You are on page 1of 4

APPLYING CUTOFFS

A number of useful results are derived from porosity, saturation, and permeability answers. For
hand picked data, there may only be a few results from each of several zones. Each zone must
be summed and averaged separately. For digitized data, many data points are summed before
the average is taken over specific zones or layers. The spreadsheets called META/ESP and
META/COR are available on the Downloads tab at www.spec2000.net that makes the work
relatively painless. The META/ESP spreadsheet does the full log analysis as well as the sums
and averages.

It is normal to apply cutoffs to each calculated result to eliminate poor quality or unproductive
zones. Cutoffs are usually applied to shale volume, porosity, water saturation, and
permeability. The layer is not counted as �pay� if it fails any one of the four cutoffs.

Typical cutoffs are:


1: Vsh <= VSHmax
2: PHIe >= PHImin
3: Sw <= SWmax
4: Perm >= PERMmin

Where: VSHmax = 0.25 � 0.40


PHImin = 0.03 � 0.16
SWmax = 0.30 � 0.70
PERMmin = 0.1 � 5.0 mD

The values chosen must be appropriate for the rock sequence.

Since porosity is somewhat proportional to shale volume, saturation somewhat proportional to


porosity, and permeability somewhat proportional to all three, it is desirable to choose a
balanced set of cutoffs. Balanced cutoffs in a hydrocarbon bearing zone usually will fail a layer
with more than one cutoff. If only one cutoff fails a layer, the cutoffs may need some
adjustment.

Cutoffs can be tested against production flowmeter data and can be tuned, in some cases,
based on actual production rates

The basic calculations are described in the following sections:

Flow capacity (KH) from log analysis can be calibrated to Kh from core, or from DST analysis,
with certain restrictions.

NET PAY AND MAPPABLE RESERVOIR PROPERTIES


Average and cumulative rock properties are the usual result required from a log analysis.
Cutoffs should be applied to each layer before summing and averaging. These data are often
posted on maps and contoured to define reservoir boundaries, quality, volume, and
productivity.

There are many incorrect ways to sum and average the reservoir properties. The following
constitutes the ONLY correct way:

STEP 1: Calculate specific volumes by summing layers which pass shale, porosity, saturation,
and permeability cutoffs:
1: PV = SUM (PHIe * THICK)
2: HPV = SUM (PHIe * (1 � Sw) * THICK)
3: KH = SUM (Perm * THICK)
4: NetPay = SUM (THICK)
STEP 2: Calculate averages:
5: PHIavg = PV / NetPay
6: SWavg = 1 � (HPV / PV)
7: Kavg = KH / NetPay
8: Khar = (1 / SUM (1 / (Perm * THICK))) / NetPay

Some computer programs print cumulative pore volume, hydrocarbon pore volume, and flow
capacity over large intervals. Subtract the values at two depths to get the sum over the interval
between the depths. Others print a summary page over specific intervals defined by the user.
Be sure the interval matches the desired zone.

USAGE RULES:

� Apply cutoffs to each layer before summing. Usually Vsh, PHIe, Sw, and Perm are
checked. If the data point fails any one of the cutoffs, then the layer is not counted as pay. A
Phi*Sw cutoff is also useful to detect zones that will make water as well as hydrocarbon.

� These procedures can be applied to log or core data.

� Cumulative volume results are in feet or meters per unit area and flow capacity is in md -
feet or md - meters.

� Net pay is seldom a good indicator of the quality of a zone unless porosity and water
saturation are constant throughout the zone in all wells.

� Both hydrocarbon pore volume and flow capacity should be mapped to determine zone
quality.

� Recoverable reserves and, in some jurisdictions, maximum permissible flow rate are
determined by hydrocarbon pore volume.

� The economics and risk assessment of a well depend almost entirely on flow capacity.
Example of a log analysis with cutoffs applied. The result is a Net Pay Flag (red bar in Track 1,
next to depth track). Due to the low permeability barriers between the three pay intervals, it
may be necessary to perforate all three zones to optimize ultimate recovery from this well.
Cutoffs used were Vsh <= 0.45, PHIe >= 0.08, and Sw <= 0.65.

Net pay summary table shows mappable properties of each reservoir layer. HCPV
(hydrocarbon pore volume) is used to calculate oil or gas in place (and reserves if recovery
factor can be estimated from similar prospects). KH (flow capacity) is used to estimate initial
productivity. Note that the lower zone has more than 15 times the flow capacity of the other two
(KH = 174 versus 7 and 4 mD-m). Not perforating it could result in an uneconomic well.

PRODUCTIVITY INDEX
Estimating productivity is a useful way to compare
the quality of wells from similar reservoirs, even
when results are not calibrated.

STEP 1: Productivity index


1: Qo = KV1 * Kh * (PF � PS) / VISO
2: Qg = KV2 * Kh * ((PF � PS) ^ 2) / (FT +
KT2)

Where: KV1 = 0.0001 for English units (bbl/day)


KV1 = 0.000 007 560 for Metric units (m3/d)
KV2 = 0.0001 for English units (mcf/day)
KV2 = 0.000 010 920 for Metric units (m3/d)
KT2 = 460 'F for English units
KT2 = 273 'C for Metric units

Results are in bbl/day or m3/day for oil and mcf/d or e3m3/day for gas. The estimated flow rate
(Qo or Qg) is called the initial deliverability, Qd. Wells are often rate limited by law or facilities
to an initial rate, Qi, which is less than deliverability, Qd.

USAGE RULES:

 Use only if zone is not fractured. Use KH from DST if zone is fractured.

 Calibrate KH from logs with core and/or un-stimulated DST, perf test, or initial production.

 These formulas should be used as guides to well quality only. However, by calibrating
permeability to core and production data, a reasonable match can be made.

 Even if results cannot be calibrated, due to lack of data, the productivity gives a good
method for comparing the relative quality of two zones.

You might also like