PROFOSED PERIMETR FENCE AND GATES

ITEM DESCRIPTION QUANTITY UNIT COST TOTAL


I. EXCAVATION 60 CU. M. 200/CU. M. 12,000.00
II. EARTHFILL/BACKFILL 1250 CU. M. 160/CU.M 200,000.00
III. MASONRY
CEMENT 222 BAGS 225/BAG 49,950.00
GRAVEL 80 CU. M. 280/CU. M. 22,400.00
SAND 86 CU. M. 300/CU. M. 25,800.00
5"CHB 3200 PCS. 10/PC 32,000.00
130,150.00
IV. STEEL REINF. BARS
10MMØ 410 PCS. 138/PS. 56,580.00
12MMØ 80 PCS. 165/PC. 13,200.00
6.1 TIE WIRE 2 ROLLS 1800/ROLL 3,600.00
73,380.00
V. STEEL/TUBING RAILING
2"X4"X20' 20 PCS. 1200/PC 24,000.00
2"X2"X20' 36 PCS. 780/PC 28,080.00
1"X1"X20' 40 PCS. 450/PC 18,000.00
WELDING ROD 10 KILOS 120/KILO 1,200.00
71,280.00
VI. PAINTING WORKS
ELASTOTEX PAINT 10 PAILS 2650/PAIL 26,500.00
LATEX GLOSS WHITE 5 PAILS 1920/PAIL 9,600.00
MARINE EPOXY 5 GAL. 480/PAIL 2,400.00
ACRYTEX PRIMER 6 GAL. 610/PAIL 3,660.00
ACRYTEX REDUCER 5 GAL. 480/PAIL 2,400.00
QUICK DRYING ENAMEL 2PAILS 2400/PAIL 4,800.00
PAINT THINER 2 GAL. 265/GAL 530.00
7"Ø PAINT ROLLER 4 SETS 275/SET 1,100.00
2"Ø PAINT BRUSH 5 PCS. 60/PC 300.00
51,290.00

SUMMARY
I. EXCAVATION 60 CU. M. 200/CU. M. 12,000.00
II. EARTHFILL/BACKFILL 1250 CU. M. 160/CU.M 200,000.00
III. MASONRY 130,150.00
IV. STEEL REINF. BARS 73,380.00
V. STEEL/TUBING RAILING 71,280.00
PAINTING WORKS 51,290.00
538,100.00