3300 / 440V TRANSFORMER MAINTENANCE
PROCEDURE

HTCB – VCB (TOSHIBA MAKE)


LTCB – ACB (TOSHIBA MAKE)

1. Obtain work permit from operations for


the required transformer with proper tag Follow
number.
2. Check all the parameters on both HV/LV
side and both LV & HV are closed. Check
both transformers are in service.
3. Prepare caution notice/permit to work
and display it on HV & LV panels.
4. Switch off LV side breaker (ACB), and
then switch off HV side breaker (ACB) of
current tag number. Make sure that there is
no power interruption.
5. Open the HT breaker panel. Lift the latch
pin upward on both the handles pull the breaker outward from service
position to test position.
6. Switch off control supply and remove control plugs and the front o
‘CB’. Remove the stopper plate, pull the VCB outside breaker
compartment
7. Open LV (ACB) breaker panel.
8. Lift the flapper (Middle of breaker – right hand side) upward and insert
rack out/in handle into the slot.
9. Rotate the handle anti-clockwise till it reaches disconnected position.
Pull the ACB outward after lifting the stopper levers on both sides of ACB
10. Position the trolley carrier and move it inside, below the lifting pins or
both sides of ACB. Lift the trolley upward will it carries breaker. Pull the
trolley outside and place the breaker on floor.
11. Release charged spring by manually operating on/off of VCB and ACB.
12. Put the earthing hand le of 3.3 KV side earthing switch compartment
which is above VCB cubicle.
13. Slide the stopper plate towards right hand side, lift earthing leaver and
release the stopper plate.
14. Remove the castle key from ACB, insert in the earthing breaker operate
the key to release the locking pin.
15. Insert the rack-in handle to the slot (right side) and turn it clockwise if
it reaches service position.
16. Remove handle and switch on control supply of earthing switch.
17. Close panel door and turn earthing switch on. Observe earthing
indication.\provide barrier caution tape on both sides of transformer of
correct tag number.
18. Clean whole transformer. Open LV & HV side terminal boxes. Inspect
and tighten terminations hi-speed bushings.
19. Clean and tighten all earthing connections. Popular Posts
20. Measure insulation resistance of primary and secondary windings with
earth and between windings. For HT winding use 2.5KV megger. For LV MECHANICAL FITTER INTERVIEW
winding use 500V megger. Remove LT side neutral link before meggering. QUESTIONS AND ANSWERS
MECHANICAL FITTER INTERVIEW
21. Close the terminal boxes. Check inert gas pressure. Take transformer QUESTIONS AND ANSWERS 1. Define
oil for testing. Valve? Valve is a Mechanical flow
control elem...

http://oilandgaselectricalandinstrumentation.blogspot.com/2013/08/3300-440v-transformer-maintenance.html 1/4
6/20/2018 OIL AND GAS ELECTRICAL AND INSTRUMENTATION ENGINEERING: 3300 / 440V TRANSFORMER MAINTENANCE PROCED…
22. Clean, check and inspect VCB and ACB for looseness and any ELECTRICAL QUESTIONS
abnormality. Apply petroleum jelly for finger contacts. Megger insulation AND ANSWERS
resistance values of terminals. Measure contact resistance of poles. 01. What is the classification
of hazardous area?
23. Check manual operations of ACB and VCB. Hazardous area classified
24. Insert VCB in breaker compartment up to test position. Put back the as Zone - 0, Zone – 1 and
Zone – 2. Zone – 0 a...
stopper flap in position. Make sure breaker is off plug in control pin plugs
and switch on control supply. ELECTRICAL
25. Rack out earthing breaker to disconnected position on LV side. Take ENGINEERING QUESTION
out the castle key. AND ANSWERS
Q: What is vaccum currcuit
26. Insert the ACB using trolley and rack – in by turning rack – in handle
breaker.define with cause
clockwise to service position. and where be use it Device?
27. Perform functional test by operating protective devices. A: A breaker is normally used to break a
circ...
28. Push both breakers to service position. Switch on HT breaker. Observe
voltage. CABLE GLANDS
29. Close LT breaker. Observe voltage and current on both HT & LT sides. Q: What is Cable Gland?
30. Remove caution tags and cancel permit. A:A device designed to
permit the entry of cable in
31. Enter rack – in / rack – out details in substation log book. to electrical equipment
32. Record all readings and values in history cards. which provides sealing, ret...
33. Send oil samples for testing acidity and dielectric strength.
VALVE ACTUATORS
VALVE ACTUATORS Some
type of actuator is necessary
to allow for the positioning of
a valve. Actuators vary from
simple manual ...

SYSTEM OF INSTRUMENT
EARTHING
Instrument earthing system
shall consist of the following
earth type: E lectrical
earthing (also called dirty
earthing or Prot...
Posted by Palanisamy Ganesan at 2:15 AM

MAINTENANCE
PROCEDURE FOR
SUBSTATIONS AND
No comments: SWITCHGEAR
MAINTENANCE
PROCEDURE FOR
Post a Comment SUBSTATIONS AND SWITCHGEAR
GENERAL The maintenance of the
switchgear and electrical ...

Enter your comment... DOL STARTER POWER


AND CONTROL DIAGRAM
DOL STARTER POWER
AND CONTROL DIAGRAM

Comment as: Google Accoun


STAR/DELTA STARTER
CONTROL CIRCUIT

Publish Preview

Newer Post Home Older Post


OIL FIELD CABLES
Subscribe to: Post Comments (Atom) Q. What are the different sizes of the
cables? A. 0.75, 1.5, 2.5, 4, 6, 10, 16, 25,
35, 50, 70, 95, 10, 150, 185, 240, 300,
400...

Total Pageviews

176,375
Search This Blog

Search

Follow by Email

Email address... Submit

Google+ Followers

http://oilandgaselectricalandinstrumentation.blogspot.com/2013/08/3300-440v-transformer-maintenance.html 2/4
6/20/2018 OIL AND GAS ELECTRICAL AND INSTRUMENTATION ENGINEERING: 3300 / 440V TRANSFORMER MAINTENANCE PROCED…
Palanisamy Ganesan
Add to circles

138 have me in circles View all

Blog Archive

► 2014 (73)
▼ 2013 (75)
► December (6)
► November (6)
► October (3)
▼ August (37)
CABLES PHOTO
UPS
DOL STARTER FOR FAN MOTOR
DOL STARTER POWER AND
CONTROL DIAGRAM
3300 / 440V TRANSFORMER
MAINTENANCE PROCEDURE
MAINTENANCE PROCEDURE FOR
SUBSTATIONS AND SWITCHGE...
OIL FIELD CABLES
ILLUMINATION
SAFETY AND GENERAL
POWER TRANSFORMER PARTS
ELECTRICAL QUESTIONS AND
ANSWERS
DIFFERENT KINDS OF RELAYS
MCC/PCC/DB/BC/ES/VCB/SF6
REFINERY BATTERIES
ELECTRICAL METERS
FIRE ALARM SYSTEM
LIGHTNING ARRESTER AND SURGE
SUPPRESSOR
EARTHING
MOTORS CONTACTORS AND
CONDITIONS
AC SINGLE PHASE MOTORS
GROUPING FACTOR
SAFETY GUIDE TO ELECTRICAL
FOREMAN
EARTH LEAKAGE CIRCUIT BREAKER
BASEEFA,INTERNSIC SAFE METERS
AND SAFETY BARRIERS
DEGREE OF PROTECTION OF
ENCLOSURES
COORDINATION OF RELAY AND
UNDER VOLTAGE RELAY:
POWER FACTOR
TYPE OF PROTECTION AND GAS
GROUP
HAZARDOUS AREA OF
CLASSIFICATION
H. T. MOTORS
VARIABLE SPEED DRIVERS
O/H TRANSMISSION
HV CIRCUIT BREAKERS
SWITCHGEAR
TRANSFORMER

http://oilandgaselectricalandinstrumentation.blogspot.com/2013/08/3300-440v-transformer-maintenance.html 3/4
6/20/2018 OIL AND GAS ELECTRICAL AND INSTRUMENTATION ENGINEERING: 3300 / 440V TRANSFORMER MAINTENANCE PROCED…
MOTORS
GENERATOR

► July (23)

About Me

Palanisamy Ganesan
Follow 138

View my complete profile

My Blog List

Petroleum
Community
Forum
PetroMod
2014~2016
needed
4 hours ago

POWER OIL
AND GAS
Storm Harvey
Shut In More
Refineries,
Sending Fuel
Prices Higher
9 months ago

You Are
Entering
Petroleum Zone
(P_Zone)
P_Zone
6 years ago

Home

Error loading feed.

Simple theme. Powered by Blogger.

http://oilandgaselectricalandinstrumentation.blogspot.com/2013/08/3300-440v-transformer-maintenance.html 4/4

You might also like