WARAS MEGAH BACKCHARGE

MH Timber (pcs) Steelmould Sheetpile (pcs) Per piece Unit x Price Waler Price Tot. RM/Day Status Day Total Base:
5/3 68 RM 1.50 RM 102.00 RM 58.14 RM 160.14 SSP future 365 - RM 2.50 for 12m Sheetpile/piece
5/4 97 RM 1.50 RM 145.50 RM 82.94 RM 228.44 155 RM 35,407.43 - 165% timber price from Sheetpile
5/5 68 RM 1.50 RM 102.00 RM 58.14 RM 160.14 95 RM 15,213.30
5/6 7.98 ton 95
5/7 55 RM 1.50 RM 82.50 RM 47.03 RM 129.53 126 RM 16,320.15
5/8 77 RM 1.50 RM 115.50 RM 65.84 RM 181.34 92 RM 16,682.82
5/9 58 RM 1.50 RM 87.00 RM 49.59 RM 136.59 105 RM 14,341.95
5/10 75 RM 1.50 RM 112.50 RM 64.13 RM 176.63 86 RM 15,189.75
5/11 58 RM 1.50 RM 87.00 RM 49.59 RM 136.59 126 RM 17,210.34 Prorates:
5/20 12.89 ton 13.4 tapper 143
5/21 40 RM 3.13 RM 125.20 RM 30.05 RM 155.25 I-Beam 76 timber RM 16.50
5/39 48 RM 2.50 RM 120.00 RM 28.80 RM 148.80 93 RM 13,838.40 sheetpile RM 10.00
5/40 41 RM 3.13 RM 128.33 RM 30.80 RM 159.13 75 RM 11,934.69 difference 1.65
5/45 56 RM 3.13 RM 175.28 RM 42.07 RM 217.35 Pipe Rec 52
5/46 62 RM 2.50 RM 155.00 RM 37.20 RM 192.20 168 RM 32,289.60
5/47 77 RM 3.13 RM 241.01 RM 57.84 RM 298.85 153 RM 45,724.42 waler RM 11,721.72 RM 34,721.28 RM 26,402.64 RM 41,231.52 RM 22,687.20 RM 25,153.20 RM 32,945.76
5/48 68 RM 3.13 RM 212.84 RM 51.08 RM 263.92 115 RM 30,350.98 sheetpile RM 46,872.00 RM 139,708.80 RM 103,017.60 RM 160,637.40 RM 98,532.00 RM 111,812.40 RM 145,189.80
5/49 58 RM 2.50 RM 145.00 RM 34.80 RM 179.80 11.7 pipe.rec difference 0.25 0.25 0.26 0.26 0.23 0.22 0.23
5/50 69 RM 3.13 RM 215.97 RM 51.83 RM 267.80 167 RM 44,723.07
5/54 63 RM 3.13 RM 197.19 RM 47.33 RM 244.52 176 RM 43,034.75 waler RM 16,801.68 RM 4,971.46 RM 4,142.88 RM 4,524.29
5/55 56 RM 3.13 RM 175.28 RM 42.07 RM 217.35 Pipe Rec 146 timber RM 30,045.17 RM 8,388.92 RM 7,372.08 RM 7,807.87
5/58 61 RM 3.13 RM 190.93 RM 45.82 RM 236.75 209 RM 49,481.42 difference 0.56 0.59 0.56 0.58
5/59 53 RM 3.13 RM 165.89 RM 39.81 RM 205.70 Pipe Rec 32
5/60 60 RM 3.13 RM 187.80 RM 45.07 RM 232.87 STP 62 RM 14,438.06
RM 416,181.12
TARGET JUNE 2017

TODAY REPORT :- 25-May-17 red (no changes from yesterday) blue (progressing) green (completed)

JUNE 2017
DISTANCE NEEDED
SIZE 1st Stretch 2nd Stretch 3rd Stretch TOTAL SETTING 1 SETTING 2 SETTING 3 DAYS LEFT DISTANCE LEFT PER DAY
MH12/05 MH12/04
375mm Target
73.2 73.2 8 27 73.2 2.7
Completion 0 0
MH12/03 MH12/02
375mm (2) Target
67.3 67.3 10 25 67.3 2.7
Completion 0 0
MH14/11-3 MH14/11-2 MH14/11-1 MH14/11-2
525mm Target
82.6 83.6 166.2 8 7 20 166.2 8.3
Completion 0 0 0
MH12/14 MH12/15 MH12/11 MH12/10
600mm Target
84.7 83.6 168.3 2 7 26 168.3 6.5
Completion 0 0 0
MH6/24 MH6/23 MH6/22 MH6/23
750mm Target
61.6 89.59 151.19 3 7 25 151.19 6
Completion 0 0 0
MH12/22 MH12/21
900mm(1) Target
39.3 39.3 12 23 39.3 1.7 23
Completion 0 0 67.16
MH12/20 MH12/21 MH12/20 MH12/19 67.16
900mm (2) Target
48 88 136 12 7 16 136 8.5
Completion 0 0 0
MH05/30 MH05/31 MH5/30 MH5/29
1050mm(1) Target
101.68 48.48 150.16 11 7 17 150.16 8.8
Completion 0 0 0
MH6/49 MH6/48
1050mm (2) Target
134.31 134.31 14 21 134.31 6.4
Completion 0 0
MH12/30 MH12/31 MH12/30 MH12/29
1200mm(1) Target
76.04 0 76.04 14 21 76.04 3.6
Completion 0 0 0
MH12/32 MH12/31
1200mm(2) Target
150 150 9 26 150 5.8
Completion 0 0
TARGET TOTAL 1312
COMPLETION TOTAL 0

MANHOLE TARGET JUNE 2017

TODAY REPORT :- 25-May-17 progress by WARAS progress by MH Subcon

Large Diameter Manhole Precast


Base Pipe Tappertop Make-up Piece Cast IronTop
& Concrete
Manhole Excavation Concreting Jointing Alumina 2nd Wall & Top Coal Tar Chamber Concreting Coverslab Remarks
1st Wall Haunching Concreting
Cement Slab Epoxy
MH5/20 29-Mar 29-Mar 31-Mar N/A 4-Apr 5-Apr N/A N/A 11-Apr 13-Apr Day 42 TARGET 9/5 WM to complete backfill
MH5/21 20-Apr 22-Apr 28-Apr N/A 3-May Day 22 N/A N/A TARGET I-Beam obstruction
MH5/22 5-Apr 6-Apr 11-Apr N/A 14-Apr 19-Apr N/A N/A 29-Apr 3-May Day 22 TARGET 14/5 WM to complete backfill
MH5/23 30-Mar 31-Mar 5-Apr N/A 10-Apr 18-Apr N/A N/A 20-Apr 21-Apr Day 34 TARGET 19/5 WM to cmplete backfill
MH5/34 TARGET
MH5/45 TARGET
MH5/46 Done 28-Nov Done 5-Jan 19-Jan Done 13-Feb 14-Mar 24-Feb 17-Apr Day 38 TARGET Vibro to mob-in 11/5
MH5/47 Done 30-Dec Done 10-Feb 21-Jan Done 21-Feb 18-Mar 17-Apr 21-Apr Day 34 TARGET Vibro to mob-in 13/5
MH5/48 Done 30-Dec Done 14-Jan 19-Jan Done 13-Feb 13-Mar 24-Feb 17-Apr Day 38 TARGET WM to fill crusherrun 5/5
MH5/49 Done 20-Jan TARGET Pipe Rec to Propose
MH5/50 Done 8-Mar 11-Mar 18-Mar 18-Mar 23-Mar 30-Mar 19-Apr 21-Apr 22-Apr Day 33 TARGET Vibro to mob-in 15/5
MH5/53 TARGET WM rectification cmpleted
MH5/54 9-Apr 10-Apr 15-Apr 27-Apr 27-Apr Day 28 19-May TARGET Alumina to arrive 5/5
MH5/55 Pipe rec to propose
MH5/56 28-Apr Day 27 Pipe Rec to Propose
MH5/57 Day 15 Pipe rec to start 17/5. Shtpile
MH5/58 30-Mar 31-Mar 20-Apr 25-May Day 0 formwork
MH5/59 Day 26 TARGET Pipe Rec to Propose
MH5/4-59 TARGET
MH12/8 24-Apr 25-Apr 26-Apr N/A 25-May N/A N/A 25-May 225 VCP
MH12/12 21-Apr 21-Apr 24-Apr N/A 27-Apr 4-May N/A N/A 4-May 5-May
MH12/13 TARGET N/A N/A
MH12/27 22-May N/A N/A
MH12/28 TARGET

compressor air brekaer


1 2
submerse robin
4 of 6 5

PIT TARGET JUNE 2017

TODAY REPORT :- 25-May-17

Concrete
Pit Depth Progress Sheetpiling Bracing Base Remarks

MH5/30 8.7 6.5 75% 75% TARGET steelplate driven


MH5/29 9.52 TARGET

MH6/21 6.64 TARGET


MH6/22 7.46 TARGET
MH6/23 9.3 7.5 81% 81% TARGET pending plate for caisson
MH6/49 8 2 25% 25% TARGET pend. drain diversion CBB
MH6/50 5.93 TARGET

MH12/10 4.9 TARGET


MH12/18 TARGET
MH12/19 TARGET
MH12/20 TARGET
MH12/21 TARGET
MH12/22 6.6 5 76% 76% TARGET in progress
MH12/23 6.82 TARGET piloting confirmed
MH12/32 9 7 78% 78% TARGET in progress

MH14/11 4.16 TARGET pend. Ex IL checking


MANHOLE ACHIEVEMENT APRIL 2018

TODAY REPORT :- 8-Jun-18 progress by WARAS progress by MH Subcon

Large Diameter Manhole Precast


Manhole Clearing Base Concreting Pipe Jointing Chamber Tappertop Coverslab Make-up Piece Cast Iron & Concrete Remarks Type of Pit
1st Wall Haunching Alumina 2nd Wall & Top Coal Tar Concreting Top
Cement Slab Epoxy Concreting WM Handover Memo
LINE 5
MH5/3 5-Jul 6-Jul Day 337 Timber Shoring
MH5/4 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring
MH5/5 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring handover 27/8/16 8/27/2016
MH5/6 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Steel Caisson handover 27/8/16 8/27/2016
MH5/7 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring handover 16/8/16 8/16/2016
MH5/8 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring handover 24/8/16 8/24/2016
MH5/9 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring handover 2/9/16 9/2/2016
MH5/10 Done Done Done N/A Done Done N/A N/A Done Done Done Done Done Completed Timber Shoring handover 20/9/16 9/20/2016
MH5/11 Done 23-Feb Done N/A Done 2-Mar N/A N/A 28-Feb 9-Mar 31-Mar 31-Mar 31-Mar Completed Timber Shoring handover 1/10/16 10/1/2016
MH5/12 Done 15-Feb Done N/A Done 20-Feb N/A N/A 4-Mar 9-Mar 31-Mar 31-Mar 31-Mar Completed Steel Caisson
MH5/15 Done 13-Mar 14-Mar N/A 17-Mar 20-Mar N/A N/A 22-Mar 23-Mar 29-Apr 29-Apr 29-Apr Completed Steel Caisson
MH5/20 29-Mar 29-Mar 31-Mar N/A 4-Apr 5-Apr N/A N/A 11-Apr 13-Apr 27-Jul 27-Jul 27-Jul Completed Steel Caisson handover 2/11/16 11/2/2016
MH5/21 20-Apr 22-Apr 28-Apr N/A 3-May 4-May N/A N/A Day 400 I-Beam obstruction Sheetpile
MH5/22 5-Apr 6-Apr 11-Apr N/A 14-Apr 19-Apr N/A N/A 29-Apr 3-May 27-Jul 27-Jul 27-Jul Completed Sheetpile handover 6/4/17 4/6/2017
MH5/23 30-Mar 31-Mar 5-Apr N/A 10-Apr 18-Apr N/A N/A 20-Apr 21-Apr 27-Jul 27-Jul 27-Jul Completed Concrete Caisson handover 6/4/17 4/6/2017
MH5/31 Steel Caisson
MH5/32 19-Jul 20-Jul Day 323 pipe jointing. Pipe ready Concrete Caisson
MH5/34 11-Jul 12-Jul 19-Jul Day 324 1st wall Concrete Caisson
MH5/35 Sheetpile handover 28/03/18 3/28/2018
MH5/36 Concrete Caisson handover 03/05/18 5/3/2018
MH5/38 Sheetpile handover 3/5/2018 5/3/2018
MH5/39 Done Done Done 14-Feb 14-Feb Done 4-Mar 18-Mar 29-Mar 30-Mar 27-Apr 27-Apr Done Completed Sheetpile handover 9/11/16 11/9/2016
MH5/40 Done Done Done 10-Feb 10-Feb Done 1-Mar 16-Mar 29-Mar 30-Mar 27-Apr 27-Apr Done Completed Sheetpile handover 28/11/16 11/28/2016
MH5/41 3-May 6-May 7-May 7-Jun 7-Jun 8-Jun Day 0 rebar base done Sheetpile handover 25/01/18 1/25/2018
MH5/42 12-Jan Day 147 Pipe rectification Sheetpile handover 25/01/18 1/25/2018
MH5/44 prepare discharge outlet Concrete Caisson
MH5/45 Sheetpile handover 6/4/17 4/6/2017
MH5/46 Done 28-Nov Done 5-Jan 19-Jan Done 13-Feb 14-Mar 24-Feb 17-Apr 18-Jul 18-Jul 18-Jul Completed Sheetpile
MH5/47 Done 30-Dec Done 10-Feb 21-Jan Done 21-Feb 18-Mar 17-Apr 21-Apr 7-Sep 7-Sep 7-Sep Completed Sheetpile
MH5/48 Done 30-Dec Done 14-Jan 19-Jan Done 13-Feb 13-Mar 24-Feb 17-Apr 18-Jul 18-Jul 18-Jul Completed Sheetpile handover 20/9/16 9/20/2016
MH5/49 Done 20-Jan Day 504 pipe jointing Sheetpile handover 20/9/2016 9/20/2016
MH5/50 Done 8-Mar 11-Mar 18-Mar 18-Mar 23-Mar 30-Mar 19-Apr 21-Apr 22-Apr 18-Jul 18-Jul 18-Jul Completed Sheetpile handover 6/10/16 10/6/2016
MH5/53 Done SSP level check Sheetpile handover 20/2/2017 2/20/2017
MH5/54 9-Apr 10-Apr 15-Apr 27-Apr 27-Apr 7-May 19-May 2-Jun 6-Sep 7-Sep Day 274 sheetpile Backfill completed Sheetpile handover 28/12/16 12/28/2016
MH5/55 Pipe Rec to Propose Sheetpile handover 28/12/16 12/28/2016
MH5/56 20-Apr Day 49 Sheetpile handover 24/4/2018 4/24/2018
MH5/57 Pipe rec pending Sheetpile
MH5/58 30-Mar 31-Mar 20-Apr 25-May 25-May 7-Oct Day 244 Sheetpile handover 25/11/16 11/25/2016
MH5/59 Sheetpile handover 6/5/17 & 3/5/2 4/26/2018
MH5/4-59 10-Aug 11-Aug Day 301 Concrete Caisson
LINE 6
MH6/17 17-Apr 18-Apr 19-Apr N/A 20-Apr 21-Apr N/A N/A 21-Apr 21-Apr Day 48 Pend Backfilling Concrete Caisson handover 28/03/18 3/28/2018
MH6/18 6-Apr 9-Apr 10-Apr N/A 12-Apr 13-Apr N/A N/A 13-Apr 13-Apr 20-Apr 20-Apr 20-Apr Completed Concrete Caisson handover 8/3/18 & 28/3 3/28/2018
MH6/21 17-Mar 24-Mar 26-Mar N/A 28-Mar 29-Mar N/A N/A 29-Mar 30-Mar 4-Apr 4-Apr 4-Apr Completed Sheetpile handover 8/3/18 3/8/2018
MH6/22 23-Sep 30-Sep 20-Oct N/A 25-Oct 26-Mar N/A N/A 28-Mar 28-Mar 30-Mar 30-Mar 30-Mar Pend Backfilling Steel Caisson
MH6/23 23-Sep Day 258 cut only N/A N/A N/A MOS pipe jointing Concrete Caisson *handover 17/8/17 8/17/2017
MH6/24 23-Sep 26-Sep 13-Oct N/A 16-Nov 27-Mar N/A N/A 7-Apr 7-Apr 9-Apr 9-Apr 9-Apr Pend Backfilling Concrete Caisson *handover 17/8/17 8/17/2017
MH6/26 Concrete Caisson handover 01/06/18 6/1/2018
MH6/33 N/A N/A N/A Concrete Caisson handover 01/06/18 6/1/2018
MH6/34 N/A N/A N/A Concrete Caisson handover 1/6/18 6/1/2018
MH6/35 N/A N/A N/A Concrete Caisson handover 25/01/18 1/25/2018
MH6/36 2-May 3-May 5-May N/A 7-May 8-May N/A N/A 8-May 8-May Day 31 Concrete Caisson handover 25/01/18 1/25/2018
MH6/38 16-Aug 14-May 15-May N/A 18-May 18-May N/A N/A 19-May 19-May Day 20 Concrete Caisson
MH6/39 Concrete Caisson handover 25/01/18 1/25/2018
MH6/41 Concrete Caisson
MH6/42 Concrete Caisson
MH6/43 Concrete Caisson handover 25/01/18 1/25/2018
MH6/44 Concrete Caisson handover 25/01/18 1/25/2018
MH6/44a 20-Feb 23-Feb NA NA Day 105 *Shifting PBA pipe/NPS pump Concrete Caisson *Temporary works for road opening
probleum
MH6/45 Sheetpile handover 25/01/18 1/25/2018
MH6/47 Concrete Caisson
MH6/48 Concrete Caisson handover 9/4/18 4/9/2018
MH6/49 Sheetpile handover 25/1/18 & 9/4 4/9/2018
MH6/50 Sheetpile handover 8/3/18 3/8/2018
MH6/51 Sheetpile handover 8/3/18 3/8/2018
MH6/52 Sheetpile handover 7/6/18
MH6/53-1 NA NA NA Concrete Caisson handover 24/4/18 4/24/2018
MH6/53-2 9-Mar 12-Mar 9-Apr N/A 11-Apr 12-Apr N/A N/A 12-Apr 12-Apr 23-Apr 23-Apr 23-Apr Completed Concrete Caisson handover 25/01/18 1/25/2018
MH6/53-3 NA NA NA Concrete Caisson handover 8/3/18 3/8/2018
MH6/53-4 13-Mar 15-Mar 15-Apr N/A 17-Apr 18-Apr N/A N/A 18-Apr 18-Apr 23-Apr 23-Apr 23-Apr Completed Concrete Caisson handover 8/3/18 3/8/2018
MH6/53-5 20-Dec 23-Apr 25-Apr N/A 26-Apr 27-Apr N/A N/A 28-Apr 28-Apr Day 41 Concrete Caisson
MH6/53-6 Concrete Caisson handover 1/6/18 6/1/2018
MH6/53-6-1 Concrete Caisson handover 01/06/2018 6/1/2018
MH6/53-6-2 Concrete Caisson handover 7/6/18
LINE 12
MH12/2 12-Nov 13-Nov N/A N/A 15-Nov 16-Nov N/A N/A Day 204 pipe backdrop installation Precast Caisson
MH12/3 24-Oct 26-Oct 31-Oct N/A 2-Nov 3-Nov N/A N/A 9-Nov 13-Nov 22-Nov 22-Nov 22-Nov Completed Precast Caisson
MH12/4 21-Nov 22-Nov 24-Nov N/A 24-Nov 25-Nov N/A N/A 30-Nov 11-Dec 23-Dec 23-Dec 23-Dec Completed Precast Caisson
MH12/5 24-Nov 24-Nov 27-Nov N/A 28-Nov 29-Nov N/A N/A 1-Dec 1-Dec 6-Dec 6-Dec 6-Dec Completed Precast Caisson *NCR
MH12/6 30-Nov 30-Nov 1-Dec N/A 2-Dec 4-Dec N/A N/A 6-Dec 22-Dec 23-Dec 23-Dec 23-Dec Completed Precast Caisson
MH12/7 6-Dec 7-Dec 9-Dec N/A 11-Dec 12-Dec N/A N/A 13-Dec 13-Dec 21-Dec 21-Dec 21-Dec Completed Concrete Caisson
MH12/8 24-Apr 25-Apr 26-Apr N/A 25-May 26-May N/A N/A 6-Jun 7-Jun Day 366 pipe backdrop installation Concrete Caisson
MH12/9 22-Aug 22-Aug 14-Dec N/A 15-Dec 16-Dec N/A N/A 21-Dec 21-Dec 8-Jan 8-Jan 8-Jan Completed Concrete Caisson *handover 17/8/17 8/17/2017
MH12/10 10-Aug 11-Aug Day 301 N/A N/A N/A will proceed works *SSP new flow- Concrete Caisson
in *handover 17/8/17 8/17/2017
MH12/11 31-Jul 1-Aug 20-Dec N/A 21-Dec 22-Dec N/A N/A 23-Dec 23-Dec 3-Jan 3-Jan 3-Jan Completed Concrete Caisson *handover 17/8/17 8/17/2017
MH12/12 21-Apr 21-Apr 24-Apr N/A 27-Apr 4-May N/A N/A 4-May 5-May 22-Aug 22-Aug 22-Aug Completed Concrete Caisson
MH12/13 12-Jun 15-Jun 19-Jun N/A 2-Aug 3-Aug N/A N/A 3-Aug 4-Aug 22-Aug 22-Aug 22-Aug Completed Concrete Caisson make good finishing level
MH12/14 26-Jul 27-Jul 30-Jul N/A 31-Jul 1-Aug N/A N/A 2-Aug 3-Aug 22-Aug 22-Aug 22-Aug Completed Concrete Caisson
MH12/15-4 Concrete Caisson handover 7/6/2018
MH12/15-5 23-May 24-May 25-May N/A 26-May 28-May N/A N/A 30-May 30-May 30-May 2-Jun 2-Jun Pend Backfilling Concrete Caisson handover 16/5/2018 5/16/2018
MH12/15-6 23-May 24-May N/A N/A 26-May 30-May N/A N/A 30-May 30-May 30-May 2-Jun 2-Jun Pend Backfilling Concrete Caisson
MH12/15-7 2-Feb 5-Feb 6-Feb N/A 7-Feb 8-Feb N/A N/A 8-Feb 10-Feb 2-Jun 2-Jun 2-Jun Completed Precast Caisson to proceed 2nd chambering n tappertop
MH12/15-8 27-Jan 30-Jan N/A N/A 1-Feb 2-Feb N/A N/A 2-Feb 5-Feb 7-Feb 7-Feb 7-Feb Completed Precast Caisson handover 25/1/2018 1/25/2018
MH12/16 26-Dec 27-Dec 10-Jan N/A 10-Feb Day 118 N/A N/A formwork for freedrop Concrete Caisson
MH12/17 21-Jan Day 138 N/A N/A N/A Hacking work Concrete Caisson
MH12/18 N/A N/A N/A Concrete Caisson
MH12/19 20-Aug 22-Aug Day 290 N/A N/A N/A Pipe Rec pending Concrete Caisson in progress
MH12/20 29-Aug 29-Aug 12-Jan N/A 15-Jan 17-Jan N/A N/A 17-Jan 30-Jan 1-Feb 1-Feb 1-Feb Completed Concrete Caisson *handover 17/8/17 8/17/2017
MH12/21 30-Aug 30-Aug 24-Oct N/A 24-Nov 2-Dec N/A N/A 8-Jan 9-Jan 17-Jan 17-Jan 17-Jan Completed Concrete Caisson *handover 17/8/17 8/17/2017
MH12/22 4-Oct 6-Oct 12-Oct N/A 3-Jan 4-Jan N/A N/A 4-Jan 8-Jan 17-Jan 17-Jan 17-Jan Completed Concrete Caisson Rectifield pipe lackage
MH12/23 22-Jan Day 137 N/A N/A N/A no LDM n backdrop needed Steel Caisson *handover 17/8/17 8/17/2017
MH12/24 20-Jun 29-Jun Done N/A 21-Jul 24-Jul N/A N/A 25-Jul 27-Jul 25-Sep 25-Sep 25-Sep Completed Concrete Caisson to re-hack for 300mm
MH12/26 10-Jun 14-Jun 16-Jun N/A 19-Jun 20-Jun N/A N/A 29-Jun 29-Jun 25-Sep 25-Sep 25-Sep Completed Concrete Caisson
MH12/27 22-May 23-May 7-Jun N/A 9-Jun 10-Jun N/A N/A 15-Jun 19-Jun 25-Sep 25-Sep 25-Sep Completed Concrete Caisson
MH12/28 9-Jun 9-Jun N/A 14-Jun 15-Jun 16-Jun N/A N/A 20-Jun 22-Jun 25-Sep 25-Sep 25-Sep Completed Concrete Caisson To hack & re-construct
MH12/29 Concrete Caisson
MH12/30 Concrete Caisson handover 8/3/18 3/8/2018
MH12/31 Concrete Caisson handover 8/3/18 3/8/2018
MH12/32 Concrete Caisson
MH12/33 Concrete Caisson
LINE 14
MH14/1 18-May 21-May 22-May N/A 22-May 23-May N/A N/A 24-May 24-May 2-Jun 2-Jun 2-Jun Completed
MH14/11-1 28-Feb 7-Mar 7-Jun N/A Day 1 N/A N/A Pipe jointing Precast Caisson
MH14/11-2 21-Feb 23-Feb 23-Feb N/A 27-Feb 1-Mar N/A N/A 1-Mar 7-Mar Day 93 Cover slab, makeup piece top Precast Caisson
MH14/11-3 22-Jul 22-Jul 12-Feb N/A 13-Feb 21-Feb N/A N/A 22-Feb 23-Feb 1-Mar 1-Mar 1-Mar Completed Precast Caisson *Clear debries
MH14/11-4 30-Jun 30-Jun 24-Jul N/A 26-Jul 21-Feb N/A N/A 13-Feb 27-Feb 1-Mar 1-Mar 1-Mar Completed Precast Caisson *start backfill on 13/03/18
MH14/14 Concrete Caisson
LIST OF MATERIALS

Alumina Cement: 172 5 5 3 3 4 5 3 3 3 3


OPC Cement 25 4 3 2 2 1 2
Paku 2 1/2" 10 2
Dawai ikat 8
6mm Normal plywood 60 3 3 3 3 3
12mm Normal plywood 48 5 2
Chambering 1200 d x 900 h 3
Chambering 1200 d x 1200 h 2
Chambering 1200 d x 1500 h 10
Chambering 1350 X 900 3 1 1
Chambering 1350 d X 1200 h 2 1 1
Chambering 1350 d X 1500 h 6
Chambering 1500 d x 600 h 0
Chambering 1500 d x 900 h 7 1
Chambering 1500 d x 1200 h 2
Chambering 1500 d x 1500 h 5
Chambering 1800 d X 600 h 5
Chambering 1800 d X 900 h 7 1 1 2 1
Chambering 1800 d X 1200 h 4 1 1 1
Chambering 1800 d X 1500 h 13 1 1 2
Tapper Top 1200 d x 600 h 1
Tapper top 1350 d X 900 h 5 1 1
Tapper top 1500 d X 900 h 4 1
Tapper top 1800 X 900 h 6 1 1 1 1 1 1
Chamber Cover 1020 x 600 x 14 5
Make up piece 600 d X 125 h 12 4 1
Make up piece 600 d X 150 h 7 1 1
Make up piece 600 d X 225 h 14 1 1
Make up piece 600 d X 300 h 7 1 1
Pipe 375mm D X 2.0m L (open cu 0
Pipe 450mm D X 2.0m L (open cu 33
Pipe 525mm D X 2.0m L(open cut 95 15
Pipe 600mm D X 2.92m L(open c 69
Pipe 750mm D X 2.92m L(open c 2
Pipe 900mm D X 2.92m L(open c 12
Pipe 1050mm D X 2.92m L(open
Pipe 1200mm D X 2.92m L(open
Pipe 1500mm D X 2.92m L(open
Pipe 375mm D X 2.0m L 0
Pipe 525mm D X 2.0m L 5
Pipe 600mm D X 2.92m L 0
Pipe 750mm D X 2.92m L 11
Pipe 900mm D X 2.92m L 2
Pipe 1050mm D X 2.92m L 4
Pipe 1200mm D X 2.92m L 4
Pipe 1500mm D X 2.92m L 7
Cast Iron Manhole Cover 8 2 1 1 1 1 1