You are on page 1of 16

TASK

task_code status_code wbs_id


Activity ID Activity Status WBS Code
A1000 Not Started P1
A1010 Not Started P1.WBS 1
A1020 Not Started P1.WBS 4
A1030 Not Started P1.WBS 3
A1040 Not Started P1.WBS 2
A1050 Not Started P1.WBS 1
A1060 Not Started P1.WBS 4
A1070 Not Started P1.WBS 3
A1080 Not Started P1.WBS 2
A1090 Not Started P1

Page 1
TASK

task_name start_date end_date


Activity Name (*)Start (*)Finish
start 7/11/2011 7:00:00 AM 7/11/2011 7:00:00 AM
Activity 1 7/11/2011 7:00:00 AM 7/18/2011 1:00:00 PM
Activity 2 7/11/2011 7:00:00 AM 7/13/2011 11:00:00 AM
Activity 3 7/18/2011 1:00:00 PM 7/25/2011 11:00:00 AM
Activity 4 7/13/2011 11:00:00 AM 7/15/2011 3:00:00 PM
Activity 5 7/15/2011 3:00:00 PM 7/20/2011 9:00:00 AM
Activity 6 7/13/2011 11:00:00 AM 7/14/2011 5:00:00 PM
Activity 7 7/25/2011 11:00:00 AM 7/27/2011 3:00:00 PM
Activity 8 7/27/2011 3:00:00 PM 7/29/2011 11:00:00 AM
finish 7/29/2011 11:00:00 AM 7/29/2011 11:00:00 AM

Page 2
TASK

resource_list delete_record_flag
(*)Resources Delete This Row

Page 3
TASKPRED

pred_proj_i proj_id PREDTASK_TASK__PROJpred_task_i task_id PREDTASK_TASK__tas


(*)Predeces(*)Successo(*)Predece (*)Success Predecesso Successor (*)Predeces(*)Successo
P1 P1 P1 PROJECTP1 PROJECTA1000 A1010 start Activity 1
P1 P1 P1 PROJECTP1 PROJECTA1000 A1020 start Activity 2
P1 P1 P1.WBS 1 P1.WBS 1 A1010 A1030 Activity 1 Activity 3
P1 P1 P1.WBS 4 P1.WBS 4 A1020 A1040 Activity 2 Activity 4
P1 P1 P1.WBS 2 P1.WBS 2 A1040 A1050 Activity 4 Activity 5
P1 P1 P1.WBS 4 P1.WBS 4 A1060 A1050 Activity 6 Activity 5
P1 P1 P1.WBS 4 P1.WBS 4 A1020 A1060 Activity 2 Activity 6
P1 P1 P1.WBS 3 P1.WBS 3 A1030 A1070 Activity 3 Activity 7
P1 P1 P1.WBS 1 P1.WBS 1 A1050 A1080 Activity 5 Activity 8
P1 P1 P1.WBS 3 P1.WBS 3 A1070 A1080 Activity 7 Activity 8
P1 P1 P1.WBS 2 P1.WBS 2 A1080 A1090 Activity 8 finish

Page 4
TASKPRED

pred_type lag_hr_cnt PREDTASK__TASK__stat PREDTASK__TASK__rsrc_delete_record_flag


Relationshi Lag(d) (*)Predeces(*)Successo(*)Predeces(*)SuccessoDelete This Row
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte
FS 0 Not Starte Not Starte

Page 5
PROJCOST

task_id cost_name TASK__stat target_cost act_cost remain_costotal_cost delete_record_flag


Activity ID Expense It (*)Activity Budgeted CActual CostRemaining At Complet Delete This Row

Page 6
PROJCOST

delete_record_flag
Delete This Row

Page 7
RSRC

rsrc_short rsrc_name rsrc_type unit_id role_id def_qty_per_hr


Resource I Resource (*)ResourceUnit of Mea(*)Role ID Default Units / Time(h/d)
Project Cos Project Co Nonlabor 8
Site L Sitework LaLabor 8
Design Design Cos Labor 8
Structure L Structural Labor 8
Ext. FinisheExterior Fi Labor 8
Int.Finishes Interior Fin Labor 8
Mech L Heating, Ai Labor 8
Elev L Elevator La Labor 8
Elec L Electrical Labor 8
Site NL Site Non LaNonlabor 8
Site M Site MateriaMaterial Hour 8
Structure NStructure NNonlabor 8
Structure MStructure MMaterial Hour 8
Ext. Finish Exterior Fi Nonlabor 8
Ext Finishe Exterior FinMaterial Hour 8
Interior Fin Interior Fin Nonlabor 8
Interior Fin Interior Fin Material 8
Elev NL Elevator NoNonlabor 8
Elev M Elevator MaMaterial Hour 8
Mech NL Heating, Ai Nonlabor 8
Mech M Heating, Ai Material Hour 8
Electrical NElectrical Nonlabor 8
Electrical MElectrical MMaterial Hour 8
Foundation Foundation Labor 8
Foundation Foundation Nonlabor 8
Foundation Foundation Material Hour 8
Foundation Foundation Labor 8
Foundation Steve Stee Labor 8
Structure L Gary HeinriLabor 8
Subcontrac Subcontrac Labor 8
Survey Site SurveyLabor 8
Innovative Innovative Labor 8
IS Informatio Labor 8
Purchasing Purchasing Labor 8
Design EngDesign EngLabor 8
ManagemenManagemenLabor 8
Highway Pr Resources fLabor
Construct Constructi Labor 8
PRINTCST Printing Co Nonlabor
ENGR Proje Resources fLabor
School School Proj Labor 8
GR George RobLabor IT 8
PK Paul Kim Labor 8
WR Wendy Res Labor 8
AC Ace Corp Labor Accounting 8
JY Jeff Young Labor Manage 8
CostEng Cost Engin Labor
PMs Project Ma Labor 8

Page 8
RSRC

OR Oliver RockLabor Accounting 8


StructEng Structural Labor
InstrEng InstrumentaLabor
Highway LaHighway LaLabor 8
School Sub Subcontrat Nonlabor 8
Construct Material Re Material 8
ENGR Labo Engineer L Labor 8
ED Ed Wood Labor 8
ElecEng Electrical Labor
Exec Executive Labor 8
CivilEng Civil Engin Labor
Construct LLabor Reso Labor 8
AM Ashok MehtLabor IT 8
Schedulers Project Ma Labor 8
Highway MaHighway MaMaterial 8
Arch Senior ArchLabor
MechEng Mechanical Labor
ProgrammeProgrammeLabor IT 8
Fld Eng1 Field Eng-S Labor IT 8
Rghcarp Rough CarpLabor Trades 8
Machinist Machinist Labor Trades 8
Painter Painter Labor Trades 8
Electrcn Electrician Labor Trades 8
GENCNTR General ConLabor
Sfwr Eng Software E Labor IT 8
HV2KATYD Katy Dunn, Labor
Plumber Plumber Labor Trades 8
Hvac Tec Heating VeLabor Trades 8
Excavatr Excavator Labor Trades 8
HV1TEDG Ted Green, Labor
Finisher Finisher Labor Trades 8
Irwk Ironworker Labor Trades 8
Fld Eng2 Field Engin Labor IT 8
Op Eng Operating Labor Trades 8
ME1MARKHMark Hall, Labor
Fld Eng3 Field Eng-A Labor IT 8
Elev Inst Elevator InsLabor Trades 8
ST2JENM Jen Martin, Labor
PM1BOBP Bob PattersLabor
PM1SUEW Sue White, Labor
Mason Mason Labor Trades 8
CT2FRANK Frank Dans Labor
CV2MIKEH Mike Hall, CLabor
EE1BARBW Barb Wire, Labor
EE2BILLS Bill SandersLabor
Hdwr Spec Hardware Sp Labor IT 8
PE3 Planning EnLabor
PEXEC Project Exe Labor
Fnshcarp Finishes Ca Labor Trades 8
Flrlyr Floor and CLabor Trades 8

Page 9
RSRC

ME2DEBO Deb O'BrienLabor


Laborer Laborer-ConLabor Trades 8
ME1GREGVGreg Van, SLabor
PAVER Asphalt PavLabor
ST1LISAH Lisa Hall, S Labor Manage
ST2GREGM Greg Miller Labor
STRIPPER Paint StrippLabor
SHEETING Sheeting DrLabor
CARP Carpenter Labor
FOREMAN Foreman Labor
DRIVER Truck Drive Labor
ELEC Electrician Labor
LABOR-G General La Labor
LABOR-S Skilled Lab Labor
Piping Mat Piping MateMaterial Cubic yards
IE2PAULK Paul Kelly, Labor
IE2PETEL Pete Lopez,Labor
CV1KERIB Keri Brown,Labor
IE1BRETS Bret SanderLabor
AR1LORIW Lori White, Labor
CT1KELLY Kelly Frank Labor
OPERL Equipment O Labor
LANGPAV Lang Pavin Nonlabor Site 8
POSTDRVR Post Driver Labor
OPERATOR Equipment Labor
BRISTLE Bristle Pai Material Hour 8
JOLT Jolt Electri Nonlabor Elec 8
STONY Stony MasoNonlabor Mason 8
HASKLE Haskle Mech Nonlabor HVAC 8
CNTYLN County LineNonlabor Struct 8
ALPHA Alpha Plum Material Hour 8
LOADER Loader/Bac Material Each 8
SPREADER Aggregate Material Each
CV2WILLS Will Summer Labor
ROLLER1 Roller, Tan Material Each
ROLLER2 Roller, Ste Material Each
TRUCK Truck - Flat Material Each
TRUCKD Dump Truc Material Each
VIBRATOR Gas Engine Material Each
CRANE Truck Cran Material Each
DOZER Dozer, 200 Material Each
COMPR Air Compre Material Each
GOCRETE Go Concret Nonlabor Conc 8
REGENT Regent ConNonlabor CW 8
Edison Res Edison Hig Nonlabor 8
Cont Contractor Nonlabor 8
02 Division 02 Nonlabor 8
Demo Demolition Nonlabor 8
Lofty ResouLofty HeighNonlabor 8
LH Labor LH Labor Labor Corp 8

Page 10
RSRC

LH Non-LabLH Non-LabNonlabor 8
LH ExpenseLH ExpenseNonlabor 8
LH MaterialLH MaterialMaterial Lump Sum 8
LH Subs LH Sub-ContNonlabor 8
01 Division 01 Nonlabor 8
11 Division 11 Nonlabor 8
07 Division 07 Nonlabor 8
15 Division 15 Nonlabor 8
08 Division 08 Nonlabor 8
05 Division 05 Nonlabor 8
03 Division 03 Nonlabor 8
10 Division 10 Nonlabor 8
06 Division 06 Nonlabor 8
09 Division 09 Nonlabor 8
12 Division 12 Nonlabor 8
14 Division 14 Nonlabor 8
16 Division 16 Nonlabor 8
04 Division 04 Nonlabor 8
Curb Curb & Wal Nonlabor 8
Earth Earthwork Nonlabor 8
Pave Paving Cre Nonlabor 8
Conc Concrete C Nonlabor 8
Drain Storm Drai Nonlabor 8
Surv Survey Cre Nonlabor 8
Irrig Irrigation Nonlabor 8
Mas Masonry CrNonlabor 8
Tilt Tiltwall Cr Nonlabor 8
Door Doors & Fr Nonlabor 8
Fin Finish Har Nonlabor 8
Win Window Fr Nonlabor 8
Glaz Glass Crew Nonlabor 8
Landsc Landscape Nonlabor 8
Dry Drywall Cr Nonlabor 8
Plas Plaster Cre Nonlabor 8
Tile Tile Crew Nonlabor 8
AccC Accoustical Nonlabor 8
WdFlr Wood Floor Nonlabor 8
Oflr Other Floor Nonlabor 8
Paint Painting Cr Nonlabor 8
Steel Steel Crew Nonlabor 8
Spec Specialties Nonlabor 8
Clean Cleaning C Nonlabor 8
Insul Insulation Nonlabor 8
Roof Roofing Cr Nonlabor 8
Clear Site Cleari Nonlabor 8
Ath Athletic E Nonlabor 8
Blind Blind & Sh Nonlabor 8
Elev Elevator C Nonlabor 8
HVAC HVAC Crew Nonlabor 8
Plum Plumbing CNonlabor 8

Page 11
RSRC

FS Fire Suppre Nonlabor 8


Punch Punch CrewNonlabor 8
Ins Insurance Nonlabor 8
FGC Field GenerNonlabor 8
Bond Project BonNonlabor 8
Conting ContingencNonlabor 8
OHP Overhead &Nonlabor 8
CF ConstructioNonlabor 8
EnvironmenEnvironment Labor 8
Geotech Geotechnic Labor 8
Demolition Demolition Labor 8
Concrete Concrete F Labor 8
Masonry Masonry SuLabor 8
Structural Structural Labor 8
Specialty MSpecialty MLabor 8
Rough CarpRough CapeLabor 8
Finish Carp Finish Carp Labor 8
Millwork CaMillwork SuLabor 8
Thermal ProThermal ProLabor 8
Sheet MetaSheet MetalLabor 8
Roofing Roofing SubLabor 8
Glass Glass & GlaLabor 8
Drywall Drywall SubLabor 8
Finishes Finishes & Labor 8
Flooring Flooring Su Labor 8
Painting Painting Su Labor 8
Specialties FF&E SpeciaLabor 8
Pools Pool Instal Labor 8
Conveying Conveying Labor 8
Fire Suppre Fire Suppre Labor 8
Plumbing Plumbing S Labor 8
HVAC Sub Heating, VeLabor 8
Integrated Integrated Labor 8
Electrical Electrical Labor 8
CommunicaTelecommun Labor 8
Electronic Electronic Labor 8
Earthwork Earthwork Labor 8
Paving Paving & R Labor 8
Utilities Utilities Su Labor 8
Process Process Int Labor 8
LandscapinLandscapinLabor 8
Carptr Carpentry Nonlabor 8
Electr Electrical Nonlabor 8
EMA Ed Mallard Labor PE 8
JLA Jeff Lange Labor Supt 8
KAN Ken AndersLabor PM 8
JRO John Rock Labor 8
LBA Lourdes BarLabor Controls 8
ATE Angel TejadLabor Controls 8
BBU Buck Buch Labor Supt 8

Page 12
RSRC

MMA Mark Mallo Labor Foreman 8


MNE Mark Newt Labor Supt 8
SRO Steve RohaLabor Engineer 8
BFE Bill Feeley Labor Labor 8
TCA Tom Campbe Labor Inspector 8
JGA Juan GarciaLabor Labor 8
DLO Don LouserLabor Controls 8
HEP Harry EpsteLabor PM 8
TNI Tim NicholsLabor Foreman 8
JME Jose MendeLabor Foreman 8
SKE Sean Kenn Labor Supt 8
SFO Sally Foon Labor Clerical/Ad 8
JMI Jane Miller Labor Clerical/Ad 8
SJE Scott Jeffer Labor Labor 8
CSA Chris Sawy Labor Supt 8
JDI Juan Diaz Labor EOper 8
BSM Barb Smith Labor EOper 8
JMO Joe Monmo Labor EOper 8
ACO Alice CoopeLabor Labor 8
JMA Jorge Marti Labor EOper 8
RCR Ray CrammLabor EOper 8
MMO Michael Mo Labor Labor 8
ASW Al Switcher Labor EOper 8
GC General ConLabor 8
Frame Framing CoLabor 8
Cranes Cranes Labor 8
Stucco Stucco Labor 8
LABOR-H Highway LaLabor
Project SpecProject Spe Labor 8
CV1ERUA Erun Azia, Labor
EXT External re Labor 8
IMC IMC Nonlabor 8
MKC MKC Nonlabor 8
School Lab Labor Labor 8
School Car School Car Labor Carpentry 8
mikeb Mike BrownLabor 8
bobm Bob McArthu Labor 8
trents Trent SmithLabor PM 8
johnm John McDouLabor PM 8
charlesn Charles NorLabor BA 8
frankl Frank Lee Labor PM 8
georgea George AbrLabor 8
rajp Raj Patel, Labor SD 8
team TEAM MEM Labor SN 8

Page 13
TASKRSRC

task_id TASK__stat rsrc_id role_id acct_id rsrc_type cost_per_qtstart_date


Activity ID (*)Activity Resource I Role ID Cost Accoun(*)Resource(*)Price / U (*)Start

Page 14
TASKRSRC

end_date delete_record_flag
(*)Finish Delete This Row

Page 15
USERDATA

user_data
UserSettings Do Not Edit

Page 16

You might also like