Bathroom Remodeling Bid Sheet

Copyright 2006 HomeAdditionPlus.com

HomeAdditionPlus.com
Mark J. Donovan
Rev 1.1
Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

Copyright 2006 By HomeAdditionPlus.com

All rights reserved. No part of this document shall be reproduced, stored in a retrieval system,
or transmitted by any means, electronic, mechanical, photocopying, recording or otherwise,
without written permission by the author and HomeAdditionPlus.com. No patent liability is
assumed with respect to the use of the information contained herein. Although every
precaution has been taken in the preparation of this document, the publisher and author
assume no responsibility for errors and omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein.

Bathroom Remodeling Bid Sheet Rev1.1 Page 2 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

Authors Message

The Bathroom Remodeling Bid Sheet from HomeAdditionPlus.com consists of a


comprehensive questionnaire (Request for Proposal) form, as well as advice and tips on
making your new home building project go smoothly.

The questionnaire is designed so that you can provide it to prospective general contractors
for them to complete and return to you. The questionnaire is written so that you have
sufficient information about the prospective contractor to determine if they are capable of
completing the project on time, on budget and to your satisfaction.

You can make as many copies of the questionnaire as necessary for your home building
project.

In addition to the questionnaire and project building advice, this bid sheet also contains cost
and timeline estimates you may expect to see from your prospective contractors. However, it
is important to remember that these estimates are only estimates. The actual costs and
schedules bids you receive from your prospective contractors could vary significantly from the
estimates contained in this document, as labor and material costs, as well as material types
and real estate conditions, vary over time and with local areas and market conditions.

Mark J. Donovan

Publisher and Editor of HomeAdditionPlus.com.

Bathroom Remodeling Bid Sheet Rev1.1 Page 3 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

Table of Contents

1.0 REQUEST FOR QUOTATION .......................................................................................... 5


1.1 GENERAL CHECKLIST QUESTIONS.................................................................... 5
1.2 SITE PREPARATION AND DEMOLITION OF OLD BATHROOM ......................... 7
1.3 FRAMING/ ROUGH CONSTRUCTION (IF REQUIRED)........................................ 7
1.4 BATHROOM CABINET/VANITY............................................................................. 8
1.5 BATHROOM COUNTERTOP ................................................................................. 8
1.6 DRYWALL AND INTERIOR PAINTING (IF REQUIRED)........................................ 9
1.7 FLOORING ............................................................................................................. 9
1.8 ELECTRIC ............................................................................................................ 10
1.9 PLUMBING ........................................................................................................... 10
1.10 HVAC.................................................................................................................. 11
1.11 INSULATION ...................................................................................................... 11
1.12 EXTERIOR PAINTING (IF REQUIRED) ............................................................. 12
1.13 INTERIOR FINISHED WORK (WHERE REQUIRED) ........................................ 12
1.14 TILE WORK ........................................................................................................ 13
1.15 WALL PAPERING and BORDER ....................................................................... 13
1.16 ODDS and ENDS................................................................................................ 13
1.17 CHANGE REQUESTS........................................................................................ 15
1.18 TOTAL COST OF PROJECT.............................................................................. 15
1.19 PAYMENT SCHEDULE ...................................................................................... 15
2.0 FOR THE HOMEOWNER ............................................................................................... 17
2.1 EXPECTED BATHROOM REMODELING COSTS............................................... 17
2.2 EXPECTED TIME INTERVALS FOR VARIOUS BATHROOM REMODELING
TASKS ........................................................................................................................ 18
2.3 SUGGESTED MANUFACTURERS OF KEY BATHROOM PRODUCTS ............. 19
2.4 Recommendations for a Smoother Bathroom Remodeling Project....................... 20
2.4.1 Prior to the Start of Remodeling .............................................................. 20
2.4.2 Site Preparation and Demolition of the old Bathroom ............................. 21
2.4.3 Rough Framing (If Required)................................................................... 21
2.4.4 Interior Framing (If Required) .................................................................. 22
2.4.5 Bath Cabinetry and Sinks/Countertops ................................................... 22
2.4.6 Flooring ................................................................................................... 23
2.4.7 Electrical, Plumbing and Heating ............................................................ 23
2.4.8 Finish Work ............................................................................................. 24
2.4.9 Drywall (If Required) ............................................................................... 24
2.4.10 Selection/Installation of Mirror and Glass Bathtub/Shower Enclosures. 25
2.4.11 Installation of Towel and Toilet Paper Racks ........................................ 25
2.4.12 Installation of Wall Paper or Border....................................................... 25
2.4.13 Inspections ............................................................................................ 25
2.4.14 General ................................................................................................. 26
2.5 FINAL NOTE TO HOMEOWNER: ........................................................................ 27

Bathroom Remodeling Bid Sheet Rev1.1 Page 4 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

1.0 REQUEST FOR QUOTATION

Homeowner:_________________________ Contractor: __________________________

Address:____________________________ Address: ___________________________

City/State/Zip:_______________________ City/State/Zip: _______________________

Phone: _____________________________ Phone: _____________________________

Phone (Cell): ________________________ Phone (Cell): ________________________

Email: _____________________________ Email: ______________________________

Project Location:_____________________ Contractor License: __________________

The Following Items should be submitted to the Contractor upon Request for Quote

Have bathroom design sketches been provided to the remodeling contractor? Y/N

If key bathroom remodeling materials/features have already been determined,


have they been communicated to the remodeling contractor? Y/N

Target bathroom remodeling budget provided to the remodeling contractor? Y/N

1.1 GENERAL CHECKLIST QUESTIONS

1) When can you start the project? Start Date: _______________


2) When can you complete the project? Complete Date: ___________
3) Do you warranty your work (as well as your subcontractors’ work) and if so what are
the terms? ________________________________________________________________
4) Can we visit a couple of your previous equivalent projects? Y/N
5) Please provided three references from previous projects (homeowners):

Reference 1: Name: ____________________________


Address: __________________________
Phone Number: _____________________

Bathroom Remodeling Bid Sheet Rev1.1 Page 5 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

Reference 2: Name: ____________________________


Address: __________________________
Phone Number: _____________________

Reference 3: Name: ____________________________


Address: __________________________
Phone Number: _____________________

6) Provide Names and phone numbers of subcontractors

Framer: ___________________________________________________________
Electrician: __________________________________________________________
Plumber: ____________________________________________________________
HVAC: ______________________________________________________________
Drywall Installer: ______________________________________________________
Interior Painter: _______________________________________________________
Finished Carpenter: ___________________________________________________
Flooring Contractor: __________________________________________________
Bathroom Cabinet Designer/Installer: ____________________________________
Countertop Designer/Installer: __________________________________________
Wall Paper Installer: ___________________________________________________
Tub/Shower Enclosure Installer: _________________________________________

7) Will you pull the construction permits and schedule all Inspections? Y/N
8) Are you insured and if so by who and policy #? Y/ N _________________________
9) When does the Insurance policy expire? _____________________________________
10) Are your subcontractors insured? Y/N
11) Does your insurance cover material damage/theft on site? Y/N
12) How frequently will you broom clean the work site? __________________________
13) Do you remove all debris from site and if so how frequently? Y / N; __________

Bathroom Remodeling Bid Sheet Rev1.1 Page 6 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

1.2 SITE PREPARATION AND DEMOLITION OF OLD BATHROOM

1) Will you remove and dispose of existing bathroom cabinets and countertops? Y / N
2) Will your remove and dispose of existing tub, shower, toilet? Y/N
3) Will you remove and dispose of existing flooring material? Y/N
4) Will you remove and dispose of existing wall paper / wall tile? Y/N
5) Will you remove and dispose of any existing framing/drywall material that may need
demolition per the new bathroom plans? Y/N

1.3 FRAMING/ ROUGH CONSTRUCTION (IF REQUIRED)

1) If a new Jacuzzi tub or oversize tub to be installed will framing be required? Y/N
2) Will any additional structural framing be required in the floor joists to support the
additional weight associated with a Jacuzzi tub or oversized tub? __________________
3) Will any bathroom walls need to be framed in, and if so where? Y / N__________
__________________________________________________________________________
4) Will any walls need to be removed, and if so where? Y / N ____________________
5) Will any subflooring need to be temporarily moved to enable plumber to
install/modify supply/drain lines, and if so specify location? Y / N ________________
__________________________________________________________________________
6) Will additional floor joists need to be sistered (laminated to the existing floor joists)
to maintain floor integrity if (a) large tub is added or (b) large cut outs are required for
new drain lines? Y / N ____________________________________________________
7) Will any doorway entrances need to be added or removed, and if so where? Y/N
__________________________________________________________________________
8) Will any ceilings need to be framed in? Y/N
9) Will any type of ceiling soffit need to be framed out for new lighting? Y/N
10) Will a closet be added as part of the bathroom remodeling and if so any framing
required? Y/N
11) Will any windows be added or removed and if so where? Y / N ________________
__________________________________________________________________________
12) Will any type of framing be required for knee walls/partitions? Y/ N

Bathroom Remodeling Bid Sheet Rev1.1 Page 7 of 27


Bathroom Remodeling Bid Sheet Date: __________
Copyright 2006 HomeAdditionPlus.com

__________________________________________________________________________
13) What type of stud material will be used for framing (e.g. 2”x4”s)? _______________
14) What is the on-center spacing of studs? ____________________________________
15) If adding a ceiling, will strapping be used on ceilings for hanging drywall? Y/N
16) If Doors and/or Windows to be added - manufacturer and type (e.g. tilt out)? ______
__________________________________________________________________________

1.4 BATHROOM CABINET/VANITY

1) If a bathroom Cabinet/Vanity is not going to be required, as may be the case if a


pedestal sink is to be used, then skip this section. Otherwise read on.
2) What is the budget for bathroom cabinet(s)? _________________________________
3) Will cabinet(s) be custom built on site or off-the-shelf pre-manufactured? _________
__________________________________________________________________________
4) What is the size of the bathroom cabinet(s)? __________________________________
5) What type of material will the cabinets be constructed of? ______________________
6) What is the style of the cabinet/door/drawers? ________________________________
7) What is the bathroom cabinet configuration (e.g. number and location of doors, and
drawers)? _________________________________________________________________
8) What will be the finished cabinet/counter height? _____________________________
9) What is the type of hardware on the bathroom cabinet? (Knobs, Handles, Material
type, color, etc.) ___________________________________________________________
10) Do you have a contractor-preferred cabinet Manufacturer or distributor that we
must use? Y/N
If yes, who? _____________________________________________
11) If there is a contractor-preferred cabinet manufacturer/distributor, do we receive a
discount from the distributor, and if so how much? Y / N _____________________
12) If upper cabinets to be installed, again provide size, location, material type,
hardware? ________________________________________________________________

1.5 BATHROOM COUNTERTOP

1) What is the budget for bathroom countertop? _________________________________