PLANT PROC-FC-CB/NASHPA/PROJ-1247/2015
OGDCL
Zealcon Vendor HBP/HH ZEL
(Owner
(Representative) (Representative) (EPC contractor) (Consultant)
representative)
Date: Date: Date: Date: Date:
□ YES√,NO×
□ YES√,NO×
objects inside the disc, such as transport pads, supports or tools. □ YES√,NO×
1.2.4 检查装置的内、外是否清洁。Check whether all devices are clean inside and outside. □
YES√,NO×
□ YES√,NO×
1.1.2 检查吸干机和制氮机接线是否松动。Check whether the wiring of the dryer box & nitrogen box
is loose。
□ YES√,NO×
NASHPA GAS PROCESSING AND LPG RECOVERY PLANT
PROC-FC-CB/NASHPA/PROJ-1247/2015
DOC. NO. DOCUMENT NO.: NGP-001-SAT-15.71-001-A1
SAT FOR INSTRUMENT & UTILITY AIR AND NITROGEN
DESCRIPTION GENERATION SYSTEM
PAGE 3 OF 5
grounded □ YES√,NO×
□ YES√,NO×
YES√,NO×
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
NASHPA GAS PROCESSING AND LPG RECOVERY PLANT
PROC-FC-CB/NASHPA/PROJ-1247/2015
DOC. NO. DOCUMENT NO.: NGP-001-SAT-15.71-001-A1
SAT FOR INSTRUMENT & UTILITY AIR AND NITROGEN
DESCRIPTION GENERATION SYSTEM
PAGE 4 OF 5
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
□ YES√,NO×
3.2 空压机、吸干机打到远程控制模式后,启动设备是否正常。
Air compressor & dryer remote control test at remote mode.
□ YES√,NO×
running. □ YES√,NO×
注意:在进行负荷试验时,相关人员需佩戴护耳设备。
Note: During the load test, the relevant personnel need to wear ear protection equipment.
comments: