You are on page 1of 2

Add Equipment

Unit Number 100

Edit Equipment
CEPCI 576.4
Remove All Equipment

User Added Equipment


Area (square Purchased Bare Module
Dryers Type meters) Equipment Cost Cost
Dy-101 Tray 6 $ 16,000 $ 20,000

Shell Pressure Tube Pressure Area (square Purchased Bare Module


Exchangers Exchanger Type (barg) (barg) MOC meters) Equipment Cost Cost
E-101 Spiral Tube 0 1 Carbon Steel / Carbon Steel 12.3 $ 32,600 $ 107,000
E-102 Spiral Tube 0 1 Carbon Steel / Carbon Steel 7.34 $ 24,700 $ 81,300
E-103 Spiral Tube 0 1 Carbon Steel / Carbon Steel 2.68 $ 16,800 $ 55,400
E-104 Air Cooler 1 Carbon Steel 7.14 $ 30,200 $ 65,400
E-105 Air Cooler 1 Carbon Steel 7.87 $ 30,200 $ 65,400

Area (square Purchased Bare Module


Filters Type meters) Equipment Cost Cost
Fr-101 Gravity 4.9 $ 51,800 $ 85,500
Fr-102 Gravity 12.6 $ 81,400 $ 134,000

Steam Pressure Purchased Bare Module


Fired Heaters Type Heat Duty (MJ/h) Superheat (°C) MOC (barg) Equipment Cost Cost
H-101 Process Heater 3600 Carbon Steel 1 $ 686,000 $ 1,460,000
Volume Purchased Bare Module
Reactors Type (cubic meters) Equipment Cost Cost
R-101 Jacketed Non-Agitated 18.4 $ 27,000 $ 108,000

Storage Volume Purchased Bare Module


Tanks Tank Type (cubic meters) Equipment Cost Cost
Tk-101 Floating Roof 4.69 $ 261,000 $ 287,000

Length/Height Diameter Pressure Purchased Bare Module


Vessels Orientation (meters) (meters) MOC Demister MOC (barg) Equipment Cost Cost
V-101 Vertical 2 2 Titanium Clad 1 $ 12,200 $ 131,000
V-102 Vertical 1 2 Titanium Clad 1 $ 8,110 $ 87,300

Total Bare Module Cost $ 2,687,300

You might also like