Welding Procedure Specification:- Example

Weld Procedure Number 30 P1 TIG 01 Issue A


Qualifying Welding Procedure (WPAR) WP T17/A

Method Of
Machine and
Preparation
Degrease
Manufacturer: National Fabs Ltd and Cleaning:
25 Lane End Parent Metal Grade 304L
Birkenshaw Specification: Stainless Steel
Leeds
Parent Metal
3 to 8mm Wall
Thickness
Location: Workshop
Pipe Outside
Welding Process: Manual TIG 25 to 100mm
Diameter
Joint Type: Single Sided Butt Weld
Welding Position: All Positions
Welding Progression: Upwards

Joint Design Welding Sequences

Size Of Wire
Current Voltage Type Of Travel Heat
Run Process Filler Feed
A V Current/Polarity Speed Input
Metal Speed
1
TIG 1.2mm 70 - 90 DC-
2 And N/A N/A N/A N/A
TIG 1.6mm 80 - 140 DC-
Subs
Welding Consumables:- Production Sequence
Type, Designation Trade Name: BS 2901 Part 2 : 308S92
Any Special Baking or Drying: No 1. Clean weld and 25mm
borders to bright metal
Gas Flux: Argon 99.99% Purity using approved solvent.
Gas Flow Rate - Shield: 8 - 12 LPM 2. Position items to be
- Backing: 5 LPM welded ensuring good
fit up and apply purge
Tungsten Electrode Type/ Size: 2% Thoriated 2.4mm Dia
3. Tack weld parts together
Details of Back Gouging/Backing: Gas Backing
using TIG, tacks to at
least 5mm min length
Preheat Temperature: 5°C Min
Interpass temperature: 200°C Max 4. Deposit root run using
1.2mm dia. wire.
Post Weld Heat Treatment Not Required 5. Inspect root run
Time, temperature, method: internally
Heating and Cooling Rates*: 6. Complete weld using
1.6mm dia wire using
stringer beads as
required.
7. 100% Visual inspection
of completed weld

Revision History
Date Issue Changes Authorization
26/11/2000 A First Issue Jack Straw Jack Straw