advertisements without sanction by professional consensus and years of experience. His action is unethical with respect to his relation to whom? Bid Bulletin Additional information on contract documents issued to bidders before date of bidding Proposal The offer of a bidder to perform the work described by the contract documents when made out and submitted on the prescribed proposal form, properly signed and sealed Proposal Bond The cashier’s check or surety bond accompanying the proposal submitted by the bidder, as a guaranteed that the bidder will enter into a contract with the owner for the construction of the work. If the contract is awarded Special Provision Instructions which may be issued prior to the bidding to supplement and or/ modify drawings, specifications and/ or general conditions of the contract Specifications -Written or printed description of work to be done describing qualities of material and mode of construction -if there is a variance/discrepancy between the drawing and specifications, what shall be followed? Written Notice Means information, advice or notification pertinent to the project delivered in person or sent by registered mail to the individual, firm or corporation at the last known business address of such individual firm or corporation Work Includes labor or materials or both as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the contract Install Means to build in, mount in position, connect or apply any object specified ready for the intended use Furnish Means to purchase and / or fabricate and deliver to jobsite Provide Means to furnish and install 50 % No further retention shall be made on the balance of the contract when how may percent 65 % No payment shall be made on contracts in excess of how many percent of the contract price 80 % The guaranteed bond is equal to how many percent of the contract price? 30 % How many percent of the architect’s fee is payable to the architect upon completion of the preparation of the schematic design phase and up to final design development phase? 25 Standard factor computed for changes and/or revisions made on completed contracts 12 sq. m Approximately, how many square meters of office space for the architect is built by the contractor as temporary facilities for the project 50 / contractor All trees and other plants that need to be transplanted elsewhere within ___ meters shall be done by the ___at his own expenses 15 days How many days prior to bidding shall the contractor seek the architect’s clarification as to the particular areas of work, which requires evaluation of the architects? 15 days How many days upon written notice can a contractor terminate a contract with a valid reason? 90 days Suspension of work for ___ days by order of any court or other public authority through no act or fault of the contractor gives to him the right to terminate contract False (30 days) True or false, the contractor can terminate contract if the owner should fail to pay the contractor any sum within 15 days after its award by arbitration False (15 days) True or false, the contractor can terminate contract if the owner should fail to act upon any request for payment within 30 days after its certification by the architect Contractor Who declares bankruptcy as a valid reason for the termination of a contract? True True or false, upon termination of contract and upon the decision the architect that materials and equipment left by the contractor which do not belong to him can be used and rent of such shall be borne by the failing contractor False True or false, owner has no right to claim liquidated damages if the takes over the work from the contractor for failure to complete the project 10 days How many days prior to canceling insurance be given to the owner stipulating the intention to cancel? 15 % How many percent of the contract amount is the performance bond? 15 % How many percent of the contract amount is the payment bond? Penalty clause A contract provision setting forth the damages a party must pay in the event of his breach 5,000 to first 50 hectares Basic fee for Physical Planning type 1 or site such as industrial estates, commercial centers, sports complex, resorts etc. R.A 6451 Predecessor of PC 1096 PD 1308 What presidential decree institutionalized the profession of environmental planning? Liens It is a right enforceable against specific property to secure payment of an obligation 6% Minimum basic fee for simple projects 150 % Minimum basic fee for alterations/renovations 200/hr When the architect is engaged to render opinion or advice, clarification or explanation on technical matters pertaining to his profession, the minimum basic fee shall be __ 500/hr When rendering service as an expert witness, the architects is compensated ___/hr 12 % Minimum basic fee for Group 5 projects (monumental) Repetitive construction What group 6-project classification?
Minimum basic fee for housing projects 10 % of 1st unit
60% 2nd – 10th unit 30% 11th – above Group 3 (exceptional) Under what classification of projects does Hospitals and medical buildings fall? -Stadium P750 Minimum per diem paid to the architect if work is beyond 50 kms form office Construction phase service On the remaining 15%work fee of the architect, where does the 5% go? 5 days Repairs and corrective works at he expense of the contractor should be done within how many days after written notice by owner 10 days Failure on the part of the contractor to remove condemned work shall give the owner right to remove said work at contractor’s expense and contractor shall pay the owner the expenses incurred within how many days form removal by the owner of said work? 7th day / Notice to Proceed Contract time reckoning shall commence on the ___from receipt of ___ Civic center An area of a city where municipal buildings are grouped Reciprocity No person unless the country of his relation allows the same __ Contract Documents Phase The third phase of an architects regular services Pre-design services Project financing falls under what kind of service of the architect Specialized allied services Comprehensive planning falls under what service of the architect 10 % The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services 10 % What percentage of an architect’s work is liability under the civil code 50 % For interior design services, the architect shall be paid what percentage of the fee upon submission of the final design 85 % When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive what percentage of the fee upon submission of the final design 12 % The minimum basic fee for specialized decorative building 6% The minimum basic fee for industrial buildings with a project cost below 50 million pesos 8% The minimum basic fee for hospital with a project cost below 50 million pesos Architect In design-build services, the single point responsibility of project delivery puts the legal liability for both the design and construction on the 3 months The release of 10% retention by the owner shall be done after how many months form the date of final payment General conditions Printed documents stipulating the procedural and administrative aspect of the contract Quotation A rice given by a contractor, sub contractor, material supplier or vendor to furnish material, labor or both Certificate of Payment A statement from the architect confirming the amount of money due the contractor for work accomplished Performance Bond A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with the terms of the contract Bid An offer to perform the work prescribed in a contract at a specified cost 7% The fee of the architect for design-build services by administration Closed specification A stipulation of the use of specific products or processes without provision for substitution Instruction to Bidders A list of instructions stipulating the manner on which bids are to be prepared 2 months The performance and Payment Bonds shall be released by the owner after the expiration of how many months from the final acceptance of the work 12 months / 1 year The Guarantee Bond is released how many months after the date of final payment 30 days How many days shall the building official issue a certificate of occupancy after final inspection of the project Statue of Limitation A statue specifying the period of time within which legal action must be brought for alleged damage or injury Statutory Bond A bond, the form or content of which is prescribed by statue Statue of Frauds A rule that certain kinds of contracts are enforceable unless signed and in writing or unless there is a written memorandum of their terms signed by the party to be charged Lease A contract transferring the right of possession of building, property, etc. for a fixed period of time, usually for periodical compensation called “rent” Leasehold A tenure by lease; real estate held under a lease Lesse The person receiving a possessory interest in buildings, property, etc. by lease Lessor The person granting a possessory interest in building, property, etc. by lease 2-2.5 Range of the multiplier for Multiple of Direct Personnel Expenses Multiple of Direct Personnel Expenses This type of compensation is only applied to non-creative work True Supervision work is a non creative work Percentage of Construction A world-wide used method of compensation for architectural services