Professional Documents
Culture Documents
Introduction
Summary
Purposes of Soil Instrumentations
Site Investigation Design Verification Construction
Control
Ground
Critical Conditions Instrument
Parameters Life
WHY DO WE NEED
INSTRUMENTATION?? It is a useful tool to
supplement what we can not
identify trend of
behaviours & quantify the E
W
changes of the crucial
parameters affecting the
bahaviours in the
observation.
S
Benefits of Soil Instrumentation
1
3
Design Verification 2
& Optimisation Cost & Time
Saving
Construction &
Operational Safety
If you can not get high quality and reliable data, then better
don’t initiate any instrumentation scheme because it will
create more problems than being advantageous.
Responsibility
Instrument
Installation
Data
Instruments Cycle related to Collection
Selection High quality
Instrumentation
Scheme
• Acceptance tests
Field • Instrument installation
• Establish baseline reading Instrumentation
Instrumentation
• Maintaining & calibrating Specialist
Service instruments regularly
• Data collection, processing &
presentation
PROBABILITY
DENSITY
PRECISION
SG EXT SM
SM
INC
Piezo
Inclinometer
Inclinometer
Application of
Inclinometer
Application of
Inclinometer
Settlement Extensometer
Gauge
Inclinometer Inclinometer
& Surface Marker
Sign of Sign of
Rotational Translation
failure failure
TYPES OF PIEZOMETER
STANDPIPE PIEZOMETER
HYDRAULIC PIEZOMETER
PNEUMATIC PIEZOMETER
Casagrande Standpipe
Piezometer
and
Water Level Meter/
Dipmeter
Standpipe Piezometer
Limitations
• Often very slow to respond to
changes in Pore Pressure particularly
Advantages
in low permeability soils
• Economical
• Prone to damage at the surface
• Simple to install
• Limited to long term pore pressure
• Simple to monitor
monitoring and ground water level
• Normally reliable due to simplicity
monitoring
• Can be up-graded to ADAS if
necessary
Hydraulic Piezometers
Operating principle
Hydraulic Piezometers
Advantages Limitations
Advantages Limitations
3
Cumulative Settlement(m)/Ht.of Fill(m)
Series1
1
SG27
-1
-2
-3
-200 -100 0 100 200 300 400 500 600 700
Time (days)
Magnetic Probe Extensometer
Instruments for
Monitoring Settlement
or Vertical
Displacement
Magnetic Extensometer
Magnetic
Extensometer
System
APPLICATION OF GEOTECHNICAL INSTRUMENT IN
CONSTRUCTION CONTROL
• Change in Pore Water Pressure > 0.7
Increase in Embankment Pressure
SM
INC
Piezo
APPLICATION OF GEOTECHNICAL INSTRUMENT IN CONSTRUCTION CONTROL
4.5
4.0
3.5
Settlement ρt (m)
3.0
2.5
2.0
1.5
1.0
0.5
0.0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4