RANGKAIAN PAIP PEMBETUNGAN DI BAYAN BARU, PULAU PINANG.

Summary of resurface area


LINE 7

Width (m)
Manhole
No. Resurface/ Side
table/River side Length(m) Width (A) Width (B)
1 Resurface 50 7.54 7.4
2 Resurface 50 8 8.3
3 Resurface 25 8 7.3
4 Resurface 25 6.8 5.2
5 Resurface 50 7.6 6.9
6 Resurface 50 15.2 14.5
6-1 Resurface 50 8.32 8
6-2 Resurface 50 8.12 8.04
7 Resurface 50 13.46 14.8
8 Resurface 50 14.3 15.2
9 Resurface 50 11 3.6
9-1 Sidetable
9-2 Resurface 50 9.1 9.5
9-3 Resurface 50 8.6 8.3
9-4 Resurface 50 9.7 9.2
9-5 Resurface 50 7.2 8.6
9-6 Resurface 50 8.8 7.9

TOTAL 750 151.74 142.74

TOTAL COST = RM
sidetable/omitted
unsure
dth (m)

Avg.Width Area (m2) Remarks


7.47 373.5
8.15 407.5
7.65 191.25
6 150
7.25 362.5
14.85 742.5
8.16 408
8.08 404
14.13 706.5
14.75 737.5
7.3 365

9.3 465
8.45 422.5
9.45 472.5
7.9 395
8.35 417.5

147.24 7020.75 BQ QTY = 1050 m2

TOTAL COST = RM MYR 309,615.08


RANGKAIAN PAIP PEMBETUNGAN DI BAYAN BARU, PULAU PINANG.

Summary of resurface area


LINE 14

Width (m)
Manhole
No. Resurface/ Side
table/River side Length(m) Width (A) Width (B)
1 Resurface 100 8.86 8.86
2 Resurface 100 8.86 8.86
3 Resurface 100 8.86 8.86
4 Resurface 100 8.86 8.86
5 Resurface 100 7.55 7.55
6 Resurface 100 8.86 8.86
7 Resurface 100 8.86 8.86
8 Resurface 50 7 7
9 Sidetable
10 Resurface 50 6.33 7
11 Resurface 25 22 22
11-1 Sidetable
11-2 Sidetable
11-3 Resurface 50 18.6 18.6
11-4 Resurface 50 18 18
12 Resurface 50 10 10
13 Resurface 25 15 15
14 Resurface 50 11.2 11.2
15 Resurface 50 5.5 5.5
TOTAL 1100 174.34 175.01

TOTAL COST = RM
sidetable/omitted
unsure
dth (m)

Avg.Width Area (m2) Remarks


8.86 886
8.86 886
8.86 886
8.86 886
7.55 755
8.86 886
8.86 886
7 350

6.665 333.25
22 550

18.6 930
18 900
10 500
15 375
11.2 560
5.5 275
174.675 10844.25 BQ QTY = 1250 m2

TOTAL COST = RM MYR 478,231.43


RANGKAIAN PAIP PEMBETUNGAN DI BAYAN BARU, PULAU PINANG.

Summary of resurface area


LINE 12

Width (m)
Manhole
No. Resurface/ Side
table/River side Length(m) Width (A) Width (B)
1 Resurface 50 7.3 7.3
2 Resurface 50 7.2 7.2
3 Resurface 50 15.6 13
4 Resurface 50 13.5 14.5
5 Resurface 50 14.2 13.7
6 Resurface 25 9 9
7 Sidetable
8 Sidetable
8-1 PEG
9 Sidetable
10 Resurface 50 14 14
11 Resurface 50 14 14
11-3
11-2
11-1
12 Resurface 50 15 15
13 Resurface 50 15.5 15.5
14 Resurface 50 19 19
15 Resurface 50 18 18
15-1 Resurface 50 15 15
15-2 Resurface 50 15 15
15-3 Resurface 50 15 15
15-4 Resurface 50 14 14
15-5 Resurface 50 14 14
15-6 Resurface 50 14 14
15-7 Resurface 50 14 14
15-8 Resurface 50 14 14
16 Resurface 50 7 7
17 Resurface 50 17 17
18 Resurface 50 17 17
19 Resurface 50 14 14
20 Resurface 50 14 14
21 Sidetable
22 Sidetable
23 Island
24-1 Sidetable
24 Sidetable
25 Omitted
26 Sidetable
27 Sidetable
28 Sidetable
29 Sidetable
30 Resurface 50 7.5 7.5
31 Resurface
32 Resurface 50 7 7
33 Resurface 50 7.5 7.5
TOTAL 1375 368.3 366.2

TOTAL COST =
sidetable/omitted
unsure
dth (m)

Avg.Width Area (m2) Remarks


7.3 365
7.2 360
14.3 715
14 700
13.95 697.5
9 225

14 700
14 700

15 750
15.5 775
19 950
18 900
15 750

15 750
14 700
14 700
14 700
14 700
14 700
7 350
17 850
17 850
14 700
14 700
7.5 375

7 350
7.5 375
352.25 17387.5 BQ QTY = 4400 m2

TOTAL COST = MYR 766,788.75


RANGKAIAN PAIP PEMBETUNGAN DI BAYAN BARU, PULAU PINANG.

Summary of resurface area


LINE 06

Width (m)
Manhole
No. Resurface/ Side
table/River side Length(m) Width (A) Width (B)
1 Resurface 37.5 10 10
2 Resurface 37.5 12 12
3 Resurface 50 20 20
4 Resurface 50 18 18
5 Resurface 46 12 12
6 Resurface 40 10 10
7 Resurface 35 12 12
8 Resurface 50 12 12
9 Resurface 50 12 12
10 Resurface 50 8 8
11 Resurface 50 11 11
12 Resurface 42.8 17 17
12-1 Resurface 34.5 20 20
12-2 Resurface 18.4 17 17
12-3 Resurface 50 18.2 18.2
13 Resurface 50 21 21
14 Resurface 32.5 18 18
15 Resurface 50 12.5 12.5
16 Resurface 50 12.6 12.6
17 Resurface 50 11 11
18 Sidetable
19 Resurface 50 10.7 10.7
20 Resurface 50 17 17
21 Resurface 50 14 14
22 Resurface 50 14 14
23 Resurface 50 7.5 7.5
24 Resurface 50 12.6 12.6
25 Omitted
26 Sidetable
27 Resurface 50 13 13
28 Resurface 50 13 13
29 Resurface 50 13 13
30 Omitted
31 Resurface 50 14.5 14.5
32 Resurface 50 7.5 7.5
33 Resurface 50 12.2 12.2
34 Resurface 50 12.1 12.1
35 Resurface 50 12 12
36 Sidetable
37 Omitted
38 Sidetable
39 Resurface 50 9.3 9.3
40 Omitted
41-5 Resurface 50 7 7
41-4 Resurface 50 7 7
41-3 Resurface 50 6.5 6.5
41-2 Resurface 50 8.5 8.5
41-1 Resurface 50 8.5 8.5
46-1 Resurface 50 8.7 16.7
46-2 Resurface 38.9 11 11
53-1 Resurface 13.4 9 6.3
53-2 Resurface 50 12 11
53-3 Resurface 50 16 17

sidetable/omitted
unsure

Manhole Resurface/ Side


No. table/River side Length(m) Width (m)
Width (A) Width (B)
53-5 Resurface 50 2 15.3
53-6 Resurface 36.1 1.7 16.5
53-7 Resurface 50 3.3 14.5
53-6-1 Resurface 48.7 1.6 8.9
53-6-2 Sidetable
53-6-3 Resurface 50 17 17
53-6-4 Resurface 31.5 16 16
53-6-5 Resurface 30.3 4.3 14
53-6-6 Final
41 Resurface 31.7 9.6 9.6
42 Resurface 50 16.2 16.2
43 Resurface 50 14.5 14.5
44 Resurface 50 13 13
45 Sidetable
46 Resurface 50 11.2 11.2
47 Sidetable
48 Resurface 50 12 12
49 Resurface 50 9.3 9.3
50 Resurface 50 9.4 9.4
51 Resurface 50 12.5 12.5
52 Resurface 50 10.3 10.3
53 Resurface 50 17 17
54 Resurface 50 10.4 10.4
55 Resurface 50 10.8 10.8
56 Resurface 50 14.2 14.2
57 Omitted
58 Sidetable
59 Sidetable
60 Sidetable
61 Sidetable
62 Resurface 50 11 14
63 Resurface 10 3 2
64 Resurface 50 11 14
65 Resurface 50 5 12
66 Island
67 Resurface 50 17 17
68 Resurface 50 17 17
69 Resurface 50 17 17
70 Resurface 50 17 17
71 Sidetable
72 Sidetable
73 Resurface 50 16 2
1388.3
TOTAL 2076.5 560.9 566.2

TOTAL COST = RM
dth (m)

Avg.Width Area (m2) Remarks


10 375
12 450
20 1000
18 900
12 552
10 400
12 420
12 600
12 600
8 400
11 550
17 727.6
20 690
17 312.8
18.2 910
21 1050
18 585
12.5 625
12.6 630
11 550

10.7 535
17 850
14 700
14 700
7.5 375
12.6 630

13 650
13 650
13 650

14.5 725
7.5 375
12.2 610
12.1 605
12 600
9.3 465

7 350
7 350
6.5 325
8.5 425
8.5 425
12.7 635
11 427.9
7.65 102.51
11.5 575
16.5 825

dth (m)
Avg.Width Area (m2) Remarks
8.65 432.5
9.1 328.51
8.9 445
5.25 255.675

17 850
16 504
9.15 277.245

9.6 304.32
16.2 810
14.5 725
13 650
11.2 560

12 600
9.3 465
9.4 470
12.5 625
10.3 515
17 850
10.4 520
10.8 540
14.2 710

12.5 625
2.5 25
12.5 625
8.5 425

17 850
17 850
17 850
17 850

9 450

563.55 42875.06 BQ QTY = 6600m2

TOTAL COST = RM MYR 1,890,790.15


RANGKAIAN PAIP PEMBETUNGAN DI BAYAN BARU, PULAU PINANG.

Summary of resurface area


LINE 05

Width (m)
Manhole Resurface/ Side Length(m)
No. table/River side Width (A) Width (B)

1 Omitted
2 Omitted
3 Side Table
4 Side Table
5 Side Table
6 Resurface 50 9 8
7 Side Table
8 Side Table
9 Side Table
10 Side Table
11 Side Table
12 Resurface 50 13 13
13 Omitted
14 Omitted
15 Resurface 50 12.5 12.5
16 Resurface 50 8.88 7.6
17 Omitted
18 Resurface 50 10.5 10.5
19 Resurface 50 10.5 10.5
20 Resurface 50 10.5 10.5
21 Side Table
22 Resurface 50 15.5 15.5
23 Side Table
24 Resurface 50 15.5 15.5
25 Side Table
26 Side Table
27 Side Table
28 Side Table
29 Resurface 50 21 21
30 Resurface 50 18.5 8
31 Resurface 50 26.5 14.5
32 Resurface 50 12.3 12.3
33 Side Table
34 Side Table
35 Side Table
36 Resurface 50 14 11
37 Resurface 50 9 10
38 Resurface 50 10.5 10.5
39 Resurface 50 9 8
40 Resurface 50 10 9.3
41 Resurface 50 10 10
42 Resurface 50 13.5 13.5
43 Omiited
44 Resurface 50 12 11.3
45 River side
46 River side
47 River side
48 River side
49 River side
50 River side
51 River side
52 River side
53 River side
54 River side
55 River side
56 River side
57 River side
58 River side
59 River side
60 River side
TOTAL 1050 272.18 243

TOTAL COST = RM

sidetable/omitted
unsure
dth (m)
Area (m2) Remarks
Avg.Width

o/c
o/c
o/c

8.5 425 Pit size :5.5m dia. Round caisson

13 650
0
0
12.5 625
8.24 412
0
10.5 525
10.5 525
10.5 525
0 0
15.5 775
0 0
15.5 775
0 0
0 0
0 0
0 0
21 1050
13.25 662.5
20.5 1025
12.3 615
0 0
0 0
0 0
12.5 625
9.5 475
10.5 525
8.5 425
9.65 482.5
10 500
13.5 675

11.65 582.5

257.59 12879.5 BQ QTY = 4050 m2

TOTAL COST = RM MYR 567,985.95