IV.

I MODELING To be completed by:


Deadline:

Done? Project 1 Due By Notes


a Benerin lokasi jacket

Benerin lokasi barge, instate


a location
a Benerin dimensi crane skalatis
a Mooring
a tugger line, tugger beam minus tugger lines
Detail jacket gajadi convert, sudah bener semua kurang beam1, ngga nongo
a aneh
a sling
Name
Date
You can use this to-do list to help
you keep track of tasks that you
need to complete.

Enter your own project names,


tasks, and notes to personalize the
checklist for the things you need to
get done.

Then you can either print the list


and check off each item as you
complete it, or you can type the
semua kurang beam1, ngga nongol letter a in the Done? column to
make a check mark appear.

If you continue to work with this to-


do list on your computer, you can
use the AutoFilter feature of Excel
to quickly identify the tasks that
you have done or that you still
need to complete. In the Done?
column, click on the arrow to view
filtered lists.

To see filtered lists:


To see a list of items that are not
completed and still need to be
checked off, select (Blanks) in the
drop-down menu.

To see a list of items that are


checked off, select a in the drop-
down menu.

To see all the tasks again, select


(All) in the drop-down menu.

When you're finished using these


instructions, delete this text box by
selecting it and pressing DELETE.
IV.2 NERUSIN MODELING + RUN ANALISIS

Done? Project 2 Due By Notes

a Cek run pressure butuh atau ngga, bisa diganti g_pressure ?


RUN time domain, cek sudah tapi masih kendala di solution
ulang coding, maksut per catenary tugb
a command
RUN freq domain 1 jam
kalo timdom sama frq response sudah bener
a Tulis coding post structure baru bisa jalan
RUN post structure 0.5 jam
lowering jacket 2 jam
Check model status 1 jam
Simplified splash zone
analysis 1 jam
inactive tugger lines 1 jam

Problem
1. lowering berhenti Cuma sampe event 1, padahal kan baru turun 5 meter, SHEIGHT sudah diganti tapi ga nga
2. file log dari georgina sama saja, file dari geoff itu lebih ke even pas ada jacket mau diturunin, tapi dia ngga pa

Solusi
1. learning from webinar lifting, buka setiap file sample yang ada di video
2. pelajari lebih lanjut ttg yang itu, siapa tahu memang ada bagian dimana dia lowering, pastiin lokasi hook atau
3. pelajari spread.cif
4. pelajari lagi sidelift.cif , low_hit.cif

Repair
1. ref to faltinsen for computing vessel weight
2. spectrum sea used for analysis, malacca strait --> andaman sea asumsi jonswap
T sudah diganti tapi ga ngaruh sepertinya. Sebenernya SHEIGHT itu reference pointnya apa. Sudah diganti SHOOK masih sama saja n
diturunin, tapi dia ngga pakai command lowering

g, pastiin lokasi hook atau titik referensi jacketnya buat cari tahu ketinggiannya. Apakah dia turun gara2 gelombang atau memang ada

South China Sea Wind-Wave Characteristics. Part I: Validation of Wavewatch-III


Using TOPEX/Poseidon Data
ganti SHOOK masih sama saja ngga lanjut, event 1 saja. Mungkin ga nemu iterasi within tolerances

2 gelombang atau memang ada command loweringnya

ion of Wavewatch-III
Done? Project 2 Due By Notes
cek bab 1-5
insert hasil bab 5
Tulis kesimpulan
Done? Project 2 Due By Notes

Bikin ppt
Done? Project 2 Due By Notes
edit jacket
urutan sling ke jacket
atur posisi jacket
run
modifikasi barge