You are on page 1of 29

QUALITY OF LIFE

OCTOBER 9, 2018

1
RAIL YARD PROGRESS UPDATE

New Sixth-Avenue Yard Access


Ramp Looking West

Prep-work for New Storage Tracks 6 & 7


Perm Yard Looking West
2
CURRENT EAST PORTAL MPT

3
FUTURE EAST PORTAL MPT

4
PACIFIC
PARK –
B4
OCTOBER.9.2018
B4 PACIFIC PARK

FIRM PROFILE
DESIGN REPORT
MARCH.20.2018

PERKINS EASTMAN PACIFIC PARK - BUILDING 4 PERKINS EASTMAN


PRACTICE AREAS
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

PERKINS EASTMAN
GEOGRAPHIC REACH
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

NEW YORK CHARLOTTE DALLAS SAN FRANCISCO STAMFORD CANADA ECUADOR UAE
115 Fifth Avenue 520 West Sixth Street 3131 Turtle Creek Blvd. 100 Montgomery Street 422 Summer Street 247 Spadina Avenue Av. Rodríguez Marina Plaza, Level 8
New York, NY 10003 Charlotte, NC 28202 Suite 700 Suite 2300 Stamford, CT 06901 Suite 400 Chávez González PO Box 212763,
T. 212.353.7200 T. 704.940.0501 Dallas, Texas 75219 San Francisco, CA 94104 T. 203.251.7400 Toronto, Ontario M5T 3A8 Parque Empresarial Colon, Dubai Marina,
F. 212.353.7676 F. 704.362.4602 T. 214.953.2210 T. 415.926.7900 F. 203.251.7474 T. 416.506.1500 Edif. Coloncorp Mezz 1 Dubai, UAE
F. 415.926.7733 F. 416.506.0841 Guayaquil, Ecuador T. +971.4.343.3632
BOSTON CHICAGO PITTSBURGH WASHINGTON DC T. +593.4.213.6275 F. +971.4.343.3604
50 Franklin Street 351 West Hubbard Street The Pennsylvanian LOS ANGELES One Thomas Circle CHINA
Suite 203 Suite 708 1100 Liberty Avenue 5510 Lincoln Boulevard Suite 200 Huai Hai Plaza INDIA
Boston, MA 02110 Chicago, IL 60654 Pittsburgh, PA 15222 Suite 250 Washington, DC 20005 1045 Huai Hai Forbes Building, Floor 5
T. 617.449.4000 T. 312.755.1200 T. 412.456.0900 Los Angeles, CA 90094 T. 202.861.1325 Middle Road Charanjit Rai Marg, Fort,
F. 617.449.4049 F. 312.755.1155 F. 412.456.0906 T. 310.829.2249 F. 202.861.1326 Suite 3803 Mumbai 400001
F. 310.829.1736 Shanghai 200031 China India
T. +86.21.6252.1040 T. +91.22.4334.9500
F. +86.21.6473.6190 F. +91.22.4334.9502

PERKINS EASTMAN
PERKINS EASTMAN

RESIDENTIAL
PROJECTS

PERKINS EASTMAN PACIFIC PARK - BUILDING 4 PERKINS EASTMAN


CENTRIA: 18 WEST 48TH STREET
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

NEW YORK, NEW YORK

SIZE
160,000 sf (14,864 sm)

SERVICES
Architecture,
Interior Design,
Landscape Architecture

CLIENT
JD Carlisle Development
Corporation

PERKINS EASTMAN
835 SIXTH AVENUE
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

NEW YORK, NEW YORK

SIZE
620,000 sf
(57,599 sm)

SERVICES
Architecture

CLIENT
835 Ave of Americas
C/O JD Carlisle LLC

PERKINS EASTMAN
FLUSHING COMMONS
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

FLUSHING, NEW YORK

SIZE
1.9 Million sf
(176,515 sm)

SERVICES
Planning, Architecture

CLIENT
Rockefeller Group
Development Corp.

PERKINS EASTMAN
99 HUDSON
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

JERSEY CITY, NEW JERSEY

SIZE
1,500,000 sf
(139,354 sm)

SERVICES
Planning, Architecture,
Interior Design

CLIENT
China Overseas America, Inc.

PERKINS EASTMAN
B4
PACIFIC
PARK
PERKINS EASTMAN PACIFIC PARK - BUILDING 4 PERKINS EASTMAN
PACIFIC PARK – BROOKLYN'S NEWEST NEIGHBORHOOD
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

B4 Pacific Park
is a unique
development
opportunity
which will
create a distinct
architectural
identity at
1. FORT GREENE PARK 2. GRAND ARMY PLAZA
Brooklyn's
crossroads,
DOWNTOWN BROOKLYN anchoring
Pacific Park to
FORT GREENE its surrounding
1. neighborhoods.
CLINTON HILL
5.
3. BARCLAYS CENTER 4. PROSPECT PARK
6.
BOERUM HILL

3. B4

5. BRIC 6. BROOKLYN ACADEMY OF MUSIC


PROSPECT HEIGHTS
PARK SLOPE

2.

7.
8.
4.

7. BROOKLYN PUBLIC LIBRARY 8. BROOKLYN MUSEUM

PERKINS EASTMAN
THE SITE – A GATEWAY FOR PACIFIC PARK
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

ATLANTIC TERMINAL

ATLAN
TIC AV
ENUE

B4 (18 6th Ave)

PACIFIC PARK

B3 (36 6th Ave)


B2 (46 Dean St)
FLA
TBU
SH
AVE
NU

E
VENU
E

B14 (535 Carlton Ave)


6TH A

B11 (550 Vanderbilt Ave)

PERKINS EASTMAN
GOALS
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

SKYLINE VISUAL MARKER – A SCULPTURED ICON CONNECTING OLD AND NEW NEIGHBORHOODS ENLIVEN PUBLIC STREETSCAPE

PERKINS EASTMAN
CROSSROADS ANCHOR
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

B2

FLATBUSH AVE.
COMMERCIAL FLOW
B4
B3 BARCLAYS CENTER
RE ATLANTIC AVE.
SI
DE
NT
IA
LF
LO
W
L OW
A LF
CI
M ER
M
CO

6TH AVE.

PERKINS EASTMAN
CONNECTING NEIGHBORHOOD TEXTURES
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

FROM: TO:
TRADITIONAL CONTEMPORARY

PERKINS EASTMAN
THE BUILDING CONCEPT – FROM THE ROCK TO THE GEM
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

THE GEM

B4 Pacific Park is conceived using


THE CRYSTAL various textures with massing and
envelope refinements.

Using the symbolism of stone as the


building's anchor.

The "Rock"
Represents the building base to be more
articulated and grounded.

The "Crystal"
THE ROCK
A voluminous extension.

The "Gem"
Transparent and smooth, it is the most
luminous and prominent building
feature.
PERKINS EASTMAN
B4 DESIGN GUIDELINES
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

ARCHITECTURAL BREAKS

PERKINS EASTMAN
CREATING A SCULPTURED ICON
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

B4 Pacific Park responds to the unique


site and design guideline opportunities
by sculpting a dynamic and distinct
architectural articulation within the
THE CRYSTAL Brooklyn skyline.

B4 Pacific Park is further refined to


represent the natural evolution from
rock, to crystal to gem.
511'-0" MAX. HEIGHT

The Rock
THE GEM Anchors a commercial program at the
crossroads of 6th Avenue and Atlantic
avenue.

THE ROCK The Crystal


Refines the Brooklyn Skyline with an
attractive residential program.

The Gem
Opens towards downtown Brooklyn, the
6TH V6E. 6TH AVE. V E .
ANBrooklyn Bridge
C A TH AV TIC and Harbor, as well as
A
AVE TI E. TIC AVE
.
ATLAN ATL
.
ATL
AN

the Manhattan skyline beyond.

PERKINS EASTMAN
EXPRESSION OF NEIGHBORHOOD TEXTURES
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

TRANSPARENT

OPAQUE

6TH E
AVE ENU
NUE N T I C AV
ATLA

NORTH EAST CORNER


Atlantic Ave. & 6th Ave.

PERKINS EASTMAN
ENLIVEN PUBLIC STREETSCAPE AND OPEN SPACE
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

B2
B4 DEVELOPMENT ENVELOPE

B4 PROPERTY LINE

LINE OF B4 ENVELOPE ABOVE

BARCLAYS CENTER
B3 DEVELOPMENT ENVELOPE

B3 PROPERTY LINE
"
'-0
LINE OF B3 ENVELOPE ABOVE 20

B4
ATLANTIC AVE.

ATLANTIC AVE.
PACIFIC STREET
115'-4"

TERMINUS
B3

20'-0" 20'-0"
20'-0"

20'-0"
20'-0"

20'-0"
"

12'-6 ¾"
62'-2 ½" 29'-1" 43'-9 ½" 23'-7 ½" 25'-3" 25'-2" 20'11 ½" 35'-11 ¾" 30'-0" 92'-0"
RETAIL PRINCIPAL RETAIL RETAIL RETAIL BUSINESS SERV. RETAIL RES. PRINCIPAL RETAIL
ENTRANCE ENTRANCE
215'-0" 75'-0" 192'-0"

482'-0" RETAIL

6TH AVE.

PERKINS EASTMAN
ENLIVEN PUBLIC STREETSCAPE PEDESTRIAN EXPERIENCE
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

PERKINS EASTMAN
A NEW ATLANTIC AVENUE VISUAL MARKER
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

PERKINS EASTMAN
A NEW SCULPTURED ICON OF PACIFIC PARK
PACIFIC PARK – BUILDING 4
OCTOBER.9.2018

PERKINS EASTMAN
B4
PACIFIC
PARK
DEVELOPMENT UPDATE

GFCP

B12

TF Cornerstone
Brodsky

You might also like