You are on page 1of 1

Columns

375
Concrete or MLC ,GRC
200
230 375
200

505
290 320
190 375
330
190 200
230 250
150
155
3.675m 3.3m 2.515m
2.140m

4.350m 3.740m 2.770m 2.4m


2.6m 2.225m
2.150m 1.820m

300 420 265 300 200


175 320 175 175 175 175
385 580 365 385 385 270
Type 001 Type 001A Type 003 Type 005 Type 002 Type 004

Ordering of columns

1.Orders for columns should be placed timeously.


2.Caps, bases & shafts are supplied separately.
3.PLEASE ONLY GIVE OVERALL HIEGHTS.
4.Columns may vary by 20% due to manufacturing.
5.Prices quoted include caps and bases.

Specifications
All columns are reinforced with 4 bars of re-bar and depending on the length
and thickness of shaft, Y8 or Y10 are used. Should you require any special reinforcing
detail, we would be more that happy to discuss it with your engineers.

Installation of columns
We assume that the correct foundations have been prepared and all outside factors taken in.
Steel rods should be cast into the foundation and positioned so as to pass through the hole in
the precast base. (The base must be lifted should both a screed & tiling be required at a later stage).
A mixture of 1 part cement, ½ part tile adhesive & 2 parts crusher sand by volume is used to seat
the base. The hole in the base must not be filled. Wait 24 hours before placing the shaft in position.

Shaft First fill base hole with a strong concrete mix, place the shaft on top of the base with the re-bars
of the shaft passing into the base. The shaft at this stage must be plumbed, wedged, supported and
left to stand for 24 hours. Then cast the cap in position with the rebar passing through the hole and fill
with concrete, allow the column to stand for 10 days.

Disclaimer
Base The above information is only a guide as how to install columns. Modcon can not be held responsible for
any installation unless undertaken by an accredited Modcon installing agent.