INSPECTION REQUEST

TO BE FILLED-IN BY CONTRACTOR
Contractor Request No: ASKEC-M707-PX –A-Civil-128
Check the box if this is a request for re-inspection
PROJECT TITLE : Construction of 380kV D/C OHTL interconnected to Dharan South, New Dharan
Central and DHO BSP
CONTRACT NO. : 4400008460 B.I.NO. : J.O. NO. :
NAME OF CONTRACTOR : Al Sharif Group & KEC Limited Co. (ASKEC)
INSPECTION CATEGORY AND APPLICATION (Check Appropriate Box):
X Civil / Architectural Electrical Safety
Mechanical Communication Others (Specify)
1. Item for Inspection : 1st Stage Concrete Pre-Pouring
(Portion X - A)
2. Relevant Specs. and Drawings : PTS – 14EO335
3.
T#6 (2 Legs) Inspection
Location: Date: 30-06-2018 5. Time: 09.00 AM
Work is ready for inspection and complies with the Scope of Work and Technical Specifications.

Name, Signature and Date: Prabhakar Sekar Mobile. No.: 0544263239


Contractor’s QA/QC Engineer E Mail ID: sekarp@kecrpg.com
TO BE FILLED-IN BY CTAPD
TO: Division Manager, TAPD/TSPD, Rm. 1-200E, SEC-EOA (Tel. No. 858-6866, Fax No. 858-5376)
Division Manager, ISD/FF&LPD, Rm. 3-100E, SEC-EOA (Tel. No. 858-5120, Fax No. 858-5397)
Supervisor, TS&SD/ESD/PQS, Rm. 1-200E, SEC-EOA (Tel. No. 858-6627, Fax No. 858-6447)
X Others: “AJEC ENGINEERS”
Please send your Engineer to conduct inspection of the work covered by this Inspection Request
Tel. No.: 84960
Mobil No.: 0532984743
Mr. Mohammed S. Nemr Email. ID.: msnemr@se.com.sa
Project Engineer, EHVPD
TO BE FILLED-IN BY TS&SD/ESD, TAPD/TSPD, ISD/FF&LPD, SMED\P&T or BY OTHERS
INSPECTION RESULTS AND COMMENTS: Control No.: ASKEC-M707-PX –A-
Civil-128
1. Inspection Date and Time:
2. Results and Comments: X See Below X Refer to Logbook Page No.

Inspected by: Return To:


Signature: Name: Prabhakar Sekar
Name/Dept./Div.:
Date: Tel. No.: Rm. 2-200E, SEC-EOA Tel. No.:
Note: Send this Inspection Request 48-hour prior to start of the activity except re-inspection and concreting work where only 24-
hours advance notice is required.

You might also like