MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 1
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT RATE TOTAL PRICE
Description UNIT QTY
No. (AED) (AED)

SECTION 1
PRELIMINARIES AND GENERAL
REQUIREMENTS

Non-Recurring Preliminary Costs (Mobilization)


1.1
Incurred at the commencement of the Works
a Provision of all necessary air conditioned offices Item 1.00 -

b Telephone sets,fax and electronic mail in each room allowing Item 1.00
for U.A.E internal calls ,all to the engineer satisfaction -
Provision of all necessary offices, stores and facilities for
c Contractors' site staff in adequate manner as per the Works Item 1.00
required. -
Provision of sign boards with masjid perspective size and
d Item 1.00
design( as shown in the drawings). -
e Provision of site hoarding Item 1.00 -
Submittal of Performance Bond as per the Conditions of the
f Item 1.00
Contract. -
Submittal of all insurances as per the Conditions of the
g Item 1.00
Contract. -
Allow for all obligations in accordance with the Contract,
which are not mentioned above. The Contractor shall detail and
h Item 1.00
price below any other obligations indicating the relevant clause
reference in the Contract Documents. -

Recurring Preliminary Costs incurred during the Execution of


1.2
the Works
Maintenance of all necessary offices and facilities for the
j Employer and the Engineer including all services, furniture, Item 1.00
equipment and fixtures. -
Maintenance of Contractor's site staff office, stores, and
k Item 1.00
facilities. -

l Provision of Contractors site management, administrative and Item 1.00


supervisory staff in adequate manner as per the Works needs. -
Provision of all required equipment, plant and tools for the
m Item 1.00
successful execution of the Works. -
Provision of all necessary site power and lighting for the
n Item 1.00
Works. -
p Provision of all necessary water for the Works. Item 1.00 -
q Provision of all necessary sanitation for the Works. Item 1.00 -

Provision of safety and security requirements during progress


r of Works including watching, lighting, safety signs, fire Item 1.00
fighting requirements, first aid tools, safety shoes, protection
helmets, safety belts and protection barriers/handrails, etc. -
Provide, erect and maintain of all necessary scaffolds, access
s ways, ladders and the like for the safe and successful Item 1.00
completion of the Works. -
Provision of all required progress site reports, photos, and
t Item 1.00
other documentation as per the Conditions of the Contract. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 1
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT RATE TOTAL PRICE
Description UNIT QTY
No. (AED) (AED)

SECTION 1
PRELIMINARIES AND GENERAL REQUIREMENTS
(Cont'd.)

Provision of all required shop drawings and samples as


a Item 1.00
specified and required by the Engineer. -
Provision of all required Quality Assurance and Quality
b Item 1.00
Control as required by the Contract. -
Provision for all inspections and testing necessary for the
c acceptance of the Works in accordance with the Specifications Item 1.00
and the Conditions of the Contract. -
d Maintaining site hoarding and sign boards. Item 1.00 -
Cleaning up and removal of rubbish during the progress of the
e Item 1.00
Works to the satisfaction of the Engineer. -
Allow for all obligations in accordance with the Contract,
which are not mentioned above. The Contractor shall detail and
f Item 1.00
price below any other obligations indicating the relevant clause
reference in the Contract Documents. -

Non-Recurring Preliminary Costs (Demobilization) incurred at


1.3
the Completion of the Works
Demobilization and removal of all offices and facilities for the
g Employer and the Engineer including all services, furniture, Item 1.00
equipment and fixtures. -
h Item 1.00
Demobilization and removal of all offices, stores and facilities. -
j Item 1.00
Demobilization and removal of all equipment, plant and tools. -
Provision of all required As Built drawings, Operation and
k Item 1.00
Maintenance Manuals and guarantees. -

Clearing up and making good site establishment after


l Item 1.00
completion of the Works and demobilization. This includes re-
instating surrounding areas affected by the construction works. -
Allow for all obligations in accordance with the Contract,
which are not mentioned above. The Contractor shall detail and
m Item 1.00
price below any other obligations indicating the relevant clause
reference in the Contract Documents. -

1.4 Estidama Compliance

The Contractor should comply with all requirements to ensure


a 2 Pearl certification level using the Estidama Pearl Building 
n Item 1.00
Rating system. This requires that the Contractor be familiar 
with the mandatory and targeted credit requirements through 
the Estidama Design Rating submission. -

p The Contractor is responsible for all documentation required as Item 1.00


part of the Estidama Construction Rating submission. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 1
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT RATE TOTAL PRICE
Description UNIT QTY
No. (AED) (AED)

SECTION 1
PRELIMINARIES AND GENERAL REQUIREMENTS
(Cont'd.)

COLLECTION

Page No. 1 -

Page No. 2 -

TOTAL PRELIMINARIES WORK - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 1
SITE CONSTRUCTION

1.1 Dewatering (if required)


a Allow for installing, maintaining and taking away upon completion,
dewatering system as approved by local authorities, to lower the water level
Item
below foundations and keep all excavations free from water from whatever
source. -

1.2 Site Clearance


b The Contractor shall allow for the removal from site of all rubbish and
debris and any existing foundations prior to commencement of Works. Item
-

1.3 Existing Utilities


c Allow for carefully locating any existing underground utilities in work areas
including hand excavating trial holes as necessary, include all necessary Item
earthwork supports. -
d Where utilities are to remain in place provide adequate means of support and
Item
protection during excavation and shoring operations -

1.4 Demolition of Existing Buildings


e Demolish of all exisiting buildings and demolition waste to be transferred off
Item
site. -
f Allow for earthwork support to the other excavation. Item -
g Test demolition material free from Asbestos Item

1.5 Excavation
h Excavate in any material to receive foundation commencing at existing
m3
ground level -

1.6 Filling
Filling will be in layes as per the specification and lab recmmendations
j Back filling to receive the ground level m3 -
k Back filling to receive the ground floor level.. m3 -

1.7 Disposal
l Remove surplus excavated material from site Item -
m Allow for making good exposed surfaces of concrete piles after excavation.
Item
-
1.8 Anti-termite treatment
n Allow for anti-termite treatment as specified under ground slab and
Item
foundations and interlock tiles -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 1
SITE CONSTRUCTION (Cont'd)

1.09 Piling
a Design and install cast in situ reinforced Concrete Piles using temporary
casing system as Specified and as per Drawings
b The Contractor shall be responsible for the adequacy of the pile foundations
installed to carry the working loads.
c The Contractor shall be responsible to calculate the depth of piles based on
the geotechnical report and to the Municipality and Engineer's approval
d Mobilisation of plant and equipment to site. Item -

e Cast in situ piles including concrete grade 40 N boring through any type of
soil, reinforcement cages and removal of surplus material arising off site.

e.1 500 mm dia. pile, 1000 KN/Pile compaction capacity and minimum tension
No.
capacity 500 KN/Pile. -
e.2 600 mm dia. pile, 1550 KN/Pile compaction capacity and minimum tension
No.
capacity 900 KN/Pile. -

f Pile Testing
Allow for load testing on piles in accordance with the specification.
f.1 Allow for load test for piles . Item -
f.2 Allow for integrity test for all piles. No. -
f.3 Allow for chipping off the extra concrete from piles to the required height
No.
retaining the steel reinforcement using an approved method.

g demobilization of plant and equipment from site on completion. Item -

1.10 Paving
a Supply and paint Precast kerbstone lm -
b 60mm thick colored interlocking tiles. m2 -

1.11 Sundries
Allow for any other miscellaneous work in connection with site construction.
LS
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 1
SITE CONSTRUCTION (Cont'd)

Page No. 4 -

Page No. 5 -

TOTAL SITE CONSTRUCTION WORK - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 2
CONCRETE WORKS

2.1 SUBSTRUCTURE

Concrete work in accordance with specification


Plain Concrete
Plain sulphate resisting cement concrete grade 20 N
a 100 mm thick, blinding concrete m3 -

Reinforced Concrete
Reinforced insitu ordinary Portland cement concrete grade 40 N, including
Reinforcement and shuttering, complying with the specifications and with
BS 12 or ASTM, (Mix Type B)
b Pile caps & Tie beams including Boundary wall foundations m3 -
c Neck Walls and columns, Including boundary wall columns m3 -
d Slab on grade m3 -
e Water tank m3

Substructure Waterproofing
f Supply and lay polyethylene sheet, 1000 Gauge. m2 -

Supply and apply two layers of waterproofing membrane 4mm. thick,


including primer, all in accordance with drawings and specification .
g To horizontal concrete surfaces m2 -
h To vertical concrete surfaces m2 -

Protection screed as specified


j 5cm cement screed for horizontal surfaces m2 -

Protection Board as specified


k Fixed vertically against exposed waterproofing membrane m2 -

Water Tank Lining


l Supply and fix in place 3 coats cementitons water proofing for all inner
surfaces of water tank as specified. The Contractor should furnish certificate
m2
supporting that the materials used are suitable for potable water usage.
-
m Stainless steel ladder for water tank. Item -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 2
CONCRETE WORKS (Cont'd)

2.2 SUPERSTRUCTURE

Concrete work in accordance with specification


Reinforced insitu ordinary Portland cement concrete grade 50 N for (Column
C1 & Beam IB) & 40N (for all others), including Reinforcement and
shuttering as specified
a Walls and Columns m3 -
b Beams. m3 -
c Parapets & steps. m3 -
d Suspended slab and drop slab . m3 -
e Lintels m3 -
f Decorative Item -

2.3 Sundries
g Foundations for A/C machines, pumps, water tanks, etc. Item -
h Allow for any other miscellaneous work in connection with concrete work.
LS
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTIION 2
CONCRETE WORKs (Cont'd)

Page No. 7 -

Page No. 8 -

TOTAL CONCRETE WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 3
MASONRY

3.1 Precast Solid concrete blocks, as specified


a 100 mm thick, solid blockwork m2 -
b 200 mm thick, ditto m2 -

3.2 Precast Hollow concrete blocks as specified


c 100 mm thick, block walls m2 -
d 200 mm thick , ditto m2 -

3.3 Thermal Hollow Concrete Block as specified


e Blocks for all external walls m2 -

3.3 Sundries
f Allow for any other miscellaneous work in connection with masonary work.
Item
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 3
MASONRY WORKS (Cont'd)

Page No. 10 -

TOTAL MASONRY WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 4

METALWORKS

4.1 Non-Structural Metalwork


a Handrail for ramp as specified Item -
b Galvanized steel stair inside the minart as shown in the drawings Item -
c Metalic Crescent as specified Nos. -
d Aluminum Handrail for Mehrab Item -
e Stainless Steel works for bicycle rack Item -
f Decorative Cast Aluminum Shade Item -
g Cast Steel rail for the boundary walls, including the steel gates Lm -
h Stainless Steel Handrail (Grade 316) for Ablustion Area Nos. -

4.2 Structural Metalworks


j Aluminum double glazed skylight as shown in the drawings Item -
k All steel sturctural work required to fix the GRC materials Item -

4.3 Ladders
l Galvanized steel cat ladder for roof in Imam & Moazen House Item -
m Stailess Steel ladders (Grade 316) for the Mosque Item -

4.4 Sundries
n Allow for any other miscellaneous work in connection with metal work.
Item
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 4
METAL WORKS (Cont'd)

Page No. 12 -

TOTAL METAL WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 5
WOODEN WORKS

5.1 KITCHEN CABINETS


a Fabricate, supply and install approved ready made wall and base kitchen
cabinets, complete with marble worktop with backsplash, stainless steel
sinks, mixers, ironmongery and drawers, as specified.
b Wall cabinets. Lm -
c Base cabinets. Lm -

5.2 MDF SHELVES


d Book shelves as shown in the drawings Item -
e Shoes shelves as shown in the drawings Item -

5.3 SUNDRIES
f Allow for any other miscellaneous work in connection with wood work.
LS
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTIION 5
WOONDEN WORKS (Cont'd)

Page No. 14 -

TOTAL WOODEN WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 6
THERMAL AND MOISTURE PROTECTION

6.1 Roofing system


a Polyurethane Foam with 45-50kg/m3 m2 -
b Polytex Liquied U.V Protection Coat m2 -
c Polyfab Filter Membrane m2 -
d Concrete Screed m2 -
e SBR Bonding Agent m2 -
f Polyflex Combo - Top coat (800mic Thic) m2 -
g Poly Board + Backing Rod + Poly Sulphide Sealant Lm

6.2 Skirting
h Poly Bonding Agent Lm -
i 100*100mm angle Fillet Lm -
j Fabric Reinforcement Lm -
k Poly flrx COMPO-Top coat (800mic thick) Lm -

6.3 Wet area


m 50 mm thick sand cement protection screed m2 -
n 4 mm thick one layer applied waterproofing membrane on and including two
m2
coats bitumen primer. -
p 30 mm thick sand cement protection screed m2 -
q Skirting 4 mm thick one layer applied waterproofing membrane on and
Lm
including bitumen primer. -

6.4 Sundries
r Allow for any other miscellaneous work in connection with thermal and
item
moisture protection. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTIION 6
THERMAL AND MOISTURE PROTECTION (Cont'd)

Page No. 16 -

TOTAL THERMAL & MOISTURE PROTECTION- Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 7

DOORS AND WINDOWS

7.1 WOODEN DOORS


Doors shall be made as per drawings and specifications, provided with all
necessary approved accessories and ironmongery.
Subframes: as per drawings and specifications
Frame and subframe shall suit the walls thicknesses.

I -FLUSH DOORS
Door Leaf : painted hardwood veneered with solid core
Frames and architrave fabricated using painted hardwood.
a Type DT-01 No. -
b Type DT-02 No. -
c Type DT-03 No. -
d Type DT-04 No. -
e Type DT-05 No. -
f Type DT-06 No. -
g Type DT-07 No. -

7.2 ALUMINUM DOORS

Aluminium framed doors, powder coated aluminium panel including


ironmongery as specified, with double glassing 8+12+8mm both sides are
tempered, High Performance glass with Low E Film
h Type DA-01 No. -
j Type DA-02 No. -
k Type DA-03 No. -
l Type DA-04 No. -
m Type DA-05 No. -
p Type DA-06 No. -
q Type DA-07 No. -
r Type DA-08 No. -
s Type DL-01 No. -

Aluminium framed Glass doors, powder coated aluminium including


ironmongery as specified.
u Type DG-01 No. -
v Type DG-02 No. -
w Type DG-03 No. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 7
DOORS AND WINDOWS (Cont'd)

7.3 ALUMINUM WINDOWS & CURTAIN WALLS


Double glazed (6+12+6mm both sides are tempered , High Performance
glass with Low E Film) powder coated Aluminum windows including
ironmongery as specified.
a Type W1 No. -
b Type W2 No. -
c Type W3 No. -
d Type W4 No. -
e Type W5 No. -
f Type W6 No. -
g Type W7 No. -
h Type W8 No. -
j Type W9 No. -
k Type W10 No. -
l Type W11 No. -
m Type W12 No. -

7.4 SUNDRIES
n Allow for any other miscellaneous work in connection with doors and
LS
windows. -

TOTAL DOORS AND WINDOWS- Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 7
DOORS AND WINDOWS (Cont'd)

Page No. 18 -

Page No. 19 -

TOTAL DOORS AND WINDOWS- Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 8
FINISHES WORKS

8.1 I- INTERNAL FINISHES

8.1.1 Flooring

Granite & Marble Floor Tiles fixing and grouting including background as
specified.
a Granite floor tiles as specified.( F1) m2 -
b Granite treads & risers s as specified.( F7) Lm -
c Flamed marble tile as specified (F9) m2 -
d 30mm thick marble tiles - color 1 (F10) m2 -
e 30mm thick marble tiles - color 2 (F11) m2 -
f 30mm thick marble tiles - color 3 (F12) m2 -

Ceramic Floor Tiles fixing and grouting including background as specified.


g Polished ceramic tile as specified.( F2) m2 -
h Anti-slip ceramic tile as specified.( F4) m2 -
j Anti-slip ceramic tile as specified.( F14) m2 -

Terrazzo Floor Tiles fixing and grouting including background as specified.


k Terrazzo flooring tiles (F8) + (F3) m2 -

Skirting
l Granite skiriting as specified (S1) Lm -
m Polished ceramic skiriting as specified (S2) Lm -
n Terrazzo skirting as specified (S3). Lm -
p 20mm Marble skirting (S4) Lm -

Threshold
q Marble threshold, 30 mm thick, rounded edges, at door frames, for bath
Lm
rooms, kitchen,entrance and services rooms as specified . -

8.1.2 Wall finishes

Cement/sand plaster finish to internal surfaces as specified


r Walls m2 -
s plaster and vapour proof coating for wall above false ceiling m2 -

Wall tiling, fixing and grouting on and including background as specificied


t Granite wall tiles as specified.( W4) m2 -
u Glazed ceramic wall tiles as specified.( W3) m2 -
v 20mm thick marble cut to size as specified.( W6) m2 -
w Polished marble tiles as specified.( W7) m2 -

Painting and Decoration


x Emulsion paint as specified(W1). m2 -
y Stucco antique paint as specified(W4). m2 -
z Epoxy texotile paint Antifunges (W2) m2 -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 8
FINISHES WORKS ( Cont'd)

8.1.3 Ceiling Finishes

Cement/sand plaster finish to ceiling


a Concrete soffit m2 -
b vapour proof coating for soffit area above false ceiling . m2 -

Painting and Decoration


c Emulsion paint (C1). m2 -
d Epoxy, finish paint(C2) . m2 -

False ceilings
e Moisture resistant suspended decorated gypsum board as specified (C3) . m2 -
f 600*600mm Aluminum suspended ceiling tiles with concealed suspension
m2
system (C4). -
g Moisture resistant suspended gypsum board as specified (C5) . m2 -
h Moisture resistant suspended aluminum tiles as specified (C6) . m2 -

8.2 II- EXTERNAL FINISHES


8.2.1 Flooring

Granite Floor Tiles fixing and grouting including background as specified.


j Granite cut to size floor tiles as specified. m2 -
k Granite treads & risers s as specified. Lm -

Skirting
l Granite skiriting as specified (S) Lm -

8.2.2 Wall finishes


Cement/sand plaster finish to surfaces as specified
m Walls m2 -

Painting, Decoration and cladding


n 2 coat bitumen under cladding finishes m2 -
p GRC cladding as specified (Texture should be acid etched finish) m2 -
q GRC claustra LS -
r Natural Sone as specified (W8 & W9) m2 -
s Stone paint (W5) m2

8.3 SUNDRIES
t Carpet to the approval of engineers m2 -

8.4 Allow for any other miscellaneous work in connection with finishing. LS -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 8
FINISHES WORKS ( Cont'd)

Page No. 21 -

Page No. 22 -

TOTAL FINISHES WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 9
EXTERNAL WORK

9.1 HARD LANDSCAPING

Paving
a 60mm thick interlocking pavers pedestrian walkways with compacted soil
m2
and sand bedding. -
b Bicycle rack - 80 mm vehicular paver block m2 -
c concrete curb including backing, all layers (backfill, sand, mortar) m2 -
d Granite cut to size floor tiles around the mosque as specified. m2 -

Garbage Bins -
e Suppy and insall garbage bins as shown in the drawings and as per
nos.
ESTIDAMA requirements -
-
Exterior plants

f 200 mm thick, filling with sweet soil m2 -


-
Trees -
g GAZANIA HYBRIDS m2 -
h EUPHORBIA MILII m2
j PARKISONIA ACULEATA nos.
k DELONIX REGIA nos.
l YUCCA ALOIFOLIA nos.
m SARACA INDICA nos.
-
Additional Items -

n The tender is to attach with this bill of quantities any addition items with
quantities, enumerated or itemised and rates which are not previously
included to complete the build up of lump sum price. Should the tenderers
fail to insert any items here, it will be deemed that his lump sum price for the
tenders includes all items either shown on the drawings and described in the
specification or deemed necessary by the tenderer to develop the drawings
and specification to represent the entire cost of the works and no subsequent
claim for any additional item will be entertained.

-
-

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 2
Al Ain Consulting Engineering CIVIL WORKS
ITEM UNIT TOTAL
No. UNIT QTY RATE PRICE
(AED) (AED)

SECTION 9
EXTERNAL WORKS ( Cont'd)

Page No. 24 -

TOTAL FINISHES WORKS - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering ELECTRICAL WORKS


ITEM UNIT RATE TOTAL PRICE
UNIT Qty
No. (AED) (AED)

SECTION 1
ELECTRICAL WORKS

Provide and install all electrical installation strictly in accordance


with the specifications and as indicated on the drawings, but not
limited to the following items: -
Incoming Mains Installation

Allow for all works required by the specifications and shown on


the drawings for providing incoming mains installation through
ADDC including liaison, and all builder's work listed below: -
Existing network is to be located by hand excavation. -
Proper protection is to be provided by contractor for all existing
netowrks. -

All effected networks shown or if discovered during execution are


to be relocated by contractor to a proper route reservation. -
Cost of protection, relocation and other related work are to be
beard by Contractor. -
Allow for all works required by the specifications and shown on
the drawings for providing incoming mains installation through
ADDC including liaison, and all builder's work. -
Paying statutory ADDC charges for acquiring Main supply
including ( Meter) Rates and issurance. -
Existing network is to be located by hand excavation. -
Main & Distribution Low Volt main board (MDB): -
Free - standing cubicle swicth board comprising of all switch gear,
bus bar, meters, indicator lights complete as specified and shown
on the drawings. -
a Main Distribution Board Item -
Sub - main distribution boards as specified and shown on the
b drawings. Item -

c Final distribution boards as specified and shown on the drawings. Item -


Isolators to mechanical equipment as required by the local
d authority. Item -
e Capacitor Bank (140kVAR) Item -
f Cables and cable support systems. -
GI cable trays, with covers for external area with supports &
g earthing wiring for cable tray Item -
h Cable ducts and accessories. Item -
i Armored cables, cable cleats, cable terminals etc. Item -

Four core cables and wires drawn into conduits/ducts including


j terminations, supports etc.,complete from SMDB's to final DB. Item -
Four core cables and wires drawn into conduits/ducts including
terminations, supports etc.,complete from existing MDB panel to
k SMDB(s) Item -
l Electrical Manholes and all cables routing requirements Item

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering ELECTRICAL WORKS


ITEM UNIT RATE TOTAL PRICE
UNIT Qty
No. (AED) (AED)

SECTION 16
ELECTRICAL WORKS (Cont'd)

Conduits, conduit accessories, draw boxes, wires, GI accessory


boxes, fixing, etc. complete for power outlet Item
a 13Amp. Switched socket outlets - single Nos. -
b Ditto but 13Amp.Switched socket outlets W/P (single) Nos. -
c Ditto but 13Amp.Switched socket outlets (double) Nos. -
d Ditto but 15/20Amp. switched socket outlets.(Flex outlet) Nos. -
e Ditto but for Cooker control unit 32 Amp. Nos. -

Light Fixtures:
Type A (Prayer halls,ladies entrance and women's Quran reciting
f lessons) Nos. -
g Type B ( Chandelier) Nos. -
h Type C (Pendant light- Ewan and arcade) Nos. -
j Type D (Flat's corridors and lobies) Nos. -
k Type E (Mosque's toilets) Nos. -
l Type F (Houses Toilet) Nos. -
m Type G (External walls lighting above doors) Nos. -
n Type H (Toilets single above mirror) Nos. -
p Type I (External walls lighting for Roof ) Nos. -
q Type J (ablution light) Nos. -
r Type K (kitchen) Nos. -
s Type L (Library, office, services rooms) Nos. -
t Type M (Ground light-up light-for main entrances) Nos. -
u Type N (living and bed room) Nos. -
v Type O (mini bollard) Nos. -
w Type P (main dome hidden light) Nos. -
x Type Q (post-top lights for boundary wall) Nos. -
y Type R (stair case) Nos. -
Type S (Minaret and sub-dome flood light
Type T ( Minaret service lighting-internal light of minaret-)
z Occupancy sensors (Lighting Control System) Ls.

Switches
aa One way one gang Nos. -
ab One way two gang Nos. -
ac One way three gang Nos. -
ad Switch Panel Four gang (multi-switch) Nos. -
ae Switch Panel Eighteen gang (multi-switch) Nos. -
af 20A DP Switch Nos. -

Electrical services to mechanical works.

ag Single Phase Isolator (W/P) Nos. -


ah Three Phase Isolator (W/P) Nos. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering ELECTRICAL WORKS


ITEM UNIT RATE TOTAL PRICE
UNIT Qty
No. (AED) (AED)

SECTION 16
ELECTRICAL WORKS (Cont'd)
Telephone Installation:
Allow for all works required by Etisalat regarding the affected
telephone plant
a Ducts, earthing and manholes as required by ETISALAT LS -
Conduits, conduit accessories, draw boxes, wires, GI accessory
boxes, fixing, etc.., complete for telephone socket outlet as "
ETISALAT " approval.
b Telephone socket ( Dual RJ-45 ) Nos. -
c Optical Network Box ( ONT Box ) Nos. -
d Telephone Junction Box ( TJ Box) Nos. -
e Cat6 cables L.s. -
Earthing Protection System
f Earthing and Bonding Nos. -
g Earth Pits Nos. -
h Down Conductor Nos. -
i Tape Clip Nos. -
j Exothermal Weld Bonding Nos. -
k Machine Coupler Nos. -
l Earth test box Nos. -

Sound System
m Digital Signal Processor And Audio Controller, Mixer, Feedback Nos. -
n Power Amplifier Nos. -
o CD Player Nos. -
p AM/FM Tuner Nos. -
q Line Array Speakers at Main Prayer Hall Nos.
r 60 Watt Horn Speakers Nos. -
s Ceiling Speaker At Women Prayer Hall Nos. -
t Coloumn Speakers at Entrance Nos. -
u Volume Controller and Channel Selector Nos. -
v Tie Clip Microphone With receiver Nos. -
w Wireless Handheld Microphone with receiver Nos. -
x Wired Handheld Microphone with Boom Stand Nos. -
x Equipment Rack Nos. -
Satellite Receiving Television IF Systems:
Supply, install, test and commisioning of M.A.TV. system for the
Imam flats as per the enclosed specifications:
y MATV Socket outlet Nos. -
z MATV junction box Nos. -
aa Cascadable Multi-Switch Nos. -
ab Satellite dishes Nos. -
ac MATV Antenna Nos. -
PVC junction boxes in the electrical room of each floor of the
ad building. -
M.A.TV. System network as per enclosed specifications complete
with the distribution boxes, Tap-off boxes, coaxial cables and
ae cable fittings. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering ELECTRICAL WORKS


ITEM UNIT RATE TOTAL PRICE
UNIT Qty
No. (AED) (AED)

SECTION 16
ELECTRICAL WORKS (Cont'd)
All necessary concrete bases, PVC pipes, trunking and all
a accessories Ls.

b Supply, install, test and commisioning of electrical bell system Ls.

Supply, install, test and commisioning of fire alarm and


emergency lighting system as per the approved drawings by
c ADCD. Ls.
Miscellaneous items:
d Allow for painting of the installation if required. Item -
e Allow for maintenance of the installation for Two calendar years. Item -
f Allow for guarantee. Item -
g Allow for testing and commissioning. Item -
Allow for statutary chage for e-routing of all existing telephone
services within the plot and which may be affected due to the
h construction of the new building Item -
Allow for all items not included above but needed to complete the
j installation as detailed & specified Item -

Builders work
Allow for marking the position of holes, mortises, chases and the
k like in the structure Item -
Allow for the provision of A/c duct penetrations through concrete
l roof slabs at all levels as required Item -
Allow for the provision of A/c duct penetrations through concrete/
m block work walls at all levels as required Item -
Allow for providing and building in the pipe sleeves in
n accordance with the drawings Item -
Allow for any other builders work not specifically covered by
p above items Item -
Documentation:
Allow for all submittals, samples, shop drawings, As-built
q Drawings, warranty certificates, testing & commissioning. Item -
Sundries
Allow for producing all working drawings for the approval of the
r Engineer Item -
Allow for testing and commissioning the installations on
s completion to the satisfaction of the Engineer Item -
t Allow for earthing and general earth bonding Item -
Allow for providing all spares and handing to the Engineer all as
u specified Item -
Allow for providing all painting plates, disks, labels etc. for the
identification of plant, equipment cables, switches and the like as
v specified Item -
w Allow for providing drawings showing the installations “as fitted” Item -
Allow for provision of operating and maintenance manuals to the
x satisfaction of the Engineer as specified Item -
Allow for any other necessary items required for the completion of
the work as described in the relevant sections of the specifications
y and drawings and not mentioned herein. Item -
To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering ELECTRICAL WORKS


ITEM UNIT RATE TOTAL PRICE
UNIT Qty
No. (AED) (AED)

SECTION 16
ELECTRICAL WORKS (Cont'd)

COLLECTION

Page No. 26 -

Page No. 27 -

Page No. 28 -

Page No. 29 -

TOTAL ELECTRICAL WORK - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

MECHANICAL ENGINEERING INSTALLATIONS

Section Two: PLUMBING INSTALLATION

Domestic Water supply System

Water connection
Allow for water connection to the ADDC water main, including
valves, valve covers, underground pipes, sleves, excavation,
A L/S
backfilling and surrounding etc. in accordance with specification &
Drawings
Valve Pit with water meter cabient

Water meter for individual operation including meter cabinet,


valves, gaskets, hangers, supports, interconnecting pipes, fittings
B No
and accessories all in accordance with specification & Drg.WS00,
valve pit to be provided by 60 X 60 Meduim duty manhole cover

PPR pipe (Polypropylene PP Type 3 Cl 16 as per DIN 8077 &


8078,according to material approval) works ,to be fixed impeded
inside walls including fittings, accessories, laying or fixing
horizontally or vertically with brackets, hangers, supports and
plugged, screwed to concrete or block work ,angle valves to be
L/S
provided on each water point for every sanitery fixture, Concealed
valve to be provided at each main cold and hot water supply line.
All connections for the saintery ware fixtures to be same sizes as
per drawings and other ancillary works in accordance with the
specifications and with referance to drawings.

C Cold Water pipes, 1/2 inch diameter L/S

D Ditto, 3/4 inch diameter L/S

E Ditto, 1 inch diameter L/S

F Hot Water pipes, 1/2 inch diameter L/S

G Ditto, 1 inch diameter L/S

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION Two: PLUMPING WORK, (cont'd.)

Roof and Risers Water Supply Pipes


Supply and Installation of Roof and Risers Water Supply pipes
(UPVC confirming to ISO 138 / 2N 238E CL 16 with solvent
welded joints ) This item includes supply and installation of all
fittings such as elbows, reducers, tees, sockets,...etc laying or fixing
horizontally or vertically with brackets, hangers, supports and L/S
plugged, screwed to concrete or block work and to include all the
nesscary to complete the works with the specifications and with
referance to drawings WS 01 TO WS 09, all pipes at the roof to be
insulated with the following diameters:

A Pipes 1/2 inch Diameter L/S

B Pipes 1 inch Diameter L/S

C Pipes 11/2 inch Diameter L/S

D Pipes 2 inch Diameter L/S

E Pipes 4 inch Diameter L/S

Valves, including fittings and accessories

F Isolating Valve 1/2 inch Nos

G Isolating Valve 1 inch Nos

H Concealed Valve L/S

J Non Return Valve 1 inch Nos

Bib Tabs and Hose unions mosque

K Bib Tabs and Hose Pipes 15 mm Nos

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION Two: PLUMPING WORK, (cont'd.)

Water supply Equipments and accessories complete with


controllers, valves, flexible connectors, interconnecting piping
and connection to services etc., complete as shown on
Drawings and Specification

Solar system, as per Dwgs and specs. Set

Domestic water booster pump set, (1 duty & 1 standby), as per


A Set
Dwgs and specs.

Domestic water transfer pump set, (1 duty & 1 standby), as per


C Set
Dwgs and specs.

D Solar pump set, as per Dwgs and specs. Set

E Backup Electerical water heater, as per DWG

4x3x1.5 GRPand 1.5x1.5x1.0 GRPand 1.5x1.0x1.0 overhead


F water tank, including valves, drains and accessories, all tanks to be No
provided with suitable sheds

5x2.5x2 GRP Ground water tank, including valves and accessories


G No
. ( Concrete work measured separately)

External Water Supply


H Supply and Installation of External water supply pipes (UPVC

a Pipes 65 mm Diam. L/S


b Pipes 50 mm Diam. L/S

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION Two: PLUMPING WORK, (cont'd.)

Sanitary appliances

Sanitary appliances complete with taps, mixer taps, traps, valves,

A Water Closet including Hand Spray and Hose Pipe Nos

B Bidet including Bedit Mixers Nos

C Counter top wash basin including mixture tap Nos

D Pedstal Wash basin including mixture tap Nos

E Bath tub with mixer, shower, arms and shower head Nos

F Towel rail/ring Nos

G Toilet paper holder Nos

H Robe hook Nos

J Bidet spray Nos

K Shower tray including shower set Nos

L Kitchen sink with double bowl and double drain with mixer Nos

M Mirrors Nos

N Soap holder Nos

P Shelf Nos

Q Water Closet including Hand Spray and Hose Pipe Nos

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION Two: PLUMPING WORK, (cont'd.)

Drainage and Ventilation Pipes


Supply and Installation of both drainage (Internal Drainage, Rain
Water Drainage, & Risers) and ventilation pipes from PVC pipes,
to be fixed above the ground level including fixation on the walls
(vertically & horizontally). All the Y connections to be provided
A with either gates or clean out beside fixation of rubber gaskets. All L/S
nesscary fittings, and Clean outs (with suitable covers) to be
installed as per drawings. This item to include all the nesscary to
complete the works as per the technical specifications and drawings
with the following diameters:

Sanitary drainage system ancillaries including all necessary fittings,


supports, fixings and accessories; all in accordance with the
Drawings and Specification

B Floor trap Nos

C Clean out L/S

D Rain Water Outlet - Corner Type Nos

E Inspection Lock - 4 inch L/S

External Drainage

F Allow for soil pipe connection to the main sewerage system L/S
Supply and Installation External drainage pipes (UPVC CL 16)
This item includes supply and installation of all fittings such as
elbows, reducers, tees, sockets,...etc. All pipes crossing the road
shall passed inside sleeves (UPVC pipes CL 10) and encased inside
200 mm concrete cement. This item to include all the nesscary to
complete the works as per the technical specifications with the
following diameters:

G Pipes 6 inch Diam. L/S

H Gully Traps Nos

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION Two: PLUMPING WORK, (cont'd.)

Manhole including concrete work, block work, rendering, water


proofing, benching, pipe connection, step iron, ductile iron
manhole covers (heavy duty), earth works as shown on drawings
and as specified

J MH Size 60 X 60 cm No

Storm Water System

Allow for rain water pipe connection to the main storm water
K L/S
system

Supply and Installation Rain water pipes (UPVC CL 16) This


item includes supply and installation of all fittings such as elbows,
reducers, tees, sockets,...etc. All pipes crossing the road shall
passed inside sleeves (UPVC pipes CL 10) and encased inside 200
mm concrete cement. This item to include all the nesscary to
complete the works as per the technical specifications with the
following diameters (Ref DR0A):

L Pipes 6 inch Diam. L/S

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

PLUMPING WORK (Cont.)

COLLECTION

Page No. 31

Page No. 32

Page No. 33

Page No. 34

Page No. 35

Page No. 36

TOTAL PLUMPING WORK - Carried to Summary


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

SECTION 3
AIR CONDITIONING AND VENTILATION SYSTEM

Important Notes

* The Contractor shall provide all the materials, labour, cartage, plant

* The Specifications and Design Drawings are intended to indicate

* Contractor shall guarantee for the efficient performance of various L/S

* All works are to be carried out to Specification. And relevant L/S

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

AIR CONDITIONING AND VENTILATION SYSTEM

Split A/C System

Split A/C units wall mounted units and Pakage units including
valves / actuators, anti-vibration mounts, placing supports, Ref.
pipes and fittings in accordance with specification
Split Unit, Indoor and Out Door Unit as per Drawings and
A No
specification.
a AC-1200 BTU (1 TR) Nos
AC-18000 BTU (1.5 ) Nos
AC-24000 BTU (2.5) Nos

b PAKAGE UNITS No
PU-1 (5000 CFM) Nos
PU-1 (5650 CFM) Nos
PU-1 (3400 CFM) Nos

B Toilet Extract Fan 6 in as per drawings and specifications. Nos


C Kitchen Extract Fan 2 in as per drawings and specifications. Nos
Toilet Extract Ducted Inline fan (500 CFM )Roof Floor mounted
D No
in as per drawing & specifications

Supply and Installation of Galvanized sheet metal rectangular duct


work (with Acoustic lining), including bends, branches, tapers, bell
mouths, test holes, access panels, offsets, ends, etc., with all
E necessary hangers, supports, locks, nuts, angles, fittings and Nos
accessories as specified and shown in the Drawings, Duct sheet
thickness to be as per SMCNA. This item to include supply and
installation of VCD on each branch with the proper size.

Supply Air Grille/Diffuser including connectors, plenum box, and


F L/S
accessorie
G All Gas pipes with insulation as per drawing and specification L/S

All condensate drain pipes with insulation as per drawing and


H L/S
specification

I All Duct Insulation Work as per drawing and specifications L/S

J Thermostat with built-in Temperature sensor Nos

To Collection
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

AC WORK (Cont.)

COLLECTION

Page No. 38

Page No. 39

TOTAL AC WORK - Carried to Summary


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

Section Four
Fire Fighting System

Fire Fighting Extingwishers

Supply and installation of fire fighting extingwishers (wall

A CO2 Portable Fire Extingwishers 2 Kg No -


B Dry Powder Portable Fire Extingwishers 4.5 Kg No -
-
SUNDRIES AND BUILDER'S WORK -
-
Sundries -
A Supply and install, Fire Hydrants with cabinet, hoses, spray, No. -
B Automatic hose reel with swing cabines, hoses and spray L/S -
C Fire brigade 2-way inlet breeching with cabinet as specified L/S -
D Supply and install wet riser and dry riser pipes with fittings, L/S -
E Supply and install pressure reducing valves . L/S -
-
F Fire Fighting Pump Set: L/S -
G Supply, install and commission firefighting pumps as L/S -
The first two pumps shall have a flow rate of not less than -
Electric driven main pump. -
Diesel Pump. -
H Jockey Pump, with 50 G.P.M @ 90 m head L/S -
L/S -
J Builder's Work: L/S -
Allow for all Builder's work in connection with Fire Fighting
K L/S -
System's installation.
L L/S -
M Close-out Documents: L/S -
Allow for all submittals, samples, shop drawings, As-built
N L/S -
Drawings, warranty certificates, testing & commissioning.
P

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

Fire Fighting Work (Cont.)

COLLECTION
-
Page No. 41

TOTAL FIRE FIGHTING WORK - Carried to Summary -


MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

IRRIGATION NETWORK

MAIN IRRIGATION NETWORK


Supply and installation of HDPE pipelines Class SDR 11
including all fittings laid in trenches, at depths indicated
below including excavation, bedding and surround,
backfilling, compaction and field density tests, hydro
test, warning tape, thrust blocks etc. All as detailed in the
specification and as shown on drawing.

All pipe sizes for HDPE pipelines are Outside Diameters


(OD).

A 160mm OD pipe with average depth to invert not exceeding m -


1.5m

B 110mm OD pipe with average depth to invert not exceeding m -


1.5m

VALVE CHAMBERS

Air Valve Chambers

C Air valve chamber for 110mm HDPE pipeline depth to invert No. -
not exceeding 2.0 m including all civil works, valves and
fittings complete in all respects and as shown on drawings.

Washout Chambers

D Washout valve chamber for 110mm HDPE pipeline depth No. -


to invert not exceeding 2.0m including all civil works, valves
and fitting complete in all respects and as shown on drawings.

Gate Valve Chambers

E Gate Valve Chamber for 110mm HDPE pipeline depth to invert No. -
not exceeding 2.0m including all civil works, valves
and fittings complete in all respects and as shown on the drawings.

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

3 IRRIGATION NETWORK (Cont.,)

AUTOMATIC LANDSCAPE IRRIGATION SYSTEM

uPVC Pipes

Supply and installation of uPVC pipes Class 10


including all fittings, supports, required granular
bed and surround ,excavation,
backfilling,dewatering, compaction and hydro
test complete in all respect and
as shown on drawings.

A Dia 50mm uPVC Class 10 with average depth to m -


invert not exceeding 1.0m

B Dia. 32mm uPVC Class10 with average depth to m -


invert not exceeding 1.0m.

Solenoid Valves

Supply and installation of solenoid valves in connection with main


pipe line with pressure regulators complete with all fittings,
supports, valve box, pipework, ball valve, in Line Y filters
complete in all respects and as shown on the drawings for the
following sizes:
C Electric Solenoid valve assembly 25mm(1") with filter No. -
of 120 Mesh Stainless Steel for a flow range of
3 GPM to 20GPM and valve box rectangular Medium size
380mmx430mmx305mm.

D Electric Solenoid valve assembly 40mm(1.5") with filter of 120


Mesh Stainless Steel for a flow range of 15 GPM to 40 GPM and
valve box rectangular jumbo size 812mmx482mmx304mm.
No. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

3 IRRIGATION NETWORK (Cont.,)

Quick Coupling Valves

Supply and installation of Quick Coupling


Valves complete with round valve box including
all fittings and field testing complete in all
respects and as shown on the drawings.

A 1" Quick Coupling Valve No. -

B Hose (50m/roll) to suit the swivel elbow above No. -

Supply and Installation of Sub surface Driplines 16mm O.D


having integral pressure compensating, continuous self cleaning,
anti siphon, high anti drain mechanism with root guard technique
as per specification including excavation, backfilling and
compaction and all accessories, stakes, takeoff connections along
with the PVC Polyethylene tubing compression fittings, complete

C Drip line with 0.6GPH emitters flow at 40cm emitter spacing for
ground covers. m -

D Drip line with 0.9GPH emitters flow at 30cm emitter spacing for
for trees, grass, shrubs and succulents. m -

E Drip line with 1.16GPH emitters flow at 30cm emitter spacing for
for trees, grass, shrubs and succulents. m -

F Flush point on Flush Header on 32mm dia pipeline as per


specifications and standard drawings No. -

G Air Release Valve on Dripline/ Supply Header/ Flush Header as


per specifications and standard drawings No. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

3 IRRIGATION NETWORK (Cont.,)


CONTROL SYSTEM

Controllers
Supply, installation, test and commissioning of 2 wire
decoder controller installed in weatherproof protection
plastic enclosure complete with all fittings, fixtures,
earthing and electric power connection from the
nearest distribution board etc as per the technical
specifications and as shown on the drawings.

The shown controller location on the drawing is


tentaitve. The controller location may be changed
during construction to suit site conditions.
The field controllers to be connected to the central
control unit.

A Plastic pedestal mounted decoder controller No. -

Control Cables and Decoders


Supply and installation of decoder wires and decoders
including waterproof wire connectors all
necessary fittings and field testing complete as
specified in the technical specifications and as
shown on drawings.

B Irrigation Cable m -

C Supply and install single station decoders with surge Nr -


suppression and ground wire.

D SUPPLY AND INTALLATION FOR FLOW CONTROL


VALVE AFTER SOLENOID VALVE ON THE SUPPLY
LINES

Supply, install, testing and commissioning of the Flow Control


Valves as per supplier's recommendation to include all
necessary pipe, fittings, connection joints and pipe supports to
provide a complete operational system as shown on drawing.

Valves

E Flow Control Valves on 32mm uPVC pipes No. -


F Flow Control Valves on 50mm uPVC pipes No. -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

3 IRRIGATION NETWORK (Cont.,)

Connection Works to Main Irrigation Pipe line

Supply and installation of HDPE pipelines Class SDR 11


including connection to Solenoid Valve and
including all fittings laid in trenches, at depths indicated
below including excavation, bedding and surround,
backfilling, compaction and field density tests, hydro
test, warning tape etc. All as detailed in the
specification and as shown on drawings.

All pipe sizes for HDPE pipelines are Outside Diameters


(O.D).

A 110mm O.D pipe with average depth to invert not exceeding m -


1.5m

Additional Items

B The tender is to attach with this bill of quantities any addition items
with quantities, enumerated or itemised and rates which are not
previously included to complete the build up of lump sum price.
Should the tenderers fail to insert any items here, it will be deemed
that his lump sum price for the tenders includes all items either
shown on the drawings and described in the specification or
deemed necessary by the tenderer to develop the drawings and
specification to represent the entire cost of the works and no
subsequent claim for any additional item will be entertained.
Item L.S -

To Collection -
MASJID at Abu Dhabi, Sector W14-1, Plot P8 BILL NO. 3

Al Ain Consulting Engineering MEP WORKS


TOTAL
ITEM UNIT RATE
UNIT Qty PRICE
No. (AED)
(AED)

3 IRRIGATION NETWORK (Cont.,)

Page No. 43 -

Page No. 44 -

Page No. 45 -

Page No. 46 -

Page No. 47 -

TOTAL IRRIGATION NETWORK - -


MASJID at Abu Dhabi, Al Khatim New
Bill of Quantities
Summary
Al Ain Consulting Engineering

Bill No. Section UAE Dhs.

1 Prelimineries -

2 Civil Works 1. Site Works -

2. Concrete Works. -

3. Masonry Works -

4. Metal Works -

5. Wooden and GRC Works -

6. Thermal & Moistor Product -

7. Doors and Windows -

8. Finishes Works -

9. External Works

3 M.E.P Works 1. Electrical Works -

2. Plumping Works. -

3. Air Conditioning Works -

4. Fire Fighting Works -

5. Irrigation System -

Total -

Consultant Fees (6%) -

Grand Total -

Total Contracting Lump Sum (Dhs.) ______________________________________________________

14 Months including mobilization. Obtaining building completion, certificates, complete with final connection of
the permanent services (water, power & drainage ).