  Simonson Direct CN & PPL Testimony, Ex.

___, Schedule 3
Page 1 of 30

 
 
 
 
 
 
 
 

  Line 3 Replacement Project Final Report:   
Criteria for Pipe Wall Thickness ‐  
Railroad Crossings 
Job #: 091510044 
Submitted: May 1, 2015 

Prepared for: 
Enbridge Energy 
Attention: 
Mitch Repka, Manager Engineering and Construction 
1409 Hammond Ave  
Superior, WI 54880 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 2 of 30
Excellence & Integrity 
 

TABLE OF CONTENTS 
1  EXECUTIVE SUMMARY ........................................................................................................................................... 3 
2  BACKGROUND ....................................................................................................................................................... 3 
3  OBJECTIVES AND APPROACH ................................................................................................................................. 3 

3.1  PURPOSE ....................................................................................................................................................... 3 
3.2  DESIGN CRITERIA ............................................................................................................................................ 3 
3.3  ASSUMPTIONS ................................................................................................................................................ 4 
3.4  ACCEPTABLE STRESS LEVELS – CODE AND STANDARDS REVIEW .............................................................................. 5 
4  CONCLUSION ......................................................................................................................................................... 6 
5  RECOMMENDATIONS ............................................................................................................................................ 6 

APPENDIX I ‐ RESULTS ................................................................................................................................................... 7 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 1 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 3 of 30
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 4 of 30
Excellence & Integrity 
 

1 Executive Summary 
Wall thickness requirements for railroad crossings have been evaluated for the Line 3 Replacement Project 
per the operating conditions outlined in the Class 3 Pipeline Hydraulic Proposal provided by Enbridge. Stress 
calculations  were  completed  for  uncased  pipeline  crossings  of  railroads  according  to  API  1102  Liquid 
Pipelines Crossing Railroads and Highways from 6‐14 feet below the rail. A minimum wall thickness 0.741” 
was determined based on applicable codes and standards. The most stringent requirement is Hoop Stress 
calculated with a design factor of 0.50 based on Enbridge Design Standard D06‐103, which exceeds API 1102 
and the AREMA manual minimum thickness requirements. For cased crossings of railroads the minimum 
wall thickness of the casing pipe can be determined from the AREMA manual. For 46” casing the minimum 
wall thickness for uncoated or not catholically protected pipe is 0.656” and must have a SMYS of at least 
35,000 psi.    

2 Background 
The proposed common carrier pipeline, commercially known as the “Line 3 Replacement Project,” will have 
a design capacity of 760,000 barrels per day of light/heavy crude oil blends. The proposed 36‐inch‐diameter 
interstate crude pipeline originates at the end of the 34‐inch‐diameter Maintenance and Flexibility Project 
near the Canadian/US Border, crosses North Dakota and Minnesota, and extends to a delivery point at the 
Superior  Terminal  in  Wisconsin.    The  project  is  integrity  driven  and  will  ultimately  replace  the  existing 
Enbridge 34‐inch Line 3. 

3 Objectives and Approach 

3.1 Purpose 
The purpose of this analysis is to ensure that the pipe to be installed at railroad crossings is of adequate 
strength to withstand the external and dynamic forces exerted by rail loads and soil overburden.  In 
addition,  it  serves  to  calculate  the  fatigue,  circumferential,  radial,  longitudinal,  and  total  effective 
stresses  and  to  ensure  they  are  within  acceptable  limits  as  established  by  the  applicable  referenced 
Codes and Standards.    

3.2 Design Criteria 
The applicable and governing Codes, Standards, and Reference Documents are as follows: 

 American Railroad Engineering and Maintenance‐of‐Way Association (AREMA) 
Chapter 1 Part 5 – Pipelines, 2014 Edition 

 API Recommended Practice 1102 
“Steel Pipeline Crossing Railroads and Highways”, Seventh Edition, March 2014 

 ASME B31.4 
“Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids”, 2012 Edition 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 3 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 5 of 30
Excellence & Integrity 
 
 Code of Federal Regulations (CFR) 
Title 49 – Transportation, Part 195 – Transportation of Hazardous Liquids by Pipeline, February 
9, 2015 

 Enbridge Design Standards  
D06‐101 ‐ Piping Design and Construction, Mainline, December 17, 2014 
o Enbridge Technical Standards Bulletin# ‐ BUL-065-2014  
o Enbridge Technical Standards Bulletin# ‐ BUL-072-2014

 D06‐103 – Crossing Design, November 29, 2013 

 Enbridge Construction Specification 
USPCS‐SPEC‐PIPELEINE‐001 – Pipeline Construction 

 Class 3 Pipeline Hydraulic Design Proposal, October 28, 2014 
o Addendum to Hydraulic Design Proposal, March 3, 2015 

 Pressure Cycling Analysis Line 3R IP Worst Case, April 15, 2014 

3.3 Assumptions 
The following general assumptions were used for the pipe stress analysis: 

 API Recommended Practice 1102 was used as the basis for the pipe stress analysis, as referred 
to in ASME B31.4 and Enbridge Design Standard D06‐103 

 The analysis was completed for uncased crossings, for cased crossings refer to the wall thickness 
requirements in the AREMA manual 

 All railroad crossings will be installed by a method that will not create bending stress during or 
after installation 

 Pipeline analysis was completed for main transit railroads, not industrial or secondary spurs 

 Railroad crossing stresses do not need to be reevaluated for locations with increased mainline 
wall thickness per the Pressure Cycling Analysis 

 Cooper E‐80 live loading was used per API 1102 

 Railroad crossing stresses do not need to be reevaluated for locations with increased mainline 
wall thickness per the Pressure Cycling Analysis Line 3R IP Worst Case 

 The following inputs were used for the steel pipe characteristics: 
o Poisson’s Ratio, ν = 0.30 
o Young’s Modulus of Elasticity, E = 29 x 106 
o Coefficient of Thermal Expansion, α = 6.5 x 10‐6 
   

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 4 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 6 of 30
Excellence & Integrity 
 
The following Pipe Operating Condition assumptions were used for the pipe stress analysis: 

 The internal pressure used in the calculation will be the Maximum Operating Pressure (MOP) 
for each segment, 1440psi 

 Pipe used will be pipe conforming to the API 5L specification with a weld joint factor, E=1 

 Design Factor of 0.50, as outlined in Enbridge Design Standard D06‐103 

 A pipe operating temperature of 140oF 
The following Site and Installation assumptions were used for the pipe stress analysis: 

 Minimum depth of cover for uncased railroad crossings will be 10ft, per AREMA manual 

 Minimum depth of cover for cased crossings will be 6ft as specified in Enbridge Design Standard 
D06‐103 

 A  maximum  overbore  of  2  inches  per  Enbridge  Construction  Specification  USPCS‐SPEC‐


PIPELEINE‐001 

 A conservative installation temperature of 0oF. Actual installation temperatures are expected to 
be higher as the construction will be completed during the summer/fall months 

 Pipeline to cross a single track 

 Geotechnical data as assumed per API 1102 
o Average Unit Weight of Soil, γ = 120 lb/ft3 
o Modulus of Soil Reaction, E’=0.5 ksi 
o Resilient Modulus of Soil, Er=5.0 ksi 

3.4 Acceptable Stress Levels – Code and Standards Review 
49 CFR 195 requires that any external pressure that is to be exerted on the pipe is to be provided for in 
the design of such a system. ASME B31.4 and Enbridge Design Standard D06‐103 both reference the use 
of  API  1102  for  determining  the  resultant  stresses  due  to  the  external  pressures  applied  by  soil 
overburden and rail loads.  The required and/or recommended stress criterion for crossing analysis is 
outlined in Table 1 below.    
Table 1:  Allowable Stress Criteria 
Stress Type  Allowable Stress ‐ Liquids  Reference 
Hoop Stress due to Internal Pressure  0.50 SMYS Enbridge Design Standard D06‐103*
Total Effective Stress due to Internal 
Pressure, Wheel Loads, Earth Loads 
0.90 SMYS  ASME B31.4, API 1102  
and ΔT (US), Combined hoop and 
Longitudinal Stress (CA) 
The general design check for 
Fatigue Stress in Girth and 
Fatigue on Girth (ΔSLh≤SFG x F) and  ASME B31.4, API 1102 
Longitudinal Welds 
Long welds (ΔSHh≤SFG x F) 
*A design factor of 0.72 is used by API 1102 and 0.60 by AREMA 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 5 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 7 of 30
Excellence & Integrity 
 

4 Conclusion 
The wall thickness for railroad crossings is calculated to achieve the maximum operating pressure (MOP) in 
accordance  with applicable codes, standards, and  projected operating  conditions of the  proposed Line 3 
Replacement Project.  The calculations were completed in accordance with AREMA, ASME – B31.4, API ‐ 
1102, Enbridge Design Standards D06‐101 – Piping Design and Construction and D06‐103 – Crossing Design, 
and the Enbridge Construction Specification ‐ USPCS‐SPEC‐PIPELINE‐001. 
The evaluation included reviewing Enbridge Design Standard D06‐101, to confirm adherence, it should be 
noted  that  the  current  design  temperature  of  140°F  is  higher  than  the  maximum  allowable  design 
temperature of 100°F as stated in the Technical Standards Bulletin BUL‐065‐2014 associated with Enbridge 
Design Standard D06‐101. It is LSC’s understanding that a project decision record is being developed. The 
current design temperature is within the acceptable limits for railroad crossing pipe as outlined in ASME 
B31.4 2012 Edition, such that it is not necessary to vary the design calculation. 
The  railroad  crossing  wall  thickness  is  calculated  to  meet  the  minimum  thickness  required  for  the  MOP, 
operating conditions as defined in the Class 3 Hydraulic Design Proposal, and rail traffic and soil overburden 
loading.  In addition, it serves to calculate the fatigue, circumferential, radial, longitudinal, and total effective 
stresses and to ensure they are within acceptable limits as established by the applicable referenced Codes 
and Standards.    

5 Recommendations 
An analysis was completed to determine if the mainline nominal wall thickness of 0.515” met the strength 
requirements for an uncased railroad installation for depths from 6‐14 feet. The stress analysis showed that 
pipe with a wall thickness of 0.515” would not meet the hoop stress or total effective stress limits as defined 
by the codes and standards.  
A  minimum  wall  thickness  of  0.741”  was  found  to  meet  the  criteria  of  50%  hoop  stress  as  described  in 
Enbridge  Design  Standard  D06‐103,  which  is  the  most  stringent  specification.  Other  criteria  that  was 
analyzed included Barlow stress, effective stress, and weld fatigue for uncased railroad installations. This 
wall thickness is acceptable at depths from 6‐14 feet per the API 1102 stress calculations.  
If the railroad is crossed using a casing pipe, the inside diameter of the casing pipe shall be large enough to 
allow the carrier pipe to be installed within the casing, taking into account spacing between the carrier pipe 
and  casing  pipe.  The  wall  thickness  of  casing,  pipe  can  be  determined  from  the  AREMA  manual.  A 
recommended casing OD of 46” would require a wall thickness for uncoated or not catholically protected 
pipe of 0.656”, and must have a SMYS of at least 35,000 psi.    
 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 6 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 8 of 30
Excellence & Integrity 
 

APPENDIX I ‐ RESULTS 
   

SUMMARY TABLE 

Calculated  Calculated 
Stress (psi)  Allowable 
0.688"  0.741" 
Barlow Stress  35,000  37,674  34,980 
Effective Stress  63,000  55,711  52,707 
Girth Welds   6,000  5,616  5,500 
Long. Welds  11,700  8,388  8,136 
Pass/Fail     Fail  Acceptable 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 7 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 9 of 30
Excellence & Integrity 
 
0.688” ANALYSIS 

   

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 8 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 10 of 30
Excellence & Integrity 
 
0.741” ANALYSIS 

 
 
 

Criteria for Pipe Wall Thickness ‐ Railroad Crossings  Page | 9 
  Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 11 of 30

  Line 3 Replacement Project Final Report:   
Criteria for Pipe Wall Thickness – 
Road Crossings 
Job #: 091510044 
Submitted: May 1, 2015 

Prepared for: 
Enbridge Energy 
Attention: 
Mitch Repka, Manager Engineering and Construction 
1409 Hammond Ave  
Superior, WI 54880 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 12 of 30
Excellence & Integrity 
 

TABLE OF CONTENTS 
1  EXECUTIVE SUMMARY ........................................................................................................................................... 3 
2  BACKGROUND ....................................................................................................................................................... 3 
3  OBJECTIVES AND APPROACH ................................................................................................................................. 3 

3.1  PURPOSE ....................................................................................................................................................... 3 
3.2  DESIGN CRITERIA ............................................................................................................................................ 3 
3.3  ASSUMPTIONS ................................................................................................................................................ 4 
3.4  ACCEPTABLE STRESS LEVELS – CODE AND STANDARDS REVIEW .............................................................................. 5 
4  CONCLUSION ......................................................................................................................................................... 6 
5  RECOMMENDATIONS ............................................................................................................................................ 6 

APPENDIX I ‐ RESULTS ................................................................................................................................................... 7 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 1 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 13 of 30
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 14 of 30
Excellence & Integrity 
 

1 Executive Summary 
Wall thickness requirements for road crossings have been evaluated for the Line 3 Replacement Project per 
the operating conditions outlined in the Class 3 Pipeline Hydraulic Proposal provided by Enbridge. Stress 
calculations were completed for uncased pipeline crossings of roads according to API 1102 Liquid Pipelines 
Crossing Railroads and Highways from 4‐10 feet below the road surface. Based upon applicable codes and 
standards, the minimum wall thickness for 36” OD, API 5L X‐70 pipe is 0.550”.  Additionally, installations 
from 10‐20 feet below the road surface with a wall thickness of 0.550” were confirmed to be acceptable 
using ANSI GPTC Z380.1 Uncased Crossing Design. 

2 Background  
The proposed common carrier pipeline, commercially known as the “Line 3 Replacement Project,” will have 
a design capacity of 760,000 barrels per day of light/heavy crude oil blends. The proposed 36‐inch‐diameter 
interstate crude pipeline originates at the end of the 34‐inch‐diameter Maintenance and Flexibility Project 
near the Canadian/US Border, crosses North Dakota and Minnesota, and extends to a delivery point at the 
Superior  Terminal  in  Wisconsin.  The  project  is  integrity  driven  and  will  ultimately  replace  the  existing 
Enbridge 34‐inch Line 3. 

3 Objectives and Approach 

3.1 Purpose 
The purpose of this analysis is to ensure that the pipe to be installed at highway or road crossings is of 
adequate  strength  to  withstand  the  external  and  dynamic  forces  exerted  by  traffic  loads  and  soil 
overburden.  In addition, it serves to calculate the fatigue, circumferential, radial, longitudinal, and total 
effective  stresses  and  to  ensure  they  are  within  acceptable  limits  as  established  by  the  applicable 
referenced Codes and Standards.    

3.2 Design Criteria 
The applicable and governing Codes, Standards, and Reference Documents are as follows: 

 API Recommended Practice 1102 
“Steel Pipeline Crossing Railroads and Highways”, Seventh Edition, March 2014 

 ASME B31.4 
“Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids”, 2012 Edition 

 ANSI GPTC Z380.1 Appendix G‐192‐15 
“Guide for Gas Transmission and Distribution Piping Systems”, 2012 

 American Lifelines Alliance 
"Guideline for the Design of Buried Steel Pipe" 2001 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 3 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 15 of 30
Excellence & Integrity 
 
 Code of Federal Regulations (CFR) 
Title 49 – Transportation, Part 195 – Transportation of Hazardous Liquids by Pipeline, February 
9, 2015 

 Enbridge Design Standards 
D06‐101 ‐ Piping Design and Construction, Mainline, December 17, 2014 
o Enbridge Technical Standards Bulletin# ‐ BUL-065-2014  
o Enbridge Technical Standards Bulletin# ‐ BUL-072-2014
D06‐103 – Crossing Design, November 29, 2013 

 Enbridge Construction Specification 
USPCS‐SPEC‐PIPELEINE‐001 – Pipeline Construction 

 Class 3 Pipeline Hydraulic Design Proposal, October 28, 2014 
o Addendum to Hydraulic Design Proposal, March 3, 2015 

 Pressure Cycling Analysis Line 3R IP Worst Case, April 15, 2014 

3.3 Assumptions 
The following general assumptions were used for the pipe stress analysis: 

 API Recommended Practice 1102 was used as the basis for the pipe stress analysis, as referred 
to in ASME B31.4 and Enbridge Design Standard D06‐103 for depths from 4‐10 feet 

 ANSI GPTC Z380.1 was used as the basis for pipe stress analysis to confirm use of the API 1102 
specified wall thickness for depths from 10‐20 feet 

 All highway or road crossings will be uncased 

 All highway or road crossings will be installed by a method that will not create a bending stress 
during or after installation 

 Highway or road crossing stresses do not need to be reevaluated for locations with increased 
mainline wall thickness per the Pressure Cycling Analysis Line 3R IP Worst Case 

 The following inputs were used for the steel pipe characteristics: 
o Poisson’s Ratio, ν = 0.30 
o Young’s Modulus of Elasticity, E = 29 x 106 
o Coefficient of Thermal Expansion, α = 6.5 x 10‐6 
The following Pipe Operating Condition assumptions were used for the pipe stress analysis: 

 The Internal pressure used in the calculation will be the Maximum Operating Pressure (MOP) 
for each segment, 1,440 psi 

 Pipe used will be pipe conforming to the API 5L specification with a weld joint factor, E=1 

 Design Factor of 0.72 as outlined in API 1102 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 4 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 16 of 30
Excellence & Integrity 
 
 A pipe operating temperature of 140oF;    
The following Site and Installation assumptions were used for the pipe stress analysis: 

 Minimum depth of cover for highway and road crossings will be 4 feet as specified in API 1102 
and Enbridge Design Standard D06‐103 

 A  maximum  overbore  of  2  inches  per,  Enbridge  Construction  Specification  USPCS‐SPEC‐


PIPELEINE‐001 

 A conservative installation temperature of 0oF. Actual installation temperatures are expected to 
be higher as the construction will be completed during the summer/fall months 

 Design wheel load for a single axle of 12,000lbs, as recommended by API 1102 for the maximum 
design load for a single axle 

 Design  wheel  load  for  a  tandem  axle  of  10,000lbs,  as  recommended  by  API  1102  for  the 
maximum design load for a tandem axle 

 Tandem axle loading is the critical loading for all diameters at depths greater than 4 feet, per 
API 1102 Table 1 

 Unpaved  Roads.    By  API  1102  this  would  be  the  most  conservative  approach  as  asphalt  or 
concrete would not be present to aid in distributing the traffic loads 

 Geotechnical data as assumed by API 1102: 
o Average Unit Weight of Soil, γ = 120 lb/ft3 
o Modulus of Soil Reaction, E’=0.2 ksi  
o Resilient Modulus of Soil, Er=5.0 ksi 

3.4 Acceptable Stress Levels – Code and Standards Review 
CFR 195 requires that any external pressure that is to be exerted on the pipe to be provided for in the 
design of such a system.  ASME B31.4 and Enbridge D06‐103 both reference the use of API 1102 for 
determining the resultant stresses due to the external pressures applied by soil overburden and traffic 
loads.  The required and/or recommended stress criterion for crossing analysis is outlined in Table 1 
below.    
Table 1:  Allowable Stress Criteria 
Stress Type  Allowable Stress ‐ Liquids Reference
Hoop Stress due to Internal Pressure  0.72 SMYS   CFR 195, ASME B31.4
Longitudinal Stress due to ΔT, Wheel Loads 
0.90 SMYS   ASME B31.4 
and Earth Loads 
Total Effective Stress due to Internal 
Pressure, Wheel Loads, Earth Loads and ΔT 
0.90 SMYS  ASME B31.4, API 1102 
(US), Combined hoop and Longitudinal 
Stress (CA) 
Fatigue Stress in Girth and Longitudinal  The general design check for Fatigue on Girth 
Welds  (ΔSLh≤SFG x F) and Long welds (ΔSHh≤SFG x F)  ASME B31.4, API 1102 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 5 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 17 of 30
Excellence & Integrity 
 

4 Conclusion 
The wall thickness for road crossings is calculated to achieve the MOP in accordance with applicable codes, 
standards, and projected operating conditions of the proposed Line 3 Replacement Project.  The calculations 
were  completed  in  accordance  with  ASME  –  B31.4,  API  ‐  1102,  ANSI  ‐  GPTC  Z380.1  Appendix  G‐192‐15, 
Enbridge Design Standards D06‐101 – Piping Design and Construction and D06‐103 – Crossing Design, and 
the Enbridge Construction Specification ‐ USPCS‐SPEC‐PIPELINE‐001. 
The evaluation included reviewing Enbridge Design Standard D06‐101, to confirm adherence, it should be 
noted  that  the  current  design  temperature  of  140°F  is  higher  than  the  maximum  allowable  design 
temperature of 100°F as stated in the Technical Standards Bulletin BUL‐065‐2014 associated with Enbridge 
Design Standard D06‐101. It is LSC’s understanding that a project decision record is being developed. The 
current design temperature is within the acceptable limits for road crossing pipe as outlined in ASME B31.4 
2012 Edition, such that it is not necessary to vary the design calculation. 
The  road  crossing  wall  thickness  is  calculated  to  meet  the  minimum  thickness  required  for  the  MOP, 
operating conditions as defined in the Class 3 Hydraulic Design Proposal, and traffic and soil overburden 
loading.  In addition, it serves to calculate the fatigue, circumferential, radial, longitudinal, and total effective 
stresses and to ensure they are within acceptable limits as established by the applicable referenced Codes 
and Standards.    

5 Recommendations 
An analysis was completed to determine if the mainline nominal wall thickness of 0.515” met the strength 
requirements for uncased road crossing installations up to 20 feet depth. At depths below 20 feet a site 
specific engineering design is required. The stress analysis showed that pipe with a wall thickness of 0.515” 
would not meet the effective stress limits as defined by Codes and Standards.  
A  minimum  wall  thickness  of  0.550”  was  found  to  meet  the  criteria  of  fatigue,  circumferential,  radial, 
longitudinal, and total effective stresses as established by the applicable referenced Codes and Standards. 
This wall thickness is acceptable at depths from 4‐20 feet per API 1102 and ANSI GPTC Z380.1 Appendix G‐
192‐15 calculations.  
    

Criteria for Pipe Wall Thickness –Road Crossings  Page | 6 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 18 of 30
Excellence & Integrity 
 

APPENDIX I ‐ RESULTS 
 

SUMMARY TABLE 
     
Calculated  Calculated 
Stress (psi)  Allowable 
0.515"  0.550" 
Barlow Stress  50,400  50,330  47,127 
Effective Stress  63,000  66,419  62,927 
Girth Welds   8,640  1,458  1,458 
Long. Welds  11,700  2,327  2,329 
Pass/Fail     Fail  Acceptable 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 7 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 19 of 30
Excellence & Integrity 
 
0.515” ANALYSIS 

 
 
 
   

Criteria for Pipe Wall Thickness –Road Crossings  Page | 8 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 20 of 30
Excellence & Integrity 
 
0.550” ANALYSIS 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 9 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 21 of 30
Excellence & Integrity 
 

Criteria for Pipe Wall Thickness –Road Crossings  Page | 10 
  Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 22 of 30

  Line 3 Replacement Project Final Report:   
Criteria for Pipe Wall Thickness ‐ Mainline
Job #: 091510044 
Submitted: May 1, 2015 

Prepared for: 
Enbridge Energy 
Attention: 
Mitch Repka, Manager Pipeline Engineering & Construction 
1409 Hammond Ave.  
Superior, WI 54880 

 
 
 
 
 
 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 23 of 30
Excellence & Integrity 
 

TABLE OF CONTENTS 
1  EXECUTIVE SUMMARY ........................................................................................................................................... 3 
2  BACKGROUND ....................................................................................................................................................... 3 
3  OBJECTIVES AND APPROACH ................................................................................................................................. 3 

3.1  PURPOSE ....................................................................................................................................................... 3 
3.2  DESIGN CRITERIA ............................................................................................................................................ 3 
3.3  ASSUMPTIONS ................................................................................................................................................ 4 
3.4  APPROACH .................................................................................................................................................... 4 
4  CONCLUSION ......................................................................................................................................................... 5 
5  RECOMMENDATION .............................................................................................................................................. 5 

APPENDIX I ‐ LINE DESCRIPTION SUMMARY .................................................................................................................. 6 
APPENDIX II ‐ PRESSURE PROFILE .................................................................................................................................. 7 

APPENDIX III ‐ SUMMARY OF RESULTS .......................................................................................................................... 8 

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 1 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 24 of 30
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 25 of 30
Excellence & Integrity 
 

1 Executive Summary 
The minimum wall thickness requirements for mainline pipe have been evaluated for the Line 3 Replacement 
Project per the operating conditions outlined in the Class 3 Pipeline Hydraulic Design Proposal provided by 
Enbridge. Based upon applicable codes and standards, the minimum wall thickness for 36” OD, API 5L X‐70 
pipe is 0.515”. 

2 Background 
The proposed common carrier pipeline, commercially known as the “Line 3 Replacement Project,” will have 
a design capacity of 760,000 barrels per day of light/heavy crude oil blends. The proposed 36‐inch‐diameter 
interstate crude pipeline originates at the end of the 34‐inch‐diameter Maintenance and Flexibility Project 
near the Canadian/US Border, crosses North Dakota and Minnesota, and extends to a delivery point at the 
Superior  Terminal  in  Wisconsin.    The  project  is  integrity  driven  and  will  ultimately  replace  the  existing 
Enbridge 34‐inch Line 3. 

3 Objectives and Approach 

3.1 Purpose 
To  determine  a  nominal  wall  thickness  for  mainline  pipe  satisfying  requirements  for  the  maximum 
operating  pressure  (MOP)  in  accordance  with  applicable  codes,  standards,  and  projected  operating 
conditions of the proposed Line 3 Replacement Project. 

3.2 Design Criteria 
The applicable and governing Codes, Standards, and Reference Documents are as follows: 

 ASME B31.4 
“Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids”, 2012 Edition 

 Code of Federal Regulations (CFR) 
Title 49 – Transportation, Part 195 – Transportation of Hazardous Liquids by Pipeline, February 
9, 2015 

 Enbridge Design Standards  
D06‐101 ‐ Piping Design and Construction, Mainline, December 17, 2014 
o Enbridge Technical Standards Bulletin# ‐ BUL-065-2014  
o Enbridge Technical Standards Bulletin# ‐ BUL-072-2014
D06‐104 – Pipe and Fittings, Steel, December 18, 2013 
o Enbridge Technical Standards Bulletin# ‐ BUL-064-2014 

 Enbridge Equipment Standard 
EES 103 – Submerged‐Arc‐Welded Steel Pipe, November 29, 2013 

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 3 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 26 of 30
Excellence & Integrity 
 
 Class 3 Pipeline Hydraulic Design Proposal, October 28, 2014 
o Addendum to Hydraulic Design Proposal, March 3, 2015 

 Pressure Cycling Analysis Line 3R IP Worst Case, April 15, 2014 

3.3 Assumptions 
 36” outside diameter (OD), in accordance with API 5L X‐70  

 Maximum operating pressure of 1,440 psi, as outlined in the hydraulic summary 

 Maximum operating temperature of 140°F, as outlined in the hydraulic summary 

 Design Factor of 0.72, as outlined in ASME B31.4 

 Weld Joint Factor of 1, as outlined in ASME B31.4 

 D/t ratio of less than 100, as outlined in Enbridge Design Standard D06‐101 

 Additional mainline wall thickness requirements downstream of pump stations were required 
from the Pressure Cycling Analysis Line 3R IP Worst Case completed by Enbridge 

 Wall thickness is rounded up to the nearest thousandth to meet the 0.72 design factor  

3.4 Approach 
The  minimum mainline  wall thickness requirement is calculated in accordance with ASME B31.4 and 
Enbridge Design Standard D06‐101, using Barlow’s equation and checking the D/t ratio as shown below.  
 
 

 
2
Where: 
t nominal wall thickness (in)  
Pi internal design pressure (psi)
D nominal outside diameter of pipe (in)
S yield strength (psi) 


Where:
F design factor based from Table 403.3.1‐1 
E weld joint factor 
Sy = specified minimum yield strength of the pipe (psi) 

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 4 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 27 of 30
Excellence & Integrity 
 
 

100 

Where: 
D nominal outside diameter of pipe (in)  
t nominal wall thickness (in) 

4 Conclusion 
The nominal wall thickness for mainline pipe is calculated to achieve the MOP in accordance with applicable 
codes,  standards,  and  projected  operating  conditions  of  the  proposed  Line  3  Replacement  Project.    The 
calculation was completed using Barlow’s equation as outlined in ASME B31.4 2012 Edition and the Enbridge 
Design Standard D06‐101 – Piping Design and Construction. 
The evaluation included reviewing Enbridge Design Standard D06‐101, to confirm adherence, and it should 
be  noted  that  the  current  design  temperature  of  140°F  is  higher  than  the  maximum  allowable  design 
temperature of 100°F as stated in the Technical Standards Bulletin BUL‐065‐2014 associated with Enbridge 
Design Standard D06‐101. It is LSC’s understanding that a project decision record is being developed.   The 
current design temperature is within the acceptable limits for mainline pipe as outlined in ASME B31.4, such 
that it is not necessary to vary the design stress calculation.  
The  pipe  wall  thickness  was  designed  to  accommodate  the  MOP  profile  defined  in  the  Class  3  Hydraulic 
Design Proposal, ensuring the MOP between pump stations accounts for elevations at the required discharge 
pressures to meet the proposed design capacity (see Appendix I ‐ Line Description Summary and Appendix 
II ‐ Pressure Profile). 
Further, the diameter to thickness ratio (D/t ratio) was evaluated to determine whether or not the calculated 
thickness is susceptible to flattening, ovality, buckling, and denting; a D/t ratio greater than 100 may require 
additional protective measures during construction.  The D/t ratio for the Line 3 Replacement Project is less 
than 100; therefore, as outlined in ASME 31.4 and Enbridge Design standard D06‐101, normal construction 
procedures can be followed. 

5 Recommendation 
The minimum wall thickness for mainline pipe has been evaluated for the Line 3 Replacement Project per 
the operating conditions outlined in the Class 3 Pipeline Hydraulic Proposal provided by Enbridge. Based 
upon applicable codes and standards, the minimum wall thickness for 36” OD API 5L X‐70 pipe is 0.515”, 
resulting in a D/t ratio of 64.1.  See Appendix III ‐ Summary of Results for calculations. 
The Enbridge Pressure Cycling Analysis recommends additional wall thickness downstream of Clearbrook, 
Two Inlets, Backus, and Palisade Stations. Wall thicknesses of 0.750” and 0.600” are specified as mainline 
thicknesses  to  be  used.  The  specific  distances  downstream  of  each  station  can  be  found  in  the  Pressure 
Cycling Analysis Line 3R IP Worst Case, April 15, 2014.  
 

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 5 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 28 of 30
Excellence & Integrity 
 

APPENDIX I ‐ LINE DESCRIPTION SUMMARY 
The following Line Description Summary taken from the Hydraulic Design Proposal outlines the required wall thicknesses for eight (8) different segments 
of the proposed Line 3 Replacement Pipeline.  Segment 8 references the US portion of the Line 3 Replacement Project, starting at the end of the Line 3 
Maintenance and Flexibility Project terminating at the Superior Terminal.   

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 6 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 29 of 30
Excellence & Integrity 
 

APPENDIX II ‐ PRESSURE PROFILE 
The following Pressure Profile taken from the Hydraulic Design Proposal illustrates the MOP along the entire Line 3 Replacement Project route.  The 
profile shows that at no point will the pressure exceed the designed MOP of 1,440 psi, further validating the current design wall thickness criteria.  

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 7 
Simonson Direct CN & PPL Testimony, Ex. ___, Schedule 3
Page 30 of 30
Excellence & Integrity 
 

APPENDIX III ‐ SUMMARY OF RESULTS  
 

Criteria for Pipe Wall Thickness ‐ Mainline  Page | 8 