Joint locations erection sequence should be ‘Heavy’ panels are panels the

Door and window openings should be considered. Panels with openings crane may lift from a favourable
considered when determining the should preferably be placed on top position, ie lifted and erected close
location of joints. The panel width of stacks to eliminate the need for to the crane setup position. It is
next to an opening, and the panel blocking out the openings to form unlikely that all panels will be
depth over a wide opening, must subsequent panels. ‘heavy’ panels, so a few ‘heavy’
provide sufficient structural strength ■ Cranage - consideration should be panels may be able to be
to allow for the support of the panel, given to matters such as crane accommodated by planning the
plus lifting and erection forces. capacity, lifting locations to casting location or delivery access,
minimise the number of setups and crane setup with respect to the
Economics and access. final panel location.
■ Structural layout - the structural Note: While the Engineer needs to Once the crane size has been
layout, particularly the rafter consider all these matters, others confirmed, the panel area and size
spacing, will often determine the involved in the process also have can then be determined. As a guide,
joint locations and panel responsibility for specific areas, eg for the common panel thicknesses,
dimensions. Panel dimensions casting, delivery sequence, cranage, the panel weights for a concrete
should not dictate the frame temporary propping. density of 2400 kg/m3 are given in
spacing as the cost per square Table 2. For heavily reinforced
metre for panels of comparable Marketability of the building panels, the additional weight of the
size is about the same, whereas This involves both the utility and reinforcement may need to be
closer than optimum frame aesthetics of the building. Utility considered to accurately determine
spacing can incur considerable covers items such as the the appropriate cranage.
extra cost. If factory precast requirements for access, column-
panels are used, transport free space and flexibility
restrictions on panel size may to meet the needs of Table 2: Weight of common panel thicknesses
dictate the layout. subsequent
■ Construction at or near the owners/occupiers. Panel thickness Panel weight
boundary - if walls are located at Aesthetics involves an (mm) (t/m2)
or near the boundary, this will acceptable level of finish 130 0.32
affect the footing design. Also, if to the panels and facade 150 0.36
adjacent buildings are on the features to give an 175 0.42
boundary, consideration needs to appealing exterior.
be given to matters such as the Provision for later
erection process, base joint removal of panels to create
details, sealing of wall joints and openings or allow the building to Panel Systems
flashing between buildings, as be extended may also be a
work must be completed from one consideration. Concrete panels can be used either
side only. as cladding to the building, or as
■ Rafters supported by panels - Crane Size part of the loadbearing structure,
can the panel layout and openings supporting roof and wind loads,
allow panels to be designed to While the final practicality of lifting Figure 1.
carry the roof framing, or are panels must be verified with the Using panels as loadbearing
columns required in some crane contractor using appropriate elements generally reduces the
locations? crane charts (for the available crane), overall cost due to a decrease in the
■ Casting areas - can the floor slab the information in Table 1 can be weight of structural steelwork
be used as a casting bed or are used as a starting guide to the panel required. Even though more roof
temporary casting beds required? weights that can be lifted by various bracing is required, eliminating the
To ensure the quality of panels, sized cranes. columns usually provides greater
the surface tolerances, joint savings. Also, in terms of
details (sealing of joints) and the programming, the
Table 1: Crane size to panel weight
surface finishing panels can be cast and
requirements should be erected prior to the
Panel Weight
considered. Panels precast delivery of steelwork,
Crane Capacity Typical Heavy
off-site will eliminate the allowing time for
(t) (t) (t)
need for areas to be made fabrication of the
50 (hydraulic) 10 - 15 18
available for casting, a steelwork. If the concrete
70 12 - 18 23
significant consideration if the panels are used as
120 - 140 18 - 25 35
site is congested. cladding, the steelwork
200 10 - 28 50
■ Stack casting - the stacking is usually on the critical
order to enable an efficient path for the project.