7G1 MACC Audio Visual Implementation

No. Location Description of Issue Solution Deadline PIC Remark


1 VIR 1 TV Removed Replacement TV at L14 Tower A Gerakan 23-Jun-17 Daniel
BCD Deck 1 No Power Source To let Badri check, if not send back to IAV TBA Peter, Hock &
Daniel
Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark

2 VIR 2 Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark

3 VIR 3 Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark
Table to be installed PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Power Termination at table Chan Wai to terminate By 24-Jun-17 Simon, CWE
7G1 MACC Audio Visual Implementation
No. Location Description of Issue Solution Deadline PIC Remark
4 VIR 4 (Mock Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 22-Jun-17 William, PMJ
UP) Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark
Power Issue - UPS battery dead Temporary direct connect to power socket, Before 30-Jun-17 Daniel
claim UPS

5 VIR 5, 6, 7 Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark
Power Issue - UPS battery dead Temporary direct connect to power socket, Before 30-Jun-17 Daniel
claim UPS

6 VIR 8, 9 Mirror Removed - Camera unable to tilt PMJ ID to install after mock up confirm By 24-Jun-17 William, PMJ
Ramli, PMJ
Daniel to check

Equipment Rack Door to cut as according to IAV marking then PMJ ID to cut By 24-Jun-17 William, PMJ
DVD tray Ramli, PMJ
NEK to Mark
VIR 9 become temporary store for carpenter PMJ to check with their sub con By 24-Jun-17 William, PMJ
7G1 MACC Audio Visual Implementation
No. Location Description of Issue Solution Deadline PIC Remark
7 Auditorium LED Wall Bracket Size Issue IAV to cut 7mm at the top of wood frame By 21-Jun-17 Daniel

To install last 4 piece LED Panel IAV to install By 22-Jun-17 Keong


To install & shoulder lighting, lighting cable IAV to install By 23-Jun-17 Keong

To terminate signal cable of LED Wall IAV to terminate By 23-Jun-17 Kor & Hock
To terminate signal CAT6 cable at control IAV to terminate By 23-Jun-17 Dee & Keong
panel at stage
Sound engineering for line array speaker IAV sound engineering team to justify From 23 to 27 Jun-17 Kor, Peter &
Hock
Crestron Programming for Auditorium IAV programmer to program From 23 to 27 Jun-17 Desmond &
Hock
Audio Visual overall integration IAV to integrate all system From 23 to 27 Jun-17 Lai, Nek,
Daniel & Chin

8 Bilik 2 X 2 LCD Video Wall IAV to install video wall By 21-Jun-17 Keong
Mesyuarat
Utama
2 X Tannoy Speaker IAV to install Speakers From 21 to 22 Jun-17 Keong
2 X Turbo Sound Ceiling Soeaker PMJ ID to cut ceiling & IAV install By 23-Jun-17 William, PMJ
Dee, IAV
Displays issue Awaiting PMJ & PJH to confirm N/A Leslie, PMJ