Pool Side Improvements

Work activity summary

Changing Room

 Replace existing granite


 Install additional fixtures and upgrades
 Upgrade of interior toilet room

Gazebo railings modification

 Replacing existing granite


 Replacing existing boarders
 Additional railings and upgrades
 Replacing ACP cladding
 Additional slats arctic wood
 Perimeter railings
 Timber deck railings upgrade
 Upgrade gazebo roofing ACP

Outdoor shower improvements

 Replacing existing shower


 Replacing shower tile and fixtures

Perimeter fence modifications

Proposed artificial turf walkway

Bridge railings upgrade

Bollards improvements

Improvements of uplighting
Common areas renovation (Interior design)
Work activity summary

Common areas

 Repair restain wood to match existing veneer finish


 Repair of cladding and flooring
 Replace lightings and fixtures
 Repainting of ceiling
 Replace and improve lighting
 Replace leather fabric elevator seat cover
 Replace new wall cover
 Replace existing carpet
 Improve fire hose cabinet finish wall cover
 Additional wall cover
 Improve lightings and minimize wall lamps
 Relocations of other wall artworks and fixtures
 Repainting of walls
 Relocations of lockers
 Upgrade and modifications of play room
 Fabrication of playroom furniture’s (ei. Lockers, fence, bench, kids ottman)

Level 1

 Refinish Dome to champagne


 Repair on necessary restain to match existing veneer finish
 Repair on necessary restain to a brown tone to match kamagong wood
 Retaining existing stone wall cladding and flooring, repair if necessary
 Replace wall cover
 Replace existing lighting fixture and to have additional downlight and uplight, verify with the
lighting consultant
 Repainting of ceiling
 Lighting improvements
 Replacing leather fabric elevator seat cover
 Adding and improving wall cover

Level 2

 Additional wallwasher
 Improvements of lighting, verify lighting consultant
 Minimizing number of wall lamps
 Relocation of wall artworks
 Additional light cover
 Clad wall with mirror
 Additional wall cover
 Repair as necessary restain to match existing veneer finish
Level 3

 Improvements of lighting, verify lighting consultant


 Additional wall cover
 Removing existing cubby hole, to be relocated inside the play area
 Additional fence for the security of kids, add bench with storage new cubby hole lockers
 Relocation of playing equipment somewhere at the back for the security purposes