DATOS

L= 2500 m
Q= 100 lps = 0.1 m3/seg
TUBERIA PROPUESTA fibrocemento
n= 0.01
EFICIENCIA BOMBA 90 %
ELEVACION BROCAL 490 msnm
ELEVACION S.L.A 540
v= 1.2
PI/4= 0.7854

A= Q/V 0.0833

�=√𝐴/0.7854 0.3257 m 32.573 cm 12.82 12


diametro mayor y menor 14" 10"

�=[ 〖 3.21�� 〗 ^2/�^(1/2) ]


^(3/8)
Q=litros/seg

0.12870787

FORMULA HAZEN WILLIAMS

�=1.2√𝑄=
10"
DATOS
L= 2500 m
Q= 100 lps = 0.1 m3/seg
TUBERIA PROPUESTA fibrocemento
n= 0.01
EFICIENCIA BOMBA=e= 90 % 0.9
ELEVACION BROCAL 490 msnm
ELEVACION S.L.A 540
v= 1.2
/4= 0.7854
d= 250 mm 10" 0.254
Dt= 50
prof.nivel dinamico= 4.80+3 7.8
Hp= 0.7454 Kw-h
Kw-h= 5.8
Ea=modulo de elasticidad agua= 21100 kg/cm2
Et=modulo de elasticidad del tubo= 240000 kg/cm2
ee=espesor de la pared de la tuberia= 3.1 cm
intereses=r= 10 % 0.1
años de recuperacion de capital=n= 10
costo= $ 11,142,325.00

K=(10.30*n^2)/d^16/3 1.54
Hf=K*L*Q^2 38.46 m
Hf(5%)= 1.92 m
perdida total=Hft=Hf+5%HF= 40.38
desnivel dinamico total=h=Df+prof.niv.dina= 57.8
CTB=h+Hft= 98.18 m
potencia=Pot=γ*Q*H/76e= 143.54 Hp
Consumo enrgia electrica al año= E=Pot.*Hp*8760= 937278.83
costo anual de energia electrica= $ 5,436,217.23
V=Q/A= 2.04 mps
𝐻𝑔�=((145∗𝑣))/
(√(𝐸�(�))/ 225.96
(𝐸𝑡(𝑒𝑒)))

Hs=0.20*Hga= 45.19
Dt+Hft*Hs= 135.57 m
coeficiente de anualidad=a=r+(r/((1+r^n)-1))= 0.16275
costo anual tuberia instalada= $ 1,813,362.08

SUMA DE COSTOS
costo anual energia= $ 5,436,217.23
costo anual tuberia intalada= $ 1,813,362.08
COSTO TOTAL DE LA OPERACIÓN= $ 7,249,579.31
25
BOMBEO
L= 2500
Q= 100
TUBERIA PROPUESTA
n= 0.01
EFICIENCIA DE BOMBEO= 90 %
ELEVACIÓN BROCAL= 490 msnm
ELEVACION S.L.A= 540

FORMULA DE CONTINUIDAD
A= 0.0833 m2
V= 1.2 m/s

calculo dl diametro
�=√𝐴/(𝑝𝑖/4)
d= 0.32573463 = 12.8241979 = 12 "

d mayor 14 "
d menor 10 "

hf=kLQ2
Para d= 250 mm 10 " 0.01
k10= 1.5384

Para:
L= 2500 m Q= 0.1 m3/seg
hf= 38.4589 m
La ecuación de Darcy-Weisbach
ℎ�=�∗�/�∗�^2/2𝑔
hf= perdida de carga de energia por fricción

Numero de Reynolds
𝑅𝑒=��/𝑣

Re= Numero de Reynolds


V= Velocidad media m/s
D= Diametro interno de tuberia m
v= viscosidad cinematica del agua m/s2

Ecuación de Colebrock-White
�=0.25/((�𝑜𝑔((𝐸/�)/3.71+�/ 〖��〗 ^� ))^2)

DATOS DE G Y T
G= 4.555 T= 0.8764 para 4000 <Re>
G= 6.732 T= 0.9104 10^5 <Re>
G= 8.982 T= 0.93 3x10^6 <Re>

PARA UN SOLO TRAMO


ℎ�=(0.203 �)/(𝑔�^5 (�𝑜𝑔((𝐸/�)/3.71+�/ 〖��〗 ^� ))^2)

Q= 16.5 lps 0.0165 m3/s


L= 441 m
Tuberia:
Elevación F.A= 200.1 msnm
Elevación SLA= 160.25 msnm
Rugosidad= 0.0015
Viscosidad cinematica del agua a 20°c= 0.0000011

𝑆�=(�𝑒𝑠𝑛𝑖𝑣𝑒𝑙 𝐻)/(�𝑜𝑛𝑔𝑖𝑡𝑢� �𝑜𝑡�𝑙)

Sf= 0.0904
Desnivel H= 39.85
Long. Total= 441
�=0.66(𝑄^2/(𝑔∗𝑆�))^20∗(𝐸^1.25∗((𝑔∗𝑆�)/𝑄^2 ) FORMULA SWAN-JAIN
^0.25+v(1/gSfQ^3)^0.20)^0.004

D= 0.102550371 m 10.2550 cm 4.04 in 102.55


Q^2= 0.00027225
Q^3= 4.492125E-06
g*Sf= 0.886459184
E^1.25= 0.000295198
g= 9.81

DIAMETROS COMERCIALES
D1= 4.1 in 10.5 cm 0.105 m 105
D2= 3.2 in 8.16 cm 0.0816 m 81.6

A1= 0.008659035 m2
A2= 0.005229633 m2

V1= Q/A= 1.90552411 DATOS DE G Y T


V2= Q/A= 3.1550971 G= 4.555 T=
G= 6.732 T=
Re1= 181890.9382 G= 8.982 T=
Re2= 234050.8396

�1=0.25/((�𝑜𝑔((𝐸/�)/3.71+�/ 〖��〗 ^� ))^2)

f1= 0.016060581
f2= 0.015347179

k1= 103.97620 m 138.562587


k2= 350.5072108 m 531.669071

�1=(𝐻�𝑖𝑠𝑝−𝐾2𝑄^2)/(𝑄^2(𝑘1−𝑘2))

L1= 33.26502807 m 224.095111


L2= 407.7349719 m 216.904889

hf1= k1*L1*Q2 8.45368872 m


hf2= k2*L2*Q2 31.3963113 m
S1= hf1/L1 0.03772366
S2= hf2/L2 0.1447469
10^5
3x10^6
10^8
mm

mm
mm

0.8764 para 4000 <Re> 10^5


0.9104 10^5 <Re> 3x10^6
0.93 3x10^6 <Re> 10^8
piezometric
cadenamientos cota de terreno a
0 1820 5
21 1815 1850
34 1800
116 1773.93
126 1750.66 1800
155 1740.5
275 1730
305 1725 1750
356 1720
395 1715
420 1710 1700
460 1700
495 1698.75
525 1693.6 1650
550 1690

1600
0 21 34 116 126
h disponible 39.85

y x y1 x1 224.09
8.45 224.09 1.88540319 50 224.09
8.45 224.09 3.77080637 100 224.09
8.45 224.09 5.65620956 150 224.09
8.45 224.09 7.54161274 200 224.09
8.45 224.09 8.45 224.09

y x y1 x1 216.9
39.85 224.09 9.18626095 50 216.9
39.85 224.09 18.3725219 100 216.9
39.85 224.09 27.5587828 150 216.9
39.85 224.09 36.7450438 200 216.9
39.85 224.09 39.85 216.9
PERFIL DEL TERRENO

0 21 34 116 126 155 275 305 356 395 420 460 495 525 550

200 50
150 100
100 150
50 200
0 224.09

200 50
150 100
100 150
50 200
0 216.9