Contract WW300W - Sewerage Project at Highlands

SEWER RETICULATION NETWORK APPROVAL SHEET


ROAD NAME: DRAWING No:

DATE OF EXCAVATION: TRENCH WIDTH: BEDDNG MATERIAL:

DOWNSTREAM MH No: UPSTREAM MH N DATE:

PIPE DIAMETER: LENGTH:

QUALITY CHECKS
QUALITY CHECK DATE REMARKS
CROWN ALIGNMENT

COVER
JOINT ASSEMBLY

AIR TESTS
LIGHT TESTS

FROM TO FROM TO FROM TO


PIPE LAYING REMARKS

SETTING OUT

FORMATION LEVEL
BEDDING

PIPE LAYING
BACKFILLING
COMPACTION TESTS

REINSTATEMENT

SKETCH GERENAL REMARKS


Contractor's Representative WMA's Representative

Name: Name:
Designation Designation:

Signature: Signature:
EDDNG MATERIAL:

ATE:

REMARKS

GERENAL REMARKS
Contract WW346W - Design and Construction of Sewer Reticulation
at Tranquebar

SEWER CONTROL SHEET - AIR TESTS


Location: Date:

TEST DURATION TEST READING


PRESSURE
UPSTREAM DOWNSTREAM
S/No MAIN PIPE/DIA MAIN PIPE/LENGTH(m) Initial Final DROP ∆P
MANHOLE MANHOLE
START END Reading Reading (mm)
(mm) (mm)

10

11

12
13

14

Contractor Representative WMA Representative


Name: Name:

Sig: Sig:
PASS/FAIL
Contract WW346W - Design and Construction of Sewer
Reticulation at Tranquebar

SEWER CONTROL SHEET - MANHOLE LEAK TEST


Location: Date:

TEST DURATION TEST READING


MANHOLE DATE FILLED DATE TESTED WATER DROP
S/No PASS/FAIL
DESCRIPTION WITH WATER (After 24hrs) Initial Reading Final Reading ∆H (mm)
START END (mm) (mm)

10

Contractor Representative WMA Representative


Name: Name:

Sig: Sig:
Contract WW300W - Sewerage Project at `
Highlands
WATER RETICULATION NETWORK APPROVAL SHEET
DATE:

ROAD SECTION:

TRENCH CHECKLIST
A N/A REMARKS
SETTING OUT
TRENCH DIMENSIONS
FORMATION
BEDDING TYPE / THICKNESS
PIPE ALIGNMENT
PIPES QUALITY
WARNING TAPE
BACKFILLING
VALVE POSITION
ELECTROFUSION

PIPE LAYING INFORMATION


FROM CH TO CH DIAMETER REMARKS

COMMENTS

Contractor Representative WMA Representative


Name: Name:

Sig: Sig:

CWA Representative
Name:
Sig:
Contract WW300W - Sewerage Project at
Highlands
WATER RETICULATION PRESSURE TEST CONTROL SHEET

DATE: TESTING MAIN HOUSE


CONNECTION
ROAD SECTION:

PIPE
S/No. ROAD CH START CH FINISH LENGTH DIMENSION

TOTAL
LENGTH

HOUSE CONNECTION TESTED (No.)

PRESSURE TEST (Internal Hydrostatic Testing) = P1

Remaining Pressure after 1 hour

Drop to

Interval 2 mins Interval 5


Time (Mins) 0 2 4 6 8 10 15
Pressure (P) (Bars)

REMARKS

OVERALL
RESULTS

Contractor Representative WMA Representative


Name: Name:

Sig: Sig:

CWA Representative
Name:
Sig:
Interval 5 mins Interval 10 mins
20 25 30 40 50 60 70 80 90
Contract WW346W - Design and Construction of
Sewer Reticulation at Tranquebar

Site: Date:

Location: Weather: Apparatus:


Compaction Required: Compaction Equipment:
MDD.(Mg/m3): Condition of Surface:
Material: Layer No:
Manhole Details: OMC.(%):

Location Test No. Testmm


Depth Chainage Wet Density Dry Density Moisture % Compaction Remarks
(m) (Mg/m3) (Mg/m3) Content %

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Sketch
Contractor Representative WMA Representative
Name: Name:

Sig: Sig:
Apparatus:

Remarks

You might also like