SITE VISIT REPORT

GAIL (INDIA) LIMITED

TECHNICAL CONSULTANCY
&
GREP-COMPRESSOR
STATION, VAGHODIA, HVJ GAS LINE

0 04.09.2017 ISSUED FOR INFORMATION AS SM AD

REV DATE DESCRIPTION PREP CHK APPR


TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

1. SITE VISIT SCHEDULE

Date Description

 Depart from Delhi Airport at 19:10.


25.07.17
 Arrival Vadodara airport at 20.40

26.07.17  Site Visit – GREP Compressor Station Vaghodia

27.07.17  Leaving Vadodara for New Delhi airport at 05.30

2. PARTICIPANTS & DURATION OF SITE VISIT

 Site visit was carried out on 26/07/17 along with Mr. Subhash Oraon (GAIL)

The site visit team comprised of the following persons:

 Mr. Soumik Mukherjee (VCS Projects)

 Mr. Somak Gandhi (GAIL)

 Mr. Subhash Oraon (GAIL)

3. LOCATION VISITED

The team visited the following locations as per date mentioned below:

26.07.2017

 Visited GREP Compressor Station, Vaghodia

4. MAJOR OBSERVATIONS
a) Chekaria River Crossing at CH.- 338.513

Document No. Rev

SITE VISIT REPORT 0


Page 2 of 7
TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

b) Site Location near NH-24 - CH. 410.490

Document No. Rev

SITE VISIT REPORT 0


Page 3 of 7
TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

 Near NH-27- Pipeline Crossing near NH-27 with adjacent cultivable land. Farmer has graded
the area leading to less cover over Pipeline.

Document No. Rev

SITE VISIT REPORT 0


Page 4 of 7
TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

 NEAR NH-27- Pipeline crossing near NH-27 with low depth of cover approx. 0.7 m from
ground level to top of pipe.

c) Suket Sukri River Crossing at CH. 426.780


Document No. Rev

SITE VISIT REPORT 0


Page 5 of 7
TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

 High erosion on the banks observed.


 IOCL Pipeline near GAIL pipeline also had same issues. IOCL has already started working on
Bank protection
 River bed shifted also observed

Document No. Rev

SITE VISIT REPORT 0


Page 6 of 7
TECHNICAL CONSULTANCY
GREP- COMPRESSOR STATION,VAGHODIA, HVJ GAS LINE

 Due to Migration of the River form original route, heavy erosion in the bank observed

Document No. Rev

SITE VISIT REPORT 0


Page 7 of 7