57 116.46
24" x 24" nw@1.00 Ea 85.90 49.59 0.57 136.06
24 x 12 nw@1.00 Ea 57.50 49.59 0.57 107.66
2015 Heavy Construction Estimator, All Rights Reserved Page 666

30 x 14 nw@1.14 Ea 71.90 56.53 0.65 129.08


18 x 16 nw@.602 Ea 64.70 29.85 0.34 94.89
36 x 16 nw@1.54 Ea 77.30 76.37 0.88 154.55
48 x 48 nw@4.00 Ea 253.00 198.40 2.28 453.68
32 x 24 nw@2.00 Ea 102.00 99.18 1.14 202.32
32 x 40 nw@2.50 Ea 162.00 124.00 1.43 287.43

Louver type parallel blade duct dampers


Galvanized steel with 160 degree fusible link. 1-1/2 hour rated. Spring actuated. UL listed, using small
tools.
6" x 6" nw@.400 Ea 90.60 19.84 0.23 110.67
8" x 8" nw@.400 Ea 111.00 19.84 0.23 131.07
10" x 10" nw@.500 Ea 126.00 24.80 0.29 151.09
12" x 12" nw@.500 Ea 126.00 24.80 0.29 151.09
14" x 14" nw@.602 Ea 130.00 29.85 0.34 160.19
16" x 16" nw@.602 Ea 164.00 29.85 0.34 194.19
18" x 18" nw@.602 Ea 172.00 29.85 0.34 202.19
20" x 20" nw@1.00 Ea 172.00 49.59 0.57 222.16
24" x 24" nw@1.00 Ea 202.00 49.59 0.57 252.16

Round duct dampers, 2 hour rating


Steel, using small tools.
4" damper nw@.400 Ea 24.30 19.84 0.23 44.37
5" damper nw@.400 Ea 26.10 19.84 0.23 46.17
6" damper nw@.455 Ea 31.30 22.56 0.26 54.12
7" damper nw@.455 Ea 33.20 22.56 0.26 56.02
8" damper nw@.500 Ea 41.70 24.80 0.29 66.79
9" damper nw@.500 Ea 46.90 24.80 0.29 71.99
10" damper nw@.556 Ea 52.10 27.57 0.32 79.99
12" damper nw@.625 Ea 58.50 30.99 0.36 89.85
14" damper nw@.714 Ea 66.40 35.41 0.41 102.22

Round duct dampers, 4 hour rating


Steel, using small tools.
4" damper nw@.455 Ea 27.20 22.56 0.26 50.02
5" damper nw@.455 Ea 32.00 22.56 0.26 54.82
6" damper nw@.500 Ea 36.80 24.80 0.29 61.89
7" damper nw@.500 Ea 42.90 24.80 0.29 67.99
8" damper nw@.556 Ea 49.10 27.57 0.32 76.99
9" damper nw@.556 Ea 52.80 27.57 0.32 80.69
10" damper nw@.625 Ea 58.60 30.99 0.36 89.95
12" damper nw@.714 Ea 64.00 35.41 0.41 99.82
14" damper nw@.833 Ea 74.70 41.31 0.47 116.48

Curtain type gravity actuated duct dampers, 4 hour rated


UL listed, using small tools.
42" x 30" nw@1.67 Ea 108.00 82.82 0.95 191.77
44" x 24" nw@1.67 Ea 133.00 82.82 0.95 216.77
10" x 10" nw@.400 Ea 3.32 19.84 0.23 23.39

Curtain type gravity actuated duct dampers, 2 hour rated


UL listed, using small tools.
18" x 22" nw@.455 Ea 49.80 22.56 0.26 72.62
42" x 30" nw@1.67 Ea 91.20 82.82 0.95 174.97
96" x 24" nw@5.00 Ea 149.00 248.00 2.85 399.85
96" x 42" nw@5.00 Ea 261.00 248.00 2.85 511.85

CSI 15-865, Smoke and fire dampers


2015 Heavy Construction Estimator, All Rights Reserved Page 666 (part 2)

Smoke and fire dampers


Leakage class I, with firestat, air foil blades, using small tools.
20" x 16" nw@1.25 Ea 214.00 61.99 0.71 276.70
24" x 20" nw@1.43 Ea 218.00 70.91 0.82 289.73
30" x 24" nw@1.82 Ea 242.00 90.25 1.04 333.29
36" x 30" nw@2.50 Ea 325.00 124.00 1.43 450.43
40" x 36" nw@2.50 Ea 357.00 124.00 1.43 482.43
48" x 48" nw@4.00 Ea 605.00 198.40 2.28 805.68
2015 Heavy Construction Estimator, All Rights Reserved Page 667

CSI 15-866, Turning vanes

Turning vane components


Using small tools.
Turning vane rail ny@.052 LF 1.77 2.58 0.03 4.38

Turning vane sets


Using small tools.
12" (31cm) high ny@.047 LF 5.37 2.33 0.03 7.73
14" (36cm) high ny@.050 LF 5.99 2.48 0.03 8.50
16" (41cm) high ny@.053 LF 6.67 2.63 0.03 9.33
18" (46cm) high ny@.056 LF 7.30 2.78 0.03 10.11
20" (51cm) high ny@.060 LF 7.92 2.97 0.04 10.93
22" (56cm) high ny@.046 LF 8.55 2.28 0.03 10.86
24" (61cm) high ny@.067 LF 9.18 3.32 0.04 12.54
26" (66cm) high ny@.069 LF 9.80 3.42 0.04 13.26
30" (76cm) high ny@.072 LF 11.10 3.57 0.04 14.71

CSI 15-867, Distribution devices

Return/exhaust registers
With frame, single deflection, aluminum, opposed blade damper, wall or ceiling mounting, using small
tools.
8" x 4" ny@.300 Ea 23.60 14.87 0.18 38.65
8" x 6" ny@.300 Ea 28.60 14.87 0.18 43.65
10" x 6" ny@.300 Ea 31.70 14.87 0.18 46.75
10" x 10" ny@.300 Ea 31.70 14.87 0.18 46.75
12" x 6" ny@.300 Ea 29.60 14.87 0.18 44.65
12" x 12" ny@.300 Ea 38.80 14.87 0.18 53.85
16" x 16" ny@.300 Ea 46.90 14.87 0.18 61.95
18" x 18" ny@.300 Ea 52.20 14.87 0.18 67.25
20" x 20" ny@.300 Ea 60.50 14.87 0.18 75.55
24" x 12" ny@.300 Ea 60.50 14.87 0.18 75.55
24" x 18" ny@.300 Ea 66.80 14.87 0.18 81.85
24" x 24" ny@.400 Ea 70.90 19.82 0.24 90.96
30" x 12" ny@.400 Ea 73.00 19.82 0.24 93.06
30" x 18" ny@.500 Ea 79.30 24.78 0.30 104.38
30" x 24" ny@.500 Ea 88.70 24.78 0.30 113.78
30" x 30" ny@.650 Ea 134.00 32.21 0.39 166.60
36" x 12" ny@.500 Ea 83.40 24.78 0.30 108.48
36" x 18" ny@.500 Ea 93.90 24.78 0.30 118.98
36" x 24" ny@.650 Ea 125.00 32.21 0.39 157.60

Removable and reversible return/exhaust registers


Double deflection core and opposed blade damper, radiused frame with border, aluminum, for wall or
ceiling mounting, using small tools.
8" x 4" ny@.300 Ea 29.80 14.87 0.18 44.85
8" x 6" ny@.300 Ea 29.80 14.87 0.18 44.85
10" x 6" ny@.300 Ea 37.70 14.87 0.18 52.75
10"x 10" ny@.300 Ea 42.90 14.87 0.18 57.95
12" x 6" ny@.300 Ea 42.00 14.87 0.18 57.05
12" x 12" ny@.300 Ea 56.10 14.87 0.18 71.15
16" x 16" ny@.300 Ea 67.10 14.87 0.18 82.15
18" x 18" ny@.300 Ea 74.50 14.87 0.18 89.55
20" x 20" ny@.300 Ea 86.40 14.87 0.18 101.45
24" x 12" ny@.300 Ea 86.40 14.87 0.18 101.45
24" x 18" ny@.300 Ea 95.40 14.87 0.18 110.45
2015 Heavy Construction Estimator, All Rights Reserved Page 667 (part 2)

24" x 24" ny@.400 Ea 101.00 19.82 0.24 121.06


30" x 12" ny@.400 Ea 104.00 19.82 0.24 124.06
2015 Heavy Construction Estimator, All Rights Reserved Page 668

30" x 18" ny@.500 Ea 113.00 24.78 0.30 138.08


30" x 24" ny@.500 Ea 127.00 24.78 0.30 152.08
30" x 30" ny@.650 Ea 191.00 32.21 0.39 223.60
36" x 12" ny@.500 Ea 119.00 24.78 0.30 144.08
36" x 18" ny@.500 Ea 134.00 24.78 0.30 159.08
36" x 24" ny@.500 Ea 179.00 24.78 0.30 204.08
36" x 30" ny@.650 Ea 203.00 32.21 0.39 235.60
Deduct for steel construction ---@--- % 10.00 -- -- --

Single duct boxes, constant volume control


Without reheat. With pneumatic actuator. Add for electronic controls, using small tools.
4" to 6" diameter
inlet (50 to 240 CFM) ny@1.50 Ea 378.00 74.33 0.90 453.23
6" to 8" diameter
inlet (100 to 480 CFM) ny@1.50 Ea 406.00 74.33 0.90 481.23
7" to 10" diameter
inlet (150 to 720 CFM) ny@1.50 Ea 421.00 74.33 0.90 496.23
9" to 12" diameter
inlet (200 to 960 CFM) ny@1.50 Ea 443.00 74.33 0.90 518.23
12" diameter
inlet (250 to 1200 CFM) ny@1.50 Ea 443.00 74.33 0.90 518.23
14" diameter
inlet (350 to 1680 CFM) ny@2.00 Ea 508.00 99.10 1.20 608.30
16" diameter
inlet (450 to 2160 CFM) ny@3.00 Ea 827.00 148.70 1.80 977.50
20" x 16" inlet (550 to 2640 CFM) ny@3.00 Ea 881.00 148.70 1.80 1,031.50
24" x 16" inlet (650 to 3120 CFM) ny@3.00 Ea 1,020.00 148.70 1.80 1,170.50

Dual duct boxes, constant volume control


Without reheat. With pneumatic actuator. Add for electronic controls, using small tools.
4" to 6" diameter
inlet (50 to 240 CFM) ny@1.50 Ea 289.00 74.33 0.90 364.23
6" to 8" diameter
inlet (100 to 480 CFM) ny@1.50 Ea 309.00 74.33 0.90 384.23
7" to 10" diameter
inlet (150 to 720 CFM) ny@1.50 Ea 322.00 74.33 0.90 397.23
9" to 12" diameter
inlet (200 to 960 CFM) ny@1.50 Ea 338.00 74.33 0.90 413.23
12" diameter
inlet (250 to 1200 CFM) ny@1.50 Ea 338.00 74.33 0.90 413.23
14" diameter
inlet (350 to 1680 CFM) ny@2.00 Ea 388.00 99.10 1.20 488.30
16" diameter
inlet (450 to 2160 CFM) ny@3.00 Ea 631.00 148.70 1.80 781.50
20" x 16" inlet (550 to 2640 CFM) ny@3.00 Ea 672.00 148.70 1.80 822.50
24" x 16" inlet (650 to 3120 CFM) ny@3.00 Ea 780.00 148.70 1.80 930.50
Add for boxes with motor --@.000 Ea 26.00 -- -- 26.00

Variable volume single duct air terminal units


Complete with flow controllers, pneumatic actuator, insulated plenum and system powered boxed
thermostat. Add for electronic controls. No reheat. By inlet diameter, using small tools.
6" diameter inlet,
complete (75 to 350 CFM) ny@1.50 Ea 211.00 74.33 0.90 286.23
8" diameter inlet,
complete (200 to 700 CFM) ny@1.50 Ea 260.00 74.33 0.90 335.23
10" diameter inlet,
complete (400 to 1000 CFM) ny@1.50 Ea 309.00 74.33 0.90 384.23
12" diameter inlet,
complete (600 to 1400 CFM) ny@1.50 Ea 317.00 74.33 0.90 392.23
2015 Heavy Construction Estimator, All Rights Reserved Page 668 (part 2)

14" diameter inlet,


complete (900 to 1700 CFM) ny@2.00 Ea 325.00 99.10 1.20 425.30
16" diameter inlet,
complete (1200 to 2200 CFM) ny@3.00 Ea 374.00 148.70 1.80 524.50
16" diameter inlet,
complete (1500 to 3000 CFM) ny@3.00 Ea 439.00 148.70 1.80 589.50

Variable volume dual duct air terminal units


With flow control, insulated plenum and system powered boxed thermostat, using small tools.
6" diameter (75 to 350 CFM) ny@1.50 Ea 309.00 74.33 0.90 384.23
8" diameter (200 to 700 CFM) ny@1.50 Ea 365.00 74.33 0.90 440.23
10" diameter (400 to 1000 CFM) ny@1.50 Ea 506.00 74.33 0.90 581.23
12" diameter (600 to 1400 CFM) ny@1.50 Ea 562.00 74.33 0.90 637.23
14" diameter (800 to 2700 CFM) ny@2.00 Ea 731.00 99.10 1.20 831.30
16" diameter (1000 to 3500 CFM) ny@3.50 Ea 843.00 173.40 2.10 1,018.50
2015 Heavy Construction Estimator, All Rights Reserved Page 669

Adjustable curved blade air registers


Ceiling mounted, aluminum construction, 4 way pattern, flush frame, with diffuser, butterfly damper and
10' of insulated flex duct, using small tools.
6" x 6" ny@.310 Ea 31.30 15.36 0.19 46.85
8" x 8" ny@.310 Ea 33.50 15.36 0.19 49.05
12" x 6" ny@.310 Ea 35.80 15.36 0.19 51.35
10" x 10" ny@.310 Ea 40.20 15.36 0.19 55.75
12" x 12" ny@.310 Ea 42.50 15.36 0.19 58.05
14" x 14" ny@.310 Ea 49.20 15.36 0.19 64.75
16" x 16" ny@.310 Ea 53.70 15.36 0.19 69.25
18" x 18" ny@.350 Ea 61.50 17.34 0.21 79.05
24" x 24" --@.000 Ea 67.10 -- -- 67.10
Deduct for steel construction ---@--- % -10.00 -- -- --

Removable and reversible core registers


Double deflection radiused aluminum frame, aluminum construction, with diffuser and damper, using
small tools.
6" x 6" ny@.300 Ea 27.90 14.87 0.18 42.95
8" x 8" ny@.300 Ea 39.50 14.87 0.18 54.55
12" x 6" ny@.300 Ea 49.00 14.87 0.18 64.05
10" x 10" ny@.300 Ea 49.90 14.87 0.18 64.95
12" x 12" ny@.300 Ea 56.60 14.87 0.18 71.65
14" x 14" ny@.300 Ea 68.50 14.87 0.18 83.55
16" x 16" ny@.350 Ea 77.50 17.34 0.21 95.05
18" x 18" ny@.350 Ea 96.90 17.34 0.21 114.45
Deduct for steel construction ---@--- % -10.00 -- -- --

Adjustable shutter blade double deflection registers


Flat aluminum frame, grille only, using small tools.
6" x 6" ny@.300 Ea 46.00 14.87 0.18 61.05
8" x 8" ny@.300 Ea 55.10 14.87 0.18 70.15
12" x 6" ny@.300 Ea 55.10 14.87 0.18 70.15
10" x 10" ny@.300 Ea 57.80 14.87 0.18 72.85
12" x 12" ny@.300 Ea 64.40 14.87 0.18 79.45
14" x 14" ny@.300 Ea 75.10 14.87 0.18 90.15
16" x 16" ny@.350 Ea 91.20 17.34 0.21 108.75
18" x 18" ny@.350 Ea 102.00 17.34 0.21 119.55
Deduct for steel construction ---@--- % -20.00 -- -- --

Air conditioning and ventilation return air register


Ceiling or wall mounted, using small tools.
10" x 16" ny@.250 Ea 18.90 12.39 0.15 31.44
18" x 12" ny@.250 Ea 37.80 12.39 0.15 50.34
30" x 12" ny@.300 Ea 63.20 14.87 0.18 78.25
24" x 24" ny@.300 Ea 90.00 14.87 0.18 105.05
48" x 24" ny@.450 Ea 209.00 22.30 0.27 231.57

Square ceiling return air and exhaust grilles


Egg crate design, aluminum construction, using small tools.
8" x 8" nx@.200 Ea 12.90 9.13 0.12 22.15
12" x 12" nx@.250 Ea 16.90 11.41 0.15 28.46
16" x 16" nx@.250 Ea 24.80 11.41 0.15 36.36
24" x 24" nx@.300 Ea 44.60 13.69 0.17 58.46
6" x 6" nx@.200 Ea 12.50 9.13 0.12 21.75
14" x 14" nx@.250 Ea 23.20 11.41 0.15 34.76

Square wall air return and exhaust grilles


2015 Heavy Construction Estimator, All Rights Reserved Page 669 (part 2)

Square egg crate design, aluminum construction, using small tools.


8" x 8" nw@.200 Ea 12.90 9.92 0.11 22.93
12" x 12" nw@.250 Ea 16.90 12.40 0.14 29.44
18" x 18" nw@.300 Ea 24.80 14.88 0.17 39.85
24" x 24" nw@.300 Ea 44.60 14.88 0.17 59.65
2015 Heavy Construction Estimator, All Rights Reserved Page 670

28" x 28" nw@.400 Ea 89.30 19.84 0.23 109.37


36 x 36 ny@.500 Ea 209.00 24.78 0.30 234.08

Rectangular four way adjustable wall supply grilles


Aluminum construction, using small tools.
12" x 6" nw@.250 Ea 57.90 12.40 0.14 70.44
14" x 6" nw@.250 Ea 70.30 12.40 0.14 82.84
18" x 8" nw@.300 Ea 86.80 14.88 0.17 101.85
24" x 8" nw@.300 Ea 109.00 14.88 0.17 124.05
36" x 20" nw@.400 Ea 130.00 19.84 0.23 150.07

Sight proof door grilles


Inverted vee cross section, painted steel louvers and frame, using small tools.
12" x 12" nw@.250 Ea 31.70 12.40 0.14 44.24
18" x 18" nw@.250 Ea 46.80 12.40 0.14 59.34
24" x 24" nw@.300 Ea 75.80 14.88 0.17 90.85
24" x 30" nw@.350 Ea 82.00 17.36 0.20 99.56
12" x 6" nw@.250 Ea 29.80 12.40 0.14 42.34

CSI 15-868, Duct access panels and doors

Duct access doors


Insulated factory fabrication, using small tools.
12" x 12" ny@.563 Ea 19.30 27.90 0.34 47.54
12" x 18" ny@.692 Ea 25.70 34.29 0.42 60.41
18" x 18" ny@.900 Ea 30.00 44.60 0.54 75.14
24" x 18" ny@1.13 Ea 34.20 55.99 0.68 90.87
24" x 24" ny@1.50 Ea 38.50 74.33 0.90 113.73

CSI 15-871, Wall and floor diffusers

Linear wall or ceiling diffusers


Slot type, for sidewall, sill, or ceiling, 1/2", 3/4" or 1" slot spacing, 1-1/8" border, using small tools.
1 slot,
10 to 70 CFM per linear foot ny@.210 LF 8.27 10.41 0.13 18.81
2 slot,
20 to 140 CFM per linear foot ny@.230 LF 11.00 11.40 0.14 22.54
3 slot,
30 to 210 CFM per linear foot ny@.260 LF 17.40 12.88 0.16 30.44
4 slot,
40 to 280 CFM per linear foot ny@.290 LF 24.80 14.37 0.17 39.34
5 slot,
50 to 350 CFM per linear foot ny@.330 LF 32.20 16.35 0.20 48.75
Add for floor mounted diffusers ---@--- % 25.00 -- -- --

Linear wall or ceiling bar grilles and registers


For sidewall, sill or ceiling, zero degree or 15 degree deflection, 1/2" bar spacing, 1" border, using small
tools.
2" wide,
30 to 70 CFM per linear foot ny@.230 LF 39.90 11.40 0.14 51.44
3" wide,
55 to 143 CFM per linear foot ny@.260 LF 48.20 12.88 0.16 61.24
4" wide,
80 to 208 CFM per linear foot ny@.290 LF 52.30 14.37 0.17 66.84
6" wide, 125
to 325 CFM per linear foot ny@.380 LF 63.40 18.83 0.23 82.46
9" wide, 225
to 450 CFM per linear foot ny@.510 LF 88.20 25.27 0.31 113.78
2015 Heavy Construction Estimator, All Rights Reserved Page 670 (part 2)

Add for floor mounted units ---@--- % 60.00 -- -- --

CSI 15-872, Ceiling diffusers

Rectangular ceiling diffusers, perforated face


Fixed pattern, steel construction, baked enamel finish, using small tools.
6" x 6" ny@.300 Ea 12.30 14.87 0.18 27.35
8" x 8" ny@.300 Ea 14.50 14.87 0.18 29.55
9" x 9" ny@.300 Ea 15.60 14.87 0.18 30.65
10" x 10" ny@.300 Ea 17.90 14.87 0.18 32.95
12" x 12" ny@.300 Ea 20.10 14.87 0.18 35.15
18" x 12" ny@.300 Ea 36.50 14.87 0.18 51.55
24" x 12" ny@.300 Ea 47.70 14.87 0.18 62.75
24" x 24" ny@.300 Ea 73.80 14.87 0.18 88.85
2015 Heavy Construction Estimator, All Rights Reserved Page 671

Add for aluminum construction ---@--- % 30.00 -- -- --

Rectangular ceiling diffuser, louver face


Adjustable pattern with damper, steel construction, baked enamel finish, using small tools.
6" x 6" ny@.300 Ea 13.40 14.87 0.18 28.45
8" x 8" ny@.300 Ea 16.00 14.87 0.18 31.05
9" x 9" ny@.300 Ea 17.90 14.87 0.18 32.95
10" x 10" ny@.300 Ea 20.10 14.87 0.18 35.15
12" x 12" ny@.300 Ea 22.40 14.87 0.18 37.45
18" x 12" ny@.300 Ea 41.70 14.87 0.18 56.75
24" x 12" ny@.300 Ea 53.60 14.87 0.18 68.65
24" x 24" ny@.300 Ea 77.50 14.87 0.18 92.55
Add for aluminum construction ---@--- % 30.00 -- -- --

Round fixed pattern ceiling diffuser


Steel construction, baked enamel finish, using small tools.
6" (15cm) diameter ny@.300 Ea 17.90 14.87 0.18 32.95
8" (21cm) diameter ny@.300 Ea 20.90 14.87 0.18 35.95
10" (25cm) diameter ny@.300 Ea 23.80 14.87 0.18 38.85
12" (31cm) diameter ny@.300 Ea 26.80 14.87 0.18 41.85
14" (36cm) diameter ny@.300 Ea 29.80 14.87 0.18 44.85
18" (46cm) diameter ny@.300 Ea 35.80 14.87 0.18 50.85
20" (51cm) diameter ny@.300 Ea 41.70 14.87 0.18 56.75
24" (61cm) diameter ny@.300 Ea 53.60 14.87 0.18 68.65
28" (71cm) diameter ny@.300 Ea 62.60 14.87 0.18 77.65
Add for aluminum construction ---@--- % 30.00 -- -- --

Round ceiling diffuser with adjustable pattern


Steel construction, baked enamel finish, using small tools.
6" (15cm) diameter ny@.300 Ea 26.80 14.87 0.18 41.85
8" (21cm) diameter ny@.300 Ea 31.30 14.87 0.18 46.35
10" (25cm) diameter ny@.300 Ea 35.80 14.87 0.18 50.85
12" (31cm) diameter ny@.300 Ea 41.70 14.87 0.18 56.75
14" (36cm) diameter ny@.300 Ea 50.70 14.87 0.18 65.75
18" (46cm) diameter ny@.300 Ea 56.60 14.87 0.18 71.65
20" (51cm) diameter ny@.300 Ea 65.60 14.87 0.18 80.65
24" (61cm) diameter ny@.300 Ea 77.50 14.87 0.18 92.55
28" (71cm) diameter ny@.400 Ea 98.30 19.82 0.24 118.36
36" (91cm) diameter ny@.600 Ea 127.00 29.73 0.36 157.09
Add for aluminum construction ---@--- % 30.00 -- -- --

Linear type ceiling diffuser with 2 way air deflection


Using small tools.
6-1/4",
41 to 206 CFM per linear foot ny@.300 LF 35.50 14.87 0.18 50.55
9-1/4",
62 to 312 CFM per linear foot ny@.300 LF 96.40 14.87 0.18 111.45
12-1/4", 131
to 656 CFM per linear foot ny@.300 LF 45.90 14.87 0.18 60.95
4", 40 to 200 CFM per linear foot ny@.300 LF 31.30 14.87 0.18 46.35

CSI 15-873, Louvers

Fixed exhaust/intake louvers


Using small tools.
12" x 12" ny@.750 Ea 47.70 37.16 0.45 85.31
12" x 18" ny@.900 Ea 59.60 44.60 0.54 104.74
12" x 24" ny@1.13 Ea 77.50 55.99 0.68 134.17
2015 Heavy Construction Estimator, All Rights Reserved Page 671 (part 2)

CSI 15-880, Air treatment equipment

Air filters
Cost of installing the filter is included in the equipment installation cost, using small tools.
Activated charcoal air filter,
full flow --@.000 CFM 821.00 -- -- 821.00
2015 Heavy Construction Estimator, All Rights Reserved Page 672

Electrostatic filters, with frame, element, and bus bar


Using small tools.
600 to 1200 CFM --@.000 Ea 1,640.00 -- -- 1,640.00
1400 to 1800 CFM --@.000 Ea 1,980.00 -- -- 1,980.00
2000 to 2500 CFM --@.000 Ea 1,890.00 -- -- 1,890.00
High efficiency, non-support --@.000 CFM 128.00 -- -- 128.00
Medium efficiency, extended surface --@.000 CFM 124.00 -- -- 124.00
Permeable washable --@.000 CFM 17.00 -- -- 17.00
5' disposable roll, renewable --@.000 CFM 13.70 -- -- 13.70
Glass/paper, throwaway --@.000 CFM 5.34 -- -- 5.34

CSI 15-881, Air separators

Inertial air separator


Cost per cell required including a bleed air fan with extra heavy duty blades and direct drive motor, using
a 20-ton hydraulic crane with 70’ boom, and small tools.
1 cell, (100 CFM) n2@4.32 Ea 52,000.00 194.40 18.10 52,212.50
2 to 4 cells, (200 to 400 CFM) n2@3.60 Ea 6,680.00 162.00 15.10 6,857.10
5 to 9 cells, (500 to 900 CFM) n2@3.09 Ea 8,390.00 139.10 12.90 8,542.00
10 to 20 cells, (1000 to 2000 CFM) n2@2.40 Ea 11,100.00 108.00 10.10 11,218.10
21 to 30 cells, (2100 to 3000 CFM) n2@2.40 Ea 14,600.00 108.00 10.10 14,718.10
31 to 40 cells, (3100 to 4000 CFM) n2@2.16 Ea 15,000.00 97.20 9.05 15,106.25

CSI 15-883, High efficiency filters

HEPA 95% efficiency filters


Including particle board and Kraft paper frame and separator. See CSI 15-880 for prefilters. Add for filter
housing, using small tools.
12" x 12" x 6", 150 CFM, complete nx@1.00 Ea 53.60 45.63 0.58 99.81
24" x 12" x 6", 375 CFM, complete nx@1.50 Ea 84.50 68.45 0.87 153.82
24" x 18" x 6", 450 CFM, complete nx@1.75 Ea 127.00 79.85 1.02 207.87
24" x 24" x 6", 700 CFM, complete nx@1.75 Ea 134.00 79.85 1.02 214.87
12" x 12" x 12", 250 CFM, complete nx@1.75 Ea 107.00 79.85 1.02 187.87
24" x 12" x 12", 500 CFM, complete nx@2.00 Ea 169.00 91.26 1.16 261.42
24" x 18" x 12", 875 CFM, complete nx@2.00 Ea 255.00 91.26 1.16 347.42
24" x 24" x 12", 1000 CFM, complete nx@2.00 Ea 268.00 91.26 1.16 360.42

HEPA 99.99% efficiency filters


Including particle board and Kraft paper frame and separator. See CSI 15-880 for prefilters. Add for filter
housing, using small tools.
12" x 12" x 6", 150 CFM, complete nx@1.00 Ea 55.70 45.63 0.58 101.91
24" x 12" x 6", 325 CFM, complete nx@1.50 Ea 92.50 68.45 0.87 161.82
24" x 18" x 6", 550 CFM, complete nx@1.75 Ea 141.00 79.85 1.02 221.87
24" x 24" x 6", 775 CFM, complete nx@1.75 Ea 154.00 79.85 1.02 234.87
12" x 12" x 12", 250 CFM, complete nx@1.75 Ea 111.00 79.85 1.02 191.87
24" x 12" x 12", 500 CFM, complete nx@2.00 Ea 185.00 91.26 1.16 277.42
24" x 18" x 12", 775 CFM, complete nx@2.00 Ea 282.00 91.26 1.16 374.42
24" x 24" x 12", 1100 CFM, complete nx@2.00 Ea 308.00 91.26 1.16 400.42

HEPA filter housings


14 gauge galvanized sheet metal, nominal sizes, using small tools.
12" x 12" x 6" nx@2.00 Ea 445.00 91.26 1.16 537.42
24" x 12" x 6" nx@2.50 Ea 459.00 114.10 1.45 574.55
24" x 18" x 6" nx@2.50 Ea 470.00 114.10 1.45 585.55
24" x 24" x 6" nx@2.50 Ea 506.00 114.10 1.45 621.55
24" x 48" x 6" nx@4.00 Ea 585.00 182.50 2.32 769.82
24" x 72" x 6" nx@6.00 Ea 786.00 273.80 3.48 1,063.28
2015 Heavy Construction Estimator, All Rights Reserved Page 672 (part 2)

48" x 48" x 6" nx@6.00 Ea 910.00 273.80 3.48 1,187.28


48" x 72" x 6" nx@10.0 Ea 981.00 456.30 5.80 1,443.10
48" x 96" x 6" nx@10.0 Ea 1,800.00 456.30 5.80 2,262.10
12" x 12" x 12" nx@2.00 Ea 445.00 91.26 1.16 537.42
14" x 12" x 12" nx@2.00 Ea 445.00 91.26 1.16 537.42
24" x 18" x 12" nx@2.50 Ea 445.00 114.10 1.45 560.55
2015 Heavy Construction Estimator, All Rights Reserved Page 673

24" x 24" x 12" nx@2.50 Ea 445.00 114.10 1.45 560.55


24" x 48" x 12" nx@4.00 Ea 585.00 182.50 2.32 769.82
24" x 72" x 12" nx@6.00 Ea 786.00 273.80 3.48 1,063.28
48" x 48" x 12" nx@6.00 Ea 908.00 273.80 3.48 1,185.28
48" x 72" x 12" nx@10.0 Ea 981.00 456.30 5.80 1,443.10
48" x 96" x 12" nx@10.0 Ea 1,800.00 456.30 5.80 2,262.10
114" x 72" x 12" nx@15.0 Ea 3,330.00 684.50 8.70 4,023.20

Bag type filters, 90 to 95% efficiency


Using small tools.
24" x 12" x 29", .75 to 1.25 MCFM nx@4.29 Ea 47.00 195.80 2.49 245.29
24" x 24" x 29", 1.5 to 2.5 MCFM nx@4.29 Ea 83.30 195.80 2.49 281.59

Bag type filters, 80-85% efficiency


Using small tools.
24" x 12" x 29", .75 to 1.25 MCFM nx@4.29 Ea 43.00 195.80 2.49 241.29
24" x 24" x 29", 1.5 to 2.5 MCFM nx@4.29 Ea 74.20 195.80 2.49 272.49

CSI 15-888, Dust collectors

Complete dust collector system


Including all hardware (fan, cyclone and hopper). Sizing based on inlet hopper capacity and CFM rating,
using a 20-ton hydraulic crane with 70’ boom, and small tools.
4" intake, 4.8 cubic feet, 311 CFM n2@21.6 Ea 2,850.00 972.00 90.50 3,912.50
4" intake, 7.5 cubic feet, 440 CFM n2@25.7 Ea 3,980.00 1,157.00 108.00 5,245.00
4" intake, 12 cubic feet, 540 CFM n2@32.2 Ea 3,980.00 1,449.00 135.00 5,564.00
6" intake, 4.8 cubic feet, 860 CFM n2@36.0 Ea 3,980.00 1,620.00 151.00 5,751.00
6" intake, 7.5 cubic feet, 993 CFM n2@38.6 Ea 3,980.00 1,737.00 162.00 5,879.00
6" intake, 9 cubic feet, 1200 CFM n2@40.7 Ea 3,980.00 1,832.00 171.00 5,983.00
8" intake, 7.5 cubic feet, 1500 CFM n2@42.3 Ea 3,980.00 1,904.00 177.00 6,061.00
8" intake, 8.5 cubic feet, 2000 CFM n2@45.0 Ea 3,980.00 2,025.00 189.00 6,194.00
8" intake, 15 cubic feet, 2500 CFM n2@47.0 Ea 9,010.00 2,115.00 197.00 11,322.00
10" intake,
8.5 cubic feet, 3000 CFM n2@54.0 Ea 9,110.00 2,430.00 226.00 11,766.00
12" intake,
8.5 cubic feet, 4000 CFM n2@67.5 Ea 10,800.00 3,038.00 283.00 14,121.00
14" intake, 54 cubic feet, 6000 CFM n2@74.4 Ea 15,900.00 3,348.00 312.00 19,560.00

CSI 15-890, Sound attenuators

Packaged duct sound trap, 36" (91cm) long


Using small tools.
12" x 12" ny@1.64 Ea 270.00 81.26 0.98 352.24
12" x 18" ny@1.89 Ea 319.00 93.65 1.13 413.78
12" x 24" ny@2.17 Ea 367.00 107.50 1.30 475.80
12" x 36" ny@2.43 Ea 465.00 120.40 1.46 586.86
24" x 18" ny@2.43 Ea 485.00 120.40 1.46 606.86
24" x 24" ny@2.57 Ea 555.00 127.30 1.54 683.84
24" x 30" ny@2.73 Ea 633.00 135.30 1.64 769.94
24" x 36" ny@2.90 Ea 704.00 143.70 1.74 849.44
24" x 48" ny@3.27 Ea 867.00 162.00 1.96 1,030.96
36" x 18" ny@2.73 Ea 648.00 135.30 1.64 784.94
36" x 36" ny@3.27 Ea 953.00 162.00 1.96 1,116.96
36" x 48" ny@4.39 Ea 1,180.00 217.50 2.63 1,400.13
36" x 60" ny@4.62 Ea 1,400.00 228.90 2.77 1,631.67
48" x 48" ny@5.00 Ea 1,490.00 247.80 3.00 1,740.80
48" x 60" " ny@5.45 Ea 1,790.00 270.00 3.27 2,063.27
2015 Heavy Construction Estimator, All Rights Reserved Page 673 (part 2)

Packaged duct sound trap, 60" (152cm) long


Using small tools.
12" x 12" ny@1.80 Ea 315.00 89.19 1.08 405.27
12" x 18" ny@2.09 Ea 496.00 103.60 1.25 600.85
12" x 24" ny@2.40 Ea 582.00 118.90 1.44 702.34
12" x 36" ny@2.69 Ea 735.00 133.30 1.61 869.91
24" x 18" ny@2.69 Ea 751.00 133.30 1.61 885.91
24" x 24" ny@2.86 Ea 894.00 141.70 1.72 1,037.42
24" x 30" ny@3.00 Ea 1,020.00 148.70 1.80 1,170.50
24" x 36" ny@3.16 Ea 1,140.00 156.60 1.90 1,298.50
24" x 48" ny@3.60 Ea 1,380.00 178.40 2.16 1,560.56
2015 Heavy Construction Estimator, All Rights Reserved Page 674

36" x 18" ny@3.00 Ea 276.00 148.70 1.80 426.50


36" x 36" ny@3.60 Ea 400.00 178.40 2.16 580.56
36" x 48" ny@4.74 Ea 806.00 234.90 2.84 1,043.74
36" x 60" ny@5.14 Ea 908.00 254.70 3.08 1,165.78
48" x 48" ny@5.45 Ea 1,020.00 270.00 3.27 1,293.27
48" x 60" ny@6.00 Ea 1,160.00 297.30 3.60 1,460.90

Packaged duct sound trap, 84" (214cm) long


Using small tools.
6" x 12" ny@2.00 Ea 72.00 99.10 1.20 172.30
6" x 24" ny@2.25 Ea 134.00 111.50 1.35 246.85
6" x 36" ny@3.27 Ea 180.00 162.00 1.96 343.96
12" x 12" ny@2.00 Ea 109.00 99.10 1.20 209.30
12" x 18" ny@2.09 Ea 136.00 103.60 1.25 240.85
12" x 24" ny@2.40 Ea 207.00 118.90 1.44 327.34
12" x 30" ny@2.57 Ea 282.00 127.30 1.54 410.84
12" x 36" ny@2.77 Ea 257.00 137.30 1.66 395.96
12" x 42" ny@3.00 Ea 379.00 148.70 1.80 529.50
12" x 48" ny@3.27 Ea 462.00 162.00 1.96 625.96
24" x 18" ny@2.77 Ea 223.00 137.30 1.66 361.96
24" x 24" ny@2.90 Ea 454.00 143.70 1.74 599.44
24" x 30" ny@3.00 Ea 370.00 148.70 1.80 520.50
24" x 36" ny@3.16 Ea 412.00 156.60 1.90 570.50
24" x 42" ny@3.40 Ea 689.00 168.50 2.04 859.54
24" x 48" ny@3.60 Ea 652.00 178.40 2.16 832.56

CSI 15-915, Control air compressor and dryer

Air cooled single stage service air compressor package.


Includes V-belt drive, motor and 30 gallon receiver but no piping or air dryer. 125 PSIG working
pressure. Add for air dryer and pipe connections, using small tools.
1/2 HP, 1.5 ACFM pe@6.00 Ea 2,070.00 260.50 3.84 2,334.34
3/4 HP, 2.0 ACFM pe@6.00 Ea 1,860.00 260.50 3.84 2,124.34
1 HP, 2.5 ACFM pe@6.00 Ea 2,280.00 260.50 3.84 2,544.34

MIS single stage service air compressor


Variable air discharge. Includes V-belt drive, motor and receiver as noted but no piping or air dryer. 80
PSIG working pressure, using small tools.
2 HP, 30 gallon, 7.9 ACFM n6@6.00 Ea 2,300.00 305.30 3.60 2,608.90
3 HP, 60 gallon, 13.0 ACFM n6@10.0 Ea 3,800.00 508.90 6.00 4,314.90
5 HP, 80 gallon, 19.9 ACFM n6@16.0 Ea 3,850.00 814.20 9.60 4,673.80
7.5 HP, 80 gallon, 37.0 ACFM n6@16.0 Ea 8,140.00 814.20 9.60 8,963.80

Two stage service air compressor


Includes V-belt drive, motor and receiver as noted but no piping or air dryer. Discharge pressure 80 to
200 PSIG working pressure, using small tools.
1-1/2 HP, 60 gallon, 5.0 ACFM pe@10.0 Ea 3,830.00 434.10 6.40 4,270.50
2 HP, 60 gallon, 7.0 ACFM pe@10.0 Ea 4,160.00 434.10 6.40 4,600.50
3 HP, 60 gallon, 11 ACFM pe@10.0 Ea 4,250.00 434.10 6.40 4,690.50
5 HP, 80 gallon, 15 ACFM pe@16.0 Ea 4,800.00 694.60 10.20 5,504.80
10 HP, 80 gallon, 35 ACFM pe@16.0 Ea 8,660.00 694.60 10.20 9,364.80
15 HP, 120 gallon, 50 ACFM pe@22.0 Ea 15,000.00 955.00 14.10 15,969.10
20 HP, 120 gallon, 70 ACFM pe@22.0 Ea 17,800.00 955.00 14.10 18,769.10

Type T-30 service air compressor


Two stage duplex tank mounted compressor, belt drive electric motor, no piping or air drier included,
using small tools.
6 HP, 13 CFM,
2015 Heavy Construction Estimator, All Rights Reserved Page 674 (part 2)

80 gallon tank, 200 PSIG pe@16.0 Ea 9,490.00 694.60 10.20 10,194.80


6 HP, 28.2 CFM,
80 gallon tank, 200 PSIG pe@16.0 Ea 9,490.00 694.60 10.20 10,194.80
10 HP, 40 CFM,
120 gallon tank, 200 PSIG pe@22.0 Ea 9,780.00 955.00 14.10 10,749.10
15 HP, 72.8CFM,
120 gallon tank, 200 PSIG pe@22.0 Ea 18,300.00 955.00 14.10 19,269.10
20 HP, 90 CFM,
240 gallon tank, 125 PSIG pe@28.0 Ea 18,800.00 1,215.00 17.90 20,032.90
30 HP, 143 CFM,
240 gallon tank, 200 PSIG pe@28.0 Ea 32,900.00 1,215.00 17.90 34,132.90
2015 Heavy Construction Estimator, All Rights Reserved Page 675

Two stage service air compressor


Maximum discharge pressure 175 PSI. Includes V-belt drive, motor and receiver as noted but no piping
or air dryer, using small tools.
1-1/2 HP, 80 gallon, 5.0 ACFM n6@16.0 Ea 3,810.00 814.20 9.60 4,633.80
2 HP, 80 gallon, 6.4 ACFM n6@16.0 Ea 4,090.00 814.20 9.60 4,913.80
3 HP, 80 gallon, 8.1 ACFM n6@14.0 Ea 3,700.00 712.50 8.40 4,420.90
5 HP, 60 gallon, 14.8 ACFM n6@16.0 Ea 3,220.00 814.20 9.60 4,043.80
7.5 HP, 80 gallon, 19.8 ACFM n6@22.0 Ea 5,530.00 1,120.00 13.20 6,663.20
7.5 HP, 120 gallon, 25.6 ACFM n6@22.0 Ea 5,840.00 1,120.00 13.20 6,973.20
10 HP, 120 gallon, 35.0 ACFM n6@22.0 Ea 5,740.00 1,120.00 13.20 6,873.20
25 HP, 120 gallon, 84.4 ACFM n6@22.0 Ea 13,100.00 1,120.00 13.20 14,233.20
30 HP, 120 gallon, 97.2 ACFM n6@22.0 Ea 14,700.00 1,120.00 13.20 15,833.20

Refrigerated air dryers with ambient air filters


Using small tools.
10 SCFM capacity pe@2.00 Ea 1,320.00 86.82 1.28 1,408.10
25 SCFM capacity pe@2.55 Ea 2,240.00 110.70 1.63 2,352.33
50 SCFM capacity pe@4.06 Ea 2,920.00 176.20 2.60 3,098.80
75 SCFM capacity pe@5.00 Ea 4,740.00 217.10 3.20 4,960.30
100 SCFM capacity pe@6.09 Ea 5,380.00 264.40 3.90 5,648.30

Oil and water filter for air compressor


Aluminum housing rated at 250 PSI, 1/2" nominal pipe thread inlet and outlet, with manual drain and
box of 10 filters, using small tools.
To 90 SCFM n6@1.50 Ea 1,280.00 76.34 0.90 1,357.24

Pressure regulators
Heavy duty industrial type, 1" output, using small tools.
Maximum 250 PSI input,
2 to 125 PSI output pe@2.00 Ea 92.00 86.82 1.28 180.10

Connect water cooled duplex air compressor and receiver, copper pipe
Includes air side and water side copper type L piping and wrought fittings and valves. Based on 5'
connection to compressor, using small tools.
1-1/2" air side,
3/4" water side connection n9@8.25 Ea 1,310.00 386.30 4.95 1,701.25
2" air side,
3/4" water side connection n9@9.65 Ea 1,810.00 451.90 5.79 2,267.69
2-1/2" air side,
1" water side connection n9@11.7 Ea 2,760.00 547.90 7.02 3,314.92
3" air side,
1" water side connection n9@13.4 Ea 3,540.00 627.50 8.04 4,175.54
4" air side,
1" water side connection n9@16.4 Ea 5,420.00 768.00 9.84 6,197.84

Connect water cooled duplex air compressor and receiver, steel pipe
Includes air side and water side threaded and coupled schedule 40 steel pipe and fittings. Based on 5'
connection to compressor, using small tools.
1-1/2" air side,
3/4" water side connection n9@12.0 Ea 730.00 562.00 7.20 1,299.20
2" air side,
3/4" water side connection n9@13.3 Ea 793.00 622.80 7.98 1,423.78

Connect water cooled duplex air compressor and receiver, steel pipe
Includes air side and water side butt welded schedule 40 steel pipe and carbon steel fittings. Based on
5' connection to compressor, using a 300-amp skid mounted welder, and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 675 (part 2)

2-1/2" air side,


1" water side connection pa@28.0 Ea 2,230.00 1,311.00 50.40 3,591.40
3" air side,
1" water side connection pa@31.5 Ea 2,670.00 1,475.00 56.70 4,201.70
4" air side,
1" water side connection pa@40.6 Ea 3,710.00 1,901.00 73.10 5,684.10

CSI 15-930, Primary HVAC control devices

Split system HVAC controls, pneumatic


Using small tools.
Cooling coil, chilled water,
room thermostat, 3-way valve pe@17.5 Ea 307.00 759.70 11.20 1,077.90
Heating coil, hot water, 3-way valve, with freezestat,
on discharge read out pe@43.8 Ea 749.00 1,901.00 28.00 2,678.00
Cooling tower, fan cycle, damper control,
water read out at panel pe@52.8 Ea 796.00 2,292.00 33.80 3,121.80
Unit ventilator, day and night operation, with freezestat,
ASHRAE, 2 cycle pe@49.2 Ea 1,160.00 2,136.00 31.50 3,327.50
Boiler room air control, combustion
air damper controls pe@21.4 Ea 245.00 929.00 13.70 1,187.70
Fan coil, heating and cooling valve,
4-pipe system pe@20.0 Ea 1,160.00 868.20 12.80 2,041.00

Mixed air control


Including economizer cycle, with panel read out and tubing, using small tools.
To 10 tons (9072kg) pe@79.9 Ea 3,790.00 3,468.00 51.10 7,309.10
Over 10 to 20 tons (18144kg) pe@90.2 Ea 3,790.00 3,916.00 57.70 7,763.70
More than 20 tons (18144kg) pe@100. Ea 3,790.00 4,341.00 64.00 8,195.00
2015 Heavy Construction Estimator, All Rights Reserved Page 676

Boiler controls
Compensated hot water control from boiler, with valve, readout and reset at panel, using small tools.
To 60 gallons per minute pe@24.0 Ea 2,780.00 1,042.00 15.40 3,837.40
120 gallons per minute pe@24.0 Ea 2,780.00 1,042.00 15.40 3,837.40
240 gallons per minute pe@24.0 Ea 2,780.00 1,042.00 15.40 3,837.40

Air supply pneumatic control system


Controls for tank mounted duplex compressor, starter, alternator, piping, dryer and filter, using small
tools.
1/2 HP control pe@43.1 Ea 2,630.00 1,871.00 27.60 4,528.60
1-1/2 HP control pe@43.1 Ea 3,550.00 1,871.00 27.60 5,448.60
3 HP control pe@70.0 Ea 5,030.00 3,039.00 44.80 8,113.80
5 HP control pe@73.7 Ea 7,150.00 3,199.00 47.20 10,396.20

Control panel, readout


Using small tools.
Up to 12 indicators pe@7.00 Ea 256.00 303.90 4.48 564.38
Up to 24 indicators pe@9.33 Ea 512.00 405.00 5.97 922.97
48 indicators, double door n6@6.67 Ea 767.00 339.40 4.00 1,110.40

Sensors, including 200' of conduit wiring


Using a 300-amp skid mounted welder, and small tools.
Space temperature sensor pa@5.00 Ea 265.00 234.20 9.00 508.20
On/off indicator pa@5.00 Ea 199.00 234.20 9.00 442.20
Start/stop switch pa@5.00 Ea 232.00 234.20 9.00 475.20
Flow meter, gas pa@5.00 Ea 299.00 234.20 9.00 542.20
Pressure indicator pa@5.00 Ea 179.00 234.20 9.00 422.20
Flow meter, liquid pa@5.00 Ea 285.00 234.20 9.00 528.20

CSI 15-931, Thermostats

Electric room thermostats


Using small tools.
Line voltage for
electric resistance heating lj@1.10 Ea 75.30 55.11 0.43 130.84
Line voltage for heating lj@1.10 Ea 75.30 55.11 0.43 130.84
Line voltage for cooling lj@1.10 Ea 75.30 55.11 0.43 130.84
Line voltage
for heating and cooling lj@1.19 Ea 75.30 59.62 0.46 135.38
Low voltage for heating lj@1.10 Ea 21.90 55.11 0.43 77.44
Low voltage for cooling lj@1.10 Ea 21.90 55.11 0.43 77.44
Low voltage for heating and cooling lj@1.19 Ea 28.70 59.62 0.46 88.78
Low voltage
for clock heating and cooling lj@1.69 Ea 205.00 84.67 0.66 290.33
Propulsion 1 potentiometer lj@1.49 Ea 185.00 74.65 0.58 260.23
Propulsion 2 potentiometer lj@1.49 Ea 197.00 74.65 0.58 272.23

Pneumatic thermostats
Used for variable volume fan, using small tools.
Dual temperature, direct acting pe@4.74 Ea 59.70 205.80 3.03 268.53

Outside air remote bulb thermostats


Including 20' capillary tube, using small tools.
-30 to +100 degree Fahrenheit lj@1.10 Ea 122.00 55.11 0.43 177.54

Temperature sensors and controllers


2015 Heavy Construction Estimator, All Rights Reserved Page 676 (part 2)

Using small tools.


Temperature controller nz@8.00 Ea 156.00 365.00 4.64 525.64
Temperature sensor nz@3.08 Ea 122.00 140.50 1.79 264.29

CSI 15-932, Humidistats

Humidistat controls
Single pole electric with double throw switch, using small tools.
Humidistat or dehumidistat control lj@1.49 Ea 63.00 74.65 0.58 138.23

CSI 15-933, Static pressure controllers

Static pressure controllers for air handling units


Using small tools.
Static pressure controllers pe@46.7 Ea 3,630.00 2,027.00 29.90 5,686.90
2015 Heavy Construction Estimator, All Rights Reserved Page 677

CSI 15-934, Aquastats

Immersion type aquastats


Breaks contact with temperature rise, single pole, single throw, switching, using small tools.
High/low limit aquastat lj@2.00 Ea 61.60 100.20 0.78 162.58
Sequencing, 2 switch aquastat lj@2.00 Ea 107.00 100.20 0.78 207.98
Circulating aquastat lj@2.00 Ea 107.00 100.20 0.78 207.98

CSI 15-935, Freezestats

Freezestats
Using small tools.
20’ sensing element,
adjustable range nz@2.38 Ea 433.00 108.60 1.38 542.98

CSI 15-936, Carbon monoxide detectors

Carbon monoxide detector system


Using small tools.
Panel lj@3.99 Ea 1,290.00 199.90 1.56 1,491.46
Sensor lj@1.10 Ea 658.00 55.11 0.43 713.54

CSI 15-937, Control dampers

Moduflow air control dampers


Parallel or opposed blade action. Frame, blades and baffles are galvanized steel. Manual operation, add
for motorized damper acutators, using small tools.
8" x 8" nw@.450 Ea 64.40 22.32 0.26 86.98
10" x 10" nw@.450 Ea 64.40 22.32 0.26 86.98
12" x 12" nw@.450 Ea 64.40 22.32 0.26 86.98
14" x 14" nw@.550 Ea 78.90 27.27 0.31 106.48
16" x 16" nw@.750 Ea 78.90 37.19 0.43 116.52
18" x 18" nw@.850 Ea 78.90 42.15 0.48 121.53
20" x 20" nw@1.00 Ea 125.00 49.59 0.57 175.16
22" x 22" nw@1.25 Ea 125.00 61.99 0.71 187.70
24" x 24" nw@1.25 Ea 125.00 61.99 0.71 187.70
26" x 26" nw@1.25 Ea 150.00 61.99 0.71 212.70
28" x 28" nw@1.25 Ea 150.00 61.99 0.71 212.70
32" x 32" nw@1.25 Ea 174.00 61.99 0.71 236.70

Bypass air control dampers with controller


Parallel or opposed blade action. Frame, blades and baffles are galvanized steel, using small tools.
24" x 24" nw@1.75 Ea 377.00 86.78 1.00 464.78
24" x 36" nw@2.00 Ea 548.00 99.18 1.14 648.32
24" x 48" nw@2.25 Ea 669.00 111.60 1.28 781.88
48" x 48" nw@3.25 Ea 1,030.00 161.20 1.85 1,193.05
46" x 36" nw@3.00 Ea 876.00 148.80 1.71 1,026.51
54" x 36" nw@3.50 Ea 986.00 173.60 2.00 1,161.60

Low leakage insulated air control dampers


Parallel or opposed blade action. Frame, blades and baffles are galvanized steel, using small tools.
16" x 24" nw@1.00 Ea 68.40 49.59 0.57 118.56
22" x 22" nw@1.25 Ea 86.30 61.99 0.71 149.00
24" x 24" nw@1.25 Ea 103.00 61.99 0.71 165.70
32" x 32" nw@1.50 Ea 216.00 74.39 0.86 291.25
32" x 40" nw@1.50 Ea 228.00 74.39 0.86 303.25
2015 Heavy Construction Estimator, All Rights Reserved Page 677 (part 2)

42" x 44" nw@1.75 Ea 329.00 86.78 1.00 416.78


54" x 44" nw@2.00 Ea 424.00 99.18 1.14 524.32
56" x 48" nw@2.50 Ea 568.00 124.00 1.43 693.43

CSI 15-938, Control valves

Straight through pneumatic unit ventilator valves


Normally open, single seated, straight through valve, using small tools.
1/2" valve n6@.750 Ea 151.00 38.17 0.45 189.62
3/4" valve n6@.750 Ea 183.00 38.17 0.45 221.62
1" valve n6@1.00 Ea 227.00 50.89 0.60 278.49
1-1/4" valve n6@1.25 Ea 273.00 63.61 0.75 337.36
1 1/2" valve n6@1.25 Ea 241.00 63.61 0.75 305.36
2015 Heavy Construction Estimator, All Rights Reserved Page 678

2" valve n6@1.50 Ea 287.00 76.34 0.90 364.24

Three way pneumatic mixing valves


Spring loaded, self-adjusting, using small tools.
1/2" valve n6@1.52 Ea 211.00 77.35 0.91 289.26
3/4" valve n6@2.08 Ea 376.00 105.90 1.25 483.15
1" valve n6@2.50 Ea 469.00 127.20 1.50 597.70
1-1/4" valve n6@2.63 Ea 457.00 133.80 1.58 592.38
1-1/2" valve n6@2.94 Ea 711.00 149.60 1.76 862.36
2" valve n6@3.85 Ea 819.00 195.90 2.31 1,017.21

Radiator valves
Normally open, single seated, straight through valve, spring loaded and self-adjusting. Includes Teflon
packing and attached direct-acting operator with rolling diaphragm, using small tools.
1/2" valve n6@1.06 Ea 113.00 53.94 0.64 167.58
3/4" valve n6@1.25 Ea 158.00 63.61 0.75 222.36
1" valve n6@1.45 Ea 198.00 73.79 0.87 272.66

Sequencing water valves


Three pipe sequencing, using small tools.
3/8" valve n6@1.06 Ea 158.00 53.94 0.64 212.58
1/2" valve n6@1.06 Ea 158.00 53.94 0.64 212.58
3/4" valve n6@1.25 Ea 158.00 63.61 0.75 222.36

Heating control valves


Non-electric, thermostatic, hot water, using small tools.
1/2" valve, soldered n6@.240 Ea 136.00 12.21 0.14 148.35
3/4" valve, soldered n6@.300 Ea 178.00 15.27 0.18 193.45
1" valve, threaded n6@.300 Ea 301.00 15.27 0.18 316.45
1-1/4" valve n6@.040 Ea 435.00 2.04 0.02 437.06
Add for low pressure steam control ---@--- % 10.00 -- -- --

2 way electric hot water heating system control valves


Using small tools.
3/4" valve n6@1.25 Ea 122.00 63.61 0.75 186.36
2 " valve n6@1.54 Ea 340.00 78.37 0.92 419.29
2 1/2" valve n6@1.67 Ea 501.00 84.99 1.00 586.99
3" valve n6@2.22 Ea 706.00 113.00 1.33 820.33
4" valve n6@2.50 Ea 1,610.00 127.20 1.50 1,738.70

3 way electric hot water heating control valves, electric line voltage
Using small tools.
3/4" valve n6@1.67 Ea 409.00 84.99 1.00 494.99
1" valve n6@1.82 Ea 448.00 92.62 1.09 541.71
1 1/4" valve n6@2.00 Ea 536.00 101.80 1.20 639.00
1 1/2" valve n6@2.22 Ea 585.00 113.00 1.33 699.33
2" valve n6@2.50 Ea 717.00 127.20 1.50 845.70
2 1/2" valve n6@2.85 Ea 1,060.00 145.00 1.71 1,206.71
3" valve n6@2.50 Ea 1,180.00 127.20 1.50 1,308.70
4" valve n6@2.85 Ea 1,580.00 145.00 1.71 1,726.71

CSI 15-939, Control motors

Modutrol motor for damper or valve control, reversible


Using small tools.
Low or line voltage applications nz@2.00 Ea 264.00 91.26 1.16 356.42
2015 Heavy Construction Estimator, All Rights Reserved Page 678 (part 2)

CSI 15-940, Relays and switches

Relays for HVAC controls


Using small tools.
Single pole, double throw,
20 amp AC coil nz@1.33 Ea 29.60 60.69 0.77 91.06
Single pole, double throw,
20 amp DC coil nz@1.33 Ea 29.60 60.69 0.77 91.06

Switches for HVAC controls


Using small tools.
Single pole, single throw, nz@1.33 Ea 46.10 60.69 0.77 107.56
2015 Heavy Construction Estimator, All Rights Reserved Page 679

Minimum position switch


Using small tools.
Electrical nz@2.35 Ea 72.90 107.20 1.36 181.46

CSI 15-942, Timers

Time clocks
Using small tools.
7 day, with 12 hour battery backup nz@3.63 Ea 455.00 165.60 2.11 622.71

CSI 15-960, Recorders

Recorders - Hygrograph relative humidity recorder


Wall mounted, aluminum case, graduated chart, using a 300-amp skid mounted welder, and small
tools.
8" recorder pa@5.00 Ea 670.00 234.20 9.00 913.20
10" recorder pa@5.00 Ea 849.00 234.20 9.00 1,092.20
Add for remote mounting ---@--- % 12.00 -- -- --

Recorders - Thermo-hygrograph recorder


Temperature and relative humidity recorder, wall mounted, aluminum case, graduated chart, 5’ stainless
steel probe, using small tools.
8" recorder pa@5.00 Ea 870.00 234.20 9.00 1,113.20
10" recorder pa@5.00 Ea 1,050.00 234.20 9.00 1,293.20
Add for remote mounting ---@--- % 12.00 -- -- --

Recorders - Time-of-operation recorder


Wall mount, capillary type pen , 24 hour clock, 110 volts, aluminum case, using small tools.
6" recorder pa@5.00 Ea 357.00 234.20 9.00 600.20
8" recorder pa@5.00 Ea 582.00 234.20 9.00 825.20
10" recorder pa@5.00 Ea 631.00 234.20 9.00 874.20
12" recorder pa@5.00 Ea 714.00 234.20 9.00 957.20

Recorders - Pressure and vacuum recorder


Bourdon tube type, flush mount, capillary type pen, aluminum case, using small tools.
6" recorder pa@5.00 Ea 421.00 234.20 9.00 664.20
8" recorder pa@5.00 Ea 515.00 234.20 9.00 758.20
10" recorder pa@5.00 Ea 693.00 234.20 9.00 936.20
12" recorder pa@5.00 Ea 779.00 234.20 9.00 1,022.20

Recorders - Btu computer for energy monitor


Using small tools.
Btu computer meter pa@10.0 Ea 3,170.00 468.30 18.00 3,656.30

==========================================================================
Electrical
==========================================================================

CSI 16-050, Basic materials and methods

Bending EMT or RSC conduit


Costs per bend with a 12-ton hydraulic bender, using small tools.
1-1/4" EMT or RSC lp@.330 Ea -- 16.37 0.07 16.44
1-1/2" EMT or RSC lp@.370 Ea -- 18.35 0.07 18.42
2" EMT or RSC lp@.450 Ea -- 22.32 0.09 22.41
2015 Heavy Construction Estimator, All Rights Reserved Page 679 (part 2)

2-1/2" EMT or RSC lp@.640 Ea -- 31.74 0.13 31.87


3" EMT or RSC lp@.840 Ea -- 41.66 0.17 41.83
3-1/2" EMT or RSC lp@1.03 Ea -- 51.09 0.21 51.30
4" EMT or RSC lp@1.30 Ea -- 64.48 0.26 64.74

Bending heated PVC conduit


Costs per bend with a hot box bender, using small tools.
1-1/4" heated PVC lp@.200 Ea -- 9.92 0.04 9.96
1-1/2" heated PVC lp@.220 Ea -- 10.91 0.04 10.95
2" heated PVC lp@.270 Ea -- 13.39 0.05 13.44
2-1/2" heated PVC lp@.380 Ea -- 18.85 0.08 18.93
2015 Heavy Construction Estimator, All Rights Reserved Page 680

3" heated PVC lp@.500 Ea -- 24.80 0.10 24.90


3-1/2" heated PVC lp@.620 Ea -- 30.75 0.12 30.87
4" heated PVC lp@.780 Ea -- 38.69 0.16 38.85

Electrical test equipment


Purchase price.
Beckman digital voltage tester --@.000 Ea 112.00 -- -- 112.00

CSI 16-102, Cable installation methods

Cable plowed into soil with a crawler tractor


Using a D-6H crawler tractor dozer, power shift, with angle tilt blade.
Single cable in fine soil gl@.050 LF -- 1.86 2.84 4.70
Two cables in fine soil gl@.070 LF -- 2.61 3.97 6.58
Single cable in coarse soil gl@.070 LF -- 2.61 3.97 6.58

CSI 16-110, Raceways

Electrical wireway
Mounted exposed on a flat wall at up to 8' height. Based on 100' run. Labor includes unloading, layout,
assembly and installation with wood screws, using small tools.
3/4" wireway and cover lp@.035 LF 0.99 1.74 0.01 2.74
3/4" 90 degree elbow lp@.150 Ea 1.38 7.44 0.03 8.85
3/4" tee lp@.200 Ea 3.42 9.92 0.04 13.38
3/4" adapter lp@.150 Ea 4.54 7.44 0.03 12.01
2 gang surface switch
box for 3/4" surface wireway lp@.300 Ea 9.60 14.88 0.06 24.54
1" wireway and cover lp@.040 LF 1.13 1.98 0.01 3.12
1" 90 degree elbow lp@.250 Ea 1.53 12.40 0.05 13.98
1" tee lp@.250 Ea 3.42 12.40 0.05 15.87
1" adapter lp@.200 Ea 4.54 9.92 0.04 14.50
3/4" x 1-1/4" wireway and cover lp@.045 LF 1.81 2.23 0.01 4.05
3/4" x 1-1/4" 90 degree elbow lp@.300 Ea 3.41 14.88 0.06 18.35
3/4" x 1-1/4" tee lp@.300 Ea 8.98 14.88 0.06 23.92
3/4" x 1-1/4" adapter lp@.250 Ea 8.49 12.40 0.05 20.94
1" x 1-1/4" wireway and cover lp@.050 LF 2.26 2.48 0.01 4.75
1" x 1-1/4" 90 degree elbow lp@.350 Ea 5.08 17.36 0.07 22.51
1" x 1-1/4" tee lp@.350 Ea 5.78 17.36 0.07 23.21
1" x 1-1/4" adapter lp@.350 Ea 8.36 17.36 0.07 25.79
1-1/2" x 2-3/4" wireway and cover lp@.060 LF 3.67 2.98 0.01 6.66
1-1/2" x 2-3/4" 90 degree elbow lp@.400 Ea 8.87 19.84 0.08 28.79
1-1/2" x 2-3/4" tee lp@.400 Ea 14.50 19.84 0.08 34.42
1-1/2" x 2-3/4" adapter lp@.400 Ea 7.96 19.84 0.08 27.88
2-1/2" x 2-1/2" wireway and cover lp@.450 LF 1.79 22.32 0.09 24.20
2-1/2" x 2-1/2" 90 degree elbow lp@.200 Ea 41.70 9.92 0.04 51.66
2-1/2" x 2-1/2" tee lp@.350 Ea 48.90 17.36 0.07 66.33
2-1/2" x 2-1/2" adapter lp@.200 Ea 17.80 9.92 0.04 27.76
4" x 4" wireway and cover lp@.500 LF 1.93 24.80 0.10 26.83
4" x 4" 90 degree elbow lp@.200 Ea 47.60 9.92 0.04 57.56
4" x 4" tee lp@.250 Ea 56.80 12.40 0.05 69.25
4" x 4" adapter lp@.200 Ea 20.70 9.92 0.04 30.66
6" x 6" wireway & cover lp@.600 LF 37.20 29.76 0.12 67.08
6" x 6" 90 degree elbow lp@.250 Ea 52.80 12.40 0.05 65.25
6" x 6" tee lp@.300 Ea 64.60 14.88 0.06 79.54
6" x 6" adapter lp@.300 Ea 27.40 14.88 0.06 42.34
3/4" x 1-1/4" with 15 amp receptacle each 6",
3 wire, 1 circuit, grounding lp@.200 LF 5.75 9.92 0.04 15.71
2015 Heavy Construction Estimator, All Rights Reserved Page 681

Toggle bolts for wireway and conduit


4" long, including drilling in concrete, concrete block, wood or steel, using small tools.
1/4" bolt lp@.100 Ea 0.32 4.96 0.02 5.30
5/16" bolt lp@.150 Ea 0.61 7.44 0.03 8.08
3/8" bolt lp@.150 Ea 0.70 7.44 0.03 8.17
1/2" bolt lp@.150 Ea 0.83 7.44 0.03 8.30

Machine screw and 2" bolt for wireway


Drilled in concrete, concrete block, wood or steel, using small tools.
8/32" x 2" screw lp@.200 Ea 0.07 9.92 0.04 10.03
10/24"x 2" screw lp@.200 Ea 0.09 9.92 0.04 10.05
1/4-20" x 2" screw lp@.200 Ea 0.14 9.92 0.04 10.10
5/16-18" x 2" screw lp@.200 Ea 0.23 9.92 0.04 10.19
3/8-16" x 2" screw lp@.200 Ea 0.30 9.92 0.04 10.26

2" lag bolts for wireway


With lead anchor expansion shield, including drilling hole in material, using small tools.
1/4" x 2" lp@.250 Ea 0.73 12.40 0.05 13.18
5/16" x 2" lp@.250 Ea 1.00 12.40 0.05 13.45
3/8" x 2" lp@.250 Ea 1.20 12.40 0.05 13.65
1/2" x 2" lp@.250 Ea 2.07 12.40 0.05 14.52

Hanger lag bolts for wireway


With hex nuts, including drilling hole, using small tools.
1/4" x 2" lp@.250 Ea 2.10 12.40 0.05 14.55
5/16" x 2" lp@.250 Ea 3.38 12.40 0.05 15.83
3/8" x 2-1/2" lp@.250 Ea 4.95 12.40 0.05 17.40

Hollow wall screw anchors for wireway


Using small tools.
5/16" x 1/2" to 1" lp@.200 Ea 0.17 9.92 0.04 10.13
3/8" x 5/8" to 1-1/8" lp@.200 Ea 0.23 9.92 0.04 10.19
5/16" x 5/8" to 1-1/4" lp@.200 Ea 0.31 9.92 0.04 10.27
1/2" x 5/8" to 1-1/4" lp@.200 Ea 0.47 9.92 0.04 10.43

Lead anchors for wood screws


Including drilling hole in material, using small tools.
6-8 x 1" lp@.200 Ea 0.33 9.92 0.04 10.29
6-8 x 1" lp@.200 Ea 0.45 9.92 0.04 10.41
6-8 x 1" lp@.200 Ea 0.51 9.92 0.04 10.47
6-8 x 1" lp@.200 Ea 0.64 9.92 0.04 10.60

Square duct multi-service poles, 2" x 2"


Prewired for duplex receptacles, with space for telephone wire, using small tools.
102" pole lp@1.30 Ea 193.00 64.48 0.26 257.74
114" pole lp@1.35 Ea 220.00 66.96 0.27 287.23
120" pole lp@1.40 Ea 240.00 69.44 0.28 309.72

Telephone and power poles


120" long, with hangers and fasteners, using small tools.
Two 15amp, 125 volt receptacles lp@1.30 Ea 142.00 64.48 0.26 206.74
Two 15 amp, 125 volt receptacles,
one phone entrance fitting lp@1.30 Ea 184.00 64.48 0.26 248.74
Four receptacles, 15 amp, 125 volts lp@1.30 Ea 237.00 64.48 0.26 301.74
Four receptacles, 20 amp, 125 volts lk@1.30 Ea 256.00 65.13 0.25 321.38
2015 Heavy Construction Estimator, All Rights Reserved Page 681 (part 2)

CSI 16-111, Conduit

Rigid galvanized steel conduit - 1/2" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with couplings lp@.040 LF 1.51 1.98 0.01 3.50
Elbow lp@.100 Ea 3.54 4.96 0.02 8.52
2015 Heavy Construction Estimator, All Rights Reserved Page 682

Bushing set with locknuts lp@.050 Ea 0.50 2.48 0.01 2.99


Type LL or LR2 hub lp@.100 Ea 12.00 4.96 0.02 16.98
Type T3 hub bodies lp@.150 Ea 14.50 7.44 0.03 21.97
Off-set nipple lp@.100 Ea 4.76 4.96 0.02 9.74

Rigid galvanized steel conduit - 3/4" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with couplings lp@.045 LF 1.88 2.23 0.01 4.12
Elbow lp@.100 Ea 4.23 4.96 0.02 9.21
Bushing set with locknuts lp@.060 Ea 0.83 2.98 0.01 3.82
Type LL or LR2 hub lp@.150 Ea 17.20 7.44 0.03 24.67
Type T3 hub bodies lp@.020 Ea 17.30 0.99 -- 18.29
Off-set nipple lp@.150 Ea 4.98 7.44 0.03 12.45

Rigid galvanized steel conduit - 1" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with coupling lp@.050 LF 2.71 2.48 0.01 5.20
Elbow lp@.120 Ea 6.32 5.95 0.02 12.29
Bushing set with locknuts lp@.080 Ea 1.40 3.97 0.02 5.39
Type LL or LR2 hub lp@.200 Ea 25.00 9.92 0.04 34.96
Type T3 hub bodies lp@.250 Ea 25.70 12.40 0.05 38.15
Off-set nipple lp@.150 Ea 6.07 7.44 0.03 13.54

Rigid galvanized steel conduit - 1-1/4" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with coupling lp@.070 LF 3.44 3.47 0.01 6.92
Elbow lp@.150 Ea 9.05 7.44 0.03 16.52
Bushing set with locknuts lp@.100 Ea 1.86 4.96 0.02 6.84
Type LL or LR2 hub lp@.250 Ea 36.60 12.40 0.05 49.05
Type T3 hub bodies lp@.300 Ea 36.10 14.88 0.06 51.04
Off-set nipple lp@.200 Ea 14.70 9.92 0.04 24.66

Rigid galvanized steel conduit - 1-1/2" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with couplings lp@.080 LF 4.30 3.97 0.02 8.29
Elbow lp@.150 Ea 11.80 7.44 0.03 19.27
Bushing set with locknuts lp@.100 Ea 2.66 4.96 0.02 7.64
Type LL or LR2 hub lp@.250 Ea 39.80 12.40 0.05 52.25
Type T3 hub bodies lp@.300 Ea 46.30 14.88 0.06 61.24
Off-set nipple lp@.200 Ea 18.20 9.92 0.04 28.16

Rigid galvanized steel conduit - 2" RSC


Based on 100' run to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and installation on existing supports. Add the cost of support straps and hangers. See costs
for installation in slabs and masonry below, using small tools.
Conduit with couplings lp@.080 LF 5.60 3.97 0.02 9.59
Elbow lp@.200 Ea 16.70 9.92 0.04 26.66
Bushing set with locknuts lp@.150 Ea 4.37 7.44 0.03 11.84
Type LL or LR2 hub lp@.300 Ea 66.30 14.88 0.06 81.24
Type T3 hub bodies lp@.400 Ea 72.80 19.84 0.08 92.72
2015 Heavy Construction Estimator, All Rights Reserved Page 682 (part 2)

Off-set nipple lp@.250 Ea 28.70 12.40 0.05 41.15

Rigid galvanized steel conduit - RSC including supports


Based on 100' runs to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and typical installation on support straps and hangers. See costs for installation in slabs and
masonry below, using small tools.
2" RSC lp@.100 LF 7.00 4.96 0.02 11.98
2-1/2" RSC lp@.207 LF 12.00 10.27 0.04 22.31
3" RSC lp@.140 LF 14.90 6.94 0.03 21.87
2015 Heavy Construction Estimator, All Rights Reserved Page 683

3-1/2" RSC lp@.160 LF 18.20 7.94 0.03 26.17


4" RSC lp@.180 LF 21.60 8.93 0.04 30.57
5" RSC lp@.250 LF 44.30 12.40 0.05 56.75
6" RSC lp@.300 LF 62.00 14.88 0.06 76.94

Electric metallic tube (EMT) conduit


Based on 100' runs to 10' high on a flat ceiling or wall. Labor includes unloading, layout, fabrication,
assembly and typical installation. Add the cost of conduit supports. See costs for installation in slabs
and masonry below, using small tools.
1/2" with couplings lp@.033 LF 0.44 1.64 0.01 2.09
1/2" set screw connectors lp@.050 Ea 0.32 2.48 0.01 2.81
3/4" with couplings lp@.035 LF 0.67 1.74 0.01 2.42
3/4" set screw connectors lp@.060 Ea 0.53 2.98 0.01 3.52
1" with couplings lp@.040 LF 1.19 1.98 0.01 3.18
1" 90 degree elbow lp@.080 Ea 2.85 3.97 0.02 6.84
1" set screw connector lp@.080 Ea 0.85 3.97 0.02 4.84
1-1/2" with couplings lp@.055 LF 1.95 2.73 0.01 4.69
1-1/2" 90 degree elbow lp@.100 Ea 5.37 4.96 0.02 10.35
1-1/2" set screw connector lp@.100 Ea 2.14 4.96 0.02 7.12
2" EMT with couplings lp@.070 LF 2.51 3.47 0.01 5.99
2" 90 degree elbow lp@.150 Ea 8.20 7.44 0.03 15.67
2" set screw connector lp@.150 Ea 2.92 7.44 0.03 10.39
2-1/2" with couplings lp@.090 LF 5.26 4.46 0.02 9.74
2-1/2" 90 degree elbow lp@.200 Ea 20.00 9.92 0.04 29.96
2-1/2" set screw connector lp@.200 Ea 8.48 9.92 0.04 18.44
3" EMT with couplings lp@.100 LF 6.62 4.96 0.02 11.60
3" 90 degree elbow (sweep) lp@.250 Ea 29.80 12.40 0.05 42.25
3" set screw connector lp@.250 Ea 12.40 12.40 0.05 24.85

Rigid steel conduit installed in slabs and masonry


Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication, assembly and
installation within the rebar and form. Includes hold down straps and stirrups. See costs above for
installation on walls, using small tools.
1/2" conduit with couplings lp@.040 LF 1.49 1.98 0.01 3.48
2015 Heavy Construction Estimator, All Rights Reserved Page 684

1/2" 90 degree elbow lp@.050 Ea 3.54 2.48 0.01 6.03


1/2" bushing set with locknuts lp@.050 Ea 0.50 2.48 0.01 2.99
1/2" expansion joint with jumper lp@.150 Ea 83.80 7.44 0.03 91.27
3/4" conduit with couplings lp@.050 LF 1.88 2.48 0.01 4.37
3/4" 90 degree elbow lp@.060 Ea 4.23 2.98 0.01 7.22
3/4" bushing set with locknuts lp@.060 Ea 0.83 2.98 0.01 3.82
3/4" expansion joint with jumper lp@.200 Ea 92.20 9.92 0.04 102.16
1" conduit with couplings lp@.060 LF 2.71 2.98 0.01 5.70
1" 90 degree elbow lp@.080 Ea 6.32 3.97 0.02 10.31
1" bushing set with locknuts lp@.080 Ea 1.40 3.97 0.02 5.39
1" expansion joint with jumper lp@.250 Ea 102.00 12.40 0.05 114.45
1-1/2" conduit with couplings lp@.080 LF 4.30 3.97 0.02 8.29
1-1/2" 90 degree elbow lp@.150 Ea 11.80 7.44 0.03 19.27
1-1/2" bushing set with locknut lp@.150 Ea 2.66 7.44 0.03 10.13
1-1/2" expansion joint with jumper lp@.350 Ea 162.00 17.36 0.07 179.43
2" conduit with couplings lp@.100 LF 5.60 4.96 0.02 10.58
2" 90 degree elbow lp@.200 Ea 16.70 9.92 0.04 26.66
2" bushing set with locknuts lp@.200 Ea 4.37 9.92 0.04 14.33
2" expansion joint with jumper lp@.400 Ea 224.00 19.84 0.08 243.92

Electric metallic tube installed in slabs and masonry


Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication, assembly and
installation within the rebar and form. Includes hold down straps and stirrups. See costs above for
installation on walls, using small tools.
1/2" with coupling lp@.030 LF 0.44 1.49 0.01 1.94
1/2" set screw connectors lp@.050 Ea 0.85 2.48 0.01 3.34
3/4" with coupling lp@.035 LF 0.67 1.74 0.01 2.42
3/4" set screw connectors lp@.060 Ea 1.36 2.98 0.01 4.35
1" with coupling lp@.040 LF 1.19 1.98 0.01 3.18
1" 90 degree elbow lp@.080 Ea 5.12 3.97 0.02 9.11
1" set screw connector lp@.080 Ea 2.30 3.97 0.02 6.29
1-1/4" with coupling lp@.045 LF 1.63 2.23 0.01 3.87
1-1/4" 90 degree elbow lp@.100 Ea 7.01 4.96 0.02 11.99
1-1/4" set screw connector lp@.100 Ea 4.96 4.96 0.02 9.94
1-1/2" with coupling lp@.055 LF 1.95 2.73 0.01 4.69
1-1/2" 90 degree elbow lp@.100 Ea 8.89 4.96 0.02 13.87
1-1/2" set screw connector lp@.100 Ea 7.12 4.96 0.02 12.10
2" with coupling lp@.070 LF 2.51 3.47 0.01 5.99
2" 90 degree elbow lp@.150 Ea 14.20 7.44 0.03 21.67
2" set screw connector lp@.150 Ea 10.20 7.44 0.03 17.67
2-1/2" with coupling lp@.090 LF 5.26 4.46 0.02 9.74
2-1/2" 90 degree elbow lp@.200 Ea 35.50 9.92 0.04 45.46
2-1/2" set screw connector lp@.200 Ea 29.40 9.92 0.04 39.36

Liquid tight flex conduit and fittings


Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication, assembly and
installation within the rebar and form. Includes hold down straps and stirrups. Type EF or LT, using
small tools.
1/2" conduit lj@.040 LF 1.66 2.00 0.02 3.68
1/2" connector lj@.100 Ea 2.80 5.01 0.04 7.85
3/4" conduit lj@.045 LF 2.21 2.26 0.02 4.49
3/4" connector lj@.100 Ea 4.04 5.01 0.04 9.09
1" conduit lj@.050 LF 3.38 2.51 0.02 5.91
1" connector lj@.150 Ea 5.86 7.52 0.06 13.44
1-1/4" conduit lj@.060 LF 4.60 3.01 0.02 7.63
1-1/4" connector lj@.200 Ea 10.00 10.02 0.08 20.10
1-1/2" conduit lj@.070 LF 6.23 3.51 0.03 9.77
1-1/2" connector lj@.200 Ea 14.30 10.02 0.08 24.40
2" conduit lj@.090 LF 7.92 4.51 0.04 12.47
2015 Heavy Construction Estimator, All Rights Reserved Page 684 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 685

2" connector lj@.250 Ea 26.00 12.53 0.10 38.63

Fixture whips
Using small tools.
3/8" x 6' with three
12 gauge THHN conductors lj@.250 Ea 98.80 12.53 0.10 111.43

Flexible metallic conduit (Greenfield)


Using small tools.
1/2"conduit lp@.030 LF 0.43 1.49 0.01 1.93
1/2" connector lp@.050 Ea 0.44 2.48 0.01 2.93

PVC thin wall conduit in a concrete encased duct bank


Type A or EB underground duct with glued couplings. Based on 100' runs. Labor includes unloading,
measuring, cutting, layout, fabrication, assembly and installation but no excavation or backfill, using
small tools.
1" schedule 40-A with coupling ll@.033 LF 0.43 1.34 -- 1.77
1" schedule 40 elbow ll@.080 Ea 2.28 3.26 -- 5.54
1" schedule 40 adapter ll@.080 Ea 1.04 3.26 -- 4.30
2" schedule 40-EB with coupling ll@.035 LF 0.87 1.43 -- 2.30
2" elbow ll@.150 Ea 6.39 6.11 -- 12.50
2" schedule 40 adapter ll@.150 Ea 1.98 6.11 -- 8.09
3" schedule 40-EB with coupling ll@.037 LF 1.75 1.51 -- 3.26
3" elbow ll@.200 Ea 20.40 8.15 -- 28.55
3" schedule 40 adapter ll@.200 Ea 5.72 8.15 -- 13.87
4" schedule 40-EB with coupling ll@.040 LF 2.50 1.63 -- 4.13
4" elbow ll@.250 Ea 35.30 10.18 -- 45.48
4" schedule 40 adapter ll@.250 Ea 7.51 10.18 -- 17.69

Schedule 40 PVC conduit


Direct burial. Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication,
assembly and installation but no excavation or backfill, using small tools.
1/2" conduit with couplings ll@.031 LF 0.21 1.26 -- 1.47
1/2" elbow ll@.050 Ea 1.35 2.04 -- 3.39
1/2" adapter ll@.050 Ea 0.44 2.04 -- 2.48
3/4" conduit with couplings ll@.032 LF 0.28 1.30 -- 1.58
3/4" elbow ll@.060 Ea 1.49 2.44 -- 3.93
3/4" adapter ll@.060 Ea 0.74 2.44 -- 3.18
1" conduit with couplings ll@.033 LF 0.43 1.34 -- 1.77
1" elbow ll@.080 Ea 2.28 3.26 -- 5.54
1" adapter ll@.080 Ea 1.04 3.26 -- 4.30
1" intermediate spacers,
average 4" wide ll@.050 Ea 1.52 2.04 -- 3.56
1-1/2" conduit with couplings ll@.034 LF 0.67 1.39 -- 2.06
1-1/2" elbow ll@.100 Ea 4.41 4.07 -- 8.48
1-1/2" adapter ll@.100 Ea 1.43 4.07 -- 5.50
1-1/2" base spacer, average 4" wide ll@.050 Ea 1.58 2.04 -- 3.62
1-1/2" intermediate spacers,
average 4" wide ll@.050 Ea 0.83 2.04 -- 2.87
1-1/2" bell end and cap ll@.100 Ea 4.71 4.07 -- 8.78
2" conduit with couplings ll@.035 LF 0.87 1.43 -- 2.30
2" elbow ll@.150 Ea 6.39 6.11 -- 12.50
2" adapter ll@.150 Ea 1.98 6.11 -- 8.09
2" base spacer, average 4" wide ll@.050 Ea 0.89 2.04 -- 2.93
2" intermediate spacers,
average 4" wide ll@.050 Ea 1.61 2.04 -- 3.65
2" bell end and plug ll@.150 Ea 6.06 6.11 -- 12.17
3" conduit with couplings ll@.037 LF 1.75 1.51 -- 3.26
2015 Heavy Construction Estimator, All Rights Reserved Page 685 (part 2)

3" elbow ll@.200 Ea 20.40 8.15 -- 28.55


3" adapter ll@.200 Ea 5.72 8.15 -- 13.87
3" base spacer, average 4" wide ll@.050 Ea 0.96 2.04 -- 3.00
3" intermediate spacers,
average 4" wide ll@.050 Ea 1.77 2.04 -- 3.81
3" bell end and plug ll@.200 Ea 7.17 8.15 -- 15.32
4" conduit with couplings ll@.040 LF 2.50 1.63 -- 4.13
4" elbows ll@.250 Ea 35.30 10.18 -- 45.48
4" adapters ll@.250 Ea 7.51 10.18 -- 17.69
4" base spacer, average 4" wide ll@.050 Ea 1.13 2.04 -- 3.17
2015 Heavy Construction Estimator, All Rights Reserved Page 686

4" intermediate spacers,


average 4" wide ll@.050 Ea 1.97 2.04 -- 4.01
4" bell end and plug ll@.250 Ea 8.82 10.18 -- 19.00
5" conduit with couplings ll@.043 LF 3.56 1.75 -- 5.31
5" elbows ll@.300 Ea 62.10 12.22 -- 74.32
5" adapter ll@.300 Ea 19.00 12.22 -- 31.22
5" base spacer, average 4" wide ll@.050 Ea 1.28 2.04 -- 3.32
5" intermediate spacers,
average 4" wide ll@.050 Ea 2.11 2.04 -- 4.15
5" bell end and plug ll@.300 Ea 13.10 12.22 -- 25.32
6" conduit with couplings ll@.045 LF 4.62 1.83 -- 6.45
6" elbows ll@.600 Ea 105.00 24.44 -- 129.44
6" adapter ll@.500 Ea 25.10 20.37 -- 45.47
6" base spacer, average 4" wide ll@.050 Ea 2.07 2.04 -- 4.11
6" intermediate spacers,
average 4" wide ll@.050 Ea 2.23 2.04 -- 4.27
6" bell end and plug ll@.500 Ea 14.80 20.37 -- 35.17

Rigid steel conduit with 40 mil PVC coating


Direct burial. Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication,
assembly and installation but no excavation or backfill. Use base and intermediate spacer costs above,
using small tools.
1/2" conduit with couplings ll@.045 LF 2.34 1.83 -- 4.17
1/2" elbow ll@.100 Ea 8.62 4.07 -- 12.69
1/2" adapter union ll@.100 Ea 36.30 4.07 -- 40.37
3/4" conduit with couplings ll@.055 LF 2.69 2.24 -- 4.93
3/4" elbow ll@.100 Ea 8.94 4.07 -- 13.01
3/4" adapter union ll@.100 Ea 37.00 4.07 -- 41.07
1" conduit with couplings ll@.070 LF 3.49 2.85 -- 6.34
1" elbow ll@.150 Ea 10.30 6.11 -- 16.41
1" adapter union ll@.150 Ea 49.60 6.11 -- 55.71
1-1/2" conduit with couplings ll@.110 LF 4.43 4.48 -- 8.91
1-1/2" elbow ll@.200 Ea 15.50 8.15 -- 23.65
1-1/2" adapter union ll@.200 Ea 96.30 8.15 -- 104.45
2" conduit with couplings ll@.130 LF 7.01 5.30 -- 12.31
2" adapter union ll@.250 Ea 128.00 10.18 -- 138.18
2" elbow ll@.250 Ea 21.60 10.18 -- 31.78
3" conduit with couplings ll@.170 LF 13.40 6.92 -- 20.32
3" elbow ll@.350 Ea 65.20 14.26 -- 79.46
3" adapter union ll@.350 Ea 239.00 14.26 -- 253.26
4" conduit with couplings ll@.210 LF 19.30 8.55 -- 27.85
4" elbow ll@.500 Ea 90.30 20.37 -- 110.67
4" adapter union ll@.500 Ea 381.00 20.37 -- 401.37
5" conduit with couplings ll@.250 LF 34.40 10.18 -- 44.58
5" elbow ll@.750 Ea 218.00 30.55 -- 248.55
5" adapter union ll@.750 Ea 570.00 30.55 -- 600.55

Rigid steel conduit and fittings in precast concrete panels


Labor includes unloading, measuring, cutting, layout, fabrication, assembly and installation, using small
tools.
1/2" conduit with couplings lp@.040 LF 1.49 1.98 0.01 3.48
1/2" elbow lp@.050 Ea 3.54 2.48 0.01 6.03
1/2" bushing set with locknuts lp@.050 Ea 0.50 2.48 0.01 2.99
3/4" conduit with couplings lp@.045 LF 1.88 2.23 0.01 4.12
3/4" elbow lp@.060 Ea 4.23 2.98 0.01 7.22
3/4" bushing set with locknuts lp@.060 Ea 0.83 2.98 0.01 3.82
1" conduit with couplings lp@.050 LF 2.71 2.48 0.01 5.20
1" elbow lp@.080 Ea 6.32 3.97 0.02 10.31
1" bushing set with locknuts lp@.080 Ea 1.40 3.97 0.02 5.39
2015 Heavy Construction Estimator, All Rights Reserved Page 686 (part 2)

Flexible steel conduit


Labor includes unloading, measuring, cutting, layout, fabrication, assembly and installation, using small
tools.
1/2" conduit lp@.030 LF 0.43 1.49 0.01 1.93
1/2" connector lp@.050 Ea 0.44 2.48 0.01 2.93
1/2" conduit to rigid coupling lp@.050 Ea 3.24 2.48 0.01 5.73
3/4" conduit lp@.320 LF 0.57 15.87 0.06 16.50
2015 Heavy Construction Estimator, All Rights Reserved Page 687

3/4" connector lp@.060 Ea 0.80 2.98 0.01 3.79


3/4" conduit to rigid coupling lp@.060 Ea 4.94 2.98 0.01 7.93
1" conduit lp@.035 LF 1.17 1.74 0.01 2.92
1" connector lp@.080 Ea 1.70 3.97 0.02 5.69
1" to rigid coupling lp@.080 Ea 8.78 3.97 0.02 12.77

PVC conduit in concrete slabs or duct banks


Schedule 80. Labor includes unloading, measuring, cutting, layout, assembly and installation, using
small tools.
1/2" conduit with couplings ll@.031 LF 0.37 1.26 -- 1.63
1/2" 90 degree elbow ll@.050 Ea 2.11 2.04 -- 4.15
1/2" adapter ll@.050 Ea 0.44 2.04 -- 2.48
3/4" conduit with couplings ll@.032 LF 0.51 1.30 -- 1.81
3/4" 90 degree elbow ll@.060 Ea 2.99 2.44 -- 5.43
3/4" adapter ll@.060 Ea 0.74 2.44 -- 3.18
1" conduit with couplings ll@.033 LF 0.51 1.34 -- 1.85
1" 90 degree elbow ll@.080 Ea 4.57 3.26 -- 7.83
1" adapter ll@.080 Ea 1.04 3.26 -- 4.30
1" intermediate spacers,
average 4" wide ll@.050 Ea 0.81 2.04 -- 2.85
1-1/2" conduit with couplings ll@.034 LF 1.24 1.39 -- 2.63
1-1/2" 90 degree elbow ll@.100 Ea 9.09 4.07 -- 13.16
1-1/2" adapter ll@.100 Ea 1.43 4.07 -- 5.50
1-1/2" base spacer, average 4" wide ll@.050 Ea 0.92 2.04 -- 2.96
1-1/2" intermediate spacers ll@.050 Ea 0.83 2.04 -- 2.87
1-1/2" bell end and cap ll@.100 Ea 4.71 4.07 -- 8.78
2" conduit with couplings ll@.035 LF 1.66 1.43 -- 3.09
2" 90 degree elbow ll@.150 Ea 12.30 6.11 -- 18.41
2" adapter ll@.150 Ea 1.98 6.11 -- 8.09
2" base spacer, average 4" wide ll@.050 Ea 0.92 2.04 -- 2.96
2" intermediate spacers,
average 4" wide ll@.050 Ea 0.83 2.04 -- 2.87
2" bell end and plug ll@.150 Ea 6.06 6.11 -- 12.17
3" conduit with couplings ll@.037 LF 3.35 1.51 -- 4.86
3" 90 degree elbow ll@.200 Ea 41.60 8.15 -- 49.75
3" adapter ll@.200 Ea 5.72 8.15 -- 13.87
3" base spacer, average 4" wide ll@.055 Ea 1.01 2.24 -- 3.25
3" intermediate spacers,
average 4" wide ll@.050 Ea 0.94 2.04 -- 2.98
3" bell end and plug ll@.200 Ea 7.17 8.15 -- 15.32
4" conduit with couplings ll@.040 LF 4.89 1.63 -- 6.52
4" 90 degree elbow ll@.250 Ea 67.90 10.18 -- 78.08
4" adapter ll@.250 Ea 7.51 10.18 -- 17.69
4" base spacer, average 4" wide ll@.050 Ea 1.13 2.04 -- 3.17
4" intermediate spacers,
average 4" wide ll@.050 Ea 1.08 2.04 -- 3.12
4" bell end and plug ll@.250 Ea 8.82 10.18 -- 19.00
5" conduit with couplings ll@.042 LF 7.05 1.71 -- 8.76
5" 90 degree elbow ll@.300 Ea 74.40 12.22 -- 86.62
5" adapter ll@.300 Ea 19.00 12.22 -- 31.22
5" base spacer, average 4" wide ll@.050 Ea 1.28 2.04 -- 3.32
5" intermediate spacers,
average 4" wide ll@.050 Ea 1.22 2.04 -- 3.26
5" bell end and plug ll@.300 Ea 13.10 12.22 -- 25.32
6" conduit with couplings ll@.450 LF 7.56 18.33 -- 25.89
6" 90 degree elbow ll@.500 Ea 83.20 20.37 -- 103.57
6" adapter ll@.500 Ea 25.10 20.37 -- 45.47
6" base spacer, average 4" wide ll@.050 Ea 2.05 2.04 -- 4.09
6" intermediate spacers,
average 4" wide ll@.050 Ea 1.98 2.04 -- 4.02
2015 Heavy Construction Estimator, All Rights Reserved Page 687 (part 2)

6" bell end and plug ll@.500 Ea 14.80 20.37 -- 35.17

Type II plastic duct and fittings in duct banks


In a concrete duct bank. Based on 100' runs. Labor includes unloading, measuring, cutting, layout,
fabrication, assembly and installation, using small tools.
1-1/2" duct with couplings ll@.036 LF 0.46 1.47 -- 1.93
1-1/2" elbow 90 degree ll@.150 Ea 6.27 6.11 -- 12.38
1-1/2" adapter, female ll@.150 Ea 1.52 6.11 -- 7.63
2015 Heavy Construction Estimator, All Rights Reserved Page 688

1-1/2" adapter, male ll@.150 Ea 1.52 6.11 -- 7.63


1-1/2" bell end and plug ll@.150 Ea 4.00 6.11 -- 10.11
1-1/2" base spacer, average 4" wide ll@.050 Ea 0.85 2.04 -- 2.89
1" intermediate spacers,
average 4" wide ll@.050 Ea 0.78 2.04 -- 2.82
2" duct with couplings ll@.033 LF 0.55 1.34 -- 1.89
2" elbow 90 degree. ll@.200 Ea 7.83 8.15 -- 15.98
2" adapter, female ll@.200 Ea 2.04 8.15 -- 10.19
2" adapter, male ll@.200 Ea 2.04 8.15 -- 10.19
2" bell end and plug ll@.200 Ea 6.16 8.15 -- 14.31
2" base spacer, average 4" wide ll@.050 Ea 0.96 2.04 -- 3.00
2" intermediate spacers,
average 4" wide ll@.050 Ea 0.89 2.04 -- 2.93
3" duct with couplings ll@.035 LF 0.80 1.43 -- 2.23
3" elbow 90 degree. ll@.200 Ea 8.93 8.15 -- 17.08
3" adapter, female ll@.200 Ea 4.99 8.15 -- 13.14
3" adapter, male ll@.200 Ea 4.99 8.15 -- 13.14
3" bell end and plug ll@.200 Ea 7.44 8.15 -- 15.59
3" base spacer, average 4" wide ll@.050 Ea 1.06 2.04 -- 3.10
3" intermediate spacers,
average 4" wide ll@.500 Ea 0.99 20.37 -- 21.36
3-1/2" duct with couplings ll@.400 LF 1.95 16.29 -- 18.24
3-1/2" elbow 90 degree. ll@.250 Ea 11.10 10.18 -- 21.28
3-1/2" adapter, female ll@.250 Ea 6.73 10.18 -- 16.91
3-1/2" adapter, male ll@.250 Ea 6.73 10.18 -- 16.91
3-1/2" bell end and plug ll@.250 Ea 8.09 10.18 -- 18.27
3-1/2" base spacer, average 4" wide ll@.050 Ea 1.17 2.04 -- 3.21
3" intermediate spacers,
average 4" wide ll@.050 Ea 1.12 2.04 -- 3.16
4" duct with couplings ll@.040 LF 1.31 1.63 -- 2.94
4" elbow 90 degree ll@.250 Ea 14.10 10.18 -- 24.28
4" adapter, female ll@.250 Ea 8.61 10.18 -- 18.79
4" adapter, male ll@.250 Ea 8.61 10.18 -- 18.79
4" bell end and plug ll@.250 Ea 9.07 10.18 -- 19.25
4" base spacer, average 4" wide ll@.050 Ea 1.19 2.04 -- 3.23
4" intermediate spacers,
average 4" wide ll@.050 Ea 1.12 2.04 -- 3.16
5" duct with couplings ll@.045 LF 1.98 1.83 -- 3.81
5" elbow 90 degree ll@.300 Ea 24.70 12.22 -- 36.92
5" adapter, female ll@.300 Ea 16.90 12.22 -- 29.12
5" adapter, male ll@.300 Ea 16.90 12.22 -- 29.12
5" bell end and plug ll@.300 Ea 13.20 12.22 -- 25.42
5" base spacer, average 4" wide ll@.050 Ea 1.33 2.04 -- 3.37
5" intermediate spacers,
average 4" wide ll@.050 Ea 1.28 2.04 -- 3.32
6" duct with couplings ll@.060 LF 2.85 2.44 -- 5.29
6" elbow 90 degree ll@.750 Ea 46.40 30.55 -- 76.95
6" adapter, female ll@.750 Ea 20.30 30.55 -- 50.85
6" adapter, male ll@.750 Ea 20.30 30.55 -- 50.85
6" bell end and plug ll@.750 Ea 15.00 30.55 -- 45.55
6" base spacer, average 4" wide ll@.050 Ea 2.16 2.04 -- 4.20
6" intermediate spacers,
average 4" wide ll@.050 Ea 2.07 2.04 -- 4.11

Rigid galvanized steel underground duct


Based on 100' runs. Labor includes unloading, measuring, cutting, layout, fabrication, assembly and
installation but no supports, using small tools.
2-1/2" conduit with couplings lp@.120 LF 8.54 5.95 0.02 14.51
2-1/2" elbow, 48" radius lp@.400 Ea 57.50 19.84 0.08 77.42
2-1/2" bushing set with locknuts lp@.150 Ea 13.60 7.44 0.03 21.07
2015 Heavy Construction Estimator, All Rights Reserved Page 688 (part 2)

2-1/2" expansion
joint with bonding jumper lp@1.00 Ea 348.00 49.60 0.20 397.80
2-1/2" two hub conduit body lk@.300 Ea 134.00 15.03 0.06 149.09
3" conduit with couplings lp@.140 LF 10.60 6.94 0.03 17.57
3" elbow, 48" radius lp@.500 Ea 396.00 24.80 0.10 420.90
3" bushing set with locknuts lp@.200 Ea 16.60 9.92 0.04 26.56
3" expansion
joint with bonding jumper lp@1.10 Ea 419.00 54.56 0.22 473.78
3" two hub conduit body lk@.400 Ea 173.00 20.04 0.08 193.12
3-1/2" conduit with couplings lp@.160 LF 13.00 7.94 0.03 20.97
2015 Heavy Construction Estimator, All Rights Reserved Page 689

3-1/2" elbow, 48" radius lp@.500 Ea 549.00 24.80 0.10 573.90


3-1/2" bushing set with locknuts lp@.200 Ea 25.70 9.92 0.04 35.66
3 1/2" expansion
joint with bonding jumper lp@1.30 Ea 599.00 64.48 0.26 663.74
3 1/2" two hub conduit body lk@.500 Ea 277.00 25.05 0.10 302.15
4" conduit with couplings lp@.180 LF 15.40 8.93 0.04 24.37
4" elbow, 48" radius lp@.700 Ea 603.00 34.72 0.14 637.86
4" bushing set with locknuts lp@.250 Ea 31.90 12.40 0.05 44.35
4" expansion
joint with bonding jumper lp@1.50 Ea 700.00 74.40 0.30 774.70
4" two hub conduit body lk@1.00 Ea 322.00 50.10 0.19 372.29
5" conduit with couplings lp@.388 LF 31.10 19.24 0.08 50.42
5" elbow, 48 radius lp@1.00 Ea 1,080.00 49.60 0.20 1,129.80
5" bushing set with locknuts lp@.300 Ea 123.00 14.88 0.06 137.94
5" expansion
joint with bonding jumper lp@1.95 Ea 1,340.00 96.72 0.39 1,437.11
5" two hub conduit body lk@2.00 Ea 949.00 100.20 0.38 1,049.58
6" conduit with couplings lp@.300 LF 43.80 14.88 0.06 58.74
6" elbow, 48 radius lp@1.50 Ea 1,140.00 74.40 0.30 1,214.70
6" bushing set with locknuts lp@.500 Ea 202.00 24.80 0.10 226.90
6" expansion
joint with bonding jumper lp@2.50 Ea 2,210.00 124.00 0.50 2,334.50
6" two hub conduit body lk@3.00 Ea 1,530.00 150.30 0.57 1,680.87

Intermediate metal conduit (IMC) on walls


Mounted exposed on flat wall to 10’ high. All 1/2" and 3/4" elbows are assumed to be field bent. Labor
includes unloading, measuring, cutting, layout, fabrication, assembly and installation but no supports,
using small tools.
1/2" conduit with couplings lp@.037 LF 1.31 1.84 0.01 3.16
1/2" bushing set with locknut lp@.050 Ea 0.48 2.48 0.01 2.97
3/4" conduit with coupling lp@.040 LF 1.52 1.98 0.01 3.51
3/4" bushing set with locknut lp@.060 Ea 0.83 2.98 0.01 3.82
1" conduit with couplings lp@.045 LF 2.32 2.23 0.01 4.56
1" elbow lp@.080 Ea 6.71 3.97 0.02 10.70
1" bushing set with locknut lp@.080 Ea 1.38 3.97 0.02 5.37
1-1/4" conduit with couplings lp@.065 LF 2.90 3.22 0.01 6.13
1-1/4" elbow lp@.100 Ea 10.90 4.96 0.02 15.88
1-1/4" bushing set with locknut lp@.100 Ea 1.84 4.96 0.02 6.82
1-1/2" conduit with couplings lp@.073 LF 3.45 3.62 0.01 7.08
1-1/2" elbow lp@.100 Ea 12.20 4.96 0.02 17.18
1-1/2" bushing set with locknut lp@.100 Ea 2.64 4.96 0.02 7.62
2" conduit with couplings lp@.090 LF 4.76 4.46 0.02 9.24
2" elbows lp@.150 Ea 17.60 7.44 0.03 25.07
2" bushing set with locknut lp@.150 Ea 4.34 7.44 0.03 11.81
2-1/2" conduit with couplings lp@.110 LF 9.71 5.46 0.02 15.19
2-1/2" elbow lp@.200 Ea 31.20 9.92 0.04 41.16
2-1/2" bushing set with locknut lp@.200 Ea 13.50 9.92 0.04 23.46
3" conduit with couplings lp@.130 LF 12.40 6.45 0.03 18.88
3" elbow lp@.250 Ea 47.80 12.40 0.05 60.25
3" bushing set with locknut lp@.250 Ea 12.00 12.40 0.05 24.45
3-1/2" conduit with couplings lp@.150 LF 14.30 7.44 0.03 21.77
3-1/2" elbow lp@.300 Ea 72.80 14.88 0.06 87.74
3-1/2" bushing set with locknut lp@.300 Ea 21.80 14.88 0.06 36.74
4" conduit with couplings lp@.170 LF 16.80 8.43 0.03 25.26
4" elbow lp@.350 Ea 84.50 17.36 0.07 101.93
4" bushing set with locknut lp@.350 Ea 26.90 17.36 0.07 44.33

Encased intermediate (IMC) steel conduit


Direct burial in concrete slab or encasement. All 1/2" and 3/4" elbows are assumed to be field bent.
Labor includes unloading, measuring, cutting, layout, fabrication and installation in the form, using small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 689 (part 2)

1/2" conduit with couplings ll@.038 LF 1.31 1.55 -- 2.86


1/2" bushing set with locknut ll@.050 Ea 0.48 2.04 -- 2.52
3/4" conduit with coupling ll@.040 LF 1.52 1.63 -- 3.15
3/4" bushing set with locknut ll@.060 Ea 0.83 2.44 -- 3.27
1" conduit with couplings ll@.045 LF 2.32 1.83 -- 4.15
1" elbow ll@.080 Ea 6.71 3.26 -- 9.97
1" bushing set with locknut ll@.080 Ea 1.38 3.26 -- 4.64
2015 Heavy Construction Estimator, All Rights Reserved Page 690

1-1/4" conduit with couplings ll@.065 LF 2.90 2.65 -- 5.55


1-1/4" elbow ll@.100 Ea 10.90 4.07 -- 14.97
1-1/4" bushing set with locknut ll@.100 Ea 1.84 4.07 -- 5.91
1-1/2" conduit with couplings ll@.075 LF 3.45 3.06 -- 6.51
1-1/2" elbow ll@.100 Ea 12.20 4.07 -- 16.27
1-1/2" bushing set with locknut ll@.100 Ea 2.64 4.07 -- 6.71
2" conduit with couplings ll@.090 LF 4.76 3.67 -- 8.43
2" elbow ll@.150 Ea 17.60 6.11 -- 23.71
2" bushing set with locknut ll@.150 Ea 4.34 6.11 -- 10.45
2-1/2" conduit with couplings ll@.110 LF 9.71 4.48 -- 14.19
2-1/2" elbow ll@.200 Ea 31.20 8.15 -- 39.35
2-1/2" bushing set with locknut ll@.200 Ea 13.50 8.15 -- 21.65
3" conduit with couplings ll@.130 LF 12.40 5.30 -- 17.70
3" elbow ll@.250 Ea 47.80 10.18 -- 57.98
3" bushing set with locknut ll@.250 Ea 12.00 10.18 -- 22.18
3-1/2" conduit with couplings ll@.150 LF 14.30 6.11 -- 20.41
3-1/2" elbow ll@.300 Ea 72.80 12.22 -- 85.02
3-1/2" bushing set with locknut ll@.300 Ea 21.80 12.22 -- 34.02
4" conduit with couplings ll@.162 LF 16.80 6.60 -- 23.40
4" elbow ll@.300 Ea 84.50 12.22 -- 96.72
4" bushing set with locknut ll@.300 Ea 26.90 12.22 -- 39.12

Explosion proof conduit unions


For use with the conduit above, using small tools.
1/2" union lj@.150 Ea 10.60 7.52 0.06 18.18
3/4" union lj@.200 Ea 14.50 10.02 0.08 24.60
1" union lj@.250 Ea 26.20 12.53 0.10 38.83
1-1/4" union lj@.300 Ea 39.50 15.03 0.12 54.65
1-1/2" union lj@.300 Ea 50.60 15.03 0.12 65.75
2" union lj@.350 Ea 65.10 17.54 0.14 82.78
2-1/2" union lk@.400 Ea 91.90 20.04 0.08 112.02
3" union lk@.450 Ea 135.00 22.55 0.09 157.64
3-1/2" union lk@.500 Ea 223.00 25.05 0.10 248.15
4" union lk@.600 Ea 237.00 30.06 0.11 267.17

Explosion proof conduit couplings, hub boxes


For use with the conduit above, using small tools.
2 for 1/2" conduit lj@1.00 Ea 11.30 50.10 0.39 61.79
2 for 3/4" conduit lj@1.00 Ea 15.60 50.10 0.39 66.09
3 for 1/2" conduit lj@1.00 Ea 16.60 50.10 0.39 67.09
3 for 3/4" conduit lj@1.00 Ea 19.50 50.10 0.39 69.99
1/2" x 12" flex coupling lj@.500 Ea 1.89 25.05 0.20 27.14
3/4" x 12" flex coupling lj@.600 Ea 2.32 30.06 0.23 32.61

Explosion proof conduit seal-offs


For use with the conduit above, using small tools.
1/2" seal-off lj@.350 Ea 15.80 17.54 0.14 33.48
3/4" seal-off lj@.400 Ea 18.50 20.04 0.16 38.70
1" seal-off lj@.500 Ea 24.00 25.05 0.20 49.25
1-1/4" seal-off lj@.600 Ea 28.90 30.06 0.23 59.19
1-1/2" seal-off lj@.600 Ea 43.80 30.06 0.23 74.09
2" seal-off lj@.700 Ea 57.00 35.07 0.27 92.34
2-1/2" seal-off lk@.800 Ea 87.60 40.08 0.15 127.83
3" seal-off lk@.800 Ea 108.00 40.08 0.15 148.23
3-1/2" seal-off lk@.900 Ea 315.00 45.09 0.17 360.26
4" seal-off lk@1.00 Ea 451.00 50.10 0.19 501.29
2015 Heavy Construction Estimator, All Rights Reserved Page 691

CSI 16-112, Bus duct

600 volt 3-wire plug-in bus duct


Never mix copper and aluminum in a single system, dissimilar metals will lead to a failure in a very short
time. Torque all bus connections in accordance with the bus duct manufacturer's instructions.
Bus duct is very heavy, so a lifting device may be needed in placing the duct sections. Allow for a
heavy duty support system.
3-phase, 3-wire, copper conductors. Based on 100' (30m) runs at 15' (4.6m) maximum mounting height.
Each 100' includes 2 elbows, 1 end cap, switchboard stub and 20 hangers with anchors and hardware,
using small tools.
225 amp lk@.350 LF 91.60 17.54 0.07 109.21
400 amp lk@.400 LF 138.00 20.04 0.08 158.12
600 amp lk@.450 LF 179.00 22.55 0.09 201.64
800 amp lk@.500 LF 257.00 25.05 0.10 282.15
1000 amp lk@.600 LF 271.00 30.06 0.11 301.17
1350 amp lk@.800 LF 390.00 40.08 0.15 430.23

277/480 volt 4-wire plug-in bus duct


3-phase, 4-wire, 100% neutral, copper conductors. Based on 100' (30m) runs at 15' (4.6m) maximum
mounting height. Each 100' includes 2 elbows, 1 end cap, switchboard stub and 20 hangers with
anchors and hardware, using small tools.
225 amp lk@.450 LF 170.00 22.55 0.09 192.64
400 amp lk@.500 LF 254.00 25.05 0.10 279.15
600 amp lk@.550 LF 287.00 27.56 0.10 314.66
800 amp lk@.600 LF 371.00 30.06 0.11 401.17
1,000 amp lk@.700 LF 457.00 35.07 0.13 492.20
1,350amp lk@.900 LF 602.00 45.09 0.17 647.26
1,600 amp lk@1.00 LF 544.00 50.10 0.19 594.29

Cable tap boxes for 600 volt 3-wire bus duct


3-phase, 3-wire, copper conductors, using small tools.
225 amp lk@1.50 Ea 1,260.00 75.15 0.29 1,335.44
400 amp lk@1.50 Ea 1,270.00 75.15 0.29 1,345.44
600 amp lk@1.50 Ea 1,350.00 75.15 0.29 1,425.44
800 amp lk@1.50 Ea 1,420.00 75.15 0.29 1,495.44
1,000 amp lk@1.75 Ea 1,510.00 87.68 0.33 1,598.01
1,350 amp lk@2.25 Ea 1,640.00 112.70 0.43 1,753.13

Cable tap boxes for 277/480 4-wire bus duct


3-phase, 4-wire, 100 per cent neutral, copper conductors, using small tools.
225 amp lk@1.50 Ea 1,270.00 75.15 0.29 1,345.44
400 amp lk@1.50 Ea 1,350.00 75.15 0.29 1,425.44
600 amp lk@1.50 Ea 1,420.00 75.15 0.29 1,495.44
800 amp lk@1.50 Ea 1,590.00 75.15 0.29 1,665.44
1,000 amp lk@1.75 Ea 1,640.00 87.68 0.33 1,728.01
1,350 amp lk@2.25 Ea 1,880.00 112.70 0.43 1,993.13

Bus duct plug-in circuit breakers - 240 volt, 3-phase


Using small tools.
60 amp lk@.500 Ea 520.00 25.05 0.10 545.15
100 amp lk@.750 Ea 1,130.00 37.58 0.14 1,167.72

Bus duct plug-in circuit breakers - 600 volt, 3-phase


Using small tools.
60 amp lk@.500 Ea 1,130.00 25.05 0.10 1,155.15
100 amp lk@.750 Ea 1,460.00 37.58 0.14 1,497.72
2015 Heavy Construction Estimator, All Rights Reserved Page 691 (part 2)

Bus duct plug-in circuit breakers - 120/208 volt, 3-phase, 4-wire


Using small tools.
60 amp lk@.500 Ea 600.00 25.05 0.10 625.15
100 amp lk@.750 Ea 709.00 37.58 0.14 746.72

Bus duct plug-in circuit breakers - 277/480 volt, 3-phase, 4-wire


Using small tools.
60 amp lk@.500 Ea 709.00 25.05 0.10 734.15
100 amp lk@.750 Ea 1,130.00 37.58 0.14 1,167.72
225 amp lk@1.50 Ea 1,500.00 75.15 0.29 1,575.44
400 amp lk@2.50 Ea 3,670.00 125.30 0.48 3,795.78
600 amp lk@4.00 Ea 3,840.00 200.40 0.76 4,041.16
800 amp lk@6.00 Ea 4,130.00 300.60 1.14 4,431.74
2015 Heavy Construction Estimator, All Rights Reserved Page 692

Bus duct plug-in fusible switches - 240 volt 3-pole, 3-fuse


Using small tools.
30 amp lk@.500 Ea 421.00 25.05 0.10 446.15
60 amp lk@.500 Ea 451.00 25.05 0.10 476.15
100 amp lk@.750 Ea 639.00 37.58 0.14 676.72
200 amp lk@1.50 Ea 1,070.00 75.15 0.29 1,145.44
400 amp lk@2.00 Ea 2,790.00 100.20 0.38 2,890.58
600 amp lk@2.50 Ea 3,990.00 125.30 0.48 4,115.78

Bus duct plug-in fusible switches - 600 volt, 3-poles, 3-fuse


Using small tools.
30 amp lk@.500 Ea 451.00 25.05 0.10 476.15
60 amp lk@.500 Ea 480.00 25.05 0.10 505.15
100 amp lk@.750 Ea 655.00 37.58 0.14 692.72
200 amp lk@1.50 Ea 1,110.00 75.15 0.29 1,185.44
400 amp lk@2.00 Ea 2,790.00 100.20 0.38 2,890.58
600 amp lk@2.50 Ea 3,990.00 125.30 0.48 4,115.78
800 amp lk@4.00 Ea 6,930.00 200.40 0.76 7,131.16

Bus duct plug-in fusible switches - 120/208 volt, 4-pole, 3 fuse


Using small tools.
30 amp lk@.500 Ea 492.00 25.05 0.10 517.15
60 amp lk@.500 Ea 512.00 25.05 0.10 537.15
100 amp lk@.750 Ea 694.00 37.58 0.14 731.72
200 amp lk@1.00 Ea 1,180.00 50.10 0.19 1,230.29
400 amp lk@2.00 Ea 3,030.00 100.20 0.38 3,130.58
600 amp lk@2.50 Ea 4,370.00 125.30 0.48 4,495.78

Bus duct plug-in fusible switches - 277/480 volt, 4-pole, 3-fuse


Using small tools.
30 amp lk@.500 Ea 512.00 25.05 0.10 537.15
60 amp lk@.500 Ea 532.00 25.05 0.10 557.15
100 amp lk@.750 Ea 751.00 37.58 0.14 788.72
200 amp lk@1.00 Ea 1,240.00 50.10 0.19 1,290.29
400 amp lk@2.00 Ea 3,030.00 100.20 0.38 3,130.58
600 amp lk@2.50 Ea 4,370.00 125.30 0.48 4,495.78
800 amp lk@4.00 Ea 7,200.00 200.40 0.76 7,401.16

Feeder bus duct - 600 volt, 3 phase, 3 wire, ventilated


Based on 100' (30m) runs at a 15' (4.6m) maximum mounting height. Each 100' includes 2 elbows, 1
end cap, switchboard stub and 20 hangers with anchors and hardware, using small tools.
800 amp lk@.500 LF 280.00 25.05 0.10 305.15
1,000 amp lk@.600 LF 282.00 30.06 0.11 312.17
1,350 amp lk@.800 LF 376.00 40.08 0.15 416.23
1,600 amp lk@.900 LF 456.00 45.09 0.17 501.26
2,000 amp lk@1.00 LF 560.00 50.10 0.19 610.29
3,000 amp lk@1.20 LF 763.00 60.12 0.23 823.35
4,000 amp lk@1.60 LF 1,060.00 80.16 0.30 1,140.46
5,000 amp lk@1.75 LF 1,260.00 87.68 0.33 1,348.01
6,000 amp lk@2.25 LF 1,560.00 112.70 0.43 1,673.13

Feeder bus duct - 277/480 volt, 3 phase, 4 wire, half neutral


Based on 100' (30m) runs at a 15' (4.6m) maximum mounting height. Each 100' includes 2 elbows, 1
end cap, switchboard stub and 20 hangers with anchors and hardware, using small tools.
800 amp lk@.600 LF 326.00 30.06 0.11 356.17
1,000 amp lk@.800 LF 327.00 40.08 0.15 367.23
2015 Heavy Construction Estimator, All Rights Reserved Page 692 (part 2)

1,350 amp lk@.900 LF 427.00 45.09 0.17 472.26


1,600 amp lk@1.00 LF 507.00 50.10 0.19 557.29
2,000 amp lk@1.20 LF 615.00 60.12 0.23 675.35
3,000 amp lk@1.30 LF 952.00 65.13 0.25 1,017.38
4,000 amp lk@1.40 LF 1,200.00 70.14 0.27 1,270.41
5,000 amp lk@1.74 LF 1,410.00 87.17 0.33 1,497.50
6,000 amp lk@2.40 LF 1,750.00 120.20 0.46 1,870.66
2015 Heavy Construction Estimator, All Rights Reserved Page 693

CSI 16-113, Underfloor ducts

Straight underfloor duct sections


10’ (3m) long, 14 gauge steel, using small tools.
Standard duct,
3.8" square, without inserts lk@.300 Ea 60.80 15.03 0.06 75.89
Standard duct, 3.8" square,
7/8" insert each 24" lk@.300 Ea 81.00 15.03 0.06 96.09
Large duct,
8.9" square, without inserts lk@.400 Ea 121.00 20.04 0.08 141.12
Large duct, 8.9" square,
7/8" insert each 24" lk@.400 Ea 142.00 20.04 0.08 162.12

Single level underfloor duct junction boxes


Using small tools.
1 standard duct
without partitions in box lk@.500 Ea 154.00 25.05 0.10 179.15
1 large duct
without partitions in box lk@.600 Ea 180.00 30.06 0.11 210.17
1 standard and large duct per side with partitions in box, isolate each duct and form a continuous
raceway through
the box in both directions lk@.800 Ea 351.00 40.08 0.15 391.23
2 standard ducts per
side with partitions in box lk@.800 Ea 206.00 40.08 0.15 246.23
3 standard ducts per
side with partitions in box lk@1.00 Ea 351.00 50.10 0.19 401.29
2 large ducts per
side with partitions in box lk@1.00 Ea 531.00 50.10 0.19 581.29

Two level underfloor duct junction boxes


Using small tools.
2 standard ducts, intersects at right angles, raceway bottom level accepts two standard ducts to form a
continuous raceway at right angles
to the top level raceway lk@1.00 Ea 922.00 50.10 0.19 972.29
2 large ducts, bottom level accepts
two large capacity ducts lk@1.00 Ea 1,070.00 50.10 0.19 1,120.29

Underfloor duct elbow fittings - Horizontal, 90 degree


Using small tools.
Standard duct lk@.200 Ea 85.70 10.02 0.04 95.76
Large duct lk@.250 Ea 89.20 12.53 0.05 101.78

Underfloor duct elbow fittings - Vertical, 90 degree


Using small tools.
Standard duct lk@.200 Ea 34.30 10.02 0.04 44.36
Large duct lk@.250 Ea 35.70 12.53 0.05 48.28

Underfloor duct elbow fittings - Offset elbows, 45 degree


Two required for cross over or cross under, using small tools.
Standard duct lk@.250 Ea 34.30 12.53 0.05 46.88
Large duct lk@.300 Ea 35.70 15.03 0.06 50.79

Underfloor duct sleeve couplings


Using small tools.
Standard duct lk@.050 Ea 8.56 2.51 0.01 11.08
Large duct lk@.060 Ea 8.92 3.01 0.01 11.94
2015 Heavy Construction Estimator, All Rights Reserved Page 693 (part 2)

Underfloor duct expansion fittings


Using small tools.
Standard duct lk@.300 Ea 42.80 15.03 0.06 57.89
Large duct lk@.400 Ea 44.60 20.04 0.08 64.72

Underfloor duct reducing coupling


Using small tools.
Standard or large duct lk@.300 Ea 85.70 15.03 0.06 100.79

Underfloor duct combination support and coupling


With leveling legs and anchor feet, using small tools.
1 standard duct lk@.050 Ea 17.10 2.51 0.01 19.62
2 standard ducts lk@.080 Ea 17.10 4.01 0.02 21.13
3 standard ducts lk@.100 Ea 17.10 5.01 0.02 22.13
1 large duct lk@.100 Ea 17.10 5.01 0.02 22.13
2 large ducts lk@.150 Ea 17.10 7.52 0.03 24.65
1 standard and 1 large duct lk@.150 Ea 17.10 7.52 0.03 24.65
2 standard and 1 large duct lk@.200 Ea 17.10 10.02 0.04 27.16
1 standard and 2 large ducts lk@.250 Ea 17.10 12.53 0.05 29.68

Underfloor duct supports only


With leveling legs and anchor feet, using small tools.
1 standard duct lk@.050 Ea 18.90 2.51 0.01 21.42
2015 Heavy Construction Estimator, All Rights Reserved Page 694

2 standard ducts lk@.080 Ea 22.90 4.01 0.02 26.93


3 standard ducts lk@.100 Ea 28.30 5.01 0.02 33.33

Underfloor duct accessories


Using small tools.
Tile holder lk@.700 Ea 134.00 35.07 0.13 169.20
Terrazzo holder lk@.100 Ea 337.00 5.01 0.02 342.03
Closing caps for inserts lk@.100 Ea 1.34 5.01 0.02 6.37

Underfloor duct plugs


For unused junction box openings and duct ends, using small tools.
Standard lk@.100 Ea 3.43 5.01 0.02 8.46
Large lk@.100 Ea 3.43 5.01 0.02 8.46

Underfloor duct conduit adapters


Using small tools.
One 1-1/4" conduit to standard duct lk@.150 Ea 25.70 7.52 0.03 33.25
Two 1-1/4" conduit to standard duct lk@.300 Ea 26.70 15.03 0.06 41.79
One 2" conduit to standard duct lk@.250 Ea 25.70 12.53 0.05 38.28
Three 1-1/4" conduit to large duct lk@.500 Ea 25.70 25.05 0.10 50.85

Underfloor duct receptacle housing


No wiring devices included, using small tools.
Single lk@.300 Ea 42.80 15.03 0.06 57.89
Double lk@.300 Ea 42.00 15.03 0.06 57.09
Low potential service
with insulated bushings lk@.300 Ea 34.30 15.03 0.06 49.39

Underfloor duct dust pans


Using small tools.
Carpet pan lp@.250 Ea 86.20 12.40 0.05 98.65

CSI 16-114, Cable tray

Louver bottom straight cable tray


Galvanized steel, sections 12’ (3.7m) long, with hangers and supports, using small tools.
6" (15cm) lk@.100 LF 16.20 5.01 0.02 21.23
12" (31cm) lk@.125 LF 17.20 6.26 0.02 23.48
18" (46cm) lk@.150 LF 18.20 7.52 0.03 25.75
24" (61cm) lk@.175 LF 19.20 8.77 0.03 28.00
30" (76cm) lk@.200 LF 21.00 10.02 0.04 31.06

Louver bottom cable tray fittings - Horizontal elbow, 90 degree


Using small tools.
6" (15cm) lk@.400 Ea 95.10 20.04 0.08 115.22
12" (31cm) lk@.400 Ea 106.00 20.04 0.08 126.12
18" (46cm) lk@.500 Ea 121.00 25.05 0.10 146.15
24" (61cm) lk@.600 Ea 133.00 30.06 0.11 163.17
30" (76cm) lk@1.00 Ea 154.00 50.10 0.19 204.29

Louver bottom cable tray fittings - Inside vertical riser, 90 degree


Using small tools.
6" (15cm) lk@.400 Ea 144.00 20.04 0.08 164.12
12" (31cm) lk@.400 Ea 148.00 20.04 0.08 168.12
18" (46cm) lk@.500 Ea 153.00 25.05 0.10 178.15
24" (61cm) lk@.600 Ea 157.00 30.06 0.11 187.17
2015 Heavy Construction Estimator, All Rights Reserved Page 694 (part 2)

30" (76cm) lk@1.00 Ea 164.00 50.10 0.19 214.29

Louver bottom cable tray fittings - Outside vertical riser, 90 degree


Using small tools.
6" (15cm) lk@.400 Ea 144.00 20.04 0.08 164.12
12" (31cm) lk@.400 Ea 146.00 20.04 0.08 166.12
18" (46cm) lk@.500 Ea 153.00 25.05 0.10 178.15
24" (61cm) lk@.600 Ea 157.00 30.06 0.11 187.17
2015 Heavy Construction Estimator, All Rights Reserved Page 695

30" (76cm) lk@1.00 Ea 164.00 50.10 0.19 214.29

Louver bottom cable tray fittings - Horizontal tee


Using small tools.
6" (15cm) lk@.500 Ea 177.00 25.05 0.10 202.15
12" (31cm) lk@.700 Ea 193.00 35.07 0.13 228.20
18" (46cm) lk@.900 Ea 211.00 45.09 0.17 256.26
24" (61cm) lk@1.20 Ea 232.00 60.12 0.23 292.35
30" (76cm) lk@1.50 Ea 255.00 75.15 0.29 330.44

Louver bottom cable tray fittings - Horizontal cross


Using small tools.
6" (15cm) lk@1.00 Ea 238.00 50.10 0.19 288.29
12" (31cm) lk@1.25 Ea 254.00 62.63 0.24 316.87
18" (46cm) lk@1.50 Ea 274.00 75.15 0.29 349.44
24" (61cm) lk@2.00 Ea 296.00 100.20 0.38 396.58
30" (76cm) lk@3.00 Ea 321.00 150.30 0.57 471.87

Louver bottom cable tray fittings - Horizontal wye


Using small tools.
6" (15cm) lk@1.00 Ea 160.00 50.10 0.19 210.29
12" (31cm) lk@1.25 Ea 173.00 62.63 0.24 235.87
18" (46cm) lk@1.50 Ea 190.00 75.15 0.29 265.44
24" (61cm) lk@2.00 Ea 209.00 100.20 0.38 309.58
30" (76cm) lk@3.00 Ea 229.00 150.30 0.57 379.87

Louver bottom cable tray fittings - Straight reducers


Using small tools.
12" to 6" lk@.500 Ea 80.80 25.05 0.10 105.95
18" to 12" lk@.750 Ea 82.90 37.58 0.14 120.62
24" to 18" lk@1.00 Ea 85.00 50.10 0.19 135.29
30" to 24" lk@1.50 Ea 88.70 75.15 0.29 164.14

Louver bottom cable tray fittings - Vertical tee


Using small tools.
6" (15cm) lk@.500 Ea 226.00 25.05 0.10 251.15
12" (31cm) lk@.700 Ea 232.00 35.07 0.13 267.20
18" (46cm) lk@.900 Ea 239.00 45.09 0.17 284.26
24" (61cm) lk@1.25 Ea 246.00 62.63 0.24 308.87
30" (76cm) lk@1.50 Ea 256.00 75.15 0.29 331.44

Louver bottom cable tray fittings - Vertical cross


Using small tools.
6" (15cm) lk@1.00 Ea 395.00 50.10 0.19 445.29
12" (31cm) lk@1.25 Ea 406.00 62.63 0.24 468.87
18" (46cm) lk@1.50 Ea 416.00 75.15 0.29 491.44
24" (61cm) lk@2.00 Ea 430.00 100.20 0.38 530.58
30" (76cm) lk@3.00 Ea 448.00 150.30 0.57 598.87

Louver bottom straight cable tray, includes hangars and supports


Aluminum, 12’ (3.7m) tray sections, with hangers and supports, using small tools.
6" tray lk@.080 LF 12.50 4.01 0.02 16.53
12" tray lk@.100 LF 13.30 5.01 0.02 18.33
18" tray lk@.125 LF 14.20 6.26 0.02 20.48
24" tray lk@.150 LF 15.20 7.52 0.03 22.75
30" tray lk@.175 LF 16.50 8.77 0.03 25.30
2015 Heavy Construction Estimator, All Rights Reserved Page 695 (part 2)

Louver bottom tray fittings - Horizontal elbow, 90 degree


Using small tools.
6" (15cm) lk@.400 Ea 50.50 20.04 0.08 70.62
12" (31cm) lk@.400 Ea 56.30 20.04 0.08 76.42
18" (46cm) lk@.500 Ea 64.60 25.05 0.10 89.75
24" (61cm) lk@.600 Ea 71.10 30.06 0.11 101.27
30" (76cm) lk@1.00 Ea 81.70 50.10 0.19 131.99
2015 Heavy Construction Estimator, All Rights Reserved Page 696

Louver bottom tray fittings - Inside or outside vertical riser


Using small tools.
6" (15cm) lk@.400 LF 103.00 20.04 0.08 123.12
12" (31cm) lk@.400 LF 106.00 20.04 0.08 126.12
18" (46cm) lk@.500 LF 109.00 25.05 0.10 134.15
24" (61cm) lk@.600 LF 112.00 30.06 0.11 142.17
30" (76cm) lk@1.00 LF 115.00 50.10 0.19 165.29

Louver bottom tray fittings - Horizontal tee


Using small tools.
6" (15cm) lk@.700 Ea 89.10 35.07 0.13 124.30
12" (31cm) lk@.700 Ea 96.20 35.07 0.13 131.40
18" (46cm) lk@.900 Ea 106.00 45.09 0.17 151.26
24" (61cm) lk@1.20 Ea 114.00 60.12 0.23 174.35
30" (76cm) lk@1.50 Ea 125.00 75.15 0.29 200.44

Louver bottom tray fittings - Horizontal cross


Using small tools.
6" (15cm) lk@1.00 Ea 114.00 50.10 0.19 164.29
12" (31cm) lk@1.25 Ea 121.00 62.63 0.24 183.87
18" (46cm) lk@1.50 Ea 131.00 75.15 0.29 206.44
24" (61cm) lk@2.00 Ea 138.00 100.20 0.38 238.58
30" (76cm) lk@3.00 Ea 150.00 150.30 0.57 300.87

Louver bottom tray fittings - Horizontal wye


Using small tools.
6" (15cm) lk@1.00 Ea 80.10 50.10 0.19 130.39
12" (31cm) lk@1.25 Ea 86.50 62.63 0.24 149.37
18" (46cm) lk@1.50 Ea 95.20 75.15 0.29 170.64
24" (61cm) lk@2.00 Ea 102.00 100.20 0.38 202.58
30" (76cm) lk@3.00 Ea 113.00 150.30 0.57 263.87

Louver bottom tray fittings - Straight reducer


Using small tools.
12" (31cm) to 6" (15cm) lk@.500 Ea 45.40 25.05 0.10 70.55
18" (46cm) to 12" (31cm) lk@.750 Ea 46.60 37.58 0.14 84.32
24" (61cm) to 18" (46cm) lk@1.00 Ea 48.30 50.10 0.19 98.59
30" (76cm) to 24" (61cm) lk@1.50 Ea 49.80 75.15 0.29 125.24

Louver bottom tray fittings - Vertical tee


Using small tools.
6" (15cm) lk@.500 Ea 170.00 25.05 0.10 195.15
12" (31cm) lk@.700 Ea 174.00 35.07 0.13 209.20
18" (46cm) lk@.900 Ea 179.00 45.09 0.17 224.26
24" (61cm) lk@1.20 Ea 184.00 60.12 0.23 244.35
30" (76cm) lk@1.50 Ea 188.00 75.15 0.29 263.44

Louver bottom tray fittings - Vertical cross


Using small tools.
6" (15cm) lk@1.00 Ea 298.00 50.10 0.19 348.29
12" (31cm) lk@1.25 Ea 305.00 62.63 0.24 367.87
18" (46cm) lk@1.50 Ea 313.00 75.15 0.29 388.44
24" (61cm) lk@2.00 Ea 321.00 100.20 0.38 421.58
30" (76cm) lk@3.00 Ea 329.00 150.30 0.57 479.87

CSI 16-119, Metal framing materials


2015 Heavy Construction Estimator, All Rights Reserved Page 696 (part 2)

Metal framing channel mount


Based on average layout and heights to 12'. No supports included, using small tools.
1-5/8" x 13/16", 16 gauge lp@.040 LF 3.95 1.98 0.01 5.94
1-5/8" x 7/8", 12 gauge lp@.050 LF 5.26 2.48 0.01 7.75
1-5/8" x 1-3/8", 12 gauge lp@.450 LF 6.35 22.32 0.09 28.76
1-5/8" x 1-5/8", 12 gauge lp@.060 LF 6.17 2.98 0.01 9.16
Closure strips for 1-5/8" channel lp@.020 LF 3.06 0.99 -- 4.05
End caps lp@.050 Ea 2.90 2.48 0.01 5.39
2015 Heavy Construction Estimator, All Rights Reserved Page 697

Spring nuts for framing channel


Using small tools.
1/4" 20 thread lp@.060 Ea 1.18 2.98 0.01 4.17
3/8" 16 thread lp@.060 Ea 1.29 2.98 0.01 4.28

90 degree angle fittings for framing channel


Using small tools.
2 hole, 1-7/8" x 2" --@.000 Ea 2.10 -- -- 2.10
2 hole, 1-5/8" x 2-1/4" --@.000 Ea 2.14 -- -- 2.14
3 hole, 1-7/16" x 4-1/8" --@.000 Ea 2.96 -- -- 2.96
3 hole, 1-7/8" x 3-7/8" --@.000 Ea 3.04 -- -- 3.04

Pipe clamps for rigid conduit


Including hex screw and nut, using small tools.
3/4" clamp lp@.060 Ea 1.62 2.98 0.01 4.61
1" clamp lp@.080 Ea 1.72 3.97 0.02 5.71
1-1/4" clamp lp@.100 Ea 1.98 4.96 0.02 6.96
1-1/2" clamp lp@.100 Ea 2.26 4.96 0.02 7.24
2" clamp lp@.150 Ea 2.58 7.44 0.03 10.05
2-1/2" clamp lp@.200 Ea 2.82 9.92 0.04 12.78
3" clamp lp@.250 Ea 3.12 12.40 0.05 15.57
3-1/2" clamp lp@.300 Ea 3.72 14.88 0.06 18.66
4" clamp lp@.350 Ea 4.20 17.36 0.07 21.63

Beam clamps for rigid conduit


Using small tools.
Set screw, 1-5/8" lp@.150 Ea 10.30 7.44 0.03 17.77
C-clamp, used with 1/2" rod lp@.150 Ea 5.59 7.44 0.03 13.06
U bolt lp@.150 Ea 6.09 7.44 0.03 13.56

Mounting assemblies for conduit supports - Galvanized back plate


Using small tools.
1/4" x 4' x 4' lk@1.00 Ea 540.00 50.10 0.19 590.29
3/8" x 14" x 16" lk@.500 Ea 117.00 25.05 0.10 142.15
3/16" x 30" x 48" lk@.750 Ea 298.00 37.58 0.14 335.72

Mounting assemblies for conduit supports - Aluminum back plate


Using small tools.
3/16" x 2' x 2' lk@1.00 Ea 163.00 50.10 0.19 213.29
3/16" x 4' x 4' lk@1.50 Ea 594.00 75.15 0.29 669.44

CSI 16-120, Wire and cable

600 volt copper wire - Single solid conductor


Based on 100' (30m) runs pulled in conduit at heights to 12', using small tools.
#14 AWG, type THW lp@6.00 MLF 99.80 297.60 1.20 398.60
# 12 AWG, type THW lp@7.00 MLF 151.00 347.20 1.40 499.60
#10 AWG, type THW lp@8.00 MLF 238.00 396.80 1.60 636.40

600 volt copper wire - Single stranded conductor


Based on 100' (30m) runs pulled in conduit at heights to 12', using small tools.
#12 AWG, type THW lp@7.00 MLF 174.00 347.20 1.40 522.60
#10 AWG, type THW lp@8.00 MLF 262.00 396.80 1.60 660.40
#8 AWG, type THW lp@9.00 MLF 449.00 446.40 1.80 897.20
#12 AWG, type THHW lp@7.00 MLF 236.00 347.20 1.40 584.60
2015 Heavy Construction Estimator, All Rights Reserved Page 697 (part 2)

#10 AWG, type THHW lp@8.00 MLF 279.00 396.80 1.60 677.40
#8 AWG, type THHW lp@9.00 MLF 429.00 446.40 1.80 877.20

Power cable, stranded, single conductor, copper


Pulled in conduit at heights to 12', using small tools.
# 12 AWG, XLP (XHHW) lp@7.00 MLF 307.00 347.20 1.40 655.60
2015 Heavy Construction Estimator, All Rights Reserved Page 698

#10 AWG, XLP (XHHW) lp@8.00 MLF 428.00 396.80 1.60 826.40
#8 AWG, XLP (XHHW) lp@9.00 MLF 554.00 446.40 1.80 1,002.20
#6 AWG, XLP (XHHW) lp@10.0 MLF 669.00 496.00 2.00 1,167.00
# 12 AWG, RHW lp@7.00 MLF 317.00 347.20 1.40 665.60
#10 AWG, RHW lp@8.00 MLF 441.00 396.80 1.60 839.40
#8 AWG, RHW lp@9.00 MLF 630.00 446.40 1.80 1,078.20
#6 AWG, RHW lp@10.0 MLF 696.00 496.00 2.00 1,194.00

Copper fixture wire


Using small tools.
TFFN, 90 degree, #16 stranded lp@5.25 MLF 32.90 260.40 1.05 294.35

Type USE underground feeder and branch circuit cable


No excavation or backfill included, using small tools.
#10 AWG, type USE lp@8.00 MLF 444.00 396.80 1.60 842.40
#8 AWG, type USE lp@9.00 MLF 635.00 446.40 1.80 1,083.20
#6 AWG, type USE lp@10.0 MLF 702.00 496.00 2.00 1,200.00
#4 AWG, type USE lp@12.0 MLF 1,080.00 595.20 2.40 1,677.60
#2 AWG, type USE lp@13.0 MLF 1,660.00 644.80 2.60 2,307.40
#1 AWG, type USE lp@14.0 MLF 2,010.00 694.40 2.80 2,707.20
#1/0 AWG, type USE lp@15.0 MLF 2,550.00 744.00 3.00 3,297.00
#2/0 AWG, type USE lp@16.0 MLF 3,850.00 793.60 3.20 4,646.80
#3/0 AWG, type USE lp@17.0 MLF 3,920.00 843.20 3.40 4,766.60
#4/0 AWG, type USE lp@18.0 MLF 4,740.00 892.80 3.60 5,636.40
250 MCM, type USE lp@20.0 MLF 5,920.00 992.00 4.00 6,916.00
300 MCM, type USE lp@23.0 MLF 6,950.00 1,141.00 4.60 8,095.60
350 MCM, type USE lp@24.0 MLF 8,070.00 1,190.00 4.80 9,264.80
400 MCM, type USE lp@25.0 MLF 8,950.00 1,240.00 5.00 10,195.00
500 MCM, type USE lp@26.0 MLF 10,900.00 1,290.00 5.20 12,195.20

600 volt, armored cable, BX


Strapped to wall at heights to 12', using small tools.
#14 AWG, solid, 2 conductor lk@9.50 MLF 673.00 476.00 1.81 1,150.81
# 12 AWG, solid, 2 conductor lk@10.5 MLF 708.00 526.10 2.00 1,236.10
#10 AWG, solid, 2 conductor lk@11.5 MLF 1,240.00 576.20 2.19 1,818.39
#14 AWG, solid, 3 conductor lk@10.5 MLF 868.00 526.10 2.00 1,396.10
#8 AWG, stranded, 2 conductor lk@13.0 MLF 2,300.00 651.30 2.47 2,953.77
#6 AWG, stranded, 3 conductor lk@18.5 MLF 4,250.00 926.90 3.52 5,180.42
#4 AWG, stranded, 3 conductor lk@22.0 MLF 6,200.00 1,102.00 4.18 7,306.18
#2 AWG, stranded, 3 conductor lk@26.0 MLF 8,860.00 1,303.00 4.94 10,167.94

Stranded 19 conductor armored cable


Strapped to wall at heights to 12', using small tools.
# 12 lp@25.0 MLF 6,070.00 1,240.00 5.00 7,315.00

600 volt THW copper feeder wire


Single stranded, pulled in conduit at heights to 12’, using small tools.
#8 AWG, type THW lp@9.00 MLF 460.00 446.40 1.80 908.20
#6 AWG, type THW lp@10.0 MLF 646.00 496.00 2.00 1,144.00
#4 AWG, type THW lp@12.0 MLF 1,010.00 595.20 2.40 1,607.60
#2 AWG, type THW lp@13.0 MLF 1,580.00 644.80 2.60 2,227.40
2015 Heavy Construction Estimator, All Rights Reserved Page 699

#1 AWG, type THW lp@14.0 MLF 2,180.00 694.40 2.80 2,877.20


#1/0 AWG, type THW lp@15.0 MLF 2,540.00 744.00 3.00 3,287.00
#2/0 AWG, type THW lp@16.0 MLF 3,050.00 793.60 3.20 3,846.80
#3/0 AWG, type THW lp@17.0 MLF 3,930.00 843.20 3.40 4,776.60
#4/0 AWG, type THW lp@18.0 MLF 4,890.00 892.80 3.60 5,786.40
250 MCM, type THW lp@20.0 MLF 5,730.00 992.00 4.00 6,726.00
300 MCM, type THW lp@23.0 MLF 6,890.00 1,141.00 4.60 8,035.60
350 MCM, type THW lp@24.0 MLF 7,820.00 1,190.00 4.80 9,014.80
400 MCM, type THW lp@25.0 MLF 9,210.00 1,240.00 5.00 10,455.00
500 MCM, type THW lp@26.0 MLF 11,100.00 1,290.00 5.20 12,395.20

600 volt RHW copper feeder wire


Single stranded, pulled in conduit at heights to 12’, using small tools.
#8 AWG, type RHW lp@9.00 MLF 698.00 446.40 1.80 1,146.20
#6 AWG, type RHW lp@10.0 MLF 725.00 496.00 2.00 1,223.00
#4 AWG, type RHW lp@12.0 MLF 1,100.00 595.20 2.40 1,697.60
#2 AWG, type RHW lp@13.0 MLF 1,720.00 644.80 2.60 2,367.40
#1 AWG, type RHW lp@14.0 MLF 2,160.00 694.40 2.80 2,857.20
#1/0 AWG, type RHW lp@15.0 MLF 2,720.00 744.00 3.00 3,467.00
#2/0 AWG, type RHW lp@16.0 MLF 3,320.00 793.60 3.20 4,116.80
#3/0 AWG, type RHW lp@17.0 MLF 4,110.00 843.20 3.40 4,956.60
#4/0 AWG, type RHW lp@18.0 MLF 4,990.00 892.80 3.60 5,886.40
250 MCM, type RHW lp@20.0 MLF 6,240.00 992.00 4.00 7,236.00
300 MCM, type RHW lp@23.0 MLF 7,410.00 1,141.00 4.60 8,555.60
350 MCM, type RHW lp@24.0 MLF 8,340.00 1,190.00 4.80 9,534.80
400 MCM, type RHW lp@25.0 MLF 9,710.00 1,240.00 5.00 10,955.00
500 MCM, type RHW lp@26.0 MLF 11,300.00 1,290.00 5.20 12,595.20

600 volt THW aluminum feeder wire


Single stranded, pulled in conduit at heights to 12’, using small tools.
#6 AWG, type THW ll@9.00 MLF 564.00 366.60 -- 930.60
#4 AWG, type THW ll@10.0 MLF 681.00 407.30 -- 1,088.30
#2 AWG, type THW ll@11.0 MLF 873.00 448.00 -- 1,321.00
#1 AWG, type THW ll@12.0 MLF 1,130.00 488.80 -- 1,618.80
#1/0 AWG, type THW ll@13.0 MLF 1,330.00 529.50 -- 1,859.50
#2/0 AWG, type THW ll@14.0 MLF 1,510.00 570.20 -- 2,080.20
#3/0 AWG, type THW ll@15.0 MLF 1,700.00 611.00 -- 2,311.00
#4/0 AWG, type THW ll@16.0 MLF 1,940.00 651.70 -- 2,591.70
250 MCM, type THW ll@18.0 MLF 2,130.00 733.10 -- 2,863.10
300 MCM, type THW ll@19.0 MLF 2,700.00 773.90 -- 3,473.90
350 MCM, type THW ll@20.0 MLF 2,830.00 814.60 -- 3,644.60
400 MCM, type THW ll@21.0 MLF 3,600.00 855.30 -- 4,455.30
500 MCM, type THW ll@22.0 MLF 4,050.00 896.10 -- 4,946.10

600 volt THWN copper feeder wire


Single stranded, pulled in conduit at heights to 12’, using small tools.
#14, type THWN lp@6.00 MLF 109.00 297.60 1.20 407.80
# 12, type THWN lp@7.00 MLF 157.00 347.20 1.40 505.60
#10, type THWN lp@8.00 MLF 251.00 396.80 1.60 649.40
#8, type THWN lp@9.00 MLF 468.00 446.40 1.80 916.20
#6, type THWN lp@10.0 MLF 657.00 496.00 2.00 1,155.00
#4, type THWN lp@12.0 MLF 1,020.00 595.20 2.40 1,617.60
#2, type THWN lp@13.0 MLF 1,610.00 644.80 2.60 2,257.40
#1, type THWN lp@14.0 MLF 2,220.00 694.40 2.80 2,917.20
#1/0, type THWN lp@15.0 MLF 2,580.00 744.00 3.00 3,327.00
#2/0, type THWN lp@16.0 MLF 3,100.00 793.60 3.20 3,896.80
#3/0, type THWN lp@17.0 MLF 4,000.00 843.20 3.40 4,846.60
#4/0, type THWN lp@18.0 MLF 4,970.00 892.80 3.60 5,866.40
250 MCM, type THWN lp@20.0 MLF 5,830.00 992.00 4.00 6,826.00
2015 Heavy Construction Estimator, All Rights Reserved Page 699 (part 2)

350 MCM, type THWN lp@24.0 MLF 7,950.00 1,190.00 4.80 9,144.80
2015 Heavy Construction Estimator, All Rights Reserved Page 700

500 MCM, type THWN lp@26.0 MLF 11,300.00 1,290.00 5.20 12,595.20

600 volt THHN copper feeder wire


Single stranded, pulled in conduit at heights to 12’, using small tools.
#14, type THHN lp@6.00 MLF 109.00 297.60 1.20 407.80
#12, type THHN lp@7.00 MLF 157.00 347.20 1.40 505.60
#6, type THHN lp@10.0 MLF 657.00 496.00 2.00 1,155.00
#4, type THHN lp@12.0 MLF 1,020.00 595.20 2.40 1,617.60
#2, type THHN lp@13.0 MLF 1,610.00 644.80 2.60 2,257.40
#1, type THHN lp@14.0 MLF 2,220.00 694.40 2.80 2,917.20
#4/0, type THHN lp@18.0 MLF 4,970.00 892.80 3.60 5,866.40
#250 MCM, type THHN lp@20.0 MLF 5,830.00 992.00 4.00 6,826.00
#350 MCM, type THHN lp@24.0 MLF 7,950.00 1,190.00 4.80 9,144.80
#500 MCM, type THHN lp@26.0 MLF 11,300.00 1,290.00 5.20 12,595.20

Romex, type NM copper cable


Installed in open walls at heights to 12', using small tools.
Two 12 gauge conductors,
with ground lk@6.00 MLF 464.00 300.60 1.14 765.74
Three 10 gauge conductors,
with ground lk@7.50 MLF 1,190.00 375.80 1.43 1,567.23

SEU service entrance cable, copper


Using small tools.
#12-3 SEU cable lk@6.00 MLF 1,700.00 300.60 1.14 2,001.74
#10-3 SEU cable lk@9.00 MLF 2,020.00 450.90 1.71 2,472.61
#1/0-3 SEU cable lk@22.0 MLF 14,900.00 1,102.00 4.18 16,006.18

Shielded 5,000 volt cable


XLP insulation, single conductor, pulled in conduit at heights to 12’, using small tools.
#6 AWG lp@14.0 MLF 2,100.00 694.40 2.80 2,797.20
#4 AWG lp@16.0 MLF 2,550.00 793.60 3.20 3,346.80
#2 AWG lp@18.0 MLF 3,300.00 892.80 3.60 4,196.40
#1/0 AWG lp@22.0 MLF 4,620.00 1,091.00 4.40 5,715.40
#2/0 AWG lp@24.0 MLF 5,450.00 1,190.00 4.80 6,644.80
#4/0 AWG lp@28.0 MLF 8,130.00 1,389.00 5.60 9,524.60
350 MCM lp@34.0 MLF 11,700.00 1,686.00 6.80 13,392.80
500 MCM lp@36.0 MLF 15,700.00 1,786.00 7.20 17,493.20

Shielded 5,000 volt cable, direct burial


XLP insulated, single conductor, laid in an open trench, 133% insulated, no excavation or backfill
included, using small tools.
#6 AWG lp@14.0 MLF 2,100.00 694.40 2.80 2,797.20
#4 AWG lp@16.0 MLF 2,550.00 793.60 3.20 3,346.80
#2 AWG lp@18.0 MLF 3,300.00 892.80 3.60 4,196.40
#1/0 AWG lp@22.0 MLF 4,620.00 1,091.00 4.40 5,715.40
#2/0 AWG lp@24.0 MLF 5,450.00 1,190.00 4.80 6,644.80
#4/0 AWG lp@28.0 MLF 8,130.00 1,389.00 5.60 9,524.60
350 MCM lp@34.0 MLF 11,700.00 1,686.00 6.80 13,392.80
500 MCM lp@36.0 MLF 15,700.00 1,786.00 7.20 17,493.20

Shielded 5,000 volt cable, on poles


XLP insulated, single conductor, strung on poles, 133% insulated, using a line truck with aerial platform
and small tools.
#6 AWG lu@12.0 MLF 2,100.00 595.20 96.20 2,791.40
#4 AWG lu@14.0 MLF 2,550.00 694.40 112.00 3,356.40
2015 Heavy Construction Estimator, All Rights Reserved Page 701

#2 AWG lu@16.0 MLF 3,300.00 793.60 128.00 4,221.60


#1/0 AWG lu@20.0 MLF 4,620.00 992.00 160.00 5,772.00
#2/0 AWG lu@22.0 MLF 5,450.00 1,091.00 176.00 6,717.00
#4/0 AWG lu@26.0 MLF 8,130.00 1,290.00 209.00 9,629.00
350 MCM lu@32.0 MLF 11,700.00 1,587.00 257.00 13,544.00
500 MCM lu@34.0 MLF 15,700.00 1,686.00 273.00 17,659.00

Non-shielded 5,000 volt XLP cable, on poles


Single conductor, copper, using a line truck with aerial platform and small tools.
# 1/0 XLP lt@20.0 MLF 3,410.00 993.20 223.00 4,626.20
# 4/0 XLP lt@26.0 MLF 6,390.00 1,291.00 290.00 7,971.00
350 MCM XLP lt@32.0 MLF 10,400.00 1,589.00 357.00 12,346.00
500 MCM XLP lt@34.0 MLF 14,300.00 1,688.00 379.00 16,367.00

Shielded 15,000 volt cable pulled in duct


XLP insulated, single conductor copper, 133% insulated, using small tools.
#1 AWG lp@20.0 MLF 4,260.00 992.00 4.00 5,256.00
#1/0 AWG lp@26.0 MLF 5,540.00 1,290.00 5.20 6,835.20
#2/0 AWG lp@28.0 MLF 6,410.00 1,389.00 5.60 7,804.60
#4/0 AWG lp@32.0 MLF 8,540.00 1,587.00 6.40 10,133.40
350 MCM lp@38.0 MLF 13,400.00 1,885.00 7.60 15,292.60
500 MCM lp@42.0 MLF 17,300.00 2,083.00 8.40 19,391.40

Shielded 15,000 volt cable, direct burial


XLP insulated, single conductor copper, 133% insulated, using small tools.
#1 AWG lt@20.0 MLF 4,260.00 993.20 223.00 5,476.20
#1/0 AWG lt@26.0 MLF 5,540.00 1,291.00 290.00 7,121.00
#2/0 AWG lt@28.0 MLF 6,410.00 1,390.00 312.00 8,112.00
#4/0 AWG lt@32.0 MLF 8,540.00 1,589.00 357.00 10,486.00
350 MCM lt@38.0 MLF 13,400.00 1,887.00 424.00 15,711.00
500 MCM lt@42.0 MLF 17,300.00 2,086.00 468.00 19,854.00

Shielded 15,000 volt cable, on poles


XLP insulated, single conductor copper, 133% insulated, using a line truck with aerial platform and
small tools.
#1 AWG lu@18.0 MLF 4,260.00 892.80 144.00 5,296.80
#1/0 AWG lu@24.0 MLF 5,540.00 1,190.00 192.00 6,922.00
#2/0 AWG lu@26.0 MLF 6,410.00 1,290.00 209.00 7,909.00
#4/0 AWG lu@30.0 MLF 8,540.00 1,488.00 241.00 10,269.00
350 MCM lu@36.0 MLF 13,400.00 1,786.00 289.00 15,475.00
500 MCM lu@40.0 MLF 17,300.00 1,984.00 321.00 19,605.00

Non-shielded 15,000 volt cable on poles


Single conductor cable, copper, using a line truck with aerial platform and small tools.
#1/0 AWG lt@24.0 MLF 5,750.00 1,192.00 268.00 7,210.00
350 MCM lt@36.0 MLF 13,000.00 1,788.00 401.00 15,189.00
2015 Heavy Construction Estimator, All Rights Reserved Page 702

URD cable, 3 conductors


Copper, direct burial, using small tools.
#250 cable lp@.025 LF 8.62 1.24 0.01 9.87

Shielded interlocked armored copper cable


Galvanized steel armored, 3 copper conductors, laid in cable tray or hung vertical, using a line truck with
aerial platform and small tools.
#2 AWG lt@24.0 LF 10.20 1,192.00 268.00 1,470.20
#1/0 AWG lt@28.0 LF 14.70 1,390.00 312.00 1,716.70
#2 AWG TC lt@26.0 LF 10.20 1,291.00 290.00 1,591.20
#1/0 AWG TC lt@28.0 LF 14.70 1,390.00 312.00 1,716.70

70,000 volt shielded cable


Single conductor, copper, using a line truck with aerial platform and small tools.
350 MCM lu@60.0 MLF 49,500.00 2,976.00 481.00 52,957.00

Low voltage signal cable, pulled in conduit at heights to 12'


Alarm and communications cable, AWG #14, solid, including connections, using small tools.
1 pair lp@6.00 MLF 619.00 297.60 1.20 917.80
2 pair lp@6.00 MLF 1,140.00 297.60 1.20 1,438.80
3 pair lp@7.00 MLF 1,590.00 347.20 1.40 1,938.60
4 pair lp@8.00 MLF 2,070.00 396.80 1.60 2,468.40
5 pair lp@9.00 MLF 2,520.00 446.40 1.80 2,968.20
6 pair lp@10.0 MLF 2,920.00 496.00 2.00 3,418.00

Low voltage signal cable, buried in trench


Alarm and communications cable, AWG #14, solid, including connections but no excavation, using
small tools.
1 pair lp@6.00 MLF 619.00 297.60 1.20 917.80
2 pair lp@6.00 MLF 1,140.00 297.60 1.20 1,438.80
3 pair lp@7.00 MLF 1,590.00 347.20 1.40 1,938.60
4 pair lp@8.00 MLF 2,070.00 396.80 1.60 2,468.40
5 pair lp@9.00 MLF 2,520.00 446.40 1.80 2,968.20
6 pair lp@10.0 MLF 2,920.00 496.00 2.00 3,418.00

Low voltage signal cable, on poles


Alarm and communications cable, AWG #14, solid, including connections, using a line truck with aerial
platform and small tools.
1 pair lu@4.00 MLF 619.00 198.40 32.10 849.50
2 pair lu@4.00 MLF 1,140.00 198.40 32.10 1,370.50
3 pair lu@5.00 MLF 1,590.00 248.00 40.10 1,878.10
4 pair lu@6.00 MLF 2,070.00 297.60 48.10 2,415.70
5 pair lu@7.00 MLF 2,520.00 347.20 56.10 2,923.30
6 pair lu@8.00 MLF 2,920.00 396.80 64.20 3,381.00

Telephone cable, #22 AWG, pulled in conduit


Including connections, using small tools.
2 pair lp@4.00 MLF 175.00 198.40 0.80 374.20
3 pair lp@4.25 MLF 185.00 210.80 0.85 396.65
4 pair lp@4.50 MLF 197.00 223.20 0.90 421.10
6 pair lp@4.75 MLF 249.00 235.60 0.95 485.55
9 pair lp@5.25 MLF 667.00 260.40 1.05 928.45
11 pair lp@5.50 MLF 743.00 272.80 1.10 1,016.90
13 pair lp@5.75 MLF 657.00 285.20 1.15 943.35
15 pair lp@6.00 MLF 771.00 297.60 1.20 1,069.80
19 pair lp@6.50 MLF 886.00 322.40 1.30 1,209.70
2015 Heavy Construction Estimator, All Rights Reserved Page 702 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 703

23 pair lp@7.00 MLF 1,040.00 347.20 1.40 1,388.60


27 pair lp@8.00 MLF 1,380.00 396.80 1.60 1,778.40
38 pair lp@12.0 MLF 1,510.00 595.20 2.40 2,107.60
51 pair lp@18.0 MLF 2,240.00 892.80 3.60 3,136.40
75 pair lp@26.0 MLF 3,070.00 1,290.00 5.20 4,365.20
100 pair lp@30.0 MLF 3,970.00 1,488.00 6.00 5,464.00
125 pair lp@40.0 MLF 4,430.00 1,984.00 8.00 6,422.00
150 pair lp@50.0 MLF 6,410.00 2,480.00 10.00 8,900.00

Telephone cable, #22 AWG, buried in trench


Including connections but no excavation, using small tools.
2 pair lp@4.00 MLF 175.00 198.40 0.80 374.20
3 pair lp@4.25 MLF 185.00 210.80 0.85 396.65
4 pair lp@4.50 MLF 197.00 223.20 0.90 421.10
6 pair lp@4.75 MLF 249.00 235.60 0.95 485.55
9 pair lp@5.25 MLF 667.00 260.40 1.05 928.45
11 pair lp@5.50 MLF 743.00 272.80 1.10 1,016.90
13 pair lp@5.75 MLF 657.00 285.20 1.15 943.35
15 pair lp@6.00 MLF 771.00 297.60 1.20 1,069.80
19 pair lp@6.50 MLF 886.00 322.40 1.30 1,209.70
23 pair lp@7.00 MLF 1,040.00 347.20 1.40 1,388.60
27 pair lp@8.00 MLF 1,380.00 396.80 1.60 1,778.40
38 pair lp@12.0 MLF 1,510.00 595.20 2.40 2,107.60
51 pair lp@18.0 MLF 2,240.00 892.80 3.60 3,136.40
75 pair lp@26.0 MLF 3,070.00 1,290.00 5.20 4,365.20
100 pair lp@30.0 MLF 3,970.00 1,488.00 6.00 5,464.00
125 pair lp@40.0 MLF 4,430.00 1,984.00 8.00 6,422.00
150 pair lp@50.0 MLF 6,410.00 2,480.00 10.00 8,900.00

Telephone cable, #22 AWG, installed on poles


Including connections, using a line truck with aerial platform and small tools.
2 pair lu@4.00 MLF 175.00 198.40 32.10 405.50
3 pair lu@4.25 MLF 185.00 210.80 34.10 429.90
4 pair lu@4.50 MLF 197.00 223.20 36.10 456.30
6 pair lu@4.75 MLF 249.00 235.60 38.10 522.70
9 pair lu@5.25 MLF 667.00 260.40 42.10 969.50
11 pair lu@5.50 MLF 743.00 272.80 44.10 1,059.90
13 pair lu@5.75 MLF 657.00 285.20 46.10 988.30
15 pair lu@6.00 MLF 771.00 297.60 48.10 1,116.70
19 pair lu@6.50 MLF 886.00 322.40 52.10 1,260.50
23 pair lu@7.00 MLF 1,040.00 347.20 56.10 1,443.30
27 pair lu@8.00 MLF 1,380.00 396.80 64.20 1,841.00
38 pair lu@12.0 MLF 1,510.00 595.20 96.20 2,201.40
51 pair lu@18.0 MLF 2,240.00 892.80 144.00 3,276.80
75 pair lu@26.0 MLF 3,070.00 1,290.00 209.00 4,569.00
100 pair lu@30.0 MLF 3,970.00 1,488.00 241.00 5,699.00
125 pair lu@40.0 MLF 4,430.00 1,984.00 321.00 6,735.00
150 pair lu@50.0 MLF 6,410.00 2,480.00 401.00 9,291.00

Aluminum conductor steel reinforced wire, on poles


Concentric lay stranded with class A galvanizing, by American wire gauge, using a line truck with aerial
platform and small tools.
#4, swan 6/1 lu@5.50 MLF 664.00 272.80 44.10 980.90
#4, swanate 7/1 lu@5.50 MLF 634.00 272.80 44.10 950.90
#2, sparrow 6/1 lu@6.50 MLF 596.00 322.40 52.10 970.50
#2, separate 7/1 lu@6.50 MLF 590.00 322.40 52.10 964.50
#1/0, raven 6/1 lu@9.00 MLF 579.00 446.40 72.20 1,097.60
#2/0, quail 6/1 lu@10.0 MLF 573.00 496.00 80.20 1,149.20
#3/0, pigeon 6/1 lu@11.0 MLF 568.00 545.60 88.20 1,201.80
2015 Heavy Construction Estimator, All Rights Reserved Page 703 (part 2)

#4/0, penguin 6/1 lu@12.7 MLF 566.00 629.90 102.00 1,297.90


#1, bare wire lp@12.0 MLF 387.00 595.20 2.40 984.60
2015 Heavy Construction Estimator, All Rights Reserved Page 704

All aluminum conductor wire on poles


Using a line truck with aerial platform and small tools.
477 conductor lt@60.0 MLF 1,790.00 2,980.00 669.00 5,439.00
795 conductor lt@80.0 MLF 3,340.00 3,973.00 892.00 8,205.00

Single copper conductor wire on poles


Bare stranded, using a line truck with aerial platform and small tools.
#12 AWG lu@6.40 MLF 155.00 317.40 51.30 523.70
#10 AWG lu@7.00 MLF 234.00 347.20 56.10 637.30
#8 AWG lu@7.50 MLF 383.00 372.00 60.20 815.20
#6 AWG lu@8.20 MLF 523.00 406.70 65.80 995.50
#4 AWG lu@8.75 MLF 826.00 434.00 70.20 1,330.20
#2 AWG lu@10.5 MLF 1,290.00 520.80 84.20 1,895.00
#1 AWG lu@11.7 MLF 1,690.00 580.30 93.80 2,364.10
#1/0 AWG lu@12.8 MLF 2,150.00 634.90 103.00 2,887.90
#2/0 AWG lu@15.2 MLF 2,680.00 753.90 122.00 3,555.90
#3/0 AWG lu@17.5 MLF 3,400.00 868.00 140.00 4,408.00
#4/0 AWG lu@19.8 MLF 4,240.00 982.10 159.00 5,381.10
250 MCM lu@23.3 MLF 4,870.00 1,156.00 187.00 6,213.00
300 MCM lu@24.6 MLF 5,790.00 1,220.00 197.00 7,207.00
350 MCM lu@25.7 MLF 6,760.00 1,275.00 206.00 8,241.00
400 MCM lu@26.8 MLF 7,570.00 1,329.00 215.00 9,114.00
500 MCM lu@28.0 MLF 9,560.00 1,389.00 225.00 11,174.00

Single copper conductor insulated wire on poles


Insulated stranded conductor, using a line truck with aerial platform and small tools.
#12 AWG lu@6.40 MLF 172.00 317.40 51.30 540.70
#10 AWG lu@7.00 MLF 260.00 347.20 56.10 663.30
#8 AWG lu@7.60 MLF 445.00 377.00 61.00 883.00
#6 AWG lu@8.20 MLF 630.00 406.70 65.80 1,102.50
#4 AWG lu@8.75 MLF 977.00 434.00 70.20 1,481.20
#2 AWG lu@10.5 MLF 1,510.00 520.80 84.20 2,115.00
#1 AWG lu@11.7 MLF 1,950.00 580.30 93.80 2,624.10
#1/0 AWG lu@12.8 MLF 2,380.00 634.90 103.00 3,117.90
#2/0 AWG lu@15.2 MLF 2,920.00 753.90 122.00 3,795.90
#3/0 AWG lu@17.5 MLF 3,660.00 868.00 140.00 4,668.00
#4/0 AWG lu@19.8 MLF 4,530.00 982.10 159.00 5,671.10
250 MCM lu@23.3 MLF 5,410.00 1,156.00 187.00 6,753.00
300 MCM lu@24.6 MLF 6,430.00 1,220.00 197.00 7,847.00
350 MCM lu@25.7 MLF 7,520.00 1,275.00 206.00 9,001.00
400 MCM lu@26.8 MLF 8,410.00 1,329.00 215.00 9,954.00
500 MCM lu@28.0 MLF 10,600.00 1,389.00 225.00 12,214.00

Sound system cable


Shielded conductors, pulled in conduit, using small tools.
1 pair #20 AWG lp@6.00 MLF 329.00 297.60 1.20 627.80
1 pair #14 AWG lp@6.00 MLF 852.00 297.60 1.20 1,150.80
2015 Heavy Construction Estimator, All Rights Reserved Page 705

Coaxial television cable


Copper covered aluminum center core, steel armor jacket, direct burial, using small tools.
Trunk cable, 3/4" diameter lp@8.00 MLF 1,520.00 396.80 1.60 1,918.40
Distribution cable, 1/2" diameter lp@7.00 MLF 1,100.00 347.20 1.40 1,448.60
Distribution cable, 3/8" diameter lp@6.00 MLF 782.00 297.60 1.20 1,080.80
Cable drop,
1/4", #22 AWG, direct burial lp@5.00 MLF 400.00 248.00 1.00 649.00
Cable drop, 1/4",
#22 AWG, pulled in conduit lp@6.00 MLF 400.00 297.60 1.20 698.80

Low voltage thermostat wiring


18 gauge, 300 volts, for surface or interior installation, using small tools.
2 conductors lp@4.00 MLF 561.00 198.40 0.80 760.20
3 conductors lp@4.00 MLF 782.00 198.40 0.80 981.20
4 conductors lp@4.20 MLF 1,090.00 208.30 0.84 1,299.14

Aluminum duplex service drop cable


600 volt insulated, stranded aluminum conductors, steel reinforced, neutral cable, using a line truck with
aerial platform and small tools.
#6 AWG lt@12.0 MLF 472.00 595.90 134.00 1,201.90
#4 AWG lt@14.0 MLF 722.00 695.20 156.00 1,573.20
#2 AWG lt@16.0 MLF 1,260.00 794.60 178.00 2,232.60
#1/0 AWG lt@18.0 MLF 2,330.00 893.90 201.00 3,424.90

Aluminum triplex service drop cable


600 volt insulated, stranded aluminum conductors, steel reinforced, neutral cable, using a line truck with
aerial platform and small tools.
#6 AWG lt@12.0 MLF 833.00 595.90 134.00 1,562.90
#4 AWG lt@14.0 MLF 1,120.00 695.20 156.00 1,971.20
#2 AWG lt@16.0 MLF 1,510.00 794.60 178.00 2,482.60
#1/0 AWG lt@18.0 MLF 2,290.00 893.90 201.00 3,384.90
#2/0 AWG lt@20.0 MLF 2,730.00 993.20 223.00 3,946.20
#4/0 AWG lt@24.0 MLF 4,130.00 1,192.00 268.00 5,590.00

Aluminum quadruplex service drop cable


600 volt insulated, stranded aluminum conductors, steel reinforced, neutral cable, using a line truck with
aerial platform and small tools.
#6 AWG lt@16.0 MLF 1,140.00 794.60 178.00 2,112.60
#4 AWG lt@18.0 MLF 1,500.00 893.90 201.00 2,594.90
#2 AWG lt@20.0 MLF 2,040.00 993.20 223.00 3,256.20
#1/0 AWG lt@24.0 MLF 3,380.00 1,192.00 268.00 4,840.00
#2/0 AWG lt@26.0 MLF 3,880.00 1,291.00 290.00 5,461.00
#3/0 AWG lt@28.0 MLF 5,220.00 1,390.00 312.00 6,922.00
#4/0 AWG lt@30.0 MLF 5,820.00 1,490.00 335.00 7,645.00

Service entrance caps, threaded weatherheads


Using a line truck with aerial platform and small tools.
1" for #6 AWG lt@.250 Ea 12.00 12.42 2.79 27.21
1-1/2" for #4 through #2 AWG lt@.300 Ea 22.40 14.90 3.35 40.65
2" for #1/0 through #2/0 AWG lt@.500 Ea 41.80 24.83 5.58 72.21
2-1/2" for #3/0 through #4/0 lt@.600 Ea 155.00 29.80 6.69 191.49
3" for 250 through 500 MCM lk@.750 Ea 227.00 37.58 0.14 264.72
4" for 750 MCM lk@1.25 Ea 374.00 62.63 0.24 436.87
1/2" for #14 through #10 AWG lk@.150 Ea 7.82 7.52 0.03 15.37
3/4" for #12 through #8 AWG lk@.200 Ea 9.43 10.02 0.04 19.49
2015 Heavy Construction Estimator, All Rights Reserved Page 705 (part 2)

Aluminum Romex cable


600 volts, with ground, 3 conductors, using small tools.
#2 cable lp@.160 LF 2.28 7.94 0.03 10.25

CSI 16-121, Wire connections and devices

Compression type wire connectors


Tape wrapped, using small tools.
#6 AWG lk@.115 Ea 3.16 5.76 0.02 8.94
#4 AWG lk@.200 Ea 3.78 10.02 0.04 13.84
#2 AWG lk@.250 Ea 4.58 12.53 0.05 17.16
2015 Heavy Construction Estimator, All Rights Reserved Page 706

#1/0 AWG lk@.300 Ea 5.97 15.03 0.06 21.06


#2/0 AWG lk@.350 Ea 6.35 17.54 0.07 23.96
#3/0 AWG lk@.400 Ea 7.34 20.04 0.08 27.46
#4/0 AWG lk@.450 Ea 7.96 22.55 0.09 30.60
250 MCM lk@.500 Ea 8.87 25.05 0.10 34.02
300 MCM lk@.550 Ea 9.69 27.56 0.10 37.35
350 MCM lk@.600 Ea 10.00 30.06 0.11 40.17
400 MCM lk@.650 Ea 12.20 32.57 0.12 44.89
500 MCM lk@.700 Ea 14.00 35.07 0.13 49.20

Compression lug wire connectors


One hole, tape wrapped, using small tools.
#6 AWG lk@.150 Ea 3.89 7.52 0.03 11.44
#4 AWG lk@.200 Ea 3.69 10.02 0.04 13.75
#2 AWG lk@.250 Ea 4.27 12.53 0.05 16.85
#1/0 AWG lk@.300 Ea 4.50 15.03 0.06 19.59
#2/0 AWG lk@.350 Ea 4.60 17.54 0.07 22.21
#3/0 AWG lk@.400 Ea 5.15 20.04 0.08 25.27
#4/0 AWG lk@.450 Ea 5.86 22.55 0.09 28.50
250 MCM lk@.500 Ea 6.81 25.05 0.10 31.96
300 MCM lk@.550 Ea 7.91 27.56 0.10 35.57
350 MCM lk@.600 Ea 8.25 30.06 0.11 38.42
400 MCM lk@.650 Ea 9.72 32.57 0.12 42.41
500 MCM lk@.700 Ea 11.00 35.07 0.13 46.20

Split bolt wire connectors


Tape wrapped, using small tools.
#8 AWG lk@.200 Ea 2.55 10.02 0.04 12.61
#6 AWG lk@.250 Ea 2.78 12.53 0.05 15.36
#4 AWG lk@.300 Ea 3.36 15.03 0.06 18.45
#2 AWG lk@.300 Ea 4.95 15.03 0.06 20.04
#1/0 AWG lk@.500 Ea 6.94 25.05 0.10 32.09
#2/0 AWG lk@.500 Ea 11.20 25.05 0.10 36.35
#3/0 AWG lk@.600 Ea 15.30 30.06 0.11 45.47
250 MCM lk@.700 Ea 17.90 35.07 0.13 53.10
350 MCM lk@.700 Ea 33.10 35.07 0.13 68.30
500 MCM lk@.750 Ea 42.90 37.58 0.14 80.62

Cable termination lugs


Hand wrapped, no stress cones included, using small tools.
#8 AWG lk@.800 Ea 2.53 40.08 0.15 42.76
#4 AWG lk@.100 Ea 5.28 5.01 0.02 10.31
#1/0 AWG lk@.150 Ea 5.28 7.52 0.03 12.83
#4/0 AWG lk@.200 Ea 12.90 10.02 0.04 22.96
300 MCM lk@.300 Ea 19.00 15.03 0.06 34.09
500 MCM lk@.400 Ea 28.20 20.04 0.08 48.32

Power distribution blocks


Not including labor for wire terminations, 600 volt, using small tools.
250 MCM 3P lk@1.00 Ea 195.00 50.10 0.19 245.29

Terminal blocks
Not including labor for wire terminations, 600 volt, using small tools.
12 point, #22 to #10 SCW type lj@.500 Ea 21.50 25.05 0.20 46.75
12 point, #8 to #2 SCW type lj@.500 Ea 207.00 25.05 0.20 232.25

Mechanical wire connector lugs, 1 conductor


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 706 (part 2)

# 6 lugs lj@.080 Ea 0.49 4.01 0.03 4.53


# 2 lugs lj@.100 Ea 0.66 5.01 0.04 5.71
# 1/0 lugs lj@.150 Ea 0.94 7.52 0.06 8.52
2015 Heavy Construction Estimator, All Rights Reserved Page 707

# 2/0 lugs lj@.200 Ea 1.05 10.02 0.08 11.15


250 MCM lugs lj@.300 Ea 2.24 15.03 0.12 17.39

Cable splices, one conductor, shielded


5,000 volt shielded cable, using small tools.
#6 AWG lk@1.50 Ea 44.90 75.15 0.29 120.34
#2 AWG lk@1.75 Ea 92.30 87.68 0.33 180.31
#1/0 AWG lk@2.00 Ea 92.30 100.20 0.38 192.88
#2/0 AWG lk@2.25 Ea 92.30 112.70 0.43 205.43
#4/0 AWG lk@2.50 Ea 92.30 125.30 0.48 218.08
350 MCM lk@3.00 Ea 92.30 150.30 0.57 243.17
500 MCM lk@3.50 Ea 92.30 175.40 0.67 268.37

Cable termination without stress cone


5,000 volt cable, using small tools.
#6 to #4/0 lk@2.00 Ea 4.00 100.20 0.38 104.58
250 to 500 MCM lk@2.50 Ea 8.07 125.30 0.48 133.85

Cable termination with stress cone


5,000 volt cable, using small tools.
#6 to #4/0 lk@3.00 Ea 407.00 150.30 0.57 557.87
250 to 500 MCM lk@4.50 Ea 554.00 225.50 0.86 780.36

Connect to single conductor pothead


Pothead included, 5,000 volt cable, using small tools.
#6 to #4/0 lk@2.00 Ea 435.00 100.20 0.38 535.58
250 to 500 MCM lk@3.00 Ea 582.00 150.30 0.57 732.87

Connect to 2-conductor pothead


Pothead included, 5,000 volt cable, on pole, using small tools.
#6 to #4/0 lk@4.00 Ea 172.00 200.40 0.76 373.16
250 to 500 MCM lk@6.00 Ea 258.00 300.60 1.14 559.74
400 to 700 MCM lk@8.00 Ea 542.00 400.80 1.52 944.32
750 MCM lk@8.00 Ea 1,080.00 400.80 1.52 1,482.32
1000 MCM lk@10.0 Ea 2,170.00 501.00 1.90 2,672.90

Connect to three conductor pothead on pole


5 KV pothead included, using small tools.
#6 to #4/0 lk@8.00 Ea 1,510.00 400.80 1.52 1,912.32
250-500 MCM lk@8.00 Ea 1,620.00 400.80 1.52 2,022.32

Connect to single conductor pothead on rack


Pothead included, 1,500 volt cable, using small tools.
#2 to #4/0 lk@4.00 Ea 199.00 200.40 0.76 400.16
250 to 500 MCM lk@6.00 Ea 263.00 300.60 1.14 564.74

Connect to 2-conductor pothead on rack


1,500 volt cable, using small tools.
#2 to #4/0 lk@4.00 Ea 268.00 200.40 0.76 469.16
250 to 500 MCM lk@6.00 Ea 334.00 300.60 1.14 635.74

Connect to 3-conductor pothead on rack


1,500 volt cable, using small tools.
#2 to #4/0 lk@6.00 Ea 329.00 300.60 1.14 630.74
250 to 500 MCM lk@8.00 Ea 406.00 400.80 1.52 808.32
2015 Heavy Construction Estimator, All Rights Reserved Page 708

Stress cones on rack


5 KV cable, using kit and small tools.
#2 to #4/0 lk@2.50 Ea 164.00 125.30 0.48 289.78
250 to 500 MCM lk@4.00 Ea 164.00 200.40 0.76 365.16

Splicing grounded shielded cable


5 KV cable, using kit and small tools.
#2 to #4/0 lk@3.00 Ea 92.30 150.30 0.57 243.17
250 to 500 MCM lk@4.50 Ea 116.00 225.50 0.86 342.36

Splicing grounded shielded cable with splice kit


5 KV cable, universal mechanical splice kit, using small tools.
3/0 to 500 MCM, type CE-CE 2 way lk@8.00 Ea 1,310.00 400.80 1.52 1,712.32
3/0 to 500 MCM, type CE-CE-CE 3 way lk@12.0 Ea 1,870.00 601.20 2.28 2,473.48

Cable terminations
Using small tools.
#2 to #3/0 lk@1.00 Ea 89.20 50.10 0.19 139.49
#3/0 to 250 MCM lk@2.00 Ea 109.00 100.20 0.38 209.58
350 to 500 MCM lk@3.00 Ea 139.00 150.30 0.57 289.87

Stress cones, 5,000 to 1,500 volts, 4 skirted


Using small tools.
#4 to #1/0 lk@2.00 Ea 199.00 100.20 0.38 299.58
#2/0 to #3/0 lk@2.25 Ea 231.00 112.70 0.43 344.13
#4/0, 350 MCM lk@3.00 Ea 286.00 150.30 0.57 436.87
400 to 500 MCM lk@3.50 Ea 387.00 175.40 0.67 563.07

Stress cones, 5,000 to 1,500 volts, 6 skirted


Using small tools.
#4 to #1/0 lk@2.00 Ea 398.00 100.20 0.38 498.58
#2/0 to #3/0 lk@2.25 Ea 461.00 112.70 0.43 574.13
#4/0, 350 MCM lk@3.00 Ea 572.00 150.30 0.57 722.87
400 to 500 MCM lk@3.50 Ea 775.00 175.40 0.67 951.07

Splicing 35,000 volt one conductor wire


Using small tools.
#1 stranded to 4/0 stranded lk@4.00 Ea 238.00 200.40 0.76 439.16

Splicing 70,000 volt one conductor wire


Using small tools.
350 MCM lk@6.00 Ea 3,990.00 300.60 1.14 4,291.74

CSI 16-122, Multi-conductor cords, cables and associated equipment

Multi-conductor #18 SO cord


Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@8.00 MLF 473.00 400.80 1.52 875.32
3 conductors lk@9.00 MLF 559.00 450.90 1.71 1,011.61

Multi-conductor #16 SO cord


Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 708 (part 2)

2 conductors lk@9.00 MLF 542.00 450.90 1.71 994.61


3 conductors lk@9.25 MLF 627.00 463.40 1.76 1,092.16
4 conductors lk@9.50 MLF 866.00 476.00 1.81 1,343.81
5 conductors lk@9.75 MLF 890.00 488.50 1.85 1,380.35
6 conductors lk@10.0 MLF 915.00 501.00 1.90 1,417.90
7 conductors lk@10.2 MLF 939.00 511.00 1.94 1,451.94
8 conductors lk@10.5 MLF 963.00 526.10 2.00 1,491.10
9 conductors lk@10.7 MLF 987.00 536.10 2.03 1,525.13
10 conductors lk@11.0 MLF 1,010.00 551.10 2.09 1,563.19
12 conductors lk@11.2 MLF 1,030.00 561.10 2.13 1,593.23
14 conductors lk@11.5 MLF 1,060.00 576.20 2.19 1,638.39
2015 Heavy Construction Estimator, All Rights Reserved Page 709

16 conductors lk@11.7 MLF 1,080.00 586.20 2.22 1,668.42

Multi-conductor #14 SO cord


Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@10.0 MLF 866.00 501.00 1.90 1,368.90
3 conductors lk@10.3 MLF 1,030.00 516.00 1.96 1,547.96
4 conductors lk@10.5 MLF 1,280.00 526.10 2.00 1,808.10
5 conductors lk@11.0 MLF 1,530.00 551.10 2.09 2,083.19

Multi-conductor #12 SO cord


Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@12.0 MLF 1,140.00 601.20 2.28 1,743.48
3 conductors lk@12.2 MLF 1,370.00 611.20 2.32 1,983.52
4 conductors lk@12.5 MLF 1,570.00 626.30 2.38 2,198.68
5 conductors lk@13.0 MLF 1,820.00 651.30 2.47 2,473.77

Multi-conductor #10 SO cord


Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@14.0 MLF 1,400.00 701.40 2.66 2,104.06
3 conductors lk@14.3 MLF 1,720.00 716.40 2.72 2,439.12
4 conductors lk@14.5 MLF 1,970.00 726.50 2.76 2,699.26
5 conductors lk@15.0 MLF 2,220.00 751.50 2.85 2,974.35

Multi-conductor #8 SO cord
Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@15.0 MLF 2,390.00 751.50 2.85 3,144.35
3 conductors lk@15.3 MLF 2,960.00 766.50 2.91 3,729.41
4 conductors lk@15.5 MLF 3,710.00 776.60 2.95 4,489.55
5 conductors lk@16.0 MLF 3,990.00 801.60 3.04 4,794.64

Multi-conductor #6 SO cord
Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@16.0 MLF 2,780.00 801.60 3.04 3,584.64
3 conductors lk@16.3 MLF 3,990.00 816.60 3.10 4,809.70
4 conductors lk@16.5 MLF 4,750.00 826.70 3.14 5,579.84
5 conductors lk@17.0 MLF 5,130.00 851.70 3.23 5,984.93

Multi-conductor #4 SO cord
Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@15.7 MLF 3,310.00 786.60 2.98 4,099.58
3 conductors lk@16.0 MLF 4,560.00 801.60 3.04 5,364.64
4 conductors lk@16.3 MLF 5,360.00 816.60 3.10 6,179.70
5 conductors lk@16.5 MLF 5,810.00 826.70 3.14 6,639.84

Multi-conductor #2 SO cord
Based on 100' length. Includes handling, unrolling, laying in tray or fastening to wall and cutting to
length, using small tools.
2 conductors lk@16.7 MLF 3,590.00 836.70 3.17 4,429.87
3 conductors lk@17.0 MLF 5,020.00 851.70 3.23 5,874.93
4 conductors lk@17.3 MLF 5,840.00 866.70 3.29 6,709.99
5 conductors lk@17.5 MLF 6,380.00 876.80 3.33 7,260.13
2015 Heavy Construction Estimator, All Rights Reserved Page 709 (part 2)

Cord grips
With watertight connectors, zinc plated, using small tools.
For 3/4" pipe lk@.350 Ea 1.49 17.54 0.07 19.10
For 1/2" pipe lk@.300 Ea 1.33 15.03 0.06 16.42

Cable reel
Includes handling, mounting, electrical connections and installing cord, using small tools.
Extension cord reel, yellow SJO, up to 25 feet,
#16, 3 conductor lk@1.50 Ea 202.00 75.15 0.29 277.44
2015 Heavy Construction Estimator, All Rights Reserved Page 710

Heavy duty power, with 55' 5 conductor #10 SJO,


with anchor lk@4.75 Ea 318.00 238.00 0.90 556.90
Control for 60'
of 16 conductor #16 SO cord lk@6.00 Ea 760.00 300.60 1.14 1,061.74

Extension cords, 100’


Using small tools.
120 volts 12/3 lk@.500 Ea 62.70 25.05 0.10 87.85
240 volts 10/3 lk@.500 Ea 94.60 25.05 0.10 119.75

CSI 16-130, Boxes

NEMA 1 boxes
Hinged cover enclosure, using small tools.
4" x 4" x 4" lk@.300 Ea 11.20 15.03 0.06 26.29
6" x 6" x 4" lk@.350 Ea 9.22 17.54 0.07 26.83
8" x 8" x 4" lk@.450 Ea 12.70 22.55 0.09 35.34
10" x 8" x 4" lk@.500 Ea 14.50 25.05 0.10 39.65
12" x 8" x 4" lk@.550 Ea 16.50 27.56 0.10 44.16
15" x 12" x 4" lk@.650 Ea 25.20 32.57 0.12 57.89
6" x 6" x 6" lk@.400 Ea 11.20 20.04 0.08 31.32
8" x 6" x 6" lk@.600 Ea 13.00 30.06 0.11 43.17

NEMA 3R hinged cover enclosure


Including hinged cover, using small tools.
8" x 8" x 6" lk@.500 Ea 62.20 25.05 0.10 87.35
10" x 8" x 6" lk@.600 Ea 68.60 30.06 0.11 98.77
12" x 10" x 6" lk@.600 Ea 83.70 30.06 0.11 113.87
12" x 12" x 6" lk@.600 Ea 91.90 30.06 0.11 122.07
16" x 12" x 6" lk@.700 Ea 120.00 35.07 0.13 155.20
24" x 20" x 8" lk@1.00 Ea 246.00 50.10 0.19 296.29
30" x 24" x 8" lk@1.50 Ea 325.00 75.15 0.29 400.44
30" x 30" x 12" lk@2.00 Ea 528.00 100.20 0.38 628.58
36" x 24" x 12" lk@2.25 Ea 431.00 112.70 0.43 544.13
36" x 30" x 12" lk@2.50 Ea 603.00 125.30 0.48 728.78
36" x 36" x 12" lk@2.75 Ea 688.00 137.80 0.52 826.32
42" x 30" x 12" lk@3.50 Ea 677.00 175.40 0.67 853.07

NEMA 3R two door wall mounted enclosure


Using small tools.
30" x 36" x 12" lk@2.00 Ea 684.00 100.20 0.38 784.58
30" x 42" x 12" lk@2.75 Ea 766.00 137.80 0.52 904.32

NEMA type 4 or 4X enclosure


Continuous hinge, clamp cover enclosure, steel, using small tools.
4" x 4" x 3" lk@.400 Ea 57.40 20.04 0.08 77.52
6" x 4" x 3" lk@.450 Ea 64.90 22.55 0.09 87.54
8" x 6" x 3.5" lk@.500 Ea 80.00 25.05 0.10 105.15
6" x 6" x 4" lk@.500 Ea 75.50 25.05 0.10 100.65
10" x 8" x 4" lk@.600 Ea 99.20 30.06 0.11 129.37
12" x 10" x 5" lk@.750 Ea 127.00 37.58 0.14 164.72
10" x 8" x 6" lk@.650 Ea 112.00 32.57 0.12 144.69
12" x 12" x 6" lk@.800 Ea 134.00 40.08 0.15 174.23
14" x 12" x 6" lk@.850 Ea 160.00 42.59 0.16 202.75
16" x 14" x 6" lk@1.25 Ea 188.00 62.63 0.24 250.87

NEMA 4 gasketed clamp cover enclosure


Steel construction, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 710 (part 2)

4" x 4" x 3" lk@.400 Ea 51.60 20.04 0.08 71.72


6" x 6" x 4" lk@.500 Ea 68.40 25.05 0.10 93.55
2015 Heavy Construction Estimator, All Rights Reserved Page 711

NEMA 4X gasketed clamp cover enclosure


Steel construction, using small tools.
4" x 4" x 3" lk@.400 Ea 136.00 20.04 0.08 156.12
6" x 6" x 4" lk@.500 Ea 199.00 25.05 0.10 224.15

NEMA 4 clamp cover aluminum enclosure


Gasketed, using small tools.
6" x 4" x 3" lk@.400 Ea 139.00 20.04 0.08 159.12
6" x 6" x 4" lk@.500 Ea 155.00 25.05 0.10 180.15

CSI 16-140, Wiring devices

Receptacles, exposed installation, industrial grade


Using small tools.
Duplex, 120 volt, 20 amp lk@.250 Ea 7.97 12.53 0.05 20.55
Single, 120 volt, 20 amp lk@.250 Ea 8.61 12.53 0.05 21.19
Dryer, 250 volt, 30 amp lk@.300 Ea 28.30 15.03 0.06 43.39
Range, 230 volt, 60 amp lk@.500 Ea 19.50 25.05 0.10 44.65
Clock hanger, 120 volt, 20 amp, lk@.300 Ea 20.70 15.03 0.06 35.79
Floor mounted
duplex,120 volt, 20 amp lk@.500 Ea 7.97 25.05 0.10 33.12
Receptacle plug mold, receptacle each 12",
per linear foot of plug mold lk@.100 LF 4.03 5.01 0.02 9.06

Switches, industrial grade, exposed installation


Using small tools.
Single pole, single throw,
120 volt, 20 amp lk@.200 Ea 6.33 10.02 0.04 16.39
3-way, 120 volt, 20 amp lk@.300 Ea 8.32 15.03 0.06 23.41
4-way, 120 volt, 20 amp lk@.400 Ea 24.10 20.04 0.08 44.22
Double pole, single throw,
120 volt, 20 amp lk@.350 Ea 10.00 17.54 0.07 27.61
Thermal, 120 volt, 20 amp lk@.500 Ea 31.50 25.05 0.10 56.65

Telephone receptacles, exposed installation


Using small tools.
Blank lk@.060 Ea 0.46 3.01 0.01 3.48
4-pin lk@.300 Ea 3.66 15.03 0.06 18.75

Dimmers, exposed installation


With single pole, single throw switch, using small tools.
600 watt lk@.300 Ea 38.30 15.03 0.06 53.39
1,000 watt lk@.400 Ea 75.10 20.04 0.08 95.22
1,500 watt lk@.450 Ea 161.00 22.55 0.09 183.64
2,000 watt lk@.500 Ea 240.00 25.05 0.10 265.15

Receptacles, concealed installation


Using small tools.
Duplex, 120 volt, 20 amp lk@.200 Ea 7.97 10.02 0.04 18.03
Simplex, 120 volt, 20 amp lk@.200 Ea 8.61 10.02 0.04 18.67
Dryer, 230 volt, 30 amp lk@.300 Ea 9.25 15.03 0.06 24.34
Range, 230 volt, 60 amp lk@.400 Ea 14.50 20.04 0.08 34.62
Clock hanger,120 volt, 20 amp lk@.300 Ea 20.70 15.03 0.06 35.79
Floor mounted
duplex,120 volt,20 amp lk@.500 Ea 36.50 25.05 0.10 61.65
4" square x 2-1/4" deep PVC box and cover, placed
2015 Heavy Construction Estimator, All Rights Reserved Page 711 (part 2)

in precast concrete panels lk@.300 Ea 17.30 15.03 0.06 32.39


Wall plate, 1 gang, stainless steel lj@.050 Ea 1.29 2.51 0.02 3.82
Switch plate, 1 gang, plastic lj@.050 Ea 0.50 2.51 0.02 3.03

Switches, concealed installation


Using small tools.
Single pole, single throw,
120 volt, 20 amp lk@.200 Ea 6.33 10.02 0.04 16.39
3-way, 120 volt, 20 amp lk@.300 Ea 8.32 15.03 0.06 23.41
4-way, 120 volt, 20 amp, exposed lk@.400 Ea 24.10 20.04 0.08 44.22
Double pole, single throw,
120 volt, 20 amp lk@.400 Ea 10.00 20.04 0.08 30.12
Thermal switch, 120 volt, 20 amp lk@.500 Ea 35.10 25.05 0.10 60.25

Telephone receptacles, concealed installation


Using small tools.
Blank lk@.060 Ea 0.46 3.01 0.01 3.48
2015 Heavy Construction Estimator, All Rights Reserved Page 712

4 pin lk@.300 Ea 3.66 15.03 0.06 18.75

Dimmers, concealed installation


With single pole, single throw switch, using small tools.
600 watt lk@.300 Ea 10.50 15.03 0.06 25.59
1,000 watt lk@.400 Ea 89.50 20.04 0.08 109.62
1,500 watt lk@.450 Ea 183.00 22.55 0.09 205.64
2,000 watt lk@.500 Ea 236.00 25.05 0.10 261.15

Television receptacles, concealed installation


Using small tools.
With cover lk@.050 Ea 7.69 2.51 0.01 10.21

Weatherproof receptacles, 120 volt, 20 amp


Using small tools.
Duplex, exposed installation lk@.300 Ea 7.97 15.03 0.06 23.06
Simplex, exposed installation lk@.300 Ea 8.61 15.03 0.06 23.70
Duplex, concealed installation lk@.300 Ea 7.97 15.03 0.06 23.06
Simplex, concealed installation lk@.300 Ea 8.61 15.03 0.06 23.70

Weatherproof switches, 120 volt, 20 amp


Using small tools.
Single pole, single throw,
exposed installation lk@.300 Ea 6.49 15.03 0.06 21.58
3 way, exposed installation lk@.350 Ea 8.53 17.54 0.07 26.14
4 way, exposed installation lk@.400 Ea 24.70 20.04 0.08 44.82
4 way, concealed installation lk@.400 Ea 24.70 20.04 0.08 44.82
Single pole, single throw,
concealed installation lk@.300 Ea 10.30 15.03 0.06 25.39
3 way, concealed installation lk@.350 Ea 8.53 17.54 0.07 26.14
Thermal, concealed installation lk@.500 Ea 38.80 25.05 0.10 63.95

Weatherproof receptacles, 120 volt, 15 amp


Using small tools.
Duplex lj@.300 Ea 1.68 15.03 0.12 16.83
Duplex, GFI lj@.350 Ea 16.80 17.54 0.14 34.48

Specialty receptacles, 120 volt, 20 amp


Using small tools.
Duplex, ground fault interrupter,
exposed lk@.350 Ea 17.00 17.54 0.07 34.61
Simplex, explosion proof, exposed lk@1.25 Ea 406.00 62.63 0.24 468.87
120 volt transient
voltage surge suppresser lk@.750 Ea 76.20 37.58 0.14 113.92
Duplex, ground floor interrupter,
concealed lk@.350 Ea 17.00 17.54 0.07 34.61
Simplex, explosion proof, concealed lk@1.50 Ea 406.00 75.15 0.29 481.44
Twist lock, 120 volt, 30 amp lj@.350 Ea 67.30 17.54 0.14 84.98
Clock lj@.300 Ea 3.15 15.03 0.12 18.30

Specialty switches, 120 volt, 20 amp


Using small tools.
Single pole, single throw,
explosion proof, exposed lk@.750 Ea 178.00 37.58 0.14 215.72
3 way, explosion proof, exposed lk@.800 Ea 220.00 40.08 0.15 260.23
Momentary contact, exposed lk@1.00 Ea 45.10 50.10 0.19 95.39
Single pole, single throw,
2015 Heavy Construction Estimator, All Rights Reserved Page 712 (part 2)

explosion proof, concealed lk@1.00 Ea 178.00 50.10 0.19 228.29


3 way, explosion proof, concealed lk@1.10 Ea 220.00 55.11 0.21 275.32
Momentary contact,
explosion proof, concealed lk@1.50 Ea 241.00 75.15 0.29 316.44

Time switches
Using small tools.
Single pole,
single throw, 7 day dial lj@1.50 Ea 97.90 75.15 0.59 173.64

Power receptacles
Using small tools.
20 amp, 250 volt, NEMA 6-20 lk@.250 Ea 10.30 12.53 0.05 22.88
50 amp, 250 volt, NEMA 6-50 lk@.500 Ea 24.10 25.05 0.10 49.25
30 amp, 125 volt, NEMA 5-30 lk@.300 Ea 18.30 15.03 0.06 33.39
50 amp, 125 volt, NEMA 5-50 lk@.500 Ea 22.80 25.05 0.10 47.95
50 amp, 277 volt, NEMA 7-50 lk@.500 Ea 27.50 25.05 0.10 52.65
2015 Heavy Construction Estimator, All Rights Reserved Page 713

60 amp, 125/250 volt, NEMA 14-50 lk@.600 Ea 39.40 30.06 0.11 69.57
Locking,
20 amp, 125 volt, NEMA l5-20 lk@.300 Ea 18.00 15.03 0.06 33.09
Locking,
20 amp, 250 volt, NEMA l6-20 lk@.300 Ea 18.00 15.03 0.06 33.09
Locking,
20 amp, 480 volt, NEMA l8-20 lk@.300 Ea 21.80 15.03 0.06 36.89
Locking,
20 amp, 600 volt, NEMA l9-20 lk@.300 Ea 30.40 15.03 0.06 45.49
Locking, 20 amp,
125/250 volt, NEMA L10-20 lk@.300 Ea 25.30 15.03 0.06 40.39
Locking, 20 amp,
125/250 volt, NEMA L14-20 lk@.300 Ea 26.60 15.03 0.06 41.69
Locking, 30 amp, 3 phase,
250 volt, NEMA L15-30 lk@.500 Ea 34.30 25.05 0.10 59.45
Corrosion resistor,
15/20 amp, 125 volt lk@.300 Ea 42.20 15.03 0.06 57.29
Corrosion resistor,
15/20 amp, 250 volt lk@.300 Ea 99.70 15.03 0.06 114.79
100 amp,
3 phase, 480 volt, with box lk@1.50 Ea 675.00 75.15 0.29 750.44
30 amp, 3 phase, 208 volt lk@.750 Ea 161.00 37.58 0.14 198.72
60 amp, 3 phase, 208 volt lk@1.00 Ea 316.00 50.10 0.19 366.29
400 amp, 4 pole, with box lk@2.50 Ea 2,240.00 125.30 0.48 2,365.78
Pin and sleeve,
20 amp, 120/208 volt lk@1.00 Ea 110.00 50.10 0.19 160.29
Pin and sleeve,
20 amp, 277/480 volt lk@1.00 Ea 110.00 50.10 0.19 160.29
Pin and sleeve,
30 amp, 120/208 volt lk@1.25 Ea 136.00 62.63 0.24 198.87
Pin and sleeve,
30 amp, 277/480 volt lk@1.25 Ea 136.00 62.63 0.24 198.87
Cable reel, 20 amp, 120 volt lp@2.00 Ea 591.00 99.20 0.40 690.60

Isolated ground receptacles


For computers and electronic equipment, using small tools.
Duplex, 20 amp, 120 volt lk@.200 Ea 25.40 10.02 0.04 35.46
Simplex, 20 amp, 120 volt lk@.200 Ea 25.60 10.02 0.04 35.66
Simplex, 30 amp, 120 volt lk@.350 Ea 29.90 17.54 0.07 47.51
Locking, 15 amp, 250 volt lk@.300 Ea 31.60 15.03 0.06 46.69
Locking, 15 amp, 277 volt lk@.300 Ea 26.90 15.03 0.06 41.99
Locking, 30 amp, 277 volt lk@.400 Ea 48.20 20.04 0.08 68.32
Locking, 20 amp, 120/208 volt lk@.300 Ea 41.70 15.03 0.06 56.79
Locking, 30 amp, 120/208 volt lk@.400 Ea 59.50 20.04 0.08 79.62
Locking, 20 amp, 277/480 volt lk@.300 Ea 27.00 15.03 0.06 42.09
Locking, 20 amp, 347/600 volt lk@.400 Ea 43.50 20.04 0.08 63.62
30 amp, 3 phase, 208 volt, cable
reelite with 75’ 10/5 SO cord lk@.500 Ea 5,530.00 25.05 0.10 5,555.15

Door bell systems


Using small tools.
Push button and transformer lk@2.00 Ea 20.40 100.20 0.38 120.98

Outlet boxes - 4" square box, with cover, exposed


Using small tools.
1-1/2" depth lk@.250 Ea 1.51 12.53 0.05 14.09
2-1/8" depth lk@.270 Ea 3.03 13.53 0.05 16.61

Outlet boxes - 4" square box, with cover, concealed


2015 Heavy Construction Estimator, All Rights Reserved Page 713 (part 2)

Using small tools.


1-1/2" depth lk@.300 Ea 1.76 15.03 0.06 16.85
2-1/8" depth lk@.350 Ea 4.63 17.54 0.07 22.24
Steel, 4" plaster ring lj@.050 Ea 0.94 2.51 0.02 3.47
Handy box lj@.150 Ea 1.30 7.52 0.06 8.88

Outlet boxes - 4" octagonal concrete rings


Embedded in concrete slab or wall, with plate, using small tools.
2" (51mm) depth lk@.200 Ea 3.69 10.02 0.04 13.75
2-1/2" (63mm) depth lk@.200 Ea 3.79 10.02 0.04 13.85
3" (76mm) depth lk@.250 Ea 3.84 12.53 0.05 16.42
3-1/2" (88mm) depth lk@.250 Ea 4.03 12.53 0.05 16.61
4" (10cm) depth lk@.300 Ea 5.26 15.03 0.06 20.35
5" (12.5cm) depth lk@.300 Ea 6.95 15.03 0.06 22.04
6" (15cm) depth lk@.350 Ea 8.25 17.54 0.07 25.86
2015 Heavy Construction Estimator, All Rights Reserved Page 714

Outlet boxes - 4-1/2" x 1-5/8" solid gang


With cover and 3/4" knockout, exposed, using small tools.
2 gang lk@.250 Ea 1.76 12.53 0.05 14.34
4 gang lk@.500 Ea 27.60 25.05 0.10 52.75
6 gang lk@.600 Ea 41.10 30.06 0.11 71.27
9 gang lk@1.25 Ea 62.60 62.63 0.24 125.47
1 gang lk@.250 Ea 1.57 12.53 0.05 14.15

Cast outlet floor boxes


Using small tools.
Embedded, single gang lk@1.50 Ea 118.00 75.15 0.29 193.44
Two gang, embedded lk@2.00 Ea 220.00 100.20 0.38 320.58

Junction boxes with covers - Exposed


Using small tools.
4" x 4" x 2" lk@.300 Ea 12.90 15.03 0.06 27.99
4" x 4" x 4" lk@.350 Ea 19.00 17.54 0.07 36.61
6" x 6" x 6" lk@.400 Ea 21.90 20.04 0.08 42.02
4" x 4" x 2" NEMA 3R lk@.500 Ea 14.00 25.05 0.10 39.15

Junction boxes with covers - Cabinets


Using small tools.
Hinged cabinet,
type. A, 36" x 36" x 8" lp@2.50 Ea 314.00 124.00 0.50 438.50
Pull box SC NEMA 3R,
24" x 24" x 10" lp@2.00 Ea 247.00 99.20 0.40 346.60
Circuit breaker cabinet,
2 door, 40" x 36" x 10" lp@3.00 Ea 485.00 148.80 0.60 634.40

Junction boxes with covers - Concealed


Using small tools.
4" x 4" x 2" lk@.500 Ea 16.40 25.05 0.10 41.55
4" x 4" x 4" lk@.500 Ea 24.10 25.05 0.10 49.25
6" x 6" x 6" lk@.600 Ea 27.90 30.06 0.11 58.07

NEMA 1 junction boxes with cover


Using small tools.
6" x 6" x 4" lk@.350 Ea 11.90 17.54 0.07 29.51
8" x 6" x 4" lk@.400 Ea 10.20 20.04 0.08 30.32
10" x 8" x 4" lk@.500 Ea 13.60 25.05 0.10 38.75
12" x 10" x 4" lk@.550 Ea 17.70 27.56 0.10 45.36
12" x 12" x 4" lk@.550 Ea 20.10 27.56 0.10 47.76
15" x 12" x 4" lk@.600 Ea 23.60 30.06 0.11 53.77
18" x 12" x 4" lk@.650 Ea 27.10 32.57 0.12 59.79
18" x 15" x 4" lk@.700 Ea 32.00 35.07 0.13 67.20
8" x 8" x 6" lk@.450 Ea 14.30 22.55 0.09 36.94
10" x 10" x 6" lk@.550 Ea 18.60 27.56 0.10 46.26
24" x 18" x 6" lk@.800 Ea 66.00 40.08 0.15 106.23
15" x 12" x 6" lk@.650 Ea 27.60 32.57 0.12 60.29
18" x 18" x 6" lk@.750 Ea 42.10 37.58 0.14 79.82
12" x 12" x 6" lk@.600 Ea 23.60 30.06 0.11 53.77
24" x 24" x 6" lk@1.00 Ea 85.30 50.10 0.19 135.59
24" x 18" x 8" lk@1.00 Ea 132.00 50.10 0.19 182.29
24" x 24" x 8" lk@1.25 Ea 162.00 62.63 0.24 224.87
30" x 24" x 8" lk@1.50 Ea 193.00 75.15 0.29 268.44
30" x 30" x 8" lk@1.75 Ea 300.00 87.68 0.33 388.01
2015 Heavy Construction Estimator, All Rights Reserved Page 714 (part 2)

36" x 24" x 8" lk@1.60 Ea 224.00 80.16 0.30 304.46


2015 Heavy Construction Estimator, All Rights Reserved Page 715

NEMA 3R junction boxes with cover


Using small tools.
8" x 6" x 6" lk@.450 Ea 19.00 22.55 0.09 41.64
8" x 8" x 6" lk@.500 Ea 21.80 25.05 0.10 46.95
10" x 8" x 6" lk@.500 Ea 24.70 25.05 0.10 49.85
10" x 10" x 6" lk@.550 Ea 28.00 27.56 0.10 55.66
12" x 10" x 6" lk@.600 Ea 31.20 30.06 0.11 61.37
18" x 12" x 6" lk@.700 Ea 45.90 35.07 0.13 81.10
18" x 18" x 6" lk@.750 Ea 70.10 37.58 0.14 107.82
24" x 18" x 6" lk@.800 Ea 86.70 40.08 0.15 126.93
12" x 12" x 8" lk@.650 Ea 68.70 32.57 0.12 101.39
18" x 12" x 8" lk@.750 Ea 89.80 37.58 0.14 127.52
18" x 15" x 8" lk@.800 Ea 120.00 40.08 0.15 160.23
24" x 18" x 8" lk@1.00 Ea 166.00 50.10 0.19 216.29
30" x 24" x 8" lk@1.50 Ea 242.00 75.15 0.29 317.44
24" x 24" x 10" lk@1.50 Ea 243.00 75.15 0.29 318.44

Cast iron pull boxes with cover


With conduit hubs or drilled conduit holes, using small tools.
6" x 6" x 6" lk@.750 Ea 133.00 37.58 0.14 170.72
8" x 6" x 6" lk@.800 Ea 180.00 40.08 0.15 220.23
8" x 8" x 6" lk@.850 Ea 213.00 42.59 0.16 255.75
10" x 8" x 6" lk@1.00 Ea 254.00 50.10 0.19 304.29
10" x 10" x 6" lk@1.05 Ea 278.00 52.61 0.20 330.81
12" x 10" x 6" lk@1.10 Ea 366.00 55.11 0.21 421.32
12" x 12" x 6" lk@1.15 Ea 380.00 57.62 0.22 437.84
16" x 12" x 6" lk@1.30 Ea 552.00 65.13 0.25 617.38
16" x 16" x 6" lk@1.50 Ea 775.00 75.15 0.29 850.44
20" x 20" x 6" lk@2.00 Ea 1,300.00 100.20 0.38 1,400.58
24" x 18" x 8" lk@2.25 Ea 1,210.00 112.70 0.43 1,323.13
24" x 24" x 10" lk@2.50 Ea 2,330.00 125.30 0.48 2,455.78
12" x 12" x 12" lk@1.50 Ea 738.00 75.15 0.29 813.44
18" x 18" x 12" lk@2.25 Ea 1,700.00 112.70 0.43 1,813.13
24" x 24" x 12" lk@2.50 Ea 2,710.00 125.30 0.48 2,835.78
36" x 36" x 12" lk@3.00 Ea 5,670.00 150.30 0.57 5,820.87

NEMA 12 double door cabinets


Floor mounted, using small tools.
60" x 48" x 8" lk@2.50 Ea 2,140.00 125.30 0.48 2,265.78
48" x 60" x 10" lk@2.75 Ea 2,210.00 137.80 0.52 2,348.32
60" x 60" x 10" lk@3.00 Ea 2,470.00 150.30 0.57 2,620.87
72" x 60" x 10" lk@3.25 Ea 2,830.00 162.80 0.62 2,993.42
72" x 72" x 10" lk@3.50 Ea 3,150.00 175.40 0.67 3,326.07
60" x 48" x 12" lk@2.75 Ea 2,280.00 137.80 0.52 2,418.32
60" x 60" x 12" lk@3.25 Ea 2,550.00 162.80 0.62 2,713.42
72" x 60" x 12" lk@3.50 Ea 2,910.00 175.40 0.67 3,086.07
72" x 72" x 12" lk@3.75 Ea 3,240.00 187.90 0.71 3,428.61
160" x 48" x 12" lk@6.00 Ea 2,410.00 300.60 1.14 2,711.74

NEMA 4 clamp cover outlet boxes


Using small tools.
62" x 48" x 10" lm@3.00 Ea 2,890.00 148.40 8.94 3,047.34
62" x 60" x 12" lm@4.00 Ea 3,340.00 197.80 11.90 3,549.70

Explosion proof receptacle boxes


Using small tools.
10" x 18" lk@1.50 Ea 1,670.00 75.15 0.29 1,745.44
2015 Heavy Construction Estimator, All Rights Reserved Page 715 (part 2)

CSI 16-151, Motors and equipment

Electric motors, AC, single phase, 230 volt


If equipment rating is in other than horsepower, convert to horsepower to select the proper circuit
characteristics, using small tools.
1/2 HP motor lk@.650 Ea 299.00 32.57 0.12 331.69
2015 Heavy Construction Estimator, All Rights Reserved Page 716

3/4 HP motor lk@.700 Ea 312.00 35.07 0.13 347.20


1 HP motor lk@.750 Ea 334.00 37.58 0.14 371.72
1-1/2 HP motor lk@.800 Ea 355.00 40.08 0.15 395.23
2 HP motor lk@.800 Ea 359.00 40.08 0.15 399.23
3 HP motor lk@.900 Ea 428.00 45.09 0.17 473.26
5 HP motor lk@1.00 Ea 436.00 50.10 0.19 486.29
7-1/2 HP motor lk@1.25 Ea 513.00 62.63 0.24 575.87
10 HP motor lk@1.50 Ea 685.00 75.15 0.29 760.44

Electric motors, AC, three phase, 230 volt


Using small tools.
1/2 HP motor lk@.700 Ea 299.00 35.07 0.13 334.20
3/4 HP motor lk@.800 Ea 312.00 40.08 0.15 352.23
1 HP motor lk@.850 Ea 334.00 42.59 0.16 376.75
1-1/2 HP motor lk@.850 Ea 355.00 42.59 0.16 397.75
2 HP motor lk@.850 Ea 359.00 42.59 0.16 401.75
3 HP motor lk@.800 Ea 428.00 40.08 0.15 468.23
5 HP motor lk@.800 Ea 436.00 40.08 0.15 476.23
7-1/2 HP motor lk@1.00 Ea 513.00 50.10 0.19 563.29
10 HP motor lk@1.25 Ea 685.00 62.63 0.24 747.87
15 HP motor lk@1.30 Ea 789.00 65.13 0.25 854.38
20 HP motor lk@1.50 Ea 1,200.00 75.15 0.29 1,275.44
25 HP motor lk@1.80 Ea 1,360.00 90.18 0.34 1,450.52
30 HP motor lk@2.00 Ea 1,970.00 100.20 0.38 2,070.58
40 HP motor lk@2.30 Ea 2,490.00 115.20 0.44 2,605.64
50 HP motor lk@2.75 Ea 2,800.00 137.80 0.52 2,938.32
60 HP motor lk@3.50 Ea 3,510.00 175.40 0.67 3,686.07
75 HP motor lk@4.00 Ea 4,100.00 200.40 0.76 4,301.16
100 HP motor lk@6.00 Ea 5,000.00 300.60 1.14 5,301.74
125 HP motor lk@7.00 Ea 5,780.00 350.70 1.33 6,132.03
150 HP motor lk@9.00 Ea 7,130.00 450.90 1.71 7,582.61
200 HP motor lk@12.0 Ea 8,800.00 601.20 2.28 9,403.48

Electric motors, AC, three phase, 460 volt


Using small tools.
1/2 HP motor lk@.700 Ea 299.00 35.07 0.13 334.20
3/4 HP motor lk@.800 Ea 312.00 40.08 0.15 352.23
1 HP motor lk@.800 Ea 334.00 40.08 0.15 374.23
1-1/2 HP motor lk@.800 Ea 355.00 40.08 0.15 395.23
2 HP motor lk@.800 Ea 359.00 40.08 0.15 399.23
3 HP motor lk@.900 Ea 428.00 45.09 0.17 473.26
5 HP motor lk@.900 Ea 436.00 45.09 0.17 481.26
7-1/2 HP motor lk@.950 Ea 513.00 47.60 0.18 560.78
10 HP motor lk@1.00 Ea 685.00 50.10 0.19 735.29
15 HP motor lk@1.00 Ea 1,860.00 50.10 0.19 1,910.29
20 HP motor lk@1.00 Ea 2,080.00 50.10 0.19 2,130.29
25 HP motor lk@1.15 Ea 1,740.00 57.62 0.22 1,797.84
30 HP motor lk@1.30 Ea 1,970.00 65.13 0.25 2,035.38
40 HP motor lk@1.45 Ea 2,490.00 72.65 0.28 2,562.93
50 HP motor lk@1.50 Ea 2,800.00 75.15 0.29 2,875.44
60 HP motor lk@1.80 Ea 3,510.00 90.18 0.34 3,600.52
75 HP motor lk@2.10 Ea 4,100.00 105.20 0.40 4,205.60
100 HP motor lk@2.60 Ea 5,000.00 130.30 0.49 5,130.79
125 HP motor lk@3.00 Ea 5,780.00 150.30 0.57 5,930.87
150 HP motor lk@3.50 Ea 7,130.00 175.40 0.67 7,306.07
200 HP motor lk@5.00 Ea 8,800.00 250.50 0.95 9,051.45
2015 Heavy Construction Estimator, All Rights Reserved Page 717

CSI 16-152, Motor mounting

Drip-proof squirrel cage motor mounting


460 volt, 3 phase, 1,800 RPM. Includes mounting motor on the base but not the motor or base, using
small tools.
1/2 HP motor mount lk@.500 Ea -- 25.05 0.10 25.15
3/4 HP motor mount lk@.500 Ea -- 25.05 0.10 25.15
1 HP motor mount lk@.500 Ea -- 25.05 0.10 25.15
1-1/2 HP motor mount lk@.500 Ea -- 25.05 0.10 25.15
2 HP motor mount lk@.600 Ea -- 30.06 0.11 30.17
3 HP motor mount lk@.600 Ea -- 30.06 0.11 30.17
5 HP motor mount lk@.600 Ea -- 30.06 0.11 30.17
7-1/2 HP motor mount lk@.600 Ea -- 30.06 0.11 30.17
10 HP motor mount lk@.700 Ea -- 35.07 0.13 35.20
15 HP motor mount lk@.700 Ea -- 35.07 0.13 35.20
20 HP motor mount lk@.750 Ea -- 37.58 0.14 37.72
25 HP motor mount lk@.750 Ea -- 37.58 0.14 37.72
30 HP motor mount lk@.800 Ea -- 40.08 0.15 40.23
40 HP motor mount lk@.850 Ea -- 42.59 0.16 42.75
50 HP motor mount lk@.900 Ea -- 45.09 0.17 45.26
75 HP motor mount lk@.950 Ea -- 47.60 0.18 47.78
100 HP motor mount lk@1.00 Ea -- 50.10 0.19 50.29
125 HP motor mount lk@1.15 Ea -- 57.62 0.22 57.84
150 HP motor mount lk@1.25 Ea -- 62.63 0.24 62.87
200 HP motor mount lk@1.50 Ea -- 75.15 0.29 75.44

CSI 16-155, Motor starters

Manual motor starters, non-reversing - 120/240 volt, 1 phase


Includes 2-pole toggle switch with pilot light, using small tools.
NEMA 1 lk@.600 Ea 83.30 30.06 0.11 113.47
NEMA 4 lk@1.00 Ea 194.00 50.10 0.19 244.29
NEMA 7 and 9 lk@1.25 Ea 242.00 62.63 0.24 304.87

Manual motor starters, non-reversing - 480 volt, 3-phase


Without pilot light, using small tools.
Size 0, NEMA 1 enclosure lk@.500 Ea 158.00 25.05 0.10 183.15
Size 1, NEMA 1 enclosure lk@.500 Ea 200.00 25.05 0.10 225.15
Size 00, NEMA 1 enclosure lk@.500 Ea 255.00 25.05 0.10 280.15
Size 0, NEMA 4 enclosure lk@.600 Ea 428.00 30.06 0.11 458.17
Size 1, NEMA 4 enclosure lk@.600 Ea 529.00 30.06 0.11 559.17
Size 0, NEMA 7 and 9 enclosure lk@.750 Ea 546.00 37.58 0.14 583.72
Size 1, NEMA 7 and 9 enclosure lk@.750 Ea 648.00 37.58 0.14 685.72

Magnetic motor starters - NEMA 1 enclosure, 3-phase, 3-wire


60 Hz, non-reversing, using small tools.
Size 0, 230 volt at 3 HP,
480 volt at 5 HP lk@1.00 Ea 184.00 50.10 0.19 234.29
Size 1, 230 volt at 7.5 HP,
480 volt at 10 HP lk@1.25 Ea 214.00 62.63 0.24 276.87
Size 2, 208 volt at 10 HP, 230 volt at 15 HP,
480 volt at 25 HP lk@1.50 Ea 428.00 75.15 0.29 503.44
Size 3, 208 volt at 25 HP, 230 volt at 30 HP,
480 volt at 50 HP lk@1.75 Ea 714.00 87.68 0.33 802.01
Size 4, 208 volt at 40 HP, 230 volt at 50 HP,
480 volt at 100 HP lk@2.50 Ea 1,680.00 125.30 0.48 1,805.78
Size 5, 208 volt at 75 HP, 230 volt at 100 HP,
2015 Heavy Construction Estimator, All Rights Reserved Page 717 (part 2)

480 volt at 200 HP lk@4.75 Ea 3,110.00 238.00 0.90 3,348.90

Magnetic motor starters - NEMA 4 enclosure, 3-phase, 3-wire


60 Hz, non-reversing, using small tools.
Size 0, 230 volt at 3 HP,
480 volt at 5 HP lk@1.50 Ea 288.00 75.15 0.29 363.44
Size 1, 230 volt at 7.5 HP,
480 volt at 10 HP lk@1.75 Ea 314.00 87.68 0.33 402.01
Size 2, 208 volt at 10 HP, 230 volt at 15 HP,
480 volt at 25 HP lk@2.00 Ea 628.00 100.20 0.38 728.58
Size 3, 208 volt at 25 HP, 230 volt at 30 HP,
480 volt at 50 HP lk@2.25 Ea 968.00 112.70 0.43 1,081.13
Size 4, 208 volt at 40 HP, 230 volt at 50 HP,
480 volt at 100 HP lk@2.50 Ea 1,990.00 125.30 0.48 2,115.78
Size 5, 208 volt at 75 HP, 230 volt at 100 HP,
480 volt at 200 HP lk@6.00 Ea 3,580.00 300.60 1.14 3,881.74
2015 Heavy Construction Estimator, All Rights Reserved Page 718

Magnetic motor starters - NEMA 1 enclosure, 3-phase, 3-wire


60 Hz, reversing, using small tools.
Size 00, 230 volt at 1.5 HP,
480 volt at 2 HP lk@1.50 Ea 332.00 75.15 0.29 407.44
Size 0, 230 volt at 3 HP,
480 volt at 5 HP lk@1.50 Ea 332.00 75.15 0.29 407.44
Size 1, 230 volt at 7.5 HP,
480 volt at 10 HP lk@1.75 Ea 384.00 87.68 0.33 472.01
Size 2, 208 volt at 10 HP, 230 volt at 15 HP,
480 volt at 25 HP lk@2.50 Ea 695.00 125.30 0.48 820.78
Size 3, 208 volt at 25 HP, 230 volt at 30 HP,
480 volt at 50 HP lk@3.00 Ea 1,250.00 150.30 0.57 1,400.87
Size 4, 208 volt at 40 HP, 230 volt at 50 HP,
480 volt at 100 HP lk@4.00 Ea 3,040.00 200.40 0.76 3,241.16
Size 5, 208 volt at 75 HP, 230 volt at 100 HP,
480 volt at 200 HP lk@6.00 Ea 6,400.00 300.60 1.14 6,701.74

Magnetic motor starters - NEMA 4 enclosure, 3-phase, 3-wire


60 Hz, reversing, using small tools.
Size 00, 230 volt at 1.5 HP,
480 volt at 2 HP lk@2.00 Ea 532.00 100.20 0.38 632.58
Size 0, 230 volt at 3 HP,
480 volt at 5 HP lk@2.00 Ea 532.00 100.20 0.38 632.58
Size 1, 230 volt at 7.5 HP,
480 volt at 10 HP lk@2.00 Ea 663.00 100.20 0.38 763.58
Size 2, 208 volt at 10 HP, 230 volt at 15 HP,
480 volt at 25 HP lk@3.00 Ea 1,200.00 150.30 0.57 1,350.87
Size 3, 208 volt at 25 HP, 230 volt at 30 HP,
480 volt at 50 HP lk@3.50 Ea 1,920.00 175.40 0.67 2,096.07
Size 4, 208 volt at 40 HP, 230 volt at 50 HP,
480 volt at 100 HP lk@4.50 Ea 4,230.00 225.50 0.86 4,456.36
Size 5, 208 volt at 75 HP, 230 volt at 100 HP,
480 volt at 200 HP lk@6.50 Ea 7,350.00 325.70 1.24 7,676.94

Local, remote selector switches, 3 position


For reversing motor, using small tools.
For NEMA 1 enclosure lk@1.00 Ea 51.40 50.10 0.19 101.69

Reduced voltage auto transformer starters - NEMA 1 enclosure


240 to 600 volts, 3 pole, non-reversing, using small tools.
Size 3, 50 HP lk@6.00 Ea 2,870.00 300.60 1.14 3,171.74
Size 4, 100 HP lk@8.00 Ea 5,240.00 400.80 1.52 5,642.32
Size 5, 200 HP lk@9.00 Ea 9,560.00 450.90 1.71 10,012.61
Size 6, 300 HP lk@12.0 Ea 24,300.00 601.20 2.28 24,903.48
Size 7, 600 HP lk@16.0 Ea 39,100.00 801.60 3.04 39,904.64

Combination starters - NEMA 1 with disconnect switch


Non-reversing, 240 to 600 volts, 3 pole, using small tools.
Size 0 lk@1.25 Ea 478.00 62.63 0.24 540.87
Size 1 lk@1.25 Ea 504.00 62.63 0.24 566.87
Size 2 lk@1.50 Ea 799.00 75.15 0.29 874.44
Size 3 lk@2.00 Ea 1,330.00 100.20 0.38 1,430.58
Size 4 lk@3.00 Ea 2,560.00 150.30 0.57 2,710.87
Size 5 lk@6.00 Ea 5,760.00 300.60 1.14 6,061.74

Combination starters - NEMA 4 with disconnect switch


Non-reversing, 240 to 600 volts, 3 pole, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 718 (part 2)

Size 0 lk@1.50 Ea 982.00 75.15 0.29 1,057.44


Size 1 lk@1.50 Ea 1,010.00 75.15 0.29 1,085.44
Size 2 lk@2.00 Ea 1,580.00 100.20 0.38 1,680.58
Size 3 lk@3.00 Ea 2,680.00 150.30 0.57 2,830.87
Size 4 lk@4.00 Ea 4,300.00 200.40 0.76 4,501.16
Size 5 lk@7.00 Ea 10,200.00 350.70 1.33 10,552.03

Combination starters - NEMA 1 with circuit breaker


Non-reversing, 240 to 600 volts, 3 pole, using small tools.
Size 0 lk@1.25 Ea 667.00 62.63 0.24 729.87
Size 1 lk@1.25 Ea 693.00 62.63 0.24 755.87
Size 2 lk@1.50 Ea 982.00 75.15 0.29 1,057.44
Size 3 lk@2.00 Ea 1,430.00 100.20 0.38 1,530.58
Size 4 lk@3.00 Ea 3,140.00 150.30 0.57 3,290.87
2015 Heavy Construction Estimator, All Rights Reserved Page 719

Size 5 lk@4.00 Ea 7,270.00 200.40 0.76 7,471.16

Combination starters - NEMA 4 with circuit breaker


Non-reversing, 240 to 600 volts, 3 pole, using small tools.
Size 0 lk@1.50 Ea 1,170.00 75.15 0.29 1,245.44
Size 1 lk@1.50 Ea 1,200.00 75.15 0.29 1,275.44
Size 2 lk@2.00 Ea 1,760.00 100.20 0.38 1,860.58
Size 3 lk@3.00 Ea 2,780.00 150.30 0.57 2,930.87
Size 4 lk@4.00 Ea 4,870.00 200.40 0.76 5,071.16
Size 5 lk@7.00 Ea 9,590.00 350.70 1.33 9,942.03

Reversing combination starters - NEMA 1 with disconnect switch


240 to 600 volt, 3 pole, using small tools.
Size 0 lk@3.00 Ea 800.00 150.30 0.57 950.87
Size 1 lk@3.00 Ea 854.00 150.30 0.57 1,004.87
Size 2 lk@4.00 Ea 1,430.00 200.40 0.76 1,631.16
Size 3 lk@5.00 Ea 2,360.00 250.50 0.95 2,611.45
Size 4 lk@6.00 Ea 4,950.00 300.60 1.14 5,251.74

Reversing combination starters - NEMA 1 with circuit breaker


240 to 600 volt, 3 pole, using small tools.
Size 0 lk@3.00 Ea 940.00 150.30 0.57 1,090.87
Size 1 lk@3.00 Ea 1,000.00 150.30 0.57 1,150.87
Size 2 lk@4.00 Ea 1,600.00 200.40 0.76 1,801.16
Size 3 lk@5.00 Ea 2,120.00 250.50 0.95 2,371.45
Size 4 lk@6.00 Ea 5,430.00 300.60 1.14 5,731.74

Adjustable voltage drives for DC motors


Stainless steel, dynamic braking, solid state, using small tools.
0.5 to 1.5 HP, reversible lk@2.00 Ea 1,070.00 100.20 0.38 1,170.58
0.5 to 2.0 HP, non-reversible lk@2.00 Ea 1,370.00 100.20 0.38 1,470.58

CSI 16-170, Motor and circuit disconnects

Safety switches, 3 phase, NEMA 1 enclosure - 240 volt class, with fuses
Heavy duty fusible switch, using small tools.
30 amp, 3 to 7 HP lk@.500 Ea 68.10 25.05 0.10 93.25
60 amp, 7 to 15 HP lk@.700 Ea 130.00 35.07 0.13 165.20
100 amp, 15 to 30 HP lk@1.00 Ea 193.00 50.10 0.19 243.29
200 amp, 25 to 60 HP lk@1.50 Ea 308.00 75.15 0.29 383.44
400 amp, 50 to 100HP lk@2.00 Ea 727.00 100.20 0.38 827.58
600 amp, 75 to 100HP lk@4.00 Ea 1,230.00 200.40 0.76 1,431.16

Safety switches, 3 phase, NEMA 1 enclosure - 600 volt class, with fuses
Heavy duty fusible switch, using small tools.
30 amp, 3 to 7 HP lk@.500 Ea 136.00 25.05 0.10 161.15
60 amp, 7 to 15 HP lk@.700 Ea 164.00 35.07 0.13 199.20
100 amp, 15 to 30 HP lk@1.00 Ea 304.00 50.10 0.19 354.29
200 amp, 25 to 60 HP lk@1.50 Ea 440.00 75.15 0.29 515.44
400 amp, 50 to 100HP lk@2.00 Ea 1,060.00 100.20 0.38 1,160.58
600 amp, 75 to 100HP lk@4.00 Ea 1,670.00 200.40 0.76 1,871.16

Safety switches, 3 phase, NEMA 1 enclosure - 240 volt class, non-fusible


Heavy duty, using small tools.
30 amp lk@.500 Ea 56.90 25.05 0.10 82.05
60 amp lk@.700 Ea 114.00 35.07 0.13 149.20
100 amp lk@1.00 Ea 181.00 50.10 0.19 231.29
2015 Heavy Construction Estimator, All Rights Reserved Page 719 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 720

200 amp lk@1.50 Ea 330.00 75.15 0.29 405.44


400 amp lk@2.00 Ea 855.00 100.20 0.38 955.58
600 amp lk@4.00 Ea 1,620.00 200.40 0.76 1,821.16

Safety switches, 3 phase, NEMA 1 enclosure - 600 volt class, non-fusible


Heavy duty, using small tools.
30 amp lk@.500 Ea 73.30 25.05 0.10 98.45
60 amp lk@.700 Ea 130.00 35.07 0.13 165.20
100 amp lk@1.00 Ea 207.00 50.10 0.19 257.29
200 amp lk@1.50 Ea 320.00 75.15 0.29 395.44
400 amp lk@2.00 Ea 751.00 100.20 0.38 851.58
600 amp lk@4.00 Ea 1,380.00 200.40 0.76 1,581.16

Safety switches, 3 phase, NEMA 3R enclosure - 240 volt class, with fuses
Heavy duty fusible switch, using small tools.
30 amp lk@.500 Ea 84.80 25.05 0.10 109.95
60 amp lk@.700 Ea 128.00 35.07 0.13 163.20
100 amp lk@1.00 Ea 236.00 50.10 0.19 286.29
200 amp lk@1.50 Ea 411.00 75.15 0.29 486.44
400 amp lk@2.00 Ea 996.00 100.20 0.38 1,096.58
600 amp lk@4.00 Ea 2,080.00 200.40 0.76 2,281.16

Safety switches, 3 phase, NEMA 3R enclosure - 600 volt class, with fuses
Heavy duty fusible switch, using small tools.
30 amp lk@.500 Ea 230.00 25.05 0.10 255.15
60 amp lk@.700 Ea 269.00 35.07 0.13 304.20
100 amp lk@1.00 Ea 420.00 50.10 0.19 470.29
200 amp lk@1.50 Ea 582.00 75.15 0.29 657.44
400 amp lk@2.00 Ea 1,360.00 100.20 0.38 1,460.58
600 amp lk@4.00 Ea 2,680.00 200.40 0.76 2,881.16

Safety switches, 3 phase, NEMA 3R enclosure - 240 volt class, non-fusible


Heavy duty, using small tools.
30 amp lk@.500 Ea 128.00 25.05 0.10 153.15
60 amp lk@.700 Ea 225.00 35.07 0.13 260.20
100 amp lk@1.00 Ea 313.00 50.10 0.19 363.29
200 amp lk@1.50 Ea 380.00 75.15 0.29 455.44

Safety switches, 3 phase, NEMA 3R enclosure - 600 volt class, non-fusible


Heavy duty, using small tools.
30 amp lk@.500 Ea 128.00 25.05 0.10 153.15
60 amp lk@.700 Ea 225.00 35.07 0.13 260.20
100 amp lk@1.00 Ea 313.00 50.10 0.19 363.29
200 amp lk@1.50 Ea 380.00 75.15 0.29 455.44
400 amp lk@2.00 Ea 945.00 100.20 0.38 1,045.58
600 amp lk@4.00 Ea 1,890.00 200.40 0.76 2,091.16

Safety switches, 1 phase, 2 pole, NEMA 1 enclosure - 240 volt class, with fuses
Heavy duty fusible switch, using small tools.
30 amp lk@.500 Ea 38.80 25.05 0.10 63.95
60 amp lk@.700 Ea 97.60 35.07 0.13 132.80
100 amp lk@1.00 Ea 154.00 50.10 0.19 204.29
200 amp lk@1.50 Ea 289.00 75.15 0.29 364.44
400 amp lk@2.00 Ea 679.00 100.20 0.38 779.58
2015 Heavy Construction Estimator, All Rights Reserved Page 721

General duty non-fusible safety switches


1 phase, 2 pole, 240 volts, NEMA 3R, using small tools.
60 amp lk@.500 Ea 25.70 25.05 0.10 50.85

Heavy duty fused safety switches


3 phase, 3 pole, NEMA 7 and NEMA 9 enclosure, 600 volt, using small tools.
30 to 60 amps heavy duty fused disc lk@.900 Ea 1,230.00 45.09 0.17 1,275.26
100 amp lk@1.25 Ea 1,520.00 62.63 0.24 1,582.87
200 amp lk@1.50 Ea 3,420.00 75.15 0.29 3,495.44

CSI 16-182, Circuit breakers not in panelboards

Molded case breakers - NEMA 1 enclosed, standard air interrupt capacity


Using small tools.
1 pole, 240 volt, 15 to 60 amp lk@.500 Ea 64.40 25.05 0.10 89.55
2 pole, 240 volt, 15 to 60 amp lk@.550 Ea 144.00 27.56 0.10 171.66
2 pole, 240 volt, 70 to 100 amp lk@.700 Ea 415.00 35.07 0.13 450.20
2 pole, 480 volt, 15 to 60 amp lk@.550 Ea 751.00 27.56 0.10 778.66
2 pole, 480 volt, 70 to 100 amp lk@.700 Ea 967.00 35.07 0.13 1,002.20
2 pole, 240 volt, 100 to 225 amp lk@1.60 Ea 1,690.00 80.16 0.30 1,770.46
2 pole, 600 volt, 100 to 225 amp lk@1.60 Ea 2,750.00 80.16 0.30 2,830.46
3 pole, 240 volt, 15 to 60 amp lk@.550 Ea 527.00 27.56 0.10 554.66
3 pole, 480 volt, 15 to 60 amp lk@.550 Ea 967.00 27.56 0.10 994.66
3 pole, 240 volt, 70 to 100 amp lk@.700 Ea 805.00 35.07 0.13 840.20
3 pole, 480 volt, 70 to 100 amp lk@.700 Ea 1,150.00 35.07 0.13 1,185.20
3 pole, 240 volt, 100 to 225 amp lk@1.60 Ea 1,030.00 80.16 0.30 1,110.46
3 pole, 600 volt, 100 to 225 amp lk@1.60 Ea 3,380.00 80.16 0.30 3,460.46

CSI 16-211, Motor generator sets

Diesel driven motor generators, 480/277 volt or 208/120 volt


Radiator cooled, 1800 RPM, 3 phase, 4 wire. Includes fuel tank, auto transfer switch, battery charger,
indicating and operating controls. Not including concrete pad, utility piping, or wiring, using a 40-ton
hydraulic crane with 84’ boom, and small tools.
30 kw lr@5.00 Ea 23,600.00 250.20 15.40 23,865.60
40 kw lr@6.00 Ea 25,900.00 300.20 18.40 26,218.60
50 kw lr@6.00 Ea 31,000.00 300.20 18.40 31,318.60
60 kw lr@7.00 Ea 33,000.00 350.20 21.50 33,371.70
75 kw lr@8.00 Ea 49,400.00 400.20 24.60 49,824.80
80 kw lr@12.0 Ea 36,700.00 600.40 36.80 37,337.20
100 kw lr@14.0 Ea 42,400.00 700.40 43.00 43,143.40
125 kw lr@15.0 Ea 48,500.00 750.50 46.10 49,296.60
150 kw lr@16.0 Ea 54,600.00 800.50 49.10 55,449.60
175 kw lr@18.0 Ea 58,900.00 900.50 55.30 59,855.80
200 kw lr@20.0 Ea 63,000.00 1,001.00 61.40 64,062.40
250 kw lr@24.0 Ea 69,700.00 1,201.00 73.70 70,974.70
275 kw lr@25.0 Ea 82,400.00 1,251.00 76.80 83,727.80
300 kw lr@26.0 Ea 82,900.00 1,301.00 79.80 84,280.80
350 kw lr@28.0 Ea 88,300.00 1,401.00 86.00 89,787.00
400 kw lr@30.0 Ea 118,000.00 1,501.00 92.10119,593.10
500 kw lr@32.0 Ea 144,000.00 1,601.00 98.20145,699.20
600 kw lr@34.0 Ea 166,000.00 1,701.00 104.00167,805.00
650 kw lr@36.0 Ea 219,000.00 1,801.00 111.00220,912.00
750 kw lr@38.0 Ea 219,000.00 1,901.00 117.00221,018.00
800 kw lr@40.0 Ea 235,000.00 2,001.00 123.00237,124.00
900 kw lr@44.0 Ea 266,000.00 2,201.00 135.00268,336.00
1000 kw lr@48.0 Ea 294,000.00 2,401.00 147.00296,548.00
2015 Heavy Construction Estimator, All Rights Reserved Page 721 (part 2)

Gas turbine generator sets


Includes fuel tank, auto transfer switch, battery charger, indicating and operating controls. Not including
concrete pad, utility piping, or wiring, using a 40-ton hydraulic crane with 84’ boom, and small tools.
500 kw, 625 KVA, 1800 RPM lr@125. Ea 820,000.00 6,254.00 384.00826,638.00
820 kw, 1025 KVA, 3000 RPM lr@150. Ea 820,000.00 7,505.00 461.00827,966.00
2500 kw, 3125 KVA, 1800 RPM lr@175. Ea 2,050,000.00 8,755.00 537.002,059,292.00
9000 kw, 4812 KVA, 14500 RPM lr@225. Ea 2,470,000.00 11,260.00 691.002,481,951.00
2015 Heavy Construction Estimator, All Rights Reserved Page 722

460 volt AC to 250 volt DC converter


3 phase AC motor drive, using a 40-ton hydraulic crane with 84’ boom, and small tools.
33 kw lr@12.0 Ea 9,610.00 600.40 36.80 10,247.20
40 kw lr@12.0 Ea 10,200.00 600.40 36.80 10,837.20
50 kw lr@12.0 Ea 11,400.00 600.40 36.80 12,037.20
65 kw lr@14.0 Ea 13,800.00 700.40 43.00 14,543.40
85 kw lr@16.0 Ea 16,100.00 800.50 49.10 16,949.60
100 kw lr@28.0 Ea 18,300.00 1,401.00 86.00 19,787.00
125 kw lr@30.0 Ea 21,400.00 1,501.00 92.10 22,993.10

4,160 volt AC to 250 or 500 volt DC converter


3 phase AC motor drive, using a 40-ton hydraulic crane with 84’ boom, and small tools.
170 kw lr@36.0 Ea 35,500.00 1,801.00 111.00 37,412.00
200 kw lr@40.0 Ea 38,600.00 2,001.00 123.00 40,724.00
240 kw lr@48.0 Ea 46,600.00 2,401.00 147.00 49,148.00
320 kw lr@52.0 Ea 52,700.00 2,602.00 160.00 55,462.00
400 kw lr@60.0 Ea 63,300.00 3,002.00 184.00 66,486.00
560 kw lr@65.0 Ea 90,900.00 3,252.00 200.00 94,352.00
640 kw lr@72.0 Ea 92,400.00 3,602.00 221.00 96,223.00
800 kw lr@80.0 Ea 108,000.00 4,002.00 246.00112,248.00

Solid state, non-motor driven AC to DC converter


60 Hz AC input, 230 or 460 volt AC DC output, rectifier, using small tools.
3 kw, 24 amp to 125 volt DC lk@2.00 Ea 4,670.00 100.20 0.38 4,770.58
5 kw, 40 amp to 125 volt DC lk@2.00 Ea 5,740.00 100.20 0.38 5,840.58
7.5 kw, 60 amp to 125 volt DC lk@2.00 Ea 7,690.00 100.20 0.38 7,790.58
10 kw, 80 amp to 125 volt DC lk@2.50 Ea 7,750.00 125.30 0.48 7,875.78
15 kw, 120 amp to 125 volt DC lk@2.75 Ea 8,570.00 137.80 0.52 8,708.32
20 kw, 160 amp to 125 volt DC lk@3.00 Ea 9,300.00 150.30 0.57 9,450.87
25 kw, 200 amp to 125 volt DC lk@3.00 Ea 9,760.00 150.30 0.57 9,910.87
40 kw, 320 amp to 125 volt DC lk@4.00 Ea 11,800.00 200.40 0.76 12,001.16
50 kw, 400 amp to 125 volt DC lk@6.00 Ea 11,800.00 300.60 1.14 12,101.74
3 kw, 12 amp to 250 volt DC lk@2.00 Ea 5,440.00 100.20 0.38 5,540.58
5 kw, 20 amp to 250 volt DC lk@2.00 Ea 6,540.00 100.20 0.38 6,640.58
7.5 kw, 30 amp to 250 volt DC lk@2.00 Ea 7,520.00 100.20 0.38 7,620.58
10 kw, 40 amp to 250 volt DC lk@2.50 Ea 7,730.00 125.30 0.48 7,855.78
15 kw, 60 amp to 250 volt DC lk@2.75 Ea 8,730.00 137.80 0.52 8,868.32
20 kw, 80 amp to 250 volt DC lk@3.00 Ea 9,630.00 150.30 0.57 9,780.87
25 kw, 100 amp to 250 volt DC lk@3.00 Ea 9,960.00 150.30 0.57 10,110.87
40 kw, 160 amp to 250 volt DC lk@4.00 Ea 11,800.00 200.40 0.76 12,001.16
50 kw, 200 amp to 250 volt DC lk@6.00 Ea 12,500.00 300.60 1.14 12,801.74

120/240 Volt AC gasoline generator sets


Using small tools.
5 kw generator lk@25.0 Ea 7,610.00 1,253.00 4.75 8,867.75
7.5 kw generator lk@27.0 Ea 10,000.00 1,353.00 5.13 11,358.13
10 kw generator lk@30.0 Ea 13,800.00 1,503.00 5.70 15,308.70
15 kw generator lk@32.0 Ea 16,600.00 1,603.00 6.08 18,209.08
30 kw generator lk@36.0 Ea 21,600.00 1,804.00 6.84 23,410.84

CSI 16-251, Automatic transfer equipment

Automatic transfer switches - Two pole breaker


NEMA 1 enclosure, split panel, solid state logic, 3 wire, 120/240 volt, single phase, using small tools.
30 amp lk@2.00 Ea 1,770.00 100.20 0.38 1,870.58
70 amp lk@2.50 Ea 3,100.00 125.30 0.48 3,225.78
100 amp lk@3.00 Ea 3,840.00 150.30 0.57 3,990.87
2015 Heavy Construction Estimator, All Rights Reserved Page 722 (part 2)

225 amp lk@6.00 Ea 5,310.00 300.60 1.14 5,611.74


400 amp lk@8.00 Ea 7,380.00 400.80 1.52 7,782.32
600 amp lk@10.0 Ea 10,300.00 501.00 1.90 10,802.90
800 amp lk@12.0 Ea 11,800.00 601.20 2.28 12,403.48
2015 Heavy Construction Estimator, All Rights Reserved Page 723

Automatic transfer switches - Three pole breaker


NEMA 1 enclosure, split panel, solid state, 3 or 4 wire, 600 volt, 3 phase, using small tools.
30 amp lk@2.00 Ea 2,050.00 100.20 0.38 2,150.58
70 amp lk@2.50 Ea 3,770.00 125.30 0.48 3,895.78
100 amp lk@3.00 Ea 4,100.00 150.30 0.57 4,250.87
225 amp lk@6.00 Ea 5,900.00 300.60 1.14 6,201.74
400 amp lk@8.00 Ea 8,520.00 400.80 1.52 8,922.32
600 amp lk@10.0 Ea 10,800.00 501.00 1.90 11,302.90
800 amp lk@12.0 Ea 11,800.00 601.20 2.28 12,403.48

Automatic transfer switches - Four pole breaker


NEMA 1 enclosure, spit panel, solid state, logic, 3 or 4 wire, 600 volt, 3 phase, using small tools.
30 amp lk@4.00 Ea 4,140.00 200.40 0.76 4,341.16
70 amp lk@3.50 Ea 5,050.00 175.40 0.67 5,226.07
104 amp lk@4.00 Ea 6,070.00 200.40 0.76 6,271.16
225 amp lk@7.00 Ea 6,560.00 350.70 1.33 6,912.03
400 amp lk@9.00 Ea 9,340.00 450.90 1.71 9,792.61
600 amp lk@11.0 Ea 11,500.00 551.10 2.09 12,053.19
800 amp lk@13.0 Ea 13,100.00 651.30 2.47 13,753.77

Manual transfer switches


Using small tools.
Fused, 3 pole, 480 volt, 60 amp lk@1.50 Ea 491.00 75.15 0.29 566.44

Contactor type transfer switches - 3 pole with switched neutral


NEMA 1 enclosure, with inphase monitor and exerciser, using small tools.
30 amp lk@3.00 Ea 7,240.00 150.30 0.57 7,390.87
70 amp lk@3.50 Ea 7,370.00 175.40 0.67 7,546.07
100 amp lk@4.00 Ea 7,890.00 200.40 0.76 8,091.16
150 amp lk@6.00 Ea 8,910.00 300.60 1.14 9,211.74
260 amp lk@7.00 Ea 12,300.00 350.70 1.33 12,652.03
400 amp lk@9.00 Ea 14,900.00 450.90 1.71 15,352.61
600 amp lp@11.0 Ea 20,600.00 545.60 2.20 21,147.80
800 amp lp@13.0 Ea 24,200.00 644.80 2.60 24,847.40
1000 amp lp@16.0 Ea 38,600.00 793.60 3.20 39,396.80
1200 amp lp@18.0 Ea 39,800.00 892.80 3.60 40,696.40

Contactor type transfer switches - 3 pole with switched neutral


NEMA 1 enclosure, with inphase monitor and exerciser, using a boom truck and small tools.
1600 amp ln@20.0 Ea 50,400.00 996.20 27.80 51,424.00
2000 amp ln@24.0 Ea 52,200.00 1,195.00 33.40 53,428.40
3000 amp ln@28.0 Ea 89,400.00 1,395.00 38.90 90,833.90
4000 amp ln@30.0 Ea 123,000.00 1,494.00 41.70124,535.70

Contactor type transfer switches - 3 pole with bypass isolation switch


NEMA 1 enclosure, using small tools.
150 amp lp@7.00 Ea 19,800.00 347.20 1.40 20,148.60
260 amp lp@7.00 Ea 22,000.00 347.20 1.40 22,348.60
400 amp lp@9.00 Ea 29,900.00 446.40 1.80 30,348.20
600 amp lp@11.0 Ea 41,200.00 545.60 2.20 41,747.80
800 amp lp@13.0 Ea 48,800.00 644.80 2.60 49,447.40

Contactor type transfer switches - 3 pole with bypass isolation switch


NEMA 1 enclosure, using a boom truck and small tools.
1,000 amp ln@16.0 Ea 92,900.00 797.00 22.20 93,719.20
1,200 amp ln@18.0 Ea 105,000.00 896.60 25.00105,921.60
2015 Heavy Construction Estimator, All Rights Reserved Page 723 (part 2)

1,600 amp ln@20.0 Ea 135,000.00 996.20 27.80136,024.00


2015 Heavy Construction Estimator, All Rights Reserved Page 724

2,000 amp ln@24.0 Ea 151,000.00 1,195.00 33.40152,228.40

Contactor type transfer switches - 3 pole with switched neutral and bypass isolation
NEMA 1 enclosure, using small tools.
150 amp lp@7.00 Ea 27,800.00 347.20 1.40 28,148.60
260 amp lp@7.00 Ea 30,500.00 347.20 1.40 30,848.60
400 amp lp@9.00 Ea 44,400.00 446.40 1.80 44,848.20
600 amp lp@11.0 Ea 60,100.00 545.60 2.20 60,647.80
800 amp lp@13.0 Ea 69,900.00 644.80 2.60 70,547.40

Contactor type transfer switches - 3 pole with switched neutral and bypass isolation
NEMA 1 enclosure, using a boom truck and small tools.
1,000 amp ln@16.0 Ea 121,000.00 797.00 22.20121,819.20
1,200 amp ln@18.0 Ea 138,000.00 896.60 25.00138,921.60
1,600 amp ln@20.0 Ea 178,000.00 996.20 27.80179,024.00
2,000 amp ln@24.0 Ea 198,000.00 1,195.00 33.40199,228.40

Contactor type transfer switches - 3 pole, NEMA 1 enclosure


Using small tools.
30 amp lk@3.00 Ea 8,140.00 150.30 0.57 8,290.87
70 amp lk@3.50 Ea 8,230.00 175.40 0.67 8,406.07
100 amp lk@4.00 Ea 8,370.00 200.40 0.76 8,571.16
150 amp lk@6.00 Ea 9,270.00 300.60 1.14 9,571.74
260 amp lk@7.00 Ea 13,900.00 350.70 1.33 14,252.03
400 amp lk@9.00 Ea 15,400.00 450.90 1.71 15,852.61
600 amp lp@11.0 Ea 22,600.00 545.60 2.20 23,147.80
800 amp lp@13.0 Ea 26,700.00 644.80 2.60 27,347.40
1,000 amp lp@16.0 Ea 43,000.00 793.60 3.20 43,796.80
1,200 amp lp@18.0 Ea 44,600.00 892.80 3.60 45,496.40

Contactor type transfer switches - 3 pole, NEMA 1 enclosure


Using a boom truck and small tools.
1,600 amp ln@18.0 Ea 54,700.00 896.60 25.00 55,621.60
2,000 amp ln@20.0 Ea 55,700.00 996.20 27.80 56,724.00
3,000 amp ln@24.0 Ea 103,000.00 1,195.00 33.40104,228.40
4,000 amp ln@26.0 Ea 142,000.00 1,295.00 36.10143,331.10

CSI 16-252, Uninterrupted power system

Uninterrupted power supply - Single phase, 120 volt, 60 Hz output, 120 volt input
Includes static transfer and mechanical bypass switches and meters, using small tools.
5 KVA lk@8.00 Ea 12,800.00 400.80 1.52 13,202.32

Uninterrupted power supply - Single phase, 120 volt, 60 Hz output, 240 volt input
Using small tools.
5 KVA lk@8.00 Ea 12,800.00 400.80 1.52 13,202.32

Single phase, 120 volt, 60 Hz output, three phase, 208 volt input
Using small tools.
5 KVA lk@8.00 Ea 24,500.00 400.80 1.52 24,902.32
7.5 KVA lk@10.0 Ea 25,700.00 501.00 1.90 26,202.90
10 KVA lk@12.0 Ea 29,200.00 601.20 2.28 29,803.48
15 KVA lk@14.0 Ea 35,000.00 701.40 2.66 35,704.06

Single phase, 120 volt, 60 Hz output, three phase, 480 volt input
Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 724 (part 2)

5 KVA lk@8.00 Ea 24,500.00 400.80 1.52 24,902.32


7.5 KVA lk@10.0 Ea 25,700.00 501.00 1.90 26,202.90
10 KVA lk@12.0 Ea 29,200.00 601.20 2.28 29,803.48
15 KVA lk@14.0 Ea 35,000.00 701.40 2.66 35,704.06

Single phase, 220-240 volt, 50 Hz output, single phase, 220 volt input
Using small tools.
5 KVA lk@8.00 Ea 28,200.00 400.80 1.52 28,602.32
2015 Heavy Construction Estimator, All Rights Reserved Page 725

Single phase, 220-240 volt, 50 Hz output, single phase, 240 volt input
Using small tools.
5 KVA lk@8.00 Ea 28,200.00 400.80 1.52 28,602.32

Single phase, 220-240 volt, 50 Hz output, three phase, 380 volt input
Using small tools.
5 KVA lk@8.00 Ea 26,900.00 400.80 1.52 27,302.32
7.5 KVA lk@10.0 Ea 28,200.00 501.00 1.90 28,702.90
10 KVA lk@12.0 Ea 32,100.00 601.20 2.28 32,703.48
15 KVA lk@14.0 Ea 38,600.00 701.40 2.66 39,304.06

Single phase, 220-240 volt, 50 Hz output, 3 phase, 415 volt input


Using small tools.
5 KVA lk@8.00 Ea 26,900.00 400.80 1.52 27,302.32
7.5 KVA lk@10.0 Ea 28,200.00 501.00 1.90 28,702.90
10 KVA lk@12.0 Ea 32,100.00 601.20 2.28 32,703.48
15 KVA lk@14.0 Ea 38,600.00 701.40 2.66 39,304.06

Uninterrupted power supply - Power supply accessories


For single phase, 60 Hz uninterruptible power supply units, using small tools.
Remote status panel lk@2.00 Ea 848.00 100.20 0.38 948.58
External battery disconnect with enclosure,
5 KVA lk@.500 Ea 424.00 25.05 0.10 449.15
External battery disconnect with enclosure,
7.5 to 15 KVA lk@.500 Ea 763.00 25.05 0.10 788.15

Uninterrupted power supply - External power output transformers for UPS


120/240 volt, for single phase, 60 Hz uninterruptible power supply units, using small tools.
5 KVA lk@1.00 Ea 588.00 50.10 0.19 638.29
7.5 KVA lk@1.25 Ea 784.00 62.63 0.24 846.87
10 KVA lk@1.50 Ea 1,080.00 75.15 0.29 1,155.44
15 KVA lk@1.75 Ea 1,370.00 87.68 0.33 1,458.01

Uninterrupted power supply, 3 phase, 60 Hz output - 208 volt, 3 phase input


Includes static transfer switch, mechanical bypass switch, with full metering and alarms, using small
tools.
15 KVA, 120/208 volts out lp@8.00 Ea 42,100.00 396.80 1.60 42,498.40
30 KVA, 120/208 volts out lp@10.0 Ea 53,600.00 496.00 2.00 54,098.00
45 KVA, 120/208 volts out lp@12.0 Ea 73,800.00 595.20 2.40 74,397.60

Uninterrupted power supply, 3 phase, 60 Hz output - 480 volt, 3 phase input


Includes static transfer switch, mechanical bypass switch, with full metering and alarms, using small
tools.
15 KVA, 120/208 volts out lp@8.00 Ea 42,100.00 396.80 1.60 42,498.40
30 KVA, 120/208 volts out lp@10.0 Ea 53,600.00 496.00 2.00 54,098.00
45 KVA, 120/208 volts out lp@12.0 Ea 73,800.00 595.20 2.40 74,397.60

Uninterrupted power supply, 3 phase, 60 Hz output - 480 volt, 3 phase input


Includes static transfer switch, mechanical bypass switch, with full metering and alarms, using small
tools.
30 KVA, 277/480 volt out lp@10.0 Ea 53,600.00 496.00 2.00 54,098.00
45 KVA, 277/480 volt out lp@12.0 Ea 76,600.00 595.20 2.40 77,197.60

Uninterrupted power supply, 3 phase, 50 Hz output - 220 volt input, 380 volt output
Includes static transfer switch, mechanical bypass switch, with full metering and alarms, using small
tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 725 (part 2)

15 KVA lp@8.00 Ea 46,300.00 396.80 1.60 46,698.40


30 KVA lp@10.0 Ea 64,100.00 496.00 2.00 64,598.00
45 KVA lp@12.0 Ea 81,200.00 595.20 2.40 81,797.60

Uninterrupted power supply, 3 phase, 50 Hz output - 240 volt input, 415 volt output
Includes static transfer switch, mechanical bypass switch, with full metering and alarms, using small
tools.
15 KVA lp@8.00 Ea 51,000.00 396.80 1.60 51,398.40
30 KVA lp@10.0 Ea 70,500.00 496.00 2.00 70,998.00
45 KVA lp@12.0 Ea 89,300.00 595.20 2.40 89,897.60
2015 Heavy Construction Estimator, All Rights Reserved Page 726

Optional accessories for three phase output units


Using small tools.
Remote status panel lk@2.00 Ea 865.00 100.20 0.38 965.58
Digital information system lk@4.00 Ea 3,300.00 200.40 0.76 3,501.16

Battery power reserve - 5 minutes battery, with rack


Delivers full output load, lead-calcium wet cell maintenance free battery, high voltage disconnect,
internal fuse protection, system status and state of charge indicators, using small tools.
5 KVA lp@8.00 Ea 1,560.00 396.80 1.60 1,958.40
7.5 KVA lp@8.00 Ea 1,640.00 396.80 1.60 2,038.40
10 KVA lp@8.00 Ea 1,710.00 396.80 1.60 2,108.40
15 KVA lp@8.00 Ea 2,150.00 396.80 1.60 2,548.40
30 KVA lp@12.0 Ea 4,190.00 595.20 2.40 4,787.60
45 KVA lp@12.0 Ea 5,020.00 595.20 2.40 5,617.60

Battery power reserve - 15 minutes battery with rack


Delivers full output load, lead-calcium wet cell maintenance free battery, high voltage disconnect,
internal fuse protection, system status and state of charge indicators, using small tools.
5 KVA lp@8.00 Ea 1,950.00 396.80 1.60 2,348.40
7.5 KVA lp@8.00 Ea 2,080.00 396.80 1.60 2,478.40
10 KVA lp@12.0 Ea 2,510.00 595.20 2.40 3,107.60
15 KVA lp@12.0 Ea 3,630.00 595.20 2.40 4,227.60
30 KVA lp@12.0 Ea 6,940.00 595.20 2.40 7,537.60
45 KVA lp@14.0 Ea 8,650.00 694.40 2.80 9,347.20

Battery power reserve - 30 minutes battery, with rack


Delivers full output load, lead-calcium wet cell maintenance free battery, high voltage disconnect,
internal fuse protection, system status and state of charge indicators, using small tools.
5 KVA lp@8.00 Ea 2,080.00 396.80 1.60 2,478.40
7.5 KVA lp@12.0 Ea 2,510.00 595.20 2.40 3,107.60
10 KVA lp@12.0 Ea 3,630.00 595.20 2.40 4,227.60
15 KVA lp@14.0 Ea 4,840.00 694.40 2.80 5,537.20
30 KVA lp@14.0 Ea 10,100.00 694.40 2.80 10,797.20
45 KVA lp@16.0 Ea 19,000.00 793.60 3.20 19,796.80

CSI 16-311, Primary unit substations

Outdoor oil circuit breakers


Switchyard type, 14.4 thru 69 KV, 1,200 amp, frame mounted, using a 20-ton hydraulic crane with 70’
boom, small tools.
14.4 KV, 500 MVA ln@20.0 Ea 27,200.00 996.20 27.80 28,224.00
23.0 KV, 750 MVA ln@24.0 Ea 33,300.00 1,195.00 33.40 34,528.40
34.5 KV, 1500 MVA ln@28.0 Ea 38,000.00 1,395.00 38.90 39,433.90
46 KV, 2500 MVA ln@30.0 Ea 43,900.00 1,494.00 41.70 45,435.70
69 KV, 3500 MVA ln@32.0 Ea 49,800.00 1,594.00 44.50 51,438.50

Accessories for switchyard type outdoor oil circuit breakers


Using small tools.
Recloser relay,
adjustable, 3 shot, #179 lp@2.00 Ea 595.00 99.20 0.40 694.60
Overcurrent relay,
single phase, #51/51N lp@2.00 Ea 117.00 99.20 0.40 216.60
Directional overcurrent relay,
three phase, device #67 lp@2.50 Ea 209.00 124.00 0.50 333.50
Voltage relay, under or over voltage, device #27 or #59,
three phase lp@3.00 Ea 164.00 148.80 0.60 313.40
2015 Heavy Construction Estimator, All Rights Reserved Page 726 (part 2)

Differential relay package,


complete, device #87 lp@8.00 Ea 611.00 396.80 1.60 1,009.40

Switchyard substation transformers - 14.4 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
20-ton hydraulic crane with 70’ boom, small tools.
1000 KVA ln@20.0 Ea 14,800.00 996.20 27.80 15,824.00
2000 KVA ln@24.0 Ea 16,700.00 1,195.00 33.40 17,928.40
5000 KVA ln@30.0 Ea 26,000.00 1,494.00 41.70 27,535.70
2015 Heavy Construction Estimator, All Rights Reserved Page 727

Switchyard substation transformers - 14.4 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
40-ton hydraulic crane with 84’ boom, and small tools.
7500 KVA lr@36.0 Ea 38,300.00 1,801.00 111.00 40,212.00
10000 KVA lr@40.0 Ea 47,100.00 2,001.00 123.00 49,224.00

Switchyard substation transformers - 23 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
20-ton hydraulic crane with 70’ boom, small tools.
1000 KVA ln@20.0 Ea 16,300.00 996.20 27.80 17,324.00
2000 KVA ln@24.0 Ea 18,400.00 1,195.00 33.40 19,628.40
5000 KVA ln@30.0 Ea 30,400.00 1,494.00 41.70 31,935.70
7500 KVA lr@36.0 Ea 40,500.00 1,801.00 111.00 42,412.00

Switchyard substation transformers - 23 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
40-ton hydraulic crane with 84’ boom, and small tools.
10000 KVA lr@40.0 Ea 51,600.00 2,001.00 123.00 53,724.00

Switchyard substation transformers - 34.5 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
20-ton hydraulic crane with 70’ boom, small tools.
1000 KVA ln@22.0 Ea 20,600.00 1,096.00 30.60 21,726.60
2000 KVA ln@26.0 Ea 24,800.00 1,295.00 36.10 26,131.10
5000 KVA ln@32.0 Ea 34,400.00 1,594.00 44.50 36,038.50
7500 KVA lr@40.0 Ea 44,900.00 2,001.00 123.00 47,024.00

Switchyard substation transformers - 34.5 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
40-ton hydraulic crane with 84’ boom, and small tools.
10000 KVA lr@44.0 Ea 80,200.00 2,201.00 135.00 82,536.00

Switchyard substation transformers - 46 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
20-ton hydraulic crane with 70’ boom, small tools.
1000 KVA ln@22.0 Ea 32,500.00 1,096.00 30.60 33,626.60
2000 KVA ln@26.0 Ea 36,900.00 1,295.00 36.10 38,231.10
5000 KVA ln@32.0 Ea 51,600.00 1,594.00 44.50 53,238.50
7500 KVA lr@40.0 Ea 62,000.00 2,001.00 123.00 64,124.00

Switchyard substation transformers - 46 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
40-ton hydraulic crane with 84’ boom, and small tools.
10000 KVA lr@44.0 Ea 91,200.00 2,201.00 135.00 93,536.00

Switchyard substation transformers - 69 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
20-ton hydraulic crane with 70’ boom, small tools.
1000 KVA ln@24.0 Ea 48,100.00 1,195.00 33.40 49,328.40
2000 KVA ln@28.0 Ea 54,800.00 1,395.00 38.90 56,233.90
5000 KVA ln@32.0 Ea 77,200.00 1,594.00 44.50 78,838.50
7500 KVA lr@42.0 Ea 79,900.00 2,101.00 129.00 82,130.00

Switchyard substation transformers - 69 KV nominal primary


Standard NEMA design, two winding, three phase, 60 Hz, oil filled, 10% load tap changer, using a
40-ton hydraulic crane with 84’ boom, and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 727 (part 2)

10000 KVA lr@46.0 Ea 107,000.00 2,301.00 141.00109,442.00

Switchyard substation secondary switchgear - 4.16 KV, with air circuit breaker
Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes breaker element,
housing, control switch, 3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 75 MVA lt@12.0 Ea 5,480.00 595.90 134.00 6,209.90
1200 amp, 250 MVA lt@12.0 Ea 5,820.00 595.90 134.00 6,549.90
1200 amp, 350 MVA lt@12.0 Ea 8,130.00 595.90 134.00 8,859.90
2000 amp, 250 MVA lt@14.0 Ea 11,400.00 695.20 156.00 12,251.20
2000 amp, 350 MVA lt@14.0 Ea 16,900.00 695.20 156.00 17,751.20
3000 amp, 350 MVA lt@16.0 Ea 15,200.00 794.60 178.00 16,172.60

Switchyard substation secondary switchgear - 7.2 KV with air circuit breaker


Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes breaker element,
housing, control switch, 3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 500 MVA lt@12.0 Ea 8,680.00 595.90 134.00 9,409.90
2015 Heavy Construction Estimator, All Rights Reserved Page 728

2000 amp, 500 MVA lt@14.0 Ea 10,500.00 695.20 156.00 11,351.20


3000 amp, 500 MVA lt@16.0 Ea 15,300.00 794.60 178.00 16,272.60

Switchyard substation secondary switchgear - 13.8 KV with air circuit breaker


Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes breaker element,
housing, control switch, 3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 500 MVA lt@12.0 Ea 8,200.00 595.90 134.00 8,929.90
1200 amp, 750 MVA lt@12.0 Ea 11,600.00 595.90 134.00 12,329.90
1200 amp, 1000 MVA lt@12.0 Ea 17,500.00 595.90 134.00 18,229.90
2000 amp, 500 MVA lt@14.0 Ea 10,300.00 695.20 156.00 11,151.20
2000 amp, 750 MVA lt@14.0 Ea 15,600.00 695.20 156.00 16,451.20
2000 amp, 1000 MVA lt@14.0 Ea 22,400.00 695.20 156.00 23,251.20
3000 amp, 500 MVA lt@16.0 Ea 14,800.00 794.60 178.00 15,772.60
3000 amp, 750 MVA lt@16.0 Ea 21,200.00 794.60 178.00 22,172.60
3000 amp, 1000 MVA lt@45.0 Ea 28,000.00 2,235.00 502.00 30,737.00

Switchyard substation secondary switchgear - 4.16 KV without air circuit breaker


Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes housing, control switch,
3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 250 MVA lt@12.0 Ea 2,230.00 595.90 134.00 2,959.90
1200 amp, 350MVA lt@12.0 Ea 3,140.00 595.90 134.00 3,869.90
2000 amp, 250MVA lt@14.0 Ea 3,220.00 695.20 156.00 4,071.20
2000 amp, 350MVA lt@14.0 Ea 3,980.00 695.20 156.00 4,831.20
3000 amp, 350MVA lt@16.0 Ea 5,820.00 794.60 178.00 6,792.60

Switchyard substation secondary switchgear - 7.2 KV without air circuit breaker


Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes housing, control switch,
3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 500MVA lt@12.0 Ea 2,920.00 595.90 134.00 3,649.90
2000 amp, 500MVA lt@14.0 Ea 3,850.00 695.20 156.00 4,701.20
3000 amp, 500MVA lt@16.0 Ea 6,230.00 794.60 178.00 7,202.60

Switchyard substation secondary switchgear - 13.8 KV without air circuit breaker


Medium voltage, metal clad switchgear, 3 phase, 3 wire, with ground. Includes housing, control switch,
3 cable terminals, using a line truck with aerial platform and small tools.
1200 amp, 500MVA lt@12.0 Ea 2,920.00 595.90 134.00 3,649.90
1200 amp, 750MVA lt@12.0 Ea 3,190.00 595.90 134.00 3,919.90
1200 amp, 1000MVA lt@12.0 Ea 4,760.00 595.90 134.00 5,489.90
2000 amp, 500MVA lt@14.0 Ea 3,850.00 695.20 156.00 4,701.20
2000 amp, 750MVA lt@14.0 Ea 5,090.00 695.20 156.00 5,941.20
2000 amp, 1000MVA lt@14.0 Ea 5,820.00 695.20 156.00 6,671.20
3000 amp, 500MVA lt@16.0 Ea 5,090.00 794.60 178.00 6,062.60
3000 amp, 750MVA lt@16.0 Ea 5,940.00 794.60 178.00 6,912.60
3000 amp, 1000MVA lt@37.0 Ea 7,540.00 1,837.00 413.00 9,790.00

Substation secondary distribution accessories


Using a line truck with aerial platform and small tools.
1200 amp,
transformer throat connection lt@4.00 Ea 1,150.00 198.60 44.60 1,393.20
2000 amp,
transformer throat connection lt@4.00 Ea 1,550.00 198.60 44.60 1,793.20
3000 amp,
transformer throat connection lt@4.00 Ea 2,110.00 198.60 44.60 2,353.20
Three phase pothead termination lt@16.0 Ea 443.00 794.60 178.00 1,415.60

Vacuum circuit breakers


13.8 KV (budget price for basic unit), using a line truck with aerial platform and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 728 (part 2)

1200 amp, 500 MVA lt@12.0 Ea 46,000.00 595.90 134.00 46,729.90


1200 amp, 750 MVA lt@12.0 Ea 50,600.00 595.90 134.00 51,329.90
1200 amp, 1000 MVA lt@12.0 Ea 57,400.00 595.90 134.00 58,129.90
2000 amp, 500 MVA lt@14.0 Ea 53,100.00 695.20 156.00 53,951.20
2000 amp, 750 MVA lt@14.0 Ea 60,100.00 695.20 156.00 60,951.20
2000 amp, 1000 MVA lt@14.0 Ea 68,500.00 695.20 156.00 69,351.20
3000 amp, 500 MVA lt@16.0 Ea 70,200.00 794.60 178.00 71,172.60
3000 amp, 750 MVA lt@16.0 Ea 77,300.00 794.60 178.00 78,272.60
3000 amp, 1000 MVA lt@16.0 Ea 84,300.00 794.60 178.00 85,272.60
2015 Heavy Construction Estimator, All Rights Reserved Page 729

Fluarc circuit breakers


Fluarc SF6, 13.8 KV (budget prices for the basic unit), using a line truck with aerial platform and small
tools.
1200 amp, 500 MVA lt@12.0 Ea 45,500.00 595.90 134.00 46,229.90
1200 amp, 750 MVA lt@12.0 Ea 50,100.00 595.90 134.00 50,829.90
1200 amp, 1000 MVA lt@12.0 Ea 56,800.00 595.90 134.00 57,529.90
2000 amp, 500 MVA lt@14.0 Ea 52,600.00 695.20 156.00 53,451.20
2000 amp, 750 MVA lt@14.0 Ea 59,600.00 695.20 156.00 60,451.20
2000 amp, 1000 MVA lt@14.0 Ea 67,900.00 695.20 156.00 68,751.20
3000 amp, 500 MVA lt@16.0 Ea 69,700.00 794.60 178.00 70,672.60
3000 amp, 750 MVA lt@16.0 Ea 78,400.00 794.60 178.00 79,372.60
3000 amp, 1000 MVA lt@16.0 Ea 81,900.00 794.60 178.00 82,872.60

CSI 16-312, Secondary unit substations

Primary incoming section - Fused load break switch, floor mounted


15 KV, 600 amp, 3 pole, 2 position. Metal compartment includes weatherproofing, fuses, transformer
throat, pothead terminations through 500 MCM, with surge protection, using a line truck with aerial
platform and small tools.
112.5 through 1500 KVA transformers lt@40.0 Ea 24,900.00 1,986.00 446.00 27,332.00
2000 and 2500 KVA transformers lt@48.0 Ea 29,000.00 2,384.00 535.00 31,919.00

Primary incoming section - Fused load break switch, 2 position selector


Selector transfers one line to an alternate incoming line. 15 KV, 600 amp, 3 pole. Metal compartment
includes weatherproofing, fuses, transformer throat, pothead terminations through 500 MCM, with surge
protection, using a line truck with aerial platform and small tools.
112.5 through 1500 KVA transformers lt@40.0 Ea 35,500.00 1,986.00 446.00 37,932.00
2000 and 2500 KVA transformers lt@48.0 Ea 38,200.00 2,384.00 535.00 41,119.00

Primary 13.8 KV, secondary 480Y/277V or 480 volt, 60 Hz


Standard NEMA design, three phase, cover mounted tap changer, liquid level gage, thermometer,
pressure vacuum, automatic control for auxiliary cooling, weatherproof, using a 20-ton hydraulic crane
with 70’ boom, small tools.
75 KVA ln@6.00 Ea 7,900.00 298.90 8.34 8,207.24
112.5 KVA ln@6.00 Ea 9,490.00 298.90 8.34 9,797.24
150 KVA ln@6.00 Ea 10,800.00 298.90 8.34 11,107.24
225 KVA ln@8.00 Ea 12,700.00 398.50 11.10 13,109.60
300 KVA ln@10.0 Ea 14,000.00 498.10 13.90 14,512.00
500 KVA ln@12.0 Ea 19,100.00 597.70 16.70 19,714.40
750 KVA ln@14.0 Ea 17,300.00 697.30 19.50 18,016.80
1000 KVA ln@16.0 Ea 18,300.00 797.00 22.20 19,119.20
1500 KVA ln@18.0 Ea 20,500.00 896.60 25.00 21,421.60
2000 KVA ln@18.0 Ea 23,800.00 896.60 25.00 24,721.60
2500 KVA ln@20.0 Ea 26,200.00 996.20 27.80 27,224.00

Primary 13.8 KV secondary 208Y/120V 60 Hz


Standard NEMA design, three phase, cover mounted tap changer, liquid level gage, thermometer,
pressure vacuum, automatic control for auxiliary cooling, weatherproof, using small tools.
75 KVA ln@6.00 Ea 17,300.00 298.90 8.34 17,607.24
112.5 KVA ln@6.00 Ea 17,900.00 298.90 8.34 18,207.24
150 KVA ln@6.00 Ea 18,500.00 298.90 8.34 18,807.24
225 KVA ln@8.00 Ea 18,700.00 398.50 11.10 19,109.60
300 KVA ln@10.0 Ea 15,200.00 498.10 13.90 15,712.00
500 KVA ln@12.0 Ea 16,300.00 597.70 16.70 16,914.40
750 KVA ln@14.0 Ea 18,000.00 697.30 19.50 18,716.80
1000 KVA ln@16.0 Ea 19,600.00 797.00 22.20 20,419.20
1500 KVA ln@18.0 Ea 22,100.00 896.60 25.00 23,021.60
2015 Heavy Construction Estimator, All Rights Reserved Page 729 (part 2)

Transformer liquid containment area


Reinforced curb with 6" slab, using miscellaneous power tools and small tools.
112.5 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
150 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
225 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
300 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
2015 Heavy Construction Estimator, All Rights Reserved Page 730

500 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20


750 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
1000 KVA by@20.0 Ea 1,780.00 800.40 15.80 2,596.20
1500 KVA by@20.0 Ea 2,320.00 800.40 15.80 3,136.20

Dry transformers - Primary 4,160 volt (delta or wye) secondary 208Y/120V, or 240V
Dry type standard NEMA design, three phase, 150 degree centigrade rise, 60 Hz, self-cooled,
ventilated, using rolla lifts or a boom truck and small tools.
112.5 KVA ln@4.25 Ea 11,100.00 211.70 5.91 11,317.61
150 KVA ln@4.25 Ea 11,100.00 211.70 5.91 11,317.61
225 KVA ln@5.00 Ea 11,300.00 249.10 6.95 11,556.05
300 KVA ln@5.50 Ea 12,500.00 274.00 7.65 12,781.65
500 KVA ln@6.50 Ea 13,800.00 323.80 9.04 14,132.84
750 KVA ln@7.00 Ea 16,000.00 348.70 9.73 16,358.43
1000 KVA ln@10.0 Ea 18,500.00 498.10 13.90 19,012.00
1500 KVA ln@12.0 Ea 21,900.00 597.70 16.70 22,514.40
2000 KVA ln@14.0 Ea 28,800.00 697.30 19.50 29,516.80

Dry transformers - Primary 4,160 volt (delta or wye) secondary 480Y/277V, or 480V
Dry type standard NEMA design, three phase, 150 degree centigrade rise, 60 Hz, self-cooled,
ventilated, using rolla lifts or a boom truck and small tools.
112.5 KVA ln@4.25 Ea 10,700.00 211.70 5.91 10,917.61
150 KVA ln@4.25 Ea 11,100.00 211.70 5.91 11,317.61
225 KVA ln@5.00 Ea 11,300.00 249.10 6.95 11,556.05
300 KVA ln@5.50 Ea 12,500.00 274.00 7.65 12,781.65
500 KVA ln@6.50 Ea 13,800.00 323.80 9.04 14,132.84
750 KVA ln@7.00 Ea 16,000.00 348.70 9.73 16,358.43
1000 KVA ln@10.0 Ea 18,500.00 498.10 13.90 19,012.00
1500 KVA ln@12.0 Ea 21,900.00 597.70 16.70 22,514.40
2000 KVA ln@14.0 Ea 28,800.00 697.30 19.50 29,516.80
2500 KVA ln@16.0 Ea 31,700.00 797.00 22.20 32,519.20
3000 KVA ln@18.0 Ea 35,500.00 896.60 25.00 36,421.60
3750 KVA ln@20.0 Ea 41,000.00 996.20 27.80 42,024.00

Dry transformers - Primary 13,800 volt (delta or wye) secondary 208Y/120V or 240V
Dry type standard NEMA design, three phase, 150 degree centigrade rise, 60 Hz, self-cooled,
ventilated, using rolla lifts or a boom truck and small tools.
112.5 KVA ln@4.25 Ea 12,000.00 211.70 5.91 12,217.61
150 KVA ln@4.25 Ea 12,300.00 211.70 5.91 12,517.61
225 KVA ln@5.00 Ea 13,200.00 249.10 6.95 13,456.05
300 KVA ln@5.50 Ea 13,900.00 274.00 7.65 14,181.65
500 KVA ln@6.50 Ea 15,800.00 323.80 9.04 16,132.84
750 KVA ln@7.00 Ea 17,500.00 348.70 9.73 17,858.43
1000 KVA ln@10.0 Ea 20,400.00 498.10 13.90 20,912.00
1500 KVA ln@12.0 Ea 24,800.00 597.70 16.70 25,414.40
2000 KVA ln@14.0 Ea 30,200.00 697.30 19.50 30,916.80

Dry transformers - Primary 13,800 volt (delta or wye) secondary 480Y/277V, or 480V
Dry type standard NEMA design, three phase, 150 degree centigrade rise, 60 Hz, self-cooled,
ventilated, using rolla lifts or a boom truck and small tools.
112.5 KVA ln@4.25 Ea 12,000.00 211.70 5.91 12,217.61
150 KVA ln@4.25 Ea 12,300.00 211.70 5.91 12,517.61
225 KVA ln@5.00 Ea 13,200.00 249.10 6.95 13,456.05
300 KVA ln@5.50 Ea 13,900.00 274.00 7.65 14,181.65
500 KVA ln@6.50 Ea 15,800.00 323.80 9.04 16,132.84
750 KVA ln@7.00 Ea 15,200.00 348.70 9.73 15,558.43
1000 KVA ln@10.0 Ea 15,700.00 498.10 13.90 16,212.00
1500 KVA ln@12.0 Ea 19,400.00 597.70 16.70 20,014.40
2015 Heavy Construction Estimator, All Rights Reserved Page 730 (part 2)

2000 KVA ln@14.0 Ea 23,300.00 697.30 19.50 24,016.80


2500 KVA ln@16.0 Ea 26,100.00 797.00 22.20 26,919.20
3000 KVA ln@20.0 Ea 30,800.00 996.20 27.80 31,824.00
2015 Heavy Construction Estimator, All Rights Reserved Page 731

Substation low voltage drawout switchgear, with air breaker


277/480 volt, 3 phase, 4 wire, with solid state long-time and instantaneous trips, using a 20-ton
hydraulic crane with 70’ boom.
800 amp, manual DS-206 lm@8.00 Ea 10,600.00 395.60 23.80 11,019.40
1600 amp, manual DS-416 lm@10.0 Ea 16,300.00 494.50 29.80 16,824.30
2000 amp, manual DS-420 lm@14.0 Ea 22,000.00 692.30 41.70 22,734.00
3200 amp, electric DS-632 lm@16.0 Ea 37,700.00 791.20 47.70 38,538.90
4000 amp, electric DS-840 lm@20.0 Ea 48,900.00 989.00 59.60 49,948.60

Substation low voltage drawout switchgear, without air breaker


277/480 volt, 3 phase, 4 wire, using a 20-ton hydraulic crane with 70’ boom.
800 amp lm@6.00 Ea 4,670.00 296.70 17.90 4,984.60
1600 amp lm@6.00 Ea 5,400.00 296.70 17.90 5,714.60
2000 amp lm@8.00 Ea 7,070.00 395.60 23.80 7,489.40
3200 amp lm@8.00 Ea 10,300.00 395.60 23.80 10,719.40
4000 amp lm@10.0 Ea 17,400.00 494.50 29.80 17,924.30

Blank secondary switchgear compartment


Used as filler or for metering, no provision for future breakers, using a boom truck.
600 through 2000 amp lm@4.00 Ea 1,810.00 197.80 11.90 2,019.70
3000 amp lm@6.00 Ea 2,290.00 296.70 17.90 2,604.60
4000 amp lm@7.00 Ea 2,940.00 346.20 20.90 3,307.10

Substation distribution accessories


Added cost for substation secondary distribution listed above, using small tools.
Circuit breaker lifting device lk@1.00 Ea 2,110.00 50.10 0.19 2,160.29
Weatherproofing,
per vertical section lk@6.00 Ea 5,180.00 300.60 1.14 5,481.74

CSI 16-320, Sectionalizing switches

Pad mounted sectionalizing switches


Metal enclosed oil filled, three phase switching units, 15 to 95 KV. Sectionalizing, tapping and fusing
underground feeders. 200 amp replaceable busing wells, recessed locking assembly, with oil level and
oil fill plugs, using a 20-ton hydraulic crane with 70’ boom, small tools.
31 switch
up and 2 switch downstream ln@10.0 Ea 18,300.00 498.10 13.90 18,812.00
31 fuses up and 2 switch downstream ln@10.0 Ea 34,300.00 498.10 13.90 34,812.00
32 switch
up and 2 switch downstream ln@12.0 Ea 26,400.00 597.70 16.70 27,014.40
32 fuses up and 2 switch downstream ln@12.0 Ea 41,500.00 597.70 16.70 42,114.40

CSI 16-330, Transformers

General purpose dry transformers - 480 volt primary, 120/240 volt secondary
Single phase, 60 Hz, 115 degree rise, 185 degree insulation, two 2.5 per cent taps above and four 2.5
per cent taps below, using a 20-ton hydraulic crane with 70’ boom and small tools.
3 KVA ln@3.50 Ea 163.00 174.30 4.87 342.17
5 KVA ln@5.00 Ea 233.00 249.10 6.95 489.05
7.5 KVA ln@6.00 Ea 304.00 298.90 8.34 611.24
10 KVA ln@7.50 Ea 476.00 373.60 10.40 860.00
15 KVA ln@8.75 Ea 585.00 435.80 12.20 1,033.00
25 KVA ln@10.0 Ea 645.00 498.10 13.90 1,157.00
37.5 KVA ln@12.5 Ea 602.00 622.60 17.40 1,242.00
50 KVA ln@15.0 Ea 732.00 747.20 20.90 1,500.10
75 KVA ln@17.5 Ea 992.00 871.70 24.30 1,888.00
2015 Heavy Construction Estimator, All Rights Reserved Page 731 (part 2)

100 KVA ln@20.0 Ea 1,280.00 996.20 27.80 2,304.00


167 KVA ln@22.5 Ea 3,170.00 1,121.00 31.30 4,322.30
250 KVA ln@25.0 Ea 1,380.00 1,245.00 34.80 2,659.80

General purpose dry transformers - 240 x 480 volt primary, 120/240 volt secondary
Single phase, 60 Hz, 115 degree rise, 185 degree insulation, one 10%, two 5% taps, using a 20-ton
hydraulic crane with 70’ boom and small tools.
3 KVA ln@3.50 Ea 113.00 174.30 4.87 292.17
5 KVA, ln@5.00 Ea 153.00 249.10 6.95 409.05
2015 Heavy Construction Estimator, All Rights Reserved Page 732

7.5 KVA ln@6.00 Ea 215.00 298.90 8.34 522.24


10 KVA ln@7.50 Ea 266.00 373.60 10.40 650.00
15 KVA ln@8.75 Ea 585.00 435.80 12.20 1,033.00
25 KVA ln@10.0 Ea 645.00 498.10 13.90 1,157.00

Single phase mounting brackets


Set of two, using small tools.
For transformers up to 100 KVA,
three phase lp@2.00 Set 118.00 99.20 0.40 217.60

Packaged power supply, 120/240 volts secondary


480 volts primary, two 5% taps below normal, for transformers as listed below, using small tools.
5 KVA, six 1 pole, three 2 pole,
20 amp breakers lk@5.00 Ea 442.00 250.50 0.95 693.45
7.5 KVA, eight 1 pole,
four 2 pole, 30 amp breakers lk@7.00 Ea 517.00 350.70 1.33 869.03
10 KVA, ten 1 pole, five 2 pole,
maximum 40 amp breakers lk@8.50 Ea 562.00 425.90 1.62 989.52
15 KVA, sixteen 1 pole, eight 2 pole,
60 amp breakers lk@14.0 Ea 729.00 701.40 2.66 1,433.06
25 KVA, twenty-four 1 pole, twelve 2 pole,
100 amp breakers lk@20.0 Ea 1,090.00 1,002.00 3.80 2,095.80

Packaged power supply, 208/120 volts secondary


480 volt primary, two 5 per cent below normal taps, for transformers as listed below, 3 phase, 60 Hz,
using small tools.
15 KVA, twelve 1 pole,
four 3 pole, 40 amp breakers lk@14.0 Ea 1,480.00 701.40 2.66 2,184.06
22.5 KVA, eighteen 1 pole,
six 3 pole, 60 amp breakers lk@10.0 Ea 1,840.00 501.00 1.90 2,342.90
30 KVA, twenty-four 1 pole, eight 3 pole,
80 amp breakers lk@18.0 Ea 2,260.00 901.80 3.42 3,165.22

Packaged power supply, 208Y/120 volts secondary


480 volts primary, two 2.5 per cent below normal taps, three phase, 60 Hz, for transformers as listed
below, using a 20-ton hydraulic crane with 70’ boom, small tools.
9 KVA ln@4.00 Ea 856.00 199.20 5.56 1,060.76
15 KVA ln@4.00 Ea 1,170.00 199.20 5.56 1,374.76
30 KVA ln@4.00 Ea 1,100.00 199.20 5.56 1,304.76
37.5 KVA ln@4.00 Ea 1,900.00 199.20 5.56 2,104.76
45 KVA ln@5.00 Ea 1,650.00 249.10 6.95 1,906.05
50 KVA ln@5.00 Ea 2,260.00 249.10 6.95 2,516.05
75 KVA ln@6.00 Ea 2,190.00 298.90 8.34 2,497.24
112.5 KVA ln@7.00 Ea 2,750.00 348.70 9.73 3,108.43
150 KVA ln@8.00 Ea 3,670.00 398.50 11.10 4,079.60
225 KVA ln@10.0 Ea 5,070.00 498.10 13.90 5,582.00
300 KVA ln@12.0 Ea 6,160.00 597.70 16.70 6,774.40
500 KVA ln@15.0 Ea 9,030.00 747.20 20.90 9,798.10
750 KVA ln@16.0 Ea 22,000.00 797.00 22.20 22,819.20
1000 KVA ln@20.0 Ea 29,300.00 996.20 27.80 30,324.00

Packaged power supply, 480Y/277 volt secondary


480 volts primary, two 2.5 per cent above normal and four 2.5% taps below normal, three phase, 60 Hz,
for transformers as listed below, using a 20-ton hydraulic crane with 70’ boom and small tools.
30 KVA ln@4.00 Ea 2,460.00 199.20 5.56 2,664.76
45 KVA ln@5.00 Ea 2,730.00 249.10 6.95 2,986.05
75 KVA ln@6.00 Ea 4,160.00 298.90 8.34 4,467.24
112.5 KVA ln@7.00 Ea 5,240.00 348.70 9.73 5,598.43
2015 Heavy Construction Estimator, All Rights Reserved Page 732 (part 2)

150 KVA ln@8.00 Ea 6,360.00 398.50 11.10 6,769.60


225 KVA ln@10.0 Ea 8,180.00 498.10 13.90 8,692.00
300 KVA ln@12.0 Ea 9,920.00 597.70 16.70 10,534.40
500 KVA ln@15.0 Ea 16,300.00 747.20 20.90 17,068.10

Three phase mounting brackets


Per set of two, using small tools.
For transformers up to 112.5 KVA lp@2.00 Set 218.00 99.20 0.40 317.60

Single phase residential distribution transformers


Primary 4,160 ground Y/2400 to 24,940 ground Y/14400, secondary 240/120, 480/240, 277 volts. Pad
mounted mini-pack, oil filled, self-actuating pressure device, taps 4% below or two 2-1/2% above and
below. For loop feed grounded wye system, using a boom truck.
25 KVA ln@4.00 Ea 1,360.00 199.20 5.56 1,564.76
37.5 KVA ln@4.00 Ea 1,460.00 199.20 5.56 1,664.76
2015 Heavy Construction Estimator, All Rights Reserved Page 733

50 KVA ln@5.00 Ea 1,740.00 249.10 6.95 1,996.05


75 KVA ln@6.00 Ea 2,190.00 298.90 8.34 2,497.24
100 KVA ln@6.00 Ea 2,500.00 298.90 8.34 2,807.24
167 KVA ln@8.00 Ea 3,280.00 398.50 11.10 3,689.60

Single phase multiple building distribution transformers


Primary 4,160 ground, Y/2,400 to 34,500 ground Y/19900, secondary 240/120, 120/240, 240/480,
480/240, 277 volts, oil filled, self-actuating pressure relief, pad mounted, with taps 4% below or 2%
above and below, using a boom truck.
25 KVA ln@4.00 Ea 1,760.00 199.20 5.56 1,964.76
37.5 KVA ln@4.00 Ea 1,960.00 199.20 5.56 2,164.76
50 KVA ln@5.00 Ea 2,090.00 249.10 6.95 2,346.05
75 KVA ln@6.00 Ea 2,640.00 298.90 8.34 2,947.24
100 KVA ln@6.00 Ea 2,970.00 298.90 8.34 3,277.24
167 KVA ln@8.00 Ea 3,550.00 398.50 11.10 3,959.60
250 KVA ln@12.0 Ea 5,850.00 597.70 16.70 6,464.40

Oil filled distribution transformers - 13.8 KV ground, Y primary, 120/240 volt secondary
Single phase, cluster mounted, taps above and below normal, using a line truck with aerial platform.
10 KVA lt@6.00 Ea 631.00 298.00 66.90 995.90
50 KVA lt@8.00 Ea 1,190.00 397.30 89.20 1,676.50
100 KVA lt@10.0 Ea 2,190.00 496.60 112.00 2,798.60
167 KVA lt@12.0 Ea 3,040.00 595.90 134.00 3,769.90
250 KVA lt@14.0 Ea 4,120.00 695.20 156.00 4,971.20

Oil filled distribution transformers - 7,200 volts primary, 120/240 volts secondary
Single phase, cluster mounted, taps above and below normal, using a boom truck.
10 KVA lt@6.00 Ea 610.00 298.00 66.90 974.90
15 KVA lt@6.00 Ea 665.00 298.00 66.90 1,029.90
25 KVA lt@7.00 Ea 788.00 347.60 78.10 1,213.70
37.5 KVA lt@7.00 Ea 1,010.00 347.60 78.10 1,435.70
50 KVA lt@8.00 Ea 1,160.00 397.30 89.20 1,646.50
100 KVA lt@10.0 Ea 2,140.00 496.60 112.00 2,748.60
167 KVA lt@12.0 Ea 2,990.00 595.90 134.00 3,719.90
250 KVA lt@14.0 Ea 4,060.00 695.20 156.00 4,911.20

Oil filled distribution transformers - 7,200 volts primary, 240/480 volts secondary
Single phase, cluster mounted, taps above and below normal, using a boom truck.
10 KVA lt@6.00 Ea 1,020.00 298.00 66.90 1,384.90
15 KVA lt@6.00 Ea 1,110.00 298.00 66.90 1,474.90
25 KVA lt@7.00 Ea 1,320.00 347.60 78.10 1,745.70
37.5 KVA lt@7.00 Ea 1,680.00 347.60 78.10 2,105.70
50 KVA lt@8.00 Ea 1,930.00 397.30 89.20 2,416.50
75 KVA lt@9.00 Ea 3,040.00 446.90 100.00 3,586.90
100 KVA lt@10.0 Ea 3,560.00 496.60 112.00 4,168.60
167 KVA lt@12.0 Ea 4,990.00 595.90 134.00 5,719.90
250 KVA lt@14.0 Ea 6,770.00 695.20 156.00 7,621.20

Oil filled distribution transformers - 2,400 volts primary, 120/240 volts secondary
Single phase, cluster mounted, taps above and below normal, using a boom truck.
10 KVA lt@6.00 Ea 610.00 298.00 66.90 974.90
15 KVA lt@6.00 Ea 665.00 298.00 66.90 1,029.90
25 KVA lt@7.00 Ea 788.00 347.60 78.10 1,213.70
37.5 KVA lt@7.00 Ea 1,010.00 347.60 78.10 1,435.70
50 KVA lt@8.00 Ea 1,160.00 397.30 89.20 1,646.50
75 KVA lt@9.00 Ea 1,820.00 446.90 100.00 2,366.90
100 KVA lt@10.0 Ea 2,140.00 496.60 112.00 2,748.60
2015 Heavy Construction Estimator, All Rights Reserved Page 733 (part 2)

Oil filled distribution transformers - 2,400 volts primary, 240/480 volts secondary
Single phase, cluster mounted, taps above and below normal, using a boom truck.
10 KVA lt@6.00 Ea 1,020.00 298.00 66.90 1,384.90
2015 Heavy Construction Estimator, All Rights Reserved Page 734

15 KVA lt@6.00 Ea 1,110.00 298.00 66.90 1,474.90


25 KVA lt@7.00 Ea 1,320.00 347.60 78.10 1,745.70
37.5 KVA lt@7.00 Ea 1,680.00 347.60 78.10 2,105.70
50 KVA lt@8.00 Ea 1,930.00 397.30 89.20 2,416.50
75 KVA lt@9.00 Ea 3,040.00 446.90 100.00 3,586.90
100 KVA lt@10.0 Ea 3,560.00 496.60 112.00 4,168.60

Commercial distribution transformers - 480Y/277, 480 volts


Primary, 4,160 ground, Y13,800 secondary. Three phase, oil filled transformer designed for loads at
shopping centers and industrial plants with underground distribution. Pad mounted. With four taps below
and two taps above and below normal, using a boom truck.
75 KVA ln@10.0 Ea 11,800.00 498.10 13.90 12,312.00
112.5 KVA ln@12.0 Ea 13,200.00 597.70 16.70 13,814.40
150 KVA ln@14.0 Ea 15,000.00 697.30 19.50 15,716.80
225 KVA ln@16.0 Ea 17,700.00 797.00 22.20 18,519.20
300 KVA ln@18.0 Ea 19,600.00 896.60 25.00 20,521.60
500 KVA ln@20.0 Ea 26,700.00 996.20 27.80 27,724.00
750 KVA ln@22.0 Ea 35,800.00 1,096.00 30.60 36,926.60
1000 KVA ln@26.0 Ea 41,200.00 1,295.00 36.10 42,531.10

Commercial distribution transformers - 208Y/120 volts


Primary, 4,160 ground, Y13,800 secondary. Three phase, oil filled transformer designed for loads at
shopping centers and industrial plants with underground distribution. Pad mounted. With four taps below
and two taps above, using a boom truck.
75 KVA ln@10.0 Ea 11,800.00 498.10 13.90 12,312.00
112.5 KVA ln@12.0 Ea 13,200.00 597.70 16.70 13,814.40
150 KVA ln@14.0 Ea 15,000.00 697.30 19.50 15,716.80
225 KVA ln@16.0 Ea 17,800.00 797.00 22.20 18,619.20
300 KVA ln@18.0 Ea 19,800.00 896.60 25.00 20,721.60
500 KVA ln@20.0 Ea 26,800.00 996.20 27.80 27,824.00
750 KVA ln@22.0 Ea 40,600.00 1,096.00 30.60 41,726.60
1000 KVA ln@24.0 Ea 42,200.00 1,195.00 33.40 43,428.40

Commercial distribution transformers - Liquid containment area for transformers


Reinforced concrete curb with 6" slab, using miscellaneous power tools and using rolla lifts or a boom
truck.
75 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
112.5 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
150 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
225 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
300 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
500 KVA by@20.0 Ea 957.00 800.40 15.80 1,773.20
750 KVA by@20.0 Ea 985.00 800.40 15.80 1,801.20
1000 KVA by@20.0 Ea 1,390.00 800.40 15.80 2,206.20

Pad mounted commercial distribution transformers, 15KV, 480 volt, oil filled
Using a boom truck.
1500 KVA ln@16.0 Ea 20,300.00 797.00 22.20 21,119.20
2000 KVA ln@18.0 Ea 25,300.00 896.60 25.00 26,221.60
2500 KVA ln@20.0 Ea 29,000.00 996.20 27.80 30,024.00
3000 KVA ln@22.0 Ea 30,600.00 1,096.00 30.60 31,726.60
3750 KVA ln@24.0 Ea 34,700.00 1,195.00 33.40 35,928.40

CSI 16-411, Service and distribution, underground

Excavation for direct burial of wire or cable.


Includes backfill but no wire or cable, using a 46,000 lb. 3-axle 6x4 truck, with 8 CY dump body, a 2.5
CY front end wheel loader, a 1 CY hydraulic tractor excavator, and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 734 (part 2)

12" wide x 30" deep hr@.060 LF -- 2.24 2.90 5.14


24" wide x 30" deep hr@.108 LF -- 4.04 5.23 9.27
36" wide x 30" deep hr@.149 LF -- 5.57 7.21 12.78

4" deep sand bedding for direct burial of cable.


No excavation or backfill included, using small tools.
12" wide x 4" deep hr@.060 LF 0.51 2.24 2.90 5.65
2015 Heavy Construction Estimator, All Rights Reserved Page 735

18" wide x 4" deep hr@.075 LF 0.51 2.80 3.63 6.94


24" wide x 4" deep hr@.089 LF 0.65 3.33 4.31 8.29
30" wide x 4" deep hr@.099 LF 0.81 3.70 4.79 9.30
36" wide x 4" deep hr@.111 LF 0.95 4.15 5.37 10.47

Electric manholes per standard specifications, precast


Using a 20-ton hydraulic crane with 70’ boom, 46,000 Lb 3-axle 6x4 truck, with 8 CY dump body, a 25
CY front end wheel loader, a 1 CY hydraulic tractor excavator, and small tools.
Type "C" standard
power and phone combination bz@16.0 Ea 4,620.00 656.30 282.00 5,558.30
Type " G" standard power only bz@8.00 Ea 2,160.00 328.20 141.00 2,629.20
Type "E"
standard communication only bz@8.00 Ea 2,770.00 328.20 141.00 3,239.20

Electric manholes per standard specifications, precast


Using miscellaneous power tools and small tools.
Type "A" standard
power and phone combination by@16.0 Ea 2,820.00 640.30 12.60 3,472.90
Type "I" standard
power and phone combination by@20.0 Ea 2,200.00 800.40 15.80 3,016.20
Type "D"
standard power or phone only by@20.0 Ea 1,310.00 800.40 15.80 2,126.20
Type "F"
standard power or phone only by@10.0 Ea 651.00 400.20 7.90 1,059.10

Electrical handholes, listed by interior dimensions, precast


Using a 20-ton hydraulic crane with 70’ boom, 46,000 Lb 3-axle 6x4 truck, with 8 CY dump body, a 25
CY front end wheel loader, a 1 CY hydraulic tractor excavator and small tools.
24" x 24" x 30" bz@1.25 Ea 266.00 51.28 22.00 339.28
36" x 36" x 48" bz@1.50 Ea 575.00 61.53 26.40 662.93

Underground electrical concrete markers


Using small tools.
36" x 6" x 6" lk@2.78 Ea 18.00 139.30 0.53 157.83

2" concrete underground cable protection slab


Using small tools.
24" x 12" lk@.033 Ea 1.01 1.65 0.01 2.67
Underground marking tape,
6" (15cm) wide lk@.008 LF 0.07 0.40 -- 0.47

Electrical and communications manholes


Includes cable racks and supports, pulling irons, sump with removable grate and frame and cover, using
a 20-ton hydraulic crane with 70’ boom, 46,000 lb 3-axle 6x4 truck, with 8 CY dump body, a 25 CY front
end wheel loader, a 1 CY hydraulic tractor excavator, and small tools.
Single,10.5 SF x 10' deep bz@20.0 Ea 4,310.00 820.40 352.00 5,482.40
Double, first section 9.35' wide x 16.4' long x 10' deep, second section 8.69'
wide x 12.5' long x 10' deep bz@40.0 Ea 10,500.00 1,641.00 704.00 12,845.00

CSI 16-413, Pole line construction

Power poles, class 3 yellow pine


Penta-treated to 8 lbs. retention, machine dug and set, using a line truck with aerial platform and small
tools.
25’ (7.6m) lt@4.00 Ea 434.00 198.60 44.60 677.20
30’ (9.1m) lt@4.00 Ea 589.00 198.60 44.60 832.20
35’ (10.7m) lt@4.00 Ea 741.00 198.60 44.60 984.20
2015 Heavy Construction Estimator, All Rights Reserved Page 735 (part 2)

40’ (12.2m) lt@5.00 Ea 899.00 248.30 55.80 1,203.10


45’ (13.7m) lt@5.00 Ea 1,070.00 248.30 55.80 1,374.10
50’ (15.2m) lt@6.00 Ea 1,230.00 298.00 66.90 1,594.90
55’ (16.8m) lt@6.00 Ea 1,410.00 298.00 66.90 1,774.90
60’ (18.3m) lt@7.00 Ea 1,610.00 347.60 78.10 2,035.70
65’ (19.8m) lt@7.00 Ea 3,710.00 347.60 78.10 4,135.70
70’ (21.3m) lt@8.00 Ea 4,140.00 397.30 89.20 4,626.50
75' (22.9m) lt@8.00 Ea 4,620.00 397.30 89.20 5,106.50
Add for class 2 poles ---@--- % 20.00 -- -- --

Wood crossarms - Single arm


With hardware and braces, using a line truck with aerial platform and small tools.
3-1/2" x 4-1/2" x 5'7" lt@1.50 Ea 98.30 74.49 16.70 189.49
3-1/2" x 4-1/2" x 8'0" lt@2.00 Ea 109.00 99.32 22.30 230.62
2015 Heavy Construction Estimator, All Rights Reserved Page 736

3-3/4" x 4-3/4" x 10'0" lt@3.00 Ea 109.00 149.00 33.50 291.50

Wood crossarms - Double arm


With hardware and braces, using a line truck with aerial platform and small tools.
3-1/2" x 4-1/2" x 5'7" lt@3.00 Ea 219.00 149.00 33.50 401.50
3-1/2" x 4-1/2" x 8'0" lt@4.00 Ea 243.00 198.60 44.60 486.20
3-3/4" x 4-3/4" x 10'0" lt@6.00 Ea 243.00 298.00 66.90 607.90

Guying for power poles - Down guys


Using a line truck with aerial platform and small tools.
For 25' to 40' pole lt@4.00 Ea 88.50 198.60 44.60 331.70
For 45' to 60' pole lt@4.50 Ea 96.40 223.50 50.20 370.10
For 65' to 75' pole lt@5.00 Ea 113.00 248.30 55.80 417.10

Guying for power poles - Head guys, 50’ (15m) span


Using a line truck with aerial platform and small tools.
25' to 40' pole lt@5.00 Ea 84.60 248.30 55.80 388.70
45' to 60' pole lt@5.50 Ea 84.60 273.10 61.30 419.00
65' to 75' pole lt@6.00 Ea 84.60 298.00 66.90 449.50

Power pole guy strain insulators for power poles


Additional insulators as required can be installed at the same cost, using a line truck with aerial
platform and small tools.
Guy strain insulator lt@.500 Ea 4.99 24.83 5.58 35.40

Power line pin insulators, with pin


Using a line truck with aerial platform and small tools.
5 KV, class 55-3 lt@1.00 Ea 12.40 49.66 11.20 73.26
15 KV, class 55-5 lt@1.50 Ea 19.70 74.49 16.70 110.89

Power line suspension insulators


With clevis and strain clamp, using a line truck with aerial platform and small tools.
5 KV, class 52-2 lt@1.00 Ea 26.50 49.66 11.20 87.36
15 KV, class 52-4 lt@1.50 Ea 46.50 74.49 16.70 137.69
25 KV, class 2 x 52-4 lt@2.00 Ea 86.50 99.32 22.30 208.12
50 KV, class 4 x 52-4 lt@3.00 Ea 167.00 149.00 33.50 349.50

Power line spool insulators, with clevis


Using a line truck with aerial platform and small tools.
5 KV, class 53-5 lt@1.00 Ea 8.85 49.66 11.20 69.71
15 KV lt@1.50 Ea 35.40 74.49 16.70 126.59
25 KV lt@2.00 Ea 44.00 99.32 22.30 165.62

Secondary rack power line insulators


Using a line truck with aerial platform and small tools.
2 spool lt@1.00 Ea 22.70 49.66 11.20 83.56
3 spool lt@1.50 Ea 33.00 74.49 16.70 124.19
4 spool lt@1.75 Ea 34.40 86.91 19.50 140.81

Outdoor load break switches - 7.2 KV


Three phase, group operated, vertical break, 3 insulator, high strength pin insulators, worm gear
operation. Operating rods and switch bases are galvanized steel, using a line truck with aerial platform
and small tools.
600 amp lt@6.00 Ea 2,640.00 298.00 66.90 3,004.90
1200 amp lt@7.00 Ea 5,630.00 347.60 78.10 6,055.70
1600 amp lt@8.00 Ea 8,440.00 397.30 89.20 8,926.50
2015 Heavy Construction Estimator, All Rights Reserved Page 736 (part 2)

2000 amp lt@10.0 Ea 8,440.00 496.60 112.00 9,048.60

Outdoor load break switches - 14.4 KV


Three phase, group operated, vertical break, 3 insulator, high strength pin insulators, worm gear
operation. Operating rods and switch bases are galvanized steel, using a line truck with aerial platform
and small tools.
600 amp lt@6.00 Ea 3,360.00 298.00 66.90 3,724.90
1200 amp lt@7.00 Ea 7,390.00 347.60 78.10 7,815.70
1600 amp lt@8.00 Ea 8,440.00 397.30 89.20 8,926.50
2000 amp lt@10.0 Ea 8,440.00 496.60 112.00 9,048.60
2015 Heavy Construction Estimator, All Rights Reserved Page 737

Outdoor load break switches - 23 KV


Three phase, group operated, vertical break, 3 insulator, high strength pin insulators, worm gear
operation. Operating rods and switch bases are galvanized steel, using a line truck with aerial platform
and small tools.
600 amp lt@6.00 Ea 3,660.00 298.00 66.90 4,024.90
1200 amp lt@7.00 Ea 6,780.00 347.60 78.10 7,205.70
1600 amp lt@8.00 Ea 8,670.00 397.30 89.20 9,156.50
2000 amp lt@10.0 Ea 8,670.00 496.60 112.00 9,278.60

Square distribution poles - Steel tapered shaft


Add the cost of excavation and concrete, using a line truck with aerial platform and small tools.
20' high lt@8.00 Ea 1,300.00 397.30 89.20 1,786.50
25' high lt@9.00 Ea 1,450.00 446.90 100.00 1,996.90
30' high lt@10.0 Ea 1,550.00 496.60 112.00 2,158.60
35' high lt@11.0 Ea 1,720.00 546.30 123.00 2,389.30
40' high lt@12.0 Ea 2,550.00 595.90 134.00 3,279.90

Square distribution poles - Prestressed concrete


Add the cost of excavation and concrete, using a 40-ton hydraulic crane with 84’ boom, and small tools.
30' high lr@15.0 Ea 831.00 750.50 46.10 1,627.60
35' high lr@16.0 Ea 979.00 800.50 49.10 1,828.60
40' high lr@18.0 Ea 1,180.00 900.50 55.30 2,135.80
45' high lr@20.0 Ea 1,340.00 1,001.00 61.40 2,402.40
50' high lr@24.0 Ea 1,610.00 1,201.00 73.70 2,884.70
55' high lr@28.0 Ea 1,890.00 1,401.00 86.00 3,377.00
60' high lr@30.0 Ea 2,270.00 1,501.00 92.10 3,863.10

Aluminum tapered distribution poles - Round seamless shaft


Add the cost of excavation and concrete, using a line truck with aerial platform and small tools.
20' high lt@7.00 Ea 675.00 347.60 78.10 1,100.70
25' high lt@8.00 Ea 1,010.00 397.30 89.20 1,496.50
30' high lt@9.00 Ea 1,170.00 446.90 100.00 1,716.90
35' high lt@10.0 Ea 1,410.00 496.60 112.00 2,018.60
40' high lt@11.0 Ea 2,300.00 546.30 123.00 2,969.30

Galvanized steel service distribution poles - Round tapered pole


Direct embedded, bearing plated on base end, pole cap on top end, with grounding nut, using a line
truck with aerial platform and small tools.
40' high lt@12.0 Ea 1,610.00 595.90 134.00 2,339.90
45' high lt@13.0 Ea 1,930.00 645.60 145.00 2,720.60
50' high lt@14.0 Ea 2,050.00 695.20 156.00 2,901.20
55' high lt@16.0 Ea 2,450.00 794.60 178.00 3,422.60
60' high lt@18.0 Ea 3,150.00 893.90 201.00 4,244.90

Galvanized steel service distribution poles - Round tapered pole


Direct embedded, bearing plated on base end, pole cap on top end, with grounding nut, using a 40-ton
hydraulic crane with 84’ boom, and small tools.
65' high lr@22.0 Ea 3,610.00 1,101.00 67.50 4,778.50
70' high lr@25.0 Ea 3,990.00 1,251.00 76.80 5,317.80
75' high lr@28.0 Ea 4,380.00 1,401.00 86.00 5,867.00
80' high lr@32.0 Ea 4,870.00 1,601.00 98.20 6,569.20
85' high lr@34.0 Ea 5,220.00 1,701.00 104.00 7,025.00
90' high lr@38.0 Ea 5,590.00 1,901.00 117.00 7,608.00
95' high lr@40.0 Ea 6,150.00 2,001.00 123.00 8,274.00
100' high lr@42.0 Ea 6,670.00 2,101.00 129.00 8,900.00
2015 Heavy Construction Estimator, All Rights Reserved Page 737 (part 2)

Galvanized steel service distribution poles - 12 sided tapered


Direct embedded, bearing plated on base end, pole cap on top end, with grounding nut, using a line
truck with aerial platform and small tools.
40' high lt@12.0 Ea 2,560.00 595.90 134.00 3,289.90
45' high lt@13.0 Ea 2,840.00 645.60 145.00 3,630.60
2015 Heavy Construction Estimator, All Rights Reserved Page 738

50' high lt@14.0 Ea 3,170.00 695.20 156.00 4,021.20


55' high lt@16.0 Ea 3,450.00 794.60 178.00 4,422.60
60' high lt@18.0 Ea 4,750.00 893.90 201.00 5,844.90

Galvanized steel service distribution poles - 12 sided tapered


Direct embedded, bearing plated on base end, pole cap on top end, with grounding nut, using a 40-ton
hydraulic crane with 84’ boom, and small tools.
65' high lr@22.0 Ea 5,130.00 1,101.00 67.50 6,298.50
70' high lr@25.0 Ea 5,970.00 1,251.00 76.80 7,297.80
75' high lr@28.0 Ea 6,360.00 1,401.00 86.00 7,847.00
80' high lr@32.0 Ea 6,730.00 1,601.00 98.20 8,429.20
90' high lr@38.0 Ea 8,130.00 1,901.00 117.00 10,148.00
100' high lr@46.0 Ea 8,970.00 2,301.00 141.00 11,412.00
105' high lr@48.0 Ea 9,440.00 2,401.00 147.00 11,988.00

Distribution pole arms, with baseplates and endplates


Using a line truck with aerial platform and small tools.
4' arm lt@1.00 Ea 219.00 49.66 11.20 279.86
6' arm lt@1.50 Ea 278.00 74.49 16.70 369.19
8' arm lt@2.50 Ea 334.00 124.20 27.90 486.10
10' arm lt@3.00 Ea 501.00 149.00 33.50 683.50
11' arm lt@4.00 Ea 534.00 198.60 44.60 777.20

Power distribution pole standard gangs


Load bearing at any angle, using a line truck with aerial platform and small tools.
15,000 lbs. lt@1.00 Ea 24.50 49.66 11.20 85.36
30,000 lbs. lt@1.00 Ea 42.60 49.66 11.20 103.46
45,000 lbs. lt@1.00 Ea 67.50 49.66 11.20 128.36

Armless power pole hardware - Vertical insulator and equipment bracket


Using a line truck with aerial platform and small tools.
12", 1 position lt@1.00 Ea 43.20 49.66 11.20 104.06
7", 1 position lt@1.00 Ea 30.50 49.66 11.20 91.36
12", 3 position lt@1.00 Ea 63.90 49.66 11.20 124.76
18", 3 position lt@2.00 Ea 89.00 99.32 22.30 210.62
18", 1 position lt@2.00 Ea 77.00 99.32 22.30 198.62

Armless power pole hardware - Side pole, horizontal and multiple insulator brackets
Using a line truck with aerial platform and small tools.
1-7/8" clearance lt@1.00 Ea 20.50 49.66 11.20 81.36
2" clearance lt@1.00 Ea 47.30 49.66 11.20 108.16
9" clearance lt@1.50 Ea 64.00 74.49 16.70 155.19
10" clearance lt@1.50 Ea 127.00 74.49 16.70 218.19
15" clearance lt@2.00 Ea 154.00 99.32 22.30 275.62
20" clearance lt@2.00 Ea 188.00 99.32 22.30 309.62

Armless power pole hardware - Pole top bracket and pins


Using a line truck with aerial platform and small tools.
Pin, 5" lt@1.00 Ea 24.40 49.66 11.20 85.26
Bracket, 5" lt@1.00 Ea 30.90 49.66 11.20 91.76

Armless power pole hardware - Angle pins


Using a line truck with aerial platform and small tools.
25 degree 6" lt@1.00 Ea 23.60 49.66 11.20 84.46
2k degree 7-1/4" lt@1.00 Ea 44.70 49.66 11.20 105.56

Armless power pole hardware - Static and neutral wire brackets


2015 Heavy Construction Estimator, All Rights Reserved Page 738 (part 2)

Using a line truck with aerial platform and small tools.


Neutral lt@1.00 Ea 7.54 49.66 11.20 68.40
Static lt@1.00 Ea 35.90 49.66 11.20 96.76
2015 Heavy Construction Estimator, All Rights Reserved Page 739

Armless power pole hardware - Cutout, arrestor and terminator brackets


Using a line truck with aerial platform and small tools.
Cutout and arrestor lt@1.50 Ea 28.00 74.49 16.70 119.19
Equipment mounting lt@1.50 Ea 46.40 74.49 16.70 137.59

Armless power pole hardware - Miscellaneous brackets


Using a line truck with aerial platform and small tools.
Spacer cable lt@1.00 Ea 66.00 49.66 11.20 126.86
Conduit supports lt@1.00 Ea 23.10 49.66 11.20 83.96

Power pole primary fuse cutouts, non-loadbreak current limiting - 8.3 KV to 95 KV, bil
Interrupt rating of 25,000 amp symmetrical, 40,000 amp asymmetrical, using a line truck with aerial
platform and small tools.
15 amp lt@2.50 Ea 94.30 124.20 27.90 246.40
25 amp lt@2.50 Ea 94.30 124.20 27.90 246.40
40 amp lt@3.00 Ea 94.30 149.00 33.50 276.80

Power pole primary fuse cutouts, non-loadbreak current limiting - 17.1 KV to 125 KV, bil
Using a line truck with aerial platform and small tools.
15 amp lt@2.00 Ea 106.00 99.32 22.30 227.62

Fuse holders for cutouts, including current limiting fuse


Using a line truck with aerial platform and small tools.
15 amp, 8.3 KV lt@2.00 Ea 44.20 99.32 22.30 165.82
25 amp, 8.3 KV lt@2.50 Ea 44.20 124.20 27.90 196.30
40 amp, 8.3 KV lt@3.00 Ea 44.20 149.00 33.50 226.70
15 amp, 17.1 KV lt@2.00 Ea 44.20 99.32 22.30 165.82

Power pole primary fuse cutouts, loadbreak current limiting - 8.3 KV to 95 KV, bil
Interrupt rating of 25,000 amp symmetrical, 40,000 amp asymmetrical, using a line truck with aerial
platform and small tools.
15 amp lt@2.00 Ea 187.00 99.32 22.30 308.62
25 amp lt@2.50 Ea 187.00 124.20 27.90 339.10
40 amp lt@3.00 Ea 187.00 149.00 33.50 369.50

Power pole primary fuse cutouts, loadbreak current limiting - 17.1 KV to 125 KV, bil
Using a line truck with aerial platform and small tools.
15 amp lt@2.00 Ea 187.00 99.32 22.30 308.62

Fuse holders for cutouts, including current limiting fuses


Using a line truck with aerial platform and small tools.
15 amp, 8.3 KV lt@2.00 Ea 48.40 99.32 22.30 170.02
25 amp, 8.3 KV lt@2.50 Ea 48.40 124.20 27.90 200.50
40 amp, 8.3 KV lt@3.00 Ea 48.40 149.00 33.50 230.90
15 amp, 17.1 KV lt@2.00 Ea 48.40 99.32 22.30 170.02

Pole mounted capacitors


Using a line truck with aerial platform and small tools.
6 KVAR lt@2.50 Ea 527.00 124.20 27.90 679.10

Pole mount primary fuse cutouts - 5 KV


Including insulator with pin, bayonet, bolts, washers and neutral wire brackets, using a line truck with
aerial platform and small tools.
Type OH-1 lt@2.00 Ea 18.70 99.32 22.30 140.32
2015 Heavy Construction Estimator, All Rights Reserved Page 739 (part 2)

Type OH-2 lt@2.50 Ea 28.90 124.20 27.90 181.00


Type OH-3 lt@2.75 Ea 163.00 136.60 30.70 330.30
Type OH-4 lt@2.75 Ea 114.00 136.60 30.70 281.30
Type OH-5 lt@2.75 Ea 124.00 136.60 30.70 291.30
2015 Heavy Construction Estimator, All Rights Reserved Page 740

Type OH-6 lt@3.00 Ea 163.00 149.00 33.50 345.50


Type OH-7 lt@3.00 Ea 144.00 149.00 33.50 326.50
Type OH-8 lt@3.00 Ea 200.00 149.00 33.50 382.50
Type OH-9 lt@3.00 Ea 238.00 149.00 33.50 420.50
Type OH-10 lt@3.00 Ea 163.00 149.00 33.50 345.50
Type OH-11 lt@4.00 Ea 66.20 198.60 44.60 309.40
Type OH-12 lt@4.00 Ea 66.20 198.60 44.60 309.40
Type OH-13 lt@4.00 Ea 170.00 198.60 44.60 413.20
Type OH-14 lt@4.00 Ea 66.20 198.60 44.60 309.40
Type OH-15 lt@4.00 Ea 66.20 198.60 44.60 309.40
Type OH-16 lt@4.00 Ea 170.00 198.60 44.60 413.20

Pole mount primary fuse cutouts - 15 KV


Including insulator with pin, bayonet, bolts, washers and neutral wire brackets, using a line truck with
aerial platform and small tools.
Type OH-1 lt@2.75 Ea 30.60 136.60 30.70 197.90
Type OH-2 lt@2.75 Ea 45.90 136.60 30.70 213.20
Type OH-3 lt@3.00 Ea 221.00 149.00 33.50 403.50
Type OH-4 lt@3.00 Ea 134.00 149.00 33.50 316.50
Type OH-5 lt@3.00 Ea 153.00 149.00 33.50 335.50
Type OH-6 lt@3.00 Ea 221.00 149.00 33.50 403.50
Type OH-7 lt@3.00 Ea 187.00 149.00 33.50 369.50
Type OH-8 lt@3.00 Ea 287.00 149.00 33.50 469.50
Type OH-9 lt@3.00 Ea 355.00 149.00 33.50 537.50
Type OH-10 lt@3.00 Ea 221.00 149.00 33.50 403.50
Type OH-11 lt@4.00 Ea 88.30 198.60 44.60 331.50
Type OH-12 lt@4.00 Ea 88.30 198.60 44.60 331.50
Type OH-13 lt@4.00 Ea 214.00 198.60 44.60 457.20
Type OH-14 lt@4.00 Ea 88.30 198.60 44.60 331.50
Type OH-15 lt@4.00 Ea 88.30 198.60 44.60 331.50
Type OH-16 lt@4.00 Ea 214.00 198.60 44.60 457.20

Pole mount primary fuse cutouts - 25 KV


Including insulator with pin, bayonet, bolts, washers and neutral wire brackets, using a line truck with
aerial platform and small tools.
Type OH-3 lt@3.00 Ea 423.00 149.00 33.50 605.50
Type OH-4 lt@3.00 Ea 297.00 149.00 33.50 479.50
Type OH-5 lt@4.00 Ea 423.00 198.60 44.60 666.20
Type OH-6 lt@4.00 Ea 360.00 198.60 44.60 603.20
Type OH-7 lt@4.00 Ea 462.00 198.60 44.60 705.20
Type OH-8 lt@5.00 Ea 586.00 248.30 55.80 890.10
Type OH-9 lt@5.00 Ea 423.00 248.30 55.80 727.10
Type OH-13 lt@5.00 Ea 387.00 248.30 55.80 691.10
Type OH-16 lt@5.00 Ea 301.00 248.30 55.80 605.10

Pole mount primary fuse cutouts - 50 KV


Including insulator with pin, bayonet, bolts, washers and neutral wire brackets, using a line truck with
aerial platform and small tools.
Type OH-3 lt@5.00 Ea 567.00 248.30 55.80 871.10
Type OH-4 lt@5.00 Ea 328.00 248.30 55.80 632.10
Type OH-5 lt@5.00 Ea 328.00 248.30 55.80 632.10
Type OH-6 lt@5.00 Ea 567.00 248.30 55.80 871.10
Type OH-7 lt@5.00 Ea 448.00 248.30 55.80 752.10
Type OH-8 lt@5.00 Ea 813.00 248.30 55.80 1,117.10
Type OH-9 lt@5.00 Ea 1,050.00 248.30 55.80 1,354.10
Type OH-10 lt@6.00 Ea 567.00 298.00 66.90 931.90
Type OH-13 lt@6.00 Ea 474.00 298.00 66.90 838.90
Type OH-16 lt@6.00 Ea 474.00 298.00 66.90 838.90
2015 Heavy Construction Estimator, All Rights Reserved Page 740 (part 2)

Overhead to underground power conversion structures - 5 KV, 35' pole included


Includes insulator with pin, bolts, washers, crossarms, fused cutout, arrestors, ground rods, clamps,
conduit, moulding, cable termination and neutral wire brackets, using a line truck with aerial platform
and small tools.
Type OU-1-a lt@60.0 Ea 3,220.00 2,980.00 669.00 6,869.00
2015 Heavy Construction Estimator, All Rights Reserved Page 741

Type OU-1-b lt@60.0 Ea 3,190.00 2,980.00 669.00 6,839.00


Type OU-1-c lt@60.0 Ea 3,200.00 2,980.00 669.00 6,849.00
Type OU-1-d lt@60.0 Ea 3,240.00 2,980.00 669.00 6,889.00

Overhead to underground power conversion structures - 15 KV, 35' pole included


Includes insulator with pin, bolts, washers, crossarms, fused cutout, arrestors, ground rods, clamps,
conduit, moulding, cable termination and neutral wire brackets, using a line truck with aerial platform
and small tools.
Type OU-1-a lt@60.0 Ea 3,630.00 2,980.00 669.00 7,279.00
Type OU-1-b lt@60.0 Ea 3,660.00 2,980.00 669.00 7,309.00
Type OU-1-c lt@60.0 Ea 3,660.00 2,980.00 669.00 7,309.00
Type OU-1-d lt@60.0 Ea 3,660.00 2,980.00 669.00 7,309.00

Overhead to underground power conversion structures - 25 KV, pole not included


Includes insulator with pin, bolts, washers, crossarms, fused cutout, arrestors, ground rods, clamps,
conduit, moulding, cable termination and neutral wire brackets, using a line truck with aerial platform
and small tools.
Type OU-1-a lt@60.0 Ea 5,020.00 2,980.00 669.00 8,669.00
Type OU-1-b lt@60.0 Ea 5,080.00 2,980.00 669.00 8,729.00
Type OU-1-c lt@60.0 Ea 5,110.00 2,980.00 669.00 8,759.00
Type OU-1-d lt@60.0 Ea 5,080.00 2,980.00 669.00 8,729.00

Pole mounted transformer stations - 5 KV


Pole not included, using a line truck with aerial platform and small tools.
Type T1-a lt@20.0 Ea 2,830.00 993.20 223.00 4,046.20
Type T2-c lt@24.0 Ea 2,830.00 1,192.00 268.00 4,290.00
Type T3-a lt@30.0 Ea 4,260.00 1,490.00 335.00 6,085.00
Type T3-c lt@32.0 Ea 4,360.00 1,589.00 357.00 6,306.00
Type T4-a lt@36.0 Ea 4,360.00 1,788.00 401.00 6,549.00

Pole mounted transformer stations - 15 KV


Pole not included, using a line truck with aerial platform and small tools.
Type T1-a lt@20.0 Ea 3,250.00 993.20 223.00 4,466.20
Type T2-c lt@24.0 Ea 3,290.00 1,192.00 268.00 4,750.00
Type T3-a lt@30.0 Ea 4,620.00 1,490.00 335.00 6,445.00
Type T3-c lt@32.0 Ea 4,960.00 1,589.00 357.00 6,906.00
Type T4-a lt@36.0 Ea 4,960.00 1,788.00 401.00 7,149.00

Pole mounted transformer stations - 23 KV


Pole not included, using a line truck with aerial platform and small tools.
Type T1-a lt@20.0 Ea 1,110.00 993.20 223.00 2,326.20
Type T2-c lt@24.0 Ea 1,110.00 1,192.00 268.00 2,570.00
Type T3-a lt@30.0 Ea 1,110.00 1,490.00 335.00 2,935.00
Type T3-c lt@32.0 Ea 1,110.00 1,589.00 357.00 3,056.00
Type T4-a lt@36.0 Ea 1,110.00 1,788.00 401.00 3,299.00

Ground transformer stations


TS-1, without transformer and chain link fence, using a line truck with aerial platform and small tools.
Type TS-1 lt@16.0 Ea 1,630.00 794.60 178.00 2,602.60

CSI 16-430, Metering

Revenue meter sockets


Using small tools.
200 amp, single phase, 3 wire, 4 terminal meter socket, exposed,
on wood, with test bypass lk@1.00 Ea 262.00 50.10 0.19 312.29
200 amp, three phase, 3 wire, 5 terminal meter socket, exposed,
2015 Heavy Construction Estimator, All Rights Reserved Page 741 (part 2)

on wood, with test bypass lk@1.00 Ea 310.00 50.10 0.19 360.29


200 amp, three phase, 4 wire, 7 terminal meter socket, exposed,
on wood, with test bypass lk@1.00 Ea 349.00 50.10 0.19 399.29
200 amp, 4 terminal meter socket, overhead exposed, on wood,
without circuit closer lk@1.00 Ea 45.30 50.10 0.19 95.59
100 amp, underground, 5 terminal meter socket exposed, on wood,
with circuit closing lk@1.00 Ea 128.00 50.10 0.19 178.29
200 amp, 600v, 7 terminal, underground and overhead, exposed, on wood,
without circuit closer lk@1.00 Ea 112.00 50.10 0.19 162.29
Combination meter and current transformer cabinet, 13 terminal, underground, outdoor, with test
switch and transformer base lk@3.00 Ea 921.00 150.30 0.57 1,071.87
2015 Heavy Construction Estimator, All Rights Reserved Page 742

Revenue meters
Using small tools.
200 amp, 120/240 volt,
three phase, KWH meter lj@5.00 Ea 422.00 250.50 1.95 674.45

Current transformer enclosures


Using small tools.
18" x 24" x 9",
screwed cover, NEMA 3R lk@4.00 Ea 118.00 200.40 0.76 319.16

CSI 16-431, Ground fault protection

Ground fault protection


Using small tools.
Ground fault sensor, 5" x 8" window lk@2.00 Ea 2,640.00 100.20 0.38 2,740.58
Fault relay, adjustable time delay lk@1.50 Ea 4,420.00 75.15 0.29 4,495.44
Fault monitor test panel,
test with or without tripping lk@2.00 Ea 1,370.00 100.20 0.38 1,470.58

CSI 16-450, Grounding

Copper lightning protection air terminals


Using small tools.
3/8" x 10" lk@.300 Ea 10.40 15.03 0.06 25.49
1/2" x 12" lk@.300 Ea 16.00 15.03 0.06 31.09
5/8" x 12" lk@.300 Ea 22.00 15.03 0.06 37.09
1/2" x 24" lk@.500 Ea 24.30 25.05 0.10 49.45
1/2" x 60" lk@1.00 Ea 49.90 50.10 0.19 100.19

Aluminum lightning protection air terminals


Using small tools.
3/8" x 10" (outside US only) lk@.300 Ea 8.30 15.03 0.06 23.39
1/2" x 12" lk@.300 Ea 7.66 15.03 0.06 22.75
5/8" x 12" lk@.300 Ea 11.30 15.03 0.06 26.39
1/2" x 24" lk@.500 Ea 11.70 25.05 0.10 36.85
1/2" x 60" lk@1.00 Ea 22.10 50.10 0.19 72.39

Copper lightning protection air terminal bases


Using small tools.
Adhesive, 1/2" lk@.500 Ea 24.40 25.05 0.10 49.55
Bolted, 1/2" lk@.750 Ea 17.60 37.58 0.14 55.32
Hinged, 1/2" lk@1.00 Ea 31.90 50.10 0.19 82.19
Side mounted, 1/2" lk@.500 Ea 17.60 25.05 0.10 42.75
Offset point support, 1/2" lk@.500 Ea 24.40 25.05 0.10 49.55
Concealed assembly, 1/2" lk@1.50 Ea 34.60 75.15 0.29 110.04
Tee connector, 1/2" lk@1.00 Ea 40.70 50.10 0.19 90.99
36" tripod for
60" galvanized air terminal lk@1.00 Ea 30.10 50.10 0.19 80.39
Intermediate, 1/2" lk@1.00 Ea 24.40 50.10 0.19 74.69

Aluminum lightning protection air terminal bases, 1/2"


Using small tools.
Adhesive lk@.500 Ea 12.80 25.05 0.10 37.95
Bolted lk@.750 Ea 10.50 37.58 0.14 48.22
Hinged lk@1.00 Ea 18.60 50.10 0.19 68.89
Side mounted lk@.500 Ea 10.70 25.05 0.10 35.85
2015 Heavy Construction Estimator, All Rights Reserved Page 742 (part 2)

Offset point support lk@.500 Ea 13.40 25.05 0.10 38.55


Concealed assembly lk@1.50 Ea 21.30 75.15 0.29 96.74
Tee connector lk@1.00 Ea 21.10 50.10 0.19 71.39
36" tripod, for 60" air terminal,
galvanized lk@1.00 Ea 23.40 50.10 0.19 73.69
Intermediate lk@1.00 Ea 12.80 50.10 0.19 63.09

Lightning protection - Copper cable connectors


Using small tools.
Through wall lk@1.00 Ea 44.80 50.10 0.19 95.09
Through roof,
adapter assembly copper lk@1.50 Ea 47.60 75.15 0.29 123.04
Beam connector lk@1.00 Ea 29.80 50.10 0.19 80.09
Double bolt lk@.500 Ea 11.00 25.05 0.10 36.15
Cable to bar lk@.500 Ea 13.10 25.05 0.10 38.25

Lightning protection - Aluminum cable connectors


Using small tools.
Through wall lk@1.00 Ea 26.80 50.10 0.19 77.09
Through roof, adapter assembly lk@1.50 Ea 32.30 75.15 0.29 107.74
2015 Heavy Construction Estimator, All Rights Reserved Page 743

Beam connector lk@1.00 Ea 21.10 50.10 0.19 71.39


Double bolt lk@.500 Ea 7.28 25.05 0.10 32.43

Lightning protection - Copper bonding plates


Using small tools.
I beam, 8" square lk@1.00 Ea 15.30 50.10 0.19 65.59
Purlin, 8" square lk@1.00 Ea 19.00 50.10 0.19 69.29
16" square lk@1.50 Ea 25.10 75.15 0.29 100.54

Lightning protection - Aluminum bonding plates


Using small tools.
I beam, 8" square lk@1.00 Ea 8.62 50.10 0.19 58.91
Purlin, 8" square lk@1.00 Ea 11.70 50.10 0.19 61.99
16" square lk@1.50 Ea 13.40 75.15 0.29 88.84

Lightning protection - Copper cable supports


Using small tools.
Cable supports lk@.500 Ea 0.40 25.05 0.10 25.55
Adhesive cable supports lk@.500 Ea 1.57 25.05 0.10 26.72

Lightning protection - Aluminum cable supports


Using small tools.
Cable supports lk@.500 Ea 0.19 25.05 0.10 25.34
Adhesive cable supports lk@.500 Ea 0.77 25.05 0.10 25.92

Lightning protection - Copper cable straps


Using small tools.
Flex braided strap, 3/4" x 9-1/2" lk@1.00 Ea 10.80 50.10 0.19 61.09

Lightning protection - Aluminum bonding straps


Using small tools.
Flex braided strap, 3/4" x 9-1/2" lk@1.00 Ea 7.32 50.10 0.19 57.61

Lightning protection - Adapters


Using small tools.
1/2" copper swivel lk@.500 Ea 9.90 25.05 0.10 35.05
1/2" aluminum swivel lk@.500 Ea 7.77 25.05 0.10 32.92
Aluminum floor
ground receptor for 3/4" rod lk@1.50 Ea 30.10 75.15 0.29 105.54

Surge and lightning arrestors - Metal top


Intermediate type IMX, for outdoor use, single phase, using a line truck with aerial platform and small
tools.
3 KV arrestor lt@1.50 Ea 419.00 74.49 16.70 510.19
4.5 KV arrestor lt@1.50 Ea 485.00 74.49 16.70 576.19
6 KV arrestor lt@1.50 Ea 485.00 74.49 16.70 576.19
7.5 KV arrestor lt@1.50 Ea 606.00 74.49 16.70 697.19
9 KV arrestor lt@1.50 Ea 606.00 74.49 16.70 697.19
10 KV arrestor lt@1.50 Ea 707.00 74.49 16.70 798.19
12 KV arrestor lt@1.50 Ea 707.00 74.49 16.70 798.19
15 KV arrestor lt@2.00 Ea 1,000.00 99.32 22.30 1,121.62
18 KV arrestor lt@2.00 Ea 1,060.00 99.32 22.30 1,181.62
21 KV arrestor lt@3.00 Ea 1,120.00 149.00 33.50 1,302.50
24 KV arrestor lt@3.00 Ea 1,250.00 149.00 33.50 1,432.50
27 KV arrestor lt@3.00 Ea 1,590.00 149.00 33.50 1,772.50
2015 Heavy Construction Estimator, All Rights Reserved Page 743 (part 2)

Surge and lightning arrestors - Porcelain top


Intermediate type IMX, for cubicle mounting, single phase, using a line truck with aerial platform and
small tools.
3 KV arrestor lt@1.50 Ea 419.00 74.49 16.70 510.19
4.5 KV arrestor lt@1.50 Ea 485.00 74.49 16.70 576.19
6 KV arrestor lt@1.50 Ea 485.00 74.49 16.70 576.19
7.5 KV arrestor lt@1.50 Ea 606.00 74.49 16.70 697.19
9 KV arrestor lt@1.50 Ea 606.00 74.49 16.70 697.19
10 KV arrestor lt@1.50 Ea 707.00 74.49 16.70 798.19
12 KV arrestor lt@1.50 Ea 707.00 74.49 16.70 798.19
15 KV arrestor lt@2.00 Ea 1,000.00 99.32 22.30 1,121.62
2015 Heavy Construction Estimator, All Rights Reserved Page 744

18 KV arrestor lt@2.00 Ea 1,060.00 99.32 22.30 1,181.62


21 KV arrestor lt@3.00 Ea 1,120.00 149.00 33.50 1,302.50
24 KV arrestor lt@3.00 Ea 1,250.00 149.00 33.50 1,432.50
27 KV arrestor lt@3.00 Ea 1,590.00 149.00 33.50 1,772.50

Intermediate lightning arrestor accessories - 3 to 27 KV


Using a line truck with aerial platform and small tools.
Single crossarm bracket, reversible lt@2.00 Ea 285.00 99.32 22.30 406.62
Single unit, horizontal
pole mounted bracket lt@2.00 Ea 278.00 99.32 22.30 399.62
3 unit, horizontal
pole mounted bracket lt@2.00 Ea 222.00 99.32 22.30 343.62

Lightning arrestors and cutouts


Using a line truck with aerial platform and small tools.
3 KV, distribution class lt@2.00 Ea 76.40 99.32 22.30 198.02
3 KV, intermediate class lt@2.00 Ea 469.00 99.32 22.30 590.62
3 KV, station class lt@2.00 Ea 419.00 99.32 22.30 540.62
9 KV, distribution class lt@2.00 Ea 117.00 99.32 22.30 238.62
9 KV, intermediate class lt@2.00 Ea 578.00 99.32 22.30 699.62
9 KV, station class lt@2.00 Ea 606.00 99.32 22.30 727.62
15 KV, enclosed fused cutout lt@2.50 Ea 181.00 124.20 27.90 333.10
15 KV, open fused cutout lt@2.50 Ea 136.00 124.20 27.90 288.10

CSI 16-451, Copper conductors

Bare stranded copper wire, 1 conductor


Single conductor, laid in trench. No trenching or backfill included.
12 AWG ll@3.00 MLF 155.00 122.20 -- 277.20
10 AWG ll@3.25 MLF 234.00 132.40 -- 366.40
8 AWG ll@3.50 MLF 383.00 142.60 -- 525.60
6 AWG ll@3.75 MLF 523.00 152.70 -- 675.70
4 AWG ll@4.00 MLF 826.00 162.90 -- 988.90
2 AWG ll@4.25 MLF 1,290.00 173.10 -- 1,463.10
1 AWG ll@4.50 MLF 1,690.00 183.30 -- 1,873.30
1/0 MCM ll@4.75 MLF 2,150.00 193.50 -- 2,343.50
2/0 MCM ll@5.00 MLF 2,680.00 203.70 -- 2,883.70
3/0 MCM ll@5.25 MLF 3,400.00 213.80 -- 3,613.80
4/0 MCM ll@5.50 MLF 4,240.00 224.00 -- 4,464.00
250 MCM ll@5.75 MLF 4,870.00 234.20 -- 5,104.20
300 MCM ll@6.00 MLF 5,790.00 244.40 -- 6,034.40
350 MCM ll@6.25 MLF 6,760.00 254.60 -- 7,014.60
500 MCM ll@6.50 MLF 9,560.00 264.70 -- 9,824.70
2015 Heavy Construction Estimator, All Rights Reserved Page 745

Bare solid copper wire, 1 conductor


Single conductor laid in trench. No trenching or backfill included, using small tools.
12 AWG ll@3.25 MLF 151.00 132.40 -- 283.40
10 AWG ll@3.50 MLF 220.00 142.60 -- 362.60
8 AWG ll@3.75 MLF 364.00 152.70 -- 516.70
6 AWG ll@4.00 MLF 322.00 162.90 -- 484.90
4 AWG ll@4.25 MLF 809.00 173.10 -- 982.10
2 AWG ll@4.50 MLF 1,250.00 183.30 -- 1,433.30
1/0 AWG ll@4.75 MLF 2,110.00 193.50 -- 2,303.50
4/0 AWG ll@5.50 MLF 4,220.00 224.00 -- 4,444.00

Flexible braid connectors


Using small tools.
100 amp lk@1.00 LF 54.70 50.10 0.19 104.99
800 amp, for outside the US only lk@2.50 LF 162.00 125.30 0.48 287.78

Bonding jumpers for metallic conduit


Using small tools.
1/2" to 1" conduit lk@.500 Ea 41.70 25.05 0.10 66.85
1-1/4" to 2" conduit lk@.500 Ea 51.50 25.05 0.10 76.65
2-1/2" to 4" conduit lk@.750 Ea 106.00 37.58 0.14 143.72
5" and 6" conduit lk@1.00 Ea 189.00 50.10 0.19 239.29

CSI 16-452, Grounding rods

10’ copper clad grounding rods laid in an open trench


Using small tools.
1/2" diameter lk@.750 Ea 50.30 37.58 0.14 88.02
5/8" diameter lk@1.00 Ea 58.70 50.10 0.19 108.99
3/4" diameter lk@1.25 Ea 94.00 62.63 0.24 156.87

CSI 16-453, Ground clamps and fittings

Ground rod clamps


Using small tools.
1/2" clamp lk@.100 Ea 10.40 5.01 0.02 15.43
5/8" clamp lk@.100 Ea 12.20 5.01 0.02 17.23
3/4" clamp lk@.150 Ea 14.90 7.52 0.03 22.45

Bronze pipe clamps


Using small tools.
1/2" to 1" lk@.100 Ea 8.19 5.01 0.02 13.22
1-1/4" to 2" lk@.150 Ea 18.10 7.52 0.03 25.65
2-1/2" to 3" lk@.200 Ea 68.20 10.02 0.04 78.26
2-1/2" to 4" lk@.300 Ea 74.00 15.03 0.06 89.09
4" to 6" lk@.400 Ea 130.00 20.04 0.08 150.12

Insulated grounding bushings


Using small tools.
1/2" bushing lk@.150 Ea 6.04 7.52 0.03 13.59
3/4" bushing lk@.150 Ea 7.16 7.52 0.03 14.71
1" bushing lk@.150 Ea 8.05 7.52 0.03 15.60
1-1/4" bushing lk@.200 Ea 11.20 10.02 0.04 21.26
1-1/2" bushing lk@.200 Ea 13.80 10.02 0.04 23.86
2" bushing lk@.250 Ea 16.20 12.53 0.05 28.78
2-1/2" bushing lk@.250 Ea 24.30 12.53 0.05 36.88
2015 Heavy Construction Estimator, All Rights Reserved Page 745 (part 2)

3" bushing lk@.300 Ea 33.10 15.03 0.06 48.19


3-1/2" bushing lk@.300 Ea 44.20 15.03 0.06 59.29
4" bushing lk@.350 Ea 49.40 17.54 0.07 67.01
5" bushing lk@.450 Ea 113.00 22.55 0.09 135.64
6" bushing lk@.550 Ea 165.00 27.56 0.10 192.66

Ground inserts, embedded fittings


Using small tools.
2-3/8 x 16 holes,
#2 to 250 MCM cable range lk@1.25 Ea 32.50 62.63 0.24 95.37
4-3/8 x 16 holes,
#2 to 250 MCM cable range lk@1.50 Ea 40.10 75.15 0.29 115.54
2015 Heavy Construction Estimator, All Rights Reserved Page 746

4-3/8 x 16 holes,
250 to 500 MCM cable range lk@2.00 Ea 53.50 100.20 0.38 154.08

Ground rod receptacles


Using small tools.
1/2" receptacle lk@1.50 Ea 76.90 75.15 0.29 152.34
5/8" receptacle lk@1.50 Ea 83.90 75.15 0.29 159.34
3/4" receptacle lk@1.50 Ea 90.90 75.15 0.29 166.34

CSI 16-454, Cadweld bonding

Cadweld ground conductor bonding - Splice or lug


Using small tools.
#8 to 1 AWG lk@.400 Ea 0.53 20.04 0.08 20.65
#1/0 to 3/0 AWG lk@.600 Ea 7.69 30.06 0.11 37.86
#4/0 AWG to 300 MCM lk@1.00 Ea 7.69 50.10 0.19 57.98
350 to 500 MCM lk@1.25 Ea 19.80 62.63 0.24 82.67

Cadweld ground conductor bonding - Tee or wye


Using small tools.
#8 to 1 AWG lk@.750 Ea 7.69 37.58 0.14 45.41
#1/0 to 3/0 AWG lk@1.00 Ea 7.69 50.10 0.19 57.98
#4/0 AWG to 300 MCM lk@1.25 Ea 7.69 62.63 0.24 70.56
350 to 500 MCM lk@1.50 Ea 7.69 75.15 0.29 83.13

Cadweld ground conductor bonding - Cross or ground rod


Using small tools.
#8 to 1 AWG lk@.750 Ea 7.69 37.58 0.14 45.41
#1/0 to 3/0 AWG lk@1.00 Ea 7.69 50.10 0.19 57.98
#4/0 to 300 MCM lk@1.50 Ea 7.69 75.15 0.29 83.13
350 to 500 MCM lk@1.75 Ea 19.80 87.68 0.33 107.81

Cadweld ground conductor bonding - To steel rebars


Using small tools.
#8 to 1 AWG lk@.600 Ea 25.40 30.06 0.11 55.57
#1/0 to 3/0 AWG lk@.750 Ea 25.40 37.58 0.14 63.12
#4/0 AWG to 300 MCM lk@1.00 Ea 25.40 50.10 0.19 75.69
350 to 500 MCM lk@1.50 Ea 25.40 75.15 0.29 100.84

Cadweld ground conductor bonding - To structural steel


Using small tools.
#1/0 to 3/0 AWG lk@.750 Ea 25.30 37.58 0.14 63.02
#4/0 AWG to 300 MCM lk@1.00 Ea 25.30 50.10 0.19 75.59
350 to 500 MCM lk@1.50 Ea 25.30 75.15 0.29 100.74

CSI 16-456, Grounding equipment

Grounding accessories
Using small tools.
Grounding reel with
50’ galvanized steel cable lk@.200 Ea 280.00 10.02 0.04 290.06
1/4" x 2" copper bars lk@.250 LF 14.30 12.53 0.05 26.88
2" x 2"
x 1" long phenolic insulators lk@.500 Ea 3.63 25.05 0.10 28.78
Ball grounding studs lk@.500 Ea 4.75 25.05 0.10 29.90
2015 Heavy Construction Estimator, All Rights Reserved Page 747

CSI 16-460, Transformers

Oil filled distribution transformers - Primary 13.8 KV ground, Y secondary 120/240 volt
Single phase, self-protected type, 2 taps above and below normal, using a line truck with aerial platform
and small tools.
10 KVA lu@4.00 Ea 812.00 198.40 32.10 1,042.50
15 KVA lu@4.00 Ea 923.00 198.40 32.10 1,153.50
25 KVA lu@4.00 Ea 1,080.00 198.40 32.10 1,310.50
37.5 KVA lu@4.00 Ea 1,480.00 198.40 32.10 1,710.50
50 KVA lu@5.00 Ea 1,710.00 248.00 40.10 1,998.10
75 KVA lu@6.00 Ea 2,370.00 297.60 48.10 2,715.70
100 KVA lu@6.00 Ea 2,930.00 297.60 48.10 3,275.70

Oil filled distribution transformers - Primary 13.8 KV ground, Y secondary 240/480 volt
Single phase, self-protected type, 2 taps above and below normal, using a line truck with aerial platform
and small tools.
10 KVA lu@4.00 Ea 937.00 198.40 32.10 1,167.50
15 KVA lu@4.00 Ea 1,050.00 198.40 32.10 1,280.50
25 KVA lu@4.00 Ea 1,410.00 198.40 32.10 1,640.50
37.5 KVA lu@4.00 Ea 1,780.00 198.40 32.10 2,010.50
50 KVA lu@5.00 Ea 2,040.00 248.00 40.10 2,328.10
75 KVA lu@6.00 Ea 2,870.00 297.60 48.10 3,215.70
100 KVA lu@6.00 Ea 3,730.00 297.60 48.10 4,075.70

Oil filled distribution transformers - Transformer platforms


Using a line truck with aerial platform and small tools.
75 to 167 KVA lu@8.00 Ea 2,490.00 396.80 64.20 2,951.00

Oil filled distribution transformers - Primary 24.9 KV ground, Y secondary 240/480 volts
2 taps above and below normal, using a line truck with aerial platform and small tools.
10 KVA lu@6.00 Ea 1,050.00 297.60 48.10 1,395.70
15 KVA lu@6.00 Ea 1,160.00 297.60 48.10 1,505.70
25 KVA lu@6.00 Ea 1,410.00 297.60 48.10 1,755.70
37.5 KVA lu@6.00 Ea 1,780.00 297.60 48.10 2,125.70
50 KVA lu@7.00 Ea 2,040.00 347.20 56.10 2,443.30
75 KVA lu@7.00 Ea 2,870.00 347.20 56.10 3,273.30
100 KVA lu@8.00 Ea 3,730.00 396.80 64.20 4,191.00
167 KVA lu@8.00 Ea 5,020.00 396.80 64.20 5,481.00
250 KVA lu@12.0 Ea 6,380.00 595.20 96.20 7,071.40
333 KVA lu@16.0 Ea 7,490.00 793.60 128.00 8,411.60
500 KVA lu@20.0 Ea 9,720.00 992.00 160.00 10,872.00

CSI 16-470, Distribution switchboards

Fusible switch, 240 volt, three phase, 3 wire - Incoming service section main device only
Copper bus, non-metering type, with fuses, using small tools.
400 amp lk@8.00 Ea 2,540.00 400.80 1.52 2,942.32
600 amp lk@10.0 Ea 3,040.00 501.00 1.90 3,542.90
800 amp lk@12.0 Ea 6,320.00 601.20 2.28 6,923.48
1200 amp lk@20.0 Ea 7,540.00 1,002.00 3.80 8,545.80

Fusible branch circuit switches


Includes switch, fuses, and portion of the distribution section occupied by that branch device, using
small tools.
30/30 amp, twin unit lk@3.50 Ea 336.00 175.40 0.67 512.07
60/60 amp, twin unit lk@3.50 Ea 413.00 175.40 0.67 589.07
2015 Heavy Construction Estimator, All Rights Reserved Page 747 (part 2)

100/100 amp, twin unit lk@3.50 Ea 577.00 175.40 0.67 753.07


2015 Heavy Construction Estimator, All Rights Reserved Page 748

100 amp, single unit lk@4.00 Ea 375.00 200.40 0.76 576.16


200 amp, single unit lk@4.00 Ea 797.00 200.40 0.76 998.16
400 amp, single unit lk@5.00 Ea 1,860.00 250.50 0.95 2,111.45
600 amp, single unit lk@5.00 Ea 2,560.00 250.50 0.95 2,811.45
800 amp, single unit lk@6.00 Ea 5,900.00 300.60 1.14 6,201.74
1200 amp, single unit lk@8.00 Ea 6,670.00 400.80 1.52 7,072.32

Incoming service section main device only


Copper bus, non-metering type, with fuses, using small tools.
400 amp lk@6.00 Ea 3,250.00 300.60 1.14 3,551.74
600 amp lk@6.00 Ea 3,780.00 300.60 1.14 4,081.74
800 amp lk@7.00 Ea 6,800.00 350.70 1.33 7,152.03
1200 amp lk@8.00 Ea 7,920.00 400.80 1.52 8,322.32

Fusible branch circuit switch


Includes switch, fuses, and the portion of the distribution section occupied by that device, using small
tools.
30/30 amp, twin unit lk@3.50 Ea 547.00 175.40 0.67 723.07
60/60 amp, twin unit lk@3.50 Ea 547.00 175.40 0.67 723.07
100/100 amp, twin unit lk@3.50 Ea 884.00 175.40 0.67 1,060.07
100 amp, single unit lk@4.00 Ea 442.00 200.40 0.76 643.16
200 amp, single unit lk@4.00 Ea 999.00 200.40 0.76 1,200.16
400 amp, single unit lk@5.00 Ea 2,330.00 250.50 0.95 2,581.45
600 amp, single unit lk@5.00 Ea 2,770.00 250.50 0.95 3,021.45
800 amp, single unit lk@6.00 Ea 5,900.00 300.60 1.14 6,201.74
1200 amp, single unit lk@8.00 Ea 6,670.00 400.80 1.52 7,072.32

Branch circuit switch space - Unit branch circuit, copper bus, interior
Copper bus, for both 240 volt and 480 volt switches, includes fuses and the portion of the distribution
section occupied by that device, using small tools.
30/30 amp, twin unit lk@3.50 Ea 184.00 175.40 0.67 360.07
60/60 amp, twin unit lk@3.50 Ea 184.00 175.40 0.67 360.07
100/100 amp, twin unit lk@3.50 Ea 227.00 175.40 0.67 403.07
100 amp, single unit lk@4.00 Ea 227.00 200.40 0.76 428.16
200 amp, single unit lk@4.00 Ea 327.00 200.40 0.76 528.16
400 amp, single unit lk@5.00 Ea 433.00 250.50 0.95 684.45
600 amp, single unit lk@5.00 Ea 433.00 250.50 0.95 684.45
800 amp, single unit lk@8.00 Ea 482.00 400.80 1.52 884.32
1200 amp, single unit lk@8.00 Ea 482.00 400.80 1.52 884.32

Branch circuit switchboards


Circuit breaker type, 277/480 volt, three phase, using small tools.
800 amp main lk@6.00 Ea 5,130.00 300.60 1.14 5,431.74
1000 amp main lk@8.00 Ea 9,210.00 400.80 1.52 9,612.32
1200 amp main lk@10.0 Ea 12,000.00 501.00 1.90 12,502.90
1600 amp main lk@16.0 Ea 12,000.00 801.60 3.04 12,804.64
2000 amp main lk@18.0 Ea 11,100.00 901.80 3.42 12,005.22
2500 amp main lk@20.0 Ea 18,700.00 1,002.00 3.80 19,705.80
3000 amp main lk@24.0 Ea 20,500.00 1,202.00 4.56 21,706.56
4000 amp main lk@30.0 Ea 35,900.00 1,503.00 5.70 37,408.70

Type WRI distribution sections - 600 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
14 watt lk@6.00 Ea 607.00 300.60 1.14 908.74
24 to 30 watt lk@7.00 Ea 858.00 350.70 1.33 1,210.03
34 to 38 watt lk@8.00 Ea 953.00 400.80 1.52 1,355.32
2015 Heavy Construction Estimator, All Rights Reserved Page 749

42 to 48 watt lk@10.0 Ea 953.00 501.00 1.90 1,455.90

Type WRI distribution sections - 800 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
14 watt lk@6.00 Ea 607.00 300.60 1.14 908.74
24 to 30 watt lk@7.00 Ea 858.00 350.70 1.33 1,210.03
34 to 38 watt lk@8.00 Ea 953.00 400.80 1.52 1,355.32
42 to 48 watt lk@10.0 Ea 953.00 501.00 1.90 1,455.90

Type WRI distribution sections - 1200 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
14 watt lk@8.00 Ea 607.00 400.80 1.52 1,009.32
24 to 30 watt lk@10.0 Ea 858.00 501.00 1.90 1,360.90
34 to 38 watt lk@12.0 Ea 953.00 601.20 2.28 1,556.48
42 to 48 watt lk@14.0 Ea 953.00 701.40 2.66 1,657.06

Type WRI distribution sections - 1600 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
14 watt lk@8.00 Ea 1,140.00 400.80 1.52 1,542.32
24 to 30 watt lk@10.0 Ea 1,390.00 501.00 1.90 1,892.90
34 to 38 watt lk@12.0 Ea 1,490.00 601.20 2.28 2,093.48
42 to 48 watt lk@14.0 Ea 1,490.00 701.40 2.66 2,194.06

Type WRI distribution sections - 2000 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
14 watt lk@10.0 Ea 1,140.00 501.00 1.90 1,642.90
24 to 30 watt lk@12.0 Ea 1,390.00 601.20 2.28 1,993.48
34 to 38 watt lk@14.0 Ea 1,490.00 701.40 2.66 2,194.06
42 to 48 watt lk@16.0 Ea 1,490.00 801.60 3.04 2,294.64

Type WRI distribution sections - 3000 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
24 to 30 watt lk@14.0 Ea 2,310.00 701.40 2.66 3,014.06
34 to 38 watt lk@16.0 Ea 2,410.00 801.60 3.04 3,214.64
42 to 48 watt lk@18.0 Ea 2,410.00 901.80 3.42 3,315.22

Type WRI distribution sections - 4000 amp main bus, 4 wire


600 volts AC, 250 volts DC, using small tools.
24 to 30 watt lk@16.0 Ea 2,310.00 801.60 3.04 3,114.64
34 to 38 watt lk@18.0 Ea 2,410.00 901.80 3.42 3,315.22
42 to 48 watt lk@20.0 Ea 2,410.00 1,002.00 3.80 3,415.80

Type WRI distribution sections - Distribution underground pull sections


No bus or terminal included, using small tools.
12" to 20" wide, 15" to 20" deep lk@2.50 Ea 526.00 125.30 0.48 651.78
14" to 20" wide, 36" deep lk@3.00 Ea 230.00 150.30 0.57 380.87
24" to 28" wide, 20" deep lk@3.00 Ea 481.00 150.30 0.57 631.87
24" to 28" wide, 30" deep lk@3.50 Ea 481.00 175.40 0.67 657.07
28" to 30" wide, 36" deep lk@4.00 Ea 481.00 200.40 0.76 682.16
14" to 20" wide, 42" to 60" deep lk@5.00 Ea 579.00 250.50 0.95 830.45
26" to 30" wide, 42" to 60" deep lk@6.00 Ea 579.00 300.60 1.14 880.74
38" wide, 42" to 60" deep lk@7.00 Ea 579.00 350.70 1.33 931.03

Type WRI distribution sections - Distribution section pull boy


Horizontal mounted, across top of switchboard, using small tools.
18" to 24" wide,
2015 Heavy Construction Estimator, All Rights Reserved Page 749 (part 2)

30" high, open bottom lk@2.00 Ea 276.00 100.20 0.38 376.58


Drilled ebony ashstore bottom lk@2.00 Ea 308.00 100.20 0.38 408.58
Cable supports in pull boy lk@1.00 Ea 145.00 50.10 0.19 195.29
2015 Heavy Construction Estimator, All Rights Reserved Page 750

Incoming switchboard sections - 480 volt, 4 wire, no breakers


Using small tools.
600 amp lk@8.00 Ea 2,780.00 400.80 1.52 3,182.32
800 amp lk@8.00 Ea 3,070.00 400.80 1.52 3,472.32
1200 amp lk@10.0 Ea 3,790.00 501.00 1.90 4,292.90
1600 amp lk@12.0 Ea 4,160.00 601.20 2.28 4,763.48
2000 amp lk@14.0 Ea 4,440.00 701.40 2.66 5,144.06

Incoming switchboard sections - Distribution section subfeed


Using small tools.
Lug rated at 200 amps lk@6.00 Ea 1,570.00 300.60 1.14 1,871.74
Lug rated at 400 amps lk@6.00 Ea 1,780.00 300.60 1.14 2,081.74
Aluminum,120/208 or 277/480 volt,
4 wire lk@6.00 Ea 2,100.00 300.60 1.14 2,401.74
Aluminum bus without breaker,
800 amp lk@6.00 Ea 2,220.00 300.60 1.14 2,521.74
Aluminum bus without breaker,
1000 amp lk@8.00 Ea 2,420.00 400.80 1.52 2,822.32

Incoming switchboard sections - Feed section breakers


Using small tools.
FA frame 15 to 60 amp,
240 volt, single phase lk@1.50 Ea 58.10 75.15 0.29 133.54
FA frame 70 to 100 amp,
240 volt, three phase lk@1.50 Ea 75.90 75.15 0.29 151.34
KA frame 70 to 225 amp,
480 volt, three phase lk@2.50 Ea 718.00 125.30 0.48 843.78
LA frame 125 to 400 amp,
480 volt, three phase lk@3.00 Ea 1,280.00 150.30 0.57 1,430.87

Incoming switchboard sections - Branch section breakers, 240 volt


Using small tools.
100 amp, three phase lk@1.50 Ea 428.00 75.15 0.29 503.44
225 amp, three phase lk@2.50 Ea 1,610.00 125.30 0.48 1,735.78

Main circuit breakers - Manual, with static trip (no ground fault)
With current limiters and amptector, using small tools.
50 to 800 amp, DSL-206 lk@4.50 Ea 6,220.00 225.50 0.86 6,446.36
50 to 1600 amp, DSL-416 lk@6.00 Ea 11,800.00 300.60 1.14 12,101.74
1200 to 3200 amp, DSL-632 lk@12.0 Ea 29,000.00 601.20 2.28 29,603.48
4000 amp, DSL-840 lk@24.0 Ea 46,400.00 1,202.00 4.56 47,606.56

Main circuit breakers - Electrical operated with static trip (no ground fault)
With current limiters and amptector, using small tools.
50 to 800 amp, DSL-206 lk@6.00 Ea 7,600.00 300.60 1.14 7,901.74
50 to 1600 amp, DSL-416 lk@7.50 Ea 14,600.00 375.80 1.43 14,977.23
1200 to 3200 amp, DSL-632 lk@13.5 Ea 33,100.00 676.40 2.57 33,778.97
4000 amp, DSL-840 lk@25.5 Ea 50,200.00 1,278.00 4.85 51,482.85

Main circuit breakers - Manual, with ground fault and plug-in test provisions
With amptector, static trip, using small tools.
5 to 800 amp, DS-206 lk@6.00 Ea 4,640.00 300.60 1.14 4,941.74
5 to 1600 amp, DS-416 lk@7.50 Ea 8,870.00 375.80 1.43 9,247.23
2000 amp, DS-420 lk@10.0 Ea 12,400.00 501.00 1.90 12,902.90
120 to 3200 amp, DS-632 lk@13.5 Ea 21,800.00 676.40 2.57 22,478.97
4000 amp, DS-840 lk@25.5 Ea 35,100.00 1,278.00 4.85 36,382.85
2015 Heavy Construction Estimator, All Rights Reserved Page 750 (part 2)

Main circuit breakers - Electric operated, with ground fault and plug-in test
With amptector, static trip, using small tools.
50 to 800 amp, DS-206 lk@7.50 Ea 6,010.00 375.80 1.43 6,387.23
50 to 1600 amp, DS-416 lk@9.00 Ea 11,700.00 450.90 1.71 12,152.61
2000 amp, DS-420 lk@11.5 Ea 15,700.00 576.20 2.19 16,278.39
1200 to 3200 amp, DS-632 lk@15.0 Ea 25,800.00 751.50 2.85 26,554.35
4000 amp, DS-840 lk@27.0 Ea 39,200.00 1,353.00 5.13 40,558.13

Distribution section breakers - Molded case breakers, conventional, 3 pole


Connections only and using small tools.
70 to 225 amp, JB lk@1.50 Ea 984.00 75.15 0.29 1,059.44
125 to 400 amp, LB lk@3.00 Ea 2,190.00 150.30 0.57 2,340.87
2015 Heavy Construction Estimator, All Rights Reserved Page 751

300 to 600 amp, LC lk@4.50 Ea 2,460.00 225.50 0.86 2,686.36


400 to 800 amp, MC lk@6.00 Ea 3,170.00 300.60 1.14 3,471.74
600 to 1200 amp, NC lk@9.00 Ea 5,710.00 450.90 1.71 6,162.61
1000 to 2000 amp, PCC lk@12.0 Ea 10,700.00 601.20 2.28 11,303.48

Switchboard branch breakers - 480 volt, 3 pole


Connections only and using small tools.
60 amp lk@1.50 Ea 530.00 75.15 0.29 605.44
100 amp lk@1.50 Ea 593.00 75.15 0.29 668.44
225 amp lk@1.50 Ea 2,110.00 75.15 0.29 2,185.44
400 amp lk@2.00 Ea 2,820.00 100.20 0.38 2,920.58
600 amp lk@4.50 Ea 3,340.00 225.50 0.86 3,566.36
800 amp lk@6.00 Ea 3,990.00 300.60 1.14 4,291.74
1000 amp lk@9.00 Ea 6,490.00 450.90 1.71 6,942.61
1200 amp lk@9.00 Ea 6,490.00 450.90 1.71 6,942.61
1600 amp lk@12.0 Ea 9,100.00 601.20 2.28 9,703.48
2000 amp lk@12.0 Ea 10,900.00 601.20 2.28 11,503.48

Switchboard branch breakers - 277/480 volt


Connections only and using small tools.
400 amp lk@2.00 Ea 7,690.00 100.20 0.38 7,790.58
600 amp lk@2.00 Ea 7,690.00 100.20 0.38 7,790.58
800 amp lk@2.50 Ea 7,690.00 125.30 0.48 7,815.78
1200 amp lk@3.00 Ea 13,800.00 150.30 0.57 13,950.87
1600 amp lk@4.00 Ea 13,800.00 200.40 0.76 14,001.16
2000 amp lk@4.00 Ea 16,700.00 200.40 0.76 16,901.16

Switchboard, structure per section, copper, 480 volt


Connections only and using small tools.
225 amp lk@4.00 Ea 1,730.00 200.40 0.76 1,931.16
400 amp lk@4.00 Ea 2,550.00 200.40 0.76 2,751.16
600 amp lk@4.00 Ea 2,690.00 200.40 0.76 2,891.16
800 amp lk@4.00 Ea 3,100.00 200.40 0.76 3,301.16
1200 amp lk@5.00 Ea 3,810.00 250.50 0.95 4,061.45
1600 amp lk@6.00 Ea 4,570.00 300.60 1.14 4,871.74
2000 amp lk@6.00 Ea 5,280.00 300.60 1.14 5,581.74
2500 amp lk@7.00 Ea 6,750.00 350.70 1.33 7,102.03
3000 amp lk@7.00 Ea 7,870.00 350.70 1.33 8,222.03
4000 amp lk@8.00 Ea 10,600.00 400.80 1.52 11,002.32

Factory-installed distribution switchboard instruments


Connections only and using small tools.
Weatherproof modify meter lk@2.50 Ea 3,460.00 125.30 0.48 3,585.78
Resistor type control switch,
130 volt lk@1.00 Ea 60.00 50.10 0.19 110.29
Metering instruments,
volt, amp and watt hour --@.000 Ea 5,310.00 -- -- 5,310.00

Panel mounted molded case breakers - Type WRI, 600 volt, 3 pole
Using small tools.
15 to 60 amp, type EHB lk@.500 Ea 371.00 25.05 0.10 396.15
70 to 100 amp, type EHB lk@.500 Ea 438.00 25.05 0.10 463.15
125 to 150 amp, type FB lk@1.00 Ea 1,180.00 50.10 0.19 1,230.29
70 to 225 amp, type JB lk@1.25 Ea 1,230.00 62.63 0.24 1,292.87
125 to 400 amp, type LBB lk@1.75 Ea 2,190.00 87.68 0.33 2,278.01
300 to 600 amp, type LC lk@2.00 Ea 2,460.00 100.20 0.38 2,560.58
900 to 1000 amp, type NB lk@2.00 Ea 2,800.00 100.20 0.38 2,900.58
2015 Heavy Construction Estimator, All Rights Reserved Page 751 (part 2)

Panel mounted molded case breakers - Type WRI, 600 volt, 2 pole
Using small tools.
15 to 60 amp,
type EHB (outside US only) lk@.750 Ea 287.00 37.58 0.14 324.72
70 to 100 amp,
type EHB (outside US only) lk@.750 Ea 371.00 37.58 0.14 408.72
125 to 150 amp,
type FB (outside US only) lk@1.00 Ea 404.00 50.10 0.19 454.29
70 to 225 amp, type JB lk@1.00 Ea 984.00 50.10 0.19 1,034.29
2015 Heavy Construction Estimator, All Rights Reserved Page 752

125 to 400 amp, type LBB lk@1.50 Ea 1,800.00 75.15 0.29 1,875.44
300 to 600 amp, type LC lk@2.00 Ea 1,930.00 100.20 0.38 2,030.58
900 to 1000 amp, type NB lk@2.00 Ea 8,460.00 100.20 0.38 8,560.58

Voltage regulators for diesel generators - 480/277 or 208/120 volt


Mounted in a switchgear cabinet, 3 phase input and output, using small tools.
50 KVA lk@6.00 Ea 1,570.00 300.60 1.14 1,871.74
75 KVA lk@7.00 Ea 1,570.00 350.70 1.33 1,922.03
100 KVA lk@7.50 Ea 1,570.00 375.80 1.43 1,947.23

CSI 16-471, Lighting and power branch circuit panelboards

Unassembled panelboards - 3-wire main lugs only, 1 phase, 120/240 volt


Add the cost of installing plug-in branch breakers, cabinet and trim, using small tools.
100 amp, 20 circuits lk@1.50 Ea 318.00 75.15 0.29 393.44
225 amp, 42 circuits lk@2.00 Ea 360.00 100.20 0.38 460.58
400 amp, 42 circuits lk@4.00 Ea 621.00 200.40 0.76 822.16

Unassembled panelboards - Main breaker, 1 phase, 3 wire, 120/240 volt


Add the cost of installing plug-in branch breakers, cabinet and trim, using small tools.
50 amp, 10 circuits lk@1.00 Ea 573.00 50.10 0.19 623.29
100 amp, 20 circuits lk@1.50 Ea 470.00 75.15 0.29 545.44
225 amp, 42 circuits lk@2.00 Ea 871.00 100.20 0.38 971.58
400 amp, 42 circuits lk@4.00 Ea 1,870.00 200.40 0.76 2,071.16

Unassembled panelboards - 4-wire main lugs only, 3 phase, 120/208 volt


Add the cost of installing plug-in branch breakers, using small tools.
100 amp, 30 circuits lk@1.50 Ea 395.00 75.15 0.29 470.44
225 amp, 42 circuits lk@2.00 Ea 447.00 100.20 0.38 547.58
400 amp, 42 circuits lk@4.00 Ea 694.00 200.40 0.76 895.16

Unassembled panelboards - Main breaker, 3 phase, 4 wire, 120/208 volt


Add the cost of installing plug-in branch breakers, using small tools.
50 amp, 14 circuits lk@1.00 Ea 633.00 50.10 0.19 683.29
100 amp, 30 circuits lk@1.50 Ea 617.00 75.15 0.29 692.44
225 amp, 42 circuits lk@2.00 Ea 1,110.00 100.20 0.38 1,210.58
400 amp, 42 circuits lk@4.00 Ea 2,070.00 200.40 0.76 2,271.16

10,000 amp interrupting capacity (A.I.C.) plug-in circuit breakers


Using small tools.
1 pole, 120 volt, 15 to 60 amp lk@.100 Ea 11.60 5.01 0.02 16.63
1 pole, 120 volt, 70 to 100 amp lk@.100 Ea 34.90 5.01 0.02 39.93
2 pole, 240 volt, 15 to 60 amp lk@.150 Ea 25.40 7.52 0.03 32.95
2 pole, 240 volt, 70 to 100 amp lk@.150 Ea 55.90 7.52 0.03 63.45
3 pole, 240 volt, 15 to 60 amp lk@.200 Ea 86.60 10.02 0.04 96.66
3 pole, 240 volt, 70 to 100 amp lk@.200 Ea 120.00 10.02 0.04 130.06
1 pole GFI, 120 volt, 15 to 60 amp lk@.500 Ea 108.00 25.05 0.10 133.15

Unassembled panelboards - Main lugs only, 3 phase, 480 volt


Add the cost of installing branch breakers, using small tools.
100 amp, 30 breaker spaces lk@1.50 Ea 338.00 75.15 0.29 413.44
225 amp, 42 breaker spaces lk@2.00 Ea 380.00 100.20 0.38 480.58
2015 Heavy Construction Estimator, All Rights Reserved Page 753

400 amp, 42 breaker spaces lk@4.00 Ea 545.00 200.40 0.76 746.16


600 amp, 42 breaker spaces lk@5.00 Ea 685.00 250.50 0.95 936.45

Unassembled panelboards - Main breaker, 3 phase, 480 volt


Add the cost of branch breakers, using small tools.
50 amp, 14 breaker spaces lk@1.00 Ea 529.00 50.10 0.19 579.29
100 amp, 30 breaker spaces lk@1.50 Ea 814.00 75.15 0.29 889.44
150 amp, 42 breaker spaces lk@1.75 Ea 1,580.00 87.68 0.33 1,668.01
225 amp, 42 breaker spaces lk@2.00 Ea 1,430.00 100.20 0.38 1,530.58
400 amp, 42 breaker spaces lk@4.00 Ea 2,680.00 200.40 0.76 2,881.16
600 amp, 42 breaker spaces lk@5.00 Ea 4,360.00 250.50 0.95 4,611.45

Unassembled panelboards - 4-wire main lugs only, 3 phase, 277/480 volt


Add the cost of main and branch breakers, using small tools.
100 amp, 30 breaker spaces lk@2.00 Ea 326.00 100.20 0.38 426.58
225 amp, 42 breaker spaces lk@2.50 Ea 373.00 125.30 0.48 498.78
400 amp, 42 breaker spaces lk@4.50 Ea 529.00 225.50 0.86 755.36
600 amp, 42 breaker spaces lk@5.50 Ea 664.00 275.60 1.05 940.65

Unassembled panelboards - Main breaker, 3 phase, 4 wire, 277/480 volt


Add the cost of branch breakers, using small tools.
50 amp, 14 breaker spaces lk@2.00 Ea 529.00 100.20 0.38 629.58
100 amp, 30 breaker spaces lk@2.50 Ea 663.00 125.30 0.48 788.78
150 amp, 42 breaker spaces lk@2.75 Ea 1,720.00 137.80 0.52 1,858.32
225 amp, 42 breaker spaces lk@3.00 Ea 1,830.00 150.30 0.57 1,980.87
400 amp, 42 breaker spaces lk@5.00 Ea 2,680.00 250.50 0.95 2,931.45
600 amp, 42 breaker spaces lk@6.00 Ea 4,360.00 300.60 1.14 4,661.74

Branch breakers for lighting and power panelboards


14,000 amp interrupting capacity (A.I.C.) bolt-on breakers, using small tools.
1 pole, 277 volt, 15 to 60 amp lk@.300 Ea 80.80 15.03 0.06 95.89
1 pole, 277 volt, 70 to 100 amp lk@.300 Ea 144.00 15.03 0.06 159.09
2 pole, 277 volt, 15 to 60 amp lk@.400 Ea 175.00 20.04 0.08 195.12
2 pole, 277 volt, 70 to 100 amp lk@.400 Ea 259.00 20.04 0.08 279.12
3 pole, 277 volt, 15 to 60 amp lk@.700 Ea 175.00 35.07 0.13 210.20
3 pole, 277 volt, 70 to 100 amp lk@.750 Ea 238.00 37.58 0.14 275.72
2 pole, 600 volt, 15 to 60 amp lj@.700 Ea 399.00 35.07 0.27 434.34
2 pole, 600 volt, 70 to 100 amp lj@.700 Ea 399.00 35.07 0.27 434.34
3 pole, 600 volt, 15 to 60 amp lj@.750 Ea 483.00 37.58 0.29 520.87
3 pole, 600 volt, 70 to 100 amp lj@.750 Ea 1,040.00 37.58 0.29 1,077.87
1 pole GFI, 277 volt, 15 to 60 amp,
outside US only lk@.700 Ea 235.00 35.07 0.13 270.20

Assembled panelboards - 3-wire main lugs, single phase, 120/240 volt


Lighting and power panelboards. Includes main lugs, 20 amp, 1 pole branch breakers, panelboard box
and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 247.00 170.30 0.65 417.95
100 amp, 10 branch breakers lk@4.00 Ea 271.00 200.40 0.76 472.16
100 amp, 12 branch breakers lk@4.60 Ea 296.00 230.50 0.87 527.37
100 amp, 14 branch breakers lk@5.70 Ea 320.00 285.60 1.08 606.68
100 amp, 16 branch breakers lk@6.30 Ea 344.00 315.60 1.20 660.80
100 amp, 18 branch breakers lk@6.90 Ea 567.00 345.70 1.31 914.01
100 amp, 20 branch breakers lk@7.50 Ea 392.00 375.80 1.43 769.23
225 amp, 22 branch breakers lk@8.10 Ea 442.00 405.80 1.54 849.34
225 amp, 24 branch breakers lk@8.70 Ea 466.00 435.90 1.65 903.55
225 amp, 26 branch breakers lk@9.80 Ea 735.00 491.00 1.86 1,227.86
225 amp, 28 branch breakers lk@10.4 Ea 783.00 521.00 1.98 1,305.98
225 amp, 30 branch breakers lk@11.0 Ea 816.00 551.10 2.09 1,369.19
2015 Heavy Construction Estimator, All Rights Reserved Page 753 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 754

225 amp, 32 branch breakers lk@11.6 Ea 857.00 581.20 2.20 1,440.40


225 amp, 34 branch breakers lk@12.2 Ea 877.00 611.20 2.32 1,490.52
225 amp, 36 branch breakers lk@12.8 Ea 931.00 641.30 2.43 1,574.73
225 amp, 38 branch breakers lk@13.9 Ea 992.00 696.40 2.64 1,691.04
225 amp, 40 branch breakers lk@14.5 Ea 999.00 726.50 2.76 1,728.26
225 amp, 42 branch breakers lk@15.1 Ea 1,070.00 756.50 2.87 1,829.37

Assembled panelboards - Main breaker, single phase, 3 wire, 120/240 volt


Lighting and power panelboards. Includes main breaker, 20 amp, 1 pole branch breakers, panelboard
box and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 305.00 170.30 0.65 475.95
100 amp, 10 branch breakers lk@4.00 Ea 329.00 200.40 0.76 530.16
100 amp, 12 branch breakers lk@4.60 Ea 389.00 230.50 0.87 620.37
100 amp, 14 branch breakers lk@5.70 Ea 413.00 285.60 1.08 699.68
100 amp, 16 branch breakers lk@6.30 Ea 438.00 315.60 1.20 754.80
100 amp, 18 branch breakers lk@6.90 Ea 716.00 345.70 1.31 1,063.01
100 amp, 20 branch breakers lk@7.50 Ea 486.00 375.80 1.43 863.23
225 amp, 22 branch breakers lk@8.10 Ea 834.00 405.80 1.54 1,241.34
225 amp, 24 branch breakers lk@8.70 Ea 1,250.00 435.90 1.65 1,687.55
225 amp, 26 branch breakers lk@9.80 Ea 1,310.00 491.00 1.86 1,802.86
225 amp, 28 branch breakers lk@10.4 Ea 1,340.00 521.00 1.98 1,862.98
225 amp, 30 branch breakers lk@11.0 Ea 1,360.00 551.10 2.09 1,913.19
225 amp, 32 branch breakers lk@11.6 Ea 1,440.00 581.20 2.20 2,023.40
225 amp, 34 branch breakers lk@12.2 Ea 1,460.00 611.20 2.32 2,073.52
225 amp, 36 branch breakers lk@12.8 Ea 1,500.00 641.30 2.43 2,143.73
225 amp, 38 branch breakers lk@13.9 Ea 1,540.00 696.40 2.64 2,239.04
225 amp, 40 branch breakers lk@14.5 Ea 1,570.00 726.50 2.76 2,299.26
225 amp, 42 branch breakers lk@15.1 Ea 1,610.00 756.50 2.87 2,369.37

Assembled panelboards - 4-wire main lugs, 3 phase, 120/208 volt


Lighting and power panelboards. Includes main lugs, 20 amp, 1 pole branch breakers, panelboard box
and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 399.00 170.30 0.65 569.95
100 amp, 10 branch breakers lk@3.80 Ea 432.00 190.40 0.72 623.12
100 amp, 12 branch breakers lk@4.00 Ea 473.00 200.40 0.76 674.16
100 amp, 14 branch breakers lk@4.30 Ea 520.00 215.40 0.82 736.22
100 amp, 16 branch breakers lk@4.60 Ea 560.00 230.50 0.87 791.37
100 amp, 18 branch breakers lk@6.90 Ea 601.00 345.70 1.31 948.01
100 amp, 20 branch breakers lk@7.50 Ea 641.00 375.80 1.43 1,018.23
225 amp, 22 branch breakers lk@8.10 Ea 675.00 405.80 1.54 1,082.34
225 amp, 24 branch breakers lk@8.70 Ea 716.00 435.90 1.65 1,153.55
225 amp, 26 branch breakers lk@9.80 Ea 763.00 491.00 1.86 1,255.86
225 amp, 28 branch breakers lk@10.4 Ea 802.00 521.00 1.98 1,324.98
225 amp, 30 branch breakers lk@11.0 Ea 850.00 551.10 2.09 1,403.19
225 amp, 32 branch breakers lk@11.6 Ea 918.00 581.20 2.20 1,501.40
225 amp, 34 branch breakers lk@12.2 Ea 932.00 611.20 2.32 1,545.52
225 amp, 36 branch breakers lk@12.8 Ea 992.00 641.30 2.43 1,635.73
225 amp, 38 branch breakers lk@13.9 Ea 1,030.00 696.40 2.64 1,729.04
225 amp, 40 branch breakers lk@14.5 Ea 1,070.00 726.50 2.76 1,799.26
225 amp, 42 branch breakers lk@15.1 Ea 1,100.00 756.50 2.87 1,859.37

Assembled panelboards - 4-wire main breaker, 3 phase, 120/208 volt


Lighting and power panelboards. Includes main breaker, 20 amp, 1 pole branch breakers, panelboard
box and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 553.00 170.30 0.65 723.95
100 amp, 10 branch breakers lk@4.00 Ea 587.00 200.40 0.76 788.16
100 amp, 12 branch breakers lk@4.60 Ea 634.00 230.50 0.87 865.37
100 amp, 14 branch breakers lk@5.70 Ea 728.00 285.60 1.08 1,014.68
100 amp, 16 branch breakers lk@6.30 Ea 769.00 315.60 1.20 1,085.80
2015 Heavy Construction Estimator, All Rights Reserved Page 754 (part 2)

100 amp, 18 branch breakers lk@6.90 Ea 810.00 345.70 1.31 1,157.01


100 amp, 20 branch breakers lk@7.50 Ea 850.00 375.80 1.43 1,227.23
225 amp, 22 branch breakers lk@8.10 Ea 877.00 405.80 1.54 1,284.34
225 amp, 24 branch breakers lk@8.70 Ea 924.00 435.90 1.65 1,361.55
2015 Heavy Construction Estimator, All Rights Reserved Page 755

225 amp, 26 branch breakers lk@9.80 Ea 944.00 491.00 1.86 1,436.86


225 amp, 28 branch breakers lk@10.4 Ea 1,010.00 521.00 1.98 1,532.98
225 amp, 30 branch breakers lk@11.0 Ea 1,070.00 551.10 2.09 1,623.19
225 amp, 32 branch breakers lk@11.6 Ea 1,610.00 581.20 2.20 2,193.40
225 amp, 34 branch breakers lk@12.2 Ea 1,660.00 611.20 2.32 2,273.52
225 amp, 36 branch breakers lk@12.8 Ea 1,670.00 641.30 2.43 2,313.73
225 amp, 38 branch breakers lk@13.9 Ea 1,730.00 696.40 2.64 2,429.04
225 amp, 40 branch breakers lk@14.5 Ea 1,780.00 726.50 2.76 2,509.26
225 amp, 42 branch breakers lk@15.1 Ea 1,790.00 756.50 2.87 2,549.37

Assembled panelboards - 3-wire main lugs, 3 phase, 480 volt


Lighting and power panelboards. Includes main lugs only, 20 amp, 1 pole branch breakers, panelboard
box and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 501.00 170.30 0.65 671.95
100 amp, 10 branch breakers lk@4.00 Ea 553.00 200.40 0.76 754.16
100 amp, 12 branch breakers lk@4.60 Ea 604.00 230.50 0.87 835.37
100 amp, 14 branch breakers lk@5.70 Ea 656.00 285.60 1.08 942.68
100 amp, 16 branch breakers lk@6.30 Ea 708.00 315.60 1.20 1,024.80
100 amp, 18 branch breakers lk@6.90 Ea 760.00 345.70 1.31 1,107.01
100 amp, 20 branch breakers lk@7.50 Ea 811.00 375.80 1.43 1,188.23
225 amp, 22 branch breakers lk@8.10 Ea 863.00 405.80 1.54 1,270.34
225 amp, 24 branch breakers lk@8.70 Ea 915.00 435.90 1.65 1,352.55
225 amp, 26 branch breakers lk@9.80 Ea 967.00 491.00 1.86 1,459.86
225 amp, 28 branch breakers lk@10.4 Ea 1,020.00 521.00 1.98 1,542.98
225 amp, 30 branch breakers lk@11.0 Ea 1,070.00 551.10 2.09 1,623.19
225 amp, 32 branch breakers lk@11.6 Ea 1,160.00 581.20 2.20 1,743.40
225 amp, 34 branch breakers lk@12.2 Ea 1,210.00 611.20 2.32 1,823.52
225 amp, 36 branch breakers lk@12.8 Ea 1,260.00 641.30 2.43 1,903.73
225 amp, 38 branch breakers lk@13.9 Ea 1,310.00 696.40 2.64 2,009.04
225 amp, 40 branch breakers lk@14.5 Ea 1,370.00 726.50 2.76 2,099.26
225 amp, 42 branch breakers lk@15.1 Ea 1,420.00 756.50 2.87 2,179.37

Assembled panelboards - Main breaker, 3 phase, 3 wire, 480 volt


Lighting and power panelboards. Includes main breaker, 20 amp, 1 pole branch breakers, panelboard
box and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 667.00 170.30 0.65 837.95
100 amp, 10 branch breakers lk@4.00 Ea 719.00 200.40 0.76 920.16
100 amp, 12 branch breakers lk@4.60 Ea 771.00 230.50 0.87 1,002.37
100 amp, 14 branch breakers lk@5.70 Ea 1,070.00 285.60 1.08 1,356.68
100 amp, 16 branch breakers lk@6.30 Ea 1,120.00 315.60 1.20 1,436.80
100 amp, 18 branch breakers lk@6.90 Ea 1,170.00 345.70 1.31 1,517.01
100 amp, 20 branch breakers lk@7.50 Ea 1,230.00 375.80 1.43 1,607.23
225 amp, 22 branch breakers lk@8.10 Ea 1,280.00 405.80 1.54 1,687.34
225 amp, 24 branch breakers lk@8.70 Ea 1,330.00 435.90 1.65 1,767.55
225 amp, 26 branch breakers lk@9.80 Ea 1,380.00 491.00 1.86 1,872.86
225 amp, 28 branch breakers lk@10.4 Ea 1,430.00 521.00 1.98 1,952.98
225 amp, 30 branch breakers lk@11.0 Ea 1,480.00 551.10 2.09 2,033.19
225 amp, 32 branch breakers lk@11.6 Ea 2,070.00 581.20 2.20 2,653.40
225 amp, 34 branch breakers lk@12.2 Ea 2,120.00 611.20 2.32 2,733.52
225 amp, 36 branch breakers lk@12.8 Ea 2,180.00 641.30 2.43 2,823.73
225 amp, 38 branch breakers lk@13.9 Ea 2,230.00 696.40 2.64 2,929.04
225 amp, 40 branch breakers lk@14.5 Ea 2,280.00 726.50 2.76 3,009.26
225 amp, 42 branch breakers lk@15.1 Ea 2,330.00 756.50 2.87 3,089.37

Assembled panelboards - 4-wire main lugs, 3 phase, 277/480 volt


Lighting and power panelboards. Includes main lugs, 20 amp, 1 pole branch breakers, panelboard box
and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 846.00 170.30 0.65 1,016.95
100 amp, 10 branch breakers lk@4.00 Ea 987.00 200.40 0.76 1,188.16
2015 Heavy Construction Estimator, All Rights Reserved Page 755 (part 2)

100 amp, 12 branch breakers lk@4.60 Ea 1,130.00 230.50 0.87 1,361.37


100 amp, 14 branch breakers lk@5.70 Ea 1,270.00 285.60 1.08 1,556.68
100 amp, 16 branch breakers lk@6.30 Ea 1,410.00 315.60 1.20 1,726.80
2015 Heavy Construction Estimator, All Rights Reserved Page 756

100 amp, 18 branch breakers lk@6.90 Ea 1,550.00 345.70 1.31 1,897.01


100 amp, 20 branch breakers lk@7.50 Ea 1,690.00 375.80 1.43 2,067.23
225 amp, 22 branch breakers lk@8.10 Ea 1,830.00 405.80 1.54 2,237.34
225 amp, 24 branch breakers lk@8.70 Ea 1,550.00 435.90 1.65 1,987.55
225 amp, 26 branch breakers lk@9.80 Ea 2,110.00 491.00 1.86 2,602.86
225 amp, 28 branch breakers lk@10.4 Ea 2,250.00 521.00 1.98 2,772.98
225 amp, 30 branch breakers lk@11.0 Ea 1,900.00 551.10 2.09 2,453.19
225 amp, 32 branch breakers lk@11.6 Ea 2,570.00 581.20 2.20 3,153.40
225 amp, 34 branch breakers lk@12.2 Ea 2,710.00 611.20 2.32 3,323.52
225 amp, 36 branch breakers lk@12.8 Ea 2,850.00 641.30 2.43 3,493.73
225 amp, 38 branch breakers lk@13.9 Ea 3,000.00 696.40 2.64 3,699.04
225 amp, 40 branch breakers lk@14.5 Ea 4,410.00 726.50 2.76 5,139.26
225 amp, 42 branch breakers lk@15.1 Ea 3,280.00 756.50 2.87 4,039.37

Assembled panelboards - Main breaker, 3 phase, 4 wire main, 277/480 volt


Lighting and power panelboards. Includes main breaker, 20 amp, 1 pole branch breakers, panelboard
box and trim, using small tools.
100 amp, 8 branch breakers lk@3.40 Ea 1,020.00 170.30 0.65 1,190.95
100 amp, 10 branch breakers lk@4.00 Ea 1,160.00 200.40 0.76 1,361.16
100 amp, 12 branch breakers lk@4.60 Ea 1,300.00 230.50 0.87 1,531.37
100 amp, 14 branch breakers lk@5.70 Ea 1,560.00 285.60 1.08 1,846.68
100 amp, 16 branch breakers lk@6.30 Ea 1,700.00 315.60 1.20 2,016.80
100 amp, 18 branch breakers lk@6.90 Ea 1,840.00 345.70 1.31 2,187.01
100 amp, 20 branch breakers lk@7.50 Ea 1,980.00 375.80 1.43 2,357.23
225 amp, 22 branch breakers lk@8.10 Ea 2,120.00 405.80 1.54 2,527.34
225 amp, 24 branch breakers lk@8.70 Ea 1,840.00 435.90 1.65 2,277.55
225 amp, 26 branch breakers lk@9.80 Ea 2,400.00 491.00 1.86 2,892.86
225 amp, 28 branch breakers lk@10.4 Ea 2,540.00 521.00 1.98 3,062.98
225 amp, 30 branch breakers lk@11.0 Ea 2,680.00 551.10 2.09 3,233.19
225 amp, 32 branch breakers lk@11.6 Ea 3,840.00 581.20 2.20 4,423.40
225 amp, 34 branch breakers lk@12.2 Ea 3,980.00 611.20 2.32 4,593.52
225 amp, 36 branch breakers lk@12.8 Ea 4,120.00 641.30 2.43 4,763.73
225 amp, 38 branch breakers lk@13.9 Ea 4,260.00 696.40 2.64 4,959.04
225 amp, 40 branch breakers lk@14.5 Ea 4,400.00 726.50 2.76 5,129.26
225 amp, 42 branch breakers lk@14.5 Ea 4,540.00 726.50 2.76 5,269.26

Light control panels


Using small tools.
Master control panel with
keyboard and battery backup lk@12.0 Ea 28,700.00 601.20 2.28 29,303.48
Transceiver panel with thirty-two 20 amp,
277 volt relays lk@18.0 Ea 24,900.00 901.80 3.42 25,805.22

Power filters, 480/277 volt, 4 conductor


Using small tools.
200 amp, 25" x 40" x 17" lk@4.00 Ea 14,400.00 200.40 0.76 14,601.16
600 amp, 80" x 60" x 17" lk@6.00 Ea 24,000.00 300.60 1.14 24,301.74

Signal filters
Using small tools.
0.5 amp, 125 volt, 500 conductor
19" x 36-3/4" x 19-1/8" lk@12.0 Ea 10,400.00 601.20 2.28 11,003.48
0.5 amp, 125 volt, 200 conductor
29" x 40" x 11" case lk@6.00 Ea 7,190.00 300.60 1.14 7,491.74
0.5 amp, 125 volt, 3
pair conductor 12" x 12" x 4" lk@1.50 Ea 4,000.00 75.15 0.29 4,075.44
5 amp, 24 VDC, 5 volt, two 1
pair conductor signal filters lk@1.00 Ea 5,590.00 50.10 0.19 5,640.29
2015 Heavy Construction Estimator, All Rights Reserved Page 756 (part 2)

Load centers with main breaker, 120/240 volt, 1 pole


Using small tools.
125 amp main with 20 breakers lk@2.80 Ea 211.00 140.30 0.53 351.83
200 amp main with 30 breakers lk@4.30 Ea 407.00 215.40 0.82 623.22
2015 Heavy Construction Estimator, All Rights Reserved Page 757

CSI 16-510, Lighting fixtures

Incandescent lighting - Porcelain lamp holder


For outlet box mounting, using small tools.
Keyless lp@.300 Ea 2.73 14.88 0.06 17.67
Pull switch, 4' linen cord and bell lp@.300 Ea 4.09 14.88 0.06 19.03

Incandescent lighting - Adjustable lamp holder


Using small tools.
For outlet box mounting lp@.400 Ea 5.45 19.84 0.08 25.37

Industrial incandescent lighting - Standard dome reflector


Using small tools.
Pendant mounted lp@.600 Ea 59.80 29.76 0.12 89.68
Ceiling mounted lp@.500 Ea 49.50 24.80 0.10 74.40

Industrial incandescent lighting - Deep bowl reflector


Using small tools.
Pendant mounted lp@.800 Ea 31.60 39.68 0.16 71.44
Ceiling mounted lp@.700 Ea 31.60 34.72 0.14 66.46

Industrial incandescent lighting - Symmetrical angle reflector


Using small tools.
Pendant mounted lp@.800 Ea 35.30 39.68 0.16 75.14
Ceiling mounted lp@.600 Ea 35.30 29.76 0.12 65.18

Industrial incandescent lighting - Enclosed and gasketed, integral box


Vapor tight, using small tools.
Ceiling mounted lp@.700 Ea 70.90 34.72 0.14 105.76
Wall mounted lp@.700 Ea 78.10 34.72 0.14 112.96
Pendant mounted lp@1.00 Ea 57.50 49.60 0.20 107.30

Industrial incandescent lighting - Enclosed and gasketed, exposed box


Vapor tight, using small tools.
Ceiling mounted lp@1.00 Ea 51.70 49.60 0.20 101.50
Wall mounted lp@1.00 Ea 57.20 49.60 0.20 107.00
Pendant mounted lp@1.25 Ea 53.40 62.00 0.25 115.65

Industrial incandescent lighting - Enclosed and gasketed, concealed box


Vapor tight, using small tools.
Ceiling mounted lp@1.00 Ea 51.70 49.60 0.20 101.50
Wall mounted lp@1.00 Ea 57.20 49.60 0.20 107.00
Pendant mounted lp@1.25 Ea 35.60 62.00 0.25 97.85

Industrial incandescent lighting - Heavy duty enclosed and gasketed


Vapor tight, using small tools.
Ceiling mounted, dome reel lp@1.50 Ea 110.00 74.40 0.30 184.70
Pendant mounted, dome reel lp@2.00 Ea 96.10 99.20 0.40 195.70
Ceiling mounted, dome 30 degree lp@1.50 Ea 100.00 74.40 0.30 174.70
Pendant mounted, dome 30 degree lp@2.00 Ea 100.00 99.20 0.40 199.60

Incandescent lighting - Single accent fixtures


For ceiling or wall outlet box mounting, using small tools.
Satin aluminum finish lp@.600 Ea 31.00 29.76 0.12 60.88
2015 Heavy Construction Estimator, All Rights Reserved Page 757 (part 2)

Satin brass finish lp@.600 Ea 31.00 29.76 0.12 60.88


Textured black finish lp@.600 Ea 31.00 29.76 0.12 60.88
300W quartz wall bracket with brass,
arm and concrete bowl lp@2.50 Ea 435.00 124.00 0.50 559.50

Incandescent lighting - Double accent fixtures


For ceiling or wall outlet box mounting.
Satin aluminum finish lp@.800 Ea 43.70 39.68 0.16 83.54
Satin brass finish lp@.800 Ea 43.70 39.68 0.16 83.54
Textured black finish lp@.800 Ea 43.70 39.68 0.16 83.54
2015 Heavy Construction Estimator, All Rights Reserved Page 758

Incandescent lighting - Single exterior floodlights


For soffitt or wall outlet mounting, using small tools.
Satin aluminum finish lp@1.50 Ea 37.90 74.40 0.30 112.60
Textured black finish lp@1.50 Ea 35.40 74.40 0.30 110.10

Incandescent lighting - Double exterior floodlights


For soffitt or wall outlet mounting, using small tools.
Satin aluminum finish lp@1.75 Ea 74.00 86.80 0.35 161.15
Textured black finish lp@1.75 Ea 68.20 86.80 0.35 155.35

Incandescent lighting - Opal glass spherical globe fixtures


Using small tools.
12" diameter, 100 watt lamp,
pendant mounted lp@1.00 Ea 95.20 49.60 0.20 145.00
12" diameter, 100 watt lamp,
ceiling mounted lp@.600 Ea 101.00 29.76 0.12 130.88
14" diameter, 150 watt lamp,
pendant mounted lp@1.50 Ea 125.00 74.40 0.30 199.70
14" diameter, 150 watt lamp,
ceiling mounted lp@1.00 Ea 107.00 49.60 0.20 156.80

Incandescent lighting - Recessed square fixtures


With flat abalite glass, using small tools.
Baked white enamel finish lp@1.25 Ea 22.10 62.00 0.25 84.35
Satin aluminum finish lp@1.25 Ea 26.20 62.00 0.25 88.45
Add for drop opal glass lens --@.000 Ea 14.20 -- -- 14.20

Incandescent lighting - Recessed round downlights


Using small tools.
200 watt lamp lp@1.75 Ea 72.60 86.80 0.35 159.75
Incandescent Alzak 100 watt lamp lp@1.50 Ea 63.30 74.40 0.30 138.00

Incandescent lighting - Round surface mounted fixtures


Using small tools.
Rated for two 40 watt lamps lp@.600 Ea 57.50 29.76 0.12 87.38
Rated for two 60 watt lamps lp@.600 Ea 57.50 29.76 0.12 87.38
Rated for two 75 watt lamps lp@.600 Ea 65.70 29.76 0.12 95.58
Metal cylinder ISOW lp@.750 Ea 51.70 37.20 0.15 89.05

Incandescent lighting - Square surface mount fixtures


Using small tools.
Rated for two 40 watt lamps lp@.800 Ea 32.90 39.68 0.16 72.74
Rated for two 60 watt lamps lp@.800 Ea 32.90 39.68 0.16 72.74
Rated for two 75 watt lamps lp@.800 Ea 32.90 39.68 0.16 72.74

Incandescent lighting - Wall outlet box mounting


Using small tools.
With chrome plated steel base lp@1.00 Ea 24.90 49.60 0.20 74.70
With polished aluminum base lp@1.00 Ea 30.00 49.60 0.20 79.80
With brass finish steel base lp@1.00 Ea 30.00 49.60 0.20 79.80

Incandescent 60 to 150 watt fixtures


Using small tools.
Brass finish on steel lp@1.00 Ea 3.78 49.60 0.20 53.58
Copper finish on steel lp@1.00 Ea 3.78 49.60 0.20 53.58
2015 Heavy Construction Estimator, All Rights Reserved Page 758 (part 2)

Chrome finish on steel lp@1.00 Ea 3.78 49.60 0.20 53.58


Baked white enamel finish lp@1.00 Ea 3.78 49.60 0.20 53.58
Brush aluminum finish,
double face stem mount lp@1.30 Ea 3.11 64.48 0.26 67.85

Incandescent ceiling fixtures, two 60 watt lamps


Outlet box mounted, using small tools.
Antique brass finish lp@1.25 Ea 24.80 62.00 0.25 87.05
Antique copper finish lp@1.25 Ea 34.40 62.00 0.25 96.65
Matte black finish lp@1.25 Ea 34.40 62.00 0.25 96.65
Baked white enamel finish on steel lp@1.25 Ea 24.80 62.00 0.25 87.05
Brushed aluminum finish lp@1.25 Ea 24.80 62.00 0.25 87.05

Incandescent ceiling mounted adjustable height fixtures


Two 60 watt lamps, using small tools.
Antique brass finish lp@1.00 Ea 112.00 49.60 0.20 161.80
2015 Heavy Construction Estimator, All Rights Reserved Page 759

Antique copper finish lp@1.00 Ea 104.00 49.60 0.20 153.80


Matte black finish lp@1.00 Ea 104.00 49.60 0.20 153.80

Incandescent exterior wall fixtures


Using small tools.
Outlet box mounted lp@1.50 Ea 18.60 74.40 0.30 93.30

Incandescent exterior wall mount enclosed and gasketed fixtures


One lamp, using small tools.
Type 124A lp@1.25 Ea 17.40 62.00 0.25 79.65
Type 124B lp@1.25 Ea 28.50 62.00 0.25 90.75
Type 125A lp@1.30 Ea 41.70 64.48 0.26 106.44
Type 125B lp@1.30 Ea 63.90 64.48 0.26 128.64

Incandescent weathertight square insect proof fixtures


Recessed, using small tools.
Suspended plaster, drop glass lens lp@1.75 Ea 27.30 86.80 0.35 114.45
Concrete pour, drop glass lens lp@2.25 Ea 54.60 111.60 0.45 166.65
Suspended plaster, flat glass lens lp@1.75 Ea 34.20 86.80 0.35 121.35
Concrete pour, flat glass lens lp@2.25 Ea 68.40 111.60 0.45 180.45

Incandescent weathertight insect proof round fixtures


Recessed, using small tools.
Suspended plaster, drop glass lens lp@1.75 Ea 25.50 86.80 0.35 112.65
Concrete pour, drop glass lens lp@2.25 Ea 51.00 111.60 0.45 163.05
Suspended plaster, flat glass lens lp@1.75 Ea 29.80 86.80 0.35 116.95
Concrete pour, flat glass lens lp@2.25 Ea 74.00 111.60 0.45 186.05

Single circuit track lights


Using small tools.
8' long lp@1.50 Ea 133.00 74.40 0.30 207.70
White cylinder lp@.400 Ea 109.00 19.84 0.08 128.92

Cord reels with incandescent hand lamp


Using small tools.
150 watt lp@6.67 Ea 627.00 330.80 1.33 959.13

Fluorescent fixtures - Emergency battery and lamp


Add the cost of a fluorescent fixture and lamps, using small tools.
Battery and charger only lp@1.50 Ea 148.00 74.40 0.30 222.70

Fluorescent fixtures - Ceiling mounted residential circline


Using small tools.
White opal or prismatic diffuser lp@.800 Ea 38.20 39.68 0.16 78.04
Crystal or prismatic diffuser lp@.800 Ea 38.20 39.68 0.16 78.04
White opal or prismatic diffuser lp@.800 Ea 38.20 39.68 0.16 78.04

Fluorescent fixtures - Recessed, 1’ x 4’


Using small tools.
Two 40 watt tubes,
static troffer, lay-in lp@1.75 Ea 63.70 86.80 0.35 150.85
Two 40 watt tubes,
air handling troffer, lay-in lp@2.00 Ea 152.00 99.20 0.40 251.60

Fluorescent fixtures - Recessed, 2’ x 4’, static troffer lay-in


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 759 (part 2)

Two 40 watt lamps lp@1.50 Ea 73.60 74.40 0.30 148.30


Three 40 watt lamps lp@1.75 Ea 81.60 86.80 0.35 168.75
Four 40 watt lamps lp@2.00 Ea 77.60 99.20 0.40 177.20

Fluorescent fixtures - Recessed, 2’ x 4’, air handling troffer, lay-in


Using small tools.
Two 40 watt lamps lp@1.75 Ea 84.60 86.80 0.35 171.75
Three 40 watt lamps lp@2.00 Ea 93.80 99.20 0.40 193.40
Four 40 watt lamps lp@2.25 Ea 89.30 111.60 0.45 201.35

Fluorescent fixtures - Recessed, 4’ x 4’, static troffer, lay-in


Using small tools.
Four 40 watt lamps lp@3.00 Ea 371.00 148.80 0.60 520.40
2015 Heavy Construction Estimator, All Rights Reserved Page 760

Six 40 watt lamps lp@3.50 Ea 386.00 173.60 0.70 560.30

Fluorescent fixtures - Recessed, 4’ x 4’, air handling, lay-in


Using small tools.
Four 40 watt lamps lp@3.00 Ea 400.00 148.80 0.60 549.40
Six 40 watt lamps lp@3.50 Ea 415.00 173.60 0.70 589.30

Fluorescent fixtures - Recessed industrial lay in


Dome reflector, drop opal lens, using small tools.
4’ x 4’, four 40 watt lamps lp@3.00 Ea 314.00 148.80 0.60 463.40
4’ x 4’, six 40 watt lamps lp@3.50 Ea 356.00 173.60 0.70 530.30
4’ x 4’, eight 40 watt lamps lp@4.00 Ea 445.00 198.40 0.80 644.20
1’ x 4’, two 40 watt lamps lp@1.00 Ea 118.00 49.60 0.20 167.80
2’ x 4’, two 40 watt lamps lp@1.50 Ea 123.00 74.40 0.30 197.70
2’ x 4’, three 40 watt lamps lp@1.75 Ea 153.00 86.80 0.35 240.15
2’ x 4’, four 40 watt lamps lp@2.00 Ea 153.00 99.20 0.40 252.60

Fluorescent fixtures - Recessed, static


Using small tools.
Recessed down light lp@1.75 Ea 141.00 86.80 0.35 228.15

Fluorescent fixtures - Surface ceiling mount, 1’ x 4’


Two 40-watt lamps, using small tools.
45 by 45 light stabilized lens lp@1.30 Ea 102.00 64.48 0.26 166.74
35 by 25 parabolic aluminized lens lp@1.30 Ea 115.00 64.48 0.26 179.74

Fluorescent fixtures - Prismatic lens, 2’ x 4’


Surface ceiling mount, metal sides, using small tools.
Two 40 watt lamps lp@1.25 Ea 123.00 62.00 0.25 185.25
Four 40 watt lamps lp@1.50 Ea 249.00 74.40 0.30 323.70

Fluorescent fixtures - Drop opal lens, 1’ x 4’


Surface ceiling mount, using small tools.
Two 40 watt lamps lp@1.00 Ea 137.00 49.60 0.20 186.80

Fluorescent fixtures - Drop opal lens, 2’ x 4’


Surface ceiling mount, using small tools.
Two 40 watt lamps lp@1.25 Ea 201.00 62.00 0.25 263.25
Three 40 watt lamps lp@1.50 Ea 213.00 74.40 0.30 287.70
Four 40 watt lamps lp@2.00 Ea 205.00 99.20 0.40 304.60

Fluorescent fixtures - Drop opal lens, 4’ x 4’


Surface ceiling mount, using small tools.
Four 40 watt lamps lp@4.00 Ea 287.00 198.40 0.80 486.20
Six 40 watt lamps lp@5.00 Ea 299.00 248.00 1.00 548.00
Eight 40 watt lamps lp@6.00 Ea 299.00 297.60 1.20 597.80

Fluorescent fixtures - Wraparound, 7" x 48"


Surface ceiling mount, using small tools.
One 40 watt lamps lp@1.00 Ea 77.40 49.60 0.20 127.20

Fluorescent fixtures - Wraparound fixture, 7" x 96"


Surface ceiling mount, using small tools.
Two 40 watt lamps lp@1.75 Ea 180.00 86.80 0.35 267.15
2015 Heavy Construction Estimator, All Rights Reserved Page 760 (part 2)

Fluorescent fixtures - Surface strip fixture, without reflector


Using small tools.
One 40 watt lamps lp@.750 Ea 37.70 37.20 0.15 75.05
Two 40 watt lamps lp@.800 Ea 43.60 39.68 0.16 83.44

Fluorescent fixtures - Surface strip fixture, symmetric reflector


Using small tools.
One 40 watt lamps lp@.800 Ea 64.70 39.68 0.16 104.54
Two 40 watt lamps lp@.850 Ea 64.70 42.16 0.17 107.03
2015 Heavy Construction Estimator, All Rights Reserved Page 761

Fluorescent fixtures - Surface strip fixture, asymmetric reflector


Using small tools.
One 40 watt lamps lp@.750 Ea 67.90 37.20 0.15 105.25
Two 40 watt lamps lp@.800 Ea 71.90 39.68 0.16 111.74

Fluorescent fixtures - Enclosed wall mounted, direct or indirect


Using small tools.
48" long, two 40 watt lp@1.50 Ea 90.40 74.40 0.30 165.10

Fluorescent fixtures - Enclosed wall mounted, direct


Using small tools.
48" long, one 40 watt lp@1.30 Ea 53.10 64.48 0.26 117.84
48" long, two 40 watt lp@1.50 Ea 78.70 74.40 0.30 153.40

Fluorescent fixtures - Corridor, recessed, 48" long


One 40 watt lamp, using small tools.
Prismatic acrylic lens lp@1.50 Ea 70.50 74.40 0.30 145.20
1/2" acrylic cube louver lp@1.50 Ea 78.20 74.40 0.30 152.90
1/2" polystyrene cube louver lp@1.50 Ea 78.20 74.40 0.30 152.90

Fluorescent fixtures - Corridor, recessed, 96" long


Two 40 watt lamps, using small tools.
Prismatic acrylic lens lp@2.25 Ea 93.20 111.60 0.45 205.25
1/2" acrylic cube louver lp@2.25 Ea 93.20 111.60 0.45 205.25
1/2" polystyrene cube louver lp@2.25 Ea 93.20 111.60 0.45 205.25

Fluorescent fixtures - Pendant mounted


Direct or indirect lighting, using small tools.
Metal louver lp@2.50 Ea 115.00 124.00 0.50 239.50
Prismatic acrylic lens lp@2.50 Ea 150.00 124.00 0.50 274.50

Fluorescent fixtures - Suspended open face


Industrial open type, using small tools.
Two 800 M amps, 8' long lamps lp@2.50 Ea 109.00 124.00 0.50 233.50
Three 800 M amps, 8' long lamps lp@2.50 Ea 193.00 124.00 0.50 317.50
Two 1500 M amps, 8' long lamps lp@2.75 Ea 239.00 136.40 0.55 375.95
Two 40 watt lamps, 4' long lp@1.25 Ea 64.70 62.00 0.25 126.95
Three 40 watt lamps, 4' long lp@1.50 Ea 117.00 74.40 0.30 191.70

High intensity interior fixtures - Emergency standby lighting


Using small tools.
Fixture with 250 watt quartz lamp lp@1.75 Ea 106.00 86.80 0.35 193.15

High intensity interior fixtures - Enclosed pendant high bay


Integrally ballasted industrial, using small tools.
Metal halide lamp lp@1.75 Ea 400.00 86.80 0.35 487.15
High pressure sodium lp@1.75 Ea 303.00 86.80 0.35 390.15
High pressure sodium lp@1.75 Ea 478.00 86.80 0.35 565.15
1000 watt, high pressure sodium lp@1.75 Ea 703.00 86.80 0.35 790.15

High intensity interior fixtures - Enclosed pendant low bay


Integrally ballasted industrial, using small tools.
Metal halide lamp lp@2.00 Ea 442.00 99.20 0.40 541.60
High pressure sodium lp@2.00 Ea 468.00 99.20 0.40 567.60
2015 Heavy Construction Estimator, All Rights Reserved Page 761 (part 2)
2015 Heavy Construction Estimator, All Rights Reserved Page 762

High intensity interior fixtures - Enclosed recessed 2’ x 2’ lay-in


Integrally ballasted, using small tools.
175 watt, metal halide lamp lp@2.25 Ea 717.00 111.60 0.45 829.05
250 watt, metal halide lamp lp@2.25 Ea 750.00 111.60 0.45 862.05
100 watt, high press sodium lp@2.25 Ea 428.00 111.60 0.45 540.05
150 watt, high press sodium lp@2.25 Ea 470.00 111.60 0.45 582.05
175 watt, metal halide lamp lp@2.25 Ea 565.00 111.60 0.45 677.05
150 watt, high pressure sodium lp@2.25 Ea 470.00 111.60 0.45 582.05

High intensity interior fixtures - Surface mount, enclosed, 2’ x 2’


Integrally ballasted, using small tools.
175 watt, metal halide lamp lp@2.25 Ea 363.00 111.60 0.45 475.05
150 watt, high pressure sodium lp@2.25 Ea 357.00 111.60 0.45 469.05

High intensity interior fixtures - Surface mount enclosed and gasketed


Surface mount, 2’ x 2’, integrally ballasted, using small tools.
100 watt, mercury vapor lp@2.50 Ea 329.00 124.00 0.50 453.50
175 watt, mercury vapor lp@2.50 Ea 341.00 124.00 0.50 465.50
175 watt, metal halide lp@2.50 Ea 361.00 124.00 0.50 485.50
70 watt, high pressure sodium lp@2.50 Ea 414.00 124.00 0.50 538.50
150 watt, high pressure sodium lp@2.50 Ea 470.00 124.00 0.50 594.50
400 watt, high pressure sodium lk@2.50 Ea 1,080.00 125.30 0.48 1,205.78

High intensity interior fixtures - Recessed enclosed and gasketed


Integrally ballasted, 2’ x 2’, using small tools.
75 watt, mercury vapor lp@2.50 Ea 237.00 124.00 0.50 361.50
100 watt, mercury vapor lp@2.50 Ea 247.00 124.00 0.50 371.50
175 watt, mercury vapor lp@2.50 Ea 309.00 124.00 0.50 433.50
175 watt, metal halide lp@2.50 Ea 499.00 124.00 0.50 623.50

High intensity interior fixtures - Recessed round, ceiling mount


Integral ballast, plastic, ceiling mount, 100 watt mercury vapor, using small tools.
Flat prismatic glass lens lp@1.75 Ea 267.00 86.80 0.35 354.15
Flat white glass lens lp@1.75 Ea 212.00 86.80 0.35 299.15
Drop glass lens lp@1.75 Ea 229.00 86.80 0.35 316.15
Drop prismatic glass lens lp@1.75 Ea 308.00 86.80 0.35 395.15

High intensity interior fixtures - Recessed round, poured in concrete


Integral ballast, 100 watt mercury vapor, using small tools.
Flat prismatic glass lens lp@2.75 Ea 554.00 136.40 0.55 690.95
Flat white glass lens lp@2.75 Ea 592.00 136.40 0.55 728.95
Drop glass lens lp@2.75 Ea 647.00 136.40 0.55 783.95
Drop prismatic glass lens lp@2.75 Ea 647.00 136.40 0.55 783.95

Exterior high intensity fixtures - Rectangular, side mounted


Enclosed and gasketed, using a line truck with aerial platform and small tools.
For mercury vapor lamp lu@2.25 Ea 746.00 111.60 18.00 875.60
For metal halide lamp lu@2.25 Ea 746.00 111.60 18.00 875.60
For high press sodium lamp lu@2.25 Ea 805.00 111.60 18.00 934.60

Exterior high intensity fixtures - Rectangular, side mounted, heavy duty


Enclosed and gasketed, using small tools.
Rated for mercury vapor lamp lu@2.50 Ea 549.00 124.00 20.10 693.10
Rated for metal halide lamp lu@2.50 Ea 549.00 124.00 20.10 693.10
Rated for high pressure sodium lamp lu@2.50 Ea 482.00 124.00 20.10 626.10
2015 Heavy Construction Estimator, All Rights Reserved Page 762 (part 2)

Exterior high intensity fixtures - Enclosed roadway lighting


Wide pole bracket, using small tools.
175 watt, mercury vapor lamp lu@1.50 Ea 136.00 74.40 12.00 222.40
250 watt, mercury vapor lamp lu@1.50 Ea 186.00 74.40 12.00 272.40
2015 Heavy Construction Estimator, All Rights Reserved Page 763

Exterior high intensity fixtures - Enclosed high mast


Using small tools.
1000 watt, mercury vapor lamp lu@2.00 Ea 966.00 99.20 16.00 1,081.20
400 watt, metal halide lamp lu@2.00 Ea 682.00 99.20 16.00 797.20
1000 watt, metal halide lamp lu@2.00 Ea 985.00 99.20 16.00 1,100.20
400 watt, high pressure sodium lamp lu@2.00 Ea 738.00 99.20 16.00 853.20
1000 watt,
high pressure sodium lamp lu@2.00 Ea 1,080.00 99.20 16.00 1,195.20

Security high intensity fixtures - Exterior wall mount, medium output


Using small tools.
175 watt, mercury vapor lamp lk@1.50 Ea 493.00 75.15 0.29 568.44
70 watt, high pressure sodium lamp lk@1.50 Ea 532.00 75.15 0.29 607.44
100 watt, high pressure sodium lamp lk@1.50 Ea 374.00 75.15 0.29 449.44
175 watt, mercury vapor lamp lk@1.50 Ea 321.00 75.15 0.29 396.44
70 watt, high pressure sodium lamp lk@1.50 Ea 304.00 75.15 0.29 379.44
100 watt, high pressure sodium lamp lk@1.50 Ea 311.00 75.15 0.29 386.44

Security high intensity fixtures - Exterior wall mount, high output


Using small tools.
250 watt, mercury vapor lamp lk@1.50 Ea 447.00 75.15 0.29 522.44
400 watt, mercury vapor lamp lk@1.50 Ea 502.00 75.15 0.29 577.44
250 watt, high pressure sodium lamp lk@1.50 Ea 487.00 75.15 0.29 562.44
100 watt, mercury vapor lamp lk@1.50 Ea 191.00 75.15 0.29 266.44

Security high intensity fixtures - General purpose enclosed floodlight


Exterior wall mount with asymmetrical light distribution, using small tools.
400 watt, mercury vapor lamp lk@1.50 Ea 960.00 75.15 0.29 1,035.44
1000 watt, mercury vapor lamp lk@1.50 Ea 695.00 75.15 0.29 770.44
400 watt, metal halide lamp lk@1.50 Ea 1,090.00 75.15 0.29 1,165.44
1000 watt, metal halide lamp lk@1.50 Ea 665.00 75.15 0.29 740.44
400 watt, high pressure sodium lamp lk@1.50 Ea 727.00 75.15 0.29 802.44
1000 watt,
high pressure sodium lamp lk@1.50 Ea 772.00 75.15 0.29 847.44

Security high intensity fixtures - Heavy duty enclosed flood


Exterior wall mount with NEMA 6X5 asymmetrical light distribution, using small tools.
Rated for mercury vapor lamp lk@1.75 Ea 923.00 87.68 0.33 1,011.01
Rated for metal halide lamp lk@1.75 Ea 508.00 87.68 0.33 596.01
Rated for high pressure sodium lamp lk@1.75 Ea 238.00 87.68 0.33 326.01

Security high intensity fixtures - Heavy duty enclosed flood


Slip fit exterior wall mount with NEMA 6X5 asymmetrical light distribution, using small tools.
Rated for mercury vapor lamp lk@1.75 Ea 1,010.00 87.68 0.33 1,098.01
Rated for metal halide lamp lk@1.75 Ea 535.00 87.68 0.33 623.01
Rated for high pressure sodium lamp lk@1.75 Ea 264.00 87.68 0.33 352.01
250 watt, rated
for high pressure sodium lamp lk@1.75 Ea 307.00 87.68 0.33 395.01
400 watt, rated
for high pressure sodium lamp lk@1.75 Ea 325.00 87.68 0.33 413.01
1000 watt, rated
for high pressure sodium lamp lk@1.75 Ea 596.00 87.68 0.33 684.01

Security high intensity fixtures - Heavy duty quartz flood


Enclosed, 500 watt, using small tools.
508A, NEMA
2015 Heavy Construction Estimator, All Rights Reserved Page 763 (part 2)

type 5x2 light distribution lk@1.25 Ea 55.30 62.63 0.24 118.17


508B, NEMA
type 5X3 light distribution lk@1.25 Ea 55.30 62.63 0.24 118.17
508C, NEMA
type 5X5 light distribution lk@1.25 Ea 55.30 62.63 0.24 118.17

Emergency & exit fixtures - Exit sign


12 volt, two faced, using small tools.
Remote top mount lk@1.00 Ea 194.00 50.10 0.19 244.29

Emergency & exit fixtures - Emergency remote mounted flood


12 volt DC, using small tools.
13 watt lamp lk@1.00 Ea 22.20 50.10 0.19 72.49
2015 Heavy Construction Estimator, All Rights Reserved Page 764

18 watt lamp lk@1.00 Ea 26.20 50.10 0.19 76.49


25 watt lamp lk@1.00 Ea 26.20 50.10 0.19 76.49
38 watt lamp lk@1.00 Ea 55.40 50.10 0.19 105.69

Emergency & exit fixtures - Exit sign, remote


12 volt, using small tools.
End mounted, single faced lk@1.00 Ea 44.80 50.10 0.19 95.09
Top mounted, single faced lk@1.00 Ea 44.80 50.10 0.19 95.09
Back mounted, single faced lk@1.00 Ea 44.80 50.10 0.19 95.09
Stem mounted, single faced lk@1.50 Ea 56.40 75.15 0.29 131.84
End mounted, double faced lk@1.00 Ea 50.70 50.10 0.19 100.99
Top mounted, double faced lk@1.00 Ea 50.70 50.10 0.19 100.99
Stem mounted, two faced lk@1.50 Ea 50.70 75.15 0.29 126.14

Emergency & exit fixtures - Emergency battery pack


Using small tools.
Pack with two 6 volt floodlights lp@1.25 Ea 83.50 62.00 0.25 145.75

Emergency & exit fixtures - Exit sign and battery


Self-contained emergency battery, using small tools.
Single face, end mounted lk@1.75 Ea 92.80 87.68 0.33 180.81
Single face, top mounted lk@1.75 Ea 92.80 87.68 0.33 180.81
Single face, back mounted lk@1.75 Ea 92.80 87.68 0.33 180.81
Single face, stem mounted lk@2.25 Ea 104.00 112.70 0.43 217.13
Double face, end mounted lk@1.75 Ea 92.80 87.68 0.33 180.81
Double face, top mounted lk@1.75 Ea 92.80 87.68 0.33 180.81
Double face, stem mounted lk@2.25 Ea 92.80 112.70 0.43 205.93

Emergency & exit fixtures - Exit light, with stencil face


Using small tools.
Single face, end mounted lk@1.75 Ea 68.30 87.68 0.33 156.31
Single face, top mounted lk@1.75 Ea 68.30 87.68 0.33 156.31
Single face, back mounted lk@1.75 Ea 68.30 87.68 0.33 156.31
Single face, stem mounted lk@2.25 Ea 79.90 112.70 0.43 193.03
Double face, end mounted lk@1.75 Ea 83.80 87.68 0.33 171.81
Double face, top mounted lk@1.75 Ea 83.80 87.68 0.33 171.81
Double face, stem mounted lk@2.25 Ea 83.80 112.70 0.43 196.93

Emergency & exit fixtures - Exit sign, edge lit


Using small tools.
Single face, end mounted lk@1.75 Ea 140.00 87.68 0.33 228.01
Single face, top mounted lk@1.75 Ea 126.00 87.68 0.33 214.01
Single face, back mounted lk@1.75 Ea 140.00 87.68 0.33 228.01
Single face, stem mounted lk@2.25 Ea 152.00 112.70 0.43 265.13
Double face, end mounted lk@1.75 Ea 167.00 87.68 0.33 255.01
Double face, top mounted lk@1.75 Ea 151.00 87.68 0.33 239.01
Double face, stem mounted lk@2.25 Ea 163.00 112.70 0.43 276.13

Hazard lighting - Industrial incandescent fixtures


For use in NEC class I group C and D and class II group E, F and G locations, using small tools.
Without reflector lp@1.50 Ea 430.00 74.40 0.30 504.70
With standard dome reflector lp@1.75 Ea 486.00 86.80 0.35 573.15
With 30 degree angle reflector lp@1.75 Ea 491.00 86.80 0.35 578.15
With deep dome reflector lp@1.75 Ea 316.00 86.80 0.35 403.15

Hazard lighting - Industrial incandescent fixtures, no reflector or guard


For use in NEC class II group E, F, and G and class III locations, using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 764 (part 2)

Pendant mounted lp@2.00 Ea 127.00 99.20 0.40 226.60


Ceiling mounted lp@1.75 Ea 133.00 86.80 0.35 220.15
Bracket mounted lp@1.75 Ea 192.00 86.80 0.35 279.15
2015 Heavy Construction Estimator, All Rights Reserved Page 765

Hazard lighting - Industrial incandescent fixtures, standard dome reflector


For use in NEC class II group E, F, and G and class III locations, using small tools.
Pendant mounted lp@2.00 Ea 176.00 99.20 0.40 275.60
Ceiling mounted lp@1.75 Ea 181.00 86.80 0.35 268.15
Bracket mounted lp@1.75 Ea 240.00 86.80 0.35 327.15

Hazard lighting - Industrial incandescent fixtures, angle dome reflector


For use in NEC class II group E, F, and G and class III locations, using small tools.
Pendant mounted lp@2.00 Ea 169.00 99.20 0.40 268.60
Ceiling mounted lp@1.75 Ea 175.00 86.80 0.35 262.15
Bracket mounted lp@1.75 Ea 234.00 86.80 0.35 321.15

Hazard lighting - Industrial incandescent fixtures, shallow dome reflector


For use in NEC class II group E, F, and G and class III locations, using small tools.
Pendant mounted lp@2.00 Ea 294.00 99.20 0.40 393.60
Ceiling mounted lp@1.75 Ea 360.00 86.80 0.35 447.15
Bracket mounted lp@1.75 Ea 347.00 86.80 0.35 434.15

Hazard lighting - Pendant mounted industrial fluorescent fixtures


For use in NEC class II group F, and G and class III locations, using a hydraulic lift and small tools.
Two 40 watt lamps lp@2.50 Ea 2,970.00 124.00 0.50 3,094.50
Three 40 watt lamps lp@2.75 Ea 5,540.00 136.40 0.55 5,676.95

High intensity industrial lighting - Pendent mounted, without reflector


For use in NEC class I C and D, class II E, F and G and class III locations, using a hydraulic lift and
small tools.
100 watt, mercury vapor lp@1.75 Ea 1,040.00 86.80 0.35 1,127.15
175 watt, mercury vapor lp@1.75 Ea 1,080.00 86.80 0.35 1,167.15
175 watt, metal halide lp@1.75 Ea 1,310.00 86.80 0.35 1,397.15
100 watt, high pressure sodium lp@1.75 Ea 1,310.00 86.80 0.35 1,397.15
150 watt, high pressure sodium lp@1.75 Ea 1,390.00 86.80 0.35 1,477.15

High intensity industrial lighting - Standard dome reflector, pendant mounted


For use in NEC class I C and D, class II E, F and G and class III locations, using a hydraulic lift and
small tools.
100 watt, mercury vapor lp@2.00 Ea 816.00 99.20 0.40 915.60
175 watt, mercury vapor lp@2.00 Ea 845.00 99.20 0.40 944.60
175 watt, metal halide lp@2.00 Ea 1,000.00 99.20 0.40 1,099.60
100 watt, high pressure sodium lp@2.00 Ea 1,000.00 99.20 0.40 1,099.60
150 watt, high pressure sodium lp@2.00 Ea 1,060.00 99.20 0.40 1,159.60

High intensity industrial lighting - 30 degree angle dome reflector, pendant mounted
For use in NEC class I -C and D, class II E, F and G and class III locations, using a hydraulic lift and
small tools.
100 watt, mercury vapor lp@2.00 Ea 810.00 99.20 0.40 909.60
175 watt, mercury vapor lp@2.00 Ea 839.00 99.20 0.40 938.60
175 watt, metal halide lp@2.00 Ea 997.00 99.20 0.40 1,096.60
100 watt, high pressure sodium lp@2.00 Ea 997.00 99.20 0.40 1,096.60
150 watt, high pressure sodium lp@2.00 Ea 1,050.00 99.20 0.40 1,149.60

High intensity industrial lighting - Without reflector, pendant mounted


For use in NEC class I division 2 group C and D, class II division 2 group E, F and G and III locations,
using a hydraulic lift and small tools.
100 watt, mercury vapor lp@1.75 Ea 366.00 86.80 0.35 453.15
175 watt, mercury vapor lp@1.75 Ea 357.00 86.80 0.35 444.15
2015 Heavy Construction Estimator, All Rights Reserved Page 765 (part 2)

175 watt, metal halide lp@1.75 Ea 324.00 86.80 0.35 411.15


100 watt, high pressure sodium lp@1.75 Ea 466.00 86.80 0.35 553.15
150 watt, high pressure sodium lp@1.75 Ea 470.00 86.80 0.35 557.15

High intensity industrial lighting - Standard dome reflector, pendant mounted


For use in NEC class I division 2 group C and D, class II division 2 group E, F and G and III locations,
using a hydraulic lift and small tools.
100 watt, mercury vapor lp@2.00 Ea 404.00 99.20 0.40 503.60
175 watt, mercury vapor lp@2.00 Ea 382.00 99.20 0.40 481.60
175 watt, metal halide lp@2.00 Ea 346.00 99.20 0.40 445.60
100 watt, high pressure sodium lp@2.00 Ea 486.00 99.20 0.40 585.60
2015 Heavy Construction Estimator, All Rights Reserved Page 766

150 watt, high pressure sodium lp@2.00 Ea 490.00 99.20 0.40 589.60

High intensity industrial lighting - 30 degree angle dome reflector, pendant mounted
For use in NEC class I division 2 group C and D, class II division 2 group E, F and G and III locations,
using a hydraulic lift and small tools.
100 watt, mercury vapor lp@2.00 Ea 393.00 99.20 0.40 492.60
175 watt, mercury vapor lp@2.00 Ea 384.00 99.20 0.40 483.60
175 watt, metal halide lp@2.00 Ea 348.00 99.20 0.40 447.60
100 watt, high pressure sodium lp@2.00 Ea 488.00 99.20 0.40 587.60
150 watt, high pressure sodium lp@2.00 Ea 492.00 99.20 0.40 591.60

Residential incandescent fixtures


Using small tools.
Wall lantern lj@.500 Ea 52.80 25.05 0.20 78.05
Vanity light lj@.500 Ea 84.00 25.05 0.20 109.25
Foyer fixture lj@.300 Ea 86.60 15.03 0.12 101.75
Kitchen floor fixture lk@1.50 Ea 315.00 75.15 0.29 390.44
Dining fixture lj@.750 Ea 125.00 37.58 0.29 162.87
Family room fixture lj@.750 Ea 141.00 37.58 0.29 178.87
Bedroom fixture lj@.400 Ea 42.80 20.04 0.16 63.00
Hallway fixture lj@.400 Ea 21.90 20.04 0.16 42.10
Utility fixture, with pull chain lj@.300 Ea 3.74 15.03 0.12 18.89
Closet fixture lj@.300 Ea 15.80 15.03 0.12 30.95
Kitchen cabinet strip fixture lj@.600 Ea 27.20 30.06 0.23 57.49
Porch fixture lj@.300 Ea 31.20 15.03 0.12 46.35
5 blade paddle fan lj@1.50 Ea 179.00 75.15 0.59 254.74

CSI 16-511, Architectural fixtures

Architectural incandescent fixtures - Pendant mounted opal glass globe


Using small tools.
12" diameter, 100 watt lamp,
pendant mounted lp@.700 Ea 117.00 34.72 0.14 151.86
14" diameter, 150 watt lamp,
pendant mounted lp@.800 Ea 56.00 39.68 0.16 95.84
14" diameter, 200 watt lamp,
pendant mounted lp@.800 Ea 62.00 39.68 0.16 101.84
14" diameter, 300 watt lamp,
ceiling mounted lp@.800 Ea 62.50 39.68 0.16 102.34

Architectural incandescent fixtures - Ceiling mounted opal glass globe


Using small tools.
12" diameter, 100 watt lamp lp@.400 Ea 101.00 19.84 0.08 120.92
14" diameter, 150 watt lamp lp@.400 Ea 107.00 19.84 0.08 126.92
14" diameter, 200 watt lamp lp@.400 Ea 90.60 19.84 0.08 110.52
14" diameter, 300 watt lamp lp@.400 Ea 94.70 19.84 0.08 114.62

Architectural incandescent fixtures - Recessed square drop opal lens


Using small tools.
150 watt, white enamel frame lp@.750 Ea 35.90 37.20 0.15 73.25
150 watt, satin aluminum frame lp@.750 Ea 40.00 37.20 0.15 77.35
150 watt, satin chrome frame lp@.750 Ea 37.50 37.20 0.15 74.85
300 watt lp@.750 Ea 67.30 37.20 0.15 104.65

Architectural incandescent fixtures - Flat prismatic glass lens


Using small tools.
150 watt, white enamel frame lp@.750 Ea 35.90 37.20 0.15 73.25
2015 Heavy Construction Estimator, All Rights Reserved Page 766 (part 2)

150 watt, satin aluminum frame lp@.750 Ea 40.00 37.20 0.15 77.35
150 watt, satin chrome frame lp@.750 Ea 37.50 37.20 0.15 74.85
300 watt, lp@.750 Ea 67.60 37.20 0.15 104.95

Architectural incandescent fixtures - Semi-flush drop prismatic glass lens


Using small tools.
150 watt, white enamel frame lp@.750 Ea 35.90 37.20 0.15 73.25
150 watt, satin aluminum frame lp@.750 Ea 40.00 37.20 0.15 77.35
150 watt, satin chrome frame lp@.750 Ea 37.50 37.20 0.15 74.85
300 watt lp@.750 Ea 67.60 37.20 0.15 104.95
2015 Heavy Construction Estimator, All Rights Reserved Page 767

Architectural incandescent fixtures - Flat abalite glass lens


Using small tools.
150 watt, white enamel frame lp@.750 Ea 22.10 37.20 0.15 59.45
150 watt, satin aluminum frame lp@.750 Ea 26.20 37.20 0.15 63.55
150 watt, satin chrome frame lp@.750 Ea 23.70 37.20 0.15 61.05
300 watt lp@.750 Ea 44.30 37.20 0.15 81.65

Architectural incandescent fixtures - Prismatic asymmetric drop lens


Surface mount incandescent, using small tools.
150 watt lp@.400 Ea 59.00 19.84 0.08 78.92

Architectural incandescent fixtures - White opal glass drum globe


Surface mount incandescent, using small tools.
Rated for two 40 watt lamps lp@.400 Ea 57.50 19.84 0.08 77.42
Rated for two 60 watt lamps lp@.400 Ea 57.50 19.84 0.08 77.42
Rated for two 75 watt lamps lp@.400 Ea 65.70 19.84 0.08 85.62

Architectural incandescent fixtures - White opal square diffuser


Surface mount incandescent, using small tools.
Rated for two 40 watt lamps lp@.400 Ea 43.40 19.84 0.08 63.32
Rated for two 60 watt lamps lp@.400 Ea 43.40 19.84 0.08 63.32
Rated for two 75 watt lamps lp@.400 Ea 43.40 19.84 0.08 63.32

Architectural incandescent fixtures - Round downlight


Enclosed and gasketed, recessed, 100 watt, mercury vapor, using small tools.
Plaster ceiling fixture lp@.400 Ea 212.00 19.84 0.08 231.92
Poured concrete ceiling lp@1.75 Ea 674.00 86.80 0.35 761.15

CSI 16-512, Commercial fixtures

Commercial fluorescent recessed fixtures - Drop dish acrylic diffuser


Static troffer, lay in, small tools.
1’ x 4’, two 40 watt lp@.800 Ea 131.00 39.68 0.16 170.84
1’ x 4’, three 40 watt lp@1.00 Ea 180.00 49.60 0.20 229.80
2’ x 4’, two 40 watt lp@1.00 Ea 73.60 49.60 0.20 123.40
2’ x 4’, three 40 watt lp@1.25 Ea 81.60 62.00 0.25 143.85
2’ x 4’, four 40 watt lp@1.50 Ea 77.60 74.40 0.30 152.30

Commercial fluorescent recessed fixtures - Flat pattern crystal glass


Static troffer, lay in, small tools.
1’ x 4’, two 40 watt lp@.800 Ea 69.50 39.68 0.16 109.34
1’ x 4’, three 40 watt lp@1.00 Ea 161.00 49.60 0.20 210.80
2’ x 4’, two 40 watt lp@1.00 Ea 107.00 49.60 0.20 156.80
2’ x 4’, three 40 watt lp@1.25 Ea 132.00 62.00 0.25 194.25
2’ x 4’, four 40 watt lp@1.50 Ea 133.00 74.40 0.30 207.70

Commercial fluorescent recessed fixtures - Egg crate polystyrene louver


Small tools.
2’ x 2,two 40 watt lp@.800 Ea 132.00 39.68 0.16 171.84
2’ x 4’, two 40 watt lp@1.00 Ea 115.00 49.60 0.20 164.80
2’ x 4’, three 40 watt lp@1.25 Ea 125.00 62.00 0.25 187.25
2’ x 4’, four 40 watt lp@1.50 Ea 125.00 74.40 0.30 199.70
4’ x 4’, four 40 watt lp@3.00 Ea 266.00 148.80 0.60 415.40
4’ x 4’, six 40 watt lp@3.50 Ea 282.00 173.60 0.70 456.30
4’ x 4’, eight 40 watt lp@4.25 Ea 299.00 210.80 0.85 510.65
2015 Heavy Construction Estimator, All Rights Reserved Page 767 (part 2)

Commercial fluorescent recessed fixtures - Parabolic aluminum louver


Static troffer, lay in, small tools.
2’ x 2,two 40 watt lp@.800 Ea 66.60 39.68 0.16 106.44
2’ x 4’, two 40 watt lp@1.00 Ea 73.60 49.60 0.20 123.40
2’ x 4’, three 40 watt lp@1.25 Ea 81.60 62.00 0.25 143.85
2015 Heavy Construction Estimator, All Rights Reserved Page 768

2’ x 4’, four 40 watt lp@1.50 Ea 77.60 74.40 0.30 152.30


4’ x 4’, four 40 watt lp@3.00 Ea 266.00 148.80 0.60 415.40
4’ x 4’, six 40 watt lp@3.50 Ea 282.00 173.60 0.70 456.30
4’ x 4’, eight 40 watt lp@4.25 Ea 299.00 210.80 0.85 510.65

Acrylic prismatic lens - Static troffer, lay in


Small tools.
2’ x 2,two 40 watt lp@.700 Ea 124.00 34.72 0.14 158.86
2’ x 4’, two 40 watt lp@.900 Ea 99.80 44.64 0.18 144.62
2’ x 4’, three 40 watt lp@1.15 Ea 110.00 57.04 0.23 167.27
2’ x 4’, four 40 watt lp@1.40 Ea 110.00 69.44 0.28 179.72
4’ x 4’, four 40 watt lp@2.50 Ea 341.00 124.00 0.50 465.50
4’ x 4’, six 40 watt lp@3.00 Ea 386.00 148.80 0.60 535.40
4’ x 4’, eight 40 watt lp@4.00 Ea 445.00 198.40 0.80 644.20

Acrylic prismatic lens - Air handling troffer


Lay in, acrylic lens, small tools.
1’ x 4’, two 40 watt, flush door lp@.800 Ea 143.00 39.68 0.16 182.84
1’ x 4’, two 40 watt, recessed door lp@.800 Ea 143.00 39.68 0.16 182.84
2’ x 4’, two 40 watt, flush door lp@.800 Ea 169.00 39.68 0.16 208.84
2’ x 4’, four 40 watt, flush door lp@1.00 Ea 199.00 49.60 0.20 248.80
2’ x 4’, two 40 watt, recessed door lp@1.00 Ea 169.00 49.60 0.20 218.80
2’ x 4’,
four 40 watt, recessed door lp@1.25 Ea 199.00 62.00 0.25 261.25

Acrylic prismatic lens - Acrylic shield, row mounting


Small tools.
6’ x 4’, one 40 watt lp@.750 Ea 402.00 37.20 0.15 439.35
6’ x 8', two 40 watt lp@1.25 Ea 514.00 62.00 0.25 576.25

Non-recessed fluorescent fixtures - Square drop dish acrylic diffuser


Rapid start, 4’ x 4’, small tools.
Surface, four 40 watt lp@2.00 Ea 287.00 99.20 0.40 386.60
Surface, six 40 watt lp@2.50 Ea 299.00 124.00 0.50 423.50
Surface, eight 40 watt lp@3.00 Ea 299.00 148.80 0.60 448.40
Pendant, four 40 watt lp@4.00 Ea 312.00 198.40 0.80 511.20
Pendant, six 40 watt lp@4.50 Ea 324.00 223.20 0.90 548.10
Pendant, eight 40 watt lp@5.00 Ea 324.00 248.00 1.00 573.00

Non-recessed fluorescent fixtures - Drop dish acrylic diffuser


With or without side panels, small tools.
Surface, 1’ x 4’, two 40 watt lp@.750 Ea 122.00 37.20 0.15 159.35
Pendant, 1’ x 4’, two 40 watt lp@1.25 Ea 128.00 62.00 0.25 190.25
Surface, 2’ x 4’, two 40 watt lp@.800 Ea 205.00 39.68 0.16 244.84
Surface, 2’ x 4’, four 40 watt lp@1.00 Ea 205.00 49.60 0.20 254.80
Pendant, 2’ x 4’, two 40 watt lp@1.30 Ea 211.00 64.48 0.26 275.74
Pendant, 2’ x 4’, four 40 watt lp@1.50 Ea 211.00 74.40 0.30 285.70

Non-recessed fluorescent fixtures - Crystal clear glass shield lens


With pattern, with or without side panels, small tools.
Surface, 1’ x 4’, two 40 watt lp@.750 Ea 112.00 37.20 0.15 149.35
Pendant, 1’ x 4’, two 40 watt lp@1.25 Ea 129.00 62.00 0.25 191.25
Surface, 2’ x 4’, two 40 watt lp@.800 Ea 140.00 39.68 0.16 179.84
Surface, 2’ x 4’, four 40 watt lp@1.00 Ea 150.00 49.60 0.20 199.80
Pendant, 2’ x 4’, two 40 watt lp@1.30 Ea 159.00 64.48 0.26 223.74
Pendant, 2’ x 4’, four 40 watt lp@1.50 Ea 168.00 74.40 0.30 242.70
2015 Heavy Construction Estimator, All Rights Reserved Page 768 (part 2)

Non-recessed fluorescent fixtures - Egg crate polystyrene louver


Small tools.
Surface, 1’ x 4’, two 40 watt lp@.750 Ea 93.20 37.20 0.15 130.55
Pendant, 1’ x 4’, two 40 watt lp@1.25 Ea 99.40 62.00 0.25 161.65
Surface, 2’ x 4’, four 40 watt lp@.800 Ea 140.00 39.68 0.16 179.84
2015 Heavy Construction Estimator, All Rights Reserved Page 769

Pendant, 2’ x 4’, four 40 watt lp@1.50 Ea 150.00 74.40 0.30 224.70

Non-recessed fluorescent fixtures - Steel louver and louver fins


Small tools.
Surface, 1’ x 4’, two 40 watt lp@.750 Ea 115.00 37.20 0.15 152.35
Pendant, 1’ x 4’, two 40 watt lp@1.25 Ea 122.00 62.00 0.25 184.25
Surface, 2’ x 4’, four 40 watt lp@.800 Ea 115.00 39.68 0.16 154.84
Pendant, 2’ x 4’, four 40 watt lp@1.50 Ea 122.00 74.40 0.30 196.70

Non-recessed fluorescent fixtures - Wraparound acrylic diffuser


Small tools.
Surface, 1’ x 4’, two 40 watt lp@.750 Ea 50.50 37.20 0.15 87.85
Pendant, 1’ x 4’, two 40 watt lp@1.25 Ea 56.70 62.00 0.25 118.95
Surface, 2’ x 4’, four 40 watt lp@.800 Ea 111.00 39.68 0.16 150.84
Pendant, 2’ x 4’, four 40 watt lp@1.50 Ea 117.00 74.40 0.30 191.70

Tubular fluorescent fixtures


Small tools.
8' tubular fluorescent, baffled
downlight and lensed uplight lp@2.50 Ea 407.00 124.00 0.50 531.50

Ceiling mounted fluorescent fixtures - Acrylic wraparound shield


Ceiling mounted, rapid start, small tools.
One 40 watt, 7" x 48" lp@.750 Ea 77.40 37.20 0.15 114.75
Two 40 watt, 7" x 96" lp@1.25 Ea 180.00 62.00 0.25 242.25

Wall bracket fluorescent fixtures - Enclosed wall acrylic top and bottom shield
48" long, using small tools.
One 40 watt, direct and indirect lp@.750 Ea 90.40 37.20 0.15 127.75
Two 40 watt,
without switch and receptor lp@.100 Ea 53.10 4.96 0.02 58.08

Wall bracket fluorescent fixtures - Acrylic wraparound shield, 48" long, direct
Using small tools.
One 40 watt lp@.750 Ea 70.50 37.20 0.15 107.85
Two 40 watt lp@1.00 Ea 78.70 49.60 0.20 128.50

High pressure sodium recessed fixture


With prismatic lens, lay-in, small tools.
100 watt, 2’ x 2’ lp@1.25 Ea 387.00 62.00 0.25 449.25

Compact fluorescent lamp fixtures, biaxial


Using small tools.
7 watt, downlight lk@.500 Ea 71.60 25.05 0.10 96.75
9 watt, downlight lk@.500 Ea 71.60 25.05 0.10 96.75
13 watt, downlight lk@.500 Ea 71.60 25.05 0.10 96.75

Surface luminaire - Small fluorescent fixtures, less than 40 watt lamps


Small tools.
One 9 watt, biaxial lamps, white acrylic lens,
9-5/8" square lk@.600 Ea 38.30 30.06 0.11 68.47
Two 9 watt, biaxial lamps, white acrylic lens,
9-5/8" square lk@.700 Ea 46.30 35.07 0.13 81.50
Undercounter 2' long, one 20 watt,
with wraparound lens lk@.600 Ea 34.40 30.06 0.11 64.57
Undercounter 3' long, one 30 watt,
2015 Heavy Construction Estimator, All Rights Reserved Page 769 (part 2)

with wraparound lens lk@.700 Ea 42.60 35.07 0.13 77.80

Surface luminaire - High pressure sodium fixture


Small tools.
Wall mounted low energy, 50 watt lk@1.25 Ea 277.00 62.63 0.24 339.87

Track lighting - Track


Using small tools.
1 circuit, 4' long lk@.100 LF 19.50 5.01 0.02 24.53
3 circuit, 4' long lk@.100 LF 32.40 5.01 0.02 37.43
2015 Heavy Construction Estimator, All Rights Reserved Page 770

Track lighting - Fixtures


Using small tools.
Cylinder, 75 watt lk@.200 Ea 32.50 10.02 0.04 42.56
Square, 75 watt lk@.200 Ea 33.00 10.02 0.04 43.06
Oblong shaped, quartz lk@.200 Ea 107.00 10.02 0.04 117.06

CSI 16-513, Industrial fixtures

Industrial fixtures, porcelain reflector - Standard dome, pendant mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.500 Ea 32.80 24.80 0.10 57.70
150 watt, 14" diameter lp@.550 Ea 35.20 27.28 0.11 62.59
200 watt, 16" diameter lp@.600 Ea 39.70 29.76 0.12 69.58
300 to 500 watt, 15" diameter lp@.750 Ea 50.40 37.20 0.15 87.75

Industrial fixtures, porcelain reflector - Standard dome, ceiling mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.500 Ea 29.00 24.80 0.10 53.90
150 watt, 14" diameter lp@.550 Ea 31.50 27.28 0.11 58.89
200 watt, 16" diameter lp@.600 Ea 36.20 29.76 0.12 66.08
300 to 500 watt, 18" diameter lp@.750 Ea 47.40 37.20 0.15 84.75

Industrial fixtures, porcelain reflector - Standard dome, symmetrical angle mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.500 Ea 36.40 24.80 0.10 61.30
150 watt, 14" diameter lp@.550 Ea 38.80 27.28 0.11 66.19
200 watt, 16" diameter lp@.600 Ea 43.60 29.76 0.12 73.48
300 to 500 watt, 18" diameter lp@.750 Ea 54.80 37.20 0.15 92.15

Industrial fixtures, porcelain reflector - Shallow dome, pendant mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.500 Ea 32.00 24.80 0.10 56.90
150 watt, 14" diameter lp@.550 Ea 35.40 27.28 0.11 62.79
200 watt, 16" diameter lp@.600 Ea 39.40 29.76 0.12 69.28
300 to 500 watt, 18" diameter lp@.750 Ea 45.40 37.20 0.15 82.75

Industrial fixtures, porcelain reflector - Shallow dome, ceiling mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.400 Ea 26.50 19.84 0.08 46.42
150 watt, 14" diameter lp@.450 Ea 30.00 22.32 0.09 52.41
200 watt, 16" diameter lp@.500 Ea 34.00 24.80 0.10 58.90
300 to 500 watt, 18" diameter lp@.650 Ea 41.00 32.24 0.13 73.37

Industrial fixtures, porcelain reflector - Shallow dome, angle mount


Using a hydraulic lift and small tools.
100 watt, 12" diameter lp@.500 Ea 33.90 24.80 0.10 58.80
150 watt, 14" diameter lp@.550 Ea 37.40 27.28 0.11 64.79
200 watt, 16" diameter lp@.600 Ea 41.30 29.76 0.12 71.18
300 to 500 watt, 18" diameter lp@.750 Ea 49.80 37.20 0.15 87.15

Industrial fixtures, porcelain reflector - Symmetrical angle, pendant mount


Using a hydraulic lift and small tools.
100 watt, 8" diameter lp@.500 Ea 37.50 24.80 0.10 62.40
150 watt, 10" diameter lp@.550 Ea 39.00 27.28 0.11 66.39
200 watt, 12" diameter lp@.600 Ea 47.30 29.76 0.12 77.18
2015 Heavy Construction Estimator, All Rights Reserved Page 770 (part 2)

300 to 500 watt, 14" diameter lp@.750 Ea 56.30 37.20 0.15 93.65

Industrial fixtures, porcelain reflector - Symmetrical angle, ceiling mount


Using a hydraulic lift and small tools.
100 watt, 8" diameter lp@.400 Ea 32.00 19.84 0.08 51.92
150 watt, 10" diameter lp@.450 Ea 33.60 22.32 0.09 56.01
200 watt, 12" diameter lp@.500 Ea 41.80 24.80 0.10 66.70
300 to 500 watt, 14" diameter lp@.650 Ea 50.80 32.24 0.13 83.17

Industrial fixtures, porcelain reflector - Symmetrical angle reflector


Angle mount, using a hydraulic lift and small tools.
100 watt, 8" diameter lp@.400 Ea 39.40 19.84 0.08 59.32
150 watt, 10" diameter lp@.450 Ea 39.90 22.32 0.09 62.31
200 watt, 12" diameter lp@.500 Ea 49.20 24.80 0.10 74.10
2015 Heavy Construction Estimator, All Rights Reserved Page 771

300 to 500 watt, 14" diameter lp@.650 Ea 58.20 32.24 0.13 90.57

Vapor tight fixtures - Dome reel, pendant mounted


Heavy duty, enclosed and gasketed, small tools.
75 to 100 watt,12" diameter lp@.700 Ea 63.10 34.72 0.14 97.96
150 watt,14" diameter lp@.700 Ea 65.50 34.72 0.14 100.36
200 watt,16" diameter lp@.800 Ea 70.20 39.68 0.16 110.04
300 to 500 watt,18" diameter lp@1.00 Ea 81.40 49.60 0.20 131.20

Vapor tight fixtures - Dome reel, ceiling mounted


Heavy duty enclosed and gasketed, small tools.
75 to 100 watt,12" diameter lp@.600 Ea 57.70 29.76 0.12 87.58
150 watt,14" diameter lp@.600 Ea 60.10 29.76 0.12 89.98
200 watt,16" diameter lp@.700 Ea 64.80 34.72 0.14 99.66
300 to 500 watt,18" diameter lp@.900 Ea 76.00 44.64 0.18 120.82

Vapor tight fixtures - 30 degree dome, pendant mounted


Heavy duty, enclosed and gasketed, small tools.
75 to 100 watt,12" diameter lp@.700 Ea 66.10 34.72 0.14 100.96
150 watt,14" diameter lp@.700 Ea 67.60 34.72 0.14 102.46
200 watt,16" diameter lp@.800 Ea 75.90 39.68 0.16 115.74
300 to 500 watt,18" diameter lp@1.00 Ea 86.30 49.60 0.20 136.10

Vapor tight fixtures - 30 degree dome, ceiling mounted


Heavy duty, enclosed and gasketed, small tools.
75 to 100 watt,12" diameter lp@.600 Ea 60.70 29.76 0.12 90.58
150 watt,14" diameter lp@.600 Ea 62.20 29.76 0.12 92.08
200 watt,16" diameter lp@.700 Ea 70.40 34.72 0.14 105.26
300 to 500 watt,18" diameter lp@.900 Ea 79.40 44.64 0.18 124.22

Vapor tight fixtures - Cast metal guard, ceiling mounted


Heavy duty enclosed and gasketed, concealed box, small tools.
100 watt lp@.650 Ea 44.80 32.24 0.13 77.17
150 to 200 watt lp@.650 Ea 58.80 32.24 0.13 91.17

Vapor tight fixtures - Cast metal guard, wall mounted


Heavy duty enclosed and gasketed, concealed box, small tools.
100 watt lp@.650 Ea 68.90 32.24 0.13 101.27
150 to 200 watt lp@.650 Ea 108.00 32.24 0.13 140.37

Vapor tight fixtures - Ball socket with tension spring


Using small tools.
Adjustable lamp holder,
300 watt, for outlet box lp@.300 Ea 4.15 14.88 0.06 19.09
Porcelain lamp holder, switchless,
lamp holder for outlet box lp@.300 Ea 2.77 14.88 0.06 17.71

Explosion proof fixtures - Low bay high intensity discharge


Using small tools.
250 watt lp@1.50 Ea 763.00 74.40 0.30 837.70

Explosion proof fixtures - Flush mounted floor fixtures


Using small tools.
300 watt incandescent floor lp@1.75 Ea 653.00 86.80 0.35 740.15

Explosion proof fixtures - Exit lights


2015 Heavy Construction Estimator, All Rights Reserved Page 771 (part 2)

Using small tools.


With battery back-up lp@2.50 Ea 919.00 124.00 0.50 1,043.50

Explosion proof fixtures - Hand lamp work lights


Using small tools.
100 watt hand
lamp with 120 volt lift reel lp@3.00 Ea 1,680.00 148.80 0.60 1,829.40
2015 Heavy Construction Estimator, All Rights Reserved Page 772

Explosion proof fixtures - Pendant mount, standard dome


NEC class I C, class II E, F, and G, and class III locations, small tools.
75 watt, incandescent lp@1.00 Ea 259.00 49.60 0.20 308.80
100 watt, incandescent lp@1.00 Ea 259.00 49.60 0.20 308.80
100 watt, mercury vapor lp@1.50 Ea 748.00 74.40 0.30 822.70
100 watt, high pressure sodium lp@1.50 Ea 920.00 74.40 0.30 994.70
150 watt, incandescent lp@1.25 Ea 424.00 62.00 0.25 486.25
175 watt, mercury vapor lp@1.75 Ea 775.00 86.80 0.35 862.15
150 watt, high pressure sodium lp@1.75 Ea 970.00 86.80 0.35 1,057.15
175 watt, metal halide lp@1.75 Ea 920.00 86.80 0.35 1,007.15
200 to 300 watt, incandescent lp@1.50 Ea 424.00 74.40 0.30 498.70
200 to 300 watt, mercury vapor lp@2.00 Ea 573.00 99.20 0.40 672.60
200 to 300 watt,
high pressure sodium lp@2.00 Ea 728.00 99.20 0.40 827.60
200 to 300 watt, metal halide lp@2.00 Ea 537.00 99.20 0.40 636.60
300 to 500 watt, incandescent lp@1.75 Ea 299.00 86.80 0.35 386.15
300 to 500 watt, mercury vapor lp@2.25 Ea 677.00 111.60 0.45 789.05
300 to 500 watt,
high pressure sodium lp@2.25 Ea 716.00 111.60 0.45 828.05
300 to 500 watt, metal halide lp@2.25 Ea 626.00 111.60 0.45 738.05

Explosion proof fixtures - Shallow dome, pendant mounted


NEC class I C, class II E, F, and G, and class III locations, small tools.
75 watt, incandescent lp@1.00 Ea 180.00 49.60 0.20 229.80
100 watt, incandescent lp@1.00 Ea 180.00 49.60 0.20 229.80
100 watt, mercury vapor lp@1.50 Ea 479.00 74.40 0.30 553.70
100 watt, high pressure sodium lp@1.50 Ea 562.00 74.40 0.30 636.70
150 watt, incandescent lp@1.25 Ea 180.00 62.00 0.25 242.25
175 watt, mercury vapor lp@1.75 Ea 524.00 86.80 0.35 611.15
150 watt, high pressure sodium lp@1.75 Ea 588.00 86.80 0.35 675.15
175 watt, metal halide lp@1.75 Ea 460.00 86.80 0.35 547.15
200 to 300 watt, incandescent lp@1.50 Ea 188.00 74.40 0.30 262.70
200 to 300 watt, mercury vapor lp@2.00 Ea 573.00 99.20 0.40 672.60
200 to 300 watt,
high pressure sodium lp@2.00 Ea 652.00 99.20 0.40 751.60
200 to 300 watt, metal halide lp@2.00 Ea 537.00 99.20 0.40 636.60
300 to 500 watt, incandescent lp@1.75 Ea 208.00 86.80 0.35 295.15
300 to 500 watt, mercury vapor lp@2.25 Ea 677.00 111.60 0.45 789.05
300 to 500 watt,
high pressure sodium lp@2.25 Ea 716.00 111.60 0.45 828.05
300 to 500 watt, metal halide lp@2.25 Ea 626.00 111.60 0.45 738.05

Explosion proof fixtures - Angle dome, pendant mounted


NEC class I C and D, class II E, F, and G, and class III locations, small tools.
75 watt , incandescent lp@1.00 Ea 259.00 49.60 0.20 308.80
100 watt, incandescent lp@1.00 Ea 259.00 49.60 0.20 308.80
100 watt , mercury vapor lp@1.50 Ea 742.00 74.40 0.30 816.70
100 watt, high pressure sodium lp@1.50 Ea 914.00 74.40 0.30 988.70
150 watt, incandescent lp@1.25 Ea 429.00 62.00 0.25 491.25
175 watt, mercury vapor lp@1.75 Ea 769.00 86.80 0.35 856.15
150 watt, high pressure sodium lp@1.75 Ea 964.00 86.80 0.35 1,051.15
175 watt, metal halide lp@1.75 Ea 914.00 86.80 0.35 1,001.15
200 to 300 watt, incandescent lp@1.50 Ea 429.00 74.40 0.30 503.70
200 to 300 watt, mercury vapor lp@2.00 Ea 578.00 99.20 0.40 677.60
200 to 300, high pressure sodium lp@2.00 Ea 652.00 99.20 0.40 751.60
200 to 300 watt, metal halide lp@2.00 Ea 537.00 99.20 0.40 636.60
300 to 500 watt, incandescent lp@1.75 Ea 299.00 86.80 0.35 386.15
300 to 500 watt, mercury vapor lp@2.25 Ea 677.00 111.60 0.45 789.05
2015 Heavy Construction Estimator, All Rights Reserved Page 772 (part 2)

300 to 500, high pressure sodium lp@2.25 Ea 716.00 111.60 0.45 828.05
300 to 500 watt, metal halide lp@2.25 Ea 626.00 111.60 0.45 738.05

Explosion proof fixtures - Standard dome, ceiling mount


NEC class I C and D, class II E, F, and G, and class III locations, small tools.
75 watt, incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt, incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt , mercury vapor lp@1.25 Ea 479.00 62.00 0.25 541.25
2015 Heavy Construction Estimator, All Rights Reserved Page 773

100 watt, high pressure sodium lp@1.25 Ea 562.00 62.00 0.25 624.25
150 watt, incandescent lp@1.00 Ea 259.00 49.60 0.20 308.80
175 watt , mercury vapor lp@1.50 Ea 524.00 74.40 0.30 598.70
150 watt, high pressure sodium lp@1.50 Ea 588.00 74.40 0.30 662.70
175 watt, metal halide lp@1.50 Ea 460.00 74.40 0.30 534.70
200 to 300 watt, incandescent lp@1.25 Ea 270.00 62.00 0.25 332.25
200 to 300 watt, mercury vapor lp@1.75 Ea 620.00 86.80 0.35 707.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent lp@1.50 Ea 299.00 74.40 0.30 373.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Explosion proof fixtures - Shallow dome, ceiling mount


NEC class I C and D, class II E, F, and G, and class III locations, small tools.
75 watt, incandescent lp@.750 Ea 180.00 37.20 0.15 217.35
100 watt, incandescent lp@.750 Ea 180.00 37.20 0.15 217.35
100 watt, mercury vapor lp@1.25 Ea 479.00 62.00 0.25 541.25
100 watt, high pressure sodium lp@1.25 Ea 562.00 62.00 0.25 624.25
150 watt, incandescent lp@1.00 Ea 180.00 49.60 0.20 229.80
175 watt, mercury vapor lp@1.50 Ea 524.00 74.40 0.30 598.70
150 watt, high pressure sodium lp@1.50 Ea 588.00 74.40 0.30 662.70
175 watt, metal halide lp@1.50 Ea 460.00 74.40 0.30 534.70
200 to 300 watt, incandescent lp@1.25 Ea 188.00 62.00 0.25 250.25
200 to 300 watt, mercury vapor lp@1.75 Ea 620.00 86.80 0.35 707.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent lp@1.50 Ea 208.00 74.40 0.30 282.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Explosion proof fixtures - Angle dome, ceiling mount


NEC class I C and D, class II E, F, and G, and class III locations, small tools.
75 watt , incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt, incandescent lp@.750 Ea 566.00 37.20 0.15 603.35
100 watt, mercury vapor lp@1.25 Ea 769.00 62.00 0.25 831.25
100 watt, high pressure sodium lp@1.25 Ea 939.00 62.00 0.25 1,001.25
150 watt, incandescent lp@1.00 Ea 560.00 49.60 0.20 609.80
175 watt, mercury vapor lp@1.50 Ea 798.00 74.40 0.30 872.70
150 watt, high pressure sodium lp@1.50 Ea 588.00 74.40 0.30 662.70
175 watt, metal halide lp@1.50 Ea 941.00 74.40 0.30 1,015.70
200 to 300 watt, incandescent lp@1.25 Ea 270.00 62.00 0.25 332.25
200 to 300 watt, mercury vapor lp@1.75 Ea 620.00 86.80 0.35 707.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent lp@1.50 Ea 299.00 74.40 0.30 373.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Explosion proof fixtures - Standard dome, wall bracket


2015 Heavy Construction Estimator, All Rights Reserved Page 773 (part 2)

NEC class I C and D, class II E, F, and G, and class III locations, using small tools.
75 watt, incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt, incandescent lp@.750 Ea 597.00 37.20 0.15 634.35
100 watt , mercury vapor lp@1.25 Ea 804.00 62.00 0.25 866.25
100 watt, high pressure sodium lp@1.25 Ea 970.00 62.00 0.25 1,032.25
150 watt, incandescent lp@1.00 Ea 549.00 49.60 0.20 598.80
175 watt, mercury vapor lp@1.50 Ea 827.00 74.40 0.30 901.70
2015 Heavy Construction Estimator, All Rights Reserved Page 774

150 watt, high pressure sodium lp@1.50 Ea 1,020.00 74.40 0.30 1,094.70
175 watt, metal halide lp@1.50 Ea 978.00 74.40 0.30 1,052.70
200 to 300 watt, incandescent lp@1.25 Ea 270.00 62.00 0.25 332.25
200 to 300 watt, mercury vapor lp@1.75 Ea 616.00 86.80 0.35 703.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent, lp@1.50 Ea 299.00 74.40 0.30 373.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Explosion proof fixtures - Shallow dome, wall bracket mounted


NEC class I C and D, class II E, F, and G, and class III locations, using small tools.
75 watt, incandescent lp@.750 Ea 180.00 37.20 0.15 217.35
100 watt, incandescent lp@.750 Ea 180.00 37.20 0.15 217.35
100 watt, mercury vapor lp@1.50 Ea 479.00 74.40 0.30 553.70
100 watt, high pressure sodium lp@1.50 Ea 562.00 74.40 0.30 636.70
150 watt, incandescent lp@1.00 Ea 180.00 49.60 0.20 229.80
175 watt, mercury vapor lp@1.50 Ea 524.00 74.40 0.30 598.70
150 watt, high pressure sodium lp@1.50 Ea 588.00 74.40 0.30 662.70
175 watt, metal halide lp@1.50 Ea 460.00 74.40 0.30 534.70
200 to 300 watt, incandescent lp@1.25 Ea 188.00 62.00 0.25 250.25
200 to 300 watt, mercury vapor lp@1.75 Ea 616.00 86.80 0.35 703.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent lp@1.50 Ea 208.00 74.40 0.30 282.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Explosion proof fixtures - Angle dome, wall bracket mounted


NEC class I C and D, class II E, F, and G, and class III locations, using small tools.
75 watt, incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt, incandescent lp@.750 Ea 259.00 37.20 0.15 296.35
100 watt, mercury vapor lp@1.25 Ea 798.00 62.00 0.25 860.25
100 watt, high pressure sodium lp@1.25 Ea 964.00 62.00 0.25 1,026.25
150 watt, incandescent lp@1.00 Ea 554.00 49.60 0.20 603.80
175 watt, mercury vapor lp@1.50 Ea 821.00 74.40 0.30 895.70
150 watt, high pressure sodium lp@1.50 Ea 1,020.00 74.40 0.30 1,094.70
175 watt, metal halide lp@1.50 Ea 972.00 74.40 0.30 1,046.70
200 to 300 watt, incandescent lp@1.25 Ea 270.00 62.00 0.25 332.25
200 to 300 watt, mercury vapor lp@1.75 Ea 620.00 86.80 0.35 707.15
200 to 300 watt,
high pressure sodium lp@1.75 Ea 652.00 86.80 0.35 739.15
200 to 300 watt, metal halide lp@1.75 Ea 537.00 86.80 0.35 624.15
300 to 500 watt, incandescent lp@1.50 Ea 299.00 74.40 0.30 373.70
300 to 500 watt, mercury vapor lp@2.00 Ea 677.00 99.20 0.40 776.60
300 to 500 watt,
high pressure sodium lp@2.00 Ea 716.00 99.20 0.40 815.60
300 to 500 watt, metal halide lp@2.00 Ea 626.00 99.20 0.40 725.60

Dust ignition proof incandescent fixtures - Pendant mounted, standard dome


Using small tools.
100 to 150 watt lp@1.00 Ea 257.00 49.60 0.20 306.80
200 to 300 watt lp@1.50 Ea 336.00 74.40 0.30 410.70
2015 Heavy Construction Estimator, All Rights Reserved Page 774 (part 2)

Dust ignition proof incandescent fixtures - Pendant mounted, shallow dome


Small tools.
100 to 150 watt lp@1.00 Ea 257.00 49.60 0.20 306.80
200 to 300 watt lp@1.50 Ea 336.00 74.40 0.30 410.70

Dust ignition proof incandescent fixtures - Pendant mounted, angle dome


Small tools.
100 to 150 watt lp@1.00 Ea 257.00 49.60 0.20 306.80
2015 Heavy Construction Estimator, All Rights Reserved Page 775

200 to 300 watt lp@1.50 Ea 336.00 74.40 0.30 410.70

Dust ignition proof incandescent fixtures - Ceiling mounted, standard dome


Small tools.
100 to 150 watt lp@.750 Ea 257.00 37.20 0.15 294.35
200 to 300 watt lp@1.00 Ea 336.00 49.60 0.20 385.80

Dust ignition proof incandescent fixtures - Ceiling mounted, shallow dome


Small tools.
100 to 150 watt lp@.750 Ea 257.00 37.20 0.15 294.35
200 to 300 watt lp@1.00 Ea 336.00 49.60 0.20 385.80

Dust ignition proof incandescent fixtures - Ceiling mounted, angle dome


Small tools.
100 to 150 watt lp@.750 Ea 257.00 37.20 0.15 294.35
200 to 300 watt lp@1.00 Ea 336.00 49.60 0.20 385.80

Surface mounted fluorescent strip lighting - Without reflector


Small tools.
One 40 watt lp@1.25 Ea 37.00 62.00 0.25 99.25
Two 40 watt lp@1.50 Ea 60.20 74.40 0.30 134.90

Surface mounted fluorescent strip lighting - Asymmetric aluminum reflector


Small tools.
One 40 watt lp@1.25 Ea 66.60 62.00 0.25 128.85
Two 40 watt lp@1.50 Ea 84.00 74.40 0.30 158.70

Surface mounted fluorescent strip lighting - Asymmetric porcelain reflector


Using small tools.
One 40 watt lp@1.25 Ea 97.30 62.00 0.25 159.55
Two 40 watt lp@1.50 Ea 119.00 74.40 0.30 193.70

Surface mounted fluorescent strip lighting - Asymmetric white reflector


Small tools.
One 40 watt lp@1.25 Ea 66.60 62.00 0.25 128.85
Two 40 watt lp@1.50 Ea 84.00 74.40 0.30 158.70

Surface mounted fluorescent strip lighting - Symmetric aluminum reflector


Small tools.
One 40 watt lp@1.25 Ea 66.60 62.00 0.25 128.85
Two 40 watt lp@1.50 Ea 84.00 74.40 0.30 158.70

Surface mounted fluorescent strip lighting - Symmetric porcelain reflector


Small tools.
One 40 watt lp@1.25 Ea 91.80 62.00 0.25 154.05
Two 40 watt lp@1.50 Ea 112.00 74.40 0.30 186.70

Surface mounted fluorescent strip lighting - Symmetric white reflector


Small tools.
One 40 watt lp@1.25 Ea 66.60 62.00 0.25 128.85
Two 40 watt lp@1.50 Ea 84.00 74.40 0.30 158.70

Suspended fluorescent open end fixtures - Two 40 watt lamps


Small tools.
Individual mounted lp@1.25 Ea 118.00 62.00 0.25 180.25
2015 Heavy Construction Estimator, All Rights Reserved Page 775 (part 2)

Continuous mounted lp@1.20 Ea 103.00 59.52 0.24 162.76

Suspended fluorescent open end fixtures - Three 40 watt lamps


Small tools.
Individual mounted lp@1.30 Ea 185.00 64.48 0.26 249.74
Continuous mounted lp@1.25 Ea 137.00 62.00 0.25 199.25

Fluorescent vapor tight fixtures - Two lamp, 4’ long


Enclosed and gasketed, 40 watt rapid start, small tools.
Surface mounting lp@1.30 Ea 226.00 64.48 0.26 290.74
Pendant mounting lp@1.60 Ea 226.00 79.36 0.32 305.68
2015 Heavy Construction Estimator, All Rights Reserved Page 776

Fluorescent vapor tight fixtures - Two lamp, weather proof


High output, 8’ long, using small tools.
Surface mounting lk@1.50 Ea 382.00 75.15 0.29 457.44
Pendant mounting lk@1.80 Ea 382.00 90.18 0.34 472.52

Fluorescent explosion or dust proof fixtures - Heavy duty glass lamp


40 watt, using small tools.
1 lamp fixture lp@1.75 Ea 614.00 86.80 0.35 701.15
2 lamp fixture lp@2.00 Ea 745.00 99.20 0.40 844.60
4 lamp fixture lp@2.50 Ea 999.00 124.00 0.50 1,123.50

Fluorescent explosion or dust proof fixtures - Heat resistant glass door


40 watt, using small tools.
2 lamp fixture lp@2.00 Ea 384.00 99.20 0.40 483.60

High and low bay fixtures - Open or closed, high intensity


Pendant mounted, using a hydraulic lift and small tools.
250 watt, high pressure sodium lp@1.00 Ea 202.00 49.60 0.20 251.80
400 watt, high pressure sodium lp@1.00 Ea 199.00 49.60 0.20 248.80
1000 watt, high pressure sodium lp@1.25 Ea 261.00 62.00 0.25 323.25
175 watt, mercury vapor lp@.750 Ea 186.00 37.20 0.15 223.35
250 watt, mercury vapor lp@.750 Ea 186.00 37.20 0.15 223.35
400 watt, mercury vapor lp@.750 Ea 211.00 37.20 0.15 248.35
1000 watt, mercury vapor lp@1.00 Ea 255.00 49.60 0.20 304.80
400 watt, metal halide lp@.750 Ea 211.00 37.20 0.15 248.35
1000 watt, metal halide lp@1.00 Ea 255.00 49.60 0.20 304.80

CSI 16-520, Exterior lighting fixtures

Exterior fixtures, weatherproof, ceiling and wall mount


For wet location, using small tools.
150 watt, high pressure sodium lk@1.00 Ea 341.00 50.10 0.19 391.29
300 watt, high pressure sodium lk@1.00 Ea 400.00 50.10 0.19 450.29

CSI 16-521, Exterior wall mounted fixtures

Opal globe exterior wall mount incandescent fixtures


Enclosed and gasketed, without guard, one lamp, using small tools.
100 watt lp@.400 Ea 15.90 19.84 0.08 35.82
150 to 200 watt lp@.450 Ea 40.30 22.32 0.09 62.71
100 watt lp@.450 Ea 26.00 22.32 0.09 48.41
150 to 200 watt lp@.500 Ea 44.20 24.80 0.10 69.10

High intensity prismatic glass lens fixtures


Using small tools.
175 watt mercury vapor, security lp@.600 Ea 241.00 29.76 0.12 270.88
70 watt high pressure sodium lp@.850 Ea 260.00 42.16 0.17 302.33
100 watt high pressure sodium lp@.850 Ea 183.00 42.16 0.17 225.33
175 watt mercury vapor lp@.600 Ea 157.00 29.76 0.12 186.88
70 watt high pressure sodium lp@.850 Ea 148.00 42.16 0.17 190.33
100 watt high pressure sodium lp@.850 Ea 152.00 42.16 0.17 194.33
250 watt mercury vapor lp@.600 Ea 218.00 29.76 0.12 247.88
400 watt mercury vapor lp@.600 Ea 245.00 29.76 0.12 274.88
250 watt high pressure sodium lp@.850 Ea 238.00 42.16 0.17 280.33
2015 Heavy Construction Estimator, All Rights Reserved Page 776 (part 2)

Step lights, incandescent recessed


Using small tools.
150 watt lk@1.00 Ea 53.70 50.10 0.19 103.99
2015 Heavy Construction Estimator, All Rights Reserved Page 777

CSI 16-522, Walkway lighting

Walkway lighting - Incandescent


Using small tools.
Post top 300 watt lk@1.50 Ea 165.00 75.15 0.29 240.44

Walkway lighting - Mercury vapor


Using small tools.
Post top 100 watt lk@2.00 Ea 195.00 100.20 0.38 295.58
Post top 175 watt lk@2.00 Ea 239.00 100.20 0.38 339.58
Post top 250 watt lk@2.00 Ea 212.00 100.20 0.38 312.58
Post top 400 watt lk@2.00 Ea 253.00 100.20 0.38 353.58
Round luminaire 100 watt lk@2.00 Ea 216.00 100.20 0.38 316.58
Post top luminaire 100 watt lk@2.00 Ea 216.00 100.20 0.38 316.58
Post top 175 watt lk@2.00 Ea 239.00 100.20 0.38 339.58
Spherical 100 watt lk@2.00 Ea 216.00 100.20 0.38 316.58
Spherical 175 watt lk@2.00 Ea 239.00 100.20 0.38 339.58
Spherical 250 watt lk@2.00 Ea 262.00 100.20 0.38 362.58
Spherical 400 watt lk@2.00 Ea 296.00 100.20 0.38 396.58
Low walkway, 100 watt lk@1.75 Ea 216.00 87.68 0.33 304.01

CSI 16-523, Flood lights

Floodlights - Tungsten halogen quartz


Using a hydraulic lift and small tools.
100 watt, pole lk@.800 Ea 73.10 40.08 0.15 113.33
Heavy duty, 1500 watt lk@1.00 Ea 82.20 50.10 0.19 132.49

Mercury vapor
Exterior wall, using a hydraulic lift and small tools.
400 watt lk@1.25 Ea 424.00 62.63 0.24 486.87
1000 watt lk@1.50 Ea 183.00 75.15 0.29 258.44
400 watt lk@1.25 Ea 228.00 62.63 0.24 290.87
1000 watt lk@1.50 Ea 273.00 75.15 0.29 348.44
400 watt, slip fit lk@1.25 Ea 348.00 62.63 0.24 410.87
1000 watt, slip fit lk@1.50 Ea 454.00 75.15 0.29 529.44

Mercury vapor - Metal halide


Using a hydraulic lift and small tools.
400 watt lk@1.25 Ea 483.00 62.63 0.24 545.87
1000 watt lk@1.50 Ea 293.00 75.15 0.29 368.44
400 watt lk@1.25 Ea 240.00 62.63 0.24 302.87
1000 watt lk@1.50 Ea 274.00 75.15 0.29 349.44
400 watt, slip fit lk@1.25 Ea 348.00 62.63 0.24 410.87
1000 watt, slip fit lk@1.50 Ea 454.00 75.15 0.29 529.44

Mercury vapor - High pressure sodium


Exterior wall floodlights, using a hydraulic lift and small tools.
400 watt lk@1.25 Ea 223.00 62.63 0.24 285.87
400 watt lk@1.25 Ea 308.00 62.63 0.24 370.87
1000 watt lk@1.50 Ea 358.00 75.15 0.29 433.44

Mercury vapor - Incandescent, swivel knuckle mount


Using small tools.
100 watt, WP PAR 38 lk@1.25 Ea 23.10 62.63 0.24 85.97
2015 Heavy Construction Estimator, All Rights Reserved Page 777 (part 2)

CSI 16-524, Street lighting

Roadway lighting - Mercury vapor fixture with wood pole bracket


Enclosed and gasketed, using a line truck with aerial platform and small tools.
175 watt lu@1.30 Ea 72.00 64.48 10.40 146.88
100 watt lu@1.30 Ea 189.00 64.48 10.40 263.88
175 watt lu@1.30 Ea 259.00 64.48 10.40 333.88
250 watt lu@1.30 Ea 275.00 64.48 10.40 349.88
400 watt lu@1.30 Ea 291.00 64.48 10.40 365.88
1000 watt lu@1.30 Ea 441.00 64.48 10.40 515.88
2015 Heavy Construction Estimator, All Rights Reserved Page 778

Roadway lighting - Metal halide fixture and bracket


Enclosed and gasketed, using a boom truck with basket and small tools.
400 watt lu@1.30 Ea 291.00 64.48 10.40 365.88
1000 watt lu@1.30 Ea 457.00 64.48 10.40 531.88

Roadway lighting - High pressure sodium fixture and bracket


Enclosed and gasketed, using a boom truck with basket and small tools.
100 watt lu@1.30 Ea 159.00 64.48 10.40 233.88
175 watt lu@1.30 Ea 204.00 64.48 10.40 278.88
250 watt lu@1.30 Ea 246.00 64.48 10.40 320.88
400 watt lu@1.30 Ea 267.00 64.48 10.40 341.88
1000 watt lu@1.30 Ea 300.00 64.48 10.40 374.88

CSI 16-525, Exterior area lighting

Mercury vapor area lighting fixtures


Enclosed and gasketed. No poles included. See poles and standards below, using a boom truck with
basket and small tools.
1000 watt, high mast lr@1.30 Ea 469.00 65.04 3.99 538.03

Mercury vapor area lighting fixtures


Enclosed and gasketed. No poles included. See poles and standards below, using a boom truck with
basket and small tools.
175 watt, side mounted lu@1.30 Ea 215.00 64.48 10.40 289.88
250 watt, side mounted lu@1.30 Ea 294.00 64.48 10.40 368.88
400 watt, side mounted lu@1.30 Ea 362.00 64.48 10.40 436.88
1000 watt, side mounted lu@1.30 Ea 372.00 64.48 10.40 446.88

Metal halide area lighting fixtures


Enclosed and gasketed, using a boom truck with basket and small tools.
1000 watt, high mast lu@1.30 Ea 478.00 64.48 10.40 552.88
400 watt, side mounted lu@1.30 Ea 362.00 64.48 10.40 436.88
1000 watt, side mounted lu@1.30 Ea 412.00 64.48 10.40 486.88

High pressure sodium area lighting fixtures


Using a boom truck with basket and small tools.
1000 watt, high mast lu@1.30 Ea 526.00 64.48 10.40 600.88
175 watt, side mounted lu@1.30 Ea 238.00 64.48 10.40 312.88
250 watt, side mounted lu@1.30 Ea 294.00 64.48 10.40 368.88
400 watt, side mounted lu@1.30 Ea 391.00 64.48 10.40 465.88
1000 watt, side mounted lu@1.30 Ea 485.00 64.48 10.40 559.88

CSI 16-530, Special purpose lighting fixtures

Under water fixtures - Dry niche, 120 volt


Using small tools.
Par 56 lk@2.00 Ea 420.00 100.20 0.38 520.58
Par 64 lk@2.25 Ea 520.00 112.70 0.43 633.13

Under water fixtures - Wet niche, 120 volt


Using small tools.
300 watt, incandescent par 56 lk@2.00 Ea 530.00 100.20 0.38 630.58
1000 watt, tungsten halogen par 64 lk@2.25 Ea 620.00 112.70 0.43 733.13

Fountain underwater lighting fixtures


2015 Heavy Construction Estimator, All Rights Reserved Page 778 (part 2)

Using small tools.


6300 watt, incandescent lk@2.00 Ea 1,640.00 100.20 0.38 1,740.58
500 watt, tungsten halogen lk@2.25 Ea 1,370.00 112.70 0.43 1,483.13
2015 Heavy Construction Estimator, All Rights Reserved Page 779

CSI 16-570, Poles and standards

Round aluminum tapered street lighting poles - One tapered 6' (1.8m) arm per pole
Seamless pole, anchor base, with handhole. Single member arms, tapered tube, 4 bolt attachment,
using a boom truck with basket and small tools.
20' (6m) high lt@1.50 Ea 753.00 74.49 16.70 844.19
25' (7.6m) high lt@1.75 Ea 945.00 86.91 19.50 1,051.41
30' (9.1m) high lt@2.00 Ea 1,540.00 99.32 22.30 1,661.62
35' (10.7m) high lt@2.25 Ea 1,690.00 111.70 25.10 1,826.80
40' (12.2m) high lt@2.50 Ea 1,980.00 124.20 27.90 2,132.10

Round aluminum tapered street lighting poles - Two tapered 6' (1.8m) arms per pole
Seamless pole, anchor base, with handhole. Single member arms, tapered tube, 4 bolt attachment,
using a boom truck with basket and small tools.
20' (6m) high lt@1.75 Ea 1,020.00 86.91 19.50 1,126.41
25' (7.6m) high lt@2.00 Ea 1,340.00 99.32 22.30 1,461.62
30' (9.1m) high lt@2.25 Ea 1,590.00 111.70 25.10 1,726.80
35' (10.7m) high lt@2.50 Ea 1,740.00 124.20 27.90 1,892.10
40' (12.2m) high lt@2.75 Ea 2,030.00 136.60 30.70 2,197.30

Round aluminum tapered street lighting poles - One 13' (3.7m) truss arm per pole
Seamless pole, 4 bolt anchor base, with handhole. Tapered upper arm, pipe lower member, 6-bolt
attachment, using a boom truck with basket and small tools.
25' (7.6m) high lt@2.00 Ea 1,430.00 99.32 22.30 1,551.62
30' (9.1m) high lt@2.25 Ea 1,640.00 111.70 25.10 1,776.80
35' (10.7m) high lt@2.50 Ea 1,790.00 124.20 27.90 1,942.10
40' (12.2m) high lt@2.75 Ea 2,130.00 136.60 30.70 2,297.30

Round aluminum tapered street lighting poles - Two 13' (3.7m) truss arms per pole
Seamless pole, 4 bolt anchor base, with handhole. Tapered upper arm, pipe lower member, 6-bolt
attachment, using a boom truck with basket and small tools.
25' (7.6m) high lt@2.25 Ea 1,530.00 111.70 25.10 1,666.80
30' (9.1m) high lt@2.50 Ea 1,740.00 124.20 27.90 1,892.10
35' (10.7m) high lt@2.75 Ea 1,870.00 136.60 30.70 2,037.30
40' (12.2m) high lt@3.00 Ea 2,230.00 149.00 33.50 2,412.50

Round galvanized steel tapered street lighting poles - One tapered 6' (1.8m) arm per pole
Anchor base, with handhole. Single member arms, tapered tube, 4 bolt attachment, using a boom truck
with basket and small tools.
20’ (6m) high lt@1.75 Ea 976.00 86.91 19.50 1,082.41
25’ (7.6m) high lt@2.00 Ea 1,090.00 99.32 22.30 1,211.62
30’ (9.1m) high lt@2.25 Ea 1,260.00 111.70 25.10 1,396.80
35’ (10.7m) high lt@2.50 Ea 1,440.00 124.20 27.90 1,592.10
40’ (12.2m) high lt@2.75 Ea 1,570.00 136.60 30.70 1,737.30

Round galvanized steel tapered street lighting poles - Two 6' (1.8m) arms per pole
Anchor base, with handhole. Single member arms, tapered tube, using a boom truck with basket and
small tools.
20’ (6m) high lt@2.00 Ea 1,040.00 99.32 22.30 1,161.62
25’ (7.6m) high lt@2.25 Ea 1,160.00 111.70 25.10 1,296.80
30’ (9.1m) high lt@2.50 Ea 1,320.00 124.20 27.90 1,472.10
35’ (10.7m) high lt@2.75 Ea 1,500.00 136.60 30.70 1,667.30
40’ (12.2m) lt@3.00 Ea 1,630.00 149.00 33.50 1,812.50

Round galvanized steel tapered street lighting poles - One 13' (3.7m) truss arm per pole
Anchor base, with handhole. Tapered upper arm, pipe lower member, 6-bolt attachment, using a boom
truck with basket and small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 779 (part 2)

25'(7.6m) high lt@2.50 Ea 1,120.00 124.20 27.90 1,272.10


30'(9.1m) high lt@2.75 Ea 1,230.00 136.60 30.70 1,397.30
35'(10.7m) high lt@3.00 Ea 1,580.00 149.00 33.50 1,762.50
40'(12.2m) high lt@3.25 Ea 1,710.00 161.40 36.20 1,907.60
45'(13.7m) high lt@3.50 Ea 1,900.00 173.80 39.00 2,112.80

Round galvanized steel tapered street lighting poles - Two 12' arms per pole
Anchor base, with handhole. Tapered upper arm, pipe lower member, 6-bolt attachment, using a boom
truck with basket and small tools.
25'(7.6m) high lt@2.75 Ea 1,260.00 136.60 30.70 1,427.30
30'(9.1m) high lt@3.00 Ea 1,370.00 149.00 33.50 1,552.50
35'(10.7m) high lt@3.25 Ea 1,720.00 161.40 36.20 1,917.60
40'(12.2m) high lt@3.50 Ea 1,850.00 173.80 39.00 2,062.80
2015 Heavy Construction Estimator, All Rights Reserved Page 780

45'(13.7m) high lt@3.75 Ea 2,040.00 186.20 41.80 2,268.00

Area lighting poles, aluminum, 3" outside diameter - Non-tapered pole


For single luminaires, anchor base, using a boom truck with basket and small tools.
10’ (3m) high lt@.750 Ea 283.00 37.25 8.36 328.61
12’ (3.7m) high lt@.800 Ea 358.00 39.73 8.92 406.65
14’ (4.3m) high lt@1.00 Ea 441.00 49.66 11.20 501.86

Area lighting poles, aluminum, 3" outside diameter - Tapered pole


For single luminaires, anchor base, using a boom truck with basket and small tools.
10’ (3m) high lt@.750 Ea 301.00 37.25 8.36 346.61
12’ (3.7m) high lt@.800 Ea 424.00 39.73 8.92 472.65
14’ (4.3m) high lt@.900 Ea 468.00 44.69 10.00 522.69
16’ (4.9m) high lt@1.00 Ea 470.00 49.66 11.20 530.86
18’ (5.5m) high lt@1.10 Ea 681.00 54.63 12.30 747.93
20’ (6m) high lt@1.20 Ea 807.00 59.59 13.40 879.99

Area lighting poles, galvanized steel, 3" outside diameter - Tapered


For single luminaire, anchor base, using a boom truck with basket and small tools.
10’ (3m) high lt@1.00 Ea 334.00 49.66 11.20 394.86
12’ (3.7m) high lt@1.15 Ea 411.00 57.11 12.80 480.91
14’ (4.3m) high lt@1.25 Ea 462.00 62.08 13.90 537.98
16’ (4.9m) high lt@1.35 Ea 539.00 67.04 15.10 621.14
18’ (5.5m) high lt@1.45 Ea 668.00 72.01 16.20 756.21
20’ (6m) high lt@1.55 Ea 873.00 76.97 17.30 967.27

Round steel landscape lighting poles - Surface mount, 8-1/2" base


With anchor bolts and base cover, using small tools.
3' high, 1-7/8" diameter lk@.400 Ea 1,300.00 20.04 0.08 1,320.12
6' high, 1-7/8" diameter lk@.600 Ea 1,620.00 30.06 0.11 1,650.17
8' high, 1-7/8" diameter lk@.800 Ea 1,940.00 40.08 0.15 1,980.23
9' high, 2-3/8" diameter lk@.900 Ea 2,270.00 45.09 0.17 2,315.26
8' high, 2-7/8" diameter lk@.800 Ea 2,590.00 40.08 0.15 2,630.23
8' high, 3-1/2" diameter lk@.800 Ea 2,920.00 40.08 0.15 2,960.23
9' high, 3-1/2" diameter lk@.900 Ea 3,240.00 45.09 0.17 3,285.26

Round steel landscape lighting poles - Burial type, round


By height above ground, 18" burial, using small tools.
3' high, 1-7/8" diameter lk@.400 Ea 518.00 20.04 0.08 538.12
6' high, 1-7/8" diameter lk@.600 Ea 733.00 30.06 0.11 763.17
8' high, 1-7/8" diameter lk@.800 Ea 1,020.00 40.08 0.15 1,060.23
9' high, 2-3/8" diameter lk@.900 Ea 1,420.00 45.09 0.17 1,465.26
8' high, 2-7/8" diameter lk@.800 Ea 1,990.00 40.08 0.15 2,030.23
8' high, 3-1/2" diameter lk@.800 Ea 2,790.00 40.08 0.15 2,830.23
9' high, 3-1/2" diameter lk@.900 Ea 3,900.00 45.09 0.17 3,945.26

Precast concrete area lighting poles - Tapered


Precast concrete, octagonal butt, base type, using a boom truck and small tools.
28' (8.5m) high lt@2.00 Ea 541.00 99.32 22.30 662.62
30' (9.1m) high lt@2.25 Ea 541.00 111.70 25.10 677.80
33' (10m) high lt@2.50 Ea 566.00 124.20 27.90 718.10
36' (10.9m) high lt@2.75 Ea 1,030.00 136.60 30.70 1,197.30
38' (11.6m) high lt@3.00 Ea 1,030.00 149.00 33.50 1,212.50
43' (13.1m) high lt@3.25 Ea 1,190.00 161.40 36.20 1,387.60
47' (14.3m) high lt@3.50 Ea 1,400.00 173.80 39.00 1,612.80
2015 Heavy Construction Estimator, All Rights Reserved Page 781

Precast concrete area lighting poles - Single tapered aluminum arm


Precast concrete, octagonal butt, base type, using a boom truck and small tools.
6' (1.8m) long lt@.500 Ea 534.00 24.83 5.58 564.41
8' (2.4m) long lt@.600 Ea 801.00 29.80 6.69 837.49
10' (3m) long lt@.700 Ea 1,070.00 34.76 7.81 1,112.57
12' (3.7m) long lt@.800 Ea 1,600.00 39.73 8.92 1,648.65

Area lighting poles, spun cast concrete, burial type - Tapered


Using a boom truck and small tools.
13’ (4m) above ground lt@1.50 Ea 631.00 74.49 16.70 722.19
16’ (4.8m) above ground lt@2.00 Ea 692.00 99.32 22.30 813.62
18’ (5.5m) above ground lt@2.25 Ea 744.00 111.70 25.10 880.80
30’ (9.1m) above ground lt@3.25 Ea 1,010.00 161.40 36.20 1,207.60
35’ (10.7m) above ground lt@3.50 Ea 1,040.00 173.80 39.00 1,252.80
40’ (12.2m) above ground lt@3.75 Ea 1,070.00 186.20 41.80 1,298.00
45’ (13.7m) above ground lt@4.00 Ea 1,090.00 198.60 44.60 1,333.20

2" standard galvanized steel arm, bracket type


Using small tools.
6’ (1.8m) high lt@.600 Ea 978.00 29.80 6.69 1,014.49
8’ (2.4m) high lt@.700 Ea 1,380.00 34.76 7.81 1,422.57
10’ (3m) high lt@.800 Ea 1,770.00 39.73 8.92 1,818.65

CSI 16-580, Aviation lighting systems

Runway and taxi way insert lights - Runway centerline, bi-directional


Using small tools.
200 watt, semi-flush,
shallow insert base lp@.500 Ea 1,400.00 24.80 0.10 1,424.90
200 watt, semi-flush,
mounted in base housing lp@.750 Ea 794.00 37.20 0.15 831.35
200 watt,
flush, shallow insert base lp@.500 Ea 542.00 24.80 0.10 566.90
200 watt,
flush mounted in base housing lp@.750 Ea 513.00 37.20 0.15 550.35
45 watt,
flush mounted in base housing lp@.750 Ea 562.00 37.20 0.15 599.35

Runway and taxi way insert lights - Touchdown zone lighting


Semi-flush, using small tools.
200 watt, uni-directional,
shallow insert base lp@.500 Ea 1,210.00 24.80 0.10 1,234.90
115 watt, uni-directional,
shallow insert base lp@.500 Ea 1,220.00 24.80 0.10 1,244.90
62 watt, bi-directional,
shallow insert base lp@.500 Ea 1,220.00 24.80 0.10 1,244.90
200 watt, uni-directional,
mounted in base housing lp@.750 Ea 625.00 37.20 0.15 662.35
115 watt, uni-directional,
mounted in base housing lp@.750 Ea 635.00 37.20 0.15 672.35
62 watt, bi-directional,
mounted in base housing lp@.750 Ea 635.00 37.20 0.15 672.35

Runway and taxi way insert lights - Edge and threshold lighting
Bi-directional, using small tools.
200 watt, mounted in base housing lp@.750 Ea 653.00 37.20 0.15 690.35
2015 Heavy Construction Estimator, All Rights Reserved Page 781 (part 2)

300 watt, mounted in base housing lp@.750 Ea 706.00 37.20 0.15 743.35
499 watt, mounted in base housing lp@.750 Ea 796.00 37.20 0.15 833.35

Runway and taxi way insert lights - Threshold and approach lighting
Uni-directional, using small tools.
200 watt, mounted in base housing lp@.750 Ea 559.00 37.20 0.15 596.35
499 watt, mounted in base housing lp@.750 Ea 703.00 37.20 0.15 740.35

Runway and taxi way insert lights - Edge lighting


Bi-directional, using small tools.
Two 115 watt,
mounted in base housing lp@.750 Ea 631.00 37.20 0.15 668.35
Two 185 watt,
mounted in base housing lp@.750 Ea 714.00 37.20 0.15 751.35

Runway and taxi way insert lights - Threshold and end lighting
Bi-directional, using small tools.
Two 115 watt,
mounted in base housing lp@.750 Ea 172.00 37.20 0.15 209.35
Two 185 watt,
mounted in base housing lp@.750 Ea 193.00 37.20 0.15 230.35
2015 Heavy Construction Estimator, All Rights Reserved Page 782

Runway and taxi way insert lights - Approach lights


Uni-directional, semi-flush, using small tools.
115 watt, shallow insert base lp@.750 Ea 821.00 37.20 0.15 858.35
200 watt, shallow insert base lp@.750 Ea 831.00 37.20 0.15 868.35
115 watt, mounted in base housing lp@.750 Ea 267.00 37.20 0.15 304.35
200 watt, mounted in base housing lp@.750 Ea 286.00 37.20 0.15 323.35

Runway and taxi way insert lights - High intensity approach or threshold lights
Semi-flush, uni-directional, using small tools.
Approach, 500 watt quartz, clear lp@.750 Ea 1,390.00 37.20 0.15 1,427.35
Threshold, 500 watt, quartz, clear lp@.750 Ea 1,530.00 37.20 0.15 1,567.35
Approach, 500 watt quartz, red lp@.750 Ea 1,360.00 37.20 0.15 1,397.35
Threshold or end, green or red lp@.750 Ea 1,620.00 37.20 0.15 1,657.35

Runway and taxi way insert lights - Approach threshold lighting


For mounting in base housing, uni-directional, using small tools.
185 watt, mounted in base housing lp@.750 Ea 588.00 37.20 0.15 625.35

Runway and taxi way insert lights - Taxi-way lighting


Omni-directional, using small tools.
115 watt , for mounting
in shallow insert base lp@.750 Ea 480.00 37.20 0.15 517.35
115 watt, mounted in
shallow insert base housing lp@.750 Ea 324.00 37.20 0.15 361.35
45 watt, shallow insert base lp@.750 Ea 480.00 37.20 0.15 517.35
115 watt, shallow insert base lp@.750 Ea 480.00 37.20 0.15 517.35
45 watt, mounted in base housing lp@.750 Ea 324.00 37.20 0.15 361.35
115 watt, mounted in base housing lp@.750 Ea 324.00 37.20 0.15 361.35
45 watt,
flush mounted in base housing lp@.750 Ea 324.00 37.20 0.15 361.35
115 watt,
flush mounted in base housing lp@.750 Ea 324.00 37.20 0.15 361.35

Runway and taxi way insert lights - Elevated approach lighting


Using small tools.
200 watt, heavy duty assembly only lp@1.00 Ea 146.00 49.60 0.20 195.80
300 watt, heavy duty assembly only lp@1.00 Ea 146.00 49.60 0.20 195.80
500 watt, heavy duty assembly only lp@1.00 Ea 146.00 49.60 0.20 195.80
200 watt, with filter bracket lp@1.25 Ea 156.00 62.00 0.25 218.25
300 watt, with filter bracket lp@1.25 Ea 156.00 62.00 0.25 218.25
500 watt, with filter bracket lp@1.25 Ea 156.00 62.00 0.25 218.25

Airport lighting accessories


Using small tools.
45 watt transformer lp@.300 Ea 116.00 14.88 0.06 130.94
65 watt transformer lp@.300 Ea 138.00 14.88 0.06 152.94
100 watt transformer lp@.300 Ea 161.00 14.88 0.06 175.94
200 watt transformer lp@.300 Ea 169.00 14.88 0.06 183.94
200 watt transformer lp@.300 Ea 169.00 14.88 0.06 183.94
500 watt transformer lp@.300 Ea 219.00 14.88 0.06 233.94
Base housing,12" diameter lp@.500 Ea 216.00 24.80 0.10 240.90
Base housing,15" diameter lp@.500 Ea 283.00 24.80 0.10 307.90
Connector
kit for one conductor cable lp@.500 Ea 16.40 24.80 0.10 41.30
2015 Heavy Construction Estimator, All Rights Reserved Page 783

Precast concrete base lp@1.50 Ea 294.00 74.40 0.30 368.70

Runway lighting power cable assemblies


Using small tools.
Upper cable assembly lp@.750 Ea 40.20 37.20 0.15 77.55
Lower cable assembly lp@.750 Ea 40.20 37.20 0.15 77.55
Cable clamp lp@.250 Ea 24.90 12.40 0.05 37.35

Precision approach path indicators


Using small tools.
4 system, 4 units,
3 projectors per unit lp@12.0 Ea 9,740.00 595.20 2.40 10,337.60
Series power kit, 3 x 200 lp@1.50 Ea 1,050.00 74.40 0.30 1,124.70
Clinometer lp@2.50 Ea 846.00 124.00 0.50 970.50
Optical bench lp@4.00 Ea 2,080.00 198.40 0.80 2,279.20
Radio receiver, air to ground lp@3.00 Ea 1,440.00 148.80 0.60 1,589.40
Radio receiver, interface unit lp@3.00 Ea 304.00 148.80 0.60 453.40

Rotating airport beacons


Using small tools.
12 RPM, 1 beam clear, 1 beam green,
400 watt, metal halide lp@16.0 Ea 17,800.00 793.60 3.20 18,596.80
Single drum, 12 RPM,
clear beam, 500 watt quartz lp@16.0 Ea 44,500.00 793.60 3.20 45,296.80
Double drum, 6 RPM, clear and green beams,
1000 watt quartz lp@16.0 Ea 48,300.00 793.60 3.20 49,096.80
Weather proof panel board,
four 15 amp breakers lp@4.00 Ea 2,250.00 198.40 0.80 2,449.20

Airport beacon towers


Add the cost of excavation and concrete base, using a boom truck and small tools.
Tubular type, 51' high ln@16.0 Ea 15,300.00 797.00 22.20 16,119.20

Airport wind cone, 12’ illuminated


Using a boom truck and small tools.
Lighted assembly, rigid,
with obstruction light ln@6.00 Ea 1,990.00 298.90 8.34 2,297.24
Lighted assembly, rigid ln@6.00 Ea 1,830.00 298.90 8.34 2,137.24
Unlighted assembly, rigid,
with obstruction light ln@8.00 Ea 1,730.00 398.50 11.10 2,139.60
Unlighted assembly, rigid ln@6.00 Ea 1,660.00 298.90 8.34 1,967.24
Wind cone, 12’ x 3’,
slip fitter, 2.5" pipe mount ln@1.00 Ea 118.00 49.81 1.39 169.20
Cotton sock ln@2.00 Ea 302.00 99.62 2.78 404.40
Nylon sock ln@2.00 Ea 318.00 99.62 2.78 420.40
Booster transformer,
1 kw, weatherproof cabinet ln@1.00 Ea 767.00 49.81 1.39 818.20

Airport wind cone, 8’ illuminated


Using small tools.
Lighted, frangible ln@6.00 Ea 1,830.00 298.90 8.34 2,137.24
Unlighted, frangible ln@6.00 Ea 1,560.00 298.90 8.34 1,867.24
Lighted,
rigid with obstruction light ln@6.00 Ea 1,660.00 298.90 8.34 1,967.24
Lighted, rigid ln@6.00 Ea 1,310.00 298.90 8.34 1,617.24
Unlighted, rigid ln@8.00 Ea 1,180.00 398.50 11.10 1,589.60
Unlighted,
2015 Heavy Construction Estimator, All Rights Reserved Page 783 (part 2)

rigid with obstruction light ln@8.00 Ea 1,260.00 398.50 11.10 1,669.60


8' x 1-1/2' nylon sock ln@2.00 Ea 233.00 99.62 2.78 335.40

Airport lighting power control panels


Using small tools.
Series circuit monitor,
6.6 amp, 48 VDC control lp@8.00 Ea 4,570.00 396.80 1.60 4,968.40
Key selector switch lp@.500 Ea 27.80 24.80 0.10 52.70
2015 Heavy Construction Estimator, All Rights Reserved Page 784

Airport lighting series isolation transformers


Using small tools.
30/45 watt, FAA rated lp@1.00 Ea 69.60 49.60 0.20 119.40
65 watt, FAA rated lp@1.00 Ea 83.00 49.60 0.20 132.80
100 watt, FAA rated lp@1.00 Ea 96.30 49.60 0.20 146.10
300 watt, FAA rated lp@1.00 Ea 125.00 49.60 0.20 174.80
500 watt, FAA rated lp@1.00 Ea 133.00 49.60 0.20 182.80
30/45 watt, military rated lp@1.00 Ea 102.00 49.60 0.20 151.80
200 watt, military rated lp@1.00 Ea 127.00 49.60 0.20 176.80
300 watt, military rated lp@1.00 Ea 165.00 49.60 0.20 214.80
500 watt, military rated lp@1.00 Ea 195.00 49.60 0.20 244.80

Airport auxiliary lighting pilot relay cabinets


Using small tools.
20 circuit, 120 volt, 50/60 Hz lp@8.00 Ea 2,130.00 396.80 1.60 2,528.40
20 circuit, 120 volt, 50 Hz lp@8.00 Ea 2,130.00 396.80 1.60 2,528.40
24 circuit, 120 volt, 60 Hz lp@9.00 Ea 2,450.00 446.40 1.80 2,898.20
Master timer cabinet lp@12.0 Ea 9,620.00 595.20 2.40 10,217.60

Airport lighting radio control systems


Using small tools.
Radio control receiver controller lp@40.0 Ea 969.00 1,984.00 8.00 2,961.00

Current regulators for airport lighting


Using rolla lifts and small tools.
10 kw, wet type lp@6.00 Ea 6,550.00 297.60 1.20 6,848.80
20 kw, wet type lp@8.00 Ea 11,500.00 396.80 1.60 11,898.40
50 kw, wet type lp@12.0 Ea 17,200.00 595.20 2.40 17,797.60
4 kw, dry type lp@3.50 Ea 2,460.00 173.60 0.70 2,634.30
7.5 kw, dry type lp@3.75 Ea 3,620.00 186.00 0.75 3,806.75
10 kw, dry type lp@4.00 Ea 4,560.00 198.40 0.80 4,759.20

Runway lamp failure detectors


Using small tools.
120/240 volt, one 6.6 amp and three
20 amp circuit monitoring lp@4.00 Ea 5,730.00 198.40 0.80 5,929.20

Runway lighting control accessories


Using small tools.
Plug cutout lp@1.00 Ea 432.00 49.60 0.20 481.80
Primary connector kit lp@.300 Ea 12.70 14.88 0.06 27.64
Secondary connector kit lp@.300 Ea 20.80 14.88 0.06 35.74
Heat shrink kit lp@.300 Ea 6.92 14.88 0.06 21.86

Runway lighting cable


Using small tools.
Electric type C cable lp@.014 LF 7.08 0.69 -- 7.77
Terminal blocks lp@.150 Ea 90.50 7.44 0.03 97.97

Taxi guidance signs, internally illuminated, 18" letters


Using small tools.
Single face, 4' wide lp@2.00 Ea 1,160.00 99.20 0.40 1,259.60
Single face, 6' wide lp@2.00 Ea 1,950.00 99.20 0.40 2,049.60
Single face, 8' wide lp@2.50 Ea 2,720.00 124.00 0.50 2,844.50
Single face, 10' wide lp@3.00 Ea 3,350.00 148.80 0.60 3,499.40
2015 Heavy Construction Estimator, All Rights Reserved Page 784 (part 2)

Double face, 4' wide lp@2.50 Ea 1,270.00 124.00 0.50 1,394.50


Double face, 6' wide lp@3.00 Ea 2,170.00 148.80 0.60 2,319.40
Double face, 8' wide lp@3.50 Ea 3,050.00 173.60 0.70 3,224.30
Double face, 10' wide lp@4.00 Ea 3,790.00 198.40 0.80 3,989.20

Taxi guidance signs, internally illuminated, 12" to 15" letters


Using small tools.
Single face, 2 1/2' wide lp@2.00 Ea 961.00 99.20 0.40 1,060.60
Single face, 4' wide lp@2.00 Ea 1,600.00 99.20 0.40 1,699.60
Single face, 6' wide lp@2.50 Ea 2,280.00 124.00 0.50 2,404.50
Single face, 8' wide lp@3.00 Ea 2,890.00 148.80 0.60 3,039.40
Double face, 2 1/2' wide lp@2.00 Ea 1,050.00 99.20 0.40 1,149.60
Double face, 4' wide lp@2.50 Ea 1,770.00 124.00 0.50 1,894.50
Double face, 6' wide lp@3.00 Ea 2,550.00 148.80 0.60 2,699.40
Double face, 8' wide lp@3.50 Ea 4,140.00 173.60 0.70 4,314.30
2015 Heavy Construction Estimator, All Rights Reserved Page 785

Taxi guidance signs, unlighted, 18" letters


Using small tools.
Single face, 4' wide lp@1.00 Ea 828.00 49.60 0.20 877.80
Single face, 6' wide lp@1.20 Ea 1,630.00 59.52 0.24 1,689.76
Single face, 8' wide lp@1.30 Ea 2,390.00 64.48 0.26 2,454.74
Single face,10' wide lp@1.40 Ea 3,020.00 69.44 0.28 3,089.72
Double face, 4' wide lp@1.00 Ea 938.00 49.60 0.20 987.80
Double face, 6' wide lp@1.20 Ea 1,850.00 59.52 0.24 1,909.76
Double face, 8' wide lp@1.30 Ea 2,660.00 64.48 0.26 2,724.74
Double face, 10' wide lp@1.40 Ea 2,680.00 69.44 0.28 2,749.72

Runway distance marker signs, internally illuminated


Using small tools.
48" x 48" lp@2.00 Ea 1,640.00 99.20 0.40 1,739.60

Accessories for runway guidance signs


Using small tools.
100 watt transformer lp@1.00 Ea 119.00 49.60 0.20 168.80
Connector kit for 1 conductor cable lp@.600 Ea 12.10 29.76 0.12 41.98
Base housing, 12" diameter lp@1.50 Ea 121.00 74.40 0.30 195.70

Taxi way markers, tubular reflector post


With reflector strips on background, using small tools.
18" marker lp@1.00 Ea 26.40 49.60 0.20 76.20
24" marker lp@1.00 Ea 30.70 49.60 0.20 80.50
30" marker lp@1.00 Ea 37.30 49.60 0.20 87.10
36" marker lp@1.00 Ea 41.70 49.60 0.20 91.50

Heliport lighting
Using small tools.
Perimeter light,
40 watt, with base housing lp@2.00 Ea 86.50 99.20 0.40 186.10
Landing direction light,
40 watt, with base housing lp@2.00 Ea 86.50 99.20 0.40 186.10
Pad insert light,
40 watt, with base housing lp@2.00 Ea 502.00 99.20 0.40 601.60
10' steel pole,
with two 500 watt floodlights lp@8.00 Ea 2,070.00 396.80 1.60 2,468.40
Single obstruction light,
69 watt lamp lp@1.50 Ea 104.00 74.40 0.30 178.70
Two obstruction light,
two 69 watt lamps lp@1.75 Ea 144.00 86.80 0.35 231.15
Rotating beacon,
three 500 watt quartz lamps lp@16.0 Ea 2,110.00 793.60 3.20 2,906.80

Heliport lighted 20' long wind cone


Four deep-bowl 150 watt reflector fixtures, one 69 watt obstruction light, using a boom truck and small
tools.
Lighted wind cone sock, 8' x 20; ln@6.00 Ea 1,990.00 298.90 8.34 2,297.24

Heliport lighting controls


Using small tools.
Light photoelectric control lp@1.00 Ea 234.00 49.60 0.20 283.80
Air to
ground radio control receiver lp@4.00 Ea 1,330.00 198.40 0.80 1,529.20
2015 Heavy Construction Estimator, All Rights Reserved Page 785 (part 2)

Tower and obstruction lighting - Hazard beacon, flashing red


Using small tools.
Two 620 watt, with 2 wire cable lp@4.00 Ea 2,500.00 198.40 0.80 2,699.20
Two 620 watt, with 3 wire cable lp@4.00 Ea 2,830.00 198.40 0.80 3,029.20
Beacon failure alarm relay assembly lp@4.00 Ea 396.00 198.40 0.80 595.20

Tower and obstruction lighting - Obstruction marker lights


Using small tools.
One 69 watt, FAA spec l-810 lp@2.50 Ea 121.00 124.00 0.50 245.50
Two 69 watt, FAA spec l-810 lp@3.00 Ea 270.00 148.80 0.60 419.40
One 116 watt, military
specification M16-6-7830B lp@2.50 Ea 231.00 124.00 0.50 355.50
Two 116 watt, military
specification M16-6-7830B lp@3.00 Ea 452.00 148.80 0.60 601.40
Transfer relay assembly lp@4.00 Ea 688.00 198.40 0.80 887.20

Solid state aircraft hazard flashers


Cast aluminum housing, using small tools.
1 circuit lp@4.00 Ea 9,690.00 198.40 0.80 9,889.20
2015 Heavy Construction Estimator, All Rights Reserved Page 786

2 circuit, simultaneous flashing lp@5.00 Ea 19,400.00 248.00 1.00 19,649.00


3 circuit, simultaneous flashing lp@6.00 Ea 29,100.00 297.60 1.20 29,398.80
Sequential flasher lp@4.00 Ea 5,510.00 198.40 0.80 5,709.20

Aircraft hazard lighting controllers


Using small tools.
0 to 150' tower, cabinets only lp@16.0 Ea 1,260.00 793.60 3.20 2,056.80
150 to 450' tower, cabinets only lp@18.0 Ea 2,840.00 892.80 3.60 3,736.40
One obstruction light alarm lp@8.00 Ea 975.00 396.80 1.60 1,373.40
2 obstruction lights and 1 beacon alarm,
flasher fail safe lp@12.0 Ea 2,300.00 595.20 2.40 2,897.60
Alarm test switch
for 2 light obstruction lp@8.00 Ea 2,300.00 396.80 1.60 2,698.40

Junction boxes and accessories for hazard lighting


Using small tools.
Size 1, with 4 hubs,
4" diameter x 2" deep lp@2.00 Ea 77.30 99.20 0.40 176.90
Size 2, with 2 or 4 hubs,
8" x 4" x 2-1/2" deep lp@2.50 Ea 180.00 124.00 0.50 304.50
Size 3, with 4 hubs, 8-1/2"
x 11-5/8" x 3-5/8" deep lp@3.00 Ea 345.00 148.80 0.60 494.40
Size 4, with 4 hubs,
18" x 12" x 6" deep lp@4.00 Ea 486.00 198.40 0.80 685.20
Breather, screened 1" nipple,
threaded 90 degree elbow lp@.250 Ea 18.70 12.40 0.05 31.15
Drain, screened 1" nipple lp@.250 Ea 18.70 12.40 0.05 31.15
Wraplock tape,
galvanized steel, 100' roll lp@2.00 Ea 37.40 99.20 0.40 137.00
Telephone jack assembly in FD box,
with 1/2" hub lp@.500 Ea 223.00 24.80 0.10 247.90
Elevated approach bar lp@50.0 Ea 2,210.00 2,480.00 10.00 4,700.00
Termination bar complete lp@15.0 Ea 2,480.00 744.00 3.00 3,227.00

Lighting kits for towers


Complete with fixtures, junction boxes, controllers and accessories. Add the cost of wire and conduit,
using a 50-ton crane with basket and small tools.
For up to 100’ tower ls@60.0 Ea 1,250.00 2,635.00 418.00 4,303.00
For from 101' to 150’ tower ls@80.0 Ea 4,610.00 3,514.00 558.00 8,682.00
For from 151' to 200' tower ls@100. Ea 4,610.00 4,392.00 697.00 9,699.00
For from 201' to 300' tower ls@180. Ea 4,610.00 7,906.00 1,250.00 13,766.00
For from 301' to 450' tower ls@275. Ea 9,230.00 12,080.00 1,920.00 23,230.00

CSI 16-620, Emergency light and power

6 volt emergency lighting units


Using small tools.
Nickel cadmium battery,
6 volt unit with 2 heads lp@1.50 Ea 703.00 74.40 0.30 777.70
Lead acid battery,
6 volt unit with 2 heads lp@1.50 Ea 171.00 74.40 0.30 245.70
Remote head, 6 volt unit lp@.500 Ea 31.30 24.80 0.10 56.20
Nickel cadmium battery,
6 volt unit with 3 heads lp@1.75 Ea 187.00 86.80 0.35 274.15
Lead acid battery,
6 volt unit with 3 heads lp@1.75 Ea 115.00 86.80 0.35 202.15

CSI 16-622, Battery charging equipment


2015 Heavy Construction Estimator, All Rights Reserved Page 786 (part 2)

Solid state battery chargers


Single phase, including wall bracket, 10' of charging cable and standard connector, 208/240/480 volt,
using small tools.
6 cell lp@2.50 Ea 1,020.00 124.00 0.50 1,144.50
9 cell lp@2.75 Ea 1,380.00 136.40 0.55 1,516.95
12 cell lp@3.00 Ea 1,080.00 148.80 0.60 1,229.40
18 cell lp@3.25 Ea 1,370.00 161.20 0.65 1,531.85

CSI 16-630, Special electrical distribution systems

Festoon cable electrical distribution systems


Using small tools.
20' long channel type track,
galvanized steel lk@.125 LF 1.22 6.26 0.02 7.50
Channel track hanger, plated steel lk@.500 Ea 4.38 25.05 0.10 29.53
Channel track joint clamp assembly lk@.400 Ea 4.87 20.04 0.08 24.99
End stop for channel track lk@.100 Ea 1.46 5.01 0.02 6.49
End clamp and cable saddle assembly,
steel saddle lk@.500 Ea 7.30 25.05 0.10 32.45
Cable supporting trolley, steel saddle with stainless
steel ball bearing wheel lk@.040 Ea 53.50 2.00 0.01 55.51
Towing trolley assembly, steel saddle with stainless
steel ball bearing wheel lk@.050 Ea 60.80 2.51 0.01 63.32
J box with
2 term blocks and bracket lk@2.50 Ea 97.30 125.30 0.48 223.08
2015 Heavy Construction Estimator, All Rights Reserved Page 787

Watertight connector for flat cable lj@.200 Ea 12.20 10.02 0.08 22.30

Festoon cable
PVC jacketed, 600 volt, using small tools.
12 conductors, #16 lk@.050 LF 2.19 2.51 0.01 4.71
12 conductors, #14 lk@.050 LF 2.81 2.51 0.01 5.33
8 conductors, #16 lk@.050 LF 1.57 2.51 0.01 4.09
8 conductors, #14 lk@.047 LF 1.95 2.36 0.01 4.32
7 conductors, #12 lk@.047 LF 2.68 2.36 0.01 5.05
4 conductors, #14 lk@.044 LF 0.97 2.20 0.01 3.18
4 conductors, #12 lk@.044 LF 1.31 2.20 0.01 3.52

Complete festoon system


Includes of 10 cable trolleys with steel saddle and wheels, J-box, 80' of type C track, 9 hangers, 3
joints, 2 end stops, 1 end clamp, 1 towing trolley, 2 connectors for 4 conductor #14 cable, 2 connectors
for 7 conductor #12 cable, using small tools.
80' long, for wet environment lk@40.0 LS 1,840.00 2,004.00 7.60 3,851.60

CSI 16-640, Cathodic protection

Magnesium type anodes, conventional


Includes drilling a 12" dia x 10' hole with power auger and using small tools.
9 lbs. (4.08kg) lt@.500 Ea 63.40 24.83 5.58 93.81
17 lbs. (7.7kg) lt@.600 Ea 112.00 29.80 6.69 148.49
32 lbs. (14.5kg) lt@.750 Ea 204.00 37.25 8.36 249.61
48 lbs. (21.8kg) lt@1.00 Ea 310.00 49.66 11.20 370.86

Graphite anodes with epoxy cap


Includes drilling a 12" dia x 20' hole with power auger and using small tools.
3" x 60", 32 lbs. lp@2.00 Ea 137.00 99.20 0.40 236.60
4" x 80", 68 lbs. lp@2.25 Ea 314.00 111.60 0.45 426.05
6" x 72", 80 lbs. lp@2.25 Ea 647.00 111.60 0.45 759.05
6" x 36", 45 lbs. lp@2.00 Ea 350.00 99.20 0.40 449.60

Air cooled rectifiers, silicon type


Using small tools.
28 volts, 10 amps lk@2.00 Ea 1,470.00 100.20 0.38 1,570.58
20 volts, 20 amps lk@2.00 Ea 1,650.00 100.20 0.38 1,750.58

Oil immersed rectifiers, silicon type


Using small tools.
28 volts, 10 amps lk@2.50 Ea 2,480.00 125.30 0.48 2,605.78
20 volts, 20 amps lk@2.50 Ea 2,670.00 125.30 0.48 2,795.78

Anode backfill
Using small tools.
Coke breeze lp@.250 LB 0.13 12.40 0.05 12.58

Cathodic protection cable, OR2


Using small tools.
#8 cable lp@10.0 MLF 472.00 496.00 2.00 970.00
#6 cable lp@11.0 MLF 682.00 545.60 2.20 1,229.80
#4 cable lp@12.0 MLF 997.00 595.20 2.40 1,594.60
#2 cable lp@13.0 MLF 1,520.00 644.80 2.60 2,167.40
#1 cable lp@14.0 MLF 2,100.00 694.40 2.80 2,797.20
#1/0 cable lp@15.0 MLF 2,490.00 744.00 3.00 3,237.00
2015 Heavy Construction Estimator, All Rights Reserved Page 787 (part 2)

#2/0 cable lp@16.0 MLF 3,150.00 793.60 3.20 3,946.80


#4/0 cable lp@18.0 MLF 4,720.00 892.80 3.60 5,616.40

Cathodic test stations


Flush curb box type with lockable cover and terminal box, using small tools.
7 terminal box lk@1.50 Ea 173.00 75.15 0.29 248.44

Reference cell test stations


Short length of PVC conduit, coupling and plug, set flush at finish grade, using small tools.
2" diameter, set flush at ground lk@1.50 Ea 217.00 75.15 0.29 292.44
2015 Heavy Construction Estimator, All Rights Reserved Page 788

CSI 16-650, RF filters

RF filters
Using small tools.
50 amp ln@1.25 Ea 3,980.00 62.26 1.74 4,044.00
100 amp ln@1.25 Ea 6,440.00 62.26 1.74 6,504.00
150 amp ln@1.50 Ea 11,300.00 74.72 2.09 11,376.81
200 amp ln@4.00 Ea 11,300.00 199.20 5.56 11,504.76
250 amp ln@6.00 Ea 12,400.00 298.90 8.34 12,707.24
300 amp ln@6.00 Ea 12,400.00 298.90 8.34 12,707.24
500 amp ln@6.00 Ea 21,200.00 298.90 8.34 21,507.24

CSI 16-720, Alarm and detection devices

Annunciation system switch activation operability testing


Set point type alarm operation, using small tools.
Set point type alarm level test lk@5.00 LS -- 250.50 0.95 251.45

CSI 16-721, Fire alarm and detection panels

Fire alarm and detection control panels


Using small tools.
1 zone lk@1.50 Ea 724.00 75.15 0.29 799.44
2 zone lk@1.60 Ea 724.00 80.16 0.30 804.46
4 zone lk@1.70 Ea 724.00 85.17 0.32 809.49
8 zone lk@2.50 Ea 2,320.00 125.30 0.48 2,445.78
12 zone lk@3.00 Ea 2,740.00 150.30 0.57 2,890.87
16 zone lk@4.00 Ea 3,090.00 200.40 0.76 3,291.16
16 zone transmitter
with directional antenna lk@8.00 Ea 15,400.00 400.80 1.52 15,802.32

Control panel emergency power supply


Using small tools.
24 hour lk@4.00 Ea 298.00 200.40 0.76 499.16
36 hour lk@4.00 Ea 466.00 200.40 0.76 667.16
48 hour lk@4.00 Ea 618.00 200.40 0.76 819.16

Fire alarm initiating devices


Using small tools.
Flame detector,
ultra-violet type, 120 volt lk@.500 Ea 1,120.00 25.05 0.10 1,145.15
Smoke detector, photoelectric,
single station lk@.500 Ea 44.20 25.05 0.10 69.35
Smoke detector, photoelectric,
multiple station lk@.500 Ea 45.60 25.05 0.10 70.75

Ionization detectors
Using small tools.
Standard lk@.500 Ea 102.00 25.05 0.10 127.15
Recessed ceiling fixture type lk@.600 Ea 102.00 30.06 0.11 132.17
Ionization detector releasing unit lk@1.00 Ea 102.00 50.10 0.19 152.29
Self contained lk@1.00 Ea 102.00 50.10 0.19 152.29
Air duct lk@1.00 Ea 272.00 50.10 0.19 322.29
Ionization detector,
self contained air duct lk@1.25 Ea 272.00 62.63 0.24 334.87
2015 Heavy Construction Estimator, All Rights Reserved Page 788 (part 2)

Thermal detectors
Using small tools.
136 to 190 degree fixed temperature,
15 degree rate-of-rise lk@.500 Ea 16.70 25.05 0.10 41.85
Ceiling fixture lk@.500 Ea 20.90 25.05 0.10 46.05
Thermal detector releasing unit lk@1.00 Ea 20.90 50.10 0.19 71.19

Flame detectors
Using small tools.
Standard, 3, 10 or 30 second delay lk@1.25 Ea 1,020.00 62.63 0.24 1,082.87
Ceiling fixture lk@1.25 Ea 1,020.00 62.63 0.24 1,082.87

Fire alarm manual pull stations


Using small tools.
Standard lk@.500 Ea 24.20 25.05 0.10 49.35
Weatherproof lk@.500 Ea 103.00 25.05 0.10 128.15
2015 Heavy Construction Estimator, All Rights Reserved Page 789

Remote annunciation panels


Using small tools.
1 zone lk@1.50 Ea 227.00 75.15 0.29 302.44
4 zone lk@1.70 Ea 260.00 85.17 0.32 345.49
8 zone lk@2.50 Ea 454.00 125.30 0.48 579.78
12 zone lk@3.00 Ea 653.00 150.30 0.57 803.87
16 zone lk@4.00 Ea 936.00 200.40 0.76 1,137.16

Power failure annunciators


Using small tools.
Standard unit lk@2.00 Ea 260.00 100.20 0.38 360.58

Remote alarm lamps


Using small tools.
1 unit lk@1.50 Ea 36.10 75.15 0.29 111.54
4 unit lk@1.70 Ea 43.10 85.17 0.32 128.59
8 unit lk@2.50 Ea 43.10 125.30 0.48 168.88
12 unit lk@3.00 Ea 48.60 150.30 0.57 199.47

Fire alarm bells


Using small tools.
4 inch lk@.300 Ea 53.30 15.03 0.06 68.39
6 inch lk@.300 Ea 63.60 15.03 0.06 78.69
8 inch lk@.400 Ea 73.80 20.04 0.08 93.92
10 inch lk@.500 Ea 102.00 25.05 0.10 127.15

Fire alarm horns


Using small tools.
Standard lk@.500 Ea 54.50 25.05 0.10 79.65
Weatherproof lk@.500 Ea 85.10 25.05 0.10 110.25
Light and horn lk@1.00 Ea 108.00 50.10 0.19 158.29

CSI 16-730, Clock and program systems

Clock and program systems


Using small tools.
Control panel with master clock lk@16.0 Ea 1,080.00 801.60 3.04 1,884.64
12" single clock with buzzer lk@.750 Ea 114.00 37.58 0.14 151.72
12" double clock with buzzer lk@1.00 Ea 247.00 50.10 0.19 297.29
Time clock lk@2.00 Ea 598.00 100.20 0.38 698.58
Decorative clock, up to 24" lk@1.50 Ea 106.00 75.15 0.29 181.44
Digital time switch, 4 circuit lk@1.25 Ea 937.00 62.63 0.24 999.87
Digital time switch, 6 circuit lk@1.50 Ea 1,250.00 75.15 0.29 1,325.44
Digital time switch, 8 circuit lk@2.00 Ea 1,520.00 100.20 0.38 1,620.58

Burglar alarm systems


Using small tools.
Card reader lk@1.25 Ea 656.00 62.63 0.24 718.87
Exit control lock horn lk@1.50 Ea 255.00 75.15 0.29 330.44
Exit control lock light lk@1.50 Ea 310.00 75.15 0.29 385.44
Indication panel, 10 channels lk@4.00 Ea 1,020.00 200.40 0.76 1,221.16

Intrusion detection systems


Using small tools.
16 zone lk@8.00 Ea 655.00 400.80 1.52 1,057.32
2015 Heavy Construction Estimator, All Rights Reserved Page 789 (part 2)

Electric door strike lk@1.50 Ea 137.00 75.15 0.29 212.44

Access control systems


Using small tools.
12 zone multiplexer/connector panel lk@12.0 Ea 1,580.00 601.20 2.28 2,183.48
Finger print
reader with control unit lk@2.00 Ea 5,160.00 100.20 0.38 5,260.58
Infra red heat detector lk@2.00 Ea 637.00 100.20 0.38 737.58
Electric
door release with exit button lk@1.50 Ea 754.00 75.15 0.29 829.44
Signal booster lk@2.00 Ea 284.00 100.20 0.38 384.58
Host computer with
monitor and laser printer lk@8.00 Ea 5,110.00 400.80 1.52 5,512.32
2015 Heavy Construction Estimator, All Rights Reserved Page 790

CSI 16-740, Telephone equipment

Plywood backboards 3/4"


Using small tools.
4’ x 4’ x 3/4" lk@.521 Ea 21.90 26.10 0.10 48.10
4’ x 8’ x 3/4" lk@1.50 Ea 43.80 75.15 0.29 119.24

Terminal cabinets
Using small tools.
24" x 30" x 6" lk@2.60 Ea 215.00 130.30 0.49 345.79
24" x 36" x 6" lk@3.10 Ea 227.00 155.30 0.59 382.89
24" x 42" x 6" lk@3.25 Ea 322.00 162.80 0.62 485.42
30" x 48" x 6" lk@3.50 Ea 322.00 175.40 0.67 498.07
30" x 54" x 6" lk@4.00 Ea 379.00 200.40 0.76 580.16
36" x 60" x 6" lk@4.25 Ea 513.00 212.90 0.81 726.71

Terminal blocks with wire range of 22 to 8 AWG


Using small tools.
Circuit isolation switch lj@.250 Ea 3.25 12.53 0.10 15.88
Fuse holder, 600 volt, 6.3 amp lj@.150 Ea 13.40 7.52 0.06 20.98
Fuse holder, 600 volt, 10 amp lj@.150 Ea 9.22 7.52 0.06 16.80
Solderless box with lugs lj@.100 Ea 1.31 5.01 0.04 6.36
Flat connection lj@.100 Ea 0.83 5.01 0.04 5.88
Ground lj@.500 Ea 3.69 25.05 0.20 28.94
Solderless box with lug,
600 volt, 60 amp lj@.300 Ea 1.31 15.03 0.12 16.46
Mini box lug, 300 volt, 30 amp lj@.100 Ea 0.76 5.01 0.04 5.81
Flat connector, 300 volt, 20 amp lj@.150 Ea 0.72 7.52 0.06 8.30
Self lifting, 300 volt,
40 amp wire connector lj@.150 Ea 0.92 7.52 0.06 8.50

Mounting channels for cabinets


Using small tools.
5 m galvanized steel lj@.104 Ea 1.94 5.21 0.04 7.19
1 m galvanized steel lj@.109 Ea 3.48 5.46 0.04 8.98
2 m galvanized steel lj@.114 Ea 6.29 5.71 0.04 12.04
5m bi-chromium zinc lj@.119 Ea 3.03 5.96 0.05 9.04
1m bi-chromium zinc lj@.125 Ea 5.64 6.26 0.05 11.95
2m bi-chromium zinc lj@.128 Ea 10.20 6.41 0.05 16.66

Outlet blocks for phone cabinets


Using small tools.
Telephone lj@.104 Ea 7.42 5.21 0.04 12.67
Telephone for floor box,
box not included lk@.300 Ea 2.69 15.03 0.06 17.78

Interior PBX telephone systems


Complete with telephone instruments, cabling and solid state switching, using small tools.
1000 line
PBX with 1000 connector lines lp@4500 Ea --223,200.00 900.00224,100.00

Additional telephones without solid state switching (PBX)


Using small tools.
Add for each
additional PBX phone line lk@.750 Ea 167.00 37.58 0.14 204.72
2015 Heavy Construction Estimator, All Rights Reserved Page 790 (part 2)

Telephones
Using small tools.
Desk type lk@.600 Ea 40.80 30.06 0.11 70.97
Wall type lk@.600 Ea 40.80 30.06 0.11 70.97

CSI 16-760, Intercommunication equipment

Intercommunication master stations


Using small tools.
5 station lk@1.50 Ea 1,270.00 75.15 0.29 1,345.44
10 station lk@2.75 Ea 1,440.00 137.80 0.52 1,578.32
Desk style remote lk@.600 Ea 502.00 30.06 0.11 532.17
Flush wall remote lk@.600 Ea 520.00 30.06 0.11 550.17
Sound system, outlet, protector lk@.800 Ea 16.10 40.08 0.15 56.33
Sound system, microphone outlet lk@1.25 Ea 12.50 62.63 0.24 75.37
2015 Heavy Construction Estimator, All Rights Reserved Page 791

Sound system,
speaker ceiling or wall lk@.800 Ea 39.20 40.08 0.15 79.43
Sound system, monitor panel lk@2.00 Ea 161.00 100.20 0.38 261.58
Sound system, volume control lk@.500 Ea 26.70 25.05 0.10 51.85
Sound system, amp 250 watt lk@3.00 Ea 740.00 150.30 0.57 890.87
Sound system, cabinet lk@.400 Ea 294.00 20.04 0.08 314.12

Nurses call systems


Using small tools.
Page and talk relay lk@.750 Ea 265.00 37.58 0.14 302.72
Main equipment panel lk@4.00 Ea 2,630.00 200.40 0.76 2,831.16
Re-entrant horn lk@.500 Ea 227.00 25.05 0.10 252.15
Control station lk@.100 Ea 825.00 5.01 0.02 830.03
Duty station lk@3.00 Ea 607.00 150.30 0.57 757.87
Staff station lk@1.00 Ea 442.00 50.10 0.19 492.29
Single bedside station lk@1.00 Ea 407.00 50.10 0.19 457.29
Double bedside station lk@1.50 Ea 574.00 75.15 0.29 649.44
Emergency call button lk@.600 Ea 121.00 30.06 0.11 151.17
Pull cord button lk@.600 Ea 98.90 30.06 0.11 129.07
Single dome light lk@.500 Ea 81.60 25.05 0.10 106.75
Double dome light lk@.600 Ea 112.00 30.06 0.11 142.17
Pillow speaker lk@.300 Ea 314.00 15.03 0.06 329.09
Nurses call system cord set lk@.500 Ea 98.50 25.05 0.10 123.65
20-station master console lk@10.0 Ea 2,430.00 501.00 1.90 2,932.90

CSI 16-770, Public address equipment

Public address equipment - Amplifiers


Using small tools.
10 watt lk@2.00 Ea 748.00 100.20 0.38 848.58
35 watt lk@2.25 Ea 994.00 112.70 0.43 1,107.13
60 watt lk@2.50 Ea 1,500.00 125.30 0.48 1,625.78
100 watt lk@3.00 Ea 549.00 150.30 0.57 699.87

Public address equipment - Speakers


Using small tools.
Recessed mounted lk@1.50 Ea 73.80 75.15 0.29 149.24
Surface mounted lk@1.00 Ea 101.00 50.10 0.19 151.29

Public address equipment - Accessories


Using small tools.
Microphone and stand lk@1.50 Ea 107.00 75.15 0.29 182.44
Tape deck lk@2.00 Ea 166.00 100.20 0.38 266.58
Phonograph lk@2.00 Ea 102.00 100.20 0.38 202.58
Weather proof horn lk@1.00 Ea 245.00 50.10 0.19 295.29
Trumpet driver,
line matching transformer lk@2.00 Ea 622.00 100.20 0.38 722.58
Hand set instrument lk@2.75 Ea 265.00 137.80 0.52 403.32
Microphone jack lk@.500 Ea 41.70 25.05 0.10 66.85
Terminal cabinet lk@3.00 Ea 171.00 150.30 0.57 321.87
Volume control lk@.500 Ea 96.50 25.05 0.10 121.65

CSI 16-780, Closed circuit television

General use video camera


Using small tools.
9.0 mm lens lk@2.50 Ea 535.00 125.30 0.48 660.78
12.5 mm lens lk@2.50 Ea 174.00 125.30 0.48 299.78
2015 Heavy Construction Estimator, All Rights Reserved Page 791 (part 2)

25 mm lens lk@2.50 Ea 129.00 125.30 0.48 254.78


50 mm lens lk@2.50 Ea 156.00 125.30 0.48 281.78
75 mm lens lk@2.50 Ea 483.00 125.30 0.48 608.78
15 to 180 mm 12x zoom lk@3.00 Ea 3,040.00 150.30 0.57 3,190.87

Adverse environment video camera


Using small tools.
12.5 mm lens lk@4.00 Ea 263.00 200.40 0.76 464.16
25 mm lens lk@4.00 Ea 180.00 200.40 0.76 381.16
2015 Heavy Construction Estimator, All Rights Reserved Page 792

50 mm lens lk@4.00 Ea 393.00 200.40 0.76 594.16


75 mm lens lk@4.00 Ea 519.00 200.40 0.76 720.16
15 to 180 mm 12x zoom lk@6.00 Ea 3,040.00 300.60 1.14 3,341.74

Very low light level camera


1" silicon intensifier target video camera, using small tools.
12.5 mm lk@4.00 Ea 558.00 200.40 0.76 759.16
25 mm lk@4.00 Ea 405.00 200.40 0.76 606.16
50 mm lk@4.00 Ea 429.00 200.40 0.76 630.16
75 mm lk@4.00 Ea 519.00 200.40 0.76 720.16
15 to 180 mm, 12x zoom lk@5.00 Ea 3,190.00 250.50 0.95 3,441.45

Ultra low light level camera


1" silicon intensifier target video camera, using small tools.
18 to 108 mm 6x zoom lk@6.00 Ea 3,560.00 300.60 1.14 3,861.74
15 to 180 mm 12x zoom lk@6.00 Ea 4,050.00 300.60 1.14 4,351.74
15 to 150 mm 10x zoom, with controlled
extender 23.5 to 235 mm lk@6.00 Ea 8,020.00 300.60 1.14 8,321.74

Camera column mounting


Using small tools.
Fixed floor or ceiling mounting lk@1.50 Ea 116.00 75.15 0.29 191.44
Adjustable floor mounting lk@2.00 Ea 116.00 100.20 0.38 216.58
Adjustable ceiling mounting lk@3.00 Ea 116.00 150.30 0.57 266.87

Camera scanner mounts, indoor or outdoor, all weather


Using small tools.
24 vacuum model lk@2.00 Ea 1,420.00 100.20 0.38 1,520.58
115 vacuum model lk@2.00 Ea 1,420.00 100.20 0.38 1,520.58
115 vacuum auto-scan lk@2.00 Ea 2,270.00 100.20 0.38 2,370.58

Camera housing mounts


Using small tools.
Outdoor domed lk@3.00 Ea 3,090.00 150.30 0.57 3,240.87
Outdoor recessed, wall or ceiling lk@3.00 Ea 4,050.00 150.30 0.57 4,200.87
Outdoor pendant, wall lk@3.00 Ea 1,820.00 150.30 0.57 1,970.87
Indoor corner lk@3.00 Ea 183.00 150.30 0.57 333.87
Indoor recessed lk@3.00 Ea 533.00 150.30 0.57 683.87
Indoor pendant lk@3.00 Ea 798.00 150.30 0.57 948.87

Video motion detector


Using small tools.
Video motion detector, digital multi-channel,
1 to 16 cameras lk@95.1 Ea 1,210.00 4,765.00 18.10 5,993.10

Video monitors for closed circuit TV systems


Using small tools.
5" video monitor lk@4.00 Ea 652.00 200.40 0.76 853.16
9" video monitor lk@4.00 Ea 364.00 200.40 0.76 565.16
12" video monitor lk@4.00 Ea 550.00 200.40 0.76 751.16
15" video monitor lk@4.00 Ea 686.00 200.40 0.76 887.16
19" video monitor lk@4.00 Ea 882.00 200.40 0.76 1,083.16

Microprocessor matrix switcher/controller


Using small tools.
16 camera x 2 monitor lk@12.0 Ea 10,100.00 601.20 2.28 10,703.48
2015 Heavy Construction Estimator, All Rights Reserved Page 792 (part 2)

16 camera x 4 monitor lk@12.0 Ea 12,000.00 601.20 2.28 12,603.48


32 camera x 2 monitor lk@24.1 Ea 12,000.00 1,207.00 4.58 13,211.58
32 camera x 4 monitor lk@24.1 Ea 13,900.00 1,207.00 4.58 15,111.58
2015 Heavy Construction Estimator, All Rights Reserved Page 793

64 camera x 8 monitor lk@71.4 Ea 21,400.00 3,577.00 13.60 24,990.60

TV distribution outlets, per outlet


Using small tools.
VHF reception, 12 outlets lk@1.39 Ea 56.20 69.64 0.26 126.10
UHF reception, 100 outlets lk@.639 Ea 46.80 32.01 0.12 78.93

CSI 16-795, Fiber optics cable and accessories

Fiber optic cable for data transmission, 62.5 microns


Using a line truck with aerial platform and small tools.
Direct burial cable, 4 fiber lt@.040 LF 1.20 1.99 0.45 3.64

Fiber optic cable for data transmission, 62.5 microns


Using small tools.
Indoor cable, 2 fiber lk@.020 LF 0.42 1.00 -- 1.42
Outdoor aerial/duct cable lk@.012 LF 0.86 0.60 -- 1.46

Fiber optic receivers


Using small tools.
Range 6.2 miles lk@1.00 Ea 478.00 50.10 0.19 528.29
Range 2,000 meters lk@1.00 Ea 246.00 50.10 0.19 296.29
Range 3,000 meters lk@4.00 Ea 246.00 200.40 0.76 447.16

Fiber optic transmitters


Using small tools.
Range 6.2 miles lk@1.00 Ea 478.00 50.10 0.19 528.29
Range 2,000 meters lk@1.00 Ea 246.00 50.10 0.19 296.29
Range 3,000 meters lk@4.00 Ea 246.00 200.40 0.76 447.16

Fiber optic modems


Using small tools.
Range 6.2 miles lk@4.00 Ea 796.00 200.40 0.76 997.16
Range 2,000 meters lk@4.00 Ea 332.00 200.40 0.76 533.16
Range 3 miles, 12 channels lk@4.00 Ea 1,790.00 200.40 0.76 1,991.16

Fiber optic connectors


Stainless steel, for 62.5 micron cables, using small tools.
For transmission equipment lk@.500 Ea 9.29 25.05 0.10 34.44
For cable splice lk@.500 Ea 8.63 25.05 0.10 33.78

Fiber optic repeaters


Including transmitter and receiver back to back, no power source included, using small tools.
6.2 miles lk@2.00 Ea 478.00 100.20 0.38 578.58
2000 meters lk@2.00 Ea 246.00 100.20 0.38 346.58
3,000 meters lk@4.00 Ea 246.00 200.40 0.76 447.16
2,000 meters lk@4.00 Ea 689.00 200.40 0.76 890.16

Fiber optic transceivers


Using small tools.
Range 3,000 meters lk@4.00 Ea 365.00 200.40 0.76 566.16
Range 2,000 meters, digital lk@4.00 Ea 365.00 200.40 0.76 566.16

Fiber optic cable enclosure encapsulant


Using small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 793 (part 2)

Interior NEMA13 lk@2.86 Ea 247.00 143.30 0.54 390.84


Splice lk@1.25 Ea 227.00 62.63 0.24 289.87

Fiber optic cable, 50 microns


Using small tools.
Direct burial, 8 fiber lp@.009 LF 1.59 0.45 -- 2.04
Direct burial, 12 fiber lp@.009 LF 2.11 0.45 -- 2.56
Indoor, 12 fiber lp@.049 LF 1.99 2.43 0.01 4.43

Fiber optic cable, 125 microns


Fiber optic connectors, stainless steel, for 125 microns cable, using small tools.
For transmission equipment lk@1.25 Ea 13.10 62.63 0.24 75.97
2015 Heavy Construction Estimator, All Rights Reserved Page 794

CSI 16-797, Intrusion detection system

Intrusion detection sensors - Fence sensors


Using a 20-ton hydraulic crane with 70’ boom, small tools.
Capacitance proximity detector,
300’ ln@65.6 Ea 2,040.00 3,268.00 91.20 5,399.20
Electric, 300' zone ln@65.6 Ea 2,690.00 3,268.00 91.20 6,049.20
Electric field disturbance ln@65.6 Ea 11,400.00 3,268.00 91.20 14,759.20
8' high tension wire ln@65.6 Ea 11,500.00 3,268.00 91.20 14,859.20

Intrusion detection sensors - Microwave


Using small tools.
Bi-static, 600’ range ln@65.6 Ea 1,790.00 3,268.00 91.20 5,149.20
Mono-static, 100’ range ln@32.8 Ea 1,060.00 1,634.00 45.60 2,739.60

Intrusion detection sensors - Motion


Using small tools.
Microwave, 50’ x 30’ range lk@5.00 Ea 270.00 250.50 0.95 521.45
Passive infrared, 60’ range lk@5.00 Ea 83.60 250.50 0.95 335.05
Ultrasonic, 30’ x 25’ range lk@4.00 Ea 91.50 200.40 0.76 292.66
Vibration lk@4.00 Ea 126.00 200.40 0.76 327.16
Video exterior, 300' zone lk@5.00 Ea 20,200.00 250.50 0.95 20,451.45
Video interior, digital lk@5.00 Ea 2,390.00 250.50 0.95 2,641.45

Intrusion detection sensors - General sensors


Using small tools.
Capacitance proximity detector lk@5.00 Ea 775.00 250.50 0.95 1,026.45
Glass break lk@4.00 Ea 16.30 200.40 0.76 217.46
Photo-electric interior, 500' lk@5.00 Ea 101.00 250.50 0.95 352.45
Photo-electric exterior, 700' lk@5.00 Ea 826.00 250.50 0.95 1,077.45

Intrusion detection simulators


Using small tools.
Vibration lk@4.00 Ea 68.80 200.40 0.76 269.96

Intrusion detection switches


Using small tools.
Balanced magnetic with cover tamper lk@4.00 Ea 91.90 200.40 0.76 293.06
Foot rail duress alarm lk@4.00 Ea 87.40 200.40 0.76 288.56
Push-button duress alarm lk@4.00 Ea 35.70 200.40 0.76 236.86
Wireless duress alarm lk@4.00 Ea 91.40 200.40 0.76 292.56
Access/secure alarm lk@4.00 Ea 51.20 200.40 0.76 252.36

Intrusion detection signal processors


Using small tools.
Central, security console lk@20.0 Ea 29,700.00 1,002.00 3.80 30,705.80
Local lk@5.00 Ea 1,090.00 250.50 0.95 1,341.45

Intrusion detection software


Using small tools.
Application, 386, OPA funded lk@10.0 Ea 3,370.00 501.00 1.90 3,872.90
System, 386, OPA funded lk@5.00 Ea 1,150.00 250.50 0.95 1,401.45

Intrusion detection accessories


Using a 20-ton hydraulic crane with 70’ boom, small tools.
2015 Heavy Construction Estimator, All Rights Reserved Page 794 (part 2)

Buried guided radar, 300’ ln@65.6 Ea 7,640.00 3,268.00 91.20 10,999.20


Fixed map display, 30" x 48" ll@13.0 Ea 9,030.00 529.50 -- 9,559.50

Intrusion detection accessories


Using small tools.
4 hour 2 KVA power supply lk@5.00 Ea 8,450.00 250.50 0.95 8,701.45
60" x 96" security screen lk@5.00 Ea 67.40 250.50 0.95 318.85
Video graphics display lk@5.00 Ea 16,900.00 250.50 0.95 17,151.45

Intrusion detection cameras - Vidicon tube


Using small tools.
2/3" tube 3j@2.17 Ea 577.00 88.41 2.10 667.51
1" tube 3j@2.17 Ea 2,160.00 88.41 2.10 2,250.51

Intrusion detection cameras - Silicon diode tube camera


Using small tools.
2/3" tube 3j@2.17 Ea 1,760.00 88.41 2.10 1,850.51
2015 Heavy Construction Estimator, All Rights Reserved Page 795

1" tube 3j@2.17 Ea 3,740.00 88.41 2.10 3,830.51

Intrusion detection cameras - Zinc selenide tube


Using small tools.
2/3" tube 3j@2.17 Ea 2,530.00 88.41 2.10 2,620.51
1" tube 3j@2.17 Ea 2,900.00 88.41 2.10 2,990.51

Intrusion detection cameras - Solid state


Using small tools.
1/2" tube 3j@2.17 Ea 1,420.00 88.41 2.10 1,510.51
2/3" tube 3j@2.17 Ea 1,870.00 88.41 2.10 1,960.51

Intrusion detection cameras - Auto iris lenses


Using small tools.
5.7 mm lenses, 2/3" format lk@.625 Ea 657.00 31.31 0.12 688.43
8.0 mm lenses, 2/3" format lk@.625 Ea 503.00 31.31 0.12 534.43
16.0 mm lenses, 2/3" format lk@.625 Ea 427.00 31.31 0.12 458.43
9.0 mm lenses, 1" format lk@.625 Ea 625.00 31.31 0.12 656.43
12.5 mm lenses, 1" format lk@.625 Ea 479.00 31.31 0.12 510.43
25.0 mm lenses, 1" format lk@.625 Ea 446.00 31.31 0.12 477.43
50.0 mm lenses, 1" format lk@.625 Ea 457.00 31.31 0.12 488.43

Intrusion detection cameras - Camera housing


Using small tools.
Environmental lk@2.50 Ea 2,220.00 125.30 0.48 2,345.78
Interior ll@3.25 Ea 979.00 132.40 -- 1,111.40

Intrusion detection cameras - Head end equipment


Using small tools.
Video recorder with rack mount lk@1.25 Ea 5,150.00 62.63 0.24 5,212.87
Video frame store lk@1.25 Ea 26,900.00 62.63 0.24 26,962.87
Ground loop corrector lk@.625 Ea 254.00 31.31 0.12 285.43
Video synchronization/distribution
amplifier lk@1.25 Ea 2,760.00 62.63 0.24 2,822.87
Video equalizing amplifier lk@1.25 Ea 930.00 62.63 0.24 992.87
Video synchronization generator lk@1.25 Ea 10,100.00 62.63 0.24 10,162.87
Head end equipment,
video distribution amplifier lk@1.25 Ea 709.00 62.63 0.24 771.87

Intrusion detection camera equipment - Poles


Using a 20-ton hydraulic crane with 70’ boom, small tools.
Cantil fixed camera pole ln@16.4 Ea 12,200.00 816.90 22.80 13,039.70
Cantil swing down camera pole ln@16.4 Ea 14,900.00 816.90 22.80 15,739.70
15' straight camera type pole ln@16.4 Ea 11,900.00 816.90 22.80 12,739.70
Pan/tilt mounting pole ln@16.4 Ea 11,900.00 816.90 22.80 12,739.70

Intrusion detection camera equipment - Pole hardware


Using small tools.
Pan or tilt mount with driver 3j@4.34 Ea 3,340.00 176.80 4.21 3,521.01
16" wall mount 3j@2.17 Ea 105.00 88.41 2.10 195.51
24" wall mount 3j@2.17 Ea 141.00 88.41 2.10 231.51
36" wall mount 3j@2.17 Ea 173.00 88.41 2.10 263.51

Access control equipment - Entrance card readers


Using small tools.
Barium ferrite lk@5.00 Ea 681.00 250.50 0.95 932.45
2015 Heavy Construction Estimator, All Rights Reserved Page 795 (part 2)

Magnetic stripe lk@5.00 Ea 839.00 250.50 0.95 1,090.45


Proximity lk@5.00 Ea 691.00 250.50 0.95 942.45
Weigand wire EF lk@5.00 Ea 998.00 250.50 0.95 1,249.45

Access control equipment - Computer hardware


Using small tools.
Local processor for card readers lk@5.00 Ea 1,790.00 250.50 0.95 2,041.45

Access control equipment - Scanners


Using small tools.
Eye retina gate opener lk@5.00 Ea 17,200.00 250.50 0.95 17,451.45

Access control equipment - Gate openers


Using small tools.
Cantilever, 12’ arm 3j@8.68 Ea 6,460.00 353.60 8.42 6,822.02
2015 Heavy Construction Estimator, All Rights Reserved Page 796

Access control equipment - Switches


Using small tools.
Tamper lk@3.33 Ea 49.90 166.80 0.63 217.33

Access control equipment - Accessories


Using small tools.
Electric door strike/bolt lk@4.00 Ea 750.00 200.40 0.76 951.16
Electromagnetic lock lk@4.00 Ea 1,440.00 200.40 0.76 1,641.16
Keypad for card reader, OPA funded lk@5.00 Ea 638.00 250.50 0.95 889.45

CSI 16-860, Finned electric resistance heating

Fin type electric heating element, 10" enclosure


Including enclosure and electric element, using small tools.
Low capacity,
under 250 watts per foot ny@.250 LF 38.30 12.39 0.15 50.84
High capacity,
250 watts per foot or more ny@.250 LF 46.00 12.39 0.15 58.54

Fin type electric heating elements, 16" enclosure


Using small tools.
Low capacity,
under 250 watts per foot ny@.250 LF 53.60 12.39 0.15 66.14
High capacity,
250 watts per foot or more ny@.250 LF 68.90 12.39 0.15 81.44

Electric convectors, floor standing units - 4" deep


Using small tools.
38" long x 14" high x 4" deep ny@1.50 Ea 547.00 74.33 0.90 622.23
50" long x 14" high x 4" deep ny@1.50 Ea 630.00 74.33 0.90 705.23

Electric convectors, floor standing units - 6" deep


Using small tools.
38" long x 14" high x 6" deep ny@1.50 Ea 668.00 74.33 0.90 743.23
50" long x 14" high x 6" deep ny@1.50 Ea 795.00 74.33 0.90 870.23
62" long x 20" high x 6" deep ny@1.50 Ea 907.00 74.33 0.90 982.23
74" long x 20" high x 6" deep ny@1.50 Ea 1,080.00 74.33 0.90 1,155.23

CSI 16-881, Electric duct heaters and reheaters

Electric slip-in blast coil duct heaters, open coils


Using small tools.
1/2 KW heater nz@1.54 Ea 614.00 70.27 0.89 685.16
1 KW heater nz@1.67 Ea 614.00 76.20 0.97 691.17
2 KW heater nz@1.82 Ea 614.00 83.05 1.06 698.11
3 KW heater nz@1.87 Ea 614.00 85.33 1.08 700.41
4 KW heater nz@2.00 Ea 614.00 91.26 1.16 706.42
5 KW heater nz@2.15 Ea 614.00 98.10 1.25 713.35
6 KW heater nz@2.41 Ea 720.00 110.00 1.40 831.40
8 KW heater nz@2.63 Ea 720.00 120.00 1.53 841.53
10 KW heater nz@2.94 Ea 808.00 134.20 1.71 943.91
12-1/2 KW heater nz@3.23 Ea 808.00 147.40 1.87 957.27
15 KW heater nz@3.51 Ea 808.00 160.20 2.04 970.24
20 KW heater nz@3.77 Ea 814.00 172.00 2.19 988.19
30 KW heater nz@4.00 Ea 1,350.00 182.50 2.32 1,534.82
40 KW heater nz@4.26 Ea 3,000.00 194.40 2.47 3,196.87
2015 Heavy Construction Estimator, All Rights Reserved Page 796 (part 2)

50 KW heater nz@4.88 Ea 3,260.00 222.70 2.83 3,485.53


60 KW heater nz@5.41 Ea 3,920.00 246.90 3.14 4,170.04
70 KW heater nz@5.88 Ea 4,070.00 268.30 3.41 4,341.71
80 KW heater nz@6.45 Ea 4,460.00 294.30 3.74 4,758.04
90 KW heater nz@6.90 Ea 5,690.00 314.80 4.00 6,008.80
100 KW heater nz@7.41 Ea 6,280.00 338.10 4.30 6,622.40
125 KW heater nz@8.00 Ea 7,830.00 365.00 4.64 8,199.64
150 KW heater nz@8.70 Ea 8,880.00 397.00 5.05 9,282.05

Electric slip-in blast coil duct heaters, finned coils


Using small tools.
1 KW heater nz@1.67 Ea 2,180.00 76.20 0.97 2,257.17
2 KW heater nz@1.82 Ea 2,250.00 83.05 1.06 2,334.11
2015 Heavy Construction Estimator, All Rights Reserved Page 797

3 KW heater nz@1.82 Ea 2,320.00 83.05 1.06 2,404.11


4 KW heater nz@2.00 Ea 2,390.00 91.26 1.16 2,482.42
5 KW heater nz@2.00 Ea 3,440.00 91.26 1.16 3,532.42
6 KW heater nz@2.00 Ea 3,540.00 91.26 1.16 3,632.42
8 KW heater nz@2.22 Ea 3,540.00 101.30 1.29 3,642.59
9 KW heater nz@2.50 Ea 3,540.00 114.10 1.45 3,655.55
10 KW heater nz@2.50 Ea 3,590.00 114.10 1.45 3,705.55
15 KW heater nz@2.86 Ea 4,190.00 130.50 1.66 4,322.16
20 KW heater nz@2.86 Ea 5,170.00 130.50 1.66 5,302.16
30 KW heater nz@3.33 Ea 5,560.00 151.90 1.93 5,713.83
40 KW heater nz@3.33 Ea 7,870.00 151.90 1.93 8,023.83

CSI 16-890, Electric Heaters

Electric unit heaters with enclosed coil


5 KW through 15 KW units include built-in thermostat and wall mounting bracket, using small tools.
5 KW, with
thermostat and wall bracket ny@2.07 Ea 692.00 102.60 1.24 795.84
7.5 KW, with
thermostat and wall bracket ny@2.61 Ea 791.00 129.30 1.57 921.87
10 KW, with thermostat,
wall bracket ny@3.10 Ea 824.00 153.60 1.86 979.46
12.5 KW, with
thermostat and wall bracket ny@3.60 Ea 1,020.00 178.40 2.16 1,200.56
15 KW, with
thermostat and wall bracket ny@4.19 Ea 1,040.00 207.60 2.51 1,250.11
20 KW ny@4.62 Ea 1,570.00 228.90 2.77 1,801.67
25 KW ny@5.14 Ea 1,570.00 254.70 3.08 1,827.78
30 KW ny@5.63 Ea 1,770.00 279.00 3.38 2,052.38
35 KW ny@6.21 Ea 1,770.00 307.70 3.73 2,081.43
40 KW ny@6.67 Ea 2,370.00 330.50 4.00 2,704.50
50 KW ny@7.20 Ea 2,690.00 356.80 4.32 3,051.12

CSI 16-921, Motor control centers, incoming section

Motor control centers - Incoming section


Three pole, including structure and feeder air circuit breaker, using small tools.
70 to 100 amps, 14,000 amp bracing lk@4.00 Ea 458.00 200.40 0.76 659.16
125 to 225 amps, 22,000 amp bracing lk@5.00 Ea 778.00 250.50 0.95 1,029.45
125 to 400 amps, 30,000 amp bracing lk@6.00 Ea 849.00 300.60 1.14 1,150.74
125 to 600 amps, 30,000 amp bracing lk@7.00 Ea 1,420.00 350.70 1.33 1,772.03
125 to 1200amps, 30,000 amp bracing lk@8.00 Ea 1,750.00 400.80 1.52 2,152.32
125 to 2000amps, 30,000 amp bracing lk@10.0 Ea 2,620.00 501.00 1.90 3,122.90
125 to 400 amps,
100,000 amp bracing lk@12.0 Ea 6,790.00 601.20 2.28 7,393.48

Motor control centers - Incoming section with main lugs only


Using small tools.
600 amp lk@4.00 Ea 146.00 200.40 0.76 347.16
800 amp lk@4.00 Ea 146.00 200.40 0.76 347.16
1,200 amp lk@6.00 Ea 146.00 300.60 1.14 447.74
2,000 amp lk@6.00 Ea 1,030.00 300.60 1.14 1,331.74
3,000 amp lk@8.00 Ea 1,660.00 400.80 1.52 2,062.32
4,000 amp lk@10.0 Ea 2,550.00 501.00 1.90 3,052.90

CSI 16-922, Motor control center distribution section

Circuit breaker combination motor starters - Class I, type A


2015 Heavy Construction Estimator, All Rights Reserved Page 797 (part 2)

Includes mounting pan, door with control devices and using small tools.
Size 1 lk@1.50 Ea 363.00 75.15 0.29 438.44
Size 2 lk@2.00 Ea 438.00 100.20 0.38 538.58
Size 3 lk@2.50 Ea 670.00 125.30 0.48 795.78
Size 4 lk@3.00 Ea 1,220.00 150.30 0.57 1,370.87
2015 Heavy Construction Estimator, All Rights Reserved Page 798

Size 5 lk@3.50 Ea 2,500.00 175.40 0.67 2,676.07

Circuit breaker combination motor starters - Class I, type B


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@1.25 Ea 367.00 62.63 0.24 429.87
Size 2 lk@1.75 Ea 438.00 87.68 0.33 526.01
Size 3 lk@2.00 Ea 670.00 100.20 0.38 770.58
Size 4 lk@2.50 Ea 1,220.00 125.30 0.48 1,345.78
Size 5 lk@3.00 Ea 2,500.00 150.30 0.57 2,650.87

Circuit breaker combination motor starters - Class I type C


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@1.25 Ea 424.00 62.63 0.24 486.87
Size 2 lk@1.75 Ea 493.00 87.68 0.33 581.01
Size 3 lk@2.00 Ea 760.00 100.20 0.38 860.58
Size 4 lk@2.50 Ea 1,310.00 125.30 0.48 1,435.78
Size 5 lk@3.00 Ea 2,590.00 150.30 0.57 2,740.87

Circuit breaker combination motor starters - Class II, type B


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@1.50 Ea 312.00 75.15 0.29 387.44
Size 2 lk@2.00 Ea 519.00 100.20 0.38 619.58
Size 3 lk@2.50 Ea 793.00 125.30 0.48 918.78
Size 4 lk@3.00 Ea 1,450.00 150.30 0.57 1,600.87
Size 5 lk@3.50 Ea 2,980.00 175.40 0.67 3,156.07

Circuit breaker combination motor starters - Class II, type C


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@1.50 Ea 485.00 75.15 0.29 560.44
Size 2 lk@2.00 Ea 575.00 100.20 0.38 675.58
Size 3 lk@2.50 Ea 884.00 125.30 0.48 1,009.78
Size 4 lk@3.00 Ea 1,540.00 150.30 0.57 1,690.87
Size 5 lk@3.50 Ea 3,070.00 175.40 0.67 3,246.07

Fused disconnect combination motor starters - Class I, type A


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@2.00 Ea 315.00 100.20 0.38 415.58
Size 2 lk@2.50 Ea 514.00 125.30 0.48 639.78
Size 3 lk@3.00 Ea 920.00 150.30 0.57 1,070.87
Size 4 lk@3.50 Ea 1,240.00 175.40 0.67 1,416.07
Size 5 lk@4.00 Ea 2,490.00 200.40 0.76 2,691.16

Fused disconnect combination motor starters - Class I, type B


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@2.00 Ea 355.00 100.20 0.38 455.58
Size 2 lk@2.50 Ea 472.00 125.30 0.48 597.78
Size 3 lk@3.00 Ea 745.00 150.30 0.57 895.87
Size 4 lk@3.50 Ea 1,340.00 175.40 0.67 1,516.07
Size 5 lk@4.00 Ea 2,600.00 200.40 0.76 2,801.16

Fused disconnect combination motor starters - Class I, type C


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@2.00 Ea 405.00 100.20 0.38 505.58
Size 2 lk@2.50 Ea 539.00 125.30 0.48 664.78
Size 3 lk@3.00 Ea 860.00 150.30 0.57 1,010.87
Size 4 lk@3.50 Ea 1,460.00 175.40 0.67 1,636.07
Size 5 lk@4.00 Ea 2,420.00 200.40 0.76 2,621.16
2015 Heavy Construction Estimator, All Rights Reserved Page 798 (part 2)

Fused disconnect combination motor starters - Class II, type B


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@2.00 Ea 414.00 100.20 0.38 514.58
Size 2 lk@2.50 Ea 551.00 125.30 0.48 676.78
Size 3 lk@3.00 Ea 866.00 150.30 0.57 1,016.87
Size 4 lk@3.50 Ea 1,560.00 175.40 0.67 1,736.07
Size 5 lk@4.00 Ea 3,010.00 200.40 0.76 3,211.16
2015 Heavy Construction Estimator, All Rights Reserved Page 799

Fused disconnect combination motor starters - Class II, type C


Includes mounting pan, door with control devices and using small tools.
Size 1 lk@2.00 Ea 464.00 100.20 0.38 564.58
Size 2 lk@2.50 Ea 618.00 125.30 0.48 743.78
Size 3 lk@3.00 Ea 975.00 150.30 0.57 1,125.87
Size 4 lk@3.50 Ea 1,660.00 175.40 0.67 1,836.07
Size 5 lk@4.00 Ea 3,120.00 200.40 0.76 3,321.16

Motor starter space complete with bus and hardware - Circuit breaker type
Using small tools.
Size 1 lk@2.00 Ea 89.10 100.20 0.38 189.68
Size 2 lk@2.50 Ea 89.10 125.30 0.48 214.88
Size 3 lk@3.00 Ea 135.00 150.30 0.57 285.87
Size 4 lk@2.50 Ea 140.00 125.30 0.48 265.78
Size 5 lk@4.00 Ea 269.00 200.40 0.76 470.16

Motor starter space complete with bus and hardware - Fused disconnect type
Using small tools.
Size 1 lk@2.00 Ea 89.10 100.20 0.38 189.68
Size 2 lk@2.50 Ea 104.00 125.30 0.48 229.78
Size 3 lk@3.00 Ea 156.00 150.30 0.57 306.87
Size 4 lk@3.50 Ea 311.00 175.40 0.67 487.07
Size 5 lk@4.00 Ea 415.00 200.40 0.76 616.16

CSI 16-923, Factory installed motor starter accessories

Motor starter accessories - Control circuit transformers


Using small tools.
Fuse and holder, small,
dual element time delay lj@.250 Ea 18.80 12.53 0.10 31.43

Motor starter accessories - Cover mounted control devices


Using small tools.
2 unit push button station lk@.400 Ea 54.70 20.04 0.08 74.82
2 to 3 unit selector switch lk@.500 Ea 56.80 25.05 0.10 81.95
Pilot light lk@.400 Ea 58.80 20.04 0.08 78.92
Hand-off automatic switch,
with pilot light lk@.750 Ea 113.00 37.58 0.14 150.72
Auxiliary contact add per starter lk@.500 Ea 236.00 25.05 0.10 261.15

Motor starter accessories - Extra interlocks


Per contact, using small tools.
Class I, type A lk@.300 Ea 32.00 15.03 0.06 47.09
Class I, type B lk@.300 Ea 54.90 15.03 0.06 69.99
Class I, type C lk@.300 Ea 68.60 15.03 0.06 83.69
Class II, type B lk@.300 Ea 64.00 15.03 0.06 79.09
Class II, type C lk@.300 Ea 73.20 15.03 0.06 88.29

Auxiliary relays for motor control centers


Using small tools.
Industrial control relay, 10 amp,
class A600 with 2 contacts lj@.500 Ea 90.10 25.05 0.20 115.35
Timing relay, solid state, double pole, double throw, 0.1 to 10 second variable,
off delay lj@.500 Ea 82.80 25.05 0.20 108.05
General purpose control relay240 VAC,
10 amps, with base lj@.500 Ea 28.20 25.05 0.20 53.45
2015 Heavy Construction Estimator, All Rights Reserved Page 799 (part 2)

Lighting contactors - Electrically held, 2 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
30 amp lk@1.50 Ea 229.00 75.15 0.29 304.44
60 amp lk@2.00 Ea 471.00 100.20 0.38 571.58
100 amp lk@2.50 Ea 776.00 125.30 0.48 901.78
200 amp lk@3.00 Ea 1,830.00 150.30 0.57 1,980.87

Lighting contactors - Electrically held, 3 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
20 amp lk@1.75 Ea 163.00 87.68 0.33 251.01
30 amp lk@1.75 Ea 249.00 87.68 0.33 337.01
2015 Heavy Construction Estimator, All Rights Reserved Page 800

60 amp lk@2.25 Ea 499.00 112.70 0.43 612.13


100 amp lk@2.75 Ea 831.00 137.80 0.52 969.32
200 amp lk@3.25 Ea 1,850.00 162.80 0.62 2,013.42

Lighting contactors - Electrically held, 4 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
30 amp lk@2.00 Ea 305.00 100.20 0.38 405.58
60 amp lk@2.50 Ea 623.00 125.30 0.48 748.78
100amp lk@3.00 Ea 1,030.00 150.30 0.57 1,180.87
200amp lk@3.50 Ea 2,600.00 175.40 0.67 2,776.07

Lighting contactors - Mechanically held, 2 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
30 amp lk@1.50 Ea 357.00 75.15 0.29 432.44
60 amp lk@2.00 Ea 720.00 100.20 0.38 820.58
100amp lk@2.50 Ea 1,010.00 125.30 0.48 1,135.78
200amp lk@3.00 Ea 2,590.00 150.30 0.57 2,740.87

Lighting contactors - Mechanically held, 3 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
30 amp lk@1.75 Ea 378.00 87.68 0.33 466.01
60 amp lk@2.25 Ea 748.00 112.70 0.43 861.13
100 amp lk@2.75 Ea 1,070.00 137.80 0.52 1,208.32
200 amp lk@3.25 Ea 2,920.00 162.80 0.62 3,083.42

Lighting contactors - Mechanically held, 4 pole


NEMA I enclosure, 600 volt, ampere rating at 120, 240 or 480 volts, using small tools.
30 amp lk@2.00 Ea 398.00 100.20 0.38 498.58
60 amp lk@2.50 Ea 887.00 125.30 0.48 1,012.78
100 amp lk@3.00 Ea 1,270.00 150.30 0.57 1,420.87
200 amp lk@3.50 Ea 3,570.00 175.40 0.67 3,746.07

Photo-cell, relay, lighting arrester, receptacle and bracket


Using small tools.
105 to 130 volt lk@1.50 Ea 56.70 75.15 0.29 132.14
105 to 285 volt lk@1.50 Ea 66.10 75.15 0.29 141.54

CSI 16-950, Electric heating and cooling controls

Room thermostats - Residential, low voltage


Using small tools.
Heat only, or heat and cool,
with subbase lj@.500 Ea 82.90 25.05 0.20 108.15
Heat and cool, with
contact relay and subbase lj@.667 Ea 41.30 33.42 0.26 74.98
Clock, with subbase,
up to 3 cycles/day lj@.667 Ea 141.00 33.42 0.26 174.68

Room thermostats - Industrial, line voltage


Using small tools.
Light duty, heat and cool only lj@.500 Ea 53.90 25.05 0.20 79.15
Heavy duty, lj@.500 Ea 80.00 25.05 0.20 105.25

CSI 16-960, Limit switches

Heavy duty limit switches - Lever arm


2015 Heavy Construction Estimator, All Rights Reserved Page 800 (part 2)

Plunger, wobble stick type, precision, oil tight, using small tools.
Weatherproof, 10 amp rated lk@1.25 Ea 224.00 62.63 0.24 286.87

CSI 16-961, Sensing devices

Heavy duty limit switches - Ultrasonic level sensing


Using small tools.
Transmitter, sensing
range 4 to 20 MA output lk@3.50 Ea 4,200.00 175.40 0.67 4,376.07
2015 Heavy Construction Estimator, All Rights Reserved Page 801

CSI 16-962, Level switches

Piesometer water level switches


Using small tools.
Float switch, with 50' cable --@.000 Ea 705.00 -- -- 705.00

CSI 16-990, Cabinets and associated components

Sensor control cabinets


Using small tools.
Counter mounted,
20" x 24", oil tight lk@2.50 Ea 174.00 125.30 0.48 299.78

Large, free-standing control cabinets


Double door, one access, NEMA 12, using a 20-ton hydraulic crane with 70’ boom.
60" x 48" with 18" door lm@8.00 Ea 1,200.00 395.60 23.80 1,619.40
72" x 48" with 18" door lm@8.00 Ea 1,320.00 395.60 23.80 1,739.40

Single door NEMA 4 control cabinets


Using a 20-ton hydraulic crane with 70’ boom.
60" x 48" with 18" door lm@8.00 Ea 1,170.00 395.60 23.80 1,589.40
72" x 31" with 24" door lm@8.00 Ea 1,430.00 395.60 23.80 1,849.40
72" x 25" with 24" door lm@8.00 Ea 1,560.00 395.60 23.80 1,979.40

Legend plates for sensor control cabinets


Using small tools.
3" phenolic plastic,
engraved with 1/2" letters lk@.100 Ea 2.51 5.01 0.02 7.54
3" engraved aluminum,
engraved with 1/2" letters lk@.100 Ea 3.87 5.01 0.02 8.90
2015 Heavy Construction Estimator, All Rights Reserved Page 802

This is the end of the 2015 Heavy Construction Estimator

You might also like