SIMULASI TAHUN KERING 2015 (Q=90%)

Bulan Jumlah Hari Elevasi Awal V awal Q in Q out


m m3/s m3/s
6.33E+01 January 31 178.57 10309393.95 0.75 3.54E-01
6.41E+01 February 29 180.82 11071859.77 0.37 3.54E-01
6.37E+01 MArch 31 179.85 10738459.28 0.17 3.54E-01
6.26E+01 April 30 176.68 9693790.89 0.17 3.54E-01
6.12E+01 May 31 172.78 8480627.56 0.68 3.54E-01
6.14E+01 June 30 173.34 8650709.36 1.09 3.54E-01
6.30E+01 July 31 177.85 10074105.58 1.07 3.54E-01
6.48E+01 August 31 183.00 11836366.97 0.52 3.54E-01
6.52E+01 September 30 183.95 12178139.82 0.41 3.54E-01
6.52E+01 October 31 184.14 12248386.40 0.37 3.54E-01
6.52E+01 November 30 184.00 12196656.03 0.14 3.54E-01
6.44E+01 December 31 181.77 11402328.10 0.11 3.54E-01
178.57 10309394.28
0.00 7.64E+02 0.49
el awal = el akhir elevasi * q

179.73

Pola
195.00

190.00

185.00

180.00
Elevasi (m)

175.00

170.00
Elevasi (
175.00

170.00

165.00

160.00
January February MArch Apri l May Jun
V in V out Ea Luas permukaan Evap V spillway Q spillway
m3 m3 mm/bln m2 m3
2020529.80 948855.35 77.58 3.21E+05 2.49E+01 0 0.00
925801.07 887638.88 71.27 3.34E+05 2.38E+01 0 0.00
457671.02 948855.35 84.30 3.29E+05 2.77E+01 0 0.00
438080.44 918247.11 98.38 3.11E+05 3.06E+01 0 0.00
1829192.19 948855.35 99.94 2.89E+05 2.89E+01 0 0.00
2831455.92 918247.11 79.11 2.92E+05 2.31E+01 0 0.00
2870776.70 948855.35 75.48 3.17E+05 2.40E+01 0 0.00
1380825.98 948855.35 84.61 3.46E+05 2.93E+01 0 0.00
1064235.58 918247.11 89.02 3.52E+05 3.13E+01 0 0.00
983522.84 948855.35 97.96 3.53E+05 3.46E+01 0 0.00
369547.49 918247.11 83.35 3.52E+05 2.94E+01 0 0.00
304830.37 948855.35 78.99 3.40E+05 2.68E+01 0 0.00
3.21E+05

Jumlah Hari 2015


15
January
16
14
February
14
15
March
16
Pola Operasi Waduk
15
April
15 1.60
15
May
16
1.40
15
June
15
15 1.20
July
16
15
August 1.00
16
15
September
15
0.80

0.60

0.40
0.80

0.60

0.40

0.20

0.00
Apri l May June Jul y August September October November December
V akhir Elevasi Akhir

1.14E+07 180.82
1.11E+07 179.85
1.02E+07 176.68
9.21E+06 172.78
9.36E+06 173.34
1.06E+07 177.85
1.20E+07 183.00
1.23E+07 183.95
1.23E+07 184.14
1.23E+07 184.00
1.16E+07 181.77
1.08E+07 178.57

Pola Operasion alTahun 2015

1260.852

1.60

1.40

1.20

1.00
Q infow (m3/s)

0.80

0.60

0.40
0.80

Q infow (
0.60

0.40

0.20

0.00
November December
Kur va Per ba ndi ng an I nfow & O utf ow
l (Q =50% )
Kurv a Perba ndi ng a n Infow & Outf l ow (Q =50% )
KURVA MASSA POLA OPERASI RENCANA (Q=50%)

KURVA MASSA POLA OPERASI RENCANA (Q=50%)


=50%)
SIMULASI TAHUN KERING 2015 (Q=80%)

Bulan Jumlah Hari Elevasi Awal V awal Q in Q out


m m3/s m3/s
1.03E+02 January 31 182.80 11766685.91 0.84 5.66E-01
1.05E+02 February 29 184.75 12470289.82 0.38 5.66E-01
1.04E+02 MArch 31 183.01 11841435.73 0.21 5.66E-01
1.01E+02 April 30 179.06 10475130.36 0.34 5.66E-01
9.93E+01 May 31 175.35 9269198.95 0.68 5.66E-01
9.86E+01 June 30 174.19 8910418.17 1.21 5.66E-01
1.01E+02 July 31 177.87 10078809.79 1.49 5.66E-01
1.05E+02 August 31 184.93 12534618.26 0.96 5.66E-01
1.07E+02 September 30 188.40 13847743.39 0.52 5.66E-01
1.07E+02 October 31 188.92 14046556.73 0.38 5.66E-01
1.07E+02 November 30 188.26 13790295.94 0.22 5.66E-01
1.05E+02 December 31 186.08 12963444.46 0.18 5.66E-01
182.80 11766686.17
0.00 1.24E+03 0.62
el awal = el akhir elevasi * q

182.80

Pola Oper
195.00

190.00

185.00

180.00
Elevasi (m)

175.00

170.00

165.00
ry ry ch ri l ay ne ly
n ua rua Ar Ap M Ju Ju
b M A
Ja Fe

Bulan
V in V out Ea Luas permukaan Evap V spillway
m3 m3 mm/bln m2 m3
2249383.99 1516094.08 77.58 3.45E+05 2.68E+01 0
948069.60 1418281.56 71.27 3.56E+05 2.54E+01 0
569231.10 1516094.08 84.30 3.47E+05 2.92E+01 0
881924.08 1467187.82 98.38 3.24E+05 3.19E+01 0
1831221.78 1516094.08 99.94 3.03E+05 3.03E+01 0
3124585.54 1467187.82 79.11 2.97E+05 2.35E+01 0
3988131.36 1516094.08 75.48 3.18E+05 2.40E+01 0
2562033.14 1516094.08 84.61 3.57E+05 3.02E+01 0
1354674.80 1467187.82 89.02 3.77E+05 3.36E+01 0
1005357.70 1516094.08 97.96 3.80E+05 3.72E+01 0
565763.82 1467187.82 83.35 3.76E+05 3.14E+01 0
492977.53 1516094.08 78.99 3.64E+05 2.88E+01 0
3.45E+05

Jumlah Hari 2015


Pola Operasi Waduk
15
January 1.60
16
14 1.40
February
14
1.20
15
March
16 1.00
15
Q infow (m3/s)

April 0.80
15 El eva s i
0.60 Qi n
15
May Qout
16 0.40
15
June 0.20
15
15 0.00
ry ch i l July y e ly st er r r r
ua Ar Ap
r
M
a
Ju
n J u g u b16 o be be be
M u e m ct m m
A pt 15 O ve ce
August Se No De
16
Bulan 15
September
15
Q spillway V akhir Elevasi Akhir

0.00 1.25E+07 184.75


0.00 1.20E+07 183.01
0.00 1.09E+07 179.06
0.00 9.89E+06 175.35
0.00 9.58E+06 174.19
0.00 1.06E+07 177.87
0.00 1.26E+07 184.93
0.00 1.36E+07 188.40
0.00 1.37E+07 188.92
0.00 1.35E+07 188.26
0.00 1.29E+07 186.08
0.00 1.19E+07 182.80

PolaOperasionalTahun 2015

1260.852
Kurv a Per ba ndi ng a n Infow & O utf l ow ( Q=50 % )
KURVA MASSA POLA OPERASI RENCANA (Q=50%)

KURVA MASSA POLA OPERASI RENCANA (Q=50%)


OPERASI RENCANA (Q=50% )

SSA POLA OPERASI RENCANA (Q=50%)


SIMULASI TAHUN KERING 2015 (Q=80%)

Bulan Jumlah Hari Elevasi Awal V awal Q in Q out


m m3/s m3/s
1.64E+02 January 31 179.77 10711890.29 0.97 9.15E-01
1.64E+02 February 29 178.94 10432889.75 0.49 9.15E-01
1.59E+02 MArch 31 173.33 8645112.84 0.35 9.15E-01
1.50E+02 April 30 164.48 6184331.09 0.42 9.15E-01
1.42E+02 May 31 155.11 4058436.43 0.86 9.15E-01
1.38E+02 June 30 150.68 3223432.63 2.48 9.15E-01
1.51E+02 July 31 165.13 6352429.04 2.73 9.15E-01
1.65E+02 August 31 180.17 10850139.28 1.65 9.15E-01
1.70E+02 September 30 185.85 12875182.45 1.32 9.15E-01
1.73E+02 October 31 189.54 14291732.03 0.72 9.15E-01
1.73E+02 November 30 188.99 14074225.75 0.34 9.15E-01
1.69E+02 December 31 185.00 12560777.94 0.37 9.15E-01
179.77 10711890.30
0.00 1.92E+03 1.06
el awal = el akhir elevasi * q

174.75

Pola Oper
200.00
180.00
160.00
140.00
120.00
100.00
Elevasi (m)

80.00
60.00
40.00
20.00
0.00
ry ry ch ri l ay ne ly
n ua rua Ar Ap M Ju Ju
b M A
Ja Fe

Bulan
V in V out Ea Luas permukaan Evap V spillway
m3 m3 mm/bln m2 m3
2598048.00 2450049.45 77.58 3.28E+05 2.55E+01 0
1215216.00 2291981.75 71.27 3.24E+05 2.31E+01 0
924048.00 2450049.45 84.30 2.92E+05 2.46E+01 0
1088640.00 2371015.60 98.38 2.43E+05 2.39E+01 0
2290032.00 2450049.45 99.94 1.92E+05 1.92E+01 0
6428160.00 2371015.60 79.11 1.69E+05 1.33E+01 0
7298640.00 2450049.45 75.48 2.47E+05 1.86E+01 0
4419360.00 2450049.45 84.61 3.31E+05 2.80E+01 0
3421440.00 2371015.60 89.02 3.63E+05 3.23E+01 0
1915056.00 2450049.45 97.96 3.84E+05 3.76E+01 0
868320.00 2371015.60 83.35 3.81E+05 3.17E+01 0
977616.00 2450049.45 78.99 3.58E+05 2.83E+01 0
3.28E+05

Jumlah Hari 2015


Pola Operasi Waduk
15
January 3.00
16
14
February 2.50
14
15
March 2.00
16
15
Q infow (m3/s)

April 1.50
15 El eva s i
Qi n
15 1.00
May Qout
16
15 0.50
June
15
15 0.00
ry ch i l July y e ly st er r r r
ua Ar Ap
r
M
a
Ju
n J u g u b16 o be be be
M u e m ct m m
A pt 15 O ve ce
August Se No De
16
Bulan 15
September
15
Q spillway V akhir Elevasi Akhir

0.00 1.09E+07 178.94


0.00 9.36E+06 173.33
0.00 7.12E+06 164.48
0.00 4.90E+06 155.11
0.00 3.90E+06 150.68
0.00 7.28E+06 165.13
0.00 1.12E+07 180.17
0.00 1.28E+07 185.85
0.00 1.39E+07 189.54
0.00 1.38E+07 188.99
0.00 1.26E+07 185.00
0.00 1.11E+07 179.77

PolaOperasionalTahun 2015

1260.852
Kurv a Per ba ndi ng a n Infow & O utf l ow ( Q=50 % )
KURVA MASSA POLA OPERASI RENCANA (Q=50%)

KURVA MASSA POLA OPERASI RENCANA (Q=50%)


OPERASI RENCANA (Q=50% )

SSA POLA OPERASI RENCANA (Q=50%)


Tahun Jan Feb Mar Apr Mei Jun Jul Ags Sep

2004 0.65 0.21 0.06 0.34 0.68 1.41 1.07 0.39 0.41
2005 0.84 0.37 0.33 0.64 1.46 1.09 1.49 1.12 0.55
2006 0.99 0.85 0.5 0.43 0.85 3.86 2.58 0.96 0.52
2007 0.87 0.46 0.17 0.55 0.68 2.85 1.9 1.34 1.3
2008 1.09 0.85 0.37 0.56 1.66 2.62 3.29 4.62 4.09
2009 1.03 0.51 0.23 0.17 0.69 0.79 0.98 0.52 0.33
2010 0.95 0.38 0.21 0.16 0.66 2.34 2.87 3.25 1.88
2011 1.03 0.84 0.5 0.54 3.69 3.74 3.08 1.96 1.34
2012 0.75 0.43 0.68 0.41 2.13 4.3 4.8 3.61 1.95
2013 1.09 0.95 0.36 0.36 0.86 1.21 5.19 4.24 2.42
Jumlah 9.29 5.86 3.42 4.16 13.37 24.2 27.25 22 14.8

Rata-rata 0.93 0.59 0.34 0.42 1.34 2.42 2.72 2.2 1.48

Max 1.09 0.95 0.68 0.64 3.69 4.3 5.19 4.62 4.09
Min 0.65 0.21 0.06 0.16 0.66 0.79 0.98 0.39 0.33
Debit
andalan 0.97 0.49 0.35 0.42 0.86 2.48 2.73 1.65 1.32
50 %
Debit
andalan 0.84 0.38 0.21 0.34 0.68 1.21 1.49 0.96 0.52
80 %
Debit
andalan 0.75 0.37 0.17 0.17 0.68 1.09 1.07 0.52 0.41
90 %

1 0.090909 1.09 0.95 0.68 0.64 3.69 4.3 5.19 4.62


2 0.181818 1.09 0.85 0.5 0.56 2.13 3.86 4.8 4.24
3 0.272727 1.03 0.85 0.5 0.55 1.66 3.74 3.29 3.61
4 0.363636 1.03 0.84 0.37 0.54 1.46 2.85 3.08 3.25
5 0.454545 0.99 0.51 0.36 0.43 0.86 2.62 2.87 1.96
6 0.545455 0.95 0.46 0.33 0.41 0.85 2.34 2.58 1.34
7 0.636364 0.87 0.43 0.23 0.36 0.69 1.41 1.9 1.12
8 0.727273 0.84 0.38 0.21 0.34 0.68 1.21 1.49 0.96
9 0.818182 0.75 0.37 0.17 0.17 0.68 1.09 1.07 0.52
10 0.909091 0.65 0.21 0.06 0.16 0.66 0.79 0.98 0.39
Q50 0.97 0.485 0.345 0.42 0.855 2.48 2.725 1.65
Okt Nov Des Rata-rata

0.38 0.14 0.05 0.48


0.37 0.39 0.42 0.76
0.18 0.06 0.24 1.00
0.91 0.53 0.55 1.01
1.97 0.85 0.64 1.88
0.44 0.22 0.18 0.51
0.7 0.45 0.66 1.21
0.73 0.26 0.31 1.50
0.85 0.28 0.11 1.69
1.03 0.39 0.47 1.55
7.55 3.58 3.64

0.75 0.36 0.36

1.97 0.85 0.66


0.18 0.06 0.05

0.72 0.34 0.37 1.06

0.38 0.22 0.18 0.62

0.37 0.14 0.11 0.49

4.09 1.97 0.85 0.66


2.42 1.03 0.53 0.64
1.95 0.91 0.45 0.55
1.88 0.85 0.39 0.47
1.34 0.73 0.39 0.42
1.3 0.7 0.28 0.31
0.55 0.44 0.26 0.24
0.52 0.38 0.22 0.18
0.41 0.37 0.14 0.11
0.33 0.18 0.06 0.05
1.32 0.715 0.335 0.365

You might also like