BOQ ITEM
Cumilative
Ghoon
2.3 Lay sewer pipe 95.85 34.1 36.9 31.3 38.2 74.1 44.0 1.4 89.2 16 461.05
200mm˂1.5
2.17 Asphalt 913.0 135 170. 128 172 786 222.64 115 1150 562.9 4355.11
57 m2
JOINT MEASUREMENT
2.19 Allow for reshaping 8 8
works with asphalt
3.1 Lay sewer pipe 114.3 15.7 11 15.4 5 30.95 4.15 44.35 5.5 246.35
110mm
3.2 Lay sewer pipe 106+ 16.9 13.4 9.5 39.1 22.5 148.2 67 437.08
160mm 14.48
riser
pipe
3.14 Reinstate concrete 1.977 0.07 0.57 0.029 0.64 0.877 4.45 1.18 9.8m3
floor(m3) 14 5 4 68
Thk.0.07mm
Macadam