Name of Project : Agno River Basin Flood Control Project - Construction of Bank Protection along Brgy.

ong Brgy. Capandanan (Phase I), Lingayen, Pangasinan


Description : To construct Gabion Reventment
Goals/Objectives : To mitigate flooding from the affected barangays
Location : Brgy. Angarian, Bugallon, Pangasinan
Project Cost : Php 50,000,000.00(quantities are approximate only, pending to conduct of detailed survey of the river)

INDICATORS WITHOUT THE PROJECT WITH THE PROJECT REMARKS


1. Flood Return Period yearly 10years
2. Inundation Area 80 ha 4 ha
3. Inundation Period 7 days 2 days
4. Affected/Protected Population 4500 people or 900 families 600 people or 150 families
5. Flood Damage P6,500,000.00 Livestock P500,000.00 Livestock
(type and number of structures, properties P7,500,000.00 Properties P500,000.00 Properties
or crops, estimated worth of damages if
flood control structures is not built) P6,000,000.00 Ricestocks P1,000,000.00 Ricestocks
6. Flood Control Structure/s built or to
Gabion of Reventment Construction of Gabion Reventment
be built for the last 10 years
7. If dredging, volume and location of
none none
spoil site
*note: the said quantities are estimated for funding purpose only, actual damages may be computed from the actual survey
Inspected By: Validated By:

REYNALDO T. SIBAYAN, JR. FERNANDO F. BUGARIN


Engineer II OIC-Chief, Planning & Design Section
FC Checklist Form A

DPWH CHECKLIST FOR SLOPE PROTECTION, DRAINAGE AND COASTAL PROTECTION WORKS ALONG NATIONAL
ROADS/BRIDGES
Agno River Basin Flood Control Project -
Name of Project : Construction of Bank Protection along Brgy.
Capandanan (Phase I), Lingayen, Pangasinan Check (P)
the
Location : Brgy. Capandanan (Phase I), Lingayen, Pangasinan Remarks
appropriate
Project Code : box

Type of Structure : Construction of Gabion Reventment


1. Current ProjectsofStatus
a. Continuation on-going/phase - implemented project with RDC
Endorsement
If with RDC Endorsement, please
b. New Proposal with RDC Endorsement
attach
c. New Proposal without RDC Endorsement
2. Covered by a Foreign-Assisted Project(FAP)
a. Yes
If yes, indicate what FAP
b. No
3. Identified as Flood Prone Area under the Study on Nationwide Flood Risk Assessment and Flood
Mitigation Plan for the Selected Areas (NFRAFMP)
a. Under 18 Major River Basins
b. Under First 56 Priority Rivers Refer to NFRAMP
c. Under First 120 Prioriy Rivers
4. Status of the Project
a.
b. With
With Feasibity StudyStudy/Technical
Pre-Feasibility or Master Plan Study
(date completed:__________)
(date
If with study (a) or (b), please
completed:__________)
attach soft copy
c. Without Study
5. Protects structure within 1Kilometer Radius
a. National Bridge
b. National Road Please attach Location Map and
c. Public Building (Hospital, Municipality/City Hall, School) identify project site and structure
*Encircle which
6. Project is
a. Rehabilitation
b. Upgrading/Improvement If not a, or b, or c, or d, please
specify here the scope
c. New Construction ___________
d. Desilting/Dredging/Deeping
7. Located within
a. City
b. 1st Class Municipality
c. 2nd Class Municipality If traversing more than one(1),
please specify how many cities or
d. 3rd Class Municipality municipalities __________
e. 4th Class Municipality
f. 5th Class Municipality
8. With ROW
a. Yes If with ROW, please state the
b. No amount of ROW
9. Within Buildable Zone
Refer to Multi-Hazard Map (if you
a. Yes do not have one, go to DENR or
b. No DOST)

Validated and Submitted By:

EDITA L. MANUEL
District Engineer