You are on page 1of 23

BAR BENDING SCHEDULE FOR PORTION B

Weight in kg. Total Length in ft.


Dia No of No. bar Total No Length
SN Particular length
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm Remarks a (ft) b (ft) c (ft)
in ft.
A FOUNDATION REBAR
B Column
1 Col C1
Basement 12 1 8 8 12.50 - - 27.07 - 100 10.50 2.00
Stirrups 10 1 32 32 5.17 - 31.10 - - 58.17 165.33 5.17

2 Col C2
Longitudinal Bars 16 1 4 4 12.50 - - - 24.05 50 10.50 2.00
12 1 4 4 12.50 - - 13.54 - 50 10.50 2.00
Stirrups 8 1 32 32 5.17 19.91 - - - #VALUE! 165.33 5.17
2 Col C3 - - - - - -
Longitudinal Bars 16 1 4 4 12.50 - - - 24.05 50 10.50 2.00
12 1 8 8 12.50 - - 27.07 - 100 10.50 2.00
Stirrups 10 1 32 32 5.17 - 31.10 - - 82.23 165.33 5.17

3 Col C1B
foundations 12 1 16 16 5.50 - - 23.82 - 88 3.50 2.00
8 1 6 6 21.00 15.17 - - - 126 19.00 2.00
12 1 16 16 3.50 - - 15.16 - 56 1.50 2.00
8 1 6 6 26.00 18.79 - - - 156 24.00 2.00
72.95

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 2 of 2
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Foundation
1 Raft Main Bar top/bot 20 2 82 164 40.50 - - - - 4993.65 -
20 2 82 164 43.00 - - - - 5301.90 -
20 2 52 104 63.17 - - - - 4939.28 -
ld 20 2 52 104 3.75 - - - - 293.21 -

2 Raft Distribution Bar top/bot 20 2 70 140 112.50 - - - - 11841.31 -


ld 20 6 70 420 3.75 - - - - 1184.13 -
20 2 12 24 71.50 - - - - 1290.14 -
ld 20 2 12 24 3.75 - - - - 67.66 -
20 2 40 80 30.50 - - - - 1834.46 -

3 Stirrups for Column Pedastral 12 20 10 200 16.50 - - 893.41 - - -


12 20 10 200 16.50 - - 893.41 - - -

Stirrups for Column Pedastral 12 20 10 200 12.50 - - 676.83 - - -


12 20 10 200 12.50 - - 676.83 - - -

A FOUNDATION REBAR 0.00 0.00 3140.49 0.00 31745.75 0.00 34886.24


B Column
1 Col C3A - - - - - - - -
upto Plinth Lvl 25 8 18 144 21.50 - - - - - 3636.86
Ground/ first floor 25 8 18 144 28.75 - - - - - 4863.24
Second floor 20 8 18 144 16.75 - - - - 1813.41 -

2 Col C3B - - - - - - - -
upto Plinth Lvl 25 4 16 64 21.50 - - - - - 1616.38
Ground/ first floor 25 4 16 64 28.75 - - - - - 2161.44
Second floor 20 4 16 64 16.75 - - - - 805.96 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 3 of 3
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Stirrups C3 for no of floor
stirrup 1 10 48 27 1,296 5.99 - 1460.30 - - - - 4.00
stirrup 2 10 48 27 1,296 4.49 - 1094.62 - - - - 4.00
stirrup 3 10 48 27 1,296 4.49 - 1094.62 - - - - 4.00

3 Col C2A - - - - - - - -
upto Plinth Lvl 25 4 12 48 21.50 - - - - - 1212.29
Ground/ first floor 25 4 12 48 28.75 - - - - - 1621.08
Second floor 20 4 12 48 16.75 - - - - 604.47 -

Stirrups C2 for no of floor


stirrup 1 10 16 27 432 5.67 - 460.76 - - - - 4.00
stirrup 2 10 16 27 432 4.17 - 338.87 - - - - 4.00
stirrup 3 10 16 27 432 4.49 - 364.87 - - - - 4.00

4 Col C1A - - - - - - - -
upto Plinth Lvl 25 4 10 40 21.50 - - - - - 1010.24
Ground/ first floor 25 2 10 20 28.75 - - - - - 675.45
Second floor 20 2 10 20 16.75 - - - - 251.86 -

Stirrups C1 for no of floor


stirrup 1 10 4 27 108 4.67 - 94.88 - - - - 1.00
stirrup 2 10 4 27 108 3.67 - 74.56 - - - - 1.00

Stirrups C1 for no of floor


stirrup 1 10 6 27 162 4.67 - 142.31 - - - - 3.00
stirrup 2 10 6 27 162 3.67 - 111.84 - - - - 3.00

5 Retaining Wall - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 4 of 4
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
upto Plinth Lvl vertical 12 1 354 354 18.00 - - 1725.10 - - -

Binders for no of floor


Binders 10 1 21 21 177.00 - 699.20 - - - - 1.00
ld 10 5 21 105 2.00 - 39.50 - - - - 1.00

B TOTAL COLUMN REBAR 0.00 5976.34 1725.10 0.00 3475.71 16796.97 27974.11

C StairCase 1 at Ground Floor


1 Flight 1
main bar 12 1 12 12 21.25 - - 69.04 - - -
12 1 12 12 9.50 - - 30.86 - - -
12 1 12 12 9.50 - - 30.86 - - -
distribution bar 10 2 40 80 6.66 - 100.22 - - - -
nosing bar 12 1 7 7 6.00 - - 11.37 - - -
step bars 10 5 7 35 2.66 - 17.51 - - - -

2 Flight 2 - - - - - - - -
main bar 12 1 12 12 25.00 - - 81.22 - - -
12 1 12 12 9.50 - - 30.86 - - -
12 1 12 12 9.50 - - 30.86 - - -
distribution bar 10 2 48 96 6.66 - 120.27 - - - -
nosing bar 12 1 10 10 6.00 - - 16.24 - - -
step bars 10 5 10 50 2.66 - 25.02 - - - -

3 Flight 3
main bar 12 1 12 12 23.75 - - 77.16 - - -
12 1 12 12 9.50 - - 30.86 - - -
12 1 12 12 12.00 - - 38.99 - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 5 of 5
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
distribution bar 10 2 48 96 6.66 - 120.27 - - - -
nosing bar 12 1 7 7 6.00 - - 11.37 - - -
step bars 10 5 7 35 2.66 - 17.51 - - - -

4 Slab bars at lobby


main bar 12 2 18 36 9.50 - - 92.59 - - -
distribution 10 2 14 28 3.75 - 19.75 - - - -

Sub Total for Staircase at Ground Floor 0.00 420.56 552.29 0.00 0.00 0.00

Staircase 1 for first, second and third floor 3 0.00 1261.68 1656.88 0.00 0.00 0.00
C TOTAL for STAIRCASE 1 0.00 1682.24 2209.17 0.00 0.00 0.00 3891.41
- - - - - - - -
D BEAM at GF lvl -0'-0" - - - - - - - -
1 Grid 9/ 8 ( 2 nos) B2 - - - - - - - -
Bottom bars 20 2 2 4 110.50 - - - - 332.31 -
ld 20 2 6 12 3.75 - - - - 33.83 -
Bottom bars 16 2 2 4 109.00 - - - 209.76 - -
ld 20 2 6 12 3.00 - - - - 27.07 -
Top Bars 20 2 2 4 110.50 - - - - 332.31 -
ld 20 2 6 12 3.75 - - - - 33.83 -
extra top bars at G 25 2 2 4 12.42 - - - - - 58.36
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 3 6 16.17 - - - - - 113.97
25 2 3 6 12.42 - - - - - 87.54
Stirrups 10 2 300 600 4.99 - 563.20 - - - -

2 Grid 7 ( 1 nos) B1 - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 6 of 6
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Bottom bars 20 1 2 2 110.50 - - - - 166.15 -
ld 20 1 6 6 3.75 - - - - 16.92 -
Bottom bars 16 1 2 2 109.00 - - - 104.88 - -
ld 20 1 6 6 3.00 - - - - 13.53 -
Top Bars 20 1 2 2 110.50 - - - - 166.15 -
ld 20 1 6 6 3.75 - - - - 16.92 -
extra top bars at G 20 1 2 2 12.42 - - - - 18.68 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 3 3 16.17 - - - - 36.47 -
20 1 3 3 12.42 - - - - 28.01 -
Stirrups 10 1 300 300 4.17 - 235.33 - - - -

3 Grid 5 - - - - - - - -
Bottom bars 20 1 2 2 29.50 - - - - 44.36 -
16 1 2 2 29.50 - - - 28.38 - -
Top Bars 20 1 2 2 29.50 - - - - 44.36 -
extra top bars 25 1 2 2 12.42 - - - - - 29.18
25 1 2 2 12.42 - - - - - 29.18

Stirrups 10 1 64 64 4.99 - 60.07 - - - -

4 Secondary beam 2 nos - - - - - - - -


Bottom bars 16 2 2 4 109.00 - - - 209.76 - -
ld 12 2 6 12 3.00 - - 9.75 - - -
Bottom bars 12 2 1 2 109.00 - - 59.02 - - -
ld 12 2 3 6 3.00 - - 4.87 - - -
Top Bars 16 2 2 4 109.00 - - - 209.76 - -
ld 16 2 6 12 3.00 - - - 17.32 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 7 of 7
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
extra top bars at G 20 2 1 2 11.42 - - - - 17.17 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 11.42 - - - - 17.17 -
Stirrups 10 2 300 600 3.67 - 414.22 - - - -

5 Grid G-M ( 6 nos) B2 - - - - - - - -


Bottom bars 20 6 2 12 39.83 - - - - 359.34 -
Bottom bars 16 6 2 12 38.33 - - - 221.29 - -
Top Bars 20 6 2 12 39.83 - - - - 359.34 -
extra top bars at G 25 6 3 18 21.92 - - - - - 463.49
25 6 3 18 13.42 - - - - - 283.76
Stirrups 10 6 96 576 4.99 - 540.67 - - - -

6 Grid G & h ( 2 nos) B2 - - - - - - - -


Bottom bars 20 2 2 4 47.50 - - - - 142.85 -
Bottom bars 16 2 2 4 46.00 - - - 88.52 - -
Top Bars 20 2 2 4 47.50 - - - - 142.85 -
extra top bars at G 25 2 3 6 21.92 - - - - - 154.50
25 2 3 6 13.42 - - - - - 94.59
Stirrups 10 2 40 80 4.99 - 75.09 - - - -

7 Secondary beam 7 nos - - - - - - - -


Bottom bars 16 7 2 14 31.00 - - - 208.80 - -
Bottom bars 12 7 1 7 31.00 - - 58.75 - - -
Top Bars 16 7 2 14 31.00 - - - 208.80 - -
extra top bars at G 20 7 1 7 11.42 - - - - 60.10 -
20 7 1 7 5.92 - - - - 31.16 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 8 of 8
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Stirrups 10 7 75 525 3.67 - 362.44 - - - -

Sub Total for Beam at Level 0'-0" 0.00 2251.02 132.39 1507.26 2611.08 1542.49

Beam 1 for first, second and third floor 3 0.00 6753.07 397.16 4521.78 7833.24 4627.48
D TOTAL for BEAM 0.00 9004.10 529.55 6029.04 10444.32 6169.97 32176.98

E SLAB at level 0'-0" - - - - - - - -


1 S1 23'x23' 2 nos - - - - - - - -
main bars 12 2 24 48 35.17 - - 457.04 - - -
12 2 24 48 30.17 - - 392.06 - - -
binders 8 4 12 48 15.00 86.71 - - - - -
distribution bars 10 2 24 48 35.17 - 317.56 - - - -
10 2 24 48 30.17 - 272.41 - - - -
binders 8 4 12 48 15.00 86.71 - - - - -
extra bars - - - - - - - -

2 S1 23'x20' 3 nos - - - - - - - -
main bars 10 3 24 72 26.67 - 361.22 - - - -
10 3 24 72 26.67 - 361.22 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
distribution bars 10 3 20 60 35.17 - 396.95 - - - -
10 3 20 60 30.17 - 340.52 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
extra bars - - - - - - - -

3 S3 23'x7' 5 nos - - - - - - - -
main bars 12 5 46 230 13.67 - - 851.21 - - -
12 5 46 230 13.67 - - 851.21 - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 9 of 9
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION A


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
binders - - - - - - - -
distribution bars 10 5 14 70 27.17 - 357.77 - - - -
10 5 14 70 27.17 - 357.77 - - - -
binders - - - - - - - -
extra bars - - - - - - - -

Sub Total for Slab at Level 0'-0" 433.54 2765.40 2551.52 0.00 0.00 0.00

Slab for first, second and third floor 3 1300.61 8296.20 7654.55 0.00 0.00 0.00
E TOTAL for SLAB 1734.15 11061.61 10206.07 0.00 0.00 0.00 23001.82

TOTAL REBAR (A+B+C+D+E) 1.73 27.72 17.81 6.03 45.67 22.97 121.93
tonn

10 % contingencies shall be added

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 10 of 10
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Foundation
1 Raft Main Bar top/bot 20 2 82 164 40.50 - - - - 4993.65 -
ld - 3.75 - - - - - -

2 Raft Distribution Bar top/bot 20 2 70 140 91.50 - - - - 9630.93 -


ld 20 2 70 140 3.75 - - - - 394.71 -

3 Stirrups for Column Pedastral 12 15 10 150 16.50 - - 670.06 - - -


12 15 10 150 16.50 - - 670.06 - - -

Stirrups for Column Pedastral 12 15 10 150 12.50 - - 507.62 - - -


12 15 10 150 12.50 - - 507.62 - - -

A FOUNDATION REBAR 0.00 0.00 2355.37 0.00 15019.29 0.00 17374.66


B Column
1 Col C3A - - - - - - - -
upto Plinth Lvl 25 6 18 108 21.50 - - - - - 2727.64
Ground/ first floor 25 6 18 108 28.75 - - - - - 3647.43
Second floor 20 6 18 108 16.75 - - - - 1360.06 -

2 Col C3B - - - - - - - -
upto Plinth Lvl 25 4 16 64 21.50 - - - - - 1616.38
Ground/ first floor 25 4 16 64 28.75 - - - - - 2161.44
Second floor 20 4 16 64 16.75 - - - - 805.96 -

Stirrups C3 for no of floor


stirrup 1 10 40 27 1,080 5.99 - 1216.92 - - - - 4.00
stirrup 2 10 40 27 1,080 4.49 - 912.18 - - - - 4.00
stirrup 3 10 40 27 1,080 4.49 - 912.18 - - - - 4.00

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 11 of 11
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
3 Col C1A - - - - - - - -
upto Plinth Lvl 25 5 10 50 21.50 - - - - - 1262.80
Ground/ first floor 25 3 10 30 28.75 - - - - - 1013.17
Second floor 20 3 10 30 16.75 - - - - 377.79 -

Stirrups C1 for no of floor


stirrup 1 10 5 27 135 4.67 - 118.59 - - - - 1.00
stirrup 2 10 5 27 135 3.67 - 93.20 - - - - 1.00

Stirrups C1 for no of floor


stirrup 1 10 9 27 243 4.67 - 213.47 - - - - 3.00
stirrup 2 10 9 27 243 3.67 - 167.76 - - - - 3.00

5 Retaining Wall - - - - - - - -
upto Plinth Lvl vertical 12 1 228 228 18.00 - - 1111.08 - - -

Binders for no of floor


Binders 10 1 21 21 114.00 - 450.33 - - - - 1.00
ld 10 2 21 42 2.00 - 15.80 - - - - 1.00

B TOTAL COLUMN REBAR 0.00 4100.44 1111.08 0.00 2543.81 12428.86 20184.20

C BEAM at GF lvl -0'-0" - - - - - - - -


1 Grid 9/ 8 ( 2 nos) B2 - - - - - - - -
Bottom bars 20 2 2 4 90.50 - - - - 272.16 -
ld 20 2 4 8 3.75 - - - - 22.55 -
Bottom bars 16 2 2 4 89.00 - - - 171.27 - -
ld 20 2 4 8 3.00 - - - - 18.04 -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 12 of 12
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Top Bars 20 2 2 4 90.50 - - - - 272.16 -
ld 20 2 4 8 3.75 - - - - 22.55 -
extra top bars at A 25 2 2 4 12.42 - - - - - 58.36
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 2 4 16.17 - - - - - 75.98
25 2 3 6 12.42 - - - - - 87.54
Stirrups 10 2 240 480 4.99 - 450.56 - - - -

2 Grid 7 ( 1 nos) B1 - - - - - - - -
Bottom bars 20 1 2 2 90.50 - - - - 136.08 -
ld 20 1 4 4 3.75 - - - - 11.28 -
Bottom bars 16 1 2 2 89.00 - - - 85.64 - -
ld 20 1 4 4 3.00 - - - - 9.02 -
Top Bars 20 1 2 2 90.50 - - - - 136.08 -
ld 20 1 4 4 3.75 - - - - 11.28 -
extra top bars at A 20 1 2 2 12.42 - - - - 18.68 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 3 3 12.42 - - - - 28.01 -
Stirrups 10 1 240 240 4.17 - 188.26 - - - -

3 Secondary beam 2 nos - - - - - - - -


Bottom bars 16 2 2 4 89.00 - - - 171.27 - -
ld 12 2 4 8 3.00 - - 6.50 - - -
Bottom bars 12 2 1 2 89.00 - - 48.19 - - -
ld 12 2 2 4 3.00 - - 3.25 - - -
Top Bars 16 2 2 4 89.00 - - - 171.27 - -
ld 16 2 4 8 3.00 - - - 11.55 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 13 of 13
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
extra top bars at A 20 2 1 2 11.42 - - - - 17.17 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 11.42 - - - - 17.17 -
Stirrups 10 2 240 480 3.67 - 331.37 - - - -

5 Grid A-F ( 5 nos) B2 - - - - - - - -


Bottom bars 20 5 2 10 39.83 - - - - 299.45 -
Bottom bars 16 5 2 10 38.33 - - - 184.40 - -
Top Bars 20 5 2 10 39.83 - - - - 299.45 -
extra top bars at G 25 5 3 15 21.92 - - - - - 386.24
25 5 3 15 13.42 - - - - - 236.47
Stirrups 10 5 96 480 4.99 - 450.56 - - - -

7 Secondary beam 5 nos - - - - - - - -


Bottom bars 16 5 2 10 31.00 - - - 149.14 - -
Bottom bars 12 5 1 5 31.00 - - 41.96 - - -
Top Bars 16 5 2 10 31.00 - - - 149.14 - -
extra top bars at F 20 5 1 5 11.42 - - - - 42.93 -
20 5 1 5 5.92 - - - - 22.25 -
Stirrups 10 5 75 375 3.67 - 258.89 - - - -

Sub Total for Beam at Level 0'-0" 0.00 1679.64 99.90 1093.68 1802.22 996.54

Beam 1 for first, second and third floor 3 0.00 5038.92 299.70 3281.04 5406.67 2989.62
C TOTAL for BEAM 0.00 6718.57 399.60 4374.72 7208.90 3986.16 22687.95

D SLAB at level 0'-0" - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 14 of 14
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
1 S1 23'x23' 1 nos - - - - - - - -
main bars 12 1 24 24 35.17 - - 228.52 - - -
12 1 24 24 30.17 - - 196.03 - - -
binders 8 2 12 24 15.00 43.35 - - - - -
distribution bars 10 1 24 24 35.17 - 158.78 - - - -
10 1 24 24 30.17 - 136.21 - - - -
binders 8 2 12 24 15.00 43.35 - - - - -
extra bars - - - - - - - -

2 S1 23'x20' 3 nos - - - - - - - -
main bars 10 3 24 72 26.67 - 361.22 - - - -
10 3 24 72 26.67 - 361.22 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
distribution bars 10 3 20 60 35.17 - 396.95 - - - -
10 3 20 60 30.17 - 340.52 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
extra bars - - - - - - - -

3 S3 23'x7' 4 nos - - - - - - - -
main bars 12 4 46 184 13.67 - - 680.97 - - -
12 4 46 184 13.67 - - 680.97 - - -
binders - - - - - - - -
distribution bars 10 4 14 56 27.17 - 286.21 - - - -
10 4 14 56 27.17 - 286.21 - - - -
binders - - - - - - - -
extra bars - - - - - - - -

Sub Total for Slab at Level 0'-0" 346.83 2327.31 1786.48 0.00 0.00 0.00

Slab for first, second and third floor 3 1040.49 6981.93 5359.45 0.00 0.00 0.00

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 15 of 15
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION C


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
D TOTAL for SLAB 1387.32 9309.24 7145.93 0.00 0.00 0.00 17842.48

TOTAL REBAR (A+B+C+D) 1.39 20.13 11.01 4.37 24.77 16.42 78.09
tonn

10 % contingencies shall be added

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 16 of 16
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
A Foundation
1 Raft Main Bar top/bot 20 2 162 324 41.00 - - - - 9987.30 -
ld - 3.75 - - - - - -

2 Raft Distribution Bar top/bot 20 2 70 140 85.00 - - - - 8946.77 -


ld 20 6 70 420 3.75 - - - - 1184.13 -

3 Stirrups for Column Pedastral 12 18 10 180 13.00 - - 633.51 - - -


12 18 10 180 13.00 - - 633.51 - - -

Stirrups for Column Pedastral 12 18 10 180 9.00 - - 438.59 - - -


12 18 10 180 9.00 - - 438.59 - - -

A FOUNDATION REBAR 0.00 0.00 2144.20 0.00 20118.20 0.00 22262.39


B Column
1 Col C2A - - - - - - - -
upto Plinth Lvl 25 8 12 96 4.75 - - - - - 535.66
Ground/ first floor 25 8 12 96 28.75 - - - - - 3242.16
Second floor 20 8 12 96 16.75 - - - - 1208.94 -

2 Col C2B - - - - - - - -
upto Plinth Lvl 25 4 6 24 4.75 - - - - - 133.92
upto Plinth Lvl 20 4 4 16 4.75 - - - - 57.14 -
Ground/ first floor 25 4 6 24 28.75 - - - - - 810.54
Ground/ first floor 20 4 4 16 28.75 - - - - 345.84 -
Second floor 20 4 10 40 16.75 - - - - 503.73 -

Stirrups C2 for no of floor


stirrup 1 10 36 27 972 5.67 - 1036.72 - - - - 3.00
stirrup 2 10 36 27 972 4.17 - 762.45 - - - - 3.00

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 17 of 17
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
stirrup 3 10 36 27 972 4.49 - 820.96 - - - - 3.00

3 Col C1B - - - - - - - -
upto Plinth Lvl 25 6 6 36 4.75 - - - - - 200.87
upto Plinth Lvl 16 6 2 12 4.75 - - - 27.42 - -
Ground/ first floor 25 6 6 36 28.75 - - - - - 1215.81
Ground/ first floor 16 6 2 12 28.75 - - - 165.98 - -
Second floor 20 6 6 36 16.75 - - - - 453.35 -
Second floor 16 6 2 12 16.75 - - - 96.70 - -

Stirrups C1 for no of floor


stirrup 1 10 18 27 486 4.67 - 426.94 - - - - 3.00
stirrup 2 10 18 27 486 3.67 - 335.52 - - - - 3.00

B TOTAL COLUMN REBAR 0.00 3382.59 0.00 290.10 2569.00 6138.96 12380.65

C StairCase 2 at Ground Floor


1 Flight 1
main bar 12 1 8 8 27.33 - - 59.19 - - -
12 1 8 8 10.50 - - 22.74 - - -
12 1 8 8 10.50 - - 22.74 - - -
distribution bar 10 2 46 92 6.66 - 115.26 - - - -
nosing bar 12 1 12 12 4.00 - - 13.00 - - -
step bars 10 5 12 60 2.66 - 30.02 - - - -

2 Landing - - - - - - - -
main bar 12 1 8 8 9.67 - - 20.94 - - -
12 1 8 8 10.67 - - 23.11 - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 18 of 18
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
3 Flight 2
main bar 12 1 8 8 27.33 - - 59.19 - - -
12 1 8 8 10.50 - - 22.74 - - -
12 1 8 8 10.50 - - 22.74 - - -
distribution bar 10 2 46 92 6.66 - 115.26 - - - -
nosing bar 12 1 12 12 4.00 - - 13.00 - - -
step bars 10 5 12 60 2.66 - 30.02 - - - -

4 Slab bars at lobby


main bar 12 1 8 8 9.67 - - 20.94 - - -
10 1 8 8 10.67 - 16.06 - - - -

Sub Total for Staircase at Ground Floor 0.00 306.62 300.34 0.00 0.00 0.00

Staircase 1 for first and second floor 2 0.00 613.24 600.68 0.00 0.00 0.00
C TOTAL for STAIRCASE 2 0.00 919.86 901.02 0.00 0.00 0.00 1820.87
- - - - - - - -
D BEAM at GF lvl -0'-0" - - - - - - - -
1 Grid L/M ( 2 nos) B2 - - - - - - - -
Bottom bars 20 2 2 4 85.50 - - - - 257.13 -
ld 20 2 2 4 3.75 - - - - 11.28 -
Bottom bars 16 2 2 4 84.00 - - - 161.65 - -
ld 20 2 2 4 3.00 - - - - 9.02 -
Top Bars 20 2 2 4 85.50 - - - - 257.13 -
ld 20 2 2 4 3.75 - - - - 11.28 -
extra top bars at 1 25 2 2 4 22.17 - - - - - 104.17
25 2 2 4 16.17 - - - - - 75.98
16 2 2 4 13.17 - - - 25.34 - -
16 2 2 4 22.00 - - - 42.34 - -
Stirrups 10 2 226 452 4.99 - 424.28 - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 19 of 19
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks

2 Grid K ( 1 nos) B1 - - - - - - - -
Bottom bars 20 1 2 2 85.50 - - - - 128.56 -
ld 20 1 2 2 3.75 - - - - 5.64 -
Bottom bars 16 1 2 2 84.00 - - - 80.82 - -
ld 20 1 2 2 3.00 - - - - 4.51 -
Top Bars 20 1 2 2 85.50 - - - - 128.56 -
ld 20 1 2 2 3.75 - - - - 5.64 -
extra top bars at G 20 1 2 2 22.17 - - - - 33.34 -
20 1 2 2 16.17 - - - - 24.31 -
20 1 2 2 13.17 - - - - 19.80 -
20 1 2 2 22.00 - - - - 33.08 -
Stirrups 10 1 226 226 4.17 - 177.28 - - - -

4 Secondary beam 1 nos - - - - - - - -


Bottom bars 16 2 2 4 84.00 - - - 161.65 - -
ld 12 2 2 4 3.00 - - 3.25 - - -
Bottom bars 12 2 1 2 84.00 - - 45.48 - - -
ld 12 2 1 2 3.00 - - 1.62 - - -
Top Bars 16 2 2 4 84.00 - - - 161.65 - -
ld 16 2 2 4 3.00 - - - 5.77 - -
extra top bars at G 20 2 1 2 21.17 - - - - 31.83 -
20 2 1 2 16.17 - - - - 24.31 -
20 2 1 2 13.17 - - - - 19.80 -
20 2 1 2 22.00 - - - - 33.08 -
Stirrups 10 2 226 452 3.67 - 312.04 - - - -

5 Grid G-M ( 6 nos) B2 - - - - - - - -


Bottom bars 20 6 2 12 39.50 - - - - 356.37 -
Bottom bars 16 6 2 12 38.00 - - - 219.38 - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 20 of 20
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
Top Bars 20 6 2 12 39.50 - - - - 356.37 -
extra top bars at K 25 6 3 18 22.92 - - - - - 484.63
25 6 3 18 13.42 - - - - - 283.76
Stirrups 10 6 94 564 4.99 - 529.41 - - - -

7 Secondary beam 1 nos - - - - - - - -


Bottom bars 16 1 2 2 31.00 - - - 29.83 - -
Bottom bars 12 1 1 1 31.00 - - 8.39 - - -
Top Bars 16 1 2 2 31.00 - - - 29.83 - -
extra top bars at G 20 1 1 1 11.42 - - - - 8.59 -
20 1 1 1 5.92 - - - - 4.45 -
Stirrups 10 1 75 75 3.67 - 51.78 - - - -

Sub Total for Beam at Level 0'-0" 0.00 1494.79 58.75 918.26 1764.08 948.54

Beam 1 for first, second floor 2 0.00 2989.57 117.50 1836.52 3528.15 1897.09
D TOTAL for BEAM 0.00 4484.36 176.25 2754.78 5292.23 2845.63 15553.25

E SLAB at level 0'-0" - - - - - - - -


1 S1 23'x23' 1 nos - - - - - - - -
main bars 12 1 24 24 35.17 - - 228.52 - - -
12 1 24 24 30.17 - - 196.03 - - -
binders 8 2 12 24 15.00 43.35 - - - - -
distribution bars 10 1 24 24 35.17 - 158.78 - - - -
10 1 24 24 30.17 - 136.21 - - - -
binders 8 2 12 24 15.00 43.35 - - - - -
extra bars - - - - - - - -

2 S1 23'x17' 3 nos - - - - - - - -

Prepared By: Checked/ Forwarded By: Approved By: .


Project: Academic Building of Mathematics Department RE_NEW CONSULT (P) LTD. Page No: 21 of 21
Location: TU, Kirtipur KULESHWOR Date: 26 th Apr 2014

BAR BENDING SCHEDULE FOR PORTION D


Dia No of No. bar Length Weight in kg.
SN Particular Total No
mm unit /unit ft. 8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Remarks
main bars 10 3 24 72 23.67 - 320.58 - - - -
10 3 24 72 23.67 - 320.58 - - - -
binders 8 6 12 72 13.00 112.72 - - - - -
distribution bars 10 3 17 51 35.17 - 337.41 - - - -
10 3 17 51 30.17 - 289.44 - - - -
binders 8 6 12 72 15.00 130.06 - - - - -
extra bars - - - - - - - -

3 S3 20'x7' 5 nos - - - - - - - -
main bars 12 5 20 100 13.67 - - 370.09 - - -
12 5 20 100 13.67 - - 370.09 - - -
binders - - - - - - - -
distribution bars 10 5 14 70 23.67 - 311.68 - - - -
10 5 14 70 23.67 - 311.68 - - - -
binders - - - - - - - -
extra bars - - - - - - - -

Sub Total for Slab at Level 0'-0" 329.49 2186.36 1164.73 0.00 0.00 0.00

Slab for first, second floor 2 658.98 4372.72 2329.46 0.00 0.00 0.00
E TOTAL for SLAB 988.46 6559.07 3494.19 0.00 0.00 0.00 11041.73

TOTAL REBAR (A+B+C+D+E) 0.99 15.35 6.72 3.04 27.98 8.98 63.06
tonn

10 % contingencies shall be added

Prepared By: Checked/ Forwarded By: Approved By: .


Weight in kg.
8 mm 10 mm 12 mm 16 mm 20 mm 25 mm Total
block A 1.04 12.15 4.68 2.80 5.29 2.85 28.81
block B 1.73 27.72 17.81 6.03 45.67 22.97 121.93
block C 1.39 20.13 11.01 4.37 24.77 16.42 78.09
block D 0.99 15.35 6.72 3.04 27.98 8.98 63.06
Grand Total 291.89 mts.

291892.5 kgs