BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
Ⅰ. Preparation Works

Mobilization and Mobilization and Demobilization for manpower, equipments.


1.1 LS
Demobilization Incl. insurance and other expen.

Temporary facilities, office, accommodation. Including


1.2 Temporary Facilities LS
construction, utilization, maintenance and dismantle etc.

Ⅱ. Decoration Works

1. 2-3 mm nonmetal aggregate wear - resisting 1. Contractor supply:


layer(nonmetal aggregate material is made up of quartz concrete, rebar
aggregate, special cement and other addictive of a certain 1.甲供:钢筋、混凝土
DM 1A -非金属骨料耐磨混凝土地坪 grain degree)
1. 2-3厚非金属骨料耐磨层,专用抹平机压实磨平 2. 50 mm C20 fine aggregate concrete, proper placed
)非金属耐磨地坪材料是含有石英骨料、特种水 finished;
泥和聚合物添加剂制成; 3. one layer of neat cement binding course;
DM 1A - Wear-resisting 2. 50厚C20细石混凝土; 4. grade A ground slab(Φ10@200 two layer rebar, 250mm
2.1 nonmetal aggregate-A 3. 素水泥浆一道; concrete)(detail refer T0103-02) M2
Thickness 350 mm 4. A级地面垫层(Φ10@200双层双向钢筋,250厚 5.Polyethylene film slab;
钢筋混凝土)(详见 T0103-02) 6.150mm gravel perfused with M5 cement mortar, vibrated
5. 聚乙烯薄膜防潮层; and compacted;
6. 150厚碎石灌M5水泥浆,振捣密实; 7.rammed by soil (including surface cleaning and
7. 素土夯实。 levelling)

1/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. 2-3mm nonmetal aggregate wear - resisting 1. Contractor supply:
layer(nonmetal aggregate material is made up of quartz concrete, rebar
aggregate, special cement and other addictive of a certain 1.甲供:钢筋、混凝土
DM 1B -非金属骨料耐磨混凝土地坪 grain degree)
1. 2-3厚非金属骨料耐磨层,专用抹平机压实磨平 2. 50 mm C20 fine aggregate concrete, proper placed
)非金属耐磨地坪材料是含有石英骨料、特种水 finished;
泥和聚合物添加剂制成; 3. one layer of neat cement binding course;
DM 1B - Wear-resisting 2. 50厚C20细石混凝土; 4. grade B ground slab(Φ10@300 single layer rebar,
2.2 nonmetal aggregate-B 3. 素水泥浆一道; 120mm concrete)(detail refer T0103-02) M2
Thickness 250 mm 4. B级地面垫层(Φ10@300单层双向钢筋,120厚 5.Polyethylene film slab;
钢筋混凝土)(详见 T0103-02) 6.150mm gravel perfused with M5 cement mortar, vibrated
5. 聚乙烯薄膜防潮层; and compacted;
6. 150厚碎石灌M5水泥浆,振捣密实; 7.rammed by soil
7. 素土夯实。

1. Contractor supply:
1. 8~10mm tiles, seams be filled by neat cement; concrete, rebar
DM 2A -地板砖地面 2. 20mm 1:3 cement mortar; 1.甲供:钢筋、混凝土
1. 8-10厚地砖,素水泥浆擦缝; 3. One layer of neat cement binding
2. 20厚1:3水泥砂浆; course (mixed with construction glue);
DM 2A - Wear-resisting 3. 素水泥浆一道(內掺建筑胶); 4. Grade A ground slab (Φ10@200 two layer rebar,
2.3 tile-A Thickness 230 mm 4. A级地面垫层(Φ10@200双层钢筋,250厚钢筋 250mm concrete)(detail refer T0103-02) M2
(tile size 600*600) 混凝土)(详见 T0103-02) 5. polyethylene film vapor barrier;
5. 聚乙烯薄膜防潮层; 6. 150mm gravel perfused with M5 cement mortar, vibrated
6. 150厚碎石灌M5水泥浆,振捣密实; and compacted.
7. 素土夯实。 7. Rammed by soil.(including surface cleaning and
levelling)

2/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
1. 8~10mm tiles, seams be filled by neat cement; 1.甲供:钢筋、混凝土
DM 2B -地板砖地面
2. 20mm 1:3 cement mortar;
1. 8-10厚地砖,素水泥浆擦缝;
3. One layer of neat cement binding course (mixed with
2. 20厚1:3水泥砂浆;
construction glue);
DM 2B - Wear-resisting 3. 素水泥浆一道(內掺建筑胶);
4. Grade B ground slab (Φ10@300 single layer two-way
2.4 tile-B Thickness 330 mm 4. B级地面垫层(Φ10@300单层双向钢筋,120厚 M2
concrete slab, 120mm concrete)(detail refer T0103-02)
(tile size 600*600) 钢筋混凝土)(详见 T0103-02)
5. polyethylene film vapor barrier;
5. 聚乙烯薄膜防潮层;
6. 150mm gravel perfused with M5 cement mortar, vibrated
6. 150厚碎石灌M5水泥浆,振捣密实;
and compacted.
7. 素土夯实。
7. Rammed by soil.

1. Contractor supply:
concrete, rebar
1. 8~10mm tiles firmly paved and clapped to be smooth , 1.甲供:钢筋、混凝土
seams be filled by neat cement;
2. 20mm 1:3 cement mortar;
DM 3 -防水地板砖地面
3. 1.5mm polyurethane waterproofing paint, the surface be
1. 8-10厚地砖铺实拍平,素水泥浆擦缝;
sprinkled with sand, at the junction of metope and
2. 20厚1:3水泥砂浆;
ground, the paint should be 150mm over the ground along
3. 1.5厚聚氨酯防水涂料(2道),面撒细黄沙,
the wall.
四周沿墙上翻150mm高
4. One layer of base primer;
DM 3 - waterproof tile- 4. 刷基层处理剂一遍;
5. fine aggregate concrete, 1% slope to ground
2.5 Thickness 232 mm 5. 最薄处20mm厚C20细石混凝土,向地漏找坡 M2
leakage(the thinnest point should not be less than
(tile size 300*300) 1%;
20mm);
6. B级地面垫层(Φ10@300单层双向钢筋,120厚
6. Grade B ground slab (Φ10@300 single layer two-way
钢筋混凝土)(详见 T0103-02)
concrete slab, 120mm concrete)(detail refer T0103-02)
7. 聚乙烯薄膜防潮层;
7. polyethylene film vapor barrier;
8. 150厚碎石灌M5水泥浆,振捣密实;
8. 150mm gravel perfused with M5 cement mortar, vibrated
9. 素土夯实。
and compacted.
9. Rammed by soil.(including surface cleaning and
levelling)

3/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
2. Φ4 rebar supply by
1. 40mm C20 fine aggregate concrete, reinforced with subcontractor
bidirectional Ф4 rebar, distance @150, the surface be 1. 甲供:Φ10钢筋、混凝
sprinkled with 2~3mm fine cement and be pressed 土;
DM 4A -非金属骨料面层防水混凝土 polish(nonmetal aggregate material is made up of quartz 2. 分包商自供Φ4钢筋
1. 40mm厚C20细石混凝土,配Φ4@150双向钢 aggregate, special cement and other addictive of a certain
筋,面撒2-3mm厚耐磨非金属骨料,专用抹平机 grain degree, the relevant technical information refer to
压实磨平)非金属耐磨地坪材料是含有石英骨料 subcontractor’s specifications) ;
、特种水泥和聚合物添加剂制成; 2. 1.5mm polyurethane waterproofing paint, the surface be
DM 4A - Wear-resisting 2. 1.5厚聚氨酯防水涂料(2道),面撒细黄沙, sprinkled with sand, at the junction of metope and
nonmetal aggregate 四周沿墙上翻150mm高 ground, the paint should be 150mm over the ground along
2.6 3. 刷基层处理剂一遍; M2
waterproof concrete-A the wall.
Thickness 262 mm 4. 最薄处20mm厚水泥砂浆找坡; 3. One layer of base primer;
5. A级地面垫层(Φ10@200双层双向钢筋,250厚 4. 20mm 1:3 cement mortar sloping(thinnest point);
钢筋混凝土)(详见 T0103-02) 5. Grade A ground slab (Φ10@200 two layer rebar,
6. 聚乙烯薄膜防潮层; 250mm concrete)(detail refer T0103-02)
7. 150厚碎石灌M5水泥浆,振捣密实; 6. polyethylene film vapor barrier;
8. 素土夯实。 7. 150mm gravel perfused with M5 cement mortar, vibrated
and compacted.
8. Rammed by soil.(including surface cleaning and
levelling)

4/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
2. Φ4 rebar supply by
1. 40mmC20 fine aggregate concrete, reinforced with subcontractor
bidirectional Ф4 rebar, distance @150, the surface be 1. 甲供:Φ10钢筋、混凝
sprinkled with 2~3mm fine cement and be pressed polish 土;
DM 4B -非金属骨料面层防水混凝土 (nonmetal aggregate material is made up of quartz 2. 分包商自供Φ4钢筋
1. 40mm厚C20细石混凝土,配Φ4@150双向钢 aggregate, special cement and other addictive
筋,面撒2-3mm厚耐磨非金属骨料,专用抹平机 of a certain grain degree, the relevant technical information
压实磨平)非金属耐磨地坪材料是含有石英骨料 refer to subcontractor’s specifications) ;
、特种水泥和聚合物添加剂制成;
DM 4B - Wear-resisting 2. 1.5厚聚氨酯防水涂料(2道),面撒细黄沙, 2. 1.5mm polyurethane waterproofing paint, the surface be
四周沿墙上翻150mm高 sprinkled with sand, at the junction of metope and ground,
nonmetal aggregate
2.7 3. 刷基层处理剂一遍; the paint should be 150mm over the ground along the wall. M2
waterproof concrete-B
4. 最薄处20mm厚水泥砂浆找坡; 3. One layer of base primer;
Thickness 262 mm
5. B级地面垫层(Φ10@200双层双向钢筋,250厚 4. 20mm 1:3 cement mortar sloping(thinnest point);
钢筋混凝土)(详见 T0103-02) 5. Grade B ground slab (Φ10@200 two layer two-way
6. 聚乙烯薄膜防潮层; concrete slab, 250mm concrete)(detail refer T0103-02)
7. 150厚碎石灌M5水泥浆,振捣密实; 6. polyethylene film vapor barrier;
8. 素土夯实。 7. 150mm gravel perfused with M5 cement mortar, vibrated
and compacted.
8. Rammed by soil.(including surface cleaning and
levelling)

5/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
1. anti-static raised floor (the elevation see from the design 1.甲供:钢筋、混凝土
DM 5 -活动地板 drawings);
1. 抗静电活动地板(高度见设计); 2. 20mm1:2 cement mortar precausions and light pressure;
2. 20mm厚1:2水泥砂浆抹面压光 3. One layer of neat cement binding course;
3. 素水泥结合层一道; 4. 20mm1:2 cement mortar precausions;
4. 20mm1:2厚水泥砂浆找平; 5. Plain cement binds together;
5. 素水泥结合层一道; 6. 20mm thickness of polymer cement waterproofing
2.8 DM 5 - raised floor M2
6.20mm厚聚合物水泥防水砂浆; mortar;
7. B级地面垫层(Φ10@300单层双向钢筋,120厚 7. Grade B ground slab;
钢筋混凝土)(详见 T0103-02) 8. polyethylene film vapor barrier;
8. 聚乙烯薄膜防潮层; 9. 150mm gravel perfused with M5 cement mortar, vibrated
9. 150厚碎石灌M5水泥浆,振捣密实; and compacted.
10. 素土夯实。 10. Rammed by soil. (including surface cleaning and
levelling)

1. Contractor supply:
concrete, rebar
1. 20mm 1:2.5 cement mortar which is no sparking, surface 1.甲供:钢筋、混凝土
DM 6 -不发火花水泥砂浆地面 screeding and pressed polish;
1. 20mm厚1:2.5不发火花水泥砂浆抹面压光 2. One layer of neat cement binding course;
2. 素水泥结合层一道; 3. Grade B ground slab (Φ10@300 single layer two-way
DM 6 - no-sparkig cement 3. B级地面垫层(Φ10@300单层双向钢筋,120厚 concrete slab, 120mm concrete)(detail refer T0103-02) ;
2.9 M2
motor floor 钢筋混凝土)(详见 T0103-02) 4. polyethylene film vapor barrier;
4. 聚乙烯薄膜防潮层; 5. 150mm gravel perfused with M5 cement mortar, vibrated
5. 150厚碎石灌M5水泥浆,振捣密实; and compacted.
6. 素土夯实。 6. Rammed by soil.(including surface cleaning and
levelling)(including surface cleaning and levelling)

6/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
1.甲供:钢筋、混凝土

1. 20mm granites tiles firmly paved


and clapped to be smooth , seams be filled by epoxy resin
DM 7 -防腐花岗岩 daub;
1. 20mm厚花岗岩铺实拍平,环氧胶泥擦缝; 2. 4~6mm epoxy cement bonding layer;
2. 4-6mm环氧胶泥结合层; 3. 1.5mm polyurethane waterproofing paint, the surface be
3. 1.5mm厚聚氨酯防水涂料(2道),面撒细黄沙 sprinkled with sand, at the junction of metope and ground,
,四周沿墙上翻150mm the paint should be 150mm over the ground along the wall.
4. 刷基层处理剂一遍; 4. One layer of base primer;
DM 7 - anti-corrosion
5. 最薄处20mm厚C20细石混凝土,向地漏找坡 5. C20 fine aggregate concrete, 1% slope to ground
2.10 granites tiles floor M2
1%; leakage(the thinnest point should not be less than 20mm);
(tile size 600*600)
6. 素水泥浆一道 6. Neat cement binding course
7. B级地面垫层(Φ10@300单层双向钢筋,120厚 7. Grade B ground slab (Φ10@300 single layer two-way
钢筋混凝土)(详见 T0103-02) concrete slab, 120mm concrete)(detail refer T0103-02)
8. 聚乙烯薄膜防潮层; 8. polyethylene film vapor barrier;
9. 150厚碎石灌M5水泥浆,振捣密实; 9. 150mm gravel perfused with M5 cement mortar, vibrated
10. 素土夯实。 and compacted.
10. Rammed by soil.(including surface cleaning and
levelling)

7/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete
1. 2~3mm nonmetal aggregate wearresisting 1.甲供:混凝土
layer (nonmetal aggregate material is made up of quartz
aggregate, special cement and other
LM 1 -非金属骨料耐磨混凝土楼面 addictive of a certain grain degree,
1. 2-3厚非金属骨料耐磨层,专用抹平机压实磨平 the relevant technical information
LM1 wear-resisting )非金属耐磨地坪材料是含有石英骨料、特种水 refer to subcontractor’s
2.11 泥和聚合物添加剂制成; M2
nonmetal aggregate 2. 30厚C20细石混凝土抹光; specifications);
3. 素水泥浆一道; 2. 30mm C20 fine aggregate concrete,
4. 钢筋混凝土楼板(已完成) proper placed and finished;
3. One layer of neat cement binding
course;
4. Reinforced concrete slab.

LM 2 -地板砖楼面
1. 8~10mm tiles firmly paved and clapped to be smooth ,
1. 8-10厚地砖,素水泥浆擦缝;
seams be filled by neat cement;
LM 2 tile 2. 20厚1:3干硬性水泥砂浆;
2.12 2. 20mm 1:3 dry-hard cement mortar; M2
(tile size 600*600) 3. 素水泥浆结合层一道;
3. One layer of neat cement binding course;
4. 钢筋混凝土楼板(已完成)
4. Reinforced concrete slab (finished).

1. Contractor supply:
C20 concrete
1. 8~10mm tiles firmly paved and clapped to be smooth , 1.甲供:混凝土 C20
LM 3 -防水地板砖楼面
seams be filled by neat cement;
1. 8-10厚地砖,素水泥浆擦缝;
2. 25mm 1:4 dry-hard cement mortar;
2. 25厚1:4干硬性水泥砂浆;
3. 1.5mm polyurethane waterproofing paint, the surface be
3.1.5mm厚聚氨酯防水涂料(2道),面撒细黄沙
sprinkled with sand, at the junction of metope and ground,
,四周沿墙上翻150mm;
LM 3 waterproof tile the paint should be 150mm over the ground along the wall.
2.13 4. 基层处理剂一遍; M2
(tile size 300*300) 4. One layer of base primer;
5. 15mm1:2水泥砂浆找平;
5. 15mm 1:2 cement mortar screeding;
6. 50mmC20细石混凝土向地漏找1%坡(最薄处
6. 50mm C20 fine aggregate concrete, 0.5% slope to
不小于30mm)
ground leakage(the thinnest point should not be less
7. 钢筋混凝土楼板(已完成);
than 30mm);
7. Reinforced concrete slab (finished).

8/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
C20 concrete
1.甲供:混凝土 C20
1. 40mm C20 fine aggregate concrete, reinforced with
bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2mm fine cement and be pressed polish
LM 4 -非金属骨料面层防水混凝土 楼面 (nonmetal aggregate material is made up of quartz
1. 40mm厚C20细石混凝土,配Φ4@150双向钢 aggregate, special cement and other addictive of a certain
筋,面撒2-3mm厚耐磨非金属骨料,专用抹平机 grain degree, the relevant technical information refer to
压实磨平)非金属耐磨地坪材料是含有石英骨料 subcontractor’sspecifications);
LM 4 - Wear-resisting
、特种水泥和聚合物添加剂制成;
2.14 nonmetal aggregate 2. 1.5厚聚氨酯防水涂料(2道),面撒细黄沙, 2. 1.5mm polyurethane waterproofing paint, the surface be M2
waterproof concrete 四周沿墙上翻150mm高 sprinkled with sand, at the junction of metope and
3. 刷基层处理剂一遍; ground, the paint should be 150mm over the ground along
4. 最薄处20mm厚1:2水泥砂浆找坡; the wall.
5. 钢筋混凝土楼板(已完成) 3. 1:2 cement mortar screeding to falls (the thickness of the
thinnest point should not be less than 20mm), the
junction of metope and ground be plastered into slope foot.
4. Reinforced concrete slab (finished).

1. Contractor supply:
C20 concrete
1. 20mm granites tiles firmly paved and clapped to be 1.甲供:混凝土 C20
LM 5 -防腐花岗岩 smooth , seams be filled by epoxy resin daub;
1. 20mm厚花岗岩铺实拍平,环氧胶泥擦缝; 2. 4~6mm epoxy cement bonding layer;
2. 4-6mm环氧胶泥结合层; 3. 1.5mm polyurethane waterproofing paint, the surface be
3. 1.5mm厚聚氨酯防水涂料(2道),面撒细黄沙 sprinkled with sand, at the junction of metope and
LM 5 - anti-corrosion
,四周沿墙上翻150mm ground, the paint should be 150mm over the ground along
2.15 granites tiles floor M2
4. 刷基层处理剂一遍; the wall.
(tile size 600*600)
5. 最薄处20mm厚C20细石混凝土,向地漏找坡 4. One layer of base primer;
1%; 5. 15mm 1:2 cement mortar screeding;
6. 素水泥浆一道 6. C20 fine aggregate concrete, 1% slope to trench(the
7. 钢筋混凝土楼板(已完成) thinnest point should not be less than 20mm);
7. Reinforced concrete slab (finished).

9/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

LM 6 -活动地板
1. anti-static raised floor(height refer to building architecture
1. 抗静电活动地板(高度见设计);
drawings);
2. 20mm厚1:2水泥砂浆抹面压光
2. 20mm1:2 cement mortar precausions and light pressure;
3. 素水泥结合层一道;
2.16 LM 6 - raised floor 3. One layer of neat cement binding course; M2
4. 20mm厚水泥砂浆找平;
4. 15mm 1:2 cement mortar screeding and pressed polish;
5. 素水泥结合层一道;
5. One layer of neat cement binding course;
6.钢筋混凝土楼板(已完成)
6. Reinforced concrete slab (finished).

1. Mixed Mortar or spray (or brush) latex paint of internal


混合砂浆
Interior wall 1A - 内墙涂料- 1. 喷涂或涂刷内墙乳胶漆 wall;
1A 2. 5mm thick 1:0.5:3 cement-lime mortar;
2.17 wall painting -1A 2. 5mm 1:0.5:3 水泥石灰砂浆 M2
3. 15mm thick 1:1:6 cement-lime mortar;
3. 15mm 1:1:6水泥石灰砂浆
thickness 20mm 4. brush building glue and plain compo once(building
4.刷建筑胶素水泥浆以便(1:4)
glue:water=1:4)
水泥砂浆 1. Mixed Mortar or spray (or brush) latex paint of internal
Interior wall 1B - 内墙涂料- 1. 喷涂或涂刷内墙乳胶漆 wall;
1B 2. 5mm 1:0.5:3 水泥砂浆 2. 5mm thick 1:0.5:3 cement-lime mortar;
2.18 wall painting -1B M2
3. 15mm 1:1:6水泥砂浆 3. 15mm thick 1:1:6 cement-lime mortar;
thickness 20mm 4.刷建筑胶素水泥浆以便(1:4) 4. brush building glue and plain compo once(building
glue:water=1:4)
耐酸漆 1. brush antacid painting of internal wall (thickness);
Interior wall 1C - 内墙 1. 涂刷内墙耐酸漆
2. 5mm thick 1:0.5:3 cement-lime mortar;
涂料-1C 2. 5mm 1:0.5:3 水泥砂浆
2.19 wall painting -1C 3. 15mm thick 1:1:6 cement-lime mortar; M2
3. 15mm 1:1:6水泥砂浆
4. brush building glue and plain compo once(building
thickness 20mm 4.刷建筑胶素水泥浆以便(1:4)
glue:water=1:4)

瓷砖 1. 5~7mm white glazed ceramic tile, seams filled with white


1. 5-7mm厚白色釉面瓷砖,白色水泥擦缝; cement.
Interior wall 2 - 内墙瓷 2. 3-4mm 1:1 水泥加水重20%建筑胶结合层; 2. 3~4mm 1:1 cement paste and add the 20% weight
砖-2
2.20 glazed ceramic wall tile 3. 素水泥浆结合层一道; construction glue of it; M2
4. 15mm 1:1:6水泥砂浆抹平 3. One layer of neat cement binding course;
thickness 25mm
5.刷专用界面剂一遍 4. 15mm 1:3 cement mortar;
5. Brush exclusive interface agent for one layer;

10/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
油漆
1. 调和漆两遍,刷底油一遍; 1. Brush with coated mixed paint twice (thickness) and
Interior wall 3 - 内墙油
2. 满刮腻子一道; brush coated primer once;
漆-3
2.21 wall painting -3 thickness 3. 5mm 1:2水泥砂浆 2. Scraping putty leveling once; M2
4. 15mm 1:3水泥砂浆 3. 5~8mm 1:2cement mortar;
20mm
4. 15mm 1:3 cement mortar;

防腐花岗岩墙面 1. 20mm granites tiles firmly paved and clapped to be


1. 20mm花岗岩墙裙,环氧胶泥擦缝; smooth, seams be filled by epoxy resin daub.
2. 5mm配套环氧胶泥结合层;
Interior wall 4 - 防腐花 2. 5mm mating epoxy cement bonded layer;
3. 1.5mm厚聚氨酯防水涂料,面撒细黄沙;
岗岩-4 3. 1.5mm polyurethane waterproofing paint, the surface be
2.22 wall painting -4 thickness 4. 7mm厚聚合物水泥砂浆找平; M2
sprinkled with sand;
40mm 5. 5mm 1:2水泥砂浆 4. 7mm polymer cement mortar screeding;
6. 刷专用界面剂一遍; 5. 5mm 1:3 cement mortar;
6. Brush exclusive interface agent for one layer;

油漆 1. 1. Brush with coated mixed paint twice (thickness) and


1. 调和漆两遍,刷底油一遍; brush coated primer once;
2. 5mm干粉类聚合物水泥防水砂浆,中间压入1 2. 5mm dry powder type of polymer cement waterproof
Exterior wall 3 - 乳胶漆外
层耐碱玻璃纤维网布; mortar, and press a layer of alkali resistant glass
墙面-3
2.23 wall painting -3 thickness 3. 6mm 1:2.5水泥砂浆找平 M2
fiber mesh inside it;
4. 9mm 1:3水泥砂浆
30mm 3. 6mm 1:2.5 cement mortar;
5. 刷专用界面剂一遍
4. 9mm 1:3 cement mortar;
5. Brush exclusive interface agent for one layer;

1. Contractor supply:
concrete brick
200mm thickness, with masonry motor
混凝土空心砖墙 1. brick install with motor, 1.甲供:混凝土空心砖
2.24 Concrete Brick wall 1. 砖墙砌筑(水泥砂浆) M2
2. others works for the brick
2. 砖墙相关的其它工作;

1. Contractor supply:
Concrete column
concrete, rebar
practical,Bond beam &
1.甲供:钢筋、混凝土
2.25 lintel beam, wall 1. 包含模板、施工、养护等 1. including form works, construction etc. M3
concrete foundation
构造柱、过梁、圈梁
Ceiling DP 1 - aluminum
alloy plate ceiling with 配套铝合金龙骨; 1. Matched aluminum alloy keel;
2.26 M2
aluminum alloy keel 方或矩形PVC 铝合金板 2. Square (rectangle) PVC board.
铝合金龙骨铝合金板吊顶
11/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

1. Standard light gage steel keel: the central distance of


Ceiling DP 2 - mineral
轻钢龙骨标准骨架:主龙骨中距不大于1.2米,次 main keels should not more than 1200, and of the second-
2.27 wool board with light gage 龙骨中距0.6m,靠墙处吊顶间距小于0.3米 rate keels should be 600mm, the wall should be less than M2
steel keel
装天花板; 300mm apart from the nearest hanging bar;
轻钢龙骨高级矿棉板吊顶
2. Mineral wool board.

12/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
2.28

Base Board T1 - (high 刷专用界面剂一道; 1. Brush exclusive interface agent for one layer;
2.29 150) cement mortar 12mm1:3水泥砂浆 2. 12mm 1:3 cement lime mortar; M2
washboard 6mm1:2水泥砂浆抹面压光 3. 6mm 1:2 cement lime mortar plaster and pressed polish;

1. Brush exclusive interface agent for one layer;


刷专用界面剂一道; 2. 9mm 1:3 cement lime mortar;
9mm1:3水泥砂浆 3. 6mm 1:2 cement lime mortar;
Base Board T2 - (high 6mm1:2水泥砂浆 4. One layer of neat cement binding course;
2.30 150) ceramic tile 素水泥浆一道 M2
5. 3~4mm 1:1 cement paste and add the 20% weight
washboard thickness 26 3-4mm1:1水泥砂浆加水重20%建筑胶粘结层
construction glue of it;
mm 5-7mm面砖,尺寸600*100,水泥浆擦缝或填缝剂
填缝; 6. 5~7mm white glazed ceramic tile, size is
600mmx100mm, seams filled with white cement.

1. Contractor supply:
concrete, rebar
1. 60mm C20 thick fine aggregate concrete pavement, 1.甲供:钢筋、混凝土
bestrewed crosswise by grooves whose depth is 15mm.
1. 60mmC20细石混凝土面层留出横向连续凹槽,
2. One layer of neat cement binding course (mixed with
深15mm
construction glue).
2. 素水泥浆结合层一道;
2.31 Ramp A P1-A 3. Concrete slab grade A (Φ10@200 double layer rebar, M2
坡道 3. A级地面垫层(Φ10@200双层钢筋,250厚钢筋
250mm concrete)(detail refer T0103-02) .
混凝土)(详见 T0103-02)
4. 100mm thick screes(gravels) whose grain diameter is
4. 100mm厚10-40mm卵石(砾石)M5水泥砂浆
10~40mm,poured with M5 cement mortar,
5. rammed earth

13/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1. Contractor supply:
concrete, rebar
1. 60mm thick fine aggregate concrete pavement, 1.甲供:钢筋、混凝土
fck=4000psi bestrewed crosswise by grooves whose depth
1. 60mmC20细石混凝土面层留出横向连续凹槽, is 15mm.
深15mm 2. One layer of neat cement binding course(mixed with
2. 素水泥浆结合层一道; construction glue);
2.32 Ramp B P1-B M2
坡道 3. B级地面垫层(Φ10@300单层双向钢筋,120厚 3. Concrete slab grade B (Φ10@300 single layer two-way
钢筋混凝土)(详见 T0103-02) concrete slab, 120mm concrete)(detail refer T0103-02) ;
4. 100mm厚10-40mm卵石(砾石)M5水泥砂浆 4. 100mm thick screes(gravels) whose grain diameter is
10~40mm,poured with M5 cement mortar,
5. rammed earth

1. Contractor supply:
C20 step and barricade concrete, rebar
concrete 包含模板、钢筋绑扎、砼浇筑等,Refer T0103-
2.33 1. including form works, construction etc. 1.甲供:钢筋、混凝土 M3
台阶、坡道挡墙C20混凝土 03

1. Contractor supply:
1. 60mm厚C20混凝土随捣压光 concrete
1. 60mm thick fine aggregate concrete pavement,
2.34 Apron 2. 150mm10-40卵石灌M2.5混合砂浆 1.甲供:混凝土 M2
散水 2. 150mm thickness 10-40mm stone with M2.5 motor
3. 素土夯实,向外找坡5%

1. 8~10mm tiles firmly paved and clapped to be smooth ,


seams be 5~8mm, and filled by 1:1 cement mortar;
1. 8-10mm厚地砖铺面拍实,缝宽5-8mm, 1:1水泥 2. 20mm 1:4 dry-hard cement mortar, the surface be
砂浆填缝;
WM 1A: sprinkled with plain cement;
2. 25mm 1:3干硬性水泥砂浆结合层;
RC roof (grade I, 3. One layer of 0.4mm polyethylene film be fully paved;
3. 满铺0.4mm聚乙烯薄膜一道;
4. Two layers of waterproof roll;
2.35 architectural slop and 4. 防水卷材二层; M2
often-step roof) 5. 20mm 1:3 cement mortar screeding, and
5. 20mm1:3水泥砂浆找平;
钢筋混凝土屋面(建筑找坡 6. 30mm厚(最薄处)1:8水泥珍珠岩找坡2%; 0.75~0.90kg/m3 nylon being mixed;
I级上人屋面) 6. 1:8 expanded pearlite cement sloping by 2%, and the
7. 50mm挤塑板;
thinnest point is not less than 30mm;
8. 钢筋混凝土楼板(已施工)
7. 50mm extruded sheet;
8. Clean up the concrete roof boarding base.

14/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

1. 8~10mm tiles firmly paved and clapped to be smooth ,


1. 8-10mm厚地砖铺面拍实,缝宽5-8mm, 1:1水泥 seams be 5~8mm, and filled by 1:1 cement mortar;
WM 1B: 砂浆填缝; 2. 25mm 1:4 dry-hard cement mortar, the surface be
RC roof (grade I, 2. 25mm 1:3干硬性水泥砂浆结合层; sprinkled with plain cement;
structural slop and often- 3. 满铺0.4mm聚乙烯薄膜一道; 3. One layer of 0.4mm polyethylene film be fully paved;
2.36 M2
step roof) 4. 防水卷材二层; 4. Two layers of waterproof roll;
钢筋混凝土屋面(结构找坡 5. 20mm1:3水泥砂浆找平; 5. 20mm 1:3 cement mortar screeding, and
I级上人屋面) 6. 50mm挤塑板; 0.75~0.90kg/m3 nylon being mixed;
7. 钢筋混凝土楼板(已施工) 6. 50mm extruded sheet;
7. reinforced concrete floor (under construction).

1. Two layers of waterproof roll, and surface protection;


WM 1C: 1. 防水卷材二层(上面一层防水卷材自带保护层 2. 20mm 1:3 cement mortar screeding, and
RC roof (grade I, );
0.75~0.90kg/m3 nylon being mixed;
structural slop and non- 2. 25mm 1:3水泥砂浆找平;
2.37 3. 1:8 expanded pearlite cement sloping by 2%, and the M2
step roof) 3. 30mm厚(最薄处)1:8水泥珍珠岩找坡2%;
thinnest point is not less than 20mm;
钢筋混凝土屋面(结构找坡 4. 50mm挤塑板;
4. 50mm extruded sheet;
I级不上人屋面) 5. 钢筋混凝土楼板(已施工)
5. reinforced concrete floor (under construction).

WM 1D:
1. 防水卷材二层(上面一层防水卷材自带保护层 1. Two layers of waterproof roll, and surface protection;
RC roof (grade I,
); 2. 20mm 1:3 cement mortar screeding, and
2.38 structural slop and often- 2. 25mm 1:3水泥砂浆找平;; 0.75~0.90kg/m3 nylon being mixed; M2
step roof) 3. 50mm挤塑板; 3. 50mm extruded sheet;
钢筋混凝土屋面(结构找坡 4. 钢筋混凝土楼板(已施工)
4. reinforced concrete floor (under construction).
I级上人屋面)

15/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

1. 8~10mm tiles firmly paved and clapped to be smooth ,


seams be 5~8mm, and filled by 1:1 cement mortar;
1. 8-10mm厚地砖铺面拍实,缝宽5-8mm, 1:1水泥 2. 25mm 1:4 dry-hard cement mortar, the surface be
砂浆填缝;
WM 2A: sprinkled with plain cement;
2. 25mm 1:3干硬性水泥砂浆结合层;
RC roof (grade I, 3. One layer of 0.4mm polyethylene film be fully paved;
3. 满铺0.4mm聚乙烯薄膜一道;
structural slop and often- 4. One layer of water-proof roll;
2.39 4. 防水卷材一层; M2
step roof) 5. 20mm 1:3 cement mortar screeding, and
5. 20mm1:3水泥砂浆找平;
钢筋混凝土屋面(结构找坡 6. 30mm厚(最薄处)1:8水泥珍珠岩找坡2%; 0.75~0.90kg/m3 nylon being mixed;
I级上人屋面) 6. 1:8 expanded pearlite cement sloping by 2%, and the
7. 50mm挤塑板;
thinnest point is not less than 30mm;
8. 钢筋混凝土楼板(已施工)
7. 50mm extruded sheet;
8. reinforced concrete floor (under construction).

1. 防滑地砖; 1. Floor for steel stairs, NOT including the steel stairs
2.40 Floor for Steel Stairs M2
2. 水泥砂浆找平 ,详见T0103-03 2. Cement Mortar Screeding (see details from T0103-03)

2.41 Embedded 1. 埋件供货、制作、安装 1. including material supply and construction etc. T


埋件
由于主厂房建筑图详图未出,以上2.1-2.41项的工程量为预估工程量,仅作为投标参考;最终工程量将根据批复的建筑图确定。

Due to the design drawings is not completed, the quantity of above item 2.1 to 2.41 is estimated, just for bidding, the final quantity shall based on the final designed drawings.

Ⅲ. Door and Window size


FFM1021 Aluminum alloy doors(Crorosion protection Including door and frame, accessories, hardware, painting
3.1 etc. Ls
(1000*2100) type)
含门框、门、配件、五金,油漆等
3.2 FFM1524 铝合金门(防腐型) Ls

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.3 FM0821 doors,fire-resistant limit is 1.5h.
etc. Ls
含门框、门、配件、五金,油漆等

16/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.4 FM1021 doors,fire-resistant limit is 1.5h. etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.5 FM1224 doors,fire-resistant limit is 1.5h. etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.6 FM1524 doors,fire-resistant limit is 1.5h. etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.7 FM1824 doors,fire-resistant limit is 1.5h. etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware, painting


钢制防火门,耐火极限1.5h· (Steel fire-
3.8 FM1827 doors,fire-resistant limit is 1.5h. etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware,


防火卷帘,耐火极限 220V/60HZ电机(steel fire- painting, motor and relate cable, electrical switch and
3.9 FM3038 doors,fire-resistant limit is 1.5h. 220V/60Hz distribution box etc. Ls
tubular motor 含门框、门、配件、五金,油漆、电机、及配套线路、开关
、配电箱等

Including door and frame, accessories, hardware,


电动卷帘门220v 60Hz 电机 Electric rolling painting, motor and relate cable, electrical switch and
3.10 GJM5027 distribution box etc. Ls
shutter door 220v/60Hz tubular motor
含门框、门、配件、五金,油漆、电机、及配套线路、开关
、配电箱等

Including door and frame, accessories, hardware, painting


3.11 GM0815 开平钢制门 Hinged steel doors etc. Ls
含门框、门、配件、五金,油漆等

Including door and frame, accessories, hardware, painting


3.12 GM0821 开平钢制门 Hinged steel doors etc. Ls
含门框、门、配件、五金,油漆等

17/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
Including door and frame, accessories, hardware, painting
3.13 GM1221 开平钢制门 Hinged steel doors etc. Ls
含门框、门、配件、五金,油漆等
Including door and frame, accessories, hardware, painting
3.14 GM2727 开平钢制门 Hinged steel doors etc. Ls
含门框、门、配件、五金,油漆等
Including door and frame, accessories, hardware, painting
3.15 GM5760 钢制折叠门 steel folding door etc. Ls
含门框、门、配件、五金,油漆等
Including door and frame, accessories, hardware, painting
3.16 LM1021 开平门 Vertical hinged door etc. Ls
含门框、门、配件、五金,油漆等
Including door and frame, accessories, hardware, painting
3.17 LM1521 开平门 Vertical hinged door etc. Ls
含门框、门、配件、五金,油漆等
Including door and frame, accessories, hardware, painting
3.18 LMB1021 开平门 Vertical hinged door etc. Ls
含门框、门、配件、五金,油漆等

推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.19 C1515 Ls
window) 含窗框、窗、配件、五金等

推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.20 C2115 Ls
window) 含窗框、窗、配件、五金等

推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.21 C3015 Ls
window) 含窗框、窗、配件、五金等

推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.22 C18018 Ls
window) 含窗框、窗、配件、五金等

推拉窗(带纱窗) Side window(with screen Including windows and frame, accessories, hardware etc.
3.23 C97018 Ls
window) 含窗框、窗、配件、五金等

18/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

Including windows and frame, accessories, hardware etc.


3.24 C0909 固定窗(Fixed window) Ls
含窗框、窗、配件、五金等

19/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

Ⅳ. Plumbing and Drainage Pipeline in Main Power House

squatting pot 陶瓷 Including materials, accessories, hardware etc.


4.1 set
蹲便器 ceramic 含所有材料、配件、五金等
urinal 陶瓷 Including materials, accessories, hardware etc.
4.2 set
小便器 ceramic 含所有材料、配件、五金等
wash basin 陶瓷 Including materials, accessories, hardware etc.
4.3 set
洗手盆 ceramic 含所有材料、配件、五金等

slop sink 陶瓷 Including materials, accessories, hardware etc.


4.4 set
拖布池 ceramic 含所有材料、配件、五金等

self-closing flush valve Including materials, accessories, hardware etc.


4.5 DN25 set
自闭式冲洗阀 含所有材料、配件、五金等

self-closing flush valve Including materials, accessories, hardware etc.


4.6 DN15 set
自闭式冲洗阀 含所有材料、配件、五金等

tap for wash basin DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.7 set
洗手盆水龙头 不锈钢 含所有材料、配件、五金等

tap for slop sink DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.8 set
拖布池水龙头 不锈钢 含所有材料、配件、五金等

DN15 PN 0.6MPa, stainless steel (including


angle valve Including materials, accessories, hardware etc.
4.9 pipe) set
角阀 含所有材料、配件、五金等
不锈钢, 包括软管

4.10 globe valve DN40 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等

4.11 globe valve DN32 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等

globe valve DN25 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc.
4.12 set
截止阀 不锈钢 含所有材料、配件、五金等

20/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

4.13 globe valve DN15 PN 0.6MPa, stainless steel Including materials, accessories, hardware etc. set
截止阀 不锈钢 含所有材料、配件、五金等

4.14 water pipe DN40 ø42*1 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

4.15 water pipe DN32 ø38*1 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

4.16 water pipe DN25 ø28*0.8 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

4.17 water pipe DN20 ø22*0.6 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

4.18 water pipe DN15 ø16*0.6 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

4.19 water pipe DN40 ø42*3 PN 0.6MPa, stainless steel 316L Including materials, accessories, hardware etc. m
生活水管 不锈钢 含所有材料、配件、五金等

Including materials, accessories, hardware etc.


4.20 floor drain DN50 UPVC ,self-styled type set
地漏 含所有材料、配件、五金等
Including materials, accessories, hardware etc.
4.21 side vent DN100 set
侧墙通气帽 含所有材料、配件、五金等
check hole Including materials, accessories, hardware etc.
4.22 DN100 set
排水检查口 含所有材料、配件、五金等
P-water trap Including materials, accessories, hardware etc.
4.23 DN100, UPVC set
P型存水弯 含所有材料、配件、五金等
S-water trap Including materials, accessories, hardware etc.
4.24 DN50, UPVC set
S型存水弯 含所有材料、配件、五金等

4.25 reducer Including materials, accessories, hardware etc.


DN100/50, UPVC set
大小头 含所有材料、配件、五金等

21/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

4.26 drainage pipe tee Including materials, accessories, hardware etc.


DN100X100, UPVC set
下水三通 含所有材料、配件、五金等

4.27 drainage pipe tee Including materials, accessories, hardware etc.


DN100X50, UPVC set
下水三通 含所有材料、配件、五金等

4.28 drainage pipe ELBOW Including materials, accessories, hardware etc.


DN100, UPVC 90° set
下水弯头 含所有材料、配件、五金等

4.29 drainage pipe ELBOW Including materials, accessories, hardware etc.


DN50, UPVC 90° set
下水弯头 含所有材料、配件、五金等

4.30 drainage pipe ELBOW Including materials, accessories, hardware etc.


DN100, UPVC 45° set
下水弯头 含所有材料、配件、五金等

4.31 drainage pipe joint Including materials, accessories, hardware etc.


DN100, PN 0.6MPa ,UPVC set
下水管伸缩节 含所有材料、配件、五金等

4.32 drainage pipe Including materials, accessories, hardware etc.


DN100, PN 0.6MPa ,UPVC m
下水管 含所有材料、配件、五金等

drainage pipe Including materials, accessories, hardware etc.


4.33 DN500, PN 0.6MPa ,UPVC m
下水管 含所有材料、配件、五金等

4.34 hangers lot


支吊架

V. Mechanical Work

L=1200m3/h,H=200Pa Including equipments, materials, accessories, hardware


Jet flow ventiator
5.1 etc. set
射流风机 400v/3/50Hz P=7.5kw 含所有设备,材料、配件、五金等

Aluminum alloy
Including materials, accessories, hardware etc.
5.2 waterproof shutter 3000*3500mm 含所有材料、配件、五金等
Pcs
铝合金防雨百叶
Angle steel
5.3 L50*5mm m
角钢
Angle steel
5.4 L40*5mm m
角钢

22/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
Angle steel
5.5 W=80mm,h=5mm m
钢板

Ⅵ . Electrical Work

lighting distribution Box NM-XRMG3-36B Including materials, accessories, hardware etc.


6.1
含所有材料、配件、五金等
set
照明配电箱

23/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况

lighting distribution Box NM-XRMG3-12B Including materials, accessories, hardware etc.


6.2
含所有材料、配件、五金等
set
照明配电箱

wall-type tri-proof lamp 220V 150W Including materials, accessories, hardware etc.
6.3
含所有材料、配件、五金等
set
吸壁式三防灯
emergency wall-type tri-
Including materials, accessories, hardware etc.
6.4 proof lamp 220V 100W 含所有材料、配件、五金等
set
应急吸壁式三防灯
wall-type explosion tri-
Including materials, accessories, hardware etc.
6.5 proof lamp 220V 150W 含所有材料、配件、五金等
set
吸壁式防爆三防灯

emergency wall-type
Including materials, accessories, hardware etc.
6.6 explosion tri-proof lamp 220V 100W 含所有材料、配件、五金等
set
应急吸壁式防爆三防灯

factory lamp Including materials, accessories, hardware etc.


6.7 220V 400W 含所有材料、配件、五金等
set
工厂灯

trough type fluorestcent


Including materials, accessories, hardware etc.
6.8 lamps double-tube 220V 36*2W 含所有材料、配件、五金等
set
线槽式双管荧光灯

trough type fluorestcent


Including materials, accessories, hardware etc.
6.9 lamps single-tube 220V 36W 含所有材料、配件、五金等
set
线槽式单管荧光灯

fluorestcent lamp
Including materials, accessories, hardware etc.
6.10 single-tube 220V 36W 含所有材料、配件、五金等
set
单管荧光灯
fluorestcent lamp
Including materials, accessories, hardware etc.
6.11 double-tube 220V 36*2W 含所有材料、配件、五金等
set
双管荧光灯

24/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
explosion fluorestcent
Including materials, accessories, hardware etc.
6.12 lamp single-tube 220V 36W 含所有材料、配件、五金等
set
防爆单管荧光灯
canister lamp Including materials, accessories, hardware etc.
6.13 220V 9W 含所有材料、配件、五金等
set
筒灯
embedded fluorestcent
Including materials, accessories, hardware etc.
6.14 lamps four-tube 220V 36*4W 含所有材料、配件、五金等
set
嵌入式四管荧光灯
embedded fluorestcent
Including materials, accessories, hardware etc.
6.15 lamps double-tube 220V 36*2W 含所有材料、配件、五金等
set
嵌入式双管荧光灯
embedded fluorestcent
Including materials, accessories, hardware etc.
6.16 lamps three-tube 220V 18*3W 含所有材料、配件、五金等
set
嵌入式三管荧光灯
ceiling lamp Including materials, accessories, hardware etc.
6.17 220V 32W 含所有材料、配件、五金等
set
吸顶灯
concedled double-
control three-pole Including materials, accessories, hardware etc.
6.18 250V 10A 含所有材料、配件、五金等
set
switch
暗装三联双控开关

25/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
concedled double-
control double-pole Including materials, accessories, hardware etc.
6.19 250V 10A 含所有材料、配件、五金等
set
switch
暗装双联双控开关
single switch Including materials, accessories, hardware etc.
6.20 250V 10A 含所有材料、配件、五金等
set
单极开关
double-pale switch Including materials, accessories, hardware etc.
6.21 250V 10A 含所有材料、配件、五金等
set
双联单极开关
waterproof switch Including materials, accessories, hardware etc.
6.22 250V 10A 含所有材料、配件、五金等
set
防潮防溅开关
Including materials, accessories, hardware etc.
exit lamp 含所有材料、配件、五金等
6.23 220V 8W 自带蓄电池,持续时间不小于2H. With the battery, and set
诱导灯
continue power supply not less than 2 hours.

Including materials, accessories, hardware etc.


explosion exit lamp 含所有材料、配件、五金等
6.24 220V 8W 自带蓄电池,持续时间不小于2H. With the battery, and set
防爆诱导灯
continue power supply not less than 2 hours.

Plastic copper wire


6.25 ZR-BYJ-750-4 m
铜芯绝缘导线
Plastic copper wire
6.26 ZR-BYJ-750-2.5 m
铜芯绝缘导线
galvanized steel pipe
6.27 φ25 m
镀锌钢管

26/80
BOQ of Architectural Construction of Main Po

Scopes of Works Material supply


No. Item Scopes of Works Unit
工作内容(图纸要求) 材料供应情况
1.The above mentioned original materials, if it was supplied by contractor, the related test and detection shall carry out by contractor, the others test and detection shall be carry out by subc
transport to where the mixer truck can be arrive.
以上清单中除甲供材料的原材检测和试验由甲方负责外,其它检测和试验由分包商负责。其中混凝土供应,仅提供至搅拌车能到位置。
2.Except the especial mentioned in above sheet,all others materials and accessories etc shall supply by subcontractor.
除备注甲供材料外,其它材料及相应的配件等均由分包商负责提供。

27/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

1.00 -

1.00 -

1,000 302,500 302,500,000

28/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

200 292,500 58,500,000

50 479,500 23,975,000

29/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

50 469,500 23,475,000

50 524,500 26,225,000

30/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

200 384,000 76,800,000

31/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

50 374,500 18,725,000

32/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

50 2,088,500 104,425,000

438 228,000 99,864,000

33/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

50 1,824,500 91,225,000

34/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

6,000 156,000 936,000,000

1,600 382,000 611,200,000

31 513,000 15,728,580

35/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

300 203,000 60,900,000

20 1,735,000 34,700,000

36/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

50 1,960,000 98,000,000

500 165,000 82,500,000

6,000 166,000 996,000,000

300 166,000 49,800,000

50 215,000 10,750,000

37/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

1,000 187,000 187,000,000

20 1,772,000 35,440,000

560 187,000 104,720,000

1,800 105,000 189,000,000

30 2,945,000 88,350,000

30 66,000 1,980,000

38/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

600 24,000 14,400,000

39/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
-

90 135,000 12,150,000

30 349,800 10,494,000

30 196,000 5,880,000

40/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

20.00 196,000 3,920,000

10.00 4,150,000 41,500,000

300.00 130,000 39,000,000

20.00 418,500 8,370,000

41/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

20.00 418,500 8,370,000

20.00 327,000 6,540,000

20.00 307,000 6,140,000

42/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

20.00 373,500 7,470,000

440.00 83,000 36,520,000

2.00 24,000,000 48,000,000

quantity shall based on the final designed drawings.

1 4,250,000 1,800,000 6,050,000


Anticorrosion door
3 7,220,000 3,090,000 30,930,000

2 6,380,000 2,730,000 18,220,000

43/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

44 7,980,000 3,420,000 501,600,000

1 10,950,000 4,690,000 15,640,000

15 15,740,000 6,740,000 337,200,000


FIRE-DOOR

3 18,880,000 8,090,000 80,910,000

5 21,250,000 9,100,000 151,750,000

4 49,840,000 21,360,000 284,800,000

2 96,190,000 41,225,000 274,830,000

1 4,340,000 1,860,000 6,200,000

1 6,080,000 2,600,000 8,680,000 Steel door(light gray)

44/80
onstruction of Main Power Building
Unit Price Total Price
Qty Steel door(lightRemark
gray)
Material Construction (IDR)

1 9,130,000 3,910,000 13,040,000

2 30,380,000 13,020,000 86,800,000

1 142,540,000 61,090,000 203,630,000

10 3,920,000 1,680,000 56,000,000

2 5,890,000 2,520,000 16,820,000 Aluminum alloy doors

2 6,180,000 2,650,000 17,660,000

25 700,000 300,000 25,000,000

11 980,000 420,000 15,400,000

21 1,400,000 600,000 42,000,000


Aluminum alloy windows
2 10,090,000 4,320,000 28,820,000

1 54,410,000 23,320,000 77,730,000

45/80
onstruction of Main Power Building Aluminum alloy windows

Unit Price Total Price


Qty Remark
Material Construction (IDR)

2 250,000 100,000 700,000

46/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

4 2,050,000 155,000 8,820,000 Squating Pot (Ex. Toto CE9, Ina)

2 4,090,000 255,000 8,690,000 Urinoir (Ex. Toto U57, Ina)

Washbasin/Wastafel (Ex. Toto LW211CJ,


2.00 950,000 200,000 2,300,000 Ina)

2.00 7,630,000 200,000 15,660,000 Slop Sink(Ex. Toto SK508, Ina)

self-closing flush valve for Squatting Pot


4.00 2,420,000 9,680,000 (Ex. Toto tv150nwv12j, Ina)

self-closing flush valve for Urinoir (Ex. Toto


2.00 1,040,000 2,080,000 t60p, Ina)

2.00 743,000 1,486,000 Faucet (Ex. Toto TX109LD, Ina)

2.00 634,000 1,268,000 Faucet (Ex. Toto t30arq13n, Ina)

2.00 70,000 140,000

1.00 302,000 302,000

2.00 274,000 548,000

1.00 224,000 224,000

47/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

1.00 182,000 182,000

18.00 88,000 1,584,000

4.00 75,000 300,000

5.00 63,000 315,000

3.00 45,000 135,000

10.00 36,000 360,000

2.00 101,000 202,000

4.00 578,000 2,312,000 Toto, Ina

1.00 230,000 230,000

2.00 458,100 916,200

4.00 228,000 912,000 Rucika, Pralon

6.00 282,000 1,692,000 Rucika, Pralon

3.00 125,000 375,000 Rucika, Pralon

48/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

8.00 129,550 1,036,400 Rucika, Pralon

5.00 101,730 508,650 Rucika, Pralon

4.00 99,000 396,000 Rucika, Pralon

1.00 47,000 47,000 Rucika, Pralon

8.00 112,000 896,000 Rucika, Pralon

4.00 93,800 375,200 Rucika, Pralon

35.00 205,000 7,175,000 Rucika, Pralon

2.00 1,294,000 2,588,000 Rucika, Pralon

1.00 5,000,000 5,000,000

10 0 0 - 电缆等是否有?

8 0 0 -

60 25,500 25,500 3,060,000

125 20,000 20,000 5,000,000

49/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

125 57,000 57,000 14,250,000

7 0 -

50/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

7 -

197 125,000 24,625,000 附150W高压钠灯光源

89 125,000 11,125,000 附100W高压钠灯光源

24 125,000 3,000,000 附150W高压钠灯光源

14 125,000 1,750,000 附100W高压钠灯光源

30 449,000 125,000 17,220,000 附400W高压钠灯光源

116 232,000 125,000 41,412,000

38 111,500 125,000 8,987,000

81 111,500 125,000 19,156,500

123 232,000 125,000 43,911,000

51/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

24 4,500,000 125,000 111,000,000

6 86,500 125,000 1,269,000 LED灯 9W

45 485,000 125,000 27,450,000

31 174,750 125,000 9,292,250

24 470,000 125,000 14,280,000

46 65,000 125,000 8,740,000

21 12,300 100,000 2,358,300 broco

52/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)

32 15,500 100,000 3,696,000

57 12,300 100,000 6,401,100

11 15,500 100,000 1,270,500

9 100,000 900,000

46 60,000 125,000 8,510,000

2 4,000,000 125,000 8,250,000

24000 15,000 360,000,000

15300 15,000 229,500,000

13100 15,000 196,500,000

Total amount: 8,138,595,680

53/80
onstruction of Main Power Building
Unit Price Total Price
Qty Remark
Material Construction (IDR)
ontractor, the others test and detection shall be carry out by subcontractor. The concrete shall be

车能到位置。

54/80
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
II. Decorative Works
2-3 mm nonmetal aggregate wear - resisting layer(nonmetal aggregate material is made up of quartz
120,000
aggregate, special cement and other addictive of a certain grain degree)
50 mm C20 fine aggregate concrete, proper placed finished; 25,000
Wear-resisting
one layer of neat cement binding course; 21,000
2.1 DM1A nonmetal aggregate-A 302,500 m2
Thickness 350 mm grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000
Polyethylene film slab; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted; 60,000
rammed by soil (including surface cleaning and levelling) 30,000
2-3 mm nonmetal aggregate wear - resisting layer(nonmetal aggregate material is made up of quartz
120,000
aggregate, special cement and other addictive of a certain grain degree)
50 mm C20 fine aggregate concrete, proper placed finished; 25,000
Wear-resisting
one layer of neat cement binding course; 21,000
2.2 DM1B nonmetal aggregate-B 292,500 m2
Thickness 250 mm grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
Polyethylene film slab; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted; 60,000
rammed by soil (including surface cleaning and levelling) 30,000
8~10mm tiles, seams be filled by neat cement; 262,000
20mm 1:3 cement mortar; 60,000
Wear-resisting tile-A One layer of neat cement binding course (mixed with construction glue); 21,000
2.3 DM2A Thickness 230 mm grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000 479,500 m2
(tile size 600*600) polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
8~10mm tiles, seams be filled by neat cement; 262,000
20mm 1:3 cement mortar; 60,000
Wear-resisting tile-B One layer of neat cement binding course (mixed with construction glue); 21,000
2.4 DM2B Thickness 330 mm grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 469,500 m2
(tile size 600*600) polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil. 30,000
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 170,000
20mm 1:3 cement mortar; 60,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and 120,000
ground, the paint should be 150mm over the ground along the wall.
waterproof tile- One layer of base primer; 30,000
2.5 DM3 Thickness 232 mm 524,500 m2
fine aggregate concrete, 1% slope to ground leakage (not include material) 18,000
(tile size 300*300)
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
40mm C20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2~3mm fine cement and be pressed polish(nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’s specifications) ;

Wear-resisting 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
nonmetal aggregate ground, the paint should be 150mm over the ground along the wall.
2.6 DM4A 384,000 m2
waterproof concrete-A
One layer of base primer; 30,000
Thickness 262 mm
20mm 1:3 cement mortar sloping(thinnest point); 60,000
grade A ground slab(Φ10@200 two layer rebar, 250mm concrete)not included material 45,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
40mmC20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2~3mm fine cement and be pressed polish (nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’s specifications)

Wear-resisting
nonmetal aggregate
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Wear-resisting 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
nonmetal aggregate ground, the paint should be 150mm over the ground along the wall.
2.7 DM4B 374,500 m2
waterproof concrete-B One layer of base primer; 30,000
Thickness 262 mm
20mm 1:3 cement mortar sloping(thinnest point); 60,000
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
anti-static raised floor (the elevation see from the design drawings); 1,800,000
20mm1:2 cement mortar precausions and light pressure; 45,000
One layer of neat cement binding course; 21,000
20mm1:2 cement mortar precausions; 45,000
Plain cement binds together; 21,000
2.8 DM5 raised floor 2,088,500 m2
20mm thickness of polymer cement waterproofing mortar; 30,000
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil. (including surface cleaning and levelling) 30,000
20mm 1:2.5 cement mortar which is no sparking, surface screeding and pressed polish; 81,020
One layer of neat cement binding course; 21,000
no-sparkig cement grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
2.9 DM6 228,520 m2
motor floor polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling)(including surface cleaning and levelling) 30,000
20mm granites tiles firmly paved and clapped to be smooth , seams be filled by epoxy resin daub; 1,450,000
4~6mmpolyurethane
1.5mm epoxy cementwaterproofing
bonding layer;paint, the surface be sprinkled with sand, at the junction of metope and 67,000
ground, the paint should be 150mm over the ground along the wall. 120,000
One layer of base primer; 30,000
anti-corrosion granites C20 fine aggregate concrete, 1% slope to ground leakage(the thinnest point should not be less than 20mm); 10,000
2.10 DM7 tiles floor 1,824,500 m2
Neat cement binding course 21,000
(tile size 600*600)
grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000
polyethylene film vapor barrier; 1,500
150mm gravel perfused with M5 cement mortar, vibrated and compacted. 60,000
Rammed by soil.(including surface cleaning and levelling) 30,000
1. 2~3mm nonmetal aggregate wearresisting layer (nonmetal aggregate material is made up of quartz
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information 120,000
wear-resisting nonmetal refer to subcontractor’s specifications);
2.11 LM1 156,000 m2
aggregate 2. 30mm C20 fine aggregate concrete, proper placed and finished; 15,000
3. One layer of neat cement binding course; 21,000
4. Reinforced concrete slab. (Finished) -
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 262,000
tile 20mm 1:3 dry-hard cement mortar; 99,000
2.12 LM2 382,000 m2
(tile size 600*600)
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name
tile (IDR)
2.12 LM2 382,000 m2
(tile size 600*600) One layer of neat cement binding course; 21,000
Reinforced concrete slab (finished). -
8~10mm tiles firmly paved and clapped to be smooth , seams be filled by neat cement; 170,000
25mm 1:4 dry-hard cement mortar; 110,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
120,000
ground, the paint should be 150mm over the ground along the wall.
waterproof tile
2.13 LM3 One layer of base primer; 30,000 513,000 m2
(tile size 300*300)
15mm 1:2 cement mortar screeding; 58,000
50mm C20 fine aggregate concrete, 0.5% slope to ground leakage(the thinnest point should not be less than
25,000
30mm);
Reinforced concrete slab (finished). -
40mm C20 fine aggregate concrete, reinforced with bidirectional Ф4 rebar, distance @150, the surface be
sprinkled with 2mm fine cement and be pressed polish (nonmetal aggregate material is made up of quartz
38,000
aggregate, special cement and other addictive of a certain grain degree, the relevant technical information
refer to subcontractor’sspecifications);
Wear-resisting
2.14 LM4 nonmetal aggregate 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and 120,000 203,000 m2
waterproof concrete ground, the paint should be 150mm over the ground along the wall.
1:2 cement mortar screeding to falls (the thickness of the thinnest point should not be less than 20mm), the
45,000
junction of metope and ground be plastered into slope foot.
Reinforced concrete slab (finished). -
20mm granites tiles firmly paved and clapped to be smooth , seams be filled by epoxy resin daub; 1,450,000
4~6mm epoxy cement bonding layer; 67,000
1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand, at the junction of metope and
anti-corrosion granites ground, the paint should be 150mm over the ground along the wall. 120,000
2.15 LM5 tiles floor 1,735,000 m2
(tile size 600*600) One layer of base primer; 30,000
15mm 1:2 cement mortar screeding; 58,000
C20 fine aggregate concrete, 1% slope to trench(the thinnest point should not be less than 20mm); 10,000
Reinforced concrete slab (finished). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
anti-static raised floor(height refer to building architecture drawings); 1,800,000
20mm1:2 cement mortar precausions and light pressure; 60,000
One layer of neat cement binding course; 21,000
2.16 LM6 raised floor 1,960,000 m2
15mm 1:2 cement mortar screeding and pressed polish; 58,000
One layer of neat cement binding course; 21,000
Reinforced concrete slab (finished). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Mixed Mortar or spray (or brush) latex paint of internal wall; 27,000
Interior wall -1A 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.17 IW1A wall painting -1A 165,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
brush antacid painting of internal wall (thickness); 28,000
Interior wall-1B 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.18 IW1B wall painting -1B 166,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
brush antacid painting of internal wall (thickness); 28,000
Interior wall -1C 5mm thick 1:0.5:3 cement-lime mortar; 32,000
2.19 IW1C wall painting -1C 166,000 m2
15mm thick 1:1:6 cement-lime mortar; 53,000
thickness 20mm
brush building glue and plain compo once(building glue:water=1:4) 53,000
5~7mm white glazed ceramic tile, seams filled with white cement. 70,000
Inerior Wall 2 - glazed 3~4mm 1:1 cement paste and add the 20% weight construction glue of it; 28,000
2.20 IW2 ceramic wall tile One layer of neat cement binding course; 21,000 215,000 m2
thickness 25mm 15mm 1:3 cement mortar; 58,000
Brush exclusive interface agent for one layer; 38,000
Brush with coated mixed paint twice (thickness) and brush coated primer once; 75,000
Interior Wall 3- wall Scraping putty leveling once; 3,000
2.21 IW3 painting -3 thickness 187,000 m2
5~8mm 1:2cement mortar; 51,000
20mm
15mm 1:3 cement mortar; 58,000
20mm granites tiles firmly paved and clapped to be smooth, seams be filled by epoxy resin daub. 1,450,000
5mm mating epoxy cement bonded layer; 49,000
Interior wall 4 - 1.5mm polyurethane waterproofing paint, the surface be sprinkled with sand; 120,000
2.22 IW4 wall painting -4 1,772,000 m2
7mm polymer cement mortar screeding; 70,000
thickness 40mm
5mm 1:3 cement mortar; 45,000
Brush exclusive interface agent for one layer; 38,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Brush with coated mixed paint twice (thickness) and brush coated primer once; 87,000
5mm dry powder type of polymer cement waterproof mortar, and press a layer of alkali resistant glass fiber
Exterior wall 3 - 70,000
mesh inside it;
2.23 EW3 wall painting -3 269,250 m2
thickness 30mm 6mm 1:2.5 cement mortar; 29,700
9mm 1:3 cement mortar; 44,550
Brush exclusive interface agent for one layer; 38,000
brick install with motor, 90,000
2.24 Concrete Brick wall others works for the brick 15,000 105,000 m2

Concrete column
practical, Bond beam &
2.25 including form works, construction etc. 2,945,000.00 2,945,000 m2
lintel beam, wall
concrete foundation
Ceiling aluminum alloy Matched aluminum alloy keel;
2.26 DP1 plate ceiling with Square (rectangle) PVC board. 66,000 m2
aluminum alloy keel

Standard light gage steel keel: the central distance of main keels should not more than 1200, and of the
Ceiling DP 2 - mineral second-rate keels should be 600mm, the wall should be less than 300mm apart from the nearest hanging
2.27 DP2 wool board with light bar; 24,000 m2
gage steel keel
Mineral wool board.
Base Board T1 - (high Brush exclusive interface agent for one layer; 38,000
2.29 150) cement mortar 12mm 1:3 cement lime mortar; 59,400 135,650 m2
washboard 6mm 1:2 cement lime mortar plaster and pressed polish; 38,250
Brush exclusive interface agent for one layer; 38,000
Base Board T2 - (high 9mm 1:3 cement lime mortar; 44,550
150) ceramic tile 6mm 1:2 cement lime mortar; 38,250
2.30 349,800 m2
washboard thickness 26 One layer of neat cement binding course; 21,000
mm 3~4mm 1:1 cement paste and add the 20% weight construction glue of it; 28,000
5~7mm white glazed ceramic tile, size is 600mmx100mm, seams filled with white cement. 180,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
60mm thick fine aggregate concrete pavement, fck=4000psi bestrewed crosswise by grooves whose depth is
70,000
15mm.
One layer of neat cement binding course(mixed with construction glue); 21,000
2.31 Ramp A P1-A grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 196,000 m2
100mm thick screes(gravels) whose grain diameter is 10~40mm,poured with M5 cement mortar, 40,000
rammed earth 30,000
60mm thick fine aggregate concrete pavement, fck=4000psi bestrewed crosswise by grooves whose depth is
70,000
15mm.
One layer of neat cement binding course(mixed with construction glue); 21,000
2.32 Ramp B P1-B grade B ground slab(Φ10@300 single layer rebar, 120mm concrete)not included material 35,000 196,000 m2
100mm thick screes(gravels) whose grain diameter is 10~40mm,poured with M5 cement mortar, 40,000
rammed earth 30,000
C20 step and barricade 1. including form works, construction etc.
2.33 4,150,000 m3
concrete
60mm thick fine aggregate concrete pavement,
70,000
150mm thickness 10-40mm stone with M2.5 motor 60,000
2.34 Apron 130,000 m3

8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar;
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
RC roof (grade I, One layer of 0.4mm polyethylene film be fully paved; 1,500
2.35 WM 1A architectural slop and Two layers of waterproof roll; 195,000 418,500 m2
often-step roof) 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar; -
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
RC roof (grade I, One layer of 0.4mm polyethylene film be fully paved; 1,500
2.36 WM 1B structural slop and Two layers of waterproof roll; 195,000 418,500 m2
often-step roof) 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
Two layers of waterproof roll, and surface protection; 195,000
RC roof (grade I, 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
2.37 WM 1C structural slop and non- 1:8 expanded pearlite cement sloping by 2%, and the thinnest point is not less than 20mm; 20,000 327,000 m2
step roof) 50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Two layers of waterproof roll, and surface protection; 195,000
RC roof (grade I, 20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
2.38 WM 1D structural slop and 50mm extruded sheet; 35,000 307,000 m2
often-step roof) reinforced concrete floor (under construction). -

8~10mm tiles firmly paved and clapped to be smooth , seams be 5~8mm, and filled by 1:1 cement mortar; -
25mm 1:4 dry-hard cement mortar, the surface be sprinkled with plain cement; 110,000
One layer of 0.4mm polyethylene film be fully paved; 1,500
RC roof (grade I, One layer of water-proof roll; 130,000
2.39 WM 2A structural slop and 373,500 m2
20mm 1:3 cement mortar screeding, and 0.75~0.90kg/m3 nylon being mixed; 77,000
often-step roof)
1:8 expanded pearlite cement sloping by 2%, and the thinnest point is not less than 30mm; 20,000
50mm extruded sheet; 35,000
reinforced concrete floor (under construction). -
Floor for steel stairs, NOT including the steel stairs
25,000
2.40 Floor for Steel Stairs 83,000 m2
Cement Mortar Screeding (see details from T0103-03) 58,000
including material supply and construction etc. 24,000,000
2.41 Embedded 24,000,000 T

IV. Decorative Works


Squatting Squating Pot (Ex. Toto CE9, Ina) 2,024,000
4.1 ceramic 2,058,000 set
pot Cement Mortar 34,000
Urinoir (Ex. Toto U57, Ina) 2,576,000
4.2 Urinal ceramic Separator (Ex. Toto A100) 1,500,000 4,092,000 set
Cement Mortar 16,000
Washbasin/Wastafel (Ex. Toto LW211CJ, Ina) 588,800
4.3 Wash basin ceramic Accesoris (THX1A-3N, TX277S) 350,000 954,800 set
Cement Mortar 16,000
Slop Sink(Ex. Toto SK508, Ina) 7,268,000
4.4 Slop Sink ceramic Accesoris (THX1A-3N, TX277S) 350,000 7,634,000 set
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code
4.4 Slop Sink Name
ceramic (IDR)
7,634,000 set
Cement Mortar etc. 16,000
self-closing flush valve for Squatting Pot (Ex. Toto tv150nwv12j, Ina) 2,392,000
4.5 self-closing flush valve DN25 Construction Cost 20,000 2,428,000 set
Seal Tape etc. 16,000
self-closing flush valve for Urinoir (Ex. Toto t60p, Ina) 1,012,000
4.6 self-closing flush valve DN25 Construction Cost 20,000 1,048,000 set
Seal Tape etc. 16,000
Faucet (Ex. Toto TX109LD, Ina) 707,480
4.7 Tap for wash basin Construction Cost 20,000 743,480 set
Seal Tape etc. 16,000
Faucet (Ex. Toto t30arq13n, Ina) 598,000
4.8 Tap for Slop Sink Construction Cost 20,000 634,000 set
Seal Tape etc. 16,000
Angle Valve 1/2" (DN 15) 56,000
4.9 Angle Valve DN15 PN 0.6MPa Construction Cost 13,000 70,000 set
Seal Tape etc. 1,000
Globe Valve 1 1/2" (DN 40) 288,000
4.10 Globe Valve DN40 PN 0.6MPa Construction Cost 13,000 302,000 set
Seal Tape etc. 1,000
Globe Valve 1 1/4" (DN 32) 260,000
4.11 Globe Valve DN32 PN 0.6MPa Construction Cost 13,000 274,000 set
Seal Tape etc. 1,000
Globe Valve 1" (DN 25) 210,000
4.12 Globe Valve DN25 PN 0.6MPa Construction Cost 13,000 224,000 set
Seal Tape etc. 1,000
Globe Valve 1/2" (DN 15) 168,000
4.13 Globe Valve DN15 PN 0.6MPa Construction Cost 13,000 182,000 set
Seal Tape etc. 1,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
DN40 ø42*1 PN Stainless Steel Pipe DN40 52,500
4.14 Water Pipe 0.6MPa, stainless steel Construction Cost 20,000 88,250 m
316L Seal Tape etc. 15,750
DN32 ø38*1 PN Stainless Steel Pipe DN32 42,500
4.15 Water Pipe 0.6MPa, stainless steel Construction Cost 20,000 75,250 m
316L Seal Tape etc. 12,750
DN25 ø28*0.8 PN Stainless Steel Pipe DN25 37,500
4.16 Water Pipe 0.6MPa, stainless steel Construction Cost 15,000 63,750 m
316L Seal Tape etc. 11,250
DN20 ø22*0.6 PN Stainless Steel Pipe DN20 23,750
4.17 Water Pipe 0.6MPa, stainless steel Construction Cost 15,000 45,875 m
316L Seal Tape etc. 7,125
DN15 ø16*0.6 PN Stainless Steel Pipe DN15 16,250
4.18 Water Pipe 0.6MPa, stainless steel Construction Cost 15,000 36,125 m
316L Seal Tape etc. 4,875
DN40 ø42*3 PN Stainless Steel Pipe DN40 62,500
4.19 Water Pipe 0.6MPa, stainless steel Construction Cost 20,000 101,250 m
316L Seal Tape etc. 18,750
Floor Drain Dn50 500,000
DN50 UPVC ,self-
4.20 Floor Darin Construction Cost 28,000 578,000 set
styled type
Seal Tape etc. 50,000
Side Vent DN100 150,000
4.21 Side Vent DN100 Construction Cost 35,000 230,000 set
Seal Tape etc. 45,000
Check Hole DN100 337,000
4.22 Check Hole DN100 Construction Cost 20,000 458,100 set
Seal Tape etc. 101,100
P Water Trap DN100 UPVC 160,000
4.23 P Water trap DN100 Construction Cost 20,000 228,000 set
Seal Tape etc. 48,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)
S Water Trap DN100 UPVC 190,000
4.24 S Water trap DN100 Construction Cost 35,000 282,000 set
Seal Tape etc. 57,000
Reducer DN100/50 UPVC 90,000
4.25 Reducer DN100/50 Construction Cost 8,000 125,000 set
Seal Tape etc. 27,000
tee DN100x100 UPVC 93,500
4.26 Tee way DN100x100 Construction Cost 8,000 129,550 set
Seal Tape etc. 28,050
tee DN100x50 UPVC 72,100
4.27 Tee way DN100x50 Construction Cost 8,000 101,730 set
Seal Tape etc. 21,630
Elbow DN100 UPVC 90 70,000
4.28 Elbow DN100 Construction Cost 8,000 99,000 set
Seal Tape etc. 21,000
Elbow DN50 UPVC 90 30,000
4.29 Elbow DN50 Construction Cost 8,000 47,000 set
Seal Tape etc. 9,000
Elbow DN100 UPVC 45 80,000
4.30 Elbow DN100 Construction Cost 8,000 112,000 set
Seal Tape etc. 24,000
Pipe Joint/Sock DN100 UPVC 66,000
Pipe
4.31 DN100 Construction Cost 8,000 93,800 set
Joint/Sock
Seal Tape etc. 19,800
Drainage Pipe DN100 UPVC 150,000
Drainage
4.32 DN100 Construction Cost 10,000 205,000 set
Pipe
Seal Tape etc. 45,000
Drainage Pipe DN500 UPVC 980,000
Drainage
4.33 DN500 Construction Cost 20,000 1,294,000 set
Pipe
Seal Tape etc. 294,000
Unit Price List
Item Total Unit Price
No. Scopes of Works Price (IDR) Unit
Code Name (IDR)

lighting
6.1 distribution NM-XRMG3-36B - set
Box

lighting
6.2 distribution NM-XRMG3-36B - -
Box
Proyek : Project Pembangunan Jalan Tol Cinere Jagorawi Paket 2A (Tengah)
Waktu Pelaksanaan : 14 Bulan
Waktu Pemeliharaan : 36 Bulan (Jaminan Performa)
Nilai Kontrak :
RINCIAN BIAYA UMUM LAPANGAN

No. Uraian Pekerjaan Unit Volume

71500 B. BIAYA UMUM LAPANGAN

71510 Biaya Pegawai (Gaji Pokok + Tunjangan Lapangan)

1 Project Manager 1 Bln 12.00


2 Site Administration Manager 1 Bln 12.00
1 Accounting / Tax / Finace 1 Bln 12.00
2 Administrasi Kontrak 1 Bln 12.00
3 General Affair 1 Bln 12.00
4 Site Operation Manager 1 Bln 12.00
5 Pelaksana Zona 1 2 Bln 12.00
9 Pelaksana Zona 2 2 Bln 12.00
6 Pelaksana Zona 3 2 Bln 12.00
7 Pelaksana Zona 4 2 Bln 12.00
8 Pelaksana Peralatan 1 Bln 12.00
9 Assiten Peralatan / Mekanik 1 Bln 12.00
10 Site Procurement Manager 1 Bln 12.00
11 Logistik 2 Bln 12.00
12 Gudang 1 Bln 12.00
13 Site Engineer Manager 1 Bln 12.00
14 Plan Engineer 1 Bln 12.00
15 Adiministrasi Teknik 1 Bln 12.00
16 Material Engineer 1 Bln 12.00
17 Quantity Engineer 1 Bln 12.00
22 Chief Surveyor 1 Bln 12.00
18 Surveyor 1 1 Bln 12.00
19 Surveyor 2 1 Bln 12.00
26 Surveyor 3 1 Bln 12.00
27 Surveyor 4 1 Bln 12.00
28 Asisten Surveyor 4 Bln 12.00
29 Drafter 1 Bln 12.00
30 Design Grafis 1 Bln 12.00
31 Pengendalian 1 Bln 12.00
32 Construction Engineer 1 Bln 12.00
33 QSHE Manager 1 Bln 12.00
34 Sekretaris / PPDM 1 Bln 12.00
35 Driver 3 Bln 12.00
36 Office Boy 2 Bln 18.00
37 Koordinator Keamanan 1 Bln 12.00
38 Keamanan 5 Bln 12.00
39
40
TOTAL JUMLAH PEGAWAI 51 ORANG
No. Uraian Pekerjaan Unit Volume

41 Penunjang Uang makan ls


42 Penunjang Uang lembur ls 1.00
43 Penunjang Pesangon dan Tunjangan cuti ls 2.00
44 Penunjang THR ( 1 Bulan Gaji ) ls 1.00

Total Biaya Pegawai


No. Uraian Pekerjaan Unit Volume

No. Uraian Pekerjaan Unit Volume

71520 Biaya Umum


a Biaya Peralatan Kantor
1 Meja Rapat + Kursi (HK) set 4.00
2 Meja & Kursi set 6.00
3 Meja + kursi kerja Kantor Proyek (HK) set 51.00
4 Papan tulis unit 5.00
5 Filling cabinet unit 3.00
6 Brankas unit 1.00
7 Computer Intel Core 2 Duo ( Sejenis) unit 4.00
8 Note Book Lenovo 14 " ( sejenis ) unit 3.00
9 Printer Desk Jet 1120 C - Ukuran max A3 unit 3.00
10 Printer pixma MP 150 unit 1.00
11 Calculator casio bh 10.00
12 Mesin Foto Copy ( Beli baru) unit 1.00
13 Telephone & Instalasi unit 1.00
13 Faxcimile, unit 1.00
14 Dispencer unit 2.00
15 Rak arsip dan ISO ls 1.00
16 Camera Digital unit 3.00
18 Modem external unit 2.00

Sub Total
b Biaya Kantor & Rumah Tangga
1 Sewa Kantor Kontraktor & pemeliharaan bln 14.00
1 Sewa Mess karyawan bln 14.00
3 AC 3/4 PK bh 6.00
2 Tagihan PLN Mess bln 14.00
5 Tagihan telephone + Internet bln 14.00
3 Tagihan PAM Mess bln 14.00
7 Progress photos & Montly report bln 14.00
4 Alat-alat tulis bln 14.00
5 Administrasi ISO-9002 lot 14.00
10 Rapat mingguan bln 14.00
6 Catering ( 30 Org x 25 hr x Rp. 7500 ) bln 14.00
7 Selamatan lot 1.00
8 Tol dan Restribusi oprs kantor 2x30x50000 bln 14.00
9 Copy original lbr 100.00
15 As build draw 10 set uk A3 lbr 100.00
16 As build draw 1 set uk A1 Kalkir Sephia lbr 100.00
10 Jilid dokumen lot 25.00
11 Tempat tidur dan perlengkapan bh 30.00
12 Aqua ( 4 galon x 30 Day x Rp.12000 ) bln 14.00
13 Kertas
- Uk.A3 ( 15 rim/bln) bln 14.00
- Uk.A4 ( 20 rim/bln) bln 14.00
- Uk.A1 1500 lbr lbr 1,500.00
- Kertas Blangko, request, dll bln 14.00
14 Kelengkapan Satpam + seragam 3 set lot 3.00
15 Tinta printer ( 4 nos/month ) bln 14.00
16 Akomodasi Mess bln 14.00
17 Lembur Konsultan bln 14.00
No. Uraian Pekerjaan Unit Volume

18 Pengobatan Karyawan Bln 14.00


19 Pulsa Handphone Manager 5 Orang Bln 14.00
20 Pulsa HP Pelaksana Lap & Eng.(10 orng) Bln 14.00

Sub Total
c Biaya Administrasi Umum Dll
1 Pengurusan tagihan bln 12.00
2 Pengurusan Dokumen kontrak, dan PHO nos 1.00
3 Biaya Pemeliharaan dan FHO nos 1.00
4 Biaya Fasilitas direksi ls 1.00
Sub Total
d Biaya Lain-lain
1 Buang Sampah Harian bln 1.00
2 Biaya Penambahan Daya listrik lot 1.00
3 Biaya Pembersihan Akhir/perbaikan Ls 1.00
2 Operasional Konsultan MK & Supervisi bln 14.00

Sub Total
Total Biaya Umum
No. Uraian Pekerjaan Unit Volume

No. Uraian Pekerjaan Unit Volume

71530 Biaya Pemasaran


Total Biaya Pemasaran

71540 Biaya Kunjungan Tamu

1 Kunjungan Tamu Proyek bln 14.00


2 Kunjungan Team Iso & Ohsas lot 2.00

Total Biaya Kunjungan Tamu


71550 Biaya Laboratorium

1 Test Concrete Cube bh 3,000.00


2 Test Bar reinforcement lot 20.00
3 Test Tanah quarry complete lot 3.00
4 Test Bearing Pad lot 8.00
5 Test Expantion Joint lot 8.00
6 Test Asphalt lot 2.00

Total Biaya Laboratorium

71570 Biaya Kendaraan

Investasi kendaraan
Pembelian Mobil Toyota Kijang Inova Type G ( Diesel) unit -
( masuk ke biaya alat)

Sewa Kendaraan
Sewa Kend. Niaga untuk Manager ( 3 unit) bln 14.00
Sewa Kend. Niaga untuk operasional kantor ( 1 unit) bln 14.00
Sewa Kend. Pick-up untuk lapangan ( 2 unit) bln 14.00
Sewa Sepeda Motor ( 5 unit ) bln 14.00

1 Operasional kendaraan
Kendaraan operasional (7 unit)
- Fuel ( 20 Ltr x 25 day x Rp 6500 x 3) untuk Manager Bln 14.00
- Fuel ( 20 ltr x 25 day x Rp 6500 x 3 ) bln 14.00
- Service : Tune Up nos 21.00
- Ganti Ban nos 12.00
- Tol & Retribusi ( 15000 x 14 x 25 ) bln 14.00
- Fuel ( 2 ltr x 25 day x Rp 6500 x 5 ) Spd Mtr bln 14.00

2 R & O Kendaraan Operasional bln 14.00


Total Biaya Kendaraan

71580 Biaya ISO & OHSAS & SMK3L


a
1 Operasional ISO & OHSAS & SMK3L Set 1.00
2 Biaya SMK3L
- Personil K3 ( 4 Orang) bln 56.00
- Seragam Karyawan ( 60 psg x 3 stel) stel 180.00
No. Uraian Pekerjaan Unit Volume

- APD Staf (Sepatu Safety , Rompi, Helm) org 60.00


- APD Pekerja (Sepatu Boot , Rompi, Helm) org 100.00
- Rambu-rambu, banner dll bln 14.00
- Biaya adm / rapat K3 bln 14.00
- Award k3 bln 14.00

Total Biaya Iso & Ohsas & SMK3L

Biaya Persiapan, Perijinan & Koordinasi


b Perijinan
1 - Local authority lot 14.00
2 - Permit RT / RW ( lingkungan ) lot 14.00
3 - Pengawas Pemda bln 14.00
4 - Police Permit & Traffic Permit lot 14.00
Sub Total Perijinan

TOTAL BIAYA UMUM LAPANGAN


Cinere Jagorawi Paket 2A (Tengah)

Harga Jumlah

21,133,148.00 253,597,776.00
16,093,668.00 193,124,016.00
7,000,000.00 84,000,000.00
5,500,000.00 66,000,000.00
9,896,545.60 118,758,547.20
11,853,016.00 142,236,192.00
9,896,545.60 237,517,094.40
7,000,000.00 168,000,000.00
7,000,000.00 168,000,000.00
9,821,790.40 235,722,969.60
9,896,545.60 118,758,547.20
5,500,000.00 66,000,000.00
11,816,072.80 141,792,873.60
6,500,000.00 156,000,000.00
4,000,000.00 48,000,000.00
11,563,339.60 138,760,075.20
10,975,898.40 131,710,780.80
6,500,000.00 78,000,000.00
7,500,000.00 90,000,000.00
10,975,898.40 131,710,780.80
7,500,000.00 90,000,000.00
10,025,068.40 120,300,820.80
7,000,000.00 84,000,000.00
7,000,000.00 84,000,000.00
7,000,000.00 84,000,000.00
6,500,000.00 312,000,000.00
6,500,000.00 78,000,000.00
8,746,222.00 104,954,664.00
6,500,000.00 78,000,000.00
9,821,790.40 117,861,484.80
7,000,000.00 84,000,000.00
4,000,000.00 48,000,000.00
6,503,079.40 234,110,858.40
3,000,000.00 108,000,000.00
4,000,000.00 48,000,000.00
2,500,000.00 150,000,000.00

4,592,917,480.80
Harga Jumlah

Include Gaji
135,590,748.86 135,590,748.86
329,330,590.11 658,661,180.23
329,330,590.11 329,330,590.11

Rp 5,716,500,000.00
Harga Jumlah

Harga Jumlah

3,500,000.00 14,000,000.00
3,000,000.00 18,000,000.00
750,000.00 38,250,000.00
200,000.00 1,000,000.00
1,200,000.00 3,600,000.00
2,800,000.00 2,800,000.00
7,000,000.00 28,000,000.00
9,000,000.00 27,000,000.00
5,000,000.00 15,000,000.00
1,250,000.00 1,250,000.00
150,000.00 1,500,000.00
60,000,000.00 60,000,000.00
1,500,000.00 1,500,000.00
1,250,000.00 1,250,000.00
1,100,000.00 2,200,000.00
5,000,000.00 5,000,000.00
1,600,000.00 4,800,000.00
1,500,000.00 3,000,000.00

Rp 228,150,000.00

12,500,000.00 175,000,000.00
3,500,000.00 49,000,000.00
4,500,000.00 27,000,000.00
2,500,000.00 35,000,000.00
3,000,000.00 42,000,000.00
1,500,000.00 21,000,000.00
150,000.00 2,100,000.00
750,000.00 10,500,000.00
350,000.00 4,900,000.00
1,000,000.00 14,000,000.00
5,625,000.00 78,750,000.00
7,500,000.00 7,500,000.00
3,000,000.00 42,000,000.00
50,000.00 5,000,000.00
70,000.00 7,000,000.00
45,000.00 4,500,000.00
100,000.00 2,500,000.00
250,000.00 7,500,000.00
1,440,000.00 20,160,000.00

150,000.00 2,100,000.00
150,000.00 2,100,000.00
3,000.00 4,500,000.00
1,000,000.00 14,000,000.00
500,000.00 1,500,000.00
2,000,000.00 28,000,000.00
500,000.00 7,000,000.00
12,000,000.00 168,000,000.00
Harga Jumlah

5,000,000.00 70,000,000.00
750,000.00 10,500,000.00
1,000,000.00 14,000,000.00

Rp 877,110,000.00

5,000,000.00 60,000,000.00
50,000,000.00 50,000,000.00
63,890,000.00 63,890,000.00
120,000,000.00 120,000,000.00
Rp 293,890,000.00

100,000.00 100,000.00
7,500,000.00 7,500,000.00
5,000,000.00 5,000,000.00
12,000,000.00 168,000,000.00

Rp 180,600,000.00
Rp 1,579,750,000.00
Harga Jumlah

Harga Jumlah

Rp -

3,000,000.00 42,000,000.00
7,500,000.00 15,000,000.00

57,000,000.00

15,000.00 45,000,000.00
750,000.00 15,000,000.00
2,500,000.00 7,500,000.00
1,500,000.00 12,000,000.00
1,500,000.00 12,000,000.00
5,000,000.00 10,000,000.00

otal Biaya Laboratorium Rp 101,500,000.00

- -

12,000,000.00 168,000,000.00
5,000,000.00 70,000,000.00
4,500,000.00 63,000,000.00
3,750,000.00 52,500,000.00

9,750,000.00 136,500,000.00
9,750,000.00 136,500,000.00
2,000,000.00 42,000,000.00
1,000,000.00 12,000,000.00
5,250,000.00 73,500,000.00
1,625,000.00 22,750,000.00

1,000,000.00 14,000,000.00
otal Biaya Kendaraan Rp 790,750,000.00

3,000,000.00 3,000,000.00

3,500,000.00 196,000,000.00
250,000.00 45,000,000.00
Harga Jumlah

300,000.00 18,000,000.00
200,000.00 20,000,000.00
2,000,000.00 28,000,000.00
500,000.00 7,000,000.00
4,000,000.00 56,000,000.00

otal Biaya Iso & Ohsas & SMK3L 373,000,000.00

3,000,000.00 42,000,000.00
750,000.00 10,500,000.00
1,000,000.00 14,000,000.00
2,500,000.00 35,000,000.00
b Total Perijinan Rp 101,500,000.00

8,720,000,000.00