Tekla BIM Awards (year)

Project E.g. Chennai Airport Expansion


Modeled by Company name
Submitted by Contact person's name
Purpose/use of the structure/building E.g. Airport Size (e.g. tons/square meters):
Location E.g. Chennai, India Estimated completion (year/month):
Category BIM, steel, concrete, Engineering (list all that apply)

Project participants Use of BIM tools


Yes No

Project owner
General contractor
Designers
Architect
Structural design
Mechanical engineering
Other design
Detailers
Steel detailing
CIP/reinforcement detailing
Precast concrete detailing
Other structural detailing
HVAC/MEP detailing
Other detailing
Subcontractors
Steel fabrication
Precast concrete fabrication
HVAC/MEP fabrication
Other subcontractors
Other participants

If no, which
Use of Tekla software/model Yes
tool?

Sales/conceptual design
Foundation Structural design (modeling) x
Detailing incl. reinforcement / CIP x
Frame structure, concrete Structural design (modeling) x
Detailing incl. reinforcement / CIP x
Prefabricated units E.g. beams, columns, floors x

Design and fabrication


Frame structure, steel Structural design (modeling) x
Fabrication planning x

Facade, concrete Structural design (modeling) x


Precast units, detailing x
Facade, other materials Structural design (modeling) x
Detailing x
Project communication Tekla Web Viewer/BIMsight x
Drawings x
Bills of material x
Data transfer and use of reference models
Import formats (e.g. IFC, DWG)
Export formats (ERP, DSTV) x
Erection/follow up
Facilities management
Tekla Structures environment
Project description (150 - 500 words, incl. E.g. Sutter Medical Center Castro Valley (SMCCV) is an innovative 130-bed replacement hospital currently under construction
special challenges and success of the project) Completion is scheduled for June 2012. The estimated maximum price set for this project is $320 million. This seven-story
approximate scope? building is a composite steel and concrete framed structure. The structural design of this building is considerably more comple
than usual due to the new seismic requirements set forth in California's legislation. This fast track project is scheduled to be
delivered 30% faster than comparable healthcare projects in California. This schedule would not be possible without the use o
BIM technologies and the innovative 11-party IPD (lntegrated Project Delivery) team. This team has been working together
since 2008 to build a completely coordinated and constructable model that will eventually get passed onto the owner for
facilities management use. Entire effort in exterior skin modeling from vendor shop drawings (2D) was to communicate the
design in a 3D environment to convey issues back to the 2D detailers.

Special challenges

What made the project succesful?

Material provided for the competition The .db1 and profile database file of the Tekla model (model folder)
Full Tekla BIMsight model (.tbp) including bolts, reinforcement and reference files
Snapshots of the model (min. 3 image files e.g. JPG featuring the whole model and relevant details)
We also recommend you to highlight the best parts of your project by saving them as snapshots in the Tekla BIMsight project.)
Sample drawings of the projects (2-3 PDF files)
Project information filled in to given XLS form
Photographs (min .1 image file) or artist's impressions of the project

Note, IF you have done any system modifications please submit also:

*profile database (profdb.bin)


*material database (matdb.bin)
*bolt database (screwdb.db)
*bolt assembly database (assdb.db)
*rebar database (rebar_database.inp)
*parametric profiles (profitab.inp)
IM tools
Can't say Not in this
project
Can't say Not in this
project

x
pital currently under construction.
320 million. This seven-story
ng is considerably more complex
ack project is scheduled to be
ot be possible without the use of
m has been working together
passed onto the owner for
2D) was to communicate the

the Tekla BIMsight project.)