Input
Pile Property Data
I t em Value Unit
Total Pile Length 14 m
Pile Length Over EGL 0.5 m
Diameter 0.4 m
Pile Head Condition Fixed
Modulus of Elasticity 24000 MPa

Soil Property Data


I t em Value Unit
Type of Soil PreLoaded Cl
Unconfined CoCompressive St
Strength of
of Cl
Clayey so
soil Greater th
tha

Loads Data
I t em Value Unit
Designed Max. Vert. Load Capacity 800 kN
Designed Lat. Load Capacity 100 kN
 Allowable Deflection 0.03 m

Constants
I t em Value Unit
Grade of Concrete M15
Grade of Steel Fe 250

Reinforcement Details
I t em Value Unit
Clear Cover 0.05 m
Dia.of Main Reinforcement(mm) 20
Minimum Steel % 0.4
Maximum Steel % 4
Dia.of Transverse Reinforcement 10
Type of Transverse Reinf Circular  
Minimum Spacing for Transverse Reinf 0.1 m
Maximum Spacing for Transverse Reinf 0.3 m

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 1 of 5


J ob No Sheet No Rev
Company Name 2
Engineer  Date

Job Title Checked Date

 Approved Date

Client F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03

Output

PILE GEOMETRY

Pile Length (m) Pile Length Over G.L. (m)

14.00 0.50

Pile Diameter (mm) Pile Head Condition

400.00 Fixed

LOAD DATA

Vertical Load Capacity (KN) Lateral Load Capacity (KN)

800.00 100.00

Length of Fixity (m) Maximum Moment (KNm)

2.04 102.93

STABILITY

Actual Lateral De
Deflection (m
(mm) Allowable La
Lateral De
Deflection (m
(mm)

4.53 30.00

REINFORCEMENT DETAILS

Longitudinal Reinforcement Detail

Required Perc. of Steel Provided Perc. of Steel

3.69 3.75

Required Area of Steel (mm^2) Provided Area of Steel (mm^2)

4643.27 4712.39

Dia. of Longitudinal Reinf.(mm) No. of Bars

20 15

Transverse Reinforcement Detail

Type
Type of Rein
Reinfo
forc
rcem
emen
ent.
t. Dia.
Dia. of Reinf
einfor
orce
ceme
ment
nt (mm)
(mm) Spac
Spacin
ing.
g. of Reinf
einfor
orce
ceme
ment
nt (mm)
(mm)

Circular 10 140.00

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 2 of 5


J ob No Sheet No Rev
Company Name 3
Engineer  Date

Job Title Checked Date

 Approved Date

Client F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03

Calculation

D esi
sigg n of
of P i le
less : P ond
nda
asi B or P i le M ena
narr a M asji
sjid 

 DESIGN CALCULATIONS 
Calculation of Length of Fixity
Total Length of Pile =
 14.00 m
Length of Pile Over Ground Level, L1 =
 0.50 m
Diameter of Pile=
 400.00 mm
Modulus of Elasticity of Concrete =
 24000.00 N/mm2
Pile Head Condition =
 Fixed
Type of Soil =
 Preloaded Clay
Moment of Inertia =
 1256637061.44 mm4
K2 =
 195.50 Kg/cm2
R=
 1114.47 mm
L1/R =
 0.45
Corresponding value of Lf/R =
 1.83 , where Lf = Length of Fixity
Length of Fixity, Lf =
 2.04 m
Checking of Deflection
Lateral Load Capacity of Pile, Q =
 100.00 KN
Actual Lateral Deflection =
 4.53 mm
Allowable Lateral Deflection =
 30.00 mm
Allowable Lateral Deflection > Actual Lateral Deflection, Hence O.K.
Final Loads and Moments Calculation
Gross Vertical Load Capacity of Pile =
 800.00 KN
Maximum Moment
Moment Due to Lateral Load, Q = Q(L1 + Lf)^3 / 12EI =
 127.02 KNm
Moment Reduction Factor =
 0.81
Final Reduced Moment =
 102.93 KNm
Calculation of Reinforcements
Required Percentage of Steel =
 3.69
Required Area of Steel =
 4643.27 mm2

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 3 of 5


J ob No Sheet No Rev
Company Name 4
Engineer  Date

Job Title Checked Date

 Approved Date

Client F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03

Calculation, cont...

Dia of Main Reinforcement =


 20.00 mm
Area of Main Reinforcement
Reinforcement =
 314.16 mm2
Total no. of Bars reqd. =
 15.00
Total no. of Bars Provided. =
 15.00
Area of Steel Provided. =
 4712.39 mm2
Percentage of Steel Provided. =
 3.75
Check For Shear 
Type of Stirrup. =
 Circular 
Dia of Stirrup. =
 10.00 mm
Area of Stirrup. =
 78.54 mm2
Actual Shear Stress, Tau_V. =
 1.10 n/mm2
Allowable Shear Stress, Tau_C. =
 0.65 n/mm2
Actual Shear Stress, Tau_V > Allowable Shear Stress Tau_C
Vus. =
 41.02 KN
Calculated Spacing of Stirrups =
 141.61 mm
Final Provided Spacing =
 140.00 mm

Print Time/Date: 04/18/2018 21:16 STAAD.etc Release 4.5 Page 4 of 5


J ob No Sheet No Rev
Company Name 5
Engineer  Date

Job Title Checked Date

 Approved Date

Client F ile Detail Tulangan Tiang Dt/Tm 18-Apr-2018 21:03

Ground Level

10 mm dia stirrups @ 140.00 mm c/c

15 Nos. 20 mm dia bars

  m
   0
   5
 .
   0

  m
   0
   0
 .
   4
   1
0.40 m

0.40 m