Shazand Arak Refinery Expansion

and Upgrading Project

NIOEC
WPS & PQR
Originator Project No.: RF02 NIOEC Project No.: 2260
Document No.:ME-1-2-0700-0-WS-103 Date: 23-Jun-08 Rev.: 02 Page: 1 Of 24

WPS & PQR

02 ISSUED FOR APPROVAL 23-June-08 I.M I.M H.GH


01 ISSUED FOR APPROVAL 17-May-08 I.M I.M H.GH --
00 ISSUED FOR APPROVAL 13-Apr-08 I.M I.M H.GH --
REV. DESCRIPTION DATE PREPARED CHECKED APPROVED AC
1- Approved(Released for Manufacturing) OEC Code:RF02 Unit:20-19-18-16

2-Approved as Noted for Item No.:TK-2085/2088a-b/2087/2094a-b/2089a-


Vendor Job No.:P02
Fabrication(Fabrication May Proceed) b/1601/1801/1881/1831/1951/1931

3-Approved as Noted for Re-


Designation:
Issue(Fabrication Shall not Proceed)

4-Rejected Vendor Doc No.:ME-1-2-0700-0-WS-103

5-Not Returned Requisition No.:2260-IR-ME-1-2-0700-0


Date: Sign: POD: POI: Status:
Shazand Arak Refinery Expansion
and Upgrading Project

NIOEC
WPS & PQR
Originator Project No.: ODCC NIOEC Project No.: 2260
Document No.:ME-1-2-0700-0-WS-103 Date: 6/23/2008 Rev.: 02 Page: 2of 24
SHEET REVISION REMARK SHEET REVISION REMARK
D D D D D D D D D
D0 D2 D3 D4 D5 D6 D7
0 1 2 3 4 5 6 7 1
1 √
2 √
3 √
4 √
5 √
6 √
7 √
8 √
9 √
10 √
11 √
12 √
13 √
14 √
15 √
16 √
17 √
18 √
19 √
20 √
21 √
22 √
23 √
24 √