You are on page 1of 1

1 2 3 4 5 6

CLIENT

1 2 2A 2B 3 4

P
RAM
P
SET

RAM
F

KING FAISAL
2
SPECIALIST HOSPITAL
A A
DN IRRIGATION DETAILS NETWORK IS UNDER AND
CONTRACTOR SCOPE OF WORK BY IRRIGATION

STAIR LANDING -2
DN
SUPPLIER BASED ON LANDSCAPE DRAWINGS RESEARCH CENTRE
CONSULTANT:

1257B02-P101b 1257B02-P101b
VB

VB

1257B02-P101d
G FHC IRRIGATION SYSTEM
Saudi Diyar Consultants

SUB CONSULTANT:
FEED THE WATER
FEATURE PUMP ROOM
FROM AD/AC BOOSTER
PUMP SET

H
NOTES:

B B
1. PLUMBING DRAWINGS SHALL BE READ AS ONE UNIT
INCLUDING PLANS, RISER DIAGRAMS AND
MISCELLANEOUS DETAILS..

2. PLUMBING DRAWINGS SHALL BE READ WITH THE


ARCHITECTURAL, STRUCTURAL,ELECTRICAL, A/C AND
OTHER DRAWINGS FOR COORDINATION, VERIFICATION
OF ADEQUATE SPACES AND EARLY DETERMINATION OF
ANY CONTRADICTIONS OR INTERFERENCE PER THE
PROVISIONS OF THE SPECIFICATION.

3. DRAWINGS SHALL NOT BE SCALED FOR EXECUTING THE


WORKS.
FOR CONT.REFER
TO DWG.B02-PW401A 4. ALL MEASUREMENTS SHALL BE MADE FROM
ESTABLISHED
LINES, LEVELS & BENCHMARKS.
J
AC-01 5. THE DRAWINGS ARE ONLY DIAGRAMMATIC.

6. THE CON- TRACTOR SHALL EXECUTE ALL WORK IN


ACCORDANCE WITH APPROVED SHOP AND
INSTALLATION DRAWINGS PER THE PROVISIONS OF THE
SPECIFICATION.
AC-01
7. FOR PLUMBING FIXTURES DESIGNATIONS REFER TO
THE FIXTURE DESIGNATION TYPE NUMBER GIVEN IN
THE ARCHITECTURAL DRAWINGS.

8. FOR EQUIPMENT CAPACITIES, RATINGS, TYPES AND


FHC CHARACTERISTICS REFER TO THE "SCHEDULE OF
EQUIPMENT" DRAWINGS.

9. FOR EQUIPMENT HOOK-UPS AND CONTROL DIAGRAMS


FHC REFER TO THE "MISCELLANEOUS DETAILS" DRAWINGS.
FOR SERVICES CONNECTED WITH A/C WORKS REFER
AC 02 WS TO A/C DRAWINGS FOR THE EXACT LOCATION, SIZE AND
C TA B02.A-P501 OTHER REQUIREMENTS, ALL SUCH SERVICES SHALL BE C
COORDINATED WITH THE A/C TRADE.
K
10. PLUMBING WORKS REQUIRING ELECTRICAL SERVICES
1 SHALL BE COORDINATED WITH THE ELECTRICAL TRADE.

11. PIPE MATERIAL SHALL BE AS PER SPECIFICATION.

12.ALL EQUIPMENT SHALL BE PROVIDED BY VACUM


BREAKER AND BACK FLOW PREVENTER.

UP

2 REVISED AS CLOUDED 15-07-2015


1 REVISED AS CLOUDED 12-02-2015
0 FOR CONSTRUCTION 23-07-2014

L REV.NO. DESCRIPTION DATE

KEY PLAN

D D

SHAFT

M PROJECT MANAGER ARCHITECT STRUCTURAL

AM SL FA

1257B02-P101d
ELECTRICAL MECHANICAL ICT

YS MA ZM

CIVIL/LS DRAWN BY CHECKED BY

AE/HF W.A F.H

PROJECT TITLE:

KING FAISAL
SPECIALIST HOSPITAL
AND
RESEARCH CENTRE
Jeddah - Saudi Arabia

DRAWING TITLE:

E WATER SUPPLY LAYOUT E

LEVEL 01 FLOOR PLAN


SEGMENT A

SCALE DATE CAD FILE

1:100 JULY 2015 1257B02-P101

DRAWING NUMBER REVISION


0 5 10

01 LEVEL
SCALE 1:100
01 FLOOR PLAN - SEGMENT A SCALE 1:100 METERS
1257B02-P101a 2
1 2 3 4 5 6 Saudi Diyar Consultants

You might also like